Vous êtes sur la page 1sur 1

1.

 Input Data:

Yield Strength of Steel, fy = 420 MPa


Compressive Strength of Concrete, fcu = 40 MPa
Main Bar Diameter, D = 32 mm
Section Depth, h = 1000 mm
Section Width, b = 25400 mm
Effective Concrete Depth, hd = 500 mm Consider 250mm at each face, hd 
[Clause 5.2]
2. Crack Spacing Check:
Effective Concrete Area, Ac (Consider per meter strip) = 500000 mm2 [hd x 1000]
0.7
Tensile strength of immature concrete, fct* = 1.59 [0.12 x (fcu) ]
Stress ratio = 0.004 [fct* / fy]

Minimum Reinforcement, Asmin1:  = 1889 mm2 [(fct* / fy) x Ac]

3. Crack Width Check:
Short term temperature fall, T 1  (°C): 4

Steel Formwork 18mm Plywood Formwork
Cement Content (kg/m3)
Winter Summer Winter Summer
300 12 18 20 28
350 15 23 27 35
400 17 27 32 43

2 Type of Portland Cement:
Modified T1 = 28 °C

Long term seasonal temperature fall, T 2  (°C):

2 Full Movement Joints provided at less than 15m spacings/ Restraint provided by a section subject to the same 
climatic exposure as that being restrained? Yes/No

Long term seasonal temperature fall, T2 = 20 °C [Clause 5.9]

Coefficient of thermal expansion, α = 0.000012
Thermal Strain, ϵth = 0.00046 [0.8 x α x (T1 + T2)]
Ultimate Tensile Strain,  ϵult = 200 microstrains [Clause 5.3]
Shrinkage Strain, ϵsh = 100 microstrains [Clause 5.6]

3 Type of Rebar:
Stress Ratio, fct*/fb = 0.67

1 Restraint Condition:
Restraint Factor, R = 0.2 [Table 2]
Allowable Crack width, w = 0.1 mm

Minimum Reinforcement, Asmin2: = 652 mm2 [(fct* / fb) x Ac x (D/2w) x {R x (ϵsh+ϵth) ‐ 0.5 x (ϵult)}]

Required Early thermal Reinforcement  = 1889 mm2 [Max (Asmin1, Asmin2)]

Required Early thermal Reinforcement per face = 945 mm 2

Vous aimerez peut-être aussi