Vous êtes sur la page 1sur 30

OFFSHORE

INTERNATIONAL FZC

A L&T SapuraCrest
Joint Venture

Rely On Us

Rely On Us
PRESENTATION
MODULES
Company Overview

QHSE

Market Focus

Capabilities

The LTS 3000

Oct 2009 2
COMPANY
OVERVIEW

 Company Background

 Mission and Vision

 Global Partners : Larsen & Toubro Ltd.


& SapuraCrest

Oct 2009 3
COMPANY
BACKGROUND

• Offshore International FZC (OIF) is a Joint Venture company formed by


Larsen & Toubro Ltd. (L&T), India and SapuraCrest Petroleum Berhad,
Malaysia for providing services to offshore construction industry
worldwide.

• Company’s equity is held in the ratio 60:40 by L&T and SapuraCrest


respectively.

• Company registered with the Hamriyah Free Zone of Sharjah, UAE. Will
own and operate the LTS 3000, a Heavy Lift cum Pipe lay Vessel.

Oct 2009 4
MISSION
AND VISION
MISSION
• To be an innovative, safe and reliable provider of construction services
to the offshore Oil & Gas industry

VISION
• OIF shall be recognized as the Best in Class provider of offshore
construction services, committed to excellence, continuous
improvement and profitable growth
• Customer satisfaction shall be the prime concern and OIF shall strive to
build mutually beneficial and long term relationships with all
stakeholders
• OIF shall follow safe, secure and environmentally friendly practices in
all its operations

Oct 2009 5
GLOBAL PARTNERS
LARSEN & TOUBRO LTD.
• Larsen & Toubro Ltd. (L&T) is a technology-driven USD 7 billion (2009
revenues) ISO 9001:2000 and OHSAS 18001 certified Indian company
• A diversified group consisting of 102 subsidiary companies, and 24
associate companies with operations in more than 45 countries
• The L&T Group has a presence in Heavy Engineering and Fabrication,
Engineering and Construction projects, Infrastructure Development,
Industrial Machinery and Products, Electrical and Electronics
equipment and Information Technology
• Ranked No.1 in Quality and Reputation in a Wall Street Journal Asia
Survey in 2006-2007
• Received India’s ‘Best Managed Company’ Award presented by
Business Today and Ernst & Young in 2008. Awarded ‘Best for Investor
Relations’ by Asiamoney in 2009

Oct 2009 6
GLOBAL PARTNERS
SAPURACREST

• SapuraCrest Petroleum is the largest Malaysian group of companies


providing integrated services to the oil and gas industry including
offshore drilling, marine installation and construction, offshore geo-
technical investigations and geophysical surveys.
• SapuraCrest has registered a revenue of 1 billion USD for the FY 2009
• TL Offshore as Part of the Sapura Group is the only Malaysian
company providing offshore marine installation services.

Oct 2009 7
JOINT VENTURE
ORGANOGRAM
SAPURACREST JV BOARD

V Ashwini Kumar
Chief Executive

Dheeraj Walajapet Sudip Sengupta A.K.Goswami Manish Sinha


Gondane Parathasarthy S Vijayakumar
Head Head Head
Construction Head Head
Installation Marketing & Marine
Manager Finance & Engineering QHSE (MR)
Commercial Operations
Accounts

Marketing,
Finance &
Costing and PMS
Accounts
Operations Installation Proposals HSE Manager Below Deck
Personnel & HR
Field Engineers Engineering, Project Welding Crew
Secretarial Purchasing Engineering
Above Deck Project Marine Stat.
Functions
Crew Engineers JVA Quality Systems Compliance
SAP & IT Administration Logistics
Systems
SOPs

Oct 2009 8
QUALITY, HEALTH,
SAFETY & ENVIRONMENT

 QHSE : Our Guiding Principle

 Establishing The Right Culture

 Industry Body Memberships

Oct 2009 9
QHSE
OUR GUIDING PRINCIPLE

• An integrated management system: QMS - ISO 9001:2008, EMS - ISO


14001:2004, OHSAS - 18001:2007

• Total Quality Management


• Customer focus
• Work Processes, Training and knowledge sharing
• Total involvement of people

• Reliability, efficiency and consistency while protecting


• Our assets
• People
• Environment

• Most Competitive through highest standards of QHSE

Oct 2009 10
ESTABLISHING
THE RIGHT CULTURE…

People
At Offshore
International we
have a work
Skills Shared Systems culture which is
Value
client focused,
and
cohesive,
Success collaborative and
enables knowledge
sharing.

Assets Strategy

Oct 2009 11
INDUSTRY
BODY MEMBERSHIPS

IMCA : International Marine Contractors Association

IPLOCA : International Pipeline & Offshore Contractors Association

Oct 2009 12
MARKET
FOCUS

 Market Focus : Present and Future

Oct 2009 13
MARKET FOCUS
PRESENT AND FUTURE

PRESENT
• Conventional
Projects relating to the installation of fixed platforms (jackets,
topsides and decks) and their associated pipelines, flow lines and
umbilicals

• Trunklines
Installation of large diameter export pipelines worldwide.

FUTURE
• Subsea, Umbilicals, Risers and Flowlines (SURF)
Projects related to subsea field development including the design,
installation and commissioning of subsea infrastructure, risers and
flowline systems in deepwater and harsh environments

Oct 2009 14
CAPABILITIES

 Installation Engineering

 Project Management

 Operations

Oct 2009 15
CAPABILITIES
INSTALLATION ENGINEERING

STRUCTURES
 Load-out & Transportation
Analysis of Jackets, Topsides &
Modules
 Launch, Floatation, Upending of
Jackets
 Lift Analysis & Rigging Design
 Jacket On-bottom stability and
Mudmat design review

Jacket Upending Analysis

Oct 2009 16
CAPABILITIES
INSTALLATION ENGINEERING
Jacket Upending Analysis

STRUCTURES
 Pile/ Conductor Drivability
Analysis, Pile make up, Hammer
selection
 Design of Installation Aids
3D CAD Simulation of (guides, bumpers, local
Jacket Lifting and
Positioning strengthening etc.)
 Ballasting and Stability
calculations

Oct 2009 17
CAPABILITIES
INSTALLATION ENGINEERING

Pile
Drivability
Analysis
using
GRL-WEAP

Oct 2009 18
CAPABILITIES
INSTALLATION ENGINEERING
Jacket Launch
Analysis

Oct 2009 19
CAPABILITIES
INSTALLATION ENGINEERING

PIPELINES
 Pipe Lay and Strength Analyses
 Davit Lift analysis and Surface Tie-in
 Abandonment & Recovery Analyses

Software like SACS, GRL WEAP, OFFPIPE and in-house programs aid our
Engineering

Oct 2009 20
CAPABILITIES
PROJECT MANAGEMENT

• L&T and SapuraCrest have extensive Project Management


experience in offshore EPC and installation projects

• OIF can draw upon these resources to provide technical expertise


and exceptional project management capabilities to ensure timely
and cost-effective execution of projects around the world

Oct 2009 21
CAPABILITIES
PROJECT MANAGEMENT

New Well New Process Subsea Pipeline


Platforms Platform Kilometers
[28] [5] [510+]

Gas Compression Living Quarter Platform


Module Module Modifications
[7] [4] [134+]

[#] Number of facilities executed (1988 – 2008)


Oct 2009 22
CAPABILITIES
PROJECT MANAGEMENT
PROJECTS EXECUTED BY L&T
• Block 5 Development Plan • HRC Process Platform
2005:Package 14 at Qatar for Maersk • Enron (British Gas) - TPP Process
Oil Qatar Deck & Topsides
• Bunduq Gas Re-injection Project at
• MHS Re-development Phase –II
UAE for Bunduq Company Ltd.
Project
• PS - 2/3 Living Quarters & Power
Upgrade at Qatar for Qatar • 9 Well Head Platforms Project
Petroleum • 4 Well Platforms Project – I
• Songo-Songo Gas Development and (MH – B&S)
Power Generation Project at • N9/N10 Platforms & Pipelines
Tanzania for Songas Project
• Vasai East Development Project • NQ Reconstruction Project
• BCP-B2 Booster Compressor • PRP Pipeline Replacement &
Platform Project Modification Project
• MNW Process Platform Project

Oct 2009 23
CAPABILITIES
PROJECT MANAGEMENT
PROJECTS EXECUTED BY SAPURACREST (TL Offshore)

• EMEPMI Year 2007 Installation • Block PM3 Development Area for


Program for ExxonMobil Talisman Malaysia Ltd
Exploration and Production • MASA Project for Petronas Carigali
Malaysia Inc. Sdn Bhd
• PCSB Year 2007 Installation
• Installation of MLNG Dua Offshore
Programme for Petronas Carigali
Pipelines for Sarawak Shell Bhd
Sdn Bhd
• Ledang Anoa Project for MMHE/ • Block PM 305 SAA Project for
Petronas Carigali Sdn Bhd Talisman Malaysia Ltd

• Champion West Project for Brunei • Transportation and Offshore


Shell Petroleum Installation of Angsi for Petronas
Carigali Sdn Bhd

Oct 2009 24
CAPABILITIES
OPERATIONS

• Operations group supported by SapuraCrest / TL Offshore

• OIF has ready access to marine spread, assets and resources of


SapuraCrest subsidiaries

Oct 2009 25
THE
LTS 3000

 Technical Specifications

 Special Features

 Facts and Status

 Construction Status

Oct 2009 26
LTS 3000
TECHNICAL SPECIFICATIONS
• Length Over All 161.53 m
• Breadth 37.8 m
• Depth 15.0 m
• Draught 6.20 m
• Accommodation 290 persons
• Main Crane Capacity 3000 st
• Pipelay capacity
• Pipe OD 6” to 60”
• Pipe Tensioner 2 x 100 mt
• Azimuth Thrusters 2 x 2400 kW
• Bow Tunnel Thrusters 1 x 1250 kW
• Maximum Speed 11 knots
• Main Diesel Generator 3 x 2600 kW
• Mooring System 10 point
• Deck Capacity 10t/m2

Oct 2009 27
LTS 3000
SPECIAL FEATURES

• Vessel is self propelled, transit speed 11 knots

• DP1 capability, designed for upgradation to DP3 and deep water


capability

• Highly fuel efficient


• Innovative use of regenerated power
• Low Loss Electrical Power generation and distribution concept

• Firing line under clear working deck

Oct 2009 28
LTS 3000
FACTS AND STATUS

• Designed by Sea of Solutions BV, Netherlands


• Vessel Construction being executed by ASL Shipyard, Singapore
• Vessel Launched on 30th January, 2009
• Outfitting work is currently under progress
• Scheduled to commence operations by February, 2010

Oct 2009 29
CONSTRUCTION
STATUS

Top View

Side View

Oct 2009 30

Vous aimerez peut-être aussi