INGENIUM II
PRODUCTION BARGE
REFURBISMENT
KRISENERGY (APSARA) LTD
DAVE/MARC/
B 22-02-19 Re - Issued for Review ES SS RR
ROB
DAVE/MARC/
A 30-11-18 Issued for Review ES SS RR
ROB
APP DATE
REV DATE DESCRIPTION BY CHK APP
KE APP.
TABLE OF CONTENTS
1. SCOPE .....................................................................................................5
4. DESIGN REQUIREMENTS........................................................................9
5. MATERIAL ............................................................................................. 13
1. SCOPE
This specification covers the minimum requirements for the design, material, fabrication, inspection
and testing of Air Compressor Package, complete with start-up, one (1) year spare parts and vendor
data.
1.1 General
It shall be supplement by and shall be read in conjunction with the Codes and Standards necessary
to meet applicable Government and other Regulatory & Statutory requirements as stated in this
document.
Company KrisEnergy
Project Production Barge (Ingenium II) Cambodia (Apsara) Block “A” Field Development
Vendor or A company who performs design and/or fabrication and/or supply of the material
and/or equipment and/or construction services for the Project under a supply or
subcontract agreement with Contractor/Purchaser
Inspector Any personnel(s) engaged by and acting on behalf of Purchaser to conduct inspection
of the material and/or equipment supplied by Vendor and/or its Sub-Vendor for the
Project. Purchaser Inspector is not to be construed as Authorized Inspector assigned
for compliance with governmental rules or regulations
2. GENERAL REQUIREMENTS
The purpose of this specification and referenced codes, standards, general specifications and project
documents is to establish a minimum level of acceptable quality. Alternate standard designs of equal
or superior quality may be proposed, provided all exceptions are listed and written approval for all
exceptions are obtained from COMPANY.
In case of conflict between the documents, Vendor shall submit the discrepancy to COMPANY for
final resolution. In his Bid Document, Vendor shall provide for the more stringent requirement unless
otherwise instructed in writing by the COMPANY.
Equipment specified by this specification shall be complete in all details and ready for installation.
This specification shall normally be utilized in conjunction with COMPANY supplied vessel outline
drawings. Outline drawings will indicate critical major dimensions, design and operating conditions. It
shall be Vendor's responsibility to perform detailed mechanical design of and prepare all necessary
detailed fabrication drawings for the vessels.
In cases where a process guarantee is requested, it shall be Vendor's responsibility to perform all
necessary process calculations for the vessel based on COMPANY supplied operating parameters
and fluid properties.
Equipment shall be designed for continuous use in an exposed, tropical, offshore, salt laden,
corrosive atmosphere with minimum/maximum 22C/34C ambient temperatures and 100% relative
humidity.
SPECIFICATION FOR Doc. No.
AIR COMPRESSORS AND AIR DRYER IPB-OCS-KEA-MEC-SPE-0011
PACKAGES Revision: B Doc. Status: IFR
Discipline : MEC Document type: SP Rev. Date :22-02-19 Page 8 of 21
OCS Job No: R1948
3. SCOPE OF SUPPLY
The complete package shall comprise three (3) 100% duty, electric motor driven; oil flooded type,
screw compressor and two (2) dryer packages. The package / unit are to be skid mounted, complete
with but not necessarily limited to the following auxiliaries.
Compressor air inlet filters.
Compressor lubrication system(s).
Process air oil separators and filters.
Process air coolers.
Compressor oil coolers.
Process air condensate separator with automatic moisture trap(s).
Interconnecting pipe work and valves, including relief valves.
Wiring controls and instruments.
Local gauge panel (if required).
Two twin-tower type heatless absorption air dryer complete with duplex pre-filters and after filters
with block valves.
Automatic desiccant regeneration and dryer changeover sequence control and protection
facilities.
Desiccant charge.
Lifting frames and slings.
Motors complete with accessories.
All documentation as requested in this specification.
Inspection and testing as requested in this specification.
Painting and coating.
Preservation and preparation for shipment.
SPECIFICATION FOR Doc. No.
AIR COMPRESSORS AND AIR DRYER IPB-OCS-KEA-MEC-SPE-0011
PACKAGES Revision: B Doc. Status: IFR
Discipline : MEC Document type: SP Rev. Date :22-02-19 Page 9 of 21
OCS Job No: R1948
4. DESIGN REQUIREMENTS
4.1 Design Condition
4.1.1 The air compressor package shall be designed to comply with standard NEMA.
4.1.2 The air compressor package shall be installed under shelter and suitable for use in an offshore non-
hazardous, humid facility as shown in the data sheet(s).
4.5.6 Pipe work shall be sized and designed in accordance with good engineering practices. All pipe-work
shall be adequately supported for shipment and operation. Termination flange size shall be 2 inches.
4.5.7 The use of flexible hoses shall be kept to a minimum. Any flexible hoses shall be braided and have a
pressure rating in excess of the system relief valve set pressure at the maximum service
temperature.
shall be ultrasonically tested to ensure soundness and the integrity of the affixing weld. The Vendor
shall provide a spreader bar should this be necessary to effect the single point lift.
4.9.5 The entire area of the skid shall be provided with a drip pan. Drip pans shall be sloped 1:50 to the
low point drain (min. 2” NB) and shall be covered with a galvanized grating.
4.9.6 The Vendor shall provide all information necessary for PURCHASER’s steel work design. This shall
include:
Mass centre of gravity of equipment
Magnitude, location and frequency, of internal forces and couples, torque reactions and out of
balance forces.
Fixing details.
Details of any transient forces that may occur in passing through a speed on start up etc.
4.9.7 Two earthing bosses shall be provided. Each item of equipment shall be suitably bonded to the skid
by a separate earthing strap to ensure earthing continuity.
4.11 Driver
4.11.1 Electric motor driven shall be in accordance with IPB-OCS-KEA-ELE-SPE-0005 LV Induction Motor.
4.11.2 Electric motor driven shall be properly aligned prior to testing. On completion of testing the units shall
be drilled, reamed and fitted with tapered dowel pins. Straight dowels and fitted bolts shall not be
allowed.
5. MATERIAL
Materials shall be new, free from defects and in accordance with the Air compressor package Data
Sheet.
Structural steel material shall conform to the requirements of ASTM A36. The carbon content shall be
limited to 0.23%.
All welding of pressure containing parts shall receive 100 percent inspection after stress relieving.
Magnetic particle or dye penetrant methods shall be used for surface inspection. Ultrasonic or
radiographic methods shall be used for sub-surface inspection
The Supplier shall furnish material certificates in accordance with ISO 10474/BS EN 10204, Type
2.3. is as a minimum.
Material certificates in accordance with Type B are required for all pressure-containing parts in
hydrocarbon services with an operating temperature above 0 °C and for the main bolts and nuts in
contact with hydrocarbon services.
Material certificates in accordance with Type C are required for pressure-containing parts of low
and high alloy steels (martensite steels, ferrite and austenitic stainless steel, duplex stainless
steel ), nickel alloy (copper-nickel, Monel, Inconel, Incoloy, nickel aluminium bronze etc.) and titanium
and for carbon steel pressure containing parts in hydrocarbon services with an operating temperature
of 0°C and below
SPECIFICATION FOR Doc. No.
AIR COMPRESSORS AND AIR DRYER IPB-OCS-KEA-MEC-SPE-0011
PACKAGES Revision: B Doc. Status: IFR
Discipline : MEC Document type: SP Rev. Date :22-02-19 Page 14 of 21
OCS Job No: R1948
6. PROTECTIVE COATING
Surface preparation and coating of all exposed metal parts shall be in accordance with IPB-OCS-
KEA-PIP-SPE-0006 Specification for Painting & Coating. Insulation is required only when specified or
indicated on data sheets or outline drawings.
SPECIFICATION FOR Doc. No.
AIR COMPRESSORS AND AIR DRYER IPB-OCS-KEA-MEC-SPE-0011
PACKAGES Revision: B Doc. Status: IFR
Discipline : MEC Document type: SP Rev. Date :22-02-19 Page 15 of 21
OCS Job No: R1948
The Vendor shall furnish a detailed test procedure for COMPANY review and approval three (3)
months prior to schedule testing.
The Vendor shall be responsible for testing of the unit.
The Vendor shall notify COMPANY of all inspections and tests at least fourteen (14) days prior to
scheduled factory inspection/test dates such that COMPANY may witness said inspection/test.
The Vendor shall submit to COMPANY reports of all inspections and tests within two (2) weeks
following their completion.
COMPANY shall have free and immediate access to Vendor's facilities to inspect all work pertaining
to COMPANY equipment in all stages of manufacture.
SPECIFICATION FOR Doc. No.
AIR COMPRESSORS AND AIR DRYER IPB-OCS-KEA-MEC-SPE-0011
PACKAGES Revision: B Doc. Status: IFR
Discipline : MEC Document type: SP Rev. Date :22-02-19 Page 17 of 21
OCS Job No: R1948
8.4 Tools
The Vendor shall supply one full set of special tools required for the complete disassembly and
reassembly of all items of equipment supplied as part of the unit. Each tool shall be clearly labelled
and identified in the Special Tools List specified in the Data Requirement Sheet.
SPECIFICATION FOR Doc. No.
AIR COMPRESSORS AND AIR DRYER IPB-OCS-KEA-MEC-SPE-0011
PACKAGES Revision: B Doc. Status: IFR
Discipline : MEC Document type: SP Rev. Date :22-02-19 Page 18 of 21
OCS Job No: R1948
9. START UP ASSISTANCE
The Vendor shall supply, as part of his initial package, service of component technician who shall
supervise the onsite commissioning start up and operating tests.
The Vendor shall supply, as part of his proposal, a detail costing for the services of the
commissioning/ start-up technician to remain onsite following start-up to assist COMPANY will inform
the Vendor of the need for training prior to mobilizing the technician for commissioning/start-up.
The Vendor shall supply one full set of documentation, as listed in the Data Requirement Sheet,
package with the equipment for installation, commissioning and on site testing.
SPECIFICATION FOR Doc. No.
AIR COMPRESSORS AND AIR DRYER IPB-OCS-KEA-MEC-SPE-0011
PACKAGES Revision: B Doc. Status: IFR
Discipline : MEC Document type: SP Rev. Date :22-02-19 Page 19 of 21
OCS Job No: R1948
Tools and spare parts shall be packed in metal boxes suitable for long term storage. The boxes shall
be galvanized or coated in accordance with IPB-OCS-KEA-PIP-SPE-0006 Specification for Painting
& Coating.
SPECIFICATION FOR Doc. No.
AIR COMPRESSORS AND AIR DRYER IPB-OCS-KEA-MEC-SPE-0011
PACKAGES Revision: B Doc. Status: IFR
Discipline : MEC Document type: SP Rev. Date :22-02-19 Page 21 of 21
OCS Job No: R1948
12. GUARANTEE
Material and/or equipment shall be guaranteed by Vendor/Manufacturer to perform in accordance
with specification requirements and to be free of defects and poor workmanship including, but not
limited to those caused by inadequate preparation for shipment, as per Section 11.0 of this
document, for a period of one (1) year after material/equipment is placed in service, but not
exceeding eighteen (18) months following delivery to the contracted destination.
Vendor shall repair or replace all defective items during the guarantee period at no cost to
COMPANY.