Nuevas Tecnologías para Control de Erosión y

Estabilidad en Taludes y Canales

Francisco Pizarro G.
(francisco.pizarro@propexglobal.com)

Regional Manager Latin America


January 30, 2018
Linkedin: Propex Geosolutions – Latin America

Linkedin: Francisco Pizarro, Propex

Twitter: @propex_SAmerica

January 30, 2018


Breve Historia de Propex

2015
LAUNCH OF DUAL FUNCTION
SALES STRUCTURE

pg 3 www.propexglobal.com
Nuestra huella alrededor del mundo

pg 4 www.propexglobal.com
El Problema: Movimiento de finos

pg 5 www.propexglobal.com
Soluciones Convencionales

pg 6 www.propexglobal.com
Soluciones Convencionales

pg 7 www.propexglobal.com
Soluciones Convencionales

www.propexglobal.com
8
Soluciones Convencionales

pg 9 www.propexglobal.com
Soluciones Convencionales

ESTRATEGIA DEFENSIVA
¿Solo controlar sedimentos es lo
que queremos?

pg 10 www.propexglobal.com
Hechos

• Sobre US $1 billón en remoción de


sedimentos (al año)
• La EPA estima que la remoción de
sedimentos de reservorios supera
los sediment US $500 millones (al
año)
• Aguas contaminadas que implican
el reemplazo con costos anuales
asociados de US $2 a US$6
billones.

pg 11 www.propexglobal.com
Los Beneficios de la Vegetación

“Una de las formas más efectivas


de prevenir erosión y sedimentación
es estabilizar el terreno mediante la
adición de vegetación”

“…proveer tanto control de polvo y


una reducción en el riesgo de
erosión, mediante el incremento en
la filtración, el atrapamiento de
sedimentos, la estabilización de
suelos y la disipación de la energía
posterior a una lluvia agresiva”
pg 12 www.propexglobal.com
Mantos de control de erosión (TRM's)

pg 13 www.propexglobal.com
Refuerzo a través de vegetación

pg 14 www.propexglobal.com
Portafolio de Soluciones

pg 15 www.propexglobal.com
Servicios de Ingeniería

Slope Stability Analysis & Design Hydraulic Analysis & Design

Plan & Detail Generation Testing & Field Support

pg 16 www.propexglobal.com
LANDLOK® 450 TRM: 1era Generación

Tres capas
• Dos redes en el exterior
• Compuesto de polipropileno

Resistencia
• 400 x 300 lb/ft
• 5.8 x 4.4 kN/m

Estabilización UV Moderada
• Hasta 10 años de vida útil
• 80% a 1,000 horas (ASTM D 4355)

Aplicaciones Apropiadas
• Canales con flujos menores
• Taludes de menor evergadura
• Condiciones de bajo stress

pg 17 www.propexglobal.com
LANDLOK® 450 TRM

pg 18 www.propexglobal.com
Lecciones Clave de Mantos de 1era Generación

Aplicación Impropia
• Condiciones hidráulicas que excedían la performance del TRM
• Esfuerzos no hidráulicos no considerados
• Vida útil limitada
Especificación del TRM Inadecuada
• Debe ser la adecuada para la aplicación
• Materiales alternativos deben cumplir los requerimientos
Control de Calidad en Instalación
• Especificación debe estipular guía de instalación
• Reunión en el sitio entre contratista, ingenieros y fabricante

pg 19 www.propexglobal.com
PYRAMAT® HPTRM: 2da Generación
Geomanto tejido tridimensional de
polipropileno:
• PYRAMAT® 25 Turf Reinforcement Mat (TRM)
• PYRAMAT® 75 High Performance Turf
Reinforcement Mat (HPTRM)

Construcción:
• Tecnología X3®
• Tejido y uniforme
• Estructura homogénea
Creada especialmente para suplir las
limitaciones de los TRM’s de 1era generación:
• Capaz de resistir esfuerzos no hidráulicos
• Diseñada para vida útil de hasta 75 años

pg 20 www.propexglobal.com
PYRAMAT® 25 TRM

TRM de 2da Generación


Tejido Homogéneo
Resistencia
• 2,000 x 1,800 lb/ft
• 29.2 x 26.3 kN/m
Estabilización UV Moderada
• Hasta 25 años de exposición directa
• 90% a 3,000 horas (ASTM D 4355)
Aplicaciones Apropiadas
• Canales de flujo medio / moderado
• Taludes moderados
• Esfuerzos no hidráulicos menores

pg 21 www.propexglobal.com
PYRAMAT® 25 TRM

pg 22 www.propexglobal.com
PYRAMAT® 75 HPTRM

• HPTRM de 2da Generación


• Tejido Homogéneo
• Resistencia
• 4,000 x 3,000 lb/ft
• 58.4 x 43.8 kN/m
• Estabilización UV Extrema
• Hasta 75 años de exposición directa
• 90% a 6,000 hours (ASTM D 4355)
• Aplicaciones Apropiadas
• Flujos agresivos en canales
• Taludes / Terraplenes inclinados
• Condiciones no hidráulicas severas

pg 23 www.propexglobal.com
Criterio de Diseño

• Se debe diseñar tanto para esfuerzos hidráulicos como


no hidráulicos
• Resistencia a esfuerzos hidráulicos (velocidad y esfuerzos
de corte)
• Resistencia a esfuerzos no hidráulicos

Hidráulicos No Hidráulicos

pg 24 www.propexglobal.com
Esfuerzos No Hidráulicos

• Carga de mantención
• Carga de escombros
• Carga de animales
• Nieve
• Mayores factore de seguridad

pg 25 www.propexglobal.com
ARMORMAX® 75

Componentes del Sistema ARMORMAX® 75:


1. PYRAMAT® 75 HPTRM
2. Anclajes hincados y activados

pg 26 www.propexglobal.com
Soluciones de Control de Erosión
PYRAMAT® ARMORMAX®
LANDLOK® 450 PYRAMAT® 25 75
75

MATERIAL DESIGN
PRODUCT APPLICATION
COMPOSITION LIFE
Levees, Canal/Stream Banks, Shorelines, Channels,
ARMORMAX® 75 ARVS Anchored Woven 75 Years Wave Overtopping, Shallow Plane Slope Failures
High Loading/High Survivability

Vegetated Channels and Slopes


PYRAMAT® 75 HPTRM Homogenous Woven 75 Years
High Loading/High Survivability

PYRAMAT® 25 TRM Vegetated Channels and Slopes


Homogeneous Woven 25 Years
Moderate Non-Hydraulic Stresses.

Vegetated Channels and Slopes


LANDLOK® 450 TRM Stitch Bonded 10 Years
Minimal Non-Hydraulic Stresses

pg 27 www.propexglobal.com
27
27
Anclaje

pg 28 www.propexglobal.com
Anclaje

Tipo B1
• Largo 0.9-1.5 m
• 200-600 lbs, 0.89-2.67 kN
resistencia pullout

Tipo B2
• Largo 1.8-3.6 m
• 800-2,000 lbs, 3.56-8.90
kN resistencia pullout

pg 29 www.propexglobal.com
Estabilización de Taludes

• Engineered Earth Anchors are


designed to provide resistance
to shear and lateral forces, and
embedded beyond the predicted
High Performance plane of failure
Turf Reinforcement
Mat (HPTRM) • HPTRM distributes loads
amongst anchors while providing
a continuous compressive cover
• HPTRM is also permeable for
pore pressure relief and
promotes vegetative
establishment

Identified
Failure
Surfaces

Engineered
Earth
Anchor

pg 30 www.propexglobal.com
Aplicaciones

Diques Estabilización de Taludes

Canales Lagunas

pg 31 www.propexglobal.com
5th Runway Slope Stabilization

Application: Slope Stabilization


Client: Hartsfield-Jackson Atlanta
International Airport
Contractor: Athena Construction Group
CW Matthews Contracting
Installed: 2016
Product: ARMORMAX® ARVS
9’ Type B2 Anchors
0.62 anchors per square yard
0.75 anchors per square meter
Quantity: 1,000 SY
800 SM

pg 32 www.propexglobal.com
5th Runway Slope Stabilization

pg 33 www.propexglobal.com
5th Runway Slope Stabilization

May 2014

pg 34 www.propexglobal.com
5th Runway Slope Stabilization

August 2015

pg 35 www.propexglobal.com
5th Runway Slope Stabilization

May 2016

pg 36 www.propexglobal.com
5th Runway Slope Stabilization

Scenario Factor of Safety


Original Unreinforced Slope 1.026
ARMORMAX® Reinforced Slope 1.349

pg 37 www.propexglobal.com
5th Runway Slope Stabilization

pg 38 www.propexglobal.com
5th Runway Slope Stabilization

pg 39 www.propexglobal.com
5th Runway Slope Stabilization

pg 40 www.propexglobal.com
5th Runway Slope Stabilization

pg 41 www.propexglobal.com
5th Runway Slope Stabilization

pg 42 www.propexglobal.com
5th Runway Slope Stabilization

pg 43 www.propexglobal.com
5th Runway Slope Stabilization

pg 44 www.propexglobal.com
5th Runway Slope Stabilization

pg 45 www.propexglobal.com
John T. Montford Dam at Lake Alan Henry, Lubbock, TX

• Application: Erosion Control for Dam


Safety
• Client: City of Lubbock, TX
• Installed: March 2013
• Product: Pyramat® HPTRM installed over
801HUV non-woven geotextile
• Quantity: 140,000 SY
• Design Considerations:
 Earthen dam constructed in 1990 for
City’s water supply
 Poor vegetation establishment left rilling
and gullies on landside of dam, severe
erosion threatened to undermine dam
core
 Pyramat® with non-woven
underlayment was used in lieu of
shotcrete and riprap – saved the City
over $1.5MM and cut construction
schedule in half

www.propexglobal.com
John T. Montford Dam at Lake Alan Henry, Lubbock, TX

4,000 ft
Earthen
Dam

www.propexglobal.com
John T. Montford Dam at Lake Alan Henry, Lubbock, TX

Major Rilling and Gully Erosion Compounding on Landside


of Dam, Threatening Undermining of Dam Core

www.propexglobal.com
John T. Montford Dam at Lake Alan Henry, Lubbock, TX

Beginning of Construction in January 2013 – Smoothing


and Repairing Landside Grades

www.propexglobal.com
John T. Montford Dam at Lake Alan Henry, Lubbock, TX

Installation of PYRAMAT® HPTRM, Secured with 12” Pins


over 801-HUV (Tan) Non-woven Underlayment

www.propexglobal.com
John T. Montford Dam at Lake Alan Henry – Lubbock, TX

Installation of PYRAMAT® HPTRM, Secured with 12” Pins


over 801-HUV (Tan) Non-woven Underlayment

www.propexglobal.com
John T. Montford Dam at Lake Alan Henry , Lubbock, TX

Aerial Photo of Installation – March 2013

www.propexglobal.com
La Hacienda, Estado de Guerrero
Cliente
Conagua
Problema
Los daños causados por los
huracanes Manuel y Raymond en
2013
Solución
Armormax utilizando anclajes B1 de
1.5 m con HPTRM Pyramat
Beneficios
El contratista proporciona al cliente
un ahorro de 40% frente a la
propuesta original de gaviones.
Fecha de instalación
Enero 2015.
Cantidad
28,000 m2

pg 53 www.propexglobal.com
La Hacienda, Estado de Guerrero

pg 54 www.propexglobal.com
La Hacienda, Estado de Guerrero

pg 55 www.propexglobal.com
La Hacienda, Estado de Guerrero

pg 56 www.propexglobal.com
West City Ditch Repairs
Application: Channel Slope Stabilization
Client: City of Kissimmee, FL
Designer: TY Lin International
Contractor: Underwater Engineering
Services, Inc.
Installed: 2010
Product: ARMORMAX®
6-12’ Type B2 Anchors
0.5 anchors per square yard
0.6 anchors per square meter
Quantity: 20,000 SY
16,700 SM

pg 57 www.propexglobal.com
West City Ditch Repairs

pg 58 www.propexglobal.com
West City Ditch Repairs
STANDARD PENETRATION TEST BORING RESULTS

SPT Boring Summary


• Soils encountered
consist of fine sand,
silty fine sand, and
clayey fine sand to a
depth of 15’
• Blow counts ranged
from 3 to 23, with most
above 10 (and
categorized as medium
dense sand)
• Groundwater
encountered between 4-
7 feet

pg 59 www.propexglobal.com
West City Ditch Repairs

Slope Stability
Analysis:
Material Properties and
Existing Conditions Results
• Separate unit weights and
φ angles designated using
SPT results
• Water table considered in
unit weights and rapid
drawdown conditions
• Six cross sections
analyzed, none met
minimum FS values
without reinforcement

pg 60 www.propexglobal.com
West City Ditch Repairs
SLOPE STABILITY ANALYSIS – CROSS SECTION 2

Long-Term Normal Condition Rapid Drawdown Condition


No Reinforcement No Reinforcement
Calculated FS = 1.2 Calculated FS = 0.4
Minimum Acceptable FS = 1.5 Minimum Acceptable FS = 1.1

pg 61 www.propexglobal.com
West City Ditch Repairs
ARMORMAX® SELECTED INSTALLATION DETAILS

Specified “B-2” Slope Face


Engineered Earth Anchor Installation Detail
Length varies per section HPTRM panels shingled downslope
Size selected to meet pull-out requirement. Anchor trenches at top and toe of slope

pg 62 www.propexglobal.com
West City Ditch Repairs
ARMORMAX® SELECTED INSTALLATION DETAILS

Specified Anchoring
Pattern
• Spacing of 4 ft in the
‘X’ direction, 5 ft in the
“Y” direction
• 6-inch overlap for
HPTRM panels
• Pattern staggered to
secure HPTRM
efficiently
• Spacing and density
modeled in slope
stability software

pg 63 www.propexglobal.com
West City Ditch Repairs
ANCHOR DESIGN LENGTHS PER PLAN VIEW SECTION

6-FT, 9-FT, & 12-FT (Nominal) Anchor Lengths Designated in


Various Sections, per Factor of Safety Determinations
pg 64 www.propexglobal.com
West City Ditch Repairs

Construction Begins!
Smoothing side slopes, near Cross
Section 2
August 25, 2009
pg 65 www.propexglobal.com
West City Ditch Repairs

Earthwork Complete – Installing HPTRM


Inserting into lower trench for pulling up slope
September 5, 2009

pg 66 www.propexglobal.com
West City Ditch Repairs

Stabilization Continues
Installed HPTRM near ‘Cross Section 2’
September 5, 2009

pg 67 www.propexglobal.com
West City Ditch Repairs

Further HPTRM Installation


Looking ahead towards ‘Cross Section 2’
September 14, 2009

pg 68 www.propexglobal.com
West City Ditch Repairs

Installing Engineered Earth Anchors


Using a 65-lb Percussion Hammer
September 14, 2009

pg 69 www.propexglobal.com
West City Ditch Repairs

Quality Control Load Testing


Spot checks of random anchors to verify load
spec
September 29, 2009

pg 70 www.propexglobal.com
West City Ditch Repairs

Completed ARMORMAX® Installation


Looking south towards ‘Cross Section 2’
October 8, 2009

pg 71 www.propexglobal.com
West City Ditch Repairs

Storm Hits!
ARMORMAX® provides protection prior to
vegetation
October 11, 2009
pg 72 www.propexglobal.com
West City Ditch Repairs

Proven Performance
Slope stability and erosion control with soft
armoring
April 17, 2012
pg 73 www.propexglobal.com
West City Ditch Repairs

Proven Performance
Slope stability and erosion control with soft
armoring
April 17, 2012

pg 74 www.propexglobal.com
Carlota Mine – Powers Gulch Channel, Miami, AZ

• Application: Diversion Channel Drop Structure Lining


• Client: Carlota Copper Company / Quadra Mining
• Designer: Arcadis
• Installer: ARS Companies
• Installed: November 2008
• Product:
– Pyramat® High Performance Turf Reinforcement Mat, secured
with rock bolts and welded-wire mesh
• Quantity: Approximately 8,000 SY
• Design Considerations:
– Steep channel realignment with drop structures required for
diversion around heap leach pads
– Flood conveyance and erosion control critical for sensitive
watershed
– Pyramat used in conjunction with grouted gabions for varying
velocities through channel drop structures

www.propexglobal.com
Carlota Mine – Powers Gulch Channel, Miami, AZ

Diversion
Channel

Leach
Pad

Overall Mine Drop Structure


Site Schematic

www.propexglobal.com
Carlota Mine – Powers Gulch Channel, Miami, AZ
Typical PYRAMAT® Lined Drop Structure

Grouted
Gabion
Mattress

www.propexglobal.com
Carlota Mine – Powers Gulch Channel, Miami, AZ

www.propexglobal.com
Carlota Mine – Powers Gulch Channel, Miami, AZ

www.propexglobal.com
Carlota Mine – Powers Gulch Channel, Miami, AZ

www.propexglobal.com
Carlota Mine – Powers Gulch Channel, Miami, AZ

www.propexglobal.com
Carlota Mine – Powers Gulch Channel, Miami, AZ

www.propexglobal.com
Carlota Mine – Powers Gulch Channel, Miami, AZ

www.propexglobal.com
Carlota Mine – Powers Gulch Channel, Miami, AZ

www.propexglobal.com
Carlota Mine – Powers Gulch Channel, Miami, AZ

www.propexglobal.com
Carlota Mine – Powers Gulch Channel, Miami, AZ

www.propexglobal.com
Mining Reclamation
Diversion Channel
(Southwestern U.S.A.)

www.propexglobal.com
Carlota Mine – Powers Gulch Channel, Miami, AZ

www.propexglobal.com
GRACIAS!
Francisco Pizarro G.
(francisco.pizarro@propexglobal.com)

Regional Manager Latin America

January 30, 2018