Académique Documents
Professionnel Documents
Culture Documents
Window W1 size: width of window W1 is shown 1500 As discussed and confirmed by JE, we have
& 1800 mm both in the same floor plan. casted the slab with 1500mm width for W1
- OK
Architectural drawings / structural drawings of all the As discussed with JE, we have casted the
floors doesn’t have any sunken slabs at toilets areas Mezzanine floor slab without sunken slab at
toilets area - OK
False ceilings in all the floors- Services drawings are
showing false ceilings in all the floors but GFC
Reflected flase ceiling drawings are not available in
the revised set of drawings. Will be clarified by architect
From 1st floor to terrace- structural staircase working
drawing is not complete. Will be clarified by architect
Third floor plan- in the drawing between staircase and
lift shaft shear walls brickwall hatching is shown, but
text mentioned is structural glazing. Please clarify
ATC Tower WD/ATC/DT- 05 which one to follow Will be clarified by architect
4th floor plan- 600mm wide slab projection / 1000 Slab concrete has to be done as per
mm wide corridor both are shown in the plan. Please structural drawing. Architectural
clarify the same. elements will be clarified as early as
possible
Roof truss fabrication drawing is not available
UG Sump &
Details of puddle flanges is required
3 Pump room
In the upper level slab above pump room- staricase
cutout location to be shown. Section through pump
room will give more clarity. Please provide the Start point of staircase from Ground to
WD/STR/UGWT-02 required detail. lower level is from the beam face.
Staircase structural drawing is not matching with the Staircase to be casted as per the actual
details shown in the architectural drawing [1st flight, heights keeping raiser height as
WD/STR/UGWT-05 no of steps] 150mm & tread 300mm.
Section A-A is showing roof projection of 300mm wide
in gird from A2- D2. This is not mentioned in the
structural drawing of upper level slab [drg no: Slab projects to be provided as per
WD/UGWT/AR-01 WD/STR/UGWT-02]. archtectural drawings.
ESS
[Electrical
4 Sub station]
115mm thick brick wall partition between POL, Store
& Office room - height of the wall from floor level is
TD/ESS/D- 01 not shwon To take it up to full height
False ceiling is shown in sectional views of toilet. But
GFC false ceiling drawing is not availabe in the set of
drawings Will be clarified by architect
Please confirm whether false ceiling is requied in
Office, Store & POL rooms. If yes GFC false ceiling
detail drawing is requied. Will be clarified by architect
Structural column & wall junction:
8mm / 10mm reinforcement steel of
min 300mm long to be welded to the
External wall: joint of structural column, due to
steel column at random locations to
different materials there will always be gap because
increase bonding strength; vertical
of which there is a chance of rainwater seapage into
groove in plaster to be made at the
the building.
junction of wall & structural column.
Pole earthing details required for both Earth pit for every 5 poles (pipe
approach area and peripheral areas earthing)
[individual earthing for each pole or looping]
Each feeder pillar cable size required for solar
3.5C x 25 sq mm for FP 4.
supply and EB supply
In peripheral areas sub feeder pillar locations
required and number of light points in each Architect will provide drawing.
circuit
Cable size for High mast pole & location of
4C x 6 sq mm
High mast pole is required
PTB lightning arrestors drawing and routing is Architect will provide PTB
required. lightning arrester drawing.
If in case it is necessory.
ATC Tower and OHT lightning arrestors Because, ATC Tower and OHT
drawing and routing is required are taller than ATC Building
Details of body earthing & neutral earthing,
location, type of earthing and number of earth Clarification not given.
pits is required.
Server room DB location and circuit details are
Surface mounted fixing at server.
required
Electrical requirement for Security room near Need to take supply from nearest
main gate is not provided. If yes please let us feeder pillar.
know from which panel it is to be tapped.
Height of Light poles at car parking 4 mts or 9 4M pole. Supply from nearest
mts, please confirm feeder pillar.
3 phase power is required for flag post. Taping Supply from nearest feeder pillar
location is required. with 4 x 6 sq mm
Cable size and routing for solar power and
Clarification not given.
syncronization details are requied.
Ceiling fans- for the present height of terminal Provide 1600mm vanes and 1ft
building air throw with 1200mm normal ceiling hanging rod from FCL.
fan is not adequate. Need suggession on this
Conduiting of Distribution Boards in ATC
Building are exposing.
Construction of Greenfields No frills airport at Orvakal, Kurnool Dist.
Not confirmed