Estimated cost Rs.

60333/-
Name of work:- Insttt. Of Deep well Hand Pumps in IPH Division Paonta Sahib in tehsil Paonta Sahib Earnest Rs.1225/-
Distt. Simour (HP)(SH: Energisation of Hand Pump tosustain the source of GWSS Baneri) Time:-Fifteen days.

Sr.No. Item of work. Qty. Rate. Unit.


1 2 3 4 5
1 1 Set 26500.00 P/Set
2 Supply installation testing and commissioning of cubical type powder coated floor/wall mounted 1 Set 4500.00 P/Set
type readymade pannel box of Bentex/L&T or BCH make to accomodate all the items made from
Fabricarted duly painted and complete internal wiring and composing of air break starter main
switch of suitable Amps, Amperemeter, Voltmeter single phase indicating lamp etc. as per
requirement at site complete in all respect .

3 75 Rmt 95.00 P/Rmt


4 Providing and fixing increaser/reducer/sockets/bends /Nut bolts/Clamps testing of all above items 1 Job 1500.00 P/Job
as per directions of Engineer incharge.
5 Supplying and fixing 25 mm dia O.D.(outer dia) H.D. Pipe as column pipe into the bore hole 40 Rmt 135.00 P/Rmt
complete as per the direction of Engineer incharge.
6 Supplying & fixing floor mounted sheet metal box of size 45x45mm made up of 16 SWG M.S.sheet 1 No. 16500.00 Each.
having locking arrangement and duly poweder coated and embeded with MS angle iron 1.20 Mtr.
Height & 1 Mtr. In width covered with foo of MS sheet with leg embeded in floor with nut & bolt
complete in all respect.

7 Providing and fixing of Stablizer of suitable make to submersible motor confirming to relevant IS code 1 No. 15000.00 Each.
make Bentex/L&T or BGH make to accommodate all store including all leads,lifts and carriage of
material and as per direction of the Engineer-in-charge.
6 Providing and fixing steel rope of 5mm thick for hanging the Submersible pump set into the bore for 50 Rmt 58.00 P/Rmt
its extract from the well and as per direction of the Engineer-in-charge.
Total:-
TERMS AND CONDITIONS
1 The work shall be done as per IPH specifications.
2 Security, Sale Tax & Income tax shall be deduction as per rule.
3 Payment will be made after successful testing at site. Executive Engineer,
4 The guarantee period of pumpng machinery six months I&PH Division,
Paonta Sahib (HP)
Estimated cost Rs.99750/-
Name of work:- R/M of various LWSS under IPH section Dhaula Kuan & Giri Nagar under IPH Sub Division Earnest Money Rs.2000/-
Majra in tehsil Paonta Sahib Distt. Simour (HP)(SH: Supply & fixing of sluice valve & NRV) Time:-Fifteen days.

Sr.No. Item of work. Qty. Rate. Unit.


1 2 3 4 5
1 Supply of Kirloskar/Kilburn/IVC/BIR/GLED/Leader/BHEL/KSB make of suitable size Cast iron/Cast 1 Set 26500.00 P/Set
steel double flanged sluice valve and capable of withstanding nominal seat pressure as mentioned
confirming to BIS/780-1984 standards with upto date ammendments for delivery line of Pump.(Note
The sluice valve shall confirm to BIS-780-1984 latest with upto date ammendments. However if the
seat pressure exceeds the limits prescribed in BIS 780 then the sluice valves shall be of cast steel
confirming to class 150 ASA (Seat pressure 105 Kg. /cm^2_as per BS 1414(API150)

i) 150mm dia. 1 No. Each.


ii) 125mm dia. 1 No. Each.
iii) 80mm dia., 4 Nos. Each.
iv) 50mm dia. 1 No. Each.
2 Supply of Kirloskar/Kilburn/IVC/Fources/GLED/BHEL/Leader/KSB make of suitable size Cast
steel/Cast iron double flanged swing check type Non Returning valve having bye pass arrangement
and capable of withstanding nominal seat pressure as mentioned confirming to BIS 5312 standards
with upto date ammendments for delivery line of Pump.Note: The Non returning valve shall confirm
to BIS-5312-1954(Part-I) latest with upto date ammendments .However if the seat pressure exceeds
the limits prescribed in BIS 5312 then the Reflux valve shall be oc cast steel confirming to class ASA
150. (Seat pressure 105 Kg./cm^2) as per BS-1414(API 150)

50mm dia. 1 No. Each.


Total:-
TERMS AND CONDITIONS
1 The work shall be done as per IPH specifications.
2 Security, Sale Tax & Income tax shall be deduction as per rule.
3 Payment will be made after successful testing at site. Executive Engineer,
4 The guarantee period of pumpng machinery six months I&PH Division,
Paonta Sahib (HP)

Estimated cost Rs.60333/-


Name of work:- Insttt. Of Deep well Hand Pumps under I&PH Sub Division Majra in Tehsil Paonta Sahib Earnest Rs.1225/-
Distt. Simour (HP)(SH: Energisation of03 Nos Hand Pump 1 No. nr house of Sh Gulsher Mohd. In vill. Pipliwala 2 No. nr. Time:-Fifteen days.
h/o Shri Yasin Mohd in vill. Misserwala & 3 No. in I&PH colony at Majra.
Sr.No. Item of work. Qty. Rate. Unit.
1 2 3 4 5
1 1 Set 26500.00 P/Set
2 Supply installation testing and commissioning of cubical type powder coated floor/wall mounted 1 Set 4500.00 P/Set
type readymade pannel box of Bentex/L&T or BCH make to accomodate all the items made from
Fabricarted duly painted and complete internal wiring and composing of air break starter main
switch of suitable Amps, Amperemeter, Voltmeter single phase indicating lamp etc. as per
requirement at site complete in all respect .

3 75 Rmt 95.00 P/Rmt


4 Providing and fixing increaser/reducer/sockets/bends /Nut bolts/Clamps testing of all above items 1 Job 1500.00 P/Job
as per directions of Engineer incharge.
5 Supplying and fixing 25 mm dia O.D.(outer dia) H.D. Pipe as column pipe into the bore hole 40 Rmt 135.00 P/Rmt
complete as per the direction of Engineer incharge.
6 Supplying & fixing floor mounted sheet metal box of size 45x45mm made up of 16 SWG M.S.sheet 1 No. 16500.00 Each.
having locking arrangement and duly poweder coated and embeded with MS angle iron 1.20 Mtr.
Height & 1 Mtr. In width covered with foo of MS sheet with leg embeded in floor with nut & bolt
complete in all respect.
7 Providing and fixing of Stablizer of suitable make to submersible motor confirming to relevant IS code 1 No. 15000.00 Each.
make Bentex/L&T or BGH make to accommodate all store including all leads,lifts and carriage of
material and as per direction of the Engineer-in-charge.
6 Providing and fixing steel rope of 5mm thick for hanging the Submersible pump set into the bore for 50 Rmt 58.00 P/Rmt
its extract from the well and as per direction of the Engineer-in-charge.
Total:-
TERMS AND CONDITIONS
1 The work shall be done as per IPH specifications.
2 Security, Sale Tax & Income tax shall be deduction as per rule.
3 Payment will be made after successful testing at site. Executive Engineer,
4 The guarantee period of pumpng machinery six months I&PH Division,
Paonta Sahib (HP)

Estimated cost Rs.24073/-


Name of work:- (SH: Energisation of Hand Pump in vill. Johron Near House of Sh.Kesho Khan under Earnes tMoney Rs.500/-
IPH Sub Division Majra in Tehsil Paonta Sahib Distt. Sirmour (HP) Time:-Fifteen days.

Sr.No. Item of work. Qty. Rate. Unit.


1 2 3 4 5
1 1 Set 25500.00 P/Set
2 Supplying and fixing of control pannel for submersible Pumps complete with sheet,Fabricarted duly 1 Set 4500.00 P/Set
painted and complete internal wiring and composing of air break starter main switch of suitable
Amps, Amperemeter, Voltmeter single phase indicating lamp etc. as per requirement at site complete
in all respect .

3 50 Rmt 95.00 P/Rmt


4 Providing and fixing increaser/reducer/sockets/bends /Nut bolts/Clamps testing of all above items 1 Job 1500.00 P/Job
as per directions of Engineer incharge.
5 Supplying and fixing 40 mm dia O.D.(outer dia) H.D. Pipe as column pipe into the bore hole 32 Rmt 135.00 P/Rmt
complete as per the direction of Engineer incharge.
6 Providing and fixing steel rope of 6mm thick for hanging the Submersible pump set into the bore for 33 Rmt 60.00 P/Rmt
its extract from the well and as per direction of the Engineer-in-charge.
Total:-
TERMS AND CONDITIONS
1 The work shall be done as per IPH specifications.
2 Security, Sale Tax & Income tax shall be deduction as per rule.
3 Payment will be made after successful testing at site. Executive Engineer,
4 The guarantee period of pumpng machinery six months I&PH Division,
Paonta Sahib (HP)

Estimated cost Rs.60333/-


Name of work:- Insttt. Of Deep well Hand Pumps under I&PH Sub Division Majra in Tehsil Paonta Sahib Earnest Rs.1225/-
Distt. Simour (HP)(SH: Energisation of03 Nos Hand Pump 1 No. nr house of Sh Gulsher Mohd. In vill. Pipliwala 2 No. nr. Time:-Fifteen days.
h/o Shri Yasin Mohd in vill. Misserwala & 3 No. in I&PH colony at Majra.
Sr.No. Item of work. Qty. Rate. Unit.
1 2 3 4 5
1 3 Set 26500.00 P/Set
2 Supply installation testing and commissioning of cubical type powder coated floor/wall mounted 3 Set 4500.00 P/Set
type readymade pannel box of Bentex/L&T or BCH make to accomodate all the items made from
Fabricarted duly painted and complete internal wiring and composing of air break starter main
switch of suitable Amps, Amperemeter, Voltmeter single phase indicating lamp etc. as per
requirement at site complete in all respect .

3 116 Rmt 95.00 P/Rmt


4 Providing and fixing increaser/reducer/sockets/bends /Nut bolts/Clamps testing of all above items 3 Job 1500.00 P/Job
as per directions of Engineer incharge.
5 Supplying and fixing 25 mm dia O.D.(outer dia) H.D. Pipe as column pipe into the bore hole 108 Rmt 135.00 P/Rmt
complete as per the direction of Engineer incharge.
6 Providing and fixing steel rope of 6mm thick for hanging the Submersible pump set into the bore for 114 Rmt 58.00 P/Rmt
its extract from the well and as per direction of the Engineer-in-charge.
Total:-
TERMS AND CONDITIONS
1 The work shall be done as per IPH specifications.
2 Security, Sale Tax & Income tax shall be deduction as per rule.
3 Payment will be made after successful testing at site. Executive Engineer,
4 The guarantee period of pumpng machinery six months I&PH Division,
Paonta Sahib (HP)

Estimated cost Rs.98609/-


Name of work:- Insttt. Of Deep well Hand Pumps under I&PH Sub Division Majra in Tehsil Paonta Sahib Earnest Rs.2000/-
Distt. Simour (HP)(SH: Energisation of 03 Nos Hand Pump 1 No. vill. Amargarh 1 No. nr house of Sh Kamil (near Maszid)Time:-One Month.
02 No. nr/ h/o of Ash.Mehboob Ali in vill. Amargarh & 3 No. in New Maszid (Near GPS )vill. Amargarh
Sr.No. Item of work. Qty. Rate. Unit.
1 2 3 4 5
1 3 Set 25500.00 P/Set
2 Supplying and fixing of control pannel for submersible Pumps complete with sheet,Fabricarted duly 3 Set 4500.00 P/Set
painted and complete internal wiring and composing of air break starter main switch of suitable
Amps, Amperemeter, Voltmeter single phase indicating lamp etc. as per requirement at site complete
in all respect .

3 116 Rmt 95.00 P/Rmt


4 Providing and fixing increaser/reducer/sockets/bends /Nut bolts/Clamps testing of all above items 3 Job 1500.00 P/Job
as per directions of Engineer incharge.
5 Supplying and fixing 32 mm dia O.D.(outer dia) H.D. Pipe as column pipe into the bore hole 131 Rmt 135.00 P/Rmt
complete as per the direction of Engineer incharge.
6 Providing and fixing steel rope of 6mm thick for hanging the Submersible pump set into the bore for 115 Rmt 60.00 P/Rmt
its extract from the well and as per direction of the Engineer-in-charge.
Total:-
TERMS AND CONDITIONS
1 The work shall be done as per IPH specifications.
2 Security, Sale Tax & Income tax shall be deduction as per rule.
3 Payment will be made after successful testing at site. Executive Engineer,
4 The guarantee period of pumpng machinery six months I&PH Division,
Paonta Sahib (HP)
REVISED SCHEDULE OF QUANTITY Estimated cost Rs.41613/-
Name of work:- Insttt. Of Deep well Hand Pumps under I&PH Sub Division Majra in Tehsil Paonta Sahib Earnest Rs.900/-
Distt. Simour (HP)(SH: Energisation of 01 No Hand Pump nr house of Sh Jagdish Chand S/o Shri Ram Diya vill. PuruwalaTime:-One Month.
Kanshipur
Sr.No. Item of work. Qty. Rate. Unit.
1 2 3 4 5
1 1 Set 25500.00 P/Set
2 Supplying and fixing of control pannel for submersible Pumps complete with sheet,Fabricarted duly 1 Set 4500.00 P/Set
painted and complete internal wiring and composing of air break starter main switch of suitable
Amps, Amperemeter, Voltmeter single phase indicating lamp etc. as per requirement at site complete
in all respect .

3 55 Rmt 95.00 P/Rmt


4 Providing and fixing increaser/reducer/sockets/bends /Nut bolts/Clamps testing of all above items 1 Job 1500.00 P/Job
as per directions of Engineer in-charge.
5 Supplying and fixing 32 mm dia O.D.(outer dia) H.D. Pipe as column pipe into the bore hole 42 Rmt 135.00 P/Rmt
complete as per the direction of Engineer incharge.
6 Providing and fixing steel rope of 6mm thick for hanging the Submersible pump set into the bore for 45 Rmt 60.00 P/Rmt
its extract from the well and as per direction of the Engineer-in-charge.
Total:-
TERMS AND CONDITIONS
1 The work shall be done as per IPH specifications.
2 Security, Sale Tax & Income tax shall be deduction as per rule.
3 Payment will be made after successful testing at site. Executive Engineer,
4 The guarantee period of pumpng machinery six months I&PH Division,
Paonta Sahib (HP)

Estimated cost Rs.98609/-


Name of work:- Insttt. Of Deep well Hand Pumps under I&PH Sub Division Majra in Tehsil Paonta Sahib Earnest Rs.2000/-
Distt. Simour (HP)(SH: Energisation of 04 Nos Hand Pump 1 No. nr house of Sh Topnki Ram S/o Sh. Tulshi Ram in vill. Time:-One Month.
Amargarh 02 No. nr/ h/o of sh.Surjeet Singh S/o Shri Ram Kishan in vill. Amargarh, 3 Nos. S.Bhajan Singh S/o Sh. Joginder
Singh in vill. Santokhgarh & 4 No. Nr. H/o Shri Ram Pal S/o Sh. Milkhi Ram in vill. Johron.
Sr.No. Item of work. Qty. Rate. Unit.
1 2 3 4 5
1 4 Set 25500.00 P/Set
2 Supplying and fixing of control pannel for submersible Pumps complete with sheet,Fabricarted duly 4 Set 4500.00 P/Set
painted and complete internal wiring and composing of air break starter main switch of suitable
Amps, Amperemeter, Voltmeter single phase indicating lamp etc. as per requirement at site complete
in all respect .

3 183 Rmt 95.00 P/Rmt


4 Providing and fixing increaser/reducer/sockets/bends /Nut bolts/Clamps testing of all above items 3 Job 1500.00 P/Job
as per directions of Engineer incharge.
5 Supplying and fixing 32 mm dia O.D.(outer dia) H.D. Pipe as column pipe into the bore hole 142 Rmt 135.00 P/Rmt
complete as per the direction of Engineer incharge.
6 Providing and fixing steel rope of 6mm thick for hanging the Submersible pump set into the bore for 159 Rmt 60.00 P/Rmt
its extract from the well and as per direction of the Engineer-in-charge.
Total:-
TERMS AND CONDITIONS
1 The work shall be done as per IPH specifications.
2 Security, Sale Tax & Income tax shall be deduction as per rule.
3 Payment will be made after successful testing at site. Executive Engineer,
4 The guarantee period of pumpng machinery six months I&PH Division,
Paonta Sahib (HP)

REVISED SCHEDULE OF QUANTITY Estimated cost Rs.89940/-


Name of work:- Prov. LWSS Badripur Taruwala & Gondpur in Tehsil Paonta Sahib Distt. Simour (HP) Earnest Rs.1800/-
(SH: Energisation of Hand Pump nr H/O Kamal Kishore R/O Dharamkot , Near House of Sh. Khem Raj Time:-One Month.
R/O Dharamkot & Sh. Ram Kumar R/O Bain Kuan
Sr.No. Item of work. Qty. Rate. Unit.
1 2 3 4 5
1 Providing and installation of Submersible Pump of suitable make such as 3 Set 25500.00 P/Set
KSB/Johnston/Calama/BS/SU/Amrut confirming to ISS 1984-1976 alongwith a directly coubpled
submesible type Square cage electrical induction motor of suitable 2.00 HP for the operation on
220+1 phase 50 CPS AC supply with water lubricated bearings and provided with pivoted segment
type thrust bearing to withstand non vertical head with uniform wear and duly fitted with device to
take in/Out the exemption of water with heating of motor complete in all respect. Total Head 40 to
65 Mtr. Discharge 50 to 60 Mtr.

2 Supplying and fixing of control pannel for submersible Pumps complete with sheet,Fabricarted duly 3 Set 4500.00 P/Set
painted and complete internal wiring and composing of air break starter main switch of suitable
Amps, Amperemeter, Voltmeter single phase indicating lamp etc. as per requirement at site complete
in all respect .

3 Supplying and fixing submersible cable to submersible motor of suitable size 1.50mm 2 approved 154 Rmt 95.00 P/Rmt
make & relevant ISS as per 1554-1988 of Siemens/ Finolex/JEC/ ICS/ELCO/ GRADLY/ Natural make
in all respect.

4 Providing and fixing increaser/reducer/sockets/bends /Nut bolts/Clamps testing of all above items 3 Job 1500.00 P/Job
as per directions of Engineer incharge.

5 Supplying and fixing 32 mm dia O.D.(outer dia) H.D. Pipe as column pipe into the bore hole 154 Rmt 135.00 P/Rmt
complete as per the direction of Engineer incharge.

6 Providing and fixing steel rope of 4mm thick for hanging the Submersible pump set into the bore for 154 Rmt 65.00 P/Rmt
its extract from the well and as per direction of the Engineer-in-charge.

Total:-
TERMS AND CONDITIONS
1 The work shall be done as per IPH specifications.
2 Security, Sale Tax & Income tax shall be deduction as per rule.
3 Payment will be made after successful testing at site. Executive Engineer,
4 The guarantee period of pumpng machinery six months I&PH Division,
Paonta Sahib (HP)
REVISED SCHEDULE OF QUANTITY Estimated cost Rs.86580/-
Name of work:- Prov. LWSS Jamniwala Khara in Tehsil Paonta Sahib Distt. Simour (HP) Earnest Rs.1732/-
(SH: Energisation of Hand Pump nr Shiv Mandir Bain Kuan , N/H of Shri Amarjeet Pal Singh R/O Bain Kuan Time:-One Month.
& Shri Dayal Singh R/O Bain Kuan
Sr.No. Item of work. Qty. Rate. Unit.
1 2 3 4 5
1 Providing and installation of Submersible Pump of suitable make such as 3 Set 25500.00 P/Set
KSB/Johnston/Calama/BS/SU/Amrut confirming to ISS 1984-1976 alongwith a directly coubpled
submesible type Square cage electrical induction motor of suitable 2.00 HP for the operation on
220+1 phase 50 CPS AC supply with water lubricated bearings and provided with pivoted segment
type thrust bearing to withstand non vertical head with uniform wear and duly fitted with device to
take in/Out the exemption of water with heating of motor complete in all respect. Total Head 40 to
65 Mtr. Discharge 50 to 60 Mtr.

2 Supplying and fixing of control pannel for submersible Pumps complete with sheet,Fabricarted duly 3 Set 4500.00 P/Set
painted and complete internal wiring and composing of air break starter main switch of suitable
Amps, Amperemeter, Voltmeter single phase indicating lamp etc. as per requirement at site complete
in all respect .

3 Supplying and fixing submersible cable to submersible motor of suitable size 1.50mm 2 approved 138 Rmt 95.00 P/Rmt
make & relevant ISS as per 1554-1988 of Siemens/ Finolex/JEC/ ICS/ELCO/ GRADLY/ Natural make
in all respect.

4 Providing and fixing increaser/reducer/sockets/bends /Nut bolts/Clamps testing of all above items 3 Job 1500.00 P/Job
as per directions of Engineer incharge.
5 Supplying and fixing 32 mm dia O.D.(outer dia) H.D. Pipe as column pipe into the bore hole 138 Rmt 135.00 P/Rmt
complete as per the direction of Engineer incharge.
6 Providing and fixing steel rope of 4mm thick for hanging the Submersible pump set into the bore for 138 Rmt 65.00 P/Rmt
its extract from the well and as per direction of the Engineer-in-charge.
Total:-
TERMS AND CONDITIONS
1 The work shall be done as per IPH specifications.
2 Security, Sale Tax & Income tax shall be deduction as per rule.
3 Payment will be made after successful testing at site. Executive Engineer,
4 The guarantee period of pumpng machinery six months I&PH Division,
Paonta Sahib (HP)

REVISED SCHEDULE OF QUANTITY Estimated cost Rs.86580/-


Name of work:- Sustainability of source of GWSS Kher in GP Bharog Baneri in Tehsil Paonta Sahib Distt. Earnest Rs.1732/-
Simour (HP) (SH: Laying & jointing of GMS pipe in Rising main, distribution line by energied Borewell) Time:-One Month.

Sr.No. Item of work. Qty. Rate. Unit.


1 2 3 4 5

1 Excavation in drains & channel etc.in earth work in all kinds of soil such as pick work ,jumper work 278.00 Cum 160.00 P/Cum
blasting work, decomposed conglomerate saturated soil soft and hard rock including dressing of
sides and beds and prepareation of sub grade to level or slope including refilling the trenches and
disposing of surplus earth upto all leads,lifts disposed earth to be levelled and neatly dressed
including jungle clearance and as per directions of the Engineer-incharge

2 Laying and jointing of GMS Pipes of various dia in trenches (earth work in trenches to be measured
and paid for seperately) including all leads lifts and carriage of material at site as per direction of
Engineer-in-charge of following dias.
i) 32mm dia. 630 Rmt. 8.00 P/Rmt.
ii) 15mm dia. 495 Rmt. 6.00 P/Rmt.
3 Providing and fixing of Full way valve with wheel of approved make & relevant ISS complete in all
respect including all leads,lifts and carriage of material at site and as per direction of the Engineer-
in-charge.
i) 32mm dia 1 No. 680.00 Each.
ii) 15mm dia. 1 No. 350.00 Each.
4 Providing and fixing of Pipe fitting material of approved make & relevant ISS complete in all respect
including sll leads,lifts and carriage of material at site and as per direction of the Engineer-in-charge.

i) GI Union 32 mm dia. 7 Nos. 140.00 Each.


ii) G.I.Union 15mm dia. 10 Nos. 60.00 Each.
iii) M.S.clamp 32x15mm dia. 4 Nos. 110.00 Each.
iv) Nipple 15mm dia. 4 Nos. 30.00 Each.
v) Elbow 15mm dia. 8 Nos. 35.00 Each.
5 Providing and installation of Submersible Pump of suitable make such as 1 Set 26500.00 P/Set
KSB/Johnston/Calama/BS/SU/Amrut confirming to IS 8034-1976 alongwith required length of
column pipe (column pipe shall be measured and paid for separately) and alongwith a directly
coupled submesible type Square cage electrical induction motor of suitable400 V 3 phase, 50
cycles/second. AC supply confirming to IS 325-1970, water lubricated bearings and provided with
pivoted segment type thrust bearing to withstand non vertical head withminimum and teat and duly
fitted with heating of motor complete. The power of electric motor should be at least (+) 10% and
(-)25% of the duty point head complete in all respect and should be capable of following performance
complete in all respect. Total Head 40 to 65 Mtr. Discharge 50 to 60 Mtr.

6 Supplying and fixing of control pannel for submersible Pumps complete with sheet,Fabricarted duly 1 Set 5500.00 P/Set
painted and complete internal wiring and composing of air break starter main switch of suitable
Amps, Amperemeter, Voltmeter single phase indicating lamp etc. as per requirement at site complete
in all respect .

7 Supplying and fixing submersible cable to submersible motor of suitable size 2.50mm 2 approved 125 Rmt 95.00 P/Rmt
make & relevant ISS as per 1554-1988 of Siemens/ Finolex/JEC/ ICS/ELCO/ GRADLY/ Natural make
in all respect.

8 Providing and fixing increaser/reducer/sockets/bends /Nut bolts/Clamps testing of all above items 1 Job 2000.00 P/Job
as per directions of Engineer incharge.

9 Supplying and fixing 32 mm dia O.D.(outer dia) H.D. Pipe as column pipe into the bore hole 46 Rmt 160.00 P/Rmt
complete as per the direction of Engineer incharge.
10 Supplying & fixing floor mounted sheet metal box of size 45x45mm made up of 16 SWG M.S.sheet 1 No. 16000.00 Each.
having locking arrangement and dulypowder coated and embeded with MS angle iron 1.20 Mtr.
Height & 1 Mtr. in width covered with roof of MS sheet with leg embeded in floor with nut & botls
complete in allo respect.

11 Providing and fixing of stabliser of suitable make to submersible motor confirming to relevant IS code 1 No. 12000.00 Each.
make Bentex/L&T or BCH make to accommodate all store including all leadslifts and carriage of
material as per direction of the Engineer-in-charge.
12 Providing and fixing steel rope of 6mm thick for hanging the Submersible pump set into the bore for 50 Rmt 70.00 P/Rmt
its extract from the well and as per direction of the Engineer-in-charge.
Total:-
TERMS AND CONDITIONS
1 The work shall be done as per IPH specifications.
2 Security, Sale Tax & Income tax shall be deduction as per rule.
3 Payment will be made after successful testing at site. Executive Engineer,
4 The guarantee period of pumpng machinery six months I&PH Division,
Paonta Sahib (HP)

REVISED SCHEDULE OF QUANTITY Estimated cost Rs.69052/-


Name of work:- Sustainability of source of GWSS Bharog Baneri in Tehsil Paonta Sahib Distt. Simour Earnest Rs.1400/-
(HP) (SH:Laying & jointing of GMS pipe in Rising main by Energied Bore well Time:-One Month.
Sr.No. Item of work. Qty. Rate. Unit.
1 2 3 4 5

1 Excavation in drains & channel etc.in earth work in all kinds of soil such as pick work ,jumper work 39.60 Cum 160.00 P/Cum
blasting work, decomposed conglomerate saturated soil soft and hard rock including dressing of
sides and beds and prepareation of sub grade to level or slope including refilling the trenches and
disposing of surplus earth upto all leads,lifts disposed earth to be levelled and neatly dressed
2 including jungle
Laying and clearance
jointing of GMSand as per
Pipes directions
of various of the
dia in Engineer-incharge
trenches (earth work in trenches to be measured 120 Rmt. 9.00 P/Rmt.
and paid for seperately) including all leads lifts and carriage of material at site as per direction of
Engineer-in-charge of following dias.32mm dia.

3 Providing and fixing of Full way valve with wheel of approved make & relevant ISS complete in all
respect including all leads,lifts and carriage of material at site and as per direction of the Engineer-
in-charge. i) 32mm dia 1 No. 690.00 Each.
4 Providing and fixing of Pipe fitting material of approved make & relevant ISS complete in all respect
including sll leads,lifts and carriage of material at site and as per direction of the Engineer-in-charge.

i) GI Union 32 mm dia. 3 Nos. 140.00 Each.


ii) Nipple 32mm dia. 2 Nos. 110.00 Each.
iii) Elbow 32mm dia. 4 No. 60.00 Each.
5 Providing and installation of Submersible Pump of suitable make such as 1 Set 26500.00 P/Set
KSB/Johnston/Calama/BS/SU/Amrut confirming to IS 8034-1976 alongwith required length of
column pipe (column pipe shall be measured and paid for separately) and alongwith a directly
coupled submesible type Square cage electrical induction motor of suitable400 V 3 phase, 50
cycles/second. AC supply confirming to IS 325-1970, water lubricated bearings and provided with
pivoted segment type thrust bearing to withstand non vertical head with minimum and treat and
duly fitted with heating of motor complete. The power of electric motor should be at least (+) 10%
and (-)25% of the duty point head complete in all respect and should be capable of following
performance complete in all respect. Total Head 40 to 65 Mtr. Discharge 50 to 60 Mtr.

6 Supplying and fixing of control pannel for submersible Pumps complete with sheet,Fabricarted duly 1 Set 5500.00 P/Set
painted and complete internal wiring and composing of air break starter main switch of suitable
Amps, Amperemeter, Voltmeter single phase indicating lamp etc. as per requirement at site complete
in all respect .
7 Supplying and fixing submersible cable to submersible motor of suitable size 1.50mm 2 approved 130 Rmt 95.00 P/Rmt
make & relevant ISS as per 1554-1988 of Siemens/ Finolex/JEC/ ICS/ELCO/ GRADLY/ Natural make
in all respect.

8 Providing and fixing increaser/reducer/sockets/bends /Nut bolts/Clamps testing of all above items 1 Job 2000.00 P/Job
as per directions of Engineer incharge.

9 Supplying and fixing 32 mm dia O.D.(outer dia) H.D. Pipe as column pipe into the bore hole 46 Rmt 195.00 P/Rmt
complete as per the direction of Engineer incharge.

10 Supplying & fixing floor mounted sheet metal box of size 45x45mm made up of 16 SWG M.S.sheet 1 No. 16000.00 Each.
having locking arrangement and dulypowder coated and embeded with MS angle iron 1.20 Mtr.
Height & 1 Mtr. in width covered with roof of MS sheet with leg embeded in floor with nut & botls
complete in allo respect.
11 Providing and fixing of stabliser of suitable make to submersible motor confirming to relevant IS code 1 No. 12000.00 Each.
make Bentex/L&T or BCH make to accommodate all store including all leadslifts and carriage of
material as per direction of the Engineer-in-charge.
12 Providing and fixing steel rope of 4mm thick for hanging the Submersible pump set into the bore for 50 Rmt 70.00 P/Rmt
its extract from the well and as per direction of the Engineer-in-charge.
Total:-
TERMS AND CONDITIONS
1 The work shall be done as per IPH specifications.
2 Security, Sale Tax & Income tax shall be deduction as per rule.
3 Payment will be made after successful testing at site. Executive Engineer,
4 The guarantee period of pumpng machinery six months I&PH Division,
Paonta Sahib (HP)
d cost Rs.60333/-

Amount.
6
26500.00
4500.00

7125.00
1500.00

5400.00

16500.00

15000.00

2900.00

79425.00
d cost Rs.99750/-
Money Rs.2000/-

Amount.
6
26500.00
26500.00

d cost Rs.60333/-

Amount.
6
26500.00
4500.00

7125.00
1500.00

5400.00

16500.00
15000.00

2900.00

79425.00

d cost Rs.24073/-
Money Rs.500/-

Amount.
6
25500.00
4500.00

4750.00
1500.00

4320.00

1980.00
42550.00

d cost Rs.60333/-

Amount.
6
79500.00
13500.00

11020.00
4500.00

14580.00

6612.00

129712.00
d cost Rs.98609/-

Amount.
6
76500.00
13500.00

11020.00
4500.00

17685.00

6900.00

130105.00
d cost Rs.41613/-

Amount.
6
25500.00
4500.00

5225.00
1500.00

5670.00

2700.00

45095.00

d cost Rs.98609/-
Amount.
6
102000.00
18000.00

17385.00
4500.00

19170.00

9540.00

170595.00
Amount.
6
76500.00

13500.00

14630.00

4500.00

20790.00

10010.00

139930.00
Amount.
6
76500.00

13500.00

13110.00

4500.00

18630.00

8970.00

135210.00
Amount.
6

44480.00

5040.00
2970.00

680.00
350.00
980.00
600.00
440.00
120.00
280.00
26500.00

5500.00

11875.00

2000.00

7360.00
16000.00

12000.00

3500.00

140675.00
Amount.
6

6336.00

1080.00

690.00

420.00
220.00
240.00
26500.00

5500.00
12350.00

2000.00

8970.00

16000.00

12000.00

3500.00

95806.00
Name of work:- R/M of LWSS Tokion Sainwala and LWSS Sainwala Mubarikpur (Under SCCP) in Tehsil
Paonta Sahib Distt. Simour (HP)(SH: Development of T/well)

Sr.No. Item of work. Qty.


1 2 3
1 Transportation of Support Vehicle alongwith allied accessires etc. complete 2
including errection and levelling at site through all kind of roads approaches
fields etc. in all leads,lift amd carriage of material and as per direction of the
Engineer-in-charge.

2 Development of T/well by back washing method with Air Compressor of 60


minimum 750 CFM capacity pumping of 20mm size and Air line of minimum
65mm size of with other suitable method till the well is throughly developed as
per clause 4.2 of IS 11189-1985 with upto date ammendments complete in all
respects and as per directions of the Engineer-in-charge.

TERMS AND CONDITIONS


1 The work shall be done as per IPH specifications.
2 Security, Sale Tax & Income tax shall be deduction as per rule.
3 Payment will be made after successful testing at site.

REVISED SCHEDULE OF QUANTITY


Name of work:- Installation of Deep well Hand Pumps under IPH Sub Division Majra in Tehsil Paonta Sahib Distt.
(HP) (SH:- Repair of deep wellHand Pumps Mark-II & III under section Giri Nagar)
Sr.No Description of items
1 2
1 Transportation of rig alongwith allied accessories etc.complete including 16
errection and leveling at site , through all kinds of roads approaches fields etc .
In all leads and lifts upto site of work. Complete in all respects as per the
direction of Engineer incharge.

2 Replacement of cylinders including all leads,lifts and carriage of material and as 10


per direction of the Engineer-in-charge.
3 Providing and fixing Chain including all leads,lifts and carriage of material and 8
as per direction of the Engineer-in-charge.
4 Replacement of unserviceable G.I. socket 65mm dia including all leads,lifts and 30
carriage of material and as per directions of the Engineer-in-charge.
5 Repairing of cylinders opf Mark-II & III including with material such as Plunger 6
washer etc. including all leads,lifts and carriage of material and as per direction
of the Engineer-in-charge.
6 Taking out of followeing riser Pipes and further lowering of pipe including 16
labour charge complete.
7 Collection unsecured fallen assembly from the Borewell complete in all respect 5
and as per direction of the Engineer-in-charge.
8 Replacement of defective connecting Rods complete in all respect. 40
9 Development of bore well and yield testing with air compresssor through V- 10
Notch and disinfection etc. complete in all respect and as per direction of the
Engineer-in-charge.

TERMS AND CONDITIONS


1 The work shall be done as per IPH specifications.
2 Security, Sale Tax & Income tax shall be deduction as per rule.
3 Payment will be made after successful testing at site.

REVISED SCHEDULE OF QUANTITY


Name of work:- Installation of Deep well Hand Pumps under IPH Sub Division Majra in Tehsil Paonta Sahib
Distt.Sirmour (HP) (SH:- Repair of deep wellHand Pumps Mark-II & III under I&PH Sub Division Majra)
Sr.No Description of items
1 2
1 Transportation of rig alongwith allied accessories etc.complete including 16
errection and leveling at site , through all kinds of roads approaches fields etc .
In all leads and lifts upto site of work. Complete in all respects as per the
direction of Engineer incharge.

2 Replacement of cylinders including all leads,lifts and carriage of material and as 8


per direction of the Engineer-in-charge.
3 Providing and fixing Chain including all leads,lifts and carriage of material and 8
as per direction of the Engineer-in-charge.
4 Replacement of unserviceable G.I. socket 65mm dia including all leads,lifts and 30
carriage of material and as per directions of the Engineer-in-charge.
5 Repairing of cylinders opf Mark-II & III including with material such as Plunger 8
washer etc. including all leads,lifts and carriage of material and as per direction
of the Engineer-in-charge.
6 Taking out of following risert pipes and further lowering of pipe including all 16
leads,lifts and carriage of material and as per direction of the Engineer-n-
charge.
7 Collection unsecured fallen assembly from the Bore well complete in all respect 5
and as per direction of the Engineer-in-charge.
8 Replacement of defective connecting Rods complete in all respect and as per 45
direction of the Engineer-in-charge.
9 Development of bore well and yield testing with air compresssor through V- 10
Notch and disinfection etc. complete in all respect and as per direction of the
Engineer-in-charge.

TERMS AND CONDITIONS


1 The work shall be done as per IPH specifications.
2 Security, Sale Tax & Income tax shall be deduction as per rule.
3 Payment will be made after successful testing at site.

REVISED SCHEDULE OF QUANTITY


Name of work:- Installation of Deep well Hand Pumps under IPH Sub Division Majra in Tehsil Paonta Sahib Distt.
(HP) (SH:- Repair of deep well Hand Pumps Mark-II & III under I&PH Section Dhaula Kuan).
Sr.No Description of items
1 2
1 Transportation errection dismentalling and carriage of rig alongwith allied 10
accessories etc.complete including errection and leveling at site , through all
kinds of roads approaches fields etc . In all leads and lifts upto site of work.
Complete in all respects as per the direction of Engineer incharge.

2 transportation of spot vechicle complete in all respect and as per direction of the 6
Engineer-in-charge.
3 Replacement of cylinders including all leads,lifts and carriage of material and as 10
per direction of the Engineer-in-charge.
4 Providing and fixing Chain including all leads,lifts and carriage of material and 8
as per direction of the Engineer-in-charge.
5 Replacement of unserviceable G.I. socket 65mm dia including all leads,lifts and 30
carriage of material and as per directions of the Engineer-in-charge.
6 Repairing of cylinders of Mark-II & III including with material such as Plunger 5
washer etc. including all leads,lifts and carriage of material and as per direction
of the Engineer-in-charge.
7 Taking out of following risert pipes and further lowering of pipe including all 16
leads,lifts and carriage of material and as per direction of the Engineer-n-
charge.
8 Collection unsecured fallen assembly from the Bore well complete in all respect 6
and as per direction of the Engineer-in-charge.
9 Replacement of defective connecting Rods complete in all respect and as per 50
direction of the Engineer-in-charge.
10 Development of bore well and yield testing with air compresssor through V- 10
Notch and disinfection etc. complete in all respect and as per direction of the
Engineer-in-charge.

TERMS AND CONDITIONS


1 The work shall be done as per IPH specifications.
2 Security, Sale Tax & Income tax shall be deduction as per rule.
3 Payment will be made after successful testing at site.

REVISED SCHEDULE OF QUANTITY


Name of work:- Sustainability of various sources (B.M.Canal) under Giri irrigation Sub Division, Majra in Tehsil Pao
Sahib Distt.Sirmour(HP) (SH:- Drilling of 1 No. 200mm dia at village Matak Majri to fulfil the water requirement o
Canal) Bore No.1.
Sr.No Description of items
1 Transportation of suitable truck mounted DTH & ODEX/Percussion calyx/RC 1
drilling rigs alongw with necessary accessories etc. to the site of work and
errectiion of rig including levelling etc. complete in all leads and lifts upto site
of work. Complete in all respects as per the direction of Engineer incharge.

2 Drilling bores of 200mm dia per IS:2900-1979 using ODEX/Tube attatchment 30


required for drilling collapssible strata conglomerate boulders,Pabbles,gravels
silt clay etc.including cost of attatchment .Consumable stores,bits water,POL
etc.with system of simultaneous lowering of 128mm dia fincut casing which will
be welded together using 2.5mm dia Advani serlikon electricles with one plain
end and the other and chamferred to 50degree removing galganishing on the
areas to be welded inclusive of the cost of bio-degradouble and non-Toxi From
Flush Etc.The cost including off the threads of GMS pipes if used.

3 Supplying and lowering of IS marked 176mm N.B.5mm thick Fin cut MSERW 30
casing pipes as per IS 4270-2001 and requirement of ODEX attachment from
approved manufactures complete in all respect and as per directions of the
Engineer-in-charge for 200mm dia Bore.

4 Providing and fixing suitable casing shoe and bit tube as per required of ODEX 1
attachment from approved complete in all respect and asper direction of the
Engineer-in-charge.for 200mmdia Bore.
5 Collection and preservation of soil samples in polythene bags complete in all 1
respect and as per direction of the Engineer-in-charge.
6 Development of bore well and yield testing with air compresssor through V- 10
Notch and disinfection etc. complete in all respect and as per direction of the
Engineer-in-charge.

TERMS AND CONDITIONS


1 The work shall be done as per IPH specifications.
2 Security, Sale Tax & Income tax shall be deduction as per rule.
3 Payment will be made after successful testing at site.
4 The guarantee period of pumpng machinery six months

REVISED SCHEDULE OF QUANTITY


Name of work:- Sustainability of various sources (B.M.Canal) under Giri irrigation Sub Division, Majra in Tehsil Pao
Sahib Distt.Sirmour(HP) (SH:- Drilling of 1 No. 200mm dia at village Matak Majri to fulfil the water requirement o
Canal) Bore No.2.
Sr.No Description of items
1 2
1 Transportation of suitable truck mounted DTH & ODEX/Percussion calyx/RC 1
drilling rigs alongw with necessary accessories etc. to the site of work and
errectiion of rig including levelling etc. complete in all leads and lifts upto site
of work. Complete in all respects as per the direction of Engineer incharge.
2 Drilling bores of 200mm dia per IS:2900-1979 using ODEX/Tube attatchment 37
required for drilling collapssible strata conglomerate boulders,Pabbles,gravels
silt clay etc.including cost of attatchment .Consumable stores,bits water,POL
etc.with system of simultaneous lowering of 128mm dia fincut casing which will
be welded together using 2.5mm dia Advani serlikon electricles with one plain
end and the other and chamferred to 50degree removing galganishing on the
areas to be welded inclusive of the cost of bio-degradouble and non-Toxi From
Flush Etc.The cost including off the threads of GMS pipes if used.

3 Supplying and lowering of IS marked 176mm N.B.5mm thick Fin cut MSERW 37
casing pipes as per IS 4270-2001 and requirement of ODEX attachment from
approved manufactures complete in all respect and as per directions of the
Engineer-in-charge for 200mm dia Bore.

4 Providing and fixing suitable casing shoe and bit tube as per required of ODEX 1
attachment from approved complete in all respect and asper direction of the
Engineer-in-charge.for 200mmdia Bore.
5 Collection and preservation of soil samples in polythene bags complete in all 1
respect and as per direction of the Engineer-in-charge.
6 Development of bore well and yield testing with air compresssor through V- 10
Notch and disinfection etc. complete in all respect and as per direction of the
Engineer-in-charge.

TERMS AND CONDITIONS


1 The work shall be done as per IPH specifications.
2 Security, Sale Tax & Income tax shall be deduction as per rule.
3 Payment will be made after successful testing at site.
4 The guarantee period of pumpng machinery six months
Estimated cost Rs.98000/-
r SCCP) in Tehsil Earnest Money Rs.2000/-
Time:-One Month.

Rate. Unit. Amount.


4 5 6
Job. 25000.00 P/ job. 50000.00

Hrs. 1250.00 Per Hrs. 75000.00

Total:- 125000.00

Executive Engineer,
I&PH Division,
Paonta Sahib (HP)

Estimated Cost Rs.99900/-


il Paonta Sahib Distt. Earnest money Rs.2000/-
Time:- One Month.
Qty. Rate Unit. Amount.
3 4 5 6
Nos. 3450.00 Each. 55200.00

Nos. 2950.00 Each. 29500.00

Nos. 240.00 Each. 1920.00


Nos. 85.00 Each. 2550.00

Nos. 500.00 Each. 3000.00

Nos. 2100.00 Each. 33600.00

Nos. 8400.00 Each. 42000.00

Nos. 200.00 Each. 8000.00


job. 1250.00 Per job. 12500.00

Total:- 188270.00

Executive Engineer,
I&PH Division.,
Paonta Sahib(HP)
Estimated Cost Rs.98375/-
il Paonta Sahib Earnest money Rs.2000/-
sion Majra) Time:- One Month.
Qty. Rate Unit. Amount.
3 4 5 6
Nos. 3450.00 Each. 55200.00

Nos. 2950.00 Each. 23600.00

Nos. 240.00 Each. 1920.00

Nos. 85.00 Each. 2550.00

Nos. 500.00 Each. 4000.00

Nos. 2100.00 Each. 33600.00

Nos. 8400.00 Each. 42000.00

Nos. 200.00 Each. 9000.00

Hrs. 1250.00 Per job. 12500.00

Total:- 184370.00
Executive Engineer,
I&PH Division.,
Paonta Sahib(HP)

Estimated Cost Rs.99425/-


il Paonta Sahib Distt. Earnest money Rs.2000/-
Time:- One Month.
Qty. Rate Unit. Amount.
3 4 5 6
Nos. 3450.00 Each. 34500.00

Nos. 2000.00 Each. 12000.00

Nos. 2950.00 Each. 29500.00

Nos. 240.00 Each. 1920.00

Nos. 85.00 Each. 2550.00

Nos. 500.00 Each. 2500.00

Nos. 2100.00 Each. 33600.00

Nos. 8400.00 Each. 50400.00

Nos. 200.00 Each. 10000.00

job. 2650.00 Per job. 26500.00

Total:- 203470.00

Executive Engineer,
I&PH Division.,
Paonta Sahib(HP)

Estimated Cost Rs.90740/-


on, Majra in Tehsil PaoEarnest money Rs.2300/-
water requirement oTime:- One Month.
Qty. Rate Unit. Amount.
Nos. 3450.00 Each. 3450.00

4500 P/Rmt 135000.00

Mtr 2200 P/Rmt 66000.00

Nos. 6000.00 Each. 6000.00

Nos. 30.00 Each. 30.00

Hrs. 2650.00 Per Hrs. 26500.00

Total:- 236980.00

Executive Engineer,
I&PH Division.,
Paonta Sahib(HP)

Estimated Cost Rs.90740/-


on, Majra in Tehsil PaoEarnest money Rs.2300/-
water requirement oTime:- One Month.

Qty. Rate Unit. Amount.


3 4 5 6
Nos. 3450.00 Each. 3450.00
Mtr 4500.00 P/Rmt 166500.00

Mtr 2200.00 P/Rmt 81400.00

Nos. 6000.00 Each. 6000.00

Nos. 30.00 Each. 30.00

Hrs. 2650.00 Per Hrs. 26500.00

Total:- 283880.00

Executive Engineer,
I&PH Division.,
Paonta Sahib(HP)
REVISED SCHEDULE OF QAUNTITY
NAME OF WORK :Improvement of LIS at RD 14220 on LBC for village Toka Nagla in Tehsil Paonta Sahib Distt. Estimated Cost:Rs.90000/-
Sirmour (HP) (SH: Supply & Errection of Centrifugal Pumping machinery with allied accessories) Earnest Money: Rs. 1800/-
Time: Two Months
S.NO. DESCRIPTION QTY RATE UNIT AMOUNT

1 Supply, erection, testing & commissioning of Horizontal spindle,horizontal split 1 set of set 6300.00 Each 157500.00
casing,radial split single/multistages centrifugal pumps of standard make such 25 HP set.
such as KSB/Mather & platt/ Jyoti/ Kirloskar /Beaconweir/BS & BE confirming to
BIS 1520-1980 with upto date ammendments read with BIS 9137-1978 or latest
edition to handle cleat water having turbidity upto 50ppm with impellers, casing
ring, priming funnels & shaft sleeves of brounze shaft of steel with cast iron casing
of suitable capacity copupled directly through a flexible coupling on a common
base plate of cast steel to BHEL/Kirloskar/ NGEF/ Crompton /Siemen /Jyoti/GEC
make slip ring /squarrel cage screen protected drip proof induction electrict motor
suitable for operation on the date given below:(Including Base frame.)

a) Total Head in mtrs (i/c depth of Column Pipe in case of t/well) : 1x25 HP
b) Capacity (in LPS) 25.50
LPS
c) Dia of R/Main (in mm) 125 mm

d) Dia of Column pipe (in mm) TOTAL: 157500.00

Executive Engineer,
I&PH Division,
Paonta Sahib.
ame of Work: C/o LIS Gojjer Adrein in Tehsil Paonta Sahib Distt. Sirmour (HP)(SH: Supply & Errection of Submersible

PUMPING MACHINERY.
1 The firm shall forward a copy of supply order /indent placed by it, for the supply if pumps and motors on the
manufacturers/authorized dealers of the pumps and motors to the consignee within 30 days after issue of the letter
of intent/award by the Engineer In-charge. The copy of supply order/intent to the consignee should also accompany
the dealership certificate of the dealer for the pumping machinery in case the pumps and motors are arranged from
the authorized dealer.

2 The firm shall arrange dispatch of offered pumps and motors to the consignee direct from the manufacturers/their
authorized dealer of the pumping machinery for which the supply order/indent has been placed by the firm. The
packing slip should indicate the details of materials in the package and material of construction of pumps and
motors.
3 The shop test for the pumps and motors shall be carried out at manufacturer's works in the presence of
representative of the department as per IS: 325-1978. The test performance certificate of the pumping machinery
shall be arranged by the firm from the manufacturers and get it approved from the Engineer In-charge before actual
dispatch of the pumping machinery.

4 The firm shall supply the recommended list of spares and quantities required for
normal working of pumping machinery (2 years) from the manufacturers of the
aforesaid equipment at the time of quoting rates and shall quote item rates for the
same also.
5 The firm shall supply the manufacturer's manuals for the operation and
maintenance of the pumping equipment.
6 The firm shall arrange operation and maintenance training to the operating staff for
the pumping machinery without extra cost for a period of 7 days I.e. during the
testing period.
7 The characteristic curves/performance curve chart in original of the offered
pumping equipments shall be supplied with the tender by the participating firms
failing which the tender shall be rejected.
8
9 The installation of pumping machinery above 100HP shall be inspected by the
technical representative of the manufacturer of rank not less than that of a service
engineer, at the work site and inspection certificate shall be supplied to the
Engineer In-charge. This inspection shall be in addition to the test report and
nothing extra shall be paid on this account.
10 C/O all the civil work including foundation & P/machinery shall be constructed by
the contractor.
11 The wiring and installation of electric equipment shall be as per HPSEB rules and
regulations and subject to the approval of the Chief Electrical Inspector and or his
authorized officer. Any defect pointed out shall be rectified by the firm without any
extra cost. The wiring and installation of all electric equipment shall be done by
licensed contractor of approved class of HPSEB and test report shall be got
accepted from the HPSEB authorities on their approval format (Form-D) for release
of power connection by the firm without extra cost.

12 The temporary electrical connection, if required during installation shall be arranged


by the firm at its own cost and energy charges shall also be paid directly by the firm
to the HPSEBL.
13 Prices of all the items shall be FOR site of work inclusive of all leads and lifts and
shall be inclusive of all charges of transportation. Insurance, packing, taxes and
duties such as sales tax, excise duty and local taxes extra.
14 The rates shall be quoted only on the format of schedule of quantities which is
attached with the tender documents giving all specified data so desired there in.

15 The rates offered for, the specified makes in the schedule of quantities only shall be
considered. Rates quoted for part of non specified makes shall lead to rejection of
the tender.
16 The site of work is located at ________Kms from ________________ is situated at
_________________road. The rates quoted by the firm shall be inclusive of all
mechanical and manual transport within all leads and lifts.
17 All the equipments /material shall conform to the relevant BIS specifications
wherever applicable and in its absence to any accepted national/International
standards.
18 All the equipment shall be guaranteed against any manufacturing defect including
metallurgy and its performance for a period of 12(twelve) months from the date of
commissioning/15 (fifteen) months from the date of supply whichever is earlier. Any
defect if noticed within the stipulated period shall be rectified by the firm at its own
cost within 15 days of bringing the same to its notice. The guarantee clause shall
be substantiated by a guarantee bond of a Nationalized Bank for an amount equal
to the cost of pumping and electric equipment (accessories included) pledged in the
name of the Executive Engineer in-charge at the time of applying for refund of
security deposits. The guarantee bond shall be released after the expiry of the
guarantee period.

19 The installed pumping machinery and other allied accessories shall be tested daily
for stipulated pumping hours in the NIT for a period of seven days without extra
cost. However, the cost of electricity and water shall be borne by the deptt.

20 During the guarantee period efficiency of the pumping and the electric equipment
should not vary beyond the range of (+/-) 2.5% .If during guarantee period, the
efficiency falls beyond 2.5% to a maximum of 5%, 1% cost of the pump set for 1%
fall of the efficiency shall be deducted. In case of fall of efficiency beyond 5% the
pump set shall be rejected and cost of the defected pump set recovered from the
pledged Bank guarantee & or from the security deposit as the case may be.

21 90% (ninety percent) payment of the cost of pumping machinery and equipment
less 10% security and other statutory recovery shall be made after receipt of
complete pumping machinery I.e. pump and motor received together at site of work
in good condition. The balance 10% cost after deduction of the security and other
recoveries shall be released after successful and satisfactory installation, testing of
the entire equipment. Ten percent security deposit shall be released as stipulated in
the agreement.

22 90% (ninety percent) installation charges shall be released after satisfactory


installation of all the pumping and electrical equipment. Remaining 10% of
installation charges shall be released after testing of the entire equipment.
23 The installation of pumping machinery shall be inspected by the technical
representative of manufacturer of rank not less than that of service Engineers at
site of work and inspection certificate shall be supplied by to the engineer in
charge. This inspection shall be in addition to the test report and nothing extra be
paid on this account.
24 Unless otherwise specified delivery pipe and pipe for common header shall be of
same specification as of Rising Main in initial R.D,s near pump house.
25 Only manufacturers or their authorized dealers shall be eligible to participate in the
tender process. They shall have to provide certificate from principal manufacturers.
26 Those firms/persons having sub-dealership of any approved make of pump shall be
allowed to participate in tender process if and only if they are authorized dealer of
any one of the approved make of pump.
27 Documentary proof of dealership/sub-dealership for supplying pumping machinery
of NIT make must be attached with the tender by the participating firms/ contractors

28 In case a principal manufacturer or authorized dealer offers a Pump of which he is


not a manufacturer or an authorized dealer, he must at least have sub dealer-ship
of the pump "make" offered by him
29 Any authorized dealer participating in the tender process of the given work shall not
be allowed to give authority to any individual/firm for the same work
30 A firm or a person who has not done any work of providing & fixing of pumping
machcinery shall not be
allowed to quote for work even if he has been authorized for any particular work by
authorised dealer.

Executive Engineer,

I&PH Division,
Paonta Sahib
(HP)
& Errection of Submersible Pumping machinery)

umps and motors on the


30 days after issue of the letter
nsignee should also accompany
s and motors are arranged from

t from the manufacturers/their


been placed by the firm. The
construction of pumps and

s in the presence of
ate of the pumping machinery
Engineer In-charge before actual
REVISED SCHEDULE OF QUANTITY
Name of work: Providing LWSS to PC Hab. In GP Haripur Khol in Tehsil Paonta Sahib Distt. Sirmour (HP)
(SH:Providing drinking water facility to inhabitants of tail enders of village Charanawala.)
Sr.No. Description. Qty.
1 Excavation in drains & channel etc.in earth work in all kinds of soil such as pick 334.00
work ,jumper work blasting work, decomposed conglomerate saturated soil
soft and hard rock including dressing of sides and beds and prepareation of
sub grade to level or slope including refilling the trenches and disposing of
surplus earth upto all leads,lifts disposed earth to be levelled and neatly
dressed including jungle clearance and as per directions of the Engineer-
incharge

2 Laying and jointing of GMS Pipes of various dia in trenches (earth work in 1350
trenches to be measured and paid for seperately) including all leads lifts and
carriage of material at site as per direction of Engineer-in-charge of following
dias.

3 Providing and fixing of Full way valve with wheel of approved make & relevant
ISS complete in all respect including all leads,lifts and carriage of material at
site and as per direction of the Engineer-in-charge.

i) 32mm dia 1
4 Providing and fixing of Pipe fitting material of approved make & relevant ISS
complete in all respect including sll leads,lifts and carriage of material at site
and as per direction of the Engineer-in-charge.

i) GI Union 32 mm dia. 15
ii) Nipple 32mm dia. 2
iii) Reducer 32x25mm dia. 1

TERMS AND CONDITIONS:-


1 The work shall be executed as per IPH/PWD specification and
instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 GI Pipe shall be issued free of cost from IPH Store Bhatanwali.
4 GI Fitting shall be provided by the contractor.
5 In addition to normal security 5% will be withheld for want of test of pipes against leakages.

DRAFT SCHEDULE OF QUANTITY


Name of work: Construction of LWSS Toka Nagla (Jhaba Basti) in Tehsil Paonta Sahib Distt. Sirmour (HP)
(SH:Laying & jointing of distribution system from Hand Pump)
Sr.No. Description. Qty.
1 Excavation in drains & channel etc.in earth work in all kinds of soil such as pick 252.00
work ,jumper work blasting work, decomposed conglomerate saturated soil
soft and hard rock including dressing of sides and beds and prepareation of
sub grade to level or slope including refilling the trenches and disposing of
surplus earth upto all leads,lifts disposed earth to be levelled and neatly
dressed including jungle clearance and as per directions of the Engineer-
incharge

2 Laying and jointing of GMS Pipes of various dia in trenches (earth work in 800
trenches to be measured and paid for seperately) including all leads lifts and
carriage of material at site as per direction of Engineer-in-charge of following
dias. 15mm dia.

3 Providing and fixing of Full way valve with wheel of approved make & relevant
ISS complete in all respect including all leads,lifts and carriage of material at
site and as per direction of the Engineer-in-charge.
i) 15mm dia 1
4 Providing and fixing of Pipe fitting material of approved make & relevant ISS
complete in all respect including sll leads,lifts and carriage of material at site
and as per direction of the Engineer-in-charge.
i) GI Union 15 mm dia. 5

TERMS AND CONDITIONS:-


1 The work shall be executed as per IPH/PWD specification and
instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 GI Pipe shall be issued free of cost from IPH Store Bhatanwali.
4 GI Fitting shall be provided by the contractor.
5 In addition to normal security 5% will be withheld for want of test of pipes against leakages.
Estimated cost Rs 28578/-
t. Sirmour (HP) Earnest money Rs.600/-
Time:- Two Months
Rate. Unit Amount.
Cum 155.00 P/Cum 51770.00

Rmt. 16.00 P/Rmt. 21600.00

Nos. 700.00 Each. 700.00

Nos. 180.00 Each. 2700.00


Nos. 80.00 Each. 160.00
No. 100.00 Each. 100.00
Total: 77030.00

Executive Engineer,
es against leakages.I&PH Division, Paonta Sahib.

Estimated cost Rs 19694/-


istt. Sirmour (HP) Earnest Money:
Time:- One Month.
Rate. Unit Amount.
Cum 75.95 P/Cum 19139.00

Rmt. 0.50 Per Rmt. 400.00

No. 66.50 Each. 67.00

Nos. 17.50 Each. 88.00


Total: 19694.00

Assistant Engineer,
es against leakages.I&PH Sub Division, Paonta Sahib.
REVISED SCHEDULE OF QUANTITY Estimated cost Rs 13
Name of work: Restoration of Rain damages to FIS Chandni in Tehsil Paonta Sahib Distt. Sirmour Earnest money Rs.30
(HP) (SH:Removal of silt/slips at various RD's)
Time:- Three Months
Sr.No. Description. Qty. Rate.
1 Removal of silt/slips in all kind of soil including saturated soil but 348.57 Cum 130.00
excluding boulders and rocky portion requiring blasting upto a
distance of 20 metres disposing of unserviceable materials
stacking the serviceable materials and neatly dressed the surface
complete in all respect including all leads,lifts and carriage of
material and as per direction of the Engineer-in-charge.

TERMS AND CONDITIONS:-


1 The work shall be executed as per IPH/PWD specification
and instructions of the Engineer-in-charge.

2 Security,Sale tax & Income tax shall be deducted as per


rules.
3 Nothing shall be paid for rejected/defective work.
Executive Engineer,
I&PH Division, Paonta Sa

REVISED SCHEDULE OF QUANTITY Estimated cost Rs 13


Name of work: R/M of LIS /LWSS Phandi Bodiwala in Tehsil Paonta Sahib Distt. Sirmour (HP) Earnest money Rs.28
(SHDismentalling & Relaying of RCC Pipe) Time:- One Month
Sr.No. Description. Qty. Rate.
1 Excavation in foundation and trenches etc.in earth work in 60.75 Cum 155.00
all kinds of soil such as pick work ,jumper work decomposed
conglomerate saturated soil soft and hard rock upto all leads
lifts stacking the excavated soil not more than 3mtr.clear
from the edge of excavation and then returning the stacked
soil in 15cm layers when required in to plinth sides of
foundation etc. consolidating each deposited layers by
ramming and watering and then disposing of all surplus
excavated earth as directed with in all leads lifts and as per
directions of the Engineer-incharge

2 Dismentalling of RCC Pipe of 150mm dia NP-2 including all 100 Rmt. 95.00
leads,lifts and carriage of material at site and as per directions of
the Engineer-in-charge.
3 Relaying of RCC Pipe of 150mm dia NP-2 includiong all leads,lifts 100 Rmt. 100.00
and carriage of material at site and as per direction of the
Engineer-in-charge.

TERMS AND CONDITIONS:-


1 The work shall be executed as per IPH/PWD specification
and instructions of the Engineer-in-charge.

2 Security,Sale tax & Income tax shall be deducted as per


rules.
3 Cement will be issued @ 315/- per bag & steel @ - per Kg.
at IPH store Bhatanwali Paonta Sahib.
4 Empty cement bags shall be returned to the deptt. Otherwise
Rs. 2/- per bag shall be deducted from the each bill of the
contractor.
5 Royality certificate in respect of stone agg. Sand etc. shall be
produced by the contractor

Executive Engineer,
I&PH Division,
Paonta Sahib.
Estimated cost Rs 13769/-
Earnest money Rs.300/-

Time:- Three Months


Unit Amount.
P/Cum 45314.00

Total: 45314.00

Executive Engineer,
I&PH Division, Paonta Sahib.

Estimated cost Rs 13841/-


Earnest money Rs.280/-
Time:- One Month
Unit Amount.
P/Cum 9416.00

Per Rmt. 9500.00

Per Rmt. 10000.00

Total: 28916.00

Executive Engineer,
I&PH Division,
Paonta Sahib.
REVISED SCHEDULE OF QUANTITY
Name of work: R/M of various WATER SUPPLY SCHEMES under IPH S/Division Shillai in Tehsil
Shillai Distt. Sirmour (HP) (SH: Prov. & supplying of various type of fitting material. )
S.No Description Qty.
1 2 3
1 Providing and Supplying of Brass full way valve with wheel of superior
quality as per standard design & relevant ISS of following dia complete
in all respect and as per satisfaction of the Engineer-in-charge.

i) 15mm dia 10 Nos.

ii) 20mm dia 70 Nos.

iii) 25 mm dia. 35 Nos.


iv) 32mm dia. 40 Nos.

v) 40mm dia. 20 Nos.


vi) 50mm dia. 10 Nos.
vii) 65mm dia. 10 Nos.
2 Providing and Supplying of the G.I.Unions of the follwing sizes
Confirming to IS 1879 in the various schemes complete in all respect
and as per satisfaction of the Engineer-in-charge.

i) 15mm dia 80 Nos.

ii) 20mm dia 60 Nos.

iii) 25 mm dia. 60 Nos.

iv) 32mm dia. 40 Nos.

v) 40mm dia. 40 Nos.

vi) 50mm dia. 20 Nos.

vii) 65mm dia. 20 Nos.

viii) 80mm dia. 20 Nos.

3 Providing and Supplying of the G.I.Elbow of the follwing sizes


onfirming to IS 1879 in the various schemes complete in all respect
and as per satisfaction of the Engineer-in-charge.
i) 15mm dia 60 Nos.

ii) 20mm dia 60 Nos.


iii) 25 mm dia. 40 Nos.

iv) 32mm dia. 20 Nos.


v) 40mm dia. 20 Nos.

vi) 50mm dia. 25 Nos.

vii) 65mm dia. 20 Nos.


viii) 80mm dia. 20 Nos.

4 Providing Wrench set of following sizes confirming tyo IS 1879 in the various
schemes as per details attached for repair of damaged distribution /main
G.I.Pipe Line.
i) 14" 8 Nos.
ii) 18" 8 Nos.
iii) 24" 5 Nos.

TERMS AND CONDITIONS:-


1 The work shall be executed as per IPH/PWD specification and instructions of
the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 The materials will be received in good condition.
4 Nothing shall be paid for rejected material
REVISED SCHEDULE OF QUANTITY
Name of work: A/ R & M/O to various LWSS/GWSS under IPH Sub Division Shillai in Tehsil
Shillai Distt. Sirmour (HP) (SH: Prov. & supplying of various type of fitting material.)
S.No Description Qty.
1 2 3
1 Providing and Supplying of the G.I.Unions of the follwing sizes
Confirming to IS 1879 in the various schemes complete in all respect
and as per satisfaction of the Engineer-in-charge.
i) 15mm dia 100 Nos.
ii) 20mm dia 90 Nos.
iii) 25 mm dia. 150 Nos.
iv) 32mm dia. 171 Nos.
v) 40mm dia. 160 Nos.
vi) 50mm dia. 90 Nos.
vii) 65mm dia. 80 Nos.
viii) 80mm dia. 40 Nos.
ix) 100mm dia. 24 Nos.
3 Providing and Supplying of the G.Itee of the following sizes onfirming
to IS 1879 in the various schemes complete in all respect and as per
satisfaction of the Engineer-in-charge.
i) 25x15 mm dia 100 Nos.
ii)25x 20mm dia 110 Nos.
iii) 32x 15 mm dia. 100 Nos.
iv) 32x20 mm dia. 90 Nos.
v) 40 x 15 mm dia. 15 Nos.
vi) 40x 20mm dia. 50 Nos.
vii)40x25mm dia. 50 Nos.
viii) 40x32 mm dia. 90 Nos.
ix) 50x20mm dia. 30 Nos.
x) 50x25mm dia. 42 Nos.
xi) 50x32mm dia. 50 Nos.
xii) 50x40mm dia. 40 Nos.
TERMS AND CONDITIONS:-
1 The work shall be executed as per IPH/PWD specification and instructions of
the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 The materials will be received in good condition.
4 Nothing shall be paid for rejected material

REVISED SCHEDULE OF QUANTITY


Name of work: R/M of various LIFT WATER SUPPLY SCHEMES under IPH S/Division Paonta Sahib (Section Rajban)
Paonta Sahib Distt. Sirmour (HP) (SH: Prov. & supplying of various type of fitting material. )
S.No Description Qty.
1 2 3
1 Providing and Supplying of Brass full way valve with wheel of superior
quality as per standard design & relevant ISS of following dia complete
in all respect and as per satisfaction of the Engineer-in-charge.

i) 15mm dia 10 Nos.


ii) 20mm dia 70 Nos.
iii) 25 mm dia. 35 Nos.
iv) 32mm dia. 40 Nos.
v) 40mm dia. 20 Nos.
vi) 50mm dia. 10 Nos.
vii) 65mm dia. 10 Nos.
2 Providing and Supplying of the G.I.Unions of the follwing sizes
Confirming to IS 1879 in the various schemes complete in all respect
and as per satisfaction of the Engineer-in-charge.
i) 15mm dia 80 Nos.
ii) 20mm dia 60 Nos.
iii) 25 mm dia. 60 Nos.
iv) 32mm dia. 40 Nos.
v) 40mm dia. 40 Nos.
vi) 50mm dia. 20 Nos.
vii) 65mm dia. 20 Nos.
viii) 80mm dia. 20 Nos.
3 Providing and Supplying of the G.I.Elbow of the follwing sizes
onfirming to IS 1879 in the various schemes complete in all respect
and as per satisfaction of the Engineer-in-charge.
i) 15mm dia 60 Nos.
ii) 20mm dia 60 Nos.
iii) 25 mm dia. 40 Nos.
iv) 32mm dia. 20 Nos.
v) 40mm dia. 20 Nos.
vi) 50mm dia. 25 Nos.
vii) 65mm dia. 20 Nos.
viii) 80mm dia. 20 Nos.
4 Providing Wrench set of following sizes confirming tyo IS 1879 in the various
schemes as per details attached for repair of damaged distribution /main
G.I.Pipe Line.
i) 14" 8 Nos.
ii) 18" 8 Nos.
iii) 24" 5 Nos.

TERMS AND CONDITIONS:-


1 The work shall be executed as per IPH/PWD specification and instructions of
the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 The materials will be received in good condition.
4 Nothing shall be paid for rejected material
Estimated Cost:99494/-
Earnest Money: 2000/-
Time: One Month.
Rate Unit Amount
4 5 6.

350.00 Each. 3500.00

420.00 Each. 29400.00

510.00 Each. 17850.00


800.00 Each. 32000.00

1500.00 Each. 30000.00


2800.00 Each. 28000.00
4000.00 Each. 40000.00

70.00 Each. 5600.00

100.00 Each. 6000.00

125.00 Each. 7500.00

175.00 Each. 7000.00

300.00 Each. 12000.00

320.00 Each. 6400.00

520.00 Each. 10400.00

800.00 Each. 16000.00

60.00 Each. 3600.00

80.00 Each. 4800.00


110.00 Each. 4400.00

160.00 Each. 3200.00


240.00 Each. 4800.00

250.00 Each. 6250.00

480.00 Each. 9600.00


700.00 Each. 14000.00

490.00 Each. 3920.00


670.00 Each. 5360.00
980.00 Each. 4900.00

TOTAL: 316480.00

Executive Engineer,
I&PH Division,
Paonta Sahib.
Estimated Cost:99829/-
Earnest Money: 2000/-
Time: 15 Days.
Rate Unit Amount
4 5 6.

70.00 Each. 7000.00


100.00 Each. 9000.00
125.00 Each. 18750.00
175.00 Each. 29925.00
300.00 Each. 48000.00
320.00 Each. 28800.00
520.00 Each. 41600.00
800.00 Each. 32000.00
900.00 21600.00

60.00 Each. 6000.00


80.00 Each. 8800.00
110.00 Each. 11000.00
150.00 Each. 13500.00
190.00 Each. 2850.00
220.00 Each. 11000.00
240.00 Each. 12000.00
250.00 Each. 22500.00
270.00 Each. 8100.00
350.00 Each. 14700.00
400.00 Each. 20000.00
450.00 Each. 18000.00
TOTAL: 385125.00

Executive Engineer,
I&PH Division,
Paonta Sahib.

Estimated Cost:99494/-
Earnest Money: 2000/-
Time: One Month.
Rate Unit Amount
4 5 6.
350.00 Each. 3500.00
420.00 Each. 29400.00
510.00 Each. 17850.00
800.00 Each. 32000.00
1500.00 Each. 30000.00
2300.00 Each. 23000.00
3500.00 Each. 35000.00

70.00 Each. 5600.00


100.00 Each. 6000.00
125.00 Each. 7500.00
170.00 Each. 6800.00
300.00 Each. 12000.00
320.00 Each. 6400.00
520.00 Each. 10400.00
800.00 Each. 16000.00

60.00 Each. 3600.00


80.00 Each. 4800.00
110.00 Each. 4400.00
160.00 Each. 3200.00
240.00 Each. 4800.00
250.00 Each. 6250.00
480.00 Each. 9600.00
700.00 Each. 14000.00

490.00 Each. 3920.00


670.00 Each. 5360.00
980.00 Each. 4900.00

TOTAL: 306280.00
Executive Engineer,
I&PH Division,
Paonta Sahib.
Name of work:-Aug. & Imp. of GWSS Staun in Tehsil Paonta Sahib in Tehsil Paonta Sahib Distt.Sirmour(HP)
(SH: C/O Breast Wall back of treatment Units )
S.No Description Qty.
1 Cutting in earth work in all kind of soil and dispoal of the excavated earth upt all 49.64
leads,lifts and as directed by the Engineer-in-charge complete in all respect.

2 Excavation in foundation and trenches etc.in earth work in all kinds of soil 16.05
such as pick work ,jumper work decomposed conglomerate saturated soil
soft and hard rock upto all leads lifts stacking the excavated soil not more
than 3mtr.clear from the edge of excavation and then returning the
stacked soil in 15cm layers when required in to plinth sides of foundation
etc. consolidating each deposited layers by ramming and watering and
then disposing of all surplus excavated earth as directed with in all leads
lifts and as per directions of the Engineer-incharge

3 Providing and laying cement concrete 1:6:12(1cement:6sand:12 graded 9.24


stone agg.40mm nominal size)and curing complete excluding the cost of
centring shuttering in foundation & plinth including all leads lifts and
carriage of material and as per the directions of Engineer-in-charge.

4 Random rubble masonary /Poly rubble masonary (uncoursed/brought to 74.74


coursed) with hard stone of approved quality in foundation and plinth including
levelling up with cement concrete 1:6.12(1cement:6sand:12 graded stone agg.
20mm nominal size)in cement mortor 1:6 (1 Cement: 6 sand ) in breast wall &
Retaining walls including all leads lifts and carriage of material and as per the
directions of Engineer-in-charge.

TERMS AND CONDITIONS.

The work shall be executed as per IPH/PWD specification and instructions of the
1 Engineer-in-charge.
Security,Sale tax & Income tax shall be deducted as per rules.
2
Cement shall be issued @ Rs.315/- per bag & steel @ 53/- per Kg. from IPH store
3 Bhatanwali Paonta Sahib.
Royality certificate in respect of stone agg. Sand etc. shall be produced by the
4 contractor
5 The watch & ward of the store by the contractor.
Estimated Cost :-Rs.97675/-
stt.Sirmour(HP) Earnest Money :-Rs.2000/-
Time:- Two months.
Rate Unit Amount
Cum 59.55 P/Cum 2956.00

Cum. 92.75 Per Cum. 1489.00

Cum 905.10 P/Cum 8363.00

Cum 1135.50 P/Cum 84867.00

Total: ###

Assistant Engineer,
I&PH Sub Division
Kaffota.
REVISED SCHEDULE OF QUANTITY Estimated cost Rs 63130/-
Name of work:-R/M of GWSS Kuffer Panyali GP Banour in Tehsil Paonta Sahib Distt. Sirmour (HP) Earnest money Rs.1300-
(SH:-C/o RCC Raw Water Tank). Time:- Three months.
Sr.No. Description. Qty. Rate Unit Amount.
1 2 3 4 5 6
1 Demolition /dismentalling above ground level upto floor two level including disposal of 0.71 Cum. 900.00 P/Cum 639.00
unserviceable materials, stacking serviceable materials and cutting the necessary
reinforcement and separating out from RCC/RB work , RCC work complete in all respects
and as per direction of the Engineer-in-charge.

2 Excavation in foundation and trenches etc.in earth work in all kinds of soil such as pick work 6.85 Cum. P/Cum 0.00
,jumper work decomposed conglomerate saturated soil soft and hard rock upto all leads lifts
stacking the excavated soil not more than 3mtr.clear from the edge of excavation and then
returning the stacked soil in 15cm layers when required in to plinth sides of foundation etc.
consolidating each deposited layers by ramming and watering and then disposing of all surplus
excavated earth as directed with in all leads lifts and as per directions of the Engineer-incharge

3 Providing and laying cement concrete 1:4:8(1cement:4sand:8 graded stone agg.40mm nominal 1.26 Cum P/Cum 0.00
size)and curing complete excluding the cost of form work in foundation & plinth including all
leads lifts and carriage of material and as per the directions of Engineer-in-charge.

4 Providing and laying cement concrete work 1:1 1/2:3 (1cement:1 1/2 sand: 3 graded stone agg.
20mm nominal size & curing complete) excluding cost of form workand reinforcement for RCC
work including all leads lifts complete and carriage of material etc. as per directions of Engineer
incharge.

i) In foundation and Plinth 0.95 Cum. P/Cum. 0.00


ii) In vertical walls any thickness but not less than 0.10 Metres. 2.60 Cum. P/Cum. 0.00
4 Providing and laying cement concrete 1:2:4(1cement:2app.sand: 4 app. graded stone agg. 20mm 0.84 Cum P/Cum 0.00
nominal size )and curing complete excluding cost of form work & reinforcement for reinforced
work in suspended floors, roofs landing shelves and their supports balconies, beams, girders
bressumers and cantilivers upto to floor two level in all height and depth, including all leads lifts
and carriage of material at site and as per direction of the Engineer-incharge.
5 Providing form work with steel sheets 3.15mm thick welded with angle iron 30x30x5 mm so as to
give rough finish i/c centring shuttering structing and propping etc. with wooden bettens &
Ballies, height or propping & centering below supporting floor to ceiling not exceeding 4 mtr.and
removal of the same for insitu RCC work and PCC work.including all leads lifts and carriage of
material at site & as per direction of Engineer in charge in:-

a) Flat surfaces such as soffits of suspended floor roofs landing and like upto 200mm in thickness. 4.63 Sqm. P/Sqm. 0.00

ii) In vertical walls any thickness but not less than 0.10 Metres. 26.34 Sqm. P/Sqm. 0.00
6 Providing and laying cement concrete 1:2:4(1cement:2app.sand: 4 app. graded stone agg. 20mm 0.84 Cum P/Cum 0.00
nominal size )and curing complete excluding cost of form work & reinforcement for reinforced
work in suspended floors, roofs landing shelves and their supports balconies, beams, girders
bressumers and cantilivers upto to floor two level in all height and depth, including all leads lifts
and carriage of material at site and as per direction of the Engineer-incharge.

7 Providing Mild Steel/Tor steel reinforcement including bending binding & placing in positing I/c 257.00 Kg. P/kg 0.00
all leads lifts and carriage of material and as per direction of the Engineer-in-charge.

8 Laying and jointing of GI Pipe for scour pipe & outlet pipe 32mm dia complete in all respect and as 6.00 Rmt. Per Rmt. 0.00
per direction of the Engineer-in-charge.

9 Excavation in drains & channel etc.in earth work in all kinds of soil such as pick work ,jumper 382.50 Cum P/Cum 0.00
work blasting work, decomposed conglomerate saturated soil soft and hard rock including
dressing of sides and beds and prepareation of sub grade to level or slope including refilling the
trenches and disposing of surplus earth upto all leads,lifts disposed earth to be levelled and neatly
dressed including jungle clearance and as per directions of the Engineer-incharge

10 Laying and jointing of GMS Pipes of various dia in trenches (earth work in trenches to be 0.00
measured and paid for seperately) including all leads lifts and carriage of material at site as per
direction of Engineer-in-charge of following dias.

i)15mm dia 540 Rmt P/Rmt. 0.00


ii) 20mm dia. 300 Rmt P/Rmt. 0.00
iii) 25mm dia. 710 Rmt P/Rmt. 0.00
iv) 32mm dia. 150 Rmt P/Rmt. 0.00
11 Providing and fixing peet valve of superior quanlity of following dia complete in all respect and as 0.00
per direction of the Engineer-in-charge.
i) 15mm dia. 1 No. Each. 0.00
ii) 20mm dia. 1 No. Each. 0.00
Total: 639.00
TERMS AND CONDITIONS:-
1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-
charge.

2 Security,Sale tax & Income tax shall be deducted as per rules.


3 Cement will be issued @ 250/- per bag & steel @ 41/- per Kg. at IPH store Bhatanwali Paonta
Sahib.
4 Empty cement bags shall be returned to the deptt. Otherwise Rs. 2/- per bag shall be deducted
from the earch bill of the contractor.
5 Royality certificate in respect of stone agg. Sand etc. shall be produced by the contractor
7 GI Pipe shall be issued free of cost from IPH Store Bhatanwali.
8 GI Fitting shall be provided by the contractor. Assistant
Engineer,
I&PH Sub Division, Kaffota.
REVISED SCHEDULE OF QUANTITY Estimated cost Rs 62961/-
Name of work:-C/o LWSS Patlion in Tehsil Paonta Sahib Distt. Sirmour (HP) Earnest money Rs.1260/-
(SH:-Laying & jointing of GI pipe in distribution system for Jat Basti) Time:- One month.
Sr.No. Description. Qty. Rate Unit Amount.
1 2 3 4 5 6
1 Excavation in drains & channel etc.in earth work in all kinds of soil such as pick work ,jumper 286.78 Cum 160.00 P/Cum 45885.00
work blasting work, decomposed conglomerate saturated soil soft and hard rock including
dressing of sides and beds and prepareation of sub grade to level or slope including refilling the
trenches and disposing of surplus earth upto all leads,lifts disposed earth to be levelled and neatly
dressed including jungle clearance and as per directions of the Engineer-incharge

2 Laying and jointing of GMS Pipes of various dia in trenches (earth work in trenches to be
measured and paid for seperately) including all leads lifts and carriage of material at site as per
direction of Engineer-in-charge of following dias.

i)32mm dia 120 Rmt 20.00 P/Rmt. 2400.00


ii) 50mm dia. 545 Rmt 30.00 P/Rmt. 16350.00
3 Providing and fixing peet valve of superior quanlity of following dia complete in all respect and as
per direction of the Engineer-in-charge.

i) 32mm dia. 1 No. 950.00 Each. 950.00

ii) 50mm dia. 1 No. 1250.00 Each. 1250.00


Total: 66835.00

TERMS AND CONDITIONS:-


1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 GI Pipe shall be issued free of cost from IPH Store Bhatanwali.
4 GI Fitting shall be provided by the contractor. Executive Engineer,
I&PH Division,
Paonta Sahib.
REVISED SCHEDULE OF QUANTITY Estimated Cost :-Rs.97130/-
Name of work: R/M of Various schemes under IPH Sub Division Shillai Distt. Sirmour (HP) Earnest Money :-Rs.1860/-
(SH: Providing and supplying of Ratched Die set Pipe Wrench and Gate valves of various dia)Section Timbi) Time:- One month
S.No Description Qty. Rate Unit
1 2 3 4 5
1 Providing and supplying of Ratched pipe threader set of following size ISI marked and of
standard make i.e. INDER/SHAKTIMAN/JHALANI incluuding all leads lifts and carriage of
material at site and as per direction of Engineer-in-charge.

i)Size 15mm to 25mm. 5 Set 3200.00 P/Set


ii)Size 32mm to 50mm. 5 Set 5600.00 P/Set
iii)Size 65mm to 80mm. 3 Set 7500.00 P/Set
2 Providing & supplying Pipe Wrench of following sizes confirming to IS 1879 in the various
schemes as perattached for repair of damaged distribution/Main G.I.Pipe lines including all
leads,lifts and carriage of material as per direction of the Engineer-in-charge.

i) 18" 15 Nos. 610.00 Each


ii) 24" 10 Nos. 980.00 Each
iii) 36" 8 Nos. 1210.00 Each
iv) 48" 5 Nos. 2500.00 Each
3 Providing and supplying of Gun Metal Peet valves of following sizes of damaged /Non functional
valves in various schemes including all leads,lifts and carriage of material as per direction of
Engineer-in-charge.
i) 15mm dia. 50 Nos. 350.00 Each.
ii) 20mm dia. 90 Nos. 420.00 Each.
iii)25mm dia . 80 Nos. 510.00 Each.
iv) 32mm dia. 55 Nos. 580.00 Each.
v) 40mm dia. 40 Nos. 1500.00 Each.
vi) 50mm dia. 30 Nos. 2100.00 Each.
TERMS AND CONDITIONS. Total:
1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 The materials will be received in good condition.
4 Nothing shall be paid for rejected material Executive Engineer,
I&PH Division,
Paonta Sahib.

Estimated Cost :-Rs.97944/-


Name of work: A/R & M/O to various LWSS/GWSS under IPH Sub Division Shillai Distt. Sirmour (HP) Earnest Money :-Rs.2000/-
(SH: Providing and supplying of Ratched Die set ,Wrench set & Tool Kit.)) Time:- One month
Unit
S.No Description Qty. Rate 5
1 2 3 4
1 Providing and supplying of Ratched pipe threader set of following size ISI marked and of P/Set
standard make i.e. INDER/SHAKTIMAN/JHALANI incluuding all leads lifts and carriage of
material at site and as per direction of Engineer-in-charge.
i)Size 15mm to 25mm. 12 Set 3200.00 P/Set
ii)Size 32mm to 50mm. 12 Set 5600.00 P/Set
iii)Size 65mm to 80mm. 6 Set 8000.00
2 Providing Wrench set of following sizes confirming to IS 1879 in the various schemes as per Each
direction of the Engineer-in-charge.
i) 10" 8 Nos. 370.00 Each
ii) 12" 8 Nos. 395.00 Each
iii) 14" 8 Nos. 490.00 Each
iv) 18" 8 Nos. 610.00 Each
v) 24" 6 Nos. 980.00 Each
vi) 36" 6 Nos. 2250.00 Each
vii) 48" 6 Nos. 4500.00 each
3 Providing and supplying of Pump house tool kit of M.S. sheet box comprising of Hexa Frame with 10 Nos 12000.00 Total:-
6 Nos blade Spanner set Double ended, Ring Spanner set, Piller, Screw driver set, Hammer 200
gms, Club Hammer 1000 gms, Chisels 3 Nos Test Pen , Pipe wrench 350mm, L-Key set, Bearing
Puller and Flat File of standard make i.e. INDER/JHALANI/TAPARIA/SHAKTIMAN MAKE
incluuding all leads lifts and carriage of material at site and as per direction of Engineer-in-
charge.

TERMS AND CONDITIONS:-


1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-
charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 The materials will be received in good condition.
4 Nothing shall be paid for rejected material Executive Engineer,
I&PH Division,
Paonta Sahib.
ed Cost :-Rs.97130/-
Money :-Rs.1860/-

Amount
6.

16000.00
28000.00
22500.00

9150.00
9800.00
9680.00
12500.00

17500.00
37800.00
40800.00
31900.00
60000.00
63000.00
358630.00
Executive Engineer,
I&PH Division,
Paonta Sahib.

ed Cost :-Rs.97944/-
Money :-Rs.2000/-

Amount
6.

38400.00

67200.00
48000.00

2960.00

3160.00
3920.00
4880.00
5880.00
13500.00
27000.00
120000.00
334900.00

Executive Engineer,
I&PH Division,
Paonta Sahib.
SCHEDULE OF QUANTITY
Name of work: Restoration of Rain damages to GWSS Shilla Lalog GP Shilla in Tehsil Paonta Sahib Distt. Sirmour (HP)
(SH:Providing laying & jointing of GI Pipe)
Sr.No. Description.
1 Excavation in drains & channel etc.in earth work in all kinds of soil such as pick work
,jumper work blasting work, decomposed conglomerate saturated soil soft and hard rock
including dressing of sides and beds and prepareation of sub grade to level or slope
including refilling the trenches and disposing of surplus earth upto all leads,lifts disposed
earth to be levelled and neatly dressed including jungle clearance and as per directions of
the Engineer-incharge

2 Laying and jointing of GMS Pipes of various dia in trenches (earth work in trenches to be
measured and paid for seperately) including all leads lifts and carriage of material at site
as per direction of Engineer-in-charge of following dias.
i) 15mm dia.
ii) 20mm dia

TERMS AND CONDITIONS:-


1 The work shall be executed as per IPH/PWD specification and instructions of the
Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 GI Pipe shall be issued free of cost from IPH Store Bhatanwali.
4 GI Fitting shall be provided by the contractor.
5 In addition to normal security 5% will be withheld for want of test of pipes against leakages.

SCHEDULE OF QUANTITY
Name of work: Providing LWSS to PC habitation CV Kando in GP Dugana in Tehsil Paonta Sahib Distt. Sirmour (HP)
(SH:laying & jointing of GI Pipe Extension to Shilon)
Sr.No. Description.
1 Excavation in drains & channel etc.in earth work in all kinds of soil such as pick work
,jumper work blasting work, decomposed conglomerate saturated soil soft and hard rock
including dressing of sides and beds and prepareation of sub grade to level or slope
including refilling the trenches and disposing of surplus earth upto all leads,lifts disposed
earth to be levelled and neatly dressed including jungle clearance and as per directions of
the Engineer-incharge

2 Laying and jointing of GMS Pipes of various dia in trenches (earth work in trenches to be
measured and paid for seperately) including all leads lifts and carriage of material at site
as per direction of Engineer-in-charge of following dias.
i) 15mm dia.
TERMS AND CONDITIONS:-
1 The work shall be executed as per IPH/PWD specification and instructions of the
Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 GI Pipe shall be issued free of cost from IPH Store Bhatanwali.
4 GI Fitting shall be provided by the contractor.
5 In addition to normal security 5% will be withheld for want of test of pipes against leakages.
Estimated cost Rs 34474/-
a Sahib Distt. Sirmour (HP) Earnest money Rs.700/-
Time:- Two Months
Qty. Rate. Unit Amount.
441.00 Cum P/Cum

840 Rmt. P/Rmt.


1120 Rmt. P/Rmt.
Total:

Assistant Engineer,
es against leakages. I&PH Sub Division,
Kaffota.

Estimated cost Rs 34474/-


ahib Distt. Sirmour (HP) Earnest money Rs.700/-
Time:- Two Months
Qty. Rate. Unit Amount.
202.50 Cum 75.95 P/Cum 15380.00

1500 Rmt. 0.50 P/Rmt. 750.00


Total:

Assistant Engineer,
es against leakages. I&PH Sub Division,
REVISED SCHEDULE OF QUANTITY Estimated cost Rs 1
Name of work: Aug. of LWSS Harizan Basti Palhori in Tehsil Paonta Sahib Distt. Sirmour (HP) Earnest money Rs.2
(SH: Laying & jointing of Various dia pipe line & C/o RCC Storage Tank 18500 Litrs . ) Part-Ist. Time:- Three Month
Sr.No. Description. Qty. Rate
1 Excavation in drains & channel etc.in earth work in all kinds of soil 982.58 Cum 155.00
such as pick work ,jumper work blasting work, decomposed
conglomerate saturated soil soft and hard rock including dressing
of sides and beds and prepareation of sub grade to level or slope
including refilling the trenches and disposing of surplus earth upto
all leads,lifts disposed earth to be levelled and neatly dressed
including jungle clearance and as per directions of the Engineer-
incharge

2 Laying and jointing of GMS Pipes of various dia in trenches (earth


work in trenches to be measured and paid for seperately) including
all leads lifts and carriage of material at site as per direction of
Engineer-in-charge of following dias.

i)20mm dia 915 Rmt 10.00


ii) 25mm dia. 297 Rmt 14.00
iii) 40mm dia. 1170 Rmt 19.00
3 Providing and fixing peet valve with wheel of superior quality of the
following dia meter complete in all respect and as per direction of
the Engineer-in-charge.
i)20mm dia 5 Nos. 340.00
ii) 25mm dia. 1 Nos. 445.00
iii) 40mm dia. 1 Nos. 700.00
4 Providing and fixing of G.I.Union superior quality of the following
dia meter complete in all respect and as per direction of the
Engineer-in-charge.
i)20mm dia 11 Nos. 80.00
ii) 25mm dia. 4 Nos. 120.00
iii) 40mm dia. 14 Nos. 190.00
5 Excavation in foundation and trenches etc.in earth work in all kinds 36.96 Cum 155.00
of soil such as pick work ,jumper work decomposed conglomerate
saturated soil soft and hard rock upto all leads lifts stacking the
excavated soil not more than 3mtr.clear from the edge of excavation
and then returning the stacked soil in 15cm layers when required in
to plinth sides of foundation etc. consolidating each deposited
layers by ramming and watering and then disposing of all surplus
excavated earth as directed with in all leads lifts and as per
directions of the Engineer-incharge

6 Providing and laying cement concrete 1:4:8(1cement:4sand:8 2.46 Cum 4000


graded stone agg.40mm nominal size)and curing complete
excluding the cost of form work in foundation & plinth including all
leads lifts and carriage of material and as per the directions of
Engineer-in-charge.
7 Providing and laying cement concrete work 1:1 1/2:3 (1cement:1
1/2 sand: 3 graded stone agg. 20mm nominal size & curing
complete) excluding cost of form work in all height and depth
including all leads lifts complete and carriage of material etc. as per
directions of Engineer incharge.

a) In foundation and plinth 2.11 Cum. 5500.00

b) Vertical surface such as wall any thickness. 7.01 Cum. 5600.00

8 Providing form work with steel sheets 3.15mm thick welded with
angle iron 30x30x5 mm so as to give rough finish i/c centring
shuttering structing and propping etc. with wooden bettens &
Ballies, height or propping & centering below supporting floor to
ceiling not exceeding 4 mtr.and removal of the same for insitu RCC
work and PCC work.including all leads lifts and carriage of material
at site & as per direction of Engineer in charge in:-

a) Flat surfaces. 1.73 Sqm. 290.00


b) Vertical surface such as wall any thickness. 6.61 Sqm. 200.00

9 Providing and laying cement concrete 1:2:4(1cement:2app.sand: 4 1.77 Cum 5200.00


app. graded stone agg. 20mm nominal size )and curing complete
excluding cost of form work & reinforcement for reinforced work in
suspended floors, roofs landing shelves and their supports
balconies, beams, girders bressumers and cantilivers upto to floor
two level in all height and depth, including all leads lifts and
carriage of material at site and as per direction of the Engineer-
incharge.

10 Providing Mild Steel/Tor steel reinforcement including bending 1089.00 Kg. 64.00
binding & placing in positing I/c all leads lifts and carriage of
material and as per direction of the Engineer-in-charge.

TERMS AND CONDITIONS:-


1 The work shall be executed as per IPH/PWD specification and
instructions of the Engineer-in-charge.

2 Security,Sale tax & Income tax shall be deducted as per rules.

3 Cement will be issued @ 250/- per bag & steel @ 41/- per Kg. at
IPH store Bhatanwali Paonta Sahib.

4 Empty cement bags shall be returned to the deptt. Otherwise Rs.


2/- per bag shall be deducted from the each bill of the contractor.
Executive Engineer,
5 Royality certificate in respect of stone agg. Sand etc. shall be
produced by the contractor I&PH Division, Paonta S
6 GI Pipe shall be issued free of cost from IPH Store Bhatanwali.
7 GI Fitting shall be provided by the contractor.
Estimated cost Rs 136271/-
Earnest money Rs.2730/-
Time:- Three Months
Unit Amount.
P/Cum ###

P/Rmt. 9150.00
P/Rmt. 4158.00
P/Rmt. 22230.00

Each. 1700.00
Each. 445.00
Each. 700.00

Each. 880.00
Each. 480.00
Each. 2660.00
P/Cum 5729.00

P/Cum 9840.00
P/Cum. 11605.00

P/Cum. 39256.00

P/Sqm. 502.00
P/Cum 1322.00

P/Cum 9204.00

P/kg 69696.00

Total: ###

Executive Engineer,

I&PH Division, Paonta Sahib.


REVISED SCHEDULE OF QUANTITY
Name of work: R/M of LWSS Melion Naya Gaon in Tehsil Paonta Sahib Distt. Sirmour(HP)
(SH:- Rewinding & Repair of 15 HP Submersible Pumping set ).
Sr.No. Item of work. Qty.
1 2 3
MOTOR.
1 Rewinding & repair of 15 HP Submersible motor with superior enamelled 1
PVC insulated winding wire finolex make complete in all respect.

2 Providing and fixing Gun Metal thrust plate 1

3 Providing and fixing Upper & lower housing bush. 2

4 Repair and balancing of rotor shaft S.S. 1

5 Providing Cable connection compound & water proofing tap. 1

PUMP.
6 Repair & reconditioning of G.M.impellers. 6

7 Providing and fixing neckrings.. 8

8 Repair of difusers. 8

9 Providing and fixing G.M.Pump discharge bush. 8


10 Providing and fixing Nut & bolts. 8
11 Providing and fixing Packing sheets. 24

12/ Providing and fixing coupling Key. 1

11 Carriage of Pumping machinery from site to workshop and back to site 1


complete fitting etc.

2% rebate on all over the amount.

TERMS AND CONDITIONS:-


1 The work shall be done as per IPH/PWD specifications and instructions of
the Engineer-in-charge..
2 10% Security,2 % Sale tax & 2% Income tax shall be deducted as per rules.

3 Payment will be made after completion of work.


4 The repair will be guaranteed for six months.
5 Nothing shall be paid for rejected material
REVISED SCHEDULE OF QUANTITY
Name of work: R/M of LWSS Melion Naya Gaon in Tehsil Paonta Sahib Distt. Sirmour(HP)
(SH:- Supplying & fixing of Submersible cable 6mm2 & Sluice valve 80mm dia Kirloskar make. )
Sr.No. Item of work. Qty.
1 2 3

1 Providing & laying copper PVC insulated 3 core armoured


(Submersible ) power cable ( One cable carrying all the three phases) of
suitable size and capacity to motor and all other electricalal equipment
as per IS- 1554 (P-1) 1988 or latest with upto date ammendments of
finolex L&T Gloastar , JEC, ICS Natural , Grandly capital make and of
following sizes a including carriage labour other material complete in all
respect as per direction of Engineer-in-Charge.

i) 6mm2 45
2 Providing and fixing of Kirloskar make of Sluice valve nominal delivery side
of Pump and capable of withstanding nominal seaty pressure as BSI/API-
standard with upto date ammendments for delivery line of Pump as per
direction of the Engineer-in-charge.

i) 80mm dia. 2
3 Carriage of material and fixing at site complete in all respect . 1

TERMS AND CONDITIONS:-


1 The work shall be done as per IPH/PWD specifications and instructions
of the Engineer-in-chrge..
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Payment will be made after successful testing of work.
4 Nothing shall be paid for rejectrd materials.
Estimated cost Rs.18823/-
irmour(HP) Earnest Money: Rs.400/-
Time:- 15 days
Rate. Unit. Amount.
4 5 6

job. 9000.00 Per job. 9000.00

job. 750.00 P/job. 750.00

Nos. 450.00 Each. 900.00

job. 700.00 P/job. 700.00

job. 300.00 P/job. 300.00

Nos. 300.00 Each. 1800.00

Nos. 250.00 Each. 2000.00

Nos. 250.00 Each. 2000.00

Nos. 250.00 Each. 2000.00


Kg. 90.00 Per Kg. 720.00
Nos. 50.00 Each. 1200.00

No. 120.00 Each. 120.00

job. 1200.00 P/job. 1200.00

Total:- ###
(-) 541.00
Total:- ###

Executive Engineer,
I&PH Division,
Paonta Sahib.

Estimated cost Rs.22348/-


irmour(HP) Earnest Money: Rs.500/-
Kirloskar make. ) Time:- 15 days
Rate. Unit. Amount.
4 5 6

Mtr 450.00 P/mtr. ###

Nos. 3500.00 Each. 7000.00


job. 200.00 Each. 200.00

Total:- ###

Executive Engineer,
I&PH Division,
Paonta Sahib (HP)
DRAFT SCHEDULE OF QUANTITY Estimated cost Rs 34512/-
Name of work:- R/M of LWSS to Tatiana to Shiv Guffa at Kimulani GP Tatiana in Tehsil Paonta Sahib Distt. Sirmour (HP)Earnest money Rs.700/-
(SH:-C/o RCCcollection tank, laying & jointing of GI Pipes) Time:- Three months.
Sr.No. Description. Qty. Rate. Unit Amount.
1 2 3 4 5 6
1 Excavation in foundation and trenches etc.in earth work in all kinds of soil such as pick 6.85 Cum. 92.85 P/Cum 636.00
work ,jumper work decomposed conglomerate saturated soil soft and hard rock upto all
leads lifts stacking the excavated soil not more than 3mtr.clear from the edge of
excavation and then returning the stacked soil in 15cm layers when required in to plinth
sides of foundation etc. consolidating each deposited layers by ramming and watering and
then disposing of all surplus excavated earth as directed with in all leads lifts and as per
directions of the Engineer-incharge

2 Providing and laying cement concrete 1:4:8(1cement:4sand:8 graded stone agg.40mm 1.26 Cum 1104.8 P/Cum 1392.00
nominal size)and curing complete excluding the cost of form work in foundation & plinth
including all leads lifts and carriage of material and as per the directions of Engineer-in-
charge.

3 Providing and laying cement concrete work 1:1 1/2:3 (1cement:1 1/2 sand: 3 graded
stone agg. 20mm nominal size & curing complete) excluding cost of form workand
reinforcement for RCC work including all leads lifts complete and carriage of material
etc. as per directions of Engineer incharge.

i) In foundation and Plinth 1.28 Cum. 1866.80 P/Cum. 2390.00

ii) In vertical walls any thickness but not less than 0.10 Metres. 2.52 Cum. 1923.00 P/Cum. 4846.00

4 Providing form work with steel sheets 3.15mm thick welded with angle iron 30x30x5 mm
so as to give rough finish i/c centring shuttering structing and propping etc. with wooden
bettens & Ballies, height or propping & centering below supporting floor to ceiling not
exceeding 4 mtr.and removal of the same for insitu RCC work and PCC work.including all
leads lifts and carriage of material at site & as per direction of Engineer in charge in:-

a) Flat surfaces such as soffits of suspended floor roofs landing and like upto 200mm in 4.89 Sqm. 134.10 P/Sqm. 656.00
thickness.
ii) In vertical walls any thickness but not less than 0.10 Metres. 33.54 Sqm. 80.70 P/Sqm. 2707.00

5 Providing and laying cement concrete 1:2:4(1cement:2app.sand: 4 app. graded stone agg. 0.60 Cum 1658.90 P/Cum 995.00
20mm nominal size )and curing complete excluding cost of form work & reinforcement
for reinforced work in suspended floors, roofs landing shelves and their supports
balconies, beams, girders bressumers and cantilivers upto to floor two level in all height
and depth, including all leads lifts and carriage of material at site and as per direction of
the Engineer-incharge.

6 Providing Mild Steel/Tor steel reinforcement including bending binding & placing in 273.32 Kg. 20.70 P/kg 5658.00
positing I/c all leads lifts and carriage of material and as per direction of the Engineer-
in-charge.
7 Excavation in drains & channel etc.in earth work in all kinds of soil such as pick work 194.56 Cum 75.95 P/Cum 14777.00
,jumper work blasting work, decomposed conglomerate saturated soil soft and hard rock
including dressing of sides and beds and prepareation of sub grade to level or slope
including refilling the trenches and disposing of surplus earth upto all leads,lifts disposed
earth to be levelled and neatly dressed including jungle clearance and as per directions of
the Engineer-incharge

8 Laying and jointing of GMS Pipes of various dia in trenches (earth work in trenches to be
measured and paid for seperately) including all leads lifts and carriage of material at site
as per direction of Engineer-in-charge of following dias.
i) 15mm dia. 910 Rmt. 0.50 P/Rmt. 455.00
Total: 34512.00
TERMS AND CONDITIONS:-
The work shall be executed as per IPH/PWD specification and instructions of the
Engineer-in-charge.
1 Security,Sale tax & Income tax shall be deducted as per rules.
2 Cement will be issued @ 315/- per bag & steel @ 53/- per Kg. at IPH store Bhatanwali
Paonta Sahib.
3 Empty cement bags shall be returned to the deptt. Otherwise Rs. 2/- per bag shall be
deducted from the earch bill of the contractor.
4 Royality certificate in respect of stone agg. Sand etc. shall be produced by the contractor

5 GI Pipe shall be issued free of cost from IPH Store Bhatanwali.


7 GI Fitting shall be provided by the contractor. Assistant
Engineer,

I&PH Sub Division, Kaffota.

REVISED SCHEDULE OF QUANTITY Estimated cost Rs 49098/-


Name of work:- R/M of GWSS to LOH of CV & GP Shilla (Sirgaon) in Tehsil Paonta Sahib Distt. Sirmour (HP) Earnest money Rs.1000/-
(SH:-C/o RCC collection tank 1 No.,C/o RCC Tank 5000 Litre Tank, laying & jointing of GI Pipes) Time:- Three months.
Sr.No. Description. Qty. Rate. Unit Amount.
1 2 3 4 5 6
1 Excavation in foundation and trenches etc.in earth work in all kinds of soil such as pick 10.39 Cum. 155.00 P/Cum 1610.00
work ,jumper work decomposed conglomerate saturated soil soft and hard rock upto all
leads lifts stacking the excavated soil not more than 3mtr.clear from the edge of
excavation and then returning the stacked soil in 15cm layers when required in to plinth
sides of foundation etc. consolidating each deposited layers by ramming and watering and
then disposing of all surplus excavated earth as directed with in all leads lifts and as per
directions of the Engineer-incharge

2 Providing and laying cement concrete 1:4:8(1cement:4sand:8 graded stone agg.40mm 1.14 Cum 3300.00 P/Cum 3762.00
nominal size)and curing complete excluding the cost of form work in foundation & plinth
including all leads lifts and carriage of material and as per the directions of Engineer-in-
charge.

3 Providing and laying cement concrete work 1:1 1/2:3 (1cement:1 1/2 sand: 3 graded
stone agg. 20mm nominal size & curing complete) excluding cost of form workand
reinforcement for RCC work including all leads lifts complete and carriage of material
etc. as per directions of Engineer incharge.

i) In foundation and Plinth 1.28 Cum. 4900.00 P/Cum. 6272.00


ii) In vertical walls any thickness but not less than 0.10 Metres. 2.52 Cum. 5000.00 P/Cum. 12600.00
4 Providing form work with steel sheets 3.15mm thick welded with angle iron 30x30x5 mm
so as to give rough finish i/c centring shuttering structing and propping etc. with wooden
bettens & Ballies, height or propping & centering below supporting floor to ceiling not
exceeding 4 mtr.and removal of the same for insitu RCC work and PCC work.including all
leads lifts and carriage of material at site & as per direction of Engineer in charge in:-

a) Flat surfaces such as soffits of suspended floor roofs landing and like upto 200mm in 4.20 Sqm. 300.00 P/Sqm. 1260.00
thickness.
ii) In vertical walls any thickness but not less than 0.10 Metres. 40.74 Sqm. 200.00 P/Sqm. 8148.00
5 Providing and laying cement concrete 1:2:4(1cement:2app.sand: 4 app. graded stone agg. 0.82 Cum 4500.00 P/Cum 3690.00
20mm nominal size )and curing complete excluding cost of form work & reinforcement
for reinforced work in suspended floors, roofs landing shelves and their supports
balconies, beams, girders bressumers and cantilivers upto to floor two level in all height
and depth, including all leads lifts and carriage of material at site and as per direction of
the Engineer-incharge.

6 Providing Mild Steel/Tor steel reinforcement including bending binding & placing in 282.20 Kg. 64.00 P/kg 18061.00
positing I/c all leads lifts and carriage of material and as per direction of the Engineer-
in-charge.
7 Excavation in drains & channel etc.in earth work in all kinds of soil such as pick work 364.50 Cum 155.00 P/Cum 56498.00
,jumper work blasting work, decomposed conglomerate saturated soil soft and hard rock
including dressing of sides and beds and prepareation of sub grade to level or slope
including refilling the trenches and disposing of surplus earth upto all leads,lifts disposed
earth to be levelled and neatly dressed including jungle clearance and as per directions of
the Engineer-incharge

8 Laying and jointing of GMS Pipes of various dia in trenches (earth work in trenches to be
measured and paid for seperately) including all leads lifts and carriage of material at site
as per direction of Engineer-in-charge of following dias.

i) 20mm dia. 1800 Rmt. 9.00 P/Rmt. 16200.00


Total: 128101.00
TERMS AND CONDITIONS:-
The work shall be executed as per IPH/PWD specification and instructions of the
1 Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Cement will be issued @ 315/- per bag & steel @ 53/- per Kg. at IPH store Bhatanwali
Paonta Sahib.
4 Empty cement bags shall be returned to the deptt. Otherwise Rs. 2/- per bag shall be
deducted from the earch bill of the contractor.
5 Royality certificate in respect of stone agg. Sand etc. shall be produced by the contractor

Executive Engineer,

I&PH Division,
Paonta Sahib.
0
Name of work :Restoration of Rain damages to IPH/Giri irrigation Sub Division office Building Majra in Tehsil Paonta
Distt. Sirmour (HP) (SH: Providing laying 80mm thick heavy precast CC interlocking paver)

S.No
1

2
3
4

6
DRAFT SCHEDULE OF QUANTITY
Name of work :Restoration of Rain damages to IPH/Giri irrigation Sub Division office Building Majra in Tehsil Paonta Sahib
Distt. Sirmour (HP) (SH: Providing laying 80mm thick heavy precast CC interlocking paver)

Sub-Head and item of work.


Providing and laying cement concrete 1:6:12(1cement:6sand:12 graded stone agg.40mm
nominal size)and curing complete excluding the cost of centring shuttering in foundation &
plinth including all leads lifts and carriage of material and as per the directions of Engineer-
in-charge.

Providing and laying 80mm thick heavy duty precast cement conctete inter locking paver blocks
manufactured by the leap of Hydro vibratory machine having compressive strength of M40 as per IS
15858-2006 .The paver shall be laid in 40mm sand filling complete in all respect including all
leads,lifts and carriage of material and as per direction of the Engineer-in-charge.

Providing and laying cement concrete 1:2:4(1cement:2sand:4graded stone agg. ) 20mm nominal
size) & curing complete excluding the cost of form work in foundation & plinth and as per direction
of the Engineer-in-charge.

TERMS & CONDITIONS

The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-
charge.
Security,Sale tax & Income tax shall be deducted as per rules.
Nothing shall be paid for rejected/defective material.
Cement will be issued @ 315/- per bag & steel @ 53/- per Kg. at IPH store Bhatanwali Paonta Sahib.

Empty cement bags shall be returned to the deptt. Otherwise Rs. 2/- per bag shall be deducted from
the each bill of the contractor.
Royality certificate in respect of stone agg. Sand etc. shall be produced by the contractor
Estimated cost Rs 99325/-
Majra in Tehsil Paonta Sahib Earnest money Rs.2000/-
Time:- Three Months

Qty. Rates, Unit Amount.


15.56 Cum 905.10 P/Cum 14083.00

223.31 Sqm. 364.21 P/Sqm 81332.00

2.42 Cum 1615.90 P/Cum 3910.00

Total: ###

Assistant Engineer,
I&PH Sub Division, Majra.
REVISED SCHEDULE OF QUANTITY Estimated cost Rs 93516/-
Name of work:-Restoration of Rain damages to Nimbu Ka Khalla in Tehsil Paonta Sahib Distt. Sirmour (HP) Earnest money Rs.1900/-
(SH: C/o Retaining wall in Plum concrete ) on Right Bank of Kahlla. Time:- One Month.
S.No Sub-Head and item of work. Qty. Rates, Unit
1 2 3 4 5
1 Excavation in foundation and trenches etc.in earth work in all kinds of soil such as pick work 33.08 Cum P/Cum
,jumper work decomposed conglomerate saturated soil soft and hard rock upto all leads lifts
stacking the excavated soil not more than 3mtr.clear from the edge of excavation and then
returning the stacked soil in 15cm layers when required in to plinth sides of foundation etc.
consolidating each deposited layers by ramming and watering and then disposing of all surplus
excavated earth as directed with in all leads lifts and as per directions of the Engineer-incharge

2 Providing form work with steel sheets 3.15mm thick welded with angle iron 30x30x5
mm so as to give rough finish i/c centring shuttering structing and propping etc. with
wooden bettens & Ballies, height or propping & centering below supporting floor to
ceiling not exceeding 4 mtr.and removal of the same for insitu RCC work and PCC work
including all leads lifts and carriage of material at site & as per direction of Engineer
incharge in:-

a) Vertiocal surfaces 156.54 Sqm P/Sqm

3 Providing and laying cement concrete work 1:5:10(1cement:5 sand: 10 graded stone 76.86 Cum P/Cum
agg. 40mm nominal size) with 15% plum and curing complete excluding cost of form
work and in retaining walls/ Breast walls, the size of Plums shall usually be 150mm to
300mm as per PWD specificatioin including all leads lifts and carriage of material and as
per direction of Engineer incharge.

TERMS & CONDITIONS Total:


1 The work shall be executed as per IPH/PWD specification and instructions of the
Engineer-in-charge.
2 Security,Sale tax & Income tax & labour cess shall be deducted as per rules.
3 Royality certificate in respect of stone agg. Sand etc. shall be produced by the contractor
4 Cement shall be issued @ 250/- per Bag & Steel @ 41/- per Kg. at IPH Store Bhatanwali Paonta Sahib.
5 Empty cement bags shall be returned to the Deptt. Otherwise Rs. 2/- per bag shall deducted from the Executive Engineer
each bill of the contractor I&PH Division,
Paonta Sahib.
REVISED SCHEDULE OF QUANTITY Estimated cost Rs 45290/-
Name of work:-Restoration of Rain damages to FIS Jaithal Kog Dabra (Part Shawga) in Tehsil Paonta Sahib Earnest money Rs.1000/-
Distt. Sirmour (HP)(SH: C/o Retaining wall to protect the channel ) Time:- Three Months.
S.No Sub-Head and item of work. Qty. Rates, Unit
1 Cutting in earth work in all kind of soil and dispoal of the excavated earth upt all leads,lifts and 22.86 Cum 135.00 P/Cum
as directed by the Engineer-in-charge complete in all respect.

2 Excavation in foundation and trenches etc.in earth work in all kinds of soil such as pick work 6.74 Cum 155.00 P/Cum
,jumper work decomposed conglomerate saturated soil soft and hard rock upto all leads lifts
stacking the excavated soil not more than 3mtr.clear from the edge of excavation and then
returning the stacked soil in 15cm layers when required in to plinth sides of foundation etc.
consolidating each deposited layers by ramming and watering and then disposing of all surplus
excavated earth as directed with in all leads lifts and as per directions of the Engineer-incharge

3 Providing form work with steel sheets 3.15mm thick welded with angle iron 30x30x5
mm so as to give rough finish i/c centring shuttering structing and propping etc. with
wooden bettens & Ballies, height or propping & centering below supporting floor to
ceiling not exceeding 4 mtr.and removal of the same for insitu RCC work and PCC work
including all leads lifts and carriage of material at site & as per direction of Engineer
incharge in:-

a) Vertiocal surfaces 84.38 Sqm 200.00 P/Sqm


4 Providing and laying cement concrete work 1:5:10(1cement:5 sand: 10 graded stone 39.06 Cum 2700.00 P/Cum
agg. 40mm nominal size) with 15% plum and curing complete excluding cost of form
work and in retaining walls/ Breast walls, the size of Plums shall usually be 150mm to
300mm as per PWD specificatioin including all leads lifts and carriage of material and as
per direction of Engineer incharge.
TERMS & CONDITIONS Total:
1 The work shall be executed as per IPH/PWD specification and instructions of the
Engineer-in-charge.
2 Security,Sale tax & Income tax & labour cess shall be deducted as per rules.
3 Royality certificate in respect of stone agg. Sand etc. shall be produced by the contractor
4 Cement shall be issued @ 315/- per Bag & Steel @ 53/- per Kg. at IPH Store Bhatanwali Paonta Sahib.
5 Empty cement bags shall be returned to the Deptt. Otherwise Rs. 2/- per bag shall deducted from the Executive Engineer
each bill of the contractor I&PH Division,
Paonta Sahib.
REVISED SCHEDULE OF QUANTITY Estimated cost Rs 40788/-
Name of work:-Aug. & Imp. of WSS group of villages in GP kando Kansar ,Barthal Mandhana & Bharog Earnest money Rs.825/-
Baneri(Partly)in Tehsil Paonta Distt. Sirmour (HP)(SH: C/o Path to Pump House of 2nd stage at vill. Tanlog.) Time:- One Month.
S.No Sub-Head and item of work. Qty. Rates, Unit
1 Excavation in foundation and trenches etc.in earth work in all kinds of soil such as pick work 20.06 Cum 160.00 P/Cum
,jumper work decomposed conglomerate saturated soil soft and hard rock upto all leads lifts
stacking the excavated soil not more than 3mtr.clear from the edge of excavation and then
returning the stacked soil in 15cm layers when required in to plinth sides of foundation etc.
consolidating each deposited layers by ramming and watering and then disposing of all surplus
excavated earth as directed with in all leads lifts and as per directions of the Engineer-incharge

2 Providing form work with steel sheets 3.15mm thick welded with angle iron 30x30x5 mm so as
to give rough finish i/c centring shuttering structing and propping etc. with wooden bettens &
Ballies, height or propping & centering below supporting floor to ceiling not exceeding 4
mtr.and removal of the same for insitu RCC work and PCC work including all leads lifts and
carriage of material at site & as per direction of Engineer incharge in:-

3 a) Vertiocal surfaces 30.25 Sqm 200.00 P/Sqm


Providing and laying cement concrete work 1:5:10(1cement:5 sand: 10 graded stone agg. 40mm 8.42 Cum 3270.00 P/Cum
nominal size) with 15% plum and curing complete excluding cost of form work and in retaining
walls/ Breast walls, the size of Plums shall usually be 150mm to 300mm as per PWD
specificatioin including all leads lifts and carriage of material and as per direction of Engineer
incharge.
4 Providing boulder filling under CC flooring including all leads,lifts and carriage of material at 12.41 Cum. 635.00 P/Cum.
site complete in all respect and as per direction of the Engineer-in-charge.

5 Providing Cement concrete flooring 1:2;4 (1cement:2sand:4graded stone agg. 20mm nminal 62.05 Sqm. 260.00 P/sqm.
size0 laid in one layer finished with floating coat of neat cement 40mm thick in including all
leads,lifts and carriage of materials and as per direction of the Engineer-in-charge.

TERMS & CONDITIONS Total:


1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax & labour cess shall be deducted as per rules.
3 Royality certificate in respect of stone agg. Sand etc. shall be produced by the contractor
4 Cement shall be issued @ 315/- per Bag & Steel @ 53/- per Kg. at IPH Store Bhatanwali Paonta Sahib.
5 Empty cement bags shall be returned to the Deptt. Otherwise Rs. 2/- per bag shall deducted from the Executive Engineer
each bill of the contractor I&PH Division,
Paonta Sahib.
d cost Rs 93516/-
money Rs.1900/-
ne Month.
Amount.
6
0.00

0.00

0.00

0.00
Executive Engineer
I&PH Division,
Paonta Sahib.
d cost Rs 45290/-
money Rs.1000/-
hree Months.
Amount.
3086.00

1045.00

16876.00
105462.00
123383.00

Executive Engineer
I&PH Division,
Paonta Sahib.
cost Rs 40788/-
money Rs.825/-

Amount.
3210.00

6050.00
27533.00
7880.00

16133.00

60806.00

Executive Engineer
I&PH Division,
Paonta Sahib.
REVISED SCHEDULE OF QUANTITY Estimated cost Rs 14790/-
Name of work:-Restoration of Rain damages to various GWSS/LWSS under I&PH Sub DivisionKaffota in Earnest money Rs. 400/-
Tehsil Paonta Sahib Distt. Sirmour (HP)(SH: Prov. & supplying of GI Unions of various dias.) Time:- 7 days.
S.No Sub-Head and item of work. Qty. Rates, Unit
1 2 3 4 5
1 Providing and supplying of the GI Unions of the following sizes confirming to IS: 1879 in the
various schemes as per detail attached..

1) 15mm dia. 120 Nos. 50.00 Each.


ii) 20mm dia. 120 Nos. 80.00 Each.
iii) 25mm dia. 100 Nos. 120.00 Each.
iv) 32mm dia. 100 Nos. 180.00 Each.

TERMS & CONDITIONS Total:


1 The work shall be executed as per IPH/PWD specification and instructions of the
Engineer-in-charge.
2 Security,Sale tax & Income tax & labour cess shall be deducted as per rules.

Executive Engineer,
I&PH Division,
Paonta Sahib.

REVISED SCHEDULE OF QUANTITY Estimated cost Rs 84295/-


Name of work:-R/M of various LWSS under IPH Sub Division Paonta Sahib (Section Rajban) in Tehsil Paonta Earnest money Rs. 1686/-
Sahib Distt. Sirmour (HP) (SH: Prov. & supplying of Gate Valve of various dia.) Time:- 15 Days.
S.No Sub-Head and item of work. Qty. Rates, Unit
1 2 3 4 5
1 Providing and supply of Gate Valve /Brass full way valve of superior quality of the following
dia complete in all respect including all leads,lifts and carriage of material at site and as per
direction of the Engineer-in-chrge.
1) 20mm dia. 15 Nos. 420.00 Each.
ii) 25mm dia. 25 Nos. 550.00 Each.
iii) 32mm dia. 25 Nos. 650.00 Each.
iv) 40mm dia. 20 Nos. 1100.00 Each.
v) 50mm dia. 15 Nos. 1600.00 Each.
vi) 65mm dia. 10 Nos. 2800.00 Each.
vii) 80mm dia. 10 Nos. 3600.00 Each.
TERMS & CONDITIONS Total:
1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax & labour cess shall be deducted as per rules.
3 The material will be received in good condition.
4 Credit for old dismentalled matrial shall be given by the contractor.
Executive Engineer,
I&PH Division,
Paonta Sahib.
REVISED SCHEDULE OF QUANTITY Estimated cost Rs 79850/-
Name of work:-R/M of various LWSS under IPH Sub Division Paonta Sahib (Section Rajban)in Tehsil Paonta Sahib Di
Earnest money Rs. 1600/-
Sirmour (HP) (SH: Prov. & supplying of G.I.Unions of various dia.) Time:- 15 Days.
S.No Sub-Head and item of work. Qty. Rates, Unit
1 2 3 4 5
1 Providing and supply of G.I. Unions of the following sizes confirming to IS 1879 complete in
all respect including all leads,lifts and carriage of material at site and as per direction of the
Engineer-in-chrge.
1) 20mm dia. 105 Nos. 100.00 Each.
ii) 25mm dia. 100 Nos. 125.00 Each.
iii) 32mm dia. 115 Nos. 175.00 Each.
iv) 40mm dia. 110 Nos. 300.00 Each.
v) 50mm dia. 105 Nos. 320.00 Each.
vi) 65mm dia. 100 Nos. 520.00 Each.
vii) 80mm dia. 100 Nos. 820.00 Each.
TERMS & CONDITIONS Total:
1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax & labour cess shall be deducted as per rules.
3 The material will be received in good condition.
4 Nothing shall be paid for rejected material.
Executive Engineer,
I&PH Division,
Paonta Sahib.
d cost Rs 14790/-
money Rs. 400/-

Amount.
6

6000.00
9600.00
12000.00
18000.00

45600.00

e Engineer,

d cost Rs 84295/-
money Rs. 1686/-

Amount.
6
6300.00
13750.00
16250.00
22000.00
24000.00
28000.00
36000.00
146300.00

e Engineer,
d cost Rs 79850/-
money Rs. 1600/-

Amount.
6

10500.00
12500.00
20125.00
33000.00
33600.00
52000.00
82000.00
243725.00
e Engineer,
REVISED SCHEDULE OF QUANTITY Estimated cost Rs 78565/-
Name of work: Restoration of Rain damages to FIS Maloon GP Tatiana & Shilla in Tehsil Paonta Sahib Distt.
Earnest money Rs.2000/-
Sirmour (HP) (SH:Removal of silt/slips ) Time:- Two Months
Sr.No. Description. Qty. Rate. Unit Amount.
1 Removal of silt/slips in all kind of soil including saturated soil but excluding 654.71 Cum 130.00 P/Cum 85112.00
boulders and rocky portion requiring blasting upto a distance of 20 metres
disposing of unserviceable materials stacking the serviceable materials and
neatly dressed the surface complete in all respect including all leads,lifts and
carriage of material and as per direction of the Engineer-in-charge.

Total: 85112.00
TERMS AND CONDITIONS:-
1 The work shall be executed as per IPH/PWD specification and instructions
of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Nothing shall be paid for rejected/defective work.
Executive Engineer
I&PH Division,
Paonta Sahib.
SCHEDULE OF QUANTITY Estimated cost Rs 33153/-
Name of work: FIS Fedth in GP Dugana in Tehsil Paonta Sahib Distt. Earnest money Rs.700/-
Sirmour (HP) (SH:Removal of Slips ) Time:- Three Months
Sr.No. Description. Qty. Rate. Unit Amount.
1 Removal of silt/slips in all kind of soil including saturated soil but excluding 861.15 Cum P/Cum
boulders and rocky portion requiring blasting upto a distance of 20 metres
disposing of unserviceable materials stacking the serviceable materials and
neatly dressed the surface complete in all respect including all leads,lifts and
carriage of material and as per direction of the Engineer-in-charge.

Total:
TERMS AND CONDITIONS:-
1 The work shall be executed as per IPH/PWD specification and instructions
of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Nothing shall be paid for rejected/defective work.
Assistant Engineer,
I&PH Sub Division,
Kaffota.
REVISED SCHEDULE OF QUANTITY Estimated cost Rs 44264/-
Name of work: Imp. of Left Bank Canal at RD 0/0 to 24/0 Km in Tehsil Paonta Sahib Distt. Earnest money Rs.885/-
Sirmour (HP) (SH: Desilting of Left Bank Canal at RD 5200 to 6900 Mtrs.) Time:- Three Months
Sr.No. Description. Qty. Rate. Unit Amount.
1 Removal of silt/slips in all kind of soil including saturated soil but excluding 1137.90 Cum 130.00 P/Cum 147927.00
boulders and rocky portion requiring blasting upto a distance of 20 metres
disposing of unserviceable materials stacking the serviceable materials and
neatly dressed the surface complete in all respect including all leads,lifts and
carriage of material and as per direction of the Engineer-in-charge.

Total: 147927.00
TERMS AND CONDITIONS:-
1 The work shall be executed as per IPH/PWD specification and instructions
of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Nothing shall be paid for rejected/defective work.
Executive Engineer,
I&PH Division,
Paonta Sahib.
REVISED SCHEDULE OF QUANTITY Estimated cost Rs 44264/-
Name of work: Imp. of Left Bank Canal at RD 0/0 to 24/0 Km in Tehsil Paonta Sahib Distt. Earnest money Rs.885/-
Sirmour (HP) (SH: Desilting of Left Bank Canal at RD 5200 to 6900 Mtrs.) Time:- Three Months
Sr.No. Description. Qty. Rate. Unit Amount.
1 Removal of silt/slips in all kind of soil including saturated soil but excluding 1137.90 Cum 130.00 P/Cum 147927.00
boulders and rocky portion requiring blasting upto a distance of 20 metres
disposing of unserviceable materials stacking the serviceable materials and
neatly dressed the surface complete in all respect including all leads,lifts and
carriage of material and as per direction of the Engineer-in-charge.

Total: 147927.00
TERMS AND CONDITIONS:-
1 The work shall be executed as per IPH/PWD specification and instructions
of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Nothing shall be paid for rejected/defective work.
Executive Engineer,
I&PH Division,
Paonta Sahib.
REVISED SCHEDULE OF QUANTITY Estimated cost Rs 48197/-
Name of work: Imp. of Left Bank Canal at RD 0/0 to 24/0 Km in Tehsil Paonta Sahib Distt. Earnest money Rs.1000/-
Sirmour (HP) (SH: Desilting of Left Bank Canal at RD 7000 to 8700 Mtrs.) Time:- 15 Days.
Sr.No. Description. Qty. Rate. Unit Amount.
1 Removal of silt/slips in all kind of soil including saturated soil but excluding 1239.00 Cum 130.00 P/Cum 161070.00
boulders and rocky portion requiring blasting upto a distance of 20 metres
disposing of unserviceable materials stacking the serviceable materials and
neatly dressed the surface complete in all respect including all leads,lifts and
carriage of material and as per direction of the Engineer-in-charge.

Total: 161070.00
TERMS AND CONDITIONS:-
1 The work shall be executed as per IPH/PWD specification and instructions
of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Nothing shall be paid for rejected/defective work.
Executive Engineer,
I&PH Division,
Paonta Sahib.
REVISED SCHEDULE OF QUANTITY
Name of Work : Providing LWSS/LIS/GWSS under I&PH Sub-Division Kaffota in Tehsil Paonta Sahib
Distt.Sirmour(HP) (SH: Writing of Sign Board, )
S.No Description Qty.
1 2 3
1 Applying priming coat new steel and other metal surface and i/c painting the 71.28
surface by throughly cleaning the oil grass dust other foreign matter and scoured
the write brushes fine steel wood scrape paper with ready mixed priming paint
brushing welded i/c all leads and lifts and carriage of material at site and as per
direction of the Engineer-in-charge.

2 Painting two coats(one priming coat) new steel and other foreign metal surface 71.28
under coat with ready mixed paint brushing to give even shade i/c cleaning the
surface all dirt dust and other foreign matter with ready mixed paint including all
leads lifts and carriage of material and as per direction of Engineer-in-charge.

3 Writing letter or figure any surface with block Japan paint stop and the like not to be
measured and paid for seperately with in all leads and lifts and carriage of material
as per direction of Engineer-in-charge.
i) 15cm height letter/figure 2500
ii) 10cm height letter/figure 2000
iii) 5cm height letter/figure 4000
iv) 2cm height letter/figure 6000

TERMS AND CONDITIONS:-


1 The work shall be executed as per IPH/PWD specification and instructions of the
Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Nothing shall be paid for rejected material
Estimated Cost Rs.73628/-
Paonta Sahib Earnest money Rs.1500/-
Time:- Three months.
Rate Unit Amount
4 5 6
Sqm 21.00 P/Sqm 1497.00

Sqm 46.00 P/Sqm 3279.00

Nos 11.00 Each 27500.00


Nos 9.00 Each 18000.00
Nos 6.00 Each 24000.00
Nos 4.00 Each 24000.00
Total:- ###

Executive
Engineer,

I&PH Division,
Paonta Sahib.
REVISED SCHEDULE OF QUANTITY Estimated cost Rs 90660/-
Name of work:- Restoration of Rain damages to T/well Bherewala Ist. in Tehsil Paonta Sahib Distt. Sirmour Earnest money Rs.1850/-
(HP) (SH:C/o Boundry wall around the Pump House ) Time:- Two Months.
S.No Sub-Head and item of work. Qty. Rates, Unit Amount.
1 2 3 4 5 6
1 Excavation in foundation and trenches etc.in earth work in all kinds of soil such as pick 7.98 Cum 155.00 P/Cum 1237.00
work ,jumper work decomposed conglomerate saturated soil soft and hard rock upto all
leads lifts stacking the excavated soil not more than 3mtr.clear from the edge of
excavation and then returning the stacked soil in 15cm layers when required in to plinth
sides of foundation etc. consolidating each deposited layers by ramming and watering
and then disposing of all surplus excavated earth as directed with in all leads lifts and as
per directions of the Engineer-incharge

2 Providing and laying cement concrete work 1:5:10(1cement:5 sand: 10 graded stone agg. 10.64 Cum 2600.00 P/Cum 27664.00
40mm nominal size) with 15% plum and curing complete excluding cost of form work
and in retaining walls/ Breast walls, the size of Plums shall usually be 150mm to 300mm
as per PWD specificatioin including all leads lifts and carriage of material and as per
direction of Engineer incharge.

3 Providing form work with steel sheets 3.15mm thick welded with angle iron 30x30x5
mm so as to give rough finish i/c centring shuttering structing and propping etc. with
wooden bettens & Ballies, height or propping & centering below supporting floor to
ceiling not exceeding 4 mtr.and removal of the same for insitu RCC work and PCC work
including all leads lifts and carriage of material at site & as per direction of Engineer
incharge in:-

a) Vertiocal surfaces 9.91 Sqm 200.00 Per Sqm 1982.00

4 Ist. Class brick work using common burnt clay building bricks in foundation and plinth in 4.88 Cum. 5300.00 Per Cum. 25864.00
cement mortar 1:6(1cement :6sand) and as directed by the Engineer-in-charge.

5 Fixing of M.S. fencing panel in Boundry wall of wire mesh 1.80x1.20 mtr., complete in all 18 Nos. 250.00 Each. 4500.00
respect and as per direction of the Engineer-in-charge.
6 Fixing of M.S. Gate complete inall respect and as per direction of the Engineer-in-charge. 1 No. 1800.00 Each. 1800.00

7 15mm thick cement plaster in single coat on rough side of brick masonary for interior 214.13 Sqm. 130.00 P/Sqm. 27837.00
plastert upto two level including arises internal rounded angles chamfers and or
rounded angles not exceeding 80mm in girth and finished even and smooth with cement
Mortar 1:4(1cement:4sand) and as directed by the Engineer-in-charge.

8 Providing and fixing of M.S grill of required pattern in pressed steel frame with MS flat 88.72 Cum. 72.00 P/Cum. 6388.00
square /round bars 10mm dia with round headed bolts and nuts or by screws plain grill
complete in all resepct and as per direction of the Engineer-in-chage.

TOTAL: 97272.00
TERMS & CONDITIONS
1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax & labour cess shall be deducted as per rules.
3 Royality certificate in respect of stone agg. Sand etc. shall be produced by the contractor
4 Cement shall be issued @ 315/- per Bag & Steel @ 53/- per Kg. at IPH Store Bhatanwali Paonta Sahib.
5 Empty cement bags shall be returned to the Deptt. Otherwise Rs. 2/- per bag shall deducted from
the bill. Executive Engineer,
6 Fencing panel shall be issued by the deptt. free of cost. I&PH Division,
Paonta Shib.
REVISED SCHEDULE OF QUANTITY Estimated cost Rs 67815/-
Name of work:- C/o LIS Bata mandi in Tehsil Paonta Sahib Distt. Sirmour (HP) (SH:C/o Retaining Earnest money Rs.1400/-
wall to protect the field channel & cultivated land of Sh.Mohan Lal & Sh.Ramesh Chand etc. Job No.1 Time:- One Month.
S.No Sub-Head and item of work. Qty. Rates, Unit Amount.
1 2 3 4 5 6
1 Excavation in foundation and trenches etc.in earth work in all kinds of soil such as pick 39.37 Cum 160.00 P/Cum 6299.00
work ,jumper work decomposed conglomerate saturated soil soft and hard rock upto all
leads lifts stacking the excavated soil not more than 3mtr.clear from the edge of
excavation and then returning the stacked soil in 15cm layers when required in to plinth
sides of foundation etc. consolidating each deposited layers by ramming and watering
and then disposing of all surplus excavated earth as directed with in all leads lifts and as
per directions of the Engineer-incharge

2 Providing and laying cement concrete work 1:5:10(1cement:5 sand: 10 graded stone agg. 51.50 Cum 2100.00 P/Cum 108150.00
40mm nominal size) with 15% plum and curing complete excluding cost of form work
and in retaining walls/ Breast walls, the size of Plums shall usually be 150mm to 300mm
as per PWD specificatioin including all leads lifts and carriage of material and as per
direction of Engineer incharge.

3 Providing form work with steel sheets 3.15mm thick welded with angle iron 30x30x5
mm so as to give rough finish i/c centring shuttering structing and propping etc. with
wooden bettens & Ballies, height or propping & centering below supporting floor to
ceiling not exceeding 4 mtr.and removal of the same for insitu RCC work and PCC work
including all leads lifts and carriage of material at site & as per direction of Engineer
incharge in:-

a) Vertiocal surfaces 198.94 Sqm 200.00 Per Sqm 39788.00

TOTAL: 154237.00
TERMS & CONDITIONS
1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax & labour cess shall be deducted as per rules.
3 Royality certificate in respect of stone agg. Sand etc. shall be produced by the contractor
4 Cement shall be issued @ 315/- per Bag & Steel @ 53/- per Kg. at IPH Store Bhatanwali Paonta Sahib.
5 Empty cement bags shall be returned to the Deptt. Otherwise Rs. 2/- per bag shall deducted from Executive Engineer,
the bill. I&PH Division,
Paonta Shib.
REVISED SCHEDULE OF QUANTITY Estimated cost Rs 62585/-
Name of work: Aug. & Imp. of WSS of group of villages in GP Kando Kansar in Tehsil Paonta Sahib Distt.Sirmour (HP) Earnest money Rs.1300/-
(SH: C/O Sub Storage tank aat village Mehat & Janglot.) Time:- One Month.
S.No Sub-Head and item of work. Qty. Rates, Unit
1 2 3 4 5
1 Excavation in foundation and trenches etc.in earth work in all kinds of soil such as pick 41.37 Cum 230.00 P/Cum
work ,jumper work decomposed conglomerate saturated soil soft and hard rock upto all
leads lifts stacking the excavated soil not more than 3mtr.clear from the edge of excavation
and then returning the stacked soil in 15cm layers when required in to plinth sides of
foundation etc. consolidating each deposited layers by ramming and watering and then
disposing of all surplus excavated earth as directed with in all leads lifts and as per
directions of the Engineer-in-charge

2 Providing and laying cement concrete 1:4:8(1cement:4sand:8 graded stone agg.40mm 3.45 Cum 6000.00 P/Cum
nominal size)and curing complete excluding the cost of form work in foundation & plinth
including all leads lifts and carriage of material and as per the directions of Engineer-in-
charge.

3 Providing and laying cement concrete work 1:1 1/2:3 (1cement:1 1/2 sand: 3 graded
stone agg. 20mm nominal size & curing complete) excluding cost of form work in
foundation & plinth in all height and depth including all leads lifts complete and carriage
of material etc. as per directions of Engineer incharge.

i) In foundation and Plinth etc. 2.47 Cum. 7950.00 P/Cum.

ii) Vertical surfaces such as walls of any thickness but not than 00.1 Mtr. Thick including 6.88 Cum. 8100.00 P/Cum.
attached pillasters buttresses plinth and string courses etc. from top of foundation upto
floor two level including all leads,lifts and carraige of ateral at site and as directed by the
Engineer-in-charge.

5 Providing and laying cement concrete 1:2:4(1cement:2app.sand: 4 app. graded stone agg. 1.97 Cum 7540.00 P/Cum
20mm nominal size )and curing complete excluding cost of form work & reinforcement for
reinforced work in suspended floors, roofs landing shelves and their supports balconies,
beams, girders bressumers and cantilivers upto to floor two level in all height and depth,
including all leads lifts and carriage of material at site and as per direction of the Engineer-
incharge.
6 Providing Mild Steel/Tor steel reinforcement including bending binding & placing in 849.00 Kg. 72.00 P/kg
positing I/c all leads lifts and carriage of material and as per direction of the Engineer-in-
charge.

7 Providing form work with steel sheets 3.15mm thick welded with angle iron 30x30x5 mm
so as to give rough finish i/c centring shuttering structing and propping etc. with wooden
bettens & Ballies, height or propping & centering below supporting floor to ceiling not
exceeding 4 mtr.and removal of the same for insitu RCC work and PCC work.including all
leads lifts and carriage of material at site & as per direction of Engineer in charge in:-

a) Vertical surface such as wall any thickness. 89.10 Sqm. 380.00 P/Sqm.
b) Flat surfaces such as soffits of suspended floor roofs landings and like upto 200mm in 13.65 Sqm. 300.00 P/Sqm.
thickness
8 Providing and fixing of cast iron manhole cover of 500mm dia internal dia (Medium) duty 2 Nos. 2000.00 Each.
the weight of manhole cover should not be less than 23 Kg. including all leads,lifts and
carriage of material complete in all respect and as per direction of the Engineer-incharge.

9 Providing and fixing of cast iron rings 200mm wide with chequered/ribbed non slip 22 Nos. 95.00 Each.
surface including fixing 200x100x100mm cement concrete 1:3:6(1cement:3sand:6graded
stone agg. 40mm nominal size) including all leads,lifts and carriage of material and as per
direction of the Engineer-in-charge.

10 Laying & jointing of sour pipe /inlet/outlet pipe including all leads,lifts and carriage of 12 Rmt. 40.00 P/Rmt.
material and as per direction of the Engineer-in-charge. 65mm dia.

TOTAL:
TERMS & CONDITIONS
1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Cement will be issued @ 315/- per bag & steel @ 53/- per Kg. at IPH store Bhatanwali Paonta Sahib.
4 Empty cement bags shall be returned to the deptt. Otherwise Rs. 2/- per bag shall be
deducted from the each bill of the contractor.
5 Royality certificate in respect of stone agg. Sand etc. shall be produced by the contractor
6 GI pipe shall be issued free of cost by the deptt. at IPHstore Bhatanwali Paonta Sahib. Executive Engineer,
7 In addition to normal security 5% will be withheld for want of testing of pipe S/tank against leakage I&PH Division,
and will be released after successful testing. Paonta Sahib.

REVISED SCHEDULE OF QUANTITY Estimated cost Rs 43893/-


Name of work: Aug. & Imp. of WSS of group of villages in GP Kando Kansar in Tehsil Paonta Sahib Distt.Sirmour (HP) Earnest money Rs.900/-
(SH: C/O Sub Storage tank at village Bharog) Time:- One Month.
S.No Sub-Head and item of work. Qty. Rates, Unit
1 2 3 4 5
1 Excavation in foundation and trenches etc.in earth work in all kinds of soil such as pick 29.28 Cum 230.00 P/Cum
work ,jumper work decomposed conglomerate saturated soil soft and hard rock upto all
leads lifts stacking the excavated soil not more than 3mtr.clear from the edge of excavation
and then returning the stacked soil in 15cm layers when required in to plinth sides of
foundation etc. consolidating each deposited layers by ramming and watering and then
disposing of all surplus excavated earth as directed with in all leads lifts and as per
directions of the Engineer-in-charge

2 Providing and laying cement concrete 1:4:8(1cement:4sand:8 graded stone agg.40mm 2.44 Cum 6000.00 P/Cum
nominal size)and curing complete excluding the cost of form work in foundation & plinth
including all leads lifts and carriage of material and as per the directions of Engineer-in-
charge.

3(a) Providing and laying cement concrete work 1:1 1/2:3 (1cement:1 1/2 sand: 3 graded
stone agg. 20mm nominal size & curing complete) excluding cost of form work in
foundation & plinth in all height and depth including all leads lifts complete and carriage
of material etc. as per directions of Engineer incharge.

i) In foundation and Plinth etc. 1.84 Cum. 7950.00 P/Cum.


3 (b) Providing and laying cement concrete work 1:1 1/2:3 (1cement:1 1/2 sand: 3 graded 4.97 Cum. 8100.00 P/Cum.
stone agg. 20mm nominal size & curing complete) excluding cost of form work in
foundation & plinth in all height and depth including all leads lifts complete and carriage
of material etc. as per directions of Engineer incharge. In walls.

4 Providing and laying cement concrete 1:2:4(1cement:2app.sand: 4 app. graded stone agg. 1.47 Cum 7540.00 P/Cum
20mm nominal size )and curing complete excluding cost of form work & reinforcement for
reinforced work in suspended floors, roofs landing shelves and their supports balconies,
beams, girders bressumers and cantilivers upto to floor two level in all height and depth,
including all leads lifts and carriage of material at site and as per direction of the Engineer-
incharge.

5 Providing Mild Steel/Tor steel reinforcement including bending binding & placing in 621.00 Kg. 72.00 P/kg
positing I/c all leads lifts and carriage of material and as per direction of the Engineer-in-
charge.
6 Providing form work with steel sheets 3.15mm thick welded with angle iron 30x30x5 mm
so as to give rough finish i/c centring shuttering structing and propping etc. with wooden
bettens & Ballies, height or propping & centering below supporting floor to ceiling not
exceeding 4 mtr.and removal of the same for insitu RCC work and PCC work.including all
leads lifts and carriage of material at site & as per direction of Engineer in charge in:-

a) Vertical surface such as wall any thickness. 64.49 Sqm. 390.00 P/Sqm.
b) Flat surfaces such as soffits of suspended floor roofs landings and like upto 200mm in 10.47 Sqm. 300.00 P/Sqm.
thickness
7 Providing and fixing of cast iron manhole cover of 500mm dia internal dia (Medium) duty 1 Nos. 2000.00 Each.
the weight of manhole cover should not be less than 23 Kg. including all leads,lifts and
carriage of material complete in all respect and as per direction of the Engineer-incharge.

8 Providing and fixing of cast iron rings 200mm wide with chequered/ribbed non slip 14 Nos. 95.00 Each.
surface including fixing 200x100x100mm cement concrete 1:3:6(1cement:3sand:6graded
stone agg. 40mm nominal size) including all leads,lifts and carriage of material and as per
direction of the Engineer-in-charge.
9 Laying & jointing of sour pipe /inlet/outlet pipe including all leads,lifts and carriage of 6 Rmt. 40.00 P/Rmt.
material and as per direction of the Engineer-in-charge. 65mm dia.

TOTAL:
TERMS & CONDITIONS
1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Cement will be issued @ 315/- per bag & steel @ 53/- per Kg. at IPH store Bhatanwali Paonta Sahib.
4 Empty cement bags shall be returned to the deptt. Otherwise Rs. 2/- per bag shall be
deducted from the each bill of the contractor.
5 Royality certificate in respect of stone agg. Sand etc. shall be produced by the contractor
6 GI pipe shall be issued free of cost by the deptt. at IPHstore Bhatanwali Paonta Sahib. Executive Engineer,
7 Crushed stone Sand & agg. Shall be used by the contractor. I&PH Division,
8 In addition to normal security 5% will be withheld for want of testing of pipe S/tank against leakage Paonta Sahib.
and will be released after successful testing.

REVISED SCHEDULE OF QUANTITY Estimated cost Rs 73395/-


Name of work: Aug. & Imp. of WSS of group of villages in GP Kando Kansar in Tehsil Paonta Sahib Distt.Sirmour (HP) Earnest money Rs. 1475/-
(SH: C/O Sub Storage tank at village Pudli & Baneri) Time:- One Month.
S.No Sub-Head and item of work. Qty. Rates, Unit
1 2 3 4 5
1 Excavation in foundation and trenches etc.in earth work in all kinds of soil such as pick 52.31 Cum 230.00 P/Cum
work ,jumper work decomposed conglomerate saturated soil soft and hard rock upto all
leads lifts stacking the excavated soil not more than 3mtr.clear from the edge of excavation
and then returning the stacked soil in 15cm layers when required in to plinth sides of
foundation etc. consolidating each deposited layers by ramming and watering and then
disposing of all surplus excavated earth as directed with in all leads lifts and as per
directions of the Engineer-in-charge
2 Providing and laying cement concrete 1:4:8(1cement:4sand:8 graded stone agg.40mm 4.36 Cum 6000.00 P/Cum
nominal size)and curing complete excluding the cost of form work in foundation & plinth
including all leads lifts and carriage of material and as per the directions of Engineer-in-
charge.

3 Providing and laying cement concrete work 1:1 1/2:3 (1cement:1 1/2 sand: 3 graded
stone agg. 20mm nominal size & curing complete) excluding cost of form work in
foundation & plinth in all height and depth including all leads lifts complete and carriage
of material etc. as per directions of Engineer incharge.

i) In foundation and Plinth etc. 3.23 Cum. 7950.00 P/Cum.


ii) Vertical surfaces such as walls of any thickness but not than 00.1 Mtr. Thick including 7.79 Cum. 8100.00 P/Cum.
attached pillasters buttresses plinth and string courses etc. from top of foundation upto
floor two level including all leads,lifts and carraige of ateral at site and as directed by the
Engineer-in-charge.

4 Providing and laying cement concrete 1:2:4(1cement:2app.sand: 4 app. graded stone agg. 2.49 Cum 7540.00 P/Cum
20mm nominal size )and curing complete excluding cost of form work & reinforcement for
reinforced work in suspended floors, roofs landing shelves and their supports balconies,
beams, girders bressumers and cantilivers upto to floor two level in all height and depth,
including all leads lifts and carriage of material at site and as per direction of the Engineer-
incharge.

6 Providing Mild Steel/Tor steel reinforcement including bending binding & placing in 1020.75 Kg. 72.00 P/kg
positing I/c all leads lifts and carriage of material and as per direction of the Engineer-in-
charge.

7 Providing form work with steel sheets 3.15mm thick welded with angle iron 30x30x5 mm
so as to give rough finish i/c centring shuttering structing and propping etc. with wooden
bettens & Ballies, height or propping & centering below supporting floor to ceiling not
exceeding 4 mtr.and removal of the same for insitu RCC work and PCC work.including all
leads lifts and carriage of material at site & as per direction of Engineer in charge in:-

a) Vertical surface such as wall any thickness. 100.70 Sqm. 375.00 P/Sqm.
b) Flat surfaces such as soffits of suspended floor roofs landings and like upto 200mm in 18.17 Sqm. 300.00 P/Sqm.
thickness
8 Providing and fixing of cast iron manhole cover of 500mm dia internal dia (Medium) duty 2 Nos. 2000.00 Each.
the weight of manhole cover should not be less than 23 Kg. including all leads,lifts and
carriage of material complete in all respect and as per direction of the Engineer-incharge.

9 Providing and fixing of cast iron rings 200mm wide with chequered/ribbed non slip 22 Nos. 95.00 Each.
surface including fixing 200x100x100mm cement concrete 1:3:6(1cement:3sand:6graded
stone agg. 40mm nominal size) including all leads,lifts and carriage of material and as per
direction of the Engineer-in-charge.

10 Laying & jointing of sour pipe /inlet/outlet pipe including all leads,lifts and carriage of 12 Rmt. 40.00 P/Rmt.
material and as per direction of the Engineer-in-charge. 65mm dia.

TOTAL:
TERMS & CONDITIONS
1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Cement will be issued @ 315/- per bag & steel @ 53/- per Kg. at IPH store Bhatanwali Paonta Sahib.
4 Empty cement bags shall be returned to the deptt. Otherwise Rs. 2/- per bag shall be deducted from the each bill of the
5 contractor.
Royality certificate in respect of stone agg. Sand etc. shall be produced by the contractor
6 GI pipe shall be issued free of cost by the deptt. at IPHstore Bhatanwali Paonta Sahib. Executive Engineer,
7 Crushed stone Sand & agg. Shall be used by the contractor. I&PH Division,
8 In addition to normal security 5% will be withheld for want of testing of pipe S/tank against leakage Paonta Sahib.
and will be released after successful testing.

REVISED SCHEDULE OF QUANTITY Estimated cost Rs 77875/-


Name of work: Aug. & Imp. of WSS of group of villages in GP Kando KansarBarthal Madhana & Bharog Baneri in Tehsil
Earnest money Rs. 1600/-
Paonta Sahib Distt.Sirmour (HP) (SH: C/O Sub Storage tank at village Bhatna Kalan & Khair) Time:- One Month.
S.No Sub-Head and item of work. Qty. Rates, Unit
1 2 3 4 5
1 Excavation in foundation and trenches etc.in earth work in all kinds of soil such as pick 56.66 Cum 230.00 P/Cum
work ,jumper work decomposed conglomerate saturated soil soft and hard rock upto all
leads lifts stacking the excavated soil not more than 3mtr.clear from the edge of excavation
and then returning the stacked soil in 15cm layers when required in to plinth sides of
foundation etc. consolidating each deposited layers by ramming and watering and then
disposing of all surplus excavated earth as directed with in all leads lifts and as per
directions of the Engineer-in-charge

2 Providing and laying cement concrete 1:4:8(1cement:4sand:8 graded stone agg.40mm 4.72 Cum 6000.00 P/Cum
nominal size)and curing complete excluding the cost of form work in foundation & plinth
including all leads lifts and carriage of material and as per the directions of Engineer-in-
charge.

3 Providing and laying cement concrete work 1:1 1/2:3 (1cement:1 1/2 sand: 3 graded
stone agg. 20mm nominal size & curing complete) excluding cost of form work in
foundation & plinth in all height and depth including all leads lifts complete and carriage
of material etc. as per directions of Engineer incharge.

i) In foundation and Plinth etc. 3.54 Cum. 7950.00 P/Cum.


ii) Vertical surfaces such as walls of any thickness but not than 00.1 Mtr. Thick including 8.19 Cum. 8100.00 P/Cum.
attached pillasters buttresses plinth and string courses etc. from top of foundation upto
floor two level including all leads,lifts and carraige of ateral at site and as directed by the
Engineer-in-charge.

5 Providing and laying cement concrete 1:2:4(1cement:2app.sand: 4 app. graded stone agg. 2.83 Cum 7540.00 P/Cum
20mm nominal size )and curing complete excluding cost of form work & reinforcement for
reinforced work in suspended floors, roofs landing shelves and their supports balconies,
beams, girders bressumers and cantilivers upto to floor two level in all height and depth,
including all leads lifts and carriage of material at site and as per direction of the Engineer-
incharge.

6 Providing Mild Steel/Tor steel reinforcement including bending binding & placing in 1092.00 Kg. 72.00 P/kg
positing I/c all leads lifts and carriage of material and as per direction of the Engineer-in-
charge.
7 Providing form work with steel sheets 3.15mm thick welded with angle iron 30x30x5 mm
so as to give rough finish i/c centring shuttering structing and propping etc. with wooden
bettens & Ballies, height or propping & centering below supporting floor to ceiling not
exceeding 4 mtr.and removal of the same for insitu RCC work and PCC work.including all
leads lifts and carriage of material at site & as per direction of Engineer in charge in:-

a) Vertical surface such as wall any thickness. 105.79 Sqm. 390.00 P/Sqm.
b) Flat surfaces such as soffits of suspended floor roofs landings and like upto 200mm in 20.10 Sqm. 300.00 P/Sqm.
thickness
8 Providing and fixing of cast iron manhole cover of 500mm dia internal dia (Medium) duty 2 Nos. 2000.00 Each.
the weight of manhole cover should not be less than 23 Kg. including all leads,lifts and
carriage of material complete in all respect and as per direction of the Engineer-incharge.

9 Providing and fixing of cast iron rings 200mm wide with chequered/ribbed non slip 22 Nos. 95.00 Each.
surface including fixing 200x100x100mm cement concrete 1:3:6(1cement:3sand:6graded
stone agg. 40mm nominal size) including all leads,lifts and carriage of material and as per
direction of the Engineer-in-charge.

10 Laying & jointing of sour pipe /inlet/outlet pipe including all leads,lifts and carriage of 12 Rmt. 40.00 P/Rmt.
material and as per direction of the Engineer-in-charge. 65mm dia.

TOTAL:
TERMS & CONDITIONS
1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Cement will be issued @ 315/- per bag & steel @ 53/- per Kg. at IPH store Bhatanwali Paonta Sahib.
4 Empty cement bags shall be returned to the deptt. Otherwise Rs. 2/- per bag shall be
deducted from the each bill of the contractor.
5 Royality certificate in respect of stone agg. Sand etc. shall be produced by the contractor
6 GI pipe shall be issued free of cost by the deptt. at IPHstore Bhatanwali Paonta Sahib. Executive Engineer,
7 Crushed stone sand & agg. Shall be used by the cpontractor. I&PH Division,
8 In addition to normal security 5% will be withheld for want of testing of pipe S/tank against leakage Paonta Sahib.
and will be released after successful testing.

REVISED SCHEDULE OF QUANTITY Estimated cost Rs 86788/-


Name of work: Aug. & Imp. of WSS of group of villages in GP Kando KansarBarthal Madhana & Bharog Baneri in Tehsil Earnest money Rs. 1750/-
Paonta Sahib
Distt.Sirmour (HP) (SH: C/O Sub Storage tank at village Kansar) Time:- One Month.
S.No Sub-Head and item of work. Qty. Rates, Unit
1 2 3 4 5
1 Excavation in foundation and trenches etc.in earth work in all kinds of soil such as pick 61.15 Cum 230.00 P/Cum
work ,jumper work decomposed conglomerate saturated soil soft and hard rock upto all
leads lifts stacking the excavated soil not more than 3mtr.clear from the edge of excavation
and then returning the stacked soil in 15cm layers when required in to plinth sides of
foundation etc. consolidating each deposited layers by ramming and watering and then
disposing of all surplus excavated earth as directed with in all leads lifts and as per
directions of the Engineer-in-charge

2 Providing and laying cement concrete 1:4:8(1cement:4sand:8 graded stone agg.40mm 6.44 Cum 6000.00 P/Cum
nominal size)and curing complete excluding the cost of form work in foundation & plinth
including all leads lifts and carriage of material and as per the directions of Engineer-in-
charge.

3 Providing and laying cement concrete work 1:1 1/2:3 (1cement:1 1/2 sand: 3 graded
stone agg. 20mm nominal size & curing complete) excluding cost of form work in
foundation & plinth in all height and depth including all leads lifts complete and carriage
of material etc. as per directions of Engineer incharge.

i) In foundation and Plinth etc. 5.29 Cum. 7950.00 P/Cum.

ii) Vertical surfaces such as walls of any thickness but not than 00.1 Mtr. Thick including 9.69 Cum. 8100.00 P/Cum.
attached pillasters buttresses plinth and string courses etc. from top of foundation upto
floor two level including all leads,lifts and carraige of ateral at site and as directed by the
Engineer-in-charge.
4 Providing and laying cement concrete 1:2:4(1cement:2app.sand: 4 app. graded stone agg. 3.17 Cum 7540.00 P/Cum
20mm nominal size )and curing complete excluding cost of form work & reinforcement for
reinforced work in suspended floors, roofs landing shelves and their supports balconies,
beams, girders bressumers and cantilivers upto to floor two level in all height and depth,
including all leads lifts and carriage of material at site and as per direction of the Engineer-
incharge.

5 Providing Mild Steel/Tor steel reinforcement including bending binding & placing in 1361.25 Kg. 72.00 P/kg
positing I/c all leads lifts and carriage of material and as per direction of the Engineer-in-
charge.
6 Providing form work with steel sheets 3.15mm thick welded with angle iron 30x30x5 mm
so as to give rough finish i/c centring shuttering structing and propping etc. with wooden
bettens & Ballies, height or propping & centering below supporting floor to ceiling not
exceeding 4 mtr.and removal of the same for insitu RCC work and PCC work.including all
leads lifts and carriage of material at site & as per direction of Engineer in charge in:-

a) Vertical surface such as wall any thickness. 95.04 Sqm. 390.00 P/Sqm.
b) Flat surfaces such as soffits of suspended floor roofs landings and like upto 200mm in 22.91 Sqm. 300.00 P/Sqm.
thickness
7 Providing and fixing of cast iron manhole cover of 500mm dia internal dia (Medium) duty 1 No. 2000.00 Each.
the weight of manhole cover should not be less than 23 Kg. including all leads,lifts and
carriage of material complete in all respect and as per direction of the Engineer-incharge.

8 Providing and fixing of cast iron rings 200mm wide with chequered/ribbed non slip 14 Nos. 95.00 Each.
surface including fixing 200x100x100mm cement concrete 1:3:6(1cement:3sand:6graded
stone agg. 40mm nominal size) including all leads,lifts and carriage of material and as per
direction of the Engineer-in-charge.

9 Laying & jointing of sour pipe /inlet/outlet pipe including all leads,lifts and carriage of 6.00 Rmt. 40.00 P/Rmt.
material and as per direction of the Engineer-in-charge. 65mm dia.

TOTAL:
TERMS & CONDITIONS
1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Cement will be issued @ 315/- per bag & steel @ 53/- per Kg. at IPH store Bhatanwali Paonta Sahib.
4 Empty cement bags shall be returned to the deptt. Otherwise Rs. 2/- per bag shall be
deducted from the each bill of the contractor.
5 Royality certificate in respect of stone agg. Sand etc. shall be produced by the contractor
6 GI pipe shall be issued free of cost by the deptt. at IPH store Bhatanwali Paonta Sahib. Executive Engineer,
7 Crushed stone sand & agg. Shall be used by the cpontractor. I&PH Division,
8 In addition to normal security 5% will be withheld for want of testing of pipe S/tank against leakage Paonta Sahib.
and will be released after successful testing.

REVISED SCHEDULE OF QUANTITY Estimated cost Rs 85671/-


Name of work: Aug. & Imp. of WSS of group of villages in GP Kando KansarBarthal Madhana & Bharog Baneri in Tehsil Earnest money Rs. 1750/-
Paonta Sahib
Distt.Sirmour (HP) (SH: C/O Sub Storage tank near existing tank at Kando Bhaila) Time:- Three Months.
S.No Sub-Head and item of work. Qty. Rates, Unit
1 2 3 4 5
1 Excavation in foundation and trenches etc.in earth work in all kinds of soil such as pick 61.15 Cum 230.00 P/Cum
work ,jumper work decomposed conglomerate saturated soil soft and hard rock upto all
leads lifts stacking the excavated soil not more than 3mtr.clear from the edge of excavation
and then returning the stacked soil in 15cm layers when required in to plinth sides of
foundation etc. consolidating each deposited layers by ramming and watering and then
disposing of all surplus excavated earth as directed with in all leads lifts and as per
directions of the Engineer-in-charge

2 Providing and laying cement concrete 1:4:8(1cement:4sand:8 graded stone agg.40mm 6.44 Cum 6000.00 P/Cum
nominal size)and curing complete excluding the cost of form work in foundation & plinth
including all leads lifts and carriage of material and as per the directions of Engineer-in-
charge.
3 Providing and laying cement concrete work 1:1 1/2:3 (1cement:1 1/2 sand: 3 graded
stone agg. 20mm nominal size & curing complete) excluding cost of form work in
foundation & plinth in all height and depth including all leads lifts complete and carriage
of material etc. as per directions of Engineer incharge.

i) In foundation and Plinth etc. 5.29 Cum. 7950.00 P/Cum.


ii) Vertical wall any thickness. 9.69 Cum. 8100.00 P/Cum.
4 Providing form work with steel sheets 3.15mm thick welded with angle iron 30x30x5 mm
so as to give rough finish i/c centring shuttering structing and propping etc. with wooden
bettens & Ballies, height or propping & centering below supporting floor to ceiling not
exceeding 4 mtr.and removal of the same for insitu RCC work and PCC work.including all
leads lifts and carriage of material at site & as per direction of Engineer in charge in:-

a) Vertical surface such as wall any thickness. 95.04 Sqm. 390.00 P/Sqm.
b) Flat surfaces such as soffits of suspended floor roofs landings and like upto 200mm in 22.91 Sqm. 300.00 P/Sqm.
thickness
5 Providing and laying cement concrete 1:2:4(1cement:2app.sand: 4 app. graded stone agg. 3.17 Cum 7540.00 P/Cum
20mm nominal size )and curing complete excluding cost of form work & reinforcement for
reinforced work in suspended floors, roofs landing shelves and their supports balconies,
beams, girders bressumers and cantilivers upto to floor two level in all height and depth,
including all leads lifts and carriage of material at site and as per direction of the Engineer-
incharge.

6 Providing Mild Steel/Tor steel reinforcement including bending binding & placing in 1361.25 Kg. 72.00 P/kg
positing I/c all leads lifts and carriage of material and as per direction of the Engineer-in-
charge.
7 Providing and fixing of cast iron rings 200mm wide with chequered/ribbed non slip 14 Nos. 95.00 Each.
surface including fixing 200x100x100mm cement concrete 1:3:6(1cement:3sand:6graded
stone agg. 40mm nominal size) including all leads,lifts and carriage of material and as per
direction of the Engineer-in-charge.

TOTAL:
TERMS & CONDITIONS
1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Cement will be issued @ 315/- per bag & steel @ 53/- per Kg. at IPH store Bhatanwali Paonta Sahib.
4 Empty cement bags shall be returned to the deptt. Otherwise Rs. 2/- per bag shall be
deducted from the each bill of the contractor.

5 Royality certificate in respect of stone agg. Sand etc. shall be produced by the contractor
6 Crushed stone sand & agg. Shall be used by the cpontractor.
Executive Engineer,
7 In addition to normal security 5% will be withheld for want of testing of pipe S/tank against I&PH Division,
leakageand will be released after successful testing. Paonta Sahib.

REVISED SCHEDULE OF QUANTITY Estimated cost Rs 66213/-


Name of work: Aug. & Imp. of WSS of group of villages in GP Kando KansarBarthal Madhana & Bharog Baneri in Tehsil Earnest money Rs. 1350/-
Paonta Sahib Distt.Sirmour (HP) (SH: C/O Sub Storage tank atvill. Mandhara 2800 Ltrs. Cap. & Swara landasi 8000 Ltr. Time:- One Month.

Cap.
S.No Sub-Head and item of work. Qty. Rates, Unit
1 2 3 4 5
1 Excavation in foundation and trenches etc.in earth work in all kinds of soil such as pick 50.92 Cum 230.00 P/Cum
work ,jumper work decomposed conglomerate saturated soil soft and hard rock upto all
leads lifts stacking the excavated soil not more than 3mtr.clear from the edge of excavation
and then returning the stacked soil in 15cm layers when required in to plinth sides of
foundation etc. consolidating each deposited layers by ramming and watering and then
disposing of all surplus excavated earth as directed with in all leads lifts and as per
directions of the Engineer-in-charge
2 Providing and laying cement concrete 1:4:8(1cement:4sand:8 graded stone agg.40mm 4.25 Cum 6000.00 P/Cum
nominal size)and curing complete excluding the cost of form work in foundation & plinth
including all leads lifts and carriage of material and as per the directions of Engineer-in-
charge.

3 Providing and laying cement concrete work 1:1 1/2:3 (1cement:1 1/2 sand: 3 graded
stone agg. 20mm nominal size & curing complete) excluding cost of form work in
foundation & plinth in all height and depth including all leads lifts complete and carriage
of material etc. as per directions of Engineer incharge.

i) In foundation and Plinth etc. 3.14 Cum. 7950.00 P/Cum.


ii )Vertical walls any thickness. 7.82 Cum. 8100.00 P/Cum.
4 Providing form work with steel sheets 3.15mm thick welded with angle iron 30x30x5 mm
so as to give rough finish i/c centring shuttering structing and propping etc. with wooden
bettens & Ballies, height or propping & centering below supporting floor to ceiling not
exceeding 4 mtr.and removal of the same for insitu RCC work and PCC work.including all
leads lifts and carriage of material at site & as per direction of Engineer in charge in:-

a)Flat surfaces such as soffits of suspended floor roofs landings and like upto 200mm in 17.68 Sqm. 300.00 P/Sqm.
thickness
b) Vertical surface such as wall any thickness. 100.97 Sqm. 390.00 P/Sqm.
5 Providing and laying cement concrete 1:2:4(1cement:2app.sand: 4 app. graded stone agg. 2.51 Cum 7540.00 P/Cum
20mm nominal size )and curing complete excluding cost of form work & reinforcement for
reinforced work in suspended floors, roofs landing shelves and their supports balconies,
beams, girders bressumers and cantilivers upto to floor two level in all height and depth,
including all leads lifts and carriage of material at site and as per direction of the Engineer-
incharge.

6 Providing Mild Steel/Tor steel reinforcement including bending binding & placing in 1010.25 Kg. 72.00 P/kg
positing I/c all leads lifts and carriage of material and as per direction of the Engineer-in-
charge.

7 Providing and fixing of cast iron rings 200mm wide with chequered/ribbed non slip 22 Nos. 95.00 Each.
surface including fixing 200x100x100mm cement concrete 1:3:6(1cement:3sand:6graded
stone agg. 40mm nominal size) including all leads,lifts and carriage of material and as per
direction of the Engineer-in-charge.

TOTAL:
TERMS & CONDITIONS
1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Cement will be issued @ 315/- per bag & steel @ 53/- per Kg. at IPH store Bhatanwali Paonta Sahib.
4 Empty cement bags shall be returned to the deptt. Otherwise Rs. 2/- per bag shall be
deducted from the each bill of the contractor.
5 Royality certificate in respect of stone agg. Sand etc. shall be produced by the contractor
6 GI pipe shall be issued free of cost by the deptt. at IPHstore Bhatanwali Paonta Sahib.
Executive Engineer,
7 Crushed sand & agg. Shall be used by the contractor. I&PH Division,
8 In addition to normal security 5% will be withheld for want of testing of pipe S/tank against leakage Paonta Sahib.
and will be released after successful testing.

REVISED SCHEDULE OF QUANTITY Estimated cost Rs 85671/-


Name of work: Aug. & Imp. of WSS of group of villages in GP Kando Kansar in Tehsil Paonta Sahib Distt.Sirmour (HP)
Earnest money Rs. 1750/-
(SH: C/O Sub Storage tank near existing tank at Kando Baila) Time:- Three Months.
S.No Sub-Head and item of work. Qty. Rates, Unit
1 2 3 4 5
1 Excavation in foundation and trenches etc.in earth work in all kinds of soil such as pick 61.15 Cum 170.00 P/Cum
work ,jumper work decomposed conglomerate saturated soil soft and hard rock upto all
leads lifts stacking the excavated soil not more than 3mtr.clear from the edge of excavation
and then returning the stacked soil in 15cm layers when required in to plinth sides of
foundation etc. consolidating each deposited layers by ramming and watering and then
disposing of all surplus excavated earth as directed with in all leads lifts and as per
directions of the Engineer-in-charge

2 Providing and laying cement concrete 1:4:8(1cement:4sand:8 graded stone agg.40mm 6.44 Cum 4650.00 P/Cum
nominal size)and curing complete excluding the cost of form work in foundation & plinth
including all leads lifts and carriage of material and as per the directions of Engineer-in-
charge.

3 Providing and laying cement concrete work 1:1 1/2:3 (1cement:1 1/2 sand: 3 graded
stone agg. 20mm nominal size & curing complete) excluding cost of form work in
foundation & plinth in all height and depth including all leads lifts complete and carriage
of material etc. as per directions of Engineer incharge.

i) In foundation and Plinth etc. 5.29 Cum. 6150.00 P/Cum.


In vertical walls any thickeness. 9.69 Cum. 6250.00 P/Cum.
4 Providing form work with steel sheets 3.15mm thick welded with angle iron 30x30x5 mm
so as to give rough finish i/c centring shuttering structing and propping etc. with wooden
bettens & Ballies, height or propping & centering below supporting floor to ceiling not
exceeding 4 mtr.and removal of the same for insitu RCC work and PCC work.including all
leads lifts and carriage of material at site & as per direction of Engineer in charge in:-

a) Vertical surface such as wall any thickness. 22.91 Sqm. 200.00 P/Sqm.
b) Flat surfaces such as soffits of suspended floor roofs landings and like upto 200mm in 95.04 Sqm. 300.00 P/Sqm.
thickness
5 Providing and laying cement concrete 1:2:4(1cement:2app.sand: 4 app. graded stone agg. 3.17 Cum 5800.00 P/Cum
20mm nominal size )and curing complete excluding cost of form work & reinforcement for
reinforced work in suspended floors, roofs landing shelves and their supports balconies,
beams, girders bressumers and cantilivers upto to floor two level in all height and depth,
including all leads lifts and carriage of material at site and as per direction of the Engineer-
incharge.

6 Providing Mild Steel/Tor steel reinforcement including bending binding & placing in 1361.25 Kg. 65.00 P/kg
positing I/c all leads lifts and carriage of material and as per direction of the Engineer-in-
charge.
7 Providing and fixing of cast iron rings 200mm wide with chequered/ribbed non slip 14 Nos. 95.00 Each.
surface including fixing 200x100x100mm cement concrete 1:3:6(1cement:3sand:6graded
stone agg. 40mm nominal size) including all leads,lifts and carriage of material and as per
direction of the Engineer-in-charge.

TOTAL:
TERMS & CONDITIONS
1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.

3 Cement will be issued @ 315/- per bag & steel @ 53/- per Kg. at IPH store Bhatanwali Paonta Sahib.

4 Empty cement bags shall be returned to the deptt. Otherwise Rs. 2/- per bag shall be deducted from the each bill of the
contractor.

5 Royality certificate in respect of stone agg. Sand etc. shall be produced by the contractor
6 GI pipe shall be issued free of cost by the deptt. at IPHstore Bhatanwali Paonta Sahib.
7 Crushed stone Sand & agg. Shall be used by the contractor.

Executive Engineer,
I&PH Division,

Paonta Sahib.

REVISED SCHEDULE OF QUANTITY Estimated cost Rs 87893/-


Name of work: Aug. & Imp. of WSS of group of villages in GP Kando Kansar Barthal Mandhara & Bharog Baneri (Partly)
Earnest money Rs. 1800/-
in Tehsil Paonta Sahib Distt. Sirmour (HP) (SH: C/O Sub Storage tank at village Barthal Mandhara 57000 Litre cap.) Time:- Three Months.
S.No Sub-Head and item of work. Qty. Rates, Unit
1 2 3 4 5
1 Excavation in foundation and trenches etc.in earth work in all kinds of soil such as pick 63.07 Cum 230.00 P/Cum
work ,jumper work decomposed conglomerate saturated soil soft and hard rock upto all
leads lifts stacking the excavated soil not more than 3mtr.clear from the edge of excavation
and then returning the stacked soil in 15cm layers when required in to plinth sides of
foundation etc. consolidating each deposited layers by ramming and watering and then
disposing of all surplus excavated earth as directed with in all leads lifts and as per
directions of the Engineer-in-charge

2 Providing and laying cement concrete 1:4:8(1cement:4sand:8 graded stone agg.40mm 6.64 Cum 6000.00 P/Cum
nominal size)and curing complete excluding the cost of form work in foundation & plinth
including all leads lifts and carriage of material and as per the directions of Engineer-in-
charge.

3 Providing and laying cement concrete work 1:1 1/2:3 (1cement:1 1/2 sand: 3 graded
stone agg. 20mm nominal size & curing complete) excluding cost of form work in
foundation & plinth in all height and depth including all leads lifts complete and carriage
of material etc. as per directions of Engineer incharge.
i) In foundation and Plinth etc. 5.47 Cum. 7950.00 P/Cum.

ii) Vertical walls any thickness. 9.86 Cum. 8100.00 P/Cum.


4 Providing form work with steel sheets 3.15mm thick welded with angle iron 30x30x5 mm
so as to give rough finish i/c centring shuttering structing and propping etc. with wooden
bettens & Ballies, height or propping & centering below supporting floor to ceiling not
exceeding 4 mtr.and removal of the same for insitu RCC work and PCC work.including all
leads lifts and carriage of material at site & as per direction of Engineer in charge in:-

a) Flat surfaces such as soffits of suspended floor roofs landings and like upto 200mm in 23.77 Sqm. 300.00 P/Sqm.
thickness
b) Vertical surface such as wall any thickness. 96.74 Sqm. 375.00 P/Sqm.

5 Providing and laying cement concrete 1:2:4(1cement:2app.sand: 4 app. graded stone agg. 3.28 Cum 7540.00 P/Cum
20mm nominal size )and curing complete excluding cost of form work & reinforcement for
reinforced work in suspended floors, roofs landing shelves and their supports balconies,
beams, girders bressumers and cantilivers upto to floor two level in all height and depth,
including all leads lifts and carriage of material at site and as per direction of the Engineer-
incharge.

6 Providing Mild Steel/Tor steel reinforcement including bending binding & placing in 1395.75 Kg. 72.00 P/kg
positing I/c all leads lifts and carriage of material and as per direction of the Engineer-in-
charge.

7 Providing and fixing of cast iron rings 200mm wide with chequered/ribbed non slip 14 Nos. 95.00 Each.
surface including fixing 200x100x100mm cement concrete 1:3:6(1cement:3sand:6graded
stone agg. 40mm nominal size) including all leads,lifts and carriage of material and as per
direction of the Engineer-in-charge.

8 Laying & jointing of sour pipe /inlet/outlet pipe including all leads,lifts and carriage of 6 Rmt. 40.00 P/Rmt.
material and as per direction of the Engineer-in-charge. 65mm dia.

TOTAL:
TERMS & CONDITIONS
1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Cement will be issued @ 315/- per bag & steel @ 53/- per Kg. at IPH store Bhatanwali Paonta Sahib.
4 Empty cement bags shall be returned to the deptt. Otherwise Rs. 2/- per bag shall be
deducted from the each bill of the contractor.
5 Royality certificate in respect of stone agg. Sand etc. shall be produced by the contractor
6 GI pipe shall be issued free of cost by the deptt. at IPHstore Bhatanwali Paonta Sahib. Executive Engineer,
7 Crushed stone sand & agg. Shall be used by the contractor. I&PH Division,
8 In addition to normal security 5% will be withheld for want of testing of pipe S/tank against leakage Paonta Sahib.
and will be released after successful testing.
REVISED SCHEDULE OF QUANTITY Estimated cost Rs 93762/-
Name of work: R/M of LWSS Patlion in GP Patlion in Tehsil Paonta Sahib Distt. Sirmour (HP) Earnest money Rs. 1880/-
(SH: Repair of sumpwell by jacketing, making temporary byepass arrangement for LWSS Patlon, Laying/jointing Time:- One Month.
of GI pipes in distribution system of LWSS Patlion welding of feeder line of Surajpur and Ghutanpur)
S.No Sub-Head and item of work. Qty. Rates, Unit
1 2 3 4 5
1 Providing and laying cement concrete work 1:1 1/2:3 (1cement:1 1/2 sand: 3 graded
stone agg. 20mm nominal size & curing complete) excluding cost of form work in
foundation & plinth in all height and depth including all leads lifts complete and carriage
of material etc. as per directions of Engineer incharge.

i) In foundation and Plinth etc. 1.40 Cum. 4200.00 P/Cum.


ii) Vertical wall any thickness. 3.00 Cum. 4300.00 P/Cum.
2 Providing Mild Steel/Tor steel reinforcement including bending binding & placing in 228.00 Kg. 65.00 P/kg
positing I/c all leads lifts and carriage of material and as per direction of the Engineer-in-
charge.
3 Providing form work with steel sheets 3.15mm thick welded with angle iron 30x30x5 mm
so as to give rough finish i/c centring shuttering structing and propping etc. with wooden
bettens & Ballies, height or propping & centering below supporting floor to ceiling not
exceeding 4 mtr.and removal of the same for insitu RCC work and PCC work.including all
leads lifts and carriage of material at site & as per direction of Engineer in charge in:-

a) Vertical surface such as wall any thickness. 30.62 Sqm. 300.00 P/Sqm.
4 Making byepass arrangement (to byepass the sumpwell )including cutting welding and 1 No. Each.
carriage at site and as per direction of the Engineer-in-charge.
5 Welding of 11 joints of feeder lines at site complete in all respect including excavation as 1 job. 7540.00 P/job.
per directions of the Enigneer-in-charge.
6 Excavation in drains & channel etc.in earth work in all kinds of soil such as pick work 719.65 Cum 160.00
,jumper work blasting work, decomposed conglomerate saturated soil soft and hard rock
including dressing of sides and beds and prepareation of sub grade to level or slope
including refilling the trenches and disposing of surplus earth upto all leads,lifts disposed
earth to be levelled and neatly dressed including jungle clearance and as per directions of
the Engineer-in-charge

7 Laying and jointing of GMS Pipes of various dia in trenches (earth work in trenches to be
measured and paid for seperately) including all leads lifts and carriage of material at site
as per direction of Engineer-in-charge of following dias.
i) 32mm dia. 455 Mtr. 18 P/Mtr.
ii) 40mm dia. 1558 Mtr. 22 P/Mtr.
8 Providing and fixing of peet valve with wheel of superior quality of the following dia
meters complete in all respect and as per direction of the Engineer-in-charge.
i) 32mm dia. 1 No. 650.00 Each.
ii) 40mm dia. 1 No. 850.00
Each.
TERMS & CONDITIONS TOTAL:
1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Cement will be issued @ 315/- per bag & steel @ 53/- per Kg. at IPH store Bhatanwali Paonta Sahib.
4 Empty cement bags shall be returned to the deptt. Otherwise Rs. 2/- per bag shall be
deducted from the each bill of the contractor.

5 Royality certificate in respect of stone agg. Sand etc. shall be produced by the contractor
6 Crushed stone sand & agg. Shall be used by the cpontractor.
Executive Engineer,
7 In addition to normal security 5% will be withheld for want of testing of pipe S/tank against I&PH Division,
leakageand will be released after successful testing. Paonta Sahib.
cost Rs 62585/-
oney Rs.1300/-

Amount.
6
9515.00

20700.00

19637.00

55728.00

14854.00
61128.00

33858.00
4095.00

4000.00

2090.00

480.00

226085.00
cost Rs 43893/-
oney Rs.900/-

Amount.
6
6734.00

14640.00

14628.00
40257.00

11084.00

44712.00

25151.00
3141.00

2000.00

1330.00
240.00

163917.00

cost Rs 73395/-
oney Rs. 1475/-

Amount.
6
12031.00
26160.00

25679.00
63099.00

18775.00

73494.00

37763.00
5451.00
4000.00

2090.00

480.00

269022.00

cost Rs 77875/-
oney Rs. 1600/-

Amount.
6
13032.00

28320.00

28143.00
66339.00

21338.00

78624.00
41258.00
6030.00

4000.00

2090.00

480.00

289654.00
cost Rs 86788/-
oney Rs. 1750/-

Amount.
6
14065.00

38640.00

42056.00

78489.00
23902.00

98010.00

37066.00
6873.00

2000.00

1330.00

240.00

342671.00
cost Rs 85671/-
oney Rs. 1750/-
ee Months.
Amount.
6
14065.00

38640.00
42056.00
78489.00

37066.00
6873.00

23902.00

98010.00

1330.00

340431.00
cost Rs 66213/-
oney Rs. 1350/-

Amount.
6
11712.00
25500.00

24963.00
63342.00

5304.00

39378.00
18925.00

72738.00

2090.00

263952.00
cost Rs 85671/-
oney Rs. 1750/-
ee Months.
Amount.
6
10396.00

29946.00

32534.00
60563.00

4582.00
28512.00

18386.00

88481.00
1330.00

274730.00
cost Rs 87893/-
oney Rs. 1800/-
ee Months.
Amount.
6
14506.00

39840.00
43487.00

79866.00

7131.00

36278.00

24731.00

100494.00

1330.00

240.00

293557.00
cost Rs 93762/-
oney Rs. 1880/-

Amount.
6

5880.00
12900.00
14820.00

9186.00
0.00

7540.00
115144.00

8190.00
34276.00

650.00
850.00
165470.00
Name of work: Aug. & Imp. Of WSS of grounp of villages in GP Kando Kansar Barthal Mandhana & Bharog Baneri(Partly)

in Tehsil Paonta Sahib Distt. Sirmour (HP) (SH:Laying & jointing of Feeder line from S/S/Tank Baneri to S/S/Tank
at village Bharog (Node I to Node J ) RD 0/0 to RD 1335 Mtrs.)
Sr.No.
1

2
3

Name of work: Aug. & Imp. Of WSS of grounp of villages in GP Kando Kansar Barthal Mandhana & Bharog Baneri(Partl
in Tehsil Paonta Sahib Distt. Sirmour (HP) (SH:Laying & jointing of Feeder line from Main Storage Tank Chiyan to
S/S/Tank at vill. Pudli Node No. A to Node No.F, RD 0 to 1440 Mtrs. job No.1.
Sr.No.
1

2
3

Name of work: Aug. & Imp. Of WSS of grounp of villages in GP Kando Kansar Barthal Mandhana & Bharog Baneri(Partly)
in Tehsil Paonta Sahib Distt. Sirmour (HP) (SH:Laying & jointing of Feeder line from Main Storage Tank Chiyan to
S/S/Tank at vill. Kansar Node No. A to Node No.G RD 0 to 1080 Mtrs.) Job No.1.
Sr.No.
1

2
3

2
3
4

Name of work: Aug. & Imp. Of WSS of grounp of villages in GP Kando Kansar Barthal Mandhana & Bharog Baneri(Partly)
in Tehsil Paonta Sahib Distt. Sirmour (HP) (SH:Laying & jointing of Feeder line from Main Storage Tank Chiyan to
S/S/Tank at vill. Pudli Node No. A to Node No.F RD1440 to 2340 Mtrs. job No.2.
Sr.No.
1

2
3

2
3
4

Name of work: Aug. & Imp. Of WSS of grounp of villages in GP Kando Kansar Barthal Mandhana & Bharog Baneri(Partly)
in Tehsil Paonta Sahib Distt. Sirmour (HP) (SH:Laying & jointing of Feeder line from S/S/Tank to vill. Kher Node G to Nod
RD1560 to RD 3120 Mtrs. job No.2.
Sr.No.
1

1
2
3
4

Name of work: Aug. & Imp. Of WSS of grounp of villages in GP Kando Kansar Barthal Mandhana & Bharog Baneri(Partly)

in Tehsil Paonta Sahib Distt. Sirmour (HP) (SH:Laying & jointing of Feeder line from 2nd stage Tanlog to S/S/Tank
at village Tanlog to S/S/Tank at vill. Mehat Node D to Node E.
Sr.No.
1

2
3
4
Name of work: Aug. & Imp. Of WSS of group of villages in GP Kando Kansar Barthal Mandhana & Bharog Baneri(Partly)
in Tehsil Paonta Sahib Distt. Sirmour (HP) (SH:Laying & jointing of Feeder line from S/S/Tank to vill. Baneri Node H to N
RD 0 to RD 540 Mtrs. )
Sr.No.
1

2
3
4

Name of work: Aug. & Imp. of WSS of group of villages in GP Kando Kansar Barthal Mandhana & Bharog Baneri(Partly) in
Paonta Distt. Sirmour (HP) (SH:Laying & jointing of Feeder line from Existing Tank Bhatna Kalan to village Katwari Bagh

Sr.No.
1

2
3
4
Name of work: Aug. & Imp. Of WSS of grounp of villages in GP Kando Kansar Barthal Mandhana & Bharog Baneri(Partly)
in Tehsil Paonta Sahib Distt. Sirmour (HP) (SH:Laying & jointing of Feeder line from S/S/Tank to vill. Kher Node G to Nod
RD 0 to RD 1560 Mtrs. job No.1.
Sr.No.
1

2
3
4
Name of work: c/O lis Mehat in GP Kando Kansar in Tehsil Paonta Sahib Distt.Sirmour (HP)
(SH: C/O Foundation of Pumping Machinery, Flooring of Pump House, White washing ,Pillaster of Boundry wall
S.No
1
1

10
11

12

13

14

15

1
2
3
4

5
Name of
work:
Aug. &
Imp. Of
WSS of
grounp
of
villages
in GP
Kando
Kansar
Barthal
Mandhan
a&
Bharog
Baneri(P
artly)

in Tehsil Paonta Sahib Distt. Sirmour (HP) (SH:Laying & jointing of Feeder line from Main Storage Tank Chiyan to
S/S/Tank at vill. Pudli Node No. A to Node F RD 2340 to 3750 Mtrs. job No.3.
Sr.No.
1

2
3
4
Name of
work:
Aug. &
Imp. Of
WSS of
grounp
of
villages
in GP
Kando
Kansar
Barthal
Mandhan
a&
Bharog
Baneri(P
artly)

in Tehsil Paonta Sahib Distt. Sirmour (HP) (SH:Laying & jointing & Testing of GMS Pipe to Left Out area of village Upper T
GPS & Anganwari of village Chiyan Maiyana)
Sr.No.
1

2
3

2
3

Name of
work:
Aug. &
Imp. of
WSS of
grounp
of
villages
in GP
Kando
Kansar
Barthal
Mandhan
a&
Bharog
Baneri(P
artly)

in Tehsil Paonta Sahib Distt. Sirmour (HP) (SH:Laying & jointing of Feeder line from S/S/Tank to vill. Kher Node G to Nod
RD 1560 to RD 3120 Mtrs. job No.2.
Sr.No.
1

2
3
Name of
work:
Aug. &
Imp. of
WSS of
grounp
of
villages
in GP
Kando
Kansar
Barthal
Mandhan
a&
Bharog
Baneri(P
artly)

in Tehsil Paonta Sahib Distt. Sirmour (HP) (SH:Laying & jointing of Feeder line from Main Storage tank Chiayan to S/S/T
village Pudli Node A to Node F ) RD 1440 to 2340 Mtrs. Job No.2
Sr.No.
1

2
3
Name of
work:
Aug. &
Imp. of
WSS of
grounp
of
villages
in GP
Kando
Kansar
Barthal
Mandhan
a&
Bharog
Baneri(P
artly)

in Tehsil Paonta Sahib Distt. Sirmour (HP) (SH:Laying & jointing of Feeder line from Main Storage tank Chiayan to S/S/T
village Kansar Node A to Node G ) RD 1080 to 2220 Mtrs. Job No.2
Sr.No.
1

2
3

Name of work: Aug. & Imp. of WSS of group of villages in GP Kando Kansar in Tehsil Paonta Sahib Distt.Sirmour (HP)
(SH: C/O Sub Storage tank aat village Mehat & Janglot.)
S.No
1
1

8
9

10

11

12

13

14

15

1
2
3
4

5
REVISED SCHEDULE OF QUANTITY
Name of work: Aug. & Imp. Of WSS of grounp of villages in GP Kando Kansar Barthal Mandhana & Bharog Baneri(Partly)

in Tehsil Paonta Sahib Distt. Sirmour (HP) (SH:Laying & jointing of Feeder line from S/S/Tank Baneri to S/S/Tank
at village Bharog (Node I to Node J ) RD 0/0 to RD 1335 Mtrs.)
Description.
Excavation in drains & channel etc.in earth work in all kinds of soil such as pick work ,jumper work blasting work,
decomposed conglomerate saturated soil soft and hard rock including dressing of sides and beds and prepareation
of sub grade to level or slope including refilling the trenches and disposing of surplus earth upto all leads,lifts
disposed earth to be levelled and neatly dressed including jungle clearance and as per directions of the Engineer-
incharge.

Laying and jointing of GMS Pipes of various dia in trenches (earth work in trenches to be measured and paid for
seperately) including all leads lifts and carriage of material at site as per direction of Engineer-in-charge of
following dias.
i) 65mm dia (RD 0 to 1335 Mtrs.

Providing and fixing of Brass full way valves with wheel of superior quality of the following dia meter complete in
all respect and as per direction of the Engineer-in-charge.
i) 65mm dia
Providing and fixing of pipe fitting material of approved make & relavant ISS complete in all respect including of all
leads,lifts and carriage of material at site and as per direction of the Engineer-in-charge.
i) G.I.Union 65mm dia

ii) G.I.Nipple 65mm

iii) G.I.Elbow 65x65mm.

TERMS AND CONDITIONS:-


The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.

Security,Sale tax & Income tax shall be deducted as per rules.


GI Pipe shall be issued free of cost from IPH Store Bhatanwali.

REVISED SCHEDULE OF QUANTITY


Name of work: Aug. & Imp. Of WSS of grounp of villages in GP Kando Kansar Barthal Mandhana & Bharog Baneri(Partly)
in Tehsil Paonta Sahib Distt. Sirmour (HP) (SH:Laying & jointing of Feeder line from Main Storage Tank Chiyan to
S/S/Tank at vill. Pudli Node No. A to Node No.F, RD 0 to 1440 Mtrs. job No.1.
Description.
Excavation in drains & channel etc.in earth work in all kinds of soil such as pick work ,jumper work blasting work,
decomposed conglomerate saturated soil soft and hard rock including dressing of sides and beds and prepareation
of sub grade to level or slope including refilling the trenches and disposing of surplus earth upto all leads,lifts
disposed earth to be levelled and neatly dressed including jungle clearance and as per directions of the Engineer-
incharge

Laying and jointing of GMS Pipes of various dia in trenches (earth work in trenches to be measured and paid for
seperately) including all leads lifts and carriage of material at site as per direction of Engineer-in-charge of
following dias.
i) 80mm dia
Providing and fixing of Brass full way valves with wheel of superior quality of the following dia meter complete in
all respect and as per direction of the Engineer-in-charge.
i) 80mm dia
Providing and fixing of pipe fitting material of approved make & relavant ISS complete in all respect including of all
leads,lifts and carriage of material at site and as per direction of the Engineer-in-charge.
i) MS clamp 150x80mm

ii) G.Iunion 80mm

iii) G.I Nipple 80mm.

TERMS AND CONDITIONS:-


The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.

Security,Sale tax & Income tax shall be deducted as per rules.


GI Pipe shall be issued free of cost from IPH Store Bhatanwali.

REVISED SCHEDULE OF QUANTITY


Name of work: Aug. & Imp. Of WSS of grounp of villages in GP Kando Kansar Barthal Mandhana & Bharog Baneri(Partly)
in Tehsil Paonta Sahib Distt. Sirmour (HP) (SH:Laying & jointing of Feeder line from Main Storage Tank Chiyan to
S/S/Tank at vill. Kansar Node No. A to Node No.G RD 0 to 1080 Mtrs.) Job No.1.
Description.
Excavation in drains & channel etc.in earth work in all kinds of soil such as pick work ,jumper work blasting work,
decomposed conglomerate saturated soil soft and hard rock including dressing of sides and beds and prepareation
of sub grade to level or slope including refilling the trenches and disposing of surplus earth upto all leads,lifts
disposed earth to be levelled and neatly dressed including jungle clearance and as per directions of the Engineer-
incharge

Laying and jointing of GMS Pipes of various dia in trenches (earth work in trenches to be measured and paid for
seperately) including all leads lifts and carriage of material at site as per direction of Engineer-in-charge of
following dias.
i) 80mm dia
Providing and fixing of C.I.Sluice valves of Cast Iron PN 1 Kirloskar/LEADER/BIR make & Relevant ISS complete in
all respect including all leads,lifts and carriage of material at site and as per direction of the Engineer-in-charge.

i) 80mm dia
Providing and fixing of pipe fitting material of approved make & relavant ISS complete in all respect including of all
leads,lifts and carriage of material at site and as per direction of the Engineer-in-charge.
i) G.I Union 80mm

ii) G.I Nipple 80mm.

TERMS AND CONDITIONS:-


The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.

Security,Sale tax & Income tax shall be deducted as per rules.


GI Pipe shall be issued free of cost from IPH Store Bhatanwali.
No payment shall be issued free of cost from IPH Store Bhatanwali Paonta Sahib.

REVISED SCHEDULE OF QUANTITY


Name of work: Aug. & Imp. Of WSS of grounp of villages in GP Kando Kansar Barthal Mandhana & Bharog Baneri(Partly)
in Tehsil Paonta Sahib Distt. Sirmour (HP) (SH:Laying & jointing of Feeder line from Main Storage Tank Chiyan to
S/S/Tank at vill. Pudli Node No. A to Node No.F RD1440 to 2340 Mtrs. job No.2.
Description.
Excavation in drains & channel etc.in earth work in all kinds of soil such as pick work ,jumper work blasting work,
decomposed conglomerate saturated soil soft and hard rock including dressing of sides and beds and prepareation
of sub grade to level or slope including refilling the trenches and disposing of surplus earth upto all leads,lifts
disposed earth to be levelled and neatly dressed including jungle clearance and as per directions of the Engineer-
incharge

Laying and jointing of GMS Pipes of various dia in trenches (earth work in trenches to be measured and paid for
seperately) including all leads lifts and carriage of material at site as per direction of Engineer-in-charge of
following dias.

i) 80mm dia
Providing and fixing of MS flanges(IS 6392-1971 of Table-17 confirm to IS 816-1965 electric rod as per IS 814-1967
including required no of Nut & bolt as per IS 1369-1967 and 3mm thick AF jointing gasket confirming to IS 2712-
1965. The welding of flange should be done in two layer both side and one layer inner side to make the joints air
tight and to entire satisfaction of the Engineer-in-charge.

i) 80mm dia Table-17.


Butt welding in pipes

i) G.Iunion 80mm
ii) G.I Nipple 80mm.

TERMS AND CONDITIONS:-


The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.

Security,Sale tax & Income tax shall be deducted as per rules.


GI Pipe shall be issued free of cost from IPH Store Bhatanwali.
No payment shall be issued free of cost from IPH Store Bhatanwali Paonta Sahib.

REVISED SCHEDULE OF QUANTITY


Name of work: Aug. & Imp. Of WSS of grounp of villages in GP Kando Kansar Barthal Mandhana & Bharog Baneri(Partly)
in Tehsil Paonta Sahib Distt. Sirmour (HP) (SH:Laying & jointing of Feeder line from S/S/Tank to vill. Kher Node G to Node H
RD1560 to RD 3120 Mtrs. job No.2.
Description.
Excavation in drains & channel etc.in earth work in all kinds of soil such as pick work ,jumper work blasting work,
decomposed conglomerate saturated soil soft and hard rock including dressing of sides and beds and prepareation
of sub grade to level or slope including refilling the trenches and disposing of surplus earth upto all leads,lifts
disposed earth to be levelled and neatly dressed including jungle clearance and as per directions of the Engineer-
incharge

Laying and jointing of GMS Pipes of various dia in trenches (earth work in trenches to be measured and paid for
seperately) including all leads lifts and carriage of material at site as per direction of Engineer-in-charge of
following dias.
i) 65mm dia
Providing and fixing of Brass full way valves with wheel of superior quality of the following dia meter complete in
all respect and as per direction of the Engineer-in-charge.
i) 65mm dia
Providing and fixing of pipe fitting material of approved make & relavant ISS complete in all respect including of all
leads,lifts and carriage of material at site and as per direction of the Engineer-in-charge.
i) G.Iunion 65mm
ii) G.I Nipple 65mm.
iii) G.I. Tee 65x65mm

TERMS AND CONDITIONS:-


The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
Security,Sale tax & Income tax shall be deducted as per rules.
GI Pipe shall be issued free of cost from IPH Store Bhatanwali.
No payment shall be issued free of cost from IPH Store Bhatanwali Paonta Sahib.

REVISED SCHEDULE OF QUANTITY


Name of work: Aug. & Imp. Of WSS of grounp of villages in GP Kando Kansar Barthal Mandhana & Bharog Baneri(Partly)

in Tehsil Paonta Sahib Distt. Sirmour (HP) (SH:Laying & jointing of Feeder line from 2nd stage Tanlog to S/S/Tank
at village Tanlog to S/S/Tank at vill. Mehat Node D to Node E.
Description.
Excavation in drains & channel etc.in earth work in all kinds of soil such as pick work ,jumper work blasting work,
decomposed conglomerate saturated soil soft and hard rock including dressing of sides and beds and prepareation
of sub grade to level or slope including refilling the trenches and disposing of surplus earth upto all leads,lifts
disposed earth to be levelled and neatly dressed including jungle clearance and as per directions of the Engineer-
incharge

Laying and jointing of GMS Pipes of various dia in trenches (earth work in trenches to be measured and paid for
seperately) including all leads lifts and carriage of material at site as per direction of Engineer-in-charge of
following dias.
i) 65mm dia
Providing and fixing of Brass full way valves with wheel of superior quality of the following dia meter complete in
all respect and as per direction of the Engineer-in-charge.
i) 65mm dia
Providing and fixing of pipe fitting material of approved make & relavant ISS complete in all respect including of all
leads,lifts and carriage of material at site and as per direction of the Engineer-in-charge.
i) G.I Union 65mm
ii) G.I Nipple 65mm.

TERMS AND CONDITIONS:-


The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.

Security,Sale tax & Income tax shall be deducted as per rules.


GI Pipe shall be issued free of cost from IPH Store Bhatanwali.
No payment shall be issued free of cost from IPH Store Bhatanwali Paonta Sahib.
REVISED SCHEDULE OF QUANTITY
Name of work: Aug. & Imp. Of WSS of group of villages in GP Kando Kansar Barthal Mandhana & Bharog Baneri(Partly)
in Tehsil Paonta Sahib Distt. Sirmour (HP) (SH:Laying & jointing of Feeder line from S/S/Tank to vill. Baneri Node H to Node I
RD 0 to RD 540 Mtrs. )
Description.
Excavation in drains & channel etc.in earth work in all kinds of soil such as pick work ,jumper work blasting work,
decomposed conglomerate saturated soil soft and hard rock including dressing of sides and beds and prepareation
of sub grade to level or slope including refilling the trenches and disposing of surplus earth upto all leads,lifts
disposed earth to be levelled and neatly dressed including jungle clearance and as per directions of the Engineer-
incharge

Laying and jointing of GMS Pipes of various dia in trenches (earth work in trenches to be measured and paid for
seperately) including all leads lifts and carriage of material at site as per direction of Engineer-in-charge of
following dias.
i) 65mm dia
Providing and fixing of Brass full way valves with wheel of superior quality of the following dia meter complete in
all respect and as per direction of the Engineer-in-charge.
i) 65mm dia
Providing and fixing of pipe fitting material of approved make & relavant ISS complete in all respect including of all
leads,lifts and carriage of material at site and as per direction of the Engineer-in-charge.
i) G.Iunion 65mm
ii) G.I Nipple 65mm.
iii) G.I. Tee 65x65mm

TERMS AND CONDITIONS:-


The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.

Security,Sale tax & Income tax shall be deducted as per rules.


GI Pipe shall be issued free of cost from IPH Store Bhatanwali.
No payment shall be issued free of cost from IPH Store Bhatanwali Paonta Sahib.

REVISED SCHEDULE OF QUANTITY


Name of work: Aug. & Imp. of WSS of group of villages in GP Kando Kansar Barthal Mandhana & Bharog Baneri(Partly) in Tehsil
Paonta Distt. Sirmour (HP) (SH:Laying & jointing of Feeder line from Existing Tank Bhatna Kalan to village Katwari Baghrath)

Description.
Excavation in drains & channel etc.in earth work in all kinds of soil such as pick work ,jumper work blasting work,
decomposed conglomerate saturated soil soft and hard rock including dressing of sides and beds and prepareation
of sub grade to level or slope including refilling the trenches and disposing of surplus earth upto all leads,lifts
disposed earth to be levelled and neatly dressed including jungle clearance and as per directions of the Engineer-
incharge

Laying and jointing of GMS Pipes of various dia in trenches (earth work in trenches to be measured and paid for
seperately) including all leads lifts and carriage of material at site as per direction of Engineer-in-charge of
following dias.
i) 65mm dia
Providing and fixing of Brass full way valves with wheel of superior quality of the following dia meter complete in
all respect and as per direction of the Engineer-in-charge.
i) 65mm dia

TERMS AND CONDITIONS:-


The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.

Security,Sale tax & Income tax shall be deducted as per rules.


GI Pipe shall be issued free of cost from IPH Store Bhatanwali.
No payment shall be issued free of cost from IPH Store Bhatanwali Paonta Sahib.
REVISED SCHEDULE OF QUANTITY
Name of work: Aug. & Imp. Of WSS of grounp of villages in GP Kando Kansar Barthal Mandhana & Bharog Baneri(Partly)
in Tehsil Paonta Sahib Distt. Sirmour (HP) (SH:Laying & jointing of Feeder line from S/S/Tank to vill. Kher Node G to Node H
RD 0 to RD 1560 Mtrs. job No.1.
Description.
Excavation in drains & channel etc.in earth work in all kinds of soil such as pick work ,jumper work blasting work,
decomposed conglomerate saturated soil soft and hard rock including dressing of sides and beds and prepareation
of sub grade to level or slope including refilling the trenches and disposing of surplus earth upto all leads,lifts
disposed earth to be levelled and neatly dressed including jungle clearance and as per directions of the Engineer-
incharge

Laying and jointing of GMS Pipes of various dia in trenches (earth work in trenches to be measured and paid for
seperately) including all leads lifts and carriage of material at site as per direction of Engineer-in-charge of
following dias.
i) 65mm dia
Providing and fixing of Brass full way valves with wheel of superior quality of the following dia meter complete in
all respect and as per direction of the Engineer-in-charge.
i) 65mm dia
Providing and fixing of pipe fitting material of approved make & relavant ISS complete in all respect including of all
leads,lifts and carriage of material at site and as per direction of the Engineer-in-charge.
i) G.Iunion 65mm
ii) G.I Nipple 65mm.
iii) G.I. Tee 65x65mm
iv) Reducer 80x65mm.

TERMS AND CONDITIONS:-


The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.

Security,Sale tax & Income tax shall be deducted as per rules.


GI Pipe shall be issued free of cost from IPH Store Bhatanwali.
No payment shall be issued free of cost from IPH Store Bhatanwali Paonta Sahib.
REVISED SCHEDULE OF QUANTITY
Name of work: c/O lis Mehat in GP Kando Kansar in Tehsil Paonta Sahib Distt.Sirmour (HP)
(SH: C/O Foundation of Pumping Machinery, Flooring of Pump House, White washing ,Pillaster of Boundry wall
Sub-Head and item of work.
2
Excavation in foundation and trenches etc.in earth work in all kinds of soil such as pick work ,jumper work
decomposed conglomerate saturated soil soft and hard rock upto all leads lifts stacking the excavated soil not more
than 3mtr.clear from the edge of excavation and then returning the stacked soil in 15cm layers when required in to
plinth sides of foundation etc. consolidating each deposited layers by ramming and watering and then disposing of
all surplus excavated earth as directed with in all leads lifts and as per directions of the Engineer-in-charge

Providing and laying cement concrete 1:4:8(1cement:4sand:8 graded stone agg.40mm nominal size)and curing
complete excluding the cost of form work in foundation & plinth including all leads lifts and carriage of material
and as per the directions of Engineer-in-charge.
Providing and laying cement concrete work 1:1 1/2:3 (1cement:1 1/2 sand: 3 graded stone agg. 20mm nominal size
& curing complete) excluding cost of form work in foundation & plinth in all heioght and depth including all leads
lifts complete and carriage of material etc. as per directions of Engineer incharge.
i) In foundation and Plinth etc.
Providing form work with steel sheets 3.15mm thick welded with angle iron 30x30x5 mm so as to give rough finish
i/c centring shuttering structing and propping etc. with wooden bettens & Ballies, height or propping & centering
below supporting floor to ceiling not exceeding 4 mtr.and removal of the same for insitu RCC work and PCC
work.including all leads lifts and carriage of material at site & as per direction of Engineer in charge in:-

a) Flat surfaces such as soffits of suspended floor roofs landings and like upto 200mm in thickness
b) Vertical surface such as wall any thickness.
Providing sand filling around the foundation of Pumping Machinery including all leads,lifts and carriage of material
complete in all respect and as per direction of the Engineer-incharge.
Providing CC flooring in Cement Mortar 1:2:4(1cement : 2 sand: 4 graded stone aggregate 20mm nominal size) laid
in one layer finished even with a floating coat of neat cement 40mm thick including all leads,lifts and carrige of
material complete and as per direction of the Engineer-in-charge.
White washing with lime on decorated wall surface (two coat) to give an even shade including throughly brooming
the surface to remove all dirt dust mortar drops and loose scale of lime wash and other foreign matter including all
leadsmlifts and carriage of material and as per direction of the Engineer-in-charge.
Finishing wall with water proofing cement paint of approved brand and manufacture and of required shade on
decorated wall surface to give an even shade after thoroughly brushing the surface to remove all dirt and remain of
loose powered material complete in all respect and as per direction of the Engineer-in-charge.

Painting two coats (excluding priming coat) on new wood and wood based with surfaces with ready mixed paint
other then white brushing to give an even shade including cleaning the surface of dirt dust and other foreign
matter,sand papering and stopping. Including all leads lifts and carriage of material at site as per direction of
Engineer incharge.

20 mm thick cement plaster in single coat of rough side of bricks/stone masonary for interior plastering upto floor
two level including arrises internal rounded angles chamfers rounded angles not exceeding 80mm in girth and
finished even and smooth in cement mortor 1:6(1cement:6 sand) and curing complete including all leads lifts and
carriage of materials at site as per direction of Engineer-incharge.
Himrachi colour wash on undecorated wall surface (two coat) to give an even shade including thoroughly brushing
the surface free from Mortor drops and other foreign matter complete in all respect and as per direction of the
Engineer-in-charge.
Providing and laying reinforced cement concrete 1:2:4(1cement :2app.sand: 4app. graded stone agg.20mm nominal
size )and curing complete excluding cost of form work & reinforcement in suspended floors, roofs, shelves &
supports, balconies beams etc. upto floor in two level in all height and depth including all leads lifts & carriage of
material at site and as per direction of the Engineer-incharge.

Providing Mild Steel/Tor steel reinforcement including bending binding & placing in positing I/c all leads lifts and
carriage of material and as per direction of the Engineer-in-charge.
Ist. Class brick work using common burnt clay building bricks (Iind class) in foundation & plinth in Cement Mortar
1:6 (1cement:6sand) and carriage of material at site and as per direction of the Engineer-in-charge.
Providing plinth protction 50mm thick cement concrete 1:3:6(1cement:3sand:6graded stone agg. ) 20mm nomional
size & curing complete and carriage of material at site and as per direction of the Engineer-in-charge.

TERMS & CONDITIONS


The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
Security,Sale tax & Income tax shall be deducted as per rules.
Cement will be issued @ 315/- per bag & steel @ 53/- per Kg. at IPH store Bhatanwali Paonta Sahib.
Empty cement bags shall be returned to the deptt. Otherwise Rs. 2/- per bag shall be deducted from the each bill of
the contractor.
Royality certificate in respect of stone agg. Sand etc. shall be produced by the contractor

REVISED SCHEDULE OF QUANTITY


in Tehsil Paonta Sahib Distt. Sirmour (HP) (SH:Laying & jointing of Feeder line from Main Storage Tank Chiyan to
S/S/Tank at vill. Pudli Node No. A to Node F RD 2340 to 3750 Mtrs. job No.3.
Description.
Excavation in drains & channel etc.in earth work in all kinds of soil such as pick work ,jumper work blasting work,
decomposed conglomerate saturated soil soft and hard rock including dressing of sides and beds and prepareation
of sub grade to level or slope including refilling the trenches and disposing of surplus earth upto all leads,lifts
disposed earth to be levelled and neatly dressed including jungle clearance and as per directions of the Engineer-
incharge

Laying and jointing of GMS Pipes of various dia in trenches (earth work in trenches to be measured and paid for
seperately) including all leads lifts and carriage of material at site as per direction of Engineer-in-charge of
following dias.
i) 80mm dia
Providing and fixing of pipe fitting material of approved make & relavant ISS complete in all respect including of all
leads,lifts and carriage of material at site and as per direction of the Engineer-in-charge.
i) G.Iunion 80mm
ii) G.I Elbow 80mm.

TERMS AND CONDITIONS:-


The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.

Security,Sale tax & Income tax shall be deducted as per rules.


GI Pipe shall be issued free of cost from IPH Store Bhatanwali.
REVISED SCHEDULE OF QUANTITY

in Tehsil Paonta Sahib Distt. Sirmour (HP) (SH:Laying & jointing & Testing of GMS Pipe to Left Out area of village Upper Tanlog
GPS & Anganwari of village Chiyan Maiyana)
Description.
Excavation in drains & channel etc.in earth work in all kinds of soil such as pick work ,jumper work blasting work,
decomposed conglomerate saturated soil soft and hard rock including dressing of sides and beds and prepareation
of sub grade to level or slope including refilling the trenches and disposing of surplus earth upto all leads,lifts
disposed earth to be levelled and neatly dressed including jungle clearance and as per directions of the Engineer-
incharge

Laying and jointing of GMS Pipes of various dia in trenches (earth work in trenches to be measured and paid for
seperately) including all leads lifts and carriage of material at site as per direction of Engineer-in-charge of
following dias.
i) 32mm dia
ii) 25mm dia
iii) 15mm dia
Providing and fixing of Brass full way valves with wheel of superior quality of the following dia meter complete in
all respect and as per direction of the Engineer-in-charge.
i) 32mm dia
ii) 25mm dia.
iii) 15mm dia
Providing and fixing of pipe fitting material of approved make & relavant ISS complete in all respect including of all
leads,lifts and carriage of material at site and as per direction of the Engineer-in-charge.
i) G.I Union 32mm
ii) G.I.Union 25mm dia.
iii) G.I.Union 15mm dia
iv) M. S.Clamp 32x15mm
v) M.S.Clamp 25x15mm

TERMS AND CONDITIONS.


The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.

Security,Sale tax & Income tax shall be deducted as per rules.


GI Pipe shall be issued free of cost from IPH Store Bhatanwali.

REVISED SCHEDULE OF QUANTITY

in Tehsil Paonta Sahib Distt. Sirmour (HP) (SH:Laying & jointing of Feeder line from S/S/Tank to vill. Kher Node G to Node H
RD 1560 to RD 3120 Mtrs. job No.2.
Description.
Excavation in drains & channel etc.in earth work in all kinds of soil such as pick work ,jumper work blasting work,
decomposed conglomerate saturated soil soft and hard rock including dressing of sides and beds and prepareation
of sub grade to level or slope including refilling the trenches and disposing of surplus earth upto all leads,lifts
disposed earth to be levelled and neatly dressed including jungle clearance and as per directions of the Engineer-
incharge

Laying and jointing of GMS Pipes of various dia in trenches (earth work in trenches to be measured and paid for
seperately) including all leads lifts and carriage of material at site as per direction of Engineer-in-charge of
following dias.
i) 65mm dia
Providing and fixing of Brass full way valves with wheel of superior quality of the following dia meter complete in
all respect and as per direction of the Engineer-in-charge.
i) 65mm dia
Providing and fixing of pipe fitting material of approved make & relavant ISS complete in all respect including of all
leads,lifts and carriage of material at site and as per direction of the Engineer-in-charge.
i) G.Iunion 65mm
ii) G.I Nipple 65mm.
iii) G.I. Tee 65x65mm

TERMS AND CONDITIONS:-


The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.

Security,Sale tax & Income tax shall be deducted as per rules.


GI Pipe shall be issued free of cost from IPH Store Bhatanwali.

REVISED SCHEDULE OF QUANTITY


in Tehsil Paonta Sahib Distt. Sirmour (HP) (SH:Laying & jointing of Feeder line from Main Storage tank Chiayan to S/S/Tank at
village Pudli Node A to Node F ) RD 1440 to 2340 Mtrs. Job No.2
Description.
Excavation in drains & channel etc.in earth work in all kinds of soil such as pick work ,jumper work blasting work,
decomposed conglomerate saturated soil soft and hard rock including dressing of sides and beds and prepareation
of sub grade to level or slope including refilling the trenches and disposing of surplus earth upto all leads,lifts
disposed earth to be levelled and neatly dressed including jungle clearance and as per directions of the Engineer-in-
charge

Laying and jointing of GMS Pipes of various dia in trenches (earth work in trenches to be measured and paid for
seperately) including all leads lifts and carriage of material at site as per direction of Engineer-in-charge of
following dias.
i) 80 mm dia .(M)
Providing and fixing of flanges 6392-1971 ) of table 17 confirm to IS: 816-1965 electric rod as per IS 814-1967
including reuired no. of Nut & bolt as per IS: 1369-1967 and 3mm thick AF jointing gasket confirming to IS 2712-
1965. The welding of flange should be done in two layer both side and one layer inner side to make the joints ar
tight and to entire satisfaction of the Engineer-in-charge.

i) 80mm dia Table-17.


Butt welding in pipes including cutting welding and making Bends of required degree for 80mm dia medium class
pipe(excluding cost of pipes Nuts & bolts to be measured abd paid for separately complete in all respect including
all leads,lifts and carriage of material at site and as directed by the Engineer-in-charge.
i) G.M.S.Pipe 80mm dia.

TERMS AND CONDITIONS:-


The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.

Security,Sale tax & Income tax shall be deducted as per rules.


GI Pipe shall be issued free of cost from IPH Store Bhatanwali.
REVISED SCHEDULE OF QUANTITY

in Tehsil Paonta Sahib Distt. Sirmour (HP) (SH:Laying & jointing of Feeder line from Main Storage tank Chiayan to S/S/Tank at
village Kansar Node A to Node G ) RD 1080 to 2220 Mtrs. Job No.2
Description.
Excavation in drains & channel etc.in earth work in all kinds of soil such as pick work ,jumper work blasting work,
decomposed conglomerate saturated soil soft and hard rock including dressing of sides and beds and prepareation
of sub grade to level or slope including refilling the trenches and disposing of surplus earth upto all leads,lifts
disposed earth to be levelled and neatly dressed including jungle clearance and as per directions of the Engineer-in-
charge

Laying and jointing of GMS Pipes of various dia in trenches (earth work in trenches to be measured and paid for
seperately) including all leads lifts and carriage of material at site as per direction of Engineer-in-charge of
following dias.

i) 80 mm dia .(M)
ii) 80mm dia (L)
Providing and fixing of flanges 6392-1971 ) of table 17 confirm to IS: 816-1965 electric rod as per IS 816-1967
including reuired no. of Nut & bolt as per IS: 1369-1967 and 3mm thick AF jointing gasket confirming to IS 2712-
1965. The welding of flange should be done in two layer both side and one layer inner side to make the joints ar
tight and to entire satisfaction of the Engineer-in-charge.

i) 80mm dia Table-17.


Butt welding in pipes including cutting welding and making Bends of required degree for 80mm dia medium class
pipe(excluding cost of pipes Nuts & bolts to be measured abd paid for separately complete in all respect including
all leads,lifts and carriage of material at site and as directed by the Engineer-in-charge.
i) G.M.S.Pipe 80mm dia.
Providing and fixing double flanged cast iron class P.N.1.0 sluice valves of LEADER /BHEL/KIRLOSKAR
/GLED/KILBURN/FOURCES & KSB make of following dia for the delivery pipe and capable of with standing the
normal seat pressure as per IS 780-1992 relevant with upto date ammendments inclusing cost of providing and
welding of M.S.flanges of Table-5. The flanges should be as per IS 6392-1971 with up to date ammendments as per
direction of the Engineer-in-charge. 80-mm dia

Providing and fixing of pipe fitting material of approved make & relavant ISS complete in all respect including of all
leads,lifts and carriage of material at site and as per direction of the Engineer-in-charge.
i) G.I.Union 80mm
ii) G.I Nipple 80mm.
TERMS AND CONDITIONS:-
The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.

Security,Sale tax & Income tax shall be deducted as per rules.


GI Pipe shall be issued free of cost from IPH Store Bhatanwali.

REVISED SCHEDULE OF QUANTITY


Name of work: Aug. & Imp. of WSS of group of villages in GP Kando Kansar in Tehsil Paonta Sahib Distt.Sirmour (HP)
(SH: C/O Sub Storage tank aat village Mehat & Janglot.)
Sub-Head and item of work.
2
Excavation in foundation and trenches etc.in earth work in all kinds of soil such as pick work ,jumper work
decomposed conglomerate saturated soil soft and hard rock upto all leads lifts stacking the excavated soil not more
than 3mtr.clear from the edge of excavation and then returning the stacked soil in 15cm layers when required in to
plinth sides of foundation etc. consolidating each deposited layers by ramming and watering and then disposing of
all surplus excavated earth as directed with in all leads lifts and as per directions of the Engineer-in-charge

Providing and laying cement concrete 1:4:8(1cement:4sand:8 graded stone agg.40mm nominal size)and curing
complete excluding the cost of form work in foundation & plinth including all leads lifts and carriage of material
and as per the directions of Engineer-in-charge.
Providing and laying cement concrete work 1:1 1/2:3 (1cement:1 1/2 sand: 3 graded stone agg. 20mm nominal size
& curing complete) excluding cost of form work in foundation & plinth in all height and depth including all leads
lifts complete and carriage of material etc. as per directions of Engineer incharge.
i) In foundation and Plinth etc.
Providing and laying cement concrete work 1:1 1/2:3 (1cement:1 1/2 sand: 3 graded stone agg. 20mm nominal size
& curing complete) excluding cost of form work in foundation & plinth in all height and depth including all leads
lifts complete and carriage of material etc. as per directions of Engineer incharge. In walls.

Providing form work with steel sheets 3.15mm thick welded with angle iron 30x30x5 mm so as to give rough finish
i/c centring shuttering structing and propping etc. with wooden bettens & Ballies, height or propping & centering
below supporting floor to ceiling not exceeding 4 mtr.and removal of the same for insitu RCC work and PCC
work.including all leads lifts and carriage of material at site & as per direction of Engineer in charge in:-

a) Flat surfaces such as soffits of suspended floor roofs landings and like upto 200mm in thickness
b) Vertical surface such as wall any thickness.
Providing sand filling around the foundation of Pumping Machinery including all leads,lifts and carriage of material
complete in all respect and as per direction of the Engineer-incharge.
Providing CC flooring in Cement Mortar 1:2:4(1cement : 2 sand: 4 graded stone aggregate 20mm nominal size) laid
in one layer finished even with a floating coat of neat cement 40mm thick including all leads,lifts and carrige of
material complete and as per direction of the Engineer-in-charge.
White washing with lime on decorated wall surface (two coat) to give an even shade including throughly brooming
the surface to remove all dirt dust mortar drops and loose scale of lime wash and other foreign matter including all
leadsmlifts and carriage of material and as per direction of the Engineer-in-charge.
Finishing wall with water proofing cement paint of approved brand and manufacture and of required shade on
decorated wall surface to give an even shade after thoroughly brushing the surface to remove all dirt and remain of
loose powered material complete in all respect and as per direction of the Engineer-in-charge.
Painting two coats (excluding priming coat) on new wood and wood based with surfaces with ready mixed paint
other then white brushing to give an even shade including cleaning the surface of dirt dust and other foreign
matter,sand papering and stopping. Including all leads lifts and carriage of material at site as per direction of
Engineer incharge.

20 mm thick cement plaster in single coat of rough side of bricks/stone masonary for interior plastering upto floor
two level including arrises internal rounded angles chamfers rounded angles not exceeding 80mm in girth and
finished even and smooth in cement mortor 1:6(1cement:6 sand) and curing complete including all leads lifts and
carriage of materials at site as per direction of Engineer-incharge.

Himrachi colour wash on undecorated wall surface (two coat) to give an even shade including thoroughly brushing
the surface free from Mortor drops and other foreign matter complete in all respect and as per direction of the
Engineer-in-charge.
Providing and laying reinforced cement concrete 1:2:4(1cement :2app.sand: 4app. graded stone agg.20mm nominal
size )and curing complete excluding cost of form work & reinforcement in suspended floors, roofs, shelves &
supports, balconies beams etc. upto floor in two level in all height and depth including all leads lifts & carriage of
material at site and as per direction of the Engineer-incharge.

Providing Mild Steel/Tor steel reinforcement including bending binding & placing in positing I/c all leads lifts and
carriage of material and as per direction of the Engineer-in-charge.
Ist. Class brick work using common burnt clay building bricks (Iind class) in foundation & plinth in Cement Mortar
1:6 (1cement:6sand) and carriage of material at site and as per direction of the Engineer-in-charge.
Providing plinth protction 50mm thick cement concrete 1:3:6(1cement:3sand:6graded stone agg. ) 20mm nomional
size & curing complete and carriage of material at site and as per direction of the Engineer-in-charge.

TERMS & CONDITIONS


The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
Security,Sale tax & Income tax shall be deducted as per rules.
Cement will be issued @ 315/- per bag & steel @ 53/- per Kg. at IPH store Bhatanwali Paonta Sahib.
Empty cement bags shall be returned to the deptt. Otherwise Rs. 2/- per bag shall be deducted from the each bill of
the contractor.
Royality certificate in respect of stone agg. Sand etc. shall be produced by the contractor
Estimated cost Rs 68559/-
rtly)
Earnest money Rs.1400/-
Time:- One Month

Qty. Rate. Unit Amount.


330.00 Cum 170.00 P/Cum 56100.00

1335 Rmt 44.00 P/Rmt. 58740.00

2 Nos. 2000.00 Each. 4000.00

15 Nos. 300.00 Each. 4500.00

2 Nos. 150.00 Each. 300.00

2 Nos. 140.00 Each. 280.00


Total: ###

Executive Engineer,
I&PH Division, Paonta Sahib.

Estimated cost Rs 95138/-


Earnest money Rs.1900/-
Time:- One Month

Qty. Rate. Unit Amount.


356.00 Cum 170.00 P/Cum 60520.00

1440 Rmt 46.50 P/Rmt. 66960.00

1 Nos. 2000.00 Each. 2000.00

1 No. 450.00 Each. 450.00

16 Nos. 600.00 Each. 9600.00

2 Nos. 180.00 Each. 360.00


Total: ###

Executive Engineer,
I&PH Division,
Paonta Sahib.

Estimated cost Rs 64725/-


rtly) Earnest money Rs.1300/-
Time:- One Month

Qty. Rate. Unit Amount.


267.00 Cum 170.00 P/Cum 45390.00
1080 Rmt 46.50 P/Rmt. 50220.00

1 No. 13500.00 Each. 13500.00

12 Nos. 600.00 Each. 7200.00

2 Nos. 175.00 Each. 350.00

Total: ###

Executive Engineer,
I&PH Division, Paonta Sahib.

Estimated cost Rs 99675/-


rtly)
Earnest money Rs.2000/-
Time:- One Month

Qty. Rate. Unit Amount.


223.00 Cum 170.00 P/Cum 37910.00

900 Rmt 38.00 P/Rmt. 34200.00


50 Pair. Per Pair. 0.00

12 No. Each. 0.00


2 Nos. Each. 0.00

Total: 0.00

Executive Engineer,
I&PH Division, Paonta Sahib.
Estimated cost Rs 79411/-
rtly)
Earnest money Rs.1600/-
Time:- One Month.

Qty. Rate. Unit Amount.


386.00 Cum 170.00 P/Cum 65620.00

0.00

1560 Rmt 44.00 P/Rmt. 68640.00

2 Nos. 1800.00 Each. 3600.00

17 Nos. 600.00 Each. 10200.00


2 Nos. 300.00 Each. 600.00
1 No. 500.00 Each. 500.00
Total:
###
Executive Engineer,
I&PH Division, Paonta Sahib.

Estimated cost Rs 98770/-


rtly)
Earnest money Rs.1975/-
Time:- One Month.

Qty. Rate. Unit Amount.


483.00 Cum 170.00 P/Cum 82110.00

1950 Rmt 44.00 P/Rmt. 85800.00

1 No. 1800.00 Each. 1800.00

22 Nos. 550.00 Each. 12100.00


2 Nos. 150.00 Each. 300.00
Total: ###

Executive Engineer,
I&PH Division, Paonta Sahib.
Estimated cost Rs 29734/-
tly)
Earnest money Rs.600/-
Time:- One Month.

Qty. Rate. Unit Amount.


134.00 Cum 170.00 P/Cum 22780.00

540 Rmt 44.00 P/Rmt. 23760.00

2 Nos. 1800.00 Each. 3600.00

6 Nos. 550.00 Each. 3300.00


2 Nos. 150.00 Each. 300.00
1 No. 200.00 Each. 200.00
Total: 53940.00

Executive Engineer,
I&PH Division, Paonta Sahib.

Estimated cost Rs 98556/-


tly) in Tehsil Earnest money Rs.1975/-
Time:- One Month.

Qty. Rate. Unit Amount.


519.75 Cum 170.00 P/Cum 88358.00

2100 Rmt 44.00 P/Rmt. 92400.00

1 No. 1800.00 Each. 1800.00


Total: ###

Executive Engineer,
I&PH Division, Paonta Sahib.
Estimated cost Rs 79556/-
rtly) Earnest money Rs.1600/-
Time:- One Month.

Qty. Rate. Unit Amount.


386.00 Cum 170.00 P/Cum 65620.00

1560 Rmt 44.00 P/Rmt. 68640.00

2 Nos. 1800.00 Each. 3600.00

17 Nos. 550.00 Each. 9350.00


2 Nos. 150.00 Each. 300.00
1 No. 200.00 Each. 200.00
1 No. 190.00 Each. 190.00
Total: ###

Executive Engineer,
I&PH Division, Paonta Sahib.
Estimated cost Rs 46111/-
Earnest money Rs.925/-
Time:- 16 Days.
Qty. Rates, Unit Amount.
3 4 5 6
4.93 Cum 170.00 P/Cum 838.00

0.82 Cum 1104.80 P/Cum 906.00

2.55 Cum. 1866.80 P/Cum. 4760.00

19.65 Sqm. 134.10 P/Sqm. 2635.00


11.76 Sqm. 80.70 P/Sqm. 949.00
1.02 Cum 1658.90 P/Cum 1692.00

40.09 Sqm. 20.70 Per Sqm. 830.00

218.65 Sqm. 75.95 P/Sqm. 16606.00

218.65 Sqm. Per Sqm.

10.74 Sqm 55.00 P/Sqm 591.00

138 Sqm 110.00 P/Sqm 15180.00


2.94 Cum 3250.00 P/Cum 9555.00

594.64 Kg. 20.70 P/kg 12309.00

20.47 Sqm. Per Sqm.

TOTAL: TOTAL:

Executive Engineer,
I&PH Division,
Paonta Sahib.

Estimated cost Rs 71830/-


Earnest money Rs.1450/-
Time:- One Month

Qty. Rate. Unit Amount.


349.00 Cum 170.00 P/Cum 59330.00

1410 Rmt 46.50 P/Rmt. 65565.00

16 No. 600.00 Each. 9600.00


2 Nos. 150.00 Each. 300.00
Total: ###

Executive Engineer,
I&PH Division, Paonta Sahib.
Estimated cost Rs 98408/-

Earnest money Rs. 2000/-


pper Tanlog Time:- One Month

Qty. Rate. Unit Amount.


950.00 Cum 170.00 P/Cum ###

2070 Rmt 17.00 P/Rmt. 35190.00


1200 Rmt 15.00 P/Rmt. 18000.00
570 Rmt 10.00 P/Rmt. 5700.00

2 Nos. 750.00 Each. 1500.00


2 Nos. 600.00 Each. 1200.00
1 No. 450.00 Each. 450.00

25 Nos 160.00 Each. 4000.00


15 Nos. 130.00 Each. 1950.00
15 Nos. 80.00 Each. 1200.00
8 Nos. 220.00 Each. 1760.00
4 Nos. 190.00 Each. 760.00
Total: ###

Executive Engineer,
I&PH Division, Paonta Sahib.

Estimated cost Rs 79411/-

Earnest money Rs.1600/-


Time:- One Month.

Qty. Rate. Unit Amount.


386.00 Cum 170.00 P/Cum 65620.00

1560 Rmt 44.00 P/Rmt. 68640.00

2 Nos. 1800.00 Each. 3600.00

17 Nos. 550.00 Each. 9350.00


2 Nos. 150.00 Each. 300.00
1 No. 500.00 Each. 500.00
Total: ###

Executive Engineer,
I&PH Division,
Paonta Sahib.

Estimated cost Rs 99675/-


Earnest money Rs.2000/-
S/S/Tank at Time:- One Month.

Qty. Rate. Unit Amount.


223.00 Cum 170.00 P/Cum 37910.00

900 Rmt 46.50 P/Rmt. 41850.00

50 Pair. 1250.00 Per Pair. 62500.00

100 Nos. 170.00 Each. 17000.00


Total: ###

Executive Engineer,
I&PH Division, Paonta Sahib.
Estimated cost Rs 98340/-

Earnest money Rs.2000/-


S/S/Tank at Time:- One Month.

Qty. Rate. Unit Amount.


282.00 Cum 170.00 47940.00

720 Rmt 46.50 P/Rmt. 33480.00


420 Rmt. 46.50 P/Rmt. 19530.00

40 Pair. 1250.00 Each. 50000.00

80 Nos. 170.00 Each. 13600.00


1 No. 13500.00 Each. 13500.00

5 Nos. 600.00 Each. 3000.00


2 Nos. 180.00 Each. 360.00
TOTAL: ###

Executive Engineer,
I&PH Division, Paonta Sahib.

Estimated cost Rs 62585/-


P) Earnest money Rs.1300/-
Time:- One Month.
Qty. Rates, Unit Amount.
3 4 5 6
41.37 Cum 170.00 P/Cum 7033.00

3.45 Cum 1104.80 P/Cum 3812.00

2.47 Cum. 1866.80 P/Cum. 4611.00


6.88 Cum. P/Cum.

19.65 Sqm. 134.10 P/Sqm. 2635.00


11.76 Sqm. 80.70 P/Sqm. 949.00
1.02 Cum 1658.90 P/Cum 1692.00

40.09 Sqm. 20.70 Per Sqm. 830.00

218.65 Sqm. 75.95 P/Sqm. 16606.00

218.65 Sqm. Per Sqm.


10.74 Sqm 55.00 P/Sqm 591.00

138 Sqm 110.00 P/Sqm 15180.00

2.94 Cum 3250.00 P/Cum 9555.00

594.64 Kg. 20.70 P/kg 12309.00

20.47 Sqm. Per Sqm.

TOTAL: TOTAL:

Executive Engineer,
I&PH Division,
Paonta Sahib.
REVISED SCHEDULE OF QUANTITY
Name of work: R/M of GWSS Chhainch Matyana & Bud-dhar GP Kota Pab in Tehsil Shillai Distt.Sirmour (HP)

(SH: C/O RCC collection Tank , Tank at Budhdhar & laying of Main line
S.No Sub-Head and item of work.
1 2
1 Excavation in foundation and trenches etc.in earth work in all kinds of soil such as pick
work ,jumper work decomposed conglomerate saturated soil soft and hard rock upto all
leads lifts stacking the excavated soil not more than 3mtr.clear from the edge of excavation
and then returning the stacked soil in 15cm layers when required in to plinth sides of
foundation etc. consolidating each deposited layers by ramming and watering and then
disposing of all surplus excavated earth as directed with in all leads lifts and as per
directions of the Engineer-in-charge

2 Providing and laying cement concrete 1:4:8(1cement:4sand:8 graded stone agg.40mm


nominal size)and curing complete excluding the cost of form work in foundation & plinth
including all leads lifts and carriage of material and as per the directions of Engineer-in-
charge.

3 Providing and laying cement concrete work 1:1 1/2:3 (1cement:1 1/2 sand: 3 graded
stone agg. 20mm nominal size & curing complete) excluding cost of form workand
reinforcement for RCC work including all leads lifts complete and carriage of material etc.
as per directions of Engineer incharge.

i) In foundation and Plinth etc.


ii) In vertical walls any thickness but not less than 0.10 Metres.
4 Providing form work with steel sheets 3.15mm thick welded with angle iron 30x30x5 mm
so as to give rough finish i/c centring shuttering structing and propping etc. with wooden
bettens & Ballies, height or propping & centering below supporting floor to ceiling not
exceeding 4 mtr.and removal of the same for insitu RCC work and PCC work.including all
leads lifts and carriage of material at site & as per direction of Engineer in charge in:-

a) Flat surfaces such as soffits of suspended floor roofs landings and like upto 200mm in
thickness
b) Vertical surface such as wall any thickness.
5 Providing and laying cement concrete 1:2:4(1cement:2app.sand: 4 app. graded stone agg.
20mm nominal size )and curing complete excluding cost of form work & reinforcement for
reinforced work in suspended floors, roofs landing shelves and their supports balconies,
beams, girders bressumers and cantilivers upto to floor two level in all height and depth,
including all leads lifts and carriage of material at site and as per direction of the Engineer-
incharge.

6 Providing Mild Steel/Tor steel reinforcement including bending binding & placing in
positing I/c all leads lifts and carriage of material and as per direction of the Engineer-in-
charge.
7 Excavation in drains and channels etc. in earth work in all kinds of soil such as pick
work,jumper work ,blasting work decomposed conglomerate saturated soil soft rock and
hard rock including dressing of sides and beds and preparation of sub grade to level or
slope including refilling the trenches and disposing of surplus earth upto all leads lifts
disposed earth to be levelled and neatly dressed including jungle clearance and as per
direction of Engineer-in-charge.
8 Laying and jointing of GMS Pipes of various dia in trenches (earth work in trenches to be
measured and paid for seperately) including all leads lifts and carriage of material at site
as per direction of Engineer-in-charge of following dias.
i)15mm dia .
ii)20mm dia .
iii)25mm dia .
9 Dismentling of GMS Pipes of various dia in trenches (earth work in trenches to be
measured and paid for seperately) including all leads lifts and carriage of material at site
as per direction of Engineer-in-charge of following dias.
i)15mm dia .
ii)20mm dia .
iii)25mm dia .
10 Relaying of GMS Pipes of various dia in trenches (earth work in trenches to be measured
and paid for seperately) including all leads lifts and carriage of material at site as per
direction of Engineer-in-charge of following dias.
i)15mm dia .
ii)20mm dia .
iii)25mm dia .

TERMS & CONDITIONS


1 The work shall be executed as per IPH/PWD specification and instructions of the
Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Cement will be issued @ 315/- per bag & steel @ 53/- per Kg. at IPH store Bhatanwali
Paonta Sahib.
4 Empty cement bags shall be returned to the deptt. Otherwise Rs. 2/- per bag shall be
deducted from the each bill of the contractor.

5 Royality certificate in respect of stone agg. Sand etc. shall be produced by the contractor

6 GI Pipe shall be issued free of cost from IPH Store Bhatanwali Paonta Sahib.
7 GI fitting shall be provided by the contractor.
Estimated cost Rs 91724/-
hillai Distt.Sirmour (HP)
Earnest money Rs.1900/-
Time:- Three Months
Qty. Rates, Unit Amount.
3 4 5 6
15.53 Cum 170.00 P/Cum 2640.00

2.72 Cum 4200.00 P/Cum 11424.00

2.76 Cum. 5800.00 P/Cum. 16008.00


5.47 Cum. 5900.00 P/Cum. 32273.00

10.76 Sqm. 300.00 P/Sqm. 3228.00

72.92 Sqm. 200.00 P/Sqm. 14584.00


1.31 Cum 5500.00 P/Cum 7205.00

594.64 Kg. 65.00 P/kg 38652.00

622.33 Cum 170.00 P/Cum ###


1272.00 Rmt 10.00 P/Rmt. 12720.00
388.00 Rmt. 11.00 P/Rmt. 4268.00
245.00 Rmt. 16.00 P/Rmt. 3920.00

1272.00 Rmt 9.00 P/Rmt. 11448.00


555.00 Rmt. 10.00 P/Rmt. 5550.00
350.00 Rmt. 14.00 P/Rmt. 4900.00

348.00 Rmt 9.00 P/Rmt. 3132.00


167.00 Rmt. 10.00 P/Rmt. 1670.00
105.00 Rmt. 14.00 P/Rmt. 1470.00
Total: ###

Executive
Engineer,
I&PH
Division,
Paonta Sahib.
Name of work:- Insttt. Of Deep well Hand Pumps under IPH Sub Division Majra in tehsil Paonta Sahib
Distt. Simour (HP)(SH: Energisation of 04 Nos Hand Pump near House of Shri Ronki Ram Near House of Shri Su
Singh, nr. h/o sh. Bhajan Singh and near House of Sh.Ram Pal.)
Sr.No. Item of work. Qty.
1 2 3
1 Prov.& 4
2 Supply installation testing and commissioning of cubical type powder coated floor/wall 3
mounted type readymade pannel box of Bentex/L&T or BCH make to accomodate all
the items made from Fabricarted duly painted and complete internal wiring and
composing of air break starter main switch of suitable Amps, Amperemeter, Voltmeter
single phase indicating lamp etc. as per requirement at site complete in all respect .

3 183
4 Providing and fixing increaser/reducer/sockets/bends /Nut bolts/Clamps testing of all 3
above items as per directions of Engineer incharge.
5 Supplying and fixing 32 mm dia O.D.(outer dia) H.D. Pipe as column pipe into the bore 142
hole complete as per the direction of Engineer incharge.
6 Providing and fixing steel rope of 6mm thick for hanging the Submersible pump set 159
into the bore for its extract from the well and as per direction of the Engineer-in-
charge.

TERMS AND CONDITIONS


1 The work shall be done as per IPH specifications.
2 Security, Sale Tax & Income tax shall be deduction as per rule.
3 Payment will be made after successful testing at site.
4 The guarantee period of pumpng machinery six months
Estimated cost Rs.98930/-
onta Sahib Earnest Money: Rs.1225/-
Near House of Shri Su
Time:-One Month.

Rate. Unit. Amount.


4 5 6
Set 25500.00 P/Set 102000.00
Set 4500.00 P/Set 13500.00

Rmt 95.00 P/Rmt 17385.00


Job 1500.00 P/Job 4500.00

Rmt 135.00 P/Rmt 19170.00

Rmt 60.00 P/Rmt 9540.00

Total:- 166095.00

Executive Engineer,
I&PH Division,
Paonta Sahib (HP)
REVISED SCHEDULE OF QUANTITY Estimated Cost :-Rs.80111/-
Name of work:- Restoration of Rain damages to GWSS Bhajaun in Tehsil Paonta Sahib Distt. Sirmour(HP) Earnest Money :-Rs. 1700/-
(SH: C/o sealing of source 2 Nos & C/O Boundry wall upper side of source.) Time:- Three months.
S.No Description Qty. Rate Unit Amount
1 C/o dry rubble masonary in breast wall & retaining wall Rivetment wall and parapet 11.28 Cum. 1200.00 Per cum. 13536.00
etc. complete in all respect and as per direction of the Engineer-in-charge.

2 Excavation in foundation and trenches etc.in earth work in all kinds of soil such as 7.46 Cum 155.00 P/Cum 1156.00
pick work ,jumper work decomposed conglomerate saturated soil soft and hard rock
upto all leads lifts stacking the excavated soil not more than 3mtr.clear from the edge
of excavation and then returning the stacked soil in 15cm layers when required in to
plinth sides of foundation etc. consolidating each deposited layers by ramming and
watering and then disposing of all surplus excavated earth as directed with in all
leads lifts and as per directions of the Engineer-in-charge

3 Providing and laying cement concrete 1:6:12(1cement:6sand:12 graded stone 5.54 Cum 3100.00 P/Cum 17174.00
agg.40mm nominal size)and curing complete excluding the cost of form work in
foundation & plinth including all leads lifts and carriage of material and as per the
directions of Engineer-in-charge.

4 Random rubble masonary /Poly rubble masonary (uncoursed/brought to coursed) 46.01 Cum 3700.00 P/Cum 170237.00
with hard stone of approved quality in foundation and plinth including levelling up
with cement concrete 1:6.12(1cement:6sand:12 graded stone agg. 20mm nominal
size)in cement mortor 1:6 (1 Cement: 6 sand ) in breast wall & Retaining walls
including all leads lifts and carriage of material and as per the directions of
Engineer-in-charge.
4 Providing form work with steel sheets 3.15mm thick welded with angle iron 30x30x5 mm so 0.00
as to give rough finish i/c centring shuttering structing and propping etc. with wooden
bettens & Ballies, height or propping & centering below supporting floor to ceiling not
exceeding 4 mtr.and removal of the same for insitu RCC work and PCC work.including all
leads lifts and carriage of material at site & as per direction of Engineer in charge in:-

a) Flat surfaces such as soffits of suspended floor roofs landings and like upto 200mm in 19.22 Sqm. 300.00 P/Sqm. 5766.00
thickness

5 Providing and laying cement concrete 1:2:4(1cement:2app.sand: 4 app. graded stone agg. 0.11 Cum 4300.00 P/Cum 487.00
20mm nominal size )and curing complete excluding cost of form work & reinforcement for
reinforced work in suspended floors, roofs landing shelves and their supports balconies,
beams, girders bressumers and cantilivers upto to floor two level in all height and depth,
including all leads lifts and carriage of material at site and as per direction of the Engineer-
incharge.

6 Providing Mild Steel/Tor steel reinforcement including bending binding & placing in 494.00 Kg. 64.00 P/kg 31616.00
positing I/c all leads lifts and carriage of material and as per direction of the Engineer-in-
charge.
7 Excavation in earth work and disposal of all excvatged earth upto a lead of 20 mtrs. 11.30 Cum., 155.00 P/Cum. 1752.00
(twenty metres) and lift upto 1/5- mtrs. (One point fifty metres) disposing earth to
be levelled and neatly dressed pick/jumper work within all leads,lifts and carriage of
material and as per direction of the Engineer-in-charge.

8 Providing and laying cement concrete 1:4:8(1cement:4sand:8 graded stone agg.40mm 1.42 Cum. 3500.00 P/Cum 4970.00
nominal size)and curing complete excluding the cost of form work in foundation & plinth
including all leads lifts and carriage of material and as per the directions of Engineer-in-
charge.

9 Boulder filling behind theretaining wal & Breast wall etc. complete in all respect and 6.48 Cum. 850.00 Per 5508.00
as per direction of the Engineer-in-charge. Cum.
TERMS AND CONDITIONS:- Total: ###
1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Royality certificate in respect of stone agg. Sand etc. shall be produced by the contractor
4 Cement shoall be issued @ 315/- per bag & steel @ Rs.53/- per Kig. From IPH store Bhatanwali.
5 Empty cement bags Shalol be returned to the deptt. Otherwise Rs. 2/- per bags shall be deducted from each bill.

Executive Engineer,
I&PH Division,
` Paonta Sahib.

REVISED SCHEDULE OF QUANTITY Estimated Cost :-Rs.51475/-


Name of work:- Restoration of Rain damages to Left Bank Canal in Tehsil Paonta Sahib Distt. Sirmour(HP) Earnest Money :-Rs. 1100/-
(SH: C/o Retaining wall at RD 15760 to 15772 Mtrs.) Time:- Three months.
S.No Description Qty. Rate Unit Amount
1 Excavation in foundation and trenches etc.in earth work in all kinds of soil such as 6.94 Cum 160.00 P/Cum 1110.00
pick work ,jumper work decomposed conglomerate saturated soil soft and hard rock
upto all leads lifts stacking the excavated soil not more than 3mtr.clear from the edge
of excavation and then returning the stacked soil in 15cm layers when required in to
plinth sides of foundation etc. consolidating each deposited layers by ramming and
watering and then disposing of all surplus excavated earth as directed with in all
leads lifts and as per directions of the Engineer-in-charge

2 Providing and laying cement concrete 1:6:12(1cement:6sand:12 graded stone 2.77 Cum 2680.00 P/Cum 7424.00
agg.40mm nominal size)and curing complete excluding the cost of form work in
foundation & plinth including all leads lifts and carriage of material and as per the
directions of Engineer-in-charge.
3 Random rubble masonary /Poly rubble masonary (uncoursed/brought to coursed) 21.00 Cum 2800.00 P/Cum 58800.00
with hard stone of approved quality in foundation and plinth including levelling up
with cement concrete 1:6.12(1cement:6sand:12 graded stone agg. 20mm nominal
size)in cement mortor 1:6 (1 Cement: 6 sand ) in breast wall & Retaining walls
including all leads lifts and carriage of material and as per the directions of
Engineer-in-charge.

4 Boulder filling behind theretaining wal & Breast wall etc. complete in all respect and 9.00 Cum. 850.00 Per 7650.00
as per direction of the Engineer-in-charge. Cum.

5 Dressing of side slopes and preparation of sub grade for lining in cement concrete complete 237.00 Sqm. 22.00 Per Sqm. 5214.00
in all respect and as per direction of the Engineer-in-charge.

6 20mm thick cement plaster in single coat on rough side of brick/stone masonary for interior 237.00 Sqm. 150.00 P/Sqm. 35550.00
plastering upto floor two level including arrises internal rounded angles chamfers rounded
angles not exceeding 80mm in girth and finished even & smooth in Cement Mortar
1:6(1cement:6sand) complete in all respect and as per direction of the Engineer-in-charge.

TERMS AND CONDITIONS:- Total: 115748.00


1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Royality certificate in respect of stone agg. Sand etc. shall be produced by the contractor
4 Cement shall be issued @ 315/- per bag & steel @ Rs.53/- per Kig. From IPH store Bhatanwali.
5 Empty cement bags Shalol be returned to the deptt. Otherwise Rs. 2/- per bags shall be deducted from each bill.

Executive Engineer,
I&PH Division,
` Paonta Sahib.
Estimated cost Rs.61600/-
Name of work:- Aug. of LWSS Behral Bhood in tehsil Paonta Sahib Distt. Simour (HP) Earnest Money: Rs.1300/-
(SH: Development of T/well) Time:-One Month.

Sr.No. Item of work. Qty. Rate. Unit. Amount.


1 2 3 4 5 6
1 Transportation of Support vehicle alongwith accessories etc. complete including 1 job. 25000.00 P/job. 25000.00
errection and levelling at site through all kinds of roads approaches fields etc. in all
leads,lifts and carriage of material at site of work complete in all respect and as per
direction of the Engineer-in-charge.

2 Development of T/well by back washing method with Air Compressor of Minimum 40 Hours 1250.00 Per 50000.00
750 CFM capacity pumping of 20mm size and Air line of minimum 65mm size or Hours.
with other suitable method ,till the well is throughly developed as per clause 4.2 of
IS 11189-21985 with upto date ammendments complete in all respects and as per
directions of the Engineer-in-charge.

Total:- 75000.00
TERMS AND CONDITIONS
1 The work shall be done as per IPH specifications.
2 Security, Sale Tax & Income tax shall be deduction as per rule.
3 Payment will be made after successful testing at site. Executive Engineer,
I&PH Division,
Paonta Sahib (HP)
REVISED SCHEDULE OF QUANTITY Estimated cost Rs.16800/-
Name of work:- C/o LIS Kiratpur Bhagwanpur in tehsil Paonta Sahib Distt. Simour (HP) Earnest Money: Rs. 400/-
(SH: Development of Percolation well by continous over for taking drawing down discharge of each Time:-15 Days.
percolation well)
Sr.No. Item of work. Qty. Rate. Unit. Amount.
1 2 3 4 5 6
2 Development of Percolation well by continous over pumping method with VT 16 Hours 510.00 Per 8160.00
Pumps submersible pumps of suitable capacity not less than double the dischage Hours.
establised by the compressor/design discharge until 1 the well is sand free as per
IS 11189-1985 with upto date ammendments, if any, complete in all respect as per
direction of the Engineer-in-charge. The draw down and discharge to be establised
by running the VT/Submersible for 8 Hoursd in the pressence of th Officer not less
than the rant of Assistant Engineer complete in all respect.

Total:- 8160.00
TERMS AND CONDITIONS
1 The work shall be done as per IPH specifications.
2 Security, Sale Tax & Income tax shall be deduction as per rule.
3 Payment will be made after successful testing at site. Executive Engineer,
4 Nothing shall be paid for rejected/defective work. I&PH Division,
Paonta Sahib (HP)
REVISED SCHEDULE OF QUANTITY Estimated cost Rs 45010/-
Name of work: Providing LWSS to NC/PC hab. Of CV & GP kando Dugana in Tehsil Paonta Sahib Distt.Sirmour (HP)
Earnest money Rs.900/-
(HP) (SH: C/O Sump well positive section.. Time:- Three Months
S.No Sub-Head and item of work. Qty. Rates, Unit Amount.
1 2 3 4 5 6
1 Demolition /Dismentalling above GL upto floor level including disposal of unserviceable 2.27 Cum. 900 P/Cum. 2043.00
materials stacking serviceable materials and cutting the necessary reinforcement and
separating out from RCC/RB work: RCC work complete in all respect and as per direction of
the Engineer-in-charge.

Filling with hard stone to make the positive section of existing sump well complete in all 14.44 Cum. 850 P/Cum. 12274.00
2 respect and as per direction of the Engineer-in-charge.
3 Providing and laying cement concrete 1:4:8(1cement:4sand:8 graded stone agg.40mm 1.44 Cum 4500.00 P/Cum 6480.00
nominal size)and curing complete excluding the cost of form work in foundation & plinth
including all leads lifts and carriage of material and as per the directions of Engineer-in-
charge.

4 Providing and laying cement concrete work 1:1 1/2:3 (1cement:1 1/2 sand: 3 graded stone 0.00
agg. 20mm nominal size & curing complete) excluding cost of form workand reinforcement
for RCC work including all leads lifts complete and carriage of material etc. as per directions
of Engineer incharge.

i) In foundation and Plinth etc. 1.44 Cum. 7000.00 P/Cum. 10080.00

ii) In vertical walls any thickness but not less than 0.10 Metres. 5.01 Cum. 7100.00 P/Cum. 35571.00

5 Providing form work with steel sheets 3.15mm thick welded with angle iron 30x30x5 mm so 0.00
as to give rough finish i/c centring shuttering structing and propping etc. with wooden
bettens & Ballies, height or propping & centering below supporting floor to ceiling not
exceeding 4 mtr.and removal of the same for insitu RCC work and PCC work.including all
leads lifts and carriage of material at site & as per direction of Engineer in charge in:-

a) Flat surfaces such as soffits of suspended floor roofs landings and like upto 200mm in 9.63 Sqm. 300.00 P/Sqm. 2889.00
thickness
b) Vertical surface such as wall any thickness. 48.84 Sqm. 200.00 P/Sqm. 9768.00
6 Providing and laying cement concrete 1:2:4(1cement:2app.sand: 4 app. graded stone agg. 1.14 Cum 6800.00 P/Cum 7752.00
20mm nominal size )and curing complete excluding cost of form work & reinforcement for
reinforced work in suspended floors, roofs landing shelves and their supports balconies,
beams, girders bressumers and cantilivers upto to floor two level in all height and depth,
including all leads lifts and carriage of material at site and as per direction of the Engineer-
incharge.

7 Providing Mild Steel/Tor steel reinforcement including bending binding & placing in positing 547.00 Kg. 64.00 P/kg 35008.00
I/c all leads lifts and carriage of material and as per direction of the Engineer-in-charge.

8 Providing and laying foot rest 20mm size including embeded in cement concrete 1:3:6 12.00 Nos. 120.00 Each. 1440.00
(1cement:3sand:6 graded stone agg.) 20mm nominal size) in blocks 225x225x75 cm. and
carriage of material and complete in all respect as per direction of the Engineer-in-charge.

9 Laying & jointing of GI Pipe for scour pipe of 40mm dia complete in all respect and as per 6.00 Mtr. 23.00 Per Mtr. 138.00
direction of the Engineer-in-charge.
Total: 123443.00
TERMS & CONDITIONS

1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Cement will be issued @ 315/- per bag & steel @ 53/- per Kg. at IPH store Bhatanwali Paonta Sahib.
4 Empty cement bags shall be returned to the deptt. Otherwise Rs. 2/- per bag shall be
deducted from the each bill of the contractor.

5 Royality certificate in respect of stone agg. Sand etc. shall be produced by the contractor

6 GI Pipe shall be issued free of cost from IPH Store Bhatanwali Executive Engineer,
I&PH Division,
Paonta Sahib.
DRAFT SCHEDULE OF QUANTITY Estimated cost Rs 89809/-
Name of work: Providing LWSS to NC/PC hab of CV Kando Dugana in Tehsil Paonta Distt.Sirmour (HP)
Earnest money Rs.1800/-
(SH: C/O wire crate.) Time:- Three Months
S.No Sub-Head and item of work. Qty. Rates, Unit Amount.
1 2 3 4 5 6
10 Excavation in foundation and trenches etc.in earth work in all kinds of soil such as 25.31 Cum 92.85 P/Cum 2350.00
pick work ,jumper work decomposed conglomerate saturated soil soft and hard rock
upto all leads lifts stacking the excavated soil not more than 3mtr.clear from the edge
of excavation and then returning the stacked soil in 15cm layers when required in to
plinth sides of foundation etc. consolidating each deposited layers by ramming and
watering and then disposing of all surplus excavated earth as directed with in all
leads lifts and as per directions of the Engineer-in-charge

11 Wire crates made of G.I.wire filled with boulder/hard stone of approved quality with square 93.75 Cum. 287.10 P/Cum. 26916.00
cut faces against the wire having rounded/rectangular shape weight of stones not less than
18 Kg. free from soft spots,cracks,cavaties etc.(Wire crate to be measured and paid for
separately)including all leads,lifts and carriage of material at site as direction of the
Engineer-in-charge. (Double Knot)

12 Wire crates of G.I.wire filled with boulder with square cut faces against the wire G.I.wire 450.00 Sqm. 134.54 P/Sqm. 60543.00
5mm thick corresponding to SWG 6 with 15cmx15cm mesh(boulder filling to be measured
and paid for separately including all leads,lifts and carriage of materials at site and as per
directions of the Engineer-in-charge(L.Rate)

Total: 89809.00
TERMS AND CONDITIONS:-
1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-
in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Royality certificate in respect of stone agg. Sand etc. shall be produced by the contractor

4 G.I.wire shall be provided by the contractor. Assistant Engineer,


5 Boulder shall not be less than 18 Kg. & the stone should be free from cracks and cavities. I&PH Sub Division, Kaffota

REVISED SCHEDULE OF QUANTITY Estimated cost Rs 17930/-


Name of work:Aug. of LWSS Sathaur in GP Sankholi in Tehsil Paonta Distt.Sirmour (HP) Earnest money Rs.400/-
(SH: C/O wire crate work to protect intake.) Time:- Three Months
S.No Sub-Head and item of work. Qty. Rates, Unit Amount.
1 2 3 4 5 6
1 Excavation in foundation and trenches etc.in earth work in all kinds of soil such as 23.44 Cum 160.00 P/Cum 3750.00
pick work ,jumper work decomposed conglomerate saturated soil soft and hard rock
upto all leads lifts stacking the excavated soil not more than 3mtr.clear from the edge
of excavation and then returning the stacked soil in 15cm layers when required in to
plinth sides of foundation etc. consolidating each deposited layers by ramming and
watering and then disposing of all surplus excavated earth as directed with in all
leads lifts and as per directions of the Engineer-in-charge

2 Wire crates made of G.I.wire filled with boulder/hard stone of approved quality with square 46.88 Cum. 925.00 P/Cum. 43364.00
cut faces against the wire having rounded/rectangular shape weight of stones not less than
18 Kg. free from soft spots,cracks,cavaties etc.(Wire crate to be measured and paid for
separately)including all leads,lifts and carriage of material at site as direction of the
Engineer-in-charge. (Double Knot)

3 Wire crates of G.I.wire filled with boulder with square cut faces against the wire G.I.wire 225.00 Sqm. 36.00 P/Sqm. 8100.00
5mm thick corresponding to SWG 6 with 15cmx15cm mesh(boulder filling to be measured
and paid for separately including all leads,lifts and carriage of materials at site and as per
directions of the Engineer-in-charge(L.Rate)

Total: 55214.00
TERMS AND CONDITIONS:-
1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Royality certificate in respect of stone agg. Sand etc. shall be produced by the contractor
4 G.I.wire shall be issued free of cost by the deptt. from IPH Store Bhatanwali Paonta Sahib. Executive Engineer,
5 Boulder shall not be less than 18 Kg. & the stone should be free from cracks and cavities. I&PH Division,
Paonta Sahib.
DRAFT SCHEDULE OF QUANTITY
Name of work:-C/o FIS Jaithal Kog Dabra (Part Shawga) in Tehsil Paonta Sahib Distt. Sirmour (HP)
(SH: C/o retaining wall to protect the channel at RD 38 to 89 Mtr.)
S.No Sub-Head and item of work. Qty.
1 2 3
1 Cutting in earth work in and disposal of excavated earth within all leadsin 62.61
Pick/jumper work 50% each complete in all respect and as per direction of
the Engineer-in-charge.
2 Excavation in foundation and trenches etc.in earth work in all kinds of soil 18.78
such as pick work ,jumper work decomposed conglomerate saturated soil
soft and hard rock upto all leads lifts stacking the excavated soil not more
than 3mtr.clear from the edge of excavation and then returning the stacked
soil in 15cm layers when required in to plinth sides of foundation etc.
consolidating each deposited layers by ramming and watering and then
disposing of all surplus excavated earth as directed with in all leads lifts and
as per directions of the Engineer-incharge

3 Providing form work with steel sheets 3.15mm thick welded with angle iron
30x30x5 mm so as to give rough finish i/c centring shuttering structing and
propping etc. with wooden bettens & Ballies, height or propping & centering
below supporting floor to ceiling not exceeding 4 mtr.and removal of the
same for insitu RCC work and PCC work.including all leads lifts and carriage
of material at site & as per direction of Engineer in charge in:-

b) Vertical surface such as wall any thickness. 131.00


4 Providing and laying cement concrete work 1:5:10(1cement:5 sand: 10 89.00
graded stone agg. 40mm nominal size) with 15% plum and curing complete
excluding cost of form work and in retaining walls/ Breast walls, the size of
Plums shall usually be 150mm to 300mm as per PWD specificatioin
including all leads lifts and carriage of material and as per direction of
Engineer incharge.

TERMS AND CONDITIONS:-


1 The work shall be executed as per IPH/PWD specification and instructions
of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Cement will be issued @ 315/- per bag & steel @ 53/- per Kg. at IPH store
Bhatanwali Paonta Sahib.
4 Empty cement bags shall be returned to the deptt. Otherwise Rs. 2/- per bag
shall be deducted from the earch bill of the contractor.
5 Royality certificate in respect of stone agg. Sand etc. shall be produced by
the contractor
6 Contractor shall be responsible for watch & ward of store.

DRAFT SCHEDULE OF QUANTITY


Name of work:-C/o FIS Dabua Saketi in Tehsil Paonta Sahib Distt. Sirmour (HP)
(SH: C/o Pucca Field channel at various reaches)
S.No Sub-Head and item of work. Qty.
1 2 3
1 Cutting in earth work in and disposal of excavated earth within all leadsin 14.39
Pick/jumper work 50% each complete in all respect and as per direction of
the Engineer-in-charge.
2 Excavation in foundation and trenches etc.in earth work in all kinds of soil 8.35
such as pick work ,jumper work decomposed conglomerate saturated soil
soft and hard rock upto all leads lifts stacking the excavated soil not more
than 3mtr.clear from the edge of excavation and then returning the stacked
soil in 15cm layers when required in to plinth sides of foundation etc.
consolidating each deposited layers by ramming and watering and then
disposing of all surplus excavated earth as directed with in all leads lifts and
as per directions of the Engineer-incharge

3 Providing and laying cement concrete 1:6:12(1cement:6sand:12 graded stone 4.79


agg.40mm nominal size)and curing complete excluding the cost of centring
shuttering in foundation & plinth including all leads lifts and carriage of material
and as per the directions of Engineer-in-charge.

4 Random rubble masonary /Poly rubble masonary (uncoursed/brought to 39.36


coursed) with hard stone of approved quality in foundation and plinth
including levelling up with cement concrete 1:6.12(1cement:6sand:12
graded stone agg. 20mm nominal size)in cement mortor 1:6 (1 Cement: 6
sand ) in breast wall & Retaining walls including all leads lifts and carriage
of material and as per the directions of Engineer-in-charge.
5 Excavation in drains and channels etc. in earth work in all kinds of soil such as pick 82.59
work,jumper work ,blasting work decomposed conglomerate saturated soil soft
rock and hard rock including dressing of sides and beds and preparation of sub
grade to level or slope including refilling the trenches and disposing of surplus
earth upto all leads lifts disposed earth to be levelled and neatly dressed including
jungle clearance and as per direction of Engineer-in-charge.

6 Cement concrete lining 15cm thick or less for irrigation channels using
cement concrete 1:3:6(1cement:3sand:6graded stone agg. 20mm nominal
size)and curing complete excluding cost of form work included all leads lifts
and carriage of material complete in all respect and as per direction of
Engineer-in-charge.

a)Hand Mixed concrete in bed. 18.12

b)Hand mixed concrete lining in side slopes. 24.56

7 Extra allowance for form work in concrete lining as directed by the 24.56
Engineer-in-charge including all leads lifts and carriage of matrerials at site
complete in all respects on side slopes as per direction of Engineer in
charge.

TERMS AND CONDITIONS:-


1 The work shall be executed as per IPH/PWD specification and instructions
of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Cement will be issued @ 315/- per bag & steel @ 53/- per Kg. at IPH store
Bhatanwali Paonta Sahib.
4 Empty cement bags shall be returned to the deptt. Otherwise Rs. 2/- per bag
shall be deducted from the earch bill of the contractor.
5 Royality certificate in respect of stone agg. Sand etc. shall be produced by the contractor
6 Contractor shall be responsible for watch & ward of store.

SCHEDULE OF QUANTITY
Name of work:-C/o LIS Ajoli Nariwala & Jwalapur in Tehsil Paonta Sahib Distt. Sirmour (HP)
(SH: Providing and fixing of sluice valve)
S.No Sub-Head and item of work. Qty.
1 2 3
1 Providing and fixing sluice valve with wheel of Kirloskar brand as per
standard design & relevant ISS of following dia meter comoplete in all
respect including all leads,lifts and carriage of material ast site and as per
direction of the Engineer-in-charge.

i) 300mm dia. 1.00


ii) 150mm dia. 1.00

TERMS AND CONDITIONS:-


1 The work shall be executed as per IPH/PWD specification and instructions
of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 In addition to normal security 5% will be withheld for water of testing of
pipes against leakage and will be released after successful testing.

SCHEDULE OF QUANTITY
Name of work:-A/R & M/O LIS Nawada in Tehsil Paonta Sahib Distt. Sirmour (HP) (SH: Extraction of silt f
Sump well by Pumping out the silt slurry with Raw water Pump and removal of solide silt manually (P/J)thu
foreign material) Silt clearance from Sump well 6.15m internal dia on Right Bank of Giri River.
S.No Sub-Head and item of work. Qty.
1 2 3
1 Clearance of sump well by extraction of deposited silt by pumping out the 89.18
silt slurry with Raw Water pump and removal of solid silt manually
(Pick/Jumper) work thus clearing the well of all foreign deposdition. The
extracted materials is to be disposed off within all leads,lifts to the entire
satisfaction of the Engineer-in-charge.

TERMS AND CONDITIONS:-


1 The work shall be executed as per IPH/PWD specification and instructions
of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
Estimated cost Rs 99199/-
Sirmour (HP) Earnest money Rs.2000/-
Time:- Three months.
Rates, Unit Amount.
4 5 6
Cum 59.55 P/Cum 3728.00

Cum 92.95 P/Cum 1746.00

Sqm. 80.70 P/Cum ###


Cum 934.30 P/Cum ###

Total: ###
Assistant Engineer,
I&PH Sub Division
Kaffota.

Estimated cost Rs 75685/-


Earnest money Rs.1600/-
Time:- Three months.
Rates, Unit Amount.
4 5 6
Cum 59.55 P/Cum 857.00

Cum 92.95 P/Cum 776.00

Cum 905.10 P/Cum 4335.00

Cum 1135.50 P/Cum ###


Cum 75.95 P/Cum 6273.00

Cum 423.90 P/Cum 7681.00

Cum 431.90 P/Cum ###

Cum 18.85 P/Cum 463.00

TOTAL: 75685.00

e contractor Assistant Engineer,


I&PH Sub Division
Kaffota.

Estimated cost Rs 76240/-


Earnest money Rs.1525/-
Time:- One Month.
Rates, Unit Amount.
4 5 6
No. Each. 0.00
No. Each. 0.00
TOTAL: 0.00

Assistant Engineer,
I&PH Sub Division
Paonta Sahib.

Estimated cost Rs 55670/-


H: Extraction of silt fEarnest money Rs.1113/-
silt manually (P/J)thuTime:- One Month.

Rates, Unit Amount.


4 5 6
Cum. Per
Cum.

TOTAL:

Assistant Engineer,
I&PH Sub Division
Paonta Sahib.
REVISED SCHEDULE OF QUANTITY. Estimated cost Rs 70272/-
Name of work:-Aug. of LWSS Kanti Mashwa in Tehsil Paonta Sahib Distt. Sirmour (HP) Earnest money Rs.1500/-
(SH:-Jacketing in existing Tank) Time:- Two Months.
Sr.No. Description. Qty. Rate.
1 2 3 4
1 Demolition /dismentalling above ground level upto floor two 6.70 Cum. 900.00
level including disposal of unserviceable materials, stacking
serviceable materials and cutting the necessary
reinforcement and separating out from RCC/RB work , RCC
work complete in all respects and as per direction of the
Engineer-in-charge.

2 Providing and laying cement concrete 1:2:4(1cement:2sand:4 1.17 Cum 5900.00


graded stone agg.20mm nominal size excluding cost of form
work and reinforcement work in slab floors including all
leads lifts and carriage of material and as per the directions
of Engineer-in-charge.

3 Providing and laying cement concrete work 1: 2:4 1cement:2


sand: 4 graded stone agg. 20mm nominal size & curing
complete) excluding cost of form work and reinforcement for
RCC work including all leads lifts complete and carriage of
material etc. as per directions of Engineer incharge.

i) In walls. 4.45 Cum. 6100.00


4 Providing and laying cement concrete work 1: 2:4 1cement:2 0.94 Cum. 5900.00
sand: 4 graded stone agg. 20mm nominal size & curing
complete) excluding cost of form work and reinforcement for
Reinforced in beds upto floor two level including all leads,lifts
and carriage of material as per directions of Engineer
incharge.

5 Providing form work with steel sheets 3.15mm thick welded


with angle iron 30x30x5 mm so as to give rough finish i/c
centring shuttering structing and propping etc. with wooden
bettens & Ballies, height or propping & centering below
supporting floor to ceiling not exceeding 4 mtr.and removal
of the same for insitu RCC work and PCC work.including all
leads lifts and carriage of material at site & as per direction of
Engineer in charge in:-

a) Flat surfaces such as soffits of suspended floor roofs 7.07 Sqm. 295.00
landing and like upto 200mm in thickness.
ii) In vertical walls any thickness but not less than 0.10 28.29 Sqm. 200.00
Metres.
6 Providing Mild Steel/Tor steel reinforcement including 459.20 Kg. 64.00
bending binding & placing in positing I/c all leads lifts and
carriage of material and as per direction of the Engineer-in-
charge.

7 Providing and fixing of foot rest 20mm size including 13.00 Nos. 90.00
embeded in cement concrete 1:3:6(1cement:3sand:6graded
stone agg. 20mm nominal size in block 225x225x75mm and
carriage of material and complete in all respect as per
direction of the Engineer-in-charge.

TERMS AND CONDITIONS:-


1 The work shall be executed as per IPH/PWD specification
and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.

3 Cement will be issued @ 315/- per bag & steel @ 53/- per Kg.
at IPH store Bhatanwali Paonta Sahib.
4 Empty cement bags shall be returned to the deptt. Otherwise
Rs. 2/- per bag shall be deducted from the earch bill of the
contractor.
5 Royality certificate in respect of stone agg. Sand etc. shall be
produced by the contractor

Executive Engineer,
I&PH Division,
Paonta Sahib.
Estimated cost Rs 70272/-
Earnest money Rs.1500/-
Time:- Two Months.
Unit Amount.
5 6
P/Cum 6030.00

P/Cum 6903.00

P/Cum. 27145.00
P/Cum. 5546.00

P/Sqm. 2086.00

P/Sqm. 5658.00
P/kg 29389.00

Each. 1170.00

Total: ###

Executive Engineer,
I&PH Division,
Paonta Sahib.
SCHEDULE OF QUANTITY
Name of work:-C/o LIS Ajoli Nariwala & Jwalapur in Tehsil Paonta Sahib Distt. Sirmour (HP)
(SH: Providing and fixing of sluice valve)
S.No Sub-Head and item of work.
1 2
1 Providing and fixing sluice valve with wheel of Kirloskar brand as per standard
design & relevant ISS of following dia meter comoplete in all respect including all
leads,lifts and carriage of material ast site and as per direction of the Engineer-in-
charge.

i) 300mm dia.

ii) 150mm dia.

TERMS AND CONDITIONS:-


1 The work shall be executed as per IPH/PWD specification and instructions of the
Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 In addition to normal security 5% will be withheld for water of testing of pipes
against leakage and will be released after successful testing.

SCHEDULE OF QUANTITY
Name of work:-A/R & M/O LIS Nawada in Tehsil Paonta Sahib Distt. Sirmour (HP) (SH: Extraction of silt from
Sump well by Pumping out the silt slurry with Raw water Pump and removal of solide silt manually (P/J)thus c
foreign material) Silt clearance from Sump well 6.15m internal dia on Right Bank of Giri River.
S.No Sub-Head and item of work.
1 2
1 Clearance of sump well by extraction of deposited silt by pumping out the silt
slurry with Raw Water pump and removal of solid silt manually (Pick/Jumper)
work thus clearing the well of all foreign deposdition. The extracted materials is
to be disposed off within all leads,lifts to the entire satisfaction of the Engineer-
in-charge.
TERMS AND CONDITIONS:-
1 The work shall be executed as per IPH/PWD specification and instructions of the
Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.

REVISED SCHEDULE OF QUANTITY


Name of work:-Restoration of Rain damages to Right Bank Canal of GIP Majra in Tehsil Paonta Sahib
Distt. Sirmour (HP) (SH: Earth cutting from RD 1025 to1240 Mtrs. =215 Mtrs. on Right Bank Canal
(Right side of Canal)
S.No Sub-Head and item of work.
1 2
1 Cutting in earth work in all kind of soil and disposal of the excavated earth upto a
lead of 2 Kilometres (Pick/Jumper work) including all leads,lifts and carriage of
material and as per direction of the Engineer-in-charge.

TERMS AND CONDITIONS:-


1 The work shall be executed as per IPH/PWD specification and instructions of the
Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Nothing shall be paid for rjected/defective work.
DRAFT SCHEDULE OF QUANTITY
Name of work:-Restoration of Rain damages to Right Bank Canal of GIP Majra in Tehsil Paonta Sahib
Distt. Sirmour (HP) (SH: C/o retaining wall from RD 11350 to 11365 to protect the Right Bank Canal)
S.No Sub-Head and item of work.
1 2
1 Excavation in foundation and trenches etc.in earth work in all kinds of soil such
as pick work ,jumper work decomposed conglomerate saturated soil soft and
hard rock upto all leads lifts stacking the excavated soil not more than 3mtr.clear
from the edge of excavation and then returning the stacked soil in 15cm layers
when required in to plinth sides of foundation etc. consolidating each deposited
layers by ramming and watering and then disposing of all surplus excavated
earth as directed with in all leads lifts and as per directions of the Engineer-
incharge

2 Providing form work with steel sheets 3.15mm thick welded with angle iron
30x30x5 mm so as to give rough finish i/c centring shuttering structing and
propping etc. with wooden bettens & Ballies, height or propping & centering
below supporting floor to ceiling not exceeding 4 mtr.and removal of the same
for insitu RCC work and PCC work.including all leads lifts and carriage of material
at site & as per direction of Engineer in charge in:-

b) Foundation & Footings .


3 Providing and laying cement concrete work 1:5:10(1cement:5 sand: 10 graded
stone agg. 40mm nominal size) with 15% plum and curing complete excluding
cost of form work and in retaining walls/ Breast walls, the size of Plums shall
usually be 150mm to 300mm as per PWD specificatioin including all leads lifts
and carriage of material and as per direction of Engineer incharge.

4 Providing and laying of HDPE pipe including all leads,lifts and carriage of
material at site complete in all respect and as per direction of the Engineer-in-
charge.
5 Earth work and filling in 15 cm. layers in foundation and plinths including
ramming watering and consilidating upto all leads,lifts and as per direction of the
Engineer-in-charge.

TERMS AND CONDITIONS:-


1 The work shall be executed as per IPH/PWD specification and instructions of the
Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Cement will be issued @ 250/- per bag & steel @41/- per Kg. at IPH store
Bhatanwali Paonta Sahib.
4 Empty cement bags shall be returned to the deptt. Otherwise Rs. 2/- per bag shall
be deducted from the earch bill of the contractor.
5 Royality certificate in respect of stone agg. Sand etc. shall be produced by the
contractor
Estimated cost Rs 76240/-
rmour (HP) Earnest money Rs.1525/-
Time:- One Month.
Qty. Rate Unit Amount.
3 4 5 6

1.00 No. Each.

1.00 No. Each.

TOTAL:

Assistant Engineer,
I&PH Sub Division
Paonta Sahib.

Estimated cost Rs 55670/-


) (SH: Extraction of silt from Earnest money Rs.1113/-
olide silt manually (P/J)thus cle
Time:- One Month.
of Giri River.
Qty. Rates, Unit Amount.
3 4 5 6
89.18 Cum. Per
Cum.
TOTAL:

Assistant Engineer,
I&PH Sub Division
Paonta Sahib.

Estimated cost Rs 81216/-


Tehsil Paonta Sahib Earnest money Rs.1700/-
Right Bank Canal Time:- Two Months.

Qty. Rates, Unit Amount.


3 4 5 6
728.85 Cum. 320.00 Per ###
Cum.

TOTAL: ###

Executiv
e
Engineer
,

I&PH Division
Paonta Sahib.
Estimated cost Rs 99275/-
Tehsil Paonta Sahib Earnest money Rs.1900/-
he Right Bank Canal) Time:- Two Months.
Qty. Rate. Unit Amount.
3 4 5 6
18.00 Cum 155.00 P/Cum 2790.00

145.09 Sqm. 200.00 P/Cum ###


68.06 Cum 2600.00 P/Cum ###

60 Rmt. 110.00 P/Rmt. 6600.00

72.18 Cum. 150.00 P/Cum. ###

Total: ###
Executiv
e
Engineer
,

I&PH Division
Paonta Sahib.
Name of work: Sustainability of GWSS to LOH of Tilwar, Manugnta Bas GP Dugana in Tehsil Paonta Sahib Distt.Sirmour (

(SH: C/O RCC Storage Tank at Tilwar 5000 Litres cap. ,Laying & jointing of GI Pipes)
S.No
1
1

7
8

2
3
4

5
SCHEDULE OF QUANTITY
Name of work: Sustainability of GWSS to LOH of Tilwar, Manugnta Bas GP Dugana in Tehsil Paonta Sahib Distt.Sirmour (HP)

(SH: C/O RCC Storage Tank at Tilwar 5000 Litres cap. ,Laying & jointing of GI Pipes)
Sub-Head and item of work.
2
Excavation in foundation and trenches etc.in earth work in all kinds of soil such as pick work ,jumper
work decomposed conglomerate saturated soil soft and hard rock upto all leads lifts stacking the
excavated soil not more than 3mtr.clear from the edge of excavation and then returning the stacked soil
in 15cm layers when required in to plinth sides of foundation etc. consolidating each deposited layers
by ramming and watering and then disposing of all surplus excavated earth as directed with in all leads
lifts and as per directions of the Engineer-in-charge

Providing and laying cement concrete 1:4:8(1cement:4sand:8 graded stone agg.40mm nominal
size)and curing complete excluding the cost of form work in foundation & plinth including all leads
lifts and carriage of material and as per the directions of Engineer-in-charge.
Providing and laying cement concrete work 1:1 1/2:3 (1cement:1 1/2 sand: 3 graded stone agg. 20mm
nominal size & curing complete) excluding cost of form workand reinforcement for RCC work
including all leads lifts complete and carriage of material etc. as per directions of Engineer incharge.

i) In foundation and Plinth etc.

ii) In vertical walls any thickness but not less than 0.10 Metres.

Providing form work with steel sheets 3.15mm thick welded with angle iron 30x30x5 mm so as to give
rough finish i/c centring shuttering structing and propping etc. with wooden bettens & Ballies, height
or propping & centering below supporting floor to ceiling not exceeding 4 mtr.and removal of the
same for insitu RCC work and PCC work.including all leads lifts and carriage of material at site & as per
direction of Engineer in charge in:-

a) Flat surfaces such as soffits of suspended floor roofs landings and the like upto 200mm in thickness.

b) Vertical surface such as wall any thickness.


Providing and laying cement concrete 1:2:4(1cement:2app.sand: 4 app. graded stone agg. 20mm
nominal size )and curing complete excluding cost of form work & reinforcement for reinforced work in
suspended floors, roofs landing shelves and their supports balconies, beams, girders bressumers and
cantilivers upto to floor two level in all height and depth, including all leads lifts and carriage of
material at site and as per direction of the Engineer-incharge.

Providing Mild Steel/Tor steel reinforcement including bending binding & placing in positing I/c all
leads lifts and carriage of material and as per direction of the Engineer-in-charge.
Excavation in drains and channels etc. in earth work in all kinds of soil such as pick work,jumper work
,blasting work decomposed conglomerate saturated soil soft rock and hard rock including dressing
of sides and beds and preparation of sub grade to level or slope including refilling the trenches and
disposing of surplus earth upto all leads lifts disposed earth to be levelled and neatly dressed
including jungle clearance and as per direction of Engineer-in-charge.
Laying and jointing of GMS Pipes of various dia in trenches (earth work in trenches to be measured
and paid for seperately) including all leads lifts and carriage of material at site as per direction of
Engineer-in-charge of following dias.
i) 15mm dia
ii) 20mm dia
TERMS & CONDITIONS
The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.

Security,Sale tax & Income tax shall be deducted as per rules.


Cement will be issued @ 315/- per bag & steel @ 53/- per Kg. at IPH store Bhatanwali Paonta Sahib.
Empty cement bags shall be returned to the deptt. Otherwise Rs. 2/- per bag shall be deducted from
the each bill of the contractor.
Royality certificate in respect of stone agg. Sand etc. shall be produced by the contractor
Estimated cost Rs 79124/-
hib Distt.Sirmour (HP)
Earnest money Rs.1600/-
Time:- Three Months
Qty. Rates, Unit Amount.
3 4 5 6
6.85 Cum P/Cum

1.26 Cum P/Cum

1.28 Cum. P/Cum.

2.52 Cum. P/Cum.

4.20 Sqm. P/Sqm.

82.90 Sqm. P/Sqm.


0.60 Cum. P/Cum.

257.32 Kg. P/kg

720.00 Cum. P/Cum.


1700 Rmt P/Rmt.
1500 Rmt P/Rmt.
TOTAL:

a Sahib.

Assistant Engineer,
I&PH Sub Division,
Kaffota.
REVISED SCHEDULE OF QUANTITY Estimated cost Rs 53945/-
Name of work: R/M of GWSS to LOH of CV Mashoo (Sunau Bas) GP Jamna in Tehsil Paonta Sahib Distt.Sirmour (HP) Earnest money Rs.1100/-

(SH: C/O RCC Inateke & 5000 Littres cap. ,Laying & jointing of GI Pipes) Time:- Three Months
S.No Sub-Head and item of work. Qty. Rate. Unit Amount.
1 2 3 4 5 6
1 Excavation in foundation and trenches etc.in earth work in all kinds of soil such as pick 6.85 Cum 160.00 P/Cum 1096.00
work ,jumper work decomposed conglomerate saturated soil soft and hard rock upto all
leads lifts stacking the excavated soil not more than 3mtr.clear from the edge of excavation
and then returning the stacked soil in 15cm layers when required in to plinth sides of
foundation etc. consolidating each deposited layers by ramming and watering and then
disposing of all surplus excavated earth as directed with in all leads lifts and as per
directions of the Engineer-in-charge

2 Providing and laying cement concrete 1:4:8(1cement:4sand:8 graded stone agg.40mm 1.26 Cum 3250.00 P/Cum 4095.00
nominal size)and curing complete excluding the cost of form work in foundation & plinth
including all leads lifts and carriage of material and as per the directions of Engineer-in-
charge.

3 Providing and laying cement concrete work 1:1 1/2:3 (1cement:1 1/2 sand: 3 graded stone
agg. 20mm nominal size & curing complete) excluding cost of form workand reinforcement
for RCC work including all leads lifts complete and carriage of material etc. as per
directions of Engineer incharge.

i) In foundation and Plinth etc. 1.28 Cum. 5000.00 P/Cum. 6400.00

ii) In vertical walls any thickness but not less than 0.10 Metres. 2.52 Cum. 5000.00 P/Cum. 12600.00

4 Providing form work with steel sheets 3.15mm thick welded with angle iron 30x30x5 mm
so as to give rough finish i/c centring shuttering structing and propping etc. with wooden
bettens & Ballies, height or propping & centering below supporting floor to ceiling not
exceeding 4 mtr.and removal of the same for insitu RCC work and PCC work.including all
leads lifts and carriage of material at site & as per direction of Engineer in charge in:-

a) Flat surfaces such as soffits of suspended floor roofs landings and the like upto 200mm 4.20 Sqm. 300.00 P/Sqm. 1260.00
in thickness.
b) Vertical surface such as wall any thickness. 82.90 Sqm. 200.00 P/Sqm. 16580.00
5 Providing and laying cement concrete 1:2:4(1cement:2app.sand: 4 app. graded stone agg. 0.60 Cum. 4500.00 P/Cum. 2700.00
20mm nominal size )and curing complete excluding cost of form work & reinforcement for
reinforced work in suspended floors, roofs landing shelves and their supports balconies,
beams, girders bressumers and cantilivers upto to floor two level in all height and depth,
including all leads lifts and carriage of material at site and as per direction of the Engineer-
incharge.

6 Providing Mild Steel/Tor steel reinforcement including bending binding & placing in 273.32 Kg. 64.00 P/kg 17492.00
positing I/c all leads lifts and carriage of material and as per direction of the Engineer-in-
charge.
7 Excavation in drains and channels etc. in earth work in all kinds of soil such as pick 331.88 Cum. 160.00 P/Cum. 53101.00
work,jumper work ,blasting work decomposed conglomerate saturated soil soft rock and
hard rock including dressing of sides and beds and preparation of sub grade to level or
slope including refilling the trenches and disposing of surplus earth upto all leads lifts
disposed earth to be levelled and neatly dressed including jungle clearance and as per
direction of Engineer-in-charge.

8 Laying and jointing of GMS Pipes of various dia in trenches (earth work in trenches to be
measured and paid for seperately) including all leads lifts and carriage of material at site
as per direction of Engineer-in-charge of following dias.
i) 15mm dia 455 Rmt 9.00 P/Rmt. 4095.00
ii) 20mm dia 315 Rmt 10.00 P/Rmt. 3150.00
9 Rethreading of exist pipe line(earth work in trecnehs to be measured and paid for 705 Rmt. 4.00 P/Rmt. 2820.00
separately ) including all leads,lifts and carriage of material at site and as per direction of
the Engineer-in-charge.
TERMS & CONDITIONS TOTAL: 125389.00

1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Cement will be issued @ 315/- per bag & steel @ 53/- per Kg. at IPH store Bhatanwali Paonta Sahib.
4 Empty cement bags shall be returned to the deptt. Otherwise Rs. 2/- per bag shall be
deducted from the each bill of the contractor.
Executive Engineer,
5 Royality certificate in respect of stone agg. Sand etc. shall be produced by the contractor I&PH Division,
Paonta Sahib.
REVISED SCHEDULE OF QUANTITY.
Name of work: Aug. & Extension of LWSS Kamroo in Tehsil Paonta Sahib Distt.Sirmour (HP)
(SH: C/O RCC storage tank 20000 Litres cap. & RCC Intake)
S.No Sub-Head and item of work. Qty.
1 2 3
1 Excavation in foundation and trenches etc.in earth work in all kinds of soil 11.27 Cum
such as pick work ,jumper work decomposed conglomerate saturated soil
soft and hard rock upto all leads lifts stacking the excavated soil not more
than 3mtr.clear from the edge of excavation and then returning the stacked
soil in 15cm layers when required in to plinth sides of foundation etc.
consolidating each deposited layers by ramming and watering and then
disposing of all surplus excavated earth as directed with in all leads lifts and
as per directions of the Engineer-in-charge

2 Providing and laying cement concrete 1:4:8(1cement:4sand:8 graded stone 0.70 Cum
agg.40mm nominal size)and curing complete excluding the cost of form
work in foundation & plinth including all leads lifts and carriage of material
and as per the directions of Engineer-in-charge.

3 Providing and laying cement concrete work 1:1 1/2:3 (1cement:1 1/2 sand:
3 graded stone agg. 20mm nominal size & curing complete) excluding cost of
form workand reinforcement for RCC work including all leads lifts
complete and carriage of material etc. as per directions of Engineer
incharge.

i) In foundation and Plinth etc. 2.79 Cum.


ii) In vertical walls any thickness but not less than 0.10 Metres. 1.91 Cum.
4 Providing form work with steel sheets 3.15mm thick welded with angle iron
30x30x5 mm so as to give rough finish i/c centring shuttering structing and
propping etc. with wooden bettens & Ballies, height or propping & centering
below supporting floor to ceiling not exceeding 4 mtr.and removal of the
same for insitu RCC work and PCC work.including all leads lifts and carriage
of material at site & as per direction of Engineer in charge in:-

b) Vertical surface such as wall any thickness. 14.98 Sqm.


6 Providing Mild Steel/Tor steel reinforcement including bending binding & 170.25 Kg.
placing in positing I/c all leads lifts and carriage of material and as per
direction of the Engineer-in-charge.
TERMS & CONDITIONS
1 The work shall be executed as per IPH/PWD specification and instructions
of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Cement will be issued @ 315/- per bag & steel @ 53/- per Kg. at IPH store
Bhatanwali Paonta Sahib.
4 Empty cement bags shall be returned to the deptt. Otherwise Rs. 2/- per bag shall be deducted
from the each bill of the contractor.
5 Royality certificate in respect of stone agg. Sand etc. shall be produced by the contractor
Estimated cost Rs 15434/-
Earnest money Rs. 310/-
Time:- Three Months
Rate. Unit Amount.
4 5 6
155.00 P/Cum 1747.00

3200.00 P/Cum 2240.00

4700.00 P/Cum. 13113.00


4800.00 P/Cum. 9168.00

200.00 P/Sqm. 2996.00


63.00 P/kg 10726.00

TOTAL: 39990.00

Executive Engineer,
I&PH Division,

Paonta Sahib.
DRAFT SCHEDULE OF QUANTITY Estimated cost Rs 48682/-
Name of work: Sustainability of GWSS Pab GP Bokala Pab in Tehsil Paonta Sahib Distt.Sirmour (HP) Earnest money Rs.1000/-
(SH: C/O RCC Collection Tank 1 No. ,Laying & jointing of GI Pipes) Time:- Three Months
S.No Sub-Head and item of work. Qty. Rate. Unit
1 2 3 4 5
1 Excavation in foundation and trenches etc.in earth work in all kinds of soil such as pick work 10.39 Cum 92.85 P/Cum
,jumper work decomposed conglomerate saturated soil soft and hard rock upto all leads lifts
stacking the excavated soil not more than 3mtr.clear from the edge of excavation and then returning
the stacked soil in 15cm layers when required in to plinth sides of foundation etc. consolidating
each deposited layers by ramming and watering and then disposing of all surplus excavated earth
as directed with in all leads lifts and as per directions of the Engineer-in-charge

2 Providing and laying cement concrete 1:4:8(1cement:4sand:8 graded stone agg.40mm nominal 1.26 Cum 1104.80 P/Cum
size)and curing complete excluding the cost of form work in foundation & plinth including all leads
lifts and carriage of material and as per the directions of Engineer-in-charge.

3 Providing and laying cement concrete work 1:1 1/2:3 (1cement:1 1/2 sand: 3 graded stone agg.
20mm nominal size & curing complete) excluding cost of form workand reinforcement for RCC
work including all leads lifts complete and carriage of material etc. as per directions of Engineer
incharge.

i) In foundation and Plinth etc. 1.28 Cum. 1866.80 P/Cum.


ii) In vertical walls any thickness but not less than 0.10 Metres. 2.52 Cum. 1923.40 P/Cum.
4 Providing form work with steel sheets 3.15mm thick welded with angle iron 30x30x5 mm so as to
give rough finish i/c centring shuttering structing and propping etc. with wooden bettens & Ballies,
height or propping & centering below supporting floor to ceiling not exceeding 4 mtr.and removal
of the same for insitu RCC work and PCC work.including all leads lifts and carriage of material at
site & as per direction of Engineer in charge in:-

a) Flat surfaces such as soffits of suspended floor roofs landings and the like upto 200mm in 4.20 Sqm. 134.10 P/Sqm.
thickness.
b) Vertical surface such as wall any thickness. 40.74 Sqm. 80.70 P/Sqm.
5 Providing and laying cement concrete 1:2:4(1cement:2app.sand: 4 app. graded stone agg. 20mm 0.60 Cum. 1658.90 P/Cum.
nominal size )and curing complete excluding cost of form work & reinforcement for reinforced
work in suspended floors, roofs landing shelves and their supports balconies, beams, girders
bressumers and cantilivers upto to floor two level in all height and depth, including all leads lifts
and carriage of material at site and as per direction of the Engineer-incharge.

6 Providing Mild Steel/Tor steel reinforcement including bending binding & placing in positing I/c all 273.32 Kg. 20.70 P/kg
leads lifts and carriage of material and as per direction of the Engineer-in-charge.

7 Excavation in drains and channels etc. in earth work in all kinds of soil such as pick work,jumper 364.50 Cum. 75.95 P/Cum.
work ,blasting work decomposed conglomerate saturated soil soft rock and hard rock including
dressing of sides and beds and preparation of sub grade to level or slope including refilling the
trenches and disposing of surplus earth upto all leads lifts disposed earth to be levelled and neatly
dressed including jungle clearance and as per direction of Engineer-in-charge.

8 Laying and jointing of GMS Pipes of various dia in trenches (earth work in trenches to be
measured and paid for seperately) including all leads lifts and carriage of material at site as per
direction of Engineer-in-charge of following dias.
i) 20mm dia 1800 Rmt 0.50 P/Rmt.
TERMS & CONDITIONS TOTAL:
1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Cement will be issued @ 315/- per bag & steel @ 53/- per Kg. at IPH store Bhatanwali Paonta Sahib.
4 Empty cement bags shall be returned to the deptt. Otherwise Rs. 2/- per bag shall be deducted from the each
bill of the contractor. Assistant Engineer,
5 Royality certificate in respect of stone agg. Sand etc. shall be produced by the contractor I&PH Sub Division,
Kaffota.
REVISED SCHEDULE OF QUANTITY Estimated cost Rs 75605/-
Name of work: Sustainability of GWSS Shawga to Korgoila Bas in Tehsil Paonta Sahib Distt.Sirmour Earnest money Rs.1600/-
(HP)(SH: C/O RCC Collection Tank 1 No. ,Laying & jointing of GI Pipes) Time:- Three Months
S.No Sub-Head and item of work. Qty. Rate. Unit
1 2 3 4 5
1 Excavation in foundation and trenches etc.in earth work in all kinds of soil such as pick work 7.07 Cum 160.00 P/Cum
,jumper work decomposed conglomerate saturated soil soft and hard rock upto all leads lifts
stacking the excavated soil not more than 3mtr.clear from the edge of excavation and then returning
the stacked soil in 15cm layers when required in to plinth sides of foundation etc. consolidating
each deposited layers by ramming and watering and then disposing of all surplus excavated earth
as directed with in all leads lifts and as per directions of the Engineer-in-charge

2 Providing and laying cement concrete 1:4:8(1cement:4sand:8 graded stone agg.40mm nominal 1.30 Cum 3900.00 P/Cum
size)and curing complete excluding the cost of form work in foundation & plinth including all leads
lifts and carriage of material and as per the directions of Engineer-in-charge.

3 Providing and laying cement concrete work 1:1 1/2:3 (1cement:1 1/2 sand: 3 graded stone agg.
20mm nominal size & curing complete) excluding cost of form workand reinforcement for RCC
work including all leads lifts complete and carriage of material etc. as per directions of Engineer
incharge.

i) In foundation and Plinth etc. 1.32 Cum. 5500.00 P/Cum.


ii) In vertical walls any thickness but not less than 0.10 Metres. 2.60 Cum. 5600.00 P/Cum.
4 Providing form work with steel sheets 3.15mm thick welded with angle iron 30x30x5 mm so as to
give rough finish i/c centring shuttering structing and propping etc. with wooden bettens & Ballies,
height or propping & centering below supporting floor to ceiling not exceeding 4 mtr.and removal
of the same for insitu RCC work and PCC work.including all leads lifts and carriage of material at
site & as per direction of Engineer in charge in:-

a) Flat surfaces such as soffits of suspended floor roofs landings and the like upto 200mm in 4.39 Sqm. 300.00 P/Sqm.
thickness.
b) Vertical surface such as wall any thickness. 41.86 Sqm. 200.00 P/Sqm.
5 Providing and laying cement concrete 1:2:4(1cement:2app.sand: 4 app. graded stone agg. 20mm 0.62 Cum. 1658.90 P/Cum.
nominal size )and curing complete excluding cost of form work & reinforcement for reinforced
work in suspended floors, roofs landing shelves and their supports balconies, beams, girders
bressumers and cantilivers upto to floor two level in all height and depth, including all leads lifts
and carriage of material at site and as per direction of the Engineer-incharge.

6 Providing Mild Steel/Tor steel reinforcement including bending binding & placing in positing I/c all 266.32 Kg. 64.00 P/kg
leads lifts and carriage of material and as per direction of the Engineer-in-charge.

7 Excavation in drains and channels etc. in earth work in all kinds of soil such as pick work,jumper 353.25 Cum. 160.00 P/Cum.
work ,blasting work decomposed conglomerate saturated soil soft rock and hard rock including
dressing of sides and beds and preparation of sub grade to level or slope including refilling the
trenches and disposing of surplus earth upto all leads lifts disposed earth to be levelled and neatly
dressed including jungle clearance and as per direction of Engineer-in-charge.

8 Laying and jointing of GMS Pipes of various dia in trenches (earth work in trenches to be
measured and paid for seperately) including all leads lifts and carriage of material at site as per
direction of Engineer-in-charge of following dias.
i)15 mm dia 1120 Rmt 9.00 P/Rmt.
ii) 20mm dia. 450 Rmt. 9.50 P/Rmt.
TERMS & CONDITIONS TOTAL:
1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Cement will be issued @ 315/- per bag & steel @ 53/- per Kg. at IPH store Bhatanwali Paonta Sahib.
4 Empty cement bags shall be returned to the deptt. Otherwise Rs. 2/- per bag shall be deducted from the each
5 bill of thecertificate
Royality contractor.in respect of stone agg. Sand etc. shall be produced by the contractor

Executive Engineer,
I&PH Division,
Paonta Sahib.
d cost Rs 48682/-
money Rs.1000/-

hree Months
Amount.
6
965.00

1392.00

2390.00
4847.00

563.00

3288.00
995.00

5658.00

27684.00

900.00
48682.00

Engineer,
b Division,
d cost Rs 75605/-
money Rs.1600/-
hree Months
Amount.
6
1131.00

5070.00

0.00

7260.00
14560.00
0.00

1317.00

8372.00
1029.00

17044.00

56520.00

10080.00
4275.00
122383.00
REVISED SCHEDULE OF QUANTITY Estimated cost Rs 23161/-
Name of work:- Restoration of Rain damages of FIS Kuner Dhamon (Part Kuner ) GP Poka in Tehsil Paonta Sahib Earnest money Rs.500/-
Distt. Sirmour (HP) (SH: C/o Pucca Filed channel .) Time:- Three Months
S.No Sub-Head and item of work. Qty. Rates, Unit Amount.
1 2 3 4 5 6
1 Excavation in drains and channels etc. in earth work in all kinds of soil such as pick 72.68 Cum. 155.00 P/Cum. 11265.00
work,jumper work ,blasting work decomposed conglomerate saturated soil soft rock
and hard rock including dressing of sides and beds and preparation of sub grade to
level or slope including refilling the trenches and disposing of surplus earth upto all
leads lifts disposed earth to be levelled and neatly dressed including jungle clearance
and as per direction of Engineer-in-charge.

2 Cement concrete lining 15cm thick or less for irrigation channels using cement
concrete 1:3:6(1cement:3sand:6graded stone agg. 20mm nominal size)and curing
complete excluding cost of form work included all leads lifts and carriage of material
complete in all respect and as per direction of Engineer-in-charge.

a)Hand Mixed concrete in bed. 24.23 Cum 4200.00 P/Cum 101766.00

b)Hand mixed concrete lining in side slopes. 28.69 Cum 4300.00 P/Cum 123367.00
3 Extra allowance for form work in concrete lining as directed by the Engineer-in-charge 28.69 Cum 130.00 P/Cum 3730.00
including all leads lifts and carriage of matrerials at site complete in all respects on side
slopes as per direction of Engineer in charge.

ToTAL: 240128.00
TERMS & CONDITIONS
1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.

2 Security,Sale tax & Income tax & labour cess shall be deducted as per rules.
3 Royality certificate in respect of stone agg. Sand etc. shall be produced by the contractor
4 Cement shall be issued @ 315/- per Bag & Steel @ 53/- per Kg. at IPH Store Bhatanwali Paonta Sahib.
5 Empty cement bags shall be returned to the Deptt. Otherwise Rs. 2/- per bag shall deducted from the bill.
Executive Engineer,
I&PH Division,
Paonta Sahib.
SCHEDULE OF QUANTITY Estimated cost Rs 55721/-
Name of work:- Improvement of Rampur Giri Canal in Tehsil Paonta Sahib Distt. Sirmour (HP) Earnest money Rs.1200/-
(SH: Improvement of CC Lining at RD 750 to 1125 mtrs. on RG Canal(Minor No. 1) Time:- Three Months
S.No Sub-Head and item of work. Qty. Rates, Unit Amount.
1 2 3 4 5 6
1 Dressing of side slopes & prepration of sub grade for lining in cement concrete 600.00 Sqm. P/Sqm.
complete in all respect and as per direction of the Engineer-in-charge.
2 Cement concrete lining 15cm thick or less for irrigation channels using cement
concrete 1:3:6(1cement:3sand:6graded stone agg. 20mm nominal size)and curing
complete excluding cost of form work included all leads lifts and carriage of material
complete in all respect and as per direction of Engineer-in-charge.

a)Hand Mixed concrete in bed. 8.44 Cum P/Cum

b)Hand mixed concrete lining in side slopes. 36.56 Cum P/Cum

3 Extra allowance for form work in concrete lining as directed by the Engineer-in-charge 36.56 Cum P/Cum
including all leads lifts and carriage of matrerials at site complete in all respects on side
slopes as per direction of Engineer in charge.

ToTAL:
TERMS & CONDITIONS
1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax & labour cess shall be deducted as per rules.
3 Royality certificate in respect of stone agg. Sand etc. shall be produced by the contractor
4 Cement shall be issued @ 315/- per Bag & Steel @ 53/- per Kg. at IPH Store Bhatanwali Paonta Sahib.
5 Empty cement bags shall be returned to the Deptt. Otherwise Rs. 2/- per bag shall deducted from the bill.
Assistant Engineer,
Giri Irrig. Sub Division,
Patlion.
DRAFT SCHEDULE OF QUANTITY Estimated cost Rs 43030/-
Name of work:-Restoration of Rain damages to FIS Rithog Shirog FP Kanti Mashwa & Shilla in Tehsil Paonta Sahib Earnest money Rs.900/-
Distt. Sirmour (HP) (SH:C/o Pucca Field channel. Time:- Three Months
S.No Sub-Head and item of work. Qty. Rates, Unit Amount.
1 2 3 4 5 6
1 Cement concrete lining 15cm thick or less for irrigation channels using cement
concrete 1:3:6(1cement:3sand:6graded stone agg. 20mm nominal size)and curing
complete excluding cost of form work included all leads lifts and carriage of material
complete in all respect and as per direction of Engineer-in-charge.

a)Hand Mixed concrete in bed. 64.50 Cum 423.12 P/Cum 27291.00


b)Hand mixed concrete lining in side slopes. 34.98 Cum 431.10 P/Cum 15080.00

2 Extra allowance for form work in concrete lining as directed by the Engineer-in-charge 34.98 Cum 18.85 P/Cum 659.00
including all leads lifts and carriage of matrerials at site complete in all respects on side
slopes as per direction of Engineer in charge.
ToTAL: 43030.00
TERMS & CONDITIONS
1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax & labour cess shall be deducted as per rules.
3 Royality certificate in respect of stone agg. Sand etc. shall be produced by the contractor
4 Cement shall be issued @ 315/- per Bag & Steel @ 53/- per Kg. at IPH Store Bhatanwali Paonta Sahib.
5 Empty cement bags shall be returned to the Deptt. Otherwise Rs. 2/- per bag shall deducted from the bill.
Assistant Engineer,
I&PH Sub Division,
Kaffota.
DRAFT SCHEDULE OF QUANTITY
Name of work:- Aug. of LWSS Sathaur in GP Sankholi in Tehsil Paonta Sahib Distt. Sirmour (HP)
(SH: C/o Wire crate work to protect intake )
S.No Sub-Head and item of work. Qty.
1 Excavation in foundation and trenches etc.in earth work in all kinds 37.50 Cum
of soil such as pick work ,jumper work decomposed conglomerate
saturated soil soft and hard rock upto all leads lifts stacking the
excavated soil not more than 3mtr.clear from the edge of excavation
and then returning the stacked soil in 15cm layers when required in
to plinth sides of foundation etc. consolidating each deposited layers
by ramming and watering and then disposing of all surplus
excavated earth as directed with in all leads lifts and as per
directions of the Engineer-incharge

2 Wire crates made of G.I.wire filled with boulder/hard stone of 171.87 Cum.
approved quality with square cut faces against the wire having
rounded/rectangular shape weight of stones not less than 18 Kg.
free from soft spots,cracks,cavaties etc.(Wire crate to be measured
and paid for separately)including all leads,lifts and carriage of
material at site as direction of the Engineer-in-charge. (Double
Knot)

3 Wire crates of G.I.wire filled with boulder with square cut faces 825.00 Sqm.
against the wire G.I.wire 5mm thick corresponding to SWG 6 with
15cmx15cm mesh(boulder filling to be measured and paid for
separately including all leads,lifts and carriage of materials at site
and as per directions of the Engineer-in-charge(L.Rate)

4. Removal of slips and disposal of all excavated earth in all leads,lifts 85.00 Sqm.
and carriage of material and as per direction of the Engineer-in-
charge.

TERMS AND CONDITIONS:-


1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Royality certificate in respect of stone agg. Sand etc. shall be
produced by the contractor
4 G.I.wire shall be issued free of cost from IPH store Bhatanwali Paonta Sahib
5 Boulder shall not be less than 18 Kg. & the stone should be free from cracks and cavities.

DRAFT SCHEDULE OF QUANTITY


Name of work:- Aug. of LWSS Sathaur in GP Sankholi in Tehsil Paonta Sahib Distt. Sirmour (HP)
(SH: C/o Wire crate work to protect intake )
S.No Sub-Head and item of work. Qty.
1 Excavation in foundation and trenches etc.in earth work in all kinds 23.44 Cum
of soil such as pick work ,jumper work decomposed conglomerate
saturated soil soft and hard rock upto all leads lifts stacking the
excavated soil not more than 3mtr.clear from the edge of excavation
and then returning the stacked soil in 15cm layers when required in
to plinth sides of foundation etc. consolidating each deposited layers
by ramming and watering and then disposing of all surplus
excavated earth as directed with in all leads lifts and as per
directions of the Engineer-incharge

2 Wire crates made of G.I.wire filled with boulder/hard stone of 46.88 Cum.
approved quality with square cut faces against the wire having
rounded/rectangular shape weight of stones not less than 18 Kg.
free from soft spots,cracks,cavaties etc.(Wire crate to be measured
and paid for separately)including all leads,lifts and carriage of
material at site as direction of the Engineer-in-charge. (Double
Knot)

3 Wire crates of G.I.wire filled with boulder with square cut faces 225.00 Sqm.
against the wire G.I.wire 5mm thick corresponding to SWG 6 with
15cmx15cm mesh(boulder filling to be measured and paid for
separately including all leads,lifts and carriage of materials at site
and as per directions of the Engineer-in-charge(L.Rate)

TERMS AND CONDITIONS:-


1 The work shall be executed as per IPH/PWD specification and
instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Royality certificate in respect of stone agg. Sand etc. shall be
produced by the contractor
4 G.I.wire shall be issued free of cost from IPH store Bhatanwali
Paonta Sahib

5 Boulder shall not be less than 18 Kg. & the stone should be free from
cracks and cavities.

DRAFT SCHEDULE OF QUANTITY


Name of work:- Restoration of Rain damages to Left Bank Canal in Tehsil Paonta Sahib Distt. Sirm
(SH: C/o Wire crate to protect the canal at RD 4150 to 4200 Mtrs.)
S.No Sub-Head and item of work. Qty.
1 Excavation in earth work in all kinds of soil and disposal of all 37.50 Cum
excavated earth upto all leads lifts disposed earth to be levelled and
neatly dressed including all leads lifts and carriage of material as
per directions of the Engineer-incharge

2 Wire crates made of G.I.wire filled with boulder/hard stone of 171.87 Cum.
approved quality with square cut faces against the wire having
rounded/rectangular shape weight of stones not less than 18 Kg.
free from soft spots,cracks,cavaties etc.(Wire crate to be measured
and paid for separately)including all leads,lifts and carriage of
material at site as direction of the Engineer-in-charge. (Double
Knot)

3 Wire crates of G.I.wire filled with boulder with square cut faces 825.00 Sqm.
against the wire G.I.wire 5mm thick corresponding to SWG 6 with
15cmx15cm mesh(boulder filling to be measured and paid for
separately including all leads,lifts and carriage of materials at site
and as per directions of the Engineer-in-charge(L.Rate)

4. Removal of slips and disposal of all excavated earth in all leads,lifts 85.00 Sqm.
and carriage of material and as per direction of the Engineer-in-
charge.

TERMS AND CONDITIONS:-


1 The work shall be executed as per IPH/PWD specification and
instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Royality certificate in respect of stone agg. Sand etc. shall be
produced by the contractor
4 G.I.wire shall be issued free of cost from IPH store Bhatanwali
Paonta Sahib

5 Boulder shall not be less than 18 Kg. & the stone should be free from
cracks and cavities.

REVISED SCHEDULE OF QUANTITY


Name of work:- Providing LWSS to PC habitation Misserwala Kiyarda & Jagatpur in Tehsil
Paonta Sahib Distt. Sirmour (HP) (SH: Laying & jointing of GMS pipe line, C/o Common header &
C/o wire crate to protect the Pipe line)
S.No Sub-Head and item of work. Qty.
1 Excavation in earth work and disposal ofall excavated earth upto a 25.87 Cum
lead of 20 Mtrs. And lift upto 1.50 Mtrs. disposing earth to be levelled
and neatly dressed within a leads in Pick/juper work 50% each
including all leads,lifts and carriage of material and as per direction of
the Engineer-in-charge.

2 Wire crates made of G.I.wire filled with boulder/hard stone of 23.44 Cum.
approved quality with square cut faces against the wire having
rounded/rectangular shape weight of stones not less than 18 Kg.
free from soft spots,cracks,cavaties etc.(Wire crate to be measured
and paid for separately)including all leads,lifts and carriage of
material at site as direction of the Engineer-in-charge. (Double
Knot)

3 Wire crates of G.I.wire filled with boulder with square cut faces 112.50 Sqm.
against the wire G.I.wire 5mm thick corresponding to SWG 6 with
15cmx15cm mesh(boulder filling to be measured and paid for
separately including all leads,lifts and carriage of materials at site
and as per directions of the Engineer-in-charge(L.Rate)

4. Removal of slips and disposal of all excavated earth in all leads,lifts 85.00 Sqm.
and carriage of material and as per direction of the Engineer-in-
charge.

TERMS AND CONDITIONS:-


1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Royality certificate in respect of stone agg. Sand etc. shall be
produced by the contractor
4 G.I.wire shall be issued free of cost from IPH store Bhatanwali Paonta Sahib
5 Boulder shall not be less than 18 Kg. & the stone should be free from cracks and cavities.
Estimated cost Rs 59992/-
Earnest money Rs.1200/-
Time:- One Month .
Rates, Unit Amount.
P/Cum 0.00

P/Cum. 0.00

P/Sqm. 0.00

P/Sqm.

TOTAL: 0.00

he Engineer-in-charge.

Assistant Engineer,
I&PH Sub Division, Kaffota

Estimated cost Rs 17930/-


Earnest money Rs.400/-
Time:- Three Months .
Rates, Unit Amount.
92.85 P/Cum 2176.00

287.10 P/Cum. 13459.00

10.20 P/Sqm. 2295.00

TOTAL: 17930.00

Assistant
Engineer,

I&PH Sub Division, Kaffota

Estimated cost Rs 59992/-


Earnest money Rs.1200/-
Time:- One Month .
Rates, Unit Amount.
P/Cum 0.00

P/Cum. 0.00

P/Sqm. 0.00

P/Sqm.

TOTAL: 0.00

Executive
Engineer,

I&PH Division,
Paonta Sahib.

Estimated cost Rs 59992/-


Earnest money Rs.1200/-
Time:- One Month .

Rates, Unit Amount.


P/Cum 0.00

P/Cum. 0.00

P/Sqm. 0.00

P/Sqm.

TOTAL: 0.00

he Engineer-in-charge.

Assistant Engineer,
I&PH Sub Division, Kaffota
DRAFT SCHEDULE OF QUANTITY
Name of work:- Aug. of LWSS Sathaur in GP Sankholi in Tehsil Paonta Sahib Distt. Sirmour (HP)
(SH: C/o Shutter for Pump House & C/o Intake )
S.No Sub-Head and item of work. Qty.
1 Providing & fixing steel glazed door windows shutter of standard 9.44 Sqm.
rolled steel sections joints mitred and welded with 16x3.15mm
height 10 cm. long embeded in CC blocks 15cnmx10cms x10cms size
of 1:3:6(1cement:3sand:6graded stone agg. 20mm nominal size or
with wppden plugs and screws of rawl plug and screws of with clips
or with bolt and nuts as required and iron fittings including pro and
fixcing of glass panes with glazing and special metal sesh putty of
approved make complete including providing and fixing of glass
panes with glazing clips and special metal sesh putty of approved
make complete steel primer affect pre-treaditional of surface in all
leads lifts and carriage of materials as per direction of the Engineer-
in-charge.

2 Applying priming coat over new wood and wood based surfaces after 18.87 Sqm
and including preparing the surface by throughly cleaning
oil,grease,dirt and other foreign matter with ready mixed paint
brushing with white lead for priming including all leads lifts and
carriage of material as per direction of Engineer incharge.

3 Painting two coats (excluding priming coat) on new wood and wood 18.87 Sqm
based with surfaces with ready mixed paint other then white
brushing to give an even shade including cleaning the surface of dirt
dust and other foreign matter,sand papering and stopping. Including
all leads lifts and carriage of material at site as per direction of
Engineer in-charge.

4 White washing with lime on undecorated wall surfaces (two coats) to 126.27 Sqm
give an even shade including throughly brooming the surface to
remove all dirt dust mortor drops and loose scale of lime wash and
other foreign matter including all leads lifts and carriage of material
at site as per direction of Engineer-in-charge.

TERMS AND CONDITIONS:-


1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Nothing shall be paid for rejected/defective work.
Estimated cost Rs 10441/-
Earnest money Rs.250/-
Time:- Three Months .
Rates, Unit Amount.
1900.00 Per Sqm. 17936.00

35.00 P/Sqm 660.00

68.00 P/Sqm 1283.00

12.00 P/Sqm 1515.00

Total:- 21394.00

he Engineer-in-charge.

Executive Engineer,
I&PH Division.,
Paonta Sahib.
REVISED SCHEDULE OF QUANTITY Estimated cost Rs 4611
Name of work: C/o LIS Mehat in GP Kando Kansar in Tehsil Paonta Sahib Distt.Sirmour (HP)
Earnest money Rs.925
(SH: C/O Foundation of Pumping Machinery, Flooring of Pump House, White washing ,Pillaster of Time:- 15 Days.
S.No Sub-Head and item of work. Qty. Rates,
1 2 3 4
1 Excavation in foundation and trenches etc.in earth work in all 4.93 Cum 155.00
kinds of soil such as pick work ,jumper work decomposed
conglomerate saturated soil soft and hard rock upto all leads lifts
stacking the excavated soil not more than 3mtr.clear from the edge
of excavation and then returning the stacked soil in 15cm layers
when required in to plinth sides of foundation etc. consolidating
each deposited layers by ramming and watering and then
disposing of all surplus excavated earth as directed with in all
leads lifts and as per directions of the Engineer-in-charge

2 Providing and laying cement concrete 1:4:8(1cement:4sand:8 0.82 Cum 3800.00


graded stone agg.40mm nominal size)and curing complete
excluding the cost of form work in foundation & plinth including
all leads lifts and carriage of material and as per the directions of
Engineer-in-charge.

3 Providing and laying cement concrete work 1:1 1/2:3 (1cement:1


1/2 sand: 3 graded stone agg. 20mm nominal size & curing
complete) excluding cost of form work in foundation & plinth in
all heioght and depth including all leads lifts complete and
carriage of material etc. as per directions of Engineer incharge.

i) In foundation and Plinth etc. 2.55 Cum. 5000.00

4 Providing form work with steel sheets 3.15mm thick welded with
angle iron 30x30x5 mm so as to give rough finish i/c centring
shuttering structing and propping etc. with wooden bettens &
Ballies, height or propping & centering below supporting floor to
ceiling not exceeding 4 mtr.and removal of the same for insitu RCC
work and PCC work.including all leads lifts and carriage of
material at site & as per direction of Engineer in charge in:-

a) Vertical surface such as wall any thickness. 11.76 Sqm. 200.00

b) Flat surfaces such as soffits of suspended floor roofs landings 19.65 Sqm. 300.00
and like upto 200mm in thickness
5 Providing sand filling around the foundation of Pumping 1.02 Cum 60.00
Machinery including all leads,lifts and carriage of material
complete in all respect and as per direction of the Engineer-
incharge.
6 Providing CC flooring in Cement Mortar 1:2:4(1cement : 2 sand: 4 40.09 Sqm. 270.00
graded stone aggregate 20mm nominal size) laid in one layer
finished even with a floating coat of neat cement 40mm thick
including all leads,lifts and carrige of material complete and as
per direction of the Engineer-in-charge.

7 White washing with lime on decorated wall surface (two coat) to 218.65 Sqm. 10.00
give an even shade including throughly brooming the surface to
remove all dirt dust mortar drops and loose scale of lime wash
and other foreign matter including all leadsmlifts and carriage of
material and as per direction of the Engineer-in-charge.

8 Finishing wall with water proofing cement paint of approved 218.65 Sqm. 40.00
brand and manufacture and of required shade on decorated wall
surface to give an even shade after thoroughly brushing the surface
to remove all dirt and remain of loose powered material complete
in all respect and as per direction of the Engineer-in-charge.

9 Painting two coats (excluding priming coat) on new wood and 10.74 Sqm 30.00
wood based with surfaces with ready mixed paint other then white
brushing to give an even shade including cleaning the surface of
dirt dust and other foreign matter,sand papering and stopping.
Including all leads lifts and carriage of material at site as per
direction of Engineer in-charge.

10 20 mm thick cement plaster in single coat of rough side of 138 Sqm 150.00
bricks/stone masonary for interior plastering upto floor two level
including arrises internal rounded angles chamfers rounded
angles not exceeding 80mm in girth and finished even and smooth
in cement mortor 1:6(1cement:6 sand) and curing complete
including all leads lifts and carriage of materials at site as per
direction of Engineer-incharge.

11 Himrachi colour wash on undecorated wall surface (two coat) to 13.8 Sqm. 16.00
give an even shade including thoroughly brushing the surface free
from Mortor drops and other foreign matter complete in all
respect and as per direction of the Engineer-in-charge.

12 Providing and laying reinforced cement concrete 1:2:4(1cement : 1.97 Cum 4800.00
2app.sand: 4app. graded stone agg.20mm nominal size )and curing
complete excluding cost of form work & reinforcement in
suspended floors, roofs, shelves & supports, balconies beams etc.
upto floor in two level in all height and depth including all leads
lifts & carriage of material at site and as per direction of the
Engineer-in-charge.

13 Providing Mild Steel/Tor steel reinforcement including bending 177.30 Kg. 51.00
binding & placing in positing i/c all leads lifts and carriage of
material and as per direction of the Engineer-in-charge.
14 Ist. Class brick work using common burnt clay building bricks 0.49 Cum. 5300.00
(Iind class) in foundation & plinth in Cement Mortar 1:6
(1cement:6sand) and carriage of material at site and as per
direction of the Engineer-in-charge.

15 Providing plinth protction 50mm thick cement concrete 20.47 Sqm. 200.00
1:3:6(1cement:3sand:6graded stone agg. ) 20mm nomional size &
curing complete and carriage of material at site and as per
direction of the Engineer-in-charge.

TERMS & CONDITIONS


1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.

2 Security,Sale tax & Income tax shall be deducted as per rules.

3 Cement will be issued @ 250/- per bag & steel @ 41/- per Kg. at IPH store Bhatanwali Paonta Sahib.
4 Empty cement bags shall be returned to the deptt. Otherwise Rs. 2/- per bag shall be deducted from the
each bill of the contractor.
5 Royality certificate in respect of stone agg. Sand etc. shall be produced by the contractor
Estimated cost Rs 46111/-
Earnest money Rs.925/-
Time:- 15 Days.
Unit Amount.
5 6
P/Cum 764.00

P/Cum 3116.00

P/Cum. 12750.00

P/Sqm. 2352.00

P/Sqm. 5895.00

P/Cum 61.00
Per Sqm. 10824.00

P/Sqm. 2187.00

Per Sqm. 8746.00

P/Sqm 322.00

P/Sqm 20700.00

Per Sqm. 221.00

P/Cum 9456.00

P/kg 9042.00
Per Cum. 2597.00

Per Sqm. 4094.00

TOTAL: 93127.00

neer-in-charge.

Paonta Sahib.
educted from the

Executive Engineer,
I&PH Division,
Paonta Sahib.
REVISED SCHEDULE OF QUANTITY
Name of work: R/M of Left Bank Canal Km. 0/0 to 24/0 Km. in Tehsil Paonta Sahib Distt. Sirmour (HP)
(SH: Repair of 40.00 HP Kirloskar make motor (LIS Khara in Tehsil Paonta Sahib) Starter & motor.

Sr.No. Description
1 Repair of 40.00 HP motor Kirloskar make with copper wire rewiding insulated with
insulation material complete in all respect.

2 Repairt of Rotor shaft of turning and balancing complete in all respect.

3 Repair of Housing cover wselding and turnign abnd balancing complete in all respect.

4 Providing and fixing Nut bolts washer spacing complete in all respect and as per direction of the
Engineer-in-charge.
5 Providing and fixing connection plate with bolts complete in all respect.

6 Providing and fixing of finger big size.

7 Providing and fixing of Gutka big size complete in all respect.


8 Providing & supplying of Transformer oil complete in all respect.

9 Carriage of Pumping machinery site to workshop & workshop to back to site of work complete in
all respect and as per direction of the Engineer-in-charge.

2% REBATE ON ALL OVER THE AMOUNT.

TERMS AND CONDITIONS:-


1 The work shall be done as per IPH/PWD specifications and instructions of the Engineer-in-charge..
2 10% Security,2 % Sale tax & 2% Income tax shall be deducted as per rules.
3 Payment will be made after completion of work.
4 The repair will be guaranteed for six months.
5 Nothing shall be paid for rejected material
Estimated Cost :-Rs.26439/-
Earnest Money :-Rs. 530/-
Time:- Three months.
Qty. Rate Unit Amount
1 job. 24000 P/job. 24000.00

1 job. 1800 P/job. 1800.00

1 job. 1650 P/job. 1650.00

1 job. 450 P/job. 450.00

1 job. 1500 P/job. 1500.00

6 Nos. 150 Each. 900.00

6 Nos. 120 P/job. 720.00


8 Litre 190 P/ Ltr. 1520.00

1 job. 1500 P/job. 1500.00

TOTAL: 34040.00
(-) 681.00
Total: 33359.00

the Engineer-in-charge..

Executive Engineer,
I&PH Division,
Paonta Sahib.
REVISED SCHEDULE OF QUANTITY
Name of work:-R/M of LWSS Sukhchainbpur , LWSS Jheel, LWSS Kopdewala & LWSS Lpohgarh (Old) in Tehsil
Paonta Sahib Distt. Sirmour (HP) (SH: Rewinding and Repair of 2x7.50 HP , 5.00 HP & 3.50 HP (old) Submersible
Pumping set.)
S.No Sub-Head and item of work. Qty.
1 2 3
LWSS Sukhchainpur Motor 7.50 HP)
1 Rewinding & Repair of 7.50 HP Submersible Motor with super enamelled copper 1
wire of finolex make.
2 Provididng and fixing of Gun metal thrust plate. 1
3 Providing and fixing upper & lower housing bush. 2
4 Repair & balancing of Rotor shaft S.S. 1
PUMP
5 Repair & reconditioning of G.M.impellers. 10
6 Providing and fixing G.M.neckrings . 10
7 Repair of diffusers. 10
8 Providing and fixing G.M. Pump discharge bush. 10
9 Providing and fixing Submersible cabe with Motor 2.50m2 3
10 Carriage of Pumping machinery from Pump House to wokrshop and back to Pump ho 1
LWSS Jheel Motor 7.50 HP
11 Rewinding & Repair of 7.50 HP Submersible Motor with super enamelled copper 1
wire of finolex make.
12 Provididng and fixing of Gun metal thrust plate. 1
13 Providing and fixing upper & lower housing bush. 2
14 Repair & balancing of Rotor shaft S.S. 1
PUMP
15 Repair & reconditioning of G.M.impellers. 6
16 Providing and fixing G.M. discharge bush. 6
17 Repair of diffusers. 6
18 Providing and fixing of compound Role cable jointing material new studds etc. 1
19 Carriage of Pumping machinery from Pump House to wokrshop and back to Pump ho 1
MOTOR 5.00 HP )LWSS Kodewala)
20 Rewinding & repair of 5.00 HP submersible motor . 1
21 Providing and fixing Gun metal thrust plate. 1
22 Providing and fixing upper & lower housing Bush . 2
23 Repair of balancing of toror shaft S.S. 1
PUMP.
24 Reconditioning of Pump Impeller. 4
25 Providing & fixing neckring. 6
26 Repair of difusers. 6
27 Providing and fixing Pump discharge bush. 6
28 Pump & Motor opening fitting, carriage and testing at site. 1
LWSS Lohgarh Motor 3.50 HP (Old)
29 Rewinding and repair of 3.50 HP submersible motor. 1
30 Providing and fixing Gun metal thrust plate. 1
31 Providing and fixing Upper & Lower housing bush. 2
32 Repair and balancing of totor shaft S.S. 1
33 Providing and fixing Submersible cable with motor 2.50mm2. 3
PUMP
34 Providing and fixing impeller set. 4
35 Repair & balancing of shaft. 1
36 Carriage of Pumping set from Pump House to workshop and back to site of work . 1

Less 2% rebate on all over the amount.

TERMS AND CONDITIONS:-


1 The work shall be executed as per IPH/PWD specification and instructions of the
Engineer-in-charge.

2 Security,Sale tax & Income tax shall be deducted as per rules.

3 The payment shall be made after completion & successful testing of work.

4 Guarantee period of Pumping machinery is Six months.


Estimated cost Rs.51936/-
h (Old) in Tehsil Earnest money Rs.1040/-
P (old) Submersible Time:- One Month.

Rates, Unit Amount.


4 5 6

job. 6800.00 per job. 6800.00

job. 1100.00 per job. 1100.00


Nos. 500.00 Each. 1000.00
job. 950.00 per job. 950.00

Nos. 550.00 Each. 5500.00


Nos. 450.00 Each. 4500.00
Nos. 420.00 Each. 4200.00 #REF!
Nos. 500.00 Each. 5000.00
Mtr. 250.00 Per Mtr. 750.00
job. 1800.00 Per job. 1800.00 136

job. 6800.00 per job. 6800.00

job. 1100.00 per job. 1100.00


Nos. 500.00 Each. 1000.00
job. 950.00 per job. 950.00

Nos. 500.00 Each. 3000.00


Nos. 450.00 Each. 2700.00
Nos. 400.00 Each. 2400.00
job. 450.00 Per job. 450.00
job. 400.00 Per job. 400.00
633.64
job. 4500.00 Per job. 4500.00
job. 1000.00 per job. 1000.00
Nos. 600.00 Each. 1200.00
job. 750.00 per job. 750.00

Nos. 550.00 Each. 2200.00


Nos. 420.00 Each. 2520.00
Nos. 420.00 Each. 2520.00 304.5
Nos. 500.00 Each. 3000.00
job. 1500.00 Per job. 1500.00

job. 3000.00 Per job. 3000.00


job. 900.00 Per job. 900.00
Nos. 550.00 Each. 1100.00
job. 600.00 Per job. 600.00
Mtr. 150.00 Per Mtr. 450.00

Nos. 200.00 Each. 800.00


No. 700.00 Each. 700.00
job. 1400.00 Per job. 1400.00
Total: 78540.00
(-) 1571.00
TOTAL: 76969.00

Executive Engineer,
I&PH Division,Paonta Sahib
REVISED SCHEDULE OF QUANTITY Estimated cost Rs 45687/-
Name of work:- Aug. of LWSS Kaffota Phase-II in Tehsil Paonta Sahib Distt. Sirmour (HP) (SH:C/o Retaining Earnest money Rs.1000/-
wall to protect the treatment unit LHS & fixing of fencing panel) Time:- Three Months.
S.No Sub-Head and item of work. Qty. Rates, Unit
1 2 3 4 5
1 Excavation in foundation and trenches etc.in earth work in all kinds of soil such as pick work ,jumper 9.48 Cum 155.00 P/Cum
work decomposed conglomerate saturated soil soft and hard rock upto all leads lifts stacking the
excavated soil not more than 3mtr.clear from the edge of excavation and then returning the stacked
soil in 15cm layers when required in to plinth sides of foundation etc. consolidating each deposited
layers by ramming and watering and then disposing of all surplus excavated earth as directed with in
all leads lifts and as per directions of the Engineer-incharge

2 Providing form work with steel sheets 3.15mm thick welded with angle iron 30x30x5 mm so
as to give rough finish i/c centring shuttering structing and propping etc. with wooden
bettens & Ballies, height or propping & centering below supporting floor to ceiling not
exceeding 4 mtr.and removal of the same for insitu RCC work and PCC work including all
leads lifts and carriage of material at site & as per direction of Engineer incharge in:-

a) Vertiocal surfaces 84.68 Sqm 200.00 P/Sqm

3 Providing and laying cement concrete work 1:5:10(1cement:5 sand: 10 graded stone agg. 23.10 Cum 5800.00 P/Cum
40mm nominal size) with 15% plum and curing complete excluding cost of form work and
in retaining walls/ Breast walls, the size of Plums shall usually be 150mm to 300mm as per
PWD specificatioin including all leads lifts and carriage of material and as per direction of
Engineer incharge.

4 Providing and laying cement concrete 1:4:8(1cement:4sand:8 graded stone agg.40mm nominal 2.70 Cum 6200.00 P/Cum
size)and curing complete excluding the cost of form work in foundation & plinth including all leads
lifts and carriage of material and as per the directions of Engineer-in-charge.
5 Providing and laying cement concrete work 1:3:6 (1cement:3 sand: 6 graded stone agg. 40mm 10.13 Cum. 6600.00 P/Cum.
nominal size & curing complete) excluding cost of form work in foundation & plinth including all
leads lifts & carriage of material complete and carriage of material etc. as per directions of Engineer
incharge.

TOTAL:

TERMS & CONDITIONS


1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-
in-charge.
2 Security,Sale tax & Income tax & labour cess shall be deducted as per rules.
3 Royality certificate in respect of stone agg. Sand etc. shall be produced by the contractor

4 Cement shall be issued @ 315/- per Bag & Steel @ 53/- per Kg. at IPH Store Bhatanwali
Paonta Sahib.
5 Empty cement bags shall be returned to the Deptt. Otherwise Rs. 2/- per bag shall deducted
from the bill. Executive Engineer,
I&PH Division,
Paonta Shib.
REVISED SCHEDULE OF QUANTITY Estimated cost Rs 47073/-
Name of work:- A/R & M/O to AE office cum residence building at Kaffta in Tehsil Paonta Sahib Distt. Earnest money Rs. 500/-
Sirmour (HP) (SH: C/o Retaining wall in front of type-I qtr. In plum concrete & fixing of MS panel) Time:- Two Months.
S.No Sub-Head and item of work. Qty. Rates, Unit
1 Excavation in foundation and trenches etc.in earth work in all kinds of soil such as pick work ,jumper 12.68 Cum 155.00 P/Cum
work decomposed conglomerate saturated soil soft and hard rock upto all leads lifts stacking the
excavated soil not more than 3mtr.clear from the edge of excavation and then returning the stacked
soil in 15cm layers when required in to plinth sides of foundation etc. consolidating each deposited
layers by ramming and watering and then disposing of all surplus excavated earth as directed with in
all leads lifts and as per directions of the Engineer-incharge

2 Providing form work with steel sheets 3.15mm thick welded with angle iron 30x30x5 mm so as to
give rough finish i/c centring shuttering structing and propping etc. with wooden bettens & Ballies,
height or propping & centering below supporting floor to ceiling not exceeding 4 mtr.and removal of
the same for insitu RCC work and PCC work including all leads lifts and carriage of material at site &
as per direction of Engineer incharge in:-

a) Vertiocal surfaces 109.18 Sqm 200.00 P/Sqm


3 Providing and laying cement concrete work 1:5:10(1cement:5 sand: 10 graded stone agg. 40mm 37.11 Cum 2500.00 P/Cum
nominal size) with 15% plum and curing complete excluding cost of form work and in retaining
walls/ Breast walls, the size of Plums shall usually be 150mm to 300mm as per PWD specificatioin
including all leads lifts and carriage of material and as per direction of Engineer incharge.

4 Excavation in foundation including cutting dressing back filling & disposal of excavated earth upo a 7.13 Cum 140.00 P/Cum
lead of 20 mtrs. pick/jumper work including all leads,lifts and carriage of material and as per
direction of the Engineer-in-charge.

5 Fixing of MS fencing panel complete in all respect and as per direction of the Engineer-in-charge. 44 Nos. 60.00 P/Cum.

TERMS & CONDITIONS TOTAL:


1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax & labour cess shall be deducted as per rules.
3 Royality certificate in respect of stone agg. Sand etc. shall be produced by the contractor
4 Cement shall be issued @ 315/- per Bag & Steel @ 53/- per Kg. at IPH Store Bhatanwali Paonta
5 Sahib.
Empty cement bags shall be returned to the Deptt. Otherwise Rs. 2/- per bag shall deducted from the Executive Engineer,
bill.
I&PH Division,
Paonta Shib.
d cost Rs 45687/-
money Rs.1000/-
hree Months.
Amount.
6
1469.00

16936.00

133980.00

16740.00
66858.00

235983.00

Executive Engineer,
I&PH Division,
Paonta Shib.
d cost Rs 47073/-
money Rs. 500/-
wo Months.
Amount.
1965.00

21836.00
92775.00

998.00

2640.00

120214.00

Executive Engineer,
I&PH Division,
Paonta Shib.
REVISED SCHEDULE OF QUANTITY Estimated Cost: 55555/-
Name of work:-C/o FIS Manal GP manal in Tehsil Paonta Sahib Distt. Sirmour (HP) Earnest Money: 600/-
(SH: C/o retaining wall at various reaches , C/o Pucca Field channels 400 Mtr.) Time: Three Months.
S.No Sub-Head and item of work. Qty. Rates, Unit
1 2 3 4 5
1 Excavation in foundation and trenches etc.in earth work in all kinds of soil such as pick work ,jumper 13.02 Cum P/Cum
work decomposed conglomerate saturated soil soft and hard rock upto all leads lifts stacking the
excavated soil not more than 3mtr.clear from the edge of excavation and then returning the stacked
soil in 15cm layers when required in to plinth sides of foundation etc. consolidating each deposited
layers by ramming and watering and then disposing of all surplus excavated earth as directed with in
all leads lifts and as per directions of the Engineer-incharge

2 Providing and laying cement concrete 1:6:12(1cement: 6sand: 12 graded stone agg.40mm nominal 4.38 Cum P/Cum
size)and curing complete excluding the cost of form work in foundation & plinth including all leads
lifts and carriage of material and as per the directions of Engineer-in-charge.

3 Random rubble masonary /Poly rubble masonary (uncoursed/brought to coursed) with hard stone of 29.78 Cum P/Cum
approved quality in foundation and plinth including levelling up with cement concrete
1:6.12(1cement:6sand:12 graded stone agg. 20mm nominal size)in cement mortor 1:6 (1 Cement: 6
sand ) in breast wall & Retaining walls including all leads lifts and carriage of material and as per the
directions of Engineer-in-charge.

4 Excavation in drains and channels etc. in earth work in all kinds of soil such as pick work,jumper 46.98 Cum. P/Cum.
work ,blasting work decomposed conglomerate saturated soil soft rock and hard rock including
dressing of sides and beds and preparation of sub grade to level or slope including refilling the
trenches and disposing of surplus earth upto all leads lifts disposed earth to be levelled and neatly
dressed including jungle clearance and as per direction of Engineer-in-charge.

5 Cement concrete lining 15cm thick or less for irrigation channels using cement concrete
1:3:6(1cement:3sand:6graded stone agg. 20mm nominal size)and curing complete excluding cost of
form work included all leads lifts and carriage of material complete in all respect and as per direction
of Engineer-in-charge.

a)Hand Mixed concrete in bed. 13.63 Cum P/Cum


b)Hand mixed concrete lining in side slopes. 16.02 Cum P/Cum

6 Extra allowance for form work in concrete lining as directed by the Engineer-in-charge including all 16.02 Cum P/Cum
leads lifts and carriage of matrerials at site complete in all respects on side slopes as per direction of
Engineer in charge.
Total:
TERMS AND CONDITIONS:-
1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-
in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Cement will be issued @ 315/- per bag & steel @ 53/- per Kg. at IPH store Bhatanwali Paonta
Sahib.
4 Empty cement bags shall be returned to the deptt. Otherwise Rs. 2/- per bag shall be
deducted from the each bill of the contractor.
5 Royality certificate in respect of stone agg. Sand etc. shall be produced by the contractor

Executive Engineer,

I&PH Division,Paonta Sahib..

REVISED SCHEDULE OF QUANTITY Estimated Cost: 99325/-


Name of work:-C/o LIS Nera Dhunai in Tehsil Paonta Sahib Distt. Sirmour (HP) Earnest Money: 2000/-
(SH: C/o walls to make the feeder channel ) Time: Two Months.
S.No Sub-Head and item of work. Qty. Rates, Unit
1 2 3 4 5
1 Excavation in foundation and trenches etc.in earth work in all kinds of soil such as pick work ,jumper 31.68 Cum 155.00 P/Cum
work decomposed conglomerate saturated soil soft and hard rock upto all leads lifts stacking the
excavated soil not more than 3mtr.clear from the edge of excavation and then returning the stacked
soil in 15cm layers when required in to plinth sides of foundation etc. consolidating each deposited
layers by ramming and watering and then disposing of all surplus excavated earth as directed with in
all leads lifts and as per directions of the Engineer-incharge

2 Providing and laying cement concrete 1:6:12(1cement: 6sand: 12 graded stone agg.40mm nominal 14.56 Cum 2300.00 P/Cum
size)and curing complete excluding the cost of form work in foundation & plinth including all leads
lifts and carriage of material and as per the directions of Engineer-in-charge.

3 Random rubble masonary /Poly rubble masonary (uncoursed/brought to coursed) with hard stone of 73.28 Cum 3100.00 P/Cum
approved quality in foundation and plinth including levelling up with cement concrete
1:6.12(1cement:6sand:12 graded stone agg. 20mm nominal size)in cement mortor 1:6 (1 Cement: 6
sand ) in breast wall & Retaining walls including all leads lifts and carriage of material and as per the
directions of Engineer-in-charge.

Total:
TERMS AND CONDITIONS:-
1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Cement will be issued @ 315/- per bag & steel @ 53/- per Kg. at IPH store Bhatanwali Paonta Sahib.
4 Empty cement bags shall be returned to the deptt. Otherwise Rs. 2/- per bag shall be deducted from the each bill of the
contractor.
5 Royality certificate in respect of stone agg. Sand etc. shall be produced by the contractor

Executive Engineer,
I&PH Division,
Paonta Sahib.
REVISED SCHEDULE OF QUANTITY Estimated Cost: 99325/-
Name of work:-C/o LIS Nera Dhunai in Tehsil Paonta Sahib Distt. Sirmour (HP) Earnest Money: 2000/-
(SH: C/o walls to make the feeder channel ) Time: Two Months.
S.No Sub-Head and item of work. Qty. Rates, Unit
1 2 3 4 5
1 Excavation in foundation and trenches etc.in earth work in all kinds of soil such as pick work ,jumper 31.68 Cum 155.00 P/Cum
work decomposed conglomerate saturated soil soft and hard rock upto all leads lifts stacking the
excavated soil not more than 3mtr.clear from the edge of excavation and then returning the stacked
soil in 15cm layers when required in to plinth sides of foundation etc. consolidating each deposited
layers by ramming and watering and then disposing of all surplus excavated earth as directed with in
all leads lifts and as per directions of the Engineer-incharge

2 Providing and laying cement concrete 1:6:12(1cement: 6sand: 12 graded stone agg.40mm nominal 14.56 Cum 2300.00 P/Cum
size)and curing complete excluding the cost of form work in foundation & plinth including all leads
lifts and carriage of material and as per the directions of Engineer-in-charge.

3 Random rubble masonary /Poly rubble masonary (uncoursed/brought to coursed) with hard stone of 73.28 Cum 3100.00 P/Cum
approved quality in foundation and plinth including levelling up with cement concrete
1:6.12(1cement:6sand:12 graded stone agg. 20mm nominal size)in cement mortor 1:6 (1 Cement: 6
sand ) in breast wall & Retaining walls including all leads lifts and carriage of material and as per the
directions of Engineer-in-charge.

Total:
TERMS AND CONDITIONS:-
1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Cement will be issued @ 315/- per bag & steel @ 53/- per Kg. at IPH store Bhatanwali Paonta Sahib.
4 Empty cement bags shall be returned to the deptt. Otherwise Rs. 2/- per bag shall be deducted from the each bill of the
5 contractor.
Royality certificate in respect of stone agg. Sand etc. shall be produced by the contractor

Executive Engineer,
I&PH Division,
Paonta Sahib.
ed Cost: 55555/-
Money: 600/-
hree Months.
Amount.
6
0.00

0.00

0.00

0.00

0.00
0.00

0.00

ve Engineer,

vision,Paonta Sahib..

ed Cost: 99325/-
Money: 2000/-
wo Months.
Amount.
6
4910.00

33488.00

227168.00

265566

ve Engineer,
ed Cost: 99325/-
Money: 2000/-
wo Months.
Amount.
6
4910.00

33488.00

227168.00

265566

ve Engineer,
REVISED SCHEDULE OF QUANTITY
Name of work: Sustaibaility of GWSS Thontha GP Thontha Jakhal in Tehsil Shillai Distt. Sirmour (HP)

(SH: Construction of RCC collection Tank & laying of Main line)


S.No Sub-Head and item of work. Qty.
1 2 3
1 Excavation in foundation and trenches etc.in earth work in all kinds of soil such 1.54
as pick work ,jumper work decomposed conglomerate saturated soil soft and
hard rock upto all leads lifts stacking the excavated soil not more than
3mtr.clear from the edge of excavation and then returning the stacked soil in
15cm layers when required in to plinth sides of foundation etc. consolidating
each deposited layers by ramming and watering and then disposing of all
surplus excavated earth as directed with in all leads lifts and as per directions
of the Engineer-incharge

2 Providing and laying cement concrete 1:4:8(1cement:4sand:8 graded stone 0.38


agg.40mm nominal size)and curing complete excluding the cost of form work in
foundation & plinth including all leads lifts and carriage of material and as per
the directions of Engineer-in-charge.

3 Providing and laying cement concrete work 1:1 1/2:3 (1cement:1 1/2 sand: 3
graded stone agg. 20mm nominal size & curing complete) excluding cost of
form work in all height and depth including all leads lifts complete and carriage
of material etc. as per directions of Engineer incharge.

a) In foundation and plinth 0.38

b) Vertical surface such as wall any thickness. 0.69


4 Providing form work with steel sheets 3.15mm thick welded with angle iron
30x30x5 mm so as to give rough finish i/c centring shuttering structing and
propping etc. with wooden bettens & Ballies, height or propping & centering
below supporting floor to ceiling not exceeding 4 mtr.and removal of the same
for insitu RCC work and PCC work.including all leads lifts and carriage of
material at site & as per direction of Engineer in charge in:-

a) Flat surfaces. 1.49

b) Vertical surface such as wall any thickness. 9.20


5 Providing and laying cement concrete 1:2:4(1cement:2app.sand: 4 app. graded 0.15
stone agg. 20mm nominal size )and curing complete excluding cost of form
work & reinforcement for reinforced work in suspended floors, roofs landing
shelves and their supports balconies, beams, girders bressumers and cantilivers
upto to floor two level in all height and depth, including all leads lifts and
carriage of material at site and as per direction of the Engineer-incharge.

6 Providing Mild Steel/Tor steel reinforcement including bending binding & 67.32
placing in positing I/c all leads lifts and carriage of material and as per
direction of the Engineer-in-charge.
7 Excavation in drains & channel etc.in earth work in all kinds of soil such as pick 191.25
work ,jumper work blasting work, decomposed conglomerate saturated soil
soft and hard rock including dressing of sides and beds and prepareation of sub
grade to level or slope including refilling the trenches and disposing of surplus
earth upto all leads,lifts disposed earth to be levelled and neatly dressed
including jungle clearance and as per directions of the Engineer-incharge

8 Laying and jointing of GMS Pipes of various dia in trenches (earth work in
trenches to be measured and paid for seperately) including all leads lifts and
carriage of material at site as per direction of Engineer-in-charge of following
dias.

i) 20 mm dia, 850

TERMS AND CONDITIONS:-


1 The work shall be executed as per IPH/PWD specification and instructions of
the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Cement will be issued @ 250/- per bag & steel @ 41/- per Kg. at IPH store
Bhatanwali Paonta Sahib.
4 Empty cement bags shall be returned to the deptt. Otherwise Rs. 2/- per bag
shall be deducted from the each bill of the contractor.
5 Royality certificate in respect of stone agg. Sand etc. shall be produced by the
contractor
6 G.I.Pipe shall be issued free of cost from IPH Store Bhatanwali Paonta Sahib.

7 The pipe fitting shall be provided by the contractor.


REVISED SCHEDULE OF QUANTITY
Name of work:-C/o LIS Upper Mashoo in GP Jamna in Tehsil Paonta Sahib Distt. Sirmour (HP)
(SH: C/o Breast wall to protect the channel at RD )
S.No Sub-Head and item of work. Qty.
1 2 3
1 Cutting in earth work in and disposal of excavated earth within all leadsin 16.04
Pick/jumper work 50% each complete in all respect and as per direction of the
Engineer-in-charge.
2 Excavation in foundation and trenches etc.in earth work in all kinds of soil such 10.53
as pick work ,jumper work decomposed conglomerate saturated soil soft and
hard rock upto all leads lifts stacking the excavated soil not more than
3mtr.clear from the edge of excavation and then returning the stacked soil in
15cm layers when required in to plinth sides of foundation etc. consolidating
each deposited layers by ramming and watering and then disposing of all
surplus excavated earth as directed with in all leads lifts and as per directions
of the Engineer-incharge

3 Providing and laying cement concrete 1:6:12(1cement: 6sand: 12 graded stone 5.35
agg.40mm nominal size)and curing complete excluding the cost of form work in
foundation & plinth including all leads lifts and carriage of material and as per the
directions of Engineer-in-charge.

4 Providing form work with steel sheets 3.15mm thick welded with angle iron
30x30x5 mm so as to give rough finish i/c centring shuttering structing and
propping etc. with wooden bettens & Ballies, height or propping & centering
below supporting floor to ceiling not exceeding 4 mtr.and removal of the same
for insitu RCC work and PCC work.including all leads lifts and carriage of
material at site & as per direction of Engineer in charge in:-

b) Vertical surface such as wall any thickness. 41.85


5 Providing and laying cement concrete work 1:5:10(1cement:5 sand: 10 graded 46.05
stone agg. 40mm nominal size) with 15% plum and curing complete excluding
cost of form work and in retaining walls/ Breast walls, the size of Plums shall
usually be 150mm to 300mm as per PWD specificatioin including all leads lifts
and carriage of material and as per direction of Engineer incharge.

6 Stone filling behind the retaining wall by ramming and watering and then 10.73
disposing of all surplus excavated as directed within all leads,lifts and carriage
of material and as per direction of the Engineer-in-charge.

TERMS AND CONDITIONS:-


1 The work shall be executed as per IPH/PWD specification and instructions of
the Engineer-in-charge.

2 Security,Sale tax & Income tax shall be deducted as per rules.


3 Cement will be issued @ 315/- per bag & steel @ 53/- per Kg. at IPH store
Bhatanwali Paonta Sahib.

4 Empty cement bags shall be returned to the deptt. Otherwise Rs. 2/- per bag
shall be deducted from the earch bill of the contractor.
5 Royality certificate in respect of stone agg. Sand etc. shall be produced by the
contractor
Estimated cost Rs 20134/-
irmour (HP)
Earnest money Rs.500/-
Time:- Three Months
Rates, Unit Amount.
4 5 6
Cum P/Cum

Cum P/Cum

Cum. P/Cum.

Cum. P/Cum.

Sqm. P/Cum

Sqm. P/Cum
Cum. Per
Cum.

Kg. P/kg

Cum P/Cum

Rmt P/Rmt.
Total:

Executive Engineer,
I&PH Division,
Paonta Sahib.
Estimated cost Rs 56882/-
Earnest money Rs.1200/-
Time:- Two Months.
Rates, Unit Amount.
4 5 6
Cum 130.00 P/Cum 2085.00

Cum 155.00 P/Cum 1632.00

Cum 3700 P/Cum 19795.00

Sqm. 200.00 P/Cum 8370.00


Cum 3900.00 P/Cum ###

Cum. 850.00 Per 9121.00


Cum.

Total: ###
Executive Engineer,
I&PH Division
Paonta Sahib.
DRAFT SCHEDULE OF QUANTITY Estimated cost Rs 63170/-
Name of work: C/o LIS Nav Barwa GP Staun in Tehsil Paonta Sahib Distt.Sirmour (HP) Earnest money Rs.1300/-

(SH: C/O Main delivery tank in RR Masonary& fixing of V Notch ) Time:- Three Months
S.No Sub-Head and item of work. Qty. Rate.
1 2 3 4
1 Excavation in foundation and trenches etc.in earth work in 25.85 Cum 92.85
all kinds of soil such as pick work ,jumper work
decomposed conglomerate saturated soil soft and hard
rock upto all leads lifts stacking the excavated soil not more
than 3mtr.clear from the edge of excavation and then
returning the stacked soil in 15cm layers when required in
to plinth sides of foundation etc. consolidating each
deposited layers by ramming and watering and then
disposing of all surplus excavated earth as directed with in
all leads lifts and as per directions of the Engineer-in-
charge

2 Providing and laying cement concrete 7.46 Cum 1104.80


1:4:8(1cement:4sand:8 graded stone agg.40mm nominal
size)and curing complete excluding the cost of form work in
foundation & plinth including all leads lifts and carriage of
material and as per the directions of Engineer-in-charge.

3 Providing and laying cement concrete flooring 11.44 Cum 1104.80


1:2:4(1cement:2sand:4 graded stone agg.20mm nominal
size)and curing complete excluding the cost of form work in
foundation & plinth including all leads lifts and carriage of
material and as per the directions of Engineer-in-charge.

4 Random rubble masonary /Poly rubble masonary 31.96 Cum 1135.50


(uncoursed/brought to coursed) with hard stone of
approved quality in foundation and plinth including
levelling up with cement concrete
1:6.12(1cement:6sand:12 graded stone agg. 20mm nominal
size)in cement mortor 1:6 (1 Cement: 6 sand ) in breast
wall & Retaining walls including all leads lifts and carriage
of material and as per the directions of Engineer-in-charge.

5 15 mm thick cement plaster in single coat of rough side of 42.26 Sqm 52.00
bricks/stone masonary for interior plastering upto floor
two level including arrises internal rounded angles
chamfers rounded angles not exceeding 80mm in girth and
finished even and smooth in cement mortor 1:3(1cement:3
sand) and curing complete including all leads lifts and
carriage of materials at site as per direction of Engineer-
incharge.
6, Providing and fixing of V Notch make of MS steel and angle 11 No. 1400.00
iron and duly engrooved strip of brass over steel showing
one side charge.

TERMS AND CONDITIONS:-


1 The work shall be executed as per IPH/PWD
specification and instructions of the Engineer-in-
charge.
2 Security,Sale tax & Income tax shall be deducted as
per rules.
3 Cement will be issued @ 250/- per bag & steel @ 41/-
per Kg. at IPH store Bhatanwali Paonta Sahib.

4 Empty cement bags shall be returned to the deptt.


Otherwise Rs. 2/- per bag shall be deducted from the
each bill of the contractor.
5 Royality certificate in respect of stone agg. Sand etc.
shall be produced by the contractor

Assistant Engineer,
I&PH Sub Division,
Kaffota.

DRAFT SCHEDULE OF QUANTITY Estimated cost Rs 78693/-


Name of work: C/o LIS Nav Barwa GP Staun in Tehsil Paonta Sahib Distt.Sirmour (HP)
Earnest money Rs.1300/-
(SH: Laying & jointing of GMS pipe of 100 mm dia ) Time:- Three Months
S.No Sub-Head and item of work. Qty. Rate.
1 2 3 4
1 Excavation in drains and channels etc. in earth work in all 742.50 Cum. 75.95
kinds of soil such as pick work,jumper work ,blasting work
decomposed conglomerate saturated soil soft rock and
hard rock including dressing of sides and beds and
preparation of sub grade to level or slope including refilling
the trenches and disposing of surplus earth upto all leads
lifts disposed earth to be levelled and neatly dressed
including jungle clearance and as per direction of Engineer-
in-charge.

2 Laying and jointing of GMS Pipes of various dia in trenches


(earth work in trenches to be measured and paid for
seperately) including all leads lifts and carriage of material
at site as per direction of Engineer-in-charge of following
dias.
i) 100mm dia 1000 Rmt 2.70

3 Providing and fixing Peet valve of superior quality of


following dias .

i)100mm dia. 4 Nos. 4900


TERMS & CONDITIONS
1 The work shall be executed as per IPH/PWD specification
and instructions of the Engineer-in-charge.

2 Security,Sale tax & Income tax shall be deducted as per


rules.
3 GI Pipe shall be issued by the deptt. free of cost from IPH
store Bhatanwali Paonta Sahib.
4 Nothing shall be paid for rejected/defective work.
Assistant Engineer,
I&PH Sub Division,

Kaffota.
Estimated cost Rs 63170/-
Earnest money Rs.1300/-

Time:- Three Months


Unit Amount.
5 6
P/Cum 2400.00

P/Cum 8242.00

P/Cum 12639.00

P/Cum 36291.00

P/Sqm 2198.00
Each. 1400.00

Total: 63170.00

Assistant Engineer,
I&PH Sub Division,

Estimated cost Rs 78693/-


Earnest money Rs.1300/-
Time:- Three Months
Unit Amount.
5 6
P/Cum. 56393.00
P/Rmt. 2700.00

Each. 19600
TOTAL: 78693.00

Assistant Engineer,
I&PH Sub Division,
DRAFT SCHEDULE OF QUANTITY Estimated cost Rs 63170/-
Name of work: C/o LIS Nav Barwa GP Staun in Tehsil Paonta Sahib Distt.Sirmour (HP) Earnest money Rs.1300/-
(SH: C/O Main delivery tank in RR Masonary & fixing of V Notch ) Time:- Three Months
S.No Sub-Head and item of work. Qty. Rate. Unit Amount.
1 2 3 4 5 6
1 Excavation in foundation and trenches etc.in earth work in all kinds of soil such 25.85 Cum 92.85 P/Cum 2400.00
as pick work ,jumper work decomposed conglomerate saturated soil soft and
hard rock upto all leads lifts stacking the excavated soil not more than 3mtr.clear
from the edge of excavation and then returning the stacked soil in 15cm layers
when required in to plinth sides of foundation etc. consolidating each deposited
layers by ramming and watering and then disposing of all surplus excavated
earth as directed with in all leads lifts and as per directions of the Engineer-in-
charge

2 Providing and laying cement concrete 1:4:8(1cement:4sand:8 graded stone 7.46 Cum 1104.80 P/Cum 8242.00
agg.40mm nominal size)and curing complete excluding the cost of form work in
foundation & plinth including all leads lifts and carriage of material and as per
the directions of Engineer-in-charge.

3 Providing and laying cement concrete flooring 1:2:4(1cement:2sand:4 graded 11.44 Cum 1104.80 P/Cum 12639.00
stone agg.20mm nominal size)and curing complete excluding the cost of form
work in foundation & plinth including all leads lifts and carriage of material and
as per the directions of Engineer-in-charge.

4 Random rubble masonary /Poly rubble masonary (uncoursed/brought to 31.96 Cum 1135.50 P/Cum 36291.00
coursed) with hard stone of approved quality in foundation and plinth including
levelling up with cement concrete 1:6.12(1cement:6sand:12 graded stone agg.
20mm nominal size)in cement mortor 1:6 (1 Cement: 6 sand ) in breast wall &
Retaining walls including all leads lifts and carriage of material and as per the
directions of Engineer-in-charge.
5 15 mm thick cement plaster in single coat of rough side of bricks/stone 42.26 Sqm 52.00 P/Sqm 2198.00
masonary for interior plastering upto floor two level including arrises internal
rounded angles chamfers rounded angles not exceeding 80mm in girth and
finished even and smooth in cement mortor 1:3(1cement:3 sand) and curing
complete including all leads lifts and carriage of materials at site as per direction
of Engineer-incharge.

6, Providing and fixing of V Notch make of MS steel and angle iron and duly 11 No. 1400.00 Each. 1400.00
engrooved strip of brass over steel showing one side charge.

Total: 63170.00
TERMS AND CONDITIONS:-
1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Cement will be issued @ 250/- per bag & steel @ 41/- per Kg. at IPH store Bhatanwali Paonta Sahib.
4 Empty cement bags shall be returned to the deptt. Otherwise Rs. 2/- per bag shall be deducted from the each bill of the
contractor.
5 Royality certificate in respect of stone agg. Sand etc. shall be produced by the contractor

Assistant Engineer,
I&PH Sub Division,

Kaffota.
DRAFT SCHEDULE OF QUANTITY Estimated cost Rs 63170/-
Name of work: A/R & M/O of various WSS under IPH Sub Division Kaffota in Tehsil Paonta Sahib Earnest money Rs.1300/-

Distt.Sirmour (HP) (SH: Providing and fixing of Manhole cover.) Time:- Three Months
S.No Sub-Head and item of work. Qty. Rate. Unit Amount.
1 2 3 4 5 6
1 Supplying and fixing of cast iron cover with frames for main holes of size 455mm 100.00 Nos. 900.00 Each. 90000.00
internal dia meter Cast iron cover(Medium) duty the weight of cover to be not
less than 23 Kg. including locking arrangement including all leads,lifts and
carriage of material at site and as per direction of the Engineer-in-charge.

2 Providing steel lock complete in all respect and as per direction of the Engineer- 100 Nos. 60.00 Each. 6000.00
in-charge.

TERMS AND CONDITIONS:- Total: 96000.00


1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Nothing shall be paid for rejected/defective work.
DRAFT SCHEDULE OF QUANTITY Estimated cost Rs .96000/-
Name of work: A/R & M/O of various WSS under IPH Sub Division Kaffota in Tehsil Paonta Sahib Earnest money Rs.2000/-
Distt.Sirmour (HP) (SH: Providing and fixing of Manhole cover.) Section Jakhana Time:- ONE Month
S.No Sub-Head and item of work. Qty. Rate. Unit Amount.
1 2 3 4 5 6
1 Supplying and fixing of cast iron cover with frames for main holes of size 455mm 100.00 Nos. 900.00 Each. 90000.00
internal dia meter Cast iron cover(Medium) duty the weight of cover to be not
less than 23 Kg. including locking arrangement including all leads,lifts and
carriage of material at site and as per direction of the Engineer-in-charge.

2 Providing steel lock complete in all respect and as per direction of the Engineer- 100 Nos. 60.00 Each. 6000.00
in-charge.
TERMS AND CONDITIONS:- Total: 96000.00
1 The work shall be executed as per IPH/PWD specification and instructions
of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Nothing shall be paid for rejected/defective work.

Assistant Engineer,
I&PH Sub Division,

Kaffota.
ABSTRACT OF COST.
Name of work: A/R & M/O of various WSS under IPH Sub Division Kaffota in Tehsil Paonta Sahib
Distt.Sirmour (HP) (SH: Providing and fixing of Manhole cover.)
S.No Sub-Head and item of work. Qty. Rate. Unit Amount.
1 2 3 4 5 6
1 Supplying and fixing of cast iron cover with frames for main holes of size 455mm 100.00 Nos. 3000.00 Each. 300000.00
internal dia meter Cast iron cover(Medium) duty the weight of cover to be not
less than 23 Kg. including locking arrangement including all leads,lifts and
carriage of material at site and as per direction of the Engineer-in-charge.

2 Providing steel lock complete in all respect and as per direction of the Engineer- 100 Nos. 200.00 Each. 20000.00
in-charge.

Total: 320000.00

Assistant Engineer,
I&PH Sub Division,
Kaffota.
DRAFT SCHEDULE OF QUANTITY Estimated cost Rs .96000/-
Name of work: A/R & M/O of various WSS under IPH Sub Division Kaffota in Tehsil Paonta Sahib
Earnest money Rs.2000/-
Distt.Sirmour (HP) (SH: Providing and fixing of Manhole cover.) Section Jakhana Time:- ONE Month
S.No Sub-Head and item of work. Qty. Rate. Unit Amount.
1 2 3 4 5 6
1 Supplying and fixing of cast iron cover with frames for main holes of size 455mm 100.00 Nos. 900.00 Each. 90000.00
internal dia meter Cast iron cover(Medium) duty the weight of cover to be not
less than 23 Kg. including locking arrangement including all leads,lifts and
carriage of material at site and as per direction of the Engineer-in-charge.

2 Providing steel lock complete in all respect and as per direction of the Engineer- 100 Nos. 60.00 Each. 6000.00
in-charge.
TERMS AND CONDITIONS:- Total: 96000.00
1 The work shall be executed as per IPH/PWD specification and instructions
of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Nothing shall be paid for rejected/defective work.

Assistant Engineer,
I&PH Sub Division,
Kaffota.
SCHEDULE OF QUANTITY Estimated cost Rs .96000/-
Name of work: A/R & M/O of various WSS under IPH Sub Division Kaffota in Tehsil Paonta Sahib
Earnest money Rs.2000/-
Distt.Sirmour (HP) (SH: Providing and fixing of Manhole cover.) Section Kamroo Time:- ONE Month
S.No Sub-Head and item of work. Qty. Rate. Unit Amount.
1 2 3 4 5 6
1 Supplying and fixing of cast iron cover with frames for main holes of size 455mm 100.00 Nos. Each.
internal dia meter Cast iron cover(Medium) duty the weight of cover to be not
less than 23 Kg. including locking arrangement including all leads,lifts and
carriage of material at site and as per direction of the Engineer-in-charge.

2 Providing steel lock complete in all respect and as per direction of the Engineer- 100 Nos. Each.
in-charge.
TERMS AND CONDITIONS:- Total:
1 The work shall be executed as per IPH/PWD specification and instructions
of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Nothing shall be paid for rejected/defective work.

Assistant Engineer,
I&PH Sub Division,
Kaffota.

SCHEDULE OF QUANTITY Estimated cost Rs .96000/-


Name of work: A/R & M/O of various WSS under IPH Sub Division Kaffota in Tehsil Paonta Sahib
Earnest money Rs.2000/-
Distt.Sirmour (HP) (SH: Providing and fixing of Manhole cover.) Time:- ONE Month
S.No Sub-Head and item of work. Qty. Rate. Unit Amount.
1 2 3 4 5 6
1 Supplying and fixing of cast iron cover with frames for main holes of size 455mm 100.00 Nos. Each.
internal dia meter Cast iron cover(Medium) duty the weight of cover to be not
less than 23 Kg. including locking arrangement including all leads,lifts and
carriage of material at site and as per direction of the Engineer-in-charge.

2 Providing steel lock complete in all respect and as per direction of the Engineer- 100 Nos. Each.
in-charge.
TERMS AND CONDITIONS:- Total:
1 The work shall be executed as per IPH/PWD specification and instructions
of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Nothing shall be paid for rejected/defective work.
Assistant Engineer,

I&PH Sub Division,

Kaffota.

DRAFT SCHEDULE OF QUANTITY Estimated cost Rs .67200/-


Name of work: A/R & M/O of various WSS under IPH Sub Division Shillai in Tehsil Shillai
Earnest money Rs.1400/-
Distt.Sirmour (HP) (SH: Providing and fixing of Manhole cover with proper lock & Key system) Time:- ONE Month
S.No Sub-Head and item of work. Qty. Rate. Unit Amount.
1 2 3 4 5 6
1 Supplying and fixing of cast iron cover with frames for main holes of size 455mm 30 Nos. 2100.00 Each. 63000.00
internal dia meter Cast iron cover(Medium) duty the weight of cover to be not
less than 23 Kg. including locking arrangement including all leads,lifts and
carriage of material at site and as per direction of the Engineer-in-charge.

2 Providing steel lock complete in all respect and as per direction of the Engineer- 30 Nos. 140.00 Each. 4200.00
in-charge.

TERMS AND CONDITIONS:- Total: 67200.00


1 The work shall be executed as per IPH/PWD specification and instructions
of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Nothing shall be paid for rejected/defective work.

Assistant Engineer,
I&PH Sub Division,

Shillai.
DETAIL OF MEASUREMENT.
Name of work: A/R & M/O of various WSS under IPH Sub Division Kaffota in Tehsil Paonta Sahib
Distt.Sirmour (HP) (SH: Providing and fixing of Manhole cover)
S.No Sub-Head and item of work. Qty.
1 2 3 L
1 Supplying and fixing of cast iron cover with frames for main holes of 100 Nos.
size 455mm internal dia meter Cast iron cover(Medium) duty the
weight of cover to be not less than 23 Kg. including locking
arrangement including all leads,lifts and carriage of material at site
and as per direction of the Engineer-in-charge.

2 Providing steel lock complete in all respect and as per direction of the 100 Nos.
Engineer-in-charge.

Assistant Engineer,
I&PH Sub Division,
Kaffota.
ib

Qty.
B H
100 Nos.

100Nos.

Assistant Engineer,
I&PH Sub Division,
Schedule of Quantity Estimated Cost :-Rs.80118/-
Name of work:-Restoration of Rain damages to FIS Anra GP Shawga in Tehsil Paonta Sahib Earnest Money :-Rs.1100/-
Distt.Sirmour(HP) (SH: C/O Retaining wall at RD 0 to 17 Mtrs.) Time:- Two months.
S.No Description Qty. Rate Unit Amount
1 2 3 4 5 6.
1 Excavation in earth work and disposal ofall excavated earth upto a lead of 20 Mtrs. 36.89 Cum. 38.50 Per Cum. 1420.00
And lift upto 1.50 Mtrs. disposing earth to be levelled and neatly dressed within a leads
in Pick/juper work 50% each including all leads,lifts and carriage of material and as per
direction of the Engineer-in-charge.

2 Providing and laying cement concrete 1:6:12(1cement:6sand:12 graded stone 7.53 Cum 905.10 P/Cum 6815.00
agg.40mm nominal size)and curing complete excluding the cost of centring
shuttering in foundation & plinth including all leads lifts and carriage of material
and as per the directions of Engineer-in-charge.

3 Providing and laying cement concrete work 1:4:8 (1cement: 4 sand: 8 graded stone agg. 3.21 Cum 1104.10 P/Cum 3544.00
20mm nominal size & curing complete) excluding cost of form work in foundation and
plinth in breast & retaining wall in all height and depth including all leads lifts complete
and carriage of material etc. as per directions of Engineer incharge.

4 Random rubble masonary /Poly rubble masonary (uncoursed/brought to coursed) 33.21 Cum 1135.50 P/Cum 37710.00
with hard stone of approved quality in foundation and plinth including levelling up
with cement concrete 1:6.12(1cement:6sand:12 graded stone agg. 20mm nominal
size)in cement mortor 1:6 (1 Cement: 6 sand ) in breast wall & Retaining walls
including all leads lifts and carriage of material and as per the directions of
Engineer-in-charge.

5 C/o Dry stone masonary in breast/Retaining walls/parapets etc. including all 56.01 Cum 935.50 P/Cum 52397.00
leads.lifts and carriage of material and as per direction of the Engineer-in-charge.

6 Boulder filling behind retaining wall complete in all respect and as per direction of 11.34 Cum 391.70 P/Cum 4442.00
the Engineer-in-charge.
TERMS AND CONDITIONS. Total: 106328.00
1 The work shall be executed as per IPH/PWD specification and instructions of the
Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Cement shall be issued @ Rs. 250/- per bag & steel @ 41/- per Kg. from IPH store
Bhatanwali Paonta Sahib.
4 Royality certificate in respect of stone agg. Sand etc. shall be produced by the contractor

5 Empty cement bags shall be returned to the Deptt. Otherwise Rs. 2/- per bag shall Executive Engineer,
deducted from the bill.
6 The watch & ward of the store by the contractor. I&PH Division,
Paonta Sahib.

Draft Schedule of Quantity Estimated Cost :-Rs.77471/-


Name of work:-Restoration of Rain damages to FIS Rithog Shirog GP Shilla & Kanti Mashwa in Tehsil Paonta Sahib Earnest Money :-Rs.1600/-
Distt.Sirmour(HP) (SH: C/O Retaining wall at RD 315 to 330 Mtrs.) Time:- Two months.
S.No Description Qty. Rate Unit Amount
1 2 3 4 5 6.
1 Cutting in earth work and disposal of excavated earth ithin all leads,lifts in Pick/jumper 36.77 Cum,. 38.5 P/Cum. 1416.00
work complete in all respect and as per directions of the Engineer-in-charge.

2 Excavation in foundation and trenches etc.in earth work in all kinds of soil such as pick 10.53 Cum 92.85 P/Cum 978.00
work ,jumper work decomposed conglomerate saturated soil soft and hard rock upto all
leads lifts stacking the excavated soil not more than 3mtr.clear from the edge of
excavation and then returning the stacked soil in 15cm layers when required in to plinth
sides of foundation etc. consolidating each deposited layers by ramming and watering
and then disposing of all surplus excavated earth as directed with in all leads lifts and as
per directions of the Engineer-in-Charge

3 Providing and laying cement concrete 1:6:12(1cement:6sand:12 graded stone 5.35 Cum 905.10 P/Cum 4842
agg.40mm nominal size)and curing complete excluding the cost of centring shuttering
in foundation & plinth including all leads lifts and carriage of material and as per the
directions of Engineer-in-charge.

4 Random rubble masonary /Poly rubble masonary (uncoursed/brought to coursed) with 33.21 Cum 1135.50 P/Cum 37710
hard stone of approved quality in retaining wall , breast wall and parapets complete
levelling up with cement concrete 1:6.12(1cement:6sand:12 graded stone agg. 20mm
nominal size)in cement mortor 1:6 (1 Cement: 6 sand ) in breast wall & Retaining walls
including all leads lifts and carriage of material and as per the directions of Engineer-in-
charge.

5 C/o Dry stone masonary in breast/Retaining walls/parapets etc. including all leads.lifts 32.04 Cum 935.50 P/Cum 29973
and carriage of material and as per direction of the Engineer-in-charge.

6 Boulder filling behind retaining wall complete in all respect and as per direction of the 10.13 Cum 391.70 P/Cum 3968
Engineer-in-charge.

TERMS AND CONDITIONS. Total: 77471.00


1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Cement shall be issued @ Rs. 250/- per bag & steel @ 41/- per Kg. from IPH store Bhatanwali Paonta Sahib.
4 Royality certificate in respect of stone agg. Sand etc. shall be produced by the contractor
5 Empty cement bags shall be returned to the Deptt. Otherwise Rs. 2/- per bag shall deducted from the bill.
Assistant Rngineer,
I&PH Sub Division,
Kaffota.
REVISED SCHEDULE OF QUANTITY Estimated cost Rs 55359/-
Name of work: Prov./Imp. of LWSS to various PC hab. Of CV Basog Chambiyara & Chowki etc. Earnest money Rs.1200/-
in Tehsil Paonta Sahib Distt. Sirmour (HP) (SH: Laying & jointing of GMS tube of various dia) Time:- Three Months
S.No Sub-Head and item of work. Qty. Rates, Unit Amount.
1 2 3 4 5 6
1 Excavation in drains & channel etc.in earth work in all kinds of soil such as 720.00 Cum 175.00 P/Cum 126000.00
pick work ,jumper work blasting work, decomposed conglomerate
saturated soil soft and hard rock including dressing of sides and beds and
prepareation of sub grade to level or slope including refilling the trenches
and disposing of surplus earth upto all leads,lifts disposed earth to be
levelled and neatly dressed including jungle clearance and as per
directions of the Engineer-in-charge.

2 Laying and jointing of GMS Pipes of various dia in trenches (earth work in
trenches to be measured and paid for seperately) including all leads lifts
and carriage of material at site as per direction of Engineer-in-charge of
following dias.

i) 15 mm dia, 850 Rmt 9.00 P/Rmt. 7650.00


ii) 20 mm dia 500 Rmt. 9.50 P/Rmt. 4750.00
Total: 138400.00
TERMS AND CONDITIONS:-
1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 G.I.Pipe shall be issued free of cost from IPH Store Bhatanwali Paonta Sahib.
4 The pipe fitting shall be provided by the contractor.

Executive Engineer,
I&PH Division,
Paonta Sahib.
REVISED SCHEDULE OF QUANTITY Estimated cost Rs 91965/-
Name of work: Prov./Imp. of LWSS to various PC hab. of CV Basog Chambiyara & Chowki etc. Earnest money Rs.2000/-
in Tehsil Paonta Sahib Distt. Sirmour (HP) (SH: Laying & jointing of GMS tube of various dia) Time:- Three Months
S.No Sub-Head and item of work. Qty. Rates, Unit Amount.
1 2 3 4 5 6
1 Excavation in drains & channel etc.in earth work in all kinds of soil such as 1120.50 Cum 175.00 P/Cum 196088.00
pick work ,jumper work blasting work, decomposed conglomerate
saturated soil soft and hard rock including dressing of sides and beds and
prepareation of sub grade to level or slope including refilling the trenches
and disposing of surplus earth upto all leads,lifts disposed earth to be
levelled and neatly dressed including jungle clearance and as per
directions of the Engineer-incharge

2 Laying and jointing of GMS Pipes of various dia in trenches (earth work in
trenches to be measured and paid for seperately) including all leads lifts
and carriage of material at site as per direction of Engineer-in-charge of
following dias.

i) 25 mm dia, 2360 Rmt 14.00 P/Rmt. 33040.00


ii) 50 mm dia 2425 Rmt. 22.00 P/Rmt. 53350.00
Total: 282478.00
TERMS AND CONDITIONS:-
1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 G.I.Pipe shall be issued free of cost from IPH Store Bhatanwali Paonta Sahib.
4 The pipe fitting shall be provided by the contractor.
Executive Engineer,
I&PH Division,
Paonta Sahib.
DRAFT SCHEDULE OF QUANTITY
Name of work: Prov./Imp. of LWSS to various PC hab. Of CV Basog Chambiyara & Chowki etc.
in Tehsil Paonta Sahib Distt. Sirmour (HP) (SH: Laying & jointing of GMS tube of various dia)
S.No Sub-Head and item of work. Qty.
1 2 3
1 Excavation in drains & channel etc.in earth work in all kinds of soil such 720.00
as pick work ,jumper work blasting work, decomposed conglomerate
saturated soil soft and hard rock including dressing of sides and beds
and prepareation of sub grade to level or slope including refilling the
trenches and disposing of surplus earth upto all leads,lifts disposed
earth to be levelled and neatly dressed including jungle clearance and
as per directions of the Engineer-incharge

2 Laying and jointing of GMS Pipes of various dia in trenches (earth work
in trenches to be measured and paid for seperately) including all leads
lifts and carriage of material at site as per direction of Engineer-in-
charge of following dias.

i) 15 mm dia, 850
ii) 20 mm dia 500

TERMS AND CONDITIONS:-


1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-
charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 G.I.Pipe shall be issued free of cost from IPH Store Bhatanwali Paonta Sahib.
4 The pipe fitting shall be provided by the contractor.
Estimated cost Rs 55359/-
Chowki etc. Earnest money Rs.1200/-
various dia) Time:- Three Months
Rates, Unit Amount.
4 5 6
Cum 155.00 P/Cum 111600.00

Rmt 9.00 P/Rmt. 7650.00


Rmt. 9.00 P/Rmt. 4500.00
Total: 123750.00

ons of the Engineer-in-

ahib.

Executive Engineer,
I&PH Division,
Paonta Sahib.
SCHEDULE OF QUANTITY
Name of work: Sustaibaility of GWSS Thontha GP Thontha Jakhal in Tehsil Shillai Distt. Sirmour (HP)
(SH: Construction of RCC collection Tank & laying of Main line)
S.No Sub-Head and item of work. Qty.
1 2 3
1 Excavation in foundation and trenches etc.in earth work in all 1.54 Cum
kinds of soil such as pick work ,jumper work decomposed
conglomerate saturated soil soft and hard rock upto all leads lifts
stacking the excavated soil not more than 3mtr.clear from the
edge of excavation and then returning the stacked soil in 15cm
layers when required in to plinth sides of foundation etc.
consolidating each deposited layers by ramming and watering
and then disposing of all surplus excavated earth as directed
with in all leads lifts and as per directions of the Engineer-in-
Charge

2 Providing and laying cement concrete 1:4:8(1cement:4sand:8 0.38 Cum


graded stone agg.40mm nominal size)and curing complete
excluding the cost of form work in foundation & plinth including
all leads lifts and carriage of material and as per the directions of
Engineer-in-charge.

3 Providing and laying cement concrete work 1:1 1/2:3


(1cement:1 1/2 sand: 3 graded stone agg. 20mm nominal size &
curing complete) excluding cost of form work in all height and
depth including all leads lifts complete and carriage of material
etc. as per directions of Engineer incharge.

a) In foundation and plinth 0.38 Cum.


b) Vertical surface such as wall any thickness. 0.69 Cum.
4 Providing form work with steel sheets 3.15mm thick welded
with angle iron 30x30x5 mm so as to give rough finish i/c
centring shuttering structing and propping etc. with wooden
bettens & Ballies, height or propping & centering below
supporting floor to ceiling not exceeding 4 mtr.and removal of
the same for insitu RCC work and PCC work.including all leads
lifts and carriage of material at site & as per direction of
Engineer in charge in:-

a) Flat surfaces. 1.49 Sqm.


b) Vertical surface such as wall any thickness. 9.20 Sqm.
5 Providing and laying cement concrete 1:2:4(1cement:2app.sand: 0.15 Cum.
4 app. graded stone agg. 20mm nominal size )and curing
complete excluding cost of form work & reinforcement for
reinforced work in suspended floors, roofs landing shelves and
their supports balconies, beams, girders bressumers and
cantilivers upto to floor two level in all height and depth,
including all leads lifts and carriage of material at site and as per
direction of the Engineer-incharge.

6 Providing Mild Steel/Tor steel reinforcement including bending 67.32 Kg.


binding & placing in positing I/c all leads lifts and carriage of
material and as per direction of the Engineer-in-charge.

7 Excavation in drains & channel etc.in earth work in all kinds of 191.25 Cum
soil such as pick work ,jumper work blasting work, decomposed
conglomerate saturated soil soft and hard rock including
dressing of sides and beds and prepareation of sub grade to level
or slope including refilling the trenches and disposing of surplus
earth upto all leads,lifts disposed earth to be levelled and neatly
dressed including jungle clearance and as per directions of the
Engineer-incharge

8 Laying and jointing of GMS Pipes of various dia in trenches


(earth work in trenches to be measured and paid for seperately)
including all leads lifts and carriage of material at site as per
direction of Engineer-in-charge of following dias.

i) 20 mm dia, 850 Rmt

TERMS AND CONDITIONS:-


1 The work shall be executed as per IPH/PWD specification and
instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.

3 Cement will be issued @ 250/- per bag & steel @ 41/- per Kg. at
IPH store Bhatanwali Paonta Sahib.
4 Empty cement bags shall be returned to the deptt. Otherwise Rs.
2/- per bag shall be deducted from the each bill of the
contractor.
5 Royality certificate in respect of stone agg. Sand etc. shall be
produced by the contractor
6 G.I.Pipe shall be issued free of cost from IPH Store Bhatanwali
Paonta Sahib.
7 The pipe fitting shall be provided by the contractor.
Estimated cost Rs 20134/-
istt. Sirmour (HP)
Time:- Three Months
Rates, Unit Amount.
4 5 6
155.00 P/Cum 239.00

3850.00 P/Cum 1463.00

5150.00 P/Cum. 1957.00


5250.00 P/Cum. 3623.00
0.00

300.00 P/Cum 447.00


200.00 P/Cum 1840.00
4900.00 Per 735.00
Cum.

65.00 P/kg 4376.00

155.00 P/Cum ###

10.00 P/Rmt. 8500.00


Total: ###
Assistant Engineer,
I&PH Sub Division,
Kaffota.
60000

50000

40000

REVISED SCHEDULE OF QUANTITY


Column C
30000 Column D
Estimated cost Rs 38864/-
Column F
Column G

20000

10000

0
Name of work:- R/M of LWSS Tatiana in Tehsil Paonta Sahib Distt. Sirmour (HP) 6 2
REVISED SCHEDULE OF QUANTITY. Estimated Cost: 60900/-
Name of work: R/M of LIS Mashoo in tehsil Paonta Sahib Distt. Sirmour (HP) Earnest Money: 1250/-
(SH: Rewinding & Repair of 40HP Motor ) Set No.2 & 1 starter 50 HP LWSS Kaffota.). Time : Fifteen days.
Sr.No. Description of Items. Qty Rate Unit Amount.
1 2 3 4 5 6 7
1 Rewindig and Repair of 40 HP Motorwith insulated finolex make copper wire 40 HP 550.00 Per HP 22000.00
complete in all respect
2 Repair of Housing cover welding urning and balancing complete in all respect . 2 Nos. 1200.00 Each. 2400.00

3 epair of router shaft. 1 No. 3800.00 Each. 3800.00


4 Providing and fixing of grease cup with screw cup set. 4 Nos. 550.00 Each. 2200.00
5 Providing and fixing of connection plate with nut bolt and washer complete.
1 No. 580.00 Each. 580.00
6 Providing cable connection compound water proofing tape. 1 job. 500.00 Per job. 500.00
7 Providing and fixing of Cooling Fan. 1 job. 1200 Each. 1200.00
8 Providing and supplying of wire 4mm2 complete in all respect. 20 Mtr. 160.00 Per Mtr. 3200.00
9 Coupling Pad. 1 No. 1100.00 Each. 1100.00
10 Coupling set. 1 No 850.00 Each. 850.00
11 Motor Bearing No.6308 2 Nos. 1100.00 Each. 2200.00
12 Carriage of Motor from site of work to workshop and workshop to site of work. 1 job. 6200.00 Per job. 6200.00

LWSS Kaffota 1 No. starter.


Providing and fixing suitable oild immersed Star Delta starter suitable or 15 HP of
MEI/Kilburn/Bentex/Jyoti/L&T /Siemens make as per IS 8544-1979 with upto date
ammendments for suirrel cage/slipring Motor mounted on panel board with
magnetic type overload release and dashpot time let under voltage release with or
without initial oil filling as per case may be as per IS 248 (P-V) 1983 upto date 1 No. 32000 Each. 32000.00
ammendments including all leadsifts and carriage of material as directed by the
Engineer-in-charge.

TOTAL: 78230.00
Less 2% reabte on all over the amount. (-) 1566.00
Total: 76664.00
TERMS AND CONDITIONS:-
1 The work shall be executed as per IPH/PWD specification and instructions of the
Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 The payment shall be made after completion & successful testing of work.
4 Guarantee period of Pumping machinery is Six months. Executive Engineer,
I&PH Division,
Paonta Sahib.

REVISED SCHEDULE OF QUANTITY Estimated cost Rs34405/-


Name of work:- R/M of LIS Mashoo in Tehsil Paonta Sahib Distt. Sirmour (HP) Earnest money Rs.860/-
(SH: Repair of Pump set of 40 HP) Time:- Fifteen Days.
S.No Sub-Head and item of work. Qty. Rates, Unit Amount.
1 2 3 4 5 6
MOTOR.
1 Providing and fixing of Main shaft complete in all respect. 1 job. 3500.00 per job. 3500.00
2 Providing and fixing of impelers complee in all respect. 6 Nos. 2500.00 Each. 15000.00
3 Repair of Impellors bronzing etc. 7 Nos. 750.00 Each. 5250.00
4 Indicator Lamp complete. 3 Nos. 250.00 Each. 750.00
5 Providing and supplying of 10mm wire complete in all respect. 20 Mtr. 300.00 Per Mtr. 6000.00
6 Providing and supplying of Nut bolt for 16mm size 2" 12 Nos. 50.00 Each. 600.00
7 Coupling Pad. 1 No. 500.00 Each. 500.00
8 Coupling set. 1 No 600.00 Each. 600.00
9 Providing and fixing of Motor Bearing No.6308 SKF. 2 Nos. 800.00 Each. 1600.00
10 Labour charges for Motor Repair. 1 job. deleted Per job. 0
11 Carriage of Motor from site of work to workshop and workshop to site of work. 1 job. 6500.00 Per job. 6500.00

Total: 40300.00
2% rebate on all over the amount. (-) 806.00
Total: 39494.00
TERMS AND CONDITIONS:-
1 The work shall be executed as per IPH/PWD specification and instructions of the
Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules. Executive Engineer,
3 The payment shall be made after completion & successful testing of work. I&PH Division, Paonta Sahib.
4 The repair will be guaranteed for six months.

REVISED SCHEDULE OF QUANTITY Estimated cost Rs 38864/-


Name of work:- R/M of LWSS Tatiana in Tehsil Paonta Sahib Distt. Sirmour (HP) Earnest money Rs. 1000/-
(SH: Rewinding & Repair of 40 HP Centrifugal Motor) Time:- Fifteen Days.
S.No Sub-Head and item of work. Qty. Rates, Unit Amount.
1 2 3 4 5 6
MOTOR.
1 Rewinding and Repair of 40 HP Motor maker NGOF complete in all respect. 40 HP 550.00 Per HP 22000.00
2 Providing and fixing of BEARING No. 6309 & 6310 complete in all respect. 2 Nos. 900.00 Each. 1800.00

3 Housing sheet. 2 Nos. 1000.00 Each. 2000.00

4 Bearing Rotter sheet. 2 Nos. 1200.00 Each. 2400.00

5 Providing and fixing of connection pleate with washer complete. 1 No. 1500.00 Each. 1500.00

6 Providing and fixing of copnnection lead size 7/16 6 Mtr. 6 Mtr. 1400.00 Per Mtr. 8400.00

7 Providing and fixing of cooling Fan. 1 Job. 1700.00 Per job. 1700.00
8 Providing and fixing of Nut bolts complete. 12 Nos. 50.00 Each. 600.00
9 Assembling/lowering of Motor in the Borewell 1 job. 3500.00 Per job. 3500.00
11 Carriage of Motor from site of work to workshop and workshop to site of work. 1 job. 7000.00 Per job. 7000.00

Total: 50900.00
2% rebate on all over the amount. (-) 1018.00

Total: 49882.00

TERMS AND CONDITIONS:-


1 The work shall be executed as per IPH/PWD specification and instructions of the
Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules. Executive Engineer,
3 The payment shall be made after completion & successful testing of work. I&PH Division, Paonta Sahib.
4 The repair will be guaranteed for six months.
REVISED SCHEDULE OF QUANTITY
Name of work:-C/o FIS Jakara Katli in GP Bhajaun in Tehsil Paonta Sahib Distt. Sirmour (HP)
(SH: C/o Retaining wall at various reaches, C/o Pucca Main channel RD 0 to 210 Mtr.)
S.No Sub-Head and item of work. Qty.
1 Excavation in earth work and disposal of all excavated earth upto a lead of 20 Metres and lift upto 1.50 metres disposed earth 50.00 Cum
to be levelled and neatly dressed complete in all respect and as directed in all leads,lifts and as per direction of the Engineer-
incharge
2 Providing and laying cement concrete 1:6:12(1cement: 6sand: 12 graded stone agg.40mm nominal size)and curing complete 8.00 Cum
excluding the cost of form work in foundation & plinth including all leads lifts and carriage of material and as per the
directions of Engineer-in-charge.

3 Random rubble masonary /Poly rubble masonary (uncoursed/brought to coursed) with hard stone of approved quality in 72.30 Cum
foundation and plinth including levelling up with cement concrete 1:6.12(1cement:6sand:12 graded stone agg. 20mm
nominal size)in cement mortor 1:6 (1 Cement: 6 sand ) in breast wall & Retaining walls including all leads lifts and carriage
of material and as per the directions of Engineer-in-charge.

4 Excavation in drains and channels etc. in earth work in all kinds of soil such as pick work,jumper work ,blasting work 21.35 Cum.
decomposed conglomerate saturated soil soft rock and hard rock including dressing of sides and beds and preparation of
sub grade to level or slope including refilling the trenches and disposing of surplus earth upto all leads lifts disposed earth to
be levelled and neatly dressed including jungle clearance and as per direction of Engineer-in-charge.

5 Cement concrete lining 15cm thick or less for irrigation channels using cement concrete 1:3:6(1cement:3sand:6graded stone
agg. 20mm nominal size)and curing complete excluding cost of form work included all leads lifts and carriage of material
complete in all respect and as per direction of Engineer-in-charge.

a)Hand Mixed concrete in bed. 5.37 Cum


b)Hand mixed concrete lining in side slopes. 8.09 Cum

6 Extra allowance for form work in concrete lining as directed by the Engineer-in-charge including all leads lifts and carriage of 8.09 Cum
matrerials at site complete in all respects on side slopes as per direction of Engineer in charge.

TERMS AND CONDITIONS:-


1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Cement will be issued @ 315/- per bag & steel @ 53/- per Kg. at IPH store Bhatanwali Paonta Sahib.
4 Empty cement bags shall be returned to the deptt. Otherwise Rs. 2/- per bag shall be deducted from the each bill of the contractor.
5 Royality certificate in respect of stone agg. Sand etc. shall be produced by the contractor

REVISED SCHEDULE OF QUANTITY


Name of work:-C/o FIS Jakara Katli in GP Bhajaun in Tehsil Paonta Sahib Distt. Sirmour (HP)
(SH: C/o Retaining wall at various reaches, C/o Pucca Main channel 210 to 415 Mtr.)
S.No Sub-Head and item of work. Qty.
1 2 3
1 Excavation in earth workand disposal of all excavated earth upto a lead of 20 Metres and lift upto 1.50 metres disposed earth 50.61 Cum
to be levelled and neatly dressed complete in all respect and as directed in all leads,lifts and as per direction of the Engineer-
incharge
2 Providing and laying cement concrete 1:6:12(1cement: 6sand: 12 graded stone agg.40mm nominal size)and curing complete 8.00 Cum
excluding the cost of form work in foundation & plinth including all leads lifts and carriage of material and as per the
directions of Engineer-in-charge.
3 Random rubble masonary /Poly rubble masonary (uncoursed/brought to coursed) with hard stone of approved quality in 73.00 Cum
foundation and plinth including levelling up with cement concrete 1:6.12(1cement:6sand:12 graded stone agg. 20mm
nominal size)in cement mortor 1:6 (1 Cement: 6 sand ) in breast wall & Retaining walls including all leads lifts and carriage
of material and as per the directions of Engineer-in-charge.

4 Excavation in drains and channels etc. in earth work in all kinds of soil such as pick work,jumper work ,blasting work 21.35 Cum.
decomposed conglomerate saturated soil soft rock and hard rock including dressing of sides and beds and preparation of
sub grade to level or slope including refilling the trenches and disposing of surplus earth upto all leads lifts disposed earth to
be levelled and neatly dressed including jungle clearance and as per direction of Engineer-in-charge.

5 Cement concrete lining 15cm thick or less for irrigation channels using cement concrete 1:3:6(1cement:3sand:6graded stone
agg. 20mm nominal size)and curing complete excluding cost of form work included all leads lifts and carriage of material
complete in all respect and as per direction of Engineer-in-charge.
a)Hand Mixed concrete in bed. 5.30 Cum
b)Hand mixed concrete lining in side slopes. 8.10 Cum

6 Extra allowance for form work in concrete lining as directed by the Engineer-in-charge including all leads lifts and carriage of 8.10 Cum
matrerials at site complete in all respects on side slopes as per direction of Engineer in charge.

TERMS AND CONDITIONS:-


1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.

2 Security,Sale tax & Income tax shall be deducted as per rules.


3 Cement will be issued @ 315/- per bag & steel @ 53/- per Kg. at IPH store Bhatanwali Paonta Sahib.
4 Empty cement bags shall be returned to the deptt. Otherwise Rs. 2/- per bag shall be deducted from the each bill of
the contractor.
5 Royality certificate in respect of stone agg. Sand etc. shall be produced by the contractor
Estimated Cost: 98797/-
Earnest Money: 2000/-
Time: Three Months.
Rates, Unit Amount.
155.00 P/Cum 7750.00

3600.00 P/Cum 28800.00

3900.00 P/Cum 281970.00

155.00 P/Cum. 3309.00

4500.00 P/Cum 24165.00


4500.00 P/Cum 36405.00

130.00 P/Cum 1052.00

Total: 383451
ontractor.

Executive Engineer,
I&PH Division,
Paonta Sahib.

Estimated Cost: 99590/-


Earnest Money: 2000/-
Time: Three Months.
Rates, Unit Amount.
4 5 6
155.00 P/Cum 7845.00

3600.00 P/Cum 28800.00

3900.00 P/Cum 284700.00

155.00 P/Cum. 3309.00


4500.00 P/Cum 23850.00
4500.00 P/Cum 36450.00

130.00 P/Cum 1053.00

Total: 386007

Executive Engineer,
I&PH Division,
Paonta Sahib.
REVISED SCHEDULE OF QUANTITY Estimated Cost :-Rs.68303/-
Name of work:-Const. of Tubewell in the Field of Shri Sahied Ali S/o Sh. Kasim Ali R/o Vill. Kanshipur i Earnest Money :-Rs.1750/-
Sahib Distt. Sirmour (HP) (SH:- C/O Pump House) . Time:- Three months.
Sr.No. Description Qty. Rate Unit Amount
1 Excavation in foundation and trenches etc.in earth work in all kinds of soil such 10.19 Cum 155.00 P/Cum 1579.00
as pick work ,jumper work decomposed conglomerate saturated soil soft and
hard rock upto all leads lifts stacking the excavated soil not more than
3mtr.clear from the edge of excavation and then returning the stacked soil in
consolidating each deposited layers by ramming and watering and then
disposing of all surplus excavated earth as directed with in all leads lifts and as
per directions of the Engineer-in-charge

2 Providing and laying cement concrete 1:6:12(1cement:6sand:12 graded stone 2.56 Cum 2200.00 P/Cum 5632.00
agg.40mm nominal size)and curing complete excluding the cost of form work
in foundation & plinth including all leads lifts and carriage of material and as
per the directions of Engineer-in-charge.

3 Ist Class brick work using common building bricks in foundation & plinth in 6.79 Sqm. 5200.00 P/Cum 35308.00
Cement Mortar 1:6(1cement:6sand) in all leads lifts and carriage etc. as per
direction of Engineer inchrge.
4 Providing and laying damp proof course 38mm thick with Cement concrete 2.03 Sqm. 160.00 P/Sqm. 325.00
1:2:4(1cement:2sand:4graded stone agg. 12.5 mm nominal size)and curing
complete excluding the cost of form work including all leads,lifts and carriage
of material and as per directions of Engineer-in-charge.

5 Applying a coat of hot bitumen (mexphalt 80/100 or equivalent )using 1.70 Kg. 2.03 Cum. 30.00 P/Sqm. 61.00
per sqm. On damp proof course after cleaning the surface in a piece of cloth
lightly soaked with kerosene oil including all leads,lifts and carriage of
material and as per directions of the Engineer-in-charge.

6 Ist Class brick work using common building bricks in Super structure in 11.08 Cum. 5400.00 P/Cum 59832.00
Cement Mortar 1:6(1cement:6sand) in all leads lifts and carriage etc. as per
direction of Engineer incharge.
7 Providing form work with steel sheets 3.15mm thick welded with angle iron
30x30x5 mm so as to give rough finish i/c centring shuttering structing and
propping etc. with wooden bettens & Ballies, height or propping & centering
below supporting floor to ceiling not exceeding 4 mtr.and removal of the same
for insitu RCC work and PCC work.including all leads lifts and carriage of
material at site & as per direction of Engineer incharge in:-

a) Flat surfaces such as sofits and suspended floors, roofs landing and the like 30.71 Cum. 300.00 P/Sqm 9213.00
floors etc. up to 200 mm in thickness.
8 Providing and laying reinforced cement concrete 1:2:4(1cement :2app.sand: 2.94 Cum 3400.00 P/Cum 9996.00
4app. graded stone agg.20mm nominal size )and curing complete excluding
cost of form work & reinforcement in suspended floors, roofs, shelves &
supports, balconies beams etc. upto floor in two level in all height and depth
including all leads lifts & carriage of material at site and as per direction of the
Engineer-incharge.

9 Providing mild steel/tor steel for rainforcement for RCC work including 235.20 Kg 51.00 P/kg 11995.00
bending binding and placing in position complete upto floor two level the
Engineer-in-charge.
10 20 mm thick cement plaster in single coat of rough side of bricks/stone 50.86 Sqm 135.00 P/Sqm 6866.00
masonary for interior plastering upto floor two level including arrises
internal rounded angles chamfers rounded angles not exceeding 80mm in
girth and finished even and smooth in cement mortor 1:6(1cement:6 sand)
and curing complete including all leads lifts and carriage of materials at site as
per direction of Engineer-incharge.

11 6 mm thick cement plaster in ceiling in Cement mortor 1:3 (1 cement:3 sand) 13.50 Sqm 75.00 P/Sqm 1013.00
including all leads lifts and carriage of material at site as per direction of
Engineer incharge.
12 Flush Pointing on brick work with cement motor 1:3 (1 cement:3 sand ) 64.77 Sqm. 115.00 P/Sqm 7449.00
including all leads lifts and carriage of material at site as per direction of
Engineer incharge.
13 Providing fixing pressed steel door frames manufactured from commercial
mild steel of1.25mm thickness including hinges,jump lock bud and if required
angle threshold of M.S. angle 50x25mm or base tie of 1.25mm pressed steel I/c
welding complete Including steel hinges 2.5mm thick with guard lock strick
plate and apply a coat of approved steel primer affect pre-treaditional of
surface in all leads lifts and carriage of materials as per direction of Engineer
incharge.

Profile-"A" 21.50 Rmt. 275.00 P/Rmt 5913.00


Profile "B" 6.60 Rmt. 275.00 P/Rmt. 1815.00
14 Provd./fixing pannelled glazed or pannelled and glazed shutters for doors 6.03 Sqm. 2700.00 P/Sqm 16281.00
windows and clearestorey windows including black enemelled iron butt hings
with necessary secrews complete.40mm thick 2nd.class deodar wood
including all leads lifts and carriage of material at site as per direction of
Engineer-in-charge.

15 Filling in plinth with sand under floors including watering ramming 2.03 Cum. 620.00 P/Cum. 1259.00
consolidating abd dressing complete.
16 Providing and laying cement concrete 1:4:8(1cement:4sand:8 graded stone 1.36 Cum. 2500.00 P/Cum 3400.00
agg.40mm nominal size)and curing complete excluding the cost of form work
in foundation & plinth including all leads lifts and carriage of material and as
per the directions of Engineer-in-charge.

17 40mm thick cement concrete flooring 1:2:4 (1cement:2sand: 4 graded stone 13.50 Sqm. 220.00 P/Sqm 2970.00
agg. 20mm nominal size)laid in one layer finished with a floating coat of neat
cement including curing all leads, lifts and carriage of materials at site and as
per direction of Engineer incharge

18 Providing and fixing on wall face C.I. rain water pipes 100mm dia including 7.00 Rmt. 135.00 P/Rmt 945.00
filling the joints with spun yarn soaked in neat cement slurry & cement mortor
1:2 (1 cement :2sand) i/c Clamps including all leads lifts and carriage of
material as per direction of Engineer incharge.

19 Applying priming coat over new wood and wood based surfaces after and 18.48 Sqm 35.00 P/Sqm 647.00
including preparing the surface by throughly cleaning oil,grease,dirt and other
foreign matter with ready mixed paint brushing with white lead for priming
including all leads lifts and carriage of material as per direction of Engineer
incharge.
20 Painting two coats (excluding priming coat) on new wood and wood based 18.48 Sqm 70.00 P/Sqm 1294.00
with surfaces with ready mixed paint other then white brushing to give an
even shade including cleaning the surface of dirt dust and other foreign
matter,sand papering and stopping. Including all leads lifts and carriage of
material at site as per direction of Engineer incharge.

21 White washing with lime on undecorated wall surfaces (two coats) to give an 73.55 Sqm 12.00 P/Sqm 883.00
even shade including throughly brooming the surface to remove all dirt dust
mortor drops and loose scale of lime wash and other foreign matter including
all leads lifts and carriage of material at site as per direction of Engineer-
incharge.

22 Water proofing cement paint on decorated wall surfaces (two coats) to give an 64.77 Sqm 40.00 P/Sqm 2591.00
even shade including throughly brooming the surfaces to remove all dirt dust
mortar drops and loose scale of Himrachi wash and other foreign matter as per
directionof the Engineer-in-charge.

23 Providing plinth protection 50mm thick in cement concrete 1:3:6(1cement: 12.75 Sqm. 140.00 P/Sqm 1785.00
3sand: 6graded stone agg.20mm nominal size in all leads,lifts and carriage of
material and as per direction of Engineer incharge.

24 Prov.40x3mm flat iron hold fast 40cm long including fixing to frame with 20 Nos 55.00 Each. 1100.00
10mm dia metre bolts,nuts and wooden plugs and embedding in cement
concrete block 30x10x15cms 1:3:6 (1cement: 3sand: 6 graded stone
agg.20mm nominal size)including all leads,lifts & carriage of material as per
direction of the Engineer incharge.

25 Providing and fixing tower bolts aluminium (barreled type) anodized


transparent or dyed to required shade & colour screws complete including all
leads, lifts and as per direction of Engineer incharge.
a)200x10mm 32 Nos 55.00 Each. 1760.00
26 Provd.& fixing aluminium handles anodized transparent or dyed to required
colour or shade with necessary screws etc. complete including all leads lifts &
carriage of material at site as per direction of Engineer incharge.

a)125mm 4 Nos 40.00 Each. 160.00


b)100mm 12 No. 40.00 Each. 480.00
27 Provd.& fixing Sliding door bolts anodized transparent or dyed to required 3 Nos. 180.00 Each. 540.00
colour or shade with necessary screws etc. complete including all leads lifts &
carriage of material at site as per direction of Engineer incharge. 300x15mm

28 Providing, fixing M.S. Fan clamps type-I 16mm dia M.S. bar bent to shape with 1 No. 100.00 Each. 100.00
hooked ends in RCC slab curtting, laying including painting the exposed
portion of loop as per standard drawing and design complete in all respect
including all leads lifts and carriage of material as per direction of Enginer
incharge.

29 Providing fixing M.S.grills of required pattern in wooden frames/pressed steel 35.78 Kg. 80.00 P/kg. 2862.00
frame with M.S. flat surface round bars 12mm dia with round headed bolts and
nuts or by screws .Plain grill including all leads lifts and carriage of material as
per direction of Enginer incharge.

Total:-
TERMS AND CONDITIONS:-
1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Cement shall be issued @Rs.250/-P.bag & steel @Rs.41/- P.kg.at IPH Store Bhatanwali Paonta Sahib.
4 Empty cement bags shall be returned to the Deptt.otherwise Rs.2/-per bag shall be deducted from the bill.
5 Royality certificate in respect of stone agg. Sand etc. shall be produced by the contractor

Executive Engineer,
I&PH Division,
Paonta Sahib.
REVISED SCHEDULE OF QUANTITY
Name of work:-R/M of Tubewell Sudonwala & LIS Shaheed Kulvinder Singh in Tehsil Paonta Estimated Cost :-Rs.99689/-
Sahib Distt. Sirmour (HP) (SH:-Prov. Laying & jointing of distribution system & C/o 2 Nos Outlets) Earnest Money :-Rs.2000/-
Time:- One month.
Sr.No. Description Qty. Rate Unit Amount
1 Excavation in foundation and trenches etc.in earth work in all kinds of soil such 212.39 Cum 160.00 P/Cum 33982.00
as pick work ,jumper work decomposed conglomerate saturated soil soft and
hard rock upto all leads lifts stacking the excavated soil not more than
3mtr.clear from the edge of excavation and then returning the stacked soil in
consolidating each deposited layers by ramming and watering and then
disposing of all surplus excavated earth as directed with in all leads lifts and as
per directions of the Engineer-in-charge

2 Laying & jointing of Reinforcement concrete pipe150mm dia NP-2 (earth work 340.00 Rmt. 150.00 P/Rmt. 51000.00
in trenches to be measured and paid for separately) including all leads,lifts and
carriage of material and as per direction of the Engineer-in-charge.

3 Providing and laying cement concrete 1:4:8(1cement:4sand:8 graded stone 0.82 Cum 2450.00 P/Cum 2009.00
agg.40mm nominal size)and curing complete excluding the cost of form work
in foundation & plinth including all leads lifts and carriage of material and as
per the directions of Engineer-in-charge.

4 Providing and laying cement concrete 1:2:4(1cement:2sand:4 graded stone 1.62 Sqm. 200.00 P/Sqm. 324.00
agg.20mm nominal size)and curing complete excluding the cost of form work
with floating coat of neat cement including all leads lifts and carriage of
material and as per the directions of Engineer-in-charge.

5 Ist Class brick work using common building bricks in foundation & plinth in 2.68 Cum. 5300.00 P/Cum 14204.00
Cement Mortar 1:6(1cement:6sand) in all leads lifts and carriage etc. as per
direction of Engineer inchrge.
6 Providing and laying Cement concrete 1:2:4(1cement:2sand:4graded stone 0.36 Cum. 3200.00 P/Cum. 1152.00
agg. 20 mm nominal size )and curing complete excluding the cost of form
work in foundation & Plinth including all leads,lifts and carriage of material
and as per directions of Engineer-in-charge.

7 20 mm thick cement plaster in single coat of rough side of bricks/stone 16.42 Sqm 130.00 P/Sqm 2135.00
masonary for interior plastering upto floor two level including arrises
internal rounded angles chamfers rounded angles not exceeding 80mm in
girth and finished even and smooth in cement mortor 1:4(1cement:4 sand)
and curing complete including all leads lifts and carriage of materials at site as
per direction of Engineer-incharge.

Total:- 104806.00
TERMS AND CONDITIONS:-
1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Cement shall be issued @Rs.250/-P.bag & steel @Rs.41/- P.kg.at IPH Store Bhatanwali Paonta Sahib.
4 Empty cement bags shall be returned to the Deptt.otherwise Rs.2/-per bag shall be deducted from the each bill.
5 Royality certificate in respect of stone agg. Sand etc. shall be produced by the contractor
6 RCC pipes shall be issued free of cost from IPH store Sub Division Majra.

Executive Engineer,
I&PH Division,
Paonta Sahib.
ANALYSIS OF RATE.
Unit. Qty. Rate Amount.
Providing form work or ordinary timber
plankings so as to give a rough finish including
centring shuttering strutting and propping etc.
height of propping and centring below
supporting floor to ceiling not exceeding 4
metres and removal of the saqme of insitu
reinforced concrete and plain concrete work in
:-

Under 20 cm. wide


Detail of cost for 12 metres consider 3mx3m
slab 15cm. Thick =12 m edge length

Area in contact with concrete 4x3x0.15=1.80


sqm.
MATERIAL
Planks 30mm thick(second class Kail wood)
4x3x0.15x0.030=0.054 cum.
wastage =0.003 Cum.
Total: 0.057 Cum. Cum. 0.057 40605 2314.49

Battens 75% of item No.09010802


i.e. 0.175 Cum @ 75% =0.31 cum.
CARRIAGE
Carriage of Timber
Planks. = 0.057 Cum.
Battens. =0.131 cum.
Total: =0.188 Cum. Cum. 0.131 39390 5160.09

1 KM by Mech. Transport. Cum. 0.188 110.95 20.86


100 Metres by Head Load. 1 Cum. 0.188 36.25 6.82
7502.25
Total assuming that Timber shall become
unserviceable after being used 16 times
hence cost for using once.
Each. 1/24 7502.25 312.59

Add 5% wastage for usage repetedly 15.63


Total 328.22
Labour
Carpenter 2nd class. Each. 0.75000 186.67 140.00
Beldar Each. 0.56000 116.67 65.34
Sundries. 10.00
Total: 543.56
Add for contractor profit @ 10% 54.36
Add for over head charge @ 5% 27.18
Cost for 12 Rmt. 625.10
Cost per Rmt. 52.09
Labour Rate
Actual Rate+Sundries. 215.34
Total: 215.34
Add for contractors profit @ 10% 21.53
Add for over head charge @ 5% 10.77
Labour for 12.00 Rmt. 247.64
Labour Per Rmt. 20.64
38129.88
Name of work: Restoration of Rain damages of FIS Manal in GP Bhajaun in Tehsil Paonta Sahib
Distt. Sirmour (HP) (SH: C/O Field channel & RCC slab cover.)
Agreement No.846 of 2015-16.
Agency:Sh. Gulab Singh Chaudhary R/O Manal PO Sataun Tehsil Paonta Sahib Distt. Sirmour (HP)

EXTRA ITEM STATEMENT


Sr.No. Description of item. Qty. Rate Unit Amount. Remarks.
1 Providing form work of ordinary timber 732.00 52.09 Rmt. 38130 Edges of form work has not
plankings so as to give a rough finish including taken in the agreement.,
centring shuttering strutting and propping etc.
height of propping and centring below
supporting floor to ceiling not exceeding 4
metres and removal of the saqme of insitu
reinforced concrete and plain concrete work in :-

Total: 38130

Assistant Engineer,
I&PH Sub Division, Kaffota.

Name of work: A/R & M/O to Fis Bag Abra GP Bhajaun in Tehsil Paonta Sahib

Distt. Sirmour (HP) (SH: C/O Retaining wall at RD 931 to 954 Mtr.)

Agreement No.278 of 2015-16.


Agency:Sh. Dhanbir Singh Contr. R/O Bhajaun PO Korga in Tehsil Paonta Sahib Distt. Sirmour (HP)

EXTRA ITEM STATEMENT


Sr.No. Description of item. Qty. Rate Unit Amount. Remarks.
1 Removal of slip/silt in all kind of soil including 186.12 130 Cum. 24196
saturated soil but excluding boulder & rocky
portion requiring blasting upto distance of 20
mtr. disposing of material stacking serviceable
material and neatly dressing surface as per the
directions of the Engineer-in-charge.

Total: 24196

Assistant Engineer,
I&PH Sub Division, Kaffota.

REVISED SCHEDULE OF QUANTITY Estimated cost Rs.47250/-


Name of work:-Restoration of Rain damages to R.G.Canal in tehsil Paonta Sahib E
Darnest money Rs. 945/-
(SH: Removal of slip/silt ) Time:- Fifteen Days.
S.No Sub-Head and item of work. Qty. Rates, Unit Amount.
1 2 3 4 5 6
1 Removal of slip/silt in all kind of soil including 100 Hrs. 750.00 Per Hrs. 75000
saturated soil but excluding boulder & rocky
portion requiring blasting upto distance of 20
mtr. disposing of material stacking serviceable
material and neatly dressing surface as per the
directions of the Engineer-in-charge.(Through
JCB & Tractor.)

Total:- 75000
TERMS AND CONDITIONS:-
1 The work shall be executed as per IPH/PWD specification and
2 instructions
Security,Saleoftax
the&Engineer-in-charge.
Income tax shall be
deducted as per rules.
3 Nothing shall be paid for defective work .
Executive Engineer,
I&PH Division,
Paonta Sahib.

REVISED SCHEDULE OF QUANTITY Estimated cost Rs.47250/-


Name of work:-Restoration of Rain damages to R.G.Canal in tehsil Paonta Sahib E
Darnest money Rs. 945/-
(SH: Removal of slip/silt ) Time:- Fifteen Days.
S.No Sub-Head and item of work. Qty. Rates, Unit Amount.
1 2 3 4 5 6
1 Removal of slip/silt in all kind of soil including 100 Hrs. 750.00 Per Hrs. 75000
saturated soil but excluding boulder & rocky
portion requiring blasting upto distance of 20
mtr. disposing of material stacking serviceable
material and neatly dressing surface as per the
directions of the Engineer-in-charge.(Through
JCB & Tractor.)

Total:- 75000
TERMS AND CONDITIONS:-
1 The work shall be executed as per IPH/PWD specification and
2 instructions
Security,Saleoftax
the&Engineer-in-charge.
Income tax shall be
deducted as per rules.
3 Nothing shall be paid for defective work .
Executive Engineer,
I&PH Division,
Paonta Sahib.
DRAFT SCHEDULE OF QUANTITY Estimated cost Rs. 73812/--
Name of work:- Providing Flood Protection work to cultivated Land of Sh.Shamsher Singh , Sukhdev , Sh.Prem Pal & Earnest money Rs.1500/-
Sh.Sandeep & other R/O Thakur Basti village Mohrar Giri Nagar in Tehsil Paonta Sahib Distt. Sirmour (HP) Time:- Three Months
(SH: C/O Retaining wall in PCC 1:5:10 )
S.No Sub-Head and item of work. Qty. Rates, Unit
1 2 3 4 5
1 Excavation in foundation and trenches etc.in earth work in all kinds of soil such as pick work 23.63 Cum 92.85 P/Cum
,jumper work decomposed conglomerate saturated soil soft and hard rock upto all leads lifts
stacking the excavated soil not more than 3mtr.clear from the edge of excavation and then
returning the stacked soil in 15cm layers when required in to plinth sides of foundation etc.
consolidating each deposited layers by ramming and watering and then disposing of all surplus
excavated earth as directed with in all leads lifts and as per directions of the Engineer-incharge

2 Providing form work with steel sheets 3.15mm thick welded with angle iron 30x30x5 mm so as to
give rough finish i/c centring shuttering structing and propping etc. with wooden bettens &
Ballies, height or propping & centering below supporting floor to ceiling not exceeding 4 mtr.and
removal of the same for insitu RCC work and PCC work including all leads lifts and carriage of
material at site & as per direction of Engineer incharge in:-

a) Vertical surfaces such as walls of any thicness ,partitions walls and the like. 164.72 Sqm. 80.70 P/Sqm

3 Providing and laying cement concrete work 1:5:10(1cement:5 sand: 10 graded stone agg. 40mm 62.44 Cum 934.10 P/Cum
nominal size) with 15% plum and curing complete excluding cost of form work and in retaining
walls/ Breast walls, the size of Plums shall usually be 150mm to 300mm as per PWD specificatioin
including all leads lifts and carriage of material and as per direction of Engineer incharge.

TERMS & CONDITIONS Total:


1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax & labour cess shall be deducted as per rules.
3 Nothing shall be paid for rejected material/work.
4 Cement shall be issued @ 315- per Bag & Steel @ 53/- per Kg. at IPH Store Bhatanwali Paonta Sahib.
Empty cement bags shall be returned to the Deptt. Otherwise Rs. 2/- per bag shall deducted from the bill.
5
6 Royalitry certificate in respect of(water born)stone aggregate sand etc.shalll be produced by the contractor. Executive Engineert,
I&PH Divn.Paonta Sb.
Assistant Engineer,
I&PH Sub Division,
Majra.
REVISED SCHEDULE OF QUANTITY Estimated cost Rs. 91169/--
Name of work:-Restoration of Rain damages to Sukhi Ka Khalla in Tehsil Paonta Sahib Distt. Sirmour (HP) Earnest money Rs.1900/-
(SH: C/O Retaining wall in Plum Concrete on Left Bank of Khalla) Time:- Two Months

S.No Sub-Head and item of work. Qty. Rates, Unit


1 2 3 4 5
1 Excavation in foundation and trenches etc.in earth work in all kinds of soil such as pick work 15.84 Cum 155.00 P/Cum
,jumper work decomposed conglomerate saturated soil soft and hard rock upto all leads lifts
stacking the excavated soil not more than 3mtr.clear from the edge of excavation and then
returning the stacked soil in 15cm layers when required in to plinth sides of foundation etc.
consolidating each deposited layers by ramming and watering and then disposing of all surplus
excavated earth as directed with in all leads lifts and as per directions of the Engineer-incharge

2 Providing form work with steel sheets 3.15mm thick welded with angle iron 30x30x5 mm so as to
give rough finish i/c centring shuttering structing and propping etc. with wooden bettens &
Ballies, height or propping & centering below supporting floor to ceiling not exceeding 4 mtr.and
removal of the same for insitu RCC work and PCC work including all leads lifts and carriage of
material at site & as per direction of Engineer incharge in:-

a) Vertical surfaces such as walls of any thicness ,partitions walls and the like. 94.88 Sqm. 200.00 P/Sqm

3 Providing and laying cement concrete work 1:5:10(1cement:5 sand: 10 graded stone agg. 40mm 81.13 Cum 2600.00 P/Cum
nominal size) with 15% plum and curing complete excluding cost of form work and in retaining
walls/ Breast walls, the size of Plums shall usually be 150mm to 300mm as per PWD specificatioin
including all leads lifts and carriage of material and as per direction of Engineer incharge.

TERMS & CONDITIONS Total:


1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax & labour cess shall be deducted as per rules.
3 Nothing shall be paid for rejected material/work.
4 Cement shall be issued @ 250/- per Bag & Steel @ 41/- per Kg. at IPH Store Bhatanwali Paonta Sahib.
5 Empty cement bags shall be returned to the Deptt. Otherwise Rs. 2/- per bag shall deducted from the bill.
6 Royalitry certificate in respect of(water born)stone aggregate sand etc.shalll be produced by the contractor. Executive Engineert,
I&PH Divn.Paonta Sb.
cost Rs. 73812/--
oney Rs.1500/-
ree Months

Amount.
6
2194.00

13293.00

58325.00

73812.00
Executive Engineert,
I&PH Divn.Paonta Sb.

cost Rs. 91169/--


oney Rs.1900/-

Amount.
6
2455.00

18976.00

210938.00

232369.00
Executive Engineert,
I&PH Divn.Paonta Sb.
REVISED SCHEDULE OF QUANTITY. Estimatedf Cost: 26974/-
NAME OF WORK :- Improvement of LIS at RD 14220 on Left Bank Canal in Tehsil Paonta
Earnest Money: 600/-
sahib Distt. Sirmour (HP)
(SH: Prov. Laying of GI Pipe with flanges , jointing for R/Main.) Time Limit: Three Months.

S.No. Description. Qty Rate Unit Amount


1 2 3 4 5 6
1 Excavation in drains and channels etc.in earth work for pipes up to all depths in all classification 96.53 Cum. 160.00 Per 15445
of earthwork such as pick work, jumper work, saturated soil including bailing or pumping out Cum.
water, blasting soft/hard rock or chiseling soft / hard rock where blasting is prohibited in all lifts
including jungle clearance wherever required, trimming & dressing of sides, leveling of beds to
correct grade including shoring/struting, planking, timbering & dewatering wherever required
stacking the useable/unuseable material/soil seperately & after laying, jointing & testing of pipes,
returning the useable soil in trenches in 15 cm layers including consolidating of such deposited
layer by ramming & watering & then disposing of all surplus excavated soil/unuseable material
as directed with in all leads & lifts including restoration of un-metalled surfaces to its original
condition & including cost of diversion for traffic, night signals, fixing caution boards, crossing
over trenches for access to houses, fencing etc. complete in all respects with-in all leads & lifts
as per directions of the Engineer Incharge

2 Providing Laying, testing of galvanised mild steel tube in trenches of below mentioned dioa and
classes including tube fittings and to the entire satisfaction to the entire satisfaction of the
Engineer-in-charge as per IS: 1239 (Part0I) 1979 fully jointed with M.S.flanges as per IS:6391
-1971 including welding in two layers on both faces as per IS: 816-1965 gasket sheet not less
than 3 MM in thickness nuts bolts etc, and cutting of threaded and complete in all respect ,(Cost
of M.S.flanges welding charges nuts and bolts gasket sheet and excavat/c carriage in all leads
& lifts as directed by Engineer-Incharge (Earth work shall be measured & paid for seperately).

i) GMS tube 125mm (Medium class) 130 Rmt. 75.00 Per


Rmt 9750
3 Providing, welding and fixing M.S. plate flanges of 65 mm dia (nominal bore) of following 22 Pair. 1600.00 Each. 35200
Flange Tables confirming to IS 6392-1971 or latest with up to date ammendments to MSERW/
GI pipes after every third pipe or as per site requirement including cutting of of pipes wherever
required, welding in three layers (leak proof) confirming to specifications as prescribed in relvent
I.S. Code i.e. IS 816-1969 or latest as applicable with up to date ammendments with nuts, bolts
& washers & specials etc. confirming to IS-1963 or latest with up to date ammendments
including packing sheet i.e. asbestos fibre sheet minimum 3mm thick and painting with
anticorosive paints complete in all respect in all leads, lifts and carriage of material at site and
as directed by the Engineer Incharge.

TOTAL: 60395
1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax , Income tax & Labour cess shall be deducted as per rules.
3 Contractor shall be responsible for watch & ward of store.
4 In addition to normal security 5% amount will be withheld for want of successful testing.
5 G.I.fitting shall be provided by he contractor.

Executive Engineer,
I&PH Division, Paonta Sahib.
REVISED SCHEDULE OF QUANTITY Estimated Cost:99494/-
Name of work: R/M of various WATER SUPPLY SCHEMES under IPH S/Division Shillai in Tehsil Earnest Money: 2000/-
Shillai Distt. Sirmour (HP) (SH: Prov. & supplying of various type of fitting material (Shiri Kiari Section) Time: One Month.
S.No Description Qty. Rate Unit Amount
1 2 3 4 5 6.
1 Providing and Supplying o Brass full way valve with wheel of superior quality as
per standard design & relevant ISS of following dia complete in all respect and as
per satisfaction of the Engineer-in-charge.

i) 15mm dia 10 Nos. 350.00 Each. 3500.00

ii) 20mm dia 70 Nos. 420.00 Each. 29400.00

iii) 25 mm dia. 35 Nos. 510.00 Each. 17850.00

iv) 32mm dia. 40 Nos. 800.00 Each. 32000.00

v) 40mm dia. 20 Nos. 1500.00 Each. 30000.00

vi) 50mm dia. 10 Nos. 2300.00 Each. 23000.00

vii) 65mm dia. 10 Nos. 3600.00 Each. 36000.00

2 Providing and Supplying of the G.I.Unions of the follwing sizes Confirming to IS


1879 in the various schemes complete in all respect and as per satisfaction of the
Engineer-in-charge.

i) 15mm dia 80 Nos. 70.00 Each. 5600.00


ii) 20mm dia 60 Nos. 100.00 Each. 6000.00
iii) 25 mm dia. 60 Nos. 125.00 Each. 7500.00
iv) 32mm dia. 40 Nos. 170.00 Each. 6800.00
v) 40mm dia. 40 Nos. 300.00 Each. 12000.00
vi) 50mm dia. 20 Nos. 320.00 Each. 6400.00
vii) 65mm dia. 20 Nos. 500.00 Each. 10000.00
viii) 80mm dia. 20 Nos. 800.00 Each. 16000.00
3 Providing and Supplying of the G.I.Elbow of the follwing sizes onfirming to IS
1879 in the various schemes complete in all respect and as per satisfaction of the
Engineer-in-charge.

i) 15mm dia 60 Nos. 60.00 Each. 3600.00

ii) 20mm dia 60 Nos. 80.00 Each. 4800.00


iii) 25 mm dia. 40 Nos. 110.00 Each. 4400.00
iv) 32mm dia. 20 Nos. 160.00 Each. 3200.00
v) 40mm dia. 20 Nos. 240.00 Each. 4800.00
vi) 50mm dia. 25 Nos. 250.00 Each. 6250.00
vii) 65mm dia. 20 Nos. 450.00 Each. 9000.00
viii) 80mm dia. 20 Nos. 700.00 Each. 14000.00
4 Providing Wrench set of following sizes confirming to IS 1879 in the various schemes as
per details attached for repair of damaged distribution /main G.I.Pipe Line compete in
all respect and as per direction of the Engineer-in-charge.

i) 14" 8 Nos. 340.00 Each. 2720.00


ii) 18" 8 Nos. 440.00 Each. 3520.00
iii) 24" 5 Nos. 540.00 Each. 2700.00
TERMS AND CONDITIONS:- TOTAL: 301040.00
1 The work shall be executed as per IPH/PWD specification and instructions of the
Engineer-in-charge.
2 Security,Income Tax, Sale & Labour cess shall be deducted as per rules.
3 The material will be received in good condition .
4 Material shall be guaranteed for Six months. Executive Engineer,
I&PH Division,
Paonta Sahib

REVISED SCHEDULE OF QUANTITY Estimated Cost:99494/-


Name of work: R/M of various WATER SUPPLY SCHEMES under IPH S/Division Shillai in Tehsil Earnest Money: 2000/-
Shillai Distt. Sirmour (HP) (SH: Prov. & supplying of various type of fitting material (Timbi Section) Time: One Month.
S.No Description Qty. Rate Unit Amount
1 2 3 4 5 6.
1 Providing and Supplying o Brass full way valve with wheel of superior quality as
per standard design & relevant ISS of following dia complete in all respect and as
per satisfaction of the Engineer-in-charge.
i) 15mm dia 10 Nos. 350.00 Each. 3500.00
ii) 20mm dia 70 Nos. 420.00 Each. 29400.00

iii) 25 mm dia. 35 Nos. 510.00 Each. 17850.00

iv) 32mm dia. 40 Nos. 800.00 Each. 32000.00

v) 40mm dia. 20 Nos. 1500.00 Each. 30000.00

vi) 50mm dia. 10 Nos. 2300.00 Each. 23000.00

vii) 65mm dia. 10 Nos. 3600.00 Each. 36000.00


2 Providing and Supplying of the G.I.Unions of the follwing sizes Confirming to IS
1879 in the various schemes complete in all respect and as per satisfaction of the
Engineer-in-charge.
i) 15mm dia 80 Nos. 70.00 Each. 5600.00
ii) 20mm dia 60 Nos. 100.00 Each. 6000.00
iii) 25 mm dia. 60 Nos. 125.00 Each. 7500.00
iv) 32mm dia. 40 Nos. 170.00 Each. 6800.00
v) 40mm dia. 40 Nos. 300.00 Each. 12000.00
vi) 50mm dia. 20 Nos. 320.00 Each. 6400.00
vii) 65mm dia. 20 Nos. 500.00 Each. 10000.00
viii) 80mm dia. 20 Nos. 700.00 Each. 14000.00
3 Providing and Supplying of the G.I.Elbow of the follwing sizes onfirming to IS
1879 in the various schemes complete in all respect and as per satisfaction of the
Engineer-in-charge.
i) 15mm dia 60 Nos. 60.00 Each. 3600.00

ii) 20mm dia 60 Nos. 80.00 Each. 4800.00

iii) 25 mm dia. 40 Nos. 110.00 Each. 4400.00


iv) 32mm dia. 20 Nos. 160.00 Each. 3200.00

v) 40mm dia. 20 Nos. 240.00 Each. 4800.00

vi) 50mm dia. 25 Nos. 250.00 Each. 6250.00

vii) 65mm dia. 20 Nos. 450.00 Each. 9000.00

viii) 80mm dia. 20 Nos. 600.00 Each. 12000.00


4 Providing Wrench set of following sizes confirming to IS 1879 in the various schemes as
per details attached for repair of damaged distribution /main G.I.Pipe Line compete in
all respect and as per direction of the Engineer-in-charge.

i) 14" 8 Nos. 340.00 Each. 2720.00


ii) 18" 8 Nos. 440.00 Each. 3520.00
iii) 24" 5 Nos. 540.00 Each. 2700.00
TERMS AND CONDITIONS:- TOTAL: 297040.00
1 The work shall be executed as per IPH/PWD specification and instructions of the
2 Engineer-in-charge.
Security,Income Tax, Sale & Labour cess shall be deducted as per rules.
3 The material will be received in good condition .
4 Material shall be guaranteed for Six months. Executive Engineer,
I&PH Division,
Paonta Sahib
REVISED SCHEDULE OF QUANTITY Estimated Cost:98359/-
Name of work: R/M of various Schemes under IPH Sub Division Shillai Tehsil Shillai Distt. Sirmour (HP) Earnest Money: 1960/-
(SH: Prov. & supplying of Ratched Die set, Pipe Wrench and Gate valve of various Dia) Timbi Section) Time: One Month.
S.No Description Qty. Rate Unit Amount
1 Providing and supplying of Ratched pipe threader set of following size ISI marked and of
standard make i.e. INDER/SHAKTIMAN/JHALANI incluuding all leads lifts and carriage
of material at site and as per direction of Engineer-in-charge.

i)Size 15mm to 25mm. 5 Set 3200.00 P/Set 16000.00


ii)Size 32mm to 50mm. 5 Set 5600.00 P/Set 28000.00
iii)Size 65mm to 80mm. 3 Set 7500.00 P/Set 22500.00
2 Providing Wrench set of following sizes confirming to IS 1879 in the various schemes as
per direction of the Engineer-in-charge.
i) 18" 15 Nos. 610.00 Each 9150.00
ii) 24" 10 Nos. 980.00 Each 9800.00
iii) 36" 8 Nos. 1210.00 Each 9680.00
iv) 48" 5 Nos. 2500.00 Each 12500.00
3 Providing and Supplying of Gun metal Peet valves of the folloiwing sizes in place
of damaged/ Non functional valves in various schemes complete in all respect
and as per satisfaction of the Engineer-in-charge.
i) 15mm dia 50 Nos. 350.00 Each. 17500.00
ii) 20mm dia 90 Nos. 420.00 Each. 37800.00
iii) 25 mm dia. 80 Nos. 510.00 Each. 40800.00
iv) 32mm dia. 55 Nos. 580.00 Each. 31900.00
v) 40mm dia. 40 Nos. 1500.00 Each. 60000.00
vi) 50mm dia. 30 Nos. 2100.00 Each. 63000.00
TERMS AND CONDITIONS:- TOTAL: 358630.00
1 The work shall be executed as per IPH/PWD specification and instructions of the
Engineer-in-charge.
2 Security,Income Tax, Sale & Labour cess shall be deducted as per rules.
3 The material will be received in good condition .
4 Material shall be guaranteed for Six months. Executive Engineer,
I&PH Division,
Paonta Sahib
REVISED SCHEDULE OF QUANTITY Estimated Cost:81992/-
Name of work: R/M of various Water Supply Schemes under IPH Sub Division Kaffota in Tehsil Paonta Sahib Earnest Money: 1650/-
Distt. Sirmour (HP) (SH: Prov. & supplying of Ratched Die set of various dia , Pipe Wrenchof various dia) Staun Section) Time: One Month.
S.No Description Qty. Rate Unit Amount
1 2 3 4 5 6.
1 Providing and supplying of Ratched pipe threader set of following size ISI marked and of
standard make i.e. INDER/SHAKTIMAN/JHALANI incluuding all leads lifts and carriage
of material at site and as per direction of Engineer-in-charge.

i)Size 15mm to 25mm. 6 Set 3200.00 P/Set 19200.00


ii)Size 32mm to 50mm. 6 Set 5600.00 P/Set 33600.00
iii)Size 65mm to 80mm. 6 Set 7500.00 P/Set 45000.00

2 Providing Wrench set of following sizes confirming to IS 1879 in the various schemes as
per direction of the Engineer-in-charge.

i) 10" 12 Nos. 390.00 Each. 4680.00


ii) 12" 8 Nos. 420.00 Each. 3360.00
iii) 14" 7 Nos. 510.00 Each. 3570.00

iv) 18" 15 Nos. 630.00 Each 9450.00


v) 24" 14 Nos. 1020.00 Each 14280.00
vi) 36" 12 Nos. 2300.00 Each 27600.00
vii) 48" 4 Nos. 4500.00 Each 18000.00

TERMS AND CONDITIONS:- TOTAL: 178740.00


1 The work shall be executed as per IPH/PWD specification and instructions of the
2 Engineer-in-charge.
Security,Income Tax, Sale & Labour cess shall be deducted as per rules.
3 The material will be received in good condition .
4 Material shall be guaranteed for Six months. Executive Engineer,
I&PH Division,
Paonta Sahib
REVISED SCHEDULE OF QUANTITY Estimated Cost:99494/-
Name of work: R/M of various WATER SUPPLY SCHEMES under IPH S/Division Kaffota in Tehsil Earnest Money: 2000/-
Paonta sahib Distt. Sirmour (HP) (SH: Prov. & supplying of various type of fitting material (Timbi Section) Time: One Month.
S.No Description Qty. Rate Unit Amount
1 2 3 4 5 6.
1 Providing and Supplying o Brass full way valve with wheel of superior quality as
per standard design & relevant ISS of following dia complete in all respect and as
per satisfaction of the Engineer-in-charge.
i) 15mm dia 10 Nos. 350.00 Each. 3500.00
ii) 20mm dia 70 Nos. 420.00 Each. 29400.00
iii) 25 mm dia. 35 Nos. 510.00 Each. 17850.00
iv) 32mm dia. 40 Nos. 800.00 Each. 32000.00
v) 40mm dia. 20 Nos. 1500.00 Each. 30000.00
vi) 50mm dia. 10 Nos. 2300.00 Each. 23000.00
vii) 65mm dia. 10 Nos. 3600.00 Each. 36000.00
2 Providing and Supplying of the G.I.Unions of the follwing sizes Confirming to IS
1879 in the various schemes complete in all respect and as per satisfaction of the
Engineer-in-charge.
i) 15mm dia 80 Nos. 70.00 Each. 5600.00
ii) 20mm dia 60 Nos. 100.00 Each. 6000.00
iii) 25 mm dia. 60 Nos. 125.00 Each. 7500.00
iv) 32mm dia. 40 Nos. 170.00 Each. 6800.00
v) 40mm dia. 40 Nos. 300.00 Each. 12000.00
vi) 50mm dia. 20 Nos. 320.00 Each. 6400.00
vii) 65mm dia. 20 Nos. 500.00 Each. 10000.00
viii) 80mm dia. 20 Nos. 700.00 Each. 14000.00
3 Providing and Supplying of the G.I.Elbow of the follwing sizes onfirming to IS
1879 in the various schemes complete in all respect and as per satisfaction of the
Engineer-in-charge.
i) 15mm dia 60 Nos. 60.00 Each. 3600.00
ii) 20mm dia 60 Nos. 80.00 Each. 4800.00
iii) 25 mm dia. 40 Nos. 110.00 Each. 4400.00
iv) 32mm dia. 20 Nos. 160.00 Each. 3200.00
v) 40mm dia. 20 Nos. 240.00 Each. 4800.00
vi) 50mm dia. 25 Nos. 250.00 Each. 6250.00
vii) 65mm dia. 20 Nos. 450.00 Each. 9000.00
viii) 80mm dia. 20 Nos. 600.00 Each. 12000.00
4 Providing Wrench set of following sizes confirming to IS 1879 in the various schemes as
per details attached for repair of damaged distribution /main G.I.Pipe Line compete in
all respect and as per direction of the Engineer-in-charge.
i) 14" 8 Nos. 340.00 Each. 2720.00
ii) 18" 8 Nos. 440.00 Each. 3520.00
iii) 24" 5 Nos. 540.00 Each. 2700.00
TERMS AND CONDITIONS:- TOTAL: 297040.00
1 The work shall be executed as per IPH/PWD specification and instructions of the
2 Engineer-in-charge.
Security,Income Tax, Sale & Labour cess shall be deducted as per rules.
3 The material will be received in good condition .
4 Material shall be guaranteed for Six months. Executive Engineer,
I&PH Division,
Paonta Sahib
REVISED SCHEDULE OF QUANTITY Estimated Cost:99494/-
Name of work: R/M of various WATER SUPPLY SCHEMES under IPH S/Division Shillai in Tehsil Earnest Money: 2000/-
Shillai Distt. Sirmour (HP) (SH: Prov. & supplying of various type of fitting material(Shiri Kiari & Timbi section) Time: One Month.
S.No Description Qty. Rate Unit Amount
1 2 3 4 5 6.
1 Providing and Supplying o Brass full way valve with wheel of superior quality
as per standard design & relevant ISS of following dia complete in all respect
and as per satisfaction of the Engineer-in-charge.
i) 15mm dia 10 Nos. 147.50 Each. 1475.00
ii) 20mm dia 70 Nos. 182.50 Each. 12775.00
iii) 25 mm dia. 35 Nos. 268.75 Each. 9406.00
iv) 32mm dia. 40 Nos. 417.50 Each. 16700.00
v) 40mm dia. 20 Nos. 500.00 Each. 10000.00
vi) 50mm dia. 10 Nos. 580.00 Each. 5800.00
vii) 65mm dia. 10 Nos. 1000.00 Each. 10000.00
2 Providing and Supplying of the G.I.Unions of the follwing sizes Confirming to IS
1879 in the various schemes complete in all respect and as per satisfaction of
the Engineer-in-charge.
i) 15mm dia 80 Nos. 17.50 Each. 1400.00
ii) 20mm dia 60 Nos. 25.00 Each. 1500.00
iii) 25 mm dia. 60 Nos. 31.25 Each. 1875.00
iv) 32mm dia. 40 Nos. 43.75 Each. 1750.00
v) 40mm dia. 40 Nos. 75.00 Each. 3000.00
vi) 50mm dia. 20 Nos. 80.00 Each. 1600.00
vii) 65mm dia. 20 Nos. 112.50 Each. 2250.00
viii) 80mm dia. 20 Nos. 125.00 Each. 2500.00
3 Providing and Supplying of the G.I.Elbow of the follwing sizes onfirming to IS
1879 in the various schemes complete in all respect and as per satisfaction of
the Engineer-in-charge.
i) 15mm dia 60 Nos. 17.50 Each. 1050.00
ii) 20mm dia 60 Nos. 25.00 Each. 1500.00
iii) 25 mm dia. 40 Nos. 31.25 Each. 1250.00
iv) 32mm dia. 20 Nos. 43.75 Each. 875.00
v) 40mm dia. 20 Nos. 75.00 Each. 1500.00
vi) 50mm dia. 25 Nos. 92.50 Each. 2313.00
vii) 65mm dia. 20 Nos. 95.00 Each. 1900.00
viii) 80mm dia. 20 Nos. 100.00 Each. 2000.00
4 Providing Wrench set of following sizes confirming tyo IS 1879 in the various schemes
as per details attached for repair of damaged distribution /main G.I.Pipe Line.

i) 14" 8 Nos. 225.00 Each. 1800.00


ii) 18" 8 Nos. 237.50 Each. 1900.00
iii) 24" 5 Nos. 275.00 Each. 1375.00

TOTAL: 99494.00

REVISED SCHEDULE OF QUANTITY Estimated Cost:99494/-


Name of work: R/M of various WATER SUPPLY SCHEMES under IPH S/Division Shillai in Tehsil Earnest Money: 2000/-
Shillai Distt. Sirmour (HP) (SH: Prov. & supplying of various type of fitting material(Shiri Kiari & Timbi section) Time: One Month.
S.No Description Qty. Rate Unit Amount
1 2 3 4 5 6.
1 Providing and Supplying o Brass full way valve with wheel of superior quality
as per standard design & relevant ISS of following dia complete in all respect
and as per satisfaction of the Engineer-in-charge.
i) 15mm dia 10 Nos. 147.50 Each. 1475.00
ii) 20mm dia 70 Nos. 182.50 Each. 12775.00
iii) 25 mm dia. 35 Nos. 268.75 Each. 9406.00
iv) 32mm dia. 40 Nos. 417.50 Each. 16700.00
v) 40mm dia. 20 Nos. 500.00 Each. 10000.00
vi) 50mm dia. 10 Nos. 580.00 Each. 5800.00
vii) 65mm dia. 10 Nos. 1000.00 Each. 10000.00
2 Providing and Supplying of the G.I.Unions of the follwing sizes Confirming to IS
1879 in the various schemes complete in all respect and as per satisfaction of
the Engineer-in-charge.
i) 15mm dia 80 Nos. 17.50 Each. 1400.00
ii) 20mm dia 60 Nos. 25.00 Each. 1500.00
iii) 25 mm dia. 60 Nos. 31.25 Each. 1875.00
iv) 32mm dia. 40 Nos. 43.75 Each. 1750.00
v) 40mm dia. 40 Nos. 75.00 Each. 3000.00
vi) 50mm dia. 20 Nos. 80.00 Each. 1600.00
vii) 65mm dia. 20 Nos. 112.50 Each. 2250.00
viii) 80mm dia. 20 Nos. 125.00 Each. 2500.00
3 Providing and Supplying of the G.I.Elbow of the follwing sizes onfirming to IS
1879 in the various schemes complete in all respect and as per satisfaction of
the Engineer-in-charge.
i) 15mm dia 60 Nos. 17.50 Each. 1050.00
ii) 20mm dia 60 Nos. 25.00 Each. 1500.00
iii) 25 mm dia. 40 Nos. 31.25 Each. 1250.00
iv) 32mm dia. 20 Nos. 43.75 Each. 875.00
v) 40mm dia. 20 Nos. 75.00 Each. 1500.00
vi) 50mm dia. 25 Nos. 92.50 Each. 2313.00
vii) 65mm dia. 20 Nos. 95.00 Each. 1900.00
viii) 80mm dia. 20 Nos. 100.00 Each. 2000.00
4 Providing Wrench set of following sizes confirming tyo IS 1879 in the various schemes
as per details attached for repair of damaged distribution /main G.I.Pipe Line.

i) 14" 8 Nos. 225.00 Each. 1800.00


ii) 18" 8 Nos. 237.50 Each. 1900.00
iii) 24" 5 Nos. 275.00 Each. 1375.00

TOTAL: 99494.00
REVISED SCHEDULE OF QUANTITY Estimated Cost:99440/-
Name of work: R/M of various WATER SUPPLY SCHEMES under IPH S/Division Kaffota in Tehsil Paonta Sahib Earnest Money: 2000/-
Distt. Sirmour (HP) (SH: Prov. & supplying of Peet valves of various dia) Staun Section) Time: One Month.
S.No Description Qty. Rate Unit Amount
1 2 3 4 5 6.
1 Providing and Supplying of Brass full way valve with wheel of superior quality
as per standard design & relevant ISS of following dia complete in all respect
and as per satisfaction of the Engineer-in-charge.

i) 15mm dia 40 Nos. 350.00 Each. 14000.00


ii) 20mm dia 40 Nos. 420.00 Each. 16800.00
iii) 25 mm dia. 40 Nos. 510.00 Each. 20400.00
iv) 32mm dia. 30 Nos. 800.00 Each. 24000.00
v) 40mm dia. 20 Nos. 1500.00 Each. 30000.00
vi) 50mm dia. 15 Nos. 2300.00 Each. 34500.00
vii) 65mm dia. 20 Nos. 3600.00 Each. 72000.00
viii) 80mm dia. 10 Nos. 5600.00 Each. 56000.00
ix) 100mm dia. 10 Nos. 9000.00 Each. 90000.00
TOTAL: 357700.00
TERMS AND CONDITIONS:-
1 The work shall be executed as per IPH/PWD specification and instructions of the
2 Engineer-in-charge.
Security,Income Tax, Sale & Labour cess shall be deducted as per rules.
3 The material will be received in good condition .
4 Material shall be guaranteed for Six months. Executive Engineer,
I&PH Division,
Paonta Sahib
REVISED SCHEDULE OF QUANTITY Estimated cost Rs 39182/-
Name of work: Restoration of Rain damages of Left Bank Canal , replacement of old AC pressure pipe to
GI Pipe of Earnest money Rs.800/-
150mm dia in Rising Main Time:- Two Months
S.No Sub-Head and item of work. Qty. Rates, Unit Amount.
1 2 3 4 5 6
1 Excavation in drains & channel etc.in earth work in all kinds of soil such as pick 122.50 Cum. 155.00 P/Cum. 18988.00
work ,jumper work blasting work, decomposed conglomerate saturated soil
soft and hard rock including dressing of sides and beds and prepareation of
sub grade to level or slope including refilling the trenches and disposing of
surplus earth upto all leads,lifts disposed earth to be levelled and neatly
dressed including jungle clearance and as per directions of the Engineer-in-
charge

2 Laying, testing & commissioning at site in trenches GMS pipes of 150mm (M)
confirming to BIS 1239-(Part-1)-1990 or latest with up to date ammendments,
capable of withstanding required test pressure as prescribed in BIS code, in
randum lengths of 5.5 to 6.5 mtr. The pipe's shall be socketted inculding
jointing at site of work with welding rods of standard make & all allied
accessories at site, tail pieces, tees, bends manufactured from parent pipes etc.
and cutting of pipes wherever required as per site requirement i/c carriage in
all leads & lifts as directed by Engineer-Incharge (Earth work shall be
measured & paid for seperately).

Sr.No. R.Ds Nominal Dia Grade/IS -Code


From To .
1. 0 100 150mm (M) 100 Rmt. 66.00 Per Rmt 6600
3 Providing, welding and fixing M.S. plate flanges of 150 mm dia (nominal bore)
of following Flange Table -5 confirming to IS 6392-1971 or latest with up to
date ammendments to MSERW/ GI pipes or as per site requirement including
cutting of of pipes wherever required, welding in three layers (leak proof)
confirming to specifications as prescribed in relvent I.S. Code i.e. IS 816-1969
or latest as applicable with up to date ammendments with nuts, bolts &
washers & specials etc. confirming to IS-1963 or latest with up to date
ammendments including packing sheet i.e. asbestos fibre sheet minimum 3mm 17 Pairs. 1800.00 P/Pair. 30600
thick and painting with anticorosive paints complete in all respect in all leads,
lifts and carriage of material at site and as directed by the Engineer Incharge.

4 Excavation in foundation and trenches etc.in earth work in all kinds of soil such 8.62 Cum. 155.00 P/Cum 1336.00
as pick work ,jumper work decomposed conglomerate saturated soil soft and
hard rock upto all leads lifts stacking the excavated soil not more than
3mtr.clear from the edge of excavation and then returning the stacked soil in
15cm layers when required in to plinth sides of foundation etc. consolidating
each deposited layers by ramming and watering and then disposing of all
surplus excavated earth as directed with in all leads lifts and as per directions
of the Engineer-incharge

5 Providing and laying cement concrete 1:6:12(1cement:6sand:12 graded stone 4.62 Cum 2500.00 P/Cum 11550.00
agg.40mm nominal size)and curing complete excluding the cost of form work
in foundation & plinth including all leads lifts and carriage of material and as
per the directions of Engineer-in-charge.

6 Brick work using common burnt clay building bicks in quality in foundation 2.49 Cum. 5200.00 Per Cum. 12948.00
and plinth in cement Motrar 1:4(1cement:4sand) complete in all respect and as
per direction of the Engineer-in-charge.
7 20mm thick cement plastering single coat on rough side of brick/stone 105.48 Sqm. 125.00 P/sqm. 13185.00
masonary for interior plastering upto floor two level including arrises internal
rounded angfles chamfers and/or rounded angles not exceeding 20mm girth
and finished even & smooth CC 1:6 (1cement:6sand) including all leads,lifts
complee in all respect and as per direction of the Engineer-in-charge.

8 Providing and laying of cement concrete 1:2:4(1cement:2sand: 4 graded stone 0.20 Cum. 3400.00 P/Cum. 680.00
agg.) 20mm nominal size )& cuing complete excluding cost of form work in
foundation and plinth complete in all respect and as per direction of the
Engineer-in-charge.

9 Laying ( to level or slope) and jointing precast concrete Socketted and


spigotted pipes ( earth work in trenches to be mesured and paid for seperately)
of following class with duly ISI marked as per IS:458-2003, precast concrete
pipes with and without re-inforcement 3rd revision ammendment No.3 and
with latest ammendments, it any, complete with rubber rings type-II duly ISI
marked as per IS:5382-1985 Ist.Revision ammendment No.1 and with latest
ammendments,including jointing with C.M. 1:2(1cement:2 sand) in following
dia meter including all leads lifts and carriage of material as per direction of
Engineer incharge.
i) RCC Pipe 250mm dia NP2 100 Rmt 500.00 P/Rmt. 50000.00
TOTAL: 145887.00
TERMS AND CONDITIONS:-
1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Cement shall be issued @Rs.250/-P.bag & steel @Rs.41/- P.kg from IPH Store Bhatanwali Paonta Sahib.
4 Empty cement bags shall be returned to the Deptt.otherwise Rs.2/-per bag shall be deducted from the bill.
5 Royality certificate in respect of (Water born) stone aggregate sand etc. shall be produced by the contractor
6 RCC Pipes shall be Provided by the contractor at his own cost.
7 In addition to normal security 5% amount will be withheld for want of testing of
Pipe/S. tank against leakage and will be released after successful testing.
Executive Engineer,
I&PH Division,
Paonta Sahib.
REVISED SCHEDULE OF QUANTITY
Name of work: R/M of various WATER SUPPLY SCHEMES under IPH S/Division Shillai in Tehsil
Shillai Distt. Sirmour (HP) (SH: Prov. & supplying of various type of fitting material (Shiri Kiari Section)
S.No Description Qty.
1 2 3
1 Providing and Supplying o Brass full way valve with wheel of superior quality as
per standard design & relevant ISS of following dia complete in all respect and as
per satisfaction of the Engineer-in-charge.
i) 15mm dia 10
ii) 20mm dia 70
iii) 25 mm dia. 35
iv) 32mm dia. 40
v) 40mm dia. 20
vi) 50mm dia. 10
vii) 65mm dia. 10
2 Providing and Supplying of the G.I.Unions of the follwing sizes Confirming to IS
1879 in the various schemes complete in all respect and as per satisfaction of the
Engineer-in-charge.
i) 15mm dia 80
ii) 20mm dia 60
iii) 25 mm dia. 60
iv) 32mm dia. 40
v) 40mm dia. 40
vi) 50mm dia. 20
vii) 65mm dia. 20
viii) 80mm dia. 20
3 Providing and Supplying of the G.I.Elbow of the follwing sizes onfirming to IS
1879 in the various schemes complete in all respect and as per satisfaction of the
Engineer-in-charge.
i) 15mm dia 60
ii) 20mm dia 60
iii) 25 mm dia. 40
iv) 32mm dia. 20
v) 40mm dia. 20
vi) 50mm dia. 25
vii) 65mm dia. 20
viii) 80mm dia. 20
4 Providing Wrench set of following sizes confirming to IS 1879 in the various schemes as
per details attached for repair of damaged distribution /main G.I.Pipe Line compete in
all respect and as per direction of the Engineer-in-charge.
i) 14" 8
ii) 18" 8
iii) 24" 5
TERMS AND CONDITIONS:-
1 The work shall be executed as per IPH/PWD specification and instructions of the
2 Engineer-in-charge.
Security,Income Tax, Sale & Labour cess shall be deducted as per rules.
3 The material will be received in good condition .
4 Material shall be guaranteed for Six months.
Rate quoted by Rate quoted by Sh.Rajesh Rate quoted by
Sh.Parvesh Sharma Sharma Vill.Charew Sh.Atma Ram Sharma
Dhakoli R/O Charew.

Rate Amount Rate Amount Rate Amount


4 6. 4 6. 4 6.

Nos. 480.00 4800.00 470.00 4700.00 500.00 5000.00


Nos. 550.00 38500.00 540.00 37800.00 600.00 42000.00
Nos. 650.00 22750.00 640.00 22400.00 700.00 24500.00
Nos. 950.00 38000.00 940.00 37600.00 1000.00 40000.00
Nos. 1800.00 36000.00 1790.00 35800.00 1900.00 38000.00
Nos. 2900.00 29000.00 2890.00 28900.00 3000.00 30000.00
Nos. 3900.00 39000.00 3890.00 38900.00 4200.00 42000.00

Nos. 150.00 12000.00 145.00 11600.00 160.00 12800.00


Nos. 170.00 10200.00 165.00 9900.00 178.00 10680.00
Nos. 200.00 12000.00 195.00 11700.00 220.00 13200.00
Nos. 250.00 10000.00 245.00 9800.00 300.00 12000.00
Nos. 400.00 16000.00 390.00 15600.00 440.00 17600.00
Nos. 450.00 9000.00 440.00 8800.00 500.00 10000.00
Nos. 680.00 13600.00 670.00 13400.00 730.00 14600.00
Nos. 1000.00 20000.00 990.00 19800.00 1050.00 21000.00
0.00

Nos. 120.00 7200.00 115.00 6900.00 150.00 9000.00


Nos. 150.00 9000.00 144.00 8640.00 180.00 10800.00
Nos. 200.00 8000.00 190.00 7600.00 250.00 10000.00
Nos. 250.00 5000.00 245.00 4900.00 270.00 5400.00
Nos. 350.00 7000.00 340.00 6800.00 380.00 7600.00
Nos. 600.00 15000.00 590.00 14750.00 650.00 16250.00
Nos. 700.00 14000.00 690.00 13800.00 750.00 15000.00
Nos. 900.00 18000.00 890.00 17800.00 950.00 19000.00
0.00

Nos. 600.00 4800.00 590.00 4720.00 650.00 5200.00


Nos. 1000.00 8000.00 990.00 7920.00 1100.00 8800.00
Nos. 1200.00 6000.00 1190.00 5950.00 1300.00 6500.00
TOTAL: 412850.00 406480.00 446930.00

Executive Engineer,
I&PH Division,
Paonta Sahib
DRAFT SCHEDULE OF QUANTITY Estimated cost Rs 40294/-
Name of work:- R/M of GWSS Kanti Kheel in Tehsil Paonta Sahib Distt. Sirmour (HP) Earnest money Rs.800/-
(SH:-C/o RCC Collection tank, laying & jointing of GI Pipes) Time:- Three months.
Sr.No. Description. Qty. Rate. Unit
1 2 3 4 5
1 Excavation in foundation and trenches etc.in earth work in all kinds of soil such as pick work ,jumper 6.85 Cum. 92.85 P/Cum
work decomposed conglomerate saturated soil soft and hard rock upto all leads lifts stacking the
excavated soil not more than 3mtr.clear from the edge of excavation and then returning the stacked
soil in 15cm layers when required in to plinth sides of foundation etc. consolidating each deposited
layers by ramming and watering and then disposing of all surplus excavated earth as directed with in
all leads lifts and as per directions of the Engineer-incharge

2 Providing and laying cement concrete 1:4:8(1cement:4sand:8 graded stone agg.40mm nominal 1.26 Cum 1104.8 P/Cum
size)and curing complete excluding the cost of form work in foundation & plinth including all leads
lifts and carriage of material and as per the directions of Engineer-in-charge.

3 Providing and laying cement concrete work 1:1 1/2:3 (1cement:1 1/2 sand: 3 graded stone agg.
20mm nominal size & curing complete) excluding cost of form workand reinforcement for RCC work
including all leads lifts complete and carriage of material etc. as per directions of Engineer incharge.

i) In foundation and Plinth 1.28 Cum. 1866.80 P/Cum.

ii) In vertical walls any thickness but not less than 0.10 Metres. 2.52 Cum. 1923.00 P/Cum.

4 Providing form work with steel sheets 3.15mm thick welded with angle iron 30x30x5 mm so as to
give rough finish i/c centring shuttering structing and propping etc. with wooden bettens & Ballies,
height or propping & centering below supporting floor to ceiling not exceeding 4 mtr.and removal of
the same for insitu RCC work and PCC work.including all leads lifts and carriage of material at site &
as per direction of Engineer in charge in:-

a) Flat surfaces such as soffits of suspended floor roofs landing and like upto 200mm in thickness. 4.20 Sqm. 134.10 P/Sqm.

ii) In vertical walls any thickness but not less than 0.10 Metres. 33.54 Sqm. 80.70 P/Sqm.
5 Providing and laying cement concrete 1:2:4(1cement:2app.sand: 4 app. graded stone agg. 20mm 0.60 Cum 1658.90 P/Cum
nominal size )and curing complete excluding cost of form work & reinforcement for reinforced work
in suspended floors, roofs landing shelves and their supports balconies, beams, girders bressumers
and cantilivers upto to floor two level in all height and depth, including all leads lifts and carriage of
material at site and as per direction of the Engineer-incharge.

6 Providing Mild Steel/Tor steel reinforcement including bending binding & placing in positing I/c all 273.32 Kg. 20.70 P/kg
leads lifts and carriage of material and as per direction of the Engineer-in-charge.
7 Excavation in drains & channel etc.in earth work in all kinds of soil such as pick work ,jumper work 270.00 Cum 75.95 P/Cum
blasting work, decomposed conglomerate saturated soil soft and hard rock including dressing of
sides and beds and prepareation of sub grade to level or slope including refilling the trenches and
disposing of surplus earth upto all leads,lifts disposed earth to be levelled and neatly dressed
including jungle clearance and as per directions of the Engineer-incharge

8 Laying and jointing of GMS Pipes of various dia in trenches (earth work in trenches to be measured
and paid for seperately) including all leads lifts and carriage of material at site as per direction of
Engineer-in-charge of following dias.
i) 15mm dia. 300 Rmt. 0.50 P/Rmt.
ii) 20mm dia. 900 Rmt. 0.50 T/Rmt.
Total:
TERMS AND CONDITIONS:-
The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
1 Security,Sale tax & Income tax shall be deducted as per rules.
2 Cement will be issued @ 315/- per bag & steel @ 53/- per Kg. at IPH store Bhatanwali Paonta Sahib.
3 Empty cement bags shall be returned to the deptt. Otherwise Rs. 2/- per bag shall be deducted from
the earch bill of the contractor.
4 Royality certificate in respect of stone agg. Sand etc. shall be produced by the contractor
5 GI Pipe shall be issued free of cost from IPH Store Bhatanwali.
7 GI Fitting shall be provided by the contractor. Assistant Engineer,
I&PH Sub Division, Kaffota.

REVISED SCHEDULE OF QUANTITY Estimated cost Rs 52335/-


Name of work:- Sustainability of GWSS Kando Cheog in Tehsil Paonta Sahib Distt. Sirmour (HP) Earnest money Rs.1100/-
(SH:-C/o RCC storage tank, laying & jointing of GI Pipes)Extension to Sandra Basd & Banour Bas in GP Kando Cheog. Time:- Three months.
Sr.No. Description. Qty. Rate. Unit
1 2 3 4 5
1 Excavation in foundation and trenches etc.in earth work in all kinds of soil such as pick work ,jumper 7.69 Cum. 160.00 P/Cum
work decomposed conglomerate saturated soil soft and hard rock upto all leads lifts stacking the
excavated soil not more than 3mtr.clear from the edge of excavation and then returning the stacked
soil in 15cm layers when required in to plinth sides of foundation etc. consolidating each deposited
layers by ramming and watering and then disposing of all surplus excavated earth as directed with in
all leads lifts and as per directions of the Engineer-incharge

2 Providing and laying cement concrete 1:4:8(1cement:4sand:8 graded stone agg.40mm nominal 1.15 Cum 5000 P/Cum
size)and curing complete excluding the cost of form work in foundation & plinth including all leads
lifts and carriage of material and as per the directions of Engineer-in-charge.

3 Providing and laying cement concrete work 1:1 1/2:3 (1cement:1 1/2 sand: 3 graded stone agg.
20mm nominal size & curing complete) excluding cost of form workand reinforcement for RCC work
including all leads lifts complete and carriage of material etc. as per directions of Engineer incharge.

i) In foundation and Plinth 1.17 Cum. 7000.00 P/Cum.


ii) In vertical walls any thickness but not less than 0.10 Metres. 2.46 Cum. 7200.00 P/Cum.
4 Providing form work with steel sheets 3.15mm thick welded with angle iron 30x30x5 mm so as to
give rough finish i/c centring shuttering structing and propping etc. with wooden bettens & Ballies,
height or propping & centering below supporting floor to ceiling not exceeding 4 mtr.and removal of
the same for insitu RCC work and PCC work.including all leads lifts and carriage of material at site &
as per direction of Engineer in charge in:-

a) Flat surfaces such as soffits of suspended floor roofs landing and like upto 200mm in thickness. 4.82 Sqm. 300.00 P/Sqm.

ii) In vertical walls any thickness but not less than 0.10 Metres. 32.73 Sqm. 200.00 P/Sqm.
5 Providing and laying cement concrete 1:2:4(1cement:2app.sand: 4 app. graded stone agg. 20mm 0.61 Cum 6700.00 P/Cum
nominal size )and curing complete excluding cost of form work & reinforcement for reinforced work
in suspended floors, roofs landing shelves and their supports balconies, beams, girders bressumers
and cantilivers upto to floor two level in all height and depth, including all leads lifts and carriage of
material at site and as per direction of the Engineer-incharge.

6 Providing Mild Steel/Tor steel reinforcement including bending binding & placing in positing I/c all 276.00 Kg. 66.00 P/kg
leads lifts and carriage of material and as per direction of the Engineer-in-charge.
7 Excavation in drains & channel etc.in earth work in all kinds of soil such as pick work ,jumper work 513.00 Cum 160.00 P/Cum
blasting work, decomposed conglomerate saturated soil soft and hard rock including dressing of
sides and beds and prepareation of sub grade to level or slope including refilling the trenches and
disposing of surplus earth upto all leads,lifts disposed earth to be levelled and neatly dressed
including jungle clearance and as per directions of the Engineer-incharge

8 Laying and jointing of GMS Pipes of various dia in trenches (earth work in trenches to be measured
and paid for seperately) including all leads lifts and carriage of material at site as per direction of
Engineer-in-charge of following dias.
i) 15mm dia. 840 Rmt. 10.00 P/Rmt.
ii) 20mm dia. 1440 Rmt. 11.00 T/Rmt.
9 Providing & fixing of peet valve of superior quality of the following dia metres as per the directions
of the Engineer-in-charge.
i) 15mm dia. 1 No. 450.00 Each.
ii) 20mm dia. 2 No. 500.00 Each.
Total:
TERMS AND CONDITIONS:-
The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
1 Security,Sale tax & Income tax shall be deducted as per rules.
2 Cement will be issued @ 315/- per bag & steel @ 53/- per Kg. at IPH store Bhatanwali Paonta Sahib.
3 Empty cement bags shall be returned to the deptt. Otherwise Rs. 2/- per bag shall be deducted from
the earch bill of the contractor.
4 Royality certificate in respect of stone agg. Sand etc. shall be produced by the contractor
5 GI Pipe shall be issued free of cost from IPH Store Bhatanwali.
7 GI Fitting shall be provided by the contractor. Executive Engineer,
I&PH Division,
Paonta Sahib.

REVISED SCHEDULE OF QUANTITY Estimated cost Rs 99509/-


Name of work:- c/O lis Kiratpur Bhagwanpur in Tehsil Paonta Sahib Distt. Sirmour (HP) Earnest money Rs.2000/-
(SH:-C/o RCC Sump well 76050 Ltr. Cap.) Time:- Three months.
Sr.No. Description. Qty. Rate. Unit
1 2 3 4 5
1 Excavation in foundation and trenches etc.in earth work in all kinds of soil such as pick work ,jumper 27.90 Cum. 160.00 P/Cum
work decomposed conglomerate saturated soil soft and hard rock upto all leads lifts stacking the
excavated soil not more than 3mtr.clear from the edge of excavation and then returning the stacked
soil in 15cm layers when required in to plinth sides of foundation etc. consolidating each deposited
layers by ramming and watering and then disposing of all surplus excavated earth as directed with in
all leads lifts and as per directions of the Engineer-incharge

2 Providing and laying cement concrete 1:4:8(1cement:4sand:8 graded stone agg.40mm nominal 5.60 Cum 2700.00 P/Cum
size)and curing complete excluding the cost of form work in foundation & plinth including all leads
lifts and carriage of material and as per the directions of Engineer-in-charge.

3 Providing and laying cement concrete 1:2:4(1cement:2app.sand: 4 app. graded stone agg. 20mm 21.10 Cum 3900.00 P/Cum
nominal size )and curing complete excluding cost of form work & reinforcement for reinforced work
in suspended floors, roofs landing shelves and their supports balconies, beams, girders bressumers
and cantilivers upto to floor two level in all height and depth, including all leads lifts and carriage of
material at site and as per direction of the Engineer-incharge.
4 Providing form work with steel sheets 3.15mm thick welded with angle iron 30x30x5 mm so as to
give rough finish i/c centring shuttering structing and propping etc. with wooden bettens & Ballies,
height or propping & centering below supporting floor to ceiling not exceeding 4 mtr.and removal of
the same for insitu RCC work and PCC work.including all leads lifts and carriage of material at site &
as per direction of Engineer in charge in:-

ii) In vertical walls any thickness but not less than 0.10 Metres. 147.60 Sqm. 200.00 P/Sqm.
5 Providing Mild Steel/Tor steel reinforcement including bending binding & placing in positing I/c all 2104.00 Kg. 63.00 P/kg
leads lifts and carriage of material and as per direction of the Engineer-in-charge.
5 Providing and fixig of foot rest complete in all respect and as per direction of the Engineer-in-charge. 14 Nos. 85.00 P/Cum

Total:
TERMS AND CONDITIONS:-
1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Cement will be issued @ 315/- per bag & steel @ 53/- per Kg. at IPH store Bhatanwali Paonta Sahib.
4 Empty cement bags shall be returned to the deptt. Otherwise Rs. 2/- per bag shall be deducted from
the earch bill of the contractor.
5 Royality certificate in respect of stone agg. Sand etc. shall be produced by the contractor

Executive Engineer,
I&PH Division,
Paonta Sahib.
d cost Rs 40294/-
money Rs.800/-
hree months.
Amount.
6
636.00

1392.00

2390.00

4846.00

563.00

2707.00
995.00

5658.00

20507.00

150.00
450.00
40294.00

Engineer,
b Division, Kaffota.

d cost Rs 52335/-
money Rs.1100/-
hree months.
Amount.
6
1230.00

5750.00

8190.00
17712.00

1446.00

6546.00
4087.00

18216.00

82080.00

8400.00
15840.00

169497.00

e Engineer,
d cost Rs 99509/-
money Rs.2000/-
hree months.
Amount.
6
4464.00

15120.00

82290.00
29520.00
132552.00

1190.00

265136.00

e Engineer,
DRAFT SCHEDULE OF QUANTITY Estimated Cost: 60680/
Name of work:-Restoration of Rain damages to FIS Jamna in Tehsil Paonta Sahib Distt. Sirmour (HP) Earnest Money: 1300/-
(SH: C/o Breast wall back to intake at RD 60 to 66.70 Mtrr. & removal of slips.) Three Months.
S.No Sub-Head and item of work. Qty. Rates,
1 2 3 4
1 Cutting in earth work in and disposal of excavated earth within all leadsin Pick/jumper work 50% each complete 21.51 Cum 59.55
in all respect and as per direction of the Engineer-in-chage.

2 Excavation in foundation and trenches etc.in earth work in all kinds of soil such as pick work ,jumper work 8.18 Cum 92.85
decomposed conglomerate saturated soil soft and hard rock upto all leads lifts stacking the excavated soil not
more than 3mtr.clear from the edge of excavation and then returning the stacked soil in 15cm layers when
required in to plinth sides of foundation etc. consolidating each deposited layers by ramming and watering and
then disposing of all surplus excavated earth as directed with in all leads lifts and as per directions of the
Engineer-incharge

3 Providing and laying cement concrete 1:6:12(1cement: 6sand: 12 graded stone agg.40mm nominal size)and 4.53 Cum 905.1
curing complete excluding the cost of form work in foundation & plinth including all leads lifts and carriage of
material and as per the directions of Engineer-in-charge.

4 Random rubble masonary /Poly rubble masonary (uncoursed/brought to coursed) with hard stone of approved 28.85 Cum 1135.50
quality in foundation and plinth including levelling up with cement concrete 1:6.12(1cement:6sand:12 graded
stone agg. 20mm nominal size)in cement mortor 1:6 (1 Cement: 6 sand ) in breast wall & Retaining walls
including all leads lifts and carriage of material and as per the directions of Engineer-in-charge.

5 Stone filling behind retaining wall by ramming and watering and then disposing of all surplus excavated earthg as 4.34 Cum. 391.70
directed within all leads,lifts and carriage of material and as per direction of the Engineer-in-charge.

6 Removal of slips in all kinds of soil including saturated soil but excluding boulders and rpocky portion required 521.55 Cum. 38.50
blasting portion requiring blasting upto a distance of 20 mtrs. disposing of unservice materials stacking
serviceable materials and neatly dressing the surface complete in all respect.

TERMS AND CONDITIONS:-


1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Cement will be issued @315/- per bag & steel @ 53/- per Kg. at IPH store Bhatanwali Paonta Sahib.
4 Empty cement bags shall be returned to the deptt. Otherwise Rs. 2/- per bag shall be deducted from the each bill of the contractor.
5 Royality certificate in respect of stone agg. Sand etc. shall be produced by the contractor
6 Contractor shall be responsible for watch & ward of store.
Assistant Engineer,
I&PH Sub Division,
Kaffota.
Estimated Cost: 60680/-
Earnest Money: 1300/-
Three Months.
Unit Amount.
5 6
P/Cum 1281.00

P/Cum 760.00

P/Cum 4100.00

P/Cum 32759.00

P/Cum. 1700.00

P/Cum. 20080.00

Total: 60680
tractor.

Assistant Engineer,
I&PH Sub Division,
DRAFT SCHEDULE OF QUANTITY Estimated Cost: 64383/-
Name of work:-R/M of FIS Kando Shilyan in GP Kiari Gundah in Tehsil Shillai Distt. Sirmour (HP) Earnest Money: 1300/-
(SH: Removal of slips.) One Month.
S.No Sub-Head and item of work. Qty. Rates, Unit Amount.
1 2 3 4 5 6
1 Removal of slips in all kinds of soil including saturated soil but excluding boulders 1672.28 Cum. 38.50 P/Cum. 64383.00
and rpocky portion required blasting portion requiring blasting upto a distance of 20
mtrs. disposing of unservice materials stacking serviceable materials and neatly
dressing the surface complete in all respect.

Total: 64383
TERMS AND CONDITIONS:-
1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Nothing shall be paid for rejected/defective work.

Assistant Engineer,
I&PH Sub Division,
Shillai

REVISED SCHEDULE OF QUANTITY Estimated Cost: 55670/-


Name of work:-A/R & M/O LIS Nawada in Tehsil Paonta Sahib Distt. Sirmour (HP) Earnest Money: 1113/-
(SH: Extraction of silt from the Sump well by pumping out the silt slurry with Raw water Time: One Month.
Pump & removal of solid silt manually.)
S.No Sub-Head and item of work. Qty. Rates, Unit Amount.
1 2 3 4 5 6
1 Clearance of sump well by extraction of deposited silt by pumping out the silt slurry 89.18 Cum. 1100.00 P/Cum. 98098.00
with Raw Water pump and removal of solid silt manually (Pick/Jumper )work thus
clearing the well of all foreign deposition. The extracted materials is to be disposed
off within lealds and lifts to the entire satisfaction of the Engineer-in-charge.

Total: 98098
TERMS AND CONDITIONS:-
1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Nothing shall be paid for rejected/defective work.

Executive Engineer,
I&PH Division,
Paonta Sahib.

REVISED SCHEDULE OF QUANTITY Estimated Cost: 33153/-


Name of work:- FIS Fedth in GP Dugana in Tehsil Shillai Distt. Sirmour (HP) Earnest Money: 700/-
(SH: Removal of slips.) Time: Three Months.
S.No Sub-Head and item of work. Qty. Rates, Unit Amount.
1 2 3 4 5 6
1 Removal of slips in all kinds of soil including saturated soil but excluding boulders 861.15 Cum. 130.00 P/Cum. 111950.00
and rpocky portion required blasting portion requiring blasting upto a distance of 20
mtrs. disposing of unservice materials stacking serviceable materials and neatly
dressing the surface complete in all respect.

Total: 111950
TERMS AND CONDITIONS:-
1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Nothing shall be paid for rejected/defective work.

Executive Engineer,
I&PH Division,
Paonta Sahib.
REVISED SCHEDULE OF QUANTITY Estimated Cost :-Rs.31800/-
Name of work:-Providing & supplying of RCC Pipe for Left Out area of LIS Bata Mandi in Tehsil Paonta Sahib Earnest Money :-Rs.700/-
Distt. Sirmour (HP) (SH:- Providing & Supplying of RCC Pipes in distribution system ). Time:- Three months
S.No Description Qty. Rate Unit Amount
1 2 3 4 5 6.
1 Providing and supplying of precast concrete Socketted and spigotted pipes ( earth work
in trenches to be mesured and paid for seperately) of following class with duly ISI marked
as per IS:458-2003, precast concrete pipes with and without re-inforcement 3rd revision
ammendment No.3 and with latest ammendments, it any, complete with rubber rings
type-II duly ISI marked as per IS:5382-1985 Ist.Revision ammendment No.1 and with
latest ammendments,including jointing with C.M. 1:2(1cement:2 sand) in following dia
meter including all leads lifts and carriage of material as per direction of Engineer
incharge.

i) RCC Pipe 250mm dia NP2 500 Rmt 415.00 P/Rmt. 207500.00

Total: 207500.00
TERMS AND CONDITIONS:-
1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Cement shall be issued @Rs.315/-P.bag & steel @Rs.53/- P.kg from IPH Store Bhatanwali Paonta Sahib.
4 Empty cement bags shall be returned to the Deptt.otherwise Rs.2/-per bag shall be deducted from the bill.
5 Royality certificate in respect of (Water born) stone aggregate sand etc. shall be produced by the contractor
6 RCC Pipes shall be Provided by the contractor at his own cost.
7 In addition to normal security 5% amount will be withheld for want of testing of Pipe/S.
tank against leakage and will be released after successful testing.
Executive Engineer,
I&PH Division,
Paonta Sahib.
REVISED SCHEDULE OF QUANTITY
Name of work:-Providing laying of RCC Pipe for Left Out area of LIS Bata Mandi in Tehsil Paonta
Sahib Distt. Sirmour (HP) (SH:- Providing & Laying of RCC Pipes in distribution system ).
S.No Description Qty.
1 2 3
1 Laying ( to level or slope) and jointing precast concrete Socketted and
spigotted pipes ( earth work in trenches to be mesured and paid for
seperately) of following class with duly ISI marked as per IS:458-2003,
precast concrete pipes with and without re-inforcement 3rd revision
ammendment No.3 and with latest ammendments, it any, complete with
rubber rings type-II duly ISI marked as per IS:5382-1985 Ist.Revision
ammendment No.1 and with latest ammendments,including jointing with
C.M. 1:2(1cement:2 sand) in following dia meter including all leads lifts
and carriage of material as per direction of Engineer incharge.

i) RCC Pipe 250mm dia NP2 500 Rmt

TERMS AND CONDITIONS:-


1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Cement shall be issued @Rs.315/-P.bag & steel @Rs.53/- P.kg from IPH Store Bhatanwali Paonta Sahib.
4 Empty cement bags shall be returned to the Deptt.otherwise Rs.2/-per bag shall be deducted from the bill.
5 Royality certificate in respect of (Water born) stone aggregate sand etc. shall be produced by the contractor
6 RCC Pipes shall be Provided by the contractor at his own cost.
7 In addition to normal security 5% amount will be withheld for want of
testing of Pipe/S. tank against leakage and will be released after successful
testing.
Estimated Cost :-Rs.31800/-
Earnest Money :-Rs.700/-
Time:- Three months
Rate Unit Amount
4 5 6.

P/Rmt.
Total:

ineer-in-charge.

wali Paonta Sahib.


educted from the bill.
uced by the contractor

Assistant Engineer,
Giri Irrig.Sub Division,
Patlion.
REVISED SCHEDULE OF QUANTITY Estimated Cost :-Rs.80475/-
Name of work:-Restoration of Rain damages to channelisation of Bata River from RD 17694 to 17719 Mtr.on Right Bank Earnest Money :-Rs.1610/-
in Tehsil Paonta Sahib Distt. Sirmour (HP) (SH:- C/o embankment ).
Time:- Two months
S.No Description Qty. Rate Unit Amount
1 2 3 4 5 6.
1 Excavation in earth work in all kinds of soil and disposal of all excavated earth upto all 219.00 Cum 155.00 P/Cum 33945.00
leads lifts disposed earth to be levelled and neatly dressed including all leads, lifts and
carriage of material and as per directions of the Engineer-in-charge

2 Wire crates of G.I.wire filled with boulder with square cut faces against the wire G.I.wire 721.50 Sqm. 35.00 P/Sqm. 25253.00
5mm thick corresponding to SWG 6 with 15cmx15cm mesh(boulder filling to be
measured and paid for separately including all leads,lifts and carriage of materials at
site and as per directions of the Engineer-in-charge.

3 Wire crates made of G.I.wire filled with boulder/hard stone of approved quality with 157.50 Cum. 1225.00 P/Cum. 192938.00
square cut faces against the wire having rounded/rectangular shape weight of stones
not less than 18 Kg. free from soft spots,cracks,cavaties etc.(Wire crate to be measured
and paid for separately)including all leads,lifts and carriage of material at site as
direction of the Engineer-in-charge. (Double Knot)

4 Providing and laying dry stone pitching hand packed tightly as in wire crate 35.93 Cum. 1300.00 Per Cum. 46709.00
apron/vertical bunds with slopping faces for protection work, stone shall be free from
soft, spots cracks cavaties etc. including all leads,lifts and carriage of materials and as
per direction of Engineer-in-charge.
5 Providing and fixing Geo textile filter (Non woven) of approved quality of following 105.00 Cum. 108.00 Per Cum. 11340.00
specification made of material 100% polypolythene having weight minimum 275 gram
per square meter, thickness not less than 2.50mm pore size (ASTMO-4791(dry)
between 0.15 to 0.20mm, water permeability (Ref. BS-6906/3) between 150 to 160 ltr.
per square meter per second, CBR puncture strength minimum 3850 N, wide width
tensile strength(Elongation at peak strength )minimum 17.5 KN per meter (Max 50% )
Grab tensile strength minimum 1100 N Elongation at break maximum 50% Cone
drop( Ref. BS 6906/6) Maximum 15mm , Trapezoidal tear Resistance minimum 450N
width minimum 4 Mtr. and above in embankment below the stone pitching and wire
crate apron including all leads,lifts and carriage of material and as per direction of the
Engineer-in-charge.

TOTAL: 310185.00
TERMS AND CONDITIONS:-
1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 The rates shall be tenderted by the contractor inclusive of all carriage of material and taxes etc.
3 Security,Sale tax & Income tax shall be deducted as per rules from each bill of the contractor asper clause of the agreement
4 and as per of
The weight rules prevalent at shall
stone/boulders the time
not of
bepayment..
less than 18 Kg. In launching apron and not less than 30 kg. in
stone pitching on side slope of embankment as per latest I.S.code .The stone should be rounded tough
rectangular and free from white spot s crakcs cavaties and veins etc.

5 The tenders of those contractors who do not deposit the earnest money in the prescribed manner willo
summarily be rejected.

6 The Geotextile should be laid parallel to slope, Folts and wrinkles opf fabric should be avoided
adjacent rolls should be seamed or overlaped and this overlap should not be less than 300mm.
7 G.I.wire 5.00mm thick (SWG-6) for wire crates shall be issued by the department free of cost at
IPH stone Bhatanwali

Executive Engineer,
I&PH Division, Paonta Sahib.
REVISED SCHEDULE OF QUANTITY Estimated Cost :-Rs.80475/-
Name of work:-Restoration of Rain damages to channelisation of Bata River from RD 17719 to 17744 Mtr.on Right Bank Earnest Money :-Rs.1610/-
in Tehsil Paonta Sahib Distt. Sirmour (HP) (SH:- C/o embankment ).
Time:- Two months
S.No Description Qty. Rate Unit Amount
1 2 3 4 5 6.
1 Excavation in earth work in all kinds of soil and disposal of all excavated earth upto all 219.00 Cum 155.00 P/Cum 33945.00
leads lifts disposed earth to be levelled and neatly dressed including all leads, lifts and
carriage of material and as per directions of the Engineer-in-charge

2 Wire crates of G.I.wire filled with boulder with square cut faces against the wire G.I.wire 721.50 Sqm. 35.00 P/Sqm. 25253.00
5mm thick corresponding to SWG 6 with 15cmx15cm mesh(boulder filling to be
measured and paid for separately including all leads,lifts and carriage of materials at
site and as per directions of the Engineer-in-charge.

3 Wire crates made of G.I.wire filled with boulder/hard stone of approved quality with 157.50 Cum. 1225.00 P/Cum. 192938.00
square cut faces against the wire having rounded/rectangular shape weight of stones
not less than 18 Kg. free from soft spots,cracks,cavaties etc.(Wire crate to be measured
and paid for separately)including all leads,lifts and carriage of material at site as
direction of the Engineer-in-charge. (Double Knot)

4 Providing and laying dry stone pitching hand packed tightly as in wire crate 35.93 Cum. 1300.00 Per Cum. 46709.00
apron/vertical bunds with slopping faces for protection work, stone shall be free from
soft, spots cracks cavaties etc. including all leads,lifts and carriage of materials and as
per direction of Engineer-in-charge.
5 Providing and fixing Geo textile filter (Non woven) of approved quality of following 105 Cum. 108.00 Per Cum. 11340.00
specification made of material 100% polypolythene having weight minimum 275 gram
per square meter, thickness not less than 2.50mm pore size (ASTMO-4791(dry)
between 0.15 to 0.20mm, water permeability (Ref. BS-6906/3) between 150 to 160 ltr.
per square meter per second, CBR puncture strength minimum 3850 N, wide width
tensile strength(Elongation at peak strength )minimum 17.5 KN per meter (Max 50% )
Grab tensile strength minimum 1100 N Elongation at break maximum 50% Cone
drop( Ref. BS 6906/6) Maximum 15mm , Trapezoidal tear Resistance minimum 450N
width minimum 4 Mtr. and above in embankment below the stone pitching and wire
crate apron including all leads,lifts and carriage of material and as per direction of the
Engineer-in-charge.

TOTAL: 310185.00
TERMS AND CONDITIONS:-
1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 The rates shall be tenderted by the contractor inclusive of all carriage of material and taxes etc.
3 Security,Sale tax & Income tax shall be deducted as per rules from each bill of the contractor asper clause of the agreement
4 and as per of
The weight rules prevalent at shall
stone/boulders the time
not of
bepayment..
less than 18 Kg. In launching apron and not less than 30 kg. in
5 stone
The tenders of those contractors who do not as
pitching on side slope of embankment per latest
deposit I.S.code
the earnest .The stone
money in the should be rounded
prescribed manner tough
willo
6 summarily be rejected.
The Geotextile should be laid parallel to slope, Folts and wrinkles opf fabric should be avoided
7 adjacent rolls should
G.I.wire 5.00mm thickbe seamedfor
(SWG-6) or wire
overlaped
crates and
shallthis
be overlap
issued byshould not be lessfree
the department thanof300mm.
cost at
IPH stone Bhatanwali

Executive Engineer,
I&PH Division, Paonta Sahib.
REVISED SCHEDULE OF QUANTITY Estimated Cost :-Rs.80475/-
Name of work:-Restoration of Rain damages to channelisation of Bata River from RD 17719 to 17744 Mtr.on Right Bank Earnest Money :-Rs.1610/-
in Tehsil Paonta Sahib Distt. Sirmour (HP) (SH:- C/o embankment ).
Time:- Two months
S.No Description Qty. Rate Unit Amount
1 2 3 4 5 6.
1 Excavation in earth work in all kinds of soil and disposal of all excavated earth upto all 219.00 Cum 155.00 P/Cum 33945.00
leads lifts disposed earth to be levelled and neatly dressed including all leads, lifts and
carriage of material and as per directions of the Engineer-in-charge

2 Wire crates of G.I.wire filled with boulder with square cut faces against the wire G.I.wire 721.50 Sqm. 35.00 P/Sqm. 25253.00
5mm thick corresponding to SWG 6 with 15cmx15cm mesh(boulder filling to be
measured and paid for separately including all leads,lifts and carriage of materials at
site and as per directions of the Engineer-in-charge. (L.R.)

3 Wire crates made of G.I.wire filled with boulder/hard stone of approved quality with 157.50 Cum. 1225.00 P/Cum. 192938.00
square cut faces against the wire having rounded/rectangular shape weight of stones
not less than 18 Kg. free from soft spots,cracks,cavaties etc.(Wire crate to be measured
and paid for separately)including all leads,lifts and carriage of material at site as
direction of the Engineer-in-charge. (Double Knot)

4 Providing and laying dry stone pitching hand packed tightly as in wire crate 35.93 Cum. 1300.00 Per Cum. 46709.00
apron/vertical bunds with slopping faces for protection work, stone shall be free from
soft, spots cracks cavaties etc. including all leads,lifts and carriage of materials and as
per direction of Engineer-in-charge.
5 Providing and fixing Geo textile filter (Non woven) of approved quality of following 105.00 Sqm. 108.00 Per Sqm. 11340.00
specification made of material 100% polypolythene having weight minimum 275 gram
per square meter, thickness not less than 2.50mm pore size (ASTMO-4791(dry)
between 0.15 to 0.20mm, water permeability (Ref. BS-6906/3) between 150 to 160 ltr.
per square meter per second, CBR puncture strength minimum 3850 N, wide width
tensile strength(Elongation at peak strength )minimum 17.5 KN per meter (Max 50% )
Grab tensile strength minimum 1100 N Elongation at break maximum 50% Cone
drop( Ref. BS 6906/6) Maximum 15mm , Trapezoidal tear Resistance minimum 450N
width minimum 4 Mtr. and above in embankment below the stone pitching and wire
crate apron including all leads,lifts and carriage of material and as per direction of the
Engineer-in-charge.

TOTAL: 310185.00
TERMS AND CONDITIONS:-
1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 The rates shall be tenderted by the contractor inclusive of all carriage of material and taxes etc.
3 Security,Sale tax & Income tax shall be deducted as per rules from each bill of the contractor asper clause of the agreement
4 and as per of
The weight rules prevalent at shall
stone/boulders the time
not of
bepayment..
less than 18 Kg. In launching apron and not less than 30 kg. in
5 stone
The tenders of those contractors who do not as
pitching on side slope of embankment per latest
deposit I.S.code
the earnest .The stone
money in the should be rounded
prescribed manner tough
willo
6 summarily be rejected.
The Geotextile should be laid parallel to slope, Folts and wrinkles opf fabric should be avoided
adjacent rolls should be seamed or overlaped and this overlap should not be less than 300mm.

7 G.I.wire 5.00mm thick (SWG-6) for wire crates shall be issued by the department free of cost at
IPH stone Bhatanwali

Executive Engineer,
I&PH Division, Paonta Sahib.
REVISED SCHEDULE OF QUANTITY Estimated Cost :-Rs.74726/-
Name of work:-Restoration of Rain damages to channelisation of Bata River from RD 17547 to 17558, 17558 to 17570 & Earnest Money :-Rs.1500/-
17660 to 17669 Mtr. on Right Bank in Tehsil Paonta Sahib Distt. Sirmour (HP) (SH:- C/o embankment ).
Time:- Two months
S.No Description Qty. Rate Unit Amount
1 2 3 4 5 6.
1 Excavation in earth work in all kinds of soil and disposal of all excavated earth upto all 458.75 Cum 155.00 P/Cum 71106.00
leads lifts disposed earth to be levelled and neatly dressed including all leads, lifts and
carriage of material and as per directions of the Engineer-in-charge

2 Wire crates of G.I.wire filled with boulder with square cut faces against the wire G.I.wire 515.10 Sqm. 35.00 P/Sqm. 18029.00
5mm thick corresponding to SWG 6 with 15cmx15cm mesh(boulder filling to be
measured and paid for separately including all leads,lifts and carriage of materials at
site and as per directions of the Engineer-in-charge. (L.R.)

3 Wire crates made of G.I.wire filled with boulder/hard stone of approved quality with 113.40 Cum. 1225.00 P/Cum. 138915.00
square cut faces against the wire having rounded/rectangular shape weight of stones
not less than 18 Kg. free from soft spots,cracks,cavaties etc.(Wire crate to be measured
and paid for separately)including all leads,lifts and carriage of material at site as
direction of the Engineer-in-charge. (Double Knot)

4 Providing and laying dry stone pitching hand packed tightly as in wire crate 36.53 Cum. 1300.00 Per Cum. 47489.00
apron/vertical bunds with slopping faces for protection work, stone shall be free from
soft, spots cracks cavaties etc. including all leads,lifts and carriage of materials and as
per direction of Engineer-in-charge.
5 Providing and fixing Geo textile filter (Non woven) of approved quality of following 84.00 Sqm. 108.00 Per Sqm. 9072.00
specification made of material 100% polypolythene having weight minimum 275 gram
per square meter, thickness not less than 2.50mm pore size (ASTMO-4791(dry)
between 0.15 to 0.20mm, water permeability (Ref. BS-6906/3) between 150 to 160 ltr.
per square meter per second, CBR puncture strength minimum 3850 N, wide width
tensile strength(Elongation at peak strength )minimum 17.5 KN per meter (Max 50% )
Grab tensile strength minimum 1100 N Elongation at break maximum 50% Cone
drop( Ref. BS 6906/6) Maximum 15mm , Trapezoidal tear Resistance minimum 450N
width minimum 4 Mtr. and above in embankment below the stone pitching and wire
crate apron including all leads,lifts and carriage of material and as per direction of the
Engineer-in-charge.

TOTAL: 284611.00
TERMS AND CONDITIONS:-
1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 The rates shall be tenderted by the contractor inclusive of all carriage of material and taxes etc.
3 Security,Sale tax & Income tax shall be deducted as per rules from each bill of the contractor asper clause of the agreement
4 and as per of
The weight rules prevalent at shall
stone/boulders the time
not of
bepayment..
less than 18 Kg. In launching apron and not less than 30 kg. in
5 stone
The tenders of those contractors who do not as
pitching on side slope of embankment per latest
deposit I.S.code
the earnest .The stone
money in the should be rounded
prescribed manner tough
willo
6 summarily be rejected.
The Geotextile should be laid parallel to slope, Folts and wrinkles opf fabric should be avoided
adjacent rolls should be seamed or overlaped and this overlap should not be less than 300mm.

7 G.I.wire 5.00mm thick (SWG-6) for wire crates shall be issued by the department free of cost at
IPH stone Bhatanwali

Executive Engineer,
I&PH Division, Paonta Sahib.
REVISED SCHEDULE OF QUANTITY Estimated Cost :-Rs.80475/-
Name of work:-Restoration of Rain damages to channelisation of Bata River from RD 17669 to 17694 Mtr.on Right Bank Earnest Money :-Rs.1610/-
in Tehsil Paonta Sahib Distt. Sirmour (HP) (SH:- C/o embankment ).
Time:- Two months
S.No Description Qty. Rate Unit Amount
1 2 3 4 5 6.
1 Excavation in earth work in all kinds of soil and disposal of all excavated earth upto all 219.00 Cum 155.00 P/Cum 33945.00
leads lifts disposed earth to be levelled and neatly dressed including all leads, lifts and
carriage of material and as per directions of the Engineer-in-charge

2 Wire crates of G.I.wire filled with boulder with square cut faces against the wire G.I.wire 721.50 Sqm. 35.00 P/Sqm. 25253.00
5mm thick corresponding to SWG 6 with 15cmx15cm mesh(boulder filling to be
measured and paid for separately including all leads,lifts and carriage of materials at
site and as per directions of the Engineer-in-charge. (L.R.)

3 Wire crates made of G.I.wire filled with boulder/hard stone of approved quality with 157.50 Cum. 1225.00 P/Cum. 192938.00
square cut faces against the wire having rounded/rectangular shape weight of stones
not less than 18 Kg. free from soft spots,cracks,cavaties etc.(Wire crate to be measured
and paid for separately)including all leads,lifts and carriage of material at site as
direction of the Engineer-in-charge. (Double Knot)

4 Providing and laying dry stone pitching hand packed tightly as in wire crate 35.93 Cum. 1300.00 Per Cum. 46709.00
apron/vertical bunds with slopping faces for protection work, stone shall be free from
soft, spots cracks cavaties etc. including all leads,lifts and carriage of materials and as
per direction of Engineer-in-charge.
5 Providing and fixing Geo textile filter (Non woven) of approved quality of following 105.00 Sqm. 108.00 Per Sqm. 11340.00
specification made of material 100% polypolythene having weight minimum 275 gram
per square meter, thickness not less than 2.50mm pore size (ASTMO-4791(dry)
between 0.15 to 0.20mm, water permeability (Ref. BS-6906/3) between 150 to 160 ltr.
per square meter per second, CBR puncture strength minimum 3850 N, wide width
tensile strength(Elongation at peak strength )minimum 17.5 KN per meter (Max 50% )
Grab tensile strength minimum 1100 N Elongation at break maximum 50% Cone
drop( Ref. BS 6906/6) Maximum 15mm , Trapezoidal tear Resistance minimum 450N
width minimum 4 Mtr. and above in embankment below the stone pitching and wire
crate apron including all leads,lifts and carriage of material and as per direction of the
Engineer-in-charge.

TOTAL: 310185.00
TERMS AND CONDITIONS:-
1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 The rates shall be tenderted by the contractor inclusive of all carriage of material and taxes etc.
3 Security,Sale tax & Income tax shall be deducted as per rules from each bill of the contractor asper clause of the agreement
4 and as per of
The weight rules prevalent at shall
stone/boulders the time
not of
bepayment..
less than 18 Kg. In launching apron and not less than 30 kg. in
5 stone
The tenders of those contractors who do not as
pitching on side slope of embankment per latest
deposit I.S.code
the earnest .The stone
money in the should be rounded
prescribed manner tough
willo
rectangular
summarily beand free from
rejected. white spot s crakcs cavaties and veins etc.
6 The Geotextile should be laid parallel to slope, Folts and wrinkles opf fabric should be avoided
adjacent rolls should be seamed or overlaped and this overlap should not be less than 300mm.

7 G.I.wire 5.00mm thick (SWG-6) for wire crates shall be issued by the department free of cost at
IPH stone Bhatanwali

Executive Engineer,
I&PH Division, Paonta Sahib.
REVISED SCHEDULE OF QUANTITY Estimated cost Rs 93918/-
Name of work:- Providing F.P.work to village Rampur Majri in Tehsil Paonta Sahib Distt. Sirmour (HP) (SH: Earnest money Rs.1900/-
C/O Wire crate from RD 2288 to 2307 Mtrs.18 Mtrs.on LHS ) Time:- One Month.
S.No Sub-Head and item of work. Qty. Rates, Unit Amount.
1 Excavation in earth work in all kinds of soil and disposal of all excavated earth upto all 54.53 Cum 145.00 P/Cum 7907.00
leads lifts disposed earth to be levelled and neatly dressed including all leads, lifts and
carriage of material and as per directions of the Engineer-in-charge

2 Wire crates made of G.I.wire filled with boulder/hard stone of approved quality with 110.34 Cum. 925.00 P/Cum. 102065.00
square cut faces against the wire having rounded/rectangular shape weight of stones not
less than 18 Kg. free from soft spots,cracks,cavaties etc.(Wire crate to be measured and
paid for separately)including all leads,lifts and carriage of material at site as direction of
the Engineer-in-charge. (Double Knot)

3 Wire crates of G.I.wire filled with boulder with square cut faces against the wire G.I.wire 541.73 Sqm. 36.00 P/Sqm. 19502.00
4mm thick corresponding to SWG 6 with 15cmx15cm mesh(boulder filling to be
measured and paid for separately including all leads,lifts and carriage of materials at site
and as per directions of the Engineer-in-charge(L.Rate)

TOTAL: 129474.00
TERMS AND CONDITIONS:-
1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Royality certificate in respect of stone agg. Sand etc. shall be produced by the contractor
4 G.I.wire shall be issued free of cost from IPH store Bhatanwali Paonta Sahib
5 Boulder shall not be less than 18 Kg. & the stone should be free from cracks and cavities.
Executive Engineer,
I&PH Division, Paonta Sahib.

REVISED SCHEDULE OF QUANTITY Estimated cost Rs 99701/-


Name of work:- Providing F.P.work to village Rampur Majri in Tehsil Paonta Sahib Distt. Sirmour (HP) (SH: Earnest money Rs.2000/-
C/O Wire crate from RD 2250 to 2270 Mtrs. 20 Mtrs.on LHS ) Time:- One Month.
S.No Sub-Head and item of work. Qty. Rates, Unit Amount.
1 Excavation in earth work in all kinds of soil and disposal of all excavated earth upto all 57.40 Cum 145.00 P/Cum 8323.00
leads lifts disposed earth to be levelled and neatly dressed including all leads, lifts and
carriage of material and as per directions of the Engineer-in-charge

2 Wire crates made of G.I.wire filled with boulder/hard stone of approved quality with 116.15 Cum. 925.00 P/Cum. 107439.00
square cut faces against the wire having rounded/rectangular shape weight of stones not
less than 18 Kg. free from soft spots,cracks,cavaties etc.(Wire crate to be measured and
paid for separately)including all leads,lifts and carriage of material at site as direction of
the Engineer-in-charge. (Double Knot)

3 Wire crates of G.I.wire filled with boulder with square cut faces against the wire G.I.wire 577.84 Sqm. 36.00 P/Sqm. 20802.00
4mm thick corresponding to SWG 6 with 15cmx15cm mesh(boulder filling to be
measured and paid for separately including all leads,lifts and carriage of materials at site
and as per directions of the Engineer-in-charge(L.Rate)

TOTAL: 136564.00
TERMS AND CONDITIONS:-
1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Royality certificate in respect of stone agg. Sand etc. shall be produced by the contractor
4 G.I.wire shall be issued free of cost from IPH store Bhatanwali Paonta Sahib
5 Boulder shall not be less than 18 Kg. & the stone should be free from cracks and cavities.
Executive Engineer,
I&PH Division, Paonta Sahib.
REVISED SCHEDULE OF QUANTITY Estimated cost Rs 99701/-
Name of work:- Providing F.P.work to village Rampur Majri in Tehsil Paonta Sahib Distt. Sirmour (HP) (SH: Earnest money Rs.2000/-
C/O Wire crate from RD 2307 to 2327 Mtrs. 20 Mtrs.on LHS ) Time:- One Month.
S.No Sub-Head and item of work. Qty. Rates, Unit Amount.
1 Excavation in earth work in all kinds of soil and disposal of all excavated earth upto all 57.40 Cum 145.00 P/Cum 8323.00
leads lifts disposed earth to be levelled and neatly dressed including all leads, lifts and
carriage of material and as per directions of the Engineer-in-charge

2 Wire crates made of G.I.wire filled with boulder/hard stone of approved quality with 116.15 Cum. 925.00 P/Cum. 107439.00
square cut faces against the wire having rounded/rectangular shape weight of stones not
less than 18 Kg. free from soft spots,cracks,cavaties etc.(Wire crate to be measured and
paid for separately)including all leads,lifts and carriage of material at site as direction of
the Engineer-in-charge. (Double Knot)

3 Wire crates of G.I.wire filled with boulder with square cut faces against the wire G.I.wire 577.84 Sqm. 252.00 P/Sqm. 145616.00
4mm thick corresponding to SWG 6 with 15cmx15cm mesh(boulder filling to be
measured and paid for separately including all leads,lifts and carriage of materials at site
and as per directions of the Engineer-in-charge(Through Rate)

TOTAL: 261378.00
TERMS AND CONDITIONS:-
1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Royality certificate in respect of stone agg. Sand etc. shall be produced by the contractor
4 Boulder shall not be less than 18 Kg. & the stone should be free from cracks and cavities.

Executive Engineer,
I&PH Division, Paonta Sahib.
REVISED SCHEDULE OF QUANTITY Estimated cost Rs 69470/-
Name of work:- Providing F.P.work to village Rampur Majri in Tehsil Paonta Sahib Distt. Sirmour (HP) (SH: Earnest money Rs.1390/-
C/O Wire crate from RD 2275 to 2290 Mtrs. RHS at Konthriya Khalla ) Time:- One Month.
S.No Sub-Head and item of work. Qty. Rates, Unit Amount.
1 Excavation in earth work in all kinds of soil and disposal of all excavated earth upto all 36.90 Cum 145.00 P/Cum 5351.00
leads lifts disposed earth to be levelled and neatly dressed including all leads, lifts and
carriage of material and as per directions of the Engineer-in-charge

2 Wire crates made of G.I.wire filled with boulder/hard stone of approved quality with 87.15 Cum. 925.00 P/Cum. 80614.00
square cut faces against the wire having rounded/rectangular shape weight of stones not
less than 18 Kg. free from soft spots,cracks,cavaties etc.(Wire crate to be measured and
paid for separately)including all leads,lifts and carriage of material at site as direction of
the Engineer-in-charge. (Double Knot)

3 Wire crates of G.I.wire filled with boulder with square cut faces against the wire G.I.wire 541.80 Sqm. 36.00 P/Sqm. 19505.00
4mm thick corresponding to SWG 6 with 15cmx15cm mesh(boulder filling to be
measured and paid for separately including all leads,lifts and carriage of materials at site
and as per directions of the Engineer-in-charge(L.Rate)

TOTAL: 105470.00
TERMS AND CONDITIONS:-
1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Royality certificate in respect of stone agg. Sand etc. shall be produced by the contractor
4 G.I.wire shall be issued free of cost from IPH store Bhatanwali Paonta Sahib
5 Boulder shall not be less than 18 Kg. & the stone should be free from cracks and cavities.
Executive Engineer,
I&PH Division, Paonta Sahib.
REVISED SCHEDULE OF QUANTITY Estimated cost Rs 69470/-
Name of work:- Providing F.P.work to village Rampur Majri in Tehsil Paonta Sahib Distt. Sirmour (HP) (SH: Earnest money Rs.1390/-
C/O Wire crate from RD 2275 to 2290 Mtrs. RHS at Konthriya Khalla ) Time:- One Month.
S.No Sub-Head and item of work. Qty. Rates, Unit Amount.
1 Excavation in earth work in all kinds of soil and disposal of all excavated earth upto all 36.90 Cum 145.00 P/Cum 5351.00
leads lifts disposed earth to be levelled and neatly dressed including all leads, lifts and
carriage of material and as per directions of the Engineer-in-charge

2 Wire crates made of G.I.wire filled with boulder/hard stone of approved quality with 87.15 Cum. 925.00 P/Cum. 80614.00
square cut faces against the wire having rounded/rectangular shape weight of stones not
less than 18 Kg. free from soft spots,cracks,cavaties etc.(Wire crate to be measured and
paid for separately)including all leads,lifts and carriage of material at site as direction of
the Engineer-in-charge. (Double Knot)

3 Wire crates of G.I.wire filled with boulder with square cut faces against the wire G.I.wire 541.80 Sqm. 36.00 P/Sqm. 19505.00
4mm thick corresponding to SWG 6 with 15cmx15cm mesh(boulder filling to be
measured and paid for separately including all leads,lifts and carriage of materials at site
and as per directions of the Engineer-in-charge(L.Rate)

TOTAL: 105470.00
TERMS AND CONDITIONS:-
1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Royality certificate in respect of stone agg. Sand etc. shall be produced by the contractor
4 G.I.wire shall be issued free of cost from IPH store Bhatanwali Paonta Sahib
5 Boulder shall not be less than 18 Kg. & the stone should be free from cracks and cavities.
Executive Engineer,
I&PH Division, Paonta Sahib.

REVISED SCHEDULE OF QUANTITY Estimated cost Rs 74778/-


Name of work:- Providing F.P.work to village Rampur Majri in Tehsil Paonta Sahib Distt. Sirmour (HP) (SH: Earnest money Rs.1500/-
C/O Wire crate from RD 2350 to 2400 Mtrs. LHS at Konthriya Khalla ) Time:- One Month.
S.No Sub-Head and item of work. Qty. Rates, Unit Amount.
1 Excavation in earth work in all kinds of soil and disposal of all excavated earth upto all 37.50 Cum 145.00 P/Cum 5438.00
leads lifts disposed earth to be levelled and neatly dressed including all leads, lifts and
carriage of material and as per directions of the Engineer-in-charge

2 Wire crates made of G.I.wire filled with boulder/hard stone of approved quality with 97.50 Cum. 925.00 P/Cum. 90188.00
square cut faces against the wire having rounded/rectangular shape weight of stones not
less than 18 Kg. free from soft spots,cracks,cavaties etc.(Wire crate to be measured and
paid for separately)including all leads,lifts and carriage of material at site as direction of
the Engineer-in-charge. (Double Knot)

3 Wire crates of G.I.wire filled with boulder with square cut faces against the wire G.I.wire 469.00 Sqm. 36.00 P/Sqm. 16884.00
4mm thick corresponding to SWG 6 with 15cmx15cm mesh(boulder filling to be
measured and paid for separately including all leads,lifts and carriage of materials at site
and as per directions of the Engineer-in-charge(L.Rate)

TOTAL: 112510.00
TERMS AND CONDITIONS:-
1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Royality certificate in respect of stone agg. Sand etc. shall be produced by the contractor
4 G.I.wire shall be issued free of cost from IPH store Bhatanwali Paonta Sahib
5 Boulder shall not be less than 18 Kg. & the stone should be free from cracks and cavities.
Executive Engineer,
I&PH Division, Paonta Sahib.

REVISED SCHEDULE OF QUANTITY Estimated cost Rs 80558/-


Name of work:- Providing F.P.work to village Rampur Majri in Tehsil Paonta Sahib Distt. Sirmour (HP) (SH: Earnest money Rs.1700/-
C/O Wire crate from RD 2294 to 2310 Mtrs. on RHS) Time:- One Month.
S.No Sub-Head and item of work. Qty. Rates, Unit Amount.
1 Excavation in earth work in all kinds of soil and disposal of all excavated earth upto all 45.92 Cum 145.00 P/Cum 6658.00
leads lifts disposed earth to be levelled and neatly dressed including all leads, lifts and
carriage of material and as per directions of the Engineer-in-charge

2 Wire crates made of G.I.wire filled with boulder/hard stone of approved quality with 92.92 Cum. 925.00 P/Cum. 85951.00
square cut faces against the wire having rounded/rectangular shape weight of stones not
less than 18 Kg. free from soft spots,cracks,cavaties etc.(Wire crate to be measured and
paid for separately)including all leads,lifts and carriage of material at site as direction of
the Engineer-in-charge. (Double Knot)

3 Wire crates of G.I.wire filled with boulder with square cut faces against the wire G.I.wire 469.50 Sqm. 252.00 P/Sqm. 118314.00
4mm thick corresponding to SWG 6 with 15cmx15cm mesh(boulder filling to be
measured and paid for separately including all leads,lifts and carriage of materials at site
and as per directions of the Engineer-in-charge.(Through Rate)

TOTAL: 210923.00
TERMS AND CONDITIONS:-
1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Royality certificate in respect of stone agg. Sand etc. shall be produced by the contractor
4 Boulder shall not be less than 18 Kg. & the stone should be free from cracks and cavities.

Executive Engineer,
I&PH Division, Paonta Sahib.

REVISED SCHEDULE OF QUANTITY Estimated cost Rs 88136/-


Name of work:- Providing F.P.work to village Rampur Majri in Tehsil Paonta Sahib Distt. Sirmour (HP) (SH: Earnest money Rs.1800/-
C/O Wire crate from RD 2270 to 2288 Mtrs.= 18 Mtrs. on LHS) Time:- One Month.
S.No Sub-Head and item of work. Qty. Rates, Unit Amount.
1 Excavation in earth work in all kinds of soil and disposal of all excavated earth upto all 51.66 Cum 145.00 P/Cum 7491.00
leads lifts disposed earth to be levelled and neatly dressed including all leads, lifts and
carriage of material and as per directions of the Engineer-in-charge

2 Wire crates made of G.I.wire filled with boulder/hard stone of approved quality with 104.54 Cum. 925.00 P/Cum. 96700.00
square cut faces against the wire having rounded/rectangular shape weight of stones not
less than 18 Kg. free from soft spots,cracks,cavaties etc.(Wire crate to be measured and
paid for separately)including all leads,lifts and carriage of material at site as direction of
the Engineer-in-charge. (Double Knot)

3 Wire crates of G.I.wire filled with boulder with square cut faces against the wire G.I.wire 505.61 Sqm. 252.00 P/Sqm. 127414.00
4mm thick corresponding to SWG 6 with 15cmx15cm mesh(boulder filling to be
measured and paid for separately including all leads,lifts and carriage of materials at site
and as per directions of the Engineer-in-charge.(Through Rate)

TOTAL: 231605.00
TERMS AND CONDITIONS:-
1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Royality certificate in respect of stone agg. Sand etc. shall be produced by the contractor
4 Boulder shall not be less than 18 Kg. & the stone should be free from cracks and cavities.

Executive Engineer,
I&PH Division, Paonta Sahib.

REVISED SCHEDULE OF QUANTITY Estimated cost Rs 99701/-


Name of work:- Providing F.P.work to village Rampur Majri in Tehsil Paonta Sahib Distt. Sirmour (HP) (SH: Earnest money Rs.2000/-
C/O Wire crate from RD 2250 to 2270 Mtrs.= 20 Mtrs. on LHS) Time:- One Month.
S.No Sub-Head and item of work. Qty. Rates, Unit Amount.
1 Excavation in earth work in all kinds of soil and disposal of all excavated earth upto all 57.40 Cum 145.00 P/Cum 8323.00
leads lifts disposed earth to be levelled and neatly dressed including all leads, lifts and
carriage of material and as per directions of the Engineer-in-charge

2 Wire crates made of G.I.wire filled with boulder/hard stone of approved quality with 116.15 Cum. 925.00 P/Cum. 107439.00
square cut faces against the wire having rounded/rectangular shape weight of stones not
less than 18 Kg. free from soft spots,cracks,cavaties etc.(Wire crate to be measured and
paid for separately)including all leads,lifts and carriage of material at site as direction of
the Engineer-in-charge. (Double Knot)

3 Wire crates of G.I.wire filled with boulder with square cut faces against the wire G.I.wire 577.84 Sqm. 252.00 P/Sqm. 145616.00
4mm thick corresponding to SWG 6 with 15cmx15cm mesh(boulder filling to be
measured and paid for separately including all leads,lifts and carriage of materials at site
and as per directions of the Engineer-in-charge.(Through Rate)

TOTAL: 261378.00
TERMS AND CONDITIONS:-
1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Royality certificate in respect of stone agg. Sand etc. shall be produced by the contractor
4 Boulder shall not be less than 18 Kg. & the stone should be free from cracks and cavities.

Executive Engineer,
I&PH Division, Paonta Sahib.
REVISED SCHEDULE OF QUANTITY Estimated cost Rs 99701/-
Name of work:- Providing F.P.work to village Rampur Majri in Tehsil Paonta Sahib Distt. Sirmour (HP) (SH: Earnest money Rs.2000/-
C/O Wire crate from RD 2256 to 2276 Mtrs.= 20 Mtrs. on RHS) Time:- One Month.
S.No Sub-Head and item of work. Qty. Rates, Unit Amount.
1 Excavation in earth work in all kinds of soil and disposal of all excavated earth upto all 57.40 Cum 145.00 P/Cum 8323.00
leads lifts disposed earth to be levelled and neatly dressed including all leads, lifts and
carriage of material and as per directions of the Engineer-in-charge

2 Wire crates made of G.I.wire filled with boulder/hard stone of approved quality with 116.15 Cum. 925.00 P/Cum. 107439.00
square cut faces against the wire having rounded/rectangular shape weight of stones not
less than 18 Kg. free from soft spots,cracks,cavaties etc.(Wire crate to be measured and
paid for separately)including all leads,lifts and carriage of material at site as direction of
the Engineer-in-charge. (Double Knot)

3 Wire crates of G.I.wire filled with boulder with square cut faces against the wire G.I.wire 577.84 Sqm. 252.00 P/Sqm. 145616.00
4mm thick corresponding to SWG 6 with 15cmx15cm mesh(boulder filling to be
measured and paid for separately including all leads,lifts and carriage of materials at site
and as per directions of the Engineer-in-charge.(Through Rate)

TOTAL: 261378.00
TERMS AND CONDITIONS:-
1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Royality certificate in respect of stone agg. Sand etc. shall be produced by the contractor
4 Boulder shall not be less than 18 Kg. & the stone should be free from cracks and cavities.

Executive Engineer,
I&PH Division, Paonta Sahib.

REVISED SCHEDULE OF QUANTITY Estimated cost Rs 88138/-


Name of work:- Providing F.P.work to village Rampur Majri in Tehsil Paonta Sahib Distt. Sirmour (HP) (SH: Earnest money Rs.1800/-
C/O Wire crate from RD 2276 to 2294 Mtrs. on RHS) Time:- One Month.
S.No Sub-Head and item of work. Qty. Rates, Unit Amount.
1 Excavation in earth work in all kinds of soil and disposal of all excavated earth upto all 51.60 Cum 145.00 P/Cum 7482.00
leads lifts disposed earth to be levelled and neatly dressed including all leads, lifts and
carriage of material and as per directions of the Engineer-in-charge

2 Wire crates made of G.I.wire filled with boulder/hard stone of approved quality with 104.54 Cum. 925.00 P/Cum. 96700.00
square cut faces against the wire having rounded/rectangular shape weight of stones not
less than 18 Kg. free from soft spots,cracks,cavaties etc.(Wire crate to be measured and
paid for separately)including all leads,lifts and carriage of material at site as direction of
the Engineer-in-charge. (Double Knot)

3 Wire crates of G.I.wire filled with boulder with square cut faces against the wire G.I.wire 505.61 Sqm. 252.00 P/Sqm. 127414.00
5mm thick corresponding to SWG 6 with 15cmx15cm mesh(boulder filling to be
measured and paid for separately including all leads,lifts and carriage of materials at site
and as per directions of the Engineer-in-charge.(Through Rate)

TOTAL: 231596.00
TERMS AND CONDITIONS:-
1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Royality certificate in respect of stone agg. Sand etc. shall be produced by the contractor
4 Boulder shall not be less than 18 Kg. & the stone should be free from cracks and cavities.

Executive Engineer,
I&PH Division, Paonta Sahib.

REVISED SCHEDULE OF QUANTITY Estimated cost Rs 93918/-


Name of work:- Providing F.P.work to village Rampur Majri in Tehsil Paonta Sahib Distt. Sirmour (HP) (SH: Earnest money Rs.1900/-
C/O Wire crate from RD 2288 to 2307 Mtrs.=19 Mtr. on LHS) Time:- One Month.
S.No Sub-Head and item of work. Qty. Rates, Unit Amount.
1 Excavation in earth work in all kinds of soil and disposal of all excavated earth upto all 54.53 Cum 145.00 P/Cum 7907.00
leads lifts disposed earth to be levelled and neatly dressed including all leads, lifts and
carriage of material and as per directions of the Engineer-in-charge

2 Wire crates made of G.I.wire filled with boulder/hard stone of approved quality with 110.34 Cum. 925.00 P/Cum. 102065.00
square cut faces against the wire having rounded/rectangular shape weight of stones not
less than 18 Kg. free from soft spots,cracks,cavaties etc.(Wire crate to be measured and
paid for separately)including all leads,lifts and carriage of material at site as direction of
the Engineer-in-charge. (Double Knot)
3 Wire crates of G.I.wire filled with boulder with square cut faces against the wire G.I.wire 541.73 Sqm. 252.00 P/Sqm. 136516.00
5mm thick corresponding to SWG 6 with 15cmx15cm mesh(boulder filling to be
measured and paid for separately including all leads,lifts and carriage of materials at site
and as per directions of the Engineer-in-charge.(Through Rate)

TOTAL: 246488.00
TERMS AND CONDITIONS:-
1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Royality certificate in respect of stone agg. Sand etc. shall be produced by the contractor
4 Boulder shall not be less than 18 Kg. & the stone should be free from cracks and cavities.

Executive Engineer,
I&PH Division, Paonta Sahib.

REVISED SCHEDULE OF QUANTITY Estimated cost Rs 74778/-


Name of work:- Providing F.P.work to village Rampur Majri in Tehsil Paonta Sahib Distt. Sirmour (HP) (SH: Earnest money Rs.1500/-
C/O Wire crate from RD 2275 to 2290 Mtrs. on RHS at Konthriya Khalla) Time:- One Month.
S.No Sub-Head and item of work. Qty. Rates, Unit Amount.
1 Excavation in earth work in all kinds of soil and disposal of all excavated earth upto all 37.50 Cum 145.00 P/Cum 5438.00
leads lifts disposed earth to be levelled and neatly dressed including all leads, lifts and
carriage of material and as per directions of the Engineer-in-charge

2 Wire crates made of G.I.wire filled with boulder/hard stone of approved quality with 97.50 Cum. 925.00 P/Cum. 90188.00
square cut faces against the wire having rounded/rectangular shape weight of stones not
less than 18 Kg. free from soft spots,cracks,cavaties etc.(Wire crate to be measured and
paid for separately)including all leads,lifts and carriage of material at site as direction of
the Engineer-in-charge. (Double Knot)
3 Wire crates of G.I.wire filled with boulder with square cut faces against the wire G.I.wire 469.00 Sqm. 36.00 P/Sqm. 16884.00
5mm thick corresponding to SWG 6 with 15cmx15cm mesh(boulder filling to be
measured and paid for separately including all leads,lifts and carriage of materials at site
and as per directions of the Engineer-in-charge.(Through Rate)

TOTAL: 112510.00
TERMS AND CONDITIONS:-
1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Royality certificate in respect of stone agg. Sand etc. shall be produced by the contractor
4 Boulder shall not be less than 18 Kg. & the stone should be free from cracks and cavities.
5 GI wire shall be issued free of cost by the deptt. at IPH Store Bhatanwali.
Executive Engineer,
I&PH Division, Paonta Sahib.

REVISED SCHEDULE OF QUANTITY Estimated cost Rs 74778/-


Name of work:- Providing F.P.work to village Rampur Majri in Tehsil Paonta Sahib Distt. Sirmour (HP) (SH: Earnest money Rs.1500/-
C/O Wire crate from RD 2350 to 2400 Mtrs. on RHS) Time:- One Month.
S.No Sub-Head and item of work. Qty. Rates, Unit Amount.
1 Excavation in earth work in all kinds of soil and disposal of all excavated earth upto all 37.50 Cum 145.00 P/Cum 5438.00
leads lifts disposed earth to be levelled and neatly dressed including all leads, lifts and
carriage of material and as per directions of the Engineer-in-charge
2 Wire crates made of G.I.wire filled with boulder/hard stone of approved quality with 97.50 Cum. 925.00 P/Cum. 90188.00
square cut faces against the wire having rounded/rectangular shape weight of stones not
less than 18 Kg. free from soft spots,cracks,cavaties etc.(Wire crate to be measured and
paid for separately)including all leads,lifts and carriage of material at site as direction of
the Engineer-in-charge. (Double Knot)

3 Wire crates of G.I.wire filled with boulder with square cut faces against the wire G.I.wire 469.00 Sqm. 36.00 P/Sqm. 16884.00
5mm thick corresponding to SWG 6 with 15cmx15cm mesh(boulder filling to be
measured and paid for separately including all leads,lifts and carriage of materials at site
and as per directions of the Engineer-in-charge.(Through Rate)

TOTAL: 112510.00
TERMS AND CONDITIONS:-
1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Royality certificate in respect of stone agg. Sand etc. shall be produced by the contractor
4 Boulder shall not be less than 18 Kg. & the stone should be free from cracks and cavities.

Executive Engineer,
I&PH Division, Paonta Sahib.

REVISED SCHEDULE OF QUANTITY Estimated cost Rs 96001/-


Name of work:- Restoration of Rain damages to Rampur Giri Canal in Tehsil Paonta Sahib Distt. Sirmour (HP) (SH: Earnest money Rs.2000/-
C/O Wire crate to protect the canal at RD 650 to 730 Mtrs.) Time:-Three Months.
S.No Sub-Head and item of work. Qty. Rates, Unit Amount.
1 Excavation in earth work in all kinds of soil and disposal of all excavated earth upto all 44.30 Cum 140.00 P/Cum 6202.00
leads lifts disposed earth to be levelled and neatly dressed including all leads, lifts and
carriage of material and as per directions of the Engineer-in-charge
2 Wire crates made of G.I.wire filled with boulder/hard stone of approved quality with 125.00 Cum. 925.00 P/Cum. 115625.00
square cut faces against the wire having rounded/rectangular shape weight of stones not
less than 18 Kg. free from soft spots,cracks,cavaties etc.(Wire crate to be measured and
paid for separately)including all leads,lifts and carriage of material at site as direction of
the Engineer-in-charge. (Double Knot)

3 Wire crates of G.I.wire filled with boulder with square cut faces against the wire G.I.wire 600.00 Sqm. 36.00 P/Sqm. 21600.00
4mm thick corresponding to SWG 6 with 15cmx15cm mesh(boulder filling to be
measured and paid for separately including all leads,lifts and carriage of materials at site
and as per directions of the Engineer-in-charge(L.Rate)

TOTAL: 143427.00
TERMS AND CONDITIONS:-
1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Royality certificate in respect of stone agg. Sand etc. shall be produced by the contractor
4 G.I.wire shall be issued free of cost from IPH store Bhatanwali Paonta Sahib
5 Boulder shall not be less than 18 Kg. & the stone should be free from cracks and cavities.
Executive Engineer,
I&PH Division, Paonta Sahib.

REVISED SCHEDULE OF QUANTITY Estimated cost Rs 48994/-


Name of work:- Restoration of Rain damages to Rampur Giri Canal in Tehsil Paonta Sahib Distt. Sirmour (HP) (SH: Earnest money Rs.1000/-
C/O Wire crate to protect the feeder channel ) Time:- Three Months.
S.No Sub-Head and item of work. Qty. Rates, Unit Amount.
1 Excavation in foundation and trenches etc.in earth work in all kinds of soil such as pick 30.00 Cum 145.00 P/Cum 4350.00
work ,jumper work decomposed conglomerate saturated soil soft and hard rock upto all
leads lifts stacking the excavated soil not more than 3mtr.clear from the edge of
excavation and then returning the stacked soil in 15cm layers when required in to plinth
sides of foundation etc. consolidating each deposited layers by ramming and watering
and then disposing of all surplus excavated earth as directed with in all leads lifts and as
per directions of the Engineer-incharge

2 Wire crates made of G.I.wire filled with boulder/hard stone of approved quality with 137.50 Cum. 925.00 P/Cum. 127188.00
square cut faces against the wire having rounded/rectangular shape weight of stones not
less than 18 Kg. free from soft spots,cracks,cavaties etc.(Wire crate to be measured and
paid for separately)including all leads,lifts and carriage of material at site as direction of
the Engineer-in-charge. (Double Knot)

3 Wire crates of G.I.wire filled with boulder with square cut faces against the wire G.I.wire 660.00 Sqm. 36.00 P/Sqm. 23760.00
4mm thick corresponding to SWG 6 with 15cmx15cm mesh(boulder filling to be
measured and paid for separately including all leads,lifts and carriage of materials at site
and as per directions of the Engineer-in-charge(L.Rate)

TOTAL: 155298.00
TERMS AND CONDITIONS:-
1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Royality certificate in respect of stone agg. Sand etc. shall be produced by the contractor
4 G.I.wire shall be issued free of cost from IPH store Bhatanwali Paonta Sahib
5 Boulder shall not be less than 18 Kg. & the stone should be free from cracks and cavities.
Executive Engineer,
I&PH Division,
Paonta Sahib.
COMPARATIVE STATEMENT Rate quoted by Ganga Rate quoted by M/s
Name of work:-Restoration of Rain damages to channelisation of Bata River from RD 17669 to 17694 Mtr.on Right Bank in Tehsil Paonta Boring Co. Badripur Savita Boring Co.
Sahib Distt. Sirmour (HP) (SH:- C/o embankment ). Paonta sahib. Badripur Paonta
sahib.
S.No Description Qty. Unit Rate Amount Rate Amount
1 2 3 5 4 6. 4 6.
1 Excavation in earth work in all kinds of soil and disposal of all excavated earth upto all leads lifts disposed 219.00 P/Cum 210.00 45990.00 265.00 58035.00
earth to be levelled and neatly dressed including all leads, lifts and carriage of material and as per
directions of the Engineer-in-charge
2 Wire crates of G.I.wire filled with boulder with square cut faces against the wire G.I.wire 5mm thick 721.50 P/Sqm. 46.00 33189.00 51.00 36797.00
corresponding to SWG 6 with 15cmx15cm mesh(boulder filling to be measured and paid for separately
including all leads,lifts and carriage of materials at site and as per directions of the Engineer-in-charge.

3 Wire crates made of G.I.wire filled with boulder/hard stone of approved quality with square cut faces 157.50 P/Cum. 1605.00 252788.00 1665.00 262238.00
against the wire having rounded/rectangular shape weight of stones not less than 18 Kg. free from soft
spots,cracks,cavaties etc.(Wire crate to be measured and paid for separately)including all leads,lifts and
carriage of material at site as direction of the Engineer-in-charge. (Double Knot)

4 Providing and laying dry stone pitching hand packed tightly as in wire crate apron/vertical bunds with 35.93 Per Cum. 1710.00 61440.00 1705.00 61261.00
slopping faces for protection work, stone shall be free from soft, spots cracks cavaties etc. including all
leads,lifts and carriage of materials and as per direction of Engineer-in-charge.

5 Providing and fixing Geo textile filter (Non woven) of approved quality of following specification made of 105.00 Per Sqm. 120.00 12600.00 170.00 17850.00
material 100% polypolythene having weight minimum 275 gram per square meter, thickness not less than
2.50mm pore size (ASTMO-4791(dry) between 0.15 to 0.20mm, water permeability (Ref. BS-6906/3)
between 150 to 160 ltr. per square meter per second, CBR puncture strength minimum 3850 N, wide
width tensile strength(Elongation at peak strength )minimum 17.5 KN per meter (Max 50% ) Grab tensile
strength minimum 1100 N Elongation at break maximum 50% Cone drop( Ref. BS 6906/6) Maximum
15mm , Trapezoidal tear Resistance minimum 450N width minimum 4 Mtr. and above in embankment
below the stone pitching and wire crate apron including all leads,lifts and carriage of material and as per
direction of the Engineer-in-charge.

406007.00 436181.00
The rates quoted by M/s Ganga Boring Co. Badri nagar Paonta Sahib is lowest hence recommended for approval please.

Assistant Engineer,
I&PH Sub Division,
Majra.
Rate quoted by Rate quoted by
Ganga Tubewells Co. Sh.Sohan Pal Singh
Badripur Paonta Contr.Adarsh colony
sahib. Badripur Paonta
Rate Amount sahib.
Rate Amount
4 6. 4 6.
225.00 49275.00 237.00 51903.00

47.00 33911.00 47.00 33911.00

1605.00 252788.00 1607.00 253103.00

1755.00 63057.00 1747.00 62770.00

137.00 14385.00 137.00 14385.00

413416.00 416072.00
DRAFT SCHEDULE OF QUANTITY Estimated Cost: 30575/-
Name of work:-Restoration of Rain damages to FIS Janjali Bherewali in GP Poka in Tehsil Paonta Earnest Money: 650/-
Sahib Distt. Sirmour (HP) (SH: Removal of slips at various RD,s) Time: One Month.
S.No Sub-Head and item of work. Qty. Rates, Unit Amount.
1 2 3 4 5 6
1 Removal of slips in all kinds of soil including saturated soil but excluding boulders 513.87 Cum. 59.50 P/Cum. 30575.00
and rpocky portion required blasting portion requiring blasting upto a distance of 20
mtrs. disposing of unservice materials stacking serviceable materials and neatly
dressing the surface complete in all respect.

Total: 30575.00
TERMS AND CONDITIONS:-
1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Nothing shall be paid for rejected/defective work.

Assistant Engineer,
I&PH Sub Division,
Kaffota.

REVISED SCHEDULE OF QUANTITY Estimated Cost: 20432/-


Name of work:-Restoration of Rain damages to FIS Jaithal Kog Dabra (Part Tilwari) in Tehsil Paonta Earnest Money: 500/-
Sahib Distt. Sirmour (HP) (SH: Removal of slips at various RD,s) One Month.
S.No Sub-Head and item of work. Qty. Rates, Unit Amount.
1 2 3 4 5 6
1 Removal of slips in all kinds of soil including saturated soil but excluding boulders 530.71 Cum. 130.00 P/Cum. 68992.00
and rocky portion required blasting portion requiring blasting upto a distance of 20
mtrs. disposing of unservice materials stacking serviceable materials and neatly
dressing the surface complete in all respect.

Total: 68992.00
TERMS AND CONDITIONS:-
1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Nothing shall be paid for rejected/defective work.

Executive Engineer,
I&PH Division,
Paonta Sahib.

REVISED SCHEDULE OF QUANTITY Estimated Cost: 33153/-


Name of work:-Restoration of Rain damages to FIS Fedth in Tehsil Paonta Earnest Money: 700/-
Sahib Distt. Sirmour (HP) (SH: Removal of slips ) Time: Three Month.
S.No Sub-Head and item of work. Qty. Rates, Unit Amount.
1 2 3 4 5 6
1 Removal of slips in all kinds of soil including saturated soil but excluding boulders 861.15 Cum. 130.00 P/Cum. 111950.00
and rpocky portion required blasting portion requiring blasting upto a distance of 20
mtrs. disposing of unservice materials stacking serviceable materials and neatly
dressing the surface complete in all respect.

Total: 111950.00
TERMS AND CONDITIONS:-
1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Nothing shall be paid for rejected/defective work.

Executive Engineer,
I&PH Division,
Paonta Sahib.

REVISED SCHEDULE OF QUANTITY Estimated Cost: 35902/-


Name of work:-Restoration of Rain damages to FIS Upper Dhamon in Tehsil Paonta Sahib Distt. Earnest Money: 718/-
Sirmour (HP) (SH: Removal of slips , debries & silt at various RD's) Time: Three Month.
S.No Sub-Head and item of work. Qty. Rates, Unit Amount.
1 2 3 4 5 6
1 Removal of slips in all kinds of soil including saturated soil but excluding boulders 1049.78 Cum. 130.00 P/Cum. 136471.00
and rpocky portion required blasting portion requiring blasting upto a distance of 20
mtrs. disposing of unservice materials stacking serviceable materials and neatly
dressing the surface complete in all respect.

Total: 136471.00
TERMS AND CONDITIONS:-
1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Nothing shall be paid for rejected/defective work.

Executive Engineer,
I&PH Division,
Paonta Sahib.

REVISED SCHEDULE OF QUANTITY Estimated Cost: 90000/-


Name of work:-A/R & M/O to Rampur Giri Canal and Feeder channel in Tehsil Paonta Sahib Distt. Earnest Money: 1800/-
Sirmour (HP) (SH: Removal of slips/sislt in canal feeder channel) Time: One Month.
S.No Sub-Head and item of work. Qty. Rates, Unit Amount.
1 2 3 4 5 6
1 Removal of slips in all kinds of soil including saturated soil but excluding boulders 200.00 Hours 750.00 Per 150000.00
and rpocky portion required blasting portion requiring blasting upto a distance of 20 Hours.
mtrs. disposing of unservice materials stacking serviceable materials and neatly
dressing the surface complete in all respect. (through JCB)

Total: 150000.00
TERMS AND CONDITIONS:-
1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Nothing shall be paid for rejected/defective work.

Executive Engineer,
I&PH Division,
Paonta Sahib.
DRAFT SCHEDULE OF QUANTITY Estimated Cost :-Rs.38375/-
Name of work:-C/o Pamta bandla GP Shawga in Tehsil Paonta Sahib Distt.Sirmour (HP) Earnest Money :-Rs.800/-
(SH: C/O Retaining wall to protect the Sump well.) Time:- Three Months.
S.No Description Qty. Rate Unit
1 2 3 4 5
1 Excavation in foundation and trenches etc.in earth work in all kinds of soil such as pick work 9.02 Cum. 92.85 Per Cum.
,jumper work decomposed conglomerate saturated soil soft and hard rock upto all leads lifts
stacking the excavated soil not more than 3mtr.clear from the edge of excavation and then
returning the stacked soil in 15cm layers when required in to plinth sides of foundation etc.
consolidating each deposited layers by ramming and watering and then disposing of all surplus
excavated earth as directed with in all leads lifts and as per directions of the Engineer-incharge

2 Providing and laying cement concrete 1:6:12(1cement:6sand:12 graded stone agg.40mm nominal 3.34 Cum 905.10 P/Cum
size)and curing complete excluding the cost of centring shuttering in foundation & plinth including
all leads lifts and carriage of material and as per the directions of Engineer-in-charge.

3 Random rubble masonary /Poly rubble masonary (uncoursed/brought to coursed) with hard stone of 27.95 Cum 1135.50 P/Cum
approved quality in foundation and plinth including levelling up with cement concrete
1:6.12(1cement:6sand:12 graded stone agg. 20mm nominal size)in cement mortor 1:6 (1 Cement: 6
sand ) in breast wall & Retaining walls including all leads lifts and carriage of material and as per the
directions of Engineer-in-charge.

4 Boulder filling behind retaining wall complete in all respect and as per direction of the Engineer-in- 7.09 Cum 391.70 P/Cum
charge..

TERMS AND CONDITIONS. Total:


1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Cement shall be issued @ Rs. 250/- per bag & steel @ 41/- per Kg. from IPH store Bhatanwali Paonta Sahib.
4 Royality certificate in respect of stone agg. Sand etc. shall be produced by the contractor
5 Empty cement bags shall be returned to the Deptt. Otherwise Rs. 2/- per bag shall deducted from the bill.
6 The watch & ward of the store by the contractor.
Assistant Engineer,
I&PH Sub Division, Kaffota.

REVISED SCHEDULE OF QUANTITY Estimated Cost :-Rs.54872/-


Name of work:-Prov. GWSS to PC habitation Bhajaun (Gundana) in Tehsil Paonta Sahib Distt.Sirmour (HP) Earnest Money :-Rs.1100/-
(SH: C/O Breast wall to protect the main storage tank at Gundana.) Time:- Three Months.
S.No Description Qty. Rate Unit
1 2 3 4 5
1 Excavation in earth work and disposal of all excavated earth upto a lead of 20 mtrs. lift upto 1.50 26.35 Cum. 130.00 Per Cum.
mtrs. disposing earth to be levelled and neatly dressed within a leads in pick/jumper work 50%
each including all leads,lifts and carriage of material and as per direction of the Engineer-in-
charge.

2 Providing and laying cement concrete 1:6:12(1cement:6sand:12 graded stone agg.40mm nominal 5.38 Cum 2200.00 P/Cum
size)and curing complete excluding the cost of centring shuttering in foundation & plinth including
all leads lifts and carriage of material and as per the directions of Engineer-in-charge.

3 Providing and laying cement concrete 1:4:8(1cement:4sand:8 graded stone agg.40mm nominal 2.30 Cum 2700.00 P/Cum
size)and curing complete excluding the cost of form work in foundation & plinth including all leads
lifts and carriage of material and as per the directions of Engineer-in-charge.

3 Random rubble masonary /Poly rubble masonary (uncoursed/brought to coursed) with hard stone of 24.95 Cum 2600.00 P/Cum
approved quality in foundation and plinth including levelling up with cement concrete
1:6.12(1cement:6sand:12 graded stone agg. 20mm nominal size)in cement mortor 1:6 (1 Cement: 6
sand ) in breast wall & Retaining walls including all leads lifts and carriage of material and as per the
directions of Engineer-in-charge.

4 C/o dry stone masonary in breast /retaining walls parapets etc. including all leads,lifts and carriage of 38.77 Cum 900.00 P/Cum
material and as per direction of the Engineer-in-charge.
TERMS AND CONDITIONS. Total:
1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Cement shall be issued @ Rs. 250/- per bag & steel @ 41/- per Kg. from IPH store Bhatanwali Paonta Sahib.
4 Royality certificate in respect of stone agg. Sand etc. shall be produced by the contractor
5 Empty cement bags shall be returned to the Deptt. Otherwise Rs. 2/- per bag shall deducted from the bill.
6 The watch & ward of the store by the contractor.
Executive Engineer,
I&PH Division,
Paonta Sahib.
Cost :-Rs.38375/-
oney :-Rs.800/-
ree Months.
Amount
6.
838.00

3023.00

31737.00

2777.00

38375.00

Engineer,
Division, Kaffota.

Cost :-Rs.54872/-
oney :-Rs.1100/-
ree Months.
Amount
6.
3426.00

11836.00

6210.00

64870.00

34893.00
121235.00

Engineer,
sion,
SCHEDULE OF QUANTITY Estimated cost Rs 73034/-
Name of work: R/M of GWSS to PC Hab. GP Chowki Mirigwal GP Barwas in Tehsil Paonta Sahib Distt. Sirmour (HP) Earnest money Rs.1500/-
(SH: C/O RCC collection tank,& Laying & jointing of GMS Pipesof various dia) Time:- Three Months
S.No Sub-Head and item of work. Qty. Rates, Unit
1 2 3 4 5
1 Excavation in foundation and trenches etc.in earth work in all kinds
of soil such as pick work ,jumper work 1.54 Cum 92.85 P/Cum
decomposed conglomerate saturated soil soft and hard rock upto all leads lifts stacking the excavated soil
not more than 3mtr.clear from the edge of excavation and then returning the stacked soil in 15cm layers
when required in to plinth sides of foundation etc. consolidating each deposited layers by ramming and
watering and then disposing of all surplus excavated earth as directed with in all leads lifts and as per
directions of the Engineer-incharge

2 Providing and laying cement concrete 1:4:8(1cement:4sand:8 graded stone agg.40mm nominal size)and 0.38 Cum 1104.8 P/Cum
curing complete excluding the cost of form work in foundation & plinth including all leads lifts and carriage
of material and as per the directions of Engineer-in-charge.

3 Providing and laying cement concrete work 1:1 1/2:3 (1cement:1 1/2 sand: 3 graded stone agg. 20mm nominal size
& curing complete) excluding cost of form work in all height and depth including all leads lifts complete and carriage
of material etc. as per directions of Engineer incharge.

a) In foundation and plinth 0.38 Cum. 1866.80 P/Cum.

b) Vertical surface such as wall any thickness. 0.69 Cum. 1923.00 P/Cum.
4 Providing form work with steel sheets 3.15mm thick welded with angle iron 30x30x5 mm so as to give rough finish
i/c centring shuttering structing and propping etc. with wooden bettens & Ballies, height or propping & centering
below supporting floor to ceiling not exceeding 4 mtr.and removal of the same for insitu RCC work and PCC
work.including all leads lifts and carriage of material at site & as per direction of Engineer in charge in:-

a) Flat surfaces. 0.80 Sqm. 134.10 P/Cum


b) Vertical surface such as wall any thickness. 16.40 Sqm. 80.70 P/Cum
5 Providing and laying cement concrete 1:2:4(1cement:2app.sand: 4 app. graded stone agg. 20mm nominal 0.15 Cum. 1658.10 Per
size )and curing complete excluding cost of form work & reinforcement for reinforced work in suspended Cum.
floors, roofs landing shelves and their supports balconies, beams, girders bressumers and cantilivers upto
to floor two level in all height and depth, including all leads lifts and carriage of material at site and as per
direction of the Engineer-incharge.

6 Providing Mild Steel/Tor steel reinforcement including bending binding & placing in positing I/c all leads lifts and 61.20 Kg. 20.70 P/kg
carriage of material and as per direction of the Engineer-in-charge.
7 Excavation in drains & channel etc.in earth work in all kinds of soil such as pick work ,jumper work blasting work, 855.00 Cum 75.95 P/Cum
decomposed conglomerate saturated soil soft and hard rock including dressing of sides and beds and prepareation
of sub grade to level or slope including refilling the trenches and disposing of surplus earth upto all leads,lifts
disposed earth to be levelled and neatly dressed including jungle clearance and as per directions of the Engineer-
incharge

8 Laying and jointing of GMS Pipes of various dia in trenches (earth work in trenches to be measured and paid for
seperately) including all leads lifts and carriage of material at site as per direction of Engineer-in-charge of following
dias.

i)15mm dia 1000 Rmt 0.50 P/Rmt.


ii)20mm dia 800 Rmt 0.50 P/Rmt.
iii) 25mm dia. 2000 Rmt 0.75 P/Rmt.
9 Providing and fixing of Peet valve of superior quality of following dias complete in all respect and as per direction of
the Engineer-in-charge.

i) 15mm dia. 1 No. 66.50 Each.


ii) 20mm dia. 1 No. 84.50 Each.
Total:

TERMS AND CONDITIONS:-


1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Cement will be issued @ 315/- per bag & steel @ 53/- per Kg. at IPH store Bhatanwali Paonta Sahib.
4 Empty Cement bags shall be returned to the deptt. otherwise Rs. 2/- per bag shall be deducted from the each bill of the contractor.
5 Royality certificate in respect of stone agg. Sand etc. shall be produced by the contractor
6 Contractor shall be responsible for watch & ward of store.
7 G.I.Pipe shall be issued free of cost from IPH Store Bhatanwali Paonta Sahib.
Assistant Engineer,
I&PH Sub Division,
Kaffota.

REVISDED SCHEDULE OF QUANTITY Estimated cost Rs 45308/-


Name of work: Sustainabilty of LWSS Tatiana in Tehsil Paonta Sahib Distt. Sirmour (HP) Earnest money Rs.1000/-
(SH: Laying and jointing of GI Pipes) Time:- Three Months
S.No Sub-Head and item of work. Qty. Rates, Unit
1 2 3 4 5
7 Excavation in drains & channel etc.in earth work in all kinds of soil such as pick work ,jumper work blasting work, 573.75 Cum 155.00 P/Cum
decomposed conglomerate saturated soil soft and hard rock including dressing of sides and beds and prepareation
of sub grade to level or slope including refilling the trenches and disposing of surplus earth upto all leads,lifts
disposed earth to be levelled and neatly dressed including jungle clearance and as per directions of the Engineer-in-
charge

8 Providing, Laying and jointing of GMS Pipes of various dia in trenches (earth work in trenches to be measured and
paid for seperately) including all leads lifts and carriage of material at site as per direction of the Engineer-in-charge
of following dias.

i)15mm dia 750 Rmt 9.00 P/Rmt.


ii)20mm dia 1200 Rmt 9.00 P/Rmt.
iii) 25mm dia. 600 Rmt 14.00 P/Rmt.
9 Providing and fixing of Peet valve of superior quality of following dias complete in all respect and as per direction of
the Engineer-in-charge.
i) 15mm dia. 1 No. 450.00 Each.
ii) 20mm dia. 1 No. 550.00 Each.
iii) 25mm dia. 1 No. 650.00 Each.
Total:

TERMS AND CONDITIONS:-


1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 G.I.Pipe shall be issued free of cost from IPH Store Bhatanwali Paonta Sahib.
4 In addition to normal security 5% amount will be withheld for want of testing of pipe/s/tank against leakage and will be released after
successful testing.

5 GI.Pipe fitting shall be provided by the contractor.

Executive Engineer,
I&PH Division,
Paonta Sahib.

SCHEDULE OF QUANTITY Estimated cost Rs 77480/-


Name of work: R/M of GWSS Charew (Bamog) in GP Tatiana in Tehsil Shillai Distt. Sirmour (HP) Earnest money Rs.1550/-
(SH: Laying & jointing of G.I.Pipes) Time:- Two Months
S.No Sub-Head and item of work. Qty. Rates, Unit
1 2 3 4 5
1 Excavation in drains & channel etc.in earth work in all kinds of soil such as pick work ,jumper work blasting work, 567.00 Cum 75.95 P/Cum
decomposed conglomerate saturated soil soft and hard rock including dressing of sides and beds and prepareation
of sub grade to level or slope including refilling the trenches and disposing of surplus earth upto all leads,lifts
disposed earth to be levelled and neatly dressed including jungle clearance and as per directions of the Engineer-
incharge

2 Providing, Laying and jointing of GMS Pipes of various dia in trenches (earth work in trenches to be measured and
paid for seperately) including all leads lifts and carriage of material at site as per direction of Engineer-in-charge of
following dias.

i)15mm dia 300 Rmt 0.50 P/Rmt.


ii)20mm dia 1500 Rmt 0.50 P/Rmt.
Total:

TERMS AND CONDITIONS:-


1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 G.I.Pipe shall be issued free of cost from IPH Store Bhatanwali Paonta Sahib.
4 In addition to normal security 5% amount will be withheld for want oftsting of against leakage and will be released Assistant Engineer,
after successful testing .
5 The pipe fitting shall be ysed by the contractor. I&PH Sub Division,
Shillai.
d cost Rs 73034/-
money Rs.1500/-
ree Months
Amount.
6
143.00

420.00

709.00

1327.00

107.00
1323.00
249.00

1267.00

64937.00

500.00
400.00
1500.00

67.00
85.00
73034.00
Engineer,
b Division,

d cost Rs 45308/-
money Rs.1000/-
ree Months
Amount.
6
88931.00

6750.00
10800.00
8400.00

450.00
550.00
650.00
116531.00

e Engineer,
sion,

d cost Rs 77480/-
money Rs.1550/-

Amount.
6
43064.00

0.00

150.00

750.00

43964.00

Engineer,

b Division,
REVISED SCHEDULE OF QUANTITY Estimated cost Rs.31325/-
Name of work:- Insttt. Of Deep well Hand Pumps under I&PH Sub Division majra in tehsil Paonta Sahib Earnest Money: Rs.625/-
Distt. Simour (HP)(SH: Energisation of Hand Pump Nr. House of Shri Surender Singh R/O Bhanet Haldwari) Time:-15 Days.
Sr.No. Item of work. Qty. Rate. Unit. Amount.
1 2 3 4 5 6
1 Providing and installation of Submersible Pump of suitable make such as KSB/BS/SU confirming 1 Set 25500.00 P/Set 25500.00
to ISS 1984-1976 alongwith a directly coubpled submesible type Square cage electrical induction
motor of suitable 2.00 HP for the operation on 220+1 phase 50 CPS AC supply with water
lubricated bearings and provided with pivoted segment type thrust bearing to withstand non
vertical head with uniform wear and duly fitted with device to take in/Out the exemption of water
with heating of motor complete in all respect. Total Head 55 to 75 Mtr. Discharge 1 LPS.

2 Supplying and fixing of control pannel for submersible Pumps complete with sheet,Fabricarted 1 Set 4500.00 P/Set 4500.00
duly painted and complete internal wiring and composing of air break starter main switch of
suitable Amps, Amperemeter, Voltmeter single phase indicating lamp etc. as per requirement at
site complete in all respect .

3 Supplying and fixing submersible cable to submersible motor of suitable size 1.50mm 2 approved 60 Rmt 95.00 P/Rmt 5700.00
make & relevant ISS as per 1554-1988 of Siemens/ Finolex/JEC/ ICS/ELCO/ GRADLY/ Natural
make in all respect.

4 Providing and fixing increaser/reducer/sockets/bends /Nut bolts/Clamps testing of all above 1 Job 1500.00 P/Job 1500.00
items as per directions of Engineer incharge.
5 Supplying and fixing 32 mm dia O.D.(outer dia) H.D. Pipe as column pipe into the bore hole 47 Rmt 135.00 P/Rmt 6345.00
complete as per the direction of Engineer incharge.
6 Providing and fixing steel rope of 5mm thick for hanging the Submersible pump set into the bore 48 Rmt 60.00 P/Rmt 2880.00
for its extract from the well and as per direction of the Engineer-in-charge.
Total:- 46425.00
TERMS AND CONDITIONS
1 The work shall be done as per IPH specifications.
2 Security, Sale Tax & Income tax shall be deduction as per rule.
3 Payment will be made after successful testing at site. Executive Engineer,
4 The guarantee period of pumpng machinery six months I&PH Division,
Paonta Sahib (HP)
REVISED SCHEDULE OF QUANTITY Estimated cost Rs.41613/-
Name of work:- Insttt. Of Deep well Hand Pumps under I&PH Sub Division majra in tehsil Paonta Sahib Earnest Money: Rs.900/-
Distt. Simour (HP)(SH: Energisation of Hand Pump Nr. House of Shri Jagdish Chand vill. Puruwala Kanshipur) Time:-One Month.
Sr.No. Item of work. Qty. Rate. Unit. Amount.
1 2 3 4 5 6
1 Providing and installation of Submersible Pump of suitable make such as KSB/BS confirming to 1 Set 25500.00 P/Set 25500.00
ISS 1984-1976 alongwith a directly coubpled submesible type Square cage electrical induction
motor of suitable 2.00 HP for the operation on 220+1 phase 50 CPS AC supply with water
lubricated bearings and provided with pivoted segment type thrust bearing to withstand non
vertical head with uniform wear and duly fitted with device to take in/Out the exemption of water
with heating of motor complete in all respect. Total Head 55 to 75 Mtr. Discharge 50 to 60 LPS.

2 Supplying and fixing of control pannel for submersible Pumps complete with sheet,Fabricarted 1 Set 4500.00 P/Set 4500.00
duly painted and complete internal wiring and composing of air break starter main switch of
suitable Amps, Amperemeter, Voltmeter single phase indicating lamp etc. as per requirement at
site complete in all respect .

3 Supplying and fixing submersible cable to submersible motor of suitable size 1.50mm 2 approved 55 Rmt 95.00 P/Rmt 5225.00
make & relevant ISS as per 1554-1988 of Siemens/ Finolex/JEC/ ICS/ELCO/ GRADLY/ Natural
make in all respect.

4 Providing and fixing increaser/reducer/sockets/bends /Nut bolts/Clamps testing of all above 1 Job 1500.00 P/Job 1500.00
items as per directions of Engineer incharge.
5 Supplying and fixing 32 mm dia O.D.(outer dia) H.D. Pipe as column pipe into the bore hole 42 Rmt 135.00 P/Rmt 5670.00
complete as per the direction of Engineer incharge.
6 Providing and fixing steel rope of 5mm thick for hanging the Submersible pump set into the bore 45 Rmt 60.00 P/Rmt 2700.00
for its extract from the well and as per direction of the Engineer-in-charge.
Total:- 45095.00
TERMS AND CONDITIONS
1 The work shall be done as per IPH specifications.
2 Security, Sale Tax & Income tax shall be deduction as per rule.
3 Payment will be made after successful testing at site. Executive Engineer,
4 The guarantee period of pumpng machinery six months I&PH Division,
Paonta Sahib (HP)

REVISED SCHEDULE OF QUANTITY Estimated cost Rs.41613/-


Name of work:- Insttt. Of Deep well Hand Pumps under I&PH Sub Division majra in tehsil Paonta Sahib Earnest Money: Rs.900/-
Distt. Simour (HP)(SH: Energisation of Hand Pump Nr. House of Shri Jagdish Chand vill. Puruwala Kanshipur) Time:-One Month.
Sr.No. Item of work. Qty. Rate. Unit. Amount.
1 2 3 4 5 6
1 Providing and installation of Submersible Pump of suitable make such as KSB/BS confirming to 1 Set 25500.00 P/Set 25500.00
ISS 1984-1976 alongwith a directly coubpled submesible type Square cage electrical induction
motor of suitable 2.00 HP for the operation on 220+1 phase 50 CPS AC supply with water
lubricated bearings and provided with pivoted segment type thrust bearing to withstand non
vertical head with uniform wear and duly fitted with device to take in/Out the exemption of water
with heating of motor complete in all respect. Total Head 55 to 75 Mtr. Discharge 50 to 60 LPS.

2 Supplying and fixing of control pannel for submersible Pumps complete with sheet,Fabricarted 1 Set 4500.00 P/Set 4500.00
duly painted and complete internal wiring and composing of air break starter main switch of
suitable Amps, Amperemeter, Voltmeter single phase indicating lamp etc. as per requirement at
site complete in all respect .

3 Supplying and fixing submersible cable to submersible motor of suitable size 1.50mm 2 approved 55 Rmt 95.00 P/Rmt 5225.00
make & relevant ISS as per 1554-1988 of Siemens/ Finolex/JEC/ ICS/ELCO/ GRADLY/ Natural
make in all respect.

4 Providing and fixing increaser/reducer/sockets/bends /Nut bolts/Clamps testing of all above 1 Job 1500.00 P/Job 1500.00
items as per directions of Engineer incharge.
5 Supplying and fixing 32 mm dia O.D.(outer dia) H.D. Pipe as column pipe into the bore hole 42 Rmt 135.00 P/Rmt 5670.00
complete as per the direction of Engineer incharge.
6 Providing and fixing steel rope of 5mm thick for hanging the Submersible pump set into the bore 45 Rmt 60.00 P/Rmt 2700.00
for its extract from the well and as per direction of the Engineer-in-charge.
Total:- 45095.00
TERMS AND CONDITIONS
1 The work shall be done as per IPH specifications.
2 Security, Sale Tax & Income tax shall be deduction as per rule.
3 Payment will be made after successful testing at site. Executive Engineer,
4 The guarantee period of pumpng machinery six months I&PH Division,
Paonta Sahib (HP)

REVISED SCHEDULE OF QUANTITY Estimated cost Rs.98609/-


Name of work:- Insttt. Of Deep well Hand Pumps under I&PH Sub Division majra in tehsil Paonta Sahib Earnest Money: Rs.2000/-
Distt. Simour (HP)(SH: Energisation of03 Nosa Hand Pump in village Amargarh 1 No. Nr. House of Shri Kamil nr. Time:-One Month.
Maszid 2 Nos. Nr. H/o Sh. Mehboob Aliin vill. Amargarh and 03 No. in new asszid (Nr. GPS) vill. Amargarh.
Sr.No. Item of work. Qty. Rate. Unit. Amount.
1 2 3 4 5 6
1 Providing and installation of Submersible Pump of suitable make such as KSB/BS confirming to 3 Set 25500.00 P/Set 76500.00
ISS 1984-1976 alongwith a directly coubpled submesible type Square cage electrical induction
motor of suitable 2.00 HP for the operation on 220+1 phase 50 CPS AC supply with water
lubricated bearings and provided with pivoted segment type thrust bearing to withstand non
vertical head with uniform wear and duly fitted with device to take in/Out the exemption of water
with heating of motor complete in all respect. Total Head 55 to 75 Mtr. Discharge 50 to 60 LPS.

2 Supplying and fixing of control pannel for submersible Pumps complete with sheet,Fabricarted 3 Set 4500.00 P/Set 13500.00
duly painted and complete internal wiring and composing of air break starter main switch of
suitable Amps, Amperemeter, Voltmeter single phase indicating lamp etc. as per requirement at
site complete in all respect .

3 Supplying and fixing submersible cable to submersible motor of suitable size 1.50mm 2 approved 116 Rmt 95.00 P/Rmt 11020.00
make & relevant ISS as per 1554-1988 of Siemens/ Finolex/JEC/ ICS/ELCO/ GRADLY/ Natural
make in all respect.

4 Providing and fixing increaser/reducer/sockets/bends /Nut bolts/Clamps testing of all above 3 Job 1500.00 P/Job 4500.00
items as per directions of Engineer incharge.
5 Supplying and fixing 32 mm dia O.D.(outer dia) H.D. Pipe as column pipe into the bore hole 131 Rmt 135.00 P/Rmt 17685.00
complete as per the direction of Engineer incharge.
6 Providing and fixing steel rope of 6mm thick for hanging the Submersible pump set into the bore 115 Rmt 60.00 P/Rmt 6900.00
for its extract from the well and as per direction of the Engineer-in-charge.
Total:- 130105.00
TERMS AND CONDITIONS
1 The work shall be done as per IPH specifications.
2 Security, Sale Tax & Income tax shall be deduction as per rule.
3 Payment will be made after successful testing at site. Executive Engineer,
4 The guarantee period of pumpng machinery six months I&PH Division,
Paonta Sahib (HP)

REVISED SCHEDULE OF QUANTITY Estimated cost Rs.99621/-


Name of work:- Insttt. Of Deep well Hand Pumps under I&PH Sub Division majra in tehsil Paonta Sahib Earnest Money: Rs.2000/-
Distt. Simour (HP)(SH: Energisation of 03 Nos Hand Pump Nr. House of Shri Nitin Sharma S/o Sh.Dinesh Sharma Vill. Time:-One Month.
Pipliwala Nr. H/o Sh. Maksood Ali S/o sh.Jakir Hussain vill. Jagatpur , Nr. H/o Sh. Smt. Bina Devi WE/o Laste Sh. Subhash
Chand vill. Sainwala Mubarikpur).
Sr.No. Item of work. Qty. Rate. Unit. Amount.
1 2 3 4 5 6
1 Providing and installation of Submersible Pump of suitable make such as KSB/BS confirming to 3 Set 25500.00 P/Set 76500.00
ISS 1984-1976 alongwith a directly coubpled submesible type Square cage electrical induction
motor of suitable 2.00 HP for the operation on 220+1 phase 50 CPS AC supply with water
lubricated bearings and provided with pivoted segment type thrust bearing to withstand non
vertical head with uniform wear and duly fitted with device to take in/Out the exemption of water
with heating of motor complete in all respect. Total Head 55 to 75 Mtr. Discharge 50 to 60 LPS.

2 Supplying and fixing of control pannel for submersible Pumps complete with sheet,Fabricarted 3 Set 4500.00 P/Set 13500.00
duly painted and complete internal wiring and composing of air break starter main switch of
suitable Amps, Amperemeter, Voltmeter single phase indicating lamp etc. as per requirement at
site complete in all respect .

3 Supplying and fixing submersible cable to submersible motor of suitable size 1.50mm 2 approved 140 Rmt 95.00 P/Rmt 13300.00
make & relevant ISS as per 1554-1988 of Siemens/ Finolex/JEC/ ICS/ELCO/ GRADLY/ Natural
make in all respect.

4 Providing and fixing increaser/reducer/sockets/bends /Nut bolts/Clamps testing of all above 3 Job 1500.00 P/Job 4500.00
items as per directions of Engineer incharge.
5 Supplying and fixing 32 mm dia O.D.(outer dia) H.D. Pipe as column pipe into the bore hole 123 Rmt 135.00 P/Rmt 16605.00
complete as per the direction of Engineer incharge.
6 Providing and fixing steel rope of 6mm thick for hanging the Submersible pump set into the bore 132 Rmt 60.00 P/Rmt 7920.00
for its extract from the well and as per direction of the Engineer-in-charge.
Total:- 132325.00
TERMS AND CONDITIONS
1 The work shall be done as per IPH specifications.
2 Security, Sale Tax & Income tax shall be deduction as per rule.
3 Payment will be made after successful testing at site. Executive Engineer,
4 The guarantee period of pumpng machinery six months I&PH Division,
Paonta Sahib (HP)
REVISED SCHEDULE OF QUANTITY Estimated cost Rs.96229/-
Name of work:- Insttt. Of Deep well Hand Pumps under I&PH Sub Division majra in tehsil Paonta Sahib Earnest Money: Rs.2000/-
Distt. Simour (HP)(SH: Energisation of 03 Nos Hand Pump 1 No. Nr. House of Shri Gulsher Mohd. in Vill. Time:-One Month.
Pipliwala 2 No. Nr. H/o Sh. Yasin Mohd. In vill. Misserwala, & 3 No. in I&PH Colony at Majra
Sr.No. Item of work. Qty. Rate. Unit. Amount.
1 2 3 4 5 6
1 Providing and installation of Submersible Pump of suitable make such as KSB/BS confirming to 3 Set 25500.00 P/Set 76500.00
ISS 1984-1976 alongwith a directly coubpled submesible type Square cage electrical induction
motor of suitable 2.00 HP for the operation on 220+1 phase 50 CPS AC supply with water
lubricated bearings and provided with pivoted segment type thrust bearing to withstand non
vertical head with uniform wear and duly fitted with device to take in/Out the exemption of water
with heating of motor complete in all respect. Total Head 55 to 75 Mtr. Discharge 50 to 60 LPS.

2 Supplying and fixing of control pannel for submersible Pumps complete with sheet,Fabricarted 3 Set 4500.00 P/Set 13500.00
duly painted and complete internal wiring and composing of air break starter main switch of
suitable Amps, Amperemeter, Voltmeter single phase indicating lamp etc. as per requirement at
site complete in all respect .

3 Supplying and fixing submersible cable to submersible motor of suitable size 1.50mm 2 approved 116 Rmt 95.00 P/Rmt 11020.00
make & relevant ISS as per 1554-1988 of Siemens/ Finolex/JEC/ ICS/ELCO/ GRADLY/ Natural
make in all respect.

4 Providing and fixing increaser/reducer/sockets/bends /Nut bolts/Clamps testing of all above 3 Job 1500.00 P/Job 4500.00
items as per directions of Engineer incharge.
5 Supplying and fixing 32 mm dia O.D.(outer dia) H.D. Pipe as column pipe into the bore hole 108 Rmt 135.00 P/Rmt 14580.00
complete as per the direction of Engineer incharge.
6 Providing and fixing steel rope of 6mm thick for hanging the Submersible pump set into the bore 114 Rmt 60.00 P/Rmt 6840.00
for its extract from the well and as per direction of the Engineer-in-charge.
Total:- 126940.00
TERMS AND CONDITIONS
1 The work shall be done as per IPH specifications.
2 Security, Sale Tax & Income tax shall be deduction as per rule.
3 Payment will be made after successful testing at site. Executive Engineer,
4 The guarantee period of pumpng machinery six months I&PH Division,
Paonta Sahib (HP)

REVISED SCHEDULE OF QUANTITY Estimated cost Rs.98930/-


Name of work:- Insttt. Of Deep well Hand Pumps under I&PH Sub Division majra in tehsil Paonta Sahib Earnest Money: Rs.2000/-
Distt. Simour (HP)(SH: Energisation of 04 Nos Hand Pump 1 No. Nr. House of Shri Ronki Ram S/o Sh. Tulshi Ram in Time:-One Month.
Vill. Amargarh 2 No. Nr. H/o Sh. Surjeet Singh S/o Sh. Ram Kishan in vill. Amargarh 3 No. Sh.Bhajan Singh S/o
Sh. Joginder Singh in vill. Santoshkhgarh& 4 No. Nr. H/O Sh.Ram Pal S/o Sh. Milkhi Ram in vill. Johron)
Sr.No. Item of work. Qty. Rate. Unit. Amount.
1 2 3 4 5 6
1 Providing and installation of Submersible Pump of suitable make such as KSB/BS confirming to 4 Set 25500.00 P/Set 102000.00
ISS 1984-1976 alongwith a directly coubpled submesible type Square cage electrical induction
motor of suitable 2.00 HP for the operation on 220+1 phase 50 CPS AC supply with water
lubricated bearings and provided with pivoted segment type thrust bearing to withstand non
vertical head with uniform wear and duly fitted with device to take in/Out the exemption of water
with heating of motor complete in all respect. Total Head 55 to 75 Mtr. Discharge 50 to 60 LPS.

2 Supplying and fixing of control pannel for submersible Pumps complete with sheet,Fabricarted 3 Set 4500.00 P/Set 13500.00
duly painted and complete internal wiring and composing of air break starter main switch of
suitable Amps, Amperemeter, Voltmeter single phase indicating lamp etc. as per requirement at
site complete in all respect .

3 Supplying and fixing submersible cable to submersible motor of suitable size 1.50mm 2 approved 183 Rmt 95.00 P/Rmt 17385.00
make & relevant ISS as per 1554-1988 of Siemens/ Finolex/JEC/ ICS/ELCO/ GRADLY/ Natural
make in all respect.

4 Providing and fixing increaser/reducer/sockets/bends /Nut bolts/Clamps testing of all above 3 Job 1500.00 P/Job 4500.00
items as per directions of Engineer incharge.
5 Supplying and fixing 32 mm dia O.D.(outer dia) H.D. Pipe as column pipe into the bore hole 142 Rmt 130.00 P/Rmt 18460.00
complete as per the direction of Engineer-in-charge.
6 Providing and fixing steel rope of 6mm thick for hanging the Submersible pump set into the bore 159 Rmt 60.00 P/Rmt 9540.00
for its extract from the well and as per direction of the Engineer-in-charge.

Total:- 165385.00
TERMS AND CONDITIONS
1 The work shall be done as per IPH specifications.
2 Security, Sale Tax & Income tax shall be deduction as per rule.
3 Payment will be made after successful testing at site. Executive Engineer,
4 The guarantee period of pumpng machinery six months I&PH Division,
Paonta Sahib (HP)
REVISED SCHEDULE OF QUANTITY Estimated Cost: 59992/-
Name of work:-Restoration of Rain damages to Left Bank Canal in Tehsil Paonta Sahib Distt. Sirmour Earnest Money: 1200/-
(HP) (SH: C/o Wire crate top protect the canal at RD 4150 to 4200 Mtrs.) Time: One Month.
S.No Sub-Head and item of work. Qty. Rates, Unit Amount.
1 Excavation in earth work in all kinds of soil and disposal of all excavated earth 37.50 Cum 140.00 P/Cum 5250.00
upto all leads lifts disposed earth to be levelled and neatly dressed including all
leads, lifts and carriage of material and as per directions of the Engineer-in-
charge

2 Wire crates made of G.I.wire filled with boulder/hard stone of approved quality 171.87 Cum. 925.00 P/Cum. 158980.00
with square cut faces against the wire having rounded/rectangular shape weight
of stones not less than 18 Kg. free from soft spots,cracks,cavaties etc.(Wire crate
to be measured and paid for separately)including all leads,lifts and carriage of
material at site as direction of the Engineer-in-charge. (Double Knot)

3 Wire crates of G.I.wire filled with boulder with square cut faces against the wire 825.00 Sqm. 36.00 P/Sqm. 29700.00
G.I.wire 4mm thick corresponding to SWG 6 with 15cmx15cm mesh(boulder
filling to be measured and paid for separately including all leads,lifts and carriage
of materials at site and as per directions of the Engineer-in-charge(L.Rate)

4 Removal of slips in all kinds of soil including saturated soil but excluding boulders and 85.00 Cum. 75.00 P/Cum. 6375.00
rpocky portion required blasting portion requiring blasting upto a distance of 20 mtrs.
disposing of unservice materials stacking serviceable materials and neatly dressing the
surface complete in all respect.

Total: 200305.00
TERMS AND CONDITIONS:-
1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Royality certificate in respect of stone agg. Sand etc. shall be produced by the contractor
4 G.I.wire shall be issued free of cost from IPH store Bhatanwali Paonta Sahib
5 Boulder shall not be less than 18 Kg. & the stone should be free from cracks and cavities.
Executive Engineer,
I&PH Division, Paonta Sahib.

REVISED SCHEDULE OF QUANTITY Estimated Cost: 74311/-


Name of work:-Restoration of Rain damages to LWSS Bhaila in GP Thontha Jakhal in Tehsil Paonta Earnest Money: 1500/-
Sahib Distt. Sirmour (HP) (SH: C/o Wire crate to protect the Pump House & Sump well ) Time: Three Months.
S.No Sub-Head and item of work. Qty. Rates, Unit Amount.
1 Excavation in foundation and trenches etc.in earth work in all kinds of soil such as pick 57.50 Cum 155.00 P/Cum 8913.00
work ,jumper work decomposed conglomerate saturated soil soft and hard rock upto
all leads lifts stacking the excavated soil not more than 3mtr.clear from the edge of
excavation and then returning the stacked soil in 15cm layers when required in to
plinth sides of foundation etc. consolidating each deposited layers by ramming and
watering and then disposing of all surplus excavated earth as directed with in all leads
lifts and as per directions of the Engineer-incharge

2 Wire crates made of G.I.wire filled with boulder/hard stone of approved quality 93.75 Cum. 925.00 P/Cum. 86719.00
with square cut faces against the wire having rounded/rectangular shape weight
of stones not less than 18 Kg. free from soft spots,cracks,cavaties etc.(Wire crate
to be measured and paid for separately)including all leads,lifts and carriage of
material at site as direction of the Engineer-in-charge. (Double Knot)

3 Wire crates of G.I.wire filled with boulder with square cut faces against the wire 450.00 Sqm. 36.00 P/Sqm. 16200.00
G.I.wire 5mm thick corresponding to SWG 6 with 15cmx15cm mesh(boulder
filling to be measured and paid for separately including all leads,lifts and carriage
of materials at site and as per directions of the Engineer-in-charge(L.Rate)

Total: 111832.00
TERMS AND CONDITIONS:-
1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Royality certificate in respect of stone agg. Sand etc. shall be produced by the contractor
4 G.I.wire shall be issued free of cost from IPH store Bhatanwali Paonta Sahib
5 Boulder shall not be less than 18 Kg. & the stone should be free from cracks and cavities.
Executive Engineer,
I&PH Division, Paonta Sahib.
DRAFT SCHEDULE OF QUANTITY Estimated cost Rs 20892/
0 Earnest money Rs.450/-
(SH:-Plastering of Existing Tank , Laying & jointing of GI Pipes) Time:- Three months.
Sr.No. Description. Qty. Rate.
1 2 3 4
1 Providing and laying cement concrete 1:2:4(1cement:2sand:4 graded stone agg.20mm nominal size)and curing 0.47 Cum. 1658.90
complete excluding the cost of form work & reinforcement for reinforced concrete work in foundation & plinth
including all leads lifts and carriage of material and as per the directions of Engineer-in-charge.

2 15mm thick cement plaster in single coat on rough side of brick/stone masonary for interior plastering upto floor two 12.57 Cum 48.70
level including arrises internal rounded angles chamfers and /or rounded angles not exceeding 20mm girth and
finished even and smooth Cement concrete 1:6(1cement:6sand) including all leads,lifts and carriage of material and as
per direction of the Engineer-in-charge.

3 Excavation in drains & channel etc.in earth work in all kinds of soil such as pick work ,jumper work blasting 247.50 Cum 75.95
work, decomposed conglomerate saturated soil soft and hard rock including dressing of sides and beds and
prepareation of sub grade to level or slope including refilling the trenches and disposing of surplus earth upto all
leads,lifts disposed earth to be levelled and neatly dressed including jungle clearance and as per directions of the
Engineer-incharge

4 Laying and jointing of GMS Pipes of various dia in trenches (earth work in trenches to be measured and paid for
seperately) including all leads lifts and carriage of material at site as per direction of Engineer-in-charge of
following dias.

i) 15mm dia. 300 Rmt. 0.50


ii) 20mm dia. 800 Rmt. 0.50
5 Providing and fixing of peet valve of superior quality of following dias complete in all respect and as per direction
of the Engineer-in-charge.
i) 15mm dia. 1 No. 66.50
ii) 20mm dia. 1 No. 84.50

TERMS AND CONDITIONS:-


1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Cement will be issued @ 315/- per bag & steel @ 53/- per Kg. at IPH store Bhatanwali Paonta Sahib.
4 Empty cement bags shall be returned to the deptt. Otherwise Rs. 2/- per bag shall be deducted from the each bill of the contractor.
5 Royality certificate in respect of stone agg. Sand etc. shall be produced by the contractor
6 GI Pipe shall be issued free of cost from IPH Store Bhatanwali.
7 GI Fitting shall be provided by the contractor. Assistant Engineer,
I&PH Sub Division, Kaffot
.
Estimated cost Rs 20892/-
Earnest money Rs.450/-
Time:- Three months.
Unit Amount.
5 6
P/Cum 780.00

P/Cum 612.00

P/Cum 18798.00

P/Rmt. 150.00
T/Rmt. 400.00

Each. 67.00
Each. 85.00
Total: 20892.00
Assistant Engineer,
I&PH Sub Division, Kaffota.
DRAFT SCHEDULE OF QUANTITY Estimated cost Rs 12704/-
Name of work:- R/M of GWSS to Kando Juinal Malta GP Dugana in Tehsil Paonta Sahib Distt. Sirmour (HP) Earnest money Rs.300/-
(SH: Extensiton to Majhog Bas from House of Sh. Sita Ram) Time:- Three months.
Sr.No. Description. Qty. Rate. Unit Amount.
1 2 3 4 5 6
1 Excavation in drains & channel etc.in earth work in all kinds of soil such as pick work 162.00 Cum 75.95 P/Cum 12304.00
,jumper work blasting work, decomposed conglomerate saturated soil soft and hard rock
including dressing of sides and beds and prepareation of sub grade to level or slope
including refilling the trenches and disposing of surplus earth upto all leads,lifts disposed
earth to be levelled and neatly dressed including jungle clearance and as per directions of
the Engineer-incharge

2 Laying and jointing of GMS Pipes of various dia in trenches (earth work in trenches to be
measured and paid for seperately) including all leads lifts and carriage of material at site
as per direction of Engineer-in-charge of following dias.

i) 15mm dia. 800 Rmt. 0.50 P/Rmt. 400.00


Total: 12704.00
TERMS AND CONDITIONS:-
1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 GI Pipe shall be issued free of cost from IPH Store Bhatanwali.
4 GI Fitting shall be provided by the contractor.

Assistant Engineer,
I&PH Sub Division, Kaffota.
REVISED SCHEDULE OF QUANTITY Estimated cost Rs 12704/-
Name of work:- R/M of GWSS to Kando Juinal Malta GP Dugana in Tehsil Paonta Sahib Distt. Sirmour (HP) Earnest money Rs.300/-
(SH: Extensiton to Majhog Bas from House of Sh. Sita Ram) Time:- Three months.
Sr.No. Description. Qty. Rate. Unit Amount.
1 2 3 4 5 6
1 Excavation in drains & channel etc.in earth work in all kinds of soil such as pick work 162.00 Cum 75.95 P/Cum 12304.00
,jumper work blasting work, decomposed conglomerate saturated soil soft and hard rock
including dressing of sides and beds and prepareation of sub grade to level or slope
including refilling the trenches and disposing of surplus earth upto all leads,lifts disposed
earth to be levelled and neatly dressed including jungle clearance and as per directions of
the Engineer-incharge

2 Laying and jointing of GMS Pipes of various dia in trenches (earth work in trenches to be
measured and paid for seperately) including all leads lifts and carriage of material at site
as per direction of Engineer-in-charge of following dias.
i) 15mm dia. 800 Rmt. 0.50 P/Rmt. 400.00
Total: 12704.00
TERMS AND CONDITIONS:-
1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 GI Pipe shall be issued free of cost from IPH Store Bhatanwali.
4 GI Fitting shall be provided by the contractor.

Assistant Engineer,
I&PH Sub Division, Kaffota.
REVISED SCHEDULE OF QUANTITY Estimated Cost :-Rs.80670/-
Name of work:- Providing 3 No. Tubewell in Kedarpur Bhuppur in Tehsil Paonta Sahib Distt. Sirmour (HP) Earnest Money :-Rs.1650/-
(SH:- C/O Pump House) T/well No.2. Time:- Three months.
Sr.No. Description Qty. Rate
1 Excavation in foundation and trenches etc.in earth work in all kinds of soil such as pick work ,jumper work 10.51 Cum 160.00
decomposed conglomerate saturated soil soft and hard rock upto all leads lifts stacking the excavated soil not
more than 3mtr.clear from the edge of excavation and then returning the stacked soil in consolidating each
deposited layers by ramming and watering and then disposing of all surplus excavated earth as directed with in
all leads lifts and as per directions of the Engineer-in-charge

2 Providing and laying cement concrete 1:6:12(1cement:6sand:12 graded stone agg.40mm nominal size)and 2.64 Cum 2200.00
curing complete excluding the cost of form work in foundation & plinth including all leads lifts and carriage of
material and as per the directions of Engineer-in-charge.
3 Ist Class brick work using common building bricks in foundation & plinth in Cement Mortar 10.08 Cum. 5200.00
1:6(1cement:6sand) in all leads lifts and carriage etc. as per direction of Engineer inchrge.

4 Providing and laying damp proof course 38mm thick with Cement concrete 1:2:4(1cement:2sand:4graded 2.03 Sqm. 160.00
stone agg. 12.5 mm nominal size)and curing complete excluding the cost of form work including all leads,lifts
and carriage of material and as per directions of Engineer-in-charge.

5 Applying a coat of hot bitumen (mexphalt 80/100 or equivalent )using 1.70 Kg. per sqm. On damp proof course 2.03 Cum. 30.00
after cleaning the surface in a piece of cloth lightly soaked with kerosene oil including all leads,lifts and carriage
of material and as per directions of the Engineer-in-charge.
6 Ist Class brick work using common building bricks in Super structure in Cement Mortar 1:6(1cement:6sand) in 6.99 Cum. 5400.00
all leads lifts and carriage etc. as per direction of Engineer incharge.
7 Providing form work with steel sheets 3.15mm thick welded with angle iron 30x30x5 mm so as to give rough
finish i/c centring shuttering structing and propping etc. with wooden bettens & Ballies, height or propping &
centering below supporting floor to ceiling not exceeding 4 mtr.and removal of the same for insitu RCC work
and PCC work.including all leads lifts and carriage of material at site & as per direction of Engineer incharge in:-

a) Flat surfaces such as sofits and suspended floors, roofs landing and the like floors etc. up to 200 mm in 30.69 Sqm. 300.00
thickness.
8 Providing and laying reinforced cement concrete 1:2:4(1cement :2app.sand: 4app. graded stone agg.20mm 2.94 Cum 3400.00
nominal size )and curing complete excluding cost of form work & reinforcement in suspended floors, roofs,
shelves & supports, balconies beams etc. upto floor in two level in all height and depth including all leads lifts &
carriage of material at site and as per direction of the Engineer-incharge.

9 Providing mild steel/tor steel for rainforcement for RCC work including bending binding and placing in position 234.80 Kg 64.00
complete upto floor two level the Engineer-in-charge.
10 20 mm thick cement plaster in single coat of rough side of bricks/stone masonary for interior plastering upto 50.86 Sqm 135.00
floor two level including arrises internal rounded angles chamfers rounded angles not exceeding 80mm in
girth and finished even and smooth in cement mortor 1:6(1cement:6 sand) and curing complete including all
leads lifts and carriage of materials at site as per direction of Engineer-incharge.

11 6 mm thick cement plaster in ceiling in Cement mortor 1:3 (1 cement:3 sand) including all leads lifts and 22.69 Sqm 75.00
carriage of material at site as per direction of Engineer incharge.
12 Flush Pointing on brick work with cement motor 1:3 (1 cement:3 sand ) including all leads lifts and carriage of 64.77 Sqm. 115.00
material at site as per direction of Engineer incharge.
13 Providing fixing pressed steel door frames manufactured from commercial mild steel of1.25mm thickness
including hinges,jump lock bud and if required angle threshold of M.S. angle 50x25mm or base tie of 1.25mm
pressed steel I/c welding complete Including steel hinges 2.5mm thick with guard lock strick plate and apply a
coat of approved steel primer affect pre-treaditional of surface in all leads lifts and carriage of materials as per
direction of Engineer incharge.

Profile-"A" 21.50 Rmt. 275.00


Profile "B" 6.60 Rmt. 275.00
14 Provd./fixing pannelled glazed or pannelled and glazed shutters for doors windows and clearestorey windows 6.03 Sqm. 2700.00
including black enemelled iron butt hings with necessary secrews complete.40mm thick 2nd.class deodar wood
including all leads lifts and carriage of material at site as per direction of Engineer-in-charge.

15 Filling in plinth with sand under floors including watering ramming consolidating and dressing complete. 1.89 Cum 620.00

16 Providing and laying cement concrete 1:4:8(1cement:4sand:8 graded stone agg.40mm nominal size)and curing 1.26 Cum. 2500.00
complete excluding the cost of form work in foundation & plinth including all leads lifts and carriage of material
and as per the directions of Engineer-in-charge.
17 40mm thick cement concrete flooring 1:2:4 (1cement:2sand: 4 graded stone agg. 20mm nominal size)laid in 12.60 Sqm 220.00
one layer finished with a floating coat of neat cement including curing all leads, lifts and carriage of materials at
site and as per direction of Engineer incharge

18 Providing and fixing on wall face C.I. rain water pipes 100mm dia including filling the joints with spun yarn 7.00 Rmt 135.00
soaked in neat cement slurry & cement mortor 1:2 (1 cement :2sand) i/c Clamps including all leads lifts and
carriage of material as per direction of Engineer incharge.

19 Applying priming coat over new wood and wood based surfaces after and including preparing the surface by 18.48 Sqm 35.00
throughly cleaning oil,grease,dirt and other foreign matter with ready mixed paint brushing with white lead for
priming including all leads lifts and carriage of material as per direction of Engineer incharge.

20 Painting two coats (excluding priming coat) on new wood and wood based with surfaces with ready mixed paint 18.48 Sqm 70.00
other then white brushing to give an even shade including cleaning the surface of dirt dust and other foreign
matter,sand papering and stopping. Including all leads lifts and carriage of material at site as per direction of
Engineer incharge.

21 White washing with lime on undecorated wall surfaces (two coats) to give an even shade including throughly 73.55 Sqm 12.00
brooming the surface to remove all dirt dust mortor drops and loose scale of lime wash and other foreign matter
including all leads lifts and carriage of material at site as per direction of Engineer-incharge.

22 Water proofing cement paint on decorated wall surfaces (two coats) to give an even shade including throughly 64.77 Sqm 40.00
brooming the surfaces to remove all dirt dust mortar drops and loose scale of Himrachi wash and other foreign
matter as per directionof the Engineer-in-charge.
23 Providing plinth protection 50mm thick in cement concrete 1:3:6(1cement: 3sand: 6graded stone agg.20mm 12.75 Sqm 140.00
nominal size in all leads,lifts and carriage of material and as per direction of Engineer incharge.
24 Prov.40x3mm flat iron hold fast 40cm long including fixing to frame with 10mm dia metre bolts,nuts and 20 Nos 55.00
wooden plugs and embedding in cement concrete block 30x10x15cms 1:3:6 (1cement: 3sand: 6 graded stone
agg.20mm nominal size)including all leads,lifts & carriage of material as per direction of the Engineer incharge.

25 Providing and fixing tower bolts aluminium (barreled type) anodized transparent or dyed to required shade &
colour screws complete including all leads, lifts and as per direction of Engineer incharge.
a)200x10mm 16 Nos 55.00
26 Provd.& fixing aluminium handles anodized transparent or dyed to required colour or shade with necessary
screws etc. complete including all leads lifts & carriage of material at site as per direction of Engineer incharge.
a)125mm 4 Nos 40.00
b)100mm 12 Nos 40.00
27 Provd.& fixing Sliding door bolts anodized transparent or dyed to required colour or shade with necessary 1 Nos 180.00
screws etc. complete including all leads lifts & carriage of material at site as per direction of Engineer incharge.
300x15mm
28 Providing, fixing M.S. Fan clamps type-I 16mm dia M.S. bar bent to shape with hooked ends in RCC slab curtting, 1 No. 100.00
laying including painting the exposed portion of loop as per standard drawing and design complete in all
respect including all leads lifts and carriage of material as per direction of Enginer incharge.

29 Providing fixing M.S.grills of required pattern in wooden frames/pressed steel frame with M.S. flat surface 35.78 Kg. 80.00
round bars 12mm dia with round headed bolts and nuts or by screws .Plain grill including all leads lifts and
carriage of material as per direction of Enginer incharge.
30 Steel work welded in single section including cutting hoisting fixing in position and supplying a priming coat of 1.40 Qntl. 7800.00
red lead paint in R.S.Joints channels angles tees including all leads,lifts and carriage of material and as per
direction of the Engineer-in-charge.

TERMS AND CONDITIONS:-


1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Cement shall be issued @Rs.315/-P.bag & steel @Rs.53/- P.kg.at IPH Store Bhatanwali Paonta Sahib.
4 Empty cement bags shall be returned to the Deptt.otherwise Rs.2/-per bag shall be deducted from the bill.
5 Royalitry certificate in respect of stone aggregate sand etc.shalll be produced by the contractor.

REVISED SCHEDULE OF QUANTITY Estimated Cost :-Rs.68303/-


Name of work:-Const. of Tubewell in the Field of Shri Sahied Ali S/o Sh. Kasim Ali R/o Vill. Kanshipur in Tehsil Paonta Earnest Money :-Rs.1750/-
Sahib Distt. Sirmour (HP) (SH:- C/O Pump House) . Time:- Three months.
Sr.No. Description Qty. Rate
1 Excavation in foundation and trenches etc.in earth work in all kinds of soil such as pick work ,jumper work 10.19 Cum 155.00
decomposed conglomerate saturated soil soft and hard rock upto all leads lifts stacking the excavated soil not
more than 3mtr.clear from the edge of excavation and then returning the stacked soil in consolidating each
deposited layers by ramming and watering and then disposing of all surplus excavated earth as directed with in
all leads lifts and as per directions of the Engineer-in-charge

2 Providing and laying cement concrete 1:6:12(1cement:6sand:12 graded stone agg.40mm nominal size)and 2.56 Cum 2200.00
curing complete excluding the cost of form work in foundation & plinth including all leads lifts and carriage of
material and as per the directions of Engineer-in-charge.
3 Ist Class brick work using common building bricks in foundation & plinth in Cement Mortar 6.79 Sqm. 5200.00
1:6(1cement:6sand) in all leads lifts and carriage etc. as per direction of Engineer inchrge.
4 Providing and laying damp proof course 38mm thick with Cement concrete 1:2:4(1cement:2sand:4graded 2.03 Sqm. 160.00
stone agg. 12.5 mm nominal size)and curing complete excluding the cost of form work including all leads,lifts
and carriage of material and as per directions of Engineer-in-charge.

5 Applying a coat of hot bitumen (mexphalt 80/100 or equivalent )using 1.70 Kg. per sqm. On damp proof course 2.03 Cum. 30.00
after cleaning the surface in a piece of cloth lightly soaked with kerosene oil including all leads,lifts and carriage
of material and as per directions of the Engineer-in-charge.
6 Ist Class brick work using common building bricks in Super structure in Cement Mortar 1:6(1cement:6sand) in 11.08 Cum. 5400.00
all leads lifts and carriage etc. as per direction of Engineer incharge.
7 Providing form work with steel sheets 3.15mm thick welded with angle iron 30x30x5 mm so as to give rough
finish i/c centring shuttering structing and propping etc. with wooden bettens & Ballies, height or propping &
centering below supporting floor to ceiling not exceeding 4 mtr.and removal of the same for insitu RCC work
and PCC work.including all leads lifts and carriage of material at site & as per direction of Engineer incharge in:-

a) Flat surfaces such as sofits and suspended floors, roofs landing and the like floors etc. up to 200 mm in 30.71 Cum. 300.00
thickness.
8 Providing and laying reinforced cement concrete 1:2:4(1cement :2app.sand: 4app. graded stone agg.20mm 2.94 Cum 3400.00
nominal size )and curing complete excluding cost of form work & reinforcement in suspended floors, roofs,
shelves & supports, balconies beams etc. upto floor in two level in all height and depth including all leads lifts &
carriage of material at site and as per direction of the Engineer-incharge.

9 Providing mild steel/tor steel for rainforcement for RCC work including bending binding and placing in position 235.20 Kg 51.00
complete upto floor two level the Engineer-in-charge.
10 20 mm thick cement plaster in single coat of rough side of bricks/stone masonary for interior plastering upto 50.86 Sqm 135.00
floor two level including arrises internal rounded angles chamfers rounded angles not exceeding 80mm in
girth and finished even and smooth in cement mortor 1:6(1cement:6 sand) and curing complete including all
leads lifts and carriage of materials at site as per direction of Engineer-incharge.

11 6 mm thick cement plaster in ceiling in Cement mortor 1:3 (1 cement:3 sand) including all leads lifts and 13.50 Sqm 75.00
carriage of material at site as per direction of Engineer incharge.
12 Flush Pointing on brick work with cement motor 1:3 (1 cement:3 sand ) including all leads lifts and carriage of 64.77 Sqm. 115.00
material at site as per direction of Engineer incharge.
13 Providing fixing pressed steel door frames manufactured from commercial mild steel of1.25mm thickness
including hinges,jump lock bud and if required angle threshold of M.S. angle 50x25mm or base tie of 1.25mm
pressed steel I/c welding complete Including steel hinges 2.5mm thick with guard lock strick plate and apply a
coat of approved steel primer affect pre-treaditional of surface in all leads lifts and carriage of materials as per
direction of Engineer incharge.

Profile-"A" 21.50 Rmt. 275.00


Profile "B" 6.60 Rmt. 275.00
14 Provd./fixing pannelled glazed or pannelled and glazed shutters for doors windows and clearestorey windows 6.03 Sqm. 2700.00
including black enemelled iron butt hings with necessary secrews complete.40mm thick 2nd.class deodar wood
including all leads lifts and carriage of material at site as per direction of Engineer-in-charge.

15 Filling in plinth with sand under floors including watering ramming consolidating abd dressing complete. 2.03 Cum. 620.00

16 Providing and laying cement concrete 1:4:8(1cement:4sand:8 graded stone agg.40mm nominal size)and curing 1.36 Cum. 2500.00
complete excluding the cost of form work in foundation & plinth including all leads lifts and carriage of material
and as per the directions of Engineer-in-charge.
17 40mm thick cement concrete flooring 1:2:4 (1cement:2sand: 4 graded stone agg. 20mm nominal size)laid in 13.50 Sqm. 220.00
one layer finished with a floating coat of neat cement including curing all leads, lifts and carriage of materials at
site and as per direction of Engineer incharge
18 Providing and fixing on wall face C.I. rain water pipes 100mm dia including filling the joints with spun yarn 7.00 Rmt. 135.00
soaked in neat cement slurry & cement mortor 1:2 (1 cement :2sand) i/c Clamps including all leads lifts and
carriage of material as per direction of Engineer incharge.
19 Applying priming coat over new wood and wood based surfaces after and including preparing the surface by 18.48 Sqm 35.00
throughly cleaning oil,grease,dirt and other foreign matter with ready mixed paint brushing with white lead for
priming including all leads lifts and carriage of material as per direction of Engineer incharge.

20 Painting two coats (excluding priming coat) on new wood and wood based with surfaces with ready mixed paint 18.48 Sqm 70.00
other then white brushing to give an even shade including cleaning the surface of dirt dust and other foreign
matter,sand papering and stopping. Including all leads lifts and carriage of material at site as per direction of
Engineer incharge.

21 White washing with lime on undecorated wall surfaces (two coats) to give an even shade including throughly 73.55 Sqm 12.00
brooming the surface to remove all dirt dust mortor drops and loose scale of lime wash and other foreign matter
including all leads lifts and carriage of material at site as per direction of Engineer-incharge.

22 Water proofing cement paint on decorated wall surfaces (two coats) to give an even shade including throughly 64.77 Sqm 40.00
brooming the surfaces to remove all dirt dust mortar drops and loose scale of Himrachi wash and other foreign
matter as per directionof the Engineer-in-charge.
23 Providing plinth protection 50mm thick in cement concrete 1:3:6(1cement: 3sand: 6graded stone agg.20mm 12.75 Sqm. 140.00
nominal size in all leads,lifts and carriage of material and as per direction of Engineer incharge.

24 Prov.40x3mm flat iron hold fast 40cm long including fixing to frame with 10mm dia metre bolts,nuts and 20 Nos 55.00
wooden plugs and embedding in cement concrete block 30x10x15cms 1:3:6 (1cement: 3sand: 6 graded stone
agg.20mm nominal size)including all leads,lifts & carriage of material as per direction of the Engineer incharge.

25 Providing and fixing tower bolts aluminium (barreled type) anodized transparent or dyed to required shade &
colour screws complete including all leads, lifts and as per direction of Engineer incharge.
a)200x10mm 32 Nos 55.00
26 Provd.& fixing aluminium handles anodized transparent or dyed to required colour or shade with necessary
screws etc. complete including all leads lifts & carriage of material at site as per direction of Engineer incharge.

a)125mm 4 Nos 40.00


b)100mm 12 No. 40.00
27 Provd.& fixing Sliding door bolts anodized transparent or dyed to required colour or shade with necessary 3 Nos. 180.00
screws etc. complete including all leads lifts & carriage of material at site as per direction of Engineer incharge.
300x15mm
28 Providing, fixing M.S. Fan clamps type-I 16mm dia M.S. bar bent to shape with hooked ends in RCC slab curtting, 1 No. 100.00
laying including painting the exposed portion of loop as per standard drawing and design complete in all
respect including all leads lifts and carriage of material as per direction of Enginer incharge.

29 Providing fixing M.S.grills of required pattern in wooden frames/pressed steel frame with M.S. flat surface 35.78 Kg. 80.00
round bars 12mm dia with round headed bolts and nuts or by screws .Plain grill including all leads lifts and
carriage of material as per direction of Enginer incharge.
Estimated Cost :-Rs.80670/-
Earnest Money :-Rs.1650/-
Time:- Three months.
Unit Amount
P/Cum 1682.00

P/Cum 5808.00

P/Cum 52416.00

P/Sqm. 325.00

P/Sqm. 61.00

P/Cum 37746.00

0.00

P/Sqm 9207.00
P/Cum 9996.00

P/kg 15027.00

P/Sqm 6866.00

P/Sqm 1702.00

P/Sqm 7449.00

0.00

P/Rmt 5913.00
P/Rmt. 1815.00
P/Sqm 16281.00

P/Cum. 1172.00

P/Cum 3150.00
P/Sqm 2772.00

P/Rmt 945.00

P/Sqm 647.00

P/Sqm 1294.00

P/Sqm 883.00

P/Sqm 2591.00

P/Sqm 1785.00

each 1100.00

0.00

each 880.00
0.00
each 160.00
each 480.00
each 180.00

each 100.00

P/kg. 2862.00

Per Qntl. 10920.00

Total:- 204215.00

Executive Engineer,
I&PH Division,
Paonta Sahib (HP)

Estimated Cost :-Rs.68303/-


Earnest Money :-Rs.1750/-
Time:- Three months.
Unit Amount
P/Cum 1579.00

P/Cum 5632.00

P/Cum 35308.00

P/Sqm. 325.00

P/Sqm. 61.00

P/Cum 59832.00

P/Sqm 9213.00

P/Cum 9996.00

P/kg 11995.00
P/Sqm 6866.00

P/Sqm 1013.00

P/Sqm 7449.00

P/Rmt 5913.00
P/Rmt. 1815.00
P/Sqm 16281.00

P/Cum. 1259.00

P/Cum 3400.00

P/Sqm 2970.00

P/Rmt 945.00
P/Sqm 647.00

P/Sqm 1294.00

P/Sqm 883.00

P/Sqm 2591.00

P/Sqm 1785.00

Each. 1100.00

Each. 1760.00

Each. 160.00
Each. 480.00
Each. 540.00
Each. 100.00

P/kg. 2862.00

Total:- 196054.00
SCHEDULE OF QUANTITY Estimated cost Rs 67876/-
Name of work:-Restoration of Rain damages to FIS Kanti Mashwa in Tehsil Paonta Sahib Distt. Earnest money Rs.1400/-
Sirmour (HP) (SH: C/o Pucca Main channel & C/o Retaining wall ) Time:- Three months.
S.No Sub-Head and item of work. Qty. Rates, Unit
1 2 3 4 5
1 Cutting in earth work in and disposal of excavated earth within all leadsin Pick/jumper work 17.18 Cum P/Cum
50% each complete in all respect and as per direction of the Engineer-in-charge.
2 Excavation in foundation and trenches etc.in earth work in all kinds of soil such as pick work 9.66 Cum P/Cum
,jumper work decomposed conglomerate saturated soil soft and hard rock upto all leads lifts
stacking the excavated soil not more than 3mtr.clear from the edge of excavation and then
returning the stacked soil in 15cm layers when required in to plinth sides of foundation etc.
consolidating each deposited layers by ramming and watering and then disposing of all surplus
excavated earth as directed with in all leads lifts and as per directions of the Engineer-incharge

3 Providing and laying cement concrete 1:6:12(1cement: 6sand: 12 graded stone agg.40mm 5.73 Cum P/Cum
nominal size)and curing complete excluding the cost of form work in foundation & plinth
including all leads lifts and carriage of material and as per the directions of Engineer-in-charge.

4 Random rubble masonary /Poly rubble masonary (uncoursed/brought to coursed) with hard 40.77 Cum P/Cum
stone of approved quality in foundation and plinth including levelling up with cement concrete
1:6.12(1cement:6sand:12 graded stone agg. 20mm nominal size)in cement mortor 1:6 (1
Cement: 6 sand ) in breast wall & Retaining walls including all leads lifts and carriage of
material and as per the directions of Engineer-in-charge.

5 Excavation in drains & channel etc.in earth work in all kinds of soil such as pick work ,jumper 40.17 Cum. P/Cum.
work blasting work, decomposed conglomerate saturated soil soft and hard rock including
dressing of sides and beds and prepareation of sub grade to level or slope including refilling the
trenches and disposing of surplus earth upto all leads,lifts disposed earth to be levelled and
neatly dressed including jungle clearance and as per directions of the Engineer-incharge
6 Cement concrete lining 15cm thick or less for irrigation channels using cement concrete
1:3:6(1cement:3sand:6graded stone agg. 20mm nominal size)and curing complete excluding
cost of form work included all leads lifts and carriage of material complete in all respect and as
per direction of Engineer-in-charge.

a)Hand Mixed concrete in bed. 10.27 Cum P/Cum


b)Hand mixed concrete lining in side slopes. 15.60 Cum P/Cum
7 Extra allowance for form work in concrete lining as directed by the Engineer-in-charge including 15.60 Cum P/Cum
all leads lifts and carriage of matrerials at site complete in all respects on side slopes as per
direction of Engineer in charge.
TOTAL:
TERMS AND CONDITIONS:-
1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Cement will be issued @ 315/- per bag & steel @ 53/- per Kg. at IPH store Bhatanwali Paonta Sahib.
4 Empty cement bags shall be returned to the deptt. Otherwise Rs. 2/- per bag shall be deducted from the earch
5 bill of thecertificate
Royality contractor.in respect of stone agg. Sand etc. shall be produced by the contractor
6 Contractor shall be responsible for watch & ward of store.

Assistant Engineer,
I&PH Sub Division
Kaffota.
REVISED SCHEDULE OF QUANTITY Estimated cost Rs 46904/-
Name of work:-C/o LIS Kando Cheog GP Kando Cheog in Tehsil Paonta Sahib Distt. Sirmour (HP) Earnest money Rs.1000/-
(SH: C/o Retaining wall in support of HDP pipe) Time:- Three months.
S.No Sub-Head and item of work. Qty. Rates, Unit
1 Cutting in earth work in and disposal of excavated earth within all leadsin Pick/jumper work 12.26 Cum 140.00 P/Cum
50% each complete in all respect and as per direction of the Engineer-in-charge.
2 Excavation in foundation and trenches etc.in earth work in all kinds of soil such as pick work 7.02 Cum 160.00 P/Cum
,jumper work decomposed conglomerate saturated soil soft and hard rock upto all leads lifts
stacking the excavated soil not more than 3mtr.clear from the edge of excavation and then
returning the stacked soil in 15cm layers when required in to plinth sides of foundation etc.
consolidating each deposited layers by ramming and watering and then disposing of all surplus
excavated earth as directed with in all leads lifts and as per directions of the Engineer-incharge

3 Providing and laying cement concrete 1:6:12(1cement: 6sand: 12 graded stone agg.40mm 4.09 Cum 3650 P/Cum
nominal size)and curing complete excluding the cost of form work in foundation & plinth
including all leads lifts and carriage of material and as per the directions of Engineer-in-charge.

4 Random rubble masonary /Poly rubble masonary (uncoursed/brought to coursed) with hard 36.11 Cum 3630.00 P/Cum
stone of approved quality in foundation and plinth including levelling up with cement concrete
1:6.12(1cement:6sand:12 graded stone agg. 20mm nominal size)in cement mortor 1:6 (1
Cement: 6 sand ) in breast wall & Retaining walls including all leads lifts and carriage of
material and as per the directions of Engineer-in-charge.

TERMS AND CONDITIONS:- TOTAL:


1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Cement will be issued @ 315/- per bag & steel @ 53/- per Kg. at IPH store Bhatanwali Paonta Sahib.
4 Empty cement bags shall be returned to the deptt. Otherwise Rs. 2/- per bag shall be deducted from the earch
5 bill of thecertificate
Royality contractor.in respect of stone agg. Sand etc. shall be produced by the contractor
6 Contractor shall be responsible for watch & ward of store. Executive Engineer,
I&PH Division
Paonta Sahib.
REVISED SCHEDULE OF QUANTITY Estimated cost Rs 39692/-
Name of work:-C/o LIS Kando Cheog GP Kando Cheog in Tehsil Paonta Sahib Distt. Sirmour (HP) Earnest money Rs. 800/-
(SH: C/o Retaining wall in front of the Pump House) Time:- Three months.
S.No Sub-Head and item of work. Qty. Rates, Unit
1 Cutting in earth work in and disposal of excavated earth within all leadsin Pick/jumper work 32.43 Cum 140.00 P/Cum
50% each complete in all respect and as per direction of the Engineer-in-charge.
2 Excavation in foundation and trenches etc.in earth work in all kinds of soil such as pick work 8.70 Cum 160.00 P/Cum
,jumper work decomposed conglomerate saturated soil soft and hard rock upto all leads lifts
stacking the excavated soil not more than 3mtr.clear from the edge of excavation and then
returning the stacked soil in 15cm layers when required in to plinth sides of foundation etc.
consolidating each deposited layers by ramming and watering and then disposing of all surplus
excavated earth as directed with in all leads lifts and as per directions of the Engineer-incharge

3 Providing and laying cement concrete 1:6:12(1cement: 6sand: 12 graded stone agg.40mm 4.72 Cum 3650 P/Cum
nominal size)and curing complete excluding the cost of form work in foundation & plinth
including all leads lifts and carriage of material and as per the directions of Engineer-in-charge.
4 Random rubble masonary /Poly rubble masonary (uncoursed/brought to coursed) with hard 16.38 Cum 3630.00 P/Cum
stone of approved quality in foundation and plinth including levelling up with cement concrete
1:6.12(1cement:6sand:12 graded stone agg. 20mm nominal size)in cement mortor 1:6 (1
Cement: 6 sand ) in breast wall & Retaining walls including all leads lifts and carriage of
material and as per the directions of Engineer-in-charge.

5 C/o dry stone masonary in breast wall parapets etc. including all leads,lifts and carriage of 23.10 Cum. 1250.00 P/Cum.
material and as per direction of the Engineer-in-charge.
6 Boulder filling behind the retaining wall & breast wall etc. complete in all respect and as per 6.83 Cum. 800.00 P/Cum.
direction of the Engineer-in-charge.
TERMS AND CONDITIONS:- TOTAL:
1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Cement will be issued @ 315/- per bag & steel @ 53/- per Kg. at IPH store Bhatanwali Paonta Sahib.
4 Empty cement bags shall be returned to the deptt. Otherwise Rs. 2/- per bag shall be deducted from the earch
5 bill of thecertificate
Royality contractor.in respect of stone agg. Sand etc. shall be produced by the contractor Executive Engineer,
6 Contractor shall be responsible for watch & ward of store. I&PH Division
Paonta Sahib.
d cost Rs 67876/-
money Rs.1400/-
hree months.
Amount.
6
Engineer,
d cost Rs 46904/-
money Rs.1000/-
hree months.
Amount.
1716.00

1123.00

14929.00

131079.00

148847.00
Engineer,

d cost Rs 39692/-
money Rs. 800/-
hree months.
Amount.
4540.00

1392.00

17228.00
59459.00

28875.00

5464.00

116958.00

Engineer,
REVISED SCHEDULE OF QUANTITY Estimated Cost :-Rs.62632/-
Name of work:- Channelisation of Bata River in Tehsil Paonta Sahib Distt. Sirmour (HP) Earnest Money :-Rs.1500/-
(SH:- C/O 2 Nos RCC steps path embankment of Bata River 1 No. in vill. Matak Majri & 1 No. vill.Sainwala RD 9800 Mtr.) Time:- Two Months.
Sr.No. Description Qty. Rate
1 Excavation in foundation and trenches etc.in earth work in all kinds of soil such as pick work ,jumper work 0.98 Cum 155.00
decomposed conglomerate saturated soil soft and hard rock upto all leads lifts stacking the excavated soil not
more than 3mtr.clear from the edge of excavation and then returning the stacked soil in consolidating each
deposited layers by ramming and watering and then disposing of all surplus excavated earth as directed with in
all leads lifts and as per directions of the Engineer-in-charge

2 Providing and laying cement concrete 1:4:8(1cement:4sand:8graded stone agg.40mm nominal size)and curing 8.20 Cum 2700.00
complete excluding the cost of form work in foundation & plinth including all leads lifts and carriage of material
and as per the directions of Engineer-in-charge.
3 Providing and laying cement concrete 1:2:4(1cement:2sand:4graded stone agg.20mm nominal size)and curing 2.40 Cum 3700.00
complete excluding the cost of form work in foundation & plinth including all leads lifts and carriage of material
and as per the directions of Engineer-in-charge.
4 Providing and laying reinforced cement concrete 1:2:4(1cement :2app.sand: 4app. graded stone agg.20mm 4.56 Cum 3800.00
nominal size )and curing complete excluding cost of form work & reinforcement in suspended floors, roofs,
shelves & supports, balconies beams etc. upto floor in two level in all height and depth including all leads lifts &
carriage of material at site and as per direction of the Engineer-incharge.

5 Providing mild steel/tor steel for rainforcement for RCC work including bending binding and placing in position 327.64 Kg 63.00
complete upto floor two level the Engineer-in-charge.
6 Providing form work with steel sheets 3.15mm thick welded with angle iron 30x30x5 mm so as to give rough
finish i/c centring shuttering structing and propping etc. with wooden bettens & Ballies, height or propping &
centering below supporting floor to ceiling not exceeding 4 mtr.and removal of the same for insitu RCC work
and PCC work.including all leads lifts and carriage of material at site & as per direction of Engineer incharge in:-

a) Vertical surfaces . 10.72 Sqm. 200.00

TERMS AND CONDITIONS:-


1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Cement will be issued @ 315/- per bag & steel @ 53/- per Kg. at IPH store Bhatanwali Paonta Sahib.
4 Empty cement bags shall be returned to the deptt. Otherwise Rs. 2/- per bag shall be deducted from the each bill of the contractor.
5 Royality certificate in respect of stone agg. Sand etc. shall be produced by the contractor

REVISED SCHEDULE OF QUANTITY Estimated Cost :-Rs.62632/-


Name of work:- Channelisation of Bata River in Tehsil Paonta Sahib Distt. Sirmour (HP) Earnest Money :-Rs.1500/-
(SH:- C/O 2 Nos RCC steps path embankment of Bata River 2 Nos in vill. FatehpurRD 12510 & 12600 Mtr.)Job no.1 Time:- Two Months.
Sr.No. Description Qty. Rate
1 Excavation in foundation and trenches etc.in earth work in all kinds of soil such as pick work ,jumper work 0.98 Cum 155.00
decomposed conglomerate saturated soil soft and hard rock upto all leads lifts stacking the excavated soil not
more than 3mtr.clear from the edge of excavation and then returning the stacked soil in consolidating each
deposited layers by ramming and watering and then disposing of all surplus excavated earth as directed with in
all leads lifts and as per directions of the Engineer-in-charge

2 Providing and laying cement concrete 1:4:8(1cement:4sand:8graded stone agg.40mm nominal size)and curing 8.20 Cum 2700.00
complete excluding the cost of form work in foundation & plinth including all leads lifts and carriage of material
and as per the directions of Engineer-in-charge.

3 Providing and laying cement concrete 1:2:4(1cement:2sand:4graded stone agg.20mm nominal size)and curing 2.40 Cum 3700.00
complete excluding the cost of form work in foundation & plinth including all leads lifts and carriage of material
and as per the directions of Engineer-in-charge.

4 Providing and laying reinforced cement concrete 1:2:4(1cement :2app.sand: 4app. graded stone agg.20mm 4.56 Cum 3800.00
nominal size )and curing complete excluding cost of form work & reinforcement in suspended floors, roofs,
shelves & supports, balconies beams etc. upto floor in two level in all height and depth including all leads lifts &
carriage of material at site and as per direction of the Engineer-incharge.

5 Providing mild steel/tor steel for rainforcement for RCC work including bending binding and placing in position 327.64 Kg 63.00
complete upto floor two level as per direction of the Engineer-in-charge.
6 Providing form work with steel sheets 3.15mm thick welded with angle iron 30x30x5 mm so as to give rough
finish i/c centring shuttering structing and propping etc. with wooden bettens & Ballies, height or propping &
centering below supporting floor to ceiling not exceeding 4 mtr.and removal of the same for insitu RCC work
and PCC work.including all leads lifts and carriage of material at site & as per direction of Engineer incharge in:-

a) Vertical surfaces . 10.72 Sqm. 200.00

TERMS AND CONDITIONS:-


1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Cement will be issued @ 315/- per bag & steel @ 53/- per Kg. at IPH store Bhatanwali Paonta Sahib.
4 Empty cement bags shall be returned to the deptt. Otherwise Rs. 2/- per bag shall be deducted from the each bill of the contractor.
5 Royality certificate in respect of stone agg. Sand etc. shall be produced by the contractor
Estimated Cost :-Rs.62632/-
Earnest Money :-Rs.1500/-
Time:- Two Months.
Unit Amount
P/Cum 152.00

P/Cum 22140.00

P/Cum 8880.00

P/Cum 17328.00

P/kg 20641.00

P/Sqm 2144.00
Total: 71285.00
Executive Engineer,
I&PH Division,
Paonta Sahib.

Estimated Cost :-Rs.62632/-


Earnest Money :-Rs.1500/-
Time:- Two Months.
Unit Amount
P/Cum 152.00

P/Cum 22140.00

P/Cum 8880.00

P/Cum 17328.00

P/kg 20641.00
P/Sqm 2144.00
Total: 71285.00

Executive Engineer,
I&PH Division,
Paonta Sahib.
REVISED SCHEDULE OF QUANTITY Estimated Cost :-Rs.93346/-
Name of work:- Restoration of Rain damages to T/well Bhrewala Ist in Tehsil Paonta Sahib Distt. Earnest Money :-Rs.1900/-
Sirmour (HP)(SH:-Replacement of old doors and windows roof treatment work & repair of RCC Time:- Two Months.
storage tank of LWSS Phandibodiwala)
Sr.No. Description Qty. Rate Unit Amount
1 Providing and laying cement concrete 1:4:8(1cement:4sand:8graded stone agg.40mm 1.83 Cum 3500.00 P/Cum 6405.00
nominal size)and curing complete excluding the cost of form work in foundation & plinth
including all leads lifts and carriage of material and as per the directions of Engineer-in-
charge.

2 Cement concrete flooringh 1:2:4(1cement:2sand:4graded stone agg.20mm nominal 24.45 Cum 270.00 P/Cum 6602.00
size)laid in one yaer finished with floating coat of neat cement 40mm thick and as per
the directions of Engineer-in-charge.

3 Providing and laying reinforced cement concrete 1:2:4(1cement :2app.sand: 4app. 4.25 Cum 4500.00 P/Cum 19125.00
graded stone agg.20mm nominal size )and curing complete excluding cost of form work
& reinforcement in suspended floors, roofs, shelves & supports, balconies beams etc.
upto floor in two level in all height and depth including all leads lifts & carriage of
material at site and as per direction of the Engineer-in-charge.

4 Providing mild steel/tor steel for rainforcement for RCC work including bending binding 255.00 Kg 55.00 P/kg 14025.00
and placing in position complete upto floor two level as per direction of the Engineer-in-
charge.

5 Providing fixing pressed steel door frames manufactured from commercial mild steel 0.00
of1.25mm thickness including hinges,jump lock bud and if required angle threshold of
M.S. angle 50x25mm or base tie of 1.25mm pressed steel I/c welding complete Including
steel hinges 2.5mm thick with guard lock strick plate and apply a coat of approved steel
primer affect pre-treaditional of surface in all leads lifts and carriage of materials as per
direction of Engineer incharge.

Profile-"A" 36.75 Rmt. 290.00 P/Rmt 10658.00


6 Providing and fixing 1mm thick M.S.sheet sliding shutters with frame and diagional 15.16 Sqm. 3200.00 P/Sqm. 48512.00
braces of 40x40x6mm angle iron 3.15mm MS gusset plate at junction and comers 25mm
dia Pulley 40x40x6mm angle and T iron guide at the top of bottom respectively
inculding applying a priming coat of red lead paint & as per direction of the Engineer-in-
charge.

7 White washing wth lime on decorated wall surfaces (three coat) to give an even shade 111.65 Sqm. 12.00 Per Sqm. 1340.00
including thoroughly brooming the surface to remove all dist dust and loose scale of lime
wash and other foreign matter complete in all respect and as per direction of the
Engineer-in-charge.

8 Finishing wall with water proofing paint on undecorated wall surfaces (two coats) to gve 125.15 Sqm. 42.00 Per Sqm. 5256.00
an even shade i.e. throughly brooming the surfaces to remove all dirt dust and other
foreign matter complete in all respect and as per direction of the Engineer-in-charge.

9 Applying priming coat over new steel and steel based surfaces after ad including 21.71 Sqm. 32.00 Per Sqm. 695.00
preparing the surface by throughly cleaning oil grease dirt and other foreign matter with
ready mixed paint brushing wood primer pink complete in all respect and as per
direction of the Engineer-in-charge.

10 Painting two coats excluding priming coat on enw steel ad steel surface with enamel 21.71 Sqm. 48.00 Per Sqm. 1042.00
paint to give an even shade including cleaing the suyrface of dirt dust and other foreign
matter sand paperting and stoping complete in all respect and as per direction of the
Engineer-in-charge.

Total: 113660.00
TERMS AND CONDITIONS:-
1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Cement will be issued @ 315/- per bag & steel @ 53/- per Kg. at IPH store Bhatanwali Paonta Sahib.
4 Empty cement bags shall be returned to the deptt. Otherwise Rs. 2/- per bag shall be deducted from the each bill of the
5 contractor.
Royality certificate in respect of stone agg. Sand etc. shall be produced by the contractor
Executive Engineer,
I&PH Division,
Paonta Sahib.
DRAFT SCHEDULE OF QUANTITY Estimated Cost :-Rs.97636/-
Name of work:-Prov. LWSS to PC Hab. Of CV Devi Nagar Kunja Matralion in Tehsil Paonta Sahib Distt. Sirmour (HP) Earnest Money :-Rs.2000/-
(SH:- CC flooring painting & distempering of Pump House & attendant quarter.) Time:- Three months.
Sr.No. Description Qty. Rate Unit Amount
1 2 3 4 5 6.
1 Excavation in foundation and trenches etc.in earth work in all kinds of soil such as pick work 2.82 Cum 92.85 P/Cum 262.00
,jumper work decomposed conglomerate saturated soil soft and hard rock upto all leads lifts
stacking the excavated soil not more than 3mtr.clear from the edge of excavation and then
returning the stacked soil in consolidating each deposited layers by ramming and watering and
then disposing of all surplus excavated earth as directed with in all leads lifts and as per
directions of the Engineer-incharge

2 Providing and laying cement concrete 1:6:12(1cement:6sand:12 graded stone agg.40mm 4.42 Cum 1942.50 P/Cum 8586.00
nominal size)and curing complete excluding the cost of form work in foundation & plinth
including all leads lifts and carriage of material and as per the directions of Engineer-in-charge.

3 1st. class brick work using common building bricks in foundation and plinth in Cement Mortar 3.08 Cum 2913.80 P/Cum 8975.00
1:6(1cement:6sand) in all leads lifts and carriage etc. as per direction of Engineer inchrge.

4 40mm thick cement concrete flooring 1:2:4 (1cement:2sand: 4 graded stone agg. 20mm nominal 13.96 Sqm 160.00 P/Sqm 2234.00
size)laid in one layer finished with a floating coat of neat cement including curing all leads, lifts
and carriage of materials at site and as per direction of Engineer incharge

5 Providing and laying cement concrete 1:4:8(1cement:4sand:8 graded stone agg.40mm nominal 18.36 Cum 2095.10 P/Cum 38466.00
size)and curing complete excluding the cost of form work in foundation & plinth including all
leads lifts and carriage of material and as per the directions of Engineer-in-charge.

6 Providing and fixing of tile skirting complete in all respect and as per direction of the 1.62 Sqm. 875.00 P/Sqm. 1418.00
Engineer0in0charge.
7 Providing and fixing of wall tiles complete in all leads,lifts and carriage of material and as per 4.48 Sqm. 875.00 P/Sqm. 3920.00
direction of the Engineer-in-charge.
8 Providing and fixing of sluice valve of various dia complete in all respect.
i) 65mm dias 2 Nos. 4340.00 Each. 8680.00
ii) 100 mm dia. 1 No. 6790.00 Each. 6790.00
9 Providing and fixing of various dia Union complete in all respect. 0.00

i) 15mm dias 5 Nos. 28.00 Each. 140.00


ii) 20 mm dia. 5 No. 42.00 Each. 210.00
10 Providing and fixing of Gate valve of various dia complete in all respect.
i) 15mm dias 15 Nos. 240.00 Each. 3600.00
ii) 20 mm dia. 15 No. 268.00 Each. 4020.00
11 Himrachi of colour wash on decorated wall surfaces ( two coats ) to give an even shade 52.08 Sqm. 11.00 P/Sqm. 573.00
including throughly brooming the surfaces to remove all dirt dust mortar drops and loose scale
of hirmachi wash and other foreign matter as per direction of Engineer incharge.

12 Painting two coat on wood work surface complete in all respect and as per direction of the 61.12 Sqm. 45.50 P/Sqm. 2781.00
Engineer-in-charge.

13 Distemper without bound distemper of approved quality complete in all respect. 104.10 Sqm. 35.70 P/Sqm. 3716.00

14 Water proofing cement paint (two coat )complete in all respect and as per directionof the 85.96 Sqm. 31.00 P/Sqm. 2665.00
Engineer-in-charge.
15 Providing and fixing of Brass tap of superior quality complete in all respect. 5 No. 120.00 Each. 600.00

Total:- 97636.00
TERMS AND CONDITIONS:-
1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Cement shall be issued @Rs.315/-P.bag & steel @Rs 53/- P.kg.at IPH Store Bhatanwali Paonta Sahib.
4 Empty cement bags shall be returned to the Deptt.otherwise Rs.2/-per bag shall be deducted from the bill.
5 Royalitry certificate in respect of(water born)stone aggregate sand etc.shalll be produced by the contractor.

Assistant Engineer
I&PH Sub Division.,
Paonta Sahib(HP)
REVISED SCHEDULE OF QUANTITY Estimated Cost :-Rs.99721/-
Name of work:-Prov. LWSS to PC Hab. Of CV Devi Nagar Kunja Matralion in Tehsil Paonta Sahib Distt. Sirmour (HP) Earnest Money :-Rs.2000/-
(SH:- Marble stone flooring in the pump House & attendant quarter.) Time:- Three months.
Sr.No. Description Qty. Rate Unit Amount
1 2 3 4 5 6.
1 Providing ending Marble stone flooring complete in all leads,lifts and carriage of material and as 70.00 Sqm. 1500.00 P/Sqm 105000.00
per direction of the Enginerr-in-charge.

2 Providing and fixing of metalic plate of surface including all leads lifts and carriage of material 2 Nos. 12000.00 Each. 24000.00
and as per the directions of Engineer-in-charge.

3 Providing and fixing of 1mm thick M.S. sheet for shuuter of door complete in all lreads,lifts and 5.4 Sqm. 2600.00 P/Sqm. 14040.00
carriage of material and as per direction of the Engineer-in-charge.

4 Providing fixing MS gerder of 200x200x7.8mm not less than 40 Kg. per Mtr. Complete in all 144.00 Kg. 75.00 P/Sqm 10800.00
respect and as per direction of the Engineer-in-charge.

Total:- 153840.00
TERMS AND CONDITIONS:-
1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Cement shall be issued @Rs.315/-P.bag & steel @Rs 53/- P.kg.at IPH Store Bhatanwali Paonta Sahib.
4 Empty cement bags shall be returned to the Deptt.otherwise Rs.2/-per bag shall be deducted from the bill.
5 Royalitry certificate in respect of(water born)stone aggregate sand etc.shalll be produced by the contractor.

Executive Engineer,
I&PH Division.,
Paonta Sahib(HP)
REVISED SCHEDULE OF QUANTITY. Estimated cost Rs 38660/-
Name of work:-R/M of GWSS Kando Cheog GP Kando Cheog in Tehsil Paonta Sahib Distt. Sirmour (HP) Earnest money Rs.800/-
(SH:-Jacketing in existing Tank) Time:- Two Months.
Sr.No. Description. Qty. Rate. Unit Amount.
1 2 3 4 5 6
1 Demolition /dismentalling above ground level upto floor two level including disposal of 2.08 Cum. 900.00 P/Cum 1872.00
unserviceable materials, stacking serviceable materials and cutting the necessary reinforcement
and separating out from RCC/RB work , RCC work complete in all respects and as per direction
of the Engineer-in-charge.

2 Providing and laying reinforced cement concrete 1:2:4(1cement :2app.sand: 4app. graded stone 2.03 Cum 4500.00 P/Cum 9135.00
agg.20mm nominal size )and curing complete excluding cost of form work & reinforcement
work in foundation & plinth including all leads lifts & carriage of material at site and as per
direction of the Engineer-in-charge.(in bed)

3 Providing and laying cement concrete 1:2:4(1cement:2sand:4 graded stone agg.20mm nominal 5.66 Cum 4500.00 P/Cum 25470.00
size) & curing complete excluding cost of form work and reinforcement concrete work in walls
of any thickness but not less than 0.1 mtr. thickness attached pillasters buttresses plinth and
string courses complete from top of foundation two level upto floor two level including all leads
lifts and carriage of material and as per the directions of Engineer-in-charge.

4 Providing and laying reinforced cement concrete 1:2:4(1cement :2app.sand: 4app. graded stone 2.99 Cum 4600.00 P/Cum 13754.00
agg.20mm nominal size )and curing complete excluding cost of form work & reinforcement
work in suspended floors, roofs, shelves & supports, balconies beams etc. upto floor in two level
in all height and depth including all leads lifts & carriage of material at site and as per direction
of the Engineer-in-charge.

5 Providing form work with steel sheets 3.15mm thick welded with angle iron 30x30x5 mm so as
to give rough finish i/c centring shuttering structing and propping etc. with wooden bettens &
Ballies, height or propping & centering below supporting floor to ceiling not exceeding 4
mtr.and removal of the same for insitu RCC work and PCC work including all leads lifts and
carriage of material at site & as per direction of Engineer incharge in:-

a) Flat surfaces such soffits of suspended floors roofs landing and the like floors etc. upto 19.78 Sqm. 300 Per Sqm. 5934.00
200mm in thickness.
b) Vertical surfaces such as waslls (any thickness partititions and the like including attached 37.72 Sqm. 200.00 Per Sqm. 7544.00
pillasters butteresses plinth and string courses and the like)
6 Providing Mild Steel/Tor steel reinforcement including bending binding & placing in positing 640.00 Kg. 64.00 P/kg 40960.00
I/c all leads lifts and carriage of material and as per direction of the Engineer-in-charge.

7 Providing and fixing of foot rest 20mm size including embeded in cement concrete 13 Nos. 75.00 Each. 975.00
1:3:6(1cement:3sand:6graded stone agg. 20mm nominal size in block 225x225x75mm and
carriage of material and complete in all respect as per direction of the Engineer-in-charge.

8 Providing laying and jointing of GI Pipe for sour pipe 40mm dia complete in all respect and as 6.00 Mtr. 21.00 Per Mtr. 126.00
per direction of the Engineer-in-charge.
Total: 105770.00
TERMS AND CONDITIONS:-
1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Cement will be issued @ 315/- per bag & steel @ 53/- per Kg. at IPH store Bhatanwali Paonta Sahib.
4 Empty cement bags shall be returned to the deptt. Otherwise Rs. 2/- per bag shall be deducted from the earch bill of the contractor.
5 Royality certificate in respect of stone agg. Sand etc. shall be produced by the contractor

Executive Engineer,
I&PH Division,
Paonta Sahib.
REVISED SCHEDULE OF QUANTITY
Name of work:- Aug. of LWSS Dhaula Kuan in Tehsil Paonta Sahib Distt. Sirmour (HP)
(SH:C/o Boundry wall around the Pump House Tubewell Sudonwala )
S.No Sub-Head and item of work. Qty.
1 2 3
1 Excavation in foundation and trenches etc.in earth work in all kinds of soil such as pick work ,jumper work decomposed 14.94 Cum
conglomerate saturated soil soft and hard rock upto all leads lifts stacking the excavated soil not more than 3mtr.clear from
the edge of excavation and then returning the stacked soil in 15cm layers when required in to plinth sides of foundation etc.
consolidating each deposited layers by ramming and watering and then disposing of all surplus excavated earth as directed
with in all leads lifts and as per directions of the Engineer-incharge

2 Providing and laying cement concrete work 1:5:10(1cement:5 sand: 10 graded stone agg. 40mm nominal size) with 15% 22.41 Cum
plum and curing complete excluding cost of form work and in retaining walls/ Breast walls, the size of Plums shall usually
be 150mm to 300mm as per PWD specificatioin including all leads lifts and carriage of material and as per direction of
Engineer incharge.

3 Providing form work with steel sheets 3.15mm thick welded with angle iron 30x30x5 mm so as to give rough finish i/c
centring shuttering structing and propping etc. with wooden bettens & Ballies, height or propping & centering below
supporting floor to ceiling not exceeding 4 mtr.and removal of the same for insitu RCC work and PCC work including all
leads lifts and carriage of material at site & as per direction of Engineer incharge in:-

a) Vertical surfaces 24.90 Sqm


4 Ist. Class brick work using common burnt clay building bricks in foundation and plinth in cement mortar 1:6(1cement : 2.83 Cum.
6sand) and as directed by the Engineer-in-charge.
5 Half brick work using common burnt clay building bricks in foundation and plinth incement mortar 1: 4(1cement:4 sand) 111.86 Cum.
including all leads,lifts and carriage of material and as per direction of the Enginer-in-charge.

6 Steel work welded in built up section trusses and framed work including cutting hoising fixing in positiion and applying a 1.326 Qntl.
priming coat of red lead paint in gratings framed guard bars ladders railing brackets and similar work including all
leads,lifts and carriage of material and as per direction of the Engineer-in-chage.

7 20mm thick cement plaster in single coat on rough side of brick masonary for interior plastert upto two level including 110.64 Sqm.
arises internal rounded angles chamfers and or rounded angles not exceeding 80mm in girth and finished even and smooth
with cement Mortar 1:4(1cement:4sand) and as directed by the Engineer-in-charge.
TERMS & CONDITIONS
1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax & labour cess shall be deducted as per rules.
3 Royality certificate in respect of stone agg. Sand etc. shall be produced by the contractor
4 Cement shall be issued @ 315/- per Bag & Steel @ 53/- per Kg. at IPH Store Bhatanwali Paonta Sahib.
5 Empty cement bags shall be returned to the Deptt. Otherwise Rs. 2/- per bag shall deducted from the bill.
6 Fencing panel shall be issued by the deptt. free of cost.
Estimated cost Rs 91919/-
Earnest money Rs.1900/-
Time:- Two Months.
Rates, Unit Amount.
4 5 6
155.00 P/Cum 2316.00

3000.00 P/Cum 67230.00

0.00

200.00 Per Sqm 4980.00


5300.00 Per Cum. 14999.00

780.00 P/Cum. 87251.00

8500.00 Per Qntl. 11271.00

180.00 P/Sqm. 19915.00


TOTAL: 207962.00

Executive Engineer,
I&PH Division,
Paonta Shib.
REVISED SHEDULE OF QUANTITY Estimated cost Rs 44132/-
Name of work:- Aug./Imp. of LWSS Rangwa Pabar & adjoining villages GP Jamna in Tehsil Paonta Sahib Distt. Earnest money Rs.1000/-
Sirmour (HP) (SH: Providing laying jointing & testing of 80mm GMS heavy in Rising Main) Time:- Three months.
Sr.No. Description. Qty. Rate. Unit Amount.
1 2 3 4 5 6
1 Excavation in drains & channel etc.in earth work in all kinds of soil such as pick work 126.56 Cum 160.00 P/Cum 20250.00
,jumper work blasting work, decomposed conglomerate saturated soil soft and hard rock
including dressing of sides and beds and prepareation of sub grade to level or slope
including refilling the trenches and disposing of surplus earth upto all leads,lifts disposed
earth to be levelled and neatly dressed including jungle clearance and as per directions of
the Engineer-incharge.

2 Laying and jointing of GMS Pipes of 80mm dia of following grade fitted with M.S.flanges
of following table as per IS 6392-1971 at every joint all degree bends as per site
requirement etc. (earth work in trenches to be measured and paid for seperately)
including all leads lifts and carriage of material at site as per direction of Engineer-in-
charge of following dias.

i) 80mm dia. 250 Rmt. 41.00 P/Rmt. 10250.00


3 Providing and fixing of M.S. M.S.flanges 80mm dia (nominal bore) of following table to 42 Pairs. 1200.00 Each 50400.00
GMS heavy /medium grade tubes cnfirming to IS 6392-1971 including cutting of pair.
threaded portion of pipe wherever required welding 3 layers with GMS (H) & (M) Pipes &
nts bolts washer complete of IS 1963 specification including packing sheet firefly 3mm
thick painting wih anticorosive paints complete in all leads,lifts and carriage of material
at site and as per direction of the Engineer-in-charge. 80mm dia (Medium grade) RD 0/0
to 250 Mtr.=250 Mtr. (Flange Table-5.)

Total: 80900.00
TERMS AND CONDITIONS:-
1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 GI Pipe shall be issued free of cost from IPH Store Bhatanwali.
Executive Engineer,
I&PH Division,
Paonta Sahib.
REVISED SCHEDULE OF QUANTITY Estimated cost Rs 99000/-/-
Name of work:- Aug./Imp. of LWSS Rangwa Pabar & adjoining villages GP Jamna in Tehsil Paonta Sahib Distt. Earnest money Rs.2000/-
Sirmour (HP) (SH: Supplying & errection of Booster stage & Rising Main) Time:- Three months.
Sr.No. Description. Qty. Rate. Unit Amount.
1 2 3 4 5 6
1 Supply of Horizontal spindle,horizontal split casing single/multisdtage centrifugal pumps 20 HP 8000.00 P/Cum 160000.00
of standard make such as KSB/Mather& Platt/Jyoti./Kirloskar confriming to BIS 1520-
1980 (upto date ammendments) rad with BIS 9137-1978 or latest to handle clear watert
having turbidity 50ppm with impellerscasing ring & shaft sleeves of rbonze shaft of steel
in CI casing suitable capacity coupled directly through a flexible coupling on a common
base plate to Kirloskar/NGEF/Crompton/Jyoti slip ring/squirrel cage screen protected
drip proof induction electric motor suitable for operation on the date given below.
(Booster stage .)

Total: 160000.00
TERMS AND CONDITIONS:-

Executive Engineer,
I&PH Division,
Paonta Sahib.
REVISED SCHEDULE OF QUANTITY Estimated Cost :-Rs.98344/-
Name of work:- Providing LWSS to PC hab. Misserwala Kiyarda & Jagatpur in Tehsil Paonta Sahib Distt. Sirmour (HP) Earnest Money :-Rs.2000/-
(SH:- Provi. & fixing barbed wire fencing around the Pump House, C/o R/wall to protect the R/Main line & painting Time:- Two Months.
distempering etc.)
Sr.No. Description Qty. Rate Unit
1 Excavation in foundation and trenches etc.in earth work in all kinds of soil such as pick work 23.78 Cum 155.00 P/Cum
,jumper work decomposed conglomerate saturated soil soft and hard rock upto all leads lifts
stacking the excavated soil not more than 3mtr.clear from the edge of excavation and then returning
the stacked soil in consolidating each deposited layers by ramming and watering and then disposing
of all surplus excavated earth as directed with in all leads lifts and as per directions of the Engineer-
in-charge

2 Providing form work with steel sheets 3.15mm thick welded with angle iron 30x30x5 mm so as to
give rough finish i/c centring shuttering structing and propping etc. with wooden bettens & Ballies,
height or propping & centering below supporting floor to ceiling not exceeding 4 mtr.and removal of
the same for insitu RCC work and PCC work including all leads lifts and carriage of material at site &
as per direction of Engineer incharge in:-

a) Vertiocal surfaces 68.68 Sqm 195.00 Per Sqm


3 Providing and laying cement concrete work 1:5:10(1cement:5 sand: 10 graded stone agg. 40mm 20.66 Cum 2300.00 P/Cum
nominal size) with 15% plum and curing complete excluding cost of form work and in retaining
walls/ Breast walls, the size of Plums shall usually be 150mm to 300mm as per PWD specificatioin
including all leads lifts and carriage of material and as per direction of Engineer incharge.

4 Demolition of brick work above ground level upto floor two level including stacking of serviceable 2.17 Cum 1250.00 P/Cum
materials and disposal of unserviceable material with 20 Mtrs. lead,lifts and carriage of material
and as per direction of the Engineer-in-charge.

5 Ist. Class brick work using common burnt clay building bricks in foundation and plinth in cement 2.88 Cum. 4600.00 Per Cum.
mortar 1:6(1cement :6sand) and as directed by the Engineer-in-charge.

6 20mm thick cement plaster in single coat on rough side of brick masonary for interior plastert upto 28.15 Sqm. 132.00 P/Sqm.
two level including arises internal rounded angles chamfers and or rounded angles not exceeding
80mm in girth and finished even and smooth with cement Mortar 1:4(1cement:4sand) and as
directed by the Engineer-in-charge.
7 Filling in plinth with sand Earth under floors including watering ramming consolidating and 16.80 Cum. 350.00 Per Cum.
dressing complete in all respect and as per direction of the Engineer-in-charge.

8 Providing and fixing of galvanised steel barbed wire IS 278-1962 Type-I) weighing 9.38 Kg./100 162.30 Rmt. 12.00 Per Rmt.
mtr. (Minimum) straining & fixing to any type standard rails mild steel wire staples or steel pins etc.
complete in all respect and as per direction of the Engineer-in-charge.

9 Steel work welded in built up section ange iron framed work including cutting fixing hoisting in 0.85 Qntl. 7800.00 Per Qntl.
position and applying a priming coat on read lead paint complete in all respect.
10 Finishing wall with Water Proofing cement paint on decorated wall surfaces(two coats) to give an 205.74 Sqm. 37.00 Per Sqm.
even shade i.e. thoroughly brooming the surface to remove all dirt dust and other foreign matter
complete in all respect and as per direction of the Engineer-in-charge.
11 Distempering with oil bound washable distemper of approed brand and manufactured of required 74.94 Sqm. 45.00 P/Sqm.
shade on decorated wall surfaces(two coats) to give an even shade i.e. through/brooming the
surfaces to remove give all dirt dust and other foreign matter complete in all respect and as per
direction of the Engineer-in-chage.

12 Applying priming coat over new steel and steel based surfaces after and including preparing the 63.90 Sqm. 23.00 Per Sqm.
surfaces by throughly cleaning oil grease dirt dust and other foreign matter sand papering and
stoping complete in all respect and as per direction of the Engineer-in-charge.
13 Painting two coats excluding priming coat on new steel and steelsurfaces with enamel paint to gie 63.90 Sqm. 52.00 Per Sqm.
an even shade including cleaning the surface of dirt,dust and other foreign matter sand papering
and stoping complete in all respect and as per direction of the Engineer-in-charge.

14 Supplying and fixing glass panes with putty and nails including removal of broken glass panes 4.26 Sqm. 650 Per Sqm.
wherever neessary palin glass 3mm thick and as per direction of the Engineer-in-charge.

Total:
TERMS AND CONDITIONS:-
1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Cement will be issued @ 250/- per bag & steel @ 41/- per Kg. at IPH store Bhatanwali Paonta Sahib.
4 Empty cement bags shall be returned to the deptt. Otherwise Rs. 2/- per bag shall be deducted from the each bill of the contractor.
5 Royality certificate in respect of stone agg. Sand etc. shall be produced by the contractor
Executive Engineer,
I&PH Division,
Paonta Sahib.
Cost :-Rs.98344/-
oney :-Rs.2000/-

Amount
3686.00

0.00

13393.00
47518.00

2713.00

13248.00

3716.00
5880.00

1948.00

6630.00

7612.00

3372.00

1470.00

3323.00

2769.00

117278.00

Executive Engineer,
I&PH Division,
Paonta Sahib.
REVISED SCHEDULE OF QUANTITY Estimated Cost :-Rs.40282
Name of work:-Restoration of Rain damages to FIS Manal in GP Bhajaun in Tehsil Paonta Sahib Distt.Sirmour(HP) Earnest Money :-Rs.800/-
(SH: C/O Retaining wall from Main Kuhal (Middle school) Manal to Nain Singh field at RD 110/0 /130 to 153)upper side the sump well along the Pump Time:- TWO months.
S.No Description Qty. Rate
1 2 3 4
1 Excavation in earth work and disposal of all excavated earth upto a lead of 20 Mtrs. And lift upto 1.50 Mtrs. disposing 26.68 Cum. 140.00
earth to be levelled and neatly dressed within a leads in Pick/juper work 50% each including all leads,lifts and carriage
of material and as per direction of the Engineer-in-charge.

2 Providing and laying cement concrete 1:6:12(1cement:6sand:12 graded stone agg.40mm nominal size)and 6.56 Cum 3000.00
curing complete excluding the cost of centring shuttering in foundation & plinth including all leads lifts and
carriage of material and as per the directions of Engineer-in-charge.

3 Providing and laying cement concrete work 1:4:8 (1cement: 4 sand: 8 graded stone agg. 20mm nominal size & curing 2.97 Cum 3300.00
complete) excluding cost of form work in foundation and plinth in breast & retaining wall in all height and depth
including all leads lifts complete and carriage of material etc. as per directions of Engineer incharge.

4 Random rubble masonary /Poly rubble masonary (uncoursed/brought to coursed) with hard stone of approved 24.60 Cum 2700.00
quality in foundation and plinth including levelling up with cement concrete 1:6.12(1cement:6sand:12 graded
stone agg. 20mm nominal size)in cement mortor 1:6 (1 Cement: 6 sand ) in breast wall & Retaining walls
including all leads lifts and carriage of material and as per the directions of Engineer-in-charge.

5 C/o Dry stone masonary in breast/Retaining walls/parapets etc. including all leads.lifts and carriage of material 33.03 Cum 1000.00
and as per direction of the Engineer-in-charge.

6 Boulder filling behind retaining wall by ramming and watering and then disposing of all surplus excavated earth 12.42 Cum 850.00
as directed within all leads,lifts and carriage of material and as per direction of the Engineer-in-charge.

TERMS AND CONDITIONS.


1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Cement shall be issued @ Rs. 250/- per bag & steel @ 41/- per Kg. from IPH store Bhatanwali Paonta Sahib.
4 Royality certificate in respect of stone agg. Sand etc. shall be produced by the contractor
5 Empty cement bags shall be returned to the Deptt. Otherwise Rs. 2/- per bag shall deducted from the bill.

Executive Engineer,
I&PH Division,
Paonta Sahib.
Estimated Cost :-Rs.40282/-
Earnest Money :-Rs.800/-
Time:- TWO months.
Unit Amount
5 6.
Per Cum. 3735.00

P/Cum 19680.00

P/Cum 9801.00

P/Cum 66420.00

P/Cum 33030.00

P/Cum 10557.00

Total: 143223.00
Executive Engineer,
I&PH Division,
Paonta Sahib.
REVISED SCHEDULE OF QUANTITY Estimated cost Rs 74216/-
Name of work:- Restoration of Rain damages to FIS Suinal GP Thontha Jakhal in Tehsil Paonta Sahib Earnest money Rs.1500/-
Distt. Sirmour (HP) (SH: C/o 24 Nos Haudies in Masonary & C/o Pucca Main channel 50 Mtrs. ) Time:- Three Months
S.No Sub-Head and item of work. Qty. Rates, Unit Amount.
1 2 3 4 5 6
1 Excavation in drains & channel etc.in earth work in all kinds of soil such as pick work 5.03 Cum. 155.00 P/Cum. 780.00
,jumper work blasting work, decomposed conglomerate saturated soil soft and hard
rock including dressing of sides and beds and prepareation of sub grade to level or
slope including refilling the trenches and disposing of surplus earth upto all
leads,lifts disposed earth to be levelled and neatly dressed including jungle clearance
and as per directions of the Engineer-incharge

2 Cement concrete lining 15cm thick or less for irrigation channels using cement
concrete 1:3:6(1cement:3sand:6graded stone agg. 20mm nominal size)and curing
complete excluding cost of form work included all leads lifts and carriage of material
complete in all respect and as per direction of Engineer-in-charge.

a)Hand Mixed concrete in bed. 1.28 Cum 4300.00 P/Cum 5504.00


b)Hand mixed concrete lining in side slopes. 1.95 Cum 4300.00 P/Cum 8385.00
3 Extra allowance for form work in concrete lining as directed by the Engineer-in- 1.95 Cum. 130.00 P/Cum. 254.00
charge including all leads lifts and carriage of matrerials at site complete in all
respects on side slopes as per direction of Engineer in charge.
4 Excavation in foundation and trenches etc.in earth work in all kinds of soil such as pick 31.10 Cum 155.00 P/Cum 4821.00
work ,jumper work decomposed conglomerate saturated soil soft and hard rock upto all
leads lifts stacking the excavated soil not more than 3mtr.clear from the edge of excavation
and then returning the stacked soil in consolidating each deposited layers by ramming and
watering and then disposing of all surplus excavated earth as directed with in all leads lifts
and as per directions
and layingof the Engineer-in-charge
5 Providing cement concrete 1:4:8(1cement:4sand:8graded stone agg.40mm 11.66 Cum 3800.00 P/Cum 44308.00
nominal size)and curing complete excluding the cost of form work in foundation & plinth
including all leads lifts and carriage of material and as per the directions of Engineer-in-
charge.

6 Squarre rubble masonary coursed with hard stone of approved quality in foundation and 41.30 Cum 3500.00 P/Cum 144550.00
plinth including levelling up with cement concrete 1:4(1cement:4sand ) stone agg. 20mm
nominal size)in cement mortor 1:4 (1 Cement: 4 sand ) in breast wall & Retaining walls
including all leads lifts and carriage of material and as per the directions of Engineer-in-
charge.

7 Providing and laying cement concrete flooring 1:2:4(1cement:2sand:4graded stone 54.97 Cum 280.00 P/Cum 15392.00
agg.20mm nominal size)and claid in opne layer neat cement complete cantilivers upto floor
two level in all height and depth including all leads,lifts and carriage of material at siteand as
directed by the Engineer-in-charge.

8 15mm thick cement plaster in single coat on rough side of brick masonary for interior 79.06 Sqm. 135.00 P/Sqm. 10673.00
plastert upto two level including arises internal rounded angles chamfers and or rounded
angles not exceeding 80mm in girth and finished even and smooth with cement Mortar
1:3(1cement:3sand) and as directed by the Engineer-in-charge.

TERMS & CONDITIONS 234667.00

1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-
charge.
2 Security,Sale tax & Income tax & labour cess shall be deducted as per rules.
3 Royality certificate in respect of stone agg. Sand etc. shall be produced by the contractor
4 Cement shall be issued @ 315/- per Bag & Steel @ 53/- per Kg. at IPH Store Bhatanwali Paonta Sahib.
5 Empty cement bags shall be returned to the Deptt. Otherwise Rs. 2/- per bag shall deducted from the bill. Executive Engineer,
I&PH Division,
Kaffota.
`
Name of work: Providing GWSS to Kando Cheog GP Kando Choeg in Tehsil Paonta Sahib Distt. Sirmour (HP)
(SH: Jacketing in RR masonary filter Tank)
S.No
1

3
4

5
SCHEDULE OF QUANTITY
Name of work: Providing GWSS to Kando Cheog GP Kando Choeg in Tehsil Paonta Sahib Distt. Sirmour (HP)
(SH: Jacketing in RR masonary filter Tank)
Sub-Head and item of work.
Providing and laying cement concrete 1:4:8(1cement:4sand:8 graded stone agg.40mm nominal size)and
curing complete excluding the cost of form work in foundation & plinth including all leads lifts and carriage
of material and as per the directions of Engineer-in-charge.

Providing and laying cement concrete work 1:1 1/2:3 (1cement:1 1/2 sand: 3 graded stone agg. 20mm
nominal size & curing complete) excluding cost of form workand reinforcement for RCC work including all
leads lifts complete and carriage of material etc. as per directions of Engineer incharge.

i) Foundation & Plinth.

b) Vertical surface such as wall any thickness.

Providing form work with steel sheets 3.15mm thick welded with angle iron 30x30x5 mm so as to give
rough finish i/c centring shuttering structing and propping etc. with wooden bettens & Ballies, height or
propping & centering below supporting floor to ceiling not exceeding 4 mtr.and removal of the same for
insitu RCC work and PCC work.including all leads lifts and carriage of material at site & as per direction of
Engineer in charge in:-

a) Vertical surface such as wall any thickness.

Providing Mild Steel/Tor steel reinforcement including bending binding & placing in positing I/c all leads
lifts and carriage of material and as per direction of the Engineer-in-charge.

Removal of old media and silt/sdebries in all kind of soil including saturated soil but excluding boulders
and rocky portion requiring blasting upto a distance of 20 metres disposing of unserviceable materials
stacking the serviceable materials and neatly dressed the surface complete in all respect including all
leads,lifts and carriage of material and as per direction of the Engineer-in-charge.

Providing and placing in horizontal layers filtermedia duly graded screened washed and cleaned as
specified by Engineer-in-charge.

i) Top layer fine sand effective size 0.20mm to 0.40mm and uniformity co-efficient 2.00 to 3.00 mtr.
ii) Second layer course sand 3mm to 5mm

iii) Third layer Bajri 6mm to 20mm.

iv) Fourth layer 20mm to 25mm.

v) Fifth layer or Bottom layer broken stone 50mm to 75mm.


TERMS & CONDITIONS

The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.

Security,Sale tax & Income tax shall be deducted as per rules.

Cement will be issued @ 315/- per bag & steel @ 53/- per Kg. at IPH store Bhatanwali Paonta Sahib.
Empty cement bags shall be returned to the deptt. Otherwise Rs. 2/- per bag shall be deducted from the
each bill of the contractor.

Royality certificate in respect of stone agg. Sand etc. shall be produced by the contractor
Estimated cost Rs 76355/-
HP) Earnest money Rs.1600/-
Time:- Three Months
Qty. Rates, Unit Amount.
3.31 Cum 1104.8 P/Cum 3657.00

3.31 Cum. 1866.80 P/Cum. 6179.00

7.61 Cum. 1923.00 P/Cum. 14634.00

50.76 Sqm. 80.70 P/Cum 4096.00

710.00 Kg. 20.70 P/kg 14697.00

24.50 Cum 38.50 P/Cum 943.00

3.06 Cum 1137.50 P/Cum 3481.00


2.04 Cum. 1682.80 P/ Cum. 3433.00

1.02 Cum. 1682.80 P/ Cum. 1716.00

3.06 Cum 1280.30 P/Cum 3918.00

15.31 Cum 1280.30 P/Cum 19601.00


Total: 76355.00
Assistant Engineer,
I&PH Sub Division, Kaffota.
DRAFT SCHEDULE OF QUANTITY Estimated cost Rs 40410/-
Name of work:-Restoration of Rain damages to R.G.Canal in Tehsil Paonta Sahib Distt. Sirmour (HP) Earnest money Rs.900/-
(SH: C/o retaining wall to protect the channel at RD 1250 to 1255 Mtrs.) Time:- Three months.
S.No Sub-Head and item of work. Qty. Rates, Unit
1 2 3 4 5
1 Cutting in earth work in and disposal of excavated earth within all leadsin Pick/jumper work 8.21 Cum 59.55 P/Cum
50% each complete in all respect and as per direction of the Engineer-in-chage.

2 Excavation in foundation and trenches etc.in earth work in all kinds of soil such as pick work 2.07 Cum 92.95 P/Cum
,jumper work decomposed conglomerate saturated soil soft and hard rock upto all leads lifts
stacking the excavated soil not more than 3mtr.clear from the edge of excavation and then
returning the stacked soil in 15cm layers when required in to plinth sides of foundation etc.
consolidating each deposited layers by ramming and watering and then disposing of all
surplus excavated earth as directed with in all leads lifts and as per directions of the
Engineer-incharge

3 Providing form work with steel sheets 3.15mm thick welded with angle iron 30x30x5 mm so
as to give rough finish i/c centring shuttering structing and propping etc. with wooden
bettens & Ballies, height or propping & centering below supporting floor to ceiling not
exceeding 4 mtr.and removal of the same for insitu RCC work and PCC work.including all leads
lifts and carriage of material at site & as per direction of Engineer in charge in:-

b) Vertical surface such as wall any thickness. 39.28 Sqm. 80.70 P/Cum
4 Providing and laying cement concrete 1:4:8(1cement: 4sand: 8 graded stone agg.40mm 7.65 Cum 1104.1 P/Cum
nominal size)and curing complete excluding the cost of form work in foundation & plinth
including all leads lifts and carriage of material and as per the directions of Engineer-in-
charge.
5 Providing and laying cement concrete work 1:5:10(1cement:5 sand: 10 graded stone agg. 9.18 Cum 934.30 P/Cum
40mm nominal size) with 15% plum and curing complete excluding cost of form work and in
retaining walls/ Breast walls, the size of Plums shall usually be 150mm to 300mm as per PWD
specificatioin including all leads lifts and carriage of material and as per direction of Engineer
incharge.

6 Excavation in drains & channel etc.in earth work in all kinds of soil such as pick work ,jumper 50.57 Cum. 75.95 P/Cum.
work blasting work, decomposed conglomerate saturated soil soft and hard rock including
dressing of sides and beds and prepareation of sub grade to level or slope including refilling
the trenches and disposing of surplus earth upto all leads,lifts disposed earth to be levelled
and neatly dressed including jungle clearance and as per directions of the Engineer-incharge

7 Cement concrete lining 15cm thick or less for irrigation channels using cement concrete
1:3:6(1cement:3sand:6graded stone agg. 20mm nominal size)and curing complete excluding
cost of form work included all leads lifts and carriage of material complete in all respect and
as per direction of Engineer-in-charge.

a)Hand Mixed concrete in bed. 16.89 Cum 423.10 P/Cum


b)Hand mixed concrete lining in side slopes. 19.00 Cum 431.10 P/Cum
4 Extra allowance for form work in concrete lining as directed by the Engineer-in-charge 19.00 Cum 18.85 P/Cum
including all leads lifts and carriage of matrerials at site complete in all respects on side
slopes as per direction of Engineer in charge.
Total:
TERMS AND CONDITIONS:-
1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Cement will be issued @ 315/- per bag & steel @ 53/- per Kg. at IPH store Bhatanwali Paonta Sahib.
4 Empty cement bags shall be returned to the deptt. Otherwise Rs. 2/- per bag shall be deducted from the earch bill of the contractor.
5 Royality certificate in respect of stone agg. Sand etc. shall be produced by the contractor
6 Contractor shall be responsible for watch & ward of store.
Assistant Engineer,
I&PH Sub Divn. Kaffota.

REVISED SCHEDULE OF QUANTITY Estimated cost Rs 36310/-


Name of work:-Aug. of LWSS Sathaur in GP Sankholi in Tehsil Paonta Sahib Distt. Sirmour (HP) Earnest money Rs.800/-
(SH: C/o Breast wall back side of Pump House) Time:- Three months.
S.No Sub-Head and item of work. Qty. Rates, Unit
1 2 3 4 5
1 Cutting in earth work in and disposal of excavated earth within all leadsin Pick/jumper work 20.33 Cum 140.00 P/Cum
50% each complete in all respect and as per direction of the Engineer-in-chage.

2 Excavation in foundation and trenches etc.in earth work in all kinds of soil such as pick work 6.33 Cum 160.00 P/Cum
,jumper work decomposed conglomerate saturated soil soft and hard rock upto all leads lifts
stacking the excavated soil not more than 3mtr.clear from the edge of excavation and then
returning the stacked soil in 15cm layers when required in to plinth sides of foundation etc.
consolidating each deposited layers by ramming and watering and then disposing of all
surplus excavated earth as directed with in all leads lifts and as per directions of the
Engineer-incharge

3 Providing and laying cement concrete 1:6:12(1cement:6sand:12 graded stone agg.40mm nominal 3.07 Cum 3400.00 P/Cum
size)and curing complete excluding the cost of centring shuttering in foundation & plinth including
all leads lifts and carriage of material and as per the directions of Engineer-in-charge.

4 Random rubble masonary /Poly rubble masonary (uncoursed/brought to coursed) with hard stone of 28.74 Cum 3500.00 P/Cum
approved quality in foundation and plinth including levelling up with cement concrete
1:6.12(1cement:6sand:12 graded stone agg. 20mm nominal size)in cement mortor 1:6 (1 Cement: 6
sand ) in breast wall & Retaining walls including all leads lifts and carriage of material and as per the
directions of Engineer-in-charge.

TERMS AND CONDITIONS:- Total:


1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Cement will be issued @ 315/- per bag & steel @ 53/- per Kg. at IPH store Bhatanwali Paonta Sahib.
4 Empty cement bags shall be returned to the deptt. Otherwise Rs. 2/- per bag shall be
5 deducted from the in
Royality certificate earch bill of
respect of the contractor.
stone agg. Sand etc. shall be produced by the contractor
Executive Engineer,
I&PH Division,Paonta Sahib.
ed cost Rs 40410/-
money Rs.900/-
hree months.
Amount.
6
489.00

192.00

3170.00
8446.00
8577.00

3841.00

7146.00
8191.00
358.00

40410.00

the contractor.

t Engineer,
b Divn. Kaffota.

ed cost Rs 36310/-
money Rs.800/-
hree months.
Amount.
6
2846.00

1013.00

10438.00

100590.00

114887.00
e Engineer,
vision,Paonta Sahib.
DRAFT SCHEDULE OF QUANTITY Estimated cost Rs.77948/-
Name of work:-Restoration of Rain damages to R.G.Canal in Tehsil Paonta Sahib Distt. Sirmour (HP) Earnest money Rs.1600/-
(SH: C/o retaining wall to protect the channel at RD 1250 to 1255 Mtrs.) Time:- Three months.
S.No Sub-Head and item of work. Qty. Rates, Unit
1 2 3 4 5
1 Excavation in drains & channel etc.in earth work in all kinds of soil such as pick work 60.75 Cum. 75.95 P/Cum.
,jumper work blasting work, decomposed conglomerate saturated soil soft and hard rock
including dressing of sides and beds and prepareation of sub grade to level or slope
including refilling the trenches and disposing of surplus earth upto all leads,lifts disposed
earth to be levelled and neatly dressed including jungle clearance and as per directions of
the Engineer-incharge

2 Providing and laying cement concrete work 1:5:10(1cement:5 sand: 10 graded stone agg. 58.40 Cum 934.30 P/Cum
40mm nominal size) with 15% plum and curing complete excluding cost of form work and
in retaining walls/ Breast walls, the size of Plums shall usually be 150mm to 300mm as per
PWD specificatioin including all leads lifts and carriage of material and as per direction of
Engineer incharge.

3 Providing form work with steel sheets 3.15mm thick welded with angle iron 30x30x5 mm so
as to give rough finish i/c centring shuttering structing and propping etc. with wooden
bettens & Ballies, height or propping & centering below supporting floor to ceiling not
exceeding 4 mtr.and removal of the same for insitu RCC work and PCC work.including all
leads lifts and carriage of material at site & as per direction of Engineer in charge in:-

b) Vertical surface such as wall any thickness. 232.60 Sqm. 80.70 P/Sqm
Total:
TERMS AND CONDITIONS:-
1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Cement will be issued @ 315/- per bag & steel @ 53/- per Kg. at IPH store Bhatanwali Paonta Sahib.
4 Empty cement bags shall be returned to the deptt. Otherwise Rs. 2/- per bag shall be deducted from the earch bill of the contractor.
5 Royality certificate in respect of stone agg. Sand etc. shall be produced by the contractor
6 Contractor shall be responsible for watch & ward of store. Assistant Engineer,
Giri Irrig.Sub Division.
Patlion.
DRAFT SCHEDULE OF QUANTITY Estimated cost Rs 99509/-
Name of work:- C/o LIS Kiratpur Bhagwanpur in Tehsil Paonta Sahib Distt. Sirmour (HP) Earnest money Rs.2000/-
(SH:-C/o RCC Sump well 76050 Ltr. Cap. ) Time:- Three months.
Sr.No. Description. Qty. Rate. Unit
1 Excavation in foundation and trenches etc.in earth work in all kinds of soil such as pick work ,jumper 27.90 Cum. 92.85 P/Cum
work decomposed conglomerate saturated soil soft and hard rock upto all leads lifts stacking the
excavated soil not more than 3mtr.clear from the edge of excavation and then returning the stacked
soil in 15cm layers when required in to plinth sides of foundation etc. consolidating each deposited
layers by ramming and watering and then disposing of all surplus excavated earth as directed with in
all leads lifts and as per directions of the Engineer-incharge

2 Providing and laying cement concrete 1:4:8(1cement:4sand:8 graded stone agg.40mm nominal 5.60 Cum 1104.80 P/Cum
size)and curing complete excluding the cost of form work in foundation & plinth including all leads
lifts and carriage of material and as per the directions of Engineer-in-charge.

3 Providing and laying cement concrete 1:2:4(1cement:2app.sand: 4 app. graded stone agg. 20mm 21.10 Cum 1658.90 P/Cum
nominal size )and curing complete excluding cost of form work & reinforcement for reinforced work
in suspended floors, roofs landing shelves and their supports balconies, beams, girders bressumers
and cantilivers upto to floor two level in all height and depth, including all leads lifts and carriage of
material at site and as per direction of the Engineer-incharge.

4 Providing form work with steel sheets 3.15mm thick welded with angle iron 30x30x5 mm so as to
give rough finish i/c centring shuttering structing and propping etc. with wooden bettens & Ballies,
height or propping & centering below supporting floor to ceiling not exceeding 4 mtr.and removal of
the same for insitu RCC work and PCC work.including all leads lifts and carriage of material at site &
as per direction of Engineer in charge in:-

a) In vertical walls any thickness but not less than 0.10 Metres. 147.60 Sqm. 80.70 P/Sqm.
5 Providing Mild Steel/Tor steel reinforcement including bending binding & placing in positing I/c all 2104.00 Kg. 20.70 P/kg
leads lifts and carriage of material and as per direction of the Engineer-in-charge.
6 Providing fixing foot rest complete in all respect and as per direction of the Engineer-in-charge. 14.00 Nos. 18.85 P/Cum
TERMS AND CONDITIONS:- Total:
1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Cement will be issued @ 315/- per bag & steel @ 53/- per Kg. at IPH store Bhatanwali Paonta Sahib.
4 Empty cement bags shall be returned to the deptt. Otherwise Rs. 2/- per bag shall be deducted from
the earch bill of the contractor.
5 Royality certificate in respect of stone agg. Sand etc. shall be produced by the contractor Assistant Engineer,
6 GI Pipe shall be issued free of cost from IPH Store Bhatanwali. Giri Irrig.Sub Division.
7 GI Fitting shall be provided by the contractor. Patlion.
ed cost Rs.77948/-
money Rs.1600/-
Three months.
Amount.
6
4614.00

54563.00

18771.00
77948.00
e contractor.

t Engineer,
g.Sub Division.

d cost Rs 99509/-
money Rs.2000/-
hree months.
Amount.
2591.00

6187.00

35003.00

11911.00
43553.00
264.00
99509.00

Engineer,
Sub Division.
REVISED SCHEDULE OF QUANTITY Estimated cost Rs 65423/-
Name of work:-Providing GWSS Kamoliti Bas GP Sankholi in Tehsil Paonta Sahib Distt. Sirmour (HP) Earnest money Rs.1400/-
(SH:-C/o RCC Collection Tank, 1 No. Laying & jointing of GI Pipes of 15mm dia ) Time:- Three months.
Sr.No. Description. Qty. Rate Rates, Unit
1 2 3 4 5
1 Excavation in foundation and trenches etc.in earth work in all kinds of soil such as pick work ,jumper work 6.85 Cum. 160.00 P/Cum
decomposed conglomerate saturated soil soft and hard rock upto all leads lifts stacking the excavated soil
not more than 3mtr.clear from the edge of excavation and then returning the stacked soil in 15cm layers
when required in to plinth sides of foundation etc. consolidating each deposited layers by ramming and
watering and then disposing of all surplus excavated earth as directed with in all leads lifts and as per
directions of the Engineer-incharge

2 Providing and laying cement concrete 1:4:8(1cement:4sand:8 graded stone agg.40mm nominal size)and 1.26 Cum 3800 P/Cum
curing complete excluding the cost of form work in foundation & plinth including all leads lifts and
carriage of material and as per the directions of Engineer-in-charge.

3 Providing and laying cement concrete work 1:1 1/2:3 (1cement:1 1/2 sand: 3 graded stone agg. 20mm
nominal size & curing complete) excluding cost of form workand reinforcement for RCC work including
all leads lifts complete and carriage of material etc. as per directions of Engineer incharge.

i) In foundation and Plinth 1.28 Cum. 5200.00 P/Cum.


ii) In vertical walls any thickness but not less than 0.10 Metres. 2.52 Cum. 5400.00 P/Cum.
4 Providing form work with steel sheets 3.15mm thick welded with angle iron 30x30x5 mm so as to give
rough finish i/c centring shuttering structing and propping etc. with wooden bettens & Ballies, height or
propping & centering below supporting floor to ceiling not exceeding 4 mtr.and removal of the same for
insitu RCC work and PCC work.including all leads lifts and carriage of material at site & as per direction of
Engineer in charge in:-

a) Flat surfaces such as soffits of suspended floor roofs landing and like upto 200mm in thickness. 4.20 Sqm. 300.00 P/Sqm.
ii) In vertical walls any thickness but not less than 0.10 Metres. 33.54 Sqm. 200.00 P/Sqm.
5 Providing and laying cement concrete 1:2:4(1cement:2app.sand: 4 app. graded stone agg. 20mm nominal 0.60 Cum 4990.00 P/Cum
size )and curing complete excluding cost of form work & reinforcement for reinforced work in suspended
floors, roofs landing shelves and their supports balconies, beams, girders bressumers and cantilivers upto
to floor two level in all height and depth, including all leads lifts and carriage of material at site and as per
direction of the Engineer-incharge.
6 Providing Mild Steel/Tor steel reinforcement including bending binding & placing in positing I/c all leads 267.20 Kg. 65.00 P/kg
lifts and carriage of material and as per direction of the Engineer-in-charge.

7 Excavation in drains & channel etc.in earth work in all kinds of soil such as pick work ,jumper work 692.55 Cum 160.00 P/Cum
blasting work, decomposed conglomerate saturated soil soft and hard rock including dressing of sides and
beds and prepareation of sub grade to level or slope including refilling the trenches and disposing of
surplus earth upto all leads,lifts disposed earth to be levelled and neatly dressed including jungle
clearance and as per directions of the Engineer-incharge

8 Laying and jointing of GMS Pipes of various dia in trenches (earth work in trenches to be measured and
paid for seperately) including all leads lifts and carriage of material at site as per direction of Engineer-in-
charge of following dias.

i)15mm dia 2000 Rmt 10.00 P/Rmt.

Total:
TERMS AND CONDITIONS:-
1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Cement will be issued @ 315/- per bag & steel @ 53/- per Kg. at IPH store Bhatanwali Paonta Sahib.
4 Empty cement bags shall be returned to the deptt. Otherwise Rs. 2/- per bag shall be deducted from the earch bill of the
contractor.
5 Royality certificate in respect of stone agg. Sand etc. shall be produced by the contractor
7 GI Pipe shall be issued free of cost from IPH Store Bhatanwali.
8 GI Fitting shall be provided by the contractor. Executive Engineer,
I&PH Division, .
Paonta Sahib.
REVISED SCHEDULE OF QUANTITY Estimated cost Rs 20892/-
Name of work:-Providing GWSS to PC Hab. Guina CV Chitli GP Shawga in Tehsil Paonta Sahib Distt. Sirmour (HP) Earnest money Rs.450/-
(SH:-Plastering of existing tank, laying & jointing of GI Pipes) Time:- Three months.
Sr.No. Description. Qty. Rate Rates, Unit
1 Providing and laying cement concrete 1:2:4(1cement:2sand:4 graded stone agg.20mm nominal 0.47 Cum 4500 P/Cum
size)and curing complete excluding the cost of form work in foundation & plinth including all
leads lifts and carriage of material and as per the directions of Engineer-in-charge.

2 15mm thick cement plaster in single coat on rough side of brick /stone masonary for interior 12.57 Sqm. 135.00 P/Sqm.
plastert upto two level including arises internal rounded angles chamfers and or rounded angles
not exceeding 20mm in girth and finished even and smooth with cement Mortar
1:6(1cement:6sand) and as directed by the Engineer-in-charge.

3 Excavation in drains & channel etc.in earth work in all kinds of soil such as pick work ,jumper 247.50 Cum 165.00 P/Cum
work blasting work, decomposed conglomerate saturated soil soft and hard rock including
dressing of sides and beds and prepareation of sub grade to level or slope including refilling the
trenches and disposing of surplus earth upto all leads,lifts disposed earth to be levelled and
neatly dressed including jungle clearance and as per directions of the Engineer-incharge

4 Laying and jointing of GMS Pipes of various dia in trenches (earth work in trenches to be
measured and paid for seperately) including all leads lifts and carriage of material at site as per
direction of Engineer-in-charge of following dias.

i)15mm dia 300 Rmt 12.00 P/Rmt.


ii) 20mm dia. 800 Rmt. 14.00 P/Rmt.
5 Providing and fixing of peet valve of superior quality of following dias complete in all respect and
as per direction of the Engineer-in-charge.
i)15mm dia 1 No. 450.00 Each.
ii) 20mm dia. 1 No. 550.00 Each.
TERMS AND CONDITIONS:- Total:
1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Cement will be issued @ 315/- per bag & steel @ 53/- per Kg. at IPH store Bhatanwali Paonta Sahib.
4 Empty cement bags shall be returned to the deptt. Otherwise Rs. 2/- per bag shall be deducted from the each bill of
the contractor.
5 Royality certificate in respect of stone agg. Sand etc. shall be produced by the contractor
6 GI Pipe shall be issued free of cost from IPH Store Bhatanwali. Executive Engineer,
7 GI Fitting shall be provided by the contractor. I&PH Division,
Paonta Sahib.
ost Rs 65423/-
ney Rs.1400/-

Amount.
6
1096.00

4788.00

6656.00
13608.00

1260.00
6708.00
2994.00
17368.00

110808.00

20000.00

185286.00

ngineer,
cost Rs 20892/-
oney Rs.450/-

Amount.
2115.00

1697.00

40838.00

3600.00
11200.00
450.00
550.00
60450.00

Engineer,
DRAFT SCHEDULE OF QUANTITY Estimated cost Rs 87277/-
Name of work:- Restoration of Rain damages o RG Canal in Tehsil Paonta Sahib Distt. Sirmour (HP) Earnest money Rs.1800/-
(SH:C/o Retaining wall to protect the RG Canal at RD 975 to 1035 Mtrs. ) Time:- Two Months.
S.No Sub-Head and item of work. Qty. Rates, Unit
1 2 3 4 5
1 Excavation in drains & channel etc.in earth work in all kinds of soil such as pick work 60.75 Cum 75.95 P/Cum
,jumper work blasting work, decomposed conglomerate saturated soil soft and hard
rock including dressing of sides and beds and prepareation of sub grade to level or
slope including refilling the trenches and disposing of surplus earth upto all leads,lifts
disposed earth to be levelled and neatly dressed including jungle clearance and as per
directions of the Engineer-incharge

2 Providing and laying cement concrete work 1:5:10(1cement:5 sand: 10 graded stone agg. 40mm 68.40 Cum 934.10 P/Cum
nominal size) with 15% plum and curing complete excluding cost of form work and in retaining
walls/ Breast walls, the size of Plums shall usually be 150mm to 300mm as per PWD
specificatioin including all leads lifts and carriage of material and as per direction of Engineer
incharge.

3 Providing form work with steel sheets 3.15mm thick welded with angle iron 30x30x5 mm so as
to give rough finish i/c centring shuttering structing and propping etc. with wooden bettens &
Ballies, height or propping & centering below supporting floor to ceiling not exceeding 4
mtr.and removal of the same for insitu RCC work and PCC work including all leads lifts and
carriage of material at site & as per direction of Engineer incharge in:-

a) Vertical surfaces 232.60 Sqm 80.70 Per Sqm

TOTAL:

TERMS & CONDITIONS


1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax & labour cess shall be deducted as per rules.
3 Royality certificate in respect of stone agg. Sand etc. shall be produced by the contractor
4 Cement shall be issued @ 315/- per Bag & Steel @ 53/- per Kg. at IPH Store Bhatanwali Paonta Sahib.
5 Empty cement bags shall be returned to the Deptt. Otherwise Rs. 2/- per bag shall deducted from the bill. Assistant Engineer,
6 Fencing panel shall be issued by the deptt. free of cost. Giri Irrig.Sub Division,
Patlion.
d cost Rs 87277/-
money Rs.1800/-
wo Months.
Amount.
6
4614.00

63892.00

18771.00

87277.00
Assistant Engineer,
Giri Irrig.Sub Division,
REVISED SCHEDULE OF QUANTITY Estimated Cost: 89207/-
Name of work:-Restoration of Rain damages to Left Bank Canal Km. 0/0 to 24/0 in Tehsil Paonta Earnest Money: 1800/-
Sahib Distt. Sirmour (HP) (SH: C/o Wire crate to Abhi Ka Khallato Protect the land) Time: Three Months.
S.No Sub-Head and item of work. Qty. Rates, Unit Amount.
1 Excavation in foundation and trenches etc.in earth work in all kinds of soil such as pick 26.25 Cum 155.00 P/Cum 4069.00
work ,jumper work decomposed conglomerate saturated soil soft and hard rock upto
all leads lifts stacking the excavated soil not more than 3mtr.clear from the edge of
excavation and then returning the stacked soil in 15cm layers when required in to
plinth sides of foundation etc. consolidating each deposited layers by ramming and
watering and then disposing of all surplus excavated earth as directed with in all leads
lifts and as per directions of the Engineer-incharge

2 Wire crates made of G.I.wire filled with boulder/hard stone of approved quality 120.30 Cum. 925.00 P/Cum. 111278.00
with square cut faces against the wire having rounded/rectangular shape weight
of stones not less than 18 Kg. free from soft spots,cracks,cavaties etc.(Wire crate
to be measured and paid for separately)including all leads,lifts and carriage of
material at site as direction of the Engineer-in-charge. (Double Knot)

3 Wire crates of G.I.wire filled with boulder with square cut faces against the wire 494.30 Sqm. 36.00 P/Sqm. 17795.00
G.I.wire 5mm thick corresponding to SWG 6 with 15cmx15cm mesh(boulder
filling to be measured and paid for separately including all leads,lifts and carriage
of materials at site and as per directions of the Engineer-in-charge(L.Rate)

Total: 133142.00
TERMS AND CONDITIONS:-
1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Royality certificate in respect of stone agg. Sand etc. shall be produced by the contractor
4 G.I.wire shall be issued free of cost from IPH store Bhatanwali Paonta Sahib
5 Boulder shall not be less than 18 Kg. & the stone should be free from cracks and cavities.
Executive Engineer,
I&PH Division
Paonta Sahib.
REVISED SCHEDULE OF QUANTITY Estimated Cost: 89207/-
Name of work:-Restoration of Rain damages to LEFT Bank canal in Tehsil Paonta Earnest Money: 1800/-
Sahib Distt. Sirmour (HP) (SH: C/o Wire crate to Protect the land of Dagan Ka Khalla) Time: Three Months.
S.No Sub-Head and item of work. Qty. Rates, Unit Amount.
1 Excavation in foundation and trenches etc.in earth work in all kinds of soil such as pick 26.25 Cum 155.00 P/Cum 4069.00
work ,jumper work decomposed conglomerate saturated soil soft and hard rock upto
all leads lifts stacking the excavated soil not more than 3mtr.clear from the edge of
excavation and then returning the stacked soil in 15cm layers when required in to
plinth sides of foundation etc. consolidating each deposited layers by ramming and
watering and then disposing of all surplus excavated earth as directed with in all leads
lifts and as per directions of the Engineer-incharge

2 Wire crates made of G.I.wire filled with boulder/hard stone of approved quality 120.30 Cum. 925.00 P/Cum. 111278.00
with square cut faces against the wire having rounded/rectangular shape weight
of stones not less than 18 Kg. free from soft spots,cracks,cavaties etc.(Wire crate
to be measured and paid for separately)including all leads,lifts and carriage of
material at site as direction of the Engineer-in-charge. (Double Knot)

3 Wire crates of G.I.wire filled with boulder with square cut faces against the wire 494.30 Sqm. 36.00 P/Sqm. 17795.00
G.I.wire 5mm thick corresponding to SWG 6 with 15cmx15cm mesh(boulder
filling to be measured and paid for separately including all leads,lifts and carriage
of materials at site and as per directions of the Engineer-in-charge(L.Rate)

Total: 133142.00
TERMS AND CONDITIONS:-
1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Royality certificate in respect of stone agg. Sand etc. shall be produced by the contractor
4 G.I.wire shall be issued free of cost from IPH store Bhatanwali Paonta Sahib
5 Boulder shall not be less than 18 Kg. & the stone should be free from cracks and cavities.
Executive Engineer,
I&PH Division
Paonta Sahib.
REVISED SCHEDULE OF QUANTITY Estimated Cost: 46614/-
Name of work: C/o LIS Pamta Bandla Dandla in GP Shawga in Tehsil Paonta Sahib Distt. Sirmour Earnest Money: 1000/-
(HP) (SH: C/o Wire crate to protect the Intake) Time: One Month.
S.No Sub-Head and item of work. Qty. Rates, Unit Amount.
1 Excavation in earth work in all kinds of soil and disposal of all excavated earth 11.25 Cum 145.00 P/Cum 1631.00
upto all leads lifts disposed earth to be levelled and neatly dressed including all
leads, lifts and carriage of material and as per directions of the Engineer-in-
charge

2 Wire crates made of G.I.wire filled with boulder/hard stone of approved quality 62.50 Cum. 925.00 P/Cum. 57813.00
with square cut faces against the wire having rounded/rectangular shape weight
of stones not less than 18 Kg. free from soft spots,cracks,cavaties etc.(Wire crate
to be measured and paid for separately)including all leads,lifts and carriage of
material at site as direction of the Engineer-in-charge. (Double Knot)

3 Wire crates of G.I.wire filled with boulder with square cut faces against the wire 300.00 Sqm. 250.00 P/Sqm. 75000.00
G.I.wire 4mm thick corresponding to SWG 6 with 15cmx15cm mesh(boulder
filling to be measured and paid for separately including all leads,lifts and carriage
of materials at site and as per directions of the Engineer-in-charge

Total: 134444.00
TERMS AND CONDITIONS:-
1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Royality certificate in respect of stone agg. Sand etc. shall be produced by the contractor
4 G.I.wire shall be provided by the contractor himself.
5 Boulder shall not be less than 18 Kg. & the stone should be free from cracks and cavities.
Executive Engineer,
I&PH Division
Paonta Sahib.

REVISED SCHEDULE OF QUANTITY Estimated Cost: 33942/-


Name of work:-Restoration of Rain damages to LEFT Bank canal in Tehsil Paonta Earnest Money: 550/-
Sahib Distt. Sirmour (HP) (SH: C/o Wire crate to Protect the cultivated land of shri Mohd. Time: Three Months.
Hussain S/o Sh.Taki Mohd Right side from Dagan Ka Khalla)
S.No Sub-Head and item of work. Qty. Rates, Unit Amount.
1 Excavation in foundation and trenches etc.in earth work in all kinds of soil such as pick 26.25 Cum 160.00 P/Cum 4200.00
work ,jumper work decomposed conglomerate saturated soil soft and hard rock upto
all leads lifts stacking the excavated soil not more than 3mtr.clear from the edge of
excavation and then returning the stacked soil in 15cm layers when required in to
plinth sides of foundation etc. consolidating each deposited layers by ramming and
watering and then disposing of all surplus excavated earth as directed with in all leads
lifts and as per directions of the Engineer-incharge

2 Wire crates made of G.I.wire filled with boulder/hard stone of approved quality 93.75 Cum. 925.00 P/Cum. 86719.00
with square cut faces against the wire having rounded/rectangular shape weight
of stones not less than 18 Kg. free from soft spots,cracks,cavaties etc.(Wire crate
to be measured and paid for separately)including all leads,lifts and carriage of
material at site as direction of the Engineer-in-charge. (Double Knot)
3 Wire crates of G.I.wire filled with boulder with square cut faces against the wire 450.00 Sqm. 36.00 P/Sqm. 16200.00
G.I.wire 5mm thick corresponding to SWG 6 with 15cmx15cm mesh(boulder
filling to be measured and paid for separately including all leads,lifts and carriage
of materials at site and as per directions of the Engineer-in-charge(L.Rate)

TERMS AND CONDITIONS:- Total: 107119.00


1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Royality certificate in respect of stone agg. Sand etc. shall be produced by the contractor
4 G.I.wire shall be issued free of cost from IPH store Bhatanwali Paonta Sahib
5 Boulder shall not be less than 18 Kg. & the stone should be free from cracks and cavities.
Executive Engineer,
I&PH Division
Paonta Sahib.
DRAFT SCHEDULE OF QUANTITY
Name of work:- Restoration of Rain damages on RG Canal in Tehsil Paonta Sahib Distt. Sirmour (HP)
(SH: C/o Retaining wall to protect the Inspection Path at RD 700 to 740 down stream)
S.No Sub-Head and item of work. Qty.
1 2 3
1 Excavation in foundation and trenches etc.in earth work in all kinds of soil such as pick work ,jumper work decomposed 22.36 Cum.
conglomerate saturated soil soft and hard rock upto all leads lifts stacking the excavated soil not more than 3mtr.clear from
the edge of excavation and then returning the stacked soil in 15cm layers when required in to plinth sides of foundation etc.
consolidating each deposited layers by ramming and watering and then disposing of all surplus excavated earth as directed
with in all leads lifts and as per directions of the Engineer-in-charge

2 Providing and laying cement concrete work 1:5:10(1cement:5 sand: 10 graded stone agg. 40mm nominal size) with 15% 75.00 Cum
plum and curing complete excluding cost of form work and in retaining walls/ Breast walls, the size of Plums shall usually be
150mm to 300mm as per PWD specificatioin including all leads lifts and carriage of material and as per direction of Engineer
in-charge.

3 Providing form work with steel sheets 3.15mm thick welded with angle iron 30x30x5 mm so as to give rough finish i/c
centring shuttering structing and propping etc. with wooden bettens & Ballies, height or propping & centering below
supporting floor to ceiling not exceeding 4 mtr.and removal of the same for insitu RCC work and PCC work including all leads
lifts and carriage of material at site & as per direction of Engineer in-charge in:-

a) Vertical surfaces 203.80 Sqm

TERMS & CONDITIONS


1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax & labour cess shall be deducted as per rules.
3 Royality certificate in respect of stone agg. Sand etc. shall be produced by the contractor
4 Cement shall be issued @ 315/- per Bag & Steel @ 53/- per Kg. at IPH Store Bhatanwali Paonta Sahib.
5 Empty cement bags shall be returned to the Deptt. Otherwise Rs. 2/- per bag shall deducted from the bill.
6 Fencing panel shall be issued by the deptt. free of cost.
DRAFT SCHEDULE OF QUANTITY
Name of work:- A/R & M/O Giri Puruwala & Rampur Giri Canal in Tehsil Paonta Sahib Distt. Sirmour (HP)
(SH:Providing foot Bridge at RD 4500, 6050 of GP Canal & RD 8690 of RG Canal.)
S.No Sub-Head and item of work. Qty.
1 2 3
1 Excavation in foundation and trenches etc.in earth work in all kinds of soil such as pick work ,jumper work decomposed 6.48 Cum.
conglomerate saturated soil soft and hard rock upto all leads lifts stacking the excavated soil not more than 3mtr.clear from
the edge of excavation and then returning the stacked soil in 15cm layers when required in to plinth sides of foundation etc.
consolidating each deposited layers by ramming and watering and then disposing of all surplus excavated earth as directed
with in all leads lifts and as per directions of the Engineer-in-charge

2 Providing and laying cement concrete 1:6:12(1cement:6sand:12 graded stone agg.40mm nominal size)and curing complete 1.62 Cum
excluding the cost of centring shuttering in foundation & plinth including all leads lifts and carriage of material and as per
the directions of Engineer-in-charge.

3 Providing and laying cement concrete work 1:5:10(1cement:5 sand: 10 graded stone agg. 40mm nominal size) with 15% 7.29 Cum
plum and curing complete excluding cost of form work and in retaining walls/ Breast walls, the size of Plums shall usually be
150mm to 300mm as per PWD specificatioin including all leads lifts and carriage of material and as per direction of Engineer
incharge.

4 Providing and laying cement concrete 1:2:4(1cement:2app.sand: 4 app. graded stone agg. 20mm nominal size )and curing 3.78 Cum
complete excluding cost of form work & reinforcement for reinforced work in suspended floors, roofs landing shelves and
their supports balconies, beams, girders bressumers and cantilivers upto to floor two level in all height and depth, including
all leads lifts and carriage of material at site and as per direction of the Engineer-incharge.

5 Providing form work with steel sheets 3.15mm thick welded with angle iron 30x30x5 mm so as to give rough finish i/c
centring shuttering structing and propping etc. with wooden bettens & Ballies, height or propping & centering below
supporting floor to ceiling not exceeding 4 mtr.and removal of the same for insitu RCC work and PCC work including all leads
lifts and carriage of material at site & as per direction of Engineer incharge in:-

a) Vertical surfaces 19.44 Sqm


6 Providing Mild Steel/Tor steel reinforcement including bending binding & placing in positing I/c all leads lifts and carriage of 264.00 Kg.
material and as per direction of the Engineer-in-charge.

TERMS & CONDITIONS


1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax & labour cess shall be deducted as per rules.
3 Royality certificate in respect of stone agg. Sand etc. shall be produced by the contractor
4 Cement shall be issued @ 315/- per Bag & Steel @ 53/- per Kg. at IPH Store Bhatanwali Paonta Sahib.
5 Empty cement bags shall be returned to the Deptt. Otherwise Rs. 2/- per bag shall deducted from the bill.
Estimated cost Rs 88581/-
Earnest money Rs.1800/-
Time:- Two Months.
Rates, Unit Amount.
4 5 6
92.85 P/Cum 2076.00

934.10 P/Cum 70058.00

80.70 Per Sqm 16447.00

TOTAL: 88581.00

Assistant Engineer,
Giri Irrig.Sub Division,
Patlion.
Estimated cost Rs 22180/-
Earnest money Rs.500/-
Time:- Three Months.
Rates, Unit Amount.
4 5 6
92.85 P/Cum 602.00

905.10 P/Cum 1466.00

934.10 P/Cum 6810.00

1658.10 P/Cum 6268.00

80.70 Per Sqm 1569.00


20.70 P/kg 5465.00

TOTAL: 22180.00

Assistant Engineer,
Giri Irrig.Sub Division,
Patlion.
SCHEDULE OF QUANTITY Estimated cost Rs 54488/-
Name of work:-Restoration of Rain damages to various GWSS of census village Korga/CV Sankholi section Kamroo Earnest money Rs.1100/-
in Tehsil Paonta Sahib Distt. Sirmour (HP) (SH:-C/o 13 Nos intakes structures.) Time:- Three months.
Sr.No. Description. Qty. Rate Rates, Unit Amount.
1 2 3 4 5 6
1 Excavation in foundation and trenches etc.in earth work in all kinds of soil such as pick work 19.97 Cum. P/Cum
,jumper work decomposed conglomerate saturated soil soft and hard rock upto all leads lifts
stacking the excavated soil not more than 3mtr.clear from the edge of excavation and then
returning the stacked soil in 15cm layers when required in to plinth sides of foundation etc.
consolidating each deposited layers by ramming and watering and then disposing of all surplus
excavated earth as directed with in all leads lifts and as per directions of the Engineer-incharge

2 Providing and laying cement concrete 1:4:8(1cement:4sand:8 graded stone agg.40mm nominal 3.33 Cum P/Cum
size)and curing complete excluding the cost of form work in foundation & plinth including all
leads lifts and carriage of material and as per the directions of Engineer-in-charge.

3 Providing and laying cement concrete work 1:1 1/2:3 (1cement:1 1/2 sand: 3 graded stone agg.
20mm nominal size & curing complete) excluding cost of form workand reinforcement for RCC
work including all leads lifts complete and carriage of material etc. as per directions of Engineer
incharge.

i) In foundation and Plinth 4.99 Cum. P/Cum.


ii) In vertical walls any thickness but not less than 0.10 Metres. 8.97 Cum. P/Cum.

4 Providing form work with steel sheets 3.15mm thick welded with angle iron 30x30x5 mm so as
to give rough finish i/c centring shuttering structing and propping etc. with wooden bettens &
Ballies, height or propping & centering below supporting floor to ceiling not exceeding 4 mtr.and
removal of the same for insitu RCC work and PCC work.including all leads lifts and carriage of
material at site & as per direction of Engineer in charge in:-

a) Flat surfaces such as soffits of suspended floor roofs landing and like upto 200mm in 10.37 Sqm. P/Sqm.
thickness.
ii) In vertical walls any thickness but not less than 0.10 Metres. 16.40 Sqm. P/Sqm.
5 Providing and laying cement concrete 1:2:4(1cement:2app.sand: 4 app. graded stone agg. 20mm 1.94 Cum P/Cum
nominal size )and curing complete excluding cost of form work & reinforcement for reinforced
work in suspended floors, roofs landing shelves and their supports balconies, beams, girders
bressumers and cantilivers upto to floor two level in all height and depth, including all leads lifts
and carriage of material at site and as per direction of the Engineer-incharge.

6 Providing Mild Steel/Tor steel reinforcement including bending binding & placing in positing I/c 795.10 Kg. P/kg
all leads lifts and carriage of material and as per direction of the Engineer-in-charge.

Total:
TERMS AND CONDITIONS:-
1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Cement will be issued @ 315/- per bag & steel @ 53/- per Kg. at IPH store Bhatanwali Paonta Sahib.
4 Empty cement bags shall be returned to the deptt. Otherwise Rs. 2/- per bag shall be deducted from the earch bill of
the contractor.
5 Royality certificate in respect of stone agg. Sand etc. shall be produced by the contractor
7 GI Pipe shall be issued free of cost from IPH Store Bhatanwali.
8 GI Fitting shall be provided by the contractor. Assistant Engineer,
I&PH Sub Division, Kaffota.
SCHEDULE OF QUANTITY Estimated cost Rs.36310/-
Name of work:-Aug. of LWSS Sathaur in GP Sankholi in Tehsil Paonta Sahib Distt. Sirmour (HP) Earnest money Rs.800/-
(SH: C/O Breast wall of back of Pump House) Time:- Three Months.
S.No Sub-Head and item of work. Qty. Rates, Unit
1 2 3 4 5
1 Cutting in earth work in all kind of soil and dispoal of the excavated earth upt all leads,lifts and as 20.33 Cum P/Cum
directed by the Engineer-in-charge complete in all respect.

2 Excavation in foundation and trenches etc.in earth work in all kinds of soil such as pick work ,jumper 6.33 Cum P/Cum
work decomposed conglomerate saturated soil soft and hard rock upto all leads lifts stacking the
excavated soil not more than 3mtr.clear from the edge of excavation and then returning the stacked
soil in 15cm layers when required in to plinth sides of foundation etc. consolidating each deposited
layers by ramming and watering and then disposing of all surplus excavated earth as directed with in
all leads lifts and as per directions of the Engineer-incharge

3 Providing and laying cement concrete 1:6:12(1cement:6sand:12 graded stone agg.40mm nominal 3.07 Cum P/Cum
size)and curing complete excluding the cost of centring shuttering in foundation & plinth including all
leads lifts and carriage of material and as per the directions of Engineer-in-charge.

4 Random rubble masonary /Poly rubble masonary (uncoursed/brought to coursed) with hard stone of 28.74 Cum P/Cum
approved quality in foundation and plinth including levelling up with cement concrete
1:6.12(1cement:6sand:12 graded stone agg. 20mm nominal size)in cement mortor 1:6 (1 Cement: 6
sand ) in breast wall & Retaining walls including all leads lifts and carriage of material and as per the
directions of Engineer-in-charge.

TOTAL:
TERMS AND CONDITIONS:-
1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Royality certificate in respect of stone agg. Sand etc. shall be produced by the contractor
4 Cement shall be issued @ Rs.315/- Per bag & steel @ Rs.53/- per Kg. from IPH store Bhatanwali Paonta Sahib.
5 Empty cement bags shall be returned to the deptt. Other Rs.2/- per bag shall deducted from each bill of the contractor.
Assistant Engineer,
I&PH Sub Division,
Kaffota.

SCHEDULE OF QUANTITY Estimated cost Rs.36310/-


Name of work:-Aug. of LWSS Sathaur in GP Sankholi in Tehsil Paonta Sahib Distt. Sirmour (HP) Earnest money Rs.800/-
(SH: C/O Breast wall of back of Pump House) Time:- Three Months.
S.No Sub-Head and item of work. Qty. Rates, Unit
1 2 3 4 5
1 Cutting in earth work in all kind of soil and dispoal of the excavated earth upt all leads,lifts and as 20.33 Cum P/Cum
directed by the Engineer-in-charge complete in all respect.
2 Excavation in foundation and trenches etc.in earth work in all kinds of soil such as pick work ,jumper 6.33 Cum P/Cum
work decomposed conglomerate saturated soil soft and hard rock upto all leads lifts stacking the
excavated soil not more than 3mtr.clear from the edge of excavation and then returning the stacked
soil in 15cm layers when required in to plinth sides of foundation etc. consolidating each deposited
layers by ramming and watering and then disposing of all surplus excavated earth as directed with in
all leads lifts and as per directions of the Engineer-incharge

3 Providing and laying cement concrete 1:6:12(1cement:6sand:12 graded stone agg.40mm nominal 3.07 Cum P/Cum
size)and curing complete excluding the cost of centring shuttering in foundation & plinth including all
leads lifts and carriage of material and as per the directions of Engineer-in-charge.

4 Random rubble masonary /Poly rubble masonary (uncoursed/brought to coursed) with hard stone of 28.74 Cum P/Cum
approved quality in foundation and plinth including levelling up with cement concrete
1:6.12(1cement:6sand:12 graded stone agg. 20mm nominal size)in cement mortor 1:6 (1 Cement: 6
sand ) in breast wall & Retaining walls including all leads lifts and carriage of material and as per the
directions of Engineer-in-charge.

TOTAL:
TERMS AND CONDITIONS:-
1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Royality certificate in respect of stone agg. Sand etc. shall be produced by the contractor
4 Cement shall be issued @ Rs.315/- Per bag & steel @ Rs.53/- per Kg. from IPH store Bhatanwali Paonta Sahib.
5 Empty cement bags shall be returned to the deptt. Other Rs.2/- per bag shall deducted from each bill of the contractor.
Assistant Engineer,
I&PH Sub Division,
Kaffota.

REVISED SCHEDULE OF QUANTITY Estimated cost Rs.60680/-


Name of work:-Restorationof Rain damages to FIS Jamna in Tehsil Paonta Sahib Distt. Sirmour (HP) Earnest money Rs.1300/-
(SH: C/O Breast wall back of intake at RD 60 to 66.70 Mtrs.& removal of slips) Time:- Three Months.
S.No Sub-Head and item of work. Qty. Rates, Unit
1 2 3 4 5
1 Cutting in earth work in all kind of soil and dispoal of the excavated earth upt all leads,lifts and as 21.51 Cum 140.00 P/Cum
directed by the Engineer-in-charge complete in all respect.
2 Excavation in foundation and trenches etc.in earth work in all kinds of soil such as pick work ,jumper 8.18 Cum 160.00 P/Cum
work decomposed conglomerate saturated soil soft and hard rock upto all leads lifts stacking the
excavated soil not more than 3mtr.clear from the edge of excavation and then returning the stacked
soil in 15cm layers when required in to plinth sides of foundation etc. consolidating each deposited
layers by ramming and watering and then disposing of all surplus excavated earth as directed with in
all leads lifts and as per directions of the Engineer-incharge

3 Providing and laying cement concrete 1:6:12(1cement:6sand:12 graded stone agg.40mm nominal 4.53 Cum 2900.00 P/Cum
size)and curing complete excluding the cost of centring shuttering in foundation & plinth including all
leads lifts and carriage of material and as per the directions of Engineer-in-charge.

4 Random rubble masonary /Poly rubble masonary (uncoursed/brought to coursed) with hard stone of 28.85 Cum 3300.00 P/Cum
approved quality in foundation and plinth including levelling up with cement concrete
1:6.12(1cement:6sand:12 graded stone agg. 20mm nominal size)in cement mortor 1:6 (1 Cement: 6
sand ) in breast wall & Retaining walls including all leads lifts and carriage of material and as per the
directions of Engineer-in-charge.

5 Stone filling behind the retaining wall complete in all respect as per direction of the Engineer-in- 4.34 Cum. 717.00 P/Cum.
charge.
6 Removal of slips in all kinds of soil including saturated soil but excuding boulder and rocky portion 521.55 Cum. 130.00 Per Cum.
required blastering portion requiring blasting upto distance of 20 Mtrs. disposing of unserviceable
materials stacking serviceable materials and neatly dressing the surface complete in all respect.

TOTAL:
TERMS AND CONDITIONS:-
1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Royality certificate in respect of stone agg. Sand etc. shall be produced by the contractor
4 Cement shall be issued @ Rs.315/- Per bag & steel @ Rs.53/- per Kg. from IPH store Bhatanwali Paonta Sahib.
5 Empty cement bags shall be returned to the deptt. Other Rs.2/- per bag shall deducted from each bill of the contractor.
Executive Engineer,
I&PH Division,
Paonta Sahib
d cost Rs.36310/-
money Rs.800/-
ree Months.
Amount.
6

Engineer,
d cost Rs.36310/-
money Rs.800/-
ree Months.
Amount.
6

Engineer,
d cost Rs.60680/-
money Rs.1300/-
ree Months.
Amount.
6
3011.00

1309.00

13137.00

95205.00

3112.00

67802.00

183576.00
Engineer,
REVISED SCHEDULE OF QUANTITY Estimated cost Rs.36310/-
Name of work:-R/M of various LWSS/LIS under I&PH Sub Division Kaffota in Tehsil Paonta Sahib Distt. Sirmour (HP) Earnest money Rs.800/-
(SH: Prov. & supplying of Electrical equipments.) Time:- Three Months.
S.No Sub-Head and item of work. Qty. Rates, Unit
1 2 3 4 5
1 Providing and supplying of Volt meter (0-500) Volt complete in all respect and as per direction of the 40.00 Nos. 800.00 Each.
Engineer-in-charge.

2 Providing and supplying of various type of Kit Kat complete in all respect and as per direction of the
Engineer-in-charge.

i) 63 AMP. 30.00 Nos. 550.00 Each.


ii) 200 AMP. 30.00 Nos. 1300.00 Each.
iii) 500 AMP. 30.00 Nos. 1800.00 Each.

3 Providing and supplying of M.Coil complete in all respect. 40.00 Nos. 880.00 Each.

TOTAL:
TERMS AND CONDITIONS:-
1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 No payment shall be paid for rejected/defective work.

Executive Engineer,
I&PH Division,
Paonta Sahib.
d cost Rs.36310/-
money Rs.800/-
ree Months.
Amount.
6
32000.00

0.00

16500.00
39000.00
54000.00

35200.00

176700.00

Engineer,
DRAFT SCHEDULE OF QUANTITY Estimated cost Rs 99779/-
Name of work:-Providing LWSS to PC hab. Of CV Badripur Taruwala & Gondpur in Tehsil Paonta Sahib Distt. Sirmour (HP) Earnest money Rs.2000/-
(SH:- Laying & jointing of GI Pipes in distribution system ) Time:- Three months.
Sr.No. Description. Qty. Rate. Unit Amount.
1 2 3 4 5 6
1 Excavation in drains & channel etc.in earth work in all kinds of soil such as pick work ,jumper work 256.73 Cum 75.95 P/Cum 19499.00
blasting work, decomposed conglomerate saturated soil soft and hard rock including dressing of
sides and beds and prepareation of sub grade to level or slope including refilling the trenches and
disposing of surplus earth upto all leads,lifts disposed earth to be levelled and neatly dressed
including jungle clearance and as per directions of the Engineer-incharge

2 Laying and jointing of GMS Pipes of various dia in trenches (earth work in trenches to be measured
and paid for seperately) including all leads lifts and carriage of material at site as per direction of
Engineer-in-charge of following dias.

i)20mm dia 110 Rmt 0.75 P/Rmt. 83.00


ii) 32mm dia. 375 Rmt. 1.00 P/Rmt. 375.00
iii) 100 dia (H) Plain Ended. 330 Rmt. 2.10 P/Rmt. 693.00
3 Providing and fixing of fullway valve of superior quality with wheel of the following dia complete in 0.00
all respect including all leads,lifts an carriage of material at site and as per direction of the Engineer-
in-charge.

i)20mm dia 1 No. 84.50 Each. 85.00


ii) 32mm dia. 1 No. 211.45 Each. 211.00
iii) 50mm dia. 1 No. 368.40 Each. 368.00
iv) 100 dia 1 No. 1233.93 Each. 1234.00
4 Providing fixing MS flange of 100mm dia GMS Medium grade tube confirming to IS 6392-1971 Table- 54 Pair. 815.50 Per Pair. 44037.00
5 & welding with GMS Pipe including packing sheet 3mm thick minimum & painting with anti
corrosive paint complete in all respect i/c all leads, lifts and carriage of material at site and as per
direction of Engineer in charge

5 Providing fixing Double falnge cast iron sluice valve class PN 1.6 of LEADER/BHEL/Kirloskar make 2.00 No. 11200.00 Each. 22400.00
and of 100mm dia the suction side & capable of with standing the normal seat pressure as per IS-
780-1992 with upto date ammendmens complete in all respect including all leadfs,lifts and carriage
of material at site and as per direction of the Engineer-in-charge.
6 Providing and fixing of double flange cast iron/NRV class PN 1.0 of LEADER/BHEL/Kirloskar make 1.00 No. 6993.00 Each. 6993.00
& of 100mm dia the suction side & capable of with standing the normal seat pressure as per IS 780-
1992 with upto date ammendments complete in all respect including all leads,lifts and carriage of
material at site and as per diection of the Engineer-in-charge.

7 Providing fixing Double flange bends class PN 1.6 of LEADER/BHEL/Kirloskar make and of 100mm 10.00 No. 380.10 Each. 3801.00
dia the suction side & capable of with standing the normal seat pressure as per IS-780-1992 with
upto date ammendmens complete in all respect including all leads,lifts and carriage of material at
site and as per direction of the Engineer-in-charge.

Total: 99779.00
TERMS AND CONDITIONS:-
1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Cement will be issued @ 315/- per bag & steel @ 53/- per Kg. at IPH store Bhatanwali Paonta Sahib.
4 Empty cement bags shall be returned to the deptt. Otherwise Rs. 2/- per bag shall be deducted from the earch bill of the
contractor.
5 Royality certificate in respect of stone agg. Sand etc. shall be produced by the contractor
7 GI Pipe shall be issued free of cost from IPH Store Bhatanwali.
8 GI Fitting shall be provided by the contractor. Assistant Engineer,
I&PH Sub Division,
Paonta Sahib.
REVISED SCHEDULE OF QUANTITY Estimated cost Rs 84348/-
Name of work:-R/M of LWSS Shamshergarh in Tehsil Paonta Sahib Distt. Sirmour (HP) Earnest money Rs.1687/-
(SH:- Laying & jointing of GI Pipes in distribution system ) Time:- Two Months.
Sr.No. Description. Qty. Rate. Unit Amount.
1 2 3 4 5 6
1 Excavation in drains & channel etc.in earth work in all kinds of soil such as pick work ,jumper work 558.00 Cum 160.00 P/Cum 89280.00
blasting work, decomposed conglomerate saturated soil soft and hard rock including dressing of
sides and beds and prepareation of sub grade to level or slope including refilling the trenches and
disposing of surplus earth upto all leads,lifts disposed earth to be levelled and neatly dressed
including jungle clearance and as per directions of the Engineer-incharge

2 Laying and jointing of GMS Pipes of various dia in trenches (earth work in trenches to be measured
and paid for seperately) including all leads lifts and carriage of material at site as per direction of
Engineer-in-charge of following dias.

i)25mm dia 1260 Rmt 19.00 P/Rmt. 23940.00

ii) 32mm dia. 600 Rmt. 23.00 P/Rmt. 13800.00

3 Providing and fixing ofBrass fullway valve of superior quality with wheel of the following dia
complete in all respect including all leads,lifts an carriage of material at site and as per direction of
the Engineer-in-charge.

i)25mm dia 3 No. 650.00 Each. 1950.00

ii) 32mm dia. 2 No. 900.00 Each. 1800.00


Total: 130770.00
TERMS AND CONDITIONS:-
1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 In addition to noral security 5% will be withheld for want of testing of pipes against leakage and will be released after successful testing.
4 GI Pipe shall be issued free of cost from IPH Store Bhatanwali.
5 GI Fitting shall be provided by the contractor. Executive Engineer,
I&PH Division,
Paonta Sahib.
DETAIL OF MEASUREMENT
Name of work:-Restoration of Rain damages to Misserwala Ka Khalla at village Jagatpur in Tehsil Paonta Sahib
Distt. Sirmour (HP) (SH:- C/o wire crate to protect the cultivaed land)
S.No Description L B H
1 2 3 5 4
1 Excavation in foundation and trenches etc.in earth work in all kinds of soil such as pick work ,jumper work
decomposed conglomerate saturated soil soft and hard rock upto all leads lifts stacking the excavated soil
not more than 3mtr.clear from the edge of excavation and then returning the stacked soil in 15cm layers
when required in to plinth sides of foundation etc. consolidating each deposited layers by ramming and
watering and then disposing of all surplus excavated earth as directed with in all leads lifts and as per
directions of the Engineer-in-charge

RD 0 to 30 Mtr. 30.00 1.5 1.25


RD 35 to 65 Mtr. 30.00 1.5 1.25

2 Wire crates made of G.I.wire filled with boulder/hard stone of approved quality with square cut faces
against the wire having rounded/rectangular shape weight of stones not less than 18 Kg. free from soft
spots,cracks,cavaties etc.(Wire crate to be measured and paid for separately)including all leads,lifts
and carriage of material at site as direction of the Engineer-in-charge. (Double Knot)

RD 0 to 30 Mtr. 30.00 1.5 1.25

RD 35 to 65 Mtr. 30.00 1.5 0.50

Wire crates of G.I.wire filled with boulder with square cut faces against the wire G.I.wire 5mm thick
corresponding to SWG 6 with 15cmx15cm mesh(boulder filling to be measured and paid for separately
including all leads,lifts and carriage of materials at site and as per directions of the Engineer-in-charge.

3
RD to 0 to 30 Mtr. 30.00 1.50 1.25
RD 35 to 65 Mtr. 30.00 1.5 1.25
REVISED SCHEDULE OF QUANTITY Estimated Cost: 97643/-
Name of work:-Restoration of Rain damages to Misserwala Khalla in Tehsil Paonta Sahib Distt. Earnest Money: 2000/-
Sirmour
(SH: C/o(HP)
Wire crate to protect the cultivated land & Houses) Pat-Ist. Time : One Month.
S.No Description Qty. Unit Rate
1 2 3 5 4
1 Excavation in earth work in all kinds of soil and disposal of all excavated earth upto all leads lifts 25.60 P/Cum 145.00
disposed earth to be levelled and neatly dressed including all leads, lifts and carriage of material
and as per directions of the Engineer-in-charge
2 Wire crates made of G.I.wire filled with boulder/hard stone of approved quality with square cut 130.00 P/Sqm. 925.00
faces against the wire having rounded/rectangular shape weight of stones not less than 18 Kg.
free from soft spots,cracks,cavaties etc.(Wire crate to be measured and paid for
separately)including all leads,lifts and carriage of material at site as direction of the Engineer-in-
charge. (Double Knot)

3 Wire crates of G.I.wire filled with boulder with square cut faces against the wire G.I.wire 5mm 624.00 P/Cum. 36.00
thick corresponding to SWG 6 with 15cmx15cm mesh(boulder filling to be measured and paid for
separately including all leads,lifts and carriage of materials at site and as per directions of the
Engineer-in-charge.

TERMS AND CONDITIONS:- Total


1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Royality certificate in respect of stone agg. Sand etc. shall be produced by the contractor
4 G.I.Wire shall be issued by the deptt. free of cost from IPH Store Bhatanwali.
5 Boulder shall not be less than 18 Kg. & the stone should be free from cracks and cavities.
Executive Engineer,
I&PH Division, Paonta Sahib.

REVISED SCHEDULE OF QUANTITY Estimated Cost: 96435/-


Name of work:-Improvement of Left Bank Canal at RD 5200 to 6900 & 7000 to 8700 Mtrs. in Tehsil Earnest Money: 1928/-
Paonta Sahib Distt. Sirmour (HP) (SH: Extra carraige of silt/slips at RD 52oo to 6900 & 7000 to 8700). Time : 15 Days.
S.No Description Qty. Unit Rate
1 2 3 5 4
1 Extra carriage of silt/slips from Canal of Inspection upto dumping place 1 km. as oer direction of 1426.10 P/Cum 210.00
the Engineer-in-charge.

TERMS AND CONDITIONS:- Total


1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.

Executive Engineer,
I&PH Division, Paonta Sahib.
Qty.
6.

22.50
22.50
45.00

56.25

46.00

102.25
ted Cost: 97643/-
st Money: 2000/-
One Month.
Amount
6.
3712.00

120250.00

22464.00

146426.00
ve Engineer,
ivision, Paonta Sahib.

ted Cost: 96435/-


st Money: 1928/-

Amount
6.
299481.00

299481.00
ve Engineer,
ivision, Paonta Sahib.
REVISED SCHEDULE OF QUANTITY Estimated Cost: 58566/-
Name of work:-Providing LWSS to NC/PC hab. Of CV Kando in GP Dugana in Tehsil Paonta Sahib Distt. Sirmour (HP) Earnest Money: 1171/-
(SH:- C/o wire crate ).
(SH: C/o Wire crate) Time : Three Months.
S.No Description Qty. Unit Rate
1 2 3 5 4
1 Excavation in earth work in all kinds of soil and disposal of all excavated earth upto all leads lifts 22.50 P/Cum 130.00
disposed earth to be levelled and neatly dressed including all leads, lifts and carriage of material and
as per directions of the Engineer-in-charge

2 Wire crates made of G.I.wire filled with boulder/hard stone of approved quality with square cut faces 93.75 P/Sqm. 925.00
against the wire having rounded/rectangular shape weight of stones not less than 18 Kg. free from soft
spots,cracks,cavaties etc.(Wire crate to be measured and paid for separately)including all leads,lifts
and carriage of material at site as direction of the Engineer-in-charge. (Double Knot)

3 Wire crates of G.I.wire filled with boulder with square cut faces against the wire G.I.wire 5mm thick 375.00 P/Cum. 36.00
corresponding to SWG 6 with 15cmx15cm mesh(boulder filling to be measured and paid for separately
including all leads,lifts and carriage of materials at site and as per directions of the Engineer-in-charge.

TERMS AND CONDITIONS:- Total


1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.

3 Royality certificate in respect of stone agg. Sand etc. shall be produced by the contractor

4 G.I.Wire shall be provided by the contractor.

5 Boulder shall not be less than 18 Kg. & the stone should be free from cracks and cavities.
Executive Engineer,
I&PH Division, Paonta Sahib.
REVISED SCHEDULE OF QUANTITY Estimated Cost: 96408/-
Name of work:-Restoration of Rain damagess to Left Bank Canal in Tehsil Paonta Sahib Distt. Sirmour (HP) Earnest Money: 2000/-
(SH:- C/o wire crate ).
(SH: C/o Wire crate to protect the cultivated land of vill. Khara.) Time : Two Months.
S.No Description Qty. Unit Rate
1 2 3 5 4
1 Excavation in earth work in all kinds of soil and disposal of all excavated earth upto all leads lifts disposed 25.00 P/Cum 130.00
earth to be levelled and neatly dressed including all leads, lifts and carriage of material and as per
directions of the Engineer-in-charge

2 Wire crates made of G.I.wire filled with boulder/hard stone of approved quality with square cut faces 78.12 P/Sqm. 925.00
against the wire having rounded/rectangular shape weight of stones not less than 18 Kg. free from soft
spots,cracks,cavaties etc.(Wire crate to be measured and paid for separately)including all leads,lifts and
carriage of material at site as direction of the Engineer-in-charge. (Double Knot)

3 Wire crates of G.I.wire filled with boulder with square cut faces against the wire G.I.wire 5mm thick 374.88 P/Cum. 205.00
corresponding to SWG 6 with 15cmx15cm mesh(boulder filling to be measured and paid for separately
including all leads,lifts and carriage of materials at site and as per directions of the Engineer-in-charge.

TERMS AND CONDITIONS:- Total


1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Royality certificate in respect of stone agg. Sand etc. shall be produced by the contractor
4 G.I.Wire shall be provided by the contractor.
5 Boulder shall not be less than 18 Kg. & the stone should be free from cracks and cavities.
Executive Engineer,
I&PH Division, Paonta Sahib.

REVISED SCHEDULE OF QUANTITY Estimated Cost: 97643/-


Name of work:-Restoration of Rain damages to Misserwala Khalla in Tehsil Paonta Sahib Distt. Earnest Money: 2000/-
Sirmour
(SH: C/o(HP)
Wire crate to protect the cultivated land & Houses) Pat-Ist. Time : One Month.
S.No Description Qty. Unit Rate
1 2 3 5 4
1 Excavation in earth work in all kinds of soil and disposal of all excavated earth upto all leads lifts 25.60 P/Cum 145.00
disposed earth to be levelled and neatly dressed including all leads, lifts and carriage of material
and as per directions of the Engineer-in-charge

2 Wire crates made of G.I.wire filled with boulder/hard stone of approved quality with square cut 130.00 P/Sqm. 925.00
faces against the wire having rounded/rectangular shape weight of stones not less than 18 Kg.
free from soft spots,cracks,cavaties etc.(Wire crate to be measured and paid for
separately)including all leads,lifts and carriage of material at site as direction of the Engineer-in-
charge. (Double Knot)

3 Wire crates of G.I.wire filled with boulder with square cut faces against the wire G.I.wire 5mm 624.00 P/Cum. 36.00
thick corresponding to SWG 6 with 15cmx15cm mesh(boulder filling to be measured and paid for
separately including all leads,lifts and carriage of materials at site and as per directions of the
Engineer-in-charge.

TERMS AND CONDITIONS:- Total


1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Royality certificate in respect of stone agg. Sand etc. shall be produced by the contractor
4 G.I.Wire shall be issued by the deptt. free of cost from IPH Store Bhatanwali.
5 Boulder shall not be less than 18 Kg. & the stone should be free from cracks and cavities.
Executive Engineer,
I&PH Division, Paonta Sahib.
REVISED SCHEDULE OF QUANTITY Estimated Cost: 96435/-
Name of work:-Improvement of Left Bank Canal at RD 5200 to 6900 & 7000 to 8700 Mtrs. in Tehsil Earnest Money: 1928/-
Paonta Sahib Distt. Sirmour (HP) (SH: Extra carraige of silt/slips at RD 52oo to 6900 & 7000 to 8700). Time : 15 Days.
S.No Description Qty. Unit Rate
1 2 3 5 4
1 Extra carriage of silt/slips from Canal of Inspection upto dumping place 1 km. as oer direction of 1426.10 P/Cum 210.00
the Engineer-in-charge.

TERMS AND CONDITIONS:- Total


1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.

Executive Engineer,
I&PH Division, Paonta Sahib.
REVISED SCHEDULE OF QUANTITY Estimated Cost: 84119/-
Name of work:-C/o LIS Mungalawala Kartarpur in Tehsil Paonta Sahib Distt. Sirmour (HP) Earnest Money: 1682/-
(SH:- C/o wire crate ).
(SH: C/o Wire crate) Time : Three Months.
S.No Description Qty. Unit Rate
1 2 3 5 4
1 Excavation in earth work in all kinds of soil and disposal of all excavated earth upto all leads lifts 26.25 P/Cum 140.00
disposed earth to be levelled and neatly dressed including all leads, lifts and carriage of material and
as per directions of the Engineer-in-charge
2 Wire crates made of G.I.wire filled with boulder/hard stone of approved quality with square cut faces 112.51 P/Sqm. 925.00
against the wire having rounded/rectangular shape weight of stones not less than 18 Kg. free from soft
spots,cracks,cavaties etc.(Wire crate to be measured and paid for separately)including all leads,lifts
and carriage of material at site as direction of the Engineer-in-charge. (Double Knot)

3 Wire crates of G.I.wire filled with boulder with square cut faces against the wire G.I.wire 5mm thick 448.13 P/Cum. 36.00
corresponding to SWG 6 with 15cmx15cm mesh(boulder filling to be measured and paid for separately
including all leads,lifts and carriage of materials at site and as per directions of the Engineer-in-charge.

TERMS AND CONDITIONS:- Total


1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Royality certificate in respect of stone agg. Sand etc. shall be produced by the contractor
4 G.I.Wire shall be issued free of cost from IPH store Bhatanwali Paonta Sahib.
5 Boulder shall not be less than 18 Kg. & the stone should be free from cracks and cavities.
Executive Engineer,
I&PH Division, Paonta Sahib.
ted Cost: 58566/-
Money: 1171/-
hree Months.
Amount
6.
2925.00

86719.00

13500.00

103144.00

ve Engineer,
vision, Paonta Sahib.
ted Cost: 96408/-
t Money: 2000/-
Two Months.
Amount
6.
3250.00

72261.00

76850.00

152361.00

ve Engineer,
vision, Paonta Sahib.

ted Cost: 97643/-


st Money: 2000/-
One Month.
Amount
6.
3712.00

120250.00

22464.00

146426.00

ve Engineer,
ivision, Paonta Sahib.
ted Cost: 96435/-
st Money: 1928/-

Amount
6.
299481.00

299481.00

ve Engineer,
ivision, Paonta Sahib.
ted Cost: 84119/-
Money: 1682/-
hree Months.
Amount
6.
3675.00

104072.00

16133.00

123880.00

ve Engineer,
vision, Paonta Sahib.
REVISED SCHEDULE OF QUANTITY Estimated cost Rs 98430/-
Name of work:- Restoration of Rain damages to FIS Sukara Parlo GP Kamroo in Tehsil Paonta Sahib Earnest money Rs.2000/-
Distt. Sirmour (HP) (SH:Removal of slips/silt, C/o Pucca Main channel 370 Mtr. & C/o Retaining wall) Time:- Three Months
S.No Sub-Head and item of work. Qty. Rates, Unit Amount.
1 2 3 4 5 6
1 Removal of silt/slips in all kind of soil including saturated soil but excluding boulders and 630.11 Cum 130.00 P/Cum 81914.00
rocky portion requiring blasting upto a distance of 20 metres disposing of unserviceable
materials stacking the serviceable materials and neatly dressed the surface complete in all
respect including all leads,lifts and carriage of material and as per direction of the Engineer-
in-charge.
2 Cement concrete lining 15cm thick or less for irrigation channels using cement concrete
1:3:6(1cement:3sand:6graded stone agg. 20mm nominal size)and curing complete excluding
cost of form work included all leads lifts and carriage of material complete in all respect and
as per direction of Engineer-in-charge.

a)Hand Mixed concrete in bed. 9.51 Cum 3800.00 P/Cum 36138.00

b)Hand mixed concrete lining in side slopes. 14.43 Cum 3850.00 P/Cum 55556.00
3 Extra allowance for form work in concrete lining as directed by the Engineer-in-charge 14.43 Cum 130.00 P/Cum 1876.00
including all leads lifts and carriage of matrerials at site complete in all respects on side
slopes as per direction of Engineer in charge.

4 Cutting in earth work in all kind of soil and dispoal of the excavated earth upt all leads,lifts 22.58 Cum 140.00 P/Cum 3161.00
and as directed by the Engineer-in-charge complete in all respect.

5 Excavation in foundation and trenches etc.in earth work in all kinds of soil such as pick 36.03 Cum 160.00 P/Cum 5765.00
work ,jumper work decomposed conglomerate saturated soil soft and hard rock upto all
leads lifts stacking the excavated soil not more than 3mtr.clear from the edge of excavation
and then returning the stacked soil in consolidating each deposited layers by ramming and
watering and then disposing of all surplus excavated earth as directed with in all leads lifts
and as per directions of the Engineer-in-charge

6 Providing and laying cement concrete 1:6:12(1cement:6sand:12 graded stone agg.40mm 3.98 Cum 3050.00 P/Cum 12139.00
nominal size)and curing complete excluding the cost of centring shuttering in foundation &
plinth including all leads lifts and carriage of material and as per the directions of Engineer-
in-charge.
7 Random rubble masonary /Poly rubble masonary (uncoursed/brought to coursed) with 48.74 Cum 3400.00 P/Cum 165716.00
hard stone of approved quality in foundation and plinth including levelling up with cement
concrete 1:6.12(1cement:6sand:12 graded stone agg. 20mm nominal size)in cement mortor
1:6 (1 Cement: 6 sand ) in breast wall & Retaining walls including all leads lifts and carriage
of material and as per the directions of Engineer-in-charge.

TERMS & CONDITIONS Total: 362265.00

1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax & labour cess shall be deducted as per rules.
3 Royality certificate in respect of stone agg. Sand etc. shall be produced by the contractor
4 Cement shall be issued @ 315/- per Bag & Steel @ 53/- per Kg. at IPH Store Bhatanwali Paonta Sahib.
5 Empty cement bags shall be returned to the Deptt. Otherwise Rs. 2/- per bag shall deducted from the bill. Executive Engineer,
I&PH Division,
Paonta Sahib.

REVISED SCHEDULE OF QUANTITY Estimated cost Rs 44719/-


Name of work:- R/M of GWSS Sadiyar in GP Bhajaun in Tehsil Paonta Sahib Distt. Sirmour (HP) Earnest money Rs.900/-
(SH:c.o Retaining wall to protect the Unit) Time:- Three Months
S.No Sub-Head and item of work. Qty. Rates, Unit Amount.
1 2 3 4 5 6
1 Excavation in foundation and trenches etc.in earth work in all kinds of soil such as pick 29.75 Cum 160.00 P/Cum 4760.00
work ,jumper work decomposed conglomerate saturated soil soft and hard rock upto all
leads lifts stacking the excavated soil not more than 3mtr.clear from the edge of excavation
and then returning the stacked soil in consolidating each deposited layers by ramming and
watering and then disposing of all surplus excavated earth as directed with in all leads lifts
and as per directions of the Engineer-in-charge

2 Providing and laying cement concrete 1:6:12(1cement:6sand:12 graded stone agg.40mm 3.55 Cum 2500.00 P/Cum 8875.00
nominal size)and curing complete excluding the cost of centring shuttering in foundation &
plinth including all leads lifts and carriage of material and as per the directions of Engineer-
in-charge.

3 Random rubble masonary /Poly rubble masonary (uncoursed/brought to coursed) with 33.50 Cum 3200.00 P/Cum 107200.00
hard stone of approved quality in foundation and plinth including levelling up with cement
concrete 1:6.12(1cement:6sand:12 graded stone agg. 20mm nominal size)in cement mortor
1:6 (1 Cement: 6 sand ) in breast wall & Retaining walls including all leads lifts and carriage
of material and as per the directions of Engineer-in-charge.

4 Stone filling behind the retaining wall including all leads,lifts and carriage of material and as 1.80 Cum. 750.00 P/Cum. 1350.00
per direction of the Engineer-in-charge.

TERMS & CONDITIONS Total: 122185.00


1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax & labour cess shall be deducted as per rules.
3 Royality certificate in respect of stone agg. Sand etc. shall be produced by the contractor
4 Cement shall be issued @ 315/- per Bag & Steel @ 53/- per Kg. at IPH Store Bhatanwali Paonta Sahib.
5 Empty cement bags shall be returned to the Deptt. Otherwise Rs. 2/- per bag shall deducted from the bill. Executive Engineer,
6 Contractor shall be responsible for watch & ward of store. I&PH Division,
Paonta Sahb.
DRAFT SCHEDULE OF QUANTITY Estimated cost Rs 87345/-
Name of work R/M of GWSS Staun in Tehsil Paonta Sahib Distt.Sirmour (HP) (SH: C/O RCC sedimentation Earnest money Rs.1800/-
Tank 5100 Litre cap.
Time:- Three Months
S.No Sub-Head and item of work. Qty. Rates, Unit Amount.
1 2 3 4 5 6
1
1 Excavation in foundation and trenches etc.in earth work in all kinds of soil such as pick 34.52 Cum 92.85 P/Cum 3205.00
work ,jumper work decomposed conglomerate saturated soil soft and hard rock upto all
leads lifts stacking the excavated soil not more than 3mtr.clear from the edge of excavation
and then returning the stacked soil in 15cm layers when required in to plinth sides of
foundation etc. consolidating each deposited layers by ramming and watering and then
disposing of all surplus excavated earth as directed with in all leads lifts and as per directions
of the Engineer-in-charge

2 Providing and laying cement concrete 1:4:8(1cement:4sand:8 graded stone agg.40mm 3.97 Cum 1104.8 P/Cum 4386.00
nominal size)and curing complete excluding the cost of form work in foundation & plinth
including all leads lifts and carriage of material and as per the directions of Engineer-in-
charge.

3 Providing and laying cement concrete work 1:1 1/2:3 (1cement:1 1/2 sand: 3 graded stone 0.00
agg. 20mm nominal size & curing complete) excluding cost of form workand reinforcement
for RCC work including all leads lifts complete and carriage of material etc. as per directions
of Engineer incharge.

i) In foundation and footing etc. 5.52 Cum. 1866.80 P/Cum. 10305.00


ii) In vertical walls any thickness but not less than 0.10 Metres. 13.20 Cum. 1923.40 P/Cum. 25389.00
4 Providing form work with steel sheets 3.15mm thick welded with angle iron 30x30x5 mm so 0.00
as to give rough finish i/c centring shuttering structing and propping etc. with wooden
bettens & Ballies, height or propping & centering below supporting floor to ceiling not
exceeding 4 mtr.and removal of the same for insitu RCC work and PCC work.including all
leads lifts and carriage of material at site & as per direction of Engineer in charge in:-

a) Flat surfaces. 2.88 Sqm. 134.10 P/Cum 386.00


b) Vertical surface such as wall any thickness. 223.94 Sqm. 80.70 P/Cum 18072.00
5 Providing and laying cement concrete 1:2:4(1cement:2app.sand: 4 app. graded stone agg. 1.11 Cum. 1658.90 Per 1841.00
20mm nominal size )and curing complete excluding cost of form work & reinforcement for Cum.
reinforced work in suspended floors, roofs landing shelves and their supports balconies,
beams, girders bressumers and cantilivers upto to floor two level in all height and depth,
including all leads lifts and carriage of material at site and as per direction of the Engineer-
incharge.

6 Providing Mild Steel/Tor steel reinforcement including bending binding & placing in 1041.00 Kg. 20.70 P/kg 21549.00
positing I/c all leads lifts and carriage of material and as per direction of the Engineer-in-
charge.
7 Ist. Class masonary in common bunt clay building bricks in foundation & plinth in cement 0.66 Cum. 1399.70 P/Cum. 924.00
motrar 1:3(1cement:3sand) in all leads,lifts and carriage etc. as per direction of the
Engineer-in-charge.
8 Providing and placing in horizontal layers filtermedia duly graded screened washed and 0.00
cleaned as specified by Engineer-in-charge.
i) Top layer fine sand effective size 0.20mm to 0.40mm and uniformity co-efficient 2.00 to 7.80 Cum 84.80 P/Cum 661.00
3.00 mtr.
ii) Second layer course sand 3mm to 5mm 1.56 Cum. 80.80 P/ Cum. 126.00

iii) Third layer Bajri 6mm to 20mm. 1.04 Cum. 147.15 P/ Cum. 153.00

iv) Fourth layer 20mm to 25mm. 1.56 Cum 135.40 P/Cum 211.00
v) Fifth layer or Bottom layer broken stone 50mm to 75mm. 1.56 Cum 87.80 P/Cum 137.00
Total: 87345.00
TERMS & CONDITIONS
1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-
in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Cement will be issued @ 315/- per bag & steel @ 53/- per Kg. at IPH store Bhatanwali
Paonta Sahib.
4 Empty cement bags shall be returned to the deptt. Otherwise Rs. 2/- per bag shall be Assistant Engineer,
deducted from the each bill of the contractor.
5 Royality certificate in respect of stone agg. Sand etc. shall be produced by the contractor I&PH Sub Division, Kaffota.
DRAFT SCHEDULE OF QUANTITY Estimated cost Rs 98430/-
Name of work:- C/o LIS NERA Dhunai GP Dugana in Tehsil Paonta Sahib Earnest money Rs.2000/-
Distt. Sirmour (HP) (SH:C/o R/wall at various reaches.) Time:- Three Months
S.No Sub-Head and item of work. Qty. Rates, Unit Amount.
1 2 3 4 5 6
1 Excavation in foundation and trenches etc.in earth work in all kinds of soil such as pick 34.98 Cum 92.85 P/Cum 3248.00
work ,jumper work decomposed conglomerate saturated soil soft and hard rock upto all
leads lifts stacking the excavated soil not more than 3mtr.clear from the edge of excavation
and then returning the stacked soil in consolidating each deposited layers by ramming and
watering and then disposing of all surplus excavated earth as directed with in all leads lifts
and as per directions of the Engineer-in-charge
2 Providing and laying cement concrete 1:6:12(1cement:6sand:12 graded stone agg.40mm 15.94 Cum 3050.00 P/Cum 48617.00
nominal size)and curing complete excluding the cost of centring shuttering in foundation &
plinth including all leads lifts and carriage of material and as per the directions of Engineer-
in-charge.
3 Random rubble masonary /Poly rubble masonary (uncoursed/brought to coursed) with 103.53 Cum 1135.50 P/Cum 117558.00
hard stone of approved quality in foundation and plinth including levelling up with cement
concrete 1:6.12(1cement:6sand:12 graded stone agg. 20mm nominal size)in cement mortor
1:6 (1 Cement: 6 sand ) in breast wall & Retaining walls including all leads lifts and carriage
of material and as per the directions of Engineer-in-charge.

TERMS & CONDITIONS Total: 169423.00


1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax & labour cess shall be deducted as per rules.
3 Royality certificate in respect of stone agg. Sand etc. shall be produced by the contractor
4 Cement shall be issued @ 315/- per Bag & Steel @ 53/- per Kg. at IPH Store Bhatanwali Paonta Sahib.
5 Empty cement bags shall be returned to the Deptt. Otherwise Rs. 2/- per bag shall deducted from the bill. Executive Engineer,
I&PH Division,
Paonta Sahib.
REVISED SCHEDULE OF QUANTITY Estimated cost Rs 67323/-
Name of work:- Restoration of Rain damages to FIS Sukara Parlo Part Sukara GP Kamroo in Tehsil Paonta Sahib Earnest money Rs.1400/-
Distt. Sirmour (HP) (SH:C/o Breast wall back of Intake & C/O Pucca Main channel) Time:- Two Months
S.No Sub-Head and item of work. Qty. Rates, Unit Amount.
1 2 3 4 5 6
1 Cutting in earth work and disposal of all excavated earth with in all leads,lifts in Pick/Jumper 26.70 Cum 140.00 P/Cum 3738.00
work 50% each complete in all respect and as per direction of the Engineer-in-charge.

2 Excavation in foundation and trenches etc.in earth work in all kinds of soil such as pick 12.68 Cum 160.00 P/Cum 2029.00
work ,jumper work decomposed conglomerate saturated soil soft and hard rock upto all
leads lifts stacking the excavated soil not more than 3mtr.clear from the edge of excavation
and then returning the stacked soil in consolidating each deposited layers by ramming and
watering and then disposing of all surplus excavated earth as directed with in all leads lifts
and as per directions of the Engineer-in-charge

3 Providing and laying cement concrete 1:6:12(1cement:6sand:12 graded stone agg.40mm 8.90 Cum 2800.00 P/Cum 24920.00
nominal size)and curing complete excluding the cost of centring shuttering in foundation &
plinth including all leads lifts and carriage of material and as per the directions of Engineer-
in-charge.
4 Random rubble masonary /Poly rubble masonary (uncoursed/brought to coursed) with 29.48 Cum 2800.00 P/Cum 82544.00
hard stone of approved quality in foundation and plinth including levelling up with cement
concrete 1:6.12(1cement:6sand:12 graded stone agg. 20mm nominal size)in cement mortor
1:6 (1 Cement: 6 sand ) in breast wall & Retaining walls including all leads lifts and carriage
of material and as per the directions of Engineer-in-charge.

5 Excavation in drains & channel etc.in earth work in all kinds of soil such as pick 65.34 Cum. 160.00 P/Cum 10454.00
work ,jumper work blasting work, decomposed conglomerate saturated soil soft and
hard rock including dressing of sides and beds and prepareation of sub grade to
level or slope including refilling the trenches and disposing of surplus earth upto all
leads,lifts disposed earth to be levelled and neatly dressed including jungle clearance
and as per directions of the Engineer-incharge

6 Cement concrete lining 15cm thick or less for irrigation channels using cement concrete
1:3:6(1cement:3sand:6graded stone agg. 20mm nominal size)and curing complete excluding
cost of form work included all leads lifts and carriage of material complete in all respect and
as per direction of Engineer-in-charge.

a)Hand Mixed concrete in bed. 16.32 Cum 3700.00 P/Cum 60384.00

b)Hand mixed concrete lining in side slopes. 24.77 Cum 3800.00 P/Cum 94126.00

7 Extra allowance for form work in concrete lining as directed by the Engineer-in-charge 24.77 Cum 130.00 P/Cum 3220.00
including all leads lifts and carriage of matrerials at site complete in all respects on side
slopes as per direction of Engineer in charge.

TERMS & CONDITIONS Total: 281415.00


1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax & labour cess shall be deducted as per rules.
3 Royality certificate in respect of stone agg. Sand etc. shall be produced by the contractor
4 Cement shall be issued @ 315/- per Bag & Steel @ 53/- per Kg. at IPH Store Bhatanwali Paonta Sahib.
5 Empty cement bags shall be returned to the Deptt. Otherwise Rs. 2/- per bag shall deducted from the bill. Executive Engineer,
I&PH Division,
Paonta Sahib.
REVISED SCHEDULE OF QUANTITY Estimated cost Rs 92500/-
Name of work:- R/m OF Left Bank Canal Km. 0/0 to 24/0 under Giri Irrig. Sub Division Patlion in Tehsil Earnest money Rs.2000/-
Paonta Sahib Distt. Sirmour (HP) (SH:Providing and supply of stationery articles.) Time:- Three Months
S.No Sub-Head and item of work. Qty. Rates, Unit Amount.

1 2 3 4 5 6
1 Providing and supply of tender form No.8 with agreement file cover complete in all 2500.00 Nos. 100.00 Each. 250000.00
respect and as per direction of the Engineer-in-charge.

TERMS & CONDITIONS Total: 250000.00


1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax & labour cess shall be deducted as per rules.
3 Nothing shall be paid for rejected/defective material.

Executive Engineer,
I&PH Division,
Paonta Sahib.
DRAFT SCHEDULE OF QUANTITY Estimated cost Rs 68683/-
Name of work:- CAD of FIS Jaithal Kog Dabra & Tilwar GP Shawga in Tehsil Paonta Sahib Distt. Sirmour (HP) Earnest money Rs.1400/-
(SH:Removal of slips/silt at various RD's, , C/o Pucca Main channel 370 Mtr. & C/o Retaining wall) Time:- Three Months
S.No Sub-Head and item of work. Qty. Rates,
1 2 3 4
1 Removal of silt/slips in all kind of soil including saturated soil but excluding boulders and rocky portion 452.69 Cum 160.00
requiring blasting upto a distance of 20 metres disposing of unserviceable materials stacking the serviceable
materials and neatly dressed the surface complete in all respect including all leads,lifts and carriage of material
and as per direction of the Engineer-in-charge.

2 Cement concrete lining 15cm thick or less for irrigation channels using cement concrete
1:3:6(1cement:3sand:6graded stone agg. 20mm nominal size)and curing complete excluding cost of form work
included all leads lifts and carriage of material complete in all respect and as per direction of Engineer-in-
charge.

a)Hand Mixed concrete in bed. 8.69 Cum


b)Hand mixed concrete lining in side slopes. 13.18 Cum
3 Extra allowance for form work in concrete lining as directed by the Engineer-in-charge including all leads lifts 13.18 Cum
and carriage of matrerials at site complete in all respects on side slopes as per direction of Engineer in charge.

4 Excavation in foundation and trenches etc.in earth work in all kinds of soil such as pick work ,jumper work 25.20 Cum
decomposed conglomerate saturated soil soft and hard rock upto all leads lifts stacking the excavated soil not
more than 3mtr.clear from the edge of excavation and then returning the stacked soil in consolidating each
deposited layers by ramming and watering and then disposing of all surplus excavated earth as directed with in
all leads lifts and as per directions of the Engineer-in-charge

6 Providing and laying cement concrete 1:6:12(1cement:6sand:12 graded stone agg.40mm nominal size)and 3.35 Cum
curing complete excluding the cost of centring shuttering in foundation & plinth including all leads lifts and
carriage of material and as per the directions of Engineer-in-charge.
7 Providing form work with steel sheets 3.15mm thick welded with angle iron 30x30x5 mm so as to give rough finish i/c
centring shuttering structing and propping etc. with wooden bettens & Ballies, height or propping & centering below
supporting floor to ceiling not exceeding 4 mtr.and removal of the same for insitu RCC work and PCC work.including all
leads lifts and carriage of material at site & as per direction of Engineer in charge in:-

a) Flat surfaces such as soffits of suspended floor roofs landing and like upto 200mm in thickness. 52.69 Sqm.
8 Providing and laying cement concrete work 1:5:10(1cement:5 sand: 10 graded stone agg. 40mm nominal size) 31.27 Cum
with 15% plum and curing complete excluding cost of form work and in retaining walls/ Breast walls, the size
of Plums shall usually be 150mm to 300mm as per PWD specificatioin including all leads lifts and carriage of
material and as per direction of Engineer incharge.

TERMS & CONDITIONS


1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax & labour cess shall be deducted as per rules.
3 Royality certificate in respect of stone agg. Sand etc. shall be produced by the contractor
4 Cement shall be issued @ 315/- per Bag & Steel @ 53/- per Kg. at IPH Store Bhatanwali Paonta Sahib.
5 Empty cement bags shall be returned to the Deptt. Otherwise Rs. 2/- per bag shall deducted from the bill.
Estimated cost Rs 68683/-
Earnest money Rs.1400/-
Time:- Three Months
Unit Amount.
5 6
P/Cum 72430.00

0.00

P/Cum 0.00 13.182


P/Cum 0.00
P/Cum 0.00

P/Cum 0.00

P/Cum 0.00

P/Sqm.
P/Cum

Total:

Assistant Engineer,
I&PH Sub Divn.Kaffota.
DRAFT SCHEDULE OF QUANTITY Estimated Cost :-Rs.88304/-
Name of work:- Restoration of Rain damages of R.G.Canal in Tehsil Paonta Sahib Distt. Sirmour (HP) Earnest Money :-Rs.1700/-
(SH:- C/o Retaining wall to protect the canal at RD 1100 to 1160 Mtrs. on Main canal) Time:- Two Months.

Sr.No. Description Qty. Rate Unit


1 Excavation in foundation and trenches etc.in earth work in all kinds of soil such as pick work 60.75 Cum 92.85 P/Cum
,jumper work decomposed conglomerate saturated soil soft and hard rock upto all leads lifts
stacking the excavated soil not more than 3mtr.clear from the edge of excavation and then returning
the stacked soil in consolidating each deposited layers by ramming and watering and then disposing
of all surplus excavated earth as directed with in all leads lifts and as per directions of the Engineer-
in-charge

2 Providing and laying cement concrete work 1:5:10(1cement:5 sand: 10 graded stone agg. 40mm 68.40 Cum 934.10 P/Cum
nominal size) with 15% plum and curing complete excluding cost of form work and in retaining
walls/ Breast walls, the size of Plums shall usually be 150mm to 300mm as per PWD specificatioin
including all leads lifts and carriage of material and as per direction of Engineer incharge.

3 Providing form work with steel sheets 3.15mm thick welded with angle iron 30x30x5 mm so as to
give rough finish i/c centring shuttering structing and propping etc. with wooden bettens & Ballies,
height or propping & centering below supporting floor to ceiling not exceeding 4 mtr.and removal of
the same for insitu RCC work and PCC work including all leads lifts and carriage of material at site &
as per direction of Engineer incharge in:-

a) Vertiocal surfaces 232.60 Sqm 80.70 Per Sqm

Total:
TERMS AND CONDITIONS:-
1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Cement will be issued @ 315/- per bag & steel @ 53/- per Kg. at IPH store Bhatanwali Paonta Sahib.
4 Empty cement bags shall be returned to the deptt. Otherwise Rs. 2/- per bag shall be deducted from the each bill of the contractor.
5 Royality certificate in respect of stone agg. Sand etc. shall be produced by the contractor
Assistamt Engineer,
Giri Irrig. Sub Division,
Patlion.

REVISED SCHEDULE OF QUANTITY Estimated Cost :-Rs 93513/-


Name of work:- Restoration of Rain damages TO Nimbu Ka Khalla in Tehsil Paonta Sahib Distt. Sirmour (HP) Earnest Money :-Rs.1900/-
(SH:- C/o Retaining wall in Plum concrete )on Right Bank of Khalla) Time:- One Month.
Sr.No. Description Qty. Rate Unit
1 Excavation in foundation and trenches etc.in earth work in all kinds of soil such as pick work 33.08 Cum 155.00 P/Cum
,jumper work decomposed conglomerate saturated soil soft and hard rock upto all leads lifts
stacking the excavated soil not more than 3mtr.clear from the edge of excavation and then returning
the stacked soil in consolidating each deposited layers by ramming and watering and then disposing
of all surplus excavated earth as directed with in all leads lifts and as per directions of the Engineer-
in-charge

2 Providing form work with steel sheets 3.15mm thick welded with angle iron 30x30x5 mm so as to
give rough finish i/c centring shuttering structing and propping etc. with wooden bettens & Ballies,
height or propping & centering below supporting floor to ceiling not exceeding 4 mtr.and removal of
the same for insitu RCC work and PCC work including all leads lifts and carriage of material at site &
as per direction of Engineer incharge in:-

a) Vertiocal surfaces 157.54 Sqm 200.00 Per Sqm

3 Providing and laying cement concrete work 1:5:10(1cement:5 sand: 10 graded stone agg. 40mm 76.86 Cum 2750.00 P/Cum
nominal size) with 15% plum and curing complete excluding cost of form work and in retaining
walls/ Breast walls, the size of Plums shall usually be 150mm to 300mm as per PWD specificatioin
including all leads lifts and carriage of material and as per direction of Engineer incharge.

Total:
TERMS AND CONDITIONS:-
1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Cement will be issued @ 250/- per bag & steel @41/- per Kg. at IPH store Bhatanwali Paonta Sahib.
4 Empty cement bags shall be returned to the deptt. Otherwise Rs. 2/- per bag shall be deducted from the each bill of the contractor.
5 Royality certificate in respect of stone agg. Sand etc. shall be produced by the contractor
Executive Engineer,
I&PH Division,
Paonta Sahib.
Cost :-Rs.88304/-
oney :-Rs.1700/-

Amount
5641.00

63892.00

18771.00

88304.00

Assistamt Engineer,
Giri Irrig. Sub Division,

Cost :-Rs 93513/-


oney :-Rs.1900/-

Amount
5127.00

31508.00

211365.00

248000.00
Executive Engineer,
I&PH Division,
Paonta Sahib.
REVISED SCHEDULE OF QUANTITY Estimated cost Rs 96683/-
Name of work:- Restoration of Rain damages of GWSS Sadiyar GP Bhajaun in Tehsil Paonta Sahib Distt. Sirmour (HP) (SH: Earnest money Rs.2000/-
Jacketing in sed. Tank, filter beds 3 Nos & Tanks etc.) Time:- Three Months
S.No Sub-Head and item of work. Qty. Rates, Unit
1 2 3 4 5
1 Removal dismentalling of old filter medial upto a distance of 20 mtrs. disposing of unserviceable material 30.80 Cum. 160.00 P/Cum.
stacking serviceable material and neatly dressing the surface and as per the direction of the Engineer-in-
charge.

2 Providing and laying cement concrete 1:2:4(1cement:2app.sand: 4 app. graded stone agg. 20mm nominal 5.94 Cum. 4000.00 P/Cum.
size )and curing complete excluding cost of form work & reinforcement for reinforced work in foundation
& plinth including all leads lifts and carriage of material at site and as per direction of the Engineer-
incharge.

3 Providing and laying cement concrete 1:2:4(1cement:2app.sand: 4 app. graded stone agg. 20mm nominal 10.67 Cum. 4150.00 P/Cum.
size )and curing complete excluding cost of form work & reinforcement for reinforced concrete work in
walls of any thickness but not less 0.1 mtr. thickness attached pillasters buttresses plinth & string courses
complete from top of foundation two level upto floor two level including all leads lifts and carriage of
material at site and as per direction of the Engineer-incharge.

4 Providing and laying cement concrete 1:2:4(1cement:2app.sand: 4 app. graded stone agg. 20mm nominal 2.30 Cum. 4150.00 Per Cum.
size )and curing complete excluding cost of form work & reinforcement for reinforced work in suspended
floors, roofs landing shelves and their supports balconies, beams, girders bressumers and cantilivers upto
to floor two level in all height and depth, including all leads lifts and carriage of material at site and as per
direction of the Engineer-incharge.(Slab)

5 Providing form work with steel sheets 3.15mm thick welded with angle iron 30x30x5 mm so as to give
rough finish i/c centring shuttering structing and propping etc. with wooden bettens & Ballies, height or
propping & centering below supporting floor to ceiling not exceeding 4 mtr.and removal of the same for
insitu RCC work and PCC work.including all leads lifts and carriage of material at site & as per direction of
Engineer in charge in:-

a) Flat surfaces. 17.00 Sqm. 300.00 P/Sqm.

b) Vertical surface such as wall any thickness. 139.46 Sqm. 200.00 P/Sqm.
6 Providing Mild Steel/Tor steel reinforcement including bending binding & placing in positing I/c all leads 1134.60 Kg. 63.00 P/kg
lifts and carriage of material and as per direction of the Engineer-in-charge.

7 15mm thick cement plaster in single coat on rough side of wall for interior plastering upto floor to level 187.76 Sqm. 118.00 P/Sqm.
including arrises internal rounded angles chamfered and /or rounded angles not exceeding 80mm in girth
in cement mortar 1:3 (1cement:3sand) including all leads lifts and carriage of material and as per
directionof the Engineer-in-charge.

8 Providing and fixing of foot rest 20mm size including embeded ub cement concrete 1:3:6 50 Nos. 75.00 Each.
(1cement:3sand:6 graded stone agg.) 20mm dia nominal size) in block 225x225x75mm and carriage of
material and complete in all respect and as per direction of the Engineer-in-charge.

9 Providing and placing in horizontal layers filtermedia duly graded screened washed and cleaned as
specified by Engineer-in-charge.

i) Top layer fine sand effective size 0.20mm to 0.40mm and uniformity co-efficient 2.00 to 3.00 mtr. 17.54 Cum 1850.00 P/Cum

ii) Second layer course sand 3mm to 5mm 3.50 Cum. 1850.00 P/ Cum.

iii) Third layer Bajri 6mm to 20mm. 1.17 Cum. 1650.00 P/ Cum.
iv) Fourth layer 20mm to 25mm. 2.33 Cum 1400.00 P/Cum

v) Fifth layer or Bottom layer broken stone 50mm to 75mm. 3.50 Cum 1200.00 P/Cum
Total:

TERMS AND CONDITIONS.


1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.

2 Security,Sale tax & Income tax & labour cess shall be deducted as per rules.
3 Royality certificate in respect of stone agg. Sand etc. shall be produced by the contractor
4 Cement shall be issued @ 315/- per Bag & Steel @ 53/- per Kg. at IPH Store Bhatanwali Paonta Sahib.
5 Empty cement bags shall be returned to the Deptt. Otherwise Rs. 2/- per bag shall deducted from the bill.

Executive Engineer,
I&PH Division,
Paonta Sahib.
cost Rs 96683/-
oney Rs.2000/-

Amount.
6
4928.00

23760.00

44281.00

9545.00

5100.00

27892.00
71480.00

22156.00

3750.00

32449.00

6475.00

1931.00
3262.00

4200.00
261209.00
Executive Engineer,
I&PH Division,
Paonta Sahib.
DRAFT SCHEDULE OF QUANTITY
Name of Work: R/M of various LIS at RD 10100, 13555,14220, 15400, 20480 & 20990 Estimated Cost: 44087/-
under Giri Irrig. Sub Division Patlion in Tehsil Paonta Sahib Distt. Sirmour H.P. Earnest Money: 1000/-
( SH: Prov. Internal electrification to 6 Nos Pump Houses (Gulab garh section) Time : One Month

S. NO. Description of items Qty Rate Unit Amount


1 Wiring for light point / fan point / exhaust fan / call bell point with 1.5 Sq. mm. PVC insulated heat
resistant flame retardant (HRFR) and low smoke single core (flexible) copper conductor cable in
PVC casing & capping and earthing the light point with 1.5 Sq.mm. HRFRLS/PVC insulated single
core copper conductor cable as required.

Group C. 30 Point 253.00 P/Point 7590.00

2 Wiring for light plug with 2x1.5 Sq. mm. PVC insulated heat resistant flame retardant (HRFR) and 180 Mtr. 46.00 P/.Mtr 8280.00
low smoke single core (flexible) copper conductor cable in PVC casing & capping along with 1
No.1.5 Sq.mm. HRFRLS/PVC insulated single core copper conductor cable for earthing as required.

3 Wiring for power plug with 2x4 Sq. mm. PVC insulated heat resistant flame retardant (HRFR) and 90 Mtr. 82 P/.Mtr 7380.00
low smoke single core (flexible) copper conductor cable in PVC casing & capping along with 1 No.4
Sq.mm. HRFRLS/PVC insulated single core copper conductor cable for earthing as required.

4 Wiring for power plug with 4x4 Sq. mm. PVC insulated heat resistant flame retardant (HRFR) and 5 Mtr. 154 P/.Mtr 770.00
low smoke single core (flexible) copper conductor cable in PVC casing & capping along with 2 No.4
Sq.mm. HRFRLS/PVC insulated single core copper conductor cable for earthing as required.

5 Wiring for circuit / sub-main with following size PVC insulated heat resistant flame retardant (HRFR)
and low smoke single core (flexible) copper conductor cable in PVC casing & capping along with 1
No.HRFRLS/PVC insulated single core copper conductor cable of same size for earthing as
required.
2x10 Sq. mm. 5 Mtr. 177.00 P/.Mtr 885.00
6 Providing and fixing of following sizes of PVC casing and capping on surface as required:-
20 mmx 12 mm 20 Mtr. 15.00 P/.Mtr 300.00
25 mmx 15 mm 40 Mtr. 18.00 P/.Mtr 720.00
38 mmx 19 mm 20 Mtr. 25.00 P/.Mtr 500.00
7 Supplying & fixing of G.I. modular boxes of following sizes along with modular base and cover plate
for modular switches in recess as required:-
2 modules (78mmx78mmx50mm) 2 Nos. 65.00 Each 130.00
4 modules(140mmx78mmx50mm) 4 Nos. 90.00 Each 360.00
8 modules (120mmx135mmx60mm) 4 Nos. 169.00 Each 676.00

8 Supplying & fixing following size modular base and cover plate on the existing modular metal
boxes as required:-
Modular base and cover plate, 4 module 2 Nos. 72.00 Each 144.00
Modular base and cover plate, 8 module 4 Nos. 102.00 Each 408.00
9 Supplying and fixing following rating Piano-type switch /socket on the existing switch box / cover
including connections etc. as required.
S.P. 5/ 6 Amps one way Modular switch. 16 Nos. 43.00 Each 688.00
5 pin, 5/ 6 Amps Modular socket outlet. 10 Nos. 52.00 Each 520.00
S.P. 15/ 16 Amps one way Modular switch. 15 Nos. 45.00 Each 675.00
6 pin,15/16 Amps Modular socket outlet. 15 Nos. 69.00 Each 1035.00
10 Supplying and fixing stepped type Modular fan regulator on the existing modular box including 2 Nos. 155 Each 310.00
making connections etc. as required.
11 Supplying and fixing brass batten/angle holder including connections etc. as required:- 8 Nos. 82.00 Each 656.00
12 Supplying and fixing CFL 7 W including connections etc. as required. 8 Nos. 196.00 Each 1568.00
13 Supplying and fixing ceiling rose on the existing junction box / wooden block including connections 4 Nos. 15.00 Each 60.00
etc. as required.
14 Providing and fixing following rating and breaking capacity MCCB in the existing cubical panel board
including drilling holes in the cubicle panel, making connections, etc. as required.
100 Amp. -10 KA 1 No. 2598.00 Each 2598.00
15 Supplying and fixing of following way triple pole and neutral, sheet steel MCB distribution board,
415 volts, on surface / recess, with provision to mount 8 module incomer, 2 module sub-incomer
and SP MCBs as outgoing, complete with tinned copper bus- bar, wire-set, neutral link, earth bar,
din-bar, detachable gland plate, cable, identification labels interconnections, phosphatized and
powder painted, including earthing etc. as required:-
Double door-2+4 way (8+6+12),horizontal type 1 No. 2360.00 Each 2360.00
16 Providing and fixing following surface mounting T5 luminaries with powder coated CRCA sheet steel
housing, mirror optics reflector, electronic ballast, decorative end caps, suitable for 28 watt FTL
(T5), complete with all accessories (excluding the T-5 Tube), connections, testing and
commissioning etc. as required.
1 x28 watt-FTL(T5) (Category-A) 2 Nos. 1516 Each 3032.00
17 Supplying and erection of 6 amps. to 32 amps. rating, 10 KA breaking capacity, 240 volts, 'C'
curves, miniature circuit breaker of following poles in the existing MCB DB complete with
connections etc. as required:-
Single pole & neutral. Cat-A. 12 Nos. 296 Each 3552.00
18 Supplying and fixing Ding-Dong / Electronic musical bell, suitable for D.C./A.C. single phase,230 1 No. 100 Each 100.00
volts complete as required:-
19 Providing, Installation, testing and commissioning of ceiling fan with regulator, including wiring the
down rods of standard length (up to 30 cm) with 16/0.20 mm twin twisted flexible, cotton braided,
copper cable, including providing and fixing phenolic laminated sheet cover on the fan box and
earthing etc. as required:-
Ceiling Fan 1400 mm sweep, Category-A 2 Nos. 1166 Each 2332.00
TOTAL: 47629.00
TERMS AND CONDITIONS.
1 The work shall be executed as per IPH/PWD specifictions and instruction of the Engineer-in-
charge.
2 Security, Sale Tax, Income Tax & Labour cess shall be deducted as per rules.
3 No payment shall be made for defective material. Assistant Engineer,
I&PH Sub Division,
Kaffota.
DRAFT SCHEDULE OF QUANTITY
Name of Work: R/M of various Tubewell Bherewala , Heerpur ,Kishanpura Bhungrani under Estimated Cost: 41828/-
Giri Irrig. Sub Division Patlion in Tehsil Paonta Sahib Distt. Sirmour H.P. Earnest Money: 900/-
( SH: Prov. Internal electrification to 4 Nos Pump Houses (Bhungrani Section) Time : One Month
S. NO. Description of items Qty Rate Unit Amount
1 Wiring for light point / fan point / exhaust fan / call bell point with 1.5 Sq. mm. PVC insulated
heat resistant flame retardant (HRFR) and low smoke single core (flexible) copper conductor
cable in PVC casing & capping and earthing the light point with 1.5 Sq.mm. HRFRLS/PVC
insulated single core copper conductor cable as required.

Group C. 20 Point 105.00 P/Point 2100.00


2 Wiring for light /Power plug wiring with 2x4 Sq. mm. PVC insulated copper conductor cable in 32 Point. 175.00 Per Point. 5600.00
surface recessed PVC conduit allow with one No. 2.24mm dia base copper copper conductor
wire for loopearthing complet with all leads,lifts and carriage of material and as per direction
of the Engineer-in-charge.

3 Supplying fixing of 05/06 Amp. Tumbler piano type switch on the existing switch box cover 24 Nos. 21 Each. 504.00
including connection etc. as required compete with all leads lifts and carriage of material and
as per direction of the Engineer-in-charge.

4 Supplying fixing of 15/16 AMP 3 PIN tumbler piano type switch on existing switch box cover 4 Nos. 154 Each. 616.00
including connectionetc. As required complete with all leads,lifts and carriage of material and
as per direction of the Engineer-in-charge.

5 Supplying fixing of 15/16 AMP 3 PIN Socket outlet on the existing switch box cover including 4 Nos. 177.00 Each. 708.00
connection etc. as required complete with all leads,lifts and carriage of material and as per
direction of the Engineer-in-charge.

6 Wiring for Circuit wiring with 2x1.5 Sqm. PVC insulator copper conductor single coil cable in 60 Mtr. 42.00 P/Mtr. 2520.00
surface recessed PVC conduct required complete in all respect and as per direction of the
Engineer-in-charge.

7 Providing installing testing and commissioning of ceilling fan regulator including wiring the 4 Nos. 2100.00 Each. 8400.00
down rod of standard length (upto 30 cm. )with 1.5mm PVC insulated copper conductor singe
core cable as required 1200mtr. Cut A
8 Supplying fixing 5 to 32 AMP. Rating 240 volts L-series main circuit bracket in existing MCB box
complete with commissioning connection testing etc. as required with all leads,lifts and
carriage of material and as per direction of the Engineer-in-charge.

Single pole. 8 Nos. 157.50 Each. 1260.00


Double Pole. 4 Nos. 315.00 Each. 1260.00
9 Supplying fixing single pole and natural sheet steel MCB distribution box on surface/recessed 4 Nos. 280.00 Each. 1120.00
complete with tinned copper busher neutral detachable glass plate inter connection including
painting earthing etc. 4 way complete with all leads,lifts and carriage of material and as per
direction of the Engineer-in-charge.

10 Supplying fixing metal box of following size nominal on surface recess with suitable size of
phonetic laminated sheet cover in iron as required complete in all respect and as per direction
of the Engineer-in-charge.

i) 180x100x60mm. 4 Nos. 154.00 Each 616.00


ii) 250x200x100mm. 4 Nos. 189.00 Each 756.00
11 Wiring for sub main wiring with 2x5 Sqm. PVC insulated copper conduction in single cover in 8 Nos. 65 Each. 520.00
surface or recessed in PVC conduction required with all leads,lifts and carriage of material and
as per direction of the Engineer-in-charge.

12 Providing installing testing and commissioning of pre wire flourcent tube fitting complete with 4 Nos. 350.00 Each. 1400.00
blast starter and capacitor but excluding the cost of tube rod suitable to operate on 230 V
single faces ASC supply directly on surface with copper wiring as required complete with all
leads,lifts and carriage of material F/tube fixture 1x40 watt prepex type category A complete
in all respect and as per direction of the Engineer-in-charge.

13 Supplying/ fixing of backlite battern/angle holder including connection etc. complete in all 4 Nos. 31.50 Each. 126.00
respect and as per direction of the Engineer-in-charge.
14 Supplying/ fixing of ceiling rose on existing juction box/wooden block including connection 12 Nos. 17.50 Each. 210.00
etc. as reuired complete including all leads,lifts and carriage of material and as per direction of
the Engineer-in-charge.
15 Earthing with copper plate 600x600mmx3mm including accessories and providing masonary 4 Nos. 2520.00 Each. 10080.00
enclosures with cover plate having locking arrangement and water pipe etc. (but without
charcoal or coke and salt ) complete as required complete in all respect and as per direction of
the Engineer-in-charge.

16 Extra for using salt and charcoal for G.I. or copper plate earth elecrod as required complete in 4 Nos. 784 Each 3136.00
all respect and as per directon of the Engineer-in-charge.
17 Supplying and laying of 6 WG G.I.wire of 0.5 Mtr. Below ground level for conductor earth 80 Mtr. 11.20 Each 896.00
electrod including soldering as required complete in all respect and as per direction of the
Engineer-in-charge.

TOTAL: 41828.00
TERMS AND CONDITIONS.
1 The work shall be executed as per IPH/PWD specifictions and instruction of the Engineer-in-charge.
2 Security, Sale Tax, Income Tax & Labour cess shall be deducted as per rules.
3 No payment shall be made for defective material. Assistant Engineer,
Giri Irrig. Sub Division,
Patlion.
DRAFT SCHEDULE OF QUANTITY
Name of Work: R/M of various LIS at RD 600,6345, 7920, 8465 under Giri Irrig. Sub Division Patlion Estimated Cost: 41828/-
in Tehsil Paonta Sahib Distt. Sirmour H.P. ( SH: Prov. Internal electrification to 4 Nos Pump Houses Earnest Money: 900/-
(Giri Nagar Section) Time : One Month
S. NO. Description of items Qty Rate Unit Amount
1 Wiring for light point / fan point / exhaust fan / call bell point with 1.5 Sq. mm. PVC insulated
heat resistant flame retardant (HRFR) and low smoke single core (flexible) copper conductor
cable in PVC casing & capping and earthing the light point with 1.5 Sq.mm. HRFRLS/PVC
insulated single core copper conductor cable as required.

Group C. 20 Point 105.00 P/Point 2100.00


2 Wiring for light /Power plug wiring with 2x4 Sq. mm. PVC insulated copper conductor cable in 32 Point. 175.00 Per Point. 5600.00
surface recessed PVC conduit allow with one No. 2.24mm dia base copper copper conductor
wire for loopearthing complet with all leads,lifts and carriage of material and as per direction
of the Engineer-in-charge.

3 Supplying fixing of 05/06 Amp. Tumbler piano type switch on the existing switch box cover 24 Nos. 21 Each. 504.00
including connection etc. as required compete with all leads lifts and carriage of material and
as per direction of the Engineer-in-charge.

4 Supplying fixing of 15/16 AMP 3 PIN tumbler piano type switch on existing switch box cover 4 Nos. 154 Each. 616.00
including connectionetc. As required complete with all leads,lifts and carriage of material and
as per direction of the Engineer-in-charge.

5 Supplying fixing of 15/16 AMP 3 PIN Socket outlet on the existing switch box cover including 4 Nos. 177.00 Each. 708.00
connection etc. as required complete with all leads,lifts and carriage of material and as per
direction of the Engineer-in-charge.

6 Wiring for Circuit wiring with 2x1.5 Sqm. PVC insulator copper conductor single coil cable in 60 Mtr. 42.00 P/Mtr. 2520.00
surface recessed PVC conduct required complete in all respect and as per direction of the
Engineer-in-charge.
7 Providing installing testing and commissioning of ceilling fan regulator including wiring the 4 Nos. 2100.00 Each. 8400.00
down rod of standard length (upto 30 cm. )with 1.5mm PVC insulated copper conductor singe
core cable as required 1200mtr. Cut A
8 Supplying fixing 5 to 32 AMP. Rating 240 volts L-series main circuit bracket in existing MCB box
complete with commissioning connection testing etc. as required with all leads,lifts and
carriage of material and as per direction of the Engineer-in-charge.

Single pole. 8 Nos. 157.50 Each. 1260.00

Double Pole. 4 Nos. 315.00 Each. 1260.00

9 Supplying fixing single pole and natural sheet steel MCB distribution box on surface/recessed 4 Nos. 280.00 Each. 1120.00
complete with tinned copper busher neutral detachable glass plate inter connection including
painting earthing etc. 4 way complete with all leads,lifts and carriage of material and as per
direction of the Engineer-in-charge.

10 Supplying fixing metal box of following size nominal on surface recess with suitable size of
phonetic laminated sheet cover in iron as required complete in all respect and as per direction
of the Engineer-in-charge.

i) 180x100x60mm. 4 Nos. 154.00 Each 616.00


ii) 250x200x100mm. 4 Nos. 189.00 Each 756.00
11 Wiring for sub main wiring with 2x5 Sqm. PVC insulated copper conduction in single cover in 8 Nos. 65 Each. 520.00
surface or recessed in PVC conduction required with all leads,lifts and carriage of material and
as per direction of the Engineer-in-charge.

12 Providing installing testing and commissioning of pre wire flourcent tube fitting complete with 4 Nos. 350.00 Each. 1400.00
blast starter and capacitor but excluding the cost of tube rod suitable to operate on 230 V
single faces ASC supply directly on surface with copper wiring as required complete with all
leads,lifts and carriage of material F/tube fixture 1x40 watt prepex type category A complete
in all respect and as per direction of the Engineer-in-charge.

13 Supplying/ fixing of backlite battern/angle holder including connection etc. complete in all 4 Nos. 31.50 Each. 126.00
respect and as per direction of the Engineer-in-charge.

14 Supplying/ fixing of ceiling rose on existing juction box/wooden block including connection 12 Nos. 17.50 Each. 210.00
etc. as reuired complete including all leads,lifts and carriage of material and as per direction of
the Engineer-in-charge.
15 Earthing with copper plate 600x600mmx3mm including accessories and providing masonary 4 Nos. 2520.00 Each. 10080.00
enclosures with cover plate having locking arrangement and water pipe etc. (but without
charcoal or coke and salt ) complete as required complete in all respect and as per direction of
the Engineer-in-charge.

16 Extra for using salt and charcoal for G.I. or copper plate earth elecrod as required complete in 4 Nos. 784 Each 3136.00
all respect and as per directon of the Engineer-in-charge.

17 Supplying and laying of 6 WG G.I.wire of 0.5 Mtr. Below ground level for conductor earth 80 Mtr. 11.20 Each 896.00
electrod including soldering as required complete in all respect and as per direction of the
Engineer-in-charge.
TOTAL: 41828.00
TERMS AND CONDITIONS.
1 The work shall be executed as per IPH/PWD specifictions and instruction of the Engineer-in-charge.
2 Security, Sale Tax, Income Tax & Labour cess shall be deducted as per rules.
3 No payment shall be made for defective material. Assistant Engineer,
Giri Irrig. Sub Division,
Patlion.
REVISED SCHEDULE OF QUANTITY Estimated Cost :-Rs.57751/-
Name of work:-Aug. of LWSS Kotga Kando & adjoiing villages in GP Poka in Tehsil Paonta Sahib Distt.Sirmour(HP) Earnest Money :-Rs.1200/-
(SH: C/O Retaining wall to along the Tank at Kotga & Pamta.) Time:- Two months.
S.No Description Qty. Rate Unit
1 2 3 4 5
1 Excavation in earth work and disposal ofall excavated earth upto a lead of 20 Mtrs. and lift upto 1.50 24.39 Cum. 140.00 Per Cum.
Mtrs. disposing earth to be levelled and neatly dressed within a leads in Pick/juper work 50% each
including all leads,lifts and carriage of material and as per direction of the Engineer-in-charge.

2 Providing and laying cement concrete 1:6:12(1cement:6sand:12 graded stone agg.40mm 6.59 Cum 3950.00 P/Cum
nominal size)and curing complete excluding the cost of centring shuttering in foundation &
plinth including all leads lifts and carriage of material and as per the directions of Engineer-in-
charge.

3 Providing and laying cement concrete work 1:4:8 (1cement: 4 sand: 8 graded stone agg. 20mm nominal 3.19 Cum 4600.00 P/Cum
size & curing complete) excluding cost of form work in foundation and plinth in breast & retaining wall
in all height and depth including all leads lifts complete and carriage of material etc. as per directions
of Engineer incharge.

4 Random rubble masonary /Poly rubble masonary (uncoursed/brought to coursed) with hard 26.02 Cum 4594.00 P/Cum
stone of approved quality in foundation and plinth including levelling up with cement concrete
1:6.12(1cement:6sand:12 graded stone agg. 20mm nominal size)in cement mortor 1:6 (1 Cement:
6 sand ) in breast wall & Retaining walls including all leads lifts and carriage of material and as
per the directions of Engineer-in-charge.

5 C/o Dry stone masonary in breast/Retaining walls/parapets etc. including all leads.lifts and 27.84 Cum 1450.00 P/Cum
carriage of material and as per direction of the Engineer-in-charge.
6 Boulder filling behind the retaining wall & Breast wall etc. complete in all respect and as per 11.88 Cum. 800.00 P/Cum
direction of the Engineer-in-charge.
TERMS AND CONDITIONS. Total:
1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Cement shall be issued @ Rs. 315/- per bag & steel @ 53/- per Kg. from IPH store Bhatanwali Paonta Sahib.
4 Royality certificate in respect of stone agg. Sand etc. shall be produced by the contractor
5 Empty cement bags shall be returned to the Deptt. Otherwise Rs. 2/- per bag shall deducted from the bill. Executive Engineer,
6 The watch & ward of the store by the contractor. I&PH Division,
Paonta Sahib.

REVISED SCHEDULE OF QUANTITY Estimated Cost :-Rs.63176/-


Name of work:-Aug./Imp. of LWSS Kotga Kando in GP Poka in Tehsil Paonta Sahib Distt.Sirmour(HP) Earnest Money :-Rs.1300/-
(SH: Tapping of additional sources and C/O Sealing of source at Basma Khalla 1 &2,Laying & joining of GMS Pipes. Time:- Two months.
S.No Description Qty. Rate Unit
1 2 3 4 5
1 Excavation in foundation and trenches etc.in earth work in all kinds of soil such as pick work 224.21 Cum 160.00 P/Cum
,jumper work decomposed conglomerate saturated soil soft and hard rock upto all leads lifts
stacking the excavated soil not more than 3mtr.clear from the edge of excavation and then
returning the stacked soil in consolidating each deposited layers by ramming and watering and
then disposing of all surplus excavated earth as directed with in all leads lifts and as per directions
of the Engineer-in-charge

2 Providing and laying cement concrete 1:6:12(1cement:6sand:12 graded stone agg.40mm 0.49 Cum 3880.00 P/Cum
nominal size)and curing complete excluding the cost of centring shuttering in foundation &
plinth including all leads lifts and carriage of material and as per the directions of Engineer-in-
charge.

3 Random rubble masonary /Poly rubble masonary (uncoursed/brought to coursed) with hard 4.70 Cum 4500.00 P/Cum
stone of approved quality in foundation and plinth including levelling up with cement concrete
1:6.12(1cement:6sand:12 graded stone agg. 20mm nominal size)in cement mortor 1:6 (1 Cement:
6 sand ) in breast wall & Retaining walls including all leads lifts and carriage of material and as
per the directions of Engineer-in-charge.
4 Providing form work with steel sheets 3.15mm thick welded with angle iron 30x30x5 mm
so as to give rough finish i/c centring shuttering structing and propping etc. with wooden
bettens & Ballies, height or propping & centering below supporting floor to ceiling not
exceeding 4 mtr.and removal of the same for insitu RCC work and PCC work.including all
leads lifts and carriage of material at site & as per direction of Engineer in charge in:-

a) Flat surfaces such as soffits of suspended floor roofs landing and like upto 200mm in 2.25 Sqm. 300.00 P/Sqm.
thickness.
5 Providing and laying cement concrete 1:2:4(1cement:2app.sand: 4 app. graded stone agg. 0.43 Cum 5800.00 P/Cum
20mm nominal size )and curing complete excluding cost of form work & reinforcement
for reinforced work in suspended floors, roofs landing shelves and their supports
balconies, beams, girders bressumers and cantilivers upto to floor two level in all height
and depth, including all leads lifts and carriage of material at site and as per direction of
the Engineer-incharge.

6 Providing Mild Steel/Tor steel reinforcement including bending binding & placing in 38.88 Kg. 63.00 P/kg
positing I/c all leads lifts and carriage of material and as per direction of the Engineer-in-
charge.

7 Excavation in drains & channel etc.in earth work in all kinds of soil such as pick work 450.00 Cum 160.00 P/Cum
,jumper work blasting work, decomposed conglomerate saturated soil soft and hard rock
including dressing of sides and beds and prepareation of sub grade to level or slope
including refilling the trenches and disposing of surplus earth upto all leads,lifts disposed
earth to be levelled and neatly dressed including jungle clearance and as per directions of
the Engineer-incharge

8 Laying and jointing of GMS Pipes of various dia in trenches (earth work in trenches to be measured
and paid for seperately) including all leads lifts and carriage of material at site as per direction of
Engineer-in-charge of following dias.

i) 25mm dia 990 Rmt 15.00 P/Rmt.


9 Providing and fixing of full way wheel valve of various dia complete in all respect and as per direction 1 No. 550.00 Each.
of the Engineer-in-charge.
Total:
TERMS AND CONDITIONS:-
1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Cement will be issued @ 315/- per bag & steel @ 53/- per Kg. at IPH store Bhatanwali Paonta Sahib.
4 Empty cement bags shall be returned to the deptt. Otherwise Rs. 2/- per bag shall be deducted from the
5 earch billcertificate
Royality of the contractor.
in respect of stone agg. Sand etc. shall be produced by the contractor
7 GI Pipe shall be issued free of cost from IPH Store Bhatanwali.
8 GI Fitting shall be provided by the contractor. Executive Engineer,
I&PH Division,
Paonta Sahib.
Cost :-Rs.57751/-
oney :-Rs.1200/-

Amount
6.
3415.00

26031.00

14674.00

119536.00

40368.00

9504.00

213528.00

Engineer,
sion,
hib.

Cost :-Rs.63176/-
oney :-Rs.1300/-

Amount
6.
35874.00

1901.00

21150.00
675.00

2494.00

2449.00

72000.00

14850.00
550.00

151943.00

Engineer,
sion,
hib.
REVISED SCHEDULE OF QUANTITY Estimated cost Rs 39557/-
Name of work: R/M of LWSS Satiwala in Tehsil Paonta Sahib Distt. Sirmour (HP) Earnest money Rs.800/-
(SH: laying & jointing of GI Pipes in distribution system) Time:- One Month.
S.No Sub-Head and item of work. Qty. Rates, Unit
1 2 3 4 5
1 Excavation in drains & channel etc.in earth work in all kinds of soil such as pick work 484.69 Cum. 155.00 P/Cum.
,jumper work blasting work, decomposed conglomerate saturated soil soft and hard rock
including dressing of sides and beds and prepareation of sub grade to level or slope
including refilling the trenches and disposing of surplus earth upto all leads,lifts disposed
earth to be levelled and neatly dressed including jungle clearance and as per directions of
the Engineer-incharge

2 Laying and jointing of GMS Pipes of various dia in trenches (earth work in trenches to be
measured and paid for seperately) including all leads lifts and carriage of material at site as per
direction of Engineer-in-charge of following dias.

i)20mm dia . 55 Rmt 8.00 P/Rmt.


ii)32m dia . 920 Rmt 13.00 P/Rmt.
iii) 50mm dia. 200 Rmt. 17.00 P/Rmt.
3 Providing and fixing of Peet valve of superior quality approved make & relevant ISS complete in all
respect including all leads,lifts and carriage of material and at site as per direction of the Engineer-
in-charge.
i)20mm dia . 1 No. 500.00 Each.
ii)32m dia . 2 Nos. 850.00 Each.
iii) 50mm dia. 1 No. 1600.00 Each.
4 Providing and fixing of G.I.Yunion of superior quality of following dia metres including all leads,lifts
and cariage of material at site as per direction of the Engineer-in-charge.
i)20mm dia . 1 No. 90.00 Each.
ii)32m dia . 2 Nos. 180.00 Each.
iii) 50mm dia. 1 No. 300.00 Each.
Total:
TERMS AND CONDITIONS:-
1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 G.I.Pipe shall be issued free of cost from IPH Store Bhatanwali Paonta Sahib. Executive Engineer,
4 The pipe fitting shall be provided by the contractor. I&PH Division,
Paonta Sahib.
cost Rs 39557/-
oney Rs.800/-

Amount.
6
75127.00

440.00
11960.00
3400.00

500.00
1700.00
1600.00

90.00
360.00
300.00
95477.00
Engineer,
sion,
DRAFT SCHEDULE OF QUANTITY Estimated cost Rs 57948/-
Name of work Providing LWSS Tatiana in Tehsil Paonta Sahib Distt.Sirmour (HP) (SH: C/O Boundry wall) Earnest money Rs.1200/-
Time:- Three Months
S.No Sub-Head and item of work. Qty. Rates,
1 2 3 4
1
1 Excavation in foundation and trenches etc.in earth work in all kinds of soil such as pick work ,jumper work 13.68 Cum 92.85
decomposed conglomerate saturated soil soft and hard rock upto all leads lifts stacking the excavated soil not
more than 3mtr.clear from the edge of excavation and then returning the stacked soil in 15cm layers when
required in to plinth sides of foundation etc. consolidating each deposited layers by ramming and watering and
then disposing of all surplus excavated earth as directed with in all leads lifts and as per directions of the
Engineer-in-charge

2 Providing and laying cement concrete 1:6:12(1cement:6sand:12 graded stone agg.40mm nominal size)and 6.84 Cum 1104.8
curing complete excluding the cost of form work in foundation & plinth including all leads lifts and carriage of
material and as per the directions of Engineer-in-charge.

3 Random rubble masonary /Poly rubble masonary (uncoursed/brought to coursed) with hard stone of approved 10.26 Cum 1135.50
quality in foundation and plinth including levelling up with cement concrete 1:6.12(1cement:6sand:12 graded
stone agg. 20mm nominal size)in cement mortor 1:6 (1 Cement: 6 sand ) in breast wall & Retaining walls
including all leads lifts and carriage of material and as per the directions of Engineer-in-charge.

4 Providing and fixing of brick work in super structure using common burnt clay building bricks using cement 1.90 Cum. 2913.80
mortar 1:6 (1cement :6sand ) complete in all respect and as per direction of the Engineer-in-charge.

5 Half brick masonary in Cement Mortar 1:6 (1cement:6sand) complete in all respect and as per direction of the 84.82 Sqm. 376.50
Engineer-in-charge.

TERMS & CONDITIONS


1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Cement will be issued @ 315/- per bag & steel @ 53/- per Kg. at IPH store Bhatanwali Paonta Sahib.
4 Empty cement bags shall be returned to the deptt. Otherwise Rs. 2/- per bag shall be deducted from the each Assistant Engineer,
bill of the contractor.
5 Royality certificate in respect of stone agg. Sand etc. shall be produced by the contractor I&PH Sub Division, Kaffota.
Estimated cost Rs 57948/-
Earnest money Rs.1200/-
Time:- Three Months
Unit Amount.
5 6

P/Cum 1270.00

P/Cum 7557.00

P/Cum 11650.00

P/Cum. 5536.00

P/Sqm. 31935.00

Total: 57948.00
Assistant Engineer,

I&PH Sub Division, Kaffota.


REVISED SCHEDULE OF QUANTITY Estimated cost Rs 90000/-
Name of work Providing LWSS Kamroo in Tehsil Paonta Sahib Distt.Sirmour (HP) Earnest money Rs.1800/-
(SH: Providing and supply of Cast steel sluice valves of various dia.) Time:- One Month
S.No Sub-Head and item of work. Qty. Rates, Unit Amount.
1 2 3 4 5 6
1
1 Supply of Kirloskar/Kilburn/IVC/Fources/GLED/BHEL/Leader/Pelcon make of suitable size
Cast steel double flanged swing check type reflux valve having bye pass arrangement & size one
size larger than the nominal dia of delivery of the pump or equal to dia of column pipe( in case
of T/well) anbd capable of withstanding nominal seat pressure as mentioned in item No.1 (a)
& confirming to BIS/API standards with upto date ammendments for delivery line of Pump of
dia class PN. 1.6

i) 65mm dia. 4 Nos. 18000.00 Each. 72000.00


ii) 80mm dia. 4 Nos. 22000.00 Each. 88000.00

Total: 160000.00
TERMS & CONDITIONS
1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-
charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.

3 The material will be received in good condition,


4 Nothing shall be paid for rejected materials. Executive Engineer,
I&PH Division,
Paonta Sahib.

REVISED SCHEDULE OF QUANTITY Estimated cost Rs 93000/-


Name of work Providing LWSS Tatiana & LIS Thontha Jakhal in Tehsil Paonta Sahib Distt.Sirmour (HP) Earnest money Rs.1900/-
(SH: Providing and supply of Cast steel sluice valves of various dia.) Time:- One Month
S.No Sub-Head and item of work. Qty. Rates, Unit Amount.
1 2 3 4 5 6
1
1 Supply of Kirloskar/Kilburn/IVC/Fources/GLED/BHEL/Leader/Pelcon make of suitable size
Cast steel double flanged swing check type reflux valve having bye pass arrangement & size one
size larger than the nominal dia of delivery of the pump or equal to dia of column pipe( in case
of T/well) anbd capable of withstanding nominal seat pressure as mentioned in item No.1 (a)
& confirming to BIS/API standards with upto date ammendments for delivery line of Pump of
dia class PN. 1.6

i) 50mm dia . 5 Nos. 14000.00 Each. 70000.00


ii) 65mm dia. 4 Nos. 18000.00 Each. 72000.00
Total: 142000.00
TERMS & CONDITIONS
1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-
charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 The material will be received in good condition,
4 Nothing shall be paid for rejected materials. Executive Engineer,
I&PH Division,
Paonta Sahib.

REVISED SCHEDULE OF QUANTITY Estimated cost Rs 98000/-


Name of work Providing LWSS Kaffota in Tehsil Paonta Sahib Distt.Sirmour (HP) Earnest money Rs.2000/-
(SH: Providing and supply of Cast steel sluice valves of various dia.) Time:- One Month
S.No Sub-Head and item of work. Qty. Rates, Unit Amount.
1 2 3 4 5 6
1
1 Supply of Kirloskar/Kilburn/IVC/Fources/GLED/BHEL/Leader/Pelcon make of suitable size
Cast steel double flanged swing check type reflux valve having bye pass arrangement & size one
size larger than the nominal dia of delivery of the pump or equal to dia of column pipe( in case
of T/well) and capable of withstanding nominal seat pressure as mentioned in item No.1 (a) &
confirming to BIS/API standards with upto date ammendments for delivery line of Pump of dia
class PN. 1.6

i) 50mm dia. 5 Nos. 14000.00 Each. 70000.00


ii) 65mm dia. 4 Nos. 18000.00 Each. 72000.00
iii) 80mm dia, 3 Nos. 22000.00 Each. 66000.00
Total: 208000.00
TERMS & CONDITIONS
1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-
charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 The material will be received in good condition,
4 Nothing shall be paid for rejected materials. Executive Engineer,
I&PH Division,
Paonta Sahib.

REVISED SCHEDULE OF QUANTITY Estimated cost Rs 96750/--


Name of work Providing LWSS Barwas (Chowki Mirigwal) Kaffota in Tehsil Paonta Sahib Distt.Sirmour (HP) Earnest money Rs.2000/-
(SH: Providing and supply of Cast steel sluice valves of various dia.) Time:- One Month
S.No Sub-Head and item of work. Qty. Rates, Unit Amount.
1 2 3 4 5 6
1
1 Supply of Kirloskar/Kilburn/IVC/Fources/GLED/BHEL/Leader/Pelcon make of suitable size
Cast steel double flanged swing check type reflux valve having bye pass arrangement & size one
size larger than the nominal dia of delivery of the pump or equal to dia of column pipe( in case
of T/well) anbd capable of withstanding nominal seat pressure as mentioned in item No.1 (a)
& confirming to BIS/API standards with upto date ammendments for delivery line of Pump of
dia class PN. 1.6

i) 50mm dia. 5 Nos. 14000.00 Each. 70000.00


ii) 65mm dia. 4 Nos. 18000.00 Each. 72000.00
iii) 80mm dia, 2 Nos. 22000.00 Each. 44000.00
Total: 186000.00
TERMS & CONDITIONS
1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-
charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 The material will be received in good condition,
4 Nothing shall be paid for rejected materials. Executive Engineer,
I&PH Division,
Paonta Sahib.

ABSTRACT OF COST
Name of work : C/o LIS Uttari in Tehsil Shillai Distt.Sirmour (HP)
(SH: Providing and supply of Cast steel sluice valves of various dia.)
S.No Sub-Head and item of work. Qty. Rates, Unit Amount.
1 2 3 4 5 6
1
1 Supply of Kirloskar/Kilburn/IVC/Fources/GLED/BHEL/Leader/Pelcon make of suitable size
Cast steel double flanged swing check type reflux valve having bye pass arrangement & size one
size larger than the nominal dia of delivery of the pump or equal to dia of column pipe( in case
of T/well) and capable of withstanding nominal seat pressure as mentioned in item No.1 (a) &
confirming to BIS/API standards with upto date ammendments for delivery line of Pump of dia
class PN. 1.6

i) 50mm dia. 5 Nos. 14000.00 Each. 70000.00


ii) 65mm dia. 4 Nos. 18000.00 Each. 72000.00
iii) 80mm dia, 3 Nos. 22000.00 Each. 66000.00
Total: 208000.00
TERMS & CONDITIONS
1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.

2 Security,Sale tax & Income tax shall be deducted as per rules.


3 The material will be received in good condition,
4 Nothing shall be paid for rejected materials. Executive Engineer,
I&PH Division,
Paonta Sahib.
DDRAFT SCHEDULE OF QUANTITY Estimated cost Rs 98000/-
Name of work Providing LWSS Kaffota in Tehsil Paonta Sahib Distt.Sirmour (HP) Earnest money Rs.2000/-
(SH: Providing and supply of Cast steel sluice valves of various dia.) Time:- One Month
S.No Sub-Head and item of work. Qty. Rates, Unit Amount.
1 2 3 4 5 6
1
1 Supply of Kirloskar/Kilburn/IVC/Fources/GLED/BHEL/Leader/Pelcon make of suitable size
Cast steel double flanged swing check type reflux valve having bye pass arrangement & size one
size larger than the nominal dia of delivery of the pump or equal to dia of column pipe( in case
of T/well) and capable of withstanding nominal seat pressure as mentioned in item No.1 (a) &
confirming to BIS/API standards with upto date ammendments for delivery line of Pump of dia
class PN. 1.6

i) 50mm dia. 5 Nos. 14000.00 Each. 70000.00


ii) 65mm dia. 4 Nos. 18000.00 Each. 72000.00
iii) 80mm dia, 3 Nos. 22000.00 Each. 66000.00
Total: 208000.00
TERMS & CONDITIONS
1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-
charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 The material will be received in good condition,
4 Nothing shall be paid for rejected materials. Executive Engineer,
I&PH Division,
Paonta Sahib.

abstract of cost.
Name of work Providing LWSS Millah Magnal in Tehsil Shillai Distt.Sirmour (HP)
(SH: Providing and supply of Cast steel sluice valves of various dia.)
S.No Sub-Head and item of work. Qty. Rates, Unit Amount.
1 2 3 4 5 6
1
1 Supply of Kirloskar/Kilburn/IVC/Fources/GLED/BHEL/Leader/Pelcon make of suitable size
Cast steel double flanged swing check type reflux valve having bye pass arrangement & size one
size larger than the nominal dia of delivery of the pump or equal to dia of column pipe( in case
of T/well) and capable of withstanding nominal seat pressure as mentioned in item No.1 (a) &
confirming to BIS/API standards with upto date ammendments for delivery line of Pump of dia
class PN. 1.6

i) 80mm dia. 2 Nos. 22000.00 Each. 44000.00


ii) 100mm dia. 2 Nos. 26000.00 Each. 52000.00
Total: 96000.00
TERMS & CONDITIONS
1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-
charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 The material will be received in good condition,
4 Nothing shall be paid for rejected materials. Assistant Engineer,
I&PH Sub Division,

REVISED SCHEDULE OF QUANTITY Estimated cost Rs 98826/--


Name of work R/M of various LWSS /T/wells under IPH Sub Division Majra (Dhaula Kuan section) in Earnest money Rs.2000/-
Tehsil Paonta Sahib Distt.Sirmour (HP) (SH: Supplying and fixing of Sluice valves of various dia) Time:- One Month
(LWSS Kolar-II, LWSS Sukhchainpur & T/well Khaddar)
S.No Sub-Head and item of work. Qty. Rates, Unit Amount.
1 2 3 4 5 6
1
1 Supply of Kirloskar/Kilburn/IVC/Fources/GLED/BHEL/Leader/Pelcon make of suitable size
Cast steel double flanged swing check type reflux valve having bye pass arrangement & size one
size larger than the nominal dia of delivery of the pump or equal to dia of column pipe( in case
of T/well) anbd capable of withstanding nominal seat pressure as mentioned in item No.1 (a)
& confirming to BIS/API standards with upto date ammendments for delivery line of Pump of
dia class PN. 1.6

i) 50mm dia. 2 Nos. 14000.00 Each. 28000.00


ii) 65mm dia. 2 Nos. 15000.00 Each. 30000.00
iii) 80mm dia, 2 Nos. 18500.00 Each. 37000.00
iv) 125mm dia. 1 No. 28000.00 Each. 28000.00
v) 150mm dia. 1 No. 33500.00 Each. 33500.00
Total: 156500.00
TERMS & CONDITIONS
1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-
charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 The material will be received in good condition,
4 Nothing shall be paid for rejected materials. Executive Engineer,
5 The valve certificate from original manufacturing shall be submitted by the contractor/firm to I&PH Division,
the Executive Engineer. Paonta Sahib.

REVISED SCHEDULE OF QUANTITY Estimated cost Rs 84094/--


Name of work Providing and fixing of various LWSS/GWSS under IPH section Giri Nagar in Earnest money Rs.1700/-
Tehsil Paonta Sahib Distt.Sirmour (HP) Time:- 15 Days

S.No Sub-Head and item of work. Qty. Rates, Unit Amount.


1 2 3 4 5 6
1
1 Providing and fixing of following dia of Gun metal Gate valve including all leads,lifts and
carriage of material ar site including all leads lifts and carriage of material and as per direction
of the Engineer-in-charge.

i) 80mm dia. 5 Nos. 2950.00 Each. 14750.00


ii) 65mm dia. 5 Nos. 2470.00 Each. 12350.00

iii) 50mm dia, 5 Nos. 2200.00 Each. 11000.00

iv) 40mm dia. 5 Nos. 1500.00 Each. 7500.00

v) 32mm dia. 10 Nos. 800.00 Each. 8000.00

vi) 25mm dia. 20 Nos. 510.00 Each. 10200.00

vii) 20mm dia. 20 Nos. 490.00 Each. 9800.00

viii) 15mm dia. 35 Nos. 370.00 Each. 12950.00

2 Providing and fixing of following dia of GI Unions of various dia including all leads,lifts and
carriage of material ar site including all leads lifts and carriage of material and as per direction
of the Engineer-in-charge.
i) 65mm dia. 10 Nos. 650.00 Each. 6500.00

ii) 50 mm dia. 20 Nos. 450.00 Each. 9000.00

iii) 40mm dia, 10 Nos. 420.00 Each. 4200.00

iv) 32mm dia. 55 Nos. 250.00 Each. 13750.00

v) 25mm dia. 55 Nos. 200.00 Each. 11000.00

vi) 20mm dia. 50 Nos. 180.00 Each. 9000.00

vii) 15mm dia. 80 Nos. 105.00 Each. 8400.00

3 Providing and supplying of Glain dori 3/8" complete in all respect and as per direction of the 5 Kg. 250.00 P/Kg. 1250.00
Engineer-in-charge.
4 Providing and supplying of grease complete in all respect . 10 Kg. 220.00 Per Kg. 2200.00
5 Providing and supplying of Transformer oil complete in all respect and as per direction of the 25 Litre. 270.00 P/Litre. 6750.00
Engineer-in-charge.
Total: 158600.00
TERMS & CONDITIONS
1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 The material will be received in good condition,
4 Nothing shall be paid for rejected materials. Executive Engineer,
I&PH Division,
Paonta Sahib.
Paonta Sahib.
REVISED SCHEDULE OF QUANTITY Estimated cost Rs 67879/-
Name of work:-R/M of GWSS to LOH of CV Shilla (Borar) CV & GP Shilla in Tehsil Paonta Sahib Distt. Earnest money Rs.1400/-
Sirmour (HP) (SH:-C/o RCC Collection Tank, 1 No. Laying & jointing of GI Pipes of various dias.) Time:- Three months.
Sr.No. Description. Qty. Rate, Unit
1 2 3 4 5
1 Excavation in foundation and trenches etc.in earth work in all kinds of soil such as pick 12.86 Cum. 160.00 P/Cum
work ,jumper work decomposed conglomerate saturated soil soft and hard rock upto all
leads lifts stacking the excavated soil not more than 3mtr.clear from the edge of excavation
and then returning the stacked soil in 15cm layers when required in to plinth sides of
foundation etc. consolidating each deposited layers by ramming and watering and then
disposing of all surplus excavated earth as directed with in all leads lifts and as per
directions of the Engineer-incharge

2 Providing and laying cement concrete 1:4:8(1cement:4sand:8 graded stone agg.40mm 1.80 Cum 4000 P/Cum
nominal size)and curing complete excluding the cost of form work in foundation & plinth
including all leads lifts and carriage of material and as per the directions of Engineer-in-
charge.

3 Providing and laying cement concrete work 1:1 1/2:3 (1cement:1 1/2 sand: 3 graded stone
agg. 20mm nominal size & curing complete) excluding cost of form workand reinforcement
for RCC work including all leads lifts complete and carriage of material etc. as per
directions of Engineer incharge.

i) In foundation and Plinth 1.81 Cum. 5600.00 P/Cum.


ii) In vertical walls any thickness but not less than 0.10 Metres. 3.77 Cum. 5800.00 P/Cum.
4 Providing form work with steel sheets 3.15mm thick welded with angle iron 30x30x5 mm
so as to give rough finish i/c centring shuttering structing and propping etc. with wooden
bettens & Ballies, height or propping & centering below supporting floor to ceiling not
exceeding 4 mtr.and removal of the same for insitu RCC work and PCC work.including all
leads lifts and carriage of material at site & as per direction of Engineer in charge in:-

a) Flat surfaces such as soffits of suspended floor roofs landing and like upto 200mm in 7.74 Sqm. 300.00 P/Sqm.
thickness.
ii) In vertical walls any thickness but not less than 0.10 Metres. 57.38 Sqm. 200.00 P/Sqm.
5 Providing and laying cement concrete 1:2:4(1cement:2app.sand: 4 app. graded stone agg. 0.92 Cum 1658.90 P/Cum
20mm nominal size )and curing complete excluding cost of form work & reinforcement for
reinforced work in suspended floors, roofs landing shelves and their supports balconies,
beams, girders bressumers and cantilivers upto to floor two level in all height and depth,
including all leads lifts and carriage of material at site and as per direction of the Engineer-
incharge.

6 Providing Mild Steel/Tor steel reinforcement including bending binding & placing in 410.32 Kg. 64.00 P/kg
positing I/c all leads lifts and carriage of material and as per direction of the Engineer-in-
charge.

7 Excavation in drains & channel etc.in earth work in all kinds of soil such as pick work 450.00 Cum 160.00 P/Cum
,jumper work blasting work, decomposed conglomerate saturated soil soft and hard rock
including dressing of sides and beds and prepareation of sub grade to level or slope
including refilling the trenches and disposing of surplus earth upto all leads,lifts disposed
earth to be levelled and neatly dressed including jungle clearance and as per directions of
the Engineer-incharge

8 Laying and jointing of GMS Pipes of various dia in trenches (earth work in trenches to be measured and
paid for seperately) including all leads lifts and carriage of material at site as per direction of Engineer-
in-charge of following dias.
i) 40mm dia 2000 Rmt 2.10 P/Rmt.
Total:
TERMS AND CONDITIONS:-
1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Cement will be issued @ 315/- per bag & steel @ 53/- per Kg. at IPH store Bhatanwali Paonta Sahib.
4 Empty cement bags shall be returned to the deptt. Otherwise Rs. 2/- per bag shall be deducted from the
5 earch billcertificate
Royality of the contractor.
in respect of stone agg. Sand etc. shall be produced by the contractor
7 GI Pipe shall be issued free of cost from IPH Store Bhatanwali.
8 GI Fitting shall be provided by the contractor. Assistant Engineer,
I&PH Sub Division, Kaffota.

DRAFT SCHEDULE OF QUANTITY Estimated cost Rs 79392/-


Name of work:-Sustainiability of GWSS to LOH of CV Kando Duana(Fegdali) in Tehsil Paonta Sahib Distt. Earnest money Rs.1600/-
Sirmour (HP) (SH:-C/o RCC Collection Tank, . Laying & jointing of GI Pipes of various dias.) Time:- Three months.
Sr.No. Description. Qty. Rate, Unit
1 2 3 4 5
1 Excavation in foundation and trenches etc.in earth work in all kinds of soil such as pick 12.86 Cum. 92.85 P/Cum
work ,jumper work decomposed conglomerate saturated soil soft and hard rock upto all
leads lifts stacking the excavated soil not more than 3mtr.clear from the edge of excavation
and then returning the stacked soil in 15cm layers when required in to plinth sides of
foundation etc. consolidating each deposited layers by ramming and watering and then
disposing of all surplus excavated earth as directed with in all leads lifts and as per
directions of the Engineer-incharge

2 Providing and laying cement concrete 1:4:8(1cement:4sand:8 graded stone agg.40mm 1.80 Cum 1104.8 P/Cum
nominal size)and curing complete excluding the cost of form work in foundation & plinth
including all leads lifts and carriage of material and as per the directions of Engineer-in-
charge.
3 Providing and laying cement concrete work 1:1 1/2:3 (1cement:1 1/2 sand: 3 graded stone
agg. 20mm nominal size & curing complete) excluding cost of form workand reinforcement
for RCC work including all leads lifts complete and carriage of material etc. as per
directions of Engineer incharge.

i) In foundation and Plinth 2.92 Cum. 1866.80 P/Cum.


ii) In vertical walls any thickness but not less than 0.10 Metres. 3.77 Cum. 1923.10 P/Cum.
4 Providing form work with steel sheets 3.15mm thick welded with angle iron 30x30x5 mm
so as to give rough finish i/c centring shuttering structing and propping etc. with wooden
bettens & Ballies, height or propping & centering below supporting floor to ceiling not
exceeding 4 mtr.and removal of the same for insitu RCC work and PCC work.including all
leads lifts and carriage of material at site & as per direction of Engineer in charge in:-

a) Flat surfaces such as soffits of suspended floor roofs landing and like upto 200mm in 7.74 Sqm. 134.10 P/Sqm.
thickness.
ii) In vertical walls any thickness but not less than 0.10 Metres. 57.38 Sqm. 80.70 P/Sqm.
5 Providing and laying cement concrete 1:2:4(1cement:2app.sand: 4 app. graded stone agg. 0.92 Cum 1658.90 P/Cum
20mm nominal size )and curing complete excluding cost of form work & reinforcement for
reinforced work in suspended floors, roofs landing shelves and their supports balconies,
beams, girders bressumers and cantilivers upto to floor two level in all height and depth,
including all leads lifts and carriage of material at site and as per direction of the Engineer-
incharge.

6 Providing Mild Steel/Tor steel reinforcement including bending binding & placing in 410.32 Kg. 20.70 P/kg
positing I/c all leads lifts and carriage of material and as per direction of the Engineer-in-
charge.
7 Excavation in drains & channel etc.in earth work in all kinds of soil such as pick work 585.00 Cum 75.95 P/Cum
,jumper work blasting work, decomposed conglomerate saturated soil soft and hard rock
including dressing of sides and beds and prepareation of sub grade to level or slope
including refilling the trenches and disposing of surplus earth upto all leads,lifts disposed
earth to be levelled and neatly dressed including jungle clearance and as per directions of
the Engineer-incharge
8 Laying and jointing of GMS Pipes of various dia in trenches (earth work in trenches to be measured and
paid for seperately) including all leads lifts and carriage of material at site as per direction of Engineer-
in-charge of following dias.

i) 40mm dia 2600 Rmt 2.10 P/Rmt.


Total:
TERMS AND CONDITIONS:-
1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Cement will be issued @ 315/- per bag & steel @ 53/- per Kg. at IPH store Bhatanwali Paonta Sahib.
4 Empty cement bags shall be returned to the deptt. Otherwise Rs. 2/- per bag shall be deducted from the
5 earch billcertificate
Royality of the contractor.
in respect of stone agg. Sand etc. shall be produced by the contractor
7 GI Pipe shall be issued free of cost from IPH Store Bhatanwali.
8 GI Fitting shall be provided by the contractor. Assistant Engineer,
I&PH Sub Division, Kaffota.
cost Rs 67879/-
money Rs.1400/-
ree months.
Amount.
6
2058.00

7200.00

10136.00
21866.00
2322.00

11476.00
1526.00

26260.00

72000.00
4200.00
159044.00

Engineer,
Division, Kaffota.

cost Rs 79392/-
money Rs.1600/-
ree months.
Amount.
6
1194.00

1989.00
0.00

5451.00
7250.00

1038.00

4631.00
1526.00

8494.00

44431.00
5460.00
81464.00

Engineer,
Division, Kaffota.
REVISED SCHEDULE OF QUANTITY Estimated Cost :-Rs.44105/-
Name of work: R/M of Left Bank Canal Km. 0/0 to 24/0 in Tehsil Paonta Sahib Distt. Sirmour (HP) Earnest Money :-Rs.900/-
(SH: Prov. Laying & jointing of RCC Pipe line for lecft out area of LIS at RD 10100 on LBC) Time:- Three months
S.No Description Qty. Rate Unit Amount
1 2 3 4 5 6.
1 Excavation in drains and channels etc. in earth work in all kinds of soil such as pick 193.10 Cum 160.00 P/Cum 30896.00
work,jumper work ,blasting work decomposed conglomerate saturated soil soft
rock and hard rock including dressing of sides and beds and preparation of sub
grade to level or slope including refilling the trenches and disposing of surplus earth
upto all leads lifts disposed earth to be levelled and neatly dressed including jungle
clearance and as per direction of Engineer-in-charge.

2 Excavation in foundation and trenches etc.in earth work in all kinds of soil such as 8.26 Cum. 160.00 Per cum. 1322.00
pick work ,jumper work decomposed conglomerate saturated soil soft and hard rock
upto all leads lifts stacking the excavated soil not more than 3mtr.clear from the edge
of excavation and then returning the stacked soil in 15cm layers when required in to
plinth sides of foundation etc. consolidating each deposited layers by ramming and
watering and then disposing of all surplus excavated earth as directed with in all
leads lifts and as per directions of the Engineer-incharge

3 Providing and laying cement concrete 1:4:8(1cement:4sand:8 graded stone 1.65 Cum 3300.00 P/Cum 5445.00
agg.20mm nominal size)and curing complete excluding the cost of form work in
foundation & plinth including all leads lifts and carriage of material and as per the
directions of Engineer-in-charge.

4 Ist. Class masonary in common bunt clay building bricks in foundation & plinth in 5.63 Cum. 5460.00 Per cum. 30740.00
cement motrar 1:6(1cement:6sand) in all leads,lifts and carriage etc. as per direction
of the Engineer-in-charge.

5 15mm thick cement plaster in single coat on rough sde of bricks/stone/concrete 32.30 Sqm. 140.00 Per Sqm. 4522.00
walls of interior plastering upto floor to level including arrises internal rounded
angles not exceeding 80mm in girth and finished even and smooth in cement mortar
1:6(cement:6sand) and curing complete including all leads,lifts and carriage of
material at site as per direction of the Engineer-in-charge.
6 Providing and laying cement concrete 1:2:4(1cement:2app.sand: 4 app. graded 0.30 Cum 4050.00 P/Cum 1215.00
stone agg. 20mm nominal size )and curing complete excluding cost of form work in
foundation and plinth in all depth including carriage of material at site and as per
direction of the Engineer-incharge.

7 Providing / Laying ( to level or slope) and jointing precast concrete Socketted and
spigotted pipes ( earth work in trenches to be mesured and paid for seperately) of
following class with duly ISI marked as per IS:458-2003, precast concrete pipes with
and without re-inforcement 3rd revision ammendment No.3 and with latest
ammendments, it any, complete with rubber rings type-II duly ISI marked as per
IS:5382-1985 Ist.Revision ammendment No.1 and with latest
ammendments,including jointing with C.M. 1:2(1cement:2 sand) in following dia
meter including all leads lifts and carriage of material as per direction of Engineer
incharge.

i) RCC Pipe 250mm dia NP2 260 Rmt 530.00 P/Rmt. 137800.00

Total: 211940.00
TERMS AND CONDITIONS:-
1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Cement shall be issued @Rs.315/-P.bag & steel @Rs.53/- P.kg from IPH Store Bhatanwali Paonta Sahib.
4 Empty cement bags shall be returned to the Deptt.otherwise Rs.2/-per bag shall be deducted from the bill.
5 Royality certificate in respect of (Water born) stone aggregate sand etc. shall be produced by the contractor
6 RCC Pipes shall be Provided by the contractor at his own cost.
7 In addition to normal security 5% amount will be withheld for want of testing of
Pipe/S. tank against leakage and will be released after successful testing.

Executive Engineer,
I&PH Division,
Paonta Sahib.
DRAFT SCHEDULE OF QUANTITY Estimated cost Rs.33943/-
Name of work:- Restoration of Rain damages of Left Bank Canal in Tehsil Paonta Sahib Distt. Sirmour (HP) (SH: Earnest money Rs.550/-
C/O Wire crate to protect the cultivated land of Sh.Mohd. Hussain S/o Sh. Taki Mohd. Right side from Dagan Ka Khalla ) Time:- Three Months.
S.No Sub-Head and item of work. Qty. Rates, Unit Amount.
1 Excavation in foundation and trenches etc.in earth work in all kinds of soil such as 26.25 Cum 92.85 P/Cum 2437.00
pick work ,jumper work decomposed conglomerate saturated soil soft and hard rock
upto all leads lifts stacking the excavated soil not more than 3mtr.clear from the edge
of excavation and then returning the stacked soil in 15cm layers when required in to
plinth sides of foundation etc. consolidating each deposited layers by ramming and
watering and then disposing of all surplus excavated earth as directed with in all
leads lifts and as per directions of the Engineer-incharge

2 Wire crates made of G.I.wire filled with boulder/hard stone of approved quality with 93.75 Cum. 287.10 P/Cum. 26916.00
square cut faces against the wire having rounded/rectangular shape weight of stones
not less than 18 Kg. free from soft spots,cracks,cavaties etc.(Wire crate to be
measured and paid for separately)including all leads,lifts and carriage of material at
site as direction of the Engineer-in-charge. (Double Knot)

3 Wire crates of G.I.wire filled with boulder with square cut faces against the wire 450.00 Sqm. 10.20 P/Sqm. 4590.00
G.I.wire 5mm thick corresponding to SWG 6 with 15cmx15cm mesh(boulder filling
to be measured and paid for separately including all leads,lifts and carriage of
materials at site and as per directions of the Engineer-in-charge(L.Rate)

TOTAL: 33943.00
TERMS AND CONDITIONS:-
1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Royality certificate in respect of stone agg. Sand etc. shall be produced by the contractor
4 G.I.Wire shall be issued by the deptt. free of cost.
5 Boulder shall not be less than 18 Kg. & the stone should be free from cracks and cavities.

Assistant Engineer,
Giri Irrig. Sub Division,
Patlion
REVISED SCHEDULE OF QUANTITY Estimated Cost :-Rs.81992/-
Name of work:-Aug./Imp. of GWSS Staun GP Staun in Tehsil Paonta Sahib Distt.Sirmour(HP) Earnest Money :-Rs.1650/-
(SH: C/O Boundru wall & steel work & wire fencing around the civil work) Time:- Two months.
S.No Description Qty. Rate Unit Amount
1 2 3 4 5 6.
1 Excavation in foundation and trenches etc.in earth work in all kinds of soil such as pick work 42.34 Cum. 155.00 Per cum. 6563.00
,jumper work decomposed conglomerate saturated soil soft and hard rock upto all leads lifts
stacking the excavated soil not more than 3mtr.clear from the edge of excavation and then
returning the stacked soil in 15cm layers when required in to plinth sides of foundation etc.
consolidating each deposited layers by ramming and watering and then disposing of all surplus
excavated earth as directed with in all leads lifts and as per directions of the Engineer-incharge

2 Providing and laying cement concrete 1:6:12(1cement:6sand:12 graded stone agg.40mm 10.58 Cum 2100.00 P/Cum 22218.00
nominal size)and curing complete excluding the cost of centring shuttering in foundation &
plinth including all leads lifts and carriage of material and as per the directions of Engineer-
in-charge.

3 Random rubble masonary /Poly rubble masonary (uncoursed/brought to coursed) with hard 23.51 Cum 3100.00 P/Cum 72881.00
stone of approved quality in foundation and plinth including levelling up with cement concrete
1:6.12(1cement:6sand:12 graded stone agg. 20mm nominal size)in cement mortor 1:6 (1
Cement: 6 sand ) in breast wall & Retaining walls including all leads lifts and carriage of
material and as per the directions of Engineer-in-charge.

4 Half brick masonary Ist. Class brick work with cement mortar 1:3 (1cement:3sand) complete in 107.47 Sqm. 600.00 P/Sqm. 64482.00
all respect and as per direction of the Engineer-in-charge.

5 Ist. Class brick work using common building bricks in super structure in cement mortar 2.26 Cum. 5200.00 P/Cum 11752.00
1:6(1cement:6sand) complete in all respect and as per direction of the Engineer-in-charge.
6 Steel work singele sections in built up section trusses and framed work including cutting 1.12 Qntl. 7800.00 Per Qntl. 8736.00
hoisting fixing in position and applying a priming coat of red lead paint in gratting framed
guards bars ladders railing brackets and similar works including all leads,lifts and carriage of
materials as per direction of the Engineer-in-charge.

7 Providing and fixing of galvanised steel barbed wire weighting 9.38 Kg. 100 mtr. Stroamed and 11.25 Rmt. 120.00 1350.00
fixed to posts by typing to 6mm galvanised steel bar niles/clips with GI binding wire including
all leads,lifts and carriage of material as per direction of the Engineer-in-charge.

TERMS AND CONDITIONS. Total: 187982.00


1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Cement shall be issued @ Rs. 315/- per bag & steel @ 53/- per Kg. from IPH store Bhatanwali Paonta Sahib.
4 Royality certificate in respect of stone agg. Sand etc. shall be produced by the contractor
5 Empty cement bags shall be returned to the Deptt. Otherwise Rs. 2/- per bag shall deducted from the bill.
Executive Engineer,
I&PH Division, Paonta Sahib.
REVISED SCHEDULE OF QUANTITY Estimated Cost :-Rs.57948/-
Name of work:-Providing LWSS Tatiana in Tehsil Paonta Sahib Distt.Sirmour(HP) Earnest Money :-Rs.1200/-
(SH: C/O Boundry wall) Time:- Three months.
S.No Description Qty. Rate Unit Amount
1 2 3 4 5 6.
1 Excavation in foundation and trenches etc.in earth work in all kinds of soil such as pick work 13.68 Cum. 160.00 Per cum. 2189.00
,jumper work decomposed conglomerate saturated soil soft and hard rock upto all leads lifts
stacking the excavated soil not more than 3mtr.clear from the edge of excavation and then
returning the stacked soil in 15cm layers when required in to plinth sides of foundation etc.
consolidating each deposited layers by ramming and watering and then disposing of all surplus
excavated earth as directed with in all leads lifts and as per directions of the Engineer-incharge

2 Providing and laying cement concrete 1:6:12(1cement:6sand:12 graded stone agg.40mm 6.84 Cum 3600.00 P/Cum 24624.00
nominal size)and curing complete excluding the cost of centring shuttering in foundation &
plinth including all leads lifts and carriage of material and as per the directions of Engineer-
in-charge.

3 Random rubble masonary /Poly rubble masonary (uncoursed/brought to coursed) with hard 10.26 Cum 4200.00 P/Cum 43092.00
stone of approved quality in foundation and plinth including levelling up with cement concrete
1:6.12(1cement:6sand:12 graded stone agg. 20mm nominal size)in cement mortor 1:6 (1
Cement: 6 sand ) in breast wall & Retaining walls including all leads lifts and carriage of
material and as per the directions of Engineer-in-charge.

4 Providing and fixing of brick work in super structure using common burnt clay building bricks 1.90 Cum. 7000.00 P/Sqm. 13300.00
using cement motar1:6 (1cement :6sand) complete in all respect and as per direction of the
Engineer-in-charge.
5 Half Brick masonary in cement Mortar 1:6(1cement:6sand) complete in all respect and as per 84.82 Sqm. 880.00 P/Cum 74642.00
direction of the Engineer-in-charge.
TERMS AND CONDITIONS. Total: 157847.00
1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Cement shall be issued @ Rs. 315/- per bag & steel @ 53/- per Kg. from IPH store Bhatanwali Paonta Sahib.
4 Royality certificate in respect of stone agg. Sand etc. shall be produced by the contractor
5 Empty cement bags shall be returned to the Deptt. Otherwise Rs. 2/- per bag shall deducted from the bill.
Executive Engineer,
I&PH Division, Paonta Sahib.
REVISED SCHEDULE OF QUANTITY Estimated cost Rs 59992/-
Name of work:- Restoration of Rain damages to Left Bank Canal in Tehsil Paonta Sahib Distt. Sirmour (HP) Earnest money Rs.1200/-
(SH: C/o Wire crate to protect the canal at RD 4150 to 4200 Mtrs.) Time:- One Month .
S.No Sub-Head and item of work. Qty. Rates, Unit Amount.
1 Excavation in foundation and trenches etc.in earth work in all kinds of soil such as 46.75 Cum 155.00 P/Cum 7246.00
pick work ,jumper work decomposed conglomerate saturated soil soft and hard rock
upto all leads lifts stacking the excavated soil not more than 3mtr.clear from the edge
of excavation and then returning the stacked soil in 15cm layers when required in to
plinth sides of foundation etc. consolidating each deposited layers by ramming and
watering and then disposing of all surplus excavated earth as directed with in all leads
lifts and as per directions of the Engineer-incharge

2 Wire crates made of G.I.wire filled with boulder/hard stone of approved quality with 103.13 Cum. 925.00 P/Cum. 95395.00
square cut faces against the wire having rounded/rectangular shape weight of stones
not less than 18 Kg. free from soft spots,cracks,cavaties etc.(Wire crate to be
measured and paid for separately)including all leads,lifts and carriage of material at
site as direction of the Engineer-in-charge. (Double Knot)

3 Wire crates of G.I.wire filled with boulder with square cut faces against the wire 492.94 Sqm. 35.00 P/Sqm. 17253.00
G.I.wire 5mm thick corresponding to SWG 6 with 15cmx15cm mesh(boulder filling to
be measured and paid for separately including all leads,lifts and carriage of materials
at site and as per directions of the Engineer-in-charge(L.Rate)

4. Stone filling behind wire crates including all leads,lifts and carriage of material and as 6.00 Cum. 650.00 P/ Cum. 3900.00
per direction of the Engineer-in-charge.

TOTAL: 119894.00
TERMS AND CONDITIONS:-
1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Royality certificate in respect of stone agg. Sand etc. shall be produced by the contractor
4 G.I.wire shall be issued free of cost from IPH store Bhatanwali Paonta Sahib Executive Engineer,
5 Boulder shall not be less than 18 Kg. & the stone should be free from cracks and cavities. I&PH Division,
Paonta Sahib.
REVISED SCHEDULE OF QUANTITY Estimated cost Rs 62425/-
Name of work: Providing LWSS to PC habitation of CV Jwalapur in Tehsil Paonta Sahib Distt. Sirmour (HP) Earnest money Rs.1249/-
(SH: laying & jointing of GI Pipes in distribution system a Node No.5-6, 6-7, & 6-11 )Job No. I ) Time:- Two Months.
S.No Sub-Head and item of work. Qty. Rate. Unit Amount.
1 2 3 4 5 6
1 Excavation in drains & channel etc.in earth work in all kinds of soil such as pick work 412.62 Cum. 160.00 P/Cum. 66019.00
,jumper work blasting work, decomposed conglomerate saturated soil soft and hard
rock including dressing of sides and beds and prepareation of sub grade to level or
slope including refilling the trenches and disposing of surplus earth upto all leads,lifts
disposed earth to be levelled and neatly dressed including jungle clearance and as per
directions of the Engineer-incharge

2 Laying and jointing of GMS Pipes of various dia in trenches (earth work in trenches to be
measured and paid for seperately) including all leads lifts and carriage of material at site as
per direction of Engineer-in-charge of following dias.

i)32m dia . 780 Rmt 22.00 P/Rmt. 17160.00


ii).50mm dia. 530 Rmt 45.00 P/Rmt. 23850.00
3 Providing and fixing of Peet valve of superior quality approved make & relevant ISS complete
in all respect including all leads,lifts and carriage of material and at site as per direction of the
Engineer-in-charge.

i)32m dia . 1 No. 750.00 Each. 750.00


Total: 107779.00
TERMS AND CONDITIONS:-
1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 G.I.Pipe shall be issued free of cost from IPH Store Bhatanwali Paonta Sahib. Executive Engineer,
4 The pipe fitting shall be provided by the contractor. I&PH Division,
Paonta Sahib.
REVISED SCHEDULE OF QUANTITY Estimated cost Rs 61734/-
Name of work: Providing LWSS to PC habitation of CV Jwalapur in Tehsil Paonta Sahib Distt. Sirmour (HP) Earnest money Rs.1235/-
(SH: laying & jointing of GI Pipes in distribution system Node No.2-3, 3-4, 4-5 & 5-9 )Job No. II ) Time:- Two Months.
S.No Sub-Head and item of work. Qty. Rate. Unit Amount.
1 2 3 4 5 6
1 Excavation in drains & channel etc.in earth work in all kinds of soil such as pick work 378.00 Cum. 160.00 P/Cum. 60480.00
,jumper work blasting work, decomposed conglomerate saturated soil soft and hard
rock including dressing of sides and beds and prepareation of sub grade to level or
slope including refilling the trenches and disposing of surplus earth upto all leads,lifts
disposed earth to be levelled and neatly dressed including jungle clearance and as per
directions of the Engineer-incharge

2 Laying and jointing of GMS Pipes of various dia in trenches (earth work in trenches to be
measured and paid for seperately) including all leads lifts and carriage of material at site as
per direction of Engineer-in-charge of following dias.
i)32m dia .(L) 350 Rmt 22.00 P/Rmt. 7700.00
ii)65 mm dia.(L) 790 Rmt 45.00 P/Rmt. 35550.00
iii) 80mm dia (L). 60 Rmt. 56.00 P/Rmt. 3360.00
3 Providing and fixing of Peet valve of superior quality approved make & relevant ISS complete
in all respect including all leads,lifts and carriage of material and at site as per direction of the
Engineer-in-charge.
i)32m dia . 1 No. 750.00 Each. 750.00
ii) 65mm dia. 1 No. 2100.00 Each. 2100.00
iii) 80mm dia 1 No. 3200.00 Each. 3200.00
Total: 113140.00
TERMS AND CONDITIONS:-
1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 G.I.Pipe shall be issued free of cost from IPH Store Bhatanwali Paonta Sahib. Executive Engineer,
4 The pipe fitting shall be provided by the contractor. I&PH Division,
Paonta Sahib.
DRAFT SCHEDULE OF QUANTITY Estimated cost Rs 52573/-
Name of work:-Aug./Imp. of LWSS Basog Chambiyara & Chowki GP Kamroo in Tehsil Paonta Sahib Distt. Earnest money Rs.1100/-
Sirmour (HP) (SH:-C/o RCC storage Tank 11900 Litres & 13650 Litres cap. ) Time:- Three months.
Sr.No. Description. Qty. Rate, Unit Amount.
1 2 3 4 5 6
1 Excavation in foundation and trenches etc.in earth work in all kinds of soil such as pick 18.22 Cum. 92.85 P/Cum 1692.00
work ,jumper work decomposed conglomerate saturated soil soft and hard rock upto all
leads lifts stacking the excavated soil not more than 3mtr.clear from the edge of
excavation and then returning the stacked soil in 15cm layers when required in to plinth
sides of foundation etc. consolidating each deposited layers by ramming and watering
and then disposing of all surplus excavated earth as directed with in all leads lifts and as
per directions of the Engineer-incharge

2 Providing and laying cement concrete 1:4:8(1cement:4sand:8 graded stone agg.40mm 2.93 Cum 1104.8 P/Cum 3237.00
nominal size)and curing complete excluding the cost of form work in foundation &
plinth including all leads lifts and carriage of material and as per the directions of
Engineer-in-charge.

3 Providing and laying cement concrete work 1:1 1/2:3 (1cement:1 1/2 sand: 3 graded
stone agg. 20mm nominal size & curing complete) excluding cost of form workand
reinforcement for RCC work including all leads lifts complete and carriage of material
etc. as per directions of Engineer in-charge.

i) In foundation and Plinth 2.97 Cum. 1866.80 P/Cum. 5544.00


ii) In vertical walls any thickness but not less than 0.10 Metres. 6.38 Cum. 1923.10 P/Cum. 12269.00
4 Providing form work with steel sheets 3.15mm thick welded with angle iron 30x30x5
mm so as to give rough finish i/c centring shuttering structing and propping etc. with
wooden bettens & Ballies, height or propping & centering below supporting floor to
ceiling not exceeding 4 mtr.and removal of the same for insitu RCC work and PCC
work.including all leads lifts and carriage of material at site & as per direction of
Engineer in charge in:-

a) Flat surfaces such as soffits of suspended floor roofs landing and like upto 200mm in 13.04 Sqm. 134.10 P/Sqm. 1749.00
thickness.

ii) In vertical walls any thickness but not less than 0.10 Metres. 85.07 Sqm. 80.70 P/Sqm. 6865.00
5 Providing and laying cement concrete 1:2:4(1cement:2app.sand: 4 app. graded stone 1.59 Cum 1658.90 P/Cum 2638.00
agg. 20mm nominal size )and curing complete excluding cost of form work &
reinforcement for reinforced work in suspended floors, roofs landing shelves and their
supports balconies, beams, girders bressumers and cantilivers upto to floor two level in
all height and depth, including all leads lifts and carriage of material at site and as per
direction of the Engineer-incharge.

6 Providing Mild Steel/Tor steel reinforcement including bending binding & placing in 711.00 Kg. 20.70 P/kg 14718.00
positing I/c all leads lifts and carriage of material and as per direction of the Engineer-
in-charge.

7 Supplying and fixing Cast iron cover with frames for main holes of internal dia metre 2.00 Nos. 1918.00 Each. 3836.00
Cast Iron cover (Medium) duty the weight of cover to be not less than 58 Kg. including
all leads,lifts and carriage of material at site and as directed by the Engineer-in-charge.

8 Laying and jointing of GMS Pipes of various dia in trenches (earth work in trenches to
be measured and paid for seperately) including all leads lifts and carriage of material at
site as per direction of Engineer-in-charge of following dias.

i) 32 mm dia 12 Rmt 2.10 P/Rmt. 25.00


Total: 52573.00
TERMS AND CONDITIONS:-
1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Cement will be issued @ 315/- per bag & steel @ 53/- per Kg. at IPH store Bhatanwali Paonta Sahib.
4 Empty cement bags shall be returned to the deptt. Otherwise Rs. 2/- per bag shall be deducted from the
5 earch billcertificate
Royality of the contractor.
in respect of stone agg. Sand etc. shall be produced by the contractor
7 GI Pipe shall be issued free of cost from IPH Store Bhatanwali.
8 GI Fitting shall be provided by the contractor. Assistant Engineer,
I&PH Sub Division, Kaffota.
REVISED SCHEDULE OF QUANTITY Estimated cost Rs 48682/-
Name of work:-Sustainability of GWSS Pab GP Bokala Pab in Tehsil Paonta Sahib Distt. Sirmour (HP) Earnest money Rs.1000/-
(SH:-C/o RCC collction tank, Laying & jointing of GI Pipes. ) Time:- Three months.
Sr.No. Description. Qty. Rate, Unit Amount.
1 2 3 4 5 6
1 Excavation in foundation and trenches etc.in earth work in all kinds of soil such as pick 10.39 Cum. 160.00 P/Cum 1662.00
work ,jumper work decomposed conglomerate saturated soil soft and hard rock upto all
leads lifts stacking the excavated soil not more than 3mtr.clear from the edge of
excavation and then returning the stacked soil in 15cm layers when required in to plinth
sides of foundation etc. consolidating each deposited layers by ramming and watering
and then disposing of all surplus excavated earth as directed with in all leads lifts and as
per directions of the Engineer-incharge

2 Providing and laying cement concrete 1:4:8(1cement:4sand:8 graded stone agg.40mm 1.26 Cum 3800.00 P/Cum 4788.00
nominal size)and curing complete excluding the cost of form work in foundation &
plinth including all leads lifts and carriage of material and as per the directions of
Engineer-in-charge.

3 Providing and laying cement concrete work 1:1 1/2:3 (1cement:1 1/2 sand: 3 graded 0.00
stone agg. 20mm nominal size & curing complete) excluding cost of form workand
reinforcement for RCC work including all leads lifts complete and carriage of material
etc. as per directions of Engineer in-charge.

i) In foundation and Plinth 1.28 Cum. 5300.00 P/Cum. 6784.00


ii) In vertical walls any thickness but not less than 0.10 Metres. 2.52 Cum. 5450.00 P/Cum. 13734.00
4 Providing form work with steel sheets 3.15mm thick welded with angle iron 30x30x5 0.00
mm so as to give rough finish i/c centring shuttering structing and propping etc. with
wooden bettens & Ballies, height or propping & centering below supporting floor to
ceiling not exceeding 4 mtr.and removal of the same for insitu RCC work and PCC
work.including all leads lifts and carriage of material at site & as per direction of
Engineer in charge in:-

a) Flat surfaces such as soffits of suspended floor roofs landing and like upto 200mm in 4.20 Sqm. 300.00 P/Sqm. 1260.00
thickness.
ii) In vertical walls any thickness but not less than 0.10 Metres. 40.74 Sqm. 200.00 P/Sqm. 8148.00
5 Providing and laying cement concrete 1:2:4(1cement:2app.sand: 4 app. graded stone 0.60 Cum 5000.00 P/Cum 3000.00
agg. 20mm nominal size )and curing complete excluding cost of form work &
reinforcement for reinforced work in suspended floors, roofs landing shelves and their
supports balconies, beams, girders bressumers and cantilivers upto to floor two level in
all height and depth, including all leads lifts and carriage of material at site and as per
direction of the Engineer-incharge.

6 Providing Mild Steel/Tor steel reinforcement including bending binding & placing in 272.32 Kg. 64.00 P/kg 17428.00
positing I/c all leads lifts and carriage of material and as per direction of the Engineer-
in-charge.
7 Excavation in drains & channel etc.in earth work in all kinds of soil such as pick 364.50 Cum. 160.00 P/Cum. 58320.00
work ,jumper work blasting work, decomposed conglomerate saturated soil soft
and hard rock including dressing of sides and beds and prepareation of sub
grade to level or slope including refilling the trenches and disposing of surplus
earth upto all leads,lifts disposed earth to be levelled and neatly dressed
including jungle clearance and as per directions of the Engineer-incharge

8 Laying and jointing of GMS Pipes of various dia in trenches (earth work in trenches to
be measured and paid for seperately) including all leads lifts and carriage of material at
site as per direction of Engineer-in-charge of following dias.

i)32m dia . 1800 Rmt 9.50 P/Rmt. 17100.00


Total: 132224.00
TERMS AND CONDITIONS:-
1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Cement will be issued @ 315/- per bag & steel @ 53/- per Kg. at IPH store Bhatanwali Paonta Sahib.
4 Empty cement bags shall be returned to the deptt. Otherwise Rs. 2/- per bag shall be deducted from the
5 earch billcertificate
Royality of the contractor.
in respect of stone agg. Sand etc. shall be produced by the contractor
7 GI Pipe shall be issued free of cost from IPH Store Bhatanwali.
8 GI Fitting shall be provided by the contractor. Executive Engineer,
I&PH Division,
Paonta Sahib.
REVISED SCHEDULE OF QUANTITY Estimated cost Rs 16366/-
Name of work:-Prov./Imp. of LWSS Basog Chambiyara & Chowki GP Kamroo in Tehsil Paonta Sahib Distt. Earnest money Rs.400/-
Sirmour (HP) (SH:-Lying & jointing of GI Pipes, C/o RCC stand posts.) Time:- Three months.
Sr.No. Description. Qty. Rate, Unit Amount.
1 2 3 4 5 6
1 Excavation in foundation and trenches etc.in earth work in all kinds of soil such as pick 0.35 Cum. 160.00 P/Cum 56.00
work ,jumper work decomposed conglomerate saturated soil soft and hard rock upto all
leads lifts stacking the excavated soil not more than 3mtr.clear from the edge of
excavation and then returning the stacked soil in 15cm layers when required in to plinth
sides of foundation etc. consolidating each deposited layers by ramming and watering
and then disposing of all surplus excavated earth as directed with in all leads lifts and as
per directions of the Engineer-incharge

2 Providing and laying cement concrete 1:4:8(1cement:4sand:8 graded stone agg.40mm 0.35 Cum 3700.00 P/Cum 1295.00
nominal size)and curing complete excluding the cost of form work in foundation &
plinth including all leads lifts and carriage of material and as per the directions of
Engineer-in-charge.

3 Providing and laying cement concrete 1:2:4(1cement:2sand:4 graded stone agg.20mm 0.28 Cum. 4700.00 P/Cum. 1316.00
nominal size& curing complete ) excluding the cost of form work in foundation & plinth
including all leads lifts and carriage of material and as per the directions of Engineer-in-
charge.

4 Providing form work with steel sheets 3.15mm thick welded with angle iron 30x30x5
mm so as to give rough finish i/c centring shuttering structing and propping etc. with
wooden bettens & Ballies, height or propping & centering below supporting floor to
ceiling not exceeding 4 mtr.and removal of the same for insitu RCC work and PCC
work.including all leads lifts and carriage of material at site & as per direction of
Engineer in charge in:-

i) In vertical walls any thickness but not less than 0.10 Metres. 0.36 Sqm. 200.00 P/Sqm. 72.00
5 Providing and laying cement concrete 1:2:4(1cement:2app.sand: 4 app. graded stone 0.07 Cum 4900.00 P/Cum 343.00
agg. 20mm nominal size )and curing complete excluding cost of form work &
reinforcement for reinforced work in suspended floors, roofs landing shelves and their
supports balconies, beams, girders bressumers and cantilivers upto to floor two level in
all height and depth, including all leads lifts and carriage of material at site and as per
direction of the Engineer-incharge.

6 Providing Mild Steel/Tor steel reinforcement including bending binding & placing in 5.00 Kg. 64.00 P/kg 320.00
positing I/c all leads lifts and carriage of material and as per direction of the Engineer-
in-charge.
7 Excavation in drains & channel etc.in earth work in all kinds of soil such as pick 194.36 Cum. 160.00 P/Cum. 31098.00
work ,jumper work blasting work, decomposed conglomerate saturated soil soft
and hard rock including dressing of sides and beds and prepareation of sub
grade to level or slope including refilling the trenches and disposing of surplus
earth upto all leads,lifts disposed earth to be levelled and neatly dressed
including jungle clearance and as per directions of the Engineer-incharge

8 Laying and jointing of GMS Pipes of various dia in trenches (earth work in trenches to
be measured and paid for seperately) including all leads lifts and carriage of material at
site as per direction of Engineer-in-charge of following dias.

i) 15 mm dia 865 Rmt 10.00 P/Rmt. 8650.00


9 Providing and fixing of peet valve of superior quality of following dia complete in all 1 No. 350.00 Each. 350.00
respect as per direction of the Engineer-in-charge. 15mm dia.
Total: 43500.00
TERMS AND CONDITIONS:-
1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Cement will be issued @ 315/- per bag & steel @ 53/- per Kg. at IPH store Bhatanwali Paonta Sahib.
4 Empty cement bags shall be returned to the deptt. Otherwise Rs. 2/- per bag shall be deducted from the
5 earch billcertificate
Royality of the contractor.
in respect of stone agg. Sand etc. shall be produced by the contractor
7 GI Pipe shall be issued free of cost from IPH Store Bhatanwali.
8 GI Fitting shall be provided by the contractor. Executive Engineer,
I&PH Division,
Paonta Sahib.
REVISED SCHEDULE OF QUANTITY Estimated Cost :-Rs.81992/-
Name of work:-Aug./Imp. of GWSS Staun GP Staun in Tehsil Paonta Sahib Distt.Sirmour(HP) Earnest Money :-Rs.1650/-
(SH: C/O Boundru wall & steel work & wire fencing around the civil work) Time:- Two months.
S.No Description Qty. Rate Unit
1 2 3 4 5
1 Excavation in foundation and trenches etc.in earth work in all kinds of soil such as pick work 42.34 Cum. 155.00 Per cum.
,jumper work decomposed conglomerate saturated soil soft and hard rock upto all leads lifts
stacking the excavated soil not more than 3mtr.clear from the edge of excavation and then
returning the stacked soil in 15cm layers when required in to plinth sides of foundation etc.
consolidating each deposited layers by ramming and watering and then disposing of all surplus
excavated earth as directed with in all leads lifts and as per directions of the Engineer-incharge

2 Providing and laying cement concrete 1:6:12(1cement:6sand:12 graded stone agg.40mm 10.58 Cum 2100.00 P/Cum
nominal size)and curing complete excluding the cost of centring shuttering in foundation &
plinth including all leads lifts and carriage of material and as per the directions of Engineer-
in-charge.

3 Random rubble masonary /Poly rubble masonary (uncoursed/brought to coursed) with hard 23.51 Cum 3100.00 P/Cum
stone of approved quality in foundation and plinth including levelling up with cement concrete
1:6.12(1cement:6sand:12 graded stone agg. 20mm nominal size)in cement mortor 1:6 (1
Cement: 6 sand ) in breast wall & Retaining walls including all leads lifts and carriage of
material and as per the directions of Engineer-in-charge.

4 Half brick masonary Ist. Class brick work with cement mortar 1:3 (1cement:3sand) complete in 107.47 Sqm. 600.00 P/Sqm.
all respect and as per direction of the Engineer-in-charge.
5 Ist. Class brick work using common building bricks in super structure in cement mortar 2.26 Cum. 5200.00 P/Cum
1:6(1cement:6sand) complete in all respect and as per direction of the Engineer-in-charge.

6 Steel work singele sections in built up section trusses and framed work including cutting 1.12 Qntl. 7800.00 Per Qntl.
hoisting fixing in position and applying a priming coat of red lead paint in gratting framed
guards bars ladders railing brackets and similar works including all leads,lifts and carriage of
materials as per direction of the Engineer-in-charge.
7 Providing and fixing of galvanised steel barbed wire weighting 9.38 Kg. 100 mtr. Stroamed and 11.25 Rmt. 120.00
fixed to posts by typing to 6mm galvanised steel bar niles/clips with GI binding wire including
all leads,lifts and carriage of material as per direction of the Engineer-in-charge.

TERMS AND CONDITIONS. Total:


1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Cement shall be issued @ Rs. 315/- per bag & steel @ 53/- per Kg. from IPH store Bhatanwali Paonta Sahib.
4 Royality certificate in respect of stone agg. Sand etc. shall be produced by the contractor
5 Empty cement bags shall be returned to the Deptt. Otherwise Rs. 2/- per bag shall deducted from the bill.
Executive Engineer,
I&PH Division, Paonta Sahib.
DRAFT SCHEDULE OF QUANTITY Estimated cost Rs.39692/-
Name of work:-C/o LIS Kando Cheog GP Kando Cheog in Tehsil Paonta Sahib Distt. Sirmour (HP) Earnest money Rs.800/-
(SH: C/O Retaining wall in front of the Pump House) Time:- Three Months.
S.No Sub-Head and item of work. Qty. Rates, Unit
1 2 3 4 5
1 Cutting in earth work in all kind of soil and dispoal of the excavated earth upt all leads,lifts and 32.43 Cum 59.55 P/Cum
as directed by the Engineer-in-charge complete in all respect.
2 Excavation in foundation and trenches etc.in earth work in all kinds of soil such as pick work 8.70 Cum 92.85 P/Cum
,jumper work decomposed conglomerate saturated soil soft and hard rock upto all leads lifts
stacking the excavated soil not more than 3mtr.clear from the edge of excavation and then
returning the stacked soil in 15cm layers when required in to plinth sides of foundation etc.
consolidating each deposited layers by ramming and watering and then disposing of all surplus
excavated earth as directed with in all leads lifts and as per directions of the Engineer-incharge
3 Providing and laying cement concrete 1:6:12(1cement:6sand:12 graded stone agg.40mm 4.72 Cum 1104.80 P/Cum
nominal size)and curing complete excluding the cost of centring shuttering in foundation &
plinth including all leads lifts and carriage of material and as per the directions of Engineer-in-
charge.

4 Random rubble masonary /Poly rubble masonary (uncoursed/brought to coursed) with hard 16.38 Cum 1135.50 P/Cum
stone of approved quality in foundation and plinth including levelling up with cement concrete
1:6.12(1cement:6sand:12 graded stone agg. 20mm nominal size)in cement mortor 1:6 (1
Cement: 6 sand ) in breast wall & Retaining walls including all leads lifts and carriage of
material and as per the directions of Engineer-in-charge.

5 C/o Dry stone masonary in breast/Retaining walls/parapets etc. including all leads.lifts and 23.10 Cum 453.00 P/Cum
carriage of material and as per direction of the Engineer-in-charge.
6 Boulder filling behind the retaining wall & Breast wall etc. complete in all respect and as per 6.83 Cum. 391.70 P/Cum
direction of the Engineer-in-charge.

TOTAL:
TERMS AND CONDITIONS:-
1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Royality certificate in respect of stone agg. Sand etc. shall be produced by the contractor
4 Cement shall be issued @ Rs.315/- Per bag & steel @ Rs.53/- per Kg. from IPH store Bhatanwali Paonta
5 Sahib.
Empty cement bags shall be returned to the deptt. Other Rs.2/- per bag shall deducted from each bill of the
contractor. Assistant Engineer,
I&PH Sub Division,
Kaffota.

DRAFT SCHEDULE OF QUANTITY Estimated cost Rs.46904/-


Name of work:-C/o LIS Kando Cheog GP Kando Cheog in Tehsil Paonta Sahib Distt. Sirmour (HP) Earnest money Rs.1000/-
(SH: C/O Retaining wall in support of HDP Pipe) Time:- Three Months.
S.No Sub-Head and item of work. Qty. Rates, Unit
1 2 3 4 5
1 Cutting in earth work in all kind of soil and dispoal of the excavated earth upt all leads,lifts and 12.26 Cum 59.55 P/Cum
as directed by the Engineer-in-charge complete in all respect.
2 Excavation in foundation and trenches etc.in earth work in all kinds of soil such as pick work 7.02 Cum 92.85 P/Cum
,jumper work decomposed conglomerate saturated soil soft and hard rock upto all leads lifts
stacking the excavated soil not more than 3mtr.clear from the edge of excavation and then
returning the stacked soil in 15cm layers when required in to plinth sides of foundation etc.
consolidating each deposited layers by ramming and watering and then disposing of all surplus
excavated earth as directed with in all leads lifts and as per directions of the Engineer-incharge

3 Providing and laying cement concrete 1:6:12(1cement:6sand:12 graded stone agg.40mm 4.09 Cum 1104.80 P/Cum
nominal size)and curing complete excluding the cost of centring shuttering in foundation &
plinth including all leads lifts and carriage of material and as per the directions of Engineer-in-
charge.

4 Random rubble masonary /Poly rubble masonary (uncoursed/brought to coursed) with hard 36.11 Cum 1135.50 P/Cum
stone of approved quality in foundation and plinth including levelling up with cement concrete
1:6.12(1cement:6sand:12 graded stone agg. 20mm nominal size)in cement mortor 1:6 (1
Cement: 6 sand ) in breast wall & Retaining walls including all leads lifts and carriage of
material and as per the directions of Engineer-in-charge.

TOTAL:
TERMS AND CONDITIONS:-
1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Royality certificate in respect of stone agg. Sand etc. shall be produced by the contractor
4 Cement shall be issued @ Rs.315/- Per bag & steel @ Rs.53/- per Kg. from IPH store Bhatanwali Paonta
5 Sahib.
Empty cement bags shall be returned to the deptt. Other Rs.2/- per bag shall deducted from each bill of the
contractor. Assistant Engineer,
I&PH Sub Division,
Kaffota.

REVISED SCHEDULE OF QUANTITY Estimated cost Rs.46904/-


Name of work:-Restoration of Rain damages to FIS Kanti Mashwa GP Kanti Mashwa in Tehsil Paonta Sahib Distt. Earnest money Rs.1000/-
Sirmour (HP)(SH: C/O Retaining wall to protect the channel at RD 625 to 640 Mtr. & C/O Breast wall RD 790 to 798 Mtrs.) Time:- Three Months.
S.No Sub-Head and item of work. Qty. Rates, Unit
1 2 3 4 5
1 Cutting in earth work in all kind of soil and dispoal of the excavated earth upt all leads,lifts and 12.26 Cum 59.55 P/Cum
as directed by the Engineer-in-charge complete in all respect.
2 Excavation in foundation and trenches etc.in earth work in all kinds of soil such as pick work 7.02 Cum 92.85 P/Cum
,jumper work decomposed conglomerate saturated soil soft and hard rock upto all leads lifts
stacking the excavated soil not more than 3mtr.clear from the edge of excavation and then
returning the stacked soil in 15cm layers when required in to plinth sides of foundation etc.
consolidating each deposited layers by ramming and watering and then disposing of all surplus
excavated earth as directed with in all leads lifts and as per directions of the Engineer-incharge

3 Providing and laying cement concrete 1:6:12(1cement:6sand:12 graded stone agg.40mm 4.09 Cum 1104.80 P/Cum
nominal size)and curing complete excluding the cost of centring shuttering in foundation &
plinth including all leads lifts and carriage of material and as per the directions of Engineer-in-
charge.

4 Random rubble masonary /Poly rubble masonary (uncoursed/brought to coursed) with hard 36.11 Cum 1135.50 P/Cum
stone of approved quality in foundation and plinth including levelling up with cement concrete
1:6.12(1cement:6sand:12 graded stone agg. 20mm nominal size)in cement mortor 1:6 (1
Cement: 6 sand ) in breast wall & Retaining walls including all leads lifts and carriage of
material and as per the directions of Engineer-in-charge.

TOTAL:
TERMS AND CONDITIONS:-
1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Royality certificate in respect of stone agg. Sand etc. shall be produced by the contractor
4 Cement shall be issued @ Rs.315/- Per bag & steel @ Rs.53/- per Kg. from IPH store Bhatanwali Paonta
5 Sahib.
Empty cement bags shall be returned to the deptt. Other Rs.2/- per bag shall deducted from each bill of the
contractor. Assistant Engineer,
I&PH Sub Division,
Kaffota.
DRAFT SCHEDULE OF QUANTITY Estimated cost Rs.39692/-
Name of work:-C/o FIS Stun in GP Chandni in Tehsil Paonta Sahib Distt. Sirmour (HP) Earnest money Rs.800/-
(SH: C/O R/R Masonary channel in banking /ledging in Upper side at RD _____________to B) Time:- Three Months.
S.No Sub-Head and item of work. Qty. Rates, Unit
1 2 3 4 5
1 Cutting in earth work in all kind of soil and dispoal of the excavated earth upt all leads,lifts and 57.00 Cum 59.55 P/Cum
as directed by the Engineer-in-charge complete in all respect.

2 Excavation in drains & channel etc.in earth work in all kinds of soil such as pick work 19.00 Cum 75.85 P/Cum
,jumper work blasting work, decomposed conglomerate saturated soil soft and hard
rock including dressing of sides and beds and prepareation of sub grade to level or
slope including refilling the trenches and disposing of surplus earth upto all leads,lifts
disposed earth to be levelled and neatly dressed including jungle clearance and as per
directions of the Engineer-incharge

3 Random rubble masonary /Poly rubble masonary (uncoursed/brought to coursed) with hard 32.40 Cum 1135.50 P/Cum
stone of approved quality in foundation and plinth including levelling up with cement concrete
1:6.12(1cement:6sand:12 graded stone agg. 20mm nominal size)in cement mortor 1:6 (1
Cement: 6 sand ) in breast wall & Retaining walls including all leads lifts and carriage of
material and as per the directions of Engineer-in-charge.

1 Cement concrete lining 15cm thick or less for irrigation channels using cement concrete
1:3:6(1cement:3sand:6graded stone agg. 20mm nominal size)and curing complete excluding
cost of form work included all leads lifts and carriage of material complete in all respect and as
per direction of Engineer-in-charge.

a)Hand Mixed concrete in bed. 3.80 Cum 423.10 P/Cum


b)Hand mixed concrete lining in side slopes. 3.80 Cum 431.10 P/Cum
2 Extra allowance for form work in concrete lining as directed by the Engineer-in-charge including 352.00 Cum 18.85 P/Cum
all leads lifts and carriage of matrerials at site complete in all respects on side slopes as per
direction of Engineer in charge.
Providing Mild steel /Tor steel reinforcement including bending binding & placing in position 510.00 Kg. 20.70 Per Kg.
including all leads,lifts and carriage of material and as per direction of the Engineer-in-charge.

TOTAL:
TERMS AND CONDITIONS:-
1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Royality certificate in respect of stone agg. Sand etc. shall be produced by the contractor
4 Cement shall be issued @ Rs.315/- Per bag & steel @ Rs.53/- per Kg. from IPH store Bhatanwali Paonta
5 Sahib.
Empty cement bags shall be returned to the deptt. Other Rs.2/- per bag shall deducted from each bill of the
contractor. Assistant Engineer,
I&PH Sub Division,
Kaffota.
d Cost :-Rs.81992/-
Money :-Rs.1650/-

Amount
6.
6563.00

22218.00

72881.00

64482.00

11752.00

8736.00
1350.00

187982.00

Engineer,
sion, Paonta Sahib.
d cost Rs.39692/-
money Rs.800/-
hree Months.
Amount.
6
1931.00

808.00
5215.00

18599.00

10464.00

2675.00

39692.00

Engineer,

d cost Rs.46904/-
money Rs.1000/-
hree Months.
Amount.
6
730.00
652.00

4519.00

41003.00

46904.00

Engineer,

d cost Rs.46904/-
money Rs.1000/-
hree Months.
Amount.
6
730.00

652.00

4519.00

41003.00

46904.00

Engineer,
d cost Rs.39692/-
money Rs.800/-
hree Months.
Amount.
6
3394.00

1441.00

36790.00

1608.00
1638.00
6635.00

10557.00

62063.00

Engineer,
DEVIATION STATEMENT
Name of work: A/R & M/O of various LWSS & GWSS under IPH section Kamroo,
Kaffota Jakhana & Staun under IPH Sub division Kaffota in Tehsil Paona Sahib Distt.
Sirmour (HP) (SH: Cleaning of storage tank and sump well) As per acutal
As per Measurement book., Variation.
Sr.No. Description. Qty. Rate Unit Amount. Qty. Rate Unit Amount. (+ ) (-)

1 Mechanical cleaning & disinfection of 2453 50 Per Kilolitr 122650 2653 50 Per Kilolitr 132650 10000 ---
over head and underground water
stoage tanks, removal of sludge, UV
radiation of Tank complete in all respect
as per direction of the Engineer-in-
charge.

122650 132650 (+) 10000

Assistant Engineer,
I&PH Sub Division,
Kaffota.
DETAIL OF MEASUREMENT.
Name of work: R/M of various Schemes under IPH Section Kaffota under I&PH Sub Division Kaffota in Tehsil Paonta
SahibDistt. Sirmour (HP) (SH: Prov. & supplying of GI Unions, Tees and GI Reducers of various dia)
S.No Description Qty.
1 2 3
1 Providing and Supplying of G.I. Unions of the following sizes
confirming to IS 1879 in the various schemes as per the standard
design & relevant ISS of following dia complete in all respect and as
per satisfaction of the Engineer-in-charge.

i) 15mm dia 120 Nos.


ii) 20mm dia 120 Nos.
iii) 25 mm dia. 90 Nos.
iv) 32mm dia. 43 Nos.
v) 40mm dia. 75 Nos.
vi) 50mm dia. 150 Nos.
vii) 65mm dia. 60 Nos.
viii) 80mm dia. 50 Nos.
2 Providing and Supplying of the G.I.Tees of the following sizes
Confirming to IS 1879 in the various schemes complete in all respect
and as per satisfaction of the Engineer-in-charge.

i) 15mm dia 50 Nos.


ii)20mm dia 60 Nos.
iii)25 mm dia. 100 Nos.
iv) 32mm dia. 80 Nos.
v) 40mm dia. 50 Nos.
vi) 50mm dia. 50 Nos.
vii) 65mm dia. 50 Nos.
3 Providing and Supplying of G.I.Reducer of the following sizes
onfirming to IS 1879 in the various schemes complete in all respect
and as per satisfaction of the Engineer-in-charge.

i) 15x20mm dia 65 Nos.


ii) 20x25 mm dia 50 Nos.
iii) 25x32 mm dia. 40 Nos.
iv) 32x20mm dia. 30 Nos.
v) 40x15mm dia. 25 Nos.
vi) 40x32 mm dia. 15 Nos.
4 Providing and Supplying of Socket of the following sizes onfirming
to IS 1879 in the various schemes complete in all respect and as per
satisfaction of the Engineer-in-charge.

i) 15mm dia 110 Nos.


ii) 20mm dia 85 Nos.
iii) 25 mm dia. 75 Nos.
iv) 32mm dia. 45 Nos.
v) 40mm dia. 75 Nos.
vi) 50mm dia. 150 Nos.
vii) 65mm dia. 60 Nos.
viii) 80mm dia. 50 Nos.
5 Providing and Supplying of GI Elbow of the following sizes
onfirming to IS 1879 in the various schemes complete in all respect
and as per satisfaction of the Engineer-in-charge.

i) 15mm dia 120 Nos.


ii) 20mm dia 70 Nos.
iii) 25 mm dia. 75 Nos.
iv) 32mm dia. 45 Nos.
v) 40mm dia. 75 Nos.
Kaffota in Tehsil Paonta

L B H Qty.
4 5 6.

120 Nos.
120 Nos.
90 Nos.
43 Nos.
75 Nos.
150 Nos.
60 Nos.
50 Nos.

50 Nos.
60 Nos.
100 Nos.
80 Nos.
50 Nos.
50 Nos.
50 Nos.

65 Nos.
50 Nos.
40 Nos.
30 Nos.
25 Nos.
15 Nos.

110 Nos.
85 Nos.
75 Nos.
45 Nos.
75 Nos.
150 Nos.
60 Nos.
50 Nos.

120 Nos.
70 Nos.
75 Nos.
45 Nos.
75 Nos.

Assistant Engineer,
I&PH Sub Division,
Kaffota.
ABSTRACT OF COST.
Name of work: R/M of various Schemes under IPH Section Kaffota under I&PH Sub Division Kaffota in Tehsil Paonta SahibDistt. Sirmour (HP)
(SH: Prov. & supplying of GI Unions, Tees and GI Reducers of various dia)
S.No Description Qty. Rate Unit Amount
1 Providing and Supplying of G.I. Unions of the following sizes confirming to IS 1879
in the various schemes as per the standard design & relevant ISS of following dia
complete in all respect and as per satisfaction of the Engineer-in-charge.

i) 15mm dia 120 Nos. 70.00 Each. 8400.00


ii) 20mm dia 120 Nos. 90.00 Each. 10800.00
iii) 25 mm dia. 90 Nos. 120.00 Each. 10800.00
iv) 32mm dia. 43 Nos. 140.00 Each. 6020.00
v) 40mm dia. 75 Nos. 190.00 Each. 14250.00
vi) 50mm dia. 150 Nos. 280.00 Each. 42000.00
vii) 65mm dia. 60 Nos. 310.00 Each. 18600.00
viii) 80mm dia. 50 Nos. 380.00 Each. 19000.00
2 Providing and Supplying of the G.I.Tees of the following sizes Confirming to IS 1879
in the various schemes complete in all respect and as per satisfaction of the
Engineer-in-charge.

i) 15mm dia 50 Nos. 35.00 Each. 1750.00


ii)20mm dia 60 Nos. 50.00 Each. 3000.00
iii)25 mm dia. 100 Nos. 70.00 Each. 7000.00
iv) 32mm dia. 80 Nos. 110.00 Each. 8800.00
v) 40mm dia. 50 Nos. 130.00 Each. 6500.00
vi) 50mm dia. 50 Nos. 150.00 Each. 7500.00
vii) 65mm dia. 50 Nos. 170.00 Each. 8500.00
3 Providing and Supplying of G.I.Reducer of the following sizes onfirming to IS 1879
in the various schemes complete in all respect and as per satisfaction of the
Engineer-in-charge.

i) 15x20mm dia 65 Nos. 45.00 Each. 2925.00


ii) 20x25 mm dia 50 Nos. 70.00 Each. 3500.00
iii) 25x32 mm dia. 40 Nos. 100.00 Each. 4000.00
iv) 32x20mm dia. 30 Nos. 110.00 Each. 3300.00
v) 40x15mm dia. 25 Nos. 120.00 Each. 3000.00
vi) 40x32 mm dia. 15 Nos. 130.00 Each. 1950.00
4 Providing and Supplying of Socket of the following sizes onfirming to IS 1879 in
the various schemes complete in all respect and as per satisfaction of the Engineer-
in-charge.

i) 15mm dia 110 Nos. 30.00 Each. 3300.00


ii) 20mm dia 85 Nos. 45.00 Each. 3825.00
iii) 25 mm dia. 75 Nos. 60.00 Each. 4500.00
iv) 32mm dia. 45 Nos. 70.00 Each. 3150.00
v) 40mm dia. 75 Nos. 90.00 Each. 6750.00
vi) 50mm dia. 150 Nos. 110.00 Each. 16500.00
vii) 65mm dia. 60 Nos. 125.00 Each. 7500.00
viii) 80mm dia. 50 Nos. 130.00 Each. 6500.00
5 Providing and Supplying of GI Elbow of the following sizes onfirming to IS 1879 in
the various schemes complete in all respect and as per satisfaction of the Engineer-
in-charge.

i) 15mm dia 120 Nos. 30.00 Each. 3600.00


ii) 20mm dia 120 Nos. 45.00 Each. 5400.00
iii) 25 mm dia. 100 Nos. 60.00 Each. 6000.00
iv) 32mm dia. 90 Nos. 70.00 Each. 6300.00
v) 40mm dia. 100 Nos. 90.00 Each. 9000.00
TOTAL: 273920.00

Assistant Engineer,
I&PH Sub Division,
Kaffota.
DRAFT SCHEDULE OF QUANTITY Estimated Cost: 99438/-
Name of work: R/M of various Schemes under IPH Section Kaffota under I&PH Sub Division Kaffota in Tehsil Earnest Money: 2000/-
Paonta Sahib Distt. Sirmour (HP)(SH: Prov. & supplying of GI Unions, Tees and GI Reducers of various dia) Time: One Month.
S.No Description Qty. Rate Unit Amount
1 2 3 4 5 6.
1 Providing and Supplying of G.I. Unions of the following sizes confirming to IS 1879
in the various schemes as per the standard design & relevant ISS of following dia
complete in all respect and as per satisfaction of the Engineer-in-charge.

i) 15mm dia 120 Nos. 28.00 Each. 3360.00


ii) 20mm dia 120 Nos. 36.00 Each. 4320.00
iii) 25 mm dia. 90 Nos. 48.00 Each. 4320.00
iv) 32mm dia. 43 Nos. 56.00 Each. 2408.00
v) 40mm dia. 75 Nos. 76.00 Each. 5700.00
vi) 50mm dia. 150 Nos. 112.00 Each. 16800.00
vii) 65mm dia. 60 Nos. 124.00 Each. 7440.00
viii) 80mm dia. 50 Nos. 152.00 Each. 7600.00
2 Providing and Supplying of the G.I.Tees of the following sizes Confirming to IS 1879
in the various schemes complete in all respect and as per satisfaction of the
Engineer-in-charge.
i) 15mm dia 50 Nos. 14.00 Each. 700.00
ii)20mm dia 60 Nos. 20.00 Each. 1200.00
iii)25 mm dia. 100 Nos. 28.00 Each. 2800.00
iv) 32mm dia. 80 Nos. 33.00 Each. 2640.00
v) 40mm dia. 50 Nos. 39.00 Each. 1950.00
vi) 50mm dia. 50 Nos. 45.00 Each. 2250.00
vii) 65mm dia. 50 Nos. 51.00 Each. 2550.00
3 Providing and Supplying of G.I.Reducer of the following sizes onfirming to IS 1879
in the various schemes complete in all respect and as per satisfaction of the
Engineer-in-charge.
i) 15x20mm dia 65 Nos. 18.00 Each. 1170.00
ii) 20x25 mm dia 50 Nos. 28.00 Each. 1400.00
iii) 25x32 mm dia. 40 Nos. 30.00 Each. 1200.00
iv) 32x20mm dia. 30 Nos. 33.00 Each. 990.00
v) 40x15mm dia. 25 Nos. 36.00 Each. 900.00
vi) 40x32 mm dia. 15 Nos. 39.00 Each. 585.00
4 Providing and Supplying of Socket of the following sizes onfirming to IS 1879 in
the various schemes complete in all respect and as per satisfaction of the Engineer-
in-charge.
i) 15mm dia 110 Nos. 12.00 Each. 1320.00
ii) 20mm dia 85 Nos. 18.00 Each. 1530.00
iii) 25 mm dia. 75 Nos. 24.00 Each. 1800.00
iv) 32mm dia. 45 Nos. 28.00 Each. 1260.00
v) 40mm dia. 75 Nos. 36.00 Each. 2700.00
vi) 50mm dia. 150 Nos. 44.00 Each. 6600.00
vii) 65mm dia. 60 Nos. 50.00 Each. 3000.00
viii) 80mm dia. 50 Nos. 52.00 Each. 2600.00
5 Providing and Supplying of GI Elbow of the following sizes onfirming to IS 1879 in
the various schemes complete in all respect and as per satisfaction of the Engineer-
in-charge.
i) 15mm dia 120 Nos. 9.00 Each. 1080.00
ii) 20mm dia 70 Nos. 13.50 Each. 945.00
iii) 25 mm dia. 75 Nos. 18.00 Each. 1350.00
iv) 32mm dia. 45 Nos. 21.00 Each. 945.00
v) 40mm dia. 75 Nos. 27.00 Each. 2025.00
TOTAL: 99438.00
TERMS AND CONDITIONS.
1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Nothing shall be paid for rejected/defective work.
Assistant Engineer,
I&PH Sub Division, Kaffota.

SCHEDULE OF QUANTITY Estimated Cost: 93388/-


Name of work: R/M of various Schemes under IPH Section Kaffota under I&PH Sub Division Kaffota in Tehsil Paonta Earnest Money: 1900/-
Sahib Distt. Sirmour (HP)(SH: Prov. & supplying of GI Unions, Tees and GI Reducers of various dia) Time: One Month.
S.No Description Qty. Rate Unit Amount
1 2 3 4 5 6.
1 Providing and Supplying of G.I. Unions of the following sizes confirming to IS 1879
in the various schemes as per the standard design & relevant ISS of following dia
complete in all respect and as per satisfaction of the Engineer-in-charge.

i) 15mm dia 120 Nos. Each.


ii) 20mm dia 120 Nos. Each.
iii) 25 mm dia. 90 Nos. Each.
iv) 32mm dia. 43 Nos. Each.
v) 40mm dia. 75 Nos. Each.
vi) 50mm dia. 150 Nos. Each.
vii) 65mm dia. 60 Nos. Each.
viii) 80mm dia. 50 Nos. Each.
2 Providing and Supplying of the G.I.Tees of the following sizes Confirming to IS 1879
in the various schemes complete in all respect and as per satisfaction of the
Engineer-in-charge.
i) 15mm dia 50 Nos. Each.
ii)20mm dia 60 Nos. Each.
iii)25 mm dia. 100 Nos. Each.
3 Providing and Supplying of G.I.Reducer of the following sizes onfirming to IS 1879
in the various schemes complete in all respect and as per satisfaction of the
Engineer-in-charge.
i) 15x20mm dia 65 Nos. Each.
ii) 20x25 mm dia 50 Nos. Each.
iii) 25x32 mm dia. 40 Nos. Each.
iv) 32x20mm dia. 30 Nos. Each.
v) 40x15mm dia. 25 Nos. Each.
vi) 40x32 mm dia. 15 Nos. Each.
4 Providing and Supplying of Socket of the following sizes onfirming to IS 1879 in
the various schemes complete in all respect and as per satisfaction of the Engineer-
in-charge.
i) 15mm dia 110 Nos. Each.
ii) 20mm dia 85 Nos. Each.
iii) 25 mm dia. 75 Nos. Each.
iv) 32mm dia. 45 Nos. Each.
v) 40mm dia. 75 Nos. Each.
vi) 50mm dia. 150 Nos. Each.
vii) 65mm dia. 60 Nos. Each.
viii) 80mm dia. 50 Nos. Each.
5 Providing and Supplying of GI Elbow of the following sizes onfirming to IS 1879 in
the various schemes complete in all respect and as per satisfaction of the Engineer-
in-charge.
i) 15mm dia 120 Nos. Each.
ii) 20mm dia 70 Nos. Each.
iii) 25 mm dia. 75 Nos. Each.
iv) 32mm dia. 45 Nos. Each.
v) 40mm dia. 75 Nos. Each.
TOTAL:
TERMS AND CONDITIONS.
1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Nothing shall be paid for rejected/defective work.
Assistant Engineer,
I&PH Sub Division, Kaffota.

SCHEDULE OF QUANTITY Estimated Cost: 99348/-


Name of work: R/M of various Schemes under IPH Section Kaffota under I&PH Sub Division Kaffota in Tehsil Paonta Earnest Money: 2000/-
Sahib Distt. Sirmour (HP)(SH: Prov. & supplying of GI Unions, Tees and GI Reducers of various dia) Time: One Month.
S.No Description Qty. Rate Unit Amount
1 2 3 4 5 6.
1 Providing and Supplying of G.I. Unions of the following sizes confirming to IS 1879
in the various schemes as per the standard design & relevant ISS of following dia
complete in all respect and as per satisfaction of the Engineer-in-charge.

i) 15mm dia 120 Nos. Each.


ii) 20mm dia 120 Nos. Each.
iii) 25 mm dia. 90 Nos. Each.
iv) 32mm dia. 43 Nos. Each.
v) 40mm dia. 75 Nos. Each.
vi) 50mm dia. 150 Nos. Each.
vii) 65mm dia. 60 Nos. Each.
viii) 80mm dia. 50 Nos. Each.
2 Providing and Supplying of the G.I.Tees of the following sizes Confirming to IS 1879
in the various schemes complete in all respect and as per satisfaction of the
Engineer-in-charge.
i) 15mm dia 50 Nos. Each.
ii)20mm dia 60 Nos. Each.
iii)25 mm dia. 100 Nos. Each.
iv) 32mm dia. 80 Nos. Each.
v) 40mm dia. 50 Nos. Each.
vi) 50mm dia. 50 Nos. Each.
vii) 65mm dia. 50 Nos. Each.
3 Providing and Supplying of G.I.Reducer of the following sizes onfirming to IS 1879
in the various schemes complete in all respect and as per satisfaction of the
Engineer-in-charge.
i) 15x20mm dia 65 Nos. Each.
ii) 20x25 mm dia 50 Nos. Each.
iii) 25x32 mm dia. 40 Nos. Each.
iv) 32x20mm dia. 30 Nos. Each.
v) 40x15mm dia. 25 Nos. Each.
vi) 40x32 mm dia. 15 Nos. Each.
4 Providing and Supplying of Socket of the following sizes onfirming to IS 1879 in
the various schemes complete in all respect and as per satisfaction of the Engineer-
in-charge.
i) 15mm dia 110 Nos. Each.
ii) 20mm dia 85 Nos. Each.
iii) 25 mm dia. 75 Nos. Each.
iv) 32mm dia. 45 Nos. Each.
v) 40mm dia. 75 Nos. Each.
vi) 50mm dia. 150 Nos. Each.
vii) 65mm dia. 60 Nos. Each.
viii) 80mm dia. 50 Nos. Each.
5 Providing and Supplying of GI Elbow of the following sizes onfirming to IS 1879 in
the various schemes complete in all respect and as per satisfaction of the Engineer-
in-charge.
i) 15mm dia 120 Nos. Each.
ii) 20mm dia 120 Nos. Each.
iii) 25 mm dia. 100 Nos. Each.
iv) 32mm dia. 90 Nos. Each.
v) 40mm dia. 100 Nos. Each.
TOTAL:
TERMS AND CONDITIONS.
1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Nothing shall be paid for rejected/defective work.
Assistant Engineer,
I&PH Sub Division, Kaffota.
Name of work: R/M of various Schemes under IPH Section Shiri Kiari Sub Division Shillai in Tehsil Shillai Distt. Sirmour (H
(SH: Prov. & supplying of GI Unions, Tees and GI Reducers of various dia)
S.No
1
1

3
REVISED SCHEDULE OF QUANTITY
Name of work: R/M of various Schemes under IPH Section Shiri Kiari Sub Division Shillai in Tehsil Shillai Distt. Sirmour (HP)
(SH: Prov. & supplying of GI Unions, Tees and GI Reducers of various dia)
Description
2
Providing and Supplying of G.I. Unions of the following sizes confirming to IS 1879 in the various
schemes as per the standard design & relevant ISS of following dia complete in all respect and as per
satisfaction of the Engineer-in-charge.

i) 15mm dia
ii) 20mm dia
iii) 25 mm dia.
iv) 32mm dia.
v) 40mm dia.
vi) 50mm dia.
vii) 65mm dia.
viii) 80mm dia.
Providing and Supplying of the G.I.Tees of the following sizes Confirming to IS 1879 in the various
schemes complete in all respect and as per satisfaction of the Engineer-in-charge.
i) 15mm dia
ii)20mm dia
iii)25 mm dia.
iv) 32mm dia.
v) 40 mm dia.
vi) 50 mm dia.
vii) 65mm dia.
viii) 80mm dia.
ix) 100mm dia.
Providing and Supplying of G.I.Reducer of the following sizes onfirming to IS 1879 in the various
schemes complete in all respect and as per satisfaction of the Engineer-in-charge.
i) 15x20mm dia
ii) 20x25 mm dia
iii) 25x32 mm dia.
iv) 32x20mm dia.
v) 40x15mm dia.
vi) 40x32 mm dia.
Estimated Cost:98359/-
Earnest Money: 1960/-
Time: One Month.
Qty. Rate Unit Amount
3 4 5 6.

150 Nos. 70.00 Each. 10500.00


180 Nos. 90.00 Each. 16200.00
180 Nos. 120.00 Each. 21600.00
180 Nos. 140.00 Each. 25200.00
150 Nos. 190.00 Each. 28500.00
150 Nos. 280.00 Each. 42000.00
50 Nos. 310.00 Each. 15500.00
50 Nos. 380.00 Each. 19000.00

80 Nos. 35.00 Each. 2800.00


70 Nos. 50.00 Each. 3500.00
60 Nos. 70.00 Each. 4200.00
60 Nos. 90.00 Each. 5400.00
40 Nos. 130.00 Each. 5200.00
35 Nos. 170.00 Each. 5950.00
30 Nos. 210.00 Each. 6300.00
15 Nos. 350.00 Each. 5250.00
5 Nos. 510.00 Each. 2550.00

50 Nos. 45.00 Each. 2250.00


40 Nos. 70.00 Each. 2800.00
30 Nos. 100.00 Each. 3000.00
25 Nos. 110.00 Each. 2750.00
20 Nos. 120.00 Each. 2400.00
15 Nos. 130.00 Each. 1950.00
190.00 TOTAL: 234800.00

Executive Engineer,
I&PH Division,
Paonta Sahib.
REVISED SCHEDULE OF QUANTITY
Name of work:-Providing/Imp. of LWSS to various hab. Of CV Basog Chambiyara & Chowki GP Kamroo in
Tehsil Paonta Sahib Distt. Sirmour (HP)(SH:-C/o RCC collction tank, Laying & jointing of GI Pipes. )
Sr.No. Description. Qty.
1 2 3
1 Excavation in foundation and trenches etc.in earth work in all kinds of soil such as pick 10.39
work ,jumper work decomposed conglomerate saturated soil soft and hard rock upto all
leads lifts stacking the excavated soil not more than 3mtr.clear from the edge of
excavation and then returning the stacked soil in 15cm layers when required in to plinth
sides of foundation etc. consolidating each deposited layers by ramming and watering
and then disposing of all surplus excavated earth as directed with in all leads lifts and as
per directions of the Engineer-incharge

2 Providing and laying cement concrete 1:4:8(1cement:4sand:8 graded stone agg.40mm 1.26
nominal size)and curing complete excluding the cost of form work in foundation &
plinth including all leads lifts and carriage of material and as per the directions of
Engineer-in-charge.

3 Providing and laying cement concrete work 1:1 1/2:3 (1cement:1 1/2 sand: 3 graded
stone agg. 20mm nominal size & curing complete) excluding cost of form workand
reinforcement for RCC work including all leads lifts complete and carriage of material
etc. as per directions of Engineer in-charge.

i) In foundation and Plinth 1.28


ii) In vertical walls any thickness but not less than 0.10 Metres. 2.52
4 Providing form work with steel sheets 3.15mm thick welded with angle iron 30x30x5
mm so as to give rough finish i/c centring shuttering structing and propping etc. with
wooden bettens & Ballies, height or propping & centering below supporting floor to
ceiling not exceeding 4 mtr.and removal of the same for insitu RCC work and PCC
work.including all leads lifts and carriage of material at site & as per direction of
Engineer in charge in:-

a) Flat surfaces such as soffits of suspended floor roofs landing and like upto 200mm in 4.20
thickness.
ii) In vertical walls any thickness but not less than 0.10 Metres. 40.74
5 Providing and laying cement concrete 1:2:4(1cement:2app.sand: 4 app. graded stone 0.60
agg. 20mm nominal size )and curing complete excluding cost of form work &
reinforcement for reinforced work in suspended floors, roofs landing shelves and their
supports balconies, beams, girders bressumers and cantilivers upto to floor two level in
all height and depth, including all leads lifts and carriage of material at site and as per
direction of the Engineer-incharge.

6 Providing Mild Steel/Tor steel reinforcement including bending binding & placing in 272.32
positing I/c all leads lifts and carriage of material and as per direction of the Engineer-
in-charge.
7 Excavation in drains & channel etc.in earth work in all kinds of soil such as pick 194.63
work ,jumper work blasting work, decomposed conglomerate saturated soil soft
and hard rock including dressing of sides and beds and prepareation of sub
grade to level or slope including refilling the trenches and disposing of surplus
earth upto all leads,lifts disposed earth to be levelled and neatly dressed
including jungle clearance and as per directions of the Engineer-incharge

8 Laying and jointing of GMS Pipes of various dia in trenches (earth work in trenches to
be measured and paid for seperately) including all leads lifts and carriage of material at
site as per direction of Engineer-in-charge of following dias.

i)15mm dia . 865


9 Providing and fixing of peet valve of susperior quality of following dia complete in all
respect and as per direction of the Engineer-in-charge.
i)15mm dia . 1

TERMS AND CONDITIONS:-


1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Cement will be issued @ 315/- per bag & steel @ 53/- per Kg. at IPH store Bhatanwali Paonta Sahib.
4 Empty cement bags shall be returned to the deptt. Otherwise Rs. 2/- per bag shall be deducted from the
5 earch billcertificate
Royality of the contractor.
in respect of stone agg. Sand etc. shall be produced by the contractor
7 GI Pipe shall be issued free of cost from IPH Store Bhatanwali.
8 GI Fitting shall be provided by the contractor.
Estimated cost Rs 48682/-
Earnest money Rs.1000/-
Time:- Three months.
Rate, Unit Amount.
4 5 6
Cum. 160.00 P/Cum 1662.00

Cum 3800.00 P/Cum 4788.00

0.00

Cum. 5300.00 P/Cum. 6784.00


Cum. 5450.00 P/Cum. 13734.00
0.00

Sqm. 300.00 P/Sqm. 1260.00

Sqm. 200.00 P/Sqm. 8148.00


Cum 5000.00 P/Cum 3000.00

Kg. 64.00 P/kg 17428.00


Cum. 75.95 P/Cum. 14782.00

Rmt 0.50 P/Rmt. 433.00

No. 66.50 Each. 67.00


Total: 72019.00

er-in-charge.

aonta Sahib.
ducted from the

Executive Engineer,
I&PH Division,
Paonta Sahib.
SCHEDULE OF QUANTITY Estimated cost Rs 46487/-
Name of work:- Sustainability of GWSS to Loh of CV Kando Dugana (Fegdali) in Tehsil Paonta Sahib Distt. Earnest money Rs.1000/-
Sirmour (HP) (SH:-C/o RCC Collection tank, laying & jointing of GI Pipes of various dia) Time:- Three months.
Sr.No. Description. Qty. Rate. Unit Amount.
1 Excavation in foundation and trenches etc.in earth work in all kinds of soil such as pick 6.85 Cum. P/Cum
work ,jumper work decomposed conglomerate saturated soil soft and hard rock upto all
leads lifts stacking the excavated soil not more than 3mtr.clear from the edge of
excavation and then returning the stacked soil in 15cm layers when required in to plinth
sides of foundation etc. consolidating each deposited layers by ramming and watering and
then disposing of all surplus excavated earth as directed with in all leads lifts and as per
directions of the Engineer-incharge

2 Providing and laying cement concrete 1:4:8(1cement:4sand:8 graded stone agg.40mm 1.26 Cum P/Cum
nominal size)and curing complete excluding the cost of form work in foundation & plinth
including all leads lifts and carriage of material and as per the directions of Engineer-in-
charge.

3 Providing and laying cement concrete work 1:1 1/2:3 (1cement:1 1/2 sand: 3 graded
stone agg. 20mm nominal size & curing complete) excluding cost of form workand
reinforcement for RCC work including all leads lifts complete and carriage of material
etc. as per directions of Engineer incharge.

i) In foundation and Plinth 1.28 Cum. P/Cum.


ii) In vertical walls any thickness but not less than 0.10 Metres. 2.52 Cum. P/Cum.
4 Providing form work with steel sheets 3.15mm thick welded with angle iron 30x30x5 mm
so as to give rough finish i/c centring shuttering structing and propping etc. with wooden
bettens & Ballies, height or propping & centering below supporting floor to ceiling not
exceeding 4 mtr.and removal of the same for insitu RCC work and PCC work.including all
leads lifts and carriage of material at site & as per direction of Engineer in charge in:-

a) Flat surfaces such as soffits of suspended floor roofs landing and like upto 200mm in 4.89 Sqm. P/Sqm.
thickness.
ii) In vertical walls any thickness but not less than 0.10 Metres. 40.74 Sqm. P/Sqm.
5 Providing and laying cement concrete 1:2:4(1cement:2app.sand: 4 app. graded stone agg. 0.60 Cum P/Cum
20mm nominal size )and curing complete excluding cost of form work & reinforcement
for reinforced work in suspended floors, roofs landing shelves and their supports
balconies, beams, girders bressumers and cantilivers upto to floor two level in all height
and depth, including all leads lifts and carriage of material at site and as per direction of
the Engineer-incharge.

6 Providing Mild Steel/Tor steel reinforcement including bending binding & placing in 273.32 Kg. P/kg
positing I/c all leads lifts and carriage of material and as per direction of the Engineer-
in-charge.
7 Excavation in drains & channel etc.in earth work in all kinds of soil such as pick work 339.75 Cum P/Cum
,jumper work blasting work, decomposed conglomerate saturated soil soft and hard rock
including dressing of sides and beds and prepareation of sub grade to level or slope
including refilling the trenches and disposing of surplus earth upto all leads,lifts disposed
earth to be levelled and neatly dressed including jungle clearance and as per directions of
the Engineer-incharge

8 Laying and jointing of GMS Pipes of various dia in trenches (earth work in trenches to be
measured and paid for seperately) including all leads lifts and carriage of material at site
as per direction of Engineer-in-charge of following dias.
i) 15mm dia. 550 Rmt. P/Rmt.
ii) 20mm dia. 960 Rmt. P/Rmt.
9 Providing and fixing of peet valve of superior quality of following dia complete in all
respect and as per direction of the Engineer-in-charge.
i) 15mm dia. 1 No. Each.
Total:
TERMS AND CONDITIONS:-
The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
1 Security,Sale tax & Income tax shall be deducted as per rules.
2 Cement will be issued @ 315/- per bag & steel @ 53/- per Kg. at IPH store Bhatanwali Paonta Sahib.
3 Empty cement bags shall be returned to the deptt. Otherwise Rs. 2/- per bag shall be deducted from the earch bill of the contractor.
4 Royality certificate in respect of stone agg. Sand etc. shall be produced by the contractor
5 GI Pipe shall be issued free of cost from IPH Store Bhatanwali.
7 GI Fitting shall be provided by the contractor. Assistant Engineer,

I&PH Sub Division, Kaffota.

1852
790
REVISED SCHEDULE OF QUANTITY Estimated cost Rs 59992/-
Name of work:- Restoration of Rain damages to Left Bank Canal in Tehsil Paonta Sahib Distt. Sirmour (HP) Earnest money Rs.1200/-
(SH: C/o Wire crate to protect the canal at RD 4150 to 4200 Mtrs.) Time:- One Month .
S.No Sub-Head and item of work. Qty. Rates, Unit Amount.
1 Excavation in foundation and trenches etc.in earth work in all kinds of soil such as 46.75 Cum 155.00 P/Cum 7246.00
pick work ,jumper work decomposed conglomerate saturated soil soft and hard rock
upto all leads lifts stacking the excavated soil not more than 3mtr.clear from the edge
of excavation and then returning the stacked soil in 15cm layers when required in to
plinth sides of foundation etc. consolidating each deposited layers by ramming and
watering and then disposing of all surplus excavated earth as directed with in all leads
lifts and as per directions of the Engineer-incharge

2 Wire crates made of G.I.wire filled with boulder/hard stone of approved quality with 103.13 Cum. 925.00 P/Cum. 95395.00
square cut faces against the wire having rounded/rectangular shape weight of stones
not less than 18 Kg. free from soft spots,cracks,cavaties etc.(Wire crate to be
measured and paid for separately)including all leads,lifts and carriage of material at
site as direction of the Engineer-in-charge. (Double Knot)

3 Wire crates of G.I.wire filled with boulder with square cut faces against the wire 492.94 Sqm. 35.00 P/Sqm. 17253.00
G.I.wire 5mm thick corresponding to SWG 6 with 15cmx15cm mesh(boulder filling to
be measured and paid for separately including all leads,lifts and carriage of materials
at site and as per directions of the Engineer-in-charge(L.Rate)

4. Stone filling behind wire crates including all leads,lifts and carriage of material and as 6.00 Cum. 650.00 P/ Cum. 3900.00
per direction of the Engineer-in-charge.
TOTAL: 119894.00
TERMS AND CONDITIONS:-
1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Royality certificate in respect of stone agg. Sand etc. shall be produced by the contractor
4 G.I.wire shall be issued free of cost from IPH store Bhatanwali Paonta Sahib Executive Engineer,
5 Boulder shall not be less than 18 Kg. & the stone should be free from cracks and cavities. I&PH Division,
Paonta Sahib.
DRAFT SCHEDULE OF QUANTITY Estimated cost Rs 75146/-
Name of work:- Restoration of Rain damages to FIS Choyo Kiar GP Shilla in Tehsil Paonta Sahib Distt. Sirmour Earnest money Rs.1600/-
(HP) (SH: C/o Diversion weir at Head works. at RD 0/0 to 11.25 Mtr.) Time:- One Month .
S.No Sub-Head and item of work. Qty. Rates, Unit Amount.
1 Excavation in earth work in all kinds of soil and disposal of all excavated earth upto 16.88 Cum 59.55 P/Cum 1005.00
all leads lifts disposed earth to be levelled and neatly dressed including all leads lifts
and carriage of material as per directions of the Engineer-incharge

2 Wire crates made of G.I.wire filled with boulder/hard stone of approved quality with 56.25 56.25 620.10 P/Cum. 34881.00
square cut faces against the wire having rounded/rectangular shape weight of stones
not less than 18 Kg. free from soft spots,cracks,cavaties etc.(Wire crate to be
measured and paid for separately)including all leads,lifts and carriage of material at
site as direction of the Engineer-in-charge. (Double Knot)

3 Wire crates of G.I.wire filled with boulder with square cut faces against the wire 264.38 Sqm. 148.50 P/Sqm. 39260.00
G.I.wire 5mm thick corresponding to SWG 6 with 15cmx15cm mesh(boulder filling to
be measured and paid for separately including all leads,lifts and carriage of materials
at site and as per directions of the Engineer-in-charge(L.Rate)

TOTAL: 75146.00
TERMS AND CONDITIONS:-
1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Royality certificate in respect of stone agg. Sand etc. shall be produced by the contractor
4 G.I.wire shall be Provided by the contractor . Assistant Engineer
5 Boulder shall not be less than 18 Kg. & the stone should be free from cracks and cavities. I&PH Division,
Kaffota.
REVISED SCHEDULE OF QUANTITY Estimated cost Rs 99450/-
Name of work:- Providing LWSS to NC/PC hab. To CV Kando in GP Dugana in Tehsil Paonta Sahib Distt. Earnest money Rs.2000/-
Sirmour (HP) (SH: C/o Wire crate ) Time:- One Month .
S.No Sub-Head and item of work. Qty. Rates, Unit Amount.
1 Excavation in earth work in all kinds of soil and disposal of all excavated earth upto 22.50 Cum 145.00 P/Cum 3263.00
all leads lifts disposed earth to be levelled and neatly dressed including all leads lifts
and carriage of material as per directions of the Engineer-incharge

2 Wire crates made of G.I.wire filled with boulder/hard stone of approved quality with 93.75 56.25 925.00 P/Cum. 86719.00
square cut faces against the wire having rounded/rectangular shape weight of stones
not less than 18 Kg. free from soft spots,cracks,cavaties etc.(Wire crate to be
measured and paid for separately)including all leads,lifts and carriage of material at
site as direction of the Engineer-in-charge. (Double Knot)

3 Wire crates of G.I.wire filled with boulder with square cut faces against the wire 375.00 Sqm. 230.00 P/Sqm. 86250.00
G.I.wire 5mm thick corresponding to SWG 6 with 15cmx15cm mesh(boulder filling to
be measured and paid for separately including all leads,lifts and carriage of materials
at site and as per directions of the Engineer-in-charge(L.Rate)

TOTAL: 176232.00
TERMS AND CONDITIONS:-
1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Royality certificate in respect of stone agg. Sand etc. shall be produced by the contractor
4 G.I.wire shall be Provided by the contractor . Executive Engineer,
5 Boulder shall not be less than 18 Kg. & the stone should be free from cracks and cavities. I&PH Division,
Paonta Sahib.
REVISED SCHEDULE OF QUANTITY Estimated cost Rs 98576/-
Name of work:-Aug. of LWSS Palhori in Tehsil Paonta Sahib Distt. Sirmour (HP) Earnest money Rs.2000/-
(SH: C/o Wire crate to protect the Pump House )Part-Ist. Time:- One Month .
S.No Sub-Head and item of work. Qty. Rates, Unit Amount.
1 Excavation in earth work in all kinds of soil and disposal of all excavated earth upto 54.00 Cum 145.00 P/Cum 7830.00
all leads lifts disposed earth to be levelled and neatly dressed including all leads lifts
and carriage of material as per directions of the Engineer-incharge

2 Wire crates made of G.I.wire filled with boulder/hard stone of approved quality with 128.25 56.25 925.00 P/Cum. 118631.00
square cut faces against the wire having rounded/rectangular shape weight of stones
not less than 18 Kg. free from soft spots,cracks,cavaties etc.(Wire crate to be
measured and paid for separately)including all leads,lifts and carriage of material at
site as direction of the Engineer-in-charge. (Double Knot)

3 Wire crates of G.I.wire filled with boulder with square cut faces against the wire 615.00 Sqm. 36.00 P/Sqm. 22140.00
G.I.wire 5mm thick corresponding to SWG 6 with 15cmx15cm mesh(boulder filling to
be measured and paid for separately including all leads,lifts and carriage of materials
at site and as per directions of the Engineer-in-charge(L.Rate)

TOTAL: 148601.00
TERMS AND CONDITIONS:-
1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Royality certificate in respect of stone agg. Sand etc. shall be produced by the contractor
4 G.I.wire shall be Provided by the contractor . Executive Engineer,
5 Boulder shall not be less than 18 Kg. & the stone should be free from cracks and cavities. I&PH Division,
Paonta Sahib.
REVISED SCHEDULE OF QUANTITY Estimated Cost :-Rs.97046/-
Name of work:-Prov. LWSS Tatiana in Tehsil Paonta Sahib in Tehsil Paonta Sahib Distt.Sirmour(HP) Earnest Money :-Rs.2000/-
(SH: C/O Retaining wall to protect the Sump well) Time:- Two months.
S.No Description Qty. Rate Unit
1 Cutting in earth work in all kind of soil and dispoal of the excavated earth upt all leads,lifts and as 22.21 Cum 59.55 P/Cum
directed by the Engineer-in-charge complete in all respect.

2 Excavation in foundation and trenches etc.in earth work in all kinds of soil such as pick 35.02 Cum. 92.85 Per Cum.
work ,jumper work decomposed conglomerate saturated soil soft and hard rock upto all
leads lifts stacking the excavated soil not more than 3mtr.clear from the edge of excavation
and then returning the stacked soil in 15cm layers when required in to plinth sides of
foundation etc. consolidating each deposited layers by ramming and watering and then
disposing of all surplus excavated earth as directed with in all leads lifts and as per
directions of the Engineer-incharge.

3 Providing and laying cement concrete 1:6:12(1cement:6sand:12 graded stone agg.40mm 4.17 Cum 905.10 P/Cum
nominal size)and curing complete excluding the cost of centring shuttering in foundation &
plinth including all leads lifts and carriage of material and as per the directions of
Engineer-in-charge.

4 Random rubble masonary /Poly rubble masonary (uncoursed/brought to coursed) with hard stone 69.48 Cum 4200.00 P/Cum
of approved quality in foundation and plinth including levelling up with cement concrete
1:6.12(1cement:6sand:12 graded stone agg. 20mm nominal size)in cement mortor 1:6 (1 Cement: 6
sand ) in breast wall & Retaining walls including all leads lifts and carriage of material and as per
the directions of Engineer-in-charge.

5 Boulder filling behind the retaining wall complete in all respect and as per direction of the 20.18 Cum. 1500.00 P/Cum.
Engineer-in-charge.

TERMS AND CONDITIONS. Total:

1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
Security,Sale tax & Income tax shall be deducted as per rules.
2
3 Cement shall be issued @ Rs.315/- per bag & steel @ 53/- per Kg. from IPH store Bhatanwali Paonta Sahib.
Royality certificate in respect of stone agg. Sand etc. shall be produced by the contractor
4
The watch & ward of the store by the contractor.
5
Executive Engineer,
I&PH Division,
Paonta Sahib.

DRAFT SCHEDULE OF QUANTITY Estimated Cost :-Rs.45037/-


Name of work:-Aug. of LWSS Rangwa Pabar & adjoining village Mashoo GP Jamna in Tehsil Paonta Sahib Distt.Sirmour(HP) Earnest Money :-Rs.1000/-
(SH: C/O Retaining wall to protect the tank at Kanda Bass Jakhana & Jamna) Time:- Two months.
S.No Description Qty. Rate Unit
1 Cutting in earth work in all kind of soil and dispoal of the excavated earth upt all leads,lifts and as 22.21 Cum 59.55 P/Cum
directed by the Engineer-in-charge complete in all respect.
2 Excavation in foundation and trenches etc.in earth work in all kinds of soil such as pick 35.02 Cum. 92.85 Per Cum.
work ,jumper work decomposed conglomerate saturated soil soft and hard rock upto all
leads lifts stacking the excavated soil not more than 3mtr.clear from the edge of excavation
and then returning the stacked soil in 15cm layers when required in to plinth sides of
foundation etc. consolidating each deposited layers by ramming and watering and then
disposing of all surplus excavated earth as directed with in all leads lifts and as per
directions of the Engineer-incharge.

3 Providing and laying cement concrete 1:6:12(1cement:6sand:12 graded stone agg.40mm 4.17 Cum 905.10 P/Cum
nominal size)and curing complete excluding the cost of centring shuttering in foundation &
plinth including all leads lifts and carriage of material and as per the directions of
Engineer-in-charge.

4 Random rubble masonary /Poly rubble masonary (uncoursed/brought to coursed) with hard stone 32.31 Cum 1135.50 P/Cum
of approved quality in foundation and plinth including levelling up with cement concrete
1:6.12(1cement:6sand:12 graded stone agg. 20mm nominal size)in cement mortor 1:6 (1 Cement: 6
sand ) in breast wall & Retaining walls including all leads lifts and carriage of material and as per
the directions of Engineer-in-charge.

TERMS AND CONDITIONS. Total:


1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Cement shall be issued @ Rs.315/- per bag & steel @ 53/- per Kg. from IPH store Bhatanwali Paonta Sahib.
4 Royality certificate in respect of stone agg. Sand etc. shall be produced by the contractor
5 Empty cement bags shall be returned to the Deptt.otherwise Rs.2/-per bag shall be deducted from the bill.
Assistant Engineer,
I&PH Sub Division,
Kaffota.

DRAFT SCHEDULE OF QUANTITY Estimated Cost :-Rs.45037/-


Name of work:-C/o FIS Staun in GP Staun in Tehsil Paonta Sahib Distt.Sirmour(HP) Earnest Money :-Rs.1000/-
(SH: C/O R/R Masonary channel in banking /edging in upper side) Time:- Two months.
S.No Description Qty. Rate Unit
1 Cutting in earth work in all kind of soil and dispoal of the excavated earth upt all leads,lifts and as 57.00 Cum 59.55 P/Cum
directed by the Engineer-in-charge complete in all respect.

2 Excavation in drains & channel etc.in earth work in all kinds of soil such as pick work 19.00 Cum. 75.95 P/Cum.
,jumper work blasting work, decomposed conglomerate saturated soil soft and hard rock
including dressing of sides and beds and prepareation of sub grade to level or slope
including refilling the trenches and disposing of surplus earth upto all leads,lifts disposed
earth to be levelled and neatly dressed including jungle clearance and as per directions of
the Engineer-incharge

3 Providing and laying cement concrete 1:4:8(1cement:4sand:8 graded stone agg.40mm nominal 7.60 Cum 1104.5 P/Cum
size)and curing complete excluding the cost of form work in foundation & plinth including all leads
lifts and carriage of material and as per the directions of Engineer-in-charge.
4 Random rubble masonary /Poly rubble masonary (uncoursed/brought to coursed) with hard stone 32.40 Cum 1135.50 P/Cum
of approved quality in foundation and plinth including levelling up with cement concrete
1:6.12(1cement:6sand:12 graded stone agg. 20mm nominal size)in cement mortor 1:6 (1 Cement: 6
sand ) in breast wall & Retaining walls including all leads lifts and carriage of material and as per
the directions of Engineer-in-charge.

5
6
7
8
TERMS AND CONDITIONS. Total:
1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Cement shall be issued @ Rs.315/- per bag & steel @ 53/- per Kg. from IPH store Bhatanwali Paonta Sahib.
4 Royality certificate in respect of stone agg. Sand etc. shall be produced by the contractor
5 Empty cement bags shall be returned to the Deptt.otherwise Rs.2/-per bag shall be deducted from the bill.
Assistant Engineer,
I&PH Sub Division,
Kaffota.

DRAFT SCHEDULE OF QUANTITY Estimated Cost :-Rs.45037/-


Name of work:-Providing LWSS Kiyana GP Kota Pab in Tehsil Tehsil ShillaiPaonta Sahib Distt.Sirmour(HP) Earnest Money :-Rs.1000/-
(SH: C/O R/R Masonary channel in banking /edging in upper side) Time:- Two months.
S.No Description Qty. Rate Unit
1 Cutting in earth work in all kind of soil and dispoal of the excavated earth upt all leads,lifts and as 57.00 Cum 59.55 P/Cum
directed by the Engineer-in-charge complete in all respect.
2 Excavation in drains & channel etc.in earth work in all kinds of soil such as pick work 19.00 Cum. 75.95 P/Cum.
,jumper work blasting work, decomposed conglomerate saturated soil soft and hard rock
including dressing of sides and beds and prepareation of sub grade to level or slope
including refilling the trenches and disposing of surplus earth upto all leads,lifts disposed
earth to be levelled and neatly dressed including jungle clearance and as per directions of
the Engineer-incharge

3 Providing and laying cement concrete 1:4:8(1cement:4sand:8 graded stone agg.40mm nominal 7.60 Cum 1104.5 P/Cum
size)and curing complete excluding the cost of form work in foundation & plinth including all leads
lifts and carriage of material and as per the directions of Engineer-in-charge.

4 Random rubble masonary /Poly rubble masonary (uncoursed/brought to coursed) with hard stone 32.40 Cum 1135.50 P/Cum
of approved quality in foundation and plinth including levelling up with cement concrete
1:6.12(1cement:6sand:12 graded stone agg. 20mm nominal size)in cement mortor 1:6 (1 Cement: 6
sand ) in breast wall & Retaining walls including all leads lifts and carriage of material and as per
the directions of Engineer-in-charge.

5
6
7
8
TERMS AND CONDITIONS. Total:
1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Cement shall be issued @ Rs.315/- per bag & steel @ 53/- per Kg. from IPH store Bhatanwali Paonta Sahib.
4 Royality certificate in respect of stone agg. Sand etc. shall be produced by the contractor
5 Empty cement bags shall be returned to the Deptt.otherwise Rs.2/-per bag shall be deducted from the bill.
Assistant Engineer,
I&PH Sub Division,
Kaffota.
ed Cost :-Rs.97046/-
Money :-Rs.2000/-
wo months.
Amount
1323.00

3252.00

3774.00

291816.00

30270.00

330435.00
e Engineer,

ed Cost :-Rs.45037/-
Money :-Rs.1000/-
wo months.
Amount
1323.00

3252.00

3774.00

36688.00

45037.00
Engineer,

ed Cost :-Rs.45037/-
Money :-Rs.1000/-
wo months.
Amount
3394.00

1443.00

8394.00
36790.00

50021.00

Engineer,

ed Cost :-Rs.45037/-
Money :-Rs.1000/-
wo months.
Amount
3394.00
1443.00

8394.00

36790.00

50021.00

Engineer,
REVISED SCHEDULE OF QUANTITY Estimated Cost :-Rs.99661/-
Name of work:-Aug. of LWSS Dhaula Kuan in Tehsil Paonta Sahib Distt. Sirmour (HP) Earnest Money :-Rs.2000/-
(SH:- C/o Boundry wall & Repair of Pump House) Time:- Three months.
Sr.No. Description Qty. Rate Unit Amount
1 2 3 4 5 6.
1 Excavation in foundation and trenches etc.in earth work in all kinds of soil such as pick work 11.00 Cum 160.00 P/Cum 1760.00
,jumper work decomposed conglomerate saturated soil soft and hard rock upto all leads lifts
stacking the excavated soil not more than 3mtr.clear from the edge of excavation and then
returning the stacked soil in consolidating each deposited layers by ramming and watering and
then disposing of all surplus excavated earth as directed with in all leads lifts and as per directions
of the Engineer-incharge

2 Providing and laying cement concrete 1:6:12(1cement:6sand:12 graded stone agg.40mm nominal 2.18 Cum 2500.00 P/Cum 5450.00
size)and curing complete excluding the cost of form work in foundation & plinth including all
leads lifts and carriage of material and as per the directions of Engineer-in-charge.

3 Random rubble masonary /Poly rubble masonary (uncoursed/brought to coursed) with hard 8.00 Cum 3200.00 P/Cum 25600.00
stone of approved quality in foundation and plinth including levelling up with cement concrete
1:6.12(1cement:6sand:12 graded stone agg. 20mm nominal size)in cement mortor 1:6 (1 Cement:
6 sand ) in breast wall & Retaining walls including all leads lifts and carriage of material and as
per the directions of Engineer-in-charge.

4 Providing and laying damp proof course 38mm thick with cement concrete 1:2:4 11.16 Sqm 105.00 P/Sqm 1172.00
(1cement:2sand:4graded stone agg.12.5mm nominal size)and curing complete including all
leads,lifts and carriage of material and as per direction of Engineer-in-charge.
5 Half brick masonary in 2nd class common burnt clay building bricks in Cement Morar 22.52 Sqm. 750.00 P/Sqm. 16890.00
1:6(1cement:6sand) in all leads,lifts and carriage of material and as per direction of the Engineer-
in-charge.
6 20 mm thick cement plaster in single coat of rough side of bricks/stone masonary for interior 243.84 Sqm 175.00 P/Sqm 42672.00
plastering upto floor two level including arrises internal rounded angles chamfers rounded angles
not exceeding 80mm in girth and finished even and smooth in cement mortor 1:6(1cement:6
sand) and curing complete including all leads lifts and carriage of materials at site as per
direction of Engineer-incharge.

7 6 mm thick cement plaster in ceiling in Cement mortor 1:3 (1 cement:3 sand) including all leads 41.42 Sqm 110.00 P/Sqm 4556.00
lifts and carriage of material at site as per direction of Engineer incharge.
8 40mm thick cement concrete flooring 1:2:4 (1cement:2sand: 4 graded stone agg. 20mm nominal 27.15 Sqm 220.00 P/Sqm 5973.00
size)laid in one layer finished with a floating coat of neat cement including curing all leads, lifts
and carriage of materials at site and as per direction of Engineer incharge
9 Providing fixing pressed steel door frames manufactured from commercial mild steel of1.25mm
thickness including hinges,jump lock bud and if required angle threshold of M.S. angle 50x25mm
or base tie of 1.25mm pressed steel I/c welding complete Including steel hinges 2.5mm thick with
guard lock strick plate and apply a coat of approved steel primer affect pre-treaditional of surface
in all leads lifts and carriage of materials as per direction of Engineer-in-charge.

Profile-"A" 7.90 Rmt 325.00 P/Rmt 2568.00


10 Provd./fixing pannelled glazed or pannelled and glazed shutters for doors windows and 8.62 Sqm 3500.00 P/Sqm 30170.00
clearestorey windows including black enemelled iron butt hings with necessary secrews
complete.40mm thick 2nd.class deodar wood including all leads lifts and carriage of material at
site as per direction of Engineer-in-charge.

11 Demolition above ground level upto floor two level including disposal of unserviceable materials 2.92 Cum. 950.00 P/Cum. 2774.00
within 20 mtrs. lead including cutting the necessary reinforced andseparating out from RCC work
including all leads,lifts and carriage of material and as per direction of the Engineer-in-charge.

12 Demolition of brick work of above ground level upto floor to level including stacking of 0.49 Cum. 925 P/Cum. 453.00
serviceable materials & disposal of unserviceable materials within 20 mtrs. lead in cement mortar
complete in all respect and as per direction of the Engineer-in-charge.

13 Providing form work with steel sheets 3.15mm thick welded with angle iron 30x30x5 mm so as to
give rough finish i/c centring shuttering structing and propping etc. with wooden bettens &
Ballies, height or propping & centering below supporting floor to ceiling not exceeding 4 mtr.and
removal of the same for insitu RCC work and PCC work.including all leads lifts and carriage of
material at site & as per direction of Engineer in charge in:-

a) Flat surfaces such as soffits of suspended floor roofs landing and like upto 200mm in thickness. 35.94 Sqm. 300.00 P/Sqm. 10782.00
14 Providing and laying cement concrete 1:2:4(1cement:2app.sand: 4 app. graded stone agg. 20mm 4.92 Cum 4600.00 P/Cum 22632.00
nominal size )and curing complete excluding cost of form work & reinforcement for reinforced
work in suspended floors, roofs landing shelves and their supports balconies, beams, girders
bressumers and cantilivers upto to floor two level in all height and depth, including all leads lifts
and carriage of material at site and as per direction of the Engineer-incharge.

15 Providing Mild Steel/Tor steel reinforcement including bending binding & placing in positing I/c 432.60 Kg. 65.00 P/kg 28119.00
all leads lifts and carriage of material and as per direction of the Engineer-in-charge.

16 1st. class brick work using common building bricks in foundation and plinth in Cement Mortar 8.23 Cum 5600.00 P/Cum 46088.00
1:6(1cement:6sand) in all leads lifts and carriage etc. as per direction of Engineer inchrge.

17 Applying priming coat over new wood and wood based surfaces after and including preparing the 17.24 Sqm 38.00 P/Sqm 655.00
surface by throughly cleaning oil,grease,dirt and other foreign matter with ready mixed paint
brushing with white lead for priming including all leads lifts and carriage of material as per
direction of Engineer incharge.

18 Painting two coats (excluding priming coat) on new wood and wood based with surfaces with 17.24 Sqm 70.00 P/Sqm 1207.00
ready mixed paint other then white brushing to give an even shade including cleaning the surface
of dirt dust and other foreign matter,sand papering and stopping. Including all leads lifts and
carriage of material at site as per direction of Engineer incharge.

19 White washing with lime on undecorated wall surfaces (two coats) to give an even shade including 284.86 Sqm 12.00 P/Sqm 3418.00
throughly brooming the surface to remove all dirt dust mortor drops and loose scale of lime wash
and other foreign matter including all leads lifts and carriage of material at site as per direction of
Engineer-incharge.

20 Steel work welded in single sections, in built up Section trusses and framed work,including 1.50 Qtl. 7800.00 P/Qtl. 11700.00
cutting,hoisting,fixing in position and applying a priming coat of red lead paint.In gtratings
framed,guards,bars,ladders, railling,brackets and similar works including all leads lifts and
carriage of materials as per direction of Engineer-in-charge.

Total:- 264639.00
TERMS AND CONDITIONS:-
1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Cement shall be issued @Rs.315/-P.bag & steel @53/- P.kg.at IPH Store Bhatanwali Paonta Sahib.
4 Empty cement bags shall be returned to the Deptt.otherwise Rs.2/-per bag shall be deducted from the bill.
5 Royalitry certificate in respect of(water born)stone aggregate sand etc.shalll be produced by the contractor.

Executive Engineer,
I&PH Division.,
Paonta Sahib.
DRAFT SCHEDULE OF QUANTITY Estimated cost Rs 57738/-
Name of work Providing LWSS to NC/PC hab. of CV Shawga in Tehsil Paonta Sahib Distt.Sirmour (HP) (SH: Laying & jointing Earnest money Rs.1200/-
GI Pipes, C/o RCC collection Tank, 1 No, C/o wire crate ). Time:- Three Months
S.No Sub-Head and item of work. Qty. Rates, Unit
1 2 3 4 5
1 Excavation in drains & channel etc.in earth work in all kinds of soil such as pick work ,jumper work blasting 27.00 Cum 75.95 P/Cum
work, decomposed conglomerate saturated soil soft and hard rock including dressing of sides and beds and
prepareation of sub grade to level or slope including refilling the trenches and disposing of surplus earth
upto all leads,lifts disposed earth to be levelled and neatly dressed including jungle clearance and as per
directions of the Engineer-incharge

2 Laying and jointing of GMS Pipes of various dia in trenches (earth work in trenches to be measured and
paid for seperately) including all leads lifts and carriage of material at site as per direction of Engineer-in-
charge of following dias.

i) 32mm dia. 120 Rmt. 2.10 P/Rmt.


3 Excavation in earth work in all kinds of soil and disposal of all excavated earth upto all leads lifts disposed 9.00 Cum. 59.55 P/Cum.
earth to be levelled and neatly dressed including all leads, lifts and carriage of material and as per directions
of the Engineer-in-charge

4 Wire crates made of G.I.wire filled with boulder/hard stone of approved quality with square cut faces against 25.00 Cum. 639.20 P/Cum.
the wire having rounded/rectangular shape weight of stones not less than 18 Kg. free from soft
spots,cracks,cavaties etc.(Wire crate to be measured and paid for separately)including all leads,lifts and
carriage of material at site as direction of the Engineer-in-charge. (Double Knot)

5 Wire crates of G.I.wire filled with boulder with square cut faces against the wire G.I.wire 5mm thick 120.00 Sqm. 250.00 P/Sqm.
corresponding to SWG 6 with 15cmx15cm mesh(boulder filling to be measured and paid for separately
including all leads,lifts and carriage of materials at site and as per directions of the Engineer-in-
charge(L.Rate)
6 Excavation in foundation and trenches etc.in earth work in all kinds of soil such as pick work ,jumper work 3.57 Cum 92.85 P/Cum
decomposed conglomerate saturated soil soft and hard rock upto all leads lifts stacking the excavated soil
not more than 3mtr.clear from the edge of excavation and then returning the stacked soil in 15cm layers
when required in to plinth sides of foundation etc. consolidating each deposited layers by ramming and
watering and then disposing of all surplus excavated earth as directed with in all leads lifts and as per
directions of the Engineer-in-charge

7 Providing and laying cement concrete 1:3:6(1cement:3sand:6 graded stone agg.40mm nominal size)and 2.03 Cum 1658.9 P/Cum
curing complete excluding the cost of form work in foundation & plinth including all leads lifts and carriage
of material and as per the directions of Engineer-in-charge.

8 Providing and laying cement concrete 1:4:8(1cement:4sand:8 graded stone agg.40mm nominal size)and 0.38 Cum 1104.8 P/Cum
curing complete excluding the cost of form work in foundation & plinth including all leads lifts and carriage
of material and as per the directions of Engineer-in-charge.

9 Providing and laying cement concrete work 1:1 1/2:3 (1cement:1 1/2 sand: 3 graded stone agg. 20mm
nominal size & curing complete) excluding cost of form workand reinforcement for RCC work including all
leads lifts complete and carriage of material etc. as per directions of Engineer incharge.

i) In foundation and footing etc. 0.38 Cum. 1866.80 P/Cum.


ii) In vertical walls any thickness but not less than 0.10 Metres. 0.69 Cum. 1923.40 P/Cum.
4 Providing form work with steel sheets 3.15mm thick welded with angle iron 30x30x5 mm so as to give rough
finish i/c centring shuttering structing and propping etc. with wooden bettens & Ballies, height or propping
& centering below supporting floor to ceiling not exceeding 4 mtr.and removal of the same for insitu RCC
work and PCC work.including all leads lifts and carriage of material at site & as per direction of Engineer in
charge in:-

a) Flat surfaces. 1.49 Sqm. 134.10 P/Cum

b) Vertical surface such as wall any thickness. 9.20 Sqm. 80.70 P/Cum
5 Providing and laying cement concrete 1:2:4(1cement:2app.sand: 4 app. graded stone agg. 20mm nominal 0.15 Cum. 1658.90 Per Cum.
size )and curing complete excluding cost of form work & reinforcement for reinforced work in suspended
floors, roofs landing shelves and their supports balconies, beams, girders bressumers and cantilivers upto to
floor two level in all height and depth, including all leads lifts and carriage of material at site and as per
direction of the Engineer-incharge.

6 Providing Mild Steel/Tor steel reinforcement including bending binding & placing in positing I/c all leads 76.00 Kg. 20.70 P/kg
lifts and carriage of material and as per direction of the Engineer-in-charge.

Total:
TERMS & CONDITIONS
1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.

2 Security,Sale tax & Income tax shall be deducted as per rules.


3 Cement will be issued @ 315/- per bag & steel @ 53/- per Kg. at IPH store Bhatanwali Paonta Sahib.
4 Empty cement bags shall be returned to the deptt. Otherwise Rs. 2/- per bag shall be deducted from the Assistant Engineer,
each bill of the contractor.
5 Royality certificate in respect of stone agg. Sand etc. shall be produced by the contractor I&PH Sub Division, Kaffota.
6 GI wire shall be provided by the contractor.
d cost Rs 57738/-
money Rs.1200/-
hree Months
Amount.
6
2051.00

252.00
536.00

15980.00

30000.00
331.00

3368.00

420.00

0.00

709.00
1327.00
0.00

200.00

742.00
249.00

1573.00

57738.00

Engineer,

b Division, Kaffota.
Estimated Cost:Rs. 52500/-
DRAFT SCHEDULE OF QUANTITY Earnest Money: Rs.1100/-
Name of work :Replacement of old Pumping Machinery of T/well Jhanki in Tehsil Paonta Sahib Distt. Sirmour (HP) Time: Three months.
(SH: Supplying & errection of Submersible Pumping machinery
S.NO. DESCRIPTION QTY RATE UNIT AMOUNT

8 Supply, errection, testing & commissioning of submersible pumping set of reputed make
such as KSB/BS/Johnson/worthington conforming to latest relevent BIS code. The pump
should be fitted with free flow impellers of bronze /suitable alloy as per BIS 5659 or latest
with up to date ammendments suitable for raw/clear water having greased packed bearings
& shell with wound stator on motor side & with shaft protection sleeve on pump side
ensuring better life for shaft conforming to BIS specifications. The pump shall be directly
coupled to a submersible squirrel cage electric induction motor of Kirloskar/NGEF/Jyoti /
Crompton make conforming to relevent BIS code with up to date ammendments totally
dust & water proof for submersible duty isolated from the pump by intermediate casing with
1 set of
double mechanical seal in oil chamber chamber & grease packed lubricated bearings & 12.50 HP HP 4200.00 Each. 52500
provided with stainless steel thrust bearing plate to withstand non vertical loads with
minimum wear & tear. It should also be fitted with a device to take up expansion of water
with the heating of motor. The pump set should include water level guard, errection
clamps, cable clips & depth gauge etc. & suitable for operation on data given below:-

a) Total Head in mtrs (i/c depth of Column Pipe in case of t/well) :


b) Capacity (in LPS)
c) Dia of R/Main (in mm)
d) Dia of Column pipe (in mm)

Assistant Engineer,
I&PH Sub Division,
Majra.
REVISED SCHEDULE OF QUANTITY Estimated cost Rs 91099/-
Name of work R/M of GWSS Dhamon GP Poka in Tehsil Paonta Sahib Distt.Sirmour (HP) (SH: C/O filter bed Earnest money Rs.1850/-
12.20 Sq.mtr. ) Time:- Three Months
S.No Sub-Head and item of work. Qty. Rates, Unit
1 2 3 4 5
1 Excavation in foundation and trenches etc.in earth work in all kinds of soil such as pick work ,jumper 53.98 Cum 160.00 P/Cum
work decomposed conglomerate saturated soil soft and hard rock upto all leads lifts stacking the
excavated soil not more than 3mtr.clear from the edge of excavation and then returning the stacked
soil in 15cm layers when required in to plinth sides of foundation etc. consolidating each deposited
layers by ramming and watering and then disposing of all surplus excavated earth as directed with in
all leads lifts and as per directions of the Engineer-in-charge

2 Providing and laying cement concrete 1:4:8(1cement:4sand:8 graded stone agg.40mm nominal 5.40 Cum 2800 P/Cum
size)and curing complete excluding the cost of form work in foundation & plinth including all leads
lifts and carriage of material and as per the directions of Engineer-in-charge.

3 Providing and laying cement concrete work 1:1 1/2:3 (1cement:1 1/2 sand: 3 graded stone agg.
20mm nominal size & curing complete) excluding cost of form workand reinforcement for RCC work
including all leads lifts complete and carriage of material etc. as per directions of Engineer in-
charge.

i) In foundation and footing etc. 8.10 Cum. 4100.00 P/Cum.


ii) In vertical walls any thickness but not less than 0.10 Metres. 17.94 Cum. 4200.00 P/Cum.
4 Providing form work with steel sheets 3.15mm thick welded with angle iron 30x30x5 mm so as to
give rough finish i/c centring shuttering structing and propping etc. with wooden bettens & Ballies,
height or propping & centering below supporting floor to ceiling not exceeding 4 mtr.and removal of
the same for insitu RCC work and PCC work.including all leads lifts and carriage of material at site &
as per direction of Engineer in charge in:-

a) Flat surfaces. 2.88 Sqm. 300.00 P/Cum


b) Vertical surface such as wall any thickness. 238.46 Sqm. 200.00 P/Cum
5 Providing and laying cement concrete 1:2:4(1cement:2app.sand: 4 app. graded stone agg. 20mm 0.41 Cum. 3800.00 Per Cum.
nominal size )and curing complete excluding cost of form work & reinforcement for reinforced work
in suspended floors, roofs landing shelves and their supports balconies, beams, girders bressumers
and cantilivers upto to floor two level in all height and depth, including all leads lifts and carriage of
material at site and as per direction of the Engineer-incharge.

6 Steel work welded in single sections, in built up Section trusses and framed work,including 0.62 Qtl. 7800.00 P/Qtl.
cutting,hoisting,fixing in position and applying a priming coat of red lead paint.In gtratings
framed,guards,bars,ladders, railling,brackets and similar works including all leads lifts and carriage
of materials as per direction of Engineer-in-charge.

7 Ist. Class masonary in common bunt clay building bricks in foundation & plinth in cement motrar 1.35 Cum. 5300.00 P/Cum.
1:3(1cement:3sand) in all leads,lifts and carriage etc. as per direction of the Engineer-in-charge.

8 Laying & jointing of GMS pipes (light grade) of various dia meter for stands posts and scour pipe
including all leads,lifts and carriage of material and as per direction of the Engineer-in-charge.

i)32mm dia (L) 12.00 Rmt. 16.00 P/Rmt.

9 Providing and placing in horizontal layers filtermedia duly graded screened washed and cleaned as
specified by Engineer-in-charge.
i) Top layer fine sand effective size 0.20mm to 0.40mm and uniformity co-efficient 2.00 to 3.00 mtr. 18.30 Cum 1800.00 P/Cum

ii) Second layer course sand 3mm to 5mm 6.10 Cum. 1600.00 P/ Cum.
iii) Third layer Bajri 6mm to 20mm. 2.14 Cum. 1400.00 P/ Cum.

iv) Fourth layer 20mm to 25mm. 4.88 Cum 1300.00 P/Cum

v) Fifth layer or Bottom layer broken stone 50mm to 75mm. 4.88 Cum 1200.00 P/Cum
Total:
TERMS & CONDITIONS
1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-
charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Cement will be issued @ 315/- per bag & steel @ 53/- per Kg. at IPH store Bhatanwali Paonta Sahib.
4 Empty cement bags shall be returned to the deptt. Otherwise Rs. 2/- per bag shall be deducted from
the each bill of the contractor.
Executive Engineer,
5 Royality certificate in respect of stone agg. Sand etc. shall be produced by the contractor I&PH Division,
6 GI Pipe shall be issued free of cost from IPH store Bhatanwali Paonta Sahib. Paonta Sahib.

REVISED SCHEDULE OF QUANTITY Estimated cost Rs 91468/-


Name of work Prov. GWSS Rithog GP Kanti Mashwa in Tehsil Paonta Sahib Distt.Sirmour (HP) (SH: C/O RCC Earnest money Rs.1900/-
collection Tank 1 No, Laying & jointing of GI Pipes. Time:- Three Months
S.No Sub-Head and item of work. Qty. Rates, Unit
1 2 3 4 5
1 Excavation in foundation and trenches etc.in earth work in all kinds of soil such as pick work ,jumper 9.24 Cum 160.00 P/Cum
work decomposed conglomerate saturated soil soft and hard rock upto all leads lifts stacking the
excavated soil not more than 3mtr.clear from the edge of excavation and then returning the stacked
soil in 15cm layers when required in to plinth sides of foundation etc. consolidating each deposited
layers by ramming and watering and then disposing of all surplus excavated earth as directed with in
all leads lifts and as per directions of the Engineer-in-charge

2 Providing and laying cement concrete 1:4:8(1cement:4sand:8 graded stone agg.40mm nominal 1.66 Cum 3900.00 P/Cum
size)and curing complete excluding the cost of form work in foundation & plinth including all leads
lifts and carriage of material and as per the directions of Engineer-in-charge.

3 Providing and laying cement concrete work 1:1 1/2:3 (1cement:1 1/2 sand: 3 graded stone agg.
20mm nominal size & curing complete) excluding cost of form workand reinforcement for RCC work
including all leads lifts complete and carriage of material etc. as per directions of Engineer in-
charge.

i) In foundation and footing etc. 1.68 Cum. 6400.00 P/Cum.


ii) In vertical walls any thickness but not less than 0.10 Metres. 4.05 Cum. 6600.00 P/Cum.
4 Providing form work with steel sheets 3.15mm thick welded with angle iron 30x30x5 mm so as to
give rough finish i/c centring shuttering structing and propping etc. with wooden bettens & Ballies,
height or propping & centering below supporting floor to ceiling not exceeding 4 mtr.and removal of
the same for insitu RCC work and PCC work.including all leads lifts and carriage of material at site &
as per direction of Engineer in charge in:-

a) Flat surfaces. 6.33 Sqm. 300.00 P/Cum


b) Vertical surface such as wall any thickness. 61.19 Sqm. 200.00 P/Cum
5 Providing and laying cement concrete 1:2:4(1cement:2app.sand: 4 app. graded stone agg. 20mm 0.84 Cum. 6200.00 Per Cum.
nominal size )and curing complete excluding cost of form work & reinforcement for reinforced work
in suspended floors, roofs landing shelves and their supports balconies, beams, girders bressumers
and cantilivers upto to floor two level in all height and depth, including all leads lifts and carriage of
material at site and as per direction of the Engineer-incharge.

6 Providing Mild Steel/Tor steel reinforcement including bending binding & placing in positing I/c all 76.00 Kg. 65.00 P/kg
leads lifts and carriage of material and as per direction of the Engineer-in-charge.

7 Excavation in drains & channel etc.in earth work in all kinds of soil such as pick work 541.69 Cum 160.00 P/Cum
,jumper work blasting work, decomposed conglomerate saturated soil soft and hard rock
including dressing of sides and beds and prepareation of sub grade to level or slope
including refilling the trenches and disposing of surplus earth upto all leads,lifts disposed
earth to be levelled and neatly dressed including jungle clearance and as per directions of
the Engineer-incharge

8 Laying and jointing of GMS Pipes of various dia in trenches (earth work in trenches to be
measured and paid for seperately) including all leads lifts and carriage of material at site as
per direction of Engineer-in-charge of following dias.
i) 15 mm dia, 405 Rmt 11.00 P/Rmt.
9 ii) 20mm dia 770 Rmt 16.00 P/Rmt.
iii)25mm dia. 1500 Rmt 19.00 P/Rmt.
Providing & fixing of peet valve of superior quality of following dia complete in all respect
and as per direction of the Engineer-in-charge.
i) 15 mm dia, 2 No. 350.00 Each.
ii) 20mm dia 2 No. 450.00 Each.
TERMS AND CONDITIONS:- Total:
1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Cement will be issued @ 315/-- per bag & steel @ 53/- per Kg. at IPH store Bhatanwali Paonta Sahib.
4 Empty cement bags shall be returned to the deptt. Otherwise Rs. 2/- per bag shall be deducted from the each bill of the contractor.
5 Royality certificate in respect of stone agg. Sand etc. shall be produced by the contractor
6 G.I.Pipe shall be issued free of cost from IPH Store Bhatanwali Paonta Sahib.
7 The pipe fitting shall be provided by the contractor. Executive Engineer,
I&PH Division,
Paonta Sahib.
cost Rs 91099/-
oney Rs.1850/-

Amount.
6
8637.00

15120.00

0.00

33210.00
75348.00
0.00

864.00
47692.00
1558.00

4836.00

7155.00

192.00

32940.00

9760.00
2996.00

6344.00

5856.00
252508.00
Engineer,
sion,

cost Rs 91468/-
oney Rs.1900/-

Amount.
6
1478.00

6474.00

10752.00
26730.00
0.00

1899.00
12238.00
5208.00

4940.00

86670.00

4455.00
12320.00
28500.00

700.00
900.00
203270.00

contractor.

Engineer,
sion,
DRAFT SCHEDULE OF QUANTITY
Name of work:-C/o LIS Nera Dhunai Gp Dugana in Tehsil Paonta Sahib Distt.Sirmour(HP)
(SH: C/o R/wall at various reaches)
S.No Description
1 2
1 Excavation in foundation and trenches etc.in earth work in all kinds of soil such as pick work
,jumper work decomposed conglomerate saturated soil soft and hard rock upto all leads lifts
stacking the excavated soil not more than 3mtr.clear from the edge of excavation and then
returning the stacked soil in consolidating each deposited layers by ramming and watering and
then disposing of all surplus excavated earth as directed with in all leads lifts and as per directions
of the Engineer-in-charge

2 Providing and laying cement concrete 1:6:12(1cement:6sand:12 graded stone agg.40mm


nominal size)and curing complete excluding the cost of centring shuttering in foundation &
plinth including all leads lifts and carriage of material and as per the directions of Engineer-in-
charge.

3 Random rubble masonary /Poly rubble masonary (uncoursed/brought to coursed) with hard
stone of approved quality in foundation and plinth including levelling up with cement concrete
1:6.12(1cement:6sand:12 graded stone agg. 20mm nominal size)in cement mortor 1:6 (1 Cement:
6 sand ) in breast wall & Retaining walls including all leads lifts and carriage of material and as
per the directions of Engineer-in-charge.

TERMS AND CONDITIONS:-


1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Cement will be issued @ 315/- per bag & steel @ 53/- per Kg. at IPH store Bhatanwali Paonta Sahib.
4 Empty cement bags shall be returned to the deptt. Otherwise Rs. 2/- per bag shall be deducted from th
5 earch billcertificate
Royality of the contractor.
in respect of stone agg. Sand etc. shall be produced by the contractor
7 GI Pipe shall be issued free of cost from IPH Store Bhatanwali.
8 GI Fitting shall be provided by the contractor.
Estimated Cost :-Rs.63176/-
Earnest Money :-Rs.1300/-
Time:- Two months.
Qty. Rate Unit Amount
3 4 5 6.
34.98 Cum 92.85 P/Cum 3248.00

15.94 Cum 905.10 P/Cum 14427.00

103.53 Cum 1135.50 P/Cum 117558.00

Total: 135233.00

e Engineer-in-charge.

nwali Paonta Sahib.


ll be deducted from the
ntractor

Assistant Engineer,
I&PH Sub Division, Kaffota.
REVISED SCHEDULE OF QUANTITY Estimated cost Rs 63130/-
Name of work: R/M of GWSS Kufer Paniyali GP Banour in Tehsil Paonta Sahib Distt. Sirmour (HP) Earnest money Rs.1300/-
(SH: Construction of RCC collection Tank & laying of Main line) Time:- Three Months
S.No Sub-Head and item of work. Qty. Rates,
1 2 3 4
1 Demoliation above ground Level upto floor two level including disposal of unserviceable material with 0.71 Cum. 950.00
20 Mtrs. deoth and cutting the necessary ewinfoeement and separatation out from RCC/RB work
complete in all respect and as per direction of the Engineer-in-charge.

2 Excavation in foundation and trenches etc.in earth work in all kinds of soil such as pick work ,jumper 6.85 Cum 160.00
work decomposed conglomerate saturated soil soft and hard rock upto all leads lifts stacking the
excavated soil not more than 3mtr.clear from the edge of excavation and then returning the stacked
soil in 15cm layers when required in to plinth sides of foundation etc. consolidating each deposited
layers by ramming and watering and then disposing of all surplus excavated earth as directed with in
all leads lifts and as per directions of the Engineer-incharge

3 Providing and laying cement concrete 1:4:8(1cement:4sand:8 graded stone agg.40mm nominal 1.26 Cum 3100.00
size)and curing complete excluding the cost of form work in foundation & plinth including all leads
lifts and carriage of material and as per the directions of Engineer-in-charge.

4 Providing and laying cement concrete work 1:1 1/2:3 (1cement:1 1/2 sand: 3 graded stone agg. 20mm
nominal size & curing complete) excluding cost of form work in all height and depth including all leads
lifts complete and carriage of material etc. as per directions of Engineer incharge.

a) In foundation and plinth 0.95 Cum. 4410.00

b) Vertical surface such as wall any thickness. 2.60 Cum. 4500.00


5 Providing form work with steel sheets 3.15mm thick welded with angle iron 30x30x5 mm so as to give
rough finish i/c centring shuttering structing and propping etc. with wooden bettens & Ballies, height
or propping & centering below supporting floor to ceiling not exceeding 4 mtr.and removal of the
same for insitu RCC work and PCC work.including all leads lifts and carriage of material at site & as per
direction of Engineer in charge in:-

a) Flat surfaces. 4.63 Sqm. 300.00

b) Vertical surface such as wall any thickness. 21.14 Sqm. 200.00

c ) Edges of slab & breaks in walls. 5.20 Sqm. Item


deleted.
6 Providing and laying cement concrete 1:2:4(1cement:2app.sand: 4 app. graded stone agg. 20mm 0.84 Cum. 4100.00
nominal size )and curing complete excluding cost of form work & reinforcement for reinforced work in
suspended floors, roofs landing shelves and their supports balconies, beams, girders bressumers and
cantilivers upto to floor two level in all height and depth, including all leads lifts and carriage of
material at site and as per direction of the Engineer-incharge.

7 Providing Mild Steel/Tor steel reinforcement including bending binding & placing in positing I/c all 257.00 Kg. 51.00
leads lifts and carriage of material and as per direction of the Engineer-in-charge.

8 Laying & jointing of GI Pipes for scour Pipe & outlet pipe 12mm dia cvomplete in all respect and as per 6.00 Rmt. 16.00
direction of the Engineer-in-charge.
9 Excavation in drains & channel etc.in earth work in all kinds of soil such as pick work ,jumper work 382.50 Cum 160.00
blasting work, decomposed conglomerate saturated soil soft and hard rock including dressing of sides
and beds and prepareation of sub grade to level or slope including refilling the trenches and disposing
of surplus earth upto all leads,lifts disposed earth to be levelled and neatly dressed including jungle
clearance and as per directions of the Engineer-incharge

10 Laying and jointing of GMS Pipes of various dia in trenches (earth work in trenches to be measured
and paid for seperately) including all leads lifts and carriage of material at site as per direction of
Engineer-in-charge of following dias.
i) 15 mm dia, 540 Rmt 9.00
ii) 20mm dia 300 Rmt 9.00
iii)25mm dia. 710 Rmt 14.00
iv) 32mm dia. 150 Rmt 16.00
11 Providing & fixing of peet valve of superior quality of following dia complete in all respect and as per
direction of the Engineer-in-charge.
i) 15 mm dia, 1 No. 400.00
ii) 20mm dia 1 No. 500.00
TERMS AND CONDITIONS:-
1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Cement will be issued @ 250/- per bag & steel @ 41/- per Kg. at IPH store Bhatanwali Paonta Sahib.
4 Empty cement bags shall be returned to the deptt. Otherwise Rs. 2/- per bag shall be deducted from the each bill of the contractor.
5 Royality certificate in respect of stone agg. Sand etc. shall be produced by the contractor
6 G.I.Pipe shall be issued free of cost from IPH Store Bhatanwali Paonta Sahib.
7 The pipe fitting shall be provided by the contractor. Executive Engineer,
I&PH Division,
Paonta Sahib.
Estimated cost Rs 63130/-
Earnest money Rs.1300/-
Time:- Three Months
Unit Amount.
5 6
Per Cum. 675.00

P/Cum 1096.00

P/Cum 3906.00

0.00

P/Cum. 4190.00
P/Cum. 11700.00
0.00

P/Cum 1389.00
P/Cum 4228.00
P/Sqm. 0.00

Per Cum. 3444.00

P/kg 13107.00

P/Rmt. 96.00

P/Cum 61200.00

P/Rmt. 4860.00
P/Rmt. 2700.00
P/Rmt. 9940.00
P/Rmt. 2400.00

Each. 400.00
Each. 500.00
Total: 125831.00

ontractor.

Executive Engineer,
I&PH Division,
Paonta Sahib.
REVISED SCHEDULE OF QUANTITY Estimated cost Rs. 35155/-
Name of work:- CAD of FIS JjAITHAL Kog Dabra (Part Dabra) in Tehsil Paonta Sahib Distt. Sirmour (HP) Earnest money Rs.1400/-
(SH: C/o Pucca Main channel at various reaches 800 Mtrs.) Time:- Three Months
S.No Sub-Head and item of work. Qty. Rates, Unit Amount.
1 2 3 4 5 6
1 Excavation in drains & channel etc.in earth work in all kinds of soil such as pick 133.58 Cum 160.00 P/Cum 21373.00
work ,jumper work blasting work, decomposed conglomerate saturated soil soft and
hard rock including dressing of sides and beds and prepareation of sub grade to level
or slope including refilling the trenches and disposing of surplus earth upto all
leads,lifts disposed earth to be levelled and neatly dressed including jungle clearance
and as per directions of the Engineer-incharge

2 Cement concrete lining 15cm thick or less for irrigation channels using cement concrete
1:3:6(1cement:3sand:6graded stone agg. 20mm nominal size)and curing complete excluding
cost of form work included all leads lifts and carriage of material complete in all respect and
as per direction of Engineer-in-charge.

a)Hand Mixed concrete in bed. 22.61 Cum 5950.00 P/Cum 134530.00

b)Hand mixed concrete lining in side slopes. 34.32 Cum 6000.00 P/Cum 205920.00

3 Extra allowance for form work in concrete lining as directed by the Engineer-in-charge 34.32 Cum 130.00 P/Cum 4462.00
including all leads lifts and carriage of matrerials at site complete in all respects on side
slopes as per direction of Engineer in charge.

TERMS & CONDITIONS Total: 366285.00


1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax & labour cess shall be deducted as per rules.
3 Royality certificate in respect of stone agg. Sand etc. shall be produced by the contractor
4 Cement shall be issued @ 315/- per Bag & Steel @ 53/- per Kg. at IPH Store Bhatanwali Paonta Sahib.
5 Empty cement bags shall be returned to the Deptt. Otherwise Rs. 2/- per bag shall deducted from the bill. Executive Engineer,
I&PH Division,
Paonta Sahib.
DRAFT SCHEDULE OF QUANTITY Estimated Cost :-Rs.45037/-
Name of work:-C/o FIS Malaun to Shilli Bamog GP Tatiana inTehsil Tehsil ShillaiPaonta Sahib Distt.Sirmour(HP) Earnest Money :-Rs.1000/-
(SH: C/Opattra cutting. Time:- Two months.
S.No Description Qty. Rate Unit
1 Cutting in earth work in all kind of soil and dispoal of the excavated earth upt all leads,lifts and as 2421.56 Cum 59.55 P/Cum
directed by the Engineer-in-charge complete in all respect.

2 Excavation in drains & channel etc.in earth work in all kinds of soil such as pick work 13.95 Cum. 75.95 P/Cum.
,jumper work blasting work, decomposed conglomerate saturated soil soft and hard rock
including dressing of sides and beds and prepareation of sub grade to level or slope
including refilling the trenches and disposing of surplus earth upto all leads,lifts disposed
earth to be levelled and neatly dressed including jungle clearance and as per directions of
the Engineer-incharge

3 Cement concrete lining 15cm thick or less for irrigation channels using cement concrete
1:3:6(1cement:3sand:6graded stone agg. 20mm nominal size)and curing complete excluding cost of
form work included all leads lifts and carriage of material complete in all respect and as per
direction of Engineer-in-charge.

a)Hand Mixed concrete in bed. 62.70 Cum 423.10 P/Cum

b)Hand mixed concrete lining in side slopes. 85.80 Cum 431.10 P/Cum
4 Extra allowance for form work in concrete lining as directed by the Engineer-in-charge including all 85.80 Cum 18.85 P/Cum
leads lifts and carriage of matrerials at site complete in all respects on side slopes as per direction
of Engineer in charge.

TERMS AND CONDITIONS. Total:


1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Cement shall be issued @ Rs.315/- per bag & steel @ 53/- per Kg. from IPH store Bhatanwali Paonta Sahib.
4 Royality certificate in respect of stone agg. Sand etc. shall be produced by the contractor
5 Empty cement bags shall be returned to the Deptt.otherwise Rs.2/-per bag shall be deducted from the bill.
Assistant Engineer,
I&PH Sub Division,
Kaffota.

DRAFT SCHEDULE OF QUANTITY Estimated Cost :-Rs.99814/-


Name of work:-C/o FIS Malaun to Shilli Bamog GP Tatiana inTehsil Tehsil ShillaiPaonta Sahib Distt.Sirmour(HP) Earnest Money :-Rs.2000/-
(SH: C/o Pattra cutting, C/o Pucca Main channel ) Job No.1. Time:- Two months.
S.No Description Qty. Rate Unit
1 Cutting in earth work in all kind of soil and dispoal of the excavated earth upt all leads,lifts and as 1120.00 Cum 59.55 P/Cum
directed by the Engineer-in-charge complete in all respect.

2 Excavation in drains & channel etc.in earth work in all kinds of soil such as pick work 6.95 Cum. 75.95 P/Cum.
,jumper work blasting work, decomposed conglomerate saturated soil soft and hard rock
including dressing of sides and beds and prepareation of sub grade to level or slope
including refilling the trenches and disposing of surplus earth upto all leads,lifts disposed
earth to be levelled and neatly dressed including jungle clearance and as per directions of
the Engineer-incharge

3 Cement concrete lining 15cm thick or less for irrigation channels using cement concrete
1:3:6(1cement:3sand:6graded stone agg. 20mm nominal size)and curing complete excluding cost of
form work included all leads lifts and carriage of material complete in all respect and as per
direction of Engineer-in-charge.

a)Hand Mixed concrete in bed. 31.35 Cum 423.10 P/Cum

b)Hand mixed concrete lining in side slopes. 42.95 Cum 431.10 P/Cum

4 Extra allowance for form work in concrete lining as directed by the Engineer-in-charge including all 42.95 Cum 18.85 P/Cum
leads lifts and carriage of matrerials at site complete in all respects on side slopes as per direction
of Engineer in charge.

TERMS AND CONDITIONS. Total:


1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Cement shall be issued @ Rs.315/- per bag & steel @ 53/- per Kg. from IPH store Bhatanwali Paonta Sahib.
4 Royality certificate in respect of stone agg. Sand etc. shall be produced by the contractor
5 Empty cement bags shall be returned to the Deptt.otherwise Rs.2/-per bag shall be deducted from the bill.
Assistant Engineer,
I&PH Sub Division,
Kaffota.

DRAFT SCHEDULE OF QUANTITY Estimated Cost :-Rs.99742/-


Name of work:-C/o FIS Malaun to Shilli Bamog GP Tatiana inTehsil Tehsil ShillaiPaonta Sahib Distt.Sirmour(HP) Earnest Money :-Rs.2000/-
(SH: C/o Pattra cutting, C/o Pucca Main channel ) Job No.2. Time:- Two months.
S.No Description Qty. Rate Unit
1 Cutting in earth work in all kind of soil and dispoal of the excavated earth upt all leads,lifts and as 1120.00 Cum 59.55 P/Cum
directed by the Engineer-in-charge complete in all respect.
2 Excavation in drains & channel etc.in earth work in all kinds of soil such as pick work 6.00 Cum. 75.95 P/Cum.
,jumper work blasting work, decomposed conglomerate saturated soil soft and hard rock
including dressing of sides and beds and prepareation of sub grade to level or slope
including refilling the trenches and disposing of surplus earth upto all leads,lifts disposed
earth to be levelled and neatly dressed including jungle clearance and as per directions of
the Engineer-incharge

3 Cement concrete lining 15cm thick or less for irrigation channels using cement concrete
1:3:6(1cement:3sand:6graded stone agg. 20mm nominal size)and curing complete excluding cost of
form work included all leads lifts and carriage of material complete in all respect and as per
direction of Engineer-in-charge.

a)Hand Mixed concrete in bed. 31.35 Cum 423.10 P/Cum


b)Hand mixed concrete lining in side slopes. 42.95 Cum 431.10 P/Cum
4 Extra allowance for form work in concrete lining as directed by the Engineer-in-charge including all 42.95 Cum 18.85 P/Cum
leads lifts and carriage of matrerials at site complete in all respects on side slopes as per direction
of Engineer in charge.
TERMS AND CONDITIONS. Total:
1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Cement shall be issued @ Rs.315/- per bag & steel @ 53/- per Kg. from IPH store Bhatanwali Paonta Sahib.
4 Royality certificate in respect of stone agg. Sand etc. shall be produced by the contractor
5 Empty cement bags shall be returned to the Deptt.otherwise Rs.2/-per bag shall be deducted from the bill.
Assistant Engineer,
I&PH Sub Division,
Kaffota.
17.83 698 12445
4.45 3000 13350
4.45 4300 19135
5.79 4400 25476
29.72 300 8916
59.72 200 11944
3.71 4000 14840
977 51 49827
7 110 770
109.6 165 18084
174787
12445
162342
ed Cost :-Rs.45037/-
Money :-Rs.1000/-
wo months.
Amount
144204.00

1060.00

26528.00

36988.00
1617.00

210397.00

Engineer,
ed Cost :-Rs.99814/-
Money :-Rs.2000/-
wo months.
Amount
66696.00

528.00

13264.00

18516.00

810.00

99814.00
Engineer,

ed Cost :-Rs.99742/-
Money :-Rs.2000/-
wo months.
Amount
66696.00

456.00

13264.00
18516.00
810.00

99742.00

Engineer,
DRAFT SCHEDULE OF QUANTITY Estimated Cost: 23943/-
Name of work:-Aug./Imp. of LWSS Kotga Kando, Poka & adjoining villages in GP Poka in Tehsil Paonta Sahib Distt. Earnest Money: 500/-
Sirmour (HP)(SH: C/o R/R Masdonary Intake, Boundry and retaining wall upper side to protect the Sump well) Time : One Month.
S.No Description Qty. Rate Unit.,
1 2 3 5 4
1 Excavation in earth work in all kinds of soil and disposal of all excavated earth upto a lead of 20 8.51 Cum. 59.55 P/Cum
Mtrs. (twenty metres) and lift upto1.50 Mtrs. ,disposing earth top be levelled and neatly dressed
pick/jumper work within all leads lifts disposed earth to be levelled and neatly dressed including
all leads, lifts and carriage of material and as per directions of the Engineer-in-charge

2 Providing and laying cement concrete 1:6:12(1cement:6sand:12 graded stone agg.40mm nominal 1.92 Cum 905.10 P/Cum
size)and curing complete excluding the cost of centring shuttering in foundation & plinth including all
leads lifts and carriage of material and as per the directions of Engineer-in-charge.

3 Providing and laying cement concrete 1:4:8(1cement:4sand:8 graded stone agg.40mm nominal 1.48 Cum. 1104.80 Cum
size)and curing complete excluding the cost of form work in foundation & plinth including all
leads lifts and carriage of material and as per the directions of Engineer-in-charge.

4 Random rubble masonary /Poly rubble masonary (uncoursed/brought to coursed) with hard stone of 12.86 Cum. 1135.50 Cum
approved quality in foundation and plinth including levelling up with cement concrete
1:6.12(1cement:6sand:12 graded stone agg. 20mm nominal size)in cement mortor 1:6 (1 Cement: 6 sand )
in breast wall & Retaining walls including all leads lifts and carriage of material and as per the directions
of Engineer-in-charge.

5 Providing and laying cement concrete 1:2:4(1cement:2app.sand: 4 app. graded stone agg. 20mm nominal 0.75 Cum. 1615.40 P/Cum.
size )and curing complete excluding cost of form work & reinforcement for reinforced work in foundation
& plinth including all leads lifts and carriage of material at site and as per direction of the Engineer-
incharge.
6 20 mm thick cement plaster in single coat of rough side of bricks/stone masonary for interior plastering 4 Sqm 58.40 P/Sqm
upto floor two level including arrises internal rounded angles chamfers rounded angles not exceeding
80mm in girth and finished even and smooth in cement mortor 1:6(1cement:6 sand) and curing complete
including all leads lifts and carriage of materials at site as per direction of Engineer-incharge.

7 Railing of GI pipes complete in all respect and as per direction of the Engineer-in-charge. 45 Rmt. 0.50 Per Rmt.

8 C/o dry rubble masonary in breast wall & retaining wall Rivertment walls and parapets etc. complete in all 8.81 Cum. 453.00 Per Cum.
respect and as per direction of the Engineer-in-charge.

TERMS AND CONDITIONS:- Total


1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Royality certificate in respect of stone agg. Sand etc. shall be produced by the contractor
4 G.I.Pipe shall be issued by the deptt. free of cost from IPH Store Bhatanwali.
5 Empty cement bags shall be returned to the Deptt.otherwise Rs.2/-per bag shall be deducted from the bill.
6 Cement shall be issued @ Rs.315/- per bag & steel @ 53/- per Kg. from IPH store Bhatanwali Paonta Sahib.
Assistant Engineer,
I&PH Sub Division,
Kaffota.
Amount
6.
507.00

1738.00

1635.00

14603.00

1212.00
234.00

23.00

3991.00

23943.00
DRAFT SCHEDULE OF QUANTITY Estimated cost Rs. 75829/-
Name of work:- Providing LWSS to village Sainwala Mubarikpur (Under SCCP) in Tehsil Paonta Sahib Distt. Earnest money Rs.1600/-
Sirmour (HP) (SH:C/o Retaining wall earth filling , C/o Toilets & painting distempering of LWSS Time:- Three Months.
Sainwala Mubarikpur)
S.No Sub-Head and item of work. Qty. Rates, Unit
1 2 3 4 5
1 Excavation in foundation and trenches etc.in earth work in all kinds of soil such as pick work 26.04 Cum 92.85 P/Cum
,jumper work decomposed conglomerate saturated soil soft and hard rock upto all leads lifts
stacking the excavated soil not more than 3mtr.clear from the edge of excavation and then
returning the stacked soil in 15cm layers when required in to plinth sides of foundation etc.
consolidating each deposited layers by ramming and watering and then disposing of all
surplus excavated earth as directed with in all leads lifts and as per directions of the
Engineer-incharge

2 Providing form work with steel sheets 3.15mm thick welded with angle iron 30x30x5 mm so
as to give rough finish i/c centring shuttering structing and propping etc. with wooden
bettens & Ballies, height or propping & centering below supporting floor to ceiling not
exceeding 4 mtr.and removal of the same for insitu RCC work and PCC work including all
leads lifts and carriage of material at site & as per direction of Engineer incharge in:-

a) Vertiocal surfaces 106.02 Sqm 80.70 P/Sqm


3 Providing and laying cement concrete work 1:5:10(1cement:5 sand: 10 graded stone agg. 43.73 Cum 934.10 P/Cum
40mm nominal size) with 15% plum and curing complete excluding cost of form work and
in retaining walls/ Breast walls, the size of Plums shall usually be 150mm to 300mm as per
PWD specificatioin including all leads lifts and carriage of material and as per direction of
Engineer incharge.
4 Excavation & filling in earth work and banking in 20 cm. layers incluind breaking 35.10 Cum. 59.55 Per
clods,ramming * dressing ground for the purpose of making or filling up ground depression Cum.
upto a lead of 20 mtrs. within in all leads,lifts and carriage of material and and as per
direction of the Engineer-in-charge.

5 Providing and fixing glass panes with putty and nails including removal of broken glass 4.77 Sqm. 1232.40 P/Sqm.
panes wherever necessary palin glass 3mm thick and as per direction of the Engineer-in-
charge.

6 Finishing wall with Water proofing cement paint on decorated wall surfaces (two coat) to 238.27 Sqm. 18.20 P/Sqm.
give an even shade i.e. thoroughly brooming the surfaces to removal give all dirt,dust and
other fogreign mater complete in all respect and as per direction of the Engineer-in-charge.

7 Ist Class brick work using common building bricks in Super structure in Cement Mortar 4.33 Cum 1445.00 P/Cum
1:4(1cement:4sand) in all leads lifts and carriage etc. as per direction of Engineer inchrge.

8 Providing Mild Steel/Tor steel reinforcement including bending binding & placing in 32.40 Kg. 20.70 P/kg
positing I/c all leads lifts and carriage of material and as per direction of the Engineer-in-
charge.

9 Providing and laying cement concrete 1:2:4(1cement:2app.sand: 4 app. graded stone agg. 0.36 Cum. 1658.90 P/Cum.
20mm nominal size )and curing complete excluding cost of form work & reinforcement for
reinforced work in foundation & plinth including all leads lifts and carriage of material at
site and as per direction of the Engineer-incharge.

10 20 mm thick cement plaster in single coat of rough side of bricks/stone masonary for 17.64 Sqm 58.40 P/Sqm
interior plastering upto floor two level including arrises internal rounded angles chamfers
rounded angles not exceeding 80mm in girth and finished even and smooth in cement
mortor 1:6(1cement:6 sand) and curing complete including all leads lifts and carriage of
materials at site as per direction of Engineer-incharge.
11 Providing and fixing angle iron door clearstory windows frame manufactured frame steel 4.4 Rmt. 88.28 P/Rmt.
iron steel section of 40x40x6mm thickness i/c hinges janb,beed and it required angle
thresold of mild steel 50x25mm welded or trigdly fixed by echanical means, lugs with split
end tails to and as per direction of the Engineer-in-charge.

12 Provd./fixing pannelled glazed or pannelled and glazed shutters for doors windows and 1.35 Sqm 958.75 P/Sqm
clearestorey windows including black enemelled iron butt hings with necessary secrews
complete.40mm thick 2nd.class deodar wood including all leads lifts and carriage of
material at site as per direction of Engineer-in-charge.

13 Painting two coats (excluding priming coat) on new steel and steel based with surfaces with 9.7 Sqm 22.10 P/Sqm
ready mixed paint other then white brushing to give an even shade including cleaning the
surface of dirt dust and other foreign matter,sand papering and stopping. Including all leads
lifts and carriage of material at site as per direction of Engineer incharge.

14 Providing and fixing ordinary water closet including all leads,lifts and carriage of material 1 No. 1250.00 Each
and as per direction of the Engineer-in-charge.
TOTAL:

TERMS & CONDITIONS


1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax & labour cess shall be deducted as per rules.
3 Royality certificate in respect of stone agg. Sand etc. shall be produced by the contractor
4 Cement shall be issued @ 315/- per Bag & Steel @ 53/- per Kg. at IPH Store Bhatanwali Paonta Sahib.
5 Empty cement bags shall be returned to the Deptt. Otherwise Rs. 2/- per bag shall deducted
from the bill. Assistant Engineer,
I&PH Sub Division,
Majra.
d cost Rs. 75829/-
money Rs.1600/-
hree Months.

Amount.
6
2418.00

8556.00
40848.00
2090.00

5879.00

4337.00

6257.00

671.00

597.00

1030.00
388.00

1294.00

214.00

1250.00

75829.00

Assistant Engineer,
I&PH Sub Division,
DRAFT SCHEDULE OF QUANTITY Estimated Cost :-Rs.41571/-
Name of work:-Sustainability of GWSS Pab GP Kota Pab in Tehsil Paonta Sahib Distt.Sirmour(HP) Earnest Money :-Rs.900/-
(SH: C/o pillars in Msonary , C/o R/wall to protect the intake). Time:- Two months.
S.No Description Qty. Rate Unit
1 2 3 4 5
1 Cutting in earth work and disposal of excavated earth within all leads,lifts Pick/Jumper work 50% each 17.86 Cum 59.55 P/Cum
complete in all respect and as per direction of the Engineer-in-charge.

2 Excavation in foundation and trenches etc.in earth work in all kinds of soil such as pick work 6.19 Cum 92.85 P/Cum
,jumper work decomposed conglomerate saturated soil soft and hard rock upto all leads lifts
stacking the excavated soil not more than 3mtr.clear from the edge of excavation and then
returning the stacked soil in consolidating each deposited layers by ramming and watering and
then disposing of all surplus excavated earth as directed with in all leads lifts and as per directions
of the Engineer-in-charge

3 Providing and laying cement concrete 1:6:12(1cement:6sand:12 graded stone agg.40mm 3.38 Cum 905.10 P/Cum
nominal size)and curing complete excluding the cost of centring shuttering in foundation &
plinth including all leads lifts and carriage of material and as per the directions of Engineer-in-
charge.

4 Random rubble masonary /Poly rubble masonary (uncoursed/brought to coursed) with hard 33.41 Cum 1135.50 P/Cum
stone of approved quality in foundation and plinth including levelling up with cement concrete
1:6.12(1cement:6sand:12 graded stone agg. 20mm nominal size)in cement mortor 1:6 (1 Cement:
6 sand ) in breast wall & Retaining walls including all leads lifts and carriage of material and as
per the directions of Engineer-in-charge.

Total:
TERMS AND CONDITIONS:-
1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Cement will be issued @ 315/- per bag & steel @ 53/- per Kg. at IPH store Bhatanwali Paonta Sahib.
4 Empty cement bags shall be returned to the deptt. Otherwise Rs. 2/- per bag shall be deducted from the
5 earch billcertificate
Royality of the contractor.
in respect of stone agg. Sand etc. shall be produced by the contractor
Assistant Engineer,
I&PH Sub Division, Kaffota.

DRAFT SCHEDULE OF QUANTITY Estimated Cost :-Rs.41571/-


Name of work:-Sustainability of GWSS Pab GP Kota Pab in Tehsil Paonta Sahib Distt.Sirmour(HP) Earnest Money :-Rs.900/-
(SH: C/o pillars in Msonary , C/o R/wall to protect the intake). Time:- Two months.
S.No Description Qty. Rate Unit
1 2 3 4 5
1 Cutting in earth work and disposal of excavated earth within all leads,lifts Pick/Jumper work 50% each 17.86 Cum 59.55 P/Cum
complete in all respect and as per direction of the Engineer-in-charge.
2 Excavation in foundation and trenches etc.in earth work in all kinds of soil such as pick work 6.19 Cum 92.85 P/Cum
,jumper work decomposed conglomerate saturated soil soft and hard rock upto all leads lifts
stacking the excavated soil not more than 3mtr.clear from the edge of excavation and then
returning the stacked soil in consolidating each deposited layers by ramming and watering and
then disposing of all surplus excavated earth as directed with in all leads lifts and as per directions
of the Engineer-in-charge

3 Providing and laying cement concrete 1:6:12(1cement:6sand:12 graded stone agg.40mm 3.38 Cum 905.10 P/Cum
nominal size)and curing complete excluding the cost of centring shuttering in foundation &
plinth including all leads lifts and carriage of material and as per the directions of Engineer-in-
charge.

4 Random rubble masonary /Poly rubble masonary (uncoursed/brought to coursed) with hard 33.41 Cum 1135.50 P/Cum
stone of approved quality in foundation and plinth including levelling up with cement concrete
1:6.12(1cement:6sand:12 graded stone agg. 20mm nominal size)in cement mortor 1:6 (1 Cement:
6 sand ) in breast wall & Retaining walls including all leads lifts and carriage of material and as
per the directions of Engineer-in-charge.

Total:
TERMS AND CONDITIONS:-
1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Cement will be issued @ 315/- per bag & steel @ 53/- per Kg. at IPH store Bhatanwali Paonta Sahib.
4 Empty cement bags shall be returned to the deptt. Otherwise Rs. 2/- per bag shall be deducted from the
5 earch billcertificate
Royality of the contractor.
in respect of stone agg. Sand etc. shall be produced by the contractor

Assistant Engineer,
I&PH Sub Division, Kaffota.
Cost :-Rs.41571/-
oney :-Rs.900/-

Amount
6.
1064.00

575.00

3059.00

37937.00

41571.00
Engineer,
b Division, Kaffota.

Cost :-Rs.41571/-
oney :-Rs.900/-

Amount
6.
1064.00

575.00

3059.00

37937.00

41571.00
Engineer,
b Division, Kaffota.
REVISED SCHEDULE OF QUANTITY Estimated cost Rs 99890/-
Name of work:- Restoration of Rain damages of FIS Choyo Kiar GP Shilla in Tehsil Paonta Sahib Distt. Earnest money Rs.2000/-
Sirmour (HP) (SH: C/oDiversion weir/ Wire crate ) Time:- One Month .
S.No Sub-Head and item of work. Qty. Rates, Unit Amount.
1 Excavation in foundation and trenches etc.in earth work in all kinds of 33.75 Cum 92.85 P/Cum 3134.00
soil such as pick work ,jumper work decomposed conglomerate
saturated soil soft and hard rock upto all leads lifts stacking the
excavated soil not more than 3mtr.clear from the edge of excavation and
then returning the stacked soil in consolidating each deposited layers by
ramming and watering and then disposing of all surplus excavated earth
as directed with in all leads lifts and as per directions of the Engineer-in-
charge

2 Wire crates made of G.I.wire filled with boulder/hard stone of approved 130.40 Cum. 639.20 P/Cum. 83352.00
quality with square cut faces against the wire having
rounded/rectangular shape weight of stones not less than 18 Kg. free
from soft spots,cracks,cavaties etc.(Wire crate to be measured and paid
for separately)including all leads,lifts and carriage of material at site as
direction of the Engineer-in-charge. (Double Knot)

3 Wire crates of G.I.wire filled with boulder with square cut faces against 670.20 Sqm. 20.00 P/Sqm. 13404.00
the wire G.I.wire 5mm thick corresponding to SWG 6 with 15cmx15cm
mesh(boulder filling to be measured and paid for separately including
all leads,lifts and carriage of materials at site and as per directions of the
Engineer-in-charge (L.Rate)

TOTAL: 99890.00
TERMS AND CONDITIONS:-
1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Royality certificate in respect of stone agg. Sand etc. shall be produced by the contractor
4 G.I.wire shall be issued free of cost from IPH store Bhatanwali.
5 Boulder shall not be less than 18 Kg. & the stone should be free from cracks and cavities.
Assistant Engineer,
I&PH Sub Division,
Kaffota.
DRAFT SCHEDULE OF QUANTITY Estimated cost Rs 93268/-
Name of work:- STOCK STORAGE OF Divisional store Paonta Sahib in tehsil Paonta Sahib Distt. Earnest money Rs.1900/-
Sirmour (HP) (SH: Un-loading and loading of materil from into wagon /Non tipping trucks) Time:- One Month .
S.No Sub-Head and item of work. Qty. Rates, Unit Amount.
1 Un-loading of cement from Non tripping trucks and stacking inside 18000.00 Bag 1.29 P/Bag. 23220.00
departmentall store complete including all leads,lifts and cariage of
material and as per direction and entire satisfaction of the Engineer-in-
charge.

2 Loading of cement into wagon/non tripping trucks departmantal truck 8000.00 Bag. 1.29 P/Bag. 10320.00
& stacking complete including all leads,lifts and carriage of material and
as per direction of the Engineer-in-charge.

3 Unloading of G.I., C.I. & RCC pipes upto 500 mm dia and their special like 350.00 M.T. 85.33 P/MT. 29864.00
short poieces tee,bend,elbow and other fitting steel and other store
materials from non tapping truck and stacking inside the store complete
including all leads,lifts and carriage of material and to the entire
satisfaction of the Engineer-in-charge.

4 loading of G.I., C.I. & RCC pipes upto 500 mm dia and their special like 350.00 M.T. 85.33 P/MT. 29864.00
short pieces tee,bend,elbow and other fitting steel and other store
materials from non tapping truck and stacking inside the store complete
including all leads,lifts and carriage of material and to the entire
satisfaction of the Engineer-in-charge.

TOTAL: 93268.00
TERMS AND CONDITIONS:-
1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Nothing shall be paid for rejected/defective work.

Assistant Engineer,
I&PH Sub Division,
Paonta Sahib.
REVISED SCHEDULE OF QUANTITY Estimated Cost :-Rs.84000/-
Name of work:-R/M of LWSS Kaffota under I&PH Sub Dvision Kaffota in Tehsil Paonta Sahib Distt. Sirmour (HP)Earnest Money :-Rs.2100/-
(SH:- Providing and supplying of water sample bottles(Forsil make )having size 250 ml..) Time:- One month.
Sr.No. Description Qty. Rate Unit Amount
1 2 3 4 5 6.
1 Providing and supplying of water sample bottle (borosil make) having 500.00 Nos. 240.00 P/Sqm 120000.00
size 250 ml in respect of entire specification includig all leads,lifts and
carriage of materials and as per the direction of the Engineer-in-charge.

Total:- 120000.00
TERMS AND CONDITIONS:-
1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Nothing shall be paid for rejected material.

Executive Engineer,
I&PH Division.,
Paonta Sahib(HP)

DRAFT SCHEDULE OF QUANTITY Estimated cost Rs 28080/-


Name of work:- STOCK STORAGE OF Divisional store Paonta Sahib in tehsil Paonta Sahib Distt. Earnest money Rs.600/-
Sirmour (HP) (SH: Un-loading and loading of materil from into wagon /Non tipping trucks) Time:- One Month .
S.No Sub-Head and item of work. Qty. Rates, Unit Amount.
1 Un-loading of cement from Non tripping trucks and stacking inside 18000.00 Bag 1.08 P/Bag. 19440.00
departmentall store complete including all leads,lifts and cariage of
material and as per direction and entire satisfaction of the Engineer-in-
charge.

2 Loading of cement into wagon/non tripping trucks departmantal truck 8000.00 Bag. 1.08 P/Bag. 8640.00
& stacking complete including all leads,lifts and carriage of material and
as per direction of the Engineer-in-charge.
TOTAL: 28080.00
TERMS AND CONDITIONS:-
1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Nothing shall be paid for rejected/defective work.
4 The period of loading/unloading is one year.

Assistant Engineer,
I&PH Sub Division,
Paonta Sahib.
DRAFT SCHEDULE OF QUANTITY Estimated cost Rs 71600/-
Name of work:- STOCK STORAGE OF Divisional store Paonta Sahib in tehsil Paonta Sahib Distt. Earnest money Rs.1500/-
Sirmour (HP) (SH: Un-loading and loading of materil from into wagon /Non tipping trucks) Time:- One Month .
S.No Sub-Head and item of work. Qty. Rates, Unit Amount.
1 Unloading of G.I., C.I. & RCC pipes upto 500 mm dia and their special like 400.00 M.T. 89.00 P/MT. 35600.00
short poieces tee,bend,elbow and other fitting steel and other store
materials from non tapping truck and stacking inside the store complete
including all leads,lifts and carriage of material and to the entire
satisfaction of the Engineer-in-charge.

2 loading of G.I., C.I. & RCC pipes upto 500 mm dia and their special like 400.00 M.T. 90.00 P/MT. 36000.00
short poieces tee,bend,elbow and other fitting steel and other store
materials from non tapping truck and stacking inside the store complete
including all leads,lifts and carriage of material and to the entire
satisfaction of the Engineer-in-charge.

TOTAL: 71600.00
TERMS AND CONDITIONS:-
1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Nothing shall be paid for rejected/defective work.
4 The period of loading/unloading is one year.

Assistant Engineer,
I&PH Sub Division,
Paonta Sahib.
REVISED SCHEDULE OF QUANTITY Estimated cost Rs 33544/--
Name of work:- Improvement of Left bank Canal in Tehsil Paonta Sahib Distt. Sirmour (HP) Earnest money Rs.700/-
(SH:C/o Cement concrete Lining in leakage portion at RD 2535 to 2575 , 3840 to 3870 & 5370 to 5416 Mtrs.) Time:- Three Months
S.No Sub-Head and item of work. Qty. Rates, Unit Amount.
1 2 3 4 5 6
1 Dressing of side slopes & preparation of sub grade for lining in cement concrete lining 915.40 Sqm. 20.00 P/ Sqm. 18308.00
complete in all repsect and as per direction of the Engineer-in-charge.

2 Cement concrete lining 15cm thick or less for irrigation channels using cement concrete
1:3:6(1cement:3sand:6graded stone agg. 20mm nominal size)and curing complete
excluding cost of form work included all leads lifts and carriage of material complete in
all respect and as per direction of Engineer-in-charge.

a)Hand mixed concrete lining in side slopes. 68.65 Cum 3800.00 P/Cum 260870.00

3 Extra allowance for form work in concrete lining as directed by the Engineer-in-charge 68.65 Cum 130.00 P/Cum 8925.00
including all leads lifts and carriage of matrerials at site complete in all respects on side
slopes as per direction of Engineer in charge.

TOTAL: 288103.00
TERMS & CONDITIONS
1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax & labour cess shall be deducted as per rules.
3 Royality certificate in respect of stone agg. Sand etc. shall be produced by the contractor
4 Cement shall be issued @ 315/- per Bag & Steel @ 53/- per Kg. at IPH Store Bhatanwali Paonta Sahib.
5 Empty cement bags shall be returned to the Deptt. Otherwise Rs. 2/- per bag shall deducted from the bill.

Executive Engineer,
I&PH Division,
Paonta Sahib.
REVISED SCHEDULE OF QUANTITY Estimated cost Rs. 99190/-
Name of work:- Improvement of Left bank Canal in Tehsil Paonta Sahib Distt. Sirmour (HP) Earnest money Rs.2000/-
(SH:C/o Breast wall at RD 3560 to 3600 to protect the Canal) Time:- Three Months.

S.No Sub-Head and item of work. Qty. Rates, Unit Amount.


1 2 3 4 5 6
1 Cutting in earth work in and disposal of all excavated earth in all respect and as 71.00 Cum. 140.00 Per Cum. 9940.00
per direction of the Engineer-in-charge.
2 Excavation in foundation and trenches etc.in earth work in all kinds of soil such as 21.00 Cum 160.00 P/Cum 3360.00
pick work ,jumper work decomposed conglomerate saturated soil soft and hard
rock upto all leads lifts stacking the excavated soil not more than 3mtr.clear from
the edge of excavation and then returning the stacked soil in 15cm layers when
required in to plinth sides of foundation etc. consolidating each deposited layers
by ramming and watering and then disposing of all surplus excavated earth as
directed with in all leads lifts and as per directions of the Engineer-incharge

3 Providing and laying cement concrete work 1:5:10(1cement:5 sand: 10 graded 75.00 Cum 3000.00 P/Cum 225000.00
stone agg. 40mm nominal size) with 15% plum and curing complete excluding
cost of form work and in retaining walls/ Breast walls, the size of Plums shall
usually be 150mm to 300mm as per PWD specificatioin including all leads lifts
and carriage of material and as per direction of Engineer incharge.
4 Providing form work with steel sheets 3.15mm thick welded with angle iron
30x30x5 mm so as to give rough finish i/c centring shuttering structing and
propping etc. with wooden bettens & Ballies, height or propping & centering
below supporting floor to ceiling not exceeding 4 mtr.and removal of the same for
insitu RCC work and PCC work including all leads lifts and carriage of material at
site & as per direction of Engineer incharge in:-

a) Vertiocal surfaces 203.60 Sqm 200.00 P/Sqm 40720.00


5 Extra carriage of silts/slips from canals of inspection path upto dupling place i.e 92.30 Cum. 215.00 Cum. 19845.00
Nallah of and other forest and as the cas may be by head load upto all leads.lifts
and carriage of materials and as per directions of the Engineer-in-charge.

6 Providing & fixing of HDP pipe for weep hole in retaining wall complete in all
respect and as per diorection of the Engineer-in-charge.
10.00 Mtr. 40.00 P/Rmt. 400.00
TERMS & CONDITIONS 299265.00
1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax & labour cess shall be deducted as per rules.
3 Royality certificate in respect of stone agg. Sand etc. shall be produced by the contractor
4 Cement shall be issued @ 315/- per Bag & Steel @ 53/- per Kg. at IPH Store Bhatanwali Paonta Sahib.
5 Empty cement bags shall be returned to the Deptt. Otherwise Rs. 2/- per bag shall be deducted from the each bill.

Executive Engineer,
I&PH Division,
Paonta Sahib.

REVISED SCHEDULE OF QUANTITY Estimated cost Rs 40418/--


Name of work:- Improvement of Left bank Canal in Tehsil Paonta Sahib Distt. Sirmour (HP) Earnest money Rs.850/-
(SH: Improvement of Cement concrete Lining at RD 5740/0 to 375 Mtr.) Time:- Three Months
S.No Sub-Head and item of work. Qty. Rate, Unit Amount.
1 2 3 4 5 6
1 Dressing of side slopes & preparation of sub grade for lining in cement concrete lining 600.00 Sqm. 20.00 P/ Sqm. 12000.00
complete in all repsect and as per direction of the Engineer-in-charge.
2 Cement concrete lining 15cm thick or less for irrigation channels using cement concrete
1:3:6(1cement:3sand:6graded stone agg. 20mm nominal size)and curing complete
excluding cost of form work included all leads lifts and carriage of material complete in
all respect and as per direction of Engineer-in-charge.

a)Hand mixed concrete lining in bed. 8.44 Cum 2800.00 P/Cum 23632.00
b) Hand mixed concrete lining in side slopes. 36.56 Cum. 2900.00 P/Cum. 106024.00
3 Extra allowance for form work in concrete lining as directed by the Engineer-in-charge 45.00 Cum 130.00 P/Cum 5850.00
including all leads lifts and carriage of matrerials at site complete in all respects on side
slopes as per direction of Engineer in charge.
TOTAL: 147506.00
TERMS & CONDITIONS
1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax & labour cess shall be deducted as per rules.
3 Royality certificate in respect of stone agg. Sand etc. shall be produced by the contractor
4 Cement shall be issued @ 315/- per Bag & Steel @ 53/- per Kg. at IPH Store Bhatanwali Paonta Sahib.
5 Empty cement bags shall be returned to the Deptt. Otherwise Rs. 2/- per bag shall deducted from the bill.

Executive Engineer,
I&PH Division,
Paonta Sahib.
DRAFT SCHEDULE OF QUANTITY Estimated cost Rs 69275/-
Name of work:-C/O LWSS Shilog to village Dhonkadhala in Tehsil Paonta Sahib Distt. Sirmour (HP) Earnest money Rs.1400/-
(SH:-Tapping of additional source Dhalla to Shamoila in GP Shankholi ,C/o RCC Storage Tank 11000 Litres cap. Time:- Three months.
Laying & jointing of GI Pipes of various dias.)
Sr.No. Description. Qty. Rate Rates, Unit Amount.
1 2 3 4 5 6
1 Excavation in foundation and trenches etc.in earth work in all kinds of soil such 18.93 Cum. 92.85 P/Cum 1758.00
as pick work ,jumper work decomposed conglomerate saturated soil soft and
hard rock upto all leads lifts stacking the excavated soil not more than 3mtr.clear
from the edge of excavation and then returning the stacked soil in 15cm layers
when required in to plinth sides of foundation etc. consolidating each deposited
layers by ramming and watering and then disposing of all surplus excavated
earth as directed with in all leads lifts and as per directions of the Engineer-
incharge

2 Providing and laying cement concrete 1:4:8(1cement:4sand:8 graded stone 2.24 Cum 1104.8 P/Cum 2475.00
agg.40mm nominal size)and curing complete excluding the cost of form work in
foundation & plinth including all leads lifts and carriage of material and as per
the directions of Engineer-in-charge.

3 Providing and laying cement concrete work 1:1 1/2:3 (1cement:1 1/2 sand: 3
graded stone agg. 20mm nominal size & curing complete) excluding cost of form
workand reinforcement for RCC work including all leads lifts complete and
carriage of material etc. as per directions of Engineer incharge.

i) In foundation and Plinth 2.26 Cum. 1866.80 P/Cum. 4219.00


ii) In vertical walls any thickness but not less than 0.10 Metres. 5.54 Cum. 1923.00 P/Cum. 10653.00
4 Providing form work with steel sheets 3.15mm thick welded with angle iron
30x30x5 mm so as to give rough finish i/c centring shuttering structing and
propping etc. with wooden bettens & Ballies, height or propping & centering
below supporting floor to ceiling not exceeding 4 mtr.and removal of the same
for insitu RCC work and PCC work.including all leads lifts and carriage of
material at site & as per direction of Engineer in charge in:-

a) Flat surfaces such as soffits of suspended floor roofs landing and like upto 8.31 Sqm. 134.10 P/Sqm. 1114.00
200mm in thickness.

ii) In vertical walls any thickness but not less than 0.10 Metres. 72.65 Sqm. 80.70 P/Sqm. 5863.00
5 Providing and laying cement concrete 1:2:4(1cement:2app.sand: 4 app. graded 1.04 Cum 1658.90 P/Cum 1725.00
stone agg. 20mm nominal size )and curing complete excluding cost of form work
& reinforcement for reinforced work in suspended floors, roofs landing shelves
and their supports balconies, beams, girders bressumers and cantilivers upto to
floor two level in all height and depth, including all leads lifts and carriage of
material at site and as per direction of the Engineer-incharge.

6 Providing Mild Steel/Tor steel reinforcement including bending binding & 507.00 Kg. 20.70 P/kg 10495.00
placing in positing I/c all leads lifts and carriage of material and as per direction
of the Engineer-in-charge.
7 Excavation in drains & channel etc.in earth work in all kinds of soil such as pick 382.50 Cum 75.95 P/Cum 29051.00
work ,jumper work blasting work, decomposed conglomerate saturated soil soft
and hard rock including dressing of sides and beds and prepareation of sub
grade to level or slope including refilling the trenches and disposing of surplus
earth upto all leads,lifts disposed earth to be levelled and neatly dressed
including jungle clearance and as per directions of the Engineer-incharge
8 Laying and jointing of GMS Pipes of various dia in trenches (earth work in trenches to be
measured and paid for seperately) including all leads lifts and carriage of material at site as
per direction of Engineer-in-charge of following dias.

i)15mm dia 650 Rmt 0.50 P/Rmt. 325.00


ii)20mm dia 900 Rmt 0.50 P/Rmt. 450.00
iii) 25mm dia. 600 Rmt. 0.75 P/Rmt. 450.00
iv) 32mm dia. 206 Rmt. 2.10 Per Rmt. 433.00
9 Providing and fixing Peet valve of superiod quality of following diascomplete in all respect
and as per direction of the Engineer-in-charge.
i)15mm dia 1 No. 66.50 Each. 67.00
ii)20mm dia 1 No. 84.60 P/Rmt. 85.00
iii) 25mm dia. 1 No. 111.60 P/Rmt. 112.00
Total: 69275.00
TERMS AND CONDITIONS:-
1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Cement will be issued @ 250/- per bag & steel @ 41/- per Kg. at IPH store Bhatanwali Paonta Sahib.
4 Empty cement bags shall be returned to the deptt. Otherwise Rs. 2/- per bag shall be deducted
5 from the certificate
Royality earch bill of
in the contractor.
respect of stone agg. Sand etc. shall be produced by the contractor
7 GI Pipe shall be issued free of cost from IPH Store Bhatanwali.
8 GI Fitting shall be provided by the contractor. Assistant Engineer,
I&PH Sub Division, Kaffota.
REVISED SCHEDULE OF QUANTITY Estimated cost Rs 53403/-
Name of work:-R/M of GWSS Dhamon GP Poka in Tehsil Paonta Sahib Distt. Sirmour (HP) Earnest money Rs.1100/-
(SH:-C/o RCC collection Tank). Time:- Three months.
Sr.No. Description. Qty. Rate Rates, Unit Amount.
1 2 3 4 5 6
1 Excavation in foundation and trenches etc.in earth work in all kinds of soil such 6.37 Cum. 160.00 P/Cum 1019.00
as pick work ,jumper work decomposed conglomerate saturated soil soft and
hard rock upto all leads lifts stacking the excavated soil not more than 3mtr.clear
from the edge of excavation and then returning the stacked soil in 15cm layers
when required in to plinth sides of foundation etc. consolidating each deposited
layers by ramming and watering and then disposing of all surplus excavated
earth as directed with in all leads lifts and as per directions of the Engineer-
incharge

2 Providing and laying cement concrete 1:4:8(1cement:4sand:8 graded stone 1.59 Cum 2800 P/Cum 4452.00
agg.40mm nominal size)and curing complete excluding the cost of form work in
foundation & plinth including all leads lifts and carriage of material and as per
the directions of Engineer-in-charge.

3 Providing and laying cement concrete work 1:1 1/2:3 (1cement:1 1/2 sand: 3
graded stone agg. 20mm nominal size & curing complete) excluding cost of form
workand reinforcement for RCC work including all leads lifts complete and
carriage of material etc. as per directions of Engineer incharge.

i) In foundation and Plinth 1.59 Cum. 4000.00 P/Cum. 6360.00


ii) In vertical walls any thickness but not less than 0.10 Metres. 2.61 Cum. 4100.00 P/Cum. 10701.00
4 Providing form work with steel sheets 3.15mm thick welded with angle iron
30x30x5 mm so as to give rough finish i/c centring shuttering structing and
propping etc. with wooden bettens & Ballies, height or propping & centering
below supporting floor to ceiling not exceeding 4 mtr.and removal of the same
for insitu RCC work and PCC work.including all leads lifts and carriage of
material at site & as per direction of Engineer in charge in:-

a) Flat surfaces such as soffits of suspended floor roofs landing and like upto 0.80 Sqm. 300.00 P/Sqm. 240.00
200mm in thickness.
ii) In vertical walls any thickness but not less than 0.10 Metres. 87.49 Sqm. 200.00 P/Sqm. 17498.00
5 Providing and laying cement concrete 1:2:4(1cement:2app.sand: 4 app. graded 1.06 Cum 3800.00 P/Cum 4028.00
stone agg. 20mm nominal size )and curing complete excluding cost of form work
& reinforcement for reinforced work in suspended floors, roofs landing shelves
and their supports balconies, beams, girders bressumers and cantilivers upto to
floor two level in all height and depth, including all leads lifts and carriage of
material at site and as per direction of the Engineer-incharge.

6 Providing Mild Steel/Tor steel reinforcement including bending binding & 1164.32 Kg. 54.00 P/kg 62873.00
placing in positing I/c all leads lifts and carriage of material and as per direction
of the Engineer-in-charge.
Total: 107171.00
TERMS AND CONDITIONS:-
1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Cement will be issued @ 250/- per bag & steel @ 41/- per Kg. at IPH store Bhatanwali Paonta Sahib.
4 Empty cement bags shall be returned to the deptt. Otherwise Rs. 2/- per bag shall be deducted
5 from the certificate
Royality earch bill of
in the contractor.
respect of stone agg. Sand etc. shall be produced by the contractor
6 Contractor shall be responsible for watch 7 ward of store.
Executive Engineer,
I&PH Division,
Paonta Sahib.
ANALYSIS OF RATES. Unit Qty. rate
1 Loading/Un loading in weagons/non tipping trucks within 20
mtrs. leads cement bags(including stacking) detail of cost of for
one bag 50 Kg. weight

beldar. 0.01 Each. 233.33

10% contractor profit & 5% over head charges.

Cost per
bag.
Cost per Tonne.

Assistant Engineer,
I&PH Sub Division,
Paonta Sahib.

ANALYSIS OF RATES. Unit Qty. rate


1 Loading/Un loading in weagons/non tipping trucks within 20
mtrs. leads structure steels G.I./CC, RCC Pipes upto 500mm dia
metres and steel , special C.I.covers stacks other casting slurry
items.

beldar. 0.5300 Each. 233.33


10% contractor profit & 5% over head charges.

Cost per Tonne.

Assistant Engineer,
I&PH Sub Division,
Paonta Sahib.

ANALYSIS OF RATES. Unit Qty. rate


1 Loading/Un loading in weagons/non tipping trucks within 20
mtrs. leads structure steels G.I./CC, RCC Pipes upto 500mm dia
metres and special C.I.covers stacks other casting slurry items.

beldar. 0.35 Each. 233.33


10% contractor profit & 5% over head charges.

Cost per Tonne.

Assistant Engineer,
I&PH Sub Division,
Paonta Sahib.
Cost.

1.87

0.28

Total: 2.15
43.00

Assistant Engineer,
I&PH Sub Division,
Paonta Sahib.

Cost.

123.66
18.55
Total: 142.21

142.21

Assistant Engineer,
I&PH Sub Division,
Paonta Sahib.

Cost.

81.67
12.25
Total: 93.92

Total: 93.92

Assistant Engineer,
I&PH Sub Division,
Paonta Sahib.
REVISED SCHEDULE OF QUANTITY Estimated cost Rs 99548/-
Name of work:-R/M of LIS Thakur Gwana in GP Bhanet Haldwari in Tehsil Paonta Sahib Distt. Sirmour (HP) Earnest money Rs.2000/-
(SH:-Provding irrigation facility to left out CCA of village Gwana by Laying &jointing of GMS pipe in distribution . Time:- One month.
system & C/o 3 Nos Outlet.
Sr.No. Description. Qty. Rate Rates, Unit Amount.
1 2 3 4 5 6
1 Excavation in drains & channel etc.in earth work in all kinds of soil such as pick 273.00 Cum. 170.00 P/Cum. 46410.00
work ,jumper work blasting work, decomposed conglomerate saturated soil soft
and hard rock including dressing of sides and beds and prepareation of sub
grade to level or slope including refilling the trenches and disposing of surplus
earth upto all leads,lifts disposed earth to be levelled and neatly dressed
including jungle clearance and as per directions of the Engineer-incharge

2 Providing laying & jointing of GMS pipes of following dia & class including all
leads,lifts and carriage of material and earth work etc. complete in all respect
complete in all respect and as per direction of the Engineer-in-charge.

i) 100 mm dia. 150.00 Rmt. 70.00 P/Rmt. 10500.00


ii) 80mm dia. 750.00 Rmt. 58.00 P/Rmt. 43500.00
3 Providing and fixing of MS flanges (IS 6392-1971) of table -17 confirm to IS 816-
1965 electric rod as per IS-814-1967 including required no of nut & botl as per
IS 1369-1967 and 3mm thick AF jointing gasket confirming to IS 2712-1965.
The weldingf of flange should be done in two layer both side and one layer inner
side to make the joints air tight and to entire material at site and as per
satisfaction of the Engineer incharge.

i) 80mm dia Table-5. 42.00 pair. 1250.00 Each. 52500.00


4 Butt welding ion pipes including cutting welding and making bends of required 106.00 No. 170.00 Each. 18020.00
degree for 80mm dia medium class pipe (excluding cost of pipes, nut & bolts to
be measured and paid for separately) complete in all respect and as per
direction of the Engineer-in-charge. GMS Pipe of 80 mm dia.

5 Providing and fixing of CI sluice valves of Kirloskar/Leader make & relevant ISS 4.00 No. 14000.00 Each. 56000.00
complete in all respect including all leads,lifts and carriage of material at site
and as direction by the Engineer-in-charge.80mm dia.

6 Providing and fixing of pipe fitting material of approved make & relevant ISS 2.00 No 1380.00 Each. 2760.00
complete in all respect,including all leads,lifts and carriage of material and as
per direction of the Engineer-in-charge. GI Tee 80mm dia.

7 Excavation in foundation and trenches etc.in earth work in all kinds of soil such 7.68 Cum. 170.00 P/Cum 1306.00
as pick work ,jumper work decomposed conglomerate saturated soil soft and
hard rock upto all leads lifts stacking the excavated soil not more than 3mtr.clear
from the edge of excavation and then returning the stacked soil in 15cm layers
when required in to plinth sides of foundation etc. consolidating each deposited
layers by ramming and watering and then disposing of all surplus excavated
earth as directed with in all leads lifts and as per directions of the Engineer-
incharge

8 Providing and laying cement concrete 1:4:8(1cement:4sand:8 graded stone 1.15 Cum 3200.00 P/Cum 3680.00
agg.40mm nominal size)and curing complete excluding the cost of form work in
foundation & plinth including all leads lifts and carriage of material and as per
the directions of Engineer-in-charge.

9 Providing Mild Steel/Tor steel reinforcement including bending binding & 184.00 Kg. 54.00 P/kg 9936.00
placing in positing I/c all leads lifts and carriage of material and as per direction
of the Engineer-in-charge.
10 Providing and laying cement concrete 1:2:4(1cement:2app.sand: 4 app. graded 0.38 Cum. 395.00 Per Cum. 150.00
stone agg. 20mm nominal size )and curing complete excluding cost of form work
laid in one layer finished even a coat of neat cement 40mm thick including all
leads lifts and carriage of material at site and as per direction of the Engineer-
incharge.

11 Providing form work with steel sheets 3.15mm thick welded with angle iron
30x30x5 mm so as to give rough finish i/c centring shuttering structing and
propping etc. with wooden bettens & Ballies, height or propping & centering
below supporting floor to ceiling not exceeding 4 mtr.and removal of the same
for insitu RCC work and PCC work.including all leads lifts and carriage of
material at site & as per direction of Engineer in charge in:-

i) In vertical walls any thickness but not less than 0.10 Metres. 27.60 Sqm. 200.00 P/Sqm. 5520.00
12 Providing and laying cement concrete 1:2:4(1cement:2app.sand: 4 app. graded 2.28 Cum. 4200.00 Per Cum. 9576.00
stone agg. 20mm nominal size )and curing complete excluding cost of form work
& reinforcement for reinforced work in suspended floors, roofs landing shelves
and their supports balconies, beams, girders bressumers and cantilivers upto to
floor two level in all height and depth, including all leads lifts and carriage of
material at site and as per direction of the Engineer-incharge.

Total: 259858.00
TERMS AND CONDITIONS:-
1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Cement will be issued @ 250/- per bag & steel @ 41/- per Kg. at IPH store Bhatanwali Paonta Sahib.
4 Empty cement bags shall be returned to the deptt. Otherwise Rs. 2/- per bag shall be deducted from
5 the earchcertificate
Royality bill of thein
contractor.
respect of stone agg. Sand etc. shall be produced by the contractor
6 Contractor shall be responsible for watch 7 ward of store.
Executive Engineer,
I&PH Division,
Paonta Sahib.
REVISED SCHEDULE OF QUANTITY Estimated cost Rs 54488/-
Name of work:-Restoration of Rain damages to various GWSS of Census village Korga CV Sankholi in Tehsil Earnest money Rs.1100/-
Paonta Sahib Distt. Sirmour (HP) (SH:-C/o 13 Nos Intake structures). Time:- Three months.
Sr.No. Description. Qty. Rate Rates, Unit Amount.
1 2 3 4 5 6
1 Excavation in foundation and trenches etc.in earth work in all kinds of soil such 19.37 Cum. 155.00 P/Cum 3002.00
as pick work ,jumper work decomposed conglomerate saturated soil soft and
hard rock upto all leads lifts stacking the excavated soil not more than 3mtr.clear
from the edge of excavation and then returning the stacked soil in 15cm layers
when required in to plinth sides of foundation etc. consolidating each deposited
layers by ramming and watering and then disposing of all surplus excavated
earth as directed with in all leads lifts and as per directions of the Engineer-
incharge

2 Providing and laying cement concrete 1:4:8(1cement:4sand:8 graded stone 3.33 Cum 3300 P/Cum 10989.00
agg.40mm nominal size)and curing complete excluding the cost of form work in
foundation & plinth including all leads lifts and carriage of material and as per
the directions of Engineer-in-charge.

3 Providing and laying cement concrete work 1:1 1/2:3 (1cement:1 1/2 sand: 3
graded stone agg. 20mm nominal size & curing complete) excluding cost of form
workand reinforcement for RCC work including all leads lifts complete and
carriage of material etc. as per directions of Engineer incharge.

i) In foundation and Plinth 4.99 Cum. 5100.00 P/Cum. 25449.00


ii) In vertical walls any thickness but not less than 0.10 Metres. 8.97 Cum. 5200.00 P/Cum. 46644.00
4 Providing form work with steel sheets 3.15mm thick welded with angle iron
30x30x5 mm so as to give rough finish i/c centring shuttering structing and
propping etc. with wooden bettens & Ballies, height or propping & centering
below supporting floor to ceiling not exceeding 4 mtr.and removal of the same
for insitu RCC work and PCC work.including all leads lifts and carriage of
material at site & as per direction of Engineer in charge in:-

a) Flat surfaces such as soffits of suspended floor roofs landing and like upto 10.37 Sqm. 300.00 P/Sqm. 3111.00
200mm in thickness.
ii) In vertical walls any thickness but not less than 0.10 Metres. 16.40 Sqm. 200.00 P/Sqm. 3280.00
5 Providing and laying cement concrete 1:2:4(1cement:2app.sand: 4 app. graded 1.94 Cum 4700.00 P/Cum 9118.00
stone agg. 20mm nominal size )and curing complete excluding cost of form work
& reinforcement for reinforced work in suspended floors, roofs landing shelves
and their supports balconies, beams, girders bressumers and cantilivers upto to
floor two level in all height and depth, including all leads lifts and carriage of
material at site and as per direction of the Engineer-incharge.

6 Providing Mild Steel/Tor steel reinforcement including bending binding & 795.10 Kg. 64.00 P/kg 50886.00
placing in positing I/c all leads lifts and carriage of material and as per direction
of the Engineer-in-charge.
Total: 152479.00
TERMS AND CONDITIONS:-
1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Cement will be issued @ 315/- per bag & steel @ 53/- per Kg. at IPH store Bhatanwali Paonta Sahib.
4 Empty cement bags shall be returned to the deptt. Otherwise Rs. 2/- per bag shall be deducted
5 from the certificate
Royality earch bill of
in the contractor.
respect of stone agg. Sand etc. shall be produced by the contractor
6 Contractor shall be responsible for watch 7 ward of store.
Executive Engineer,
I&PH Division,
Paonta Sahib.

REVISED SCHEDULE OF QUANTITY Estimated cost Rs 98500/-


Name of work:-Restoration of Rain damages to various schemes under I&PH Sub Division Kaffota in Tehsil Earnest money Rs.2500/-
Paonta Sahib Distt. Sirmour (HP) (SH:-Providing and supplying of tapes & altimeter) Time:- One month.
Sr.No. Description. Qty. Rate Rates, Unit Amount.
1 2 3 4 5 6
1 Providing and supplying of Altimeter(Electronic) Barigo latest count 1 meter 5 Nos. 35000.00 Each. 175000.00
range(-) 500 to (+) 60000 meter full automatic very accurate weight -80 gm.size
120x45x15mm respectively including all leads,lifts and carriage of material and
as per directions of the Engineer-in-charge.

2 Providing and supplying of metalic tapes complete in all respect including all
leads,lifts and carriage of material and as per the directions of the Engineer-in-
charge.

i) 20 meter. 5 Nos. 450.00 Each. 2250.00


ii) 30 Meter. 5 Nos. 550.00 Each. 2750.00
Total: 180000.00
TERMS AND CONDITIONS:-
1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Nothing shall be paid for rejected/defected material.
4 The contractor will be fully responsible for watch & ward of material at site of work.

Executive Engineer,
I&PH Division,
Paonta Sahib.
REVISED SCHEDULE OF QUANTITY Estimated cost Rs 90347/-
Name of work:- Providing Flood Protection work to vill. Rampur Majri in Tehsil Paonta Sahib Distt. Earnest money Rs.1810/-
Sirmour (HP) (SH: C/o Wire crate from RD 2180 to 2200 Mtr. On RHS) Time:- One Month .
S.No Sub-Head and item of work. Qty. Rates, Unit Amount.
1 Excavation in earth work in all kinds of soil and disposal of all excavated 57.40 Cum 140.00 P/Cum 8036.00
earth upto all leads lifts disposed earth to be levelled and neatly dressed
including all leads, lifts and carriage of material and as per directions of the
Engineer-in-charge

2 Wire crates made of G.I.wire filled with boulder/hard stone of approved 116.15 Cum. 925.00 P/Cum. 107439.00
quality with square cut faces against the wire having rounded/rectangular
shape weight of stones not less than 18 Kg. free from soft
spots,cracks,cavaties etc.(Wire crate to be measured and paid for
separately)including all leads,lifts and carriage of material at site as direction
of the Engineer-in-charge. (Double Knot)

3 Wire crates of G.I.wire filled with boulder with square cut faces against the 577.84 Sqm. 36.00 P/Sqm. 20802.00
wire G.I.wire 5mm thick corresponding to SWG 6 with 15cmx15cm
mesh(boulder filling to be measured and paid for separately including all
leads,lifts and carriage of materials at site and as per directions of the
Engineer-in-charge (L.Rate)

TOTAL: 136277.00
TERMS AND CONDITIONS:-
1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Royality certificate in respect of stone agg. Sand etc. shall be produced by the contractor
4 G.I.wire shall be issued free of cost from IPH store Bhatanwali.
5 Boulder shall not be less than 18 Kg. & the stone should be free from cracks and cavities.
Executive Engineer,
I&PH Division,
Paonta Sahib.
REVISED SCHEDULE OF QUANTITY Estimated cost Rs 81026/-
Name of work:- Providing Flood Protection work to vill. Rampur Majri in Tehsil Paonta Sahib Distt. Earnest money Rs.1650/-
Sirmour (HP) (SH: C/o Wire crate from RD 2200 to 2218 Mtr. on RHS) Time:- One Month .
S.No Sub-Head and item of work. Qty. Rates, Unit Amount.
1 Excavation in earth work in all kinds of soil and disposal of all excavated 51.66 Cum 140.00 P/Cum 7232.00
earth upto all leads lifts disposed earth to be levelled and neatly dressed
including all leads, lifts and carriage of material and as per directions of the
Engineer-in-charge

2 Wire crates made of G.I.wire filled with boulder/hard stone of approved 104.54 Cum. 925.00 P/Cum. 96700.00
quality with square cut faces against the wire having rounded/rectangular
shape weight of stones not less than 18 Kg. free from soft
spots,cracks,cavaties etc.(Wire crate to be measured and paid for
separately)including all leads,lifts and carriage of material at site as direction
of the Engineer-in-charge. (Double Knot)

3 Wire crates of G.I.wire filled with boulder with square cut faces against the 505.61 Sqm. 36.00 P/Sqm. 18202.00
wire G.I.wire 5mm thick corresponding to SWG 6 with 15cmx15cm
mesh(boulder filling to be measured and paid for separately including all
leads,lifts and carriage of materials at site and as per directions of the
Engineer-in-charge (L.Rate)

TOTAL: 122134.00
TERMS AND CONDITIONS:-
1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Royality certificate in respect of stone agg. Sand etc. shall be produced by the contractor
4 G.I.wire shall be issued free of cost from IPH store Bhatanwali.
5 Boulder shall not be less than 18 Kg. & the stone should be free from cracks and cavities.
Executive Engineer,
I&PH Division,
Paonta Sahib.
REVISED SCHEDULE OF QUANTITY Estimated cost Rs :45183/-
Name of work:- Providing Flood Protection work to vill.Jamnighat in Tehsil Paonta Sahib Distt. Earnest money Rs. 900/-
Sirmour (HP) (SH: C/o Wire crate) part-Ist. Time:- One Month .
S.No Sub-Head and item of work. Qty. Rates, Unit Amount.
1 Excavation in earth work in all kinds of soil and disposal of all excavated 20.25 Cum 140.00 P/Cum 2835.00
earth upto all leads lifts disposed earth to be levelled and neatly dressed
including all leads, lifts and carriage of material and as per directions of the
Engineer-in-charge

2 Wire crates made of G.I.wire filled with boulder/hard stone of approved 59.46 Cum. 925.00 P/Cum. 55001.00
quality with square cut faces against the wire having rounded/rectangular
shape weight of stones not less than 18 Kg. free from soft
spots,cracks,cavaties etc.(Wire crate to be measured and paid for
separately)including all leads,lifts and carriage of material at site as direction
of the Engineer-in-charge. (Double Knot)

3 Wire crates of G.I.wire filled with boulder with square cut faces against the 278.26 Sqm. 36.00 P/Sqm. 10017.00
wire G.I.wire 5mm thick corresponding to SWG 6 with 15cmx15cm
mesh(boulder filling to be measured and paid for separately including all
leads,lifts and carriage of materials at site and as per directions of the
Engineer-in-charge (L.Rate)

TOTAL: 67853.00
TERMS AND CONDITIONS:-
1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Royality certificate in respect of stone agg. Sand etc. shall be produced by the contractor
4 G.I.wire shall be issued free of cost from IPH store Bhatanwali.
5 Boulder shall not be less than 18 Kg. & the stone should be free from cracks and cavities.
Executive Engineer,
I&PH Division,
Paonta Sahib.
REVISED SCHEDULE OF QUANTITY Estimated cost Rs 81026/-
Name of work:- Providing Flood Protection work to vill. Rampur Majri in Tehsil Paonta Sahib Distt. Earnest money Rs.1650/-
Sirmour (HP) (SH: C/o Wire crate from RD 2238 to 2256 Mtr. on RHS) Time:- One Month .
S.No Sub-Head and item of work. Qty. Rates, Unit Amount.
1 Excavation in earth work in all kinds of soil and disposal of all excavated 51.66 Cum 140.00 P/Cum 7232.00
earth upto all leads lifts disposed earth to be levelled and neatly dressed
including all leads, lifts and carriage of material and as per directions of the
Engineer-in-charge

2 Wire crates made of G.I.wire filled with boulder/hard stone of approved 104.54 Cum. 925.00 P/Cum. 96700.00
quality with square cut faces against the wire having rounded/rectangular
shape weight of stones not less than 18 Kg. free from soft
spots,cracks,cavaties etc.(Wire crate to be measured and paid for
separately)including all leads,lifts and carriage of material at site as direction
of the Engineer-in-charge. (Double Knot)

3 Wire crates of G.I.wire filled with boulder with square cut faces against the 505.61 Sqm. 36.00 P/Sqm. 18202.00
wire G.I.wire 5mm thick corresponding to SWG 6 with 15cmx15cm
mesh(boulder filling to be measured and paid for separately including all
leads,lifts and carriage of materials at site and as per directions of the
Engineer-in-charge (L.Rate)

TOTAL: 122134.00
TERMS AND CONDITIONS:-
1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Royality certificate in respect of stone agg. Sand etc. shall be produced by the contractor
4 G.I.wire shall be issued free of cost from IPH store Bhatanwali.
5 Boulder shall not be less than 18 Kg. & the stone should be free from cracks and cavities.
Executive Engineer,
I&PH Division,
Paonta Sahib.
REVISED SCHEDULE OF QUANTITY Estimated cost Rs 19784/-
Name of work: Restoration of Rain damages to FIS Janjhali Bherewali in GP Poka in Tehsil Paonta Sahib Earnest money Rs.400/-
Distt. Sirmour (HP)(SH:Removal of silt/slips at various RD's) Time:- Three Months
Sr.No. Description. Qty. Rate. Unit Amount.
1 Removal of silt/slips in all kind of soil including saturated soil but excluding 348.57 Cum 130.00 P/Cum 45314.00
boulders and rocky portion requiring blasting upto a distance of 20 metres
disposing of unserviceable materials stacking the serviceable materials and
neatly dressed the surface complete in all respect including all leads,lifts and
carriage of material and as per direction of the Engineer-in-charge.

Total: 45314.00
TERMS AND CONDITIONS:-
1 The work shall be executed as per IPH/PWD specification and
instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Nothing shall be paid for rejected/defective work.
Executive Engineer,
I&PH Division, Paonta Sahib.

REVISED SCHEDULE OF QUANTITY Estimated cost Rs 98576/-


Name of work:- Providing Flood Protection work to vill. Rampur Majri in Tehsil Paonta Sahib Distt. Earnest money Rs.2000/-
Sirmour (HP) (SH: C/o Wire crate from RD 2180 to 2200 Mtr. On RHS) Time:- One Month .
S.No Sub-Head and item of work. Qty. Rates, Unit Amount.
1 Excavation in earth work in all kinds of soil and disposal of all excavated 54.00 Cum 140.00 P/Cum 7560.00
earth upto all leads lifts disposed earth to be levelled and neatly dressed
including all leads, lifts and carriage of material and as per directions of the
Engineer-in-charge
2 Wire crates made of G.I.wire filled with boulder/hard stone of approved 128.25 Cum. 925.00 P/Cum. 118631.00
quality with square cut faces against the wire having rounded/rectangular
shape weight of stones not less than 18 Kg. free from soft
spots,cracks,cavaties etc.(Wire crate to be measured and paid for
separately)including all leads,lifts and carriage of material at site as direction
of the Engineer-in-charge. (Double Knot)

3 Wire crates of G.I.wire filled with boulder with square cut faces against the 615.60 Sqm. 36.00 P/Sqm. 22162.00
wire G.I.wire 5mm thick corresponding to SWG 6 with 15cmx15cm
mesh(boulder filling to be measured and paid for separately including all
leads,lifts and carriage of materials at site and as per directions of the
Engineer-in-charge (L.Rate)

TOTAL: 148353.00
TERMS AND CONDITIONS:-
1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Royality certificate in respect of stone agg. Sand etc. shall be produced by the contractor
4 G.I.wire shall be issued free of cost from IPH store Bhatanwali.
5 Boulder shall not be less than 18 Kg. & the stone should be free from cracks and cavities.
Executive Engineer,
I&PH Division,
Paonta Sahib.

SCHEDULE OF QUANTITY Estimated cost Rs 98258/-


Name of work: C/o FIS Malaun in Tehsil Paonta Sahib Distt. Sirmour (HP) Earnest money Rs.2000/-
(SH:Removal of slips/silt at various RD's) Time:- Three Months
Sr.No. Description. Qty. Rate. Unit Amount.
1 Removal of silt/slips in all kind of soil including saturated soil but excluding 1650.00 Cum P/Cum
boulders and rocky portion requiring blasting upto a distance of 20 metres
disposing of unserviceable materials stacking the serviceable materials and
neatly dressed the surface complete in all respect including all leads,lifts and
carriage of material and as per direction of the Engineer-in-charge.
Total:
TERMS AND CONDITIONS:-
1 The work shall be executed as per IPH/PWD specification and
instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Nothing shall be paid for rejected/defective work.
Assistant Engineer,
I&PH Sub Division,
Kaffota.
DRAFT SCHEDULE OF QUANTITY
Name of work:- Aug. of LWSS Rangwa Pabhar & adjoining villages in Tehsil Paonta Sahib.
Distt. Sirmour (HP)(SH:Supply of various type of electrical equipment.)for Stage 2nd

S.No Sub-Head and item of work. Qty.


1 2 3
1 Providing and fixing of M.C.B 3 phase 600 volt 650 volt with thimble in copper 1
complete in all respect and to the entire satisfaction of Engineer-in-charge

2 Providing and fixing Submersibel cable 25mm2 complete in all respect and to 50
the entire satisfaction of Enngineer-in-charge including all leads,lifts and
carriage of material

3 Providing and fixing of Kit Kat of 1000 AMP complete in all respect and as per 3
direction of the Engineer-in-charge.
TERMS & CONDITIONS
1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-
2 charge.
Security,Sale tax & Income tax & labour cess shall be deducted as per rules.
3 The material will be received in good condition ..
4 Nothing shall be paid for rejected materials.
Estimated Cost: 57400/-
Estimated Cost: 1200/-
Time: Two Months.

Qty. Rates, Unit Amount.


4 5 6
No. 39900.00 Each. 39900.00

Mtr. 245.00 Per Mtr. 12250.00

Nos. 1750.00 Each. 5250.00

Total: 57400.00
e Engineer-in-

Assistant Engineer,
I&PH Sub Division,
Kaffota.
REVISED SCHEDULE OF QUANTITY Estimated cost Rs. 73812/-
Name of work:- Providing Flood Protection work to cultivated land of Shri Shamsher Singh , Sukhdev ,Sh.Prem Pal &Earnest money Rs.1500/-
Sh.Prem Prem Pal & Sh. Sandeep & others R/O Thakur Basti village Mohrar Giri Nagar in Tehsil Paonta Time:- Three Months.
Distt. Sirmour (HP)
S.No Sub-Head and item of work. Qty. Rates, Unit
1 Excavation in foundation and trenches etc.in earth work in all kinds of soil such as pick work 23.63 Cum 160.00 P/Cum
,jumper work decomposed conglomerate saturated soil soft and hard rock upto all leads lifts
stacking the excavated soil not more than 3mtr.clear from the edge of excavation and then
returning the stacked soil in 15cm layers when required in to plinth sides of foundation etc.
consolidating each deposited layers by ramming and watering and then disposing of all
surplus excavated earth as directed with in all leads lifts and as per directions of the
Engineer-incharge

2 Providing form work with steel sheets 3.15mm thick welded with angle iron 30x30x5 mm so
as to give rough finish i/c centring shuttering structing and propping etc. with wooden
bettens & Ballies, height or propping & centering below supporting floor to ceiling not
exceeding 4 mtr.and removal of the same for insitu RCC work and PCC work including all
leads lifts and carriage of material at site & as per direction of Engineer incharge in:-

a) Vertiocal surfaces 106.02 Sqm 200.00 P/Sqm


3 Providing and laying cement concrete work 1:5:10(1cement:5 sand: 10 graded stone agg. 62.55 Cum 3300.00 P/Cum
40mm nominal size) with 15% plum and curing complete excluding cost of form work and
in retaining walls/ Breast walls, the size of Plums shall usually be 150mm to 300mm as per
PWD specificatioin including all leads lifts and carriage of material and as per direction of
Engineer incharge.

TOTAL:
TERMS & CONDITIONS
1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax & labour cess shall be deducted as per rules.
3 Royality certificate in respect of stone agg. Sand etc. shall be produced by the contractor
4 Cement shall be issued @ 315/- per Bag & Steel @ 53/- per Kg. at IPH Store Bhatanwali Paonta Sahib.
5 Empty cement bags shall be returned to the Deptt. Otherwise Rs. 2/- per bag shall deducted
from the bill. Executive Engineer,
I&PH Division,
Paonta Sahib.

REVISED SCHEDULE OF QUANTITY Estimated cost Rs. 90752/-


Name of work:- Resoration of Rain damages Giri Irrigation Project Majra in Tehsil Paonta Sahib Distt. Earnest money Rs.1850/-
Sirmour (HP) (SH: C/O Retaining wall to protect the cultivated land & Residential Houses at Misserwala Time:- Two Months.
Ka Khalla near houses of Shri Alamgir ,Iqbal, Yasin & Shedu Khan )Right side of canal.
S.No Sub-Head and item of work. Qty. Rates, Unit
1 Excavation in foundation and trenches etc.in earth work in all kinds of soil such as pick work 21.94 Cum 160.00 P/Cum
,jumper work decomposed conglomerate saturated soil soft and hard rock upto all leads lifts
stacking the excavated soil not more than 3mtr.clear from the edge of excavation and then
returning the stacked soil in 15cm layers when required in to plinth sides of foundation etc.
consolidating each deposited layers by ramming and watering and then disposing of all
surplus excavated earth as directed with in all leads lifts and as per directions of the
Engineer-incharge

2 Providing form work with steel sheets 3.15mm thick welded with angle iron 30x30x5 mm so
as to give rough finish i/c centring shuttering structing and propping etc. with wooden
bettens & Ballies, height or propping & centering below supporting floor to ceiling not
exceeding 4 mtr.and removal of the same for insitu RCC work and PCC work including all
leads lifts and carriage of material at site & as per direction of Engineer incharge in:-

a) Vertiocal surfaces 196.00 Sqm 200.00 P/Sqm


3 Providing and laying cement concrete work 1:5:10(1cement:5 sand: 10 graded stone agg. 76.05 Cum 2900.00 P/Cum
40mm nominal size) with 15% plum and curing complete excluding cost of form work and
in retaining walls/ Breast walls, the size of Plums shall usually be 150mm to 300mm as per
PWD specificatioin including all leads lifts and carriage of material and as per direction of
Engineer incharge.

TOTAL:

TERMS & CONDITIONS


1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax & labour cess shall be deducted as per rules.
3 Royality certificate in respect of stone agg. Sand etc. shall be produced by the contractor
4 Cement shall be issued @ 315/- per Bag & Steel @ 53/- per Kg. at IPH Store Bhatanwali Paonta Sahib.
5 Empty cement bags shall be returned to the Deptt. Otherwise Rs. 2/- per bag shall deducted
from the bill. Executive Engineer,
I&PH Division,
Paonta Sahib.
d cost Rs. 73812/-
money Rs.1500/-
hree Months.

Amount.
3781.00

21204.00
206415.00

231400.00
Executive Engineer,
I&PH Division,
Paonta Sahib.

d cost Rs. 90752/-


money Rs.1850/-
wo Months.

Amount.
3510.00

39200.00
220545.00

263255.00

Executive Engineer,
I&PH Division,
Paonta Sahib.
REVISED SCHEDULE OF QUANTITY Estimated cost Rs 57708/-
Name of work: Providing LWSS to PC habitation Misserwala KiyardaKufer Paniyali GP Banour in Tehsil Earnest money Rs.1200/-
Paonta Sahib Distt.ofSirmour
(SH: Construction (HP) Tank & laying of Main line)
RCC collection Time:- 15 Days.
S.No Sub-Head and item of work. Qty. Rates, Unit
1 2 3 4 5
1 Excavation in foundation and trenches etc.in earth work in all kinds of soil such as 1.67 Cum 160.00 P/Cum
pick work ,jumper work decomposed conglomerate saturated soil soft and hard rock
upto all leads lifts stacking the excavated soil not more than 3mtr.clear from the edge
of excavation and then returning the stacked soil in 15cm layers when required in to
plinth sides of foundation etc. consolidating each deposited layers by ramming and
watering and then disposing of all surplus excavated earth as directed with in all leads
lifts and as per directions of the Engineer-incharge

2 Cutting in earth work lift upto 1.5 mtr. Stacking the excavated soil not more than 3 mtr. 6.07 Cum. 140.00 Per Cum.
Clear from the edge of excavation and then returning the stacked soil in 15 cm. layers
when required into plinths side of foundation etc. consoidating each deposited layers
by ramming and watering and then disosing of all durplus excavated earth as directed
of the Engineer-in- charge hard rock

3 Providing and laying cement concrete 1:2:4(1cement:2sand:4 graded stone agg.20mm 7.74 Cum 4000.00 P/Cum
nominal size)and curing complete excluding the cost of form work in foundation &
plinth including all leads lifts and carriage of material and as per the directions of
Engineer-in-charge.

4 Dismentalling of existing GMS pipe at site of following diua as directed by the 920 Rmt. 7.00 Per Rmt.
Engineer-in-charge.40mm dia.
5 Relaying and jointing of GMS Pipe available after dismentalling of following dia and as 720 Rmt. 22.00 Per Rmt.
per direction of the Engineer-in-charge. 40mm dia.
6 Laying and jointing of GMS Pipes of various dia in trenches (earth work in trenches to
be measured and paid for seperately) including all leads lifts and carriage of material
at site as per direction of Engineer-in-charge of following dias.

i) 40mm dia. 210 Rmt. 22.00 P/Rmt.


7 Providing and fixing of M.S.Socket 100mm dia welded with MS angle iron complete in 62 Nos. 35.00 Each.
all respect and as per direction of the Engineer-in-charge.
8 Providing and fixing of M.S.angle iron 40x40x5mm dia welded complete in all respect 1.86 Qntl. 7800.00 Per Qntl.
and as per direction of the Engineer-in-charge.

9 Providing and fixing of G.I.Union 40mm dia complete in all respect and as per 10 Nos. 250.00 Each.
direction of the Engineer-in-charge.

10 Providing and fixing of G.I.Elbow 40mm dia complete in all respect and as per 25 Nos. 150.00 Each.
direction of the Engineer-in-charge.
11 Providing and fixing of G.I.Nipple 40mm dia complete in all respect and as per 32 Nos. 80.00 Each.
direction of the Engineer-in-charge.
Total:
TERMS & CONDITIONS
1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax & labour cess shall be deducted as per rules.
3 Royality certificate in respect of stone agg. Sand etc. shall be produced by the contractor
4 Cement shall be issued @ 315/- per Bag & Steel @ 53/- per Kg. at IPH Store Bhatanwali Paonta Sahib.
5 Empty cement bags shall be returned to the Deptt. Otherwise Rs. 2/- per bag shall
deducted from the bill. Executive Engineer,
I&PH Division,
Paonta Sahib.
d cost Rs 57708/-
money Rs.1200/-

Amount.
6
267.00

850.00

30960.00

6440.00

15840.00
4620.00
2170.00

14508.00

2500.00

3750.00

2560.00

84465.00

Executive Engineer,
I&PH Division,
Paonta Sahib.
DRAFT SCHEDULE OF QUANTITY Estimated cost Rs 10465/-
Name of work: R/M OF Left Bank Canal in Tehsil Paonta Sahib Distt. Sirmour (HP) Earnest money Rs.300/-
(SH: Repair of7.50 HP Jyoti make Pump Motor at RD 14220 Mtr.(Toka Nagla) Time:- 15 Days.
S.No Sub-Head and item of work. Qty. Rates, Unit Amount.
1 2 3 4 5 6
1 Repair of 7.50 HP motor Jyoti make with copper wire re-winding etc. including 7.50 HP 630.00 P/HP 4725.00
varnishing complete in all respect.
2 Providing and fixing of Ball Bearing No.6308 complete in all resepct and as per direction of 2 Nos. 665 Each. 1330.00
the Engineer-in-charge.
3 Repair of Balancing Rotor complete in all respect. 1 job. 1260 Per job. 1260.00
4 Providing and fixing of water seal 36x80x10 complete in all respect and as per direction of the 1 job. 350 Per job. 350.00
Engineer-in-charge.
5 Providing and ftting of gland dori complete in all respect and as per direction of the Engineer- 1 job. 210 Per job. 210.00
in-charge.
6 Providing and fixing of Foot valve 80mm dia complete in all repsect and as per direction of 1 No. 1540 Each. 1540.00
the Engineer-in-charge.
7 Carriage of motor & Pump site to wokshop and workshop to site of work complete in all 1 job. 1050 Per Job. 1050.00
respect and as per direction of the Engineer-in-charge.

TERMS AND CONDITIONS Total: 10465.00


1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Nothing shall be paid for rejected/defective work.

Assistant Engineer,
Giri Irrig. Sub Division,

Patlion
DRAFT SCHEDULE OF QUANTITY Estimated cost Rs 95115/-
Name of work:-R/M of various LWSS Kamroo Section Tehsil Paonta Sahib Distt. Sirmour (HP) Earnest money Rs.2000/-
(SH: Prov. & supplying of Cast Iron sluice valves) Time:- 15 Days.
S.No Sub-Head and item of work. Qty. Rates, Unit
1 2 3 4 5
1 Providing and supplying of cast Iron sluic valves of BIR/Kartart/Pelicon male class PN 1.00
with flange table-17 including cost of Nut & bolts & gaskets. The dia of valves as mentioned
below in all leads,lifts and carriage of material and to the entire satisfaction of the Engineer-
in-charge.

1) 80mm dia. 4 Nos. 5827.32 Each.


ii) 65mm dia. 5 Nos. 5150.41 Each.
iii) 50mm dia. 6 Nos. 3988.99 Each.
iv) 40mm dia. 6 Nos. 3686.61 Each.

TERMS & CONDITIONS Total:


1 The work shall be executed as per IPH/PWD specification and instructions of the
Engineer-in-charge.
2 Sale tax & Income tax & labour cess shall be deducted as per rules.

Assistant Engineer,
I&PH Sub Division,
Kaffota.
DRAFT SCHEDULE OF QUANTITY Estimated cost Rs 92314/-
Name of work:-R/M of various GWSS/LWSS under IPH Sub Division Kaffota Secion Jakhana )in Tehsil Paonta Earnest money Rs.2000/-
Sahib Distt. Sirmour (HP) (SH: Prov. & supplying of various type of fitting) Time:- 15 Days.
S.No Sub-Head and item of work. Qty. Rates, Unit
1 2 3 4 5
1 Providing and supplying of G.I.Unions of the following sizes confirming to IS 1879 complete
in all respect and as per direction of the Engineer-in-charge.
1) 15mm dia. 120 Nos. 35.75 Each.
ii) 20mm dia. 120 Nos. 55.25 Each.
iii) 25mm dia. 90 Nos. 58.50 Each.
iv) 32mm dia. 80 Nos. 78.00 Each.
v) 40mm dia. 80 Nos. 156.00 Each.
vi ) 50mm dia. 60 Nos. 195.00 Each.
vii ) 65mm dia. 50 Nos. 292.50 Each.
viii) 80mm dia. 35 Nos. 422.50 Each.
1 Providing and supplying of the G.I.Sockets of the following sizes confirming to IS 1879
complete in all respect and as per direction of the Engineer-in-charge.

1) 15mm dia. 110 Nos. 14.30 Each.


ii) 20mm dia. 90 Nos. 19.50 Each.
iii) 25mm dia. 80 Nos. 29.25 Each.
iv) 32mm dia. 75 Nos. 32.50 Each.
v) 40mm dia. 55 Nos. 35.75 Each.
vi ) 50mm dia. 45 Nos. 48.75 Each.
vii ) 65mm dia. 40 Nos. 55.25 Each.
viii) 80mm dia. 35 Nos. 52.00 Each.
TERMS & CONDITIONS Total:
1 The work shall be executed as per IPH/PWD specification and instructions of the
Engineer-in-charge.
2 Sale tax & Income tax & labour cess shall be deducted as per rules.

Assistant Engineer,
I&PH Sub Division,
Kaffota.
DRAFT SCHEDULE OF QUANTITY Estimated cost Rs 93060/-
Name of work:-R/M of various LWSS under Kaffota section in Tehsil Paonta Sahib Distt. Sirmour (HP) Earnest money Rs.2000/-
(SH: Prov. & supplying of Cast Iron Non Return valves) Time:- 15 Days.
S.No Sub-Head and item of work. Qty. Rates, Unit
1 2 3 4 5
1 Providing and supplying of cast Iron Non Return Valves of BIR/Kartar/Pelicon make class PN
1.00 with flange table-17 including cost of Nut & bolts & gaskets. The dia of valves as
mentioned below in all leads,lifts and carriage of material and to the entire satisfaction of the
Engineer-in-charge.

1) 80mm dia. 5 Nos. 5684.51 Each.

ii) 65mm dia. 7 Nos. 4886.64 Each.


iii) 50mm dia. 8 Nos. 3803.87 Each.

TERMS & CONDITIONS Total:


1 The work shall be executed as per IPH/PWD specification and instructions of the
Engineer-in-charge.
2 Sale tax & Income tax & labour cess shall be deducted as per rules.

Assistant Engineer,
I&PH Sub Division,
Kaffota.

SCHEDULE OF QUANTITY Estimated cost Rs 95115/-


Name of work:-R/M of various LWSS Kamroo Section Tehsil Paonta Sahib Distt. Sirmour (HP) Earnest money Rs.2000/-
(SH: Prov. & supplying of Cast Iron sluice valves) Time:- 15 Days.
S.No Sub-Head and item of work. Qty. Rates, Unit
1 2 3 4 5
1 Providing and supplying of cast Iron sluic valves of BIR/Kartar/Pelicon make class PN 1.00
with flange table-17 including cost of Nut & bolts & gaskets. The dia of valves as mentioned
below in all leads,lifts and carriage of material and to the entire satisfaction of the Engineer-
in-charge.

1) 80mm dia. 4 Nos. Each.


ii) 65mm dia. 5 Nos. Each.
iii) 50mm dia. 6 Nos. Each.
iv) 40mm dia. 6 Nos. Each.

TERMS & CONDITIONS Total:


1 The work shall be executed as per IPH/PWD specification and instructions of the
Engineer-in-charge.
2 Sale tax & Income tax & labour cess shall be deducted as per rules.

Assistant Engineer,
I&PH Sub Division,
Kaffota.

SCHEDULE OF QUANTITY Estimated cost Rs 92314/-


Name of work:-R/M of various GWSS/LWSS under IPH Sub Division Kaffota Secion Jakhana )in Tehsil Paonta Earnest money Rs.2000/-
Sahib Distt. Sirmour (HP) (SH: Prov. & supplying of various type of fitting) Time:- 15 Days.
S.No Sub-Head and item of work. Qty. Rates, Unit
1 2 3 4 5
1 Providing and supplying ofG.I.Unions if tge following sizes confirming to IS 1879 in complete
in all respect and as per direction of the Engineer-in-charge.
1) 15mm dia. 120 Nos. Each.
ii) 20mm dia. 120 Nos. Each.
iii) 25mm dia. 90 Nos. Each.
iv) 32mm dia. 80 Nos. Each.
v) 40mm dia. 80 Nos. Each.
vi ) 50mm dia. 60 Nos. Each.
vii ) 65mm dia. 50 Nos. Each.
viii) 80mm dia. 35 Nos. Each.
1 Providing and supplying of the G.I.Sockets of the following sizes confirming to IS 1879 in
complete in all respect and as per direction of the Engineer-in-charge.
1) 15mm dia. 110 Nos. Each.
ii) 20mm dia. 90 Nos. Each.
iii) 25mm dia. 80 Nos. Each.
iv) 32mm dia. 75 Nos. Each.
v) 40mm dia. 55 Nos. Each.
vi ) 50mm dia. 45 Nos. Each.
vii ) 65mm dia. 40 Nos. Each.
viii) 80mm dia. 35 Nos. Each.
TERMS & CONDITIONS Total:
1 The work shall be executed as per IPH/PWD specification and instructions of the
Engineer-in-charge.
2 Sale tax & Income tax & labour cess shall be deducted as per rules.

Assistant Engineer,
I&PH Sub Division,
Kaffota.

SCHEDULE OF QUANTITY Estimated cost Rs 93060/-


Name of work:-R/M of various LWSS under Kaffota section in Tehsil Paonta Sahib Distt. Sirmour (HP) Earnest money Rs.2000/-
(SH: Prov. & supplying of Cast Iron Non Return valves) Time:- 15 Days.
S.No Sub-Head and item of work. Qty. Rates, Unit
1 2 3 4 5
1 Providing and supplying of cast Iron Non Return Valves of BIR/Kartar/Pelicon make class PN
1.00 with flange table-17 including cost of Nut & bolts & gaskets. The dia of valves as
mentioned below in all leads,lifts and carriage of material and to the entire satisfaction of the
Engineer-in-charge.

1) 80mm dia. 5 Nos. Each.


ii) 65mm dia. 7 Nos. Each.
iii) 50mm dia. 8 Nos. Each.

TERMS & CONDITIONS Total:


1 The work shall be executed as per IPH/PWD specification and instructions of the
Engineer-in-charge.
2 Sale tax & Income tax & labour cess shall be deducted as per rules.

Assistant Engineer,
I&PH Sub Division,
Kaffota.
d cost Rs 95115/-
money Rs.2000/-

Amount.
6

23309.00
25752.00
23934.00
22120.00

95115.00

Engineer,
d cost Rs 92314/-
money Rs.2000/-

Amount.
6

4290.00
6630.00
5265.00
6240.00
12480.00
11700.00
14625.00
14788.00

1573.00
1755.00
2340.00
2438.00
1966.00
2194.00
2210.00
1820.00
92314.00

Engineer,

d cost Rs 93060/-
money Rs.2000/-

Amount.
6

28423.00

34206.00
30431.00

93060.00

Engineer,
d cost Rs 95115/-
money Rs.2000/-

Amount.
6
Engineer,

d cost Rs 92314/-
money Rs.2000/-

Amount.
6
Engineer,

d cost Rs 93060/-
money Rs.2000/-

Amount.
6
Engineer,
REVISED SCHEDULE OF QUANTITY Estimated Cost: 98692/-
Name of work:-C/o LIS Nav Barwa GP Poka in Tehsil Paonta Sahib Distt. Sirmour (HP) Earnest Money: 2000/-
(SH: C/o 5 Nos Outlets masonary, Laying & jointing of GI Pipes.) Time : Three Months.
S.No Description Qty. Rate Unit.,
1 2 3 5 4
1 Excavation in drains & channel etc.in earth work in all kinds of soil such as pick work ,jumper 742.50 Cum. 170.00 P/Cum.
work blasting work, decomposed conglomerate saturated soil soft and hard rock including
dressing of sides and beds and prepareation of sub grade to level or slope including refilling the
trenches and disposing of surplus earth upto all leads,lifts disposed earth to be levelled and
neatly dressed including jungle clearance and as per directions of the Engineer-incharge

2 Providing laying & jointing of GMS pipes of following dia & class including all leads,lifts and
carriage of material and earth work etc. complete in all respect complete in all respect and as per
direction of the Engineer-in-charge.

i) 100 mm dia. 1000 Rmt. 70.00 P/Rmt.

3 Excavation in foundation and trenches etc.in earth work in all kinds of soil such as pick work 17.28 Cum. 160.00 P/cum.
,jumper work decomposed conglomerate saturated soil soft and hard rock upto all leads lifts
stacking the excavated soil not more than 3mtr.clear from the edge of excavation and then
returning the stacked soil in 15cm layers when required in to plinth sides of foundation etc.
consolidating each deposited layers by ramming and watering and then disposing of all surplus
excavated earth as directed with in all leads lifts and as per directions of the Engineer-incharge

4 Providing and laying cement concrete 1:4:8(1cement:4sand:8 graded stone agg.40mm nominal 4.32 Cum 5900.00 P/Cum
size)and curing complete excluding the cost of form work in foundation & plinth including all
leads lifts and carriage of material and as per the directions of Engineer-in-charge.
5 Providing and laying cement concrete 1:2:4(1cement:2sand:4 graded stone agg.20mm nominal 2.71 Cum. 8500.00 Cum
size)and curing complete excluding the cost of form work in foundation & plinth including all
leads lifts and carriage of material and as per the directions of Engineer-in-charge.

6 Random rubble masonary /Poly rubble masonary (uncoursed/brought to coursed) with hard stone of 14.36 Cum. 3900.00 Cum
approved quality in foundation and plinth including levelling up with cement concrete
1:6.12(1cement:6sand:12 graded stone agg. 20mm nominal size)in cement mortor 1:6 (1 Cement: 6 sand )
in breast wall & Retaining walls including all leads lifts and carriage of material and as per the directions
of Engineer-in-charge.

7 15 mm thick cement plaster in single coat of rough side of bricks/stone masonary for interior plastering 52.40 Sqm 220.00 P/Sqm
upto floor two level including arrises internal rounded angles chamfers rounded angles not exceeding
80mm in girth and finished even and smooth in cement mortor 1:3(1cement:3 sand) and curing complete
including all leads lifts and carriage of materials at site as per direction of Engineer-incharge.

8 Providing and fixing of V Notch make of MS steel & angle iron & duly approved strip of brass over steel 5 Nos. Item Per Rmt.
showing oe side charge. Complete in all respect and as per direction of the Engineer-in-charge. deleted.

TERMS AND CONDITIONS:- Total


1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Royality certificate in respect of stone agg. Sand etc. shall be produced by the contractor
4 G.I.Pipe shall be issued by the deptt. free of cost from IPH Store Bhatanwali.
5 Empty cement bags shall be returned to the Deptt.otherwise Rs.2/-per bag shall be deducted from the bill.
6 Cement shall be issued @ Rs.315/- per bag & steel @ 53/- per Kg. from IPH store Bhatanwali Paonta Sahib.
Executive Engineer,
I&PH Division,
Paonta Sahib.
Amount
6.
126225.00

70000.00

2765.00

25488.00
23035.00

56004.00

11528.00

0.00

315045.00

Engineer,
REVISED SCHEDULE OF QUANTITY Estimated cost Rs 95803/-
Name of work: R/M of GWSS Kando cheog in Tehsil Paonta Sahib Distt.Sirmour (HP) Earnest money Rs.1950/-
(SH: C/O RCC collection Tank , Retaining wall to protect the tank, Laying & jointing of GI pipes) Time:- Three Months
S.No Sub-Head and item of work. Qty. Rates, Unit Amount.
1 2 3 4 5 6
1 Excavation in drains & channel etc.in earth work in all kinds of soil such as pick 168.75 Cum. 160.00 P/Cum. 27000.00
work ,jumper work blasting work, decomposed conglomerate saturated soil soft
and hard rock including dressing of sides and beds and prepareation of sub grade
to level or slope including refilling the trenches and disposing of surplus earth
upto all leads,lifts disposed earth to be levelled and neatly dressed including
jungle clearance and as per directions of the Engineer-incharge

2 Providing laying & jointing of GMS pipes of following dia & class including all 750.00 Rmt. 11.00 P/Rmt. 8250.00
leads,lifts and carriage of material and earth work etc. complete in all respect
complete in all respect and as per direction of the Engineer-in-charge. 15mm dia.

3 Excavation in foundation and trenches etc.in earth work in all kinds of soil such as 23.90 Cum. 160.00 P/cum. 3824.00
pick work ,jumper work decomposed conglomerate saturated soil soft and hard
rock upto all leads lifts stacking the excavated soil not more than 3mtr.clear from
the edge of excavation and then returning the stacked soil in 15cm layers when
required in to plinth sides of foundation etc. consolidating each deposited layers
by ramming and watering and then disposing of all surplus excavated earth as
directed with in all leads lifts and as per directions of the Engineer-incharge

4 Providing and laying cement concrete 1:4:8(1cement:4sand:8 graded stone agg.40mm 2.11 Cum 4600.00 P/Cum 9706.00
nominal size)and curing complete excluding the cost of form work in foundation & plinth
including all leads lifts and carriage of material and as per the directions of Engineer-in-
charge.
5 Providing and laying cement concrete work 1:1 1/2:3 (1cement:1 1/2 sand: 3 graded
stone agg. 20mm nominal size & curing complete) excluding cost of form workand
reinforcement for RCC work including all leads lifts complete and carriage of material
etc. as per directions of Engineer in-charge.

i) In foundation and Plinth etc. 2.13 Cum. 7000.00 P/Cum. 14910.00


ii) In vertical walls any thickness but not less than 0.10 Metres. 26.39 Cum. 7200.00 P/Cum. 190008.00
6 Providing form work with steel sheets 3.15mm thick welded with angle iron 30x30x5 0.00
mm so as to give rough finish i/c centring shuttering structing and propping etc. with
wooden bettens & Ballies, height or propping & centering below supporting floor to
ceiling not exceeding 4 mtr.and removal of the same for insitu RCC work and PCC
work.including all leads lifts and carriage of material at site & as per direction of
Engineer in charge in:-

a) Flat surfaces such as soffits of suspended floor roofs landings and like upto 200mm in 60.76 Sqm. 300.00 P/Sqm. 18228.00
thickness
b) Vertical surface such as wall any thickness. 9.58 Sqm. 200.00 P/Sqm. 1916.00
7 Providing and laying cement concrete 1:2:4(1cement:2app.sand: 4 app. graded stone 1.19 Cum 6600.00 P/Cum 7854.00
agg. 20mm nominal size )and curing complete excluding cost of form work &
reinforcement for reinforced work in suspended floors, roofs landing shelves and their
supports balconies, beams, girders bressumers and cantilivers upto to floor two level in
all height and depth, including all leads lifts and carriage of material at site and as per
direction of the Engineer-incharge.

8 Providing Mild Steel/Tor steel reinforcement including bending binding & placing in 611.00 Kg. 66.00 P/kg 40326.00
positing I/c all leads lifts and carriage of material and as per direction of the Engineer-
in-charge.

9 Cutting in earth work in all kind of soil and dispoal of the excavated earth upt all 8.11 Cum 140.00 P/Cum 1135.00
leads,lifts and as directed by the Engineer-in-charge complete in all respect.
10 Providing and laying cement concrete work 1:5:10(1cement:5 sand: 10 graded 12.38 Cum 4100.00 P/Cum 50758.00
stone agg. 40mm nominal size) with 15% plum and curing complete excluding
cost of form work and in retaining walls/ Breast walls, the size of Plums shall
usually be 150mm to 300mm as per PWD specificatioin including all leads lifts
and carriage of material and as per direction of Engineer incharge.

11 stone filling behind the retaining wall complete in all respect and as per direction of the 2.40 Cum. 750.00 P/cum. 1800.00
Engineer-in-charge.

Total: 375715.00
TERMS & CONDITIONS
1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Cement will be issued @ 315/- per bag & steel @ 53/- per Kg. at IPH store Bhatanwali Paonta Sahib.
4 Empty cement bags shall be returned to the deptt. Otherwise Rs. 2/- per bag shall be
deducted from the each bill of the contractor.
5 Royality certificate in respect of stone agg. Sand etc. shall be produced by the contractor
6 GI Pipe shall be issued free of cost from IPH Store Bhatanwali Paonta Sahib.
7 GI fitting shall be provided by the contractor.
Executive Engineer,
I&PH Division,
Paonta Sahib.
SCHEDULE OF QUANTITY Estimated cost Rs 72345/-
Name of work: Special repair to Head works at Giri Nagar in Tehsil Paonta Sahib Distt.Sirmour (HP) Earnest money Rs.1500/-
(SH: Replacement & Repair of steel wire rope musical rubber seal , roller Ball Bearing of Main canal & Time:- Three Months
under sluice water control gates etc.)
S.No Sub-Head and item of work. Qty. Rates, Unit Amount.
1 2 3 4 5 6
1 Lifting of gate for repair by mobile crane as per site condition and as per 2 job. P/job.
direction of the Engineer-in-charge.

2 Remoing of old Roller 8 Nos & Ball bearing by Hydraulic press system as per 2 job. P/job.
site requirement and as per direction of the Engineer-in-charge.

3 Removing of broken rushed bolt and making new hole for fixing of new bolt 2 job. P/job.
as per site requirement and as per direction of the Engineer-in-charge.

4 Providing and fixing new full thread 12mm dia bolt & fixing of rubber seal as per 2 job. P/job.
site requirement and as per direction of the Engineer-in-charge.

5 Locking arrangement for roller as per site requirement and as per direction of the 2 job. P/job.
Engineer-in-charge.

6 Repair of bottom seal welding & griding as per site requirement etc. as per 2 job, P/job.
direction of the Engineer-in-charge.

7 Removing of damage ortion rubber seal (different size) 2 job. P/job.


8 Providing and fixing of new rubber seal of approved make & grinding and fixing 2 job. P/job.
material as per site requirement and as per directions of the Engineer-in-charge.

9 Replacement of steel rope (taking 25.0 mtr. Rope each gate) of 20mm dia with 2 job. P/job.
labour and material and fixing as per sire requirement dismentling the old ropes
complete in all respect.

10 Repair of gear box and cleaning ,greasing including required accessoires and bushes 2 job. P/job.
etc. refitting complete and as per direction of the Engineer-incharge.
11 Providing and fixing of MS flate 40x8mm including making hole as per site 2 job. P/job.
requirement and as per directions of the Engineer-in-charge.

12 Fixing of gate by crane checking of alingnment after repair complete in all respect 2 job. P/job.
and as per direction of the Engineer-in-charge.

13 Repair & fixing of Main canal & under sluice water control gate of 8 roller with shaft 2 job. P/job.
check nut & ball bearing of Superior Quality of approved make complete in all
respect and as per direction of the Engineer-in-charge.
Total:
TERMS & CONDITIONS
1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Nothing shall be paid for rejected /defective material.
Assistant Engineer,
Giri irrig. Sub Division
Patlion.
SCHEDULE OF QUANTITY Estimated cost Rs 88970/-
Name of work: Special repair to Head works at Giri Nagar in Tehsil Paonta Sahib Distt.Sirmour (HP) Earnest money Rs.1800/-
(SH: Replacement & Repair of steel wire rope musical rubber seal , roller Ball Bearing of Main canal & Time:- Three Months
under sluice water control gates etc.)
S.No Sub-Head and item of work. Qty. Rates, Unit Amount.
1 2 3 4 5 6
1 Lifting of gate for repair by mobile crane as per site condition and as per 2 job. P/job.
direction of the Engineer-in-charge.
2 Removing of old Roller 8 Nos & Ball bearing by Hydraulic press system as 2 job. P/job.
per site requirement and as per direction of the Engineer-in-charge.

3 Removing of broken rushed bolt and making new hole for fixing of new bolt 2 job. P/job.
as per site requirement and as per direction of the Engineer-in-charge.

4 Providing and fixing new full thread 12mm dia bolt & fixing of rubber seal as per 2 job. P/job.
site requirement and as per direction of the Engineer-in-charge.

5 Locking arrangement for roller as per site requirement and as per direction of the 2 job. P/job.
Engineer-in-charge.
6 Repair of bottom seal welding & griding as per site requirement etc. as per 2 job, P/job.
direction of the Engineer-in-charge.
7 Remoing of damage ortion rubber seal (different size) 2 job. P/job.

8 Providing and fixing of new rubber seal of approved make & grinding and fixing 2 job. P/job.
material as per site requirement and as per directions of the Engineer-in-charge.

9 Replacement of steel rope (taking 22.50 mtr. Rope each gate) of 20mm dia with 2 job. P/job.
labour and material and fixing as per sire requirement dismentling the old ropes
complete in all respect.
10 Repair of gear box and cleaning ,greasing including required accessoires and bushes 2 job. P/job.
etc. refitting complete and as per direction of the Engineer-incharge.

11 Providing and fixing of MS flate 40x8mm including making hole as per site 2 job. P/job.
requirement and as per directions of the Engineer-in-charge.

12 Fixing of gate by crane checking of alingnment after repair complete in all respect 2 job. P/job.
and as per direction of the Engineer-in-charge.

13 Providing and fixing of spil way water control gate of 2 roller with shaft check nuts 2 job. P/job.
ball bearing of superior quality of approved make complete in all respect and as per
direction of the Engineer-in-charge.

14 Repair & fixing of Main canal & under sluice water control gate of 8 roller with shaft 2 job. P/job.
check nut & ball bearing of Superior Quality of approved make complete in all
respect and as per direction of the Engineer-in-charge.

Total:
TERMS & CONDITIONS
1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Nothing shall be paid for rejected /defective material.
Assistant Engineer,
Giri irrig. Sub Division
Patlion.
DRAFT SCHEDULE OF QUANTITY Estimated cost Rs 28066/-
Name of work: R/M of GWSS Bhutog Forar GP Tatiana in Tehsil Paonta Sahib Distt.Sirmour (HP) Earnest money Rs.600/-
(SH: Extension to Harizan Basti Morar Bask, Laying & jointing of GI pipes) Time:- Three Months
S.No Sub-Head and item of work. Qty. Rates, Unit Amount.
1 2 3 4 5 6
1 Excavation in drains & channel etc.in earth work in all kinds of soil such as pick 180.00 Cum. 75.95 P/Cum. 13671.00
work ,jumper work blasting work, decomposed conglomerate saturated soil soft
and hard rock including dressing of sides and beds and prepareation of sub grade
to level or slope including refilling the trenches and disposing of surplus earth
upto all leads,lifts disposed earth to be levelled and neatly dressed including
jungle clearance and as per directions of the Engineer-incharge

2 Providing laying & jointing of GMS pipes of following dia & class including all 600.00 Rmt. 0.50 P/Rmt. 300.00
leads,lifts and carriage of material and earth work etc. complete in all respect
complete in all respect and as per direction of the Engineer-in-charge. 15mm dia.

3 Excavation in foundation and trenches etc.in earth work in all kinds of soil such as 5.31 Cum. 92.85 P/cum. 493.00
pick work ,jumper work decomposed conglomerate saturated soil soft and hard
rock upto all leads lifts stacking the excavated soil not more than 3mtr.clear from
the edge of excavation and then returning the stacked soil in 15cm layers when
required in to plinth sides of foundation etc. consolidating each deposited layers
by ramming and watering and then disposing of all surplus excavated earth as
directed with in all leads lifts and as per directions of the Engineer-incharge

4 Providing and laying cement concrete 1:4:8(1cement:4sand:8 graded stone agg.40mm 0.88 Cum 1104.50 P/Cum 972.00
nominal size)and curing complete excluding the cost of form work in foundation & plinth
including all leads lifts and carriage of material and as per the directions of Engineer-in-
charge.
5 Providing and laying cement concrete work 1:1 1/2:3 (1cement:1 1/2 sand: 3 graded 0.00
stone agg. 20mm nominal size & curing complete) excluding cost of form workand
reinforcement for RCC work including all leads lifts complete and carriage of material
etc. as per directions of Engineer in-charge.

i) In foundation and Plinth etc. 0.90 Cum. 1866.80 P/Cum. 1680.00


ii) In vertical walls any thickness but not less than 0.10 Metres. 1.83 Cum. 1923.00 P/Cum. 3519.00
6 Providing form work with steel sheets 3.15mm thick welded with angle iron 30x30x5 0.00
mm so as to give rough finish i/c centring shuttering structing and propping etc. with
wooden bettens & Ballies, height or propping & centering below supporting floor to
ceiling not exceeding 4 mtr.and removal of the same for insitu RCC work and PCC
work.including all leads lifts and carriage of material at site & as per direction of
Engineer in charge in:-

a) Flat surfaces such as soffits of suspended floor roofs landings and like upto 200mm in 3.40 Sqm. 134.10 P/Sqm. 456.00
thickness
b) Vertical surface such as wall any thickness. 24.34 Sqm. 80.70 P/Sqm. 1964.00
7 Providing and laying cement concrete 1:2:4(1cement:2app.sand: 4 app. graded stone 0.45 Cum 1658.90 P/Cum 747.00
agg. 20mm nominal size )and curing complete excluding cost of form work &
reinforcement for reinforced work in suspended floors, roofs landing shelves and their
supports balconies, beams, girders bressumers and cantilivers upto to floor two level in
all height and depth, including all leads lifts and carriage of material at site and as per
direction of the Engineer-incharge.

8 Providing Mild Steel/Tor steel reinforcement including bending binding & placing in 206.00 Kg. 20.70 P/kg 4264.00
positing I/c all leads lifts and carriage of material and as per direction of the Engineer-
in-charge.

Total: 28066.00
TERMS & CONDITIONS
1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Cement will be issued @ 315/- per bag & steel @ 53/- per Kg. at IPH store Bhatanwali Paonta Sahib.
4 Empty cement bags shall be returned to the deptt. Otherwise Rs. 2/- per bag shall be
deducted from the each bill of the contractor. Assistant Engineer,
5 Royality certificate in respect of stone agg. Sand etc. shall be produced by the contractor I&PH Sub Division,
6 GI Pipe shall be issued free of cost from IPH Store Bhatanwali Paonta Sahib. Kaffota.
REVISED SCHEDULE OF QUANTITY Estimated cost Rs 59992/-
Name of work:- Providing LWSS to PC habitation Misserwala Kiyarda & Jagatpur in Tehsil Earnest money Rs.1200/-
Paonta Sahib Distt. Sirmour (HP) (SH: Laying & jointing of GMS pipe line, C/o Common header & Time:- One Month .
C/o wire crate to protect the Pipe line)
S.No Sub-Head and item of work. Qty. Rates, Unit Amount.
1 Excavation in earth work and disposal ofall excavated earth upto a lead of 20 Mtrs. 25.87 Cum 140.00 P/Cum 3622.00
And lift upto 1.50 Mtrs. disposing earth to be levelled and neatly dressed within a
leads in Pick/juper work 50% each including all leads,lifts and carriage of material and
as per direction of the Engineer-in-charge.

2 Wire crates made of G.I.wire filled with boulder/hard stone of approved quality 23.44 Cum. 925.00 P/Cum. 21682.00
with square cut faces against the wire having rounded/rectangular shape weight
of stones not less than 18 Kg. free from soft spots,cracks,cavaties etc.(Wire crate to
be measured and paid for separately)including all leads,lifts and carriage of
material at site as direction of the Engineer-in-charge. (Double Knot)

3 Wire crates of G.I.wire filled with boulder with square cut faces against the wire 112.50 Sqm. 36.00 P/Sqm. 4050.00
G.I.wire 5mm thick corresponding to SWG 6 with 15cmx15cm mesh(boulder
filling to be measured and paid for separately including all leads,lifts and carriage
of materials at site and as per directions of the Engineer-in-charge(L.Rate)

4 Providing laying & jointing of GMS pipes of following dia & class including 102.00 Rmt. 49.00 P/Rmt. 4998.00
all leads,lifts and carriage of material and earth work etc. complete in all
respect complete in all respect and as per direction of the Engineer-in-
charge. 100mm dia.

5 Providing and fixing of MS flanges (IS 6392-1971) of table -17 confirm to IS 0.00
816-1965 electric rod as per IS-814-1967 including required no of nut &
botl as per IS 1369-1967 and 3mm thick AF jointing gasket confirming to
IS 2712-1965. The weldingf of flange should be done in two layer both side
and one layer inner side to make the joints air tight and to entire material
at site and as per satisfaction of the Engineer incharge.
i)100mm dia Table-5. 18 pair. 1100.00 Each. 19800.00
6 Providing and fixing of CI sluice valves of Kirloskar/Leader make & relevant 1 No. 22000.00 Each. 22000.00
ISS complete in all respect including all leads,lifts and carriage of material
at site and as direction by the Engineer-in-charge.80mm dia.

7 Providing and fixing of G.I.Union 65mm dia complete in all respect and as per 5 Nos. 325.00 Each. 1625.00
direction of the Engineer-in-charge.
8 Manufacturing of GMS bend of various dia including cutting & welding complete in
all respect and as per direction of the Engineer-in-charge.

i) 100mm dia. 2 Nos. 1200.00 Each. 2400.00


ii0 80mm dia. 1 Nos. 975.00 Each. 975.00
iii) 65mm dia. 6 Nos. 850.00 Each. 5100.00
iv) 40mm dia. 4 Nos. 650.00 Each. 2600.00
9 Providing and laying cement concrete 1:2:4(1cement:2app.sand: 4 app. graded 4.95 Cum. 3700.00 P/Cum. 18315.00
stone agg. 20mm nominal size )and curing complete excluding cost of form work
& reinforcement for reinforced work in foundation & plinth including all leads lifts
and carriage of material at site and as per direction of the Engineer-incharge.

10 Manufacturing of GMS Reducer 65mm dia including cutting & welding complete in 1 No. 850.00 Each. 850.00
all respect and as per direction of the Engineer-in-charge.

11 Manufacturing of GMS Tee of 65mm dia including cutting & welding complete in 1 No. 800.00 Each. 800.00
all respect and as per direction of the Engineer-in-charge.

12 Manufacturing & plugging 125mm dia including cutting & welding complete in all 5 Nos. 500.00 Each. 2500.00
respect and as per direction of the Engineer-in-charge.

TERMS & CONDITIONS TOTAL: 111317.00


1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Cement will be issued @ 315/- per bag & steel @ 53/- per Kg. at IPH store Bhatanwali Paonta Sahib.
4 Empty cement bags shall be returned to the deptt. Otherwise Rs. 2/- per bag shall
5 be deducted
Royality from the
certificate each billofofstone
in respect the contractor.
agg. Sand etc. shall be produced by the contractor
6 GI Pipe shall be issued free of cost from IPH Store Bhatanwali Paonta Sahib. Executive Engineer,
7 GI wire shall be issued free of cost from IPH store Bhatanwali. I&PH Division,
Paonta Sahib.
REVISED SCHEDULE OF QUANTITY Estimated cost Rs 6146/-
Name of work R/M of LWSS Majra-II in Tehsil Paonta Sahib Distt.Sirmour (HP) Earnest money Rs.150/-
(SH: Laying & joitngin of Gi Pipe line OHSR to New settled abadi) Time:- Two Months
S.No Sub-Head and item of work. Qty. Rates, Unit
1 2 3 4 5
1 Excavation in drains & channel etc.in earth work in all kinds of soil such as pick work 66.83 Cum 160.00 P/Cum
,jumper work blasting work, decomposed conglomerate saturated soil soft and hard rock
including dressing of sides and beds and prepareation of sub grade to level or slope
including refilling the trenches and disposing of surplus earth upto all leads,lifts disposed
earth to be levelled and neatly dressed including jungle clearance and as per directions of
the Engineer-incharge

2 Laying and jointing of GMS Pipes of various dia in trenches (earth work in trenches to be
measured and paid for seperately) including all leads lifts and carriage of material at site
as per direction of Engineer-in-charge of following dias.

i) 40 mm dia, 180 Rmt 22.00 P/Rmt.


ii) 32mm dia 150 Rmt 18.00 P/Rmt.
iii)25mm dia. 220 Rmt 16.00 P/Rmt.
3 Providing & fixing of peet valve of superior quality of following dia complete in all respect
and as per direction of the Engineer-in-charge.

i) 40 mm dia, 1 No. 850.00 Each.


ii) 32mm dia 1 No. 650.00 Each.
iii)25mm dia. 1 No. 600.00 Each.
TERMS AND CONDITIONS:- Total:
1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 G.I.Pipe shall be issued free of cost from IPH Store Bhatanwali Paonta Sahib.
4 The pipe fitting shall be provided by the contractor. Executive Engineer,
5 In Addition to normal security 5% will be withheld for want of testing of pipe leakage. I&PH Division,
Paonta Sahib.
REVISED SCHEDULE OF QUANTITY Estimated cost Rs 7682/-
Name of work R/M of LWSS Matak Majri Churak Majri in Tehsil Paonta Sahib Distt.Sirmour (HP) Earnest money Rs.200/-
(SH: Extension of distributiopn system of New settled abadi ) Time:- Two Months
S.No Sub-Head and item of work. Qty. Rates, Unit
1 2 3 4 5
1 Excavation in drains & channel etc.in earth work in all kinds of soil such as pick work 97.20 Cum 160.00 P/Cum
,jumper work blasting work, decomposed conglomerate saturated soil soft and hard rock
including dressing of sides and beds and prepareation of sub grade to level or slope
including refilling the trenches and disposing of surplus earth upto all leads,lifts disposed
earth to be levelled and neatly dressed including jungle clearance and as per directions of
the Engineer-incharge

2 Laying and jointing of GMS Pipes of various dia in trenches (earth work in trenches to be
measured and paid for seperately) including all leads lifts and carriage of material at site
as per direction of Engineer-in-charge of following dias.

i) 40 mm dia, 300 Rmt 22.00 P/Rmt.


ii) 32mm dia 180 Rmt 18.00 P/Rmt.
3 Providing & fixing of peet valve of superior quality of following dia complete in all respect
and as per direction of the Engineer-in-charge.
i) 40 mm dia, 1 No. 850.00 Each.
ii) 32mm dia 1 No. 650.00 Each.
TERMS AND CONDITIONS:- Total:
1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 G.I.Pipe shall be issued free of cost from IPH Store Bhatanwali Paonta Sahib.
4 The pipe fitting shall be provided by the contractor. Executive Engineer,
5 In Addition to normal security 5% will be withheld for want of testing of pipe leakage. I&PH Division,
Paonta Sahib.
REVISED SCHEDULE OF QUANTITY Estimated cost Rs.97413/-
Name of work:- Insttt. Of Deep well Hand Pumps under I&PH Sub Division Majra in tehsil Paonta Sahib Earnest Rs.1950/-
Distt. Simour (HP)(SH: Energisation of 03 Nos Hand Pump House of Shri Satpal S/o Sh.Faqir Chand, vill. Pipliwala Time:-One Month.
Nr. Baba Balak Nath temple vill.Johrons & Nr. Maszid Kiratpur.)
Sr.No. Item of work. Qty. Rate. Unit.
1 2 3 4 5
1 Providing and installation of Submersible Pump of suitable make such as 1 Set 26500.00 P/Set
KSB/Johnston/Calama/BS/SU/Amrut confirming to ISS 1984-1976 alongwith a directly coubpled
submesible type Square cage electrical induction motor of suitable 3.00 HP for the operation on
220+1 phase 50 CPS AC supply with water lubricated bearings and provided with pivoted segment
type thrust bearing to withstand non vertical head with uniform wear and duly fitted with device to
take in/Out the exemption of water with heating of motor complete in all respect. Total Head 40 to
65 Mtr. Discharge 50 to 60 Mtr.

2 Providing and installation of Submersible Pump of suitable make such as 2 Set 25500.00 P/Set
KSB/Johnston/Calama/BS/SU/Amrut confirming to ISS 1984-1976 alongwith a directly coubpled
submesible type Square cage electrical induction motor of suitable 2.00 HP for the operation on
220+1 phase 50 CPS AC supply with water lubricated bearings and provided with pivoted segment
type thrust bearing to withstand non vertical head with uniform wear and duly fitted with device to
take in/Out the exemption of water with heating of motor complete in all respect. Total Head 40 to
65 Mtr. Discharge 50 to 60 Mtr.

3 Supplying and fixing of control pannel for submersible Pumps complete with sheet,Fabricarted duly 3 Set 4500.00 P/Set
painted and complete internal wiring and composing of air break starter main switch of suitable
Amps, Amperemeter, Voltmeter single phase indicating lamp etc. as per requirement at site
complete in all respect .
4 Supplying and fixing submersible cable to submersible motor of suitable size 2.50mm 2 approved 175 Rmt 95.00 P/Rmt
make & relevant ISS as per 1554-1988 of Siemens/ Finolex/JEC/ ICS/ELCO/ GRADLY/ Natural
make in all respect.

5 Providing and fixing increaser/reducer/sockets/bends /Nut bolts/Clamps testing of all above items 3 Job 1500.00 P/Job
as per directions of Engineer incharge.

6 Supplying and fixing 40mm dia O.D.(outer dia) H.D. Pipe as column pipe into the bore hole 38 Rmt 135.00 P/Rmt
complete as per the direction of Engineer incharge.

7 Supplying and fixing 32 mm dia O.D.(outer dia) H.D. Pipe as column pipe into the bore hole 96 Rmt 135.00 P/Rmt
complete as per the direction of Engineer incharge.

8 Providing and fixing steel rope of 6mm thick for hanging the Submersible pump set into the bore for 135 Rmt 60.00 P/Rmt
its extract from the well and as per direction of the Engineer-in-charge.

Total:-
TERMS AND CONDITIONS
1 The work shall be done as per IPH specifications.
2 Security, Sale Tax & Income tax shall be deduction as per rule.
3 Payment will be made after successful testing at site. Executive Engineer,
4 The guarantee period of pumpng machinery six months I&PH Division,
Paonta Sahib (HP)

REVISED SCHEDULE OF QUANTITY Estimated cost Rs.58791/-


Name of work:- Insttt. Of Deep well Hand Pumps under I&PH Sub Division Majra in tehsil Paonta Sahib Earnest Rs.1200/-
Distt. Simour (HP)(SH: Energisation of 02 Nos Hand PumpNr. House of ShriAsgar Ali S/o Sh. Sharif Mohd. Time:-One Month.
Vill. Majra & Nr. H/o Shri Asgar Ali S/o Karimu Deen)
Sr.No. Item of work. Qty. Rate. Unit.
1 2 3 4 5
1 Providing and installation of Submersible Pump of suitable make such as 2 Set 25500.00 P/Set
KSB/Johnston/Calama/BS/SU/Amrut confirming to ISS 1984-1976 alongwith a directly coubpled
submesible type Square cage electrical induction motor of suitable 2.00 HP for the operation on
220+1 phase 50 CPS AC supply with water lubricated bearings and provided with pivoted segment
type thrust bearing to withstand non vertical head with uniform wear and duly fitted with device to
take in/Out the exemption of water with heating of motor complete in all respect. Total Head 40 to
65 Mtr. Discharge 50 to 60 Mtr.

2 Supplying and fixing of control pannel for submersible Pumps complete with sheet,Fabricarted duly 2 Set 4500.00 P/Set
painted and complete internal wiring and composing of air break starter main switch of suitable
Amps, Amperemeter, Voltmeter single phase indicating lamp etc. as per requirement at site
complete in all respect .

3 Supplying and fixing submersible cable to submersible motor of suitable size 2.50mm 2 approved 102 Rmt 95.00 P/Rmt
make & relevant ISS as per 1554-1988 of Siemens/ Finolex/JEC/ ICS/ELCO/ GRADLY/ Natural
make in all respect.

4 Providing and fixing increaser/reducer/sockets/bends /Nut bolts/Clamps testing of all above items 2 Job 1500.00 P/Job
as per directions of Engineer incharge.
5 Supplying and fixing 32 mm dia O.D.(outer dia) H.D. Pipe as column pipe into the bore hole 83 Rmt 145.00 P/Rmt
complete as per the direction of Engineer incharge.
6 Providing and fixing steel rope of 6mm thick for hanging the Submersible pump set into the bore for 89 Rmt 90.00 P/Rmt
its extract from the well and as per direction of the Engineer-in-charge.
Total:-
TERMS AND CONDITIONS
1 The work shall be done as per IPH specifications.
2 Security, Sale Tax & Income tax shall be deduction as per rule.
3 Payment will be made after successful testing at site. Executive Engineer,
4 The guarantee period of pumpng machinery six months I&PH Division,
Paonta Sahib (HP)

REVISED SCHEDULE OF QUANTITY Estimated cost Rs.58791/-


Name of work:- Insttt. Of Deep well Hand Pumps under I&PH Sub Division Majra in tehsil Paonta Sahib Earnest Rs.1200/-
Distt. Simour (HP)(SH: Energisation of 04 Nos Hand Pump nr. House of Shri Raj Kumar S/o Shri Jagdish Chand Nr. House Time:-One Month.
of Shri Karam Chand S/o Sh. Sunder Lal , Nr. H/o Sh. Mahinder Singh S/o Mani Ram vill. Puruwala & Shri Ravi Kumar S/o ritam Singh vill.Amargarh.
Sr.No. Item of work. Qty. Rate. Unit.
1 2 3 4 5
2 Providing and installation of Submersible Pump of suitable make such as 4 Set 25500.00 P/Set
KSB/Johnston/Calama/BS/SU/Amrut confirming to ISS 1984-1976 alongwith a directly coubpled
submesible type Square cage electrical induction motor of suitable 2.00 HP for the operation on
220+1 phase 50 CPS AC supply with water lubricated bearings and provided with pivoted segment
type thrust bearing to withstand non vertical head with uniform wear and duly fitted with device to
take in/Out the exemption of water with heating of motor complete in all respect. Total Head 40 to
65 Mtr. Discharge 50 to 60 Mtr.

3 Supplying and fixing of control pannel for submersible Pumps complete with sheet,Fabricarted duly 4 Set 4500.00 P/Set
painted and complete internal wiring and composing of air break starter main switch of suitable
Amps, Amperemeter, Voltmeter single phase indicating lamp etc. as per requirement at site
complete in all respect .

4 Supplying and fixing submersible cable to submersible motor of suitable size 2.50mm 2 approved 178 Rmt 95.00 P/Rmt
make & relevant ISS as per 1554-1988 of Siemens/ Finolex/JEC/ ICS/ELCO/ GRADLY/ Natural
make in all respect.

5 Providing and fixing increaser/reducer/sockets/bends /Nut bolts/Clamps testing of all above items 4 Job 1500.00 P/Job
as per directions of Engineer incharge.
7 Supplying and fixing 32 mm dia O.D.(outer dia) H.D. Pipe as column pipe into the bore hole 146 Rmt 135.00 P/Rmt
complete as per the direction of Engineer incharge.
8 Providing and fixing steel rope of 6mm thick for hanging the Submersible pump set into the bore for 156 Rmt 60.00 P/Rmt
its extract from the well and as per direction of the Engineer-in-charge.
Total:-
TERMS AND CONDITIONS
1 The work shall be done as per IPH specifications.
2 Security, Sale Tax & Income tax shall be deduction as per rule.
3 Payment will be made after successful testing at site. Executive Engineer,
4 The guarantee period of pumpng machinery six months I&PH Division,
Paonta Sahib (HP)
REVISED SCHEDULE OF QUANTITY Estimated cost Rs.61320/-
Name of work:- Insttt. Of Deep well Hand Pumps under I&PH Sub Division Majra in tehsil Paonta Sahib Earnest Money Rs.1250/-
Distt. Simour (HP)(SH: Energisation of 02 Nos Hand Pump nr. House of ShriKuldeep Singh Thakur & Near Manuwar Time:-One Month.
Basti vill. Churak Majri)
Sr.No. Item of work. Qty. Rate. Unit.
1 2 3 4 5
2 Providing and installation of Submersible Pump of suitable make such as 2 Set 25500.00 P/Set
KSB/Johnston/Calama/BS/SU/Amrut confirming to ISS 1984-1976 alongwith a directly coubpled
submesible type Square cage electrical induction motor of suitable 2.00 HP for the operation on
220+1 phase 50 CPS AC supply with water lubricated bearings and provided with pivoted segment
type thrust bearing to withstand non vertical head with uniform wear and duly fitted with device to
take in/Out the exemption of water with heating of motor complete in all respect. Total Head 40 to
65 Mtr. Discharge 50 to 60 Mtr.

3 Supplying and fixing of control pannel for submersible Pumps complete with sheet,Fabricarted duly 2 Set 4500.00 P/Set
painted and complete internal wiring and composing of air break starter main switch of suitable
Amps, Amperemeter, Voltmeter single phase indicating lamp etc. as per requirement at site
complete in all respect .

4 Supplying and fixing submersible cable to submersible motor of suitable size 2.50mm 2 approved 104 Rmt 95.00 P/Rmt
make & relevant ISS as per 1554-1988 of Siemens/ Finolex/JEC/ ICS/ELCO/ GRADLY/ Natural
make in all respect.

5 Providing and fixing increaser/reducer/sockets/bends /Nut bolts/Clamps testing of all above items 2 Job 1500.00 P/Job
as per directions of Engineer incharge.
7 Supplying and fixing 32 mm dia O.D.(outer dia) H.D. Pipe as column pipe into the bore hole 92 Rmt 135.00 P/Rmt
complete as per the direction of Engineer incharge.
8 Providing and fixing steel rope of 6mm thick for hanging the Submersible pump set into the bore for 98 Rmt 60.00 P/Rmt
its extract from the well and as per direction of the Engineer-in-charge.
Total:-
TERMS AND CONDITIONS
1 The work shall be done as per IPH specifications.
2 Security, Sale Tax & Income tax shall be deduction as per rule.
3 Payment will be made after successful testing at site. Executive Engineer,
4 The guarantee period of pumpng machinery six months I&PH Division,
Paonta Sahib (HP)

REVISED SCHEDULE OF QUANTITY Estimated cost Rs96510/-


Name of work:- Insttt. Of Deep well Hand Pumps under I&PH Sub Division Majra in tehsil Paonta Sahib Earnest Money Rs.1900/-
Distt. Simour (HP)(SH: Energisation of 04 Nos Hand Pump nr. House of Shri Mast Ram Lekh Raj Nambardar Sh.Hukam Time:-One Month.
Singh , vill. Bharapur & Ronki Ram vill. Dhaula Kuan )
Sr.No. Item of work. Qty. Rate. Unit.
1 2 3 4 5
2 Providing and installation of Submersible Pump of suitable make such as 4 Set 25500.00 P/Set
KSB/Johnston/Calama/BS/SU/Amrut confirming to ISS 1984-1976 alongwith a directly coubpled
submesible type Square cage electrical induction motor of suitable 2.00 HP for the operation on
220+1 phase 50 CPS AC supply with water lubricated bearings and provided with pivoted segment
type thrust bearing to withstand non vertical head with uniform wear and duly fitted with device to
take in/Out the exemption of water with heating of motor complete in all respect. Total Head 40 to
65 Mtr. Discharge 50 to 60 Mtr.

3 Supplying and fixing of control pannel for submersible Pumps complete with sheet,Fabricarted duly 4 Set 4500.00 P/Set
painted and complete internal wiring and composing of air break starter main switch of suitable
Amps, Amperemeter, Voltmeter single phase indicating lamp etc. as per requirement at site
complete in all respect .

4 Supplying and fixing submersible cable to submersible motor of suitable size 2.50mm 2 approved 230 Rmt 95.00 P/Rmt
make & relevant ISS as per 1554-1988 of Siemens/ Finolex/JEC/ ICS/ELCO/ GRADLY/ Natural
make in all respect.

5 Providing and fixing increaser/reducer/sockets/bends /Nut bolts/Clamps testing of all above items 4 Job 1500.00 P/Job
as per directions of Engineer incharge.
7 Supplying and fixing 32 mm dia O.D.(outer dia) H.D. Pipe as column pipe into the bore hole 190 Rmt 130.00 P/Rmt
complete as per the direction of Engineer incharge.
8 Providing and fixing steel rope of 6mm thick for hanging the Submersible pump set into the bore for 200 Rmt 60.00 P/Rmt
its extract from the well and as per direction of the Engineer-in-charge.
Total:-
TERMS AND CONDITIONS
1 The work shall be done as per IPH specifications.
2 Security, Sale Tax & Income tax shall be deduction as per rule.
3 Payment will be made after successful testing at site. Executive Engineer,
4 The guarantee period of pumpng machinery six months I&PH Division,
Paonta Sahib (HP)

REVISED SCHEDULE OF QUANTITY Estimated cost Rs. 60127/-


Name of work:- Insttt. Of Deep well Hand Pumps under I&PH Sub Division Majra in tehsil Paonta Sahib Earnest Money Rs.1200/-
Distt. Simour (HP)(SH: Energisation of 02 Nos Hand Pump in vill. Jagatpur Nr. H/o Sh. Faiz Mohd. S/o Sh. Gulsher Mohd. Time:-One Month.
& Nr. House of Shri Khurshid Mohd. S/o Sharif Mohd.)
Sr.No. Item of work. Qty. Rate. Unit.
1 2 3 4 5
2 Providing and installation of Submersible Pump of suitable make such as 2 Set 25500.00 P/Set
KSB/Johnston/Calama/BS/SU/Amrut confirming to ISS 1984-1976 alongwith a directly coubpled
submesible type Square cage electrical induction motor of suitable 2.00 HP for the operation on
220+1 phase 50 CPS AC supply with water lubricated bearings and provided with pivoted segment
type thrust bearing to withstand non vertical head with uniform wear and duly fitted with device to
take in/Out the exemption of water with heating of motor complete in all respect. Total Head 40 to
65 Mtr. Discharge 50 to 60 Mtr.

3 Supplying and fixing of control pannel for submersible Pumps complete with sheet,Fabricarted duly 2 Set 4500.00 P/Set
painted and complete internal wiring and composing of air break starter main switch of suitable
Amps, Amperemeter, Voltmeter single phase indicating lamp etc. as per requirement at site
complete in all respect .

4 Supplying and fixing submersible cable to submersible motor of suitable size 2.50mm 2 approved 103 Rmt 95.00 P/Rmt
make & relevant ISS as per 1554-1988 of Siemens/ Finolex/JEC/ ICS/ELCO/ GRADLY/ Natural
make in all respect.

5 Providing and fixing increaser/reducer/sockets/bends /Nut bolts/Clamps testing of all above items 2 Job 1500.00 P/Job
as per directions of Engineer incharge.
7 Supplying and fixing 32 mm dia O.D.(outer dia) H.D. Pipe as column pipe into the bore hole 84 Rmt 135.00 P/Rmt
complete as per the direction of Engineer incharge.
8 Providing and fixing steel rope of 6mm thick for hanging the Submersible pump set into the bore for 92 Rmt 60.00 P/Rmt
its extract from the well and as per direction of the Engineer-in-charge.

Total:-
TERMS AND CONDITIONS
1 The work shall be done as per IPH specifications.
2 Security, Sale Tax & Income tax shall be deduction as per rule.
3 Payment will be made after successful testing at site. Executive Engineer,
4 The guarantee period of pumpng machinery six months I&PH Division,
Paonta Sahib (HP)

REVISED SCHEDULE OF QUANTITY Estimated cost Rs. 59791/-


Name of work:- Insttt. Of Deep well Hand Pumps under I&PH Sub Division Majra in tehsil Paonta Sahib Earnest Money Rs.1200/-
Distt. Simour (HP)(SH: Energisation of 02 Nos Hand Pump Nr. H/o Sh. Asgar Ali S/o Sh.Sharif Mohd vill. Majra Time:-One Month.
& Nr. House of Shri Assgar Ali S/o Karimu Deen)
Sr.No. Item of work. Qty. Rate. Unit.
1 2 3 4 5
2 Providing and installation of Submersible Pump of suitable make such as 2 Set 25500.00 P/Set
KSB/Johnston/Calama/BS/SU/Amrut confirming to ISS 1984-1976 alongwith a directly coubpled
submesible type Square cage electrical induction motor of suitable 2.00 HP for the operation on
220+1 phase 50 CPS AC supply with water lubricated bearings and provided with pivoted segment
type thrust bearing to withstand non vertical head with uniform wear and duly fitted with device to
take in/Out the exemption of water with heating of motor complete in all respect. Total Head 40 to
65 Mtr. Discharge 50 to 60 Mtr.

3 Supplying and fixing of control pannel for submersible Pumps complete with sheet,Fabricarted duly 2 Set 4500.00 P/Set
painted and complete internal wiring and composing of air break starter main switch of suitable
Amps, Amperemeter, Voltmeter single phase indicating lamp etc. as per requirement at site
complete in all respect .

4 Supplying and fixing submersible cable to submersible motor of suitable size 2.50mm 2 approved 102 Rmt 95.00 P/Rmt
make & relevant ISS as per 1554-1988 of Siemens/ Finolex/JEC/ ICS/ELCO/ GRADLY/ Natural
make in all respect.
5 Providing and fixing increaser/reducer/sockets/bends /Nut bolts/Clamps testing of all above items 2 Job 1500.00 P/Job
as per directions of Engineer incharge.
7 Supplying and fixing 32 mm dia O.D.(outer dia) H.D. Pipe as column pipe into the bore hole 83 Rmt 135.00 P/Rmt
complete as per the direction of Engineer incharge.
8 Providing and fixing steel rope of 6mm thick for hanging the Submersible pump set into the bore for 89 Rmt 60.00 P/Rmt
its extract from the well and as per direction of the Engineer-in-charge.
Total:-
TERMS AND CONDITIONS
1 The work shall be done as per IPH specifications.
2 Security, Sale Tax & Income tax shall be deduction as per rule.
3 Payment will be made after successful testing at site. Executive Engineer,
4 The guarantee period of pumpng machinery six months I&PH Division,
Paonta Sahib (HP)

REVISED SCHEDULE OF QUANTITY Estimated cost Rs. 35630/-


Name of work:- Insttt. Of Deep well Hand Pumps under I&PH Sub Division Majra in tehsil Paonta Sahib Earnest Money Rs.1500/-
Distt. Simour (HP)(SH: Energisation of 02 Nos Hand Pump Nr. H/o Sh. Asgar Ali S/o Sh.Sharif Mohd vill. Majra Time:-One Month.
& Nr. House of Shri Assgar Ali S/o Karimu Deen)
Sr.No. Item of work. Qty. Rate. Unit.
1 2 3 4 5
2 Providing and installation of Submersible Pump of suitable make such as 1 Set 25500.00 P/Set
KSB/Johnston/Calama/BS/SU/Amrut confirming to ISS 1984-1976 alongwith a directly coubpled
submesible type Square cage electrical induction motor of suitable 2.00 HP for the operation on
220+1 phase 50 CPS AC supply with water lubricated bearings and provided with pivoted segment
type thrust bearing to withstand non vertical head with uniform wear and duly fitted with device to
take in/Out the exemption of water with heating of motor complete in all respect. Total Head 40 to
65 Mtr. Discharge 50 to 60 Mtr.

3 Supplying and fixing of control pannel for submersible Pumps complete with sheet,Fabricarted duly 1 Set 4500.00 P/Set
painted and complete internal wiring and composing of air break starter main switch of suitable
Amps, Amperemeter, Voltmeter single phase indicating lamp etc. as per requirement at site
complete in all respect .
4 Supplying and fixing submersible cable to submersible motor of suitable size 2.50mm 2 approved 60 Rmt 95.00 P/Rmt
make & relevant ISS as per 1554-1988 of Siemens/ Finolex/JEC/ ICS/ELCO/ GRADLY/ Natural
make in all respect.

5 Providing and fixing increaser/reducer/sockets/bends /Nut bolts/Clamps testing of all above items 1 Job 1500.00 P/Job
as per directions of Engineer incharge.
7 Supplying and fixing 32 mm dia O.D.(outer dia) H.D. Pipe as column pipe into the bore hole 50 Rmt 135.00 P/Rmt
complete as per the direction of Engineer incharge.
8 Providing and fixing steel rope of 6mm thick for hanging the Submersible pump set into the bore for 55 Rmt 60.00 P/Rmt
its extract from the well and as per direction of the Engineer-in-charge.
Total:-
TERMS AND CONDITIONS
1 The work shall be done as per IPH specifications.
2 Security, Sale Tax & Income tax shall be deduction as per rule.
3 Payment will be made after successful testing at site. Executive Engineer,
4 The guarantee period of pumpng machinery six months I&PH Division,
Paonta Sahib (HP)

REVISED SCHEDULE OF QUANTITY Estimated cost Rs. 72569/-


Name of work:- Insttt. Of Deep well Hand Pumps under I&PH Sub Division Majra in tehsil Paonta Sahib Earnest Money Rs.1500/-
Distt. Simour (HP)(SH: Energisation of 02 Nos Hand Pump Nr. Saini Basti Misserwala & Near Jai Singh Basti Sainwala Time:-One Month.

Sr.No. Item of work. Qty. Rate. Unit.


1 2 3 4 5
2 Providing and installation of Submersible Pump of suitable make such as 2 Set 25500.00 P/Set
KSB/Johnston/Calama/BS/SU/Amrut confirming to ISS 1984-1976 alongwith a directly coubpled
submesible type Square cage electrical induction motor of suitable 2.00 HP for the operation on
220+1 phase 50 CPS AC supply with water lubricated bearings and provided with pivoted segment
type thrust bearing to withstand non vertical head with uniform wear and duly fitted with device to
take in/Out the exemption of water with heating of motor complete in all respect. Total Head 40 to
65 Mtr. Discharge 50 to 60 Mtr.
3 Supplying and fixing of control pannel for submersible Pumps complete with sheet,Fabricarted duly 2 Set 4500.00 P/Set
painted and complete internal wiring and composing of air break starter main switch of suitable
Amps, Amperemeter, Voltmeter single phase indicating lamp etc. as per requirement at site
complete in all respect .

4 Supplying and fixing submersible cable to submersible motor of suitable size 2.50mm 2 approved 108 Rmt 95.00 P/Rmt
make & relevant ISS as per 1554-1988 of Siemens/ Finolex/JEC/ ICS/ELCO/ GRADLY/ Natural
make in all respect.

5 Providing and fixing increaser/reducer/sockets/bends /Nut bolts/Clamps testing of all above items 2 Job 1500.00 P/Job
as per directions of Engineer incharge.
7 Supplying and fixing 32 mm dia O.D.(outer dia) H.D. Pipe as column pipe into the bore hole 94 Rmt 135.00 P/Rmt
complete as per the direction of Engineer incharge.
8 Providing and fixing steel rope of 6mm thick for hanging the Submersible pump set into the bore for 102 Rmt 60.00 P/Rmt
its extract from the well and as per direction of the Engineer-in-charge.
Total:-
TERMS AND CONDITIONS
1 The work shall be done as per IPH specifications.
2 Security, Sale Tax & Income tax shall be deduction as per rule.
3 Payment will be made after successful testing at site. Executive Engineer,
4 The guarantee period of pumpng machinery six months I&PH Division,
Paonta Sahib (HP)

REVISED SCHEDULE OF QUANTITY Estimated cost Rs. 31325/--


Name of work:- Insttt. Of Deep well Hand Pumps under I&PH Sub Division Majra in tehsil Paonta Sahib Earnest Money Rs.625/-
Distt. Simour (HP)(SH: Energisation of Hand Pump Nr. GMS & GPS at village Pardooni.) Time:-Fifteen days.

Sr.No. Item of work. Qty. Rate. Unit.


1 2 3 4 5
2 Providing and installation of Submersible Pump of suitable make such as 1 Set 25500.00 P/Set
KSB/Johnston/Calama/BS/SU/Amrut confirming to ISS 1984-1976 alongwith a directly coubpled
submesible type Square cage electrical induction motor of suitable 2.00 HP for the operation on
220+1 phase 50 CPS AC supply with water lubricated bearings and provided with pivoted segment
type thrust bearing to withstand non vertical head with uniform wear and duly fitted with device to
take in/Out the exemption of water with heating of motor complete in all respect. Total Head 40 to
65 Mtr. Discharge 50 to 60 Mtr.

3 Supplying and fixing of control pannel for submersible Pumps complete with sheet,Fabricarted duly 1 Set 4500.00 P/Set
painted and complete internal wiring and composing of air break starter main switch of suitable
Amps, Amperemeter, Voltmeter single phase indicating lamp etc. as per requirement at site
complete in all respect .

4 Supplying and fixing submersible cable to submersible motor of suitable size 2.50mm 2 approved 60 Rmt 95.00 P/Rmt
make & relevant ISS as per 1554-1988 of Siemens/ Finolex/JEC/ ICS/ELCO/ GRADLY/ Natural
make in all respect.

5 Providing and fixing increaser/reducer/sockets/bends /Nut bolts/Clamps testing of all above items 1 Job 1500.00 P/Job
as per directions of Engineer incharge.
7 Supplying and fixing 32 mm dia O.D.(outer dia) H.D. Pipe as column pipe into the bore hole 47 Rmt 135.00 P/Rmt
complete as per the direction of Engineer incharge.
8 Providing and fixing steel rope of 5mm thick for hanging the Submersible pump set into the bore 48 Rmt 60.00 P/Rmt
for its extract from the well and as per direction of the Engineer-in-charge.
Total:-
TERMS AND CONDITIONS
1 The work shall be done as per IPH specifications.
2 Security, Sale Tax & Income tax shall be deduction as per rule.
3 Payment will be made after successful testing at site. Executive Engineer,
4 The guarantee period of pumpng machinery six months I&PH Division,
Paonta Sahib (HP)

REVISED SCHEDULE OF QUANTITY Estimated cost Rs. 98931/--


Name of work:- Insttt. Of Deep well Hand Pumps under I&PH Sub Division Majra in tehsil Paonta Sahib Earnest Money Rs.2000/-
Distt. Simour (HP)(SH: Energisation of 03 Nos Hand Pump Nr. Chaudhary Basti Vill. Surajpur , Near Maszid (Malwa) Time:-One Month.
vill. Patlion & Near Maszid vill. Surajpur .
Sr.No. Item of work. Qty. Rate. Unit.
1 2 3 4 5
1 Providing and installation of Submersible Pump of suitable make such as 3 Set 25500.00 P/Set
KSB/Johnston/Calama/BS/SU/Amrut confirming to ISS 1984-1976 alongwith a directly coubpled
submesible type Square cage electrical induction motor of suitable 2.00 HP for the operation on
220+1 phase 50 CPS AC supply with water lubricated bearings and provided with pivoted segment
type thrust bearing to withstand non vertical head with uniform wear and duly fitted with device to
take in/Out the exemption of water with heating of motor complete in all respect. Total Head 40 to
65 Mtr. Discharge 50 to 60 Mtr.

2 Supplying and fixing of control pannel for submersible Pumps complete with sheet,Fabricarted duly 3 Set 4500.00 P/Set
painted and complete internal wiring and composing of air break starter main switch of suitable
Amps, Amperemeter, Voltmeter single phase indicating lamp etc. as per requirement at site
complete in all respect .

3 Supplying and fixing submersible cable to submersible motor of suitable size 2.50mm 2 approved 147 Rmt 95.00 P/Rmt
make & relevant ISS as per 1554-1988 of Siemens/ Finolex/JEC/ ICS/ELCO/ GRADLY/ Natural
make in all respect.

4 Providing and fixing increaser/reducer/sockets/bends /Nut bolts/Clamps testing of all above items 3 Job 1500.00 P/Job
as per directions of Engineer incharge.

5 Supplying and fixing 32 mm dia O.D.(outer dia) H.D. Pipe as column pipe into the bore hole 107 Rmt 135.00 P/Rmt
complete as per the direction of Engineer incharge.

6 Providing and fixing steel rope of 5mm thick for hanging the Submersible pump set into the bore 116 Rmt 60.00 P/Rmt
for its extract from the well and as per direction of the Engineer-in-charge.
Total:-
TERMS AND CONDITIONS
1 The work shall be done as per IPH specifications.
2 Security, Sale Tax & Income tax shall be deduction as per rule.
3 Payment will be made after successful testing at site. Executive Engineer,
4 The guarantee period of pumpng machinery six months I&PH Division,
Paonta Sahib (HP)
REVISED SCHEDULE OF QUANTITY Estimated cost Rs 96989/-
Name of work:- Restoration of Rain damages to village Pipliwala in Tehsil Paonta Sahib Distt. Sirmour (HP) Earnest money Rs.1940/-
(SH: C/o wire crate to protect the land of Sh.Lakshmi Chand, Jagdish Chand etc.) Time:- One Month .

S.No Sub-Head and item of work. Qty. Rates, Unit


1 Excavation in earth work and disposal ofall excavated earth upto a lead of 20 Mtrs. And lift upto 1.50 30.00 Cum 140.00 P/Cum
Mtrs. disposing earth to be levelled and neatly dressed within a leads in Pick/juper work 50% each
including all leads,lifts and carriage of material and as per direction of the Engineer-in-charge.

2 Wire crates made of G.I.wire filled with boulder/hard stone of approved quality with square cut 125.00 Cum. 925.00 P/Cum.
faces against the wire having rounded/rectangular shape weight of stones not less than 18 Kg. free
from soft spots,cracks,cavaties etc.(Wire crate to be measured and paid for separately)including all
leads,lifts and carriage of material at site as direction of the Engineer-in-charge. (Double Knot)

3 Wire crates of G.I.wire filled with boulder with square cut faces against the wire G.I.wire 5mm thick 600.00 Sqm. 36.00 P/Sqm.
corresponding to SWG 6 with 15cmx15cm mesh(boulder filling to be measured and paid for
separately including all leads,lifts and carriage of materials at site and as per directions of the
Engineer-in-charge(L.Rate)

TERMS & CONDITIONS TOTAL:


1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 GI wire shall be issued free of cost from IPH store Bhatanwali.
4 Boulder shall not be less than 18 Kg. & the stone should be free from cracks and cavities.

Executive Engineer,
I&PH Division,
Paonta Sahib.
REVISED SCHEDULE OF QUANTITY Estimated cost Rs.60127/-
Name of work:- Insttt. Of Deep well Hand Pumps under I&PH Sub Division Majra in tehsil Paonta Sahib Earnest Money Rs.1200/-
Distt. Simour (HP)(SH: Energisation of 02 Nos Hand Pumpin village Jagatpur nr. House of Shri Faiz Mohd. S/o Time:-One Month.
Gulsher Mohd. & Nr. House of Shri Khurshid Mohd. S/o Sh. Sharif Mohd.
Sr.No. Item of work. Qty. Rate. Unit.
1 2 3 4 5
2 Providing and installation of Submersible Pump of suitable make such as 2 Set 25500.00 P/Set
KSB/Johnston/Calama/BS/SU/Amrut confirming to ISS 1984-1976 alongwith a directly coubpled
submesible type Square cage electrical induction motor of suitable 2.00 HP for the operation on
220+1 phase 50 CPS AC supply with water lubricated bearings and provided with pivoted segment
type thrust bearing to withstand non vertical head with uniform wear and duly fitted with device to
take in/Out the exemption of water with heating of motor complete in all respect. Total Head 40 to
65 Mtr. Discharge 50 to 60 Mtr.

3 Supplying and fixing of control pannel for submersible Pumps complete with sheet,Fabricarted duly 2 Set 4500.00 P/Set
painted and complete internal wiring and composing of air break starter main switch of suitable
Amps, Amperemeter, Voltmeter single phase indicating lamp etc. as per requirement at site
complete in all respect .

4 Supplying and fixing submersible cable to submersible motor of suitable size 2.50mm 2 approved 103 Rmt 95.00 P/Rmt
make & relevant ISS as per 1554-1988 of Siemens/ Finolex/JEC/ ICS/ELCO/ GRADLY/ Natural
make in all respect.

5 Providing and fixing increaser/reducer/sockets/bends /Nut bolts/Clamps testing of all above items 2 Job 1500.00 P/Job
as per directions of Engineer incharge.
7 Supplying and fixing 32 mm dia O.D.(outer dia) H.D. Pipe as column pipe into the bore hole 84 Rmt 145.00 P/Rmt
complete as per the direction of Engineer incharge.
8 Providing and fixing steel rope of 6mm thick for hanging the Submersible pump set into the bore for 92 Rmt 90.00 P/Rmt
its extract from the well and as per direction of the Engineer-in-charge.
Total:-
TERMS AND CONDITIONS
1 The work shall be done as per IPH specifications.
2 Security, Sale Tax & Income tax shall be deduction as per rule.
3 Payment will be made after successful testing at site. Executive Engineer,
4 The guarantee period of pumpng machinery six months I&PH Division,
Paonta Sahib (HP)
d cost Rs 6146/-
money Rs.150/-

Amount.
6
10693.00

0.00

3960.00
2700.00
3520.00
0.00

850.00
650.00
600.00
22979.00

e Engineer,
vision,
d cost Rs 7682/-
money Rs.200/-

Amount.
6
15552.00

6600.00
3240.00

850.00
650.00
26898.00

e Engineer,
vision,
d cost Rs.97413/-

Amount.
6
26500.00

51000.00

13500.00
16625.00

4500.00

5130.00

12960.00

8100.00

138315.00

d cost Rs.58791/-

Amount.
6
51000.00

9000.00

9690.00

3000.00

12035.00

8010.00

92735.00

d cost Rs.58791/-
Amount.
6
102000.00

18000.00

16910.00

6000.00

19710.00

9360.00

171980.00
d cost Rs.61320/-
Money Rs.1250/-

Amount.
6
51000.00

9000.00

9880.00

3000.00

12420.00

5880.00

91180.00
d cost Rs96510/-
Money Rs.1900/-

Amount.
6
102000.00

18000.00

21850.00

6000.00

24700.00

12000.00

184550.00
d cost Rs. 60127/-
Money Rs.1200/-

Amount.
6
51000.00

9000.00

9785.00

3000.00

11340.00
5520.00

89645.00

d cost Rs. 59791/-


Money Rs.1200/-

Amount.
6
51000.00

9000.00

9690.00
3000.00

11205.00

5340.00

89235.00

d cost Rs. 35630/-


Money Rs.1500/-

Amount.
6
25500.00

4500.00
5700.00

1500.00

6750.00

3300.00

47250.00

d cost Rs. 72569/-


Money Rs.1500/-

Amount.
6
51000.00
9000.00

10260.00

3000.00

12690.00

6120.00

92070.00

d cost Rs. 31325/--


Money Rs.625/-
fteen days.

Amount.
6
25500.00

4500.00

5700.00

1500.00

6345.00

2880.00

46425.00

d cost Rs. 98931/--


Money Rs.2000/-
Amount.
6
76500.00

13500.00

13965.00

4500.00

14445.00

6960.00

129870.00
d cost Rs 96989/-
money Rs.1940/-

Amount.
4200.00

115625.00

21600.00

278255.00
d cost Rs.60127/-
Money Rs.1200/-

Amount.
6
51000.00

9000.00

9785.00

3000.00

12180.00
8280.00

93245.00
DRAFT SCHEDULE OF QUANTITY Estimated cost Rs 94500/-
Name of work:- C/o FIS Manal in GP Bhajaun in Tehsil Paonta Sahib Distt. Sirmour (HP) Earnest money Rs.1900/-
(SH: Manufacturing and supplying & fixing of MS Nakka Plates) Time:- One Month .

S.No Sub-Head and item of work. Qty. Rates, Unit Amount.


1 Manufacuring and supplying and fixing of mild steel sliding gate duly painted with 300.00 Nos. 315.00 P/Cum 94500.00
water resistance paint (Nakka Plate) of 460x230mm size complete with housing frame
thickness of MS plate should not be less than 3.15mm with beading of 3.15mm thick
MS plate 10mm wide should be done on all comers of sliding gate. The frame
withhold fact duly painted shall consist of 4.50mm thick float so as to house the
sliding gate. The handle should be of 10mm dia. MS round bar & steel chain of
required length with C.M. 1:4 (1cement :4sand) complete in all respect and as per
direction of the Engineer-in-charge.

TERMS & CONDITIONS TOTAL: 94500.00


1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Nothing shall be paid for rejected/defective material.
Assistant Engineer,
I&PH Sub Division,
Kaffota.
REVISED SCHEDULE OF QUANTITY Estimated Cost :-Rs.8694/-
Name of work:- Providing LWSS to PC hab. Misserwala Kiyarda & Jagatpur in Tehsil Earnest Money :-Rs.200/-
Paonta Sahib Distt. Sirmour(HP)(SH:- Providing internal Electrification to the Pump House .) Time : One Month

S.N. Description Qty. Rate Unit


1 2 3 4 5
1 Wiring for light Point/Fan Point/Exhaust Fan Point/ Call Bell Point with 1.5 sq. mm PVC Insulated, PVC 7 Nos 380.00 Each
sheathed copper conductor cable in PVC casing and capping/ with surface recessed PVC conduit
complete with ISI Marked Cable, Switches, etc, as required complete in all respect (Group-A)

2 Wiring for Light/power plug wiring with 2x1.5 sq. mm PVC Insulated copper conductor cable in surface/ 15 mtr 50.00 P/mtr.
reccessed PVC conduit alongwith one No. 2.24mm dia base copper wire for loop earthing as required.
Complete with in all leads lifts and as per direction of Engineer in-charge.

3 Wiring for Light/power plug wiring with 2x4 sq. mm PVC Insulated copper conductor cable in surface/ 8 mtr 90.00 P/mtr.
reccessed PVC conduit alongwith one No. 2.24mm dia base copper wire for loop earthing as required.
Complete with in all leads lifts and as per direction of Engineer-in-charge.
4 Supplying fixing of 15/16 AMP 3 PIN timbler piano type switch on existing box cover including 1 No. 60.00 Each.
connection etc. as required complete with in all leads,lifts and carriage of material and as per direction of
the Engineer-in-charge.
5 Supplying fixing of 15/16 AMP 3 PIN Socket Outlet on the exiisting box cover including connection etc. as 1 No. 40.00 Each.
required complete with in all leads,lifts and carriage of material and as per direction of the Engineer-in-
charge.
6 Supplying fixing of 05/06 AMP Tumbler Piano type switch on existing box cover including connection etc. 7 No. 40.00 Each
as required complete with in all leads,lifts and carriage of material and as per direction of the Engineer-
in-charge.
7 Supplying fixing wooden box of following size nominal on surface recess with suitable size of phonetic
laminated sheet cover in front as required complete in all respect.

i) 8"x6" or 230x152mm. 1 No. 80.00 Each

ii) 4"x7" or 102x178mm 1 No. 80.00 Each


8 Wiring for Sub main wiring with 2x6 Sqm. PVC insulated copper conductorin single cover in surface or 2 Metre 100.00 P/Metre.
recessed in PVC conduction with all leads,lifts and carriage of material and as required complete in all
respect.
9 Supplying fixing 5 to 32 Amp. Rating 240 Volts L-series main circuit bracker in existing MCB box
complette with commissioning connection testing etc. as required with all leads,lifts and carrige of
material as required .
i) Single pole. 1 No. 200.00 Each
ii) Double pole. 1 No. 450.00 Each
10 Supplying fixing single pole ad natural sheet steel MCB distribution box on surface/recessed complete 1 No. 450.00 Each.
with tinned copper busher neutral ,detachable glass plate inter connection including painting earthing
etc. 4 way complete with in all leads,lifts and carriage of maerial and as per direction of the Engineer-in-
charge.

11 Providing , installing testing and commissioning of pre wire flourcent tube fitting complete with blast 4 Nos 1100.00 each
starter and capacitor but excluding the cost of tube rod suitable to operate on 230 V single faces AC
supply directly on surface with copper wiring as required complete with all leads,lifts and carrige of
material etc. F/tube fixture 1x40w prpex type category -B.

12 Supplying fixing backlite batten /angle holder including connection etc. complete with all leads,lifts and 1 No. 80.00 each
carriage of material and as per direction of the Engineer-in-charge.
13 Supplying and fixing of ceiling rose on existing junction box/wooden block including connection etc. as 5 No. 100.00 Each.
required complete with all leads,lifts and carriage of material and as per direction of the Engineer-in-
charge.
14 Earthing with copper plate 600x600x3mm including accessoires and providing masonary enclosure with 1 set. 2800.00 P/set.
cover plate having locking arrangeents and water pipe etc. (but without charcoal or coke and salt )
comlete as required complete with all leads,lifts and carriage of material and as per directionof the
Engineer-in-charge.

15 Extra for using salf and charcoal for G.I. or copper plate earth electrod as required complete with all 1 set. 850.00 P/set.
leads,lifts and carriage of material and as per direction of the Egineer-in-charge.
16 Supplying laying 6 SWG GI wire at 0.5 Mtr. Elbow ground level for conductor earth electrod including 20 Mtr. 80.00 P/Mtr.
soldering as required complete in all respect and as per direction of the Engineer-in-charge.

17 Providing, Installation, testing and commissioning of ceiling fan with regulator, including wiring the
down rods of standard length (up to 30 cm) with 16/0.20 mm twin twisted flexible, cotton braided,
copper cable, including providing and fixing phenolic laminated sheet cover on the fan box and earthing
etc. as required:-

Ceiling Fan 1200 mm sweep, Category-A 1 No. 2150 Each.


Total
TERMS AND CONDITIONS:-
1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Nothing shall be paid for rejected material and all material shall be ISI specification
4 Payment will be made after successful testing of work . Executive Engineer,
I&PH Division,
Paonta Sahib (HP)
ed Cost :-Rs.8694/-
Money :-Rs.200/-
One Month

Amount
6.
2660.00

750.00

720.00

60.00

40.00

280.00

80.00

80.00
200.00
200.00
450.00
450.00

4400.00

80.00

500.00

2800.00

850.00

1600.00

2150.00
18350.00
ve Engineer,
DRAFT SCHEDULE OF QUANTITY Estimated cost Rs 52397/-
Name of work:- Providing LWSS Makrana GP Thontha Jakhal in Tehsil Paonta Sahib Distt. Sirmour (HP) Earnest money Rs.1100/-
(SH:-Exensionthe Rising main to cover the Tirmoti Habitation & C/o RCC 10000 Litre Tank, Time:- Three months.
laying & jointing of GI Pipes)
Sr.No. Description. Qty. Rate. Unit Amount.
1 2 3 4 5 6
1 Excavation in foundation and trenches etc.in earth work in all kinds of soil such as pick 10.47 Cum. 92.85 P/Cum 972.00
work ,jumper work decomposed conglomerate saturated soil soft and hard rock upto all
leads lifts stacking the excavated soil not more than 3mtr.clear from the edge of
excavation and then returning the stacked soil in 15cm layers when required in to plinth
sides of foundation etc. consolidating each deposited layers by ramming and watering and
then disposing of all surplus excavated earth as directed with in all leads lifts and as per
directions of the Engineer-incharge

2 Providing and laying cement concrete 1:4:8(1cement:4sand:8 graded stone agg.40mm 1.28 Cum 1104.80 P/Cum 1414.00
nominal size)and curing complete excluding the cost of form work in foundation & plinth
including all leads lifts and carriage of material and as per the directions of Engineer-in-
charge.

3 Providing and laying cement concrete work 1:1 1/2:3 (1cement:1 1/2 sand: 3 graded 0.00
stone agg. 20mm nominal size & curing complete) excluding cost of form workand
reinforcement for RCC work including all leads lifts complete and carriage of material
etc. as per directions of Engineer incharge.

i) In foundation and Plinth 1.30 Cum. 1866.80 P/Cum. 2427.00


ii) In vertical walls any thickness but not less than 0.10 Metres. 2.75 Cum. 1923.00 P/Cum. 5288.00
4 Providing form work with steel sheets 3.15mm thick welded with angle iron 30x30x5 mm
so as to give rough finish i/c centring shuttering structing and propping etc. with wooden
bettens & Ballies, height or propping & centering below supporting floor to ceiling not
exceeding 4 mtr.and removal of the same for insitu RCC work and PCC work.including all
leads lifts and carriage of material at site & as per direction of Engineer in charge in:-

a) Flat surfaces such as soffits of suspended floor roofs landing and like upto 200mm in 5.51 Sqm. 134.10 P/Sqm. 739.00
thickness.
ii) In vertical walls any thickness but not less than 0.10 Metres. 40.74 Sqm. 80.70 P/Sqm. 3288.00
5 Providing and laying cement concrete 1:2:4(1cement:2app.sand: 4 app. graded stone agg. 0.69 Cum 1658.90 P/Cum 1145.00
20mm nominal size )and curing complete excluding cost of form work & reinforcement
for reinforced work in suspended floors, roofs landing shelves and their supports
balconies, beams, girders bressumers and cantilivers upto to floor two level in all height
and depth, including all leads lifts and carriage of material at site and as per direction of
the Engineer-incharge.

6 Providing Mild Steel/Tor steel reinforcement including bending binding & placing in 332.00 Kg. 20.70 P/kg 6872.00
positing I/c all leads lifts and carriage of material and as per direction of the Engineer-
in-charge.

7 Excavation in drains & channel etc.in earth work in all kinds of soil such as pick work 384.75 Cum 75.95 P/Cum 29222.00
,jumper work blasting work, decomposed conglomerate saturated soil soft and hard rock
including dressing of sides and beds and prepareation of sub grade to level or slope
including refilling the trenches and disposing of surplus earth upto all leads,lifts disposed
earth to be levelled and neatly dressed including jungle clearance and as per directions of
the Engineer-incharge

8 Laying and jointing of GMS Pipes of various dia in trenches (earth work in trenches to be
measured and paid for seperately) including all leads lifts and carriage of material at site
as per direction of Engineer-in-charge of following dias.
i) 15mm dia. 1010 Rmt. 0.50 P/Rmt. 505.00
ii)32 mm dia. 700 Rmt. 0.75 P/Rmt. 525.00
Total: 52397.00
TERMS AND CONDITIONS:-
1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Cement will be issued @ 315/- per bag & steel @ 53/- per Kg. at IPH store Bhatanwali Paonta Sahib.
4 Empty cement bags shall be returned to the deptt. Otherwise Rs. 2/- per bag shall be deducted from the each bill of
the contractor.
5 Royality certificate in respect of stone agg. Sand etc. shall be produced by the contractor

6 GI Pipes shall be issued free of cost from IPH store Bhatanwali Paonta Sahib
7 GI Fitting shall be provided by the contractor. Assistant Engineer,
I&PH Sub Division,
Kaffota.
DRAFT SCHEDULE OF QUANTITY Estimated Cost: 90662/-
Name of work:-R/M of various LWSS under I&PH Sub Division Kaffota in Tehsil Paonta Sahib Distt. Sirmour Earnest Money: 1900/-
(HP)
(SH: C/o Toilets ) Time : Three Months.
S.No Description Qty. Rate Unit., Amount
1 2 3 5 4 6.
1 Excavation in foundation and trenches etc.in earth work in all kinds of soil such as pick 29.24 Cum. 92.85 P/Cum 2715.00
work ,jumper work decomposed conglomerate saturated soil soft and hard rock upto all
leads lifts stacking the excavated soil not more than 3mtr.clear from the edge of excavation
and then returning the stacked soil in 15cm layers when required in to plinth sides of
foundation etc. consolidating each deposited layers by ramming and watering and then
disposing of all surplus excavated earth as directed with in all leads lifts and as per
directions of the Engineer-incharge

2 Providing and laying cement concrete 1:6:12(1cement:6sand:12 graded stone 2.76 Cum 905.10 P/Cum 2498.00
agg.40mm nominal size)and curing complete excluding the cost of centring shuttering
in foundation & plinth including all leads lifts and carriage of material and as per the
directions of Engineer-in-charge.

3 Random rubble masonary /Poly rubble masonary (uncoursed/brought to coursed) with 28.08 Cum. 1135.50 Cum 31885.00
hard stone of approved quality in foundation and plinth including levelling up with
cement concrete 1:6.12(1cement:6sand:12 graded stone agg. 20mm nominal size)in
cement mortor 1:6 (1 Cement: 6 sand ) in breast wall & Retaining walls including all leads
lifts and carriage of material and as per the directions of Engineer-in-charge.

4 Providing and fixing of brick work of 2nd class brick of building clay material with Cement 10.44 Cum. 1399.70 P/Cum. 14613.00
Mortar 1:6 (1cement:6sand) complete in all respect and as per direction if the Engineer-
in-charge.
5 Providing form work with steel sheets 3.15mm thick welded with angle iron 30x30x5 mm
so as to give rough finish i/c centring shuttering structing and propping etc. with wooden
bettens & Ballies, height or propping & centering below supporting floor to ceiling not
exceeding 4 mtr.and removal of the same for insitu RCC work and PCC work.including all
leads lifts and carriage of material at site & as per direction of Engineer in charge in:-

a) Flat surfaces such as soffits of suspended floor roofs landings and like upto 200mm in 24.48 Sqm. 134.10 P/Sqm. 3283.00
thickness
Providing Mild Steel/Tor steel reinforcement including bending binding & placing in 938.12 Kg. 20.70 P/kg 19419.00
positing I/c all leads lifts and carriage of material and as per direction of the Engineer-in-
charge.
5 Providing and laying cement concrete 1:2:4(1cement:2app.sand: 4 app. graded stone agg. 4.68 Cum. 1615.40 P/Cum. 7560.00
20mm nominal size )and curing complete excluding cost of form work & reinforcement for
reinforced work in foundation & plinth including all leads lifts and carriage of material at
site and as per direction of the Engineer-incharge.

6 15 mm thick cement plaster in single coat of rough side of bricks/stone masonary for 98.68 Sqm 58.40 P/Sqm 5763.00
interior plastering upto floor two level including arrises internal rounded angles chamfers
rounded angles not exceeding 80mm in girth and finished even and smooth in cement
mortor 1:6(1cement:6 sand) and curing complete including all leads lifts and carriage of
materials at site as per direction of Engineer-incharge.

7 Providing and laying of 40mm thick flooring of Cement concrete 1:2:4 9.00 Sqm. 325.10 Per Sqm 2926.00
(1cement:2app.sand: 4 app. graded stone agg. 20mm nominal size )and curing complete
excluding cost of form work & reinforcement for reinforced work in foundation & plinth
including all leads lifts and carriage of material at site and as per direction of the
Engineer-incharge.
TERMS AND CONDITIONS:- Total 90662.00
1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Royality certificate in respect of stone agg. Sand etc. shall be produced by the contractor
4 G.I.Pipe shall be issued by the deptt. free of cost from IPH Store Bhatanwali.
5 Empty cement bags shall be returned to the Deptt.otherwise Rs.2/-per bag shall be deducted from the bill.
6 Cement shall be issued @ Rs.315/- per bag & steel @ 53/- per Kg. from IPH store Bhatanwali Paonta Sahib.
Assistant Engineer,
I&PH Sub Division,
Kaffota.

ABSTRACT OF COST
Name of work:-R/M of various LWSS under I&PH Sub Division Kaffota in Tehsil Paonta Sahib Distt. Sirmour
(HP)
(SH: C/o 3 Nos Toilets )
S.No Description Qty. Rate Unit., Amount
1 2 3 5 4 6.
1 Excavation in foundation and trenches etc.in earth work in all kinds of soil such as pick 7.31 Cum. 331.80 P/Cum 2425.00
work ,jumper work decomposed conglomerate saturated soil soft and hard rock upto all
leads lifts stacking the excavated soil not more than 3mtr.clear from the edge of excavation
and then returning the stacked soil in 15cm layers when required in to plinth sides of
foundation etc. consolidating each deposited layers by ramming and watering and then
disposing of all surplus excavated earth as directed with in all leads lifts and as per
directions of the Engineer-incharge

2 Providing and laying cement concrete 1:6:12(1cement:6sand:12 graded stone 0.69 Cum 3920.00 P/Cum 2705.00
agg.40mm nominal size)and curing complete excluding the cost of centring shuttering
in foundation & plinth including all leads lifts and carriage of material and as per the
directions of Engineer-in-charge.

3 Random rubble masonary /Poly rubble masonary (uncoursed/brought to coursed) with 7.02 Cum. 3488.20 Cum 24487.00
hard stone of approved quality in foundation and plinth including levelling up with
cement concrete 1:6.12(1cement:6sand:12 graded stone agg. 20mm nominal size)in
cement mortor 1:6 (1 Cement: 6 sand ) in breast wall & Retaining walls including all leads
lifts and carriage of material and as per the directions of Engineer-in-charge.

4 Providing and fixing of brick work of 2nd class brick of building clay material with Cement 2.61 Cum. 6178.40 P/Cum. 16126.00
Mortar 1:6 (1cement:6sand) complete in all respect and as per direction if the Engineer-
in-charge.
5 Providing form work with steel sheets 3.15mm thick welded with angle iron 30x30x5 mm
so as to give rough finish i/c centring shuttering structing and propping etc. with wooden
bettens & Ballies, height or propping & centering below supporting floor to ceiling not
exceeding 4 mtr.and removal of the same for insitu RCC work and PCC work.including all
leads lifts and carriage of material at site & as per direction of Engineer in charge in:-

a) Flat surfaces such as soffits of suspended floor roofs landings and like upto 200mm in 6.12 Sqm. 46.10 P/Sqm. 282.00
thickness
6 Providing Mild Steel/Tor steel reinforcement including bending binding & placing in 234.53 Kg. 64.40 P/kg 15104.00
positing I/c all leads lifts and carriage of material and as per direction of the Engineer-in-
charge.
7 Providing and laying cement concrete 1:2:4(1cement:2app.sand: 4 app. graded stone agg. 1.17 Cum. 5935.00 P/Cum. 6944.00
20mm nominal size )and curing complete excluding cost of form work & reinforcement for
reinforced work in foundation & plinth including all leads lifts and carriage of material at
site and as per direction of the Engineer-incharge.

8 15 mm thick cement plaster in single coat of rough side of bricks/stone masonary for 24.67 Sqm 154.90 P/Sqm 3821.00
interior plastering upto floor two level including arrises internal rounded angles chamfers
rounded angles not exceeding 80mm in girth and finished even and smooth in cement
mortor 1:6(1cement:6 sand) and curing complete including all leads lifts and carriage of
materials at site as per direction of Engineer-incharge.

9 Providing and laying of 40mm thick flooring of Cement concrete 1:2:4 2.25 Sqm. 325.10 Per Sqm 731.00
(1cement:2app.sand: 4 app. graded stone agg. 20mm nominal size )and curing complete
excluding cost of form work & reinforcement for reinforced work in foundation & plinth
including all leads lifts and carriage of material at site and as per direction of the
Engineer-incharge.

72625.00
Cost for 1 No. Toilet. 72686
Cost for 3 Nos Toilets. 218058

Say Rs. 218000/-

Assistant Engineer,
I&PH Sub Division,
Kaffota.
ABSTRACT OF COST
Name of work:-R/M of various LWSS under I&PH Sub Division Kaffota in Tehsil Paonta Sahib Distt. Sirmour
(HP)
(SH: C/o Toilets )
S.No Description Qty. Rate Unit., Amount
1 2 3 5 4 6.
1 Excavation in foundation and trenches etc.in earth work in all kinds of soil such as pick 51.17 Cum. 92.85 P/Cum 4751.00
work ,jumper work decomposed conglomerate saturated soil soft and hard rock upto all
leads lifts stacking the excavated soil not more than 3mtr.clear from the edge of excavation
and then returning the stacked soil in 15cm layers when required in to plinth sides of
foundation etc. consolidating each deposited layers by ramming and watering and then
disposing of all surplus excavated earth as directed with in all leads lifts and as per
directions of the Engineer-incharge

2 Providing and laying cement concrete 1:6:12(1cement:6sand:12 graded stone 4.83 Cum 905.10 P/Cum 4372.00
agg.40mm nominal size)and curing complete excluding the cost of centring shuttering
in foundation & plinth including all leads lifts and carriage of material and as per the
directions of Engineer-in-charge.

3 Random rubble masonary /Poly rubble masonary (uncoursed/brought to coursed) with 49.14 Cum. 1135.50 Cum 55798.00
hard stone of approved quality in foundation and plinth including levelling up with
cement concrete 1:6.12(1cement:6sand:12 graded stone agg. 20mm nominal size)in
cement mortor 1:6 (1 Cement: 6 sand ) in breast wall & Retaining walls including all leads
lifts and carriage of material and as per the directions of Engineer-in-charge.

4 Providing and fixing of brick work of 2nd class brick of building clay material with Cement 18.27 Cum. 1399.70 P/Cum. 25573.00
Mortar 1:6 (1cement:6sand) complete in all respect and as per direction if the Engineer-
in-charge.
5 Providing form work with steel sheets 3.15mm thick welded with angle iron 30x30x5 mm
so as to give rough finish i/c centring shuttering structing and propping etc. with wooden
bettens & Ballies, height or propping & centering below supporting floor to ceiling not
exceeding 4 mtr.and removal of the same for insitu RCC work and PCC work.including all
leads lifts and carriage of material at site & as per direction of Engineer in charge in:-

a) Flat surfaces such as soffits of suspended floor roofs landings and like upto 200mm in 42.84 Sqm. 134.10 P/Sqm. 5745.00
thickness
Providing Mild Steel/Tor steel reinforcement including bending binding & placing in 1641.71 Kg. 20.70 P/kg 33983.00
positing I/c all leads lifts and carriage of material and as per direction of the Engineer-in-
charge.
5 Providing and laying cement concrete 1:2:4(1cement:2app.sand: 4 app. graded stone agg. 8.19 Cum. 1615.40 P/Cum. 13230.00
20mm nominal size )and curing complete excluding cost of form work & reinforcement for
reinforced work in foundation & plinth including all leads lifts and carriage of material at
site and as per direction of the Engineer-incharge.

6 15 mm thick cement plaster in single coat of rough side of bricks/stone masonary for 172.69 Sqm 58.40 P/Sqm 10085.00
interior plastering upto floor two level including arrises internal rounded angles chamfers
rounded angles not exceeding 80mm in girth and finished even and smooth in cement
mortor 1:6(1cement:6 sand) and curing complete including all leads lifts and carriage of
materials at site as per direction of Engineer-incharge.

7 Providing and laying of 40mm thick flooring of Cement concrete 1:2:4 15.75 Sqm. 325.10 Per Sqm 5120.00
(1cement:2app.sand: 4 app. graded stone agg. 20mm nominal size )and curing complete
excluding cost of form work & reinforcement for reinforced work in foundation & plinth
including all leads lifts and carriage of material at site and as per direction of the
Engineer-incharge.

TERMS AND CONDITIONS:- Total 158657.00


1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Royality certificate in respect of stone agg. Sand etc. shall be produced by the contractor
4 G.I.Pipe shall be issued by the deptt. free of cost from IPH Store Bhatanwali.
5 Empty cement bags shall be returned to the Deptt.otherwise Rs.2/-per bag shall be deducted from the bill.
6 Cement shall be issued @ Rs.315/- per bag & steel @ 53/- per Kg. from IPH store Bhatanwali Paonta Sahib.
Assistant Engineer,
I&PH Sub Division,
Kaffota.

DRAFT SCHEDULE OF QUANTITY Estimated Cost: 45202/-


Name of work:-R/M of LWSS Shilla & Bokala Pab in Tehsil Paonta Sahib Distt. Sirmour (HP) Earnest Money: 500/-
(SH: C/o 2 Nos Toilets ) Time : One Month.
S.No Description Qty. Rate Unit., Amount
1 2 3 5 4 6.
1 Excavation in foundation and trenches etc.in earth work in all kinds of soil such as pick 14.62 Cum. 92.85 P/Cum 1357.00
work ,jumper work decomposed conglomerate saturated soil soft and hard rock upto all
leads lifts stacking the excavated soil not more than 3mtr.clear from the edge of excavation
and then returning the stacked soil in 15cm layers when required in to plinth sides of
foundation etc. consolidating each deposited layers by ramming and watering and then
disposing of all surplus excavated earth as directed with in all leads lifts and as per
directions of the Engineer-incharge

2 Providing and laying cement concrete 1:6:12(1cement:6sand:12 graded stone 1.24 Cum 905.10 P/Cum 1122.00
agg.40mm nominal size)and curing complete excluding the cost of centring shuttering
in foundation & plinth including all leads lifts and carriage of material and as per the
directions of Engineer-in-charge.
3 Random rubble masonary /Poly rubble masonary (uncoursed/brought to coursed) with 14.04 Cum. 1135.50 Cum 15942.00
hard stone of approved quality in foundation and plinth including levelling up with
cement concrete 1:6.12(1cement:6sand:12 graded stone agg. 20mm nominal size)in
cement mortor 1:6 (1 Cement: 6 sand ) in breast wall & Retaining walls including all leads
lifts and carriage of material and as per the directions of Engineer-in-charge.

4 Providing and fixing of brick work of 2nd class brick of building clay material with Cement 5.22 Cum. 1399.70 P/Cum. 7306.00
Mortar 1:6 (1cement:6sand) complete in all respect and as per direction if the Engineer-
in-charge.

5 Providing form work with steel sheets 3.15mm thick welded with angle iron 30x30x5 mm
so as to give rough finish i/c centring shuttering structing and propping etc. with wooden
bettens & Ballies, height or propping & centering below supporting floor to ceiling not
exceeding 4 mtr.and removal of the same for insitu RCC work and PCC work.including all
leads lifts and carriage of material at site & as per direction of Engineer in charge in:-

a) Flat surfaces such as soffits of suspended floor roofs landings and like upto 200mm in 12.24 Sqm. 134.10 P/Sqm. 1641.00
thickness
6 Providing Mild Steel/Tor steel reinforcement including bending binding & placing in 469.06 Kg. 20.70 P/kg 9710.00
positing I/c all leads lifts and carriage of material and as per direction of the Engineer-in-
charge.

7 Providing and laying cement concrete 1:2:4(1cement:2app.sand: 4 app. graded stone agg. 2.34 Cum. 1615.40 P/Cum. 3780.00
20mm nominal size )and curing complete excluding cost of form work & reinforcement for
reinforced work in foundation & plinth including all leads lifts and carriage of material at
site and as per direction of the Engineer-incharge.

8 15 mm thick cement plaster in single coat of rough side of bricks/stone masonary for 49.34 Sqm 58.40 P/Sqm 2881.00
interior plastering upto floor two level including arrises internal rounded angles chamfers
rounded angles not exceeding 80mm in girth and finished even and smooth in cement
mortor 1:6(1cement:6 sand) and curing complete including all leads lifts and carriage of
materials at site as per direction of Engineer-incharge.
9 Providing and laying of 40mm thick flooring of Cement concrete 1:2:4 4.50 Sqm. 325.10 Per Sqm 1463.00
(1cement:2app.sand: 4 app. graded stone agg. 20mm nominal size )and curing complete
excluding cost of form work & reinforcement for reinforced work in foundation & plinth
including all leads lifts and carriage of material at site and as per direction of the
Engineer-incharge.

TERMS AND CONDITIONS:- Total 45202.00


1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Royality certificate in respect of stone agg. Sand etc. shall be produced by the contractor
4 G.I.Pipe shall be issued by the deptt. free of cost from IPH Store Bhatanwali.
5 Empty cement bags shall be returned to the Deptt.otherwise Rs.2/-per bag shall be deducted from the bill.
6 Cement shall be issued @ Rs.315/- per bag & steel @ 53/- per Kg. from IPH store Bhatanwali Paonta Sahib.
Assistant Engineer,
I&PH Sub Division,
Kaffota.

DRAFT SCHEDULE OF QUANTITY Estimated Cost: 67996/-


Name of work:-R/M of various LWSS under I&PH Sub Division Kaffota in Tehsil Paonta Sahib Distt. Sirmour Earnest Money: 1400/-
(HP)
(SH: C/O 3 Nos Toilets ) Time : Three Months.
S.No Description Qty. Rate Unit., Amount
1 2 3 5 4 6.
1 Excavation in foundation and trenches etc.in earth work in all kinds of soil such as pick 21.93 Cum. 92.85 P/Cum 2036.00
work ,jumper work decomposed conglomerate saturated soil soft and hard rock upto all
leads lifts stacking the excavated soil not more than 3mtr.clear from the edge of excavation
and then returning the stacked soil in 15cm layers when required in to plinth sides of
foundation etc. consolidating each deposited layers by ramming and watering and then
disposing of all surplus excavated earth as directed with in all leads lifts and as per
directions of the Engineer-incharge
2 Providing and laying cement concrete 1:6:12(1cement:6sand:12 graded stone 2.07 Cum 905.10 P/Cum 1874.00
agg.40mm nominal size)and curing complete excluding the cost of centring shuttering
in foundation & plinth including all leads lifts and carriage of material and as per the
directions of Engineer-in-charge.

3 Random rubble masonary /Poly rubble masonary (uncoursed/brought to coursed) with 21.06 Cum. 1135.50 Cum 23914.00
hard stone of approved quality in foundation and plinth including levelling up with
cement concrete 1:6.12(1cement:6sand:12 graded stone agg. 20mm nominal size)in
cement mortor 1:6 (1 Cement: 6 sand ) in breast wall & Retaining walls including all leads
lifts and carriage of material and as per the directions of Engineer-in-charge.

4 Providing and fixing of brick work of 2nd class brick of building clay material with Cement 7.83 Cum. 1399.70 P/Cum. 10960.00
Mortar 1:6 (1cement:6sand) complete in all respect and as per direction if the Engineer-
in-charge.
5 Providing form work with steel sheets 3.15mm thick welded with angle iron 30x30x5 mm
so as to give rough finish i/c centring shuttering structing and propping etc. with wooden
bettens & Ballies, height or propping & centering below supporting floor to ceiling not
exceeding 4 mtr.and removal of the same for insitu RCC work and PCC work.including all
leads lifts and carriage of material at site & as per direction of Engineer in charge in:-

a) Flat surfaces such as soffits of suspended floor roofs landings and like upto 200mm in 18.36 Sqm. 134.10 P/Sqm. 2462.00
thickness
Providing Mild Steel/Tor steel reinforcement including bending binding & placing in 703.59 Kg. 20.70 P/kg 14564.00
positing I/c all leads lifts and carriage of material and as per direction of the Engineer-in-
charge.
5 Providing and laying cement concrete 1:2:4(1cement:2app.sand: 4 app. graded stone agg. 3.51 Cum. 1615.40 P/Cum. 5670.00
20mm nominal size )and curing complete excluding cost of form work & reinforcement for
reinforced work in foundation & plinth including all leads lifts and carriage of material at
site and as per direction of the Engineer-incharge.

6 15 mm thick cement plaster in single coat of rough side of bricks/stone masonary for 74.01 Sqm 58.40 P/Sqm 4322.00
interior plastering upto floor two level including arrises internal rounded angles chamfers
rounded angles not exceeding 80mm in girth and finished even and smooth in cement
mortor 1:6(1cement:6 sand) and curing complete including all leads lifts and carriage of
materials at site as per direction of Engineer-incharge.
7 Providing and laying of 40mm thick flooring of Cement concrete 1:2:4 6.75 Sqm. 325.10 Per Sqm 2194.00
(1cement:2app.sand: 4 app. graded stone agg. 20mm nominal size )and curing complete
excluding cost of form work & reinforcement for reinforced work in foundation & plinth
including all leads lifts and carriage of material at site and as per direction of the
Engineer-incharge.

TERMS AND CONDITIONS:- Total 67996.00


1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Royality certificate in respect of stone agg. Sand etc. shall be produced by the contractor
4 Empty cement bags shall be returned to the Deptt.otherwise Rs.2/-per bag shall be deducted from the bill.
5 Cement shall be issued @ Rs.315/- per bag & steel @ 53/- per Kg. from IPH store Bhatanwali Paonta Sahib.

Assistant Engineer,
I&PH Sub Division,
Kaffota.
REVISED SCHEDULE OF QUANTITY Estimated cost Rs 99900/-
Name of work:- C/o 20 Nos. T/well in Paonta area for vilage Mohrar Hem Raj Basti, Parduni Joginder Ram Basti, Earnest money Rs.1998/-
Parduni Barotiwala Nr. Virender Dutt House, Misserwla (Pandit Basti)Jagatpur (Harbans Basti) ) Naya Time:- 15 Days.
Gram Majra (Near society) Khara Rampur Majri (In the land of Rattan Singh , Khamba Nagar (Upper Basti) Fandi
Bodiwala , Bharapur Chaudhary Basti Bharapur Labana Basti) Belwali (Upper Basti) Tokion Khatta Basti)
Sainwala Behrampur Dhaula Kuan (Dhiman Basti) Jamnighat Churak majri Bam Basti) Sainwala Janki Basti
Majra Bahati Basti Haripur Khol (Charnawala ) in Tehsil Paonta Sahib Distt. Sirmour (HP) (SH: Resistivity
at different depth with deep perculation generator Operated DC Resistivity meter at site).
Sr.No. Description. Qty. Rate. Unit Amount.
1 2 3 4 5 6
1 Resistivity propecting to know the strata and quality of ground water at different depth
with deep perculation generator operated D.C.Resistivity meter at various side of 20 Nos
T/wells.
i) Pardooni Joginder Ram Basti. 1 No. 16500.00 Each. 16500.00
ii) Hem Raj Basti Mohrar. 1 No. 16500.00 Each. 16500.00
iii) Jagatpur Harbans Basti 1 No. 16500.00 Each. 16500.00
iv) Bharapur Chaudhary Basti. 1 No. 16500.00 Each. 16500.00
v) Bel wali Upper Basti. 1 No. 16500.00 Each. 16500.00
vi) Sainwala Behrampur. 1 No. 16500.00 Each. 16500.00
vii) Kodewala Haripur 1 No. 16500.00 Each. 16500.00
viii) Haripur Charnawala. 1 No. 16500.00 Each. 16500.00
ix) Phandi Bodiwala. 1 No. 16500.00 Each. 16500.00
Total: 148500.00
TERMS AND CONDITIONS:-
1 The undersigned reserves the right to accept or reject any or all the tenders without any notice.
2 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
3 Security,Sale tax & Income tax shall be deducted as per rules.
4 Nothing shall be paid for defective work.
5 The repair will be guaranteed for six moths.
Executive Engineer,
I&PH Division,
Paonta Sahib.
REVISED SCHEDULE OF QUANTITY Estimated cost Rs 66600/-
Name of work:- C/o 12 Nos. T/well in Paonta area for vilage Pipliwala, Johron, Puruwla , Patlion, Earnest money Rs.1332/-
Subhkhera , Taruwala, Badripur, Amarkot, Gondpur ,Djharamkot, Kundion, Jhaba Basti in Tehsil Time:- 15 Days.
Paonta Sahib Distt. Sirmour (HP) (SH: Resistivity at different depth with deep perculation generator Operated
DC Resistivity meter at site).
Sr.No. Description. Qty. Rate. Unit Amount.
1 2 3 4 5 6
1 Resistivity propecting to know the strata and quality of ground water at different depth
with deep perculation generator operated D.C.Resistivity meter at various side of 12 Nos
T/wells.
i) Pipliwala 1 No. 16500.00 Each. 16500.00
ii) Puruwala. 1 No. 16500.00 Each. 16500.00
iii) Patlion 1 No. 16500.00 Each. 16500.00
iv) Badripur 1 No. 16500.00 Each. 16500.00
v) Amarkot 1 No. 16500.00 Each. 16500.00
vi) Kundion 1 No. 16500.00 Each. 16500.00
Total: 99000.00
TERMS AND CONDITIONS:-
1 The undersigned reserves the right to accept or reject any or all the tenders without any notice.
2 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
3 Security,Sale tax & Income tax shall be deducted as per rules.
4 Nothing shall be paid for defective work.
5 The repair will be guaranteed for six moths.

Executive Engineer,
I&PH Division,
Paonta Sahib.
DRAFT SCHEDULE OF QUANTITY Estimated cost Rs 63291/-
Name of work:-C/o FIS Staun in Tehsil Paonta Sahib Distt. Sirmour (HP) (SH: Earnest money Rs.1300/-
C/O Wire crate toapron at RD 0 to 15 ) Time:- Two Month.
S.No Sub-Head and item of work. Qty. Rates, Unit Amount.
1 Excavation in earth work in all kinds of soil and disposal of all excavated earth upto 56.25 Cum 38.50 P/Cum 2166.00
all leads lifts disposed earth to be levelled and neatly dressed including all leads, lifts
and carriage of material and as per directions of the Engineer-in-charge

2 Wire crates made of G.I.wire filled with boulder/hard stone of approved quality with 84.21 Cum. 639.20 P/Cum. 53827.00
square cut faces against the wire having rounded/rectangular shape weight of stones
not less than 18 Kg. free from soft spots,cracks,cavaties etc.(Wire crate to be
measured and paid for separately)including all leads,lifts and carriage of material at
site as direction of the Engineer-in-charge. (Double Knot)

3 Wire crates of G.I.wire filled with boulder with square cut faces against the wire 363.08 Sqm. 20.10 P/Sqm. 7298.00
G.I.wire 5mm thick corresponding to SWG 6 with 15cmx15cm mesh(boulder filling to
be measured and paid for separately including all leads,lifts and carriage of
materials at site and as per directions of the Engineer-in-charge(L.Rate)

TOTAL: 63291.00
TERMS AND CONDITIONS:-
1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Royality certificate in respect of stone agg. Sand etc. shall be produced by the contractor
4 G.I.wire shall be issued free of cost from IPH store Bhatanwali Paonta Sahib
5 Boulder shall not be less than 18 Kg. & the stone should be free from cracks and cavities.
Assistant Engineer,
I&PH Sub Division,
Kaffota.
DRAFT SCHEDULE OF QUANTITY Estimated Cost: 81749/-
Name of work:-C/o FIS Staun in Tehsil Paonta Sahib Distt. Sirmour (HP) Earnest Money: 1700/-
(SH: C/o RR Masonary channel in banking /edging in upper side at RD ) Time : One Month.
S.No Description Qty. Rate Unit., Amount
1 2 3 5 4 6.
1 Cutting in earth work and dsiposal of excavated earth upto a lead of 20 Metres in 57 Cum. 59.50 P/Cum. 3392.00
all kind of soil complete in all respect and as per direction of the Engineer-in-
charge.

2 Excavation in drains & channel etc.in earth work in all kinds of soil such as pick 19.00 Cum. 75.95 P/Cum. 1443.00
work ,jumper work blasting work, decomposed conglomerate saturated soil soft
and hard rock including dressing of sides and beds and prepareation of sub
grade to level or slope including refilling the trenches and disposing of surplus
earth upto all leads,lifts disposed earth to be levelled and neatly dressed
including jungle clearance and as per directions of the Engineer-incharge

3 Cement concrete lining 15cm thick or less for irrigation channels using cement concrete
1:3:6(1cement:3sand:6graded stone agg. 20mm nominal size)and curing complete
excluding cost of form work included all leads lifts and carriage of material complete in
all respect and as per direction of Engineer-in-charge.

a)Hand Mixed concrete in bed. 7.60 Cum 423.10 P/Cum 3216.00


4 Random rubble masonary /Poly rubble masonary (uncoursed/brought to coursed) with 32.40 Cum. 1135.50 Cum 36790.00
hard stone of approved quality in foundation and plinth including levelling up with
cement concrete 1:6.12(1cement:6sand:12 graded stone agg. 20mm nominal size)in
cement mortor 1:6 (1 Cement: 6 sand ) in breast wall & Retaining walls including all
leads lifts and carriage of material and as per the directions of Engineer-in-charge.
5 20 mm thick cement plaster in single coat of rough side of bricks/stone masonary for 48 Sqm 58.40 P/Sqm 2803.00
interior plastering upto floor two level including arrises internal rounded angles
chamfers rounded angles not exceeding 80mm in girth and finished even and smooth in
cement mortor 1:3(1cement3 sand) and curing complete including all leads lifts and
carriage of materials at site as per direction of Engineer-incharge.

6 Providing and laying cement concrete 1:2:4(1cement:2app.sand: 4 app. graded stone 10.20 Cum 1658.10 P/Cum 16913.00
agg. 20mm nominal size )and curing complete excluding cost of form work &
reinforcement for reinforced work in suspended floors, roofs landing shelves and their
supports balconies, beams, girders bressumers and cantilivers upto to floor two level in
all height and depth, including all leads lifts and carriage of material at site and as per
direction of the Engineer-incharge.

7 Extra allowance for form work in concrete lining as directed by the Engineer-in-charge 352.00 Cum 18.85 P/Cum 6635.00
including all leads lifts and carriage of matrerials at site complete in all respects on side
slopes as per direction of Engineer in charge.
8 Providing Mild Steel/Tor steel reinforcement including bending binding & placing in 510.00 Kg. 20.70 P/kg 10557.00
positing I/c all leads lifts and carriage of material and as per direction of the Engineer-
in-charge.

TERMS AND CONDITIONS:- Total 81749.00


1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-
2 charge.
Security,Sale tax & Income tax shall be deducted as per rules.
3 Royality certificate in respect of stone agg. Sand etc. shall be produced by the contractor
4 Empty cement bags shall be returned to the Deptt.otherwise Rs.2/-per bag shall be deducted from the bill.
5 Cement shall be issued @ Rs.315/- per bag & steel @ 53/- per Kg. from IPH store Bhatanwali Paonta Sahib.

Assistant Engineer,
I&PH Sub Division,
Kaffota.

REVISED SCHEDULE OF QUANTITY Estimated cost Rs 94565/-


Name of work:-Restoration of Rain damages to village Bhagwanpur Santoshgarh in GP Puruwala in Tehsil Paonta Earnest money Rs.1900/-
Sahib Distt. Sirmour (HP) (SH: C/O Wire crate to protect the land of Kabristhan ) Time:-One Month.
S.No Sub-Head and item of work. Qty. Rates, Unit Amount.
1 Excavation in earth work in all kinds of soil and disposal of all excavated earth upto 29.25 Cum 140.00 P/Cum 4095.00
all leads lifts disposed earth to be levelled and neatly dressed including all leads, lifts
and carriage of material and as per directions of the Engineer-in-charge

2 Wire crates made of G.I.wire filled with boulder/hard stone of approved quality with 121.88 Cum. 925.00 P/Cum. 112739.00
square cut faces against the wire having rounded/rectangular shape weight of stones
not less than 18 Kg. free from soft spots,cracks,cavaties etc.(Wire crate to be
measured and paid for separately)including all leads,lifts and carriage of material at
site as direction of the Engineer-in-charge. (Double Knot)

3 Wire crates of G.I.wire filled with boulder with square cut faces against the wire 585.02 Sqm. 36.00 P/Sqm. 21061.00
G.I.wire 4mm thick corresponding to SWG 6 with 15cmx15cm mesh(boulder filling to
be measured and paid for separately including all leads,lifts and carriage of
materials at site and as per directions of the Engineer-in-charge(L.Rate)

TOTAL: 137895.00
TERMS AND CONDITIONS:-
1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Royality certificate in respect of stone agg. Sand etc. shall be produced by the contractor
4 G.I.wire shall be issued free of cost from IPH store Bhatanwali Paonta Sahib
5 Boulder shall not be less than 18 Kg. & the stone should be free from cracks and cavities.
Executive Engineer,
I&PH Division,
Paonta Sahib.
REVISED SCHEDULE OF QUANTITY Estimated cost Rs 86101/-
Name of work:-Aug. of LWSS Behral Bhood in Tehsil Paonta Sahib Distt. Sirmour (HP) Earnest money Rs.1750/-
(SH: C/O Wire crate to protect the Pump House )Part-II Time:-One Month.
S.No Sub-Head and item of work. Qty. Rates, Unit Amount.
1 Excavation in earth work in all kinds of soil and disposal of all excavated earth upto 42.00 Cum 140.00 P/Cum 5880.00
all leads lifts disposed earth to be levelled and neatly dressed including all leads, lifts
and carriage of material and as per directions of the Engineer-in-charge

2 Wire crates made of G.I.wire filled with boulder/hard stone of approved quality with 87.50 Cum. 925.00 P/Cum. 80938.00
square cut faces against the wire having rounded/rectangular shape weight of stones
not less than 18 Kg. free from soft spots,cracks,cavaties etc.(Wire crate to be
measured and paid for separately)including all leads,lifts and carriage of material at
site as direction of the Engineer-in-charge. (Double Knot)

3 Wire crates of G.I.wire filled with boulder with square cut faces against the wire 420.00 Sqm. 36.00 P/Sqm. 15120.00
G.I.wire 4mm thick corresponding to SWG 6 with 15cmx15cm mesh(boulder filling to
be measured and paid for separately including all leads,lifts and carriage of
materials at site and as per directions of the Engineer-in-charge(L.Rate)

TOTAL: 101938.00
TERMS AND CONDITIONS:-
1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Royality certificate in respect of stone agg. Sand etc. shall be produced by the contractor
4 G.I.wire shall be issued free of cost from IPH store Bhatanwali Paonta Sahib
5 Boulder shall not be less than 18 Kg. & the stone should be free from cracks and cavities.
Executive Engineer,
I&PH Division,
Paonta Sahib.
REVISED SCHEDULE OF QUANTITY Estimated cost Rs 59992/-
Name of work:- Providing LWSS to PC habitation Misserwala Kiyarda & Jagatpur in Tehsil Earnest money Rs.1200/-
Paonta Sahib Distt. Sirmour (HP) (SH: Laying & jointing of GMS pipe line, C/o Common header & Time:- One Month .
C/o wire crate to protect the Pipe line)
S.No Sub-Head and item of work. Qty. Rates, Unit Amount.
1 Excavation in earth work and disposal ofall excavated earth upto a lead of 20 Mtrs. 25.87 Cum 140.00 P/Cum 3622.00
And lift upto 1.50 Mtrs. disposing earth to be levelled and neatly dressed within a
leads in Pick/juper work 50% each including all leads,lifts and carriage of material and
as per direction of the Engineer-in-charge.

2 Wire crates made of G.I.wire filled with boulder/hard stone of approved quality 23.44 Cum. 925.00 P/Cum. 21682.00
with square cut faces against the wire having rounded/rectangular shape weight
of stones not less than 18 Kg. free from soft spots,cracks,cavaties etc.(Wire crate to
be measured and paid for separately)including all leads,lifts and carriage of
material at site as direction of the Engineer-in-charge. (Double Knot)

3 Wire crates of G.I.wire filled with boulder with square cut faces against the wire 112.50 Sqm. 36.00 P/Sqm. 4050.00
G.I.wire 5mm thick corresponding to SWG 6 with 15cmx15cm mesh(boulder
filling to be measured and paid for separately including all leads,lifts and carriage
of materials at site and as per directions of the Engineer-in-charge(L.Rate)

4 Providing laying & jointing of GMS pipes of following dia & class including 102.00 Rmt. 49.00 P/Rmt. 4998.00
all leads,lifts and carriage of material and earth work etc. complete in all
respect complete in all respect and as per direction of the Engineer-in-
charge. 100mm dia.

5 Providing and fixing of MS flanges (IS 6392-1971) of table -17 confirm to IS 0.00
816-1965 electric rod as per IS-814-1967 including required no of nut &
botl as per IS 1369-1967 and 3mm thick AF jointing gasket confirming to
IS 2712-1965. The weldingf of flange should be done in two layer both side
and one layer inner side to make the joints air tight and to entire material
at site and as per satisfaction of the Engineer incharge.
i)100mm dia Table-5. 18 pair. 1100.00 Each. 19800.00
6 Providing and fixing of CI sluice valves of Kirloskar/Leader make & relevant 1 No. 22000.00 Each. 22000.00
ISS complete in all respect including all leads,lifts and carriage of material
at site and as direction by the Engineer-in-charge.80mm dia.

7 Providing and fixing of G.I.Union 65mm dia complete in all respect and as per 5 Nos. 325.00 Each. 1625.00
direction of the Engineer-in-charge.
8 Manufacturing of GMS bend of various dia including cutting & welding complete in
all respect and as per direction of the Engineer-in-charge.
i) 100mm dia. 2 Nos. 1200.00 Each. 2400.00
ii0 80mm dia. 1 Nos. 975.00 Each. 975.00
iii) 65mm dia. 6 Nos. 850.00 Each. 5100.00
iv) 40mm dia. 4 Nos. 650.00 Each. 2600.00
9 Providing and laying cement concrete 1:2:4(1cement:2app.sand: 4 app. graded 4.95 Cum. 3700.00 P/Cum. 18315.00
stone agg. 20mm nominal size )and curing complete excluding cost of form work
& reinforcement for reinforced work in foundation & plinth including all leads lifts
and carriage of material at site and as per direction of the Engineer-incharge.

10 Manufacturing of GMS Reducer 65mm dia including cutting & welding complete in 1 No. 850.00 Each. 850.00
all respect and as per direction of the Engineer-in-charge.
11 Manufacturing of GMS Tee of 65mm dia including cutting & welding complete in 1 No. 800.00 Each. 800.00
all respect and as per direction of the Engineer-in-charge.
12 Manufacturing & plugging 125mm dia including cutting & welding complete in all 5 Nos. 500.00 Each. 2500.00
respect and as per direction of the Engineer-in-charge.
TERMS & CONDITIONS TOTAL: 111317.00
1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Cement will be issued @ 315/- per bag & steel @ 53/- per Kg. at IPH store Bhatanwali Paonta Sahib.
4 Empty cement bags shall be returned to the deptt. Otherwise Rs. 2/- per bag shall
be deducted from the each bill of the contractor.
5 Royality certificate in respect of stone agg. Sand etc. shall be produced by the contractor
6 GI Pipe shall be issued free of cost from IPH Store Bhatanwali Paonta Sahib. Executive Engineer,
7 GI wire shall be issued free of cost from IPH store Bhatanwali. I&PH Division,
Paonta Sahib.
REVISED SCHEDULE OF QUANTITY Estimated Cost :-Rs.53963/-
Name of work:-Aug. of LWSS Palhori in Tehsil Paonta Sahib Distt. Sirmour (HP) Earnest Money :-Rs.1100/-
(SH:- C/O Pump House at Sunkari Basti in village Palhori). Time:- Three months.
Sr.No. Description Qty. Rate
1 Excavation in foundation and trenches etc.in earth work in all kinds of soil such as pick work ,jumper work 11.37 Cum 160.00
decomposed conglomerate saturated soil soft and hard rock upto all leads lifts stacking the excavated soil not
more than 3mtr.clear from the edge of excavation and then returning the stacked soil in consolidating each
deposited layers by ramming and watering and then disposing of all surplus excavated earth as directed with in
all leads lifts and as per directions of the Engineer-in-charge

2 Providing and laying cement concrete 1:6:12(1cement:6sand:12 graded stone agg.40mm nominal size)and 2.07 Cum 3000.00
curing complete excluding the cost of form work in foundation & plinth including all leads lifts and carriage of
material and as per the directions of Engineer-in-charge.
3 Ist Class brick work using common building bricks in foundation & plinth in Cement Mortar 8.26 Cum. 5800.00
1:6(1cement:6sand) in all leads lifts and carriage etc. as per direction of Engineer in-charge.
4 Providing and laying damp proof course 38mm thick with Cement concrete 1:2:4(1cement:2sand:4graded 2.52 Sqm. 170.00
stone agg. 12.5 mm nominal size)and curing complete excluding the cost of form work including all leads,lifts
and carriage of material and as per directions of Engineer-in-charge.

5 Applying a coat of hot bitumen (mexphalt 80/100 or equivalent )using 1.70 Kg. per sqm. On damp proof course 2.52 Sqm. 30.00
after cleaning the surface in a piece of cloth lightly soaked with kerosene oil including all leads,lifts and carriage
of material and as per directions of the Engineer-in-charge.

6 Ist Class brick work using common building bricks in Super structure in Cement Mortar 1:6(1cement:6sand) in 7.60 Cum. 5900.00
all leads lifts and carriage etc. as per direction of Engineer in-charge.
7 Providing form work with steel sheets 3.15mm thick welded with angle iron 30x30x5 mm so as to give rough
finish i/c centring shuttering structing and propping etc. with wooden bettens & Ballies, height or propping &
centering below supporting floor to ceiling not exceeding 4 mtr.and removal of the same for insitu RCC work
and PCC work.including all leads lifts and carriage of material at site & as per direction of Engineer incharge
in:-

a) Flat surfaces such as sofits and suspended floors, roofs landing and the like floors etc. up to 200 mm in 22.00 Sqm. 250.00
thickness.
8 Providing and laying reinforced cement concrete 1:2:4(1cement :2app.sand: 4app. graded stone agg.20mm 2.06 Cum 5660.00
nominal size )and curing complete excluding cost of form work & reinforcement in suspended floors, roofs,
shelves & supports, balconies beams etc. upto floor in two level in all height and depth including all leads lifts &
carriage of material at site and as per direction of the Engineer-incharge.

9 Providing mild steel/tor steel for rainforcement for RCC work including bending binding and placing in position 164.80 Kg 65.00
complete upto floor two level the Engineer-in-charge.

10 20 mm thick cement plaster in single coat of rough side of bricks/stone masonary for interior plastering upto 36.00 Sqm 178.00
floor two level including arrises internal rounded angles chamfers rounded angles not exceeding 80mm in
girth and finished even and smooth in cement mortor 1:6(1cement:6 sand) and curing complete including all
leads lifts and carriage of materials at site as per direction of Engineer-incharge.

11 6 mm thick cement plaster in ceiling in Cement mortor 1:3 (1 cement:3 sand) including all leads lifts and 16.04 Sqm 95.00
carriage of material at site as per direction of Engineer incharge.
12 Flush Pointing on brick work with cement motor 1:3 (1 cement:3 sand ) including all leads lifts and carriage of 41.50 Sqm. 120.00
material at site as per direction of Engineer incharge.

13 Providing fixing pressed steel door frames manufactured from commercial mild steel of1.25mm thickness
including hinges,jump lock bud and if required angle threshold of M.S. angle 50x25mm or base tie of 1.25mm
pressed steel I/c welding complete Including steel hinges 2.5mm thick with guard lock strick plate and apply a
coat of approved steel primer affect pre-treaditional of surface in all leads lifts and carriage of materials as per
direction of Engineer incharge.

Profile-"A" 19.10 Rmt. 285.00


14 Provd./fixing pannelled glazed or pannelled and glazed shutters for doors windows and clearestorey windows 4.29 Sqm. 2750.00
including black enemelled iron butt hings with necessary secrews complete.40mm thick 2nd.class deodar
wood including all leads lifts and carriage of material at site as per direction of Engineer-in-charge.

15 Filling in plinth with sand under floors including watering ramming consolidating and dressing complete. 1.35 Cum. 650.00

16 Providing and laying cement concrete 1:4:8(1cement:4sand:8 graded stone agg.40mm nominal size)and curing 0.90 Cum. 3250.00
complete excluding the cost of form work in foundation & plinth including all leads lifts and carriage of material
and as per the directions of Engineer-in-charge.
17 40mm thick cement concrete flooring 1:2:4 (1cement:2sand: 4 graded stone agg. 20mm nominal size)laid in 9.00 Sqm. 250.00
one layer finished with a floating coat of neat cement including curing all leads, lifts and carriage of materials at
site and as per direction of Engineer in-charge

18 Providing and fixing on wall face C.I. rain water pipes 100mm dia including filling the joints with spun yarn 7.00 Rmt. 135.00
soaked in neat cement slurry & cement mortor 1:2 (1 cement :2sand) i/c Clamps including all leads lifts and
carriage of material as per direction of Engineer in-charge.

19 Applying priming coat over new wood and wood based surfaces after and including preparing the surface by 12.57 Sqm 38.00
throughly cleaning oil,grease,dirt and other foreign matter with ready mixed paint brushing with white lead for
priming including all leads lifts and carriage of material as per direction of Engineer in-charge.

20 Painting two coats (excluding priming coat) on new wood and wood based with surfaces with ready mixed 12.57 Sqm 70.00
paint other then white brushing to give an even shade including cleaning the surface of dirt dust and other
foreign matter,sand papering and stopping. Including all leads lifts and carriage of material at site as per
direction of Engineer in-charge.

21 White washing with lime on undecorated wall surfaces (two coats) to give an even shade including throughly 52.04 Sqm 12.00
brooming the surface to remove all dirt dust mortor drops and loose scale of lime wash and other foreign
matter including all leads lifts and carriage of material at site as per direction of Engineer-in-charge.

22 Water proofing cement paint on decorated wall surfaces (two coats) to give an even shade including throughly 41.50 Sqm 40.00
brooming the surfaces to remove all dirt dust mortar drops and loose scale of Himrachi wash and other foreign
matter as per directionof the Engineer-in-charge.
23 Providing plinth protection 50mm thick in cement concrete 1:3:6(1cement: 3sand: 6graded stone agg.20mm 12.75 Sqm. 145.00
nominal size in all leads,lifts and carriage of material and as per direction of Engineer in-charge.
24 Prov.40x3mm flat iron hold fast 40cm long including fixing to frame with 10mm dia metre bolts,nuts and 20 Nos 65.00
wooden plugs and embedding in cement concrete block 30x10x15cms 1:3:6 (1cement: 3sand: 6 graded stone
agg.20mm nominal size)including all leads,lifts & carriage of material as per direction of the Engineer in-
charge.

25 Providing and fixing tower bolts aluminium (barreled type) anodized transparent or dyed to required shade &
colour screws complete including all leads, lifts and as per direction of Engineer incharge.
a)200x10mm 32 Nos 65.00
26 Provd.& fixing aluminium handles anodized transparent or dyed to required colour or shade with necessary
screws etc. complete including all leads lifts & carriage of material at site as per direction of Engineer incharge.
a)125mm 4 Nos 60.00
b)100mm 12 No. 60.00
27 Provd.& fixing Sliding door bolts anodized transparent or dyed to required colour or shade with necessary 3 No. 65.00
screws etc. complete including all leads lifts & carriage of material at site as per direction of Engineer incharge.
300x15mm
28 Providing, fixing M.S. Fan clamps type-I 16mm dia M.S. bar bent to shape with hooked ends in RCC slab curtting, 1 No. 90.00
laying including painting the exposed portion of loop as per standard drawing and design complete in all
respect including all leads lifts and carriage of material as per direction of Enginer in-charge.

29 Providing fixing M.S.grills of required pattern in wooden frames/pressed steel frame with M.S. flat surface 35.78 Kg. 80.00
round bars 12mm dia with round headed bolts and nuts or by screws .Plain grill including all leads lifts and
carriage of material as per direction of Enginer incharge.

TERMS AND CONDITIONS:-


1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Cement shall be issued @Rs.315/-P.bag & steel @Rs.53/- P.kg.at IPH Store Bhatanwali Paonta Sahib.
4 Empty cement bags shall be returned to the Deptt.otherwise Rs.2/-per bag shall be deducted from the bill.
5 Royalitry certificate in respect of stone aggregate sand etc.shalll be produced by the contractor.
Executive Engineer,
I&PH Division,
Paonta Sahib.
Estimated Cost :-Rs.53963/-
Earnest Money :-Rs.1100/-
Time:- Three months.
Unit Amount
P/Cum 1819.00

P/Cum 6210.00

P/Cum 47908.00

P/Sqm. 428.00

P/Sqm. 76.00

P/Cum 44840.00

P/Sqm 5500.00
P/Cum 11660.00

P/kg 10712.00

P/Sqm 6408.00

P/Sqm 1524.00

P/Sqm 4980.00

P/Rmt 5444.00
P/Sqm 11798.00

P/Cum. 878.00

P/Cum 2925.00
P/Sqm 2250.00

P/Rmt 945.00

P/Sqm 478.00

P/Sqm 880.00

P/Sqm 624.00

P/Sqm 1660.00

P/Sqm 1849.00

each 1300.00

each 2080.00
each 240.00
each 720.00
each 195.00

each 90.00

P/kg. 2862.00

Total:- 179283.00

Executive Engineer,
I&PH Division,
Paonta Sahib.
REVISED SCHEDULE OF QUANTITY Estimated cost Rs 93762/-
Name of work: C/o various LWSS Patlion in GP Patlion in Tehsil Paonta Sahib Distt. Sirmour (HP) Earnest money Rs.1880/-
(SH: Re[pair of Sumpwell by Jacketing, making tepmporary byepass arrangement for LWSS Patlion , laying & jointiTime:- One Month.
of GI Pipes in distribution system of LWSS Patlion welding of Feeder line of Surajpur and Ghuttanpur.)
S.No Sub-Head and item of work. Qty. Rates, Unit Amount.
1 2 3 4 5 6
1 Providing and laying cement concrete work 1:1 1/2:3 (1cement:1 1/2 sand: 3 graded
stone agg. 20mm nominal size & curing complete) excluding cost of form work in all
height and depth including all leads lifts complete and carriage of material etc. as per
directions of Engineer-in-charge.

a) In foundation and plinth 1.40 Cum. 4450.00 P/Cum. 6230.00


b) Vertical surface such as wall any thickness. 3.00 Cum. 4600.00 P/Cum. 13800.00
2 Providing Mild Steel/Tor steel reinforcement including bending binding & placing in 228.00 Kg. 58.00 P/kg 13224.00
positing I/c all leads lifts and carriage of material and as per direction of the
Engineer-in-charge.

3 Providing form work with steel sheets 3.15mm thick welded with angle iron 30x30x5
mm so as to give rough finish i/c centring shuttering structing and propping etc. with
wooden bettens & Ballies, height or propping & centering below supporting floor to
ceiling not exceeding 4 mtr.and removal of the same for insitu RCC work and PCC
work.including all leads lifts and carriage of material at site & as per direction of
Engineer in charge in:-

a) Vertical surface such as wall any thickness. 30.62 Sqm. 200.00 P/Cum 6124.00
4 Making byepass arrangement (to byepass the sumpwell ) including cutting welding 1 job. 11500.00 P/job. 11500.00
and carriage at site as per direction of the Engineer-in-charge.

5 Welding of 11 joints of feeder lines at site complete in all respect including excavation 1 job. 13500.00 Per job. 13500.00
as per direction of the Engineer-in-charge.
6 Excavation in drains & channel etc.in earth work in all kinds of soil such as pick work 719.65 Cum 160.00 P/Cum 115144.00
,jumper work blasting work, decomposed conglomerate saturated soil soft and hard
rock including dressing of sides and beds and prepareation of sub grade to level or
slope including refilling the trenches and disposing of surplus earth upto all leads,lifts
disposed earth to be levelled and neatly dressed including jungle clearance and as per
directions of the Engineer-incharge

7 Laying and jointing of GMS Pipes of various dia in trenches (earth work in trenches to
be measured and paid for seperately) including all leads lifts and carriage of material
at site as per direction of Engineer-in-charge of following dias.

i) 32 mm dia, 455 Rmt 15.00 P/Rmt. 6825.00


ii) 40mm dia 1558 Rmt 19.00 P/Rmt. 29602.00
8 Providing & fixing of peet valve of superior quality of following dia complete in all
respect and as per direction of the Engineer-in-charge.

i) 32 mm dia, 1 No. 750.00 Each. 750.00


ii) 40mm dia 1 No. 850.00 Each. 850.00
TERMS AND CONDITIONS:- Total: 217549.00
1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Cement will be issued @250/- per bag & steel @ 41/- per Kg. at IPH store Bhatanwali Paonta Sahib.
4 Empty cement bags shall be returned to the deptt. Otherwise Rs. 2/- per bag shall be deducted from the each bill of the contractor.
5 Royality certificate in respect of stone agg. Sand etc. shall be produced by the contractor
6 G.I.Pipe shall be issued free of cost from IPH Store Bhatanwali Paonta Sahib.
7 The pipe fitting shall be provided by the contractor. Executive Engineer,
I&PH Division,
Paonta Sahib.
REVISED SCHEDULE OF QUANTITY
Name of work: C/o LIS Mehat in GP Kando Kansar in Tehsil Paonta Sahib Distt. Sirmour (HP)
(SH: Providing internal electrical fitting ub Pump House)

S.No Sub-Head and item of work. Qty.


1 2 3
1 Wiring for light Point/Fan Point/Exhaust Fan Point/ Call Bell Point with 1.5 sq. mm 30
PVC Insulated, PVC sheathed copper conductor cable in PVC casing and capping/ with
surface recessed PVC conduit complete with ISI Marked Cable, Switches, etc, as
required complete in all respect (Group-A)

2 Light plug on board with copper wiring in PVC conduit witing for 3 PIN 5/6 AMPS plug 7
point with 1.5 sq.mm PVC insulated copper conductor cable i/c providing fixing 3 PIN
5/6 AMP socket outlet on switch boards (in surface/recessed PVC conduit wiring
system) and 5/6 AMP Tumbler/Piano type switch earthing the 3rd PIN painting etc. as
required complete in all respect and as directed by the Engineer-in-charge.

3 Supplying and fixing metal box of 180mmx100mmx60mm deep (nomina size0 on 7


surface or recess with suitable sizre phenolic laminated sheet cover in the front
including Providing and fixing 3 PIN 15/16 AMP socket outlet & 5/16 Amp.
Tumbler /Piano type switch earthing the 3rd PIN painting etc. complete in all respect
and as directed by the Engineer-in-charge.

4 Supplying fixing backlite batten /angle holder including connection etc. complete with 60
all leads,lifts and carriage of material and as per direction of the Engineer-in-charge.

5 Providing installation testing and commissioning of prewinded flourcent tube fitting 5


complete with ballast starter and capacitor but excluding tube rod suitable to operate
on 230 Voltss, single phase AC supply directly on surface with copper wiring as
required complete in all respect and as per direction of the Engineer-in-charge.
Flourcent tube fixture 1x40 watt vbox type Category A.

6 Supplying & fixing 5 AMP to 32 AMP Rating 240 Volts L-series mazinature circuit 7
breaker of following tube rod suitable to operate on 230 Volts single phase AC supply
directly onsurface with copper wiring as required complete in all respect and as
directed by the Engineer-in-charge.

7 Supplying & fixing 40 AMP to 63 AMP Rating 240 Volts L"Series"miniature circuit
breaker of following poles in existing MCB DB-complete with connection testing &
complete in all respect and as directed by the Engineer-in-charge.

i) 63 AMP Double pole. 7


8 Supplying & fixing of following way single pole & neutral sheet MCB distribution 8
board 240 Volts on surface recess complete with tinned copper busher neutra; link
earth bar, din bar detachable gland plate inter connecions including painting earthing
etc. complete in all respect and as per directed by the Engineer-in-charge.
9 Providing, Installation, testing and commissioning of ceiling fan with regulator,
including wiring the down rods of standard length (up to 30 cm) with 16/0.20 mm
twin twisted flexible, cotton braided, copper cable, including providing and fixing
phenolic laminated sheet cover on the fan box and earthing etc. as required:-

Ceiling Fan 1200 mm sweep, Category-A 2


10 Circuit wiring in casing caping (2x1.5 Sq.mm) wiring for circuit wiring with
2x1.5sq.mm PVC Insulated ,PVC sheated copper conductor single core cable in PVC
300
casing & capping as required complete in all respect and as per direction of the
Engineer-in-charge.
11 Wiring for Light/Power plug with 2x4 Sq.mm PVC insulated PVC sheathed copper 100
conductor single core cable in PVC casing & capping alongwith 1 No. 2.24 mm dia bare
copper wire for loop earthing as required complete in all respect and as directed by
the Engineer-in-charge.

12 Wiring of sub main with following size of pVC sheathed PVC insulated copper conductor
single core cable in PVC casing capping as required and as directed by the Engineer-in-
charge. 50

13 Providing , installing testing and commissioning of pre winded street light fitting 5
complete with rod & other accessories suitable to operate on 230 Volts single phase AC
supply directly on surface with copper wiring as required complete in all respect and
as directed by the Engineer -in-charge .

TERMS AND CONDITIONS:-


1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Nothing shall be paid for rejected material and all material shall be ISI specification
4 Payment will be made after successful testing of work .
Estimated cost Rs 38330/-
Earnest money Rs.800/-
Time:- 15 days.

Rates, Unit Amount.


4 5 6
Nos 380.00 each 11400.00

Point. 50.00 P/Point. 350.00

Nos. 90.00 Each. 630.00

Nos. 70.00 each 4200.00

No. 40.00 Each. 200.00

No. 40.00 Each 280.00

0.00

Nos. 80.00 Each 560.00


Nos. Each. 0.00
0.00

No. 2100 Each. 4200.00


0.00

Rmt. P/Rmt.

Metre 100.00 P/Metre. 10000.00

Mtr. Per Mtr.

No. Each. 0.00

Total 31820.00

eer-in-charge.

Executive Engineer,
I&PH Division,
Paonta Sahib (HP)
REVISED SCHEDULE OF QUANTITY Estimated cost Rs 84
Name of work: R/M of LIS Rampur Bharapur in Tehsil Paonta Sahib Distt. Sirmour (HP)
Earnest money Rs.17
(SH:Replacement of Existing RCC Pipe 250mm dia in to GI Pipe 150mm dia in distribution system from Main Delivery Tank to Outlet No.1 Time:- One Month.
Outlet No. 1-2 & Outlet No.2-3 Repair of Main outlet & 4 Nos Outlet Job No.1
Sr.No. Description. Qty. Rate.
1 Excavation in drains & channel etc.in earth work in all kinds of soil such as pick work ,jumper work blasting work, 230.85 Cum 137.70
decomposed conglomerate saturated soil soft and hard rock including dressing of sides and beds and prepareation
of sub grade to level or slope including refilling the trenches and disposing of surplus earth upto all leads,lifts
disposed earth to be levelled and neatly dressed including jungle clearance and as per directions of the Engineer-in-
charge

2 Dismentalling of Ex. RCC Pipe 250mm dia including all leads,lifts and carriage of material and as per direction of the 380.00 Rmt. 40.00
Engineer-in-charge.
3 Laying and jointing of GMS Pipes of various dia in trenches (earth work in trenches to be measured and paid for
seperately) including all leads lifts and carriage of material at site as per direction of Engineer-in-charge of
following dias.
i) 150 mm dia . 380 Rmt 5.75
4 Butt welding in pipes including cutting welding and making Bends of required degree for 80mm dia medium class
pipe(excluding cost of pipes Nuts & bolts to be measured abd paid for separately complete in all respect including
all leads,lifts and carriage of material at site and as directed by the Engineer-in-charge.
i) G.M.S.Pipe 150 mm dia. 25 Nos. 320.00
5 20 mm thick cement plaster in single coat of rough side of bricks/stone masonary for interior plastering upto floor 176 Sqm 130.85
two level including arrises internal rounded angles chamfers rounded angles not exceeding 80mm in girth and
finished even and smooth in cement mortor 1:3(1cement3 sand) and curing complete including all leads lifts and
carriage of materials at site as per direction of Engineer-incharge.

6 Providing and laying cement concrete work 1:1 1/2:3 (1cement:1 1/2 sand: 3 graded stone agg. 20mm nominal size
& curing complete) excluding cost of form workand reinforcement for RCC work including all leads lifts complete
and carriage of material etc. as per directions of Engineer incharge.

i) In foundation and Plinth 1.10 Cum. 3594.60


TERMS AND CONDITIONS:-
1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 GI Pipe shall be issued free of cost from IPH Store Bhatanwali.
4 Cement will be issued @250/- per bag & steel @ 41/- per Kg. at IPH store Bhatanwali Paonta Sahib.
5 Empty cement bags shall be returned to the deptt. Otherwise Rs. 2/- per bag shall be deducted from the each bill of the contractor.
6 Royality certificate in respect of stone agg. Sand etc. shall be produced by the contractor

Assistant Engineer,
I&PH Sub Division,
Majra.
SCHEDULE OF QUANTITY Estimated cost Rs 38
Name of work: C/O LIS Pamta Bandla GP Shawga in Tehsil Paonta Sahib Distt. Sirmour (HP) Earnest money Rs.80
(SH:C/o Retaining wall to protect the Sump well) Time:- Three Months

Sr.No. Description. Qty. Rate.


1 Excavation in foundation and trenches etc.in earth work in all kinds of soil such as pick work ,jumper work 9.02 Cum.
decomposed conglomerate saturated soil soft and hard rock upto all leads lifts stacking the excavated soil not more
than 3mtr.clear from the edge of excavation and then returning the stacked soil in 15cm layers when required in to
plinth sides of foundation etc. consolidating each deposited layers by ramming and watering and then disposing of
all surplus excavated earth as directed with in all leads lifts and as per directions of the Engineer-incharge

2 Providing and laying cement concrete 1:6:12(1cement:6sand:12 graded stone agg.40mm nominal size)and 3.34 Cum
curing complete excluding the cost of centring shuttering in foundation & plinth including all leads lifts and
carriage of material and as per the directions of Engineer-in-charge.

3 Random rubble masonary /Poly rubble masonary (uncoursed/brought to coursed) with hard stone of approved 27.95 Cum.
quality in foundation and plinth including levelling up with cement concrete 1:6.12(1cement:6sand:12 graded
stone agg. 20mm nominal size)in cement mortor 1:6 (1 Cement: 6 sand ) in breast wall & Retaining walls including
all leads lifts and carriage of material and as per the directions of Engineer-in-charge.

4 Boulder filling behind the retaining wall complee in all respect and as per direction of the Engineer-in-charge. 7.09 Cum.

TERMS AND CONDITIONS:-


1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Cement will be issued @250/- per bag & steel @ 41/- per Kg. at IPH store Bhatanwali Paonta Sahib.
4 Empty cement bags shall be returned to the deptt. Otherwise Rs. 2/- per bag shall be deducted from the each bill of
the contractor.
5 Royality certificate in respect of stone agg. Sand etc. shall be produced by the contractor

Assistant Engineer,
I&PH Sub Division,
Kaffota.
Estimated cost Rs 84157/-
Earnest money Rs.1700/-
Time:- One Month.

Unit Amount.
31788.00

P/Rmt. 15200.00

P/Rmt. 2185.00

Each. 8000.00
P/Sqm 23030.00

P/Cum. 3954.00
TOTAL: 84157.00
Assistant Engineer,
I&PH Sub Division,

Estimated cost Rs 38375/-


Earnest money Rs.800/-
Time:- Three Months.

Unit Amount.
P/Cum

P/Cum

Cum

P/Cum.

TOTAL:
Assistant Engineer,
I&PH Sub Division,
SCHEDULE OF QUANTITY Estimated cost Rs 76675/-
Name of work: Prov./Imp. of LWSS to various PC habitations of CV Basog Chambiyara & Chowki GP Kamroo in Tehsil Paonta Earnest money Rs.1600/-
Sahib Distt.Sirmour (HP)(SH: C/O 10000 Litres Tank at Devlan & Jacketing of existing tank & C/o R/wall to protect Time:- Three Months
the Existing Tank at Parcha.
S.No Sub-Head and item of work. Qty. Rates, Unit Amount.
1 2 3 4 5 6
1 Excavation in foundation and trenches etc.in earth work in all kinds of soil such as pick work 14.68 Cum 92.85 P/Cum 1363.00
,jumper work decomposed conglomerate saturated soil soft and hard rock upto all leads lifts
stacking the excavated soil not more than 3mtr.clear from the edge of excavation and then
returning the stacked soil in 15cm layers when required in to plinth sides of foundation etc.
consolidating each deposited layers by ramming and watering and then disposing of all surplus
excavated earth as directed with in all leads lifts and as per directions of the Engineer-in-charge

2 Providing and laying cement concrete 1:4:8(1cement:4sand:8 graded stone agg.40mm nominal 1.28 Cum 1104.80 P/Cum 1414.00
size)and curing complete excluding the cost of form work in foundation & plinth including all
leads lifts and carriage of material and as per the directions of Engineer-in-charge.

3 Providing and laying cement concrete work 1:1 1/2:3 (1cement:1 1/2 sand: 3 graded stone agg.
20mm nominal size & curing complete) excluding cost of form workand reinforcement for RCC
work including all leads lifts complete and carriage of material etc. as per directions of Engineer
incharge.

i) In foundation and Plinth etc. 1.30 Cum. 1866.80 P/Cum. 2427.00


ii) In vertical walls any thickness but not less than 0.10 Metres. 2.55 Cum. 1923.10 P/Cum. 4904.00
4 Providing form work with steel sheets 3.15mm thick welded with angle iron 30x30x5 mm so as
to give rough finish i/c centring shuttering structing and propping etc. with wooden bettens &
Ballies, height or propping & centering below supporting floor to ceiling not exceeding 4 mtr.and
removal of the same for insitu RCC work and PCC work.including all leads lifts and carriage of
material at site & as per direction of Engineer in charge in:-

a) Flat surfaces such as soffits of suspended floor roofs landings and the like upto 200mm in 10.42 Sqm. 134.10 P/Sqm. 1397.00
thickness.
b) Vertical surface such as wall any thickness. 57.61 Sqm. 80.70 P/Sqm. 4649.00
5 Providing and laying cement concrete 1:2:4(1cement:2app.sand: 4 app. graded stone agg. 20mm 1.29 Cum. 1658.90 P/Cum. 2140.00
nominal size )and curing complete excluding cost of form work & reinforcement for reinforced
work in suspended floors, roofs landing shelves and their supports balconies, beams, girders
bressumers and cantilivers upto to floor two level in all height and depth, including all leads lifts
and carriage of material at site and as per direction of the Engineer-incharge.

6 Providing Mild Steel/Tor steel reinforcement including bending binding & placing in positing I/c 727.20 Kg. 20.70 P/kg 15053.00
all leads lifts and carriage of material and as per direction of the Engineer-in-charge.

7 Demolition /dismentalling above ground level upto floor two level including disposal of 0.62 Cum. 2975.21 P/Cum 1845.00
unserviceable materials, stacking serviceable materials and cutting the necessary reinforcement
and separating out from RCC/RB work , RCC work complete in all respects and as per direction of
the Engineer-in-charge.

8 Providing and laying reinforced cement concrete 1:2:4(1cement :2app.sand: 4app. graded stone 0.73 Cum 3190.65 P/Cum 2329.00
agg.20mm nominal size )and curing complete excluding cost of form work & reinforcement
work in foundation & plinth including all leads lifts & carriage of material at site and as per
direction of the Engineer-in-charge.(in bed)

9 Providing and laying cement concrete 1:2:4(1cement:2sand:4 graded stone agg.20mm nominal 3.32 Cum 3231.20 P/Cum 10728.00
size) & curing complete excluding cost of form work and reinforcement concrete work in walls
of any thickness but not less than 0.1 mtr. thickness attached pillasters buttresses plinth and
string courses complete from top of foundation two level upto floor two level including all leads
lifts and carriage of material and as per the directions of Engineer-in-charge.

10 Providing and fixing foot rest 20mm size including embeded in cement concrete 13.00 Nos. 18.85 Each. 245.00
1:3:6(1cement:3sand:6 graded stone agg.20mm nominal size) in block 225x225x75mm and
carriage of material and complete in all respect as per direction of the Engineer-in-charge.

11 Cutting in earth work in all kind of soil and dispoal of the excavated earth upt all leads,lifts and as 7.37 Cum 59.55 P/Cum 439.00
directed by the Engineer-in-charge complete in all respect.

12 Providing and laying cement concrete 1:6:12(1cement:6sand:12 graded stone agg.40mm 2.46 Cum 905.10 P/Cum 2227.00
nominal size)and curing complete excluding the cost of centring shuttering in foundation &
plinth including all leads lifts and carriage of material and as per the directions of Engineer-
in-charge.
13 Random rubble masonary /Poly rubble masonary (uncoursed/brought to coursed) with hard 22.47 Cum 1135.50 P/Cum 25515.00
stone of approved quality in foundation and plinth including levelling up with cement concrete
1:6.12(1cement:6sand:12 graded stone agg. 20mm nominal size)in cement mortor 1:6 (1
Cement: 6 sand ) in breast wall & Retaining walls including all leads lifts and carriage of material
and as per the directions of Engineer-in-charge.

TERMS & CONDITIONS TOTAL: 76675.00


1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Cement will be issued @ 315/- per bag & steel @ 53/- per Kg. at IPH store Bhatanwali Paonta Sahib.
4 Empty cement bags shall be returned to the deptt. Otherwise Rs. 2/- per bag shall be deducted
from the each bill of the contractor. Assistant Engineer,
5 Royality certificate in respect of stone agg. Sand etc. shall be produced by the contractor I&PH Sub Division,
Kaffota.
SCHEDULE OF QUANTITY Estimated cost Rs:99695/-
Name of work:- Restoration of Rain damages to Left Bank Canal Km. 0/0 to 24/0 in Tehsil Paonta Distt. Sirmour Earnest money Rs.2000/-
(HP) (SH:Prov. Laying of HDP Pipe in distribution system for Left out area of Punching outlet at RD 2535 on LBC) Time:- Two Months.
S.No Sub-Head and item of work. Qty. Rates, Unit Amount.
1 2 3 4 5 6
1 Excavation in drains & channel etc.in earth work in all kinds of soil such as pick work 434.00 Cum P/Cum
,jumper work blasting work, decomposed conglomerate saturated soil soft and hard
rock including dressing of sides and beds and prepareation of sub grade to level or
slope including refilling the trenches and disposing of surplus earth upto all leads,lifts
disposed earth to be levelled and neatly dressed including jungle clearance and as per
directions of the Engineer-incharge

2 Laying & jointing of High Density Polythene pipes forburied water mean and services amd for 585.00 Mtr. Rmt.
water supply above ground both in side and out side building duty ISI marked IS 4984-1995 as
amended upto date in the following grade of material prusser rating and normal dia 90mm dia
PN 2.50 grade PE 63 complete in all respect and as per direction of the Engineer in charge.
(Earth work to be measured & paid for separately)

3 Excavation in foundation and trenches etc.in earth work in all kinds of soil such as pick work 19.80 Cum. P/Cum
,jumper work decomposed conglomerate saturated soil soft and hard rock upto all leads lifts
stacking the excavated soil not more than 3mtr.clear from the edge of excavation and then
returning the stacked soil in 15cm layers when required in to plinth sides of foundation etc.
consolidating each deposited layers by ramming and watering and then disposing of all surplus
excavated earth as directed with in all leads lifts and as per directions of the Engineer-in-charge

4 Providing and laying cement concrete 1:4:8(1cement:4sand:8 graded stone agg.40mm nominal 3.30 Cum P/Cum
size)and curing complete excluding the cost of form work in foundation & plinth including all
leads lifts and carriage of material and as per the directions of Engineer-in-charge.

5 1st. class brick work using common building bricks in foundation and plinth in Cement Mortar 9.5 Cum P/Cum
1:6(1cement:6sand) in all leads lifts and carriage etc. as per direction of Engineer inchrge.
6 20 mm thick cement plaster in single coat of rough side of bricks/stone masonary for interior 48.4 Sqm P/Sqm
plastering upto floor two level including arrises internal rounded angles chamfers rounded
angles not exceeding 80mm in girth and finished even and smooth in cement mortor
1:6(1cement:6 sand) and curing complete including all leads lifts and carriage of materials at
site as per direction of Engineer-incharge.

7 Providing and laying cement concrete 1:2:4(1cement:2sand:4graded stone agg. ) 20mm nominal 0.60 Cum P/Cum
size) & curing complete excluding the cost of form work in foundation & plinth and as per
direction of the Engineer-in-charge.

TOTAL:
TERMS & CONDITIONS
1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax & labour cess shall be deducted as per rules.
3 Royality certificate in respect of stone agg. Sand etc. shall be produced by the contractor
4 Cement shall be issued @ 315/- per Bag & Steel @ 53/- per Kg. at IPH Store Bhatanwali Paonta Sahib.
5 Empty cement bags shall be returned to the Deptt. Otherwise Rs. 2/- per bag shall deducted from the Assistant Engineer,
bill. Giri Irrig.Sub Division,
Patlion.
SCHEDULE OF QUANTITY Estimated cost Rs 90671/-
Name of work:- C/o 3 Nos T/well in village Kedarpur Bhuppur T/well No.1 in Tehsil Paonta Sahib Distt. Sirmour Earnest money Rs.1850/-
(HP) (SH:Prov. Laying of HDP Pipe in distribution system & RCC outlet ) T/well No.1. Time:- Two Months.
S.No Sub-Head and item of work. Qty. Rates, Unit Amount.
1 2 3 4 5 6
1 Excavation in drains & channel etc.in earth work in all kinds of soil such as pick work 410.00 Cum P/Cum
,jumper work blasting work, decomposed conglomerate saturated soil soft and hard
rock including dressing of sides and beds and prepareation of sub grade to level or
slope including refilling the trenches and disposing of surplus earth upto all leads,lifts
disposed earth to be levelled and neatly dressed including jungle clearance and as per
directions of the Engineer-incharge

2 Providing and laying High Density Polythene pipes forburied water mean and services amd for
water supply above ground both in side and out side building duty ISI marked IS 4984-1995 as
amended upto date in the following grade of material prusser rating and normal dia 100mm dia
PN 2.50 grade PE 63 complete in all respect and as per direction of the Engineer in charge.
(Earth work to be measured & paid for separately)

PPN 2.50 PE-63 180mm dia. 560.00 Rmt. P/Rmt.


PPN 4.000 PE-63 90mm dia. 200.00 Rmt. P/Rmt.
3 Excavation in foundation and trenches etc.in earth work in all kinds of soil such as pick work 3.15 Cum. P/Cum
,jumper work decomposed conglomerate saturated soil soft and hard rock upto all leads lifts
stacking the excavated soil not more than 3mtr.clear from the edge of excavation and then
returning the stacked soil in 15cm layers when required in to plinth sides of foundation etc.
consolidating each deposited layers by ramming and watering and then disposing of all surplus
excavated earth as directed with in all leads lifts and as per directions of the Engineer-incharge
4 Providing and laying cement concrete 1:4:8(1cement:4sand:8 graded stone agg.40mm nominal 0.52 Cum P/Cum
size)and curing complete excluding the cost of form work in foundation & plinth including all
leads lifts and carriage of material and as per the directions of Engineer-in-charge.

5 Providing and laying cement concrete 1:2:4(1cement:2app.sand: 4 app. graded stone agg. 1.15 Cum P/Cum
20mm nominal size )and curing complete excluding cost of form work & reinforcement for
reinforced work in suspended floors, roofs landing shelves and their supports balconies, beams,
girders bressumers and cantilivers upto to floor two level in all height and depth, including all
leads lifts and carriage of material at site and as per direction of the Engineer-incharge.

6 Providing form work with steel sheets 3.15mm thick welded with angle iron 30x30x5 mm so as
to give rough finish i/c centring shuttering structing and propping etc. with wooden bettens &
Ballies, height or propping & centering below supporting floor to ceiling not exceeding 4
mtr.and removal of the same for insitu RCC work and PCC work.including all leads lifts and
carriage of material at site & as per direction of Engineer in charge in:-

a) Vertical surface such as wall any thickness. 13.50 Sqm. P/Cum


7 Providing Mild Steel/Tor steel reinforcement including bending binding & placing in positing 68.40 Kg. P/kg
I/c all leads lifts and carriage of material and as per direction of the Engineer-in-charge.

8 Providing and laying cement concrete 1:2:4(1cement:2sand:4 graded stone agg.20mm nominal 0.32 Cum P/Cum
size)and curing complete excluding the cost of form work in foundation & plinth including all
leads lifts and carriage of material and as per the directions of Engineer-in-charge.

9 Providing and ifxing of MS Foot rest of 16mm dia bar complete in all respect. 4 Nos.

10 Providing and fixing of Cast Iron Alfa valves of superior quality with spindle nuts and bolts 1 No. Each.
complete in all respect and as per direction of the Engineer-in-charge. 150mm dia.

TOTAL:

TERMS & CONDITIONS


1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax & labour cess shall be deducted as per rules.
3 Royality certificate in respect of stone agg. Sand etc. shall be produced by the contractor
4 Cement shall be issued @ 315/- per Bag & Steel @ 53/- per Kg. at IPH Store Bhatanwali Paonta Sahib.
5 Empty cement bags shall be returned to the Deptt. Otherwise Rs. 2/- per bag shall deducted from the Assistant Engineer,
6 bill.
HDP pipe shall be issued by the deptt. free of cost from IPH store Bhatanwali. Giri Irrig.Sub Division,
Patlion.
REVISED SCHEDULE OF QUANTITY Estimated cost Rs 34485/-
Name of work:- A/R & M/o to Left Bank Canal of Left Out area of D-1 in Tehsil paonta Sahib Distt. Sirmour Earnest money Rs.690/-
(HP) (SH:Providing & laying of HDP Pipe of 90mm dia in distribution system ) Time:- One Month.
S.No Sub-Head and item of work. Qty. Rates, Unit Amount.
1 2 3 4 5 6
1 Excavation in drains & channel etc.in earth work in all kinds of soil such as pick work 194.00 Cum 160.00 P/Cum 31040.00
,jumper work blasting work, decomposed conglomerate saturated soil soft and hard
rock including dressing of sides and beds and prepareation of sub grade to level or
slope including refilling the trenches and disposing of surplus earth upto all leads,lifts
disposed earth to be levelled and neatly dressed including jungle clearance and as per
directions of the Engineer-incharge

2 Providing and laying High Density Polythene pipes forburied water mean and services and for 180.00 Mtr. 275.00 P/Cum 49500.00
water supply above ground both in side and out side building duty ISI marked IS 4984-1995 as
amended upto date in the following grade of material prusser rating and normal dia 100mm dia
PN 2.50 grade PE 63 complete in all respect and as per direction of the Engineer in charge.

TOTAL: 80540.00

TERMS & CONDITIONS


1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax & labour cess shall be deducted as per rules.
3 Finalpaymrent will be made after entire satisfaction of the Engineer-in-charge.
4 Nothing shall be paid for defective work.
5 HDP pipe shall be provided by the contractor at his own cost. Executive Engineer,
I&PH Division
Paonta Sahib.
REVISED SCHEDULE OF QUANTITY Estimated cost Rs 34485/-
Name of work:- A/R & M/o to Left Bank Canal of Left Out area of D-1 in Tehsil paonta Sahib Distt. Sirmour Earnest money Rs.690/-
(HP) (SH:Providing & laying of HDP Pipe of 90mm dia in distribution system ) Time:- One Month.
S.No Sub-Head and item of work. Qty. Rates, Unit Amount.
1 2 3 4 5 6
1 Excavation in drains & channel etc.in earth work in all kinds of soil such as pick work 194.00 Cum 160.00 P/Cum 31040.00
,jumper work blasting work, decomposed conglomerate saturated soil soft and hard
rock including dressing of sides and beds and prepareation of sub grade to level or
slope including refilling the trenches and disposing of surplus earth upto all leads,lifts
disposed earth to be levelled and neatly dressed including jungle clearance and as per
directions of the Engineer-incharge

2 Providing and laying High Density Polythene pipes forburied water mean and services and for 180.00 Mtr. 275.00 P/Cum 49500.00
water supply above ground both in side and out side building duty ISI marked IS 4984-1995 as
amended upto date in the following grade of material prusser rating and normal dia 100mm dia
PN 2.50 grade PE 63 complete in all respect and as per direction of the Engineer in charge.

TOTAL: 80540.00

TERMS & CONDITIONS


1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax & labour cess shall be deducted as per rules.
3 Finalpaymrent will be made after entire satisfaction of the Engineer-in-charge.
4 Nothing shall be paid for defective work.
5 HDP pipe shall be provided by the contractor at his own cost. Executive Engineer,
I&PH Division
Paonta Sahib.
REVISED SCHEDULE OF QUANTITY Estimated Cost :-Rs.41828/-
Name of work:- R/M of various Tubewell Bherewala, Heerpur, KishanpuraBhungrani under Giri Irrig. Sub Earnest Money :-Rs.900/-
Division Patlion in Paonta Sahib Distt. Sirmour(HP)(SH:- Providing internal Electrification to 4 Nos the Pump Time : One Month
Houses.) Bhungrani section.
S.N. Description Qty. Rate Unit Amount
1 2 3 4 5 6.
1 Wiring for light Point/Fan Point/Exhaust Fan Point/ Call Bell Point with 1.5 sq. mm PVC
Insulated, PVC sheathed copper conductor cable in PVC casing and capping/ with surface
recessed PVC conduit complete with ISI Marked Cable, Switches, etc, as required complete in
all respect (Group-C)

Group C. 20 Point 380.00 Each 7600.00


2 Wiring for Light/power plug wiring with 2x4 sq. mm PVC Insulated copper conductor cable in 32 Point. 115.00 Each. 3680.00
surface/ reccessed PVC conduit alongwith one No. 2.24mm dia base copper wire for loop
earthing as required. Complete with in all leads lifts and as per direction of Engineer- in-
charge.

3 Supplying & fixing of 05/06 Amp. Tubler piano type switch on the existing box cover including 24 Nos. 55.00 Each. 1320.00
onnection etc. as required complete with all leads,lifts and carriage of material and as per
direction of the Engineer-in-charge.

4 Supplying fixing of 15/16 AMP 3 PIN tumbler piano type switch on existing box cover including 4 Nos. 175.00 Each. 700.00
connection etc. as required complete with in all leads,lifts and carriage of material and as per
direction of the Engineer-in-charge.

5 Supplying fixing of 15/16 AMP 3 PIN Socket Outlet on the exiisting box cover including 4 Nos. 180.00 Each. 720.00
connection etc. as required complete with in all leads,lifts and carriage of material and as per
direction of the Engineer-in-charge.

6 Wiring for circuit wiring with 2x1.5Sqm. PVC insulator copper conductor single coil cable for 60 Mtr. 60.00 P/Mtr. 3600.00
surface recessed PVC conduit required complete in all repsect and as per direction of the
Engineer-in-charge.
7 Providing installing testing and commissioning of Ceiling fan regulator including wiring the 4 Nos. 1850.00 Each. 7400.00
down rod of standard length (upto 30 cm.) with 1.5mm PVC insulated copper conductor single
core cable as required 1200 Mtr. Cut A.
8 Supplying fixing 5 to 32 Amp. Rating 240 Volts L-series main circuit bracker in existing MCB 0.00
box complette with commissioning connection testing etc. as required with all leads,lifts and
carrige of material as required .

i) Single pole. 8 No. 220.00 Each 1760.00


ii) Double pole. 4 No. 350.00 Each 1400.00
9 Supplying fixing single pole and natural sheet steel MCB distribution box on surface /recessed 4 Nos. 450.00 Each. 1800.00
complete with tinned copper busher neutral detachable glass plate inter connection including
painting earthing etc. 4 way complete with all leads,lifts and carriage of material and as per
direction of the Engineer-in-charge.

10 Supplying fixing metal box of following size nominal on surface recess with suitable size of
phonetic laminated sheet cover in iron as required complete in all respect and as per direction
of the Engineer-in-charge.

i) 180x100x60mm. 4 Nos. 180.00 Each. 720.00


ii) 250x200x100mm 4 Nos. 220.00 Each. 880.00
11 Wiring for Sub main wiring with 2x5 Sqm. PVC insulated copper conductorin single cover in 8 Nos. 100.00 Each. 800.00
surface or recessed in PVC conduction with all leads,lifts and carriage of material and as
required complete in all respect.

12 Providing installing testing and commissioning of pre wire flourcent tube fitting complete with 4 Nos. 380.00 Each. 1520.00
blast starter and capacitor but excluding the cost of rube rod suitable to operate on 230 V
single faces ASC supply directly on surface with copper wiring as required complete with all
leads,lifts and carriage of material F/tube fixture 1x40watt prepex type category A complete in
all respect and as per direction of the Engineer-in-charge.

13 Supplying fixing backlite batten /angle holder including connection etc. complete with all 4 Nos. 60.00 each 240.00
leads,lifts and carriage of material and as per direction of the Engineer-in-charge.

14 Supplying /fixing of ceiling Rose on existing junction box/wooden block including connection 12 Nos. 60.00 Each. 720.00
etc. as required complete including all leads,lifts and carriage of material and as per direction
of the Engineer-in-charge.
15 Earthing with copper plate 600x600x3mm including accessoires and providing masonary 4 Nos. 3500.00 P/set. 14000.00
enclosure with cover plate having locking arrangeents and water pipe etc. (but without
charcoal or coke and salt ) comlete as required complete with all leads,lifts and carriage of
material and as per directionof the Engineer-in-charge.

16 Extra for using salf and charcoal for G.I. or copper plate earth electrod as required complete 4 Nos. 1200.00 Each. 4800.00
with all leads,lifts and carriage of material and as per direction of the Egineer-in-charge.

17 Supplying laying 6 SWG GI wire at 0.5 Mtr. Elbow ground level for conductor earth electrod 80 Mtr. 20.00 P/Mtr. 1600.00
including soldering as required complete in all respect and as per direction of the Engineer-in-
charge.

Total 55260.00
TERMS AND CONDITIONS:-
1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Nothing shall be paid for rejected material and all material shall be ISI specification
4 Payment will be made after successful testing of work . Executive Engineer,
I&PH Division,
Paonta Sahib (HP)
REVISED SCHEDULE OF QUANTITY Estimated Cost :-Rs.41828/-
Name of work:- R/M of various LISat RD 600,6345,7029,8465 under Giri irrig. Sub Division Patlion in Earnest Money :-Rs.900/-
Tehsil Paonta Sahib Distt. Sirmour(HP)(SH:- Providing internal Electrification to 4 Nos Pump Time : One Month
Houses.) Giri Nagar Section.
S.N. Description Qty. Rate Unit Amount
1 2 3 4 5 6.
1 Wiring for light Point/Fan Point/Exhaust Fan Point/ Call Bell Point with 1.5 sq. mm PVC
Insulated, PVC sheathed copper conductor cable in PVC casing and capping/ with surface
recessed PVC conduit complete with ISI Marked Cable, Switches, etc, as required complete in
all respect (Group-C)

Group C. 20 Point 380.00 Each 7600.00


2 Wiring for Light/power plug wiring with 2x4 sq. mm PVC Insulated copper conductor cable in 32 Point. 115.00 Each. 3680.00
surface/ reccessed PVC conduit alongwith one No. 2.24mm dia base copper wire for loop
earthing as required. Complete with in all leads lifts and as per direction of Engineer incharge.

3 Supplying & fixing of 05/06 Amp. Tubler piano type switch on the existing box cover including 24 Nos. 55.00 Each. 1320.00
onnection etc. as required complete with all leads,lifts and carriage of material and as per
direction of the Engineer-in-charge.

4 Supplying fixing of 15/16 AMP 3 PIN tumbler piano type switch on existing box cover including 4 Nos. 175.00 Each. 700.00
connection etc. as required complete with in all leads,lifts and carriage of material and as per
direction of the Engineer-in-charge.

5 Supplying fixing of 15/16 AMP 3 PIN Socket Outlet on the exiisting box cover including 4 Nos. 180.00 Each. 720.00
connection etc. as required complete with in all leads,lifts and carriage of material and as per
direction of the Engineer-in-charge.
6 Wiring for circuit wiring with 2x1.5Sqm. PVC insulator copper conductor single coil cable for 60 Mtr. 60.00 P/Mtr. 3600.00
surface recessed PVC conduit required complete in all repsect and as per direction of the
Engineer-in-charge.

7 Providing installing testing and commissioning of Ceiling fan regulator including wiring the 4 Nos. 1850.00 Each. 7400.00
down rod of standard length (upto 30 cm.) with 1.5mm PVC insulated copper conductor single
core cable as required 1200 Mtr. Cut A.

8 Supplying fixing 5 to 32 Amp. Rating 240 Volts L-series main circuit bracker in existing MCB 0.00
box complette with commissioning connection testing etc. as required with all leads,lifts and
carrige of material as required .

i) Single pole. 8 No. 220.00 Each 1760.00


ii) Double pole. 4 No. 350.00 Each 1400.00
9 Supplying fixing single pole and natural sheet steel MCB distribution box on surface /recessed 4 Nos. 450.00 Each. 1800.00
complete with tinned copper busher neutral detachable glass plate inter connection including
painting earthing etc. 4 way complete with all leads,lifts and carriage of material and as per
direction of the Engineer-in-charge.

10 Supplying fixing metal box of following size nominal on surface recess with suitable size of 0.00
phonetic laminated sheet cover in iron as required complete in all respect and as per direction
of the Engineer-in-charge.

i) 180x100x60mm. 4 Nos. 180.00 Each. 720.00


ii) 250x200x100mm 4 Nos. 220.00 Each. 880.00
11 Wiring for Sub main wiring with 2x6 Sqm. PVC insulated copper conductorin single cover in 8 Nos. 100.00 Each. 800.00
surface or recessed in PVC conduction with all leads,lifts and carriage of material and as
required complete in all respect.

12 Providing installing testing and commissioning of pre wire flourcent tube fitting complete with 4 Nos. 380.00 Each. 1520.00
blast starter and capacitor but excluding the cost of rube rod suitable to operate on 230 V
single faces ASC supply directly on surface with copper wiring as required complete with all
leads,lifts and carriage of material F/tube fixture 1x40watt prepex type category A complete in
all respect and as per direction of the Engineer-in-charge.
13 Supplying fixing backlite batten /angle holder including connection etc. complete with all 4 Nos. 60.00 each 240.00
leads,lifts and carriage of material and as per direction of the Engineer-in-charge.

14 Supplying /fixing of ceiling Rose on existing junction box/wooden block including connection 12 Nos. 60.00 Each. 720.00
etc. as required complete including all leads,lifts and carriage of material and as per direction
of the Engineer-in-charge.

15 Earthing with copper plate 600x600x3mm including accessoires and providing masonary 4 Nos. 3500.00 P/set. 14000.00
enclosure with cover plate having locking arrangeents and water pipe etc. (but without
charcoal or coke and salt ) comlete as required complete with all leads,lifts and carriage of
material and as per directionof the Engineer-in-charge.

16 Extra for using salt and charcoal for G.I. or copper plate earth electrod as required complete 4 Nos. 1200.00 Each. 4800.00
with all leads,lifts and carriage of material and as per direction of the Egineer-in-charge.

17 Supplying laying 6 SWG GI wire at 0.5 Mtr. Elbow ground level for conductor earth electrod 80 Mtr. 20.00 P/Mtr. 1600.00
including soldering as required complete in all respect and as per direction of the Engineer-in-
charge.

Total 55260.00
TERMS AND CONDITIONS:-
1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Nothing shall be paid for rejected material and all material shall be ISI specification
4 Payment will be made after successful testing of work . Executive Engineer,
I&PH Division,
Paonta Sahib (HP)
(b) Double pole. 6 Nos 395.00 each 2370.00
10 Supplying & fixing single Pole and neutral sheet steel MCB distribution Box on surface/ reccessed 6 Nos 376.00 each 2256.00
complete with tinned copper busher, neutral, detachable glass plate, inter connection including
painting, earthing etc. 4 way . Complete with all leads and lift as per direction of Engineer incharge.

11 Providing installing testing and commissioning of pipe wire flourcent tube fitting complete with blast 18 Nos 1025.00 each 18450.00
starter and capacitor but excluding the cost of tube rod suitable to operate on 230 V single faces AC
supply directly on surface with copper wiring as required with lead and lifts and as per direction of
Engineer incharge.
12 Supplying and fixing bakelite/angle holder including connection etc. as required and as per 6 Nos 34.00 each 204.00
direction of Engineer incharge.
13 Supplying and fixing Ceilling rose on existing junction box/ wooden block including connection etc. 18 Nos 19.00 each 342.00
as required and as per direction of Engineer incharge.
14 Earthing with G.I. wire 4 mtr. long pipe 40mm dia in stagging and providing making enclosures with 12 Set 510.00 P/Set 6120.00
cover plate having locking arrangements and watering pipe etc. (But without cacoal or coke and salt)
complete as required with all leads lifts and as required and as per direction of Engineer incharge.

15 Extra for using salt and charcoal for G.I. or copper plate earthalectrod as required .Complete with all 6 Set 820.00 P/Set 4920.00
leads lifts and as per direction of Engineer -in-charge.
16 Supplying laying 6 WG G.I. wire at 0.5 mtr. Below ground level for conductor earth electrod including 120 mtr. 25.00 P/mtr. 3000.00
soldering as required . Complete with all leads and lifts and as per direction of Engineer-in-charge.

17 Providing installing testing and commissioning of Ceiling fan and regulator including wiring the down 6 Nos 1550.00 each 9300.00
rod of standard length (upto 30 cm) with 1.5 Sq.mm 1200mm sweap as required and as per direction
of Engineer incharge..
18 Providing and fixing Kit kats i) 100 Amp 6 Nos 410.00 each 2460.00
--------------------------do----------ii) 200 Amp. 6 Nos 800.00 each 4800.00
19 Providing and fixing Volt meter i) 0 to 500 Volts 6 Nos 500.00 each 3000.00
20 Providing and fixing Ampere meter i) 0 to 15 Amp. 6 Nos 550.00 each 3300.00
--------------------------do-------------------ii) 0 to 45 Amp 6 Nos 550.00 each 3300.00
21 Providing and fixing double loop earthing and copper plate 600x600x3mm thick electrod complete 6 Job 6000.00 P/Job 36000.00
with material as such as thimbles, nuts , bolts, charcoat and common salt 25mmx5mm copper strips
as per IS-3043-10987 with upto date ammendments for motors and other electrical equipments and
digging of pits etc. complete in all respects and as direction of Engineer incharge.

22 Providing and from Power cable from Power meter to pannel board & Pannel board to motor as 6 Job 3000.00 P/Job 18000.00
required and as per direction of Engineer-in-charge.
(Rs. One lac thirty eight thousand two hundred & four) only Total 194202.00
TERMS AND CONDITIONS:-
1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 10% Security, 2% Income tax , 2% Sale Tax and 1% labour cess will be deducted from each bill.

Executive Engineer,
I&PH Division,
Paonta Sahib(HP)
SCHEDULE OF QUANTITY Estimated Cost :-Rs.79770/-
Name of work:-R/M of FIS Sataun in Tehsil Paonta Sahib Distt.Sirmour(HP) Earnest Money :-Rs.1600/-
(SH: C/O Retaining wall at RD 1450 to 1456 Mtrs.) Time:- Two months.
S.No Description Qty. Rate Unit
1 Excavation in earth work and disposal ofall excavated earth upto a lead of 20 Mtrs. and lift upto 1.50 Mtrs. 33.13 Cum. Per Cum.
disposing earth to be levelled and neatly dressed within a leads in Pick/juper work 50% each including all leads,lifts
and carriage of material and as per direction of the Engineer-in-charge.

2 Providing and laying cement concrete 1:6:12(1cement:6sand:12 graded stone agg.40mm nominal size)and 7.37 Cum P/Cum
curing complete excluding the cost of centring shuttering in foundation & plinth including all leads lifts
and carriage of material and as per the directions of Engineer-in-charge.
3 Providing and laying cement concrete work 1:4:8 (1cement: 4 sand: 8 graded stone agg. 20mm nominal size & 3.46 Cum P/Cum
curing complete) excluding cost of form work in foundation and plinth in breast & retaining wall in all height and
depth including all leads lifts complete and carriage of material etc. as per directions of Engineer incharge.

4 Random rubble masonary /Poly rubble masonary (uncoursed/brought to coursed) with hard stone of 34.62 Cum P/Cum
approved quality in foundation and plinth including levelling up with cement concrete
1:6.12(1cement:6sand:12 graded stone agg. 20mm nominal size)in cement mortor 1:6 (1 Cement: 6 sand ) in
breast wall & Retaining walls including all leads lifts and carriage of material and as per the directions of
Engineer-in-charge.

5 C/o Dry stone masonary in breast/Retaining walls/parapets etc. including all leads.lifts and carriage of 53.39 Cum P/Cum
material and as per direction of the Engineer-in-charge.

6 Boulder filling behind retaining wall complete in all respect and as per direction of the Engineer-in-charge. 9.72 Cum P/Cum

TERMS AND CONDITIONS. Total:


1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Cement shall be issued @ Rs. 315/- per bag & steel @ 53/- per Kg. from IPH store Bhatanwali Paonta Sahib.
4 Royality certificate in respect of stone agg. Sand etc. shall be produced by the contractor
5 Empty cement bags shall be returned to the Deptt. Otherwise Rs. 2/- per bag shall deducted from the bill. Assistant Engineer,
6 The watch & ward of the store by the contractor. I&PH Sub Division,
Kaffota.
DRAFT SCHEDULE OF QUANTITY Estimated Cost :-Rs.45037/-
Name of work:-Aug. of LWSS Rangwa Pabhar & adjoining villages Mashoo GP Jamna in Tehsil Paonta Sahib Earnest Money :-Rs.1000/-
Distt.Sirmour(HP) (SH: C/O Retaining wall to protect the tank at Kando Bass Jakhana Section) Time:- Two months.
S.No Description Qty. Rate Unit
1 Cutting in earth work in and disposal of excavated earth within all leadsin Pick/jumper work 50% 22.21 Cum 59.55 P/Cum
each complete in all respect and as per direction of the Engineer-in-chage.
2 Excavation in foundation and trenches etc.in earth work in all kinds of soil such as pick work ,jumper 35.02 Cum 92.85 P/Cum
work decomposed conglomerate saturated soil soft and hard rock upto all leads lifts stacking the
excavated soil not more than 3mtr.clear from the edge of excavation and then returning the stacked
soil in 15cm layers when required in to plinth sides of foundation etc. consolidating each deposited
layers by ramming and watering and then disposing of all surplus excavated earth as directed with in
all leads lifts and as per directions of the Engineer-incharge

3 Providing and laying cement concrete 1:6:12(1cement:6sand:12 graded stone agg.40mm nominal size)and 4.17 Cum 905.10 P/Cum
curing complete excluding the cost of centring shuttering in foundation & plinth including all leads lifts
and carriage of material and as per the directions of Engineer-in-charge.
4 Random rubble masonary /Poly rubble masonary (uncoursed/brought to coursed) with hard stone of 32.31 Cum 1135.50 P/Cum
approved quality in foundation and plinth including levelling up with cement concrete
1:6.12(1cement:6sand:12 graded stone agg. 20mm nominal size)in cement mortor 1:6 (1 Cement: 6 sand ) in
breast wall & Retaining walls including all leads lifts and carriage of material and as per the directions of
Engineer-in-charge.

TERMS AND CONDITIONS. Total:


1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Cement shall be issued @ Rs. 315/- per bag & steel @ 53/- per Kg. from IPH store Bhatanwali Paonta Sahib.
4 Royality certificate in respect of stone agg. Sand etc. shall be produced by the contractor
5 Empty cement bags shall be returned to the Deptt. Otherwise Rs. 2/- per bag shall deducted from the bill. Assistant Engineer,
6 The watch & ward of the store by the contractor. I&PH Sub Division,
Kaffota.
DRAFT SCHEDULE OF QUANTITY Estimated Cost :-Rs.61045/-
Name of work:-Aug. of LWSS Rangwa Pabhar & adjoining villages Mashoo GP Jamna in Tehsil Paonta Sahib Earnest Money :-Rs.1300/-
Distt.Sirmour(HP) (SH: C/O Retaining wall back side of Intake) Time:- Three months.
S.No Description Qty. Rate Unit
1 Cutting in earth work in and disposal of excavated earth within all leadsin Pick/jumper work 50% 13.50 Cum 135.00 P/Cum
each complete in all respect and as per direction of the Engineer-in-chage.
2 Excavation in foundation and trenches etc.in earth work in all kinds of soil such as pick work ,jumper 8.19 Cum 160.00 P/Cum
work decomposed conglomerate saturated soil soft and hard rock upto all leads lifts stacking the
excavated soil not more than 3mtr.clear from the edge of excavation and then returning the stacked
soil in 15cm layers when required in to plinth sides of foundation etc. consolidating each deposited
layers by ramming and watering and then disposing of all surplus excavated earth as directed with in
all leads lifts and as per directions of the Engineer-incharge

3 Providing and laying cement concrete 1:6:12(1cement:6sand:12 graded stone agg.40mm nominal size)and 4.50 Cum 2900.00 P/Cum
curing complete excluding the cost of centring shuttering in foundation & plinth including all leads lifts
and carriage of material and as per the directions of Engineer-in-charge.
4 Random rubble masonary /Poly rubble masonary (uncoursed/brought to coursed) with hard stone of 44.08 Cum 3300.00 P/Cum
approved quality in foundation and plinth including levelling up with cement concrete
1:6.12(1cement:6sand:12 graded stone agg. 20mm nominal size)in cement mortor 1:6 (1 Cement: 6 sand ) in
breast wall & Retaining walls including all leads lifts and carriage of material and as per the directions of
Engineer-in-charge.

5 Stone filling behind the retaining wall complete in all respect and as per direction of the Engineer-in-charge. 13.67 Cum. 700.00 P/Cum.

TERMS AND CONDITIONS. Total:


1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Cement shall be issued @ Rs. 315/- per bag & steel @ 53/- per Kg. from IPH store Bhatanwali Paonta Sahib.
4 Royality certificate in respect of stone agg. Sand etc. shall be produced by the contractor
5 Empty cement bags shall be returned to the Deptt. Otherwise Rs. 2/- per bag shall deducted from the bill. Executive Engineer,
I&PH Division,
Paonta Sahib.
SCHEDULE OF QUANTITY Estimated Cost :-Rs.86283/-
Name of work:-C/o LIS Thontha Jakhal GP Thontha Jakhal in Tehsil Paonta Sahib Distt.Sirmour(HP) Earnest Money :-Rs.1800/-
(SH: C/O Retaining wall back side of Pump House 2nd stage.) Time:- Two months.
S.No Description Qty. Rate Unit
1 Cutting in earth work in and disposal of excavated earth within all leadsin Pick/jumper work 50% 63.53 Cum P/Cum
each complete in all respect and as per direction of the Engineer-in-chage.

2 Excavation in foundation and trenches etc.in earth work in all kinds of soil such as pick work ,jumper 8.71 Cum P/Cum
work decomposed conglomerate saturated soil soft and hard rock upto all leads lifts stacking the
excavated soil not more than 3mtr.clear from the edge of excavation and then returning the stacked
soil in 15cm layers when required in to plinth sides of foundation etc. consolidating each deposited
layers by ramming and watering and then disposing of all surplus excavated earth as directed with in
all leads lifts and as per directions of the Engineer-incharge

3 Providing and laying cement concrete 1:6:12(1cement:6sand:12 graded stone agg.40mm nominal size)and 4.35 Cum P/Cum
curing complete excluding the cost of centring shuttering in foundation & plinth including all leads lifts
and carriage of material and as per the directions of Engineer-in-charge.

4 Random rubble masonary /Poly rubble masonary (uncoursed/brought to coursed) with hard stone of 40.61 Cum P/Cum
approved quality in foundation and plinth including levelling up with cement concrete
1:6.12(1cement:6sand:12 graded stone agg. 20mm nominal size)in cement mortor 1:6 (1 Cement: 6 sand ) in
breast wall & Retaining walls including all leads lifts and carriage of material and as per the directions of
Engineer-in-charge.
5 Providing and laying cement concrete 1:4:8(1cement:4sand:8 graded stone agg.40mm nominal size)and 3.78 Cum. P/Cum.
curing complete excluding the cost of form work in foundation & plinth including all leads lifts and carriage of
material and as per the directions of Engineer-in-charge.
6 C/o Dry stone masonary in breast/retaining walls/parapets etc. including all leads,lifts and carriage of 29.16 Cum. P/Cum.
material and as per direction of the Engineer-in-charge.
7 Boulder filling behind the retaining wall complete in all respect and as per direction of the Engineer-in-charge. 6.72 Cum. P/Cum.

TERMS AND CONDITIONS. Total:


1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Cement shall be issued @ Rs. 315/- per bag & steel @ 53/- per Kg. from IPH store Bhatanwali Paonta Sahib.
4 Royality certificate in respect of stone agg. Sand etc. shall be produced by the contractor
5 Empty cement bags shall be returned to the Deptt. Otherwise Rs. 2/- per bag shall deducted from the bill. Assistant Engineer,
I&PH Sub Divn. Kaffota.
ed Cost :-Rs.79770/-
Money :-Rs.1600/-
wo months.
Amount

t Engineer,
b Division,

ed Cost :-Rs.45037/-
Money :-Rs.1000/-
wo months.
Amount
1323.00

3252.00

3774.00

36688.00

45037.00

t Engineer,
b Division,
ed Cost :-Rs.61045/-
Money :-Rs.1300/-
hree months.
Amount
1823.00

1310.00

13050.00

145464.00

9569.00

171216.00

e Engineer,
vision,
Sahib.
ed Cost :-Rs.86283/-
Money :-Rs.1800/-
wo months.
Amount
t Engineer,
ub Divn. Kaffota.
DRAFT SCHEDULE OF QUANTITY Estimated cost Rs. 282842/-
Name of work: Providing LWSS to NC/PC habitation of CV Tatiana GP Tatiana in Tehsil Paonta Sahib Distt.Sirmour (HP) Earnest money Rs5700/-
(SH: Laying & jointing of GI Pipes) Time:- Three Months
S.No Sub-Head and item of work. Qty. Rates, Unit
1 2 3 4 5
1 Excavation in drains & channel etc.in earth work in all kinds of soil such as pick work 1660.05 Cum. 134.40 P/Cum.
,jumper work blasting work, decomposed conglomerate saturated soil soft and hard
rock including dressing of sides and beds and prepareation of sub grade to level or
slope including refilling the trenches and disposing of surplus earth upto all leads,lifts
disposed earth to be levelled and neatly dressed including jungle clearance and as per
directions of the Engineer-incharge

2 Laying & jointing of GMS pipes of following dia & class including all leads,lifts and
carriage of material and earth work etc. complete in all respect complete in all respect
and as per direction of the Engineer-in-charge. 15mm dia.

I ) 15mm dia (L) 4360.00 Rmt. 4.20 P/Rmt.


ii) 25mm dia (L) 3340.00 Rmt. 6.40 P/Rmt.
iii) 32mm dia (L) 2180.00 Rmt. 6.40 P/Rmt.
iv) 40mm dia.(L) 660.00 Rmt. 8.60 P/Rmt.
3 Fixing of Peet valve of Gun Metal of superior quality of following dias complete in all respect
and as per direction of the Engineer-in-charge.

I ) 15mm dia (L) 15.00 Nos 7.00 Each


ii) 25mm dia (L) 10.00 Nos 8.00 Each
iii) 32mm dia (L) 10.00 No. 11.50 Each
iv) 40mm dia.(L) 10.00 No. 11.50 Each
TERMS & CONDITIONS Total:
1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 GI Pipe & Fitting shall be issued free of cost from IPH Store Bhatanwali Paonta Sahib.
4 In addition to normal security 5% will be withheld for want of testing and released after successful testing. Executive Engineer,
I&PH Division,
Paonta Sahib.
d cost Rs. 282842/-
money Rs5700/-
hree Months
Amount.
6
223111.00

18312.00
21376.00
13952.00
5676.00

105.00
80.00
115.00
115.00
282842.00

e Engineer,
vision,
SCHEDULE OF QUANTITY Estimated cost Rs 47946/-
Name of work: Providing WSS to PC habitation Haripurkhol in Tehsil Paonta Sahib Distt.Sirmour (HP) Earnest money Rs.1000/-
(SH: C/O RCC collection Tank , Retaining wall to protect the tank, Laying & jointing of GI pipes) Time:- Three Months
S.No Sub-Head and item of work. Qty. Rates, Unit
1 2 3 4 5
1 Excavation in foundation and trenches etc.in earth work in all kinds of soil such as pick 23.63 Cum. 160.00 P/cum.
work ,jumper work decomposed conglomerate saturated soil soft and hard rock upto all
leads lifts stacking the excavated soil not more than 3mtr.clear from the edge of excavation
and then returning the stacked soil in 15cm layers when required in to plinth sides of
foundation etc. consolidating each deposited layers by ramming and watering and then
disposing of all surplus excavated earth as directed with in all leads lifts and as per
directions of the Engineer-incharge

2 Providing form work with steel sheets 3.15mm thick welded with angle iron 30x30x5 mm so as to
give rough finish i/c centring shuttering structing and propping etc. with wooden bettens & Ballies,
height or propping & centering below supporting floor to ceiling not exceeding 4 mtr.and removal of
the same for insitu RCC work and PCC work.including all leads lifts and carriage of material at site &
as per direction of Engineer in charge in:-

b) Vertical surface such as wall any thickness. 129.30 Sqm. 200.00 P/Sqm.

3 Providing and laying cement concrete work 1:5:10(1cement:5 sand: 10 graded stone agg. 37.80 Cum 2700.00 P/Cum
40mm nominal size) with 15% plum and curing complete excluding cost of form work and
in retaining walls/ Breast walls, the size of Plums shall usually be 150mm to 300mm as per
PWD specificatioin including all leads lifts and carriage of material and as per direction of
Engineer incharge.

Total:
TERMS & CONDITIONS
1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Cement will be issued @ 315/- per bag & steel @ 53/- per Kg. at IPH store Bhatanwali Paonta Sahib.
4 Empty cement bags shall be returned to the deptt. Otherwise Rs. 2/- per bag shall be deducted from
the each bill of the contractor.
5 Royality certificate in respect of stone agg. Sand etc. shall be produced by the contractor Executive Engineer,
6 No payment shall be made for defective work. I&PH Division,
Paonta Sahib.

REVISED SCHEDULE OF QUANTITY Estimated cost Rs 98022/-


Name of work: Restoration of Rain damages of Rampur Giri Canal in Tehsil Paonta Sahib Distt.Sirmour (HP) Earnest money Rs.2000/-
(SH: C/O Retaining wall to protect the Rampur Giri Canal at RD 1035 to 1100 Mtrs.) Time:- Three Months
S.No Sub-Head and item of work. Qty. Rates, Unit
1 2 3 4 5
1 Excavation in foundation and trenches etc.in earth work in all kinds of soil such as pick 65.81 Cum. 160.00 P/cum.
work ,jumper work decomposed conglomerate saturated soil soft and hard rock upto all
leads lifts stacking the excavated soil not more than 3mtr.clear from the edge of excavation
and then returning the stacked soil in 15cm layers when required in to plinth sides of
foundation etc. consolidating each deposited layers by ramming and watering and then
disposing of all surplus excavated earth as directed with in all leads lifts and as per
directions of the Engineer-incharge

2 Providing form work with steel sheets 3.15mm thick welded with angle iron 30x30x5 mm so as to
give rough finish i/c centring shuttering structing and propping etc. with wooden bettens & Ballies,
height or propping & centering below supporting floor to ceiling not exceeding 4 mtr.and removal of
the same for insitu RCC work and PCC work.including all leads lifts and carriage of material at site &
as per direction of Engineer in charge in:-

Foundation footings & ther Mass concrete surface. 251.60 Sqm. 180.00 P/Sqm.
3 Providing and laying cement concrete work 1:5:10(1cement:5 sand: 10 graded stone agg. 74.10 Cum 2300.00 P/Cum
40mm nominal size) with 15% plum and curing complete excluding cost of form work and
in retaining walls/ Breast walls, the size of Plums shall usually be 150mm to 300mm as per
PWD specificatioin including all leads lifts and carriage of material and as per direction of
Engineer incharge.
Total:
TERMS & CONDITIONS
1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Cement will be issued @ 315/- per bag & steel @ 53/- per Kg. at IPH store Bhatanwali Paonta Sahib.
4 Empty cement bags shall be returned to the deptt. Otherwise Rs. 2/- per bag shall be deducted from
the each bill of the contractor.
5 Royality certificate in respect of stone agg. Sand etc. shall be produced by the contractor Executive Engineer,
I&PH Division,
Paonta Sahib.
REVISED SCHEDULE OF QUANTITY Estimated cost Rs 59034/-
Name of work: Providing LWSS to PC habitation Misserwala Kiyarda & Jagatpur in Tehsil Paonta Sahib Distt.Sirmour (HP) Earnest money Rs.1300/-
(SH: C/O Retaining wall to protect the Rising Main & storage Tank) Time:- One Month
S.No Sub-Head and item of work. Qty. Rates, Unit
1 2 3 4 5
1 Excavation in foundation and trenches etc.in earth work in all kinds of soil such as pick 21.60 Cum. 160.00 P/cum.
work ,jumper work decomposed conglomerate saturated soil soft and hard rock upto all
leads lifts stacking the excavated soil not more than 3mtr.clear from the edge of excavation
and then returning the stacked soil in 15cm layers when required in to plinth sides of
foundation etc. consolidating each deposited layers by ramming and watering and then
disposing of all surplus excavated earth as directed with in all leads lifts and as per
directions of the Engineer-incharge

2 Providing form work with steel sheets 3.15mm thick welded with angle iron 30x30x5 mm so as to
give rough finish i/c centring shuttering structing and propping etc. with wooden bettens & Ballies,
height or propping & centering below supporting floor to ceiling not exceeding 4 mtr.and removal of
the same for insitu RCC work and PCC work.including all leads lifts and carriage of material at site &
as per direction of Engineer in charge in:-

Vertical surfaces. 144.00 Sqm. 200.00 P/Sqm.


3 Providing and laying cement concrete work 1:5:10(1cement:5 sand: 10 graded stone agg. 48.60 Cum 2850.00 P/Cum
40mm nominal size) with 15% plum and curing complete excluding cost of form work and
in retaining walls/ Breast walls, the size of Plums shall usually be 150mm to 300mm as per
PWD specificatioin including all leads lifts and carriage of material and as per direction of
Engineer incharge.

Total:
TERMS & CONDITIONS
1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Cement will be issued @ 315/- per bag & steel @ 53/- per Kg. at IPH store Bhatanwali Paonta Sahib.
4 Empty cement bags shall be returned to the deptt. Otherwise Rs. 2/- per bag shall be deducted from
the each bill of the contractor.
5 Royality certificate in respect of stone agg. Sand etc. shall be produced by the contractor Executive Engineer,
I&PH Division,
Paonta Sahib.
cost Rs 47946/-
money Rs.1000/-
ree Months
Amount.
6
3781.00

25860.00

102060.00

131701.00
Engineer,

cost Rs 98022/-
money Rs.2000/-
ree Months
Amount.
6
10530.00

45288.00
170430.00
226248.00

Engineer,

cost Rs 59034/-
money Rs.1300/-

Amount.
6
3456.00

28800.00
138510.00

170766.00

Engineer,
REVISED SCHEDULE OF QUANTITY Estimated cost Rs 20118/-
Name of work: R/M of LWSS Kando Bhaila in Tehsil Paonta Sahib Distt.Sirmour (HP) Earnest money Rs.400/-
(SH: Rewinding and repair of 25 HP centifugal Motor KSB make 13 stage.) Time:- 15 days.
S.No Sub-Head and item of work. Qty. Rates, Unit Amount.
Repair of Motor.
1 Rewinding and repair of 25.00 HP induction motor super enamelled PVC coated copper 25 HP 550.00 Per HP 13750.00
winding wire finolex make complete in all respect and as per direction of the Engineer-
in-charge.
2 Providing and fixing of Ball bearining No.6312 SKF make. 2 No. 750.00 Each. 1500.00
3 Providing and fixing of Ball bearining No.6310 SKF make. 2 No. 750.00 Each. 1500.00
4 Providing and fixing of complete bearing set complete in all respect. 2 Nos. 500.00 Each. 1000.00
5 Repair of Rotor bearing seat. 1 job. 450.00 Per job. 450.00
6 Repair of Rotor balancing. 1 No. 750.00 Each. 750.00
7 Providing and fixing connection plate. 1 No. 850.00 Each. 850.00
8 Providing and fixing new studs. 8 Nos. 65.00 Each. 520.00
9 Providing and fixing connection thimble. 6 Nos. 95.00 Each. 570.00
10 Providing and fixing connection lead size 100mm. 5 Mtr. 150.00 Per Mtr. 750.00
11 Providing and fixing labour for opening & refitting. 1 job. Item job. 0.00
delete.
12 Carriage of Pump set from Pump House to workshop and back to Pumphouse fitting 1 job. 2500.00 job. 2500.00
testing at site complete in all respect and as per direction of the Engineer-in-charge.

Total: 24140.00
2% rebate on all over the amount. (-) 483.00
TERMS & CONDITIONS Total. 23657.00
1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Nothing shall be paid for rejected/defective work/material.
4 The repair will be guaranteed for six months.
5 Payment will be made after successful testing of Pumping machinery at site. Executive Engineer,
I&PH Division,
Paonta Sahib.
REVISED SCHEDULE OF QUANTITY Estimated cost Rs 81118/-
Name of work: R/M of various Hand Pumps under IPH Sub Division Majra in Tehsil Paonta Sahib Earnest money Rs.1650/-
Distt.Sirmour (HP) (SH: Painting work in various Hand Pumps.) Time:- One Month.
S.No Sub-Head and item of work. Qty. Rates, Unit Amount.

1 Painting two coats (excluding priming coat)on new steel & other metal surface under 1121 Sqm. 48.00 Per HP 53820.00
coat with ready mixed paint brushing to give an even shade including cleaning the
surface all dirt dust and other matter with aluminium paint other than white and
carriage of material at site and as directed by the Engineer-in-chrge.

2 Writing letters or figures on any surface with black japan paint stops commas Hyphens 375 Nos. 125.00 Each. 46875.00
and the like not to be meausred and paid for separately.

Total: 100695.00
TERMS & CONDITIONS
1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Payment shall be paid after successful work.

Executive Engineer,
I&PH Division,
Paonta Sahib.
REVISED SCHEDULE OF QUANTITY Estimated cost Rs.30464/-
Name of work:-Restoration of Rain damages of FIS Khanyar in Tehsil Paonta Sahib Distt. Sirmour (HP) (SH: Earnest money Rs.600/-
C/o Retaining wall and Pucca Field channel) Time:- Three Months
S.No Sub-Head and item of work. Qty. Rates, Unit
1 2 3 4 5
1 Cutting in earth work and disposal of all excavated earth within all leads in Pick/Jumper work 5.25 Cum 140.00 P/Cum
50% each complete in all respect and as per direction of the Engineer-in-charge.

2 Excavation in foundation and trenches etc.in earth work in all kinds of soil such as pick 7.43 Cum 160.00 P/Cum
work ,jumper work decomposed conglomerate saturated soil soft and hard rock upto all leads
lifts stacking the excavated soil not more than 3mtr.clear from the edge of excavation and
then returning the stacked soil in 15cm layers when required in to plinth sides of foundation
etc. consolidating each deposited layers by ramming and watering and then disposing of all
surplus excavated earth as directed with in all leads lifts and as per directions of the
Engineer-in-charge

3 Providing and laying cement concrete work 1:5:10(1cement:5 sand: 10 graded stone agg. 35.00 Cum 934.10 P/Cum
40mm nominal size) with 15% plum and curing complete excluding cost of form work and in
retaining walls/ Breast walls, the size of Plums shall usually be 150mm to 300mm as per
PWD specificatioin including all leads lifts and carriage of material and as per direction of
Engineer in-charge.

4 Providing form work with steel sheets 3.15mm thick welded with angle iron 30x30x5 mm so
as to give rough finish i/c centring shuttering structing and propping etc. with wooden
bettens & Ballies, height or propping & centering below supporting floor to ceiling not
exceeding 4 mtr.and removal of the same for insitu RCC work and PCC work including all
leads lifts and carriage of material at site & as per direction of Engineer in-charge in:-

a) Vertical surfaces 22.05 Sqm 80.70 P/Sqm


TOTAL:

TERMS AND CONDITIONS:-


1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Royality certificate in respect of stone agg. Sand etc. shall be produced by the contractor
4 Cement shall be issued @ Rs.315/- Per bag & steel @ Rs.53/- per Kg. from IPH store Bhatanwali Paonta
5 Sahib.
Empty cement bags shall be returned to the deptt. Other Rs.2/- per bag shall deducted from each bill of the
6 contractor.
The watch & ward of the store by the contractor. Executive Engineer,
I&PH Division,
Paonta Sahib.

REVISED SCHEDULE OF QUANTITY Estimated cost Rs.35879/-


Name of work:-Restoration of Rain damages of FIS Khanyar in Tehsil Paonta Sahib Distt. Sirmour (HP) (SH: Earnest money Rs.800/-
C/o Retaining wall at RD 390-398 in Plum concrete. Time:- Three Months
S.No Sub-Head and item of work. Qty. Rates, Unit
1 2 3 4 5
1 Excavation in foundation and trenches etc.in earth work in all kinds of soil such as pick 11.64 Cum 92.85 P/Cum
work ,jumper work decomposed conglomerate saturated soil soft and hard rock upto all leads
lifts stacking the excavated soil not more than 3mtr.clear from the edge of excavation and
then returning the stacked soil in 15cm layers when required in to plinth sides of foundation
etc. consolidating each deposited layers by ramming and watering and then disposing of all
surplus excavated earth as directed with in all leads lifts and as per directions of the
Engineer-in-charge

2 Providing and laying cement concrete work 1:5:10(1cement:5 sand: 10 graded stone agg. 32.55 Cum 934.10 P/Cum
40mm nominal size) with 15% plum and curing complete excluding cost of form work and in
retaining walls/ Breast walls, the size of Plums shall usually be 150mm to 300mm as per
PWD specificatioin including all leads lifts and carriage of material and as per direction of
Engineer in-charge.

3 Providing form work with steel sheets 3.15mm thick welded with angle iron 30x30x5 mm so
as to give rough finish i/c centring shuttering structing and propping etc. with wooden
bettens & Ballies, height or propping & centering below supporting floor to ceiling not
exceeding 4 mtr.and removal of the same for insitu RCC work and PCC work including all
leads lifts and carriage of material at site & as per direction of Engineer in-charge in:-

a) Vertical surfaces 54.43 Sqm 80.70 P/Sqm

TOTAL:
TERMS AND CONDITIONS:-
1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Royality certificate in respect of stone agg. Sand etc. shall be produced by the contractor
4 Cement shall be issued @ Rs.315/- Per bag & steel @ Rs.53/- per Kg. from IPH store Bhatanwali Paonta
5 Sahib.
Empty cement bags shall be returned to the deptt. Other Rs.2/- per bag shall deducted from each bill of the
6 contractor.
The watch & ward of the store by the contractor. Assistant Engineer,
I&PH Sub Division,
Kaffota.
d cost Rs.30464/-
money Rs.600/-
hree Months
Amount.
6
735.00

1189.00

32694.00

1779.00
1924.00

Engineer,

d cost Rs.35879/-
money Rs.800/-
hree Months
Amount.
6
1081.00

30405.00

0.00

4393.00

35879.00

Engineer,
Division,
REVISED SCHEDULE OF QUANTITY Estimated cost Rs 67200/-
Name of work: A/R & M/O of various WSS under IPH Sub Division Kaffota in Tehsil Paonta Sahib
Earnest money Rs.1400/-
Distt.Sirmour (HP)(SH: Providing and fixing of Manhole cover) Time:- One Month
S.No Sub-Head and item of work. Qty. Rates, Unit Amount.
1 2 3 4 5 6
1 Supplying and fixing of Cast Iron Manhole cover with frame for man holes of 30.00 Nos. 2750.00 Each. 82500.00
size 455mm internal dia meter cast iron cover (Medium) duty the weight of
cover to be not less than 38 Kg. including locking arrangement with nut & bolts
including all leads,lifts and carriage of material at site and as per direction of
the Engineer-in-charge.

2 Providing steel lock compete in all respect and as per direction of the Engineer-in- 30.00 Nos. 160.00 Each 4800.00
charge.

Total: 87300.00
TERMS & CONDITIONS
1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Nothing shall be paid for rejected/defective work/material.
4 The material will be received in good condition
Executive Engineer,
I&PH Division,
Paonta Sahib.
Estimated Cost:Rs. 97500/-
SCHEDULE OF QUANTITY Earnest Money: Rs.2000/-
Name of work :Providing LWSS to PC habitation Barwas (Chandnu Sundla) GP Barwas in Tehsil Paonta Sahib Distt. Time: Three months.
Sirmour (HP) (SH: Replacement of Old Pumping machinery )
S.NO. DESCRIPTION QTY RATE UNIT AMOUNT

8 Supply, errection, testing & commissioning of submersible pumping set of reputed make
such as KSB/BS/Johnson/worthington conforming to latest relevent BIS code. The pump
should be fitted with free flow impellers of bronze /suitable alloy as per BIS 5659 or latest
with up to date ammendments suitable for raw/clear water having greased packed bearings
& shell with wound stator on motor side & with shaft protection sleeve on pump side
ensuring better life for shaft conforming to BIS specifications. The pump shall be directly
coupled to a submersible squirrel cage electric induction motor of Kirloskar/NGEF/Jyoti /
Crompton make conforming to relevent BIS code with up to date ammendments totally
dust & water proof for submersible duty isolated from the pump by intermediate casing with
double mechanical seal in oil chamber chamber & grease packed lubricated bearings & 2x15 HP Each.
provided with stainless steel thrust bearing plate to withstand non vertical loads with
minimum wear & tear. It should also be fitted with a device to take up expansion of water
with the heating of motor. The pump set should include water level guard, errection
clamps, cable clips & depth gauge etc. & suitable for operation on data given below:-

a) Total Head in mtrs . 356.00 Mtr.

b) Capacity (in LPS) 1.25 LPS


c) Dia of R/Main (in mm) 40mm dia

d) Dia of Column pipe (in mm) 0


e) Length of Rising Main. 1020 Rmt.
Total:

Assistant Engineer,
I&PH Sub Division,
Kaffota.
DRAFT SCHEDULE OF QUANTITY Estimated cost Rs51931/--
Name of work:-C/o LIS Kanti Mashwa GP Kanti Mashwa in Tehsil Paonta Sahib Distt. Sirmour (HP) Earnest money Rs.1100/-
(SH: C/o Retaining wall in front of the Pump House & Sump well) Time:- Three Months
S.No Sub-Head and item of work. Qty. Rates, Unit
1 2 3 4 5
1 Excavation in foundation and trenches etc.in earth work in all kinds of soil such as pick work 12.55 Cum 92.85 P/Cum
,jumper work decomposed conglomerate saturated soil soft and hard rock upto all leads lifts
stacking the excavated soil not more than 3mtr.clear from the edge of excavation and then
returning the stacked soil in 15cm layers when required in to plinth sides of foundation etc.
consolidating each deposited layers by ramming and watering and then disposing of all
surplus excavated earth as directed with in all leads lifts and as per directions of the
Engineer-incharge

2 Providing form work with steel sheets 3.15mm thick welded with angle iron 30x30x5 mm so
as to give rough finish i/c centring shuttering structing and propping etc. with wooden
bettens & Ballies, height or propping & centering below supporting floor to ceiling not
exceeding 4 mtr.and removal of the same for insitu RCC work and PCC work including all leads
lifts and carriage of material at site & as per direction of Engineer incharge in:-

a) Vertiocal surfaces 74.05 Sqm 80.70 P/Sqm


3 Providing and laying cement concrete work 1:5:10(1cement:5 sand: 10 graded stone agg. 47.95 Cum 934.10 P/Cum
40mm nominal size) with 15% plum and curing complete excluding cost of form work and in
retaining walls/ Breast walls, the size of Plums shall usually be 150mm to 300mm as per PWD
specificatioin including all leads lifts and carriage of material and as per direction of Engineer
incharge.

TERMS & CONDITIONS


1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax & labour cess shall be deducted as per rules.
3 Royality certificate in respect of stone agg. Sand etc. shall be produced by the contractor
4 Cement shall be issued @ 315/- per Bag & Steel @ 53/- per Kg. at IPH Store Bhatanwali Paonta Sahib.
5 Empty cement bags shall be returned to the Deptt. Otherwise Rs. 2/- per bag shall deducted Assistant Engineer,
from the bill.
I&PH Sub Division
Kaffota.

REVISED SCHEDULE OF QUANTITY Estimated cost Rs. 93205/--


Name of work:-R/M of LWSS Shillai in GP Shillai in Tehsil Shilai Distt. Sirmour (HP) Earnest money Rs.1900/-
(SH: Supply & fixing of soft starter 200 HP induction Motor of Kirloskar at stage Ist.) Time:- Three Months
S.No Sub-Head and item of work. Qty. Rates, Unit
1 2 3 4 5
1 Supply, installation and commissioning of L&T Siemen make soft starter sitable to operate on 1 No. 215000.00 Each.
415 Volt including all required connections suitable for following mechanism single phasing
over loading phase sequence reversal unbalanced current suitable for 200 HP motor
complete and as per direction of the Engineer-in-charge.

2 Supply & fixing of L&T make power contractor Model MNX-325 complete in all respect and 1 No. 42000.00 Each.
as per direction of the Engineer-in-charge.

3 Supply & fixing of L&T make heavy duty power capacitor suitable for operation on 415 Volts 40 No. 390.00 Each.
supply complete in all respect and as per direction of the Engineer-in-charge.

TERMS & CONDITIONS Total:


1 Material FOR at site of work.
2 The undersigned reserve the right to accept or reject any or all the tender without assigning any reason thereof.
3 Work will have to be done as per the instructions of the undersigned.
4 Work shall be starter within 15 days afer he award of work.
5 Secutity ,Income tax,Sale Tax & cess will be deducted from the contractors bill as applicable.
Executive Engineer,
I&PH Division
Paonta Sahib.
d cost Rs51931/--
money Rs.1100/-
ree Months
Amount.
6
1165.00

5976.00
44790.00

51931.00
Assistant Engineer,
I&PH Sub Division

d cost Rs. 93205/--


money Rs.1900/-
ree Months
Amount.
6
215000.00

42000.00

15600.00

272600.00

Executive Engineer,
I&PH Division
Paonta Sahib.
DRAFT SCHEDULE OF QUANTITY Estimated cost Rs.96962/-
Name of work:-C/o LIS Bata Mandi & LIS Kishanpura in Tehsil Paonta Sahib Distt. Sirmour (HP) (SH: Earnest money Rs.2000/-
Fixing of fencing panel in boundry wall of Pump House & Sump well). Time:- Three Months
S.No Sub-Head and item of work. Qty. Rates, Unit Amount.
1 2 3 4 5 6
1 Excavation in foundation and trenches etc.in earth work in all kinds of soil such as pick 16.20 Cum 92.85 P/Cum 1504.00
work ,jumper work decomposed conglomerate saturated soil soft and hard rock upto
all leads lifts stacking the excavated soil not more than 3mtr.clear from the edge of
excavation and then returning the stacked soil in 15cm layers when required in to
plinth sides of foundation etc. consolidating each deposited layers by ramming and
watering and then disposing of all surplus excavated earth as directed with in all leads
lifts and as per directions of the Engineer-in-charge

2 Providing and laying cement concrete work 1:5:10(1cement:5 sand: 10 graded stone 16.74 Cum 934.10 P/Cum 15637.00
agg. 40mm nominal size) with 15% plum and curing complete excluding cost of form
work and in retaining walls/ Breast walls, the size of Plums shall usually be 150mm to
300mm as per PWD specificatioin including all leads lifts and carriage of material and
as per direction of Engineer- in-charge.

3 Providing and laying cement concrete work 1:4:8 (1cement: 4 sand: 8 graded stone 34.23 Cum 1104.10 P/Cum 37793.00
agg. 20mm nominal size & curing complete) excluding cost of form work in foundation
and plinth in breast & retaining wall in all height and depth including all leads lifts
complete and carriage of material etc. as per directions of Engineer incharge.

4 Ist. Class brick masonary in common burnt clay building bricks in cement Mortar 4.44 Cum. 1399.10 P/Cum. 6212.00
1:6(1cement:6 sand) in all leads,lifts and carriage of material and as per direction of
the Engineer-in-charge.

5 20mm thick cement Plaster in single coat on rough side of brick/stone for interior 77.27 Cum. 58.40 Per cum. 4513.00
plastering upto floor two level including arrisesinternal rounded angles not exceeding
80mm in girth and finished even and smooth in Cement Mortar 1:6(1cement :6sand)
complete in all respect and as per direction of the Engineer-in-charge.
6 Providing form work with steel sheets 3.15mm thick welded with angle iron 30x30x5
mm so as to give rough finish i/c centring shuttering structing and propping etc. with
wooden bettens & Ballies, height or propping & centering below supporting floor to
ceiling not exceeding 4 mtr.and removal of the same for insitu RCC work and PCC work
including all leads lifts and carriage of material at site & as per direction of Engineer
in-charge in:-
a) Vertical surfaces 76.08 Sqm 80.70 P/Sqm 6140.00
7 Fiing of M.S. fencing panel complete in all respect and as per direction of the Engineer- 70.00 Nos. 105.00 Each. 7350.00
in-charge.

8 Providing and fixing of MS steel gate for steel work in single section including cutting 3.00 Qntl. 5937.76 P/Qntl. 17813.00
hoisting fixing in position complete in all respect and as per direction of the Engineer-
in-charge.

TOTAL: 96962.00
TERMS AND CONDITIONS:-
1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Royality certificate in respect of stone agg. Sand etc. shall be produced by the contractor
4 Cement shall be issued @ Rs.315/- Per bag & steel @ Rs.53/- per Kg. from IPH store Bhatanwali
5 Paonta Sahib. bags shall be returned to the deptt. Other Rs.2/- per bag shall deducted from each bill of
Empty cement
6 the
Thecontractor.
watch & ward of the store by the contractor. Assistant Engineer,
Giri irrig. Sub Division
Patlion.
DRAFT SCHEDULE OF QUANTITY Estimated Cost: 99980/-
Name of work: R/M of various GWSS /LIS under IPH Sub Division Kafftoa (section Staun) in Tehsil Paonta Earnest Money: 2000/-
Sahib Distt. Sirmour (HP)(SH: Prov. & supplying of GI Unions at various schemes under section staun) Time: One Month.
S.No Description Qty. Rate Unit Amount
1 2 3 4 5 6.
1 Providing and Supplying of G.I. Unions of the following sizes confirming to IS 1879
in the various schemes as per the standard design & relevant ISS of following dia
complete in all respect and as per satisfaction of the Engineer-in-charge.

i) 15mm dia 120 Nos. 30.00 Each. 3600.00


ii) 20mm dia 110 Nos. 42.00 Each. 4620.00
iii) 25 mm dia. 100 Nos. 50.00 Each. 5000.00
iv) 32mm dia. 85 Nos. 70.00 Each. 5950.00
v) 40mm dia. 75 Nos. 140.00 Each. 10500.00
vi) 50mm dia. 55 Nos. 182.00 Each. 10010.00
vii) 65mm dia. 50 Nos. 260.00 Each. 13000.00
viii) 80mm dia. 45 Nos. 500.00 Each. 22500.00
ix) 100mm dia. 40 Nos. 620.00 Each. 24800.00
TOTAL: 99980.00
TERMS AND CONDITIONS.
1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Nothing shall be paid for rejected/defective work.
Assistant Engineer,
I&PH Sub Division, Kaffota.
SCHEDULE OF QUANTITY Estimated Cost: 99980/-
Name of work: R/M of various GWSS /LIS under IPH Sub Division Kafftoa (section Staun) in Tehsil Paonta Earnest Money: 2000/-
Sahib Distt. Sirmour (HP)(SH: Prov. & supplying of GI Unions at various schemes under section staun) Time: One Month.
S.No Description Qty. Rate Unit Amount
1 2 3 4 5 6.
1 Providing and Supplying of G.I. Unions of the following sizes confirming to IS 1879
in the various schemes as per the standard design & relevant ISS of following dia
complete in all respect and as per satisfaction of the Engineer-in-charge.

i) 15mm dia 120 Nos. Each.


ii) 20mm dia 110 Nos. Each.
iii) 25 mm dia. 100 Nos. Each.
iv) 32mm dia. 85 Nos. Each.
v) 40mm dia. 75 Nos. Each.
vi) 50mm dia. 55 Nos. Each.
vii) 65mm dia. 50 Nos. Each.
viii) 80mm dia. 45 Nos. Each.
ix) 100mm dia. 40 Nos. Each.
TOTAL:
TERMS AND CONDITIONS.
1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Nothing shall be paid for rejected/defective work.
Assistant Engineer,
I&PH Sub Division, Kaffota.
REVISED SCHEDULE OF QUANTITY Estimated cost Rs 96989/-
Name of work:- Restoration of Rain damages to villagePipliwala in Tehsil Paonta Sahib Distt. Sirmour (HP) Earnest money Rs.1940/-
(SH: C/o wire crate to protect the land of Sh.Lakshmi Chand, Jagdish Chand etc.) Time:- One Month .

S.No Sub-Head and item of work. Qty. Rates, Unit Amount.


1 Excavation in earth work and disposal ofall excavated earth upto a lead of 20 Mtrs. 30.00 Cum 140.00 P/Cum 4200.00
And lift upto 1.50 Mtrs. disposing earth to be levelled and neatly dressed within a
leads in Pick/juper work 50% each including all leads,lifts and carriage of material and
as per direction of the Engineer-in-charge.

2 Wire crates made of G.I.wire filled with boulder/hard stone of approved quality 125.00 Cum. 925.00 P/Cum. 115625.00
with square cut faces against the wire having rounded/rectangular shape weight
of stones not less than 18 Kg. free from soft spots,cracks,cavaties etc.(Wire crate to
be measured and paid for separately)including all leads,lifts and carriage of
material at site as direction of the Engineer-in-charge. (Double Knot)

3 Wire crates of G.I.wire filled with boulder with square cut faces against the wire 600.00 Sqm. 36.00 P/Sqm. 21600.00
G.I.wire 5mm thick corresponding to SWG 6 with 15cmx15cm mesh(boulder
filling to be measured and paid for separately including all leads,lifts and carriage
of materials at site and as per directions of the Engineer-in-charge(L.Rate)

TERMS & CONDITIONS TOTAL: 141425.00


1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules. `
3 Royality certificate in respect of stone agg. Sand etc. shall be produced by the contractor
4 GI wire shall be issued free of cost from IPH store Bhatanwali.
Executive Engineer,
I&PH Division,
Paonta Sahib.
REVISED SCHEDULE OF QUANTITY Estimated cost Rs 87290/-
Name of work:- Restoration of Rain damages to village Pipliwala in Tehsil Paonta Sahib Distt. Sirmour (HP) Earnest money Rs.1750/-
(SH: C/o wire crate to protect the land of Sh.Yasin & Jaibantri Devi) Time:- One Month .

S.No Sub-Head and item of work. Qty. Rates, Unit Amount.


1 Excavation in earth work and disposal ofall excavated earth upto a lead of 20 Mtrs. 27.00 Cum 140.00 P/Cum 3780.00
And lift upto 1.50 Mtrs. disposing earth to be levelled and neatly dressed within a
leads in Pick/juper work 50% each including all leads,lifts and carriage of material and
as per direction of the Engineer-in-charge.

2 Wire crates made of G.I.wire filled with boulder/hard stone of approved quality 112.50 Cum. 925.00 P/Cum. 104063.00
with square cut faces against the wire having rounded/rectangular shape weight
of stones not less than 18 Kg. free from soft spots,cracks,cavaties etc.(Wire crate to
be measured and paid for separately)including all leads,lifts and carriage of
material at site as direction of the Engineer-in-charge. (Double Knot)

3 Wire crates of G.I.wire filled with boulder with square cut faces against the wire 540.00 Sqm. 36.00 P/Sqm. 19440.00
G.I.wire 5mm thick corresponding to SWG 6 with 15cmx15cm mesh(boulder
filling to be measured and paid for separately including all leads,lifts and carriage
of materials at site and as per directions of the Engineer-in-charge(L.Rate)

TERMS & CONDITIONS TOTAL: 127283.00


1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules. `
3 Royality certificate in respect of stone agg. Sand etc. shall be produced by the contractor
4 GI wire shall be issued free of cost from IPH store Bhatanwali.
5 Boulder should be free from cracks & cavaties & should not be less than 18 Kg. Executive Engineer,
I&PH Division,
Paonta Sahib.
REVISED SCHEDULE OF QUANTITY Estimated cost Rs 45183/-
Name of work:- Providing Flood Protection work to village Jamnighat in Tehsil Paonta Sahib Earnest money Rs.900/-
Distt. Sirmour (HP) (SH: C/o wire crate) Part-II. Time:- One Month .

S.No Sub-Head and item of work. Qty. Rates, Unit Amount.


1 Excavation in earth work and disposal ofall excavated earth upto a lead of 20 Mtrs. 20.25 Cum 140.00 P/Cum 2835.00
And lift upto 1.50 Mtrs. disposing earth to be levelled and neatly dressed within a
leads in Pick/juper work 50% each including all leads,lifts and carriage of material and
as per direction of the Engineer-in-charge.

2 Wire crates made of G.I.wire filled with boulder/hard stone of approved quality 59.46 Cum. 925.00 P/Cum. 55001.00
with square cut faces against the wire having rounded/rectangular shape weight
of stones not less than 18 Kg. free from soft spots,cracks,cavaties etc.(Wire crate to
be measured and paid for separately)including all leads,lifts and carriage of
material at site as direction of the Engineer-in-charge. (Double Knot)

3 Wire crates of G.I.wire filled with boulder with square cut faces against the wire 278.26 Sqm. 36.00 P/Sqm. 10017.00
G.I.wire 5mm thick corresponding to SWG 6 with 15cmx15cm mesh(boulder
filling to be measured and paid for separately including all leads,lifts and carriage
of materials at site and as per directions of the Engineer-in-charge(L.Rate)

TERMS & CONDITIONS TOTAL: 67853.00


1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules. `
3 Royality certificate in respect of stone agg. Sand etc. shall be produced by the contractor
4 GI wire shall be issued free of cost from IPH store Bhatanwali.
5 Boulder should be free from cracks & cavaties & should not be less than 18 Kg. Executive Engineer,
I&PH Division,
Paonta Sahib.
REVISED SCHEDULE OF QUANTITY Estimated Cost :-Rs.59858/-
Name of work:-Aug. of LWSS Palhori in Tehsil Paonta Sahib Distt.Sirmour(HP) Earnest Money :-Rs.1197/-
(SH: C/O Boundry wall around the Pump House) Time:- One Month.
S.No Description Qty. Rate Unit
1 2 3 4 5
1 Excavation in foundation and trenches etc.in earth work in all kinds of soil such as pick work 20.82 Cum. 160.00 Per cum.
,jumper work decomposed conglomerate saturated soil soft and hard rock upto all leads lifts
stacking the excavated soil not more than 3mtr.clear from the edge of excavation and then
returning the stacked soil in 15cm layers when required in to plinth sides of foundation etc.
consolidating each deposited layers by ramming and watering and then disposing of all surplus
excavated earth as directed with in all leads lifts and as per directions of the Engineer-incharge

2 Providing and laying cement concrete work 1:4:8 (1cement: 4 sand: 8 graded stone agg. 20mm 3.47 Cum 3500.00 P/Cum
nominal size & curing complete) excluding cost of form work in foundation and plinth in breast &
retaining wall in all height and depth including all leads lifts complete and carriage of material etc. as
per directions of Engineer incharge.

3 Random rubble masonary /Poly rubble masonary (uncoursed/brought to coursed) with hard 15.00 Cum 3400.00 P/Cum
stone of approved quality in foundation and plinth including levelling up with cement concrete
1:6.12(1cement:6sand:12 graded stone agg. 20mm nominal size)in cement mortor 1:6 (1
Cement: 6 sand ) in breast wall & Retaining walls including all leads lifts and carriage of
material and as per the directions of Engineer-in-charge.

4 IInd Class brick work using common building bricks in super structure in cement mortar 6.10 Cum. 5700.00 P/Cum
1:4(1cement:4sand) complete in all respect and as per direction of the Engineer-in-charge.

5 Half brick work using common burnt clay building bricks in foundation & Plinth cement mortar 66.15 Sqm. 750.00 P/Sqm.
1:4 (1cement:4sand) complete in all respect and as per direction of the Engineer-in-charge.

6 15mm thick cement plaster in single coat on rough side of brick/stone masonary for interior 187.87 Sqm. 150.00 P/Sqm.
plastering upto floor two level including arrises internal rounded angles chamfers and/or
rounded angles not exceeding 8-mm in girth and finished even and smooth in cement Mortar
1:4(1cement :4sand) complete in all respect and as per direction of the Engineer-in-charge.
7 Finishing wall with water proofing cement paint of approved brand and manufacture and of 187.87 Sqm. 46.00 P/Sqm.
required shadew on undedecorative wall surfaces complete in all respect and as per direction of
the Engineer-in-charge.
8 Steel work singele sections in built up section trusses and framed work including cutting 1.33 Qntl. 7900.00 Per Qntl.
hoisting fixing in position and applying a priming coat of red lead paint in gratting framed
guards bars ladders railing brackets and similar works including all leads,lifts and carriage of
materials as per direction of the Engineer-in-charge.

TERMS AND CONDITIONS. Total:


1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Cement shall be issued @ Rs. 315/- per bag & steel @ 53/- per Kg. from IPH store Bhatanwali Paonta Sahib.
4 Royality certificate in respect of stone agg. Sand etc. shall be produced by the contractor
5 Empty cement bags shall be returned to the Deptt. Otherwise Rs. 2/- per bag shall deducted from the bill.
6 The contractor shall be responsible for watch & ward. Executive Engineer,
I&PH Division, Paonta Sahib.
d Cost :-Rs.59858/-
Money :-Rs.1197/-

Amount
6.
3331.00

12145.00

51000.00

34770.00

49613.00

28181.00
8642.00

10475.00

198157.00

Engineer,
sion, Paonta Sahib.
DRAFT SCHEDEDULE OF QUANTITY
Name of work: R/M of LWSS Kaffota in tehsil Paonta Sahib Distt. Sirmour (HP) Estimated Cost.63150/-
(SH: Repair of 50 HP Pump & Motor .) Earnest Money: 1300/-
Time : Fifteen Days.
Sr.No. Description of Items. Qty Rate Unit Amount.
1 2 3 4 5 6 7
1 Repair & rewinding of 50 HP Motor with super enamelled copper wire complete in all 1 job. Per job.
respect.
2 Providing and supplying of bearing SKF-6309. 2 Nos. Each.
3 Repair of Rotor shaft. 1 No. Each.
4 Providing and fixing of grease cup with screw cut set. 4 Nos. Each.
5 Providing and fixing of connection plate with nut bolt and washer complete. 1 No. Each.
6 Providing and fixing of connection compound and water proofing tape. 1 No. Each.
7 Providing and fixing of cooling fan. 1 No. Each.
8 Providing and fixing of Motor stud. 8 Nos. Each.
9 Providing and supplying of wire 16mm2. 10 Mtr. Per Mtr.
10 Providing and supplying of Nut bolt 16mm size 2 Inch.complete in all respect.
4 Nos. Each.
11 Coupling Pad L-190. 4 Nos. Each.
REPAIR OF PUMP KSB MAKE.
1 Providing and fixing of Impeller Gun metal complete in all respect. 14 Nos. Each.
2 Providing and fixing of gland sleeves gun metal. 2 Nos. Each.
3 Providing and fixing of gland fetch plate. 2 Nos. Each.
4 Providing and fixing of glad stud and thrust plate. 2 Nos. Each.
5 Providing and fixing of difuser. 4 Nos. Each.
6 Providing and supplying of neckrings complete in all respect . 6 Nos. Each.
7 Providing and fixing of cooling pipe. 1 No. Each.
8 Labour for carriage of pump site to workshop and back to site of work. 1 job. Per job.
Total:
TERMS AND CONDITIOS.
1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax , Income tax & Labour cess shall be deducted as per rules.
3 The payment will be made after successful testing of Pumping machinery.
4 The Guarantee period shall be minimum six months from the date of testing.

Assistant Engineer,
I&PH Sub Division,
Kaffota.
DRAFT SCHEDULE OF QUANTITY Estimated cost Rs.22083/-
Name of work:-Aug. of LWSS Shamah GP Shawga in Tehsil Paonta Sahib Distt. Sirmour (HP) (SH: Earnest money Rs.500/-
C/O R/wall and Breast wall to protect the filter bed) Time:- Three Months
S.No Sub-Head and item of work. Qty. Rates, Unit
1 2 3 4 5
1 Excavation in foundation and trenches etc.in earth work in all kinds of soil such as pick 16.94 Cum 92.85 P/Cum
work ,jumper work decomposed conglomerate saturated soil soft and hard rock upto all leads
lifts stacking the excavated soil not more than 3mtr.clear from the edge of excavation and
then returning the stacked soil in 15cm layers when required in to plinth sides of foundation
etc. consolidating each deposited layers by ramming and watering and then disposing of all
surplus excavated earth as directed with in all leads lifts and as per directions of the
Engineer-in-charge

2 Providing and laying cement concrete work 1:5:10(1cement:5 sand: 10 graded stone agg. 19.11 Cum 934.10 P/Cum
40mm nominal size) with 15% plum and curing complete excluding cost of form work and in
retaining walls/ Breast walls, the size of Plums shall usually be 150mm to 300mm as per
PWD specificatioin including all leads lifts and carriage of material and as per direction of
Engineer incharge.

3 Providing form work with steel sheets 3.15mm thick welded with angle iron 30x30x5 mm so
as to give rough finish i/c centring shuttering structing and propping etc. with wooden
bettens & Ballies, height or propping & centering below supporting floor to ceiling not
exceeding 4 mtr.and removal of the same for insitu RCC work and PCC work including all
leads lifts and carriage of material at site & as per direction of Engineer in-charge in:-

a) Vertical surfaces 32.95 Sqm 80.70 P/Sqm


TOTAL:
TERMS AND CONDITIONS:-
1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Royality certificate in respect of stone agg. Sand etc. shall be produced by the contractor
4 Cement shall be issued @ Rs.315/- Per bag & steel @ Rs.53/- per Kg. from IPH store Bhatanwali Paonta
Sahib.
5 Empty cement bags shall be returned to the deptt. Other Rs.2/- per bag shall deducted from each bill of the
6 contractor.
The watch & ward of the store by the contractor. Assistant Engineer,
I&PH. Sub Division
Kaffota.
d cost Rs.22083/-
money Rs.500/-
hree Months
Amount.
6
1573.00

17851.00

2659.00
22083.00
Engineer,
b Division
REVISED SCHEDULE OF QUANTITY Estimated cost Rs 95000/-
Name of work:- R/M of LWSS Baila under IPH Sub Division Kaffota in Tehsil Paonta Distt. Sirmour Earnest money Rs.1900/-
(HP) (SH:Manufacturing & supply of fencing pannel size of 1.20x1.80 Mtr. Time:- One Month

S.No Sub-Head and item of work. Qty. Rates, Unit Amount.


1 2 3 4 5 6
1 Manufacturing and supplying of fencing pannel size 1.20x1.80 Mtr. Of Jali 25x25mm welded 50 Nos. 4200.00 Each. 210000.00
to M.S.black tube of 32mm dia of 14 gauge mm thick with MS flat 20x3mm welded all
arround the pipepanel 2 Nos on both side and providing hold fast 7 Nos of M.S.flat of
32x3mm thickness having consisting of Tee of size 15x15cms. tee acting as hodl fast
including cutting welding painting with red oxide paint to complete in all respect and as per
direction of the Engineer-in-charge.

TERMS & CONDITIONS Total: 210000.00


1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax & labour cess shall be deducted as per rules.
3 The material will be received in good condition ..
4 Nothing shall be paid for rejected materials.
Executive Engineer,
I & PH Division,
Paonta Sahib.
REVISED SCHEDULE OF QUANTITY Estimated cost Rs 96000/-
Name of work:- C/o LIS Upper Mashoo in GP Jamna in Tehsil Paonta Distt. Sirmour (HP) Earnest money Rs.1900/-
(SH:Manufacturing & supply of fencing pannel size of 1.20x1.80 Mtr. Time:- One Month

S.No Sub-Head and item of work. Qty. Rates, Unit Amount.


1 2 3 4 5 6
1 Manufacturing and supplying of fencing pannel size 1.20x1.80 Mtr. Of Jali 25x25mm welded 50 Nos. 4200.00 Each. 210000.00
to M.S.black tube of 32mm dia of 14 gauge mm thick with MS flat 20x3mm welded all
arround the pipepanel 2 Nos on both side and providing hold fast 7 Nos of M.S.flat of
32x3mm thickness having consisting of Tee of size 15x15cms. tee acting as hodl fast
including cutting welding painting with red oxide paint to complete in all respect and as per
direction of the Engineer-in-charge.

TERMS & CONDITIONS Total: 210000.00


1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax & labour cess shall be deducted as per rules.
3 The material will be received in good condition ..
4 Nothing shall be paid for rejected materials.
Executive Engineer,
I & PH Division,
Paonta Sahib.
REVISED SCHEDULE OF QUANTITY Estimated cost Rs 98900/-
Name of work:- Prov. LIS Mashoo in GP Jamna in Tehsil Paonta Distt. Sirmour (HP) Earnest money Rs.2000/-
(SH:Manufacturing & supply of fencing pannel size of 1.20x1.80 Mtr. Time:- One Month

S.No Sub-Head and item of work. Qty. Rates, Unit Amount.


1 2 3 4 5 6
1 Manufacturing and supplying of fencing pannel size 1.20x1.80 Mtr. Of Jali 25x25mm welded 50 Nos. 4200.00 Each. 210000.00
to M.S.black tube of 32mm dia of 14 gauge mm thick with MS flat 20x3mm welded all
arround the pipepanel 2 Nos on both side and providing hold fast 7 Nos of M.S.flat of
32x3mm thickness having consisting of Tee of size 15x15cms. tee acting as hodl fast
including cutting welding painting with red oxide paint to complete in all respect and as per
direction of the Engineer-in-charge.

TERMS & CONDITIONS Total: 210000.00


1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax & labour cess shall be deducted as per rules.
3 The material will be received in good condition ..
4 Nothing shall be paid for rejected materials.
Executive Engineer,
I & PH Division,
Paonta Sahib.
REVISED SCHEDULE OF QUANTITY
Name of work: R/M of various Water Supply Schemes under IPH S/Division Kaffota in Tehsil Paonta Sahib Dis
Estimated Cost :-Rs.98340/-
Sirmour (HP) (SH: Replacement of defunct CI sluice valves) . Earnest Money :-Rs. 2000/-
Time:- Three months.
Sr.No.Sub Head and item of work. Qty. Rate Unit Amount.
1 Providing double flanged CI sluice valves class PN 1.60 of reputed make and of
following dia for the existing distribution pipe and capable of with standing the
normal seat pressure as per IS 780-1984 with upto date ammendents including of
all leads,lifts and carriage of material at site and as directed by the Engineer-in-
charge.

i) 65mm.dia. 4 Nos. 18000 Each. 72000

ii) 80mm dia. 3 Nos. 24000 Each. 72000

iii) 100mm dia. 8 Nos. 28000 Each. 224000

Total: 368000.00
TERMS AND CONDITIONS.
1 The work shall be executed as per IPH/PWD specification and directions of the Engineer-in-charge.
2 Security, Sale tax , income & labour Cess tax shall be deducted as per rules.
3 Nothing shall be paid for rejected materials.
4 The payment shall only be made through electronically through NEFT/RTGS directly crediting
the amount in the bank account so the following information be supplied to this office.
5 i) Bank account No……………………………
ii) Name of Bank & Branch …………………………
iii)IFS code of Bank Branch……………………………………………..
Executive Engineer,
I&PH Division,
Paonta Sahib.

REVISED SCHEDULE OF QUANTITY. Estimated Cost:87500/-


Name of Work :- A/R & M/O to various LWSS under IPH Sub Division Kaffota in Tehsil Paonta Sahib Earnest Money: 1800/-
Distt. Sirmour (HP) (SH: Supplying of M.oil grease & Gland dori. ) Time: Fifteen Days.
S.No Description Qty. Rate Unit Amount.
1 2 3 4 5 6.
1 Supplying of M.oil to maintain pumping machinery complete in all respect and as 250.00 Litre. 300.00 P/Litre. 75000.00
per direction of the Engineer-in-charge.

2 Supplying of grease to main the Pumping Machinery 50 Kg. 300.00 15000.00


Per Kg.
3 Gland dori & packing sheet complete in all respect and as per direction of the
Engineer-in-charge.
i) 5mm thick, 1 job. 28000.00 Per job 28000.00
ii) 8mm thick.
iii)10mm thick.
TOTAL: 118000.00
TERMS AND CONDITIONS.
1 The work shall be done as per IPH/PWD specifications and instructions of the
Engineer-in-chrge..
2 10% Security,2 % Sale tax & 2% Income tax shall be deducted as per rules.
3 Payment will be made after completion of work. Executive Engineer,
I&PH Division,
Paonta Sahib.
REVISED SCHEDULE OF QUANTITY. Estimated Cost:99225/-
Name of Work :- R/M of various Lift/ Gravity Water Supply schemes under IPH Sub Division Kaffota in Tehsil Earnest Money: 2000/-
Paonta Sahib Distt. Sirmour (HP) (SH: Providing and supplying of Gate valves) Time: One Month.
S.No Description Qty. Rate Unit Amount.
1 2 3 4 5 6.
1 Providing and Supplying of Brass full way valve with wheel of superior quality as
per standard design & relevant ISS of following dia complete in all respect and as
per satisfaction of the Engineer-in-charge.

i) 15mm dia 60 Nos. 150.00 Each. 9000.00

ii) 20mm dia 50 Nos. 220.00 Each. 11000.00

iii) 25 mm dia. 50 Nos. 300.00 Each. 15000.00

iv) 32mm dia. 30 Nos. 400.00 Each. 12000.00

v) 40mm dia. 30 Nos. 820.00 Each. 24600.00

vi) 50mm dia. 15 Nos. 1100.00 Each. 16500.00


vii) 65mm dia. 10 Nos. 1600.00 Each. 16000.00

viii)80mm dia. 5 Nos. 2400.00 Each. 12000.00

TOTAL: 116100.00
TERMS AND CONDITIONS.
1 The work shall be done as per IPH/PWD specifications and instructions of the Engineer-in-chrge..
2 10% Security,2 % Sale tax & 2% Income tax shall be deducted as per rules.
3 Payment will be made after completion of work. Executive Engineer,
I&PH Division,
Paonta Sahib.

REVISED SCHEDULE OF QUANTITY. Estimated Cost:93481/-


Name of Work :- r/m OF VARIOUS gwss UNDER iph Secion Staun in Tehsil Paonta Sahib Earnest Money: 1900/-
Distt. Sirmour (HP) (SH: Providing and supplying of Gate valves) Time: One Month.
S.No Description Qty. Rate Unit Amount.
1 2 3 4 5 6.
1 Providing and Supplying of Brass full way valve with wheel of superior quality as
per standard design & relevant ISS of following dia complete in all respect and as
per satisfaction of the Engineer-in-charge.
i) 15mm dia 25 Nos. 350.00 Each. 8750.00
ii) 20mm dia 25 Nos. 420.00 Each. 10500.00
iii) 25 mm dia. 35 Nos. 510.00 Each. 17850.00
iv) 32mm dia. 40 Nos. 800.00 Each. 32000.00
v) 40mm dia. 35 Nos. 1300.00 Each. 45500.00
vi) 50mm dia. 40 Nos. 1800.00 Each. 72000.00
vii) 65mm dia. 40 Nos. 3200.00 Each. 128000.00
viii)80mm dia. 35 Nos. 4000.00 Each. 140000.00
TOTAL: 454600.00
TERMS AND CONDITIONS.
1 The work shall be done as per IPH/PWD specifications and instructions of the Engineer-in-chrge..
2 10% Security,2 % Sale tax & 2% Income tax shall be deducted as per rules.
3 Payment will be made after completion of work. Executive Engineer,
I&PH Division,
Paonta Sahib.

REVISED SCHEDULE OF QUANTITY Estimated Cost: 99348/-


Name of work: R/M of various Schemes under IPH Section Kaffota under I&PH Sub Division Kaffota in Tehsil Paonta Earnest Money: 2000/-
Sahib Distt. Sirmour (HP)(SH: Prov. & supplying of GI Unions, Tees and GI Reducers of various dia) Time: One Month.
S.No Description Qty. Rate Unit Amount
1 2 3 4 5 6.
1 Providing and Supplying of G.I. Unions of the following sizes confirming to IS 1879
in the various schemes as per the standard design & relevant ISS of following dia
complete in all respect and as per satisfaction of the Engineer-in-charge.

i) 15mm dia 120 Nos. 90.00 Each. 10800.00


ii) 20mm dia 120 Nos. 120.00 Each. 14400.00
iii) 25 mm dia. 90 Nos. 160.00 Each. 14400.00
iv) 32mm dia. 43 Nos. 180.00 Each. 7740.00
v) 40mm dia. 75 Nos. 240.00 Each. 18000.00
vi) 50mm dia. 150 Nos. 290.00 Each. 43500.00
vii) 65mm dia. 60 Nos. 350.00 Each. 21000.00
viii) 80mm dia. 50 Nos. 440.00 Each. 22000.00
2 Providing and Supplying of the G.I.Tees of the following sizes Confirming to IS 1879
in the various schemes complete in all respect and as per satisfaction of the
Engineer-in-charge.
i) 15mm dia 50 Nos. 70.00 Each. 3500.00
ii)20mm dia 60 Nos. 90.00 Each. 5400.00
iii)25 mm dia. 100 Nos. 130.00 Each. 13000.00
iv) 32mm dia. 80 Nos. 170.00 Each. 13600.00
v) 40mm dia. 50 Nos. 180.00 Each. 9000.00
vi) 50mm dia. 50 Nos. 280.00 Each. 14000.00
vii) 65mm dia. 50 Nos. 270.00 Each. 13500.00
3 Providing and Supplying of G.I.Reducer of the following sizes onfirming to IS 1879
in the various schemes complete in all respect and as per satisfaction of the
Engineer-in-charge.
i) 15x20mm dia 65 Nos. 80.00 Each. 5200.00
ii) 20x25 mm dia 50 Nos. 110.00 Each. 5500.00
iii) 25x32 mm dia. 40 Nos. 130.00 Each. 5200.00
iv) 32x20mm dia. 30 Nos. 150.00 Each. 4500.00
v) 40x15mm dia. 25 Nos. 190.00 Each. 4750.00
vi) 40x32 mm dia. 15 Nos. 200.00 Each. 3000.00
4 Providing and Supplying of Socket of the following sizes onfirming to IS 1879 in
the various schemes complete in all respect and as per satisfaction of the Engineer-
in-charge.
i) 15mm dia 110 Nos. 70.00 Each. 7700.00
ii) 20mm dia 85 Nos. 90.00 Each. 7650.00
iii) 25 mm dia. 75 Nos. 100.00 Each. 7500.00
iv) 32mm dia. 45 Nos. 120.00 Each. 5400.00
v) 40mm dia. 75 Nos. 140.00 Each. 10500.00
vi) 50mm dia. 150 Nos. 170.00 Each. 25500.00
vii) 65mm dia. 60 Nos. 180.00 Each. 10800.00
viii) 80mm dia. 50 Nos. 210.00 Each. 10500.00
5 Providing and Supplying of GI Elbow of the following sizes onfirming to IS 1879 in
the various schemes complete in all respect and as per satisfaction of the Engineer-
in-charge.
i) 15mm dia 120 Nos. 60.00 Each. 7200.00
ii) 20mm dia 120 Nos. 80.00 Each. 9600.00
iii) 25 mm dia. 100 Nos. 140.00 Each. 14000.00
iv) 32mm dia. 90 Nos. 180.00 Each. 16200.00
v) 40mm dia. 100 Nos. 190.00 Each. 19000.00
TOTAL: 403540.00
TERMS AND CONDITIONS.
1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Nothing shall be paid for rejected/defective work.
Executive Engineer,
I&PH Division,
Paonta Sahib.
REVISED SCHEDULE OF QUANTITY Estimated Cost: 93388/-
Name of work: R/M of various Schemes under IPH Section Kaffota under I&PH Sub Division Kaffota in Tehsil Paonta Earnest Money: 1900/-
Sahib Distt. Sirmour (HP)(SH: Prov. & supplying of GI Unions, Tees and GI Reducers of various dia) Time: One Month.
S.No Description Qty. Rate Unit Amount
1 Providing and Supplying of G.I. Unions of the following sizes confirming to IS 1879
in the various schemes as per the standard design & relevant ISS of following dia
complete in all respect and as per satisfaction of the Engineer-in-charge.

i) 15mm dia 120 Nos. 90.00 Each. 10800.00


ii) 20mm dia 120 Nos. 140.00 Each. 16800.00
iii) 25 mm dia. 90 Nos. 150.00 Each. 13500.00
iv) 32mm dia. 43 Nos. 170.00 Each. 7310.00
v) 40mm dia. 75 Nos. 250.00 Each. 18750.00
vi) 50mm dia. 150 Nos. 320.00 Each. 48000.00
vii) 65mm dia. 60 Nos. 380.00 Each. 22800.00
viii) 80mm dia. 50 Nos. 530.00 Each. 26500.00
2 Providing and Supplying of the G.I.Tees of the following sizes Confirming to IS 1879
in the various schemes complete in all respect and as per satisfaction of the
Engineer-in-charge.
i) 15mm dia 50 Nos. 80.00 Each. 4000.00
ii)20mm dia 60 Nos. 100.00 Each. 6000.00
iii)25 mm dia. 100 Nos. 120.00 Each. 12000.00
3 Providing and Supplying of G.I.Reducer of the following sizes onfirming to IS 1879
in the various schemes complete in all respect and as per satisfaction of the
Engineer-in-charge.
i) 15x20mm dia 65 Nos. 90.00 Each. 5850.00
ii) 20x25 mm dia 50 Nos. 120.00 Each. 6000.00
iii) 25x32 mm dia. 40 Nos. 140.00 Each. 5600.00
iv) 32x20mm dia. 30 Nos. 170.00 Each. 5100.00
v) 40x15mm dia. 25 Nos. 180.00 Each. 4500.00
vi) 40x32 mm dia. 15 Nos. 200.00 Each. 3000.00
4 Providing and Supplying of Socket of the following sizes onfirming to IS 1879 in
the various schemes complete in all respect and as per satisfaction of the Engineer-
in-charge.

i) 15mm dia 110 Nos. 70.00 Each. 7700.00


ii) 20mm dia 85 Nos. 90.00 Each. 7650.00
iii) 25 mm dia. 75 Nos. 110.00 Each. 8250.00
iv) 32mm dia. 45 Nos. 140.00 Each. 6300.00
v) 40mm dia. 75 Nos. 180.00 Each. 13500.00
vi) 50mm dia. 150 Nos. 220.00 Each. 33000.00
vii) 65mm dia. 60 Nos. 220.00 Each. 13200.00
viii) 80mm dia. 50 Nos. 250.00 Each. 12500.00
5 Providing and Supplying of GI Elbow of the following sizes onfirming to IS 1879 in
the various schemes complete in all respect and as per satisfaction of the Engineer-
in-charge.

i) 15mm dia 120 Nos. 60.00 Each. 7200.00


ii) 20mm dia 70 Nos. 80.00 Each. 5600.00
iii) 25 mm dia. 75 Nos. 110.00 Each. 8250.00
iv) 32mm dia. 45 Nos. 140.00 Each. 6300.00
v) 40mm dia. 75 Nos. 180.00 Each. 13500.00
TOTAL: 359460.00
TERMS AND CONDITIONS.
1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Nothing shall be paid for rejected/defective work.
Executive Engineer,
I&PH Division,
Paonta Sahib.

REVISED SCHEDULE OF QUANTITY Estimated Cost: 98258/-


Name of work:- C/o FIS Malaun in Tehsil Paonta Sahib Distt. Sirmour (HP) Earnest Money: 2000/-
(SH: Removal of slips/ silt at various RD's) Time: Three Month.
S.No Sub-Head and item of work. Qty. Rates, Unit Amount.
1 2 3 4 5 6
1 Removal of slips in all kinds of soil including saturated soil but excluding boulders and 1650.00 Cum. 160.00 P/Cum. 264000.00
rpocky portion required blasting portion requiring blasting upto a distance of 20 mtrs.
disposing of unservice materials stacking serviceable materials and neatly dressing the
surface complete in all respect.

Total: 264000.00
TERMS AND CONDITIONS:-
1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Nothing shall be paid for rejected/defective work.

Executive Engineer,
I&PH Division,
Paonta Sahib.

REVISED SCHEDULE OF QUANTITY Estimated Cost :-Rs.99814/-


Name of work:-C/o FIS Malaun to Shilli Bamog GP Tatiana inTehsil Tehsil ShillaiPaonta Sahib Distt.Sirmour(HP) Earnest Money :-Rs.2000/-
(SH: C/o Pattra cutting, C/o Pucca Main channel ) Job No.1. Time:- Two months.
S.No Description Qty. Rate Unit Amount
1 Cutting in earth work in all kind of soil and dispoal of the excavated earth upt all leads,lifts 1120.00 Cum 140.00 Per 156800.00
and as directed by the Engineer-in-charge complete in all respect. Cum

2 6.95 Cum. 160.00 Per 1112.00


Cum.

Excavation in drains & channel etc.in earth work in all kinds of soil such as pick
work ,jumper work blasting work, decomposed conglomerate saturated soil soft and
hard rock including dressing of sides and beds and prepareation of sub grade to
level or slope including refilling the trenches and disposing of surplus earth upto all
leads,lifts disposed earth to be levelled and neatly dressed including jungle
clearance and as per directions of the Engineer-incharge
3 Cement concrete lining 15cm thick or less for irrigation channels using cement concrete
1:3:6(1cement:3sand:6graded stone agg. 20mm nominal size)and curing complete
excluding cost of form work included all leads lifts and carriage of material complete in all
respect and as per direction of Engineer-in-charge.

a)Hand Mixed concrete in bed. 31.35 Cum 5300.00 P/Cum 166155.00

b)Hand mixed concrete lining in side slopes. 42.95 Cum 5400.00 P/Cum 231930.00
4 Extra allowance for form work in concrete lining as directed by the Engineer-in-charge 42.95 Cum 170.00 P/Cum 7302.00
including all leads lifts and carriage of matrerials at site complete in all respects on side
slopes as per direction of Engineer in charge.

TERMS AND CONDITIONS. Total: 563299.00


1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Cement shall be issued @ Rs.315/- per bag & steel @ 53/- per Kg. from IPH store Bhatanwali Paonta Sahib.
4 Royality certificate in respect of stone agg. Sand etc. shall be produced by the contractor
5 Empty cement bags shall be returned to the Deptt.otherwise Rs.2/-per bag shall be deducted from the bill.
Executive Engineer,
I&PH Division,
Paonta Sahib.
REVISED SCHEDULE OF QUANTITY Estimated Cost :-Rs.99742/-
Name of work:-C/o FIS Malaun to Shilli Bamog GP Tatiana inTehsil Tehsil ShillaiPaonta Sahib Distt.Sirmour(HP) Earnest Money :-Rs.2000/-
(SH: C/o Pattra cutting, C/o Pucca Main channel ) Job No.2. Time:- Two months.
S.No Description Qty. Rate Unit Amount
1 Cutting in earth work in all kind of soil and dispoal of the excavated earth upt all leads,lifts 1120.00 Cum 140.00 Per 156800.00
and as directed by the Engineer-in-charge complete in all respect. Cum
2 Excavation in drains & channel etc.in earth work in all kinds of soil such as pick 6.00 Cum. 160.00 Per 960.00
work ,jumper work blasting work, decomposed conglomerate saturated soil soft and Cum.
hard rock including dressing of sides and beds and prepareation of sub grade to
level or slope including refilling the trenches and disposing of surplus earth upto all
leads,lifts disposed earth to be levelled and neatly dressed including jungle
clearance and as per directions of the Engineer-incharge

3 Cement concrete lining 15cm thick or less for irrigation channels using cement concrete
1:3:6(1cement:3sand:6graded stone agg. 20mm nominal size)and curing complete
excluding cost of form work included all leads lifts and carriage of material complete in all
respect and as per direction of Engineer-in-charge.

a)Hand Mixed concrete in bed. 31.35 Cum 5300.00 P/Cum 166155.00


b)Hand mixed concrete lining in side slopes. 42.95 Cum 5400.00 P/Cum 231930.00
4 Extra allowance for form work in concrete lining as directed by the Engineer-in-charge 42.95 Cum 170.00 P/Cum 7302.00
including all leads lifts and carriage of matrerials at site complete in all respects on side
slopes as per direction of Engineer in charge.
TERMS AND CONDITIONS. Total: 563147.00
1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Cement shall be issued @ Rs.315/- per bag & steel @ 53/- per Kg. from IPH store Bhatanwali Paonta Sahib.
4 Royality certificate in respect of stone agg. Sand etc. shall be produced by the contractor
5 Empty cement bags shall be returned to the Deptt.otherwise Rs.2/-per bag shall be deducted from the bill.

Executive Engineer,
I&PH Division,
Paonta Sahib.

SCHEDULE OF QUANTITY. Estimated Cost:99225/-


Name of Work :- R/M of various Lift/ Gravity Water Supply schemes under IPH Sub Division Kaffota in Tehsil Earnest Money: 2000/-
Paonta Sahib Distt. Sirmour (HP) (SH: Providing and supplying of Gate valves) Time: One Month.
S.No Description Qty. Rate Unit Amount.
1 2 3 4 5 6.
1 Providing and Supplying of Brass full way valve with wheel of superior quality as
per standard design & relevant ISS of following dia complete in all respect and as
per satisfaction of the Engineer-in-charge.
i) 15mm dia 60 Nos. Each.
ii) 20mm dia 50 Nos. Each.
iii) 25 mm dia. 50 Nos. Each.
iv) 32mm dia. 30 Nos. Each.
v) 40mm dia. 30 Nos. Each.
vi) 50mm dia. 15 Nos. Each.
vii) 65mm dia. 10 Nos. Each.
viii)80mm dia. 5 Nos. Each.
TOTAL:
TERMS AND CONDITIONS.
1 The work shall be done as per IPH/PWD specifications and instructions of the Engineer-in-chrge..
2 10% Security,2 % Sale tax & 2% Income tax shall be deducted as per rules.
3 Payment will be made after completion of work. Assistant Engineer,
I&PH Sub Division,
Paonta Sahib.

SCHEDULE OF QUANTITY Estimated Cost: 93388/-


Name of work: R/M of various Schemes under IPH Section Kaffota under I&PH Sub Division Kaffota in Tehsil Paonta Earnest Money: 1900/-
Sahib Distt. Sirmour (HP)(SH: Prov. & supplying of GI Unions, Tees and GI Reducers of various dia) Time: One Month.
S.No Description Qty. Rate Unit Amount
1 Providing and Supplying of G.I. Unions of the following sizes confirming to IS 1879
in the various schemes as per the standard design & relevant ISS of following dia
complete in all respect and as per satisfaction of the Engineer-in-charge.

i) 15mm dia 120 Nos. Each.


ii) 20mm dia 120 Nos. Each.
iii) 25 mm dia. 90 Nos. Each.
iv) 32mm dia. 43 Nos. Each.
v) 40mm dia. 75 Nos. Each.
vi) 50mm dia. 150 Nos. Each.
vii) 65mm dia. 60 Nos. Each.
viii) 80mm dia. 50 Nos. Each.
2 Providing and Supplying of the G.I.Tees of the following sizes Confirming to IS 1879
in the various schemes complete in all respect and as per satisfaction of the
Engineer-in-charge.
i) 15mm dia 50 Nos. Each.
ii)20mm dia 60 Nos. Each.
iii)25 mm dia. 100 Nos. Each.
3 Providing and Supplying of G.I.Reducer of the following sizes onfirming to IS 1879
in the various schemes complete in all respect and as per satisfaction of the
Engineer-in-charge.
i) 15x20mm dia 65 Nos. Each.
ii) 20x25 mm dia 50 Nos. Each.
iii) 25x32 mm dia. 40 Nos. Each.
iv) 32x20mm dia. 30 Nos. Each.
v) 40x15mm dia. 25 Nos. Each.
vi) 40x32 mm dia. 15 Nos. Each.
4 Providing and Supplying of Socket of the following sizes onfirming to IS 1879 in
the various schemes complete in all respect and as per satisfaction of the Engineer-
in-charge.
i) 15mm dia 110 Nos. Each.
ii) 20mm dia 85 Nos. Each.
iii) 25 mm dia. 75 Nos. Each.
iv) 32mm dia. 45 Nos. Each.
v) 40mm dia. 75 Nos. Each.
vi) 50mm dia. 150 Nos. Each.
vii) 65mm dia. 60 Nos. Each.
viii) 80mm dia. 50 Nos. Each.
5 Providing and Supplying of GI Elbow of the following sizes onfirming to IS 1879 in
the various schemes complete in all respect and as per satisfaction of the Engineer-
in-charge.
i) 15mm dia 120 Nos. Each.
ii) 20mm dia 70 Nos. Each.
iii) 25 mm dia. 75 Nos. Each.
iv) 32mm dia. 45 Nos. Each.
v) 40mm dia. 75 Nos. Each.
TOTAL:
TERMS AND CONDITIONS.
1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Nothing shall be paid for rejected/defective work.
Assistant Engineer,
I&PH Sub Division,
Kaffota.
Rs.98340/-
Rs. 2000/-
REVISED SCHEDLE OF QUANTITY.
Name of work: R/M of various Schemes under IPH Section Kaffota under I&PH Sub Division Kaffota

in Tehsil Paonta Distt. Sirmour (HP)(SH: Prov. & supplying of GI Unions, Tees and GI Reducers of various dia)
S.No Description Qty. Rate Unit Amount.
1 Providing and Supplying of G.I. Unions of the following sizes confirming to IS 1879
in the various schemes as per the standard design & relevant ISS of following dia
complete in all respect and as per satisfaction of the Engineer-in-charge.

i) 15mm dia 120 Nos. 90.00 Each. 10800


ii) 20mm dia 120 Nos. 110.00 Each. 13200
iii) 25 mm dia. 90 Nos. 130.00 Each. 11700
iv) 32mm dia. 43 Nos. 160.00 Each. 6880
v) 40mm dia. 75 Nos. 200.00 Each. 15000
vi) 50mm dia. 150 Nos. 600.00 Each. 90000
vii) 65mm dia. 60 Nos. 700.00 Each. 42000
viii) 80mm dia. 50 Nos. 800.00 Each. 40000
2 Providing and Supplying of the G.I.Tees of the following sizes Confirming to IS Each.
1879 in the various schemes complete in all respect and as per satisfaction of the
Engineer-in-charge.
0
i) 15mm dia 50 Nos. Each. 0
ii)20mm dia 60 Nos. Each. 0
iii)25 mm dia. 100 Nos. Each. 0
3 Providing and Supplying of G.I.Reducer of the following sizes onfirming to IS 1879 Each.
in the various schemes complete in all respect and as per satisfaction of the
Engineer-in-charge.
0
i) 15x20mm dia 65 Nos. Each. 0
ii) 20x25 mm dia 50 Nos. Each. 0
iii) 25x32 mm dia. 40 Nos. Each. 0
iv) 32x20mm dia. 30 Nos. Each. 0
v) 40x15mm dia. 25 Nos. Each. 0
vi) 40x32 mm dia. 15 Nos. Each. 0
4 Providing and Supplying of Socket of the following sizes onfirming to IS 1879 in Each.
the various schemes complete in all respect and as per satisfaction of the Engineer-
in-charge.
0
i) 15mm dia 110 Nos. Each. 0
ii) 20mm dia 85 Nos. Each. 0
iii) 25 mm dia. 75 Nos. Each. 0
iv) 32mm dia. 45 Nos. Each. 0
v) 40mm dia. 75 Nos. Each. 0
vi) 50mm dia. 150 Nos. Each. 0
vii) 65mm dia. 60 Nos. Each. 0
viii) 80mm dia. 50 Nos. Each. 0
5 Providing and Supplying of GI Elbow of the following sizes onfirming to IS 1879 in Each.
the various schemes complete in all respect and as per satisfaction of the Engineer-
in-charge.
0
i) 15mm dia 120 Nos. Each. 0
ii) 20mm dia 70 Nos. Each. 0
iii) 25 mm dia. 75 Nos. Each. 0
iv) 32mm dia. 45 Nos. Each. 0
v) 40mm dia. 75 Nos. Each. 0
229580
TERMS AND CONDITIONS.
1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Nothing shall be paid for rejected/defective work.
Assistant Engineer,
I&PH Sub Division, Kaffota.
REVISED SCHEDULE OF QUANTITY Estimated Cost: 99225/-
Name of Work :- R/M of various Lift/ Gravity Water Supply schemes under IPH Sub Division Kaffota Earnest Money: 2000/-
Time: One Month.
in Tehsil Paonta Sahib Distt. Sirmour (HP) (SH: Providing and supplying of Gate valves)
S.No Description Qty. Rate Unit Amount.
1 2 3 6. 5
1 Providing and Supplying of Brass full way valve with wheel of superior quality as per standard design &
relevant ISS of following dia complete in all respect and as per satisfaction of the Engineer-in-charge.

i) 15mm dia 60 Nos. 500.00 Each. 30000

ii) 20mm dia 50 Nos. 600.00 Each. 30000

iii) 25 mm dia. 50 Nos. 750.00 Each. 37500

iv) 32mm dia. 30 Nos. 850.00 Each. 25500

v) 40mm dia. 30 Nos. 1050.00 Each. 31500

vi) 50mm dia. 15 Nos. 3000.00 Each. 45000

vii) 65mm dia. 10 Nos. 3500.00 Each. 35000

viii)80mm dia. 5 Nos. 4500.00 Each. 22500

TOTAL: 257000.00
COMPARATIVE STATEMENT Rate Quoted by shri Anil
Sharma cont.
Name of work: R/M of various Schemes under IPH Section Kaffota IN Tehsil Paonta
Distt. Sirmour (HP)(SH: Prov. & supplying of GI Unions, Tees and GI Reducers of various dia)
S.No Description Qty. Unit. Rate Amount
1 2 3 4 5 6.
1 Providing and Supplying of G.I. Unions of the following sizes confirming to
IS 1879 in the various schemes as per the standard design & relevant ISS of
following dia complete in all respect and as per satisfaction of the Engineer-
in-charge.

i) 15mm dia 120 Nos. Each. 110 13200


ii) 20mm dia 120 Nos. Each. 200 24000
iii) 25 mm dia. 90 Nos. Each. 350 31500
iv) 32mm dia. 43 Nos. Each. 500 21500
v) 40mm dia. 75 Nos. Each. 700 52500
vi) 50mm dia. 150 Nos. Each. 900 135000
vii) 65mm dia. 60 Nos. Each. 1000 60000
viii) 80mm dia. 50 Nos. Each. 1200 60000
2 Providing and Supplying of the G.I.Tees of the following sizes Confirming to
IS 1879 in the various schemes complete in all respect and as per
satisfaction of the Engineer-in-charge.
i) 15mm dia 50 Nos. Each. 110 5500

ii)20mm dia 60 Nos. Each. 200 12000


iii)25 mm dia. 100 Nos. Each. 350 35000

iv) 32mm dia. 80 Nos. Each. 500 40000


v) 40mm dia. 50 Nos. Each. 700 35000
vi) 50mm dia. 50 Nos. Each. 900 45000
vii) 65mm dia. 50 Nos. Each. 1000 50000
3 Providing and Supplying of G.I.Reducer of the following sizes onfirming to
IS 1879 in the various schemes complete in all respect and as per
satisfaction of the Engineer-in-charge.
i) 15x20mm dia 65 Nos. Each. 110 7150
ii) 20x25 mm dia 50 Nos. Each. 200 10000

iii) 25x32 mm dia. 40 Nos. Each. 350 14000


iv) 32x20mm dia. 30 Nos. Each. 500 15000

v) 40x15mm dia. 25 Nos. Each. 700 17500

vi) 40x32 mm dia. 15 Nos. Each. 900 13500


4 Providing and Supplying of Socket of the following sizes onfirming to IS
1879 in the various schemes complete in all respect and as per satisfaction
of the Engineer-in-charge.
i) 15mm dia 110 Nos. Each. 120 13200
ii) 20mm dia 85 Nos. Each. 200 17000
iii) 25 mm dia. 75 Nos. Each. 350 26250
iv) 32mm dia. 45 Nos. Each. 500 22500
v) 40mm dia. 75 Nos. Each. 700 52500
vi) 50mm dia. 150 Nos. Each. 900 135000
vii) 65mm dia. 60 Nos. Each. 1000 60000
viii) 80mm dia. 50 Nos. Each. 1200 60000
5 Providing and Supplying of GI Elbow of the following sizes onfirming to IS
1879 in the various schemes complete in all respect and as per satisfaction
of the Engineer-in-charge.
i) 15mm dia 120 Nos. Each. 120 14400
ii) 20mm dia 120 Nos. Each. 200 24000
iii) 25 mm dia. 100 Nos. Each. 350 35000
iv) 32mm dia. 90 Nos. Each. 700 63000
v) 40mm dia. 100 Nos. Each. 710 71000
TOTAL: 1291200

The rates quoted by Sh. Anil Sharma Vill. &PO Tatiana Tehsil Paonta Sahib Distt. Sirmour are the lowest , hence recommended for approval please.

Assistant Engineer,
I&PH Sub Division, Kaffota.
SCHEDULE OF QUANTITY Estimated Cost:99438/-
Name of work: R/M of various Schemes under IPH Section Kaffota IN Tehsil Paonta Earnest Money: 2000/-
Distt. Sirmour (HP)(SH: Prov. & supplying of GI Unions, Tees and GI Reducers of various dia) Time: One Month.
S.No Description Qty. Rate Unit Amount.
1 2 3 4
1 Providing and Supplying of G.I. Unions of the following sizes confirming to
IS 1879 in the various schemes as per the standard design & relevant ISS of
following dia complete in all respect and as per satisfaction of the Engineer-
in-charge.

i) 15mm dia 120 Nos. 90.00 Each. 10800


ii) 20mm dia 120 Nos. 100.00 Each. 12000
iii) 25 mm dia. 90 Nos. 110.00 Each. 9900
iv) 32mm dia. 43 Nos. 120.00 Each. 5160
v) 40mm dia. 75 Nos. 180.00 Each. 13500
vi) 50mm dia. 150 Nos. 200.00 Each. 30000
vii) 65mm dia. 60 Nos. 220.00 Each. 13200
viii) 80mm dia. 50 Nos. 250.00 Each. 12500
2 Providing and Supplying of the G.I.Tees of the following sizes Confirming to
IS 1879 in the various schemes complete in all respect and as per
satisfaction of the Engineer-in-charge.

i) 15mm dia 50 Nos. 90.00 Each. 4500


ii)20mm dia 60 Nos. 100.00 Each. 6000
iii)25 mm dia. 100 Nos. 110.00 Each. 11000
iv) 32mm dia. 80 Nos. 120.00 Each. 9600
v) 40mm dia. 50 Nos. 160.00 Each. 8000
vi) 50mm dia. 50 Nos. 280.00 Each. 14000
vii) 65mm dia. 50 Nos. 300.00 Each. 15000
3 Providing and Supplying of G.I.Reducer of the following sizes onfirming to
IS 1879 in the various schemes complete in all respect and as per
satisfaction of the Engineer-in-charge.
i) 15x20mm dia 65 Nos. 90.00 Each. 5850

ii) 20x25 mm dia 50 Nos. 110.00 Each. 5500


iii) 25x32 mm dia. 40 Nos. 150.00 Each. 6000
iv) 32x20mm dia. 30 Nos. 200.00 Each. 6000
v) 40x15mm dia. 25 Nos. 300.00 Each. 7500
vi) 40x32 mm dia. 15 Nos. 450.00 Each. 6750
4 Providing and Supplying of Socket of the following sizes onfirming to IS
1879 in the various schemes complete in all respect and as per satisfaction
of the Engineer-in-charge.
i) 15mm dia 110 Nos. 60.00 Each. 6600
ii) 20mm dia 85 Nos. 90.00 Each. 7650
iii) 25 mm dia. 75 Nos. 110.00 Each. 8250
iv) 32mm dia. 45 Nos. 140.00 Each. 6300
v) 40mm dia. 75 Nos. 200.00 Each. 15000
vi) 50mm dia. 150 Nos. 210.00 Each. 31500
vii) 65mm dia. 60 Nos. 240.00 Each. 14400
viii) 80mm dia. 50 Nos. 250.00 Each. 12500
5 Providing and Supplying of GI Elbow of the following sizes confirming to IS
1879 in the various schemes complete in all respect and as per satisfaction
of the Engineer-in-charge.
i) 15mm dia 120 Nos. 60.00 Each. 7200
ii) 20mm dia 70 Nos. 80.00 Each. 5600
iii) 25 mm dia. 75 Nos. 90.00 Each. 6750
iv) 32mm dia. 45 Nos. 150.00 Each. 6750
v) 40mm dia. 75 Nos. 200.00 Each. 15000
TERMS AND CONDITIONS. Total: 356260.00
1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Nothing shall be paid for rejected/defective work.
Executive Engineer,
I&PH Division,
Paonta Sahib.
Rate quoted by Sh Rate quoted by
Atma Ram Sharma. Sh Anil Sharma.

Rate Amount. Rate Amount. Rate Amount.

490 29400 510 30600 520 31200

700 35000 720 36000 800 40000

900 45000 1100 55000 1200 60000

1400 42000 1600 48000 1700 51000


1900 57000 2100 63000 2200 66000

3400 51000 3600 54000 3700 55500

4200 42000 4400 44000 4600 46000

4900 24500 5200 26000 5300 26500

325900.00 356600.00 376200.00


Rate Quoted by shri Rate Quoted by shri
Atma Ram Sharma cont. Parvesh Sharma cont.

150 18000 170 20400


270 32400 300 36000
450 40500 500 45000

650 27950 700 30100

800 60000 900 67500


1000 150000 1100 165000
1100 66000 1200 72000
1300 65000 1400 70000
150 7500 200 10000

250 15000 300 18000


400 40000 450 45000

600 48000 650 52000


800 40000 850 42500
1000 50000 1100 55000

1150 57500 1200 60000

150 9750 200 13000

250 12500 300 15000

400 16000 450 18000

600 18000 650 19500

800 20000 900 22500

1000 15000 1100 16500


0

150 16500 200 22000


250 21250 300 25500
400 30000 450 33750
600 27000 650 29250

800 60000 850 63750


1000 150000 1050 157500
1100 66000 1150 69000
1300 65000 1400 70000

170 20400 200 24000


300 36000 350 42000
400 40000 450 45000
800 72000 900 81000
900 90000 1000 100000

1503250 1655750

d for approval please.


Complarative Statement Rate quoted by Sh Rate quoted by Sh Atma Rate quoted by Sh Anil
Parvesh Sharma. Ram Sharma. Sharma.
Name of work: R/M of various Schemes under IPH Section Kaffota under I&PH Sub Division Kaffota

in Tehsil Paonta Distt. Sirmour (HP)(SH: Prov. & supplying of GI Unions, Tees and GI Reducers of various dia)
S.No Description Qty. Rate Amount. Rate Amount. Rate Amount. Rate Amount.
1 Providing and Supplying of G.I. Unions of the following sizes
confirming to IS 1879 in the various schemes as per the standard
design & relevant ISS of following dia complete in all respect and
as per satisfaction of the Engineer-in-charge.

i) 15mm dia 120 Nos. 110.00 13200.00 150 18000.00 130 15600.00 0.00
ii) 20mm dia 120 Nos. 200.00 24000.00 250 30000.00 230 27600.00
iii) 25 mm dia. 90 Nos. 350.00 31500.00 400 36000.00 380 34200.00
iv) 32mm dia. 43 Nos. 500.00 21500.00 600 25800.00 550 23650.00
v) 40mm dia. 75 Nos. 700.00 52500.00 900 67500.00 850 63750.00
vi) 50mm dia. 150 Nos. 900.00 135000.00 1050 157500.00 1000 150000.00
vii) 65mm dia. 60 Nos. 1000.00 60000.00 1200 72000.00 1150 69000.00
viii) 80mm dia. 50 Nos. 1200.00 60000.00 1600 80000.00 1500 75000.00
2 Providing and Supplying of the G.I.Tees of the following sizes
Confirming to IS 1879 in the various schemes complete in all
respect and as per satisfaction of the Engineer-in-charge.

i) 15mm dia 50 Nos. 120.00 6000.00 200 10000.00 160 8000.00


ii)20mm dia 60 Nos. 230.00 13800.00 300 18000.00 270 16200.00
iii)25 mm dia. 100 Nos. 400.00 40000.00 500 50000.00 460 46000.00
3 Providing and Supplying of G.I.Reducer of the following sizes
onfirming to IS 1879 in the various schemes complete in all
respect and as per satisfaction of the Engineer-in-charge.

i) 15x20mm dia 65 Nos. 130.00 8450.00 200 13000.00 160 10400.00


ii) 20x25 mm dia 50 Nos. 200.00 10000.00 300 15000.00 270 13500.00
iii) 25x32 mm dia. 40 Nos. 350.00 14000.00 500 20000.00 450 18000.00
iv) 32x20mm dia. 30 Nos. 500.00 15000.00 650 19500.00 600 18000.00
v) 40x15mm dia. 25 Nos. 700.00 17500.00 900 22500.00 800 20000.00
vi) 40x32 mm dia. 15 Nos. 900.00 13500.00 1100 16500.00 1050 15750.00
4 Providing and Supplying of Socket of the following sizes
onfirming to IS 1879 in the various schemes complete in all
respect and as per satisfaction of the Engineer-in-charge.
i) 15mm dia 110 Nos. 170.00 18700.00 200 22000.00 170 18700.00
ii) 20mm dia 85 Nos. 200.00 17000.00 300 25500.00 280 23800.00
iii) 25 mm dia. 75 Nos. 350.00 26250.00 500 37500.00 430 32250.00
iv) 32mm dia. 45 Nos. 500.00 22500.00 650 29250.00 0.00
v) 40mm dia. 75 Nos. 700.00 52500.00 900 67500.00 0.00
vi) 50mm dia. 150 Nos. 900.00 135000.00 1100 165000.00 0.00
vii) 65mm dia. 60 Nos. 1000.00 60000.00 1200 72000.00 0.00
viii) 80mm dia. 50 Nos. 1200.00 60000.00 1400 70000.00 0.00
5 Providing and Supplying of GI Elbow of the following sizes 0.00
onfirming to IS 1879 in the various schemes complete in all
respect and as per satisfaction of the Engineer-in-charge.
i) 15mm dia 120 Nos. 120.00 14400.00 250 30000.00 0.00
ii) 20mm dia 70 Nos. 200.00 14000.00 300 21000.00 0.00
iii) 25 mm dia. 75 Nos. 350.00 26250.00 500 37500.00 0.00
iv) 32mm dia. 45 Nos. 700.00 31500.00 900 40500.00 0.00
v) 40mm dia. 75 Nos. 720.00 54000.00 900 67500.00 0.00
Total: 1068050 1356550 699400
COMPARATIVE STATEMENT Rate quoted by Sh Rate quoted by Sh Rate quoted by Sh Rate quoted by
Name of Work :- R/M of various Lift/ Gravity Water Supply schemes under IPH Sub Division Kaffota
Parvesh Sharma. Rajesh Sharma. Atma Ram Sharma. Sh Anil Sharma.

in Tehsil Paonta Sahib Distt. Sirmour (HP) (SH: Providing and supplying of Gate valves)
S.No Description Qty. Unit Rate Amount. Rate Amount. Rate Amount. Rate
1 2 3 5 6.
1 Providing and Supplying of Brass full way valve with wheel of superior quality
as per standard design & relevant ISS of following dia complete in all respect
and as per satisfaction of the Engineer-in-charge.

i) 15mm dia 60 Nos. Each. 500.00 30000 490 29400 510 30600 520

ii) 20mm dia 50 Nos. Each. 700.00 35000 700 35000 720 36000 800

iii) 25 mm dia. 50 Nos. Each. 1000.00 50000 900 45000 1100 55000 1200

iv) 32mm dia. 30 Nos. Each. 1500.00 45000 1400 42000 1600 48000 1700

v) 40mm dia. 30 Nos. Each. 2000.00 60000 1900 57000 2100 63000 2200

vi) 50mm dia. 15 Nos. Each. 3500.00 52500 3400 51000 3600 54000 3700

vii) 65mm dia. 10 Nos. Each. 4300.00 43000 4200 42000 4400 44000 4600

viii)80mm dia. 5 Nos. Each. 5000.00 25000 4900 24500 5200 26000 5300

TOTAL: 340500.00 325900.00 356600.00

The rates quoted by Sh. Rajesh Sharma Vill. Charew PO Shilla Tehsil Shillai Distt. Sirmour are the lowest , hence recommended for approval please.

Assistant Engineer,
I&PH Sub Division, Kaffota.

REVISED SCHEDULE OF QUANTITY


Name of work: R/M of various Schemes under IPH Section Kaffota IN Tehsil Paonta
Distt. Sirmour (HP)(SH: Prov. & supplying of GI Unions, Tees and GI Reducers of various dia)
S.No Description Qty. Rate Unit Amount.
1 2 3 4
1 Providing and Supplying of G.I. Unions of the following
sizes confirming to IS 1879 in the various schemes as per
the standard design & relevant ISS of following dia
complete in all respect and as per satisfaction of the
Engineer-in-charge.

i) 15mm dia 120 Nos. Each. 10800


90
ii) 20mm dia 120 Nos. Each. 0
iii) 25 mm dia. 90 Nos. Each. 0
iv) 32mm dia. 43 Nos. Each. 0
v) 40mm dia. 75 Nos. Each. 0
vi) 50mm dia. 150 Nos. Each. 0
vii) 65mm dia. 60 Nos. Each. 0
viii) 80mm dia. 50 Nos. Each. 0
2 Providing and Supplying of the G.I.Tees of the following 0
sizes Confirming to IS 1879 in the various schemes
complete in all respect and as per satisfaction of the
Engineer-in-charge.

i) 15mm dia 50 Nos. Each. 0

ii)20mm dia 60 Nos. Each. 0


iii)25 mm dia. 100 Nos. Each. 0
iv) 32mm dia. 80 Nos. Each. 0
v) 40mm dia. 50 Nos. Each. 0
vi) 50mm dia. 50 Nos. Each. 0
vii) 65mm dia. 50 Nos. Each. 0
3 Providing and Supplying of G.I.Reducer of the following 0
sizes onfirming to IS 1879 in the various schemes complete
in all respect and as per satisfaction of the Engineer-in-
charge.

i) 15x20mm dia 65 Nos. Each. 0


ii) 20x25 mm dia 50 Nos. Each. 0
iii) 25x32 mm dia. 40 Nos. Each. 0

iv) 32x20mm dia. 30 Nos. Each. 0

v) 40x15mm dia. 25 Nos. Each. 0

vi) 40x32 mm dia. 15 Nos. Each. 0


4 Providing and Supplying of Socket of the following sizes 0
onfirming to IS 1879 in the various schemes complete in all
respect and as per satisfaction of the Engineer-in-charge.

i) 15mm dia 110 Nos. Each. 0


ii) 20mm dia 85 Nos. Each. 0
iii) 25 mm dia. 75 Nos. Each. 0
iv) 32mm dia. 45 Nos. Each. 0
v) 40mm dia. 75 Nos. Each. 0
vi) 50mm dia. 150 Nos. Each. 0
vii) 65mm dia. 60 Nos. Each. 0
viii) 80mm dia. 50 Nos. Each. 0
5 Providing and Supplying of GI Elbow of the following sizes 0
onfirming to IS 1879 in the various schemes complete in all
respect and as per satisfaction of the Engineer-in-charge.

i) 15mm dia 120 Nos. Each. 0


ii) 20mm dia 70 Nos. Each. 0
iii) 25 mm dia. 75 Nos. Each. 0
iv) 32mm dia. 45 Nos. Each. 0
v) 40mm dia. 75 Nos. Each. 0
10800

REVISED SCHEDULE OF QUANTITY Estimated Cost: 99225/-


Name of Work :- R/M of various Lift/ Gravity Water Supply schemes under IPH Sub Division Kaffota Earnest Money: 2000/-
in Tehsil Paonta Sahib Distt. Sirmour (HP) (SH: Providing and supplying of Gate valves) Time : One Month.
S.No Description Qty. Unit Rate Amount.
1 2 3 5 6.
1 Providing and Supplying of Brass full way valve with wheel of superior quality
as per standard design & relevant ISS of following dia complete in all respect
and as per satisfaction of the Engineer-in-charge.

i) 15mm dia 60 Nos. 350 Each. 21000

ii) 20mm dia 50 Nos. 420 Each. 21000

iii) 25 mm dia. 50 Nos. 510 Each. 25500

iv) 32mm dia. 30 Nos. 710 Each. 21300

v) 40mm dia. 30 Nos. 910 Each. 27300

vi) 50mm dia. 15 Nos. 2100 Each. 31500

vii) 65mm dia. 10 Nos. 3800 Each. 38000

viii)80mm dia. 5 Nos. 4200 Each. 21000

TERMS AND CONDITIONS. Total: 206600.00


1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Nothing shall be paid for rejected/defective work.
Executive Engineer,
I&PH Division,
Paonta Sahib.
Amount.
Rate quoted by
Sh Anil Sharma.

Amount.

31200

40000

60000

51000
66000

55500

46000

26500

376200.00
REVISED SCHEDULE OF QUANTITY Estimated cost Rs.55090/-
Name of work:-A/R & M/O of Rampur Giri Canal in Tehsil Paonta Sahib Distt. Sirmour (HP) (SH: Earnest money Rs.1101/-
Provding and laying of Foot Bridge ) Time:- Three Months
S.No Sub-Head and item of work. Qty. Rates, Unit Amount.
1 2 3 4 5 6
1 Excavation in foundation and trenches etc.in earth work in all kinds of soil such as pick 10.83 Cum 160.00 P/Cum 1733.00
work ,jumper work decomposed conglomerate saturated soil soft and hard rock upto
all leads lifts stacking the excavated soil not more than 3mtr.clear from the edge of
excavation and then returning the stacked soil in 15cm layers when required in to
plinth sides of foundation etc. consolidating each deposited layers by ramming and
watering and then disposing of all surplus excavated earth as directed with in all leads
lifts and as per directions of the Engineer-in-charge

2 Providing and laying cement concrete work 1:3:6 (1cement:3 sand: 6 graded stone agg. 10.83 Cum 2800.00 P/Cum 30324.00
40mm nominal size) & cuing completed excluding cost of form work in foundation &
plinth including all leads lifts and carriage of material and as per direction of Engineer-
in-charge.

3 Providing and laying cement concrete 1:2:4(1cement:2app.sand: 4 app. graded stone 7.03 Cum. 3600.00 P/Cum. 25308.00
agg. 20mm nominal size )and curing complete excluding cost of form work &
reinforcement for reinforced work in suspended floors, roofs landing shelves and their
supports balconies, beams, girders bressumers and cantilivers upto to floor two level
in all height and depth, including all leads lifts and carriage of material at site and as
per direction of the Engineer-in-charge.

4 Providing form work with steel sheets 3.15mm thick welded with angle iron 30x30x5
mm so as to give rough finish i/c centring shuttering structing and propping etc. with
wooden bettens & Ballies, height or propping & centering below supporting floor to
ceiling not exceeding 4 mtr.and removal of the same for insitu RCC work and PCC
work.including all leads lifts and carriage of material at site & as per direction of
Engineer in charge in:-

a) Flat surfaces such as suspended floors etc. 19.78 Sqm. 240.00 Per Sqm. 4747.00

b) Vertical surface such as wall any thickness. 42.32 Sqm. 200.00 P/Sqm. 8464.00
5 Providing Mild Steel/Tor steel reinforcement including bending binding & placing in 607.05 Kg. 63.00 P/kg 38244.00
positing I/c all leads lifts and carriage of material and as per direction of the
Engineer-in-charge.
7 Stone filling behind the retaining wall complete in all respect and as per direction of 5.59 Cum. 750.00 P/Cum. 4193.00
the Engineer-in-charge.

8 Providing and fixing of railing of GI Pipes of 32mm dia including all leads,lifts and 1.00 job. 8000.00 Per job. 8000.00
carriage of material at site and as per direction of the Engineer-in-charge.

TOTAL: 121013.00
TERMS AND CONDITIONS:-
1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.

2 Security,Sale tax & Income tax shall be deducted as per rules.


3 Royality certificate in respect of stone agg. Sand etc. shall be produced by the contractor
4 Cement shall be issued @ Rs.315/- Per bag & steel @ Rs.53/- per Kg. from IPH store Bhatanwali
Paonta Sahib.
5 Empty cement bags shall be returned to the deptt. Other Rs.2/- per bag shall deducted from each bill of
the contractor.
6 The watch & ward of the store by the contractor. Executive Engineer,
I&PH Division,
Paonta Sahib.
DRAFT SCHEDULE OF QUANTITY Estimated cost Rs.60638/-
Name of work:- Providing LWSS to NC/PC habitation of CV & GP Tatiana in Tehsil Paonta Sahib Distt. Earnest money Rs.1300/-
Sirmour (HP) (SH: C/o Anchor Blocks ) Time:- Three Months
S.No Sub-Head and item of work. Qty. Rates, Unit Amount.
1 2 3 4 5 6
1 Excavation in foundation and trenches etc.in earth work in all kinds of soil such as pick 8.10 Cum 92.85 P/Cum 752.00
work ,jumper work decomposed conglomerate saturated soil soft and hard rock upto
all leads lifts stacking the excavated soil not more than 3mtr.clear from the edge of
excavation and then returning the stacked soil in 15cm layers when required in to
plinth sides of foundation etc. consolidating each deposited layers by ramming and
watering and then disposing of all surplus excavated earth as directed with in all leads
lifts and as per directions of the Engineer-in-charge

2 Providing and laying cement concrete 1:6:12(1cement:6sand:12 graded stone 4.86 Cum 905.10 P/Cum 4399.00
agg.40mm nominal size)and curing complete excluding the cost of centring
shuttering in foundation & plinth including all leads lifts and carriage of material
and as per the directions of Engineer-in-charge.

3 Providing and laying cement concrete 1:2:4(1cement:2app.sand: 4 app. graded stone 16.61 Cum. 1659.05 P/Cum. 27557.00
agg. 20mm nominal size )and curing complete excluding cost of form work &
reinforcement for reinforced work in suspended floors, roofs landing shelves and their
supports balconies, beams, girders bressumers and cantilivers upto to floor two level
in all height and depth, including all leads lifts and carriage of material at site and as
per direction of the Engineer-in-charge.

4 Providing form work with steel sheets 3.15mm thick welded with angle iron 30x30x5
mm so as to give rough finish i/c centring shuttering structing and propping etc. with
wooden bettens & Ballies, height or propping & centering below supporting floor to
ceiling not exceeding 4 mtr.and removal of the same for insitu RCC work and PCC
work.including all leads lifts and carriage of material at site & as per direction of
Engineer in charge in:-

a) Vertical surface such as wall any thickness. 133.20 Sqm. 80.70 P/Sqm. 10749.00
5 Providing Mild Steel/Tor steel reinforcement including bending binding & placing in 830.00 Kg. 20.70 P/kg 17181.00
positing I/c all leads lifts and carriage of material and as per direction of the
Engineer-in-charge.
TOTAL: 60638.00
TERMS AND CONDITIONS:-
1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Royality certificate in respect of stone agg. Sand etc. shall be produced by the contractor Assistant Engineer,
4 Cement shall be issued @ Rs.315/- Per bag & steel @ Rs.53/- per Kg. from IPH store Bhatanwali
Paonta Sahib.
I&PH Sub Division,
5 Empty cement bags shall be returned to the deptt. Other Rs.2/- per bag shall deducted from each bill of Kaffota.
the contractor.

Executive Engineer,
I&PH Division,
Paonta Sahib.
REVISED SCHEDULE OF QUANTITY Estimated cost: 99000/-
NAME OF WORK :-R/M of LWSS Kando Bhaila in tehsil Paonta Sahib District Sirmour H.P. Earnest money:2000/-
(SH: -Replacement of old Centrifugal Pumping machinery ) Time : Two Months.
S.NO. DESCRIPTION QTY RATE UNIT AMOUNT

1. Supply, erection, testing & commissioning of horizontal spindle,horizontal split casing,radial 1 set. 275000 Per set. 275000.00
split Single,/Multistages centrifugal pumps of standarad make such as KSB make
conforming to BIS 1520-1980 with upto date ammendments read with BIS 9137-1978 or
latest edition to handle clear water having characterstics as mentioned in item 1 (a) as
under. with impelleres,casing ring, priming funnels & shaft sleeves of bronze, shaft of steel
with cast iron casing of suitable capacity coupled directly through a flexible coupling on a
common base plate of cast steel /Mild steel to BHEL /Kirlokar/ NGEF/ Crompton /
Siemen/Jyoti /GEC make slip ring /squirrel cage screen protected drip proof induction
electric motor suitable for operation on the data given below.

a) Total Head 425 Mtr Make KSB

b) Capacity of each pump set 1.03 LPS Model. Movi 32/13.


c) Dia of R/Main 40 mm dia. HP 30

TOTAL: 275000.00
TERMS AND CONDITIONS.

Executive Engineer,
I&PH Division,
Paonta Sahib.
REVISED SCHEDULE OF QUANTITY
Name of work: R/M of LWSS Misserwala in tehsil Paonta Sahib Distt. Sirmour (HP) Estimated Cost.48440/-
(SH: Rewinding & Repair of 40 HP Submersible Motor & Pumping set & Prov. & fixing of Rotor.) Earnest Money: 1000/-
Time : One Month.
Sr.No. Description of Items. Qty Rate Unit Amount.
1 2 3 4 5 6 7
1 Providing and fixing of New Rotor shaft. 1 job. 25500 Per job. 25500
Repair & Rewinding of 40 HP Submersible Motor with Fonilex make PVC insulated wire. 40 HP 500 Per HP 20000
2
3 Re-conditioning ofslleve. 4 Nos. 450 Each. 1800
4 Reconditioning of Stator slots. 1 job. 750 Per job. 750
5 Reconditioning of thrust plate. 1 job. 850 Per job. 850
6 Providing and fixing of Bush Gun metal. 4 Nos. 550 Each. 2200
7 Providing and fixing of rocker support. 1 job. 650 Per job. 650
PUMP.
Re-conditioning of Gun Metal impellers. 3 Nos. 1000 Each. 3000
8
9 Providing fixing of Gun metal impellers. 1 No. 1500 Each. 1500
10 Providing and fixing of Keys of impellers. 4 Nos. 150 Each. 600
11 Providing and fixing of distance slleve. 4 Nos. 650 Each. 2600
12 Providing and fixing of neckrings. 4 Nos. 500 Each. 2000
13 Providing and fixing ofNut & bolts. 24 Nos. 50 Each. 1200
14 Pump Motor taking out from bore well & again lowering the same with allied accessories 1 job. 3200 Per job. 3200
complete in all respect.
15 Carriage of pumping Machinery from site to workshop and testing at site of work. 1 job. 2500 Per job. 2500

Total: 68350.00
2% rebate on all over the amount. (-) 1367.00
TERMS AND CONDITIOS. Total: 66983.00
1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax , Income tax & Labour cess shall be deducted as per rules.
3 The payment will be made after successful testing of Pumping machinery.
4 The Guarantee period shall be minimum six months from the date of testing.

Executive Engineer,
I&PH Division,
Paonta Sahib.
REVISED SCHEDULE OF QUANTITY Estimated Cost.48440/-
Name of work: R/M of LWSS Kolar in tehsil Paonta Sahib Distt. Sirmour (HP) Earnest Money: 1000/-
(SH: Rewinding & Repair of 51.00 HP Submersible Pumping set Prov. & fixing of ATS starter.) Time : One Month.
Sr.No. Description of Items. Qty Rate Unit Amount.
1 Supply suitable direct on line /oil immersed ARS staryter of standard make such as 1 job. 28500 Per job. 28500
MEI/Kilburn/Siemens/capital confirming to BIS 8544/1979 latest with upto date ammendments
for squarrel cage /slip ring motor (make to be specified by the tenders) mounted on panel
board with magnetic type over load release & dashpot time lag, under toltage release
without initial oil filling complete in all respect as per direction of the Engineer-in-charge.

2 Providing and supplying of Transformer oil . 10 Litre. 250 Per litre. 2500
3 Repair & Rewinding of 51 HP submersible motor with finolex make PVC insulated wire. 51 HP 475 Per HP 24225
4 Reconditioning of upper & lower housing bush. 4 Nos. 750 Each. 3000
5 Reconditioning of upper & lower housing sleeve. 4 Nos. 750 Each. 3000
6 Reconditioning and balancing of rotor. 1 job. 3000 P/job. 3000
7 Providing and fixing sealing Kit & cable jointing material complete in all respect. 1 job. 1000 Per job. 1000
PUMP
8 Providing and fixing of stage casing bush. 6 Nos. 650 Each. 3900
9 6 Nos. 450 Each. 2700
10 Providing and fixing of top bush. 1 No. 750 Each. 750
11 Providing and fixing of section bush. 1 No. 750 Each. 750
12 Providing and fixing of distance slleve. 6 Nos. 650 Each. 3900
13 Pump Motor taking out from bore well & again lowering the same with allied accessories 1 job. 3500 P/job. 3500
complete in all respect.
14 Carriage of pumping Machinery from site to workshop and testing at site of work. 1 job. 2500 Per job. 2500
Total: 83225.00
2% rebate on all over the amount. (-) 1665.00
TERMS AND CONDITIOS. Total: 81560.00
1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax , Income tax & Labour cess shall be deducted as per rules.
3 The payment will be made after successful testing of Pumping machinery.
4 The Guarantee period shall be minimum six months from the date of testing.

Executive Engineer,
I&PH Division,
Paonta Sahib.
REVISED SCHEDULE OF QUANTITY Estimated Cost :-Rs.38330/-
Name of work:- C/o LIS Mehat in GP Kando Kansar in Tehsil Paonta Sahib Distt. Sirmour (HP) Earnest Money :-Rs800/-
SH:- Providing internal Electrical fitting in Pump House) Time :Fifteen Days.
S.N. Description Qty. Rate Unit Amount
1 2 3 4 5 6.
1 Wiring for light Point/Fan Point/Exhaust Fan Point/ Call Bell Point with 1.5 sq. mm PVC
Insulated, PVC sheathed copper conductor cable in PVC casing and capping/ with surface
recessed PVC conduit complete with ISI Marked Cable, Switches, etc, as required complete in
all respect (Group-C)

Group C. 30 Point 350.00 Each 10500.00


2 Wiring for Light/power plug wiring with 2x 1.5 sq. mm PVC Insulated copper conductor cable 30 Point. 160.00 Each. 4800.00
in surface/ reccessed PVC conduit alongwith one No. 2.24mm dia base copper wire for loop
earthing as required. Complete with in all leads lifts and as per direction of Engineer- in-
charge.

3 Providing and fixjng Metal box of 180mm x100mmx60mm deep (nominal size on surface or 7 Nos. 250.00 Each. 1750.00
recess with suitable size penolic laminated sheet cover in the front including Providing and
fixing of 3 PIN 15/16 AMP socket outlet & 15/16 AMP tumbler piano type switch earthing the
3rd PIN painting etc.complete with all leads,lifts and carriage of material and as per direction
of the Engineer-in-charge.

4 Supplying and fixing bakelite batten /angle holder including connection complete in all respect 60 Nos. 75.00 Each. 4500.00
and as directed by the Engineer-in-charge.
5 Providing installation testing and commissioning of prewinded flourecent tube fitting 5 Nos. 600.00 Each. 3000.00
complete with ballast starter and capacitor but excluding tube rod suitable to operate on 230
Volts single phase AC supply directly on surface with copper wiring as required complete om
a;; res[ect and as directed by the Engineer-in-charge.

6 Supplying and fixing of 5 AMPs to 32 Amps Rating 240 volts L series miniature circuit breaker 7 Nos. 175.00 Each. 1225.00
of following poles in existing MCB DB complete with connection testing & commissioning etc.
as required (category B) complete in all respect and as directed by the Engineer-in-charge.

7 Supplying and fixing of 40AMPs to 63 Amps Rating 240 volts L series miniature circuit breaker 7 Nos. 450.00 Each. 3150.00
of following poles in existing MCB DB complete with connection testing & commissioning etc.
as required (category B) complete in all respect and as directed by the Engineer-in-charge. 63
AMP Double pole.
8 Supplying and fixxing of following way single pole & neutral sheet steel MCB distribution board 8 Nos. 750.00 Each. 6000.00
240 volts on surface recess complete with tinned copper busher neutral link earth bard din
bar detachable gland plate inter connections, including painting earthing etc. complete in all
respect and as directed by the Engineer-in-charge.

9 Providing installation testing and commissioning ceiling fan & regulator including wiring the 3 Nos. 1850.00 Each. 5550.00
down rod of standard length (upto 30 cm.) with 1.5 sq. mm PVC insulated copper conductor
single core cable etc. as reuqired complete in all respect and as directed by the Engineer-in-
charge.

10 Circuit wiring in casing caping (2x1.5sq.mm wiring for curcuit wiring with 2x1.5 sq.mm PVC 300 Rmt. 55.00 P/Rmt. 16500.00
insulated PVC sheathed copper conductor single core cable in PVC casing & capping as
required complete in all respect and as directed by the Engineer-in-charge.
11 Wiring for light/power plug with 2x4 Sq.mm PVC insulated PVC sheathed copper conductor 100 Mtr. 135.00 P/Mtr. 13500.00
single core cable in PVC casing & capping alongwith 1 No. 2.24mm dia bare copper wire cor
loop earthing asrequired complete in all respect and as directed by the Engineer-in-charge.

12 Wiring for Sub main wiring with 2x5 Sqm. PVC insulated copper conductorin single cover in 50 Mtr. 145.00 P/Mtr. 7250.00
surface or recessed in PVC conduction with all leads,lifts and carriage of material and as
required complete in all respect.
13 Providing installation testing and commissioning of pre-winded street light fitting complete 5 Nos. 2150.00 Each. 10750.00
with rod & other accessories suitable to operate on 230 Volts single phase AC supply directly on
surface with copper wiring as required complete in all respect and as directed by the Engineer-
in-charge..

Total 88475.00
TERMS AND CONDITIONS:-
1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Nothing shall be paid for rejected material and all material shall be ISI specification
4 Payment will be made after successful testing of work . Executive Engineer,
I&PH Division,
Paonta Sahib (HP)
DRAFT SCHEDULE OF QUANTITY Estimated cost Rs 99733/-
Name of work: Restoration of Rain damages to 8800 to 10600on LBC in Tehsil Paonta Sahib Earnest money Rs.2000/-
Distt. Sirmour (HP)(SH:Removal of silt/slips from RD 8800 to 10600) Time:- Three Months
Sr.No. Description. Qty. Rate. Unit Amount.
1 Removal of silt/slips in all kind of soil including saturated soil but excluding 1385.00 Cum 38.50 P/Cum 53323.00
boulders and rocky portion requiring blasting upto a distance of 20 metres
disposing of unserviceable materials stacking the serviceable materials and
neatly dressed the surface complete in all respect including all leads,lifts and
carriage of material and as per direction of the Engineer-in-charge.

2 Extra carraige of silt/slips from canal of inspection upto dumping place with 554.00 Cum. 83.77 Per Cum. 46410.00
in 1 Km. i.e. Nallah of and other forest land as the case may be by head load
upto all leads,lifts and Katcha road and as per directions of the Engineer-in-
charge.

Total: 99733.00
TERMS AND CONDITIONS:-
1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-
charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Nothing shall be paid for rejected/defective work.
Assistant Engineer,
Giri Irrig. Sub Division,
Patlion.
DRAFT SCHEDULE OF QUANTITY Estimated cost Rs 99874/-
Name of work: C/o LIS Amb wala & Baroti wall and Akalgarh to protect the Pump House , RCC sump Earnest money Rs.2000/-
well & Head works of RG canal in Tehsil Paonta Sahib Distt. Sirmour (HP)(SH:C/o Breast wall to Time:- Three Months
protect the Pump House, RCC Sump well & Diversion weir of LIS Ambwala Barotiwala & Akalgarh &
Head works of RG canal.
Sr.No. Description. Qty. Rate. Unit Amount.
1 Excavation in foundation and trenches etc.in earth work in all kinds of soil 83.80 Cum 92.85 P/Cum 7781.00
such as pick work ,jumper work decomposed conglomerate saturated soil
soft and hard rock upto all leads lifts stacking the excavated soil not more
than 3mtr.clear from the edge of excavation and then returning the stacked
soil in 15cm layers when required in to plinth sides of foundation etc.
consolidating each deposited layers by ramming and watering and then
disposing of all surplus excavated earth as directed with in all leads lifts and
as per directions of the Engineer-in-charge

2 Removal of silt/slips in all kind of soil including saturated soil but excluding 116.18 Cum 38.50 P/Cum 4473.00
boulders and rocky portion requiring blasting upto a distance of 20 metres
disposing of unserviceable materials stacking the serviceable materials and
neatly dressed the surface complete in all respect including all leads,lifts and
carriage of material and as per direction of the Engineer-in-charge.

3 Providing and laying cement concrete work 1:5:10(1cement:5 sand: 57.93 Cum 934.10 P/Cum 54112.00
10 graded stone agg. 40mm nominal size) with 15% plum and curing
complete excluding cost of form work and in retaining walls/ Breast
walls, the size of Plums shall usually be 150mm to 300mm as per PWD
specificatioin including all leads lifts and carriage of material and as
per direction of Engineer incharge.
4 Providing form work with steel sheets 3.15mm thick welded with
angle iron 30x30x5 mm so as to give rough finish i/c centring
shuttering structing and propping etc. with wooden bettens & Ballies,
height or propping & centering below supporting floor to ceiling not
exceeding 4 mtr.and removal of the same for insitu RCC work and PCC
work including all leads lifts and carriage of material at site & as per
direction of Engineer in-charge in:-

a) Vertical surfaces 228.37 Sqm 80.70 P/Sqm 18429.00


5 Extra carraige of silt/slips from canal of inspection upto dumping place with 180.00 Cum. 83.77 Per Cum. 15079.00
in 1 Km. i.e. Nallah of and other forest land as the case may be by head load
upto all leads,lifts and Katcha road and as per directions of the Engineer-in-
charge.

TERMS AND CONDITIONS. Total: 99874.00


1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Royality certificate in respect of stone agg. Sand etc. shall be produced by the contractor
4 Cement shall be issued @ Rs.315/- Per bag & steel @ Rs.53/- per Kg. from IPH store
5 Bhatanwali
Empty cement Paonta
bagsSahib.
shall be returned to the deptt. Other Rs.2/- per bag shall deducted from
6 each bill of the contractor.
The watch & ward of the store by the contractor.
Assistant Engineer,
Giri Irrig. Sub Division,
Patlion.
SCHEDULE OF QUANTITY Estimated Cost :-Rs.43639/-
Name of work:- C/o 3 Nos T/wells in village Bhooppur Kedarpur in tehsil Paonta Sahib Distt. Sirmour (HP) Earnest Money :-Rs.900/-
(SH:- Providing internal Electrification to the tubewell No.1,2,3 Nos Pump Houses) in village Bhoopur Kedarpur Time : One Month

S.N. Description Qty. Rate Unit Amount


1 2 3 4 5 6.
1 Wiring for light Point/Fan Point/Exhaust Fan Point/ Call Bell Point with 1.5 sq. mm PVC
Insulated, PVC sheathed copper conductor cable in PVC casing and capping/ with surface
recessed PVC conduit complete with ISI Marked Cable, Switches, etc, as required complete in all
respect (Group-C)

Group C. 15 Point Each

2 Wiring for circuit wiring with 2x1.5 Sqm. PVC insulator copper conductor single coil cable for 45 Mtr. P/Mtr.
surface recessed PVC conduit required complete in all repsect and as per direction of the
Engineer-in-charge.

3 Wiring for Light/power plug wiring with 2x4 sq. mm PVC Insulated copper conductor cable in 24 Mtr. P/Metre.
surface/ reccessed PVC conduit alongwith one No. 2.24mm dia base copper wire for loop
earthing as required. Complete with in all leads lifts and as per direction of Engineer- in-
charge.

4 Supplying fixing of 15/16 AMP 3 PIN tumbler piano type switch on existing box cover including 3 Nos. Each.
connection etc. as required complete with in all leads,lifts and carriage of material and as per
direction of the Engineer-in-charge.

5 Supplying fixing of 15/16 AMP 3 PIN Socket Outlet on the exiisting box cover including 3 Nos. Each.
connection etc. as required complete with in all leads,lifts and carriage of material and as per
direction of the Engineer-in-charge.
6 Supplying & fixing of 05/06 Amp. Tubler piano type switch on the existing box cover including 18 Nos. Each.
onnection etc. as required complete with all leads,lifts and carriage of material and as per
direction of the Engineer-in-charge.

7 Providing and fixingwooden box of following size nominal on surface recess with suitable size of
phonetic laminated sheet cover in front as reuired.
i) 8"x6" or 203mmx152mm 3 Nos. Each.
ii) 4"x7" or 102mmx178mm 3 Nos. Each.
8 Wiring for Sub main wiring with 2x5 Sqm. PVC insulated copper conductorin single cover in 6 Nos. Each.
surface or recessed in PVC conduction with all leads,lifts and carriage of material and as
required complete in all respect.
9 Supplying fixing 5 to 32 Amp. Rating 240 Volts L-series main circuit bracker in existing MCB
box complette with commissioning connection testing etc. as required with all leads,lifts and
carrige of material as required .
i) Single pole. 6 No. Each
ii) Double pole. 3 No. Each
10 Supplying fixing single pole and natural sheet steel MCB distribution box on surface /recessed 3 Nos. Each.
complete with tinned copper busher neutral detachable glass plate inter connection including
painting earthing etc. 4 way complete with all leads,lifts and carriage of material and as per
direction of the Engineer-in-charge.

11 Providing installing testing and commissioning of pre wire flourcent tube fitting complete with 3 Nos. Each.
blast starter and capacitor but excluding the cost of rube rod suitable to operate on 230 V single
faces ASC supply directly on surface with copper wiring as required complete with all leads,lifts
and carriage of material F/tube fixture 1x40watt prepex type category A complete in all respect
and as per direction of the Engineer-in-charge.

12 Supplying fixing backlite batten /angle holder including connection etc. complete with all 3 Nos. each
leads,lifts and carriage of material and as per direction of the Engineer-in-charge.
13 Supplying /fixing of ceiling Rose on existing junction box/wooden block including connection 15 Nos. Each.
etc. as required complete including all leads,lifts and carriage of material and as per direction of
the Engineer-in-charge.
14 Earthing with copper plate 600x600x3mm including accessoires and providing masonary 3 Nos. P/set.
enclosure with cover plate having locking arrangeents and water pipe etc. (but without charcoal
or coke and salt ) comlete as required complete with all leads,lifts and carriage of material and
as per directionof the Engineer-in-charge.

15 Extra for using salf and charcoal for G.I. or copper plate earth electrod as required complete 3 Nos. Each.
with all leads,lifts and carriage of material and as per direction of the Egineer-in-charge.

16 Supplying laying 6 SWG GI wire at 0.5 Mtr. Elbow ground level for conductor earth electrod 60 Mtr. P/Mtr.
including soldering as required complete in all respect and as per direction of the Engineer-in-
charge.
17 Providing installing testing and commissioning of Ceiling fan regulator including wiring the 3 Nos. Each.
down rod of standard length (upto 30 cm.) with 1.5mm PVC insulated copper conductor single
core cable as required 1200 Mtr. Cut A.
18 Providing and fixing of shock proof mat size 1.00x2.00 Mtr. 12mm thick complete in all respect 3 Nos. Each.
and as per directions of the Enineer-in-charge.
19 Providing and fixing of electrical street flood light LED in Baja/Philips make of 30 watt complete 3 Nos. Each.
with all leads,lifts and carriage of material and as per direction of the Engineer-in-charge.

Total
TERMS AND CONDITIONS:-
1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Nothing shall be paid for rejected material and all material shall be ISI specification
4 Payment will be made after successful testing of work . Assistant Engineer,
Giri Irrig. Sub Division,
Patlion.
SCHEDULE OF QUANTITY Estimated Cost: 62137/-
Name of work:-C/o 3 Nos Twell in village Bhoopur Kedarpur in Tehsil Paonta Sahib Distt. Sirmour (HP) Earnest Money: 2000/-
(SH: C/o Boundry wall & Main delivery Tank ) Time : One Month.
S.No Description Qty. Rate Unit., Amount
1 2 3 5 4 6.
1 Excavation in foundation and trenches etc.in earth work in all kinds of soil such as pick work 25.30 Cum. P/Cum
,jumper work decomposed conglomerate saturated soil soft and hard rock upto all leads lifts
stacking the excavated soil not more than 3mtr.clear from the edge of excavation and then
returning the stacked soil in 15cm layers when required in to plinth sides of foundation etc.
consolidating each deposited layers by ramming and watering and then disposing of all surplus
excavated earth as directed with in all leads lifts and as per directions of the Engineer-in-charge

2 Providing and laying cement concrete work 1:4:8 (1cement: 4 sand: 8 graded stone agg. 20mm 0.97 Cum P/Cum
nominal size & curing complete) excluding cost of form work in foundation and plinth in breast
& retaining wall in all height and depth including all leads lifts complete and carriage of material
etc. as per directions of Engineer incharge.

3 Ist class masonary in common burnt clay building bricks in Cement Mortar 1:6(1cement 6 sand) 9.39 Cum. P/Cum.
complete in all respect and as per direction if the Engineer-in-charge.

4 Half Ist class brick masonary in boundry wall 1:4(1cement:4 sand) ) and as per direction of the 57.00 Sqm. Per Sqm.
Engineer-in-charge.

4 15 mm thick cement plaster in single coat of rough side of bricks/stone masonary for interior 96.19 Sqm P/Sqm
plastering upto floor two level including arrises internal rounded angles chamfers rounded
angles not exceeding 80mm in girth and finished even and smooth in cement mortor
1:4(1cement:4 sand) and curing complete including all leads lifts and carriage of materials at
site as per direction of Engineer-incharge.

5 Providing and laying Cement concrete 1:2:4(1cement:2sand:4graded stone agg 20mm jnominal 0.98 Cum. Cum
size and cuing complete excluding cost of form work in foundation and plinth complete in all
respect and as per direction of the Engineer-in-charge.
6 Providing and fixing of cast Iron Alfa valves sof 150mm dia complete in all respect and as per 2.00 Nos. Each.
direction of the Engineer-in-charge.

7 Providing and laying cement concrete work 1:5:10(1cement:5 sand: 10 graded stone agg. 40mm 16.84 Cum P/Cum
nominal size) with 15% plum and curing complete excluding cost of form work and in retaining
walls/ Breast walls, the size of Plums shall usually be 150mm to 300mm as per PWD
specificatioin including all leads lifts and carriage of material and as per direction of Engineer
incharge.

8 Steel work singele sections in built up section trusses and framed work including cutting 95.00 Kg. Per Kg.
hoisting fixing in position and applying a priming coat of red lead paint in gratting framed
guards bars ladders railing brackets and similar works including all leads,lifts and carriage of
materials as per direction of the Engineer-in-charge.

Total
TERMS AND CONDITIONS:-
1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Royality certificate in respect of stone agg. Sand etc. shall be produced by the contractor
4 Empty cement bags shall be returned to the Deptt.otherwise Rs.2/-per bag shall be deducted from the bill.
5 Cement shall be issued @ Rs.315/- per bag & steel @ 53/- per Kg. from IPH store Bhatanwali Paonta Sahib.

Assistant Engineer,
Giri Irrig. Sub Division,
Patlion.
SCHEDULE OF QUANTITY Estimated cost Rs 81673/-
Name of work: Restoration of Rain damages to Rampur Giri Canal in Tehsil Paonta Sahib Distt. Sirmour (HP) Earnest money Rs.1700/-
(SH: Cleaninring of jungle bush wood trees from bank of Rampur Giri canal & Removal of slips/silt in canal at Time:- Three Months
at RD 9600 to 11400 Mtrs. of Main Canal.)
Sr.NoDescription. Qty. Rate. Unit Amount.
1 Clearing jungle including up rooting of rank vegetation grass brush wood trees & samplings of girth 5400.00 Sqm. Per Sqm.
upto 30 cm. measured at a height of 1.00 Mtr. Above ground and removal of rubbish upto a distance
of 20 mtr. Our side periphery of to area cleared upto all leads,lifts and carriage of material and as per
direction of the Engineer-in-charge.

2 Removal of silt/slips in all kind of soil including saturated soil but excluding boulders and rocky 1385.00 Cum P/Cum
portion requiring blasting upto a distance of 20 metres disposing of unserviceable materials
stacking the serviceable materials and neatly dressed the surface complete in all respect
including all leads,lifts and carriage of material and as per direction of the Engineer-in-charge.

Total:
TERMS AND CONDITIONS:-
1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Nothing shall be paid for rejected/defective work.
Assistant Engineer,
Giri Irrig. Sub Division,
Patlion.
SCHEDULE OF QUANTITY Estimated Cost: 71369/-
Name of work:-C/o 3 Nos Twell in village Bhoopur Kedarpur in Tehsil Paonta Sahib Distt. Sirmour (HP) Earnest Money: 1500/-
(SH: C/oTopilets & Saptic Tank ) Tubewell No.1 & 3. Time : One Month.
S.No Description Qty. Rate Unit., Amount
1 Excavation in foundation and trenches etc.in earth work in all kinds of soil such as pick work ,jumper 31.82 Cum. P/Cum
work decomposed conglomerate saturated soil soft and hard rock upto all leads lifts stacking the
excavated soil not more than 3mtr.clear from the edge of excavation and then returning the stacked
soil in 15cm layers when required in to plinth sides of foundation etc. consolidating each deposited
layers by ramming and watering and then disposing of all surplus excavated earth as directed with in
all leads lifts and as per directions of the Engineer-in-charge

2 Providing and laying cement concrete 1:6:12(1cement:6sand:12 graded stone agg.40mm nominal 4.70 Cum P/Cum
size)and curing complete excluding the cost of centring shuttering in foundation & plinth including
all leads lifts and carriage of material and as per the directions of Engineer-in-charge.

3 Random rubble masonary /Poly rubble masonary (uncoursed/brought to coursed) with hard stone of 9.12 Cum. Cum
approved quality in foundation and plinth including levelling up with cement concrete
1:6.12(1cement:6sand:12 graded stone agg. 20mm nominal size)in cement mortor 1:6 (1 Cement: 6
sand ) in breast wall & Retaining walls including all leads lifts and carriage of material and as per the
directions of Engineer-in-charge.
4 2nd class masonary in common burnt clay building bricks in Cement Mortar 1:6(1cement 6 sand) 6.16 Cum. P/Cum.
complete in all respect and as per direction if the Engineer-in-charge.
5 Providing and fixing of M.S. framed of Door frame complete in all respect and as per direction of the 10.40 Sqm. P/Sqm.
Engineer-in-charge.
6 Providing and fixing of door shutter 40mm thick Ist. Class Deodar wood complete in all respect and 2.84 Sqm. P/Sqm.
as per direction of the Engineer-in-charge.
7 Providing and laying cement concrete 1:2:4(1cement:2app.sand: 4 app. graded stone agg. 20mm 3.64 Cum. P/Cum.
nominal size )and curing complete excluding cost of form work & reinforcement for reinforced work
in foundation & plinth including all leads lifts and carriage of material at site and as per direction of
the Engineer-incharge.

8 Providing form work with steel sheets 3.15mm thick welded with angle iron 30x30x5 mm so as to
give rough finish i/c centring shuttering structing and propping etc. with wooden bettens & Ballies,
height or propping & centering below supporting floor to ceiling not exceeding 4 mtr.and removal of
the same for insitu RCC work and PCC work.including all leads lifts and carriage of material at site &
as per direction of Engineer in charge in:-

a) Flat surfaces such as soffits of suspended floor roofs landings and like upto 200mm in thickness 18.86 Sqm. P/Sqm.

9 Providing Mild Steel/Tor steel reinforcement including bending binding & placing in positing I/c all 142.00 Kg. P/kg
leads lifts and carriage of material and as per direction of the Engineer-in-charge.

10 20 mm thick cement plaster in single coat of rough side of bricks/stone masonary for interior 32.94 Sqm P/Sqm
plastering upto floor two level including arrises internal rounded angles chamfers rounded angles
not exceeding 80mm in girth and finished even and smooth in cement mortor 1:4(1cement:4 sand)
and curing complete including all leads lifts and carriage of materials at site as per direction of
Engineer-in-charge.

11 6mm thick cement plaster 1:3(1cement:3 sand) finished with a floating coat o neat cement and thick 5.98 Sqm. P/Sqm.
coat of lime wash on top of wall when dry for bearing of RCC slab abd beams complete in all respect
and as per direction of the Engineer-in-charge.

12 Applying priming coat over new wood and wood based surfaces after and including preparing the 44.08 Sqm P/Sqm
surface by throughly cleaning oil,grease,dirt and other foreign matter with ready mixed paint
brushing with white lead for priming including all leads lifts and carriage of material as per direction
of Engineer incharge.
13 Painting two coats (excluding priming coat) on new wood and wood based with surfaces with ready 5.84 Sqm P/Sqm
mixed paint other then white brushing to give an even shade including cleaning the surface of dirt
dust and other foreign matter,sand papering and stopping. Including all leads lifts and carriage of
material at site as per direction of Engineer incharge.

14 40mm thick cement concrete flooring 1:2:4 (1cement:2sand: 4 graded stone agg. 20mm nominal 1.08 Sqm P/Sqm
size)laid in one layer finished with a floating coat of neat cement including curing all leads, lifts and
carriage of materials at site and as per direction of Engineer incharge

15 White washing with lime on undecorated wall surfaces (two coats) to give an even shade including 35.14 Sqm P/Sqm
throughly brooming the surface to remove all dirt dust mortor drops and loose scale of lime wash
and other foreign matter including all leads lifts and carriage of material at site as per direction of
Engineer-incharge.

16 Prov.40x3mm flat iron hold fast 40cm long including fixing to frame with 10mm dia metre bolts,nuts 8 Nos Each.
and wooden plugs and embedding in cement concrete block 30x10x15cms 1:3:6 (1cement: 3sand: 6
graded stone agg.20mm nominal size)including all leads,lifts & carriage of material as per direction of
the Engineer incharge.

17 Provd.& fixing of MS Sliding door bolts anodized transparent or dyed to required colour or shade 4 Nos Each.
with necessary screws etc. complete including all leads lifts & carriage of material at site as per
direction of Engineer incharge. 300x15mm

18 Providing and fixing tower bolts aluminium (barreled type) anodized transparent or dyed to required 4 Nos Each.
shade & colour screws complete including all leads, lifts and as per direction of Engineer incharge.

19 Provd.& fixing aluminium handles anodized transparent or dyed to required colour or shade with
necessary screws etc. complete including all leads lifts & carriage of material at site as per direction
of Engineer incharge.

a)100mm 4 Nos Each.


20 Electrical internal wiring & syntric fitting in toilet complete with all accessories as per direction of the 2 job. Each.
Engineer-in-charge.
21 Providing and laying Cement concrete 1:2:4(1cement:2sand:4graded stone agg 20mm jnominal size 0.60 Cum. Cum
and cuing complete excluding cost of form work in foundation and plinth complete in all respect and
as per direction of the Engineer-in-charge.
22 Ist. class masonary in common burnt clay building bricks in Cement Mortar 1:6(1cement 6 sand) 6.20 Cum. P/Cum.
complete in all respect and as per direction if the Engineer-in-charge.

23 15 mm thick cement plaster in single coat of rough side of bricks/stone masonary for interior 23.6 Sqm P/Sqm
plastering upto floor two level including arrises internal rounded angles chamfers rounded angles
not exceeding 80mm in girth and finished even and smooth in cement mortor 1:4(1cement:4 sand)
and curing complete including all leads lifts and carriage of materials at site as per direction of
Engineer-incharge.

TERMS AND CONDITIONS:- Total


1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Royality certificate in respect of stone agg. Sand etc. shall be produced by the contractor
4 Empty cement bags shall be returned to the Deptt.otherwise Rs.2/-per bag shall be deducted from the bill. Assistant Engineer,
5 Cement shall be issued @ Rs.315/- per bag & steel @ 53/- per Kg. from IPH store Bhatanwali Paonta Giri Irrig. Sub Division,
Sahib.
2 Providing and laying cement concrete work 1:4:8 (1cement: 4 sand: 8 graded stone agg. 20mm 0.97 Cum 1104.80 P/Cum 1072.00
nominal size & curing complete) excluding cost of form work in foundation and plinth in breast &
retaining wall in all height and depth including all leads lifts complete and carriage of material etc. as
per directions of Engineer incharge.
DRAFT SCHEDULE OF QUANTITY Estimated Cost: 82628/-
Name of work:-Restoration of Rain damages to FIS Malaun GP tatiana in Tehsil Paonta Sahib Distt. Sirmour Earnest Money:1700/-
(HP) (SH: C/o edging,Breast wall to protect the channel at different reaches) Time : One Month.
S.No Description Qty. Rate Unit., Amount
1 2 3 5 4 6.
1 Excavation in foundation and trenches etc.in earth work in all kinds of soil such as pick 37.91 Cum. 92.85 P/Cum 3520.00
work ,jumper work decomposed conglomerate saturated soil soft and hard rock upto all
leads lifts stacking the excavated soil not more than 3mtr.clear from the edge of excavation
and then returning the stacked soil in 15cm layers when required in to plinth sides of
foundation etc. consolidating each deposited layers by ramming and watering and then
disposing of all surplus excavated earth as directed with in all leads lifts and as per
directions of the Engineer-incharge

2 Providing and laying cement concrete 1:6:12(1cement:6sand:12 graded stone 11.59 Cum 905.10 P/Cum 10490.00
agg.40mm nominal size)and curing complete excluding the cost of centring shuttering
in foundation & plinth including all leads lifts and carriage of material and as per the
directions of Engineer-in-charge.

3 Random rubble masonary /Poly rubble masonary (uncoursed/brought to coursed) with 60.43 Cum. 1135.50 Cum 68618.00
hard stone of approved quality in foundation and plinth including levelling up with
cement concrete 1:6.12(1cement:6sand:12 graded stone agg. 20mm nominal size)in
cement mortor 1:6 (1 Cement: 6 sand ) in breast wall & Retaining walls including all leads
lifts and carriage of material and as per the directions of Engineer-in-charge.

TERMS AND CONDITIONS:- Total 82628.00


1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Royality certificate in respect of stone agg. Sand etc. shall be produced by the contractor
4 Empty cement bags shall be returned to the Deptt.otherwise Rs.2/-per bag shall be deducted from the bill.
5 Cement shall be issued @ Rs.315/- per bag & steel @ 53/- per Kg. from IPH store Bhatanwali Paonta Sahib.
Assistant Engineer,
I&PH Sub Division,
Kaffota.
REVISED SCHEDULE OF QUANTITY Estimated Cost: 85315/-
Name of work:-Aug./Imp. of GWSS Staun in GP Staun in Tehsil Paonta Sahib Distt. Sirmour (HP) Earnest Money:1800/-
(SH: C/o Retaining wall & Breast wall to protect the filter bed & Main storage tank) Time : Three Months.
S.No Description Qty. Rate Unit., Amount
1 2 3 5 4 6.
1 Excavation in foundation and trenches etc.in earth work in all kinds of soil such as pick 48.55 Cum. 160.00 P/Cum 7768.00
work ,jumper work decomposed conglomerate saturated soil soft and hard rock upto all
leads lifts stacking the excavated soil not more than 3mtr.clear from the edge of excavation
and then returning the stacked soil in 15cm layers when required in to plinth sides of
foundation etc. consolidating each deposited layers by ramming and watering and then
disposing of all surplus excavated earth as directed with in all leads lifts and as per
directions of the Engineer-incharge

2 Providing and laying cement concrete 1:6:12(1cement:6sand:12 graded stone 5.55 Cum 2950.00 P/Cum 16373.00
agg.40mm nominal size)and curing complete excluding the cost of centring shuttering
in foundation & plinth including all leads lifts and carriage of material and as per the
directions of Engineer-in-charge.

3 Random rubble masonary /Poly rubble masonary (uncoursed/brought to coursed) with 66.90 Cum. 3350.00 Cum 224115.00
hard stone of approved quality in foundation and plinth including levelling up with
cement concrete 1:6.12(1cement:6sand:12 graded stone agg. 20mm nominal size)in
cement mortor 1:6 (1 Cement: 6 sand ) in breast wall & Retaining walls including all leads
lifts and carriage of material and as per the directions of Engineer-in-charge.

TERMS AND CONDITIONS:- Total 248256.00


1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.

2 Security,Sale tax & Income tax shall be deducted as per rules.


3 Royality certificate in respect of stone agg. Sand etc. shall be produced by the contractor
4 Empty cement bags shall be returned to the Deptt.otherwise Rs.2/-per bag shall be deducted from the bill.
5 Cement shall be issued @ Rs.315/- per bag & steel @ 53/- per Kg. from IPH store Bhatanwali Paonta Sahib.
Executive Engineer,
I&PH Division,
Paonta Sahib.
DRAFT SCHEDULE OF QUANTITY Estimated cost Rs 30080/-
Name of work:- Providing LWSS to NC/PC habitation of CV & GP Kando Dugana in Tehsil Paonta Sahib Distt. Sirmour (Earnest money Rs.650/-
(SH:-C/o RCCcollection tank, laying & jointing of GI Pipes)(Extension to Shilon) Time:- Three months.
Sr.No. Description. Qty. Rate. Unit Amount.
1 2 3 4 5 6
1 Excavation in foundation and trenches etc.in earth work in all kinds of soil such as pick 7.01 Cum. 92.85 P/Cum 651.00
work ,jumper work decomposed conglomerate saturated soil soft and hard rock upto all
leads lifts stacking the excavated soil not more than 3mtr.clear from the edge of
excavation and then returning the stacked soil in 15cm layers when required in to plinth
sides of foundation etc. consolidating each deposited layers by ramming and watering
and then disposing of all surplus excavated earth as directed with in all leads lifts and as
per directions of the Engineer-incharge

2 Providing and laying cement concrete 1:4:8(1cement:4sand:8 graded stone agg.40mm 0.68 Cum 1104.8 P/Cum 751.00
nominal size)and curing complete excluding the cost of form work in foundation &
plinth including all leads lifts and carriage of material and as per the directions of
Engineer-in-charge.

3 Providing and laying cement concrete work 1:1 1/2:3 (1cement:1 1/2 sand: 3 graded
stone agg. 20mm nominal size & curing complete) excluding cost of form workand
reinforcement for RCC work including all leads lifts complete and carriage of material
etc. as per directions of Engineer incharge.

i) In foundation and Plinth 0.69 Cum. 1866.80 P/Cum. 1288.00


ii) In vertical walls any thickness but not less than 0.10 Metres. 1.98 Cum. 1923.00 P/Cum. 3808.00
4 Providing form work with steel sheets 3.15mm thick welded with angle iron 30x30x5
mm so as to give rough finish i/c centring shuttering structing and propping etc. with
wooden bettens & Ballies, height or propping & centering below supporting floor to
ceiling not exceeding 4 mtr.and removal of the same for insitu RCC work and PCC
work.including all leads lifts and carriage of material at site & as per direction of
Engineer in charge in:-

a) Flat surfaces such as soffits of suspended floor roofs landing and like upto 200mm in 2.35 Sqm. 134.10 P/Sqm. 315.00
thickness.
ii) In vertical walls any thickness but not less than 0.10 Metres. 26.35 Sqm. 80.70 P/Sqm. 2126.00
5 Providing and laying cement concrete 1:2:4(1cement:2app.sand: 4 app. graded stone 0.60 Cum 1658.90 P/Cum 995.00
agg. 20mm nominal size )and curing complete excluding cost of form work &
reinforcement for reinforced work in suspended floors, roofs landing shelves and their
supports balconies, beams, girders bressumers and cantilivers upto to floor two level in
all height and depth, including all leads lifts and carriage of material at site and as per
direction of the Engineer-incharge.

6 Providing Mild Steel/Tor steel reinforcement including bending binding & placing in 194.00 Kg. 20.70 P/kg 4016.00
positing I/c all leads lifts and carriage of material and as per direction of the Engineer-
in-charge.
7 Excavation in drains & channel etc.in earth work in all kinds of soil such as pick work 202.50 Cum 75.95 P/Cum 15380.00
,jumper work blasting work, decomposed conglomerate saturated soil soft and hard
rock including dressing of sides and beds and prepareation of sub grade to level or slope
including refilling the trenches and disposing of surplus earth upto all leads,lifts
disposed earth to be levelled and neatly dressed including jungle clearance and as per
directions of the Engineer-incharge

8 Laying and jointing of GMS Pipes of various dia in trenches (earth work in trenches to
be measured and paid for seperately) including all leads lifts and carriage of material at
site as per direction of Engineer-in-charge of following dias.

i) 15mm dia. 1500 Rmt. 0.50 P/Rmt. 750.00

Total: 30080.00
TERMS AND CONDITIONS:-
The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
1 Security,Sale tax & Income tax shall be deducted as per rules.
2 Cement will be issued @ 315/- per bag & steel @ 53/- per Kg. at IPH store Bhatanwali Paonta Sahib.
3 Empty cement bags shall be returned to the deptt. Otherwise Rs. 2/- per bag shall be
deducted from the earch bill of the contractor.
4 Royality certificate in respect of stone agg. Sand etc. shall be produced by the contractor
5 GI Pipe shall be issued free of cost from IPH Store Bhatanwali.
7 GI Fitting shall be provided by the contractor. Assistant Engineer,
I&PH Sub Division, Kaffota.
DEVIATION STATEMENT
Name of work:-R/m OF gwss Kando Cheog in Tehsil Paonta Sahib Distt.Sirmour(HP) Qty. as per Agreement. Qty. as per actual work done. Difference.
(SH: C/O Retaining wall ) (-)
S.No Description Qty. Rate Unit Amount Qty. Rate Unit Amount
1 2 3 4 5 6. 3 4 5 6.
1 Cutting in earth work in disposal of excavated earth within all leads, in pick/jumper 23.19 Cum. 145.00 P/Cum. 3363.00 0 Cum. 0 Per Cum. 0 0
work 50% each complete in all respect and as per directions of the Engineer-in-
charge.

2 Excavation in foundation and trenches etc.in earth work in all kinds of soil such 5.86 Cum. 155.00 P/ Cum. 908.00 10.73 Cum. 155.00 Per Cum. 1663.00 0
as pick work ,jumper work decomposed conglomerate saturated soil soft and
hard rock upto all leads lifts stacking the excavated soil not more than 3mtr.clear
from the edge of excavation and then returning the stacked soil in 15cm layers
when required in to plinth sides of foundation etc. consolidating each deposited
layers by ramming and watering and then disposing of all surplus excavated
earth as directed with in all leads lifts and as per directions of the Engineer-
incharge

3 Providing and laying cement concrete 1:6:12(1cement:6sand:12 graded stone 3.14 Cum 3000.00 P/Cum 9420.00 3.57 Cum 3000.00 P/Cum 10710.00 0
agg.40mm nominal size)and curing complete excluding the cost of centring
shuttering in foundation & plinth including all leads lifts and carriage of
material and as per the directions of Engineer-in-charge.

4 Random rubble masonary /Poly rubble masonary (uncoursed/brought to 33.09 Cum 2700.00 P/Cum 89343.00 34.05 Cum 2700.00 P/Cum 91935.00 0
coursed) with hard stone of approved quality in foundation and plinth including
levelling up with cement concrete 1:6.12(1cement:6sand:12 graded stone agg.
20mm nominal size)in cement mortor 1:6 (1 Cement: 6 sand ) in breast wall &
Retaining walls including all leads lifts and carriage of material and as per the
directions of Engineer-in-charge.

103034.00 104308.00
DEVIATION STATEMENT
Name of work:-Restoration of Rain damages to FIS Udiana GP Kathwar in Tehsil Paonta Qty. as per Agreement. Qty. as per actual work done. Difference.
Distt.Sirmour(HP)(SH: C/O Pucca Main channel at various reaches 800 Mtrs.) (+)
S.No Description Qty. Rate Unit Amount Qty. Rate Unit Amount
1 2 3 4 5 6. 3 4 5 6.
1 Cement concrete lining 15cm thick or less for irrigation channels using cement
concrete 1:3:6(1cement:3sand:6graded stone agg. 20mm nominal size)and
curing complete excluding cost of form work included all leads lifts and carriage
of material complete in all respect and as per direction of Engineer-in-charge.

a)Hand Mixed concrete in bed. 20.55 Cum 4000.00 P/ Cum. 82200.00 18.91 Cum. 4000.00 Per Cum. 75640.00 0
b)Hand mixed concrete lining in side slopes. 31.20 Cum 4100.00 P/Cum 127920.00 30.82 Cum 4100.00 P/Cum 126362.00 0
2 Extra allowance for form work in concrete lining as directed by the Engineer-in- 31.20 Cum 131.00 P/Cum 4087.00 30.82 Cum 131.00 P/Cum 4037.00 0
charge including all leads lifts and carriage of matrerials at site complete in all
respects on side slopes as per direction of Engineer in charge.

214207.00 206039.00
Difference.
(+)

755.00

1290.00

2592.00

4637
Difference.
(-)

6560.00
1558.00
50.00

8168
ABSTRACT OF COST
Name of work: R/M of various WATER SUPPLY SCHEMES under IPH section Shillai under IPH S/Division Shillai Distt. Sirmour (HP)
(SH: Prov. & supplying of various type of fitting material ).
S.No Description Qty. Rate Unit Amount
1 Providing and Supplying of the G.I.Unions of the follwing sizes onfirming to IS
1879 in the various schemes complete in all respect and as per satisfaction of
the Engineer-in-charge.

i) 15mm dia 150 Nos. 120.00 Each. 18000.00


ii) 20mm dia 150 Nos. 140.00 Each. 21000.00
iii) 25 mm dia. 150 Nos. 160.00 Each. 24000.00
iv) 32mm dia. 100 Nos. 180.00 Each. 18000.00
v) 40mm dia. 8 Nos. 200.00 Each. 1600.00
vi) 50mm dia. 80 Nos. 450.00 Each. 36000.00
vii) 65mm dia. 80 Nos. 750.00 Each. 60000.00
2 Providing and Supplying of the G.I Tees of the follwing sizes onfirming to IS
1879 in the various schemes complete in all respect and as per satisfaction of
the Engineer-in-charge.

i) 15x15mm dia 50 Nos. 120.00 Each. 6000.00

ii) 20x20 mm dia 50 Nos. 140.00 Each. 7000.00

iii) 25 x25 mm dia. 30 Nos. 160.00 Each. 4800.00

iv) 32 x32mm dia. 30 Nos. 180.00 Each. 5400.00

v) 40x 40 mm dia. 15 Nos. 200.00 Each. 3000.00

vi) 50 x50 mm dia. 10 Nos. 250.00 Each. 2500.00


vii) 65x 65 mm dia. 10 Nos. 350.00 Each. 3500.00
3 Providing and Supplying of Brass full way valve with wheel of superior quality
as per standard design & relevant ISS of following dia complete in all respect
and as per satisfaction of the Engineer-in-charge.

i) 15mm dia 30 Nos. 500.00 Each. 15000.00


ii) 20mm dia 30 Nos. 700.00 Each. 21000.00
iii) 25 mm dia. 20 Nos. 1200.00 Each. 24000.00
iv) 32mm dia. 10 Nos. 1050.00 Each. 10500.00
v) 40mm dia. 5 Nos. 1500.00 Each. 7500.00
vi ) 65mm dia. 5 Nos. 2500.00 Each. 12500.00
Total:- 301300.00

Assistant Engineer,
I&PH Sub Division,
Shillai
DRAFT SCHEDULE OF QUANTITY Estimated Cost :-Rs.99429/--
Name of work: R/M of various WATER SUPPLY SCHEMES under IPH section Shillai under IPH S/Division Shillai Earnest Money :-Rs. 2000/-
Distt. Sirmour (HP) (SH: Prov. & supplying of various type of fitting material ). Time:- One Month.
S.No Description Qty. Rate Unit Amount
1 Providing and Supplying of the G.I.Unions of the follwing sizes onfirming to IS
1879 in the various schemes complete in all respect and as per satisfaction of
the Engineer-in-charge.

i) 15mm dia 150 Nos. 39.60 Each. 5940.00

ii) 20mm dia 150 Nos. 46.20 Each. 6930.00

iii) 25 mm dia. 150 Nos. 52.80 Each. 7920.00

iv) 32mm dia. 100 Nos. 59.40 Each. 5940.00

v) 40mm dia. 8 Nos. 66.00 Each. 528.00

vi) 50mm dia. 80 Nos. 148.50 Each. 11880.00

vii) 65mm dia. 80 Nos. 247.50 Each. 19800.00

2 Providing and Supplying of the G.I Tees of the follwing sizes onfirming to IS
1879 in the various schemes complete in all respect and as per satisfaction of
the Engineer-in-charge.

i) 15x15mm dia 50 Nos. 39.60 Each. 1980.00


ii) 20x20 mm dia 50 Nos. 46.20 Each. 2310.00
iii) 25 x25 mm dia. 30 Nos. 52.80 Each. 1584.00
iv) 32 x32mm dia. 30 Nos. 59.40 Each. 1782.00
v) 40x 40 mm dia. 15 Nos. 66.00 Each. 990.00
vi) 50 x50 mm dia. 10 Nos. 82.50 Each. 825.00
vii) 65x 65 mm dia. 10 Nos. 115.50 Each. 1155.00
3 Providing and Supplying of Brass full way valve with wheel of superior quality
as per standard design & relevant ISS of following dia complete in all respect
and as per satisfaction of the Engineer-in-charge.

i) 15mm dia 30 Nos. 165.00 Each. 4950.00

ii) 20mm dia 30 Nos. 231.00 Each. 6930.00

iii) 25 mm dia. 20 Nos. 396.00 Each. 7920.00

iv) 32mm dia. 10 Nos. 346.50 Each. 3465.00

v) 40mm dia. 5 Nos. 495.00 Each. 2475.00

vi ) 65mm dia. 5 Nos. 825.00 Each. 4125.00

TERMS AND CONDITIONS:- Total:- 99429.00


1 The work shall be executed as per IPH/PWD specification and instructions of
the Engineer-in-charge.
2 Security,Income Tax, Sale & Labour cess shall be deducted as per rules.
3 The material will be received in good condition . Assistant Engineer,
4 Material shall be guaranteed for Six months. I&PH Sub Division,
Shillai
SCHEDULE OF QUANTITY Estimated Cost :-Rs.99429/--
Name of work: R/M of various WATER SUPPLY SCHEMES under IPH section Shillai under IPH S/Division Shillai Earnest Money :-Rs. 2000/-
Distt. Sirmour (HP) (SH: Prov. & supplying of various type of fitting material ). Time:- One Month.
S.No Description Qty. Rate Unit Amount
1 Providing and Supplying of the G.I.Unions of the follwing sizes onfirming to IS
1879 in the various schemes complete in all respect and as per satisfaction of
the Engineer-in-charge.
i) 15mm dia 150 Nos. Each.
ii) 20mm dia 150 Nos. Each.

iii) 25 mm dia. 150 Nos. Each.

iv) 32mm dia. 100 Nos. Each.

v) 40mm dia. 8 Nos. Each.

vi) 50mm dia. 80 Nos. Each.

vii) 65mm dia. 80 Nos. Each.


2 Providing and Supplying of the G.I Tees of the follwing sizes onfirming to IS
1879 in the various schemes complete in all respect and as per satisfaction of
the Engineer-in-charge.
i) 15x15mm dia 50 Nos. Each.

ii) 20x20 mm dia 50 Nos. Each.


iii) 25 x25 mm dia. 30 Nos. Each.
iv) 32 x32mm dia. 30 Nos. Each.
v) 40x 40 mm dia. 15 Nos. Each.
vi) 50 x50 mm dia. 10 Nos. Each.
vii) 65x 65 mm dia. 10 Nos. Each.
3 Providing and Supplying of Brass full way valve with wheel of superior quality
as per standard design & relevant ISS of following dia complete in all respect
and as per satisfaction of the Engineer-in-charge.

i) 15mm dia 30 Nos. Each.

ii) 20mm dia 30 Nos. Each.

iii) 25 mm dia. 20 Nos. Each.

iv) 32mm dia. 10 Nos. Each.

v) 40mm dia. 5 Nos. Each.

vi ) 65mm dia. 5 Nos. Each.

TERMS AND CONDITIONS:- Total:- 0.00


1 The work shall be executed as per IPH/PWD specification and instructions of
the Engineer-in-charge.
2 Security,Income Tax, Sale & Labour cess shall be deducted as per rules.
3 The material will be received in good condition . Assistant Engineer,
4 Material shall be guaranteed for Six months. I&PH Sub Division,
Shillai
Detail of Measurement
Name of work: R/M of various WATER SUPPLY SCHEMES under IPH section Shillai under IPH S/Division Shillai
Distt. Sirmour (HP) (SH: Prov. & supplying of various type of fitting material ).
S.No Description Qty. L
1 Providing and Supplying of the G.I.Unions of the follwing sizes
onfirming to IS 1879 in the various schemes complete in all
respect and as per satisfaction of the Engineer-in-charge.

i) 15mm dia 150 Nos.


ii) 20mm dia 150 Nos.
iii) 25 mm dia. 150 Nos.
iv) 32mm dia. 100 Nos.
v) 40mm dia. 8 Nos.
vi) 50mm dia. 80 Nos.
vii) 65mm dia. 80 Nos.
2 Providing and Supplying of the G.I Tees of the follwing sizes
onfirming to IS 1879 in the various schemes complete in all
respect and as per satisfaction of the Engineer-in-charge.

i) 15x15mm dia 50 Nos.


ii) 20x20 mm dia 50 Nos.
iii) 25 x25 mm dia. 30 Nos.
iv) 32 x32mm dia. 30 Nos.
v) 40x 40 mm dia. 15 Nos.
vi) 50 x50 mm dia. 10 Nos.
vii) 65x 65 mm dia. 10 Nos.
3 Providing and Supplying of Brass full way valve with wheel of
superior quality as per standard design & relevant ISS of
following dia complete in all respect and as per satisfaction of
the Engineer-in-charge.

i) 15mm dia 30 Nos.


ii) 20mm dia 30 Nos.
iii) 25 mm dia. 20 Nos.
iv) 32mm dia. 10 Nos.
v) 40mm dia. 5 Nos.
vi ) 65mm dia. 5 Nos.

Assistant Engineer,
I&PH Sub Division,
Shillai
S/Division Shillai

B H QTY.

150 Nos.
150 Nos.
150 Nos.
100 Nos.
8 Nos.
80 Nos.
80 Nos.

50 Nos.
50 Nos.
30 Nos.
30 Nos.
15 Nos.
10 Nos.
10 Nos.

30 Nos.
30 Nos.
20 Nos.
10 Nos.
5 Nos.
5 Nos.

ssistant Engineer,
&PH Sub Division,
REVISED SCHEDULE OF QUANTITY Estimated Cost:99438/-
Name of work: R/M of various Schemes under IPH Section Kaffota IN Tehsil Paonta Earnest Money: 2000/-
Distt. Sirmour (HP)(SH: Prov. & supplying of GI Unions, Tees and GI Reducers of various dia) Time: One Month.
S.No Description Qty. Rate Unit Amount.
1 2 3 4
1 Providing and Supplying of G.I. Unions of the following sizes confirming to
IS 1879 in the various schemes as per the standard design & relevant ISS of
following dia complete in all respect and as per satisfaction of the Engineer-
in-charge.

i) 15mm dia 120 Nos. 90.00 Each.


10800
ii) 20mm dia 120 Nos. 100.00 Each. 12000
iii) 25 mm dia. 90 Nos. 110.00 Each. 9900
iv) 32mm dia. 43 Nos. 120.00 Each. 5160
v) 40mm dia. 75 Nos. 180.00 Each. 13500
vi) 50mm dia. 150 Nos. 300.00 Each. 45000
vii) 65mm dia. 60 Nos. 800.00 Each. 48000
viii) 80mm dia. 50 Nos. 1000.00 Each. 50000
2 Providing and Supplying of the G.I.Tees of the following sizes Confirming to
IS 1879 in the various schemes complete in all respect and as per
satisfaction of the Engineer-in-charge.
i) 15mm dia 50 Nos. 90.00 Each. 4500
ii)20mm dia 60 Nos. 100.00 Each. 6000
iii)25 mm dia. 100 Nos. 110.00 Each. 11000
iv) 32mm dia. 80 Nos. 120.00 Each. 9600
v) 40mm dia. 50 Nos. 160.00 Each. 8000
vi) 50mm dia. 50 Nos. 280.00 Each. 14000
vii) 65mm dia. 50 Nos. 300.00 Each. 15000
3 Providing and Supplying of G.I.Reducer of the following sizes onfirming to
IS 1879 in the various schemes complete in all respect and as per
satisfaction of the Engineer-in-charge.
i) 15x20mm dia 65 Nos. 90.00 Each. 5850
ii) 20x25 mm dia 50 Nos. 110.00 Each. 5500
iii) 25x32 mm dia. 40 Nos. 150.00 Each. 6000
iv) 32x20mm dia. 30 Nos. 200.00 Each. 6000
v) 40x15mm dia. 25 Nos. 300.00 Each. 7500
vi) 40x32 mm dia. 15 Nos. 450.00 Each. 6750
4 Providing and Supplying of Socket of the following sizes onfirming to IS
1879 in the various schemes complete in all respect and as per satisfaction
of the Engineer-in-charge.
i) 15mm dia 110 Nos. 60.00 Each. 6600
ii) 20mm dia 85 Nos. 90.00 Each. 7650
iii) 25 mm dia. 75 Nos. 110.00 Each. 8250
iv) 32mm dia. 45 Nos. 140.00 Each. 6300
v) 40mm dia. 75 Nos. 200.00 Each. 15000
vi) 50mm dia. 150 Nos. 210.00 Each. 31500
vii) 65mm dia. 60 Nos. 240.00 Each. 14400
viii) 80mm dia. 50 Nos. 250.00 Each. 12500
5 Providing and Supplying of GI Elbow of the following sizes confirming to IS
1879 in the various schemes complete in all respect and as per satisfaction
of the Engineer-in-charge.
i) 15mm dia 120 Nos. 60.00 Each. 7200
ii) 20mm dia 70 Nos. 80.00 Each. 5600
iii) 25 mm dia. 75 Nos. 90.00 Each. 6750
iv) 32mm dia. 45 Nos. 150.00 Each. 6750
v) 40mm dia. 75 Nos. 200.00 Each. 15000

TERMS AND CONDITIONS. Total: 443560.00


1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Nothing shall be paid for rejected/defective work.
Executive Engineer,
I&PH Division,
Paonta Sahib.

REVISED SCHEDLE OF QUANTITY. Estimated Cost: 93388/-


Name of work: R/M of various Schemes under IPH Section Kaffota under I&PH Sub Division Kaffota Earnest Money: 2000/-
in Tehsil Paonta Distt. Sirmour (HP)(SH: Prov. & supplying of GI Unions, Tees and GI Reducers of various dia) Time: One Month.
S.No Description Qty. Rate Unit Amount.
1 Providing and Supplying of G.I. Unions of the following sizes confirming to IS 1879
in the various schemes as per the standard design & relevant ISS of following dia
complete in all respect and as per satisfaction of the Engineer-in-charge.

i) 15mm dia 120 Nos. 90.00 Each. 10800


ii) 20mm dia 120 Nos. 100.00 Each. 12000
iii) 25 mm dia. 90 Nos. 110.00 Each. 9900
iv) 32mm dia. 43 Nos. 120.00 Each. 5160
v) 40mm dia. 75 Nos. 180.00 Each. 13500
vi) 50mm dia. 150 Nos. 300.00 Each. 45000
vii) 65mm dia. 60 Nos. 800.00 Each. 48000
viii) 80mm dia. 50 Nos. 1000.00 Each. 50000
2 Providing and Supplying of the G.I.Tees of the following sizes Confirming to IS
1879 in the various schemes complete in all respect and as per satisfaction of the
Engineer-in-charge.

i) 15mm dia 50 Nos. 90.00 Each. 4500


ii)20mm dia 60 Nos. 100.00 Each.
6000
iii)25 mm dia. 100 Nos. 110.00 Each. 11000
3 Providing and Supplying of G.I.Reducer of the following sizes onfirming to IS 1879
in the various schemes complete in all respect and as per satisfaction of the
Engineer-in-charge.

i) 15x20mm dia 65 Nos. 90.00 Each. 5850


ii) 20x25 mm dia 50 Nos. 110.00 Each. 5500
iii) 25x32 mm dia. 40 Nos. 150.00 Each. 6000
iv) 32x20mm dia. 30 Nos. 200.00 Each. 6000
v) 40x15mm dia. 25 Nos. 300.00 Each. 7500
vi) 40x32 mm dia. 15 Nos. 450.00 Each. 6750
4 Providing and Supplying of Socket of the following sizes onfirming to IS 1879 in Each.
the various schemes complete in all respect and as per satisfaction of the Engineer-
in-charge.
0
i) 15mm dia 110 Nos. 60.00 Each. 6600
ii) 20mm dia 85 Nos. 90.00 Each. 7650
iii) 25 mm dia. 75 Nos. 110.00 Each. 8250
iv) 32mm dia. 45 Nos. 140.00 Each. 6300
v) 40mm dia. 75 Nos. 200.00 Each. 15000
vi) 50mm dia. 150 Nos. 210.00 Each. 31500
vii) 65mm dia. 60 Nos. 240.00 Each. 14400
viii) 80mm dia. 50 Nos. 250.00 Each. 12500
5 Providing and Supplying of GI Elbow of the following sizes onfirming to IS 1879 in
the various schemes complete in all respect and as per satisfaction of the Engineer-
in-charge.

i) 15mm dia 120 Nos. 60.00 Each. 7200


ii) 20mm dia 70 Nos. 80.00 Each. 5600
iii) 25 mm dia. 75 Nos. 90.00 Each. 6750
iv) 32mm dia. 45 Nos. 150.00 Each. 6750
v) 40mm dia. 75 Nos. 200.00 Each. 15000
Total: 396960
TERMS AND CONDITIONS.
1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Nothing shall be paid for rejected/defective work.
Executive Engineer,
I&PH Division,
Paonta Sahib.
REVISED SCHEDULE OF QUANTITY Estimated Cost: 99225/-
Name of Work :- R/M of various Lift/ Gravity Water Supply schemes under IPH Sub Division Earnest Money: 2000/-
Kaffota in Tehsil Paonta Sahib Distt. Sirmour (HP) (SH: Providing and supplying of Gate valves) Time: One Month.
S.No Description Qty. Rate Unit Amount.
1 2 3 6. 5
1 Providing and Supplying of Brass full way valve with wheel of superior quality as
per standard design & relevant ISS of following dia complete in all respect and as
per satisfaction of the Engineer-in-charge.
i) 15mm dia 60 Nos. 450.00 Each. 27000
ii) 20mm dia 50 Nos. 550.00 Each. 27500
iii) 25 mm dia. 50 Nos. 650.00 Each. 32500
iv) 32mm dia. 30 Nos. 900.00 Each. 27000
v) 40mm dia. 30 Nos. 1200.00 Each. 36000
vi) 50mm dia. 15 Nos. 3200.00 Each. 48000
vii) 65mm dia. 10 Nos. 3600.00 Each. 36000
viii)80mm dia. 5 Nos. 4000.00 Each. 20000
TOTAL: 254000.00
TERMS AND CONDITIONS.
1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Nothing shall be paid for rejected/defective work.
Executive Engineer,
I&PH Division,
Paonta Sahib.
REVISED SCHEDULE OF QUANTITY
Name of work:- Providing consultancy services for preparation of DPR of providing Flood Protction work to village
Haripurkhol in Division Paonta Sahib Distt.Sirmour (HP) (SH:- Channelisation of Devwala Khala at various RD,s from
RD 0 to 8025 mtrs. on both banks(total length =4170 mtrs. ) Lohgarh Khala at various RD's from RD 0 to 8775 on both
banks (Total Length =4100 mtrs.) Dhonwala Khalla at various RD's from RD 0 to 765 mtrs. (total length =720 mtrs.)
Kodewala Khala at various RD's from RD,s 0 to 5930 on both banks Total length=6690 mtrs.) Nimbuwala khala at variou
RD's from 0 to 1950 mtrs. (Total Length=850 Mtr.)
Sr.No Description of items
1 2
SUDONWALA KHALLA
1 Providing consultancy services for ppreparation of DPR for flood protection measured to check
soil inundation of both bank of DEvwala Khala and its tributories including carrying out
topographical Survey (with total station /GPS)plotting and preparation of drawings on Auto CAD
at the suitable scales & approval of the same from competent authority of the department
including c/o temporary bench marks as per standard drawings of CPWS manual at 1 Km.
interval complete in all respect to the entire satisfacion of the Engineer-in-charge. with in all
leads,lifts .

scope of work:
1 Data Collection.
a) Preparation of Index Plan detailed contour map of ain River prosed for channelisation /Flood
Protection measures.
b) Preparation of L-sectiopn and Cross section of Main River as per CWC/GWPRS Pune Requirement.

c) Data on Flood dischargre and damages including area affected cultivated area, house damaged
live stock lost damage to public utilitiesd, important towns affected etc. shall be collected from the
revenue authorities).
d) Sieve analysis silt factor determination has been done by the deptt. from the approved institutions
and incorporated in the recommendations of CWPRS Pune & DPR be prepared accordingly,

e) Any other Data required for the study and Preparation of DPR.
2 Field Visit:
The required field visit be conducted by the consultants for collection of the necessary data
including carrying out the necessary Topographical Survey works.

3 DESIGN OF THE FLOOD PROTECTION STRUCTURES.


Design of the Flood protection measures shall cover the following main aspects:-

i) Design of Flood protection structures shall be based on STAC approval and the
comments/observations raised by GFCC Patna shall be recetified accordingly , the detail of which
can be collected from the Divisional office of this department.

ii) A comprehensive technical and integrated Project Report shall be prepared by the Consultans
incorporating all the information and technical analysis availabel in the various reports prepared
by the Govt. departments as per duidelines of the Ministery of Water Resouces Govt. of India . The
Consultant shall present update cost analysis and prepare the DPR as per CDC guidelines.

iii) The report shall be nicely printed alongwith neat sketches very good drawingsd and the whole
report shall be bound in a nice presentable form.
iv) The report shall be forwarded through the office of the Engineer-in-chief ,IPH deptt. to the
concerned technical authorities of GOI. The consultant shall under take liason of this techical
report with the concerned authorities for obtaining technical approval and meetings and
discussions shall be attended by the consultants on the behalf of IPH department.

TERMS AND CONDITIONS,


1 The DPR shall be prepared stricty as the scope of the work described.
2 The work shall be completed within the stipulated period from the award of contract and the offer should be su
month based calculaion
The consultant will also necessary
undertake to complete
loason the project
on behalf assignment.
of the irrigation & Public Health department and shall get r
3
CWC Ministry of water Resources.
Secuities, Sales Tax, Income Tax& labour cess as admissible will be deducted from each bill of the contractor.
4
5 Permanent BM established by Survey of India shall be used for Survey work.
6 Payment & working schedule be get approved by the consultant immediately after award.
7 The duration of preparation of the report by the consultant shall be 60 days from the date of award of contract.
8 Tender shall be issued to only such contractors those having sufficient experience in such kind of works.
9 All kind of lead chart, NOCs , Inter state NOC shall be provided by the department.
10 All kind of inter departmental charges /CWPRS charges shall be paid by the department.
11 Payment Condition. %age of awarded rate.
i) On submission of Proposal Data. 20%
ii) On submission of DPR (6 copies) 40%
iii) On Clearance of DPR for P&I Shimla. 20%
iv) On submission to GFCC Patna. 10%
v) ON STAC from CWC Delhi. 10%
on work to village Estimated Cost:596450/-
a at various RD,s from Earnest Money: 11930/-
m RD 0 to 8775 on both Time: 60 Days.
length =720 mtrs.)
mbuwala khala at various 11929

Qty. Rate Unit. Amount.


4 4

6.45 Km. 45000.00 Per Km. 290250.00


Total: 290250.00

nd the offer should be supported by man-


partment and shall get report cleared from the
bill of the contractor.

f award of contract.
nd of works.

Executive Engineer,
I&PH Division,
Paonta Sahib.
REVISED SCHEDULE OF QUANTITY Estimated Cost: 99225/-
Name of Work :- R/M of various Lift/ Gravity Water Supply schemes under IPH Sub Division Kaffota Earnest Money: 2000/-
in Tehsil Paonta Sahib Distt. Sirmour (HP) (SH: Providing and supplying of Gate valves) Time : One Month.
S.No Description Qty. Unit Rate Amount.
1 2 3 5 6.
1 Providing and Supplying of Brass full way valve with wheel of superior quality
as per standard design & relevant ISS of following dia complete in all respect and
as per satisfaction of the Engineer-in-charge.

i) 15mm dia 60 Nos. 350 Each. 21000


ii) 20mm dia 50 Nos. 420 Each. 21000
iii) 25 mm dia. 50 Nos. 610 Each. 30500
iv) 32mm dia. 30 Nos. 900 Each. 27000
v) 40mm dia. 30 Nos. 1200 Each. 36000
vi) 50mm dia. 15 Nos. 2800 Each. 42000
vii) 65mm dia. 10 Nos. 3800 Each. 38000
viii)80mm dia. 5 Nos. 4200 Each. 21000
TERMS AND CONDITIONS. Total: 236500.00
1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Nothing shall be paid for rejected/defective work.
Executive Engineer,
I&PH Division,
Paonta Sahib.
Name of work:-Sustainability of GWSS Kando Cheog in Tehsil Paonta Sahib Distt. Sirmour (HP)
(SH:-Extension to Sandra & Bamrar Bas)GP Kando Cheog .
Sr.No.
1
1

9
1
2
3

4
5
7

Name of work:-C/o FIS Jakara Katli in GP Bhajaun in Tehsil Paonta Sahib Distt. Sirmour (HP)
(SH: C/o Retaining wall at various reaches, C/o Pucca Main channel RD 0 to 210 Mtr.)
S.No
1

6
1
2
3
4
5
DRAFT SCHEDULE OF QUANTITY
Name of work:-Sustainability of GWSS Kando Cheog in Tehsil Paonta Sahib Distt. Sirmour (HP)
(SH:-Extension to Sandra & Bamrar Bas)GP Kando Cheog .
Description.
2
Excavation in foundation and trenches etc.in earth work in all kinds of soil such as pick work ,jumper work decomposed
conglomerate saturated soil soft and hard rock upto all leads lifts stacking the excavated soil not more than 3mtr.clear from
the edge of excavation and then returning the stacked soil in 15cm layers when required in to plinth sides of foundation etc.
consolidating each deposited layers by ramming and watering and then disposing of all surplus excavated earth as directed
with in all leads lifts and as per directions of the Engineer-incharge

Providing and laying cement concrete 1:4:8(1cement:4sand:8 graded stone agg.40mm nominal size)and curing complete
excluding the cost of form work in foundation & plinth including all leads lifts and carriage of material and as per the
directions of Engineer-in-charge.

Providing and laying cement concrete work 1:1 1/2:3 (1cement:1 1/2 sand: 3 graded stone agg. 20mm nominal size &
curing complete) excluding cost of form workand reinforcement for RCC work including all leads lifts complete and
carriage of material etc. as per directions of Engineer incharge.

i) In foundation and Plinth


ii) In vertical walls any thickness but not less than 0.10 Metres.

Providing form work with steel sheets 3.15mm thick welded with angle iron 30x30x5 mm so as to give rough finish i/c
centring shuttering structing and propping etc. with wooden bettens & Ballies, height or propping & centering below
supporting floor to ceiling not exceeding 4 mtr.and removal of the same for insitu RCC work and PCC work.including all
leads lifts and carriage of material at site & as per direction of Engineer in charge in:-

a) Flat surfaces such as soffits of suspended floor roofs landing and like upto 200mm in thickness.

ii) In vertical walls any thickness but not less than 0.10 Metres.

iii) Edges of slab & breaks in walls upto 200mm in thickness.


Providing and laying cement concrete 1:2:4(1cement:2app.sand: 4 app. graded stone agg. 20mm nominal size )and curing
complete excluding cost of form work & reinforcement for reinforced work in suspended floors, roofs landing shelves and
their supports balconies, beams, girders bressumers and cantilivers upto to floor two level in all height and depth,
including all leads lifts and carriage of material at site and as per direction of the Engineer-incharge.

Providing Mild Steel/Tor steel reinforcement including bending binding & placing in positing I/c all leads lifts and carriage
of material and as per direction of the Engineer-in-charge.

Excavation in drains & channel etc.in earth work in all kinds of soil such as pick work ,jumper work blasting work,
decomposed conglomerate saturated soil soft and hard rock including dressing of sides and beds and prepareation of sub
grade to level or slope including refilling the trenches and disposing of surplus earth upto all leads,lifts disposed earth to be
levelled and neatly dressed including jungle clearance and as per directions of the Engineer-incharge

Laying and jointing of GMS Pipes of various dia in trenches (earth work in trenches to be measured and paid for
seperately) including all leads lifts and carriage of material at site as per direction of Engineer-in-charge of following dias.

i) 15mm dia.
i)20mm dia
Providing and fixing peet valve of superior quality of following dias complete in all respect.
i)15mm dia
ii)20mm dia

TERMS AND CONDITIONS:-


The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
Security,Sale tax & Income tax shall be deducted as per rules.
Cement will be issued @ 250/- per bag & steel @ 41/- per Kg. at IPH store Bhatanwali Paonta Sahib.
Empty cement bags shall be returned to the deptt. Otherwise Rs. 2/- per bag shall be deducted from the earch bill of the
contractor.
Royality certificate in respect of stone agg. Sand etc. shall be produced by the contractor
GI Pipe shall be issued free of cost from IPH Store Bhatanwali.
GI Fitting shall be provided by the contractor.

REVISED SCHEDULE OF QUANTITY


Name of work:-C/o FIS Jakara Katli in GP Bhajaun in Tehsil Paonta Sahib Distt. Sirmour (HP)
(SH: C/o Retaining wall at various reaches, C/o Pucca Main channel RD 0 to 210 Mtr.)
Sub-Head and item of work.
Excavation in earth work and disposal of all excavated earth upto a lead of 20 Metres and lift upto 1.50 metres
disposed earth to be levelled and neatly dressed complete in all respect and as directed in all leads,lifts and as
per direction of the Engineer-incharge
Providing and laying cement concrete 1:6:12(1cement: 6sand: 12 graded stone agg.40mm nominal size)and
curing complete excluding the cost of form work in foundation & plinth including all leads lifts and carriage of
material and as per the directions of Engineer-in-charge.
Random rubble masonary /Poly rubble masonary (uncoursed/brought to coursed) with hard stone of approved
quality in foundation and plinth including levelling up with cement concrete 1:6.12(1cement:6sand:12 graded
stone agg. 20mm nominal size)in cement mortor 1:6 (1 Cement: 6 sand ) in breast wall & Retaining walls
including all leads lifts and carriage of material and as per the directions of Engineer-in-charge.

Excavation in drains and channels etc. in earth work in all kinds of soil such as pick work,jumper work ,blasting
work decomposed conglomerate saturated soil soft rock and hard rock including dressing of sides and beds
and preparation of sub grade to level or slope including refilling the trenches and disposing of surplus earth
upto all leads lifts disposed earth to be levelled and neatly dressed including jungle clearance and as per
direction of Engineer-in-charge.

Cement concrete lining 15cm thick or less for irrigation channels using cement concrete
1:3:6(1cement:3sand:6graded stone agg. 20mm nominal size)and curing complete excluding cost of form work
included all leads lifts and carriage of material complete in all respect and as per direction of Engineer-in-
charge.

a)Hand Mixed concrete in bed.


b)Hand mixed concrete lining in side slopes.
Extra allowance for form work in concrete lining as directed by the Engineer-in-charge including all leads lifts
and carriage of matrerials at site complete in all respects on side slopes as per direction of Engineer in charge.
TERMS AND CONDITIONS:-
The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
Security,Sale tax & Income tax shall be deducted as per rules.
Cement will be issued @ 315/- per bag & steel @ 53/- per Kg. at IPH store Bhatanwali Paonta Sahib.
Empty cement bags shall be returned to the deptt. Otherwise Rs. 2/- per bag shall be deducted from the each b
Royality certificate in respect of stone agg. Sand etc. shall be produced by the contractor
Estimated cost Rs 52864/-
Earnest money Rs.1100/-
Time:- Three months.
Qty. Rate Rates, Unit Amount.
3 4 5 6
7.69 Cum. 92.85 P/Cum 714.00

1.15 Cum 1104.8 P/Cum 1271.00

1.17 Cum. 1866.80 P/Cum. 0.00


2.46 Cum. 1923.00 P/Cum.

4.82 Sqm. 134.10 P/Sqm. 646.00

32.73 Sqm. 80.70 P/Sqm. 2641.00

8.88 Sqm. 59.55 P/Sqm. 529.00


0.61 Cum 1658.90 P/Cum 1012.00

276.00 Kg. 20.70 P/kg 5713.00

513.00 Cum 75.95 P/Cum 38962.00

840 Rmt. 0.50 P/Rmt. 420.00


1440 Rmt 0.50 P/Rmt. 720.00

1 No. 66.50 Each. 67.00


2 Nos. 84.50 Each. 169.00
Total: 52864.00

Assistant
Engineer,
I&PH Sub Division, Kaffota.

Estimated Cost: 98797/-


Earnest Money: 2000/-
Time: Three Months.
Qty. Rates, Unit Amount.
50.00 Cum 155.00 P/Cum 7750.00

8.00 Cum 3600.00 P/Cum 28800.00

72.30 Cum 3900.00 P/Cum 281970.00

21.35 Cum. 155.00 P/Cum. 3309.00

5.37 Cum 4500.00 P/Cum 24165.00


8.09 Cum 4500.00 P/Cum 36405.00
8.09 Cum 130.00 P/Cum 1052.00
Total: 383451

-charge.

Sahib.
d from the each bill of the contractor.

Executive Engineer,
I&PH Division,
Paonta Sahib.
DRAFT SCHEDULE OF QUANTITY Estimated Cost :-Rs.77524/-
Name of work:-Providing LWSS Nawada in Tehsil Paonta Sahib Distt. Sirmour (HP) Earnest Money :-Rs.1600/-
(SH:- C/O Septic Tank CC flooring , Plastering ) Time:- Three months.
Sr.No. Description Qty. Rate Unit
1 2 3 4 5
1 Excavation in foundation and trenches etc.in earth work in all kinds of soil such as pick work 17.06 Cum 92.85 P/Cum
,jumper work decomposed conglomerate saturated soil soft and hard rock upto all leads lifts
stacking the excavated soil not more than 3mtr.clear from the edge of excavation and then
returning the stacked soil in consolidating each deposited layers by ramming and watering and
then disposing of all surplus excavated earth as directed with in all leads lifts and as per directions
of the Engineer-incharge

2 Providing and laying cement concrete 1:4:8(1cement:4sand:8 graded stone agg.40mm nominal 37.67 Cum 1104.80 P/Cum
size)and curing complete excluding the cost of form work in foundation & plinth including all
leads lifts and carriage of material and as per the directions of Engineer-in-charge.

3 1st. class brick work using common building bricks in foundation and plinth in Cement Mortar 12.23 Cum 1399.70 P/Cum
1:6(1cement:6sand) in all leads lifts and carriage etc. as per direction of Engineer in charge.

4 40mm thick cement concrete flooring 1:2:4 (1cement:2sand: 4 graded stone agg. 20mm nominal 48.50 Sqm 93.30 P/Sqm
size)laid in one layer finished with a floating coat of neat cement including curing all leads, lifts
and carriage of materials at site and as per direction of Engineer incharge
5 20 mm thick cement plaster in single coat of rough side of bricks/stone masonary for interior 139.86 Sqm 58.40 P/Sqm
plastering upto floor two level including arrises internal rounded angles chamfers rounded angles
not exceeding 80mm in girth and finished even and smooth in cement mortor 1:4(1cement:4
sand) and curing complete including all leads lifts and carriage of materials at site as per
direction of Engineer-incharge.

6 Providing form work with steel sheets 3.15mm thick welded with angle iron 30x30x5 mm so as to
give rough finish i/c centring shuttering structing and propping etc. with wooden bettens &
Ballies, height or propping & centering below supporting floor to ceiling not exceeding 4 mtr.and
removal of the same for insitu RCC work and PCC work.including all leads lifts and carriage of
material at site & as per direction of Engineer incharge in:-

a)Flat surfaces such as sofits and suspended floors, roofs landing and the like floors etc. up to 200 9.00 Sqm 134.10 P/Sqm
mm in thickness.
7 Providing and laying reinforced cement concrete 1:2:4(1cement :2app.sand: 4app. graded stone 1.12 Cum 1658.90 P/Cum
agg.20mm nominal size )and curing complete excluding cost of form work & reinforcement in
suspended floors, roofs, shelves & supports, balconies beams etc. upto floor in two level in all
height and depth including all leads lifts & carriage of material at site and as per direction of the
Engineer-incharge.

8 Providing mild steel/tor steel for rainforcement for RCC work including bending binding and 90.00 Kg 20.70 P/kg
placing in position complete upto floor two level the Engineer-in-charge.

9 Providing and fixing of Manhole cover of 23 Kg. weight complete in all respect and as per direction 1.00 No. 1300.00 Each.
of the Engineer-in-charge.

TERMS AND CONDITIONS:- Total:


The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
1 Security,Sale tax & Income tax shall be deducted as per rules.
2 Cement will be issued @ 315/- per bag & steel @ 53/- per Kg. at IPH store Bhatanwali Paonta Sahib.
3 Empty cement bags shall be returned to the deptt. Otherwise Rs. 2/- per bag shall be deducted from the
each bill of the contractor.
4 Royality certificate in respect of stone agg. Sand etc. shall be produced by the contractor
5 GI Pipe shall be issued free of cost from IPH Store Bhatanwali. Assistant Engineer,
I&PH Sub Division,
Paonta Sahib.
ABSTRACT OF COST.
Name of work:-Providing LWSS Nawada in Tehsil Paonta Sahib Distt. Sirmour (HP) (SH:- C/O Septic Tank)
CC flooring plastering.
Sr.No. Description Qty. Rate Unit
1 2 3 4 5
1 Excavation in foundation and trenches etc.in earth work in all kinds of soil such as pick work 17.06 Cum 312.27 P/Cum
,jumper work decomposed conglomerate saturated soil soft and hard rock upto all leads lifts
stacking the excavated soil not more than 3mtr.clear from the edge of excavation and then
returning the stacked soil in consolidating each deposited layers by ramming and watering and
then disposing of all surplus excavated earth as directed with in all leads lifts and as per directions
of the Engineer-incharge

2 Providing and laying cement concrete 1:4:8(1cement:4sand:8 graded stone agg.40mm nominal 37.67 Cum 3283.40 P/Cum
size)and curing complete excluding the cost of form work in foundation & plinth including all
leads lifts and carriage of material and as per the directions of Engineer-in-charge.

3 1st. class brick work using common building bricks in foundation and plinth in Cement Mortar 12.23 Cum 5189.30 P/Cum
1:6(1cement:6sand) in all leads lifts and carriage etc. as per direction of Engineer in charge.

4 40mm thick cement concrete flooring 1:2:4 (1cement:2sand: 4 graded stone agg. 20mm nominal 48.50 Sqm 262.40 P/Sqm
size)laid in one layer finished with a floating coat of neat cement including curing all leads, lifts
and carriage of materials at site and as per direction of Engineer incharge
5 20 mm thick cement plaster in single coat of rough side of bricks/stone masonary for interior 139.86 Sqm 155.70 P/Sqm
plastering upto floor two level including arrises internal rounded angles chamfers rounded angles
not exceeding 80mm in girth and finished even and smooth in cement mortor 1:4(1cement:4
sand) and curing complete including all leads lifts and carriage of materials at site as per
direction of Engineer-incharge.
6 Providing form work with steel sheets 3.15mm thick welded with angle iron 30x30x5 mm so as to
give rough finish i/c centring shuttering structing and propping etc. with wooden bettens &
Ballies, height or propping & centering below supporting floor to ceiling not exceeding 4 mtr.and
removal of the same for insitu RCC work and PCC work.including all leads lifts and carriage of
material at site & as per direction of Engineer incharge in:-

a)Flat surfaces such as sofits and suspended floors, roofs landing and the like floors etc. up to 200 9.00 Sqm 327.40 P/Sqm
mm in thickness.
7 Providing and laying reinforced cement concrete 1:2:4(1cement :2app.sand: 4app. graded stone 1.12 Cum 4414.20 P/Cum
agg.20mm nominal size )and curing complete excluding cost of form work & reinforcement in
suspended floors, roofs, shelves & supports, balconies beams etc. upto floor in two level in all
height and depth including all leads lifts & carriage of material at site and as per direction of the
Engineer-incharge.

8 Providing mild steel/tor steel for rainforcement for RCC work including bending binding and 90.00 Kg 63.20 P/kg
placing in position complete upto floor two level the Engineer-in-charge.
9 Providing and fixing of Manhole cover of 23 Kg. weight complete in all respect and as per direction 1.00 No. 1300.00 Each.
of the Engineer-in-charge.

TOTAL:

Assistant Engineer,
I&PH Sub Division,
Paonta Sahib.
ABSTRACT OF COST
Name of work:-Providing LWSS Nawada in Tehsil Paonta Sahib Distt. Sirmour (HP)
(SH:- Prvoding and fitting of Sanitary fitting & Eletrical fitting etc. in Pump House )
1 Providing and fixing of Vitarious china water closer complete in all respect and as per direction of 1 No. 5000.00 Each.
the Engineer-in-charge.
2 Providing fixing pressed steel door frames manufactured from commercial mild steel of1.25mm 4.55 Rmt 122.90 P/Rmt
thickness including hinges,jump lock bud and if required angle threshold of M.S. angle 50x25mm
or base tie of 1.25mm pressed steel I/c welding complete Including steel hinges 2.5mm thick with
guard lock strick plate and apply a coat of approved steel primer affect pre-treaditional of surface
in all leads lifts and carriage of materials as per direction of Engineer-in-charge.

3 Providing and fixing of MS sheet 1mm thickj shutter for door & windows complete in all respect 5.43 M2 1000.00 Per Sqm.
and as per direction of the Engineer-in-charge.
4 Providing and fixing on wall face PVC rain water pipes 100mm dia including filling the joints with 15.00 Rmt 200.00 P/Rmt
spun yarn soaked in neat cement slurry & cement mortor 1:2 (1 cement :2sand) i/c Clamps
including all leads lifts and carriage of material as per direction of Engineer incharge.

5 Providing and fixing of Garder/Central complete in all respect and as per direction of the 1 No. 2000.00 Each.
Engineer-in-charge.
6 Providing and fixing of P-Trap complete in all respect and as per direction of the Engineer-in- 1 No. 300.00 Each.
charge.
7 Providing and fixing of Bend of 100mm dia complete in all respect. 1 No. 150.00 Each.

8 Providing & fixing of Socket of 100mm dia complete in all respect 1 No. 200.00 Each.

9 Providing and fixing of 10 litre vitreous china Low level cestern system conplete in all respect and 1 No. 1463.80 Each.
as per direction of the Engineer-in-charge.
10 Laying & jointing of GMS pipe of 15mm dia comlete in all resect and as per direction of the 25 Mtr. 60.00 /Mtr.
Engineer-in-charge.
11 Providing and fixing of GI union of 15mm dia complete in all respect. 4 Nos. 110.00 Each.

12 Providing and fixing of GI Tee of 15x15x15mm dia complete in all respect. 4 Nos. 140.00 Each.
13 Providing and fixing of Elbow of 15mm dia complete in all respect. 4 Nos. 120.00 Each.

14 Providing and fixing of PVC setptic Tank of 500 Litre complete in all respect. 1 No. 2500.00 Each.

15 Providing and fixing of Gun Metal Gate Valve of 15mm dia complete in all respect. 4 Nos. 500.00 Each.

16 Providing and fixing of wall tiles of size 1.20x1.50 mm complete in all respect. 5.78 Sqm. 679.30 P/Sqm.

17 Providing and fixing of Brass Taps of approved quality complete in all respect. 2 Nos. 113.50 Each.

18 Providing and fixing of wash Besin of approved quality small size complete in all respect. 1 No. 963.70 Each.

19 Red oxide paint of approved make complete in all respect and as per direction of the Engineer-in- 8.95 Sqm. 32.90 Per Sqm.
charge.

20 Painting two coats (excluding priming coat) on new steel and steel based with surfaces with ready 8.95 Sqm. 69.20 / Sqm.
mixed paint other then white brushing to give an even shade including cleaning the surface of dirt
dust and other foreign matter,sand papering and stopping. Including all leads lifts and carriage of
21 Water
materialproofing cement
at site as paint on
per direction ofundecorated wall surfaces (Out side) to give an even shade i.e.
Engineer incharge. 48 Sqm. 53.10 / Sqm.
thoroughly /brooming the surface to remove give all dirt dust and other foreign matter complete
in all respect and as per direction of the Engineer-in-charge.
22 Providing and fixing of Oil bound distemper in side of Pump House complete in all respect. 52.56 Sqm. 49.20 P/sqm.

23 Providing and fixing of Sluice valve of 80mm dia complete in all respect and and as per direction of 3 Nos. 16000.00 Each.
the Engineer-in-charge.
24 Wiring for light Point/Fan Point/Exhaust Fan Point/ Call Bell Point with 1.5 sq. mm PVC Insulated,
PVC sheathed copper conductor cable in PVC casing and capping/ with surface recessed PVC
conduit complete with ISI Marked Cable, Switches, etc, as required complete in all respect
(Group-C)

Group C. 10 Point 350.00 Each

25 Wiring for Light/power plug wiring with 15 AMP Power Plug Point 2x 4 sq. mm PVC Insulated 60 Metre 75.00 / Metre.
copper conductor cable in surface/ reccessed PVC conduit alongwith one No. 2.24mm dia base
copper wire for loop earthing as required. Complete with in all leads lifts and as per direction of
Engineer- in-charge.
26 Wiring for Light/power plug 3 PIN wiring with 2x 1.5 sq. mm PVC Insulated copper conductor 2 Nos. 350.00 Each.
cable in surface/ reccessed PVC conduit alongwith one No. 2.24mm dia base copper wire for loop
earthing as required. Complete with in all leads lifts and as per direction of Engineer- in-charge.

27 Wiring for Light/power plug 3 PIN wiring with 2x 2.24mm sq. mm PVC Insulated copper 2 Nos. 500.00 Each.
conductor cable in surface/ reccessed PVC conduit alongwith one No. 2.24mm dia base copper
wire for loop earthing as required. Complete with in all leads lifts and as per direction of
Engineer- in-charge.

28 Circuit wiring in casing capping PVC sheathed copper conductor single core cable in PVC casing 80 Mtr. 65.00 Each.
complete in all respect and as per direction of the Engineer-in-charge.

29 Providing installation testing and commissioning of prewire flourecent tube fitting complete with 1 No. 3150.00 Each.
ballast starter and capacitor but excluding tube rod suitable to operate on 230 Volts single phase
AC supply directly on surface with copper wiring as required complete in all respect and as
directed by the Engineer-in-charge.

30 Providing Installation and testing of CFL bulb wth holder of standard size comopkerte in all 10 Nos. 250.00 Each.
respect and as per direction of the Engineer-in-charge.

31 Supplying and fixing of 5 AMPs to 32 Amps Rating 240 volts L series miniature circuit breaker of 2 Nos. 500.00 Each.
following poles in existing MCB DB complete with connection testing & commissioning etc. as
required (category B) complete in all respect and as directed by the Engineer-in-charge.

32 Supplying fixing single pole and nautral sheet steel MCB distribution box on suface /recessed 2 Nos. 400.00 Each.
complete with tinned connection testing etc. as required with all leads,lifts and carriage of
material and as per directions of the Engineer-in-charge.
33 Providing and fixing of Iron box of following size nominal on surface recess with suitable size of
phonetic laminated sheet cover in front required.
i) 8"x10" or 203mmx252mm/ 2 Nos. 220.00 Each.

ii) 4"x7" or 102mmx252mm. 2 Nos. 270.00 Each


34 Supplying and fixing of Luminary mercury sodium vapour light 60 watt of standard make 1 Nos. 12000.00 Each.
Bajaj/Philips with bend & nuts competed in all leads,lifts and carriage of material and as per
direction of the Egineer-in-charge.
35 Earthing with copper plate 600x600x3mm including accessoires and providing masonary 1 set 2800.00 P/set.
enclosure with cover plate having locking arrangeents and water pipe etc. (but without charcoal
or coke and salt ) comlete as required complete with all leads,lifts and carriage of material and as
per directionof the Engineer-in-charge.

36 Extra for using salf and charcoal for G.I. or copper plate earth electrod as required complete with 1 set. 850.00 Per set.
all leads,lifts and carriage of material and as per direction of the Egineer-in-charge.

Ttoal:

Assistant Engineer,
I&PH Sub Division,
Paonta Sahib.

DRAFT SCHEDULE OF QUANTITY. Estimated Cost: 99356/-

Name of work:-Providing LWSS Nawada in Tehsil Paonta Sahib Distt. Sirmour (HP) Earnest Money: 2000/-
Time : Three Months.
(SH:- Prvoding and fitting of Sanitary fitting & Eletrical fitting etc. in Pump House )
1 Providing and fixing of Vitarious china water closer complete in all respect and as per direction of 1 No. 3500.00 Each.
the Engineer-in-charge.

2 Providing fixing pressed steel door frames manufactured from commercial mild steel of1.25mm 122.90 Rmt 122.90 P/Rmt
thickness including hinges,jump lock bud and if required angle threshold of M.S. angle 50x25mm
or base tie of 1.25mm pressed steel I/c welding complete Including steel hinges 2.5mm thick with
guard lock strick plate and apply a coat of approved steel primer affect pre-treaditional of surface
in all leads lifts and carriage of materials as per direction of Engineer-in-charge.

3 Providing and fixing of MS sheet 1mm thickj shutter for door & windows complete in all respect 5.43 M2 700.00 Per Sqm.
and as per direction of the Engineer-in-charge.
4 Providing and fixing on wall face PVC rain water pipes 100mm dia including filling the joints with 15.00 Rmt 140.00 P/Rmt
spun yarn soaked in neat cement slurry & cement mortor 1:2 (1 cement :2sand) i/c Clamps
including all leads lifts and carriage of material as per direction of Engineer incharge.
5 Providing and fixing of Garder/Central complete in all respect and as per direction of the 1 No. 1400.00 Each.
Engineer-in-charge.
6 Providing and fixing of P-Trap complete in all respect and as per direction of the Engineer-in- 1 No. 210.00 Each.
charge.
7 Providing and fixing of Bend of 100mm dia complete in all respect. 1 No. 105.00 Each.
8 Providing & fixing of Socket of 100mm dia complete in all respect 1 No. 140.00 Each.
9 Providing and fixing of 10 litre vitreous china Low level cestern system conplete in all respect and 1 No. 1463.80 Each.
as per direction of the Engineer-in-charge.
10 Laying & jointing of GMS pipe of 15mm dia comlete in all resect and as per direction of the 25 Mtr. 0.50 /Mtr.
Engineer-in-charge.
11 Providing and fixing of GI union of 15mm dia complete in all respect. 4 Nos. 77.00 Each.
12 Providing and fixing of GI Tee of 15x15x15mm dia complete in all respect. 4 Nos. 98.00 Each.

13 Providing and fixing of Elbow of 15mm dia complete in all respect. 4 Nos. 84.00 Each.
14 Providing and fixing of PVC setptic Tank of 500 Litre complete in all respect. 1 No. 1750.00 Each.

15 Providing and fixing of Gun Metal Gate Valve of 15mm dia complete in all respect. 4 Nos. 350.00 Each.

16 Providing and fixing of wall tiles of size 1.20x1.50 mm complete in all respect. 5.78 Sqm. 475.50 P/Sqm.
17 Providing and fixing of Brass Taps of approved quality complete in all respect. 2 Nos. 79.45 Each.
18 Providing and fixing of wash Besin of approved quality small size complete in all respect. 1 No. 674.59 Each.

19 Red oxide paint of approved make complete in all respect and as per direction of the Engineer-in- 8.95 Sqm. 20.00 Per Sqm.
charge.
20 Painting two coats (excluding priming coat) on new steel and steel based with surfaces with ready 8.95 Sqm. 48.00 / Sqm.
mixed paint other then white brushing to give an even shade including cleaning the surface of dirt
dust and other foreign matter,sand papering and stopping. Including all leads lifts and carriage of
material at site as per direction of Engineer incharge.

21 Water proofing cement paint on undecorated wall surfaces (Out side) to give an even shade i.e. 48 Sqm. 37.00 / Sqm.
thoroughly /brooming the surface to remove give all dirt dust and other foreign matter complete
in all respect and as per direction of the Engineer-in-charge.
22 Providing and fixing of Oil bound distemper in side of Pump House complete in all respect. 52.56 Sqm. 35.00 P/sqm.

23 Providing and fixing of Sluice valve of 80mm dia complete in all respect and and as per direction of 3 Nos. 11200.00 Each.
the Engineer-in-charge.
24 Wiring for light Point/Fan Point/Exhaust Fan Point/ Call Bell Point with 1.5 sq. mm PVC Insulated, 10 Point 245.00 Each
PVC sheathed copper conductor cable in PVC casing and capping/ with surface recessed PVC
conduit complete with ISI Marked Cable, Switches, etc, as required complete in all respect
(Group-C)

25 Wiring for Light/power plug wiring with 15 AMP Power Plug Point 2x 4 sq. mm PVC Insulated 60 Metre 52.50 / Metre.
copper conductor cable in surface/ reccessed PVC conduit alongwith one No. 2.24mm dia base
copper wire for loop earthing as required. Complete with in all leads lifts and as per direction of
Engineer- in-charge.

26 Wiring for Light/power plug 3 PIN wiring with 2x 1.5 sq. mm PVC Insulated copper conductor 2 Nos. 245.00 Each.
cable in surface/ reccessed PVC conduit alongwith one No. 2.24mm dia base copper wire for loop
earthing as required. Complete with in all leads lifts and as per direction of Engineer- in-charge.

27 Wiring for Light/power plug 3 PIN wiring with 2x 2.24mm sq. mm PVC Insulated copper 2 Nos. 350.00 Each.
conductor cable in surface/ reccessed PVC conduit alongwith one No. 2.24mm dia base copper
wire for loop earthing as required. Complete with in all leads lifts and as per direction of
Engineer- in-charge.

28 Circuit wiring in casing capping PVC sheathed copper conductor single core cable in PVC casing 80 Mtr. 45.50 Each.
complete in all respect and as per direction of the Engineer-in-charge.
29 Providing installation testing and commissioning of prewire flourecent tube fitting complete with 1 No. 2205.00 Each.
ballast starter and capacitor but excluding tube rod suitable to operate on 230 Volts single phase
AC supply directly on surface with copper wiring as required complete in all respect and as
directed by the Engineer-in-charge.

30 Providing Installation and testing of CFL bulb wth holder of standard size comopkerte in all 10 Nos. 175.00 Each.
respect and as per direction of the Engineer-in-charge.
31 Supplying and fixing of 5 AMPs to 32 Amps Rating 240 volts L series miniature circuit breaker of 2 Nos. 350.00 Each.
following poles in existing MCB DB complete with connection testing & commissioning etc. as
required (category B) complete in all respect and as directed by the Engineer-in-charge.

32 Supplying fixing single pole and nautral sheet steel MCB distribution box on suface /recessed 2 Nos. 280.00 Each.
complete with tinned connection testing etc. as required with all leads,lifts and carriage of
material and as per directions of the Engineer-in-charge.
33 Providing and fixing of Iron box of following size nominal on surface recess with suitable size of
phonetic laminated sheet cover in fronr s required.
i) 8"x10" or 203mmx252mm/ 2 Nos. 154.00 Each.
ii) 4"x7" or 102mmx252mm. 2 Nos. 189.00 Each
34 Supplying and fixing of Luminary mercury sodium vapour light 60 watt of standard make 1 Nos. 7500.00 Each.
Bajaj/Philips with bend & nuts competed in all leads,lifts and carriage of material and as per
direction of the Egineer-in-charge.
35 Earthing with copper plate 600x600x3mm including accessoires and providing masonary 1 set 1500.00 P/set.
enclosure with cover plate having locking arrangeents and water pipe etc. (but without charcoal
or coke and salt ) comlete as required complete with all leads,lifts and carriage of material and as
per directionof the Engineer-in-charge.

36 Extra for using salf and charcoal for G.I. or copper plate earth electrod as required complete with 1 set. 595.00 Per set.
all leads,lifts and carriage of material and as per direction of the Egineer-in-charge.

TERMS AND CONDITIONS:- Ttoal:


The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
1 Security,Sale tax & Income tax shall be deducted as per rules.
2 Cement will be issued @ 315/- per bag & steel @ 53/- per Kg. at IPH store Bhatanwali Paonta Sahib. Assistant Engineer,
3 Empty cement bags shall be returned to the deptt. Otherwise Rs. 2/- per bag shall be deducted from the I&PH Sub Division,
each bill of the contractor. Paonta Sahib.
4 Royality certificate in respect of stone agg. Sand etc. shall be produced by the contractor
5 GI Pipe shall be issued free of cost from IPH Store Bhatanwali.
6 Rejected/defective material shall not paid .
d Cost :-Rs.77524/-
Money :-Rs.1600/-
hree months.
Amount
6.
1584.00

41618.00

17118.00

4525.00

8168.00

1207.00
1858.00

1863.00

1300.00

79241.00

Division,
hib.
Amount
6.
5327.00

123686.00

63465.00

12726.00

21776.00
2947.00

4944.00

5688.00

1300.00

241859.00

Assistant Engineer,
I&PH Sub Division,
Paonta Sahib.
5000.00

559.00

5430.00

3000.00

2000.00

300.00

150.00

200.00

1464.00

1500.00

440.00

560.00
480.00

2500.00

2000.00

3926.00

227.00

964.00

294.00

619.00

2549.00

2586.00

48000.00

3500.00

4500.00
700.00

1000.00

5200.00

3150.00

2500.00

1000.00

800.00

440.00

540.00
12000.00
2800.00

850.00

123728.00

Assistant Engineer,
I&PH Sub Division,
Paonta Sahib.

Cost: 99356/-
oney: 2000/-
ree Months.
3500.00

15104.00

3801.00

2100.00
1400.00

210.00

105.00
140.00
1464.00

13.00

308.00
392.00

336.00
1750.00

1400.00

2748.00
159.00
675.00

179.00

430.00

1776.00
1840.00

33600.00

2450.00

3150.00

490.00

700.00

3640.00

2205.00

1750.00

700.00

560.00
308.00
378.00
7500.00

1500.00

595.00

99356.00

Assistant Engineer,
I&PH Sub Division,
Paonta Sahib.
REVISED SCHEDULE OF QUANTITY Estimated Cost: 19223/-
Name of work:- Providing LWSS to PC habitation Tokion Sainwala in Tehsil Paonta Sahib Distt, Sirmour (HP) Earnest Money: 500/-
(SH:- Providing internal Electrification to the Pump House) Time: One Month.
S.N. Description Qty. Rate Unit
1 2 3 4 5
1 Wiring for light Point/Fan Point/Exhaust Fan Point/ Call Bell Point with 1.5 sq. mm PVC Insulated, PVC
sheathed copper conductor cable in PVC casing and capping/ with surface recessed PVC conduit complete
with ISI Marked Cable, Switches, etc, as required complete in all respect (Group-C)

Group C. 14 Point 350.00 Each


2 Wiring for Light/power plug wiring with 2x 1.5 sq. mm PVC Insulated copper conductor cable in surface/ 30 Metre 40.00 / Metre.
reccessed PVC conduit alongwith one No. 2.24mm dia base copper wire for loop earthing as required.
Complete with in all leads lifts and as per direction of Engineer- in-charge.

3 Wiring for Light/power plug wiring with 2x 4 sq. mm PVC Insulated copper conductor cable in surface/ 16 Metre 60.00 / Metre.
reccessed PVC conduit alongwith one No. 2.24mm dia base copper wire for loop earthing as required.
Complete with in all leads lifts and as per direction of the Engineer- in-charge.

4 Providing and fixing of 15/16 AMP. PIN tumbler Piano type switch on existing box cover including all 2 Nos. 60.00 Each.
leads,lifts and carriage of material and as per dirction of the Engineer-in-charge

5 Providing and fixing of 15/16 AMP. PIN Socket Outlet tumbler Piano type switch on existing box cover 2 Nos. 60.00 Each.
including all leads,lifts and carriage of material and as per dirction of the Engineer-in-charge
6 Providing and fixing of 05/06 AMP. PIN tumbler Piano type switch on existing box cover including all 14 Nos. 40.00 Each.
leads,lifts and carriage of material and as per dirction of the Engineer-in-charge
7 Providing and fixing of Iron box of following size nominal on surface recess with suitable size of phonetic
laminated sheet cover in front required.
i) 8"x10" or 203mmx252mm/ 2 Nos. 80.00 Each.
ii) 4"x7" or 102mmx252mm. 2 Nos. 80.00 Each
8 Wiring for Sub main wiring with 2x6mm Sqm. PVC insulated copper conductor in single cover in surface ir 2 Mtr. 100.00 Per Mtr.
recessed in PVC conduction required with all leads,lifts and carriage of material and as per direction of the
Engineer-in-charge.
9 Supplying and fixing of 5 AMPs to 32 Amps Rating 240 volts L series miniature circuit breaker of following
poles in existing MCB DB complete with connection testing & commissioning etc. as required (category B)
complete in all respect and as directed by the Engineer-in-charge.
Single Pole. 2 Nos. 200.00 Each.
ii) Double Pole. 2 Nos. 350.00 Each.
10 Supplying fixing single pole and nautral sheet steel MCB distribution box on suface /recessed complete with 2 Nos. 400.00 Each.
tinned connection testing etc. as required with all leads,lifts and carriage of material and as per directions of
the Engineer-in-charge.

11 Providing installation testing and commissioning of prewire flourecent tube fitting complete with ballast 3 Nos. 1000.00 Each.
starter and capacitor but excluding tube rod suitable to operate on 230 Volts single phase AC supply directly
on surface with copper wiring as required complete in all respect and as directed by the Engineer-in-charge.

12 Supplying and fixing of LED light 60 watt including connection etc. complete with all leads,lifts and carriage of 2 Nos. Item Each.
material and as per direction of the Egineer-in-charge. deleted

13 Supplying and fixing of ceiling rose on existing junctionb box/wooden block including connection etc. as 4 Nos. 30.00 Each.
reqiored complete in all respect and as per directions of the Engneer-in-charge.

14 Earthing with copper plate 600x600x3mm including accessoires and providing masonary enclosure with 1 set 2800.00 P/set.
cover plate having locking arrangeents and water pipe etc. (but without charcoal or coke and salt ) comlete as
required complete with all leads,lifts and carriage of material and as per directionof the Engineer-in-charge.

15 Extra for using salf and charcoal for G.I. or copper plate earth electrod as required complete with all leads,lifts 1 set. 850.00 Per set.
and carriage of material and as per direction of the Egineer-in-charge.

16 Supplying laying 6 SWG GI wire at 0.5 Mtr. Elbow ground level for conductor earth electrod including 40 Mtr. 30.00 P/Mtr.
soldering as required complete in all respect and as per direction of the Engineer-in-charge.

17 Providing installing testing and commissioning of Ceiling fan regulator including wiring the down rod of 2 Nos. 2150.00 Each.
standard length (upto 30 cm.) with 1.5mm PVC insulated copper conductor single core cable as required 1200
Mtr. Cut A.

TERMS AND CONDITIONS:- Total


1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Nothing shall be paid for rejected material and all material shall be ISI specification
4 Payment will be made after successful testing of work . Executive Engineer,
I&PH Division,
Paonta Sahib (HP)
d Cost: 19223/-
Money: 500/-

Amount
6.

4900.00
1200.00

960.00

120.00

120.00

560.00

160.00
160.00
200.00

400.00
700.00
800.00

3000.00

0.00

120.00

2800.00

850.00

1200.00

4300.00

22550.00
DRAFT SCHEDULE OF QUANTITY Estimated cost Rs 99407/-
Name of work: Providing GWSS Guddi Manpur GP Sharli in Tehsil Paonta Sahib Distt. Sirmour (HP) Earnest money Rs.2000/-
(SH: C/O RCC Filter Bed 41.46 Sqm.) Job. II Time:- Three Months
S.No Sub-Head and item of work. Qty. Rates, Unit
1 2 3 4 5
1 Excavation in foundation and trenches etc.in earth work in all kinds of soil such as pick work ,jumper 4.60 Cum 92.85 P/Cum
work decomposed conglomerate saturated soil soft and hard rock upto all leads lifts stacking the
excavated soil not more than 3mtr.clear from the edge of excavation and then returning the stacked soil
in 15cm layers when required in to plinth sides of foundation etc. consolidating each deposited layers by
ramming and watering and then disposing of all surplus excavated earth as directed with in all leads lifts
and as per directions of the Engineer-incharge

2 Providing and laying cement concrete 1:4:8(1cement:4sand:8 graded stone agg.40mm nominal size)and 1.96 Cum 1104.8 P/Cum
curing complete excluding the cost of form work in foundation & plinth including all leads lifts and
carriage of material and as per the directions of Engineer-in-charge.

3 Providing and laying cement concrete work 1:1 1/2:3 (1cement:1 1/2 sand: 3 graded stone agg. 20mm nominal
size & curing complete) excluding cost of form work in all height and depth including all leads lifts complete and
carriage of material etc. as per directions of Engineer incharge.

a) In foundation and plinth 4.94 Cum. 1866.80 P/Cum.

b) Vertical surface such as wall any thickness. 6.71 Cum. 1923.00 P/Cum.
4 Providing form work with steel sheets 3.15mm thick welded with angle iron 30x30x5 mm so as to give rough finish
i/c centring shuttering structing and propping etc. with wooden bettens & Ballies, height or propping & centering
below supporting floor to ceiling not exceeding 4 mtr.and removal of the same for insitu RCC work and PCC
work.including all leads lifts and carriage of material at site & as per direction of Engineer in charge in:-

a) Flat surfaces. 1.44 Sqm. 134.10 P/Cum


b) Vertical surface such as wall any thickness. 127.64 Sqm. 80.70 P/Cum
5 Providing and laying cement concrete 1:2:4(1cement:2app.sand: 4 app. graded stone agg. 20mm 0.19 Cum. 1658.10 Per
nominal size )and curing complete excluding cost of form work & reinforcement for reinforced work in Cum.
suspended floors, roofs landing shelves and their supports balconies, beams, girders bressumers and
cantilivers upto to floor two level in all height and depth, including all leads lifts and carriage of material
at site and as per direction of the Engineer-incharge.

6 Providing Mild Steel/Tor steel reinforcement including bending binding & placing in positing I/c all leads lifts and 791.00 Kg. 20.70 P/kg
carriage of material and as per direction of the Engineer-in-charge.

7 Steel work in single section including cutting hoisting fixing in position and supplying a priming coat of red lead 0.31 Qntl. 7800.00 P/Qntl.
paint and complete in all respect and as per direction of the Engineer-in-charge.

8 Laying of jointinf of GI Pipes for scour pipe of 32mm dia complete in all respect and as per direction of the 6.00 Rmt. 1.50 Per Rmt.
Engineer-in-charge.

9 Ist. class brick work using common building bricks in super structure in cement mortar 1:4(1cement:4sand) 2.05 Cum. 5700.00 P/Cum
complete in all respect and as per direction of the Engineer-in-charge.

10 Providing and placing in horizontal in layers filter media duly graded screened washed and cleaned 1.45 Cum. 1399.70 P/Cum.
as specified by the Engineer-in-charge.

i) Top layers fine sand effective size point 0.20mm to 0.40mm and informity co-efficient 2 mtrs. to 15.6 Cum. 1183.35 P/Cum.
3.00 Mtrs.

ii) Second layers course sand 3mm to 6mm. 3.12 Cum. 1143.10 P/ Cum.
iii) 3rd layer Baji 6mm to 20mm. 2.08 Cum. 1143.10 P/ Cum.
iv) 4th layer Bazari 20mm to 25mm. 3.12 Cum. 1143.10 P/ Cum.
v) 5th layers or bottom layers broken stone 50 mm to 75mm 3.12 Cum. 1092.98 P/ Cum.

Total:
TERMS AND CONDITIONS:-
1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Cement will be issued @ 315/- per bag & steel @ 53/- per Kg. at IPH store Bhatanwali Paonta Sahib.
4 Empty Cement bags shall be returned to the deptt. otherwise Rs. 2/- per bag shall be deducted from the each bill of the contractor.
5 Royality certificate in respect of stone agg. Sand etc. shall be produced by the contractor
6 Contractor shall be responsible for watch & ward of store.
7 G.I.Pipe shall be issued free of cost from IPH Store Bhatanwali Paonta Sahib.
Assistant Engineer,
I&PH Sub Division,
Kaffota.

DRAFT SCHEDULE OF QUANTITY Estimated cost Rs 73034/-


Name of work: Providing GWSS Guddi Manpur GP Sharli in Tehsil Paonta Sahib Distt. Sirmour (HP) Earnest money Rs.1500/-
(SH: C/O RCC Filter Bed 41.46 Sqm.) Time:- Three Months
S.No Sub-Head and item of work. Qty. Rates, Unit
1 2 3 4 5
1 Excavation in foundation and trenches etc.in earth work in all kinds of soil such as pick work ,jumper 9.19 Cum 92.85 P/Cum
work decomposed conglomerate saturated soil soft and hard rock upto all leads lifts stacking the
excavated soil not more than 3mtr.clear from the edge of excavation and then returning the stacked soil
in 15cm layers when required in to plinth sides of foundation etc. consolidating each deposited layers by
ramming and watering and then disposing of all surplus excavated earth as directed with in all leads lifts
and as per directions of the Engineer-incharge

2 Providing and laying cement concrete 1:4:8(1cement:4sand:8 graded stone agg.40mm nominal size)and 7.92 Cum 1104.8 P/Cum
curing complete excluding the cost of form work in foundation & plinth including all leads lifts and
carriage of material and as per the directions of Engineer-in-charge.
3 Providing and laying cement concrete work 1:1 1/2:3 (1cement:1 1/2 sand: 3 graded stone agg. 20mm nominal
size & curing complete) excluding cost of form work in all height and depth including all leads lifts complete and
carriage of material etc. as per directions of Engineer incharge.

a) In foundation and plinth 11.88 Cum. 1866.80 P/Cum.


b) Vertical surface such as wall any thickness. 19.41 Cum. 1923.00 P/Cum.
4 Providing form work with steel sheets 3.15mm thick welded with angle iron 30x30x5 mm so as to give rough finish
i/c centring shuttering structing and propping etc. with wooden bettens & Ballies, height or propping & centering
below supporting floor to ceiling not exceeding 4 mtr.and removal of the same for insitu RCC work and PCC
work.including all leads lifts and carriage of material at site & as per direction of Engineer in charge in:-

a) Flat surfaces. 2.88 Sqm. 134.10 P/Cum


b) Vertical surface such as wall any thickness. 255.28 Sqm. 80.70 P/Cum
5 Providing and laying cement concrete 1:2:4(1cement:2app.sand: 4 app. graded stone agg. 20mm 0.37 Cum. 1658.10 Per
nominal size )and curing complete excluding cost of form work & reinforcement for reinforced work in Cum.
suspended floors, roofs landing shelves and their supports balconies, beams, girders bressumers and
cantilivers upto to floor two level in all height and depth, including all leads lifts and carriage of material
at site and as per direction of the Engineer-incharge.

6 Providing Mild Steel/Tor steel reinforcement including bending binding & placing in positing I/c all leads lifts and 1582.00 Kg. 20.70 P/kg
carriage of material and as per direction of the Engineer-in-charge.
7 Steel work in single section including cutting hoisting fixing in position and supplying a priming coat of red lead 0.62 Qntl. 7800.00 P/Qntl.
paint and complete in all respect and as per direction of the Engineer-in-charge.
8 Laying of jointinf of GI Pipes for scour pipe of 32mm dia complete in all respect and as per direction of the 12.00 Rmt. 1.50 Per Rmt.
Engineer-in-charge.
9 Ist. class brick work using common building bricks in super structure in cement mortar 1:4(1cement:4sand) 6.10 Cum. 5700.00 P/Cum
complete in all respect and as per direction of the Engineer-in-charge.
10 Providing and placing in horizontal in layers filter media duly graded screened washed and cleaned 2.89 Cum. 1399.70 P/Cum.
as specified by the Engineer-in-charge.
i) Top layers fine sand effective size point 0.20mm to 0.40mm and informity co-efficient 2 mtrs. to 31.2 Cum. 1183.35 P/Cum.
3.00 Mtrs.
ii) Second layers course sand 3mm to 6mm. 6.24 Cum. 1143.10 P/ Cum.
iii) 3rd layer Baji 6mm to 20mm. 4.16 Cum. 1143.10 P/ Cum.
iv) 4th layer Bazari 20mm to 25mm. 6.24 Cum. 1143.10 P/ Cum.
v) 5th layers or bottom layers broken stone 50 mm to 75mm 6.24 Cum. 1092.98 P/ Cum.

Total:
TERMS AND CONDITIONS:-
1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Cement will be issued @ 315/- per bag & steel @ 53/- per Kg. at IPH store Bhatanwali Paonta Sahib.
4 Empty Cement bags shall be returned to the deptt. otherwise Rs. 2/- per bag shall be deducted from the each bill of the contractor.
5 Royality certificate in respect of stone agg. Sand etc. shall be produced by the contractor
6 Contractor shall be responsible for watch & ward of store.
7 G.I.Pipe shall be issued free of cost from IPH Store Bhatanwali Paonta Sahib.
Assistant Engineer,
I&PH Sub Division,
Kaffota.
cost Rs 99407/-
oney Rs.2000/-

Amount.
6
427.00

2165.00

9222.00

12903.00

193.00
10301.00
307.00

16374.00

2418.00

9.00

11685.00

2023.00

18460.00

3566.00
2378.00
3566.00
3410.00

99407.00
Engineer,
Division,

cost Rs 73034/-
oney Rs.1500/-

Amount.
6
853.00

8750.00

22178.00
37325.00

386.00
20601.00
613.00

32747.00

4836.00

18.00

34770.00

4045.00

36921.00

7133.00
4755.00
7133.00
6820.00

229884.00
Engineer,
Division,
DRAFT SCHEDULE OF QUANTITY Estimated Cost :-Rs.98873/-
Name of work:-Restoration of Rain damages to FIS Bherewali in GP Poka in Tehsil Paonta Sahib Distt.Sirmour(HP) Earnest Money :-Rs.2000/-
(SH: C/O Retaining wall at RD 225 to 285 Mtrs.) Time:- Two months.
S.No Description Qty. Rate Unit Amount
1 Excavation in earth work and disposal ofall excavated earth upto a lead of 20 Mtrs. and lift upto 1.50 33.13 Cum. 59.50 Per Cum. 1971.00
Mtrs. disposing earth to be levelled and neatly dressed within a leads in Pick/juper work 50% each
including all leads,lifts and carriage of material and as per direction of the Engineer-in-charge.

2 Providing and laying cement concrete 1:6:12(1cement:6sand:12 graded stone agg.40mm 7.37 Cum 905.10 P/Cum 6671.00
nominal size)and curing complete excluding the cost of centring shuttering in foundation &
plinth including all leads lifts and carriage of material and as per the directions of Engineer-in-
charge.

3 Providing and laying cement concrete work 1:4:8 (1cement: 4 sand: 8 graded stone agg. 20mm nominal 3.46 Cum 1104.80 P/Cum 3823.00
size & curing complete) excluding cost of form work in foundation and plinth in breast & retaining wall
in all height and depth including all leads lifts complete and carriage of material etc. as per directions
of Engineer incharge.

4 Random rubble masonary /Poly rubble masonary (uncoursed/brought to coursed) with hard 26.62 Cum 1135.50 P/Cum 30227.00
stone of approved quality in foundation and plinth including levelling up with cement concrete
1:6.12(1cement:6sand:12 graded stone agg. 20mm nominal size)in cement mortor 1:6 (1 Cement:
6 sand ) in breast wall & Retaining walls including all leads lifts and carriage of material and as
per the directions of Engineer-in-charge.

5 C/o Dry stone masonary in breast/Retaining walls/parapets etc. including all leads.lifts and 53.39 Cum 979.50 P/Cum 52296.00
carriage of material and as per direction of the Engineer-in-charge.
6 Boulder filling behind retaining wall complete in all respect and as per direction of the Engineer- 9.72 Cum 399.70 P/Cum 3885.00
in-charge.
TERMS AND CONDITIONS. Total: 98873.00
1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Cement shall be issued @ Rs. 315/- per bag & steel @ 53/- per Kg. from IPH store Bhatanwali Paonta Sahib.
4 Royality certificate in respect of stone agg. Sand etc. shall be produced by the contractor
5 Empty cement bags shall be returned to the Deptt. Otherwise Rs. 2/- per bag shall deducted from the bill. Assistant Engineer,
6 The watch & ward of the store by the contractor. I&PH Sub Division,
Kaffota.
DRAFT SCHEDULE OF QUANTITY Estimated cost Rs 59996/-
Name of work: c/O lis Upper Mashoo GP Jamna in Tehsil Paonta Sahib Distt. Sirmour (HP) Earnest money Rs.1200/-
(SH: C/O RCC Sump well) Time:- Three Months
S.No Sub-Head and item of work. Qty. Rates, Unit
1 2 3 4 5
1 Excavation in foundation and trenches etc.in earth work in all kinds of soil such as pick work
,jumper work 18.26 Cum 92.85 P/Cum
decomposed conglomerate saturated soil soft and hard rock upto all leads lifts stacking the excavated soil
not more than 3mtr.clear from the edge of excavation and then returning the stacked soil in 15cm layers
when required in to plinth sides of foundation etc. consolidating each deposited layers by ramming and
watering and then disposing of all surplus excavated earth as directed with in all leads lifts and as per
directions of the Engineer-incharge

2 Providing and laying cement concrete 1:4:8(1cement:4sand:8 graded stone agg.40mm nominal size)and 4.98 Cum 1104.8 P/Cum
curing complete excluding the cost of form work in foundation & plinth including all leads lifts and
carriage of material and as per the directions of Engineer-in-charge.

3 Providing and laying cement concrete work 1:1 1/2:3 (1cement:1 1/2 sand: 3 graded stone agg. 20mm nominal size
& curing complete) excluding cost of form work in all height and depth including all leads lifts complete and carriage
of material etc. as per directions of Engineer incharge.

a) In foundation and plinth 4.53 Cum. 1866.80 P/Cum.

b) Vertical surface such as wall any thickness. 12.54 Cum. 1923.00 P/Cum.

4 Providing form work with steel sheets 3.15mm thick welded with angle iron 30x30x5 mm so as to give rough finish
i/c centring shuttering structing and propping etc. with wooden bettens & Ballies, height or propping & centering
below supporting floor to ceiling not exceeding 4 mtr.and removal of the same for insitu RCC work and PCC
work.including all leads lifts and carriage of material at site & as per direction of Engineer in charge in:-

a) Flat surfaces. 23.77 Sqm. 134.10 P/Cum


b) Vertical surface such as wall any thickness. 128.32 Sqm. 80.70 P/Cum
5 Providing and laying cement concrete 1:2:4(1cement:2app.sand: 4 app. graded stone agg. 20mm nominal 2.74 Cum. 1658.10 Per
size )and curing complete excluding cost of form work & reinforcement for reinforced work in suspended Cum.
floors, roofs landing shelves and their supports balconies, beams, girders bressumers and cantilivers upto
to floor two level in all height and depth, including all leads lifts and carriage of material at site and as per
direction of the Engineer-incharge.

6 Providing and fixing of Manhole cover complete in all respect and as per direction of the Engineer-in-charge. 2.00 Nos. 1066.45 Each.

7 Laying and jointing of GI Pipe for scour pipe of 50mm dia complete in all respect and as per direction of Engineer-in- 6.00 Mtr. 1.50 P/Mtr.
charge.
Total:

TERMS AND CONDITIONS:-


1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Cement will be issued @ 315/- per bag & steel @ 53/- per Kg. at IPH store Bhatanwali Paonta Sahib.
4 Empty Cement bags shall be returned to the deptt. otherwise Rs. 2/- per bag shall be deducted from the each bill of the contractor.
5 Royality certificate in respect of stone agg. Sand etc. shall be produced by the contractor
6 Contractor shall be responsible for watch & ward of store.
7 G.I.Pipe shall be issued free of cost from IPH Store Bhatanwali Paonta Sahib.
Assistant Engineer,
I&PH Sub Division,
Kaffota.
cost Rs 59996/-
oney Rs.1200/-

Amount.
6
1695.00

5502.00

8457.00

24114.00

3188.00
10355.00
4543.00

2133.00

9.00

59996.00

Engineer,
Division,
DRAFT SCHEDULE OF QUANTITY Estimated cost Rs.86914/-
Name of work:-CAD to FIS Jaithal Kog Dabra & Tilwar in GP Shawga Tehsil Paonta Sahib Distt. Sirmour (HP) Earnest money Rs.1800/-
(SH: C/O Main channel at various reaches) Time:- Three Months
S.No Sub-Head and item of work. Qty. Rates, Unit
1 2 3 4 5
1 Excavation in foundation and trenches etc.in earth work in all kinds of soil such as pick work ,jumper work 30.10 Cum 170.00 P/Cum
decomposed conglomerate saturated soil soft and hard rock upto all leads lifts stacking the excavated soil not
more than 3mtr.clear from the edge of excavation and then returning the stacked soil in 15cm layers when
required in to plinth sides of foundation etc. consolidating each deposited layers by ramming and watering and
then disposing of all surplus excavated earth as directed with in all leads lifts and as per directions of the Engineer-
in-charge

2 Providing and laying cement concrete work 1:5:10(1cement:5 sand: 10 graded stone agg. 40mm nominal size) with 64.40 Cum 3900.00 P/Cum
15% plum and curing complete excluding cost of form work and in retaining walls/ Breast walls, the size of Plums
shall usually be 150mm to 300mm as per PWD specificatioin including all leads lifts and carriage of material and as
per direction of Engineer incharge.

3 Providing form work with steel sheets 3.15mm thick welded with angle iron 30x30x5 mm so as to give rough finish
i/c centring shuttering structing and propping etc. with wooden bettens & Ballies, height or propping & centering
below supporting floor to ceiling not exceeding 4 mtr.and removal of the same for insitu RCC work and PCC work
including all leads lifts and carriage of material at site & as per direction of Engineer in-charge in:-

a) Vertical surfaces 120.89 Sqm 200.00 P/Sqm


4 Cement concrete lining 15 cm thick or less for irrigation channel using cement concrete 1:3:6
(1cement:3sand:6graded stone agg. 20mm nominal size) and curing complete excluding cost of form work
included all leads,lifts and carriage of material complete in all respect and as per direction of the Engineer-in-
charge.

a) Hand Mixed concrete in bed. 12.84 Cum. 5950.00 P/ Cum.


b) Hand mixed concrete lining in side slopes. 19.50 Cum. 6000.00 P/ Cum.
5 Extra allowance for form work in concrete lining as directed by the Engineer-in-charge including all leads lifts and 19.50 Sqm 130.00 P/Sqm
carriage of matrerials at site complete in all respects on side slopes as per direction of Engineer in charge.
TOTAL:
TERMS AND CONDITIONS:-
1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Royality certificate in respect of stone agg. Sand etc. shall be produced by the contractor
4 Cement shall be issued @ Rs.315/- Per bag & steel @ Rs.53/- per Kg. from IPH store Bhatanwali Paonta Sahib.
5 Empty cement bags shall be returned to the deptt. Other Rs.2/- per bag shall deducted from each bill of the contractor. Assistant Engineer,
I&PH. Sub Division
Kaffota.
REVISED SCHEDULE OF QUANTITY Estimated cost Rs. 35155/-
Name of work:- CAD of FIS JjAITHAL Kog Dabra (Part Dabra) in Tehsil Paonta Sahib Distt. Sirmour (HP) Earnest money Rs.1400/-
(SH: C/o Pucca Main channel at various reaches 800 Mtrs.) Time:- Three Months
S.No Sub-Head and item of work. Qty. Rates, Unit
1 2 3 4 5
1 Excavation in drains & channel etc.in earth work in all kinds of soil such as pick work ,jumper work ### Cum 160.00 P/Cum
blasting work, decomposed conglomerate saturated soil soft and hard rock including dressing of
sides and beds and prepareation of sub grade to level or slope including refilling the trenches and
disposing of surplus earth upto all leads,lifts disposed earth to be levelled and neatly dressed
including jungle clearance and as per directions of the Engineer-incharge

2 Cement concrete lining 15cm thick or less for irrigation channels using cement concrete
1:3:6(1cement:3sand:6graded stone agg. 20mm nominal size)and curing complete excluding cost of form
work included all leads lifts and carriage of material complete in all respect and as per direction of Engineer-
in-charge.

a)Hand Mixed concrete in bed. 22.61 Cum 5950.00 P/Cum


b)Hand mixed concrete lining in side slopes. 34.32 Cum 6000.00 P/Cum
3 Extra allowance for form work in concrete lining as directed by the Engineer-in-charge including all leads lifts 34.32 Cum 130.00 P/Cum
and carriage of matrerials at site complete in all respects on side slopes as per direction of Engineer in
charge.
TERMS & CONDITIONS Total:
1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax & labour cess shall be deducted as per rules.
3 Royality certificate in respect of stone agg. Sand etc. shall be produced by the contractor
4 Cement shall be issued @ 315/- per Bag & Steel @ 53/- per Kg. at IPH Store Bhatanwali Paonta Sahib.
5 Empty cement bags shall be returned to the Deptt. Otherwise Rs. 2/- per bag shall deducted from the bill. Executive Engineer,
I&PH Division,
Paonta Sahib.
ed cost Rs.86914/-
money Rs.1800/-
hree Months
Amount.
6
5117.00

251160.00

24178.00

76398.00
117000.00
2535.00
476388.00

t Engineer,

ed cost Rs. 35155/-


money Rs.1400/-
Three Months
Amount.
6
21373.00

134530.00
205920.00
4462.00

366285.00
Executive Engineer,
I&PH Division,
Paonta Sahib.
DRAFT SCHEDULE OF QUANTITY
Name of Work :- Providing Irrigation Facilities to villages of Gram Panchyat Haripur Khol and Gram Panchyat Estimated Cost: 966870/-
Palhori through Water bodies in Tehsil Paonta Distt. Sirmour (HP) (SH: Topographic, Hydrological Survey & Earnest Money: 19500/-
geological investigation of 10 Nos Water bodies .) Time: Three Months.
S.No Sub Head & Item of worl. Qty. Rate Unit Amount
1 2 3 4 5 6
1 Topographical & Hydrological Survey of site for construction of various Water Bodies at 10 Nos. 54437 Each. 544370
different location in Gram Panchyat Haripur Khol & Palhori( Kodewala, Charna Wala,
Lohgarh, Haripur Khol, Jheel Banka Bara,Jamnighat & Palhori) in Tehsil Paonta Sahib
Distt. Sirmour (HP)

2 Carrying out the Geological Investigation based as Topographical Survey and 10 Nos. 42250 Each. 422500
Hydrological observations of various Water Bodies as per Item No.1.

TOTAL: 966870
TERMS AND CONDITIONS:-
1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.

3 The contractor shall submit survey Map & Geological investigation Report of each site alongwith pre-feasibility report of site in
triplicate.
4 The feasibility report shall be based on materialogical data & catchment area of site.
5 The Survey shall be carried out by the contractor through modern Survey equipments like total station ,DGPS etc.
6 All the drawings shall be submitted by the contractor in auto CAD format.
7 The drawings shall be submitted in soft as well as hard copies.
8 Geological Investigation should be carried out by Geological Survey of India or equivalent competent agency.

Executive Engineer,
I&PH Division,
Paonta Sahib.
DRAFT SCHEDULE OF QUANTITY Estimated cost Rs 15086/-
Name of work:- R/M of LWSS Barwas GP Barwas in Tehsil Paonta Sahib Distt. Sirmour (HP) Earnest money Rs.200/-
(SH:-Providing a tap to Basti Parcha Kuio) Time:- Three months.
Sr.No. Description. Qty. Rate. Unit Amount.
1 2 3 4 5 6
1 Excavation in drains & channel etc.in earth work in all kinds of soil such as pick work 192.38 Cum 75.95 P/Cum 14611.00
,jumper work blasting work, decomposed conglomerate saturated soil soft and hard
rock including dressing of sides and beds and prepareation of sub grade to level or slope
including refilling the trenches and disposing of surplus earth upto all leads,lifts
disposed earth to be levelled and neatly dressed including jungle clearance and as per
directions of the Engineer-incharge

2 Laying and jointing of GMS Pipes of various dia in trenches (earth work in trenches to
be measured and paid for seperately) including all leads lifts and carriage of material at
site as per direction of Engineer-in-charge of following dias.

i) 15mm dia. 950 Rmt. 0.50 P/Rmt. 475.00


Total: 15086.00
TERMS AND CONDITIONS:-
1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 GI Pipe shall be issued free of cost from IPH Store Bhatanwali.
4 GI Fitting shall be provided by the contractor.

Assistant Engineer,
I&PH Sub Division, Kaffota.
DRAFT SCHEDULE OF QUANTITY Estimated cost Rs 64828/-
Name of work:- C/o LIS Nav Barwa in GP Poka in Tehsil Paonta Sahib Distt. Sirmour (HP) Earnest money Rs.1300/-
(SH:-C/o RCC Anchor Block for Rising Main & foundation of Pumping machinery ) Time:- Three months.
Sr.No. Description. Qty. Rate Rates, Unit Amount.
1 Excavation in foundation and trenches etc.in earth work in all kinds of soil such as pick work ,jumper 26.90 Cum. 92.85 P/Cum 2498.00
work decomposed conglomerate saturated soil soft and hard rock upto all leads lifts stacking the
excavated soil not more than 3mtr.clear from the edge of excavation and then returning the stacked
soil in 15cm layers when required in to plinth sides of foundation etc. consolidating each deposited
layers by ramming and watering and then disposing of all surplus excavated earth as directed with in
all leads lifts and as per directions of the Engineer-incharge

2 Providing form work with steel sheets 3.15mm thick welded with angle iron 30x30x5 mm so as to
give rough finish i/c centring shuttering structing and propping etc. with wooden bettens & Ballies,
height or propping & centering below supporting floor to ceiling not exceeding 4 mtr.and removal of
the same for insitu RCC work and PCC work.including all leads lifts and carriage of material at site &
as per direction of Engineer in charge in:-

i) In vertical walls any thickness but not less than 0.10 Metres. 96.00 Sqm. 80.70 P/Sqm. 7747.00
3 Providing and laying cement concrete 1:2:4(1cement:2app.sand: 4 app. graded stone agg. 20mm 30.80 Cum 1658.90 P/Cum 51094.00
nominal size )and curing complete excluding cost of form work & reinforcement for reinforced work
in suspended floors, roofs landing shelves and their supports balconies, beams, girders bressumers
and cantilivers upto to floor two level in all height and depth, including all leads lifts and carriage of
material at site and as per direction of the Engineer-incharge.

4 Providing and laying of ecment concrete 1:2:4(1cement:2sand:4graded in foundation and Plinth 2.16 Cum. 1615.50 Cum. 3489.00
40mm nominal size) & curing complete excluding the cost of form work in foundation and plinth
complete in all respect and as per direction of the Engineer-in-charge.
Total: 64828.00
TERMS AND CONDITIONS:-
1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Cement will be issued @ 315/- per bag & steel @ 53/- per Kg. at IPH store Bhatanwali Paonta Sahib.
4 Empty cement bags shall be returned to the deptt. Otherwise Rs. 2/- per bag shall be deducted from the each bill of the contractor.
5 Royality certificate in respect of stone agg. Sand etc. shall be produced by the contractor
Assistant Engineer,
I&PH Sub Division, Kaffota.
SCHEDULE OF QUANTITY Estimated Cost Rs.30660/-
Name of Work : Providing LWSS to PC hab. Misserwala Kiyarda & Jagatpur in Tehsil Paonta Sahib Earnest money Rs.650/-
Distt.Sirmour(HP) (SH: Writing of Letters of various OHSR) Time:- One month.
S.No Description Qty. Rate Unit Amount
1 2 3 4 5 6
1 Writing letter or figure on any surface with black Japan paint( stop , Commas,Hyphens and th like
not to be measured and paid for seperately)Block letters/figures including with in all leads and
lifts and carriage of material as per direction of Engineer-in-charge.

i) 525 letters 25 cm height letter 525 Nos Each

ii) 1020 letters 15 cm height letter 1020 Nos Each

2 Painting two coats(one priming coat) new steel and other foreign metal surface under coat with 115.92 Sqm P/Sqm
ready mixed paint brushing to give even shade i/c cleaning the surface all dirt dust and other
foreign matter with ready mixed paint including all leads lifts and carriage of material and as per
direction of Engineer-in-charge.

Total:-
TERMS AND CONDITIONS:-
1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Nothing shall be paid for rejected material
4 The payment will be made after successful testing.

Assistant Engineer,
I&PH Sub Division,
Paonta Sahib(HP)
SCHEDULE OF QUANTITY Estimated cost Rs.27580/-
Name of work: R/M of LWSS Misserwala Kiyarda in Tehsil Paonta Sahib Distt. Sirmour(HP) Earnest Money: Rs.300/-
(SH:- Rewinding & repair of 40 HP Submersible Pumping set)(Stand bye) Time:- 15 days
Sr.No. Item of work. Qty. Rate. Unit. Amount.
Motor 20 HP
1 Repair & Rewinding of 40 HP Submersible Motor with PVC insulated Finox 40 HP P/HP
make( Superior enamelled copper winding wire)
2 Re-conditioning of sleeve 4 Nos. Each.
3 Re-conditioning of stator slots. 1 job. P/job.
4 Re-conditioning of thrust plate. 1 job. P/job.
5 Providing and fixing of housing bush Gun metal complete in all respect. 4 Nos. Each.
6 Providing and fixing rocker support. 1 job. P/job.
Pump
7 reconditioning of Gun metal impellers. 3 Nos. each
8 Providing fixing Keys for impellers. 4 Nos each

9 Providing and fixing of distance sleeve. 4 Nos. each


10 Providing and fixing neckrings. 4 Nos. each

11 Providing and fixing Nut & bolts. 8 Kg. P/Kg.


12 Pump motor taking out from Bore well & again lowering the same with allied accessories 1 job. P/job.
complete in all respect.

13 Carriage of Pumping set from site to workshop and testing complete. 1 job. P/job.

TERMS AND CONDITIONS:- Total:-


1 The work shall be done as per IPH/PWD specifications and instructions of the Engineer-in-chrge..
2 10% Security,2 % Sale tax & 2% Income tax shall be deducted as per rules.
3 Payment will be made after completion of work.
4 The repair will be guaranteed for six months. Assistant Engineer,
5 Nothing shall be paid for rejected materials. I&PH Sub-Division,
Majra (HP)
DRAFT SCHEDULE OF QUANTITY Estimated cost Rs:76584/-
Name of work:-Improvement of Distribution system of Left out area of LIS Khara at RD 15400 on LBC in Tehsil Earnest money Rs.1800/-
Paonta Distt. Sirmour (HP) (SH:Prov/Laying & jointing of HDP Pipe & Outlet in distribution system ) Time:- Two Months.
S.No Sub-Head and item of work. Qty. Rates, Unit Amount.
1 2 3 4 5 6
1 Excavation in foundation and trenches etc.in earth work in all kinds of soil such as pick work 7.71 Cum. 92.85 P/Cum 716.00
,jumper work decomposed conglomerate saturated soil soft and hard rock upto all leads lifts
stacking the excavated soil not more than 3mtr.clear from the edge of excavation and then
returning the stacked soil in 15cm layers when required in to plinth sides of foundation etc.
consolidating each deposited layers by ramming and watering and then disposing of all surplus
excavated earth as directed with in all leads lifts and as per directions of the Engineer-in-charge

2 Excavation in drains & channel etc.in earth work in all kinds of soil such as pick work 222.76 Cum 75.95 P/Cum 16919.00
,jumper work blasting work, decomposed conglomerate saturated soil soft and hard
rock including dressing of sides and beds and prepareation of sub grade to level or
slope including refilling the trenches and disposing of surplus earth upto all leads,lifts
disposed earth to be levelled and neatly dressed including jungle clearance and as per
directions of the Engineer-incharge

3 Providing and laying cement concrete 1:4:8(1cement:4sand:8 graded stone agg.40mm nominal 0.82 Cum 1104.50 P/Cum 906.00
size)and curing complete excluding the cost of form work in foundation & plinth including all
leads lifts and carriage of material and as per the directions of Engineer-in-charge.

4 1st. class brick work using common building bricks in foundation and plinth in Cement Mortar 3.39 Cum 1399.70 P/Cum 4745.00
1:6(1cement:6sand) in all leads lifts and carriage etc. as per direction of Engineer incharge.

5 15 mm thick cement plaster in single coat of rough side of bricks/stone masonary for interior 48.4 Sqm 58.40 P/Sqm 2827.00
plastering upto floor two level including arrises internal rounded angles chamfers rounded
angles not exceeding 80mm in girth and finished even and smooth in cement mortor
1:4(1cement:4 sand) and curing complete including all leads lifts and carriage of materials at
site as per direction of Engineer-incharge.
6 Providing and laying cement concrete 1:2:4(1cement:2sand:4graded stone agg. ) 20mm nominal 0.70 Cum 1615.50 P/Cum 1131.00
size) & curing complete excluding the cost of form work in foundation & plinth and as per
direction of the Engineer-in-charge.

7 Providing and fixing of Cast Iron Alfa valves of 150mm dia complete in all respect and as per 2 Nos. 525.00 Each. 1050.00
direction of the Engineer-in-charge.

8 Prov.Laying & jointing of High Density Polythene pipes forburied water mean and services amd 300.00 Mtr. 160.97 Rmt. 48290.00
for water supply above ground both in side and out side building duty ISI marked IS 4984-1995
as amended upto date in the following grade of material prusser rating and normal dia 90mm
dia PN 63 PE 2.5 complete in all respect and as per direction of the Engineer in charge. (Earth
work to be measured & paid for separately)

TOTAL: 76584.00

TERMS & CONDITIONS


1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax & labour cess shall be deducted as per rules.
3 Royality certificate in respect of stone agg. Sand etc. shall be produced by the contractor
4 Cement shall be issued @ 315/- per Bag & Steel @ 53/- per Kg. at IPH Store Bhatanwali Paonta Sahib.
5 Empty cement bags shall be returned to the Deptt. Otherwise Rs. 2/- per bag shall deducted from the Assistant Engineer,
bill. Giri Irrig.Sub Division,
Patlion.
DRAFT SCHEDULE OF QUANTITY Estimated cost Rs 88439/-
Name of work:- Restoration of Rain damages to Left Bank Canal in Tehsil Paonta Sahib Distt. Sirmour (HP) Earnest money Rs.1800/-
(SH: C/o wire crate to protect the cultivated land) Time:- Two Months .

S.No Sub-Head and item of work. Qty. Rates, Unit Amount.


1 Excavation in earth work and disposal ofall excavated earth upto a lead of 20 Mtrs. And lift upto 37.50 Cum 59.55 P/Cum 2233.00
1.50 Mtrs. disposing earth to be levelled and neatly dressed within a leads in Pick/juper work 50%
each including all leads,lifts and carriage of material and as per direction of the Engineer-in-charge.

2 Wire crates made of G.I.wire filled with boulder/hard stone of approved quality with square cut 117.18 Cum. 639.20 P/Cum. 74901.00
faces against the wire having rounded/rectangular shape weight of stones not less than 18 Kg.
free from soft spots,cracks,cavaties etc.(Wire crate to be measured and paid for
separately)including all leads,lifts and carriage of material at site as direction of the Engineer-in-
charge. (Double Knot)

3 Wire crates of G.I.wire filled with boulder with square cut faces against the wire G.I.wire 5mm 562.46 Sqm. 20.10 P/Sqm. 11305.00
thick corresponding to SWG 6 with 15cmx15cm mesh(boulder filling to be measured and paid
for separately including all leads,lifts and carriage of materials at site and as per directions of
the Engineer-in-charge(L.Rate)

TOTAL: 88439.00
TERMS AND CONDITIONS:-
1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax shall be deducted as per rules.
3 Royality certificate in respect of stone agg. Sand etc. shall be produced by the contractor
4 G.I.wire shall be issued free of cost from IPH store Bhatanwali Paonta Sahib Assistant Engineer,
5 Boulder shall not be less than 18 Kg. & the stone should be free from cracks and cavities. Giri Irrig. Sub Division,
Patlion.
DRAFT SCHEDULE OF QUANTITY
Estimated Cost: 88326/-
Name of work: A/R & M/O Giri Irrigation Project Majra under Giri Irrigation Sub Division No.2 Patlion in Tehsil Earnest Money: 1800/-
Paonta Sahib Distt. Sirmour (HP)(SH:Supplying & installing of computer system for Sub Division office Patlion) Time: One Month.

Sr.No. Sub Head and item of work. Qty. Rate Unit Amount.
1 Providing and supplying of computer system of Dell version series 3.00 Nos. 29442.00 P/Sqm. 88326
with intel core i3 41340 4th generation processor /4 GB DDR3
RAM/500 GB SATA HD Driver/DVD-RW Drive 18/5" or higher
widescreen TFT Monitor /integ 100/1000 mbps internet
controller/USB,Keyboard/optical Mouse/USB Ports/PL-Windows 8.1
Prof. O.S. (3 Year on site warranty except plastic parts) complete in
all respect and as per direction of the Engineer-in-charge.

Total: 88326
TERMS & CONDITIONS
1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax & labour cess shall be deducted as per rules.
3 Nothing shall be paid for rejected/ defective work/material.

Assistant Engineer,
Giri Irrig.Sub Division,
Patlion.
DRAFT SCHEDULE OF QUANTITY
Name of work:-C/o 9 Nos T/wells in Paonta area for village Bain Kuan in Tehsil Paonta Distt. Sirmour (HP)
(SH:Providing Laying & jointing of HDP Pipe & Outlet in distribution system )
S.No Sub-Head and item of work.
1 2
1 Excavation in drains & channel etc.in earth work in all kinds of soil such as pick work
,jumper work blasting work, decomposed conglomerate saturated soil soft and hard
rock including dressing of sides and beds and prepareation of sub grade to level or
slope including refilling the trenches and disposing of surplus earth upto all leads,lifts
disposed earth to be levelled and neatly dressed including jungle clearance and as per
directions of the Engineer-incharge

2 Excavation in foundation and trenches etc.in earth work in all kinds of soil such as pick work
,jumper work decomposed conglomerate saturated soil soft and hard rock upto all leads lifts
stacking the excavated soil not more than 3mtr.clear from the edge of excavation and then
returning the stacked soil in 15cm layers when required in to plinth sides of foundation etc.
consolidating each deposited layers by ramming and watering and then disposing of all surplus
excavated earth as directed with in all leads lifts and as per directions of the Engineer-in-charge

3 Providing and laying cement concrete 1:4:8(1cement:4sand:8 graded stone agg.40mm nominal
size)and curing complete excluding the cost of form work in foundation & plinth including all
leads lifts and carriage of material and as per the directions of Engineer-in-charge.

4 1st. class brick work using common building bricks in foundation and plinth in Cement Mortar
1:6(1cement:6sand) in all leads lifts and carriage etc. as per direction of Engineer incharge.

5 15 mm thick cement plaster in single coat of rough side of bricks/stone masonary for interior
plastering upto floor two level including arrises internal rounded angles chamfers rounded
angles not exceeding 80mm in girth and finished even and smooth in cement mortor
1:4(1cement:4 sand) and curing complete including all leads lifts and carriage of materials at
site as per direction of Engineer-incharge.

6 Providing and laying cement concrete 1:2:4(1cement:2sand:4graded stone agg. ) 20mm nominal
size) & curing complete excluding the cost of form work in foundation & plinth and as per
direction of the Engineer-in-charge.
7 Providing and fixing of Cast Iron Alfa valves of 150mm dia complete in all respect and as per
direction of the Engineer-in-charge.
8 Prov.Laying & jointing of High Density Polythene pipes forburied water mean and services amd
for water supply above ground both in side and out side building duty ISI marked IS 4984-1995
as amended upto date in the following grade of material prusser rating and normal dia 90mm
dia PN 63 PE 2.5 complete in all respect and as per direction of the Engineer in charge. (Earth
work to be measured & paid for separately)

9 Providing and fixing of M.S.Foot rest of 16mm dia bar complete in all respect and as per
direction of the Engineer-in-charge.

TERMS & CONDITIONS


1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax & labour cess shall be deducted as per rules.
3 Royality certificate in respect of stone agg. Sand etc. shall be produced by the contractor
4 Cement shall be issued @ 315/- per Bag & Steel @ 53/- per Kg. at IPH Store Bhatanwali Paonta Sahib.
5 Empty cement bags shall be returned to the Deptt. Otherwise Rs. 2/- per bag shall deducted from the
bill.

DRAFT SCHEDULE OF QUANTITY


Name of work:-C/o 7 Nos((9 Nos) T/wells in Paonta area for village Bain Kuan in Tehsil Paonta Distt. Sirmour (HP)
(SH:Providing Laying & jointing of HDP Pipe & Outlet in distribution system )
S.No Sub-Head and item of work.
1 2
1 Excavation in drains & channel etc.in earth work in all kinds of soil such as pick work
,jumper work blasting work, decomposed conglomerate saturated soil soft and hard
rock including dressing of sides and beds and prepareation of sub grade to level or
slope including refilling the trenches and disposing of surplus earth upto all leads,lifts
disposed earth to be levelled and neatly dressed including jungle clearance and as per
directions of the Engineer-incharge

2 Excavation in foundation and trenches etc.in earth work in all kinds of soil such as pick work
,jumper work decomposed conglomerate saturated soil soft and hard rock upto all leads lifts
stacking the excavated soil not more than 3mtr.clear from the edge of excavation and then
returning the stacked soil in 15cm layers when required in to plinth sides of foundation etc.
consolidating each deposited layers by ramming and watering and then disposing of all surplus
excavated earth as directed with in all leads lifts and as per directions of the Engineer-in-charge

3 Providing and laying cement concrete 1:4:8(1cement:4sand:8 graded stone agg.40mm nominal
size)and curing complete excluding the cost of form work in foundation & plinth including all
leads lifts and carriage of material and as per the directions of Engineer-in-charge.

4 1st. class brick work using common building bricks in foundation and plinth in Cement Mortar
1:6(1cement:6sand) in all leads lifts and carriage etc. as per direction of Engineer incharge.

5 15 mm thick cement plaster in single coat of rough side of bricks/stone masonary for interior
plastering upto floor two level including arrises internal rounded angles chamfers rounded
angles not exceeding 80mm in girth and finished even and smooth in cement mortor
1:4(1cement:4 sand) and curing complete including all leads lifts and carriage of materials at
site as per direction of Engineer-incharge.
6 Providing and laying cement concrete 1:2:4(1cement:2sand:4graded stone agg. ) 20mm nominal
size) & curing complete excluding the cost of form work in foundation & plinth and as per
direction of the Engineer-in-charge.
7 Providing and fixing of Cast Iron Alfa valves of 150mm dia complete in all respect and as per
direction of the Engineer-in-charge.
8 Prov.Laying & jointing of High Density Polythene pipes forburied water mean and services amd
for water supply above ground both in side and out side building duty ISI marked IS 4984-1995
as amended upto date in the following grade of material prusser rating and normal dia 90mm
dia PN 63 PE 2.5 complete in all respect and as per direction of the Engineer in charge. (Earth
work to be measured & paid for separately)

9 Providing and fixing of M.S.Foot rest of 16mm dia bar complete in all respect and as per
direction of the Engineer-in-charge.

TERMS & CONDITIONS


1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax & labour cess shall be deducted as per rules.
3 Royality certificate in respect of stone agg. Sand etc. shall be produced by the contractor
4 Cement shall be issued @ 315/- per Bag & Steel @ 53/- per Kg. at IPH Store Bhatanwali Paonta Sahib.
5 Empty cement bags shall be returned to the Deptt. Otherwise Rs. 2/- per bag shall deducted from the
bill.
Estimated cost Rs:90923/-
Sirmour (HP) Earnest money Rs.1900/-
Time:- Two Months.
Qty. Rates, Unit Amount.
3 4 5 6
288.75 Cum 75.95 P/Cum 21931.00

9.92 Cum. 92.85 P/Cum 921.00

1.65 Cum 1104.50 P/Cum 1822.00

4.75 Cum 1399.70 P/Cum 6649.00

25.7 Sqm 58.40 P/Sqm 1501.00

0.30 Cum 1615.50 P/Cum 485.00

2 Nos. 525.00 Each. 1050.00

350.00 Mtr. 160.97 Rmt. 56338.00

12.00 Nos. 18.85 Each. 226.00

TOTAL: 90923.00
he Engineer-in-charge.

ontractor
hatanwali Paonta Sahib.
hall deducted from the Assistant Engineer,
Giri Irrig.Sub Division,
Patlion.

Estimated cost Rs:96881/-


ta Distt. Sirmour (HP) Earnest money Rs. 2000/-
Time:- Two Months.
Qty. Rates, Unit Amount.
3 4 5 6
309.00 Cum 75.95 P/Cum 23469.00

6.61 Cum. 92.85 P/Cum 614.00

1.10 Cum 1104.50 P/Cum 1215.00

3.17 Cum 1399.70 P/Cum 4437.00

17.1 Sqm 58.40 P/Sqm 999.00


0.30 Cum 1615.50 P/Cum 485.00

2 Nos. 525.00 Each. 1050.00

400.00 Mtr. 160.97 Rmt. 64386.00

12.00 Nos. 18.85 Each. 226.00

TOTAL: 96881.00

he Engineer-in-charge.

ontractor
hatanwali Paonta Sahib.
hall deducted from the Assistant Engineer,
Giri Irrig.Sub Division,
Patlion.
REVISED SCHEDULE OF QUANTITY
Estimated Cost: 86100/-
Name of work: R/M of various LWSS/LIS/Tubewells under IPH Sub Division Majra in Tehsil Earnest Money: 1610/-
Paonta Sahib Distt. Sirmour (HP)(SH:Providing & Supplying computer/Peripherals/accessories) Time: One Month.
Sr.No. Sub Head and item of work. Qty. Rate Unit Amount.
1 Providing and supplying of basic superior computer system 18.5" LED HD INT 1 No. 38000.00 Each. 38000
screen COR I3 processor RAM 2 GB DDR 3, 2 slots/500 GB integrated one year
warranty on site with USB ,Key board, mouse complete in all respect and as per
direction of the Engineer -in-Charge.

2 Providing and supplying Dell Inspiron 15 3000 Series Laptop interl core ™I5 1 No. 46000.00 Each. 46000
-5200U processor LED HD 15.6" complete in all respect and as per direction of
the Engineer-in-charge.

3 Providing and supplying oif Canon LBP 2900B laser jet printer. 2 Nos. 8000.00 Each. 16000

4 Providing and supplying HP 1005 laser jet printer all in one with scanner 1 No. 16000.00 Each. 16000
complete in all respect and as per direction of the Engineer-in-charge.

5 Providing and supplying of UPS numeric digital 600 EX-V complete in all respect. 2 Nos. 2300.00 Each. 4600

Total: 120600
TERMS & CONDITIONS
1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Security,Sale tax & Income tax & labour cess shall be deducted as per rules.
3 Nothing shall be paid for rejected/ defective work/material.

Executive Engineer,
I&PH Division,
Paonta Sahib.
REVISED SCHEDULE OF QUANTITY Estimated cost Rs. 97710/-
Name of work:- Insttt. Of Deep well Hand Pumps in I&PH Division Paonta Sahib in tehsil Paonta Sahib Distt. Earnest Money:Rs. 2500/-
Simour (HP)(SH: Energisation of 03 Nos Hand Pump in vill. Surajpur N/H of Shri Ram Lal , Ghuttanpur in Time:-One Month.
Bahati Basti N/h of Shri Natha Ram & LWSS for vill. Patlion )
Sr.No. Item of work. Qty. Rate. Unit. Amount.
1 2 3 4 5 6
1 Extraction of Hand Pump to the bore well complete in all respect and as per 2 job. 2100 P/job. 4200
direction of the Engineer-in-charge.
2 Providing and installation of Submersible Pump of suitable make such as
KSB/Johnston/Calama/BS/SU/Amrut/SABAR confirming to ISS 1984-1976
alongwith a directly coubpled submesible type Square cage electrical
induction motor of suitable HP for the operation on 220+1 phase 50 CPS AC
supply with water lubricated bearings and provided with pivoted segment
type thrust bearing to withstand non vertical head with uniform wear and
duly fitted with device to take in/Out the exemption of water with heating of
motor complete in all respect. Total Head 40 to 65 Mtr. Discharge 50 to 60
Mtr.

i) 3.00 HP Total Head d: 40 to 65 Mtr. Discharge 50 to 60 LPM three phase. 1 Set 36000.00 P/Set 36000

ii)2.00 HP Total Head: 40 to 65 Mtr. Discharge 50 to 60 LPM single phase. 2 Set 26500.00 P/Set 53000

3 Supplying and fixing of control pannel for submersible Pumps complete with 1 Set 7500.00 P/Set 7500
sheet,Fabricarted duly painted and complete internal wiring and composing
of air break starter main switch of suitable Amps, Amperemeter, Voltmeter
Three phase indicating lamp etc. as per requirement at site complete in all
respect .
4 Supplying and fixing of control pannel for submersible Pumps complete with 2 Set 4500.00 P/Set 9000
sheet,Fabricarted duly painted and complete internal wiring and composing
of air break starter main switch of suitable Amps, Amperemeter, Voltmeter
single phase indicating lamp etc. as per requirement at site complete in all
respect .

5 Supplying and fixing submersible cable to submersible motor of suitable size 66 Rmt 110.00 P/Rmt 7260
4.00mm2 approved make & relevant ISS as per 1554-1988 of Siemens/
Finolex/JEC/ ICS/ELCO/ GRADLY/ Natural make in all respect.

6 Supplying and fixing submersible cable to submersible motor of suitable size 95 Rmt 95.00 P/Rmt 9025
2.50mm2 approved make & relevant ISS as per 1554-1988 of Siemens/
Finolex/JEC/ ICS/ELCO/ GRADLY/ Natural make in all respect.

4 Providing and fixing increaser/reducer/sockets/bends /Nut bolts/Clamps 3 Job 1500.00 P/Job 4500
testing of all above items as per directions of Engineer in-charge.

5 Supplying and fixing 32 mm dia O.D.(outer dia) H.D. Pipe as column pipe 106 Rmt 140.00 P/Rmt 14840
into the bore hole complete as per the direction of the Engineer- in- charge.

6 Providing and fixing steel rope of 6mm thick for hanging the Submersible 109 Rmt 65.00 P/Rmt 7085
pump set into the bore for its extract from the well and as per direction of
the Engineer-in-charge.

Total:- 152410.00
TERMS AND CONDITIONS
1 The work shall be done as per IPH specifications.
2 Security, Sale Tax & Income tax shall be deducted as per rule.
3 Payment will be made after successful testing at site. Executive Engineer,
4 The guarantee period of pumping machinery six months I&PH Division,
Paonta Sahib (HP)
REVISED SCHEDULE OF QUANTITY Estimated Cost: 95115/-
Name of Work :- R/M of various Lift Water Supply scheme Kamroo section in Tehsil Paonta Sahib Distt. Earnest Money: 2000/-
Sirmour (HP) (SH: Providing and supplying of Cast Iron sluice valves) Time : 15 days.
S.No Description Qty. Unit Rate Amount.
1 2 3 5 6.
1 Providing and Supplying of Cast Iron sluice valves of BIR/Kartar/Pelicon make
class PN 1 with flange table 17 including cost of Nut & bolts & gaskets. The dia of
valves as mentioned below in all leads,lifts and carriage of material and to the
entire satisfaction of the Engineer-in-charge.

i) 80 mm dia 4 Nos. 9000 Each. 36000

ii) 65mm dia 5 Nos. 8000 Each. 40000

iii) 50 mm dia. 6 Nos. 6500 Each. 39000

iv) 40mm dia. 6 Nos. 6000 Each. 36000

TERMS AND CONDITIONS. Total: 151000.00


1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Sale Tax & Income Tax & Labour cess shall be deducted as per rules.
3 Nothing shall be paid for rejected/defective work.
Executive Engineer,
I&PH Division,
Paonta Sahib.
REVISED SCHEDULE OF QUANTITY Estimated Cost: 93060/-
Name of Work :- R/M of various Lift Water Supply scheme Kaffota section in Tehsil Paonta Sahib Distt. Earnest Money: 2000/-
Sirmour (HP) (SH: Providing and supplying of Cast Iron Non return valves) Time : 15 days.
S.No Description Qty. Unit Rate Amount.
1 2 3 5 6.
1 Providing and Supplying of Cast Iron Non Return valves of BIR/Kartar/Pelicon
make class PN 1 with flange table 17 including cost of Nut & bolts & gaskets. The
dia of valves as mentioned below in all leads,lifts and carriage of material and to
the entire satisfaction of the Engineer-in-charge.

i) 80 mm dia 5 Nos. 7500 Each. 37500

ii) 65mm dia 7 Nos. 6500 Each. 45500

iii) 50 mm dia. 8 Nos. 5600 Each. 44800

TERMS AND CONDITIONS. Total: 127800.00


1 The work shall be executed as per IPH/PWD specification and instructions of the Engineer-in-charge.
2 Sale Tax & Income Tax & Labour cess shall be deducted as per rules.
3 Nothing shall be paid for rejected/defective work.
Executive Engineer,
I&PH Division,
Paonta Sahib.