IDENTIFICATION OF SERVICES :
1. VENTILATION
Methods of ventilation
Natural Ventilation
Mechanical Ventilation
Energy conservation in Ventilation System
3. LIGHTING
- Use of daylight
- Orientation of the building
- Use of artificial lighting
- Lighting required in different spaces as per the function
- Different light systems that can be incorporated
- Energy conservation in lighting
4. ELECTRICAL
- PLANNING OF ELECTRICAL INSTALLATIONS
Substations and switch rooms
Location and requirements of distribution panels
Overhead lines, wires and cables
Map of underground networks
System for power backup
7. WATER SUPPLY
- UNDERGROUND TANK
- OVER HEAD TANK
- FIRE TANK
- PUMP ROOMS
8. LIFTS
- LIFT LOBBYS
- LIFT MACHINE ROOMS AND PITS
- CAPACITY AND LOADING
CASESTUDY
- 8 ENTRY EXITS
GATE 1A, TO PARKING LOT
GATE 1, MAIN ENTRY AND EXIT
GATE 2, MAIN ENTRY EXIT
GATE 3, COMMERCIAL OFFICES ENTRY AND EXIT
GATE 4, LOADING UNLOADING ENTRY AND EXIT
GATE 5, LOADING UNLOADING ENTRY AND EXIT
GATE 6, STAFF ENTRY
GATE 7, EXIT FROM THE PARKING LOT FOR SERVICE TRUCKS
- 3 IT BUILDINGS
IT BUILDING NO 4
o Under construction
o 3 entry exits
o 3rd entry connected to loading unloading
o G+15
o Admin for construction management
IT BUILDING NO 3
o Main IT building with entire administration of the exhibition center
o G+12
o G+4 podium
o 4 restricted entry/exits
IT BUILDING NO 2
o Underconstruction
o 4 propsed entrys/ exits
o G+9
o Management administaration
- ADMIN AREA
Above hall one is the admin area
G+2
One unrestricted entry
- ROOT
IT core for meetings
G +0
Restricted entry
- FOOD COURT
Open cafeteria
6 food stalls for time being
Indoor and outdoor seating area
PARKING GROUND 2
o 4010 SQ.MT
o 150 CARS
o ENTRY AND EXITS AFROM GATE 1. 1A AND GATE7
PARKING GROUND 3
o 7267 SQ.MT
o 300 CARS
o COSEST ENTRY EXIT FROM GATE 2
PARKING GROUND 4
o 9000 SQ.MT
o 300 CARS
o ENTRY AND EXITS AFROM GATE 1 AND 1A
o PICKUP AND DROP OFF POINT FOR AUTO RIKSHAWS, OLA AND UBER
- A LUXURY HALL
THE GRANDE
o Formally HALL 2
o 2188 sqmt
o G+2
o 5 restricted entry and exits
o Two proposed toilets
HVAC SYSTEM
o 4 CHILLARS OF 900LTS CAPACITY, LOCATED AT THE BACK OF THE HALL
2 IN USE, 2 ON STANDBY
o COOLING TOWER TO SIDE ENTRY
Water is cooled down to 4 degree temperature
2100tr per tower
24kv ht supply
Two line distribution
o 36 AHUS
On a span of 3m on the mezzanine floor level created on the
exterior wall on 8m ht
21k CFM AHU
Blower and motor installed
Duct size starting from 1mx0.6m when starting from the AHU
and reducing to 0.45x 0.45m at the end
Fire rated ducting system of gi sheeting
Two restricted entry exits to the mezzanine floor
Monthly maintenance check
15 to 30 air changes per hour in its working state
- FIREFIGHTING
SPRINKLER SYSTEM ACROSS THE ROOF OF THE HALL
HOSE RAIL AT 2M OFFSET FROM THE EXTERNAL WALL
54K LTS CAPACITY FIRE TANK IMPLEMENTED FOR THE ENTIRE HALLS
FIRE PIPES OF DIA 40MM DIA RUNNING ACROSS FOR HOSE RAIL PURPOSES
FIRE EXTINGUISHGERS PROVIDED AT EVERY 6M
NO FIRE EXIT INDICATED