PIPE ENVISAGED
02.00 LIST OF REFERENCE DRAWINGS:-
SIZES PIPE SIZES
25 25
20 20
15
INPUT DATAS
FERENCE DRAWINGS:- DESCRIPTION OF THE DRAWING
PIPE SIZES
s are envisaged in the Interplant.
DN 50 25 150 125 100 80 65
60.3 x 3.91 26.7 x 3.91 168.3 x 7.11 141.3 x 6.55 114.3 x 6.02 88.9 x 5.49 73.0 x 5.16
0 0 250 0
0 0 200
1 1 05.01 300
0 1 125
1 2 05.02 100
1 3 05.03 80
1 4 05.04 65
1 5 05.05 50
1 6 05.06 25
1 7 05.07 20
0 7 15
7
50 25 20 15
All steam pipelines will be provided with adequate heat insulation and steam traps at low points.
ISOMETRIC DRAWINGS OF
MEC/11/40/Q6AT/DE/GN/00/16177 &
1 STEAM PIPELINES- DN 200 (2
MEC/11/40/Q6AT/DE/GN/00/16178
SHEETS)
OD x THICKNESS
NOMINAL DIA (mm) STANDARD
(MM X MM)
ASTM B 36.10M, WELDED
DN 350, SCH.30 355.6 X 9.53 & SEAMLESS WROUGHT
STEEL PIPE
ASTM B 36.10M, WELDED
DN 250, SCH.STD 273.0X 9.27 & SEAMLESS WROUGHT
STEEL PIPE
ASTM B 36.10M, WELDED
DN 200, SCH.40 219.1X 8.18 & SEAMLESS WROUGHT
STEEL PIPE
Now, permissible working stress as per IBR regulation 350, Table 3 (year of publication 2000)
Ts/2.7 = 42.18/2.7 = 15.62 kg/mm2
(Refer regulation 38 © of IBR
or, Et/1.50 = 0.4*Ts/1.5 = 0.4x42.18/1.5 = 11.248 kgf/mm2 for Et which is 40% of Ts)
Maximum working pressure allowable as per regulation 350(a) of IBR ( Year of publication 2000) is given by:-
WP = 2fe (t-c)/D-t+c)
= 2 x11.248 1.0 ( 7.9218 - 0.75 )
(x 355.6 - 7.9218 + 0.75 )
= 161.337094
348.4281875
= 0.4630426004 kgf/mm2
= 46.3042600421 kgf/cm2
> 10 kgf/cm2(Actual Working Pressure)
Now, permissible working stress as per IBR regulation 350, Table 3 (year of publication 2000)
Ts/2.7 = 42.18/2.7 = 15.62 kg/mm2
(Refer regulation 38 © of IBR for
or, Et/1.50 = 0.4/Ts = 0.4x42.18/1.5 = 11.248 kgf/mm2 Et which is 40% of Ts)
Maximum working pressure allowable as per regulation 350(a) of IBR ( Year of publication 2000) is given by:-
WP = 2fe (t-c)/D-t+c)
= 2 x11.248 1.0 ( 7.7057 - 0.75 )
(x 273 - 7.7057 + 0.75 )
= 156.475146
266.0443125
= 0.5881544489 kgf/mm2
= 58.8154448895 kgf/cm2
> 16 kgf/cm2 (Actual Working Pressure)
Now, permissible working stress as per IBR regulation 350, Table 3 (year of publication 2000)
Ts/2.7 = 42.18/2.7 = 15.62 kg/mm2
(Refer regulation 38 © of IBR
or, Et/1.50 = 0.4/Ts = 0.4x42.18/1.5 = 11.248 kgf/mm2 for Et which is 40% of Ts)
Maximum working pressure allowable as per regulation 350(a) of IBR ( Year of publication 2000) is given by:-
WP = 2fe (t-c)/D-t+c)
= 2 x11.248 1.0 ( 3.99 - 0.75 )
(x 163.9 - 3.99 + 0.75 )
= 72.88704
160.66
= 0.4536726005 kgf/mm2
= 45.3672600523 kgf/cm2
> 8 kgf/cm2 (Actual Working Pressure)
Now, permissible working stress as per IBR regulation 350, Table 3 (year of publication 2000)
Ts/2.7 = 42.18/2.7 = 15.62 kg/mm2
(Refer regulation 38 © of IBR
or, Et/1.50 = 0.4/Ts = 0.4x42.18/1.5 = 11.248 kgf/mm2 for Et which is 40% of Ts)
Maximum working pressure allowable as per regulation 350(a) of IBR ( Year of publication 2000) is given by:-
WP = 2fe (t-c)/D-t+c)
= 2 x11.248 1.0 ( 5.4447 - 0.75 )
(x 141.3 - 5.4447 + 0.75 )
= 105.61169
136.6053125
= 0.7731155404 kgf/mm2
= 77.3115540437 kgf/cm2
> 10 kgf/cm (Actual Working Pressure)
Now, permissible working stress as per IBR regulation 350, Table 3 (year of publication 2000)
Ts/2.7 = 42.18/2.7 = 15.62 kg/mm2
(Refer regulation 38 © of IBR
or, Et/1.50 = 0.4/Ts = 0.4x42.18/1.5 = 11.248 kgf/mm2 for Et which is 40% of Ts)
Maximum working pressure allowable as per regulation 350(a) of IBR ( Year of publication 2000) is given by:-
WP = 2fe (t-c)/D-t+c)
= 2 x11.248 1.0 ( 3.7406 - 0.75 )
(x 113.1 - 3.7406 + 0.75 )
= 67.2771
110.109375
= 0.6110024691 kgf/mm2
= 61.1002469136 kgf/cm2
> 10 kgf/cm (Actual Working Pressure)
Now, permissible working stress as per IBR regulation 350, Table 3 (year of publication 2000)
Ts/2.7 = 42.18/2.7 = 15.62 kg/mm2
(Refer regulation 38 © of IBR
or, Et/1.50 = 0.4/Ts = 0.4x42.18/1.5 = 11.248 kgf/mm2 for Et which is 40% of Ts)
Maximum working pressure allowable as per regulation 350(a) of IBR ( Year of publication 2000) is given by:-
WP = 2fe (t-c)/D-t+c)
= 2 x11.248 1.0 ( 4.5636 - 0.75 )
(x 88.9 - 4.5636 + 0.75 )
= 85.789902
85.0864375
= 1.0082676455 kgf/mm2
= 100.8267645475 kgf/cm2
> 10 kgf/cm (Actual Working Pressure)
Now, permissible working stress as per IBR regulation 350, Table 3 (year of publication 2000)
Ts/2.7 = 42.18/2.7 = 15.62 kg/mm2
(Refer regulation 38 © of IBR
or, Et/1.50 = 0.4/Ts = 0.4x42.18/1.5 = 11.248 kgf/mm2 for Et which is 40% of Ts)
Maximum working pressure allowable as per regulation 350(a) of IBR ( Year of publication 2000) is given by:-
WP = 2fe (t-c)/D-t+c)
= 2 x11.248 1.0 ( 4.2893 - 0.75 )
(x 73 - 4.2893 + 0.75 )
= 79.618968
69.46075
= 1.1462440011 kgf/mm2
= 114.6244001109 kgf/cm2
> 10 kgf/cm2 (Actual Working Pressure)
Now, permissible working stress as per IBR regulation 350, Table 3 (year of publication 2000)
Ts/2.7 = 42.18/2.7 = 15.62 kg/mm2
(Refer regulation 38 © of IBR
or, Et/1.50 = 0.4/Ts = 0.4x42.18/1.5 = 11.248 kgf/mm2 for Et which is 40% of Ts)
Maximum working pressure allowable as per regulation 350(a) of IBR ( Year of publication 2000) is given by:-
WP = 2fe (t-c)/D-t+c)
= 2 x11.248 1.0 ( 3.2502 - 0.75 )
(x 60.3 - 3.2502 + 0.75 )
= 56.244218
57.7998125
= 0.973086513 kgf/mm2
= 97.308651304 kgf/cm2
> 10 kgf/cm2 (Actual Working Pressure)
Now, permissible working stress as per IBR regulation 350, Table 3 (year of publication 2000)
Ts/2.7 = 42.18/2.7 = 15.62 kg/mm2
(Refer regulation 38 © of IBR
or, Et/1.50 = 0.4/Ts = 0.4x42.18/1.5 = 11.248 kgf/mm2 for Et which is 40% of Ts)
Maximum working pressure allowable as per regulation 350(a) of IBR ( Year of publication 2000) is given by:-
WP = 2fe (t-c)/D-t+c)
= 2 x11.248 1.0 ( 3.6827 - 0.75 )
(x 33.4 - 3.6827 + 0.75 )
= 65.973035
30.46734375
= 2.1653687811 kgf/mm2
= 216.5368781123 kgf/cm2
> 10 kgf/cm2 (Actual Working Pressure)
Now, permissible working stress as per IBR regulation 350, Table 3 (year of publication 2000)
Ts/2.7 = 42.18/2.7 = 15.62 kg/mm2
(Refer regulation 38 © of IBR
or, Et/1.50 = 0.4/Ts = 0.4x42.18/1.5 = 11.248 kgf/mm2 for Et which is 40% of Ts)
Maximum working pressure allowable as per regulation 350(a) of IBR ( Year of publication 2000) is given by:-
WP = 2fe (t-c)/D-t+c)
= 2 x11.248 1.0 ( 3.019 - 0.75 )
(x 21.3 - 3.019 + 0.75 )
= 51.042721
19.03103125
= 2.6820785658 kgf/mm2
= 268.2078565763 kgf/cm2
> 10 kgf/cm2 (Actual Working Pressure)