Académique Documents
Professionnel Documents
Culture Documents
50 m
Asumido
c: 0.25 0.25 m Ok
e: 0.23 0.25 m Ok
H: 2.48 2.50 m
H1: 0.00 0.00 m
H2: 2.25 2.25 m
Base B: 1.73 2.20 m Ok
b: 0.25 0.30 m Ok
pie: 0.25 0.30 m Ok
Talón: 1.24 1.60 m
Hrell: 1.00 1.00 m
a: 0 ° 0.00
D: 1.23 1.25 m
f: 40 ° 0.70
g: 1.80 ton/m³
c: 0.00 ton/m²
Aa: 0.20 g
f2: 36.00 ° 0.63
g2: 1.80 ton/m³
c2: 1.00 ton/m²
2. CÁLCULO DE EMPUJES
Cos a: 1.000
Cos f: 0.766
Sen f: 0.643
Ka: 0.22
Zc: 0.00 m
c/gz: 0.00
k'a: 0.377
2.2 Sobrecarga
q: 1.08 ton/m²
-2
cos 2 (f - q - b ) sen(f + d ) sen(f - q - i)
K AE 1 +
cos(q ) cos 2 (b ) cos(d + b + q ) cos(d + b + q ) cos(i - b )
Kh Kh: 0.10
q tan -1
1 - Kv Kv: 0.07
Kae: 0.281
3. REVISIONES
Cortante:
Ea: 1.22 ton/m f'c: 21 Mpa
Es: 0.59 ton/m fy: 420 Mpa
Eae: 1.47 ton/m d: 0.23 m
fVc f 0.17 f ' c b d
Vu: 2.53 ton/m f Vc: 13.44 ton/m
Ok, La Sección de Concreto es Suficiente
Flexión:
Mact: 2.01 ton-m Barra #: 4
Mu: 2.82 ton-m f: 1.27 cm
k: 532.62 kN/m² A: 1.27 cm²
r: 0.0014
As: 4.60 cm²/m Longitudinal # 4 c/ 24.78 cm
Ast: 4.60 cm²/m Transversal # 3 c/ 30.00 cm
a
σab 4.03 ton/m²
0.25
b c
0.30 1.90
R1 1.17 ton
5.59
3.79 σab R2 9.14 ton
R2
R1
2.20
Cortante:
Va-b: 0.99 ton/m
Vu: 1.39 ton/m f Vc: 10.22 ton/m
Ok, La Sección de Concreto es Suficiente
Flexión:
Ma-b: 0.58 ton-m Barra #: 4
Mu: 0.81 ton-m f: 1.27 cm
k: 265.26 kN/m² A: 1.27 cm²
r: 0.0007
As: 3.50 cm²/m Longitudinal Abajo # 4 c/ 32.57 cm
Ast: 3.50 cm²/m Transversal # 3 c/ 30.00 cm
Cortante:
Vb-c: 8.97 ton/m
Vu: 12.56 ton/m f Vc: 10.22 ton/m
d: 0.18 m
Aumentar Espesor Zapata
Flexión:
Mb-c: 2.74 ton-m Barra #: 4
Mu: 3.84 ton-m f: 1.27 cm
k: 1252.35 kN/m² A: 1.27 cm²
r: 0.0035
As: 6.04 cm²/m Longitudinal Arriba # 4 c/ 18.88 cm
Ast: 3.50 cm²/m Transversal # 3 c/ 30.00 cm
5. RESUMEN DEL DISEÑO
0.25
#3 c/ 30cm
# 3 c/ 30cm
#4 c/ 24.8cm
# 3 c/ 30cm 2.25
#4 c/ 18.9cm #3 c/ 30cm
2.2
#3 c/ 30cm #4 c/ 32.55cm
MATERIALES