Vous êtes sur la page 1sur 8

CULTURAL INTERVENTION CENTER

AT BALGANDHARVA NATYA MADIR, PUNE


BUILDING SERVICES
IDENTICATION OF SERVICES AND CASE STUDY REPORT

APURVA KORDE | 1529

SEMESTER IX

SIR J.J. COA


APURVA KORDE | 1529

IDENTIFICATION OF SERVICES :

1. VENTILATION
 Methods of ventilation
 Natural Ventilation
 Mechanical Ventilation
 Energy conservation in Ventilation System

2. AIR CONDITIONING, HEATING AND MECHANICAL VENTILATION


- OUTDOOR INDOOR DESIGN CONSIDERATIONS
- PLANNING
 Room for air conditioning plant
 Room for air handling units and package units
 Supply and return air ducts
 Cooling tower

- TYPES OF SYSTEMS IN AIR CONDITIONING AND THEIR AREA REQUIREMENTS


 Split
 Package
 Centralised

- FACTORS TAKEN INTO CONSIDERATION FOR DIFFERENT APPLICATION IN DIFFERENT


SPACES
- UNGERGROUOND/ BASEMENT CAR PARK VENTILATION
- VENTILATION OF NON AIR CONDITIONED AREAS
- HVAC SYSTEMS
 Split air conditioners
 VRF systems
 Mechanical ventilation system
 Building automation system for hvac control monitoring and ventilation

3. LIGHTING
- Use of daylight
- Orientation of the building
- Use of artificial lighting
- Lighting required in different spaces as per the function
- Different light systems that can be incorporated
- Energy conservation in lighting

4. ELECTRICAL
- PLANNING OF ELECTRICAL INSTALLATIONS
 Substations and switch rooms
 Location and requirements of distribution panels
 Overhead lines, wires and cables
 Map of underground networks
 System for power backup

- USAGE IN CAR PARK FOR ELECTRICAL VEHICULAR CHARGE


- USE OF ALTERNATIVE RESOURCES FOR GENERATIONS OF ELECTRICITY
- BUILDING MANAGEMENT SYSTEM
- SECURITY SYSTEM

5. ACCOUSTICS, SOUND INSULATIONAND NOISE CONTROL


- PLANNING AND DESIGN AGAINST OUTDOOR NOISE
 Use of green belts and landscaping
 Highway noise landscaping
- PLANNING AND DESIGN AGAINST INDOOR NOISE
 Identification of zones which produce a lot of noise
 Internal planning measures
- SOUND PROOFING/ NON PROOFING

6. FIRE PROTECTION REQUIREMENTS


- TAKING INTO CONSIDERATION BUILDING HEIGHT AND PROVIDING ADEQUATE MEASURE
OF FIRE SAFETY
- PODIUM PROPOSAL OR NO
- CONSTRUCTION MATERIALS
- EXITS
 Types of exits
 General requirements taken into consideration
- FIRE ALARM DEVICES
- ESCAPE ROUTES
- NUMBER AND WIDTH OF ESCAPE ROUTES
- REQUIREMENTYS OF EXITS
- FIRE ESCAPE BALCONIES
- REFUGE AREA
- RAMPS

7. WATER SUPPLY
- UNDERGROUND TANK
- OVER HEAD TANK
- FIRE TANK
- PUMP ROOMS
8. LIFTS
- LIFT LOBBYS
- LIFT MACHINE ROOMS AND PITS
- CAPACITY AND LOADING
CASESTUDY

NESCO EXHIBITION CENTER, GOREGAON


LOCATION:
Bombay Exhibition Centre, NESCO, Goregaon, Mumbai, Maharashtra 400063

EARLIER AN INDUSTRIAL AREA NOW CONVERTED INTO ECHIBITION CENTER

THE SITE INCLUDES

- 8 ENTRY EXITS
 GATE 1A, TO PARKING LOT
 GATE 1, MAIN ENTRY AND EXIT
 GATE 2, MAIN ENTRY EXIT
 GATE 3, COMMERCIAL OFFICES ENTRY AND EXIT
 GATE 4, LOADING UNLOADING ENTRY AND EXIT
 GATE 5, LOADING UNLOADING ENTRY AND EXIT
 GATE 6, STAFF ENTRY
 GATE 7, EXIT FROM THE PARKING LOT FOR SERVICE TRUCKS

- 6 EXHIBITION HALLS OF DIFFERENT CAPACITY


 HALL 1, 19143 SQ.M
o 7 entry/exits
o Four toilet areas (both men and women)
 T1, T2, T3, T4
o 18 to 21m span x 9 rows
o 21m ht

 HALL 2, 7378 SQ.M


o Formarly hall 5
o Adjoined to hall 3
o 5 entry/exits
o One toilet
 T6
o 15m span
o 21m ht

 HALL 3, 11799 SQ.M


o Formally hall 6
o Adjoined to hall 2
o 3 independent entry/ exits
o 3 entrys from hall 2
o 21m span
o 21m ht
o Three toilets
 T9,t10,t11

 HALL 4, 10800 SQ.M


o Formally hall 7a
o Three entry/ exits
o 18m span
o 21M HT
o 1 toilet
 T

 HALL 5, 4864 SQ.M


o Formally hall 7
o One entry/ exit
o No existing toilets, 2 proposed
o 12m span
o 21M HT

 HALL 8, 11880 SQ.M


o New proposed hall
o 6 propsed entry exits
o 4 proposed toilets
o 21m span
o 21M HT

- 3 IT BUILDINGS
 IT BUILDING NO 4
o Under construction
o 3 entry exits
o 3rd entry connected to loading unloading
o G+15
o Admin for construction management

 IT BUILDING NO 3
o Main IT building with entire administration of the exhibition center
o G+12
o G+4 podium
o 4 restricted entry/exits

 IT BUILDING NO 2
o Underconstruction
o 4 propsed entrys/ exits
o G+9
o Management administaration

- ADMIN AREA
 Above hall one is the admin area
 G+2
 One unrestricted entry

- ROOT
 IT core for meetings
 G +0
 Restricted entry

- FOOD COURT
 Open cafeteria
 6 food stalls for time being
 Indoor and outdoor seating area

- FOUR PARKING LOTS OF DIFFERENT CAPACITY


 PARKING GROUND 1
o 18500 SQ.MT
o 750 CARS
o ENTRY AND EXITS FROM GATE 1,1A AND GATE 7

 PARKING GROUND 2
o 4010 SQ.MT
o 150 CARS
o ENTRY AND EXITS AFROM GATE 1. 1A AND GATE7

 PARKING GROUND 3
o 7267 SQ.MT
o 300 CARS
o COSEST ENTRY EXIT FROM GATE 2

 PARKING GROUND 4
o 9000 SQ.MT
o 300 CARS
o ENTRY AND EXITS AFROM GATE 1 AND 1A
o PICKUP AND DROP OFF POINT FOR AUTO RIKSHAWS, OLA AND UBER

- A LUXURY HALL
 THE GRANDE
o Formally HALL 2
o 2188 sqmt
o G+2
o 5 restricted entry and exits
o Two proposed toilets

- HALL 4, 10800 SQ.M


 FORMALLY KNOWN AS HALL 7
o THREE ENTRY EXITS
o ONE STAFF ENTRY FROM GATE 6 AND 7
o 3 ROWS 12 COLUMS OF TRUSSES (C/C 10M) WITH 18M SPAN
o 21M HT
o 1 TOILET

 HVAC SYSTEM
o 4 CHILLARS OF 900LTS CAPACITY, LOCATED AT THE BACK OF THE HALL
 2 IN USE, 2 ON STANDBY
o COOLING TOWER TO SIDE ENTRY
 Water is cooled down to 4 degree temperature
 2100tr per tower
 24kv ht supply
 Two line distribution
o 36 AHUS
 On a span of 3m on the mezzanine floor level created on the
exterior wall on 8m ht
 21k CFM AHU
 Blower and motor installed
 Duct size starting from 1mx0.6m when starting from the AHU
and reducing to 0.45x 0.45m at the end
 Fire rated ducting system of gi sheeting
 Two restricted entry exits to the mezzanine floor
 Monthly maintenance check
 15 to 30 air changes per hour in its working state

o NO MAINTANCE OF THERMOSTAT REMOTE DIFFERENCE


o POWER SAVING MODE IN GIVEN EXHIBITION CHOICES
o 2 AUTOMATED VALVE ACCORDING TO TEMPERATURE CHANGE
o OZONISER AND HUMIDIFIER FIT IN THE AHU DUCTS TO AVOID ANY
ACCUMULATED FOUL SMELL
o CFD ANALYSIED
o BTU METER IS IMPLIED (BRITISH THERMAL UNIT METER)
o UPS APPLIED WHEN THE HALL IN USE (UNINTERUPPED POWER SUPPLY)
- ELECTRICAL
 2 transformers provided
 35 electrical panels provided for hvac, lighting, internal stall arrangements
 Hydroneumatic system usage of power being used for water supply
 All electrical charges are provided by the NESCO marketing team
 Total of 36 distribution panels in the hall and 2 per every toilet is provided
 12 distribution panels for the mezzanine floor
 Three meter rooms provided at the back of the hall.

- FIREFIGHTING
 SPRINKLER SYSTEM ACROSS THE ROOF OF THE HALL
 HOSE RAIL AT 2M OFFSET FROM THE EXTERNAL WALL
 54K LTS CAPACITY FIRE TANK IMPLEMENTED FOR THE ENTIRE HALLS
 FIRE PIPES OF DIA 40MM DIA RUNNING ACROSS FOR HOSE RAIL PURPOSES
 FIRE EXTINGUISHGERS PROVIDED AT EVERY 6M
 NO FIRE EXIT INDICATED

Vous aimerez peut-être aussi