401. The volume of concrete mixed per 412. Concrete shall be thoroughly 427.

ughly 427. The depth of the weakened plane


batch shall not exceed the mixer’s consolidated against and along the joint should at all times not be less
nominal capacity in cubic metre, faces of all forms and along the than ___a)___, while the width
as shown on the manufacturer’s full length and on both sides of all should not be more than
standard rating plate on the mixer, joint assemblies, by means of ___b)___.
except that an overload up to _____.
_____ above the mixer’s nominal 428. It shall consist of planes of
capacity may be permitted 413. Vibrators shall not be permitted to weakness created by forming or
provided concrete test data for come in contact with a joint cutting grooves in the surface of
strength, segregation, and uniform assembly, the grade, or a side the pavement and shall include
consistency are satisfactory, and form. In no case shall the vibrator load transfer assemblies.
provided no spillage of concrete be operated longer than _____ in
takes place. any one location. 429. It shall be formed by installing a
parting strip to be left in place as
402. The flow of water shall be 414. Concrete shall be deposited as shown on the Plans.
uniform and all water shall be in near as possible to the _____
the drum by the end of the _____ without disturbing them, but shall 430. It shall be made by depressing an
of the mixing period. not be dumped from the discharge approved tool or device into the
bucket or hopper into a joint plastic concrete.
403. The time elapsed from the time assembly unless the hopper is well
water is added to the mix until the centered on the joint assembly. 431. Sawed Contraction Joint shall be
concrete is deposited in place at created by sawing grooves in the
the Site shall not exceed _____ 415. As work progresses, at least _____ surface of the pavement of the
when the concrete is hauled in shall be taken from each 330 sq.m width not more than ___a)___,
non-agitating trucks, nor _____ of pavement, 230 mm depth, or depth should at all times not be
when hauled in truck mixers or fraction thereof placed each day. less than ___b)___, and at the
truck agitators, except that in hot spacing and lines shown on the
weather or under other conditions 416. _____ shall not be used as Plans, with an approved concrete
contributing to quick hardening of substitute for determining the saw.
the concrete, the maximum adequacy of the strength of
allowable time may be reduced by concrete. 432. Sawing of the joint shall
the Engineer. commence as soon as the concrete
417. The beams shall be made, cured, has hardened sufficiently to permit
404. Batching and mixing shall be in and tested in accordance with sawing without excessive
accordance with _____. _____. ravelling, usually ____.

405. Concrete mixing by _____ is 418. Any portion of the bottom layer of 433. All joints shall be sawed before
allowed provided that a weighing concrete which has been placed _____.
scales for determining the batch more than _____ without being
weight will be used. covered with the top layer shall be 434. The sawing of any joint shall be
removed and replaced with freshly _____ if crack occurs at or near
406. Retempering concrete by adding mixed concrete at the Contractor’s the joint location prior to the time
water or by other means shall not expense. of sawing.
be permitted, except that when
concrete is delivered in truck 419. _____ of specified length, size, 435. Sawing shall be _____ when a
mixers, additional water may be spacing and materials shall be crack develops ahead of the saw.
added to the batch materials and placed perpendicular to the
additional mixing performed to longitudinal joints; they shall be 436. If extreme condition exist which
increase the slump to meet the placed by approved mechanical make it impractical to prevent
specified requirements, if equipment or rigidly secured by erratic cracking by early sawing,
permitted by the Engineer, chair or other approved supports the _____ shall be formed prior to
provided all these operations are to prevent displacement. initial set of concrete as provided
_____. above.
420. _____ shall not be painted or
407. No _____ shall be mixed, placed coated with asphalt or other 437. Transverse Construction Joint
or finished when natural light is materials or enclosed in tubes or shall be constructed when there is
insufficient, unless an adequate sleeves. an interruption of more than
and approved artificial lighting _____ in the concreting
system is operated. 421. When shown on the Plans and operations.
when adjacent lanes of pavement
408. During hot weather, the Engineer are constructed separately, _____ 438. No transverse joint shall be
shall require that steps be taken to shall be used which will form a constructed within _____ of an
prevent the temperature of mixed keyway along the construction expansion joint, contraction joint,
concrete from exceeding a joint. or plane of weakness.
maximum temperature of _____.
422. The _____ shall be continuous, 439. If sufficient concrete has been
409. Concrete not in place within there shall be no gaps in either mixed at the time of interruption
_____ from the time the transverse or longitudinal joints at to form a slab of at least 1.5 m
ingredients were charged into the the intersection of the joints. long, the excess concrete from the
mixing drum or that has last preceding joint shall be _____
developed initial set shall not be 423. The longitudinal joint shall be as directed.
used. _____ or shortly thereafter and
before any equipment or vehicles 440. _____, when used, shall be held in
410. Placing of concrete shall be are allowed on the pavement. position parallel to the surface and
continuous between transverse center line of the slab by a metal
joints without the use of _____. 424. Longitudinal pavement insert type device that is left in the pavement.
joints shall be formed by _____
411. When concrete is to be placed which will not react adversely 441. The sleeves for dowels shall be
adjoining a previously constructed with the chemical constituent of metal designed to cover ___a)___,
lane and mechanical equipment the concrete. of the dowel, with a watertight
will be operated upon the existing closed end and with a suitable stop
lane, that previously constructed 425. Preformed joint filler shall be to hold the end of the sleeves at
lane shall have attained the furnished in lengths equal to the least ___b)___from the end of the
strength for ___a)___. If only _____ of one lane. dowel.
finishing equipment is carried on
the existing lane, paving in 426. Preformed joint filler shall be 442. Dowel may be placed in the full
adjoining lanes may be permitted furnished in lengths equal to the thickness of pavement by a _____
after ___b)___. _____ of one lane. approved by the Engineer.
may be used to smooth and fill in 466. The drag shall be maintained in
443. In general, the addition of water to open-textured areas in the such condition that the resultant
the surface of the concrete to pavement. surface is of uniform appearance
assist in finishing operations will and reasonably free from grooves
_____. If the application of water 454. _____ shall not be used to float over _____ in depth.
to the surface is permitted, it shall the entire surface of the pavement
be applied as fog spray by means in lieu of, or supplementing, one 467. Regardless of the method used for
of an approved spray equipment. of the preceding methods of final finish, the hardened surface
floating. of pavement shall have a
444. If uninterrupted operation of the coefficient of friction of ___a)___.
finishing machine, to over and 455. When strike off and consolidation Completed pavement that is found
beyond the joints causes are done by the hand method and to have a coefficient of friction
segregation of concrete, damage the crown of the pavement will less than 0.25 shall be ___b)___
to, or misalignment of the joints, not permit the use of the by the Contractor at his expense to
the finishing machine shall be longitudinal float, the surface shall provide the required coefficient of
stopped when the front screed is be _____ friction.
approximately _____from the
joint. 456. After floating, any excess water 468. At all joints, any tool marks
and laitance shall be removed appearing on the slab adjacent to
445. In the event of breakdown of the from the surface of the pavement the joints shall be eliminated by
mechanical equipment, _____ by a ___a)___ or more in length. _____ the surface. In doing this,
may be used to finish the concrete Successive drags shall be lapped the rounding of the corner of the
already deposited on the grade. ___b)___. slab shall not be disturbed. All
concrete on top of the joint filler
- In narrow widths or areas of 457. After the floating has been shall be completely removed.
irregular dimensions where completed and the excess water
operations of the mechanical removed, but while the concrete is 469. As soon as the concrete has
equipment is impractical, _____ still plastic, the surface of the hardened sufficiently, the
may be used. concrete shall be tested for pavement surface shall be tested
trueness with a 300 cm long with a ___a)___ or other specified
446. The screed for the surface of a straight-edge. For this purpose, the device. Areas showing high spots
concrete shall be at least Contractor shall furnish and use of more than ___b)___ shall be
_____longer than the maximum an accurate 300-cm straight-edge marked and immediately ground
width of the slab to be struck off. swung from handles _____. down with an approved grinding
It shall be of approved design, tool to an elevation where the area
sufficiently rigid to retain its 458. The straight-edge shall be held in or spot will not show surface
shape, and constructed either of contact with the surface in deviations in excess of 3 mm
metal or other suitable material successive positions parallel to the when tested with 3 m straight-
shod with metal. road center line and the whole edge. Where the departure from
area gone over from one side of correct cross-section exceeds
447. Consolidation shall be attained by the slab to the other as necessary. ___c)___, the pavement shall be
the use of suitable _____ or other Advances along the road shall be removed and replaced by and at
approved equipment. in successive stages of _____. the expense of the Contractor.
459. The brooming operation should be
448. After the concrete has been struck so executed that the corrugations 470. Any area or section so removed
off and consolidated, it shall be produced in the surface shall be shall be _____ in length and not
further smoothed, trued, and uniform in appearance and not less than the full width of the lane
consolidated by means of a _____, more than _____ in depth. involved. When it is necessary to
either by hand or mechanical remove and replace a section of
method. 460. _____ shall be completed before pavement, any remaining portion
the concrete is in such condition of the slab adjacent to the joints
449. The hand-operated longitudinal that the surface will be unduly that is less than 1.5 m in length,
float shall be not less than roughened by the operation. shall also be removed and
___a)___ in length and replaced.
___b)___in width, properly 461. If the surface texture is belt
stiffened to prevent flexibility and finished, when straight-edging is 472. Immediately _____ and the
warping. complete and water sheen has concrete has sufficiently set, the
practically disappeared and just entire surface of the newly placed
450. The longitudinal float, operated before the concrete becomes non- concrete shall be cured in
from foot bridges resting on the plastic, the surface shall be belted accordance with either one of the
side forms and spanning but not with _____. methods described herein.
touching the concrete, shall be
worked with a sawing motion 462. Hand belts shall have suitable 473. The concrete shall not be left
while held in a floating position handles to permit controlled, exposed for more than _____
parallel to the road center line, and uniform manipulation. The belt between stages of curing or during
moving gradually from one side of shall be operated with _____. the curing period.
the pavement to the other.
Movement ahead along the center 463. If the surface texture is drag 474. The surface of the pavement shall
line of the pavement shall be in finished, a drag shall be used be entirely covered with mats. The
successive advances of _____. which consists of a _____, which mats used shall be of such length
shall produce a uniform of gritty (or width) that as laid they will
451. The float shall pass over each texture after dragging it extend at least _____.
areas of pavement at least _____, longitudinally along the full width
but excessive operation over a of pavement. 475. Prior to being placed, the mats
given area will not be permitted. shall be _____.
464. For pavement 5 m or more in
452. As an alternative, the Contractor width, the drag shall be mounted 476. The mat shall be maintained fully
may use a machine composed of a on a bridge which travels on the wetted and in position for _____
cutting and smoothing float or forms. The dimensions of the drag after the concrete has been placed
floats suspended from and guided shall be such that a strip of burlap unless otherwise specified.
by a _____. or fabric at least _____ is in
contact with the full width of 477. The top surface and sides of the
453. The frame shall be carried by four pavement surface while the drag is pavement shall be entirely covered
or more visible wheels riding on, used. with waterproof paper, the units
and constantly in contact with the shall be lapped at least _____.
side forms. If necessary, following 465. The drag shall consist of ___a)___
one of the preceding method of of burlap with the bottom layer 478. Waterproof paper shall have such
floating, long handled floats approximately ___b)___ than the dimension but each unit as laid
having blades not less than _____ layer. will extend beyond the edges of
the slab at least ___a)___, or at 492. Material for seal applied hot shall
pavement width and ___b)___ be _____ so that localized
strips of paper for the edges. overheating does not occur.

479. When Straw curing is used, the 493. The use of _____ or similar
pavement shall be cured initially material as a cover for the seal
with burlap or cotton mats, until will not be permitted.
after final set of the concrete or, in
any case, for _____ after placing 494. Preformed elastomeric gaskets for
the concrete. sealing joints shall be of the cross-
sectional dimensions shown on the
480. As soon as the mats are removed, Plans. Seals shall be installed by
the surface and sides of the suitable tools, without elongation
pavement shall be thoroughly and secured in placed with an
wetted and covered with at least approved lubricant adhesive
_____ of straw or hay, thickness which shall cover both sides of the
of which is to be measured after concrete joints. The seals shall be
wetting. installed in a compressive
condition and shall at time of
481. The entire surface of the pavement placement be below the level of
shall be sprayed uniformly with the pavement surface by
_____ immediately after the approximately _____.
finishing of the surface and before
the set of the concrete has taken 495. The seals shall be in _____ for the
place, or if the pavement is cured full width of each transverse joint.
initially with jute or cotton mats, it
may be applied upon removal of 496. The concrete shall be placed with
the mass. an approved _____ designed to
spread, consolidate, screed and
482. The curing compound shall not be float-finish the freshly placed
applied during _____. concrete in one complete pass of
the machine in such a manner that
483. Curing compound shall be applied a minimum of hand finish will be
under pressure at the rate _____ necessary to provide a dense and
by mechanical sprayers. homogenous pavement in
conformance with the Plans and
484. The spraying equipment shall Specifications.
be equipped with a _____.
497. Any edge slump of the pavement,
485. Curing compound shall not be exclusive of edge rounding, in
applied to the ___a)___, but excess of _____ shall be corrected
approved means shall be used to before the concrete has hardened.
insure proper curing at least
___b)___ and to prevent the 498. The concrete shall be held at a
intrusion of foreign material into uniform consistency, having a
the joint before sealing has been slump of not more than _____.
completed.
499. If, for any reason, it is necessary
486. The curing compound shall be of to stop the forward movement of
such character that the film will the paver the vibratory and
harden within _____ after tamping elements shall also be
application. stopped immediately. No _____
shall be applied to the machine,
487. The top surface and sides of the except that which is controlled
pavement shall be entirely covered from the machine.
with ___a)___. The units used
shall be lapped at least ___b)___. 500. Such protective materials against
The sheeting as prepared for use rain before the concrete is
shall have such dimension that sufficiently hardened shall consist
each unit as laid will extend of standard metal forms or wood
beyond the edges of the slab at planks having a nominal thickness
least ___c)___. of ___a)___and a nominal width
of ___b)___ at its edge for the
488. After forms for concrete shall protection of the pavement edges,
remain in place undisturbed for and covering material such as
not less than _____ after concrete burlap or cotton mats, curing
pouring. paper or plastic sheeting materials
for the protection of the surface of
489. In the removal of forms, _____ the pavement.
should be used in pulling out nails
and pins.

490. In case portions of the concrete


are spalled, they shall be _____.

491. ___a)___ areas will be considered


as defective work and shall be
removed and replaced at the
expense of the Contractor. Any
area or section so removed shall
___b)___.

492. Joints shall be sealed with _____


soon after completion of the
curing period and before the
pavement is opened to traffic,
including the Contractor’s
equipment.