Vous êtes sur la page 1sur 12

INDEX

SN Description Sheet No
1 Project Details and scope 1
2 Critical Points 2
3 Engineering drawing approval 3
4 Supply Status 4
5 Site Civil Progress Report 5
6 Site Erection Progress 6
7 Financial status 7
Project
Karamnasa TSS, Kudra Summary_132/27
TSS & KVnew
Sonenagar TSS and _TSS132/25 kV Substation (TSS) at Karamnasa
Project: Sonenagar & Gaya including bays at Gaya GSS etc. under Consultancy services to East Central R
Owner: PGCIL
EPC Sub-Contractor: R S INFRA PROJECTS PVT LT
LOI Reference No.: CC-CS/840-ERllTW -3782131G3/NOAJ8749 Dated 08.10.2018

SCOPE OF Substation Work Design ,Supply,Erection including Civil work,Testing,Commissioning of Traction Substation(TSS)
Substation Details 1.Karamnasa
1) TSS_4 Nos TSS 2.Sonenagar
132 KV TSS 3.GayaTSS
Bays and 132/25KV 4. Extension
Traction system GSSphase
(Double Bays arrangement) at Karam
Total Contract Value Of TSS 2) TSS_6 Nos 132 KV Bays and 132/25KV Traction system (Double phase arrangement)at Sonen
Work (EPC Including 394399331(Approx 39.4 Cr)
Civil.Electrical ,ETC) - (i+ii)

TSS Civil ---i 140487611(Approx 14 Cr.)


TSS (Supply& ETC)----ii 253911720 (Approx.25.3 Cr)
Total Contract Value Of GSS
Work (Gaya Extension)(EPC
Including Civil.Electrical ,ETC)- 20354952 (Approx 2 Cr.)
i+ii

Total Value of Supply-GSS-- i 15510696 (Approx 1.55 Cr)

Total Value of Services-GSS--ii 4844256 (Approx 48.44 Lac)

Completion Period 18 Month


kV Substation (TSS) at Karamnasa,
ultancy services to East Central Railway.

VT LT
49 Dated 08.10.2018

ning of Traction Substation(TSS) at


GSSphase
ble Bays arrangement) at Karamnasa
ble phase arrangement)at Sonenagar
4 Cr)

Cr.)
3 Cr)

Cr.)

5 Cr)

Lac)
Karamnasa TSS, Kudra TSSCritical Points_132/27
& Sonenagar TSS and KV
new_TSS
132/25 kV Substation (TSS) at Karamnasa,
Project: Sonenagar & Gaya including bays at Gaya GSS etc. under Consultancy services to East Central Railway.
Owner: PGCIL
EPC Sub-Contractor: R S INFRA PROJECTS PVT LT
LOI Reference No.: CC-CS/840-ERllTW -3782131G3/NOAJ8749 Dated 08.10.2018

1. Design engineering can be taken only after approval of Location plan from railway headquarter and
this can be prepared only after handing opver of site .Due to this Engineering activity started late.
2. As per RDSO ,all drawings are standarad but due to different site condition like extra filling ,we have
submit the design calculation for civil,these calculations cannot be done by our design contractor. So we
have awarded this scope to a freelancher.
Approvals 3. Contour approval taking long time because of involvement of PGCIL Site/PGCIL Regional office and
PGCIL Corporate office.
4. For gaya TSS land has been approved but foul between foundations and boundary wall need
to checked

1.Karamnasa TSS- Total land of Karamnasa TSS land is handed on 19.06.2019.But In some of the parts
Progress ,optical Cables are still there, Railway to remove, decision not taken yet.

Financial
on (TSS) at Karamnasa,
vices to East Central Railway.

08.10.2018

rom railway headquarter and


ring activity started late.
tion like extra filling ,we have to
by our design contractor. So we

e/PGCIL Regional office and

tions and boundary wall need

2019.But In some of the parts


MASTERkVDRAWING
Sonenagar TSS and new 132/25 Substation&(TSS)
DOCUMENT LIST (MDL)_132/27
at Karamnasa, Sonenagar & KV _TSS
Gaya including bays at
Project: services to East Central Railway.
Owner: PGCIL
EPC Sub-Contractor: R S INFRA PROJECTS PVT LT
LOI Reference No.: CC-CS/840-ERllTW -3782131G3/NOAJ8749 Dated 08.10.2018
KARAMNASA-TSS

SN. Drawing No. Submission Approval


Date
Date

1 Location Plan 10.03.2019 28.03.2019


2 General Arrangement Layout 05.04.2019 15.04.2019
3 General Arrangement Cross Section 05.04.2019 15.04.2019
4 General Arrangement Earthing GA Pending
5 Earthing Details Pending
6 Foundation Details and Calculation sheet 26.06.2019 28.06.2019
7 Foundation General Arrangement 26.06.2019 28.06.2019
8 Foundation Plan View 14.06.2019 14.06.2019
9 Structural Layout 27.05.2019 31.05.2019
10 Structural Cross Layout 27.05.2019 31.05.2019
11 Busbar Arrangement 05.04.2019 15.04.2019
12 Busbar Schematics 05.04.2019 15.04.2019
13 Cable Trench Layout Pending
14 Control room building (5 Drawing) 18.06.2019 21.06.2019
15 Cavble Trench Cover Details Pending

Cable Run Layout Pending

16

Cable Run details Equipment to equipment Pending

17

Transformer oil soak pit drawing Pending


18

Transformer apron and oil trench layout and cros Pending


section details
19
20 Feeding Post GA Cross Section details Pending
21 FP Structural Arrangement and Cross section Pending
22 Baffle Wall Details Pending 11.07.2019
23 Fencing drawing 07.05.2019 14.05.2019
24 Retaining wall Pending 11.07.2019
Tsa,
(MDL)_132/27
Sonenagar & KV _TSS
Gaya including bays at Gaya GSS etc. under Consultancy
East Central Railway.
PGCIL
A PROJECTS PVT LT
31G3/NOAJ8749 Dated 08.10.2018
AMNASA-TSS

Approval Remarks
Category

Approved Approved
Approved Approved
Approved Approved
Will be submitted after Earth
Resistance Test (ERT Test).ERT test
will be concluded after complete
handover of S/S. and soil filling.
Approved Approved
Approved Approved
Approved Approved
Approved Approved
Approved Approved
Approved Approved
Approved Approved
CAT III (Re-submission) Submitted on 17.09.2019
Approved Approved
CAT III (Re-submission) Submitted on 17.09.2019

Will be prepared after approval


of Cable trench drawing which is
pending at PGCIL .

Will be prepared after approval


of Cable trench drawing which is
pending at PGCIL .
Submitted to PGCIL on
25.06.2019.Pending at PGCIL
end.Calculation Pending

Submitted on 11.07.19.Pending
at PGCIL end.

CAT III (Re-submission) Submitted


CAT III (Re-submission) Submitted
Approved Approved
Approved Approved
Approved Approved
Supply_Ordering Status (Traction Substation)
Quantity
- Quantity- Quantity- Total Qty. Vendor
SN Supply Item Unit Sonenaga Karanasa Gaya
r
132 KV double pole SF-6
1 gas circuit breakers Sets 2 2 2 6 ABB India
with interlock
Switchgear &
132 KV double pole Structural
2 isolators (manually No.s 2 2 2 6 (India )PVT
operated) LTD.

Switchgear &
Structural
3 25KV SP ISOLATORS No.s 8 8 8 24 (India )PVT
LTD.

Switchgear &
25KV ISOLATORS DP Structural
4 No.s 1 1 1 3
Isolators (India )PVT
LTD.
132 KV current
5 transformer assembly No.s 5 5 5 15 Lamco
(400-200/5A)
120 KV lightning
6 No.s 22 18 18 58 Lamco
arrestors

25 KV single pole
Vacuum circuit breaker
7 No.s 5 5 5 15 Alind
with interlocking of
rating 2000 amps

25 KV current
8 transformers (3000- No.s 7 7 7 21 Lamco
1500/5A)
25 KV current
9 transformers (200- No.s 1 1 1 3 Lamco
100/5A)

control & relay numeric


panel suitable for
double transformer
10 No.s 1 1 1 3 Alind
traction sub -stations of
220/27 or 132/27 KV
or 110/27 KV

132/27 KV, 30/42 MVA,


ONAN/ONAF, single
11 Sets 2 2 2 6 GE T&D
phase traction power
transformers
132 KV Potential
12 No.s 4 4 4 12 Lamco
Transformer assembly
132 KV current
13 transformer assembly No.s 5 5 5 15 Lamco
(400-200/5A)
25 KV single pole SF-6
15 Gas/Vacuum circuit No.s 1 1 1 3 Alind
breaker
25 KV current
16 transformers (1500- No.s 1 1 1 3 Lamco
750/5A)
SF-6 gas filled/vacuum
17 No.s 1 1 1 3 Alind
25 KV Interruptor
25 KV Potential
18 Trasformer Type-I or No.s 1 1 1 3 Lamco
Type-II
25 KV,1600 Amp
19 vacuum Interruptor No.s 1 1 1 3 Alind

25 KV Potential
20 Trasformer Type-I or No.s 1 1 1 3 Lamco
Type-II
42 KV Lightning
Arrestor with surge
21 No.s 3 3 3 9 Lamco
monitor, counter and
cable
22 Capacitor Bank No.s 1 1 1 3 TDK India

23 Series Reactor No.s 1 1 1 3 Quality Power

UNITED LEAD
24 Battery No.s 1 1 1 3 OXIDE
25 Battery Charge No.s 2 2 2 6 CONCORD
26 ACDB /DCDB Sets 1 1 1 3 CONCORD
Supreme
Switchgear &
27 Auxiliary Transformer No.s 2 2 2 6 TransformerPvt.
Ltd.- R2

28 Insulator Lot 1 1 1 3 IEC&Aditya Birla

R.S Infra
29 Steel Structure MT 95 95 95 285 Projects Ltd.

30 Reinforcement MT 120 120 120 360

Earthing material and


31 Lot 1 Ordered
conductor (ACSR Zebra)

Applied Techno
32 Tools and Plants/Spare Lot 1 Products

Supply_Ordering Status (Extension bay in BSPTCL)


Place of Ordering
SN Supply Item Unit Quantity Vendor Manufactu Status
ring
132 KV SF-6 gas circuit
1 Nos 2 ABB India Vadodara Done
breakers
ZIV
2 CRP Lot 1 AUTOMAT Banglore Done
ION
Mehru
Electrical
and
3 132KC CT Nos 7 Mechanic Bhiwadi Done
al
Engineers

Mehru
Electrical
and
4 132KC CVT Nos 7 Mechanic Bhiwadi Done
al
Engineers

Switchgea
r&
132KV ISOLATORS
5 Nos 6 Structural Hyderabad Done
(3Pole (India )
PVT LTD.

6 120KV LA Nos 3 Lamco Hyderabad Done


R.S Infra
7 Steel Structure MT 30 Projects
Will be
procured
8 Reinforcement MT 12 by Our
Purchase
team

Will be
procured
Earthing material and
9 Lot 1 by Our
conductor (ACSR Zebra) Purchase
team
tion)
Place of
Manufact Ordering
Status Manufacturing clearance
uring

Vadodara Done Given for Karamnasa TSS

Hyderabad Done Given for Karamnasa TSS

Hyderabad Done Given for Karamnasa TSS

Hyderabad Done Given for Karamnasa TSS

Hyderabad Done Given for Karamnasa TSS

Hyderabad Done Given for Karamnasa TSS

TRIVANDRUM Done Given for Karamnasa TSS

Hyderabad Done Given for Karamnasa TSS

Hyderabad Done Given for Karamnasa TSS

Will be given once


TRIVANDRUM Done Control room work is
started .

Naili Done Given for Karamnasa TSS.

Hyderabad Done Given for Karamnasa TSS

Hyderabad Done Given for Karamnasa TSS

TRIVANDRUM Done Given for Karamnasa TSS

Hyderabad Done Given for Karamnasa TSS


TRIVANDRUM Done Given for Karamnasa TSS

Hyderabad Done Given for Karamnasa TSS

TRIVANDRUM Done Given for Karamnasa TSS

Hyderabad Done Given for Karamnasa TSS

Hyderabad Done Given for Karamnasa TSS

Nashik Done Given for Karamnasa TSS


Kupwad
MIDC Done Given for Karamnasa TSS
Maharastr
a

GOA Done Balance

Lucknow Done Balance


Lucknow Done Balance
Aurangab
ad Done Balance
Maharash
tra
Mandidee
p/Meghas Done Given for Karamnasa TSS
ar Gujrat

Raw material inspection


call raise for stubs

Will be provided BY our


store at respective TSS.As
the quantity is approx
10MT per TSS

Once Drawing is ready,we


will procure at site on
actual quantity basis

It will be needed at site in


Gurgaon Done Month Februarary