SRM INFRASTRUCTURES

Project Name :Dental PG Block-II Painting, Tiles and Faber block Laying

Measurement Book
ITEM DESCRIPTION NOS L B D QTY

1 Laying of Paver block


Way b/w PG-ll and BMS Block 1.00 66.25 23 1,523.75
East side of PG-ll and BMS Block 1.00 166 10.5 1,743.00
3,266.75

2 Tiles Laying
1.00 34.00 36.00 1,224.00
1.00 8.00 16.00 128.00
1,352.00

Outer Painting (Preparing the surface


of wall applying one coat primer and
3 two coat emulsion with water washing
using jet machine with approved make
and shade)
Side wall of the connecting bridge 2.00 36.00 28.00 2,016.00
Connecting bridge bottom 1.00 23.00 36.00 828.00
2,844.00

Inner Painting ( Preparing the surface


4 of wall applying one coat emulsion
with approved make and shade)

2.00 36.00 12.00 864.00


2.00 34.00 12.00 816.00
1.00 16.00 12.00 192.00
1.00 7.50 12.00 90.00
1,962.00

5 Window Repairing 1.00 6.00 5.00 30.00


30.00