HOJA DE METRADOS PICOTANI

Nro SUB-
ITEM DECRIPCION UND LARGO ANCHO ALTO PARCIAL TOTAL UND
VECES TOTAL
01.00.00 CONSTRUCCION DE INFRAESTRUCTURA (BLOQUE B)
02.00.00 TRABAJOS PRELIMINARES
03.00.00 LIMPIEZA DEL TERRENO
04.00.00 LIMPIEZA DE TERRENO MANUAL m2 m2
05.00.00 TERRENO DE CONSTRUCCION 01 27.15 17.85 484.63
06.00.00 DEMOLICIONES
07.00.00 DEMOLICION DE OBRAS DE MAMPOSTERIA m3 0.00 m3
08.00.00 TRAZO, NIVELES Y REPLANTEO
09.00.00 TRAZO, NIVELES Y REPLANTEO PRELIMINAR m2 484.63 484.63 m2
10.00.00 01 27.15 17.85 484.63
11.00.00 TRAZO, NIVELES Y REPLANTEO DURANTE EL PROCESO m2 969.255 969.255 m2
12.00.00 02 27.15 17.85 969.26
13.00.00 TRANSPORTE DE MATERIALES
14.00.00 MOVIMIENTO DE TIERRAS m3 242.31 242.31 m3
15.00.00 TERRENO A REMOVER TIERRA 01 27.15 17.85 0.50 242.31
16.00.00 NIVELACION DEL TERRENO
17.00.00 NIVELACION INTERIOR APISONADO MANUAL m3 484.63 484.63 m3
18.00.00 TERRENO DE CONSTRUCCION 01 27.15 17.85 484.63
19.00.00 EXCAVACIONES
20.00.00 EXCAVACION DE ZANJAS P/ZAPATAS m3 52.92 52.92 m3
21.00.00 ZAPATA TIPO Z-1 35 1.20 1.20 1.05 52.92
22.00.00 RELLENOS
23.00.00 RELLENO Y COMP. MANUAL- MAT. DE PRESTAMO m3 7.56 7.56 m3
24.00.00 ZAPATA TIPO Z-1 35 1.2 1.2 0.15 7.56
25.00.00 ELIMINACION MATERIAL EXCEDENTE m3 45.36 45.36 m3
26.00.00 ZAPATA TIPO Z-1 35 1.20 1.20 1.05 52.92
27.00.00 ZAPATA TIPO Z-1 35 1.2 1.2 0.15 7.56
28.00.00 CONCRETO SIMPLE
29.00.00 SOLADO
30.00.00 SOLADO PARA ZAPATAS DE 4’ MEZCLA 1:12 CEMENTO-HORMIGON m2 5.04 5.04 m2
31.00.00 ZAPATA TIPO Z-1 35 1.20 1.20 0.10 5.04
32.00.00 CIMIENTOS
33.00.00 CIMIENTOS CORRIDOS MEZCLA 1:10 + 30%P.G. m3 39.75 39.75 m3
34.00.00 EJE 1 AL 7 ENTRE A AL D 21 4.50 0.25 0.60 14.18
35.00.00 EJE 1 AL 7 ENTRE D AL E 08 4.50 0.25 0.60 5.40
36.00.00 EJE A AL D ENTRE 1 AL 2 Y 6 AL 7 10 5.30 0.25 0.60 7.95
37.00.00 EJE A AL D ENTRE 2 AL 3 Y 5 AL 6 10 4.50 0.25 0.60 6.75
38.00.00 EJE A AL D ENTRE 3 AL 4 Y 4 AL 5 10 3.65 0.25 0.60 5.48
39.00.00 ENCOFRADO DE CIMENTACION m2 318.00 318.00 m2
40.00.00 EJE 1 AL 7 ENTRE A AL D 42 4.50 0.60 113.40
41.00.00 EJE 1 AL 7 ENTRE D AL E 16 4.50 0.60 43.20
42.00.00 EJE A AL D ENTRE 1 AL 2 Y 6 AL 7 20 5.30 0.60 63.60
43.00.00 EJE A AL D ENTRE 2 AL 3 Y 5 AL 6 20 4.50 0.60 54.00
44.00.00 EJE A AL D ENTRE 3 AL 4 Y 4 AL 5 20 3.65 0.60 43.80
45.00.00 SOBRECIMIENTOS
46.00.00 SOBRECIMIENTOS 1:8+25% P.M. m3 19.88 19.88 m3
47.00.00 EJE 1 AL 7 ENTRE A AL D 21 4.50 0.25 0.30 7.09
48.00.00 EJE 1 AL 7 ENTRE D AL E 08 4.50 0.25 0.30 2.70
49.00.00 EJE A AL D ENTRE 1 AL 2 Y 6 AL 7 10 5.30 0.25 0.30 3.98
50.00.00 EJE A AL D ENTRE 2 AL 3 Y 5 AL 6 10 4.50 0.25 0.30 3.38
51.00.00 EJE A AL D ENTRE 3 AL 4 Y 4 AL 5 10 3.65 0.25 0.30 2.74
52.00.00 ENCOFRADO Y DESENCOFRADO PARA SOBRECIMIENTOS m2 159.00 159.00 m2
53.00.00 EJE 1 AL 7 ENTRE A AL D 42 4.50 0.30 56.70
54.00.00 EJE 1 AL 7 ENTRE D AL E 16 4.50 0.30 21.60
55.00.00 EJE A AL D ENTRE 1 AL 2 Y 6 AL 7 20 5.30 0.30 31.80
56.00.00 EJE A AL D ENTRE 2 AL 3 Y 5 AL 6 20 4.50 0.30 27.00
57.00.00 EJE A AL D ENTRE 3 AL 4 Y 4 AL 5 20 3.65 0.30 21.90
58.00.00 PISOS DE CONCRETO
59.00.00 FALSO PISO DE 4‘ DE CONCRETO 1:10 m2 484.63 484.63 m2
60.00.00 PISO 01 27.15 17.85 484.63
61.00.00 VEREDAS
62.00.00 VEREDA DE CONCRETO F’C= 175 KG/CM2. m3 2.44 2.44 m3
63.00.00 VEREDA 01 27.15 0.60 0.15 2.44
64.00.00 ENCOFRADO Y DESENCOFRADO PARA VEREDAS m2 8.33 8.33 m2
65.00.00 ENCOFRADO DE VEREDAS 02 27.15 0.15 8.15
66.00.00 ENCOFRADO DE VEREDAS 02 0.60 0.15 0.18
67.00.00 OBRAS DE CONCRETO ARMADO
68.00.00 ZAPATAS
69.00.00 CONCRETO EN ZAPATAS F'C= 210 KG/CM2 m3 30.24 30.24 m3
70.00.00 ZAPTA TIPO Z-1 35 1.20 1.20 0.60 30.24
71.00.00 ACERO Fy=4200 KG/CM2 PARA ZAPATAS kg 763.02 kg
72.00.00 VIGAS DE CIMENTACION
73.00.00 CONCRETO EN VIGAS DE CIMENTACION FC= 210 KG/CM2 m3 0.00 m3
74.00.00 ENCOFRADO Y DESENCOFRADO PARA VIGAS DE CIMENTACION m2 0.00 m2
75.00.00 ACERO Fy=4200 KG/CM2 PARA VIGAS DE CIMENTACION kg 0.00 kg
76.00.00 COLUMNAS
77.00.00 CONCRETO EN COLUMNAS F‘C=210 KG/CM2 m3 9.45 9.45 m3
78.00.00 COLUMNA TIPO C-1 40X25 CM PRIMER NIVEL 35 0.40 0.25 2.70 9.45
79.00.00 COLUMNA TIPO C-1 40X25 Cm SEGUNDO NIVEL 35 0.40 0.25 2.40 8.40
80.00.00 CONCRETO F'C=175 KG/CM2. PARA COLUMNAS m3 0.00 m3
81.00.00 ENCOFRADO Y DESENCOFRADO DE COLUMNAS m2 61.43 61.43 m2
82.00.00 COLUMNA TIPO C-1 40X25 CM PRIMER NIVEL L=0.40 35 0.40 2.70 37.80
83.00.00 COLUMNA TIPO C-1 40X25 CM PRIMER NIVEL L=0.25 35 0.25 2.70 23.63
84.00.00 COLUMNA TIPO C-1 40X25 Cm SEGUNDO NIVEL L=0.40 35 0.40 2.40 33.60
85.00.00 COLUMNA TIPO C-1 40X25 Cm SEGUNDO NIVEL L=0.25 35 0.25 2.40 21.00
86.00.00 ACERO Fy=4200 KG/CM2 PARA COLUMNAS kg 700.96 kg
87.00.00 VIGAS
88.00.00 CONCRETO EN VIGAS F’C=210 KG/CM2 m3 23.19 23.19 m3
89.00.00 EJE 1 AL 7 ENTRE A AL D 21 4.50 0.25 0.35 8.27
90.00.00 EJE 1 AL 7 ENTRE D AL E 08 4.50 0.25 0.35 3.15
91.00.00 EJE A AL D ENTRE 1 AL 2 Y 6 AL 7 10 5.30 0.25 0.35 4.64
92.00.00 EJE A AL D ENTRE 2 AL 3 Y 5 AL 6 10 4.50 0.25 0.35 3.94
93.00.00 EJE A AL D ENTRE 3 AL 4 Y 4 AL 5 10 3.65 0.25 0.35 3.19
94.00.00 ENCOFRADO Y DESENCOFRADO DE VIGAS m2 251.75 251.75 m2
95.00.00 EJE 1 AL 7 ENTRE A AL D LATERALES 42 4.50 0.35 66.15
96.00.00 EJE 1 AL 7 ENTRE D AL E LATERALES 16 4.50 0.35 25.20
97.00.00 EJE A AL D ENTRE 1 AL 2 Y 6 AL 7 LATERALES 20 5.30 0.35 37.10
98.00.00 EJE A AL D ENTRE 2 AL 3 Y 5 AL 6 LATERALES 20 4.50 0.35 31.50
99.00.00 EJE A AL D ENTRE 3 AL 4 Y 4 AL 5 LATERALES 20 3.65 0.35 25.55
100.00.00 EJE 1 AL 7 ENTRE A AL D BASE 21 4.50 0.25 23.63
101.00.00 EJE 1 AL 7 ENTRE D AL E BASE 08 4.50 0.25 9.00
102.00.00 EJE A AL D ENTRE 1 AL 2 Y 6 AL 7 BASE 10 5.30 0.25 13.25
103.00.00 EJE A AL D ENTRE 2 AL 3 Y 5 AL 6 BASE 10 4.50 0.25 11.25
104.00.00 EJE A AL D ENTRE 3 AL 4 Y 4 AL 5 BASE 10 3.65 0.25 9.13
105.00.00 ACERO Fy=4200 KG/CM2 PARA VIGAS kg 2706.43 kg
106.00.00 LOSAS ALIGERADAS
107.00.00 CONCRETO EN LOSAS ALIGERADAS F'C=210 KG/CM2 m3 88.20 88.20 m3
108.00.00 CONCRETO EN LOSA ALIGERADA CANT./1M3=0.91M3 01 27.15 17.85 0.20 96.93
109.00.00 ENCOFRADO Y DESENCOFRADO NORMAL EN LOSAS ALIGERADAS m2 502.6275 502.6275 m2
110.00.00 ENCOFRADO LATERAL L= 27.15 02 27.15 0.20 10.86
111.00.00 ENCOFRADO LATERAL L= 17.85 02 17.85 0.20 7.14
112.00.00 ENCOFRADO BASE 01 27.15 17.85 484.63
113.00.00 ACERO GRADO 60 EN LOSAS ALIGERADAS kg kg
114.00.00 LADRILLO HUECO DE ARCILLA 15X30X30 CM PARA TECHO ALIGERADO und 4036.95 4036.95 und
115.00.00 LADRILLO CAT/1M3=8.33 LADRILLOS 01 27.15 17.85 484.63
116.00.00 ESCALERAS
117.00.00 CONCRETO EN ESCALERAS F’C=210 KG/CM2 m3 4.74 4.74 m3
118.00.00 ESCALERAS 13 6.20 0.25 0.17 3.43
119.00.00 DESCANSO DE ESCALERA 01 6.20 1.25 0.17 1.32
120.00.00 ENCOFRADO Y DESENCOFRADO NORMAL EN ESCALERAS m2 42.43 42.43 m2
121.00.00 ESCALERAS LADO LATERAL 02 24.22 0.30 14.53
122.00.00 BASE DE ESCALERA 01 6.20 4.50 27.90
123.00.00 ACERO GRADO 60 EN ESCALERAS kg 0.00 kg
124.00.00 COBERTURAS
125.00.00 TIJERALES DE MADERA L=8.40 M. und 23.00 23.00 und
126.00.00 TIJERALES DE MADERA L=8.40 M. 23 23.00
127.00.00 CORREAS DE MADERA m 986.00 986.00 m
128.00.00 CORREAS DE MADERA POR TIJERAL @0.88m 986 986.00
129.00.00 COBERTURA CON PLANCHAS DE ACERO RECUBIERTAS CON ALUMINIO und 1346.19 1346.19 und
130.00.00 COBERTURA DE 0.60X0.60 1346 1346.19
131.00.00 CUMBRERAS m 29.55 29.55 m
132.00.00 CUBRERA PARA TIJERAL 01 29.55 29.55
133.00.00 MUROS Y TABIQUES DE ALBAÑILERIA
134.00.00 MURO SOGA LADR. KING KONG 9X14X24CM m2 185.76 185.76 m2
135.00.00 LADRILLO SOGA KK EJE 2-2 01 6.05 2.70 16.34
136.00.00 LADRILLO SOGA KK EJE 3-3 Y 3'-3' 01 11.10 2.70 29.97
137.00.00 LADRILLO SOGA KK EJE 4-4 01 2.42 2.70 6.53
138.00.00 LADRILLO SOGA KK EJE 5-5 01 7.80 2.70 21.06
139.00.00 LADRILLO SOGA KK EJE 6-6 01 11.93 2.70 32.21
140.00.00 LADRILLO SOGA KK EJE B-B 01 13.55 2.70 36.59
141.00.00 LADRILLO SOGA KK EJE C-C 01 11.40 2.70 30.78
142.00.00 LADRILLO SOGA KK EJE D-D 01 4.55 2.70 12.29
143.00.00 LADRILLO CABEZA KK EJE 1-1 SEGUNDO NIVEL 01 15.85 2.40 38.04
144.00.00 LADRILLO SOGA KK EJE 2-2 SEGUNDO NIVEL 01 13.35 2.40 32.04
145.00.00 LADRILLO SOGA KK EJE 3-3 Y 3'-3' SEGUNDO NIVEL 01 11.83 2.40 28.39
146.00.00 LADRILLO SOGA KK EJE 4-4 SEGUNDO NIVEL 01 4.10 2.40 9.84
147.00.00 LADRILLO SOGA KK EJE 5-5 SEGUNDO NIVEL 01 11.83 2.40 28.39
148.00.00 LADRILLO SOGA KK EJE 6-6 SEGUNDO NIVEL 01 13.35 2.40 32.04
149.00.00 LADRILLO CABEZA KK EJE 7-7 SEGUNDO NIVEL 01 15.85 2.40 38.04
150.00.00 LADRILLO CABEZA KK EJE A-A SEGUNDO NIVEL 01 25.40 2.40 60.96
151.00.00 LADRILLO SOGA KK EJE B-B SEGUNDO NIVEL 01 14.40 2.40 34.56
152.00.00 LADRILLO SOGA KK EJE C-C SEGUNDO NIVEL 01 6.80 2.40 16.32
153.00.00 LADRILLO SOGA KK EJE D-D SEGUNDO NIVEL 01 0.00 2.40 0.00
154.00.00 LADRILLO CABEZA KK EJE E-E SEGUNDO NIVEL 01 22.60 2.40 54.24
155.00.00 MURO CABEZA LADR. KING KONG DE 9X14X24CM m2 165.32 165.32 m2
156.00.00 LADRILLO CABEZA KK EJE 1-1 01 11.93 2.70 32.21
157.00.00 LADRILLO CABEZA KK EJE 7-7 01 15.85 2.70 42.80
158.00.00 LADRILLO CABEZA KK EJE A-A 01 4.55 2.70 12.29
159.00.00 LADRILLO CABEZA KK EJE E-E 01 28.90 2.70 78.03
160.00.00 REVOQUES, ENLUCIDOS Y MOLDURAS
161.00.00 EN MUROS
162.00.00 TARRAJEO PRIMARIO RAYADO CON CEMENTO-ARENA m2 1447.89 1447.89 m2
163.00.00 EJE1-1 02 11.93 2.70 64.42
164.00.00 EJE2-2 02 6.05 2.70 32.67
165.00.00 EJE 3-3 Y 3'-3' 02 11.10 2.70 59.94
166.00.00 EJE 4-4 02 2.42 2.70 13.07
167.00.00 EJE 5-5 02 7.80 2.70 42.12
168.00.00 EJE 6-6 02 11.93 2.70 64.42
169.00.00 EJE 7-7 02 15.85 2.70 85.59
170.00.00 EJE A-A 02 4.55 2.70 24.57
171.00.00 EJE B-B 02 13.55 2.70 73.17
172.00.00 EJE C-C 02 11.40 2.70 61.56
173.00.00 EJE D-D 02 4.55 2.70 24.57
174.00.00 EJE E-E 02 28.90 2.70 156.06
175.00.00 EJE1-1 SEGUNDO NIVEL 02 15.85 2.40 76.08
176.00.00 EJE2-2 SEGUNDO NIVEL 02 13.35 2.40 64.08
177.00.00 EJE 3-3 Y 3'-3' SEGUNDO NIVEL 02 11.83 2.40 56.78
178.00.00 EJE 4-4 SEGUNDO NIVEL 02 4.10 2.40 19.68
179.00.00 EJE 5-5 SEGUNDO NIVEL 02 11.83 2.40 56.78
180.00.00 EJE 6-6 SEGUNDO NIVEL 02 13.35 2.40 64.08
181.00.00 EJE 7-7 SEGUNDO NIVEL 02 15.85 2.40 76.08
182.00.00 EJE A-A SEGUNDO NIVEL 02 25.40 2.40 121.92
183.00.00 EJE B-B SEGUNDO NIVEL 02 14.40 2.40 69.12
184.00.00 EJE C-C SEGUNDO NIVEL 02 6.80 2.40 32.64
185.00.00 EJE D-D SEGUNDO NIVEL 02 0.00 2.40 0.00
186.00.00 EJE E-E SEGUNDO NIVEL 02 22.60 2.40 108.48
187.00.00 TARRAJEO EN INTERIORES m2 723.95 723.945 m2
188.00.00 EJE1-1 01 11.93 2.70 32.21
189.00.00 EJE2-2 01 6.05 2.70 16.34
190.00.00 EJE 3-3 Y 3'-3' 01 11.10 2.70 29.97
191.00.00 EJE 4-4 01 2.42 2.70 6.53
192.00.00 EJE 5-5 01 7.80 2.70 21.06
193.00.00 EJE 6-6 01 11.93 2.70 32.21
194.00.00 EJE 7-7 01 15.85 2.70 42.80
195.00.00 EJE A-A 01 4.55 2.70 12.29
196.00.00 EJE B-B 01 13.55 2.70 36.59
197.00.00 EJE C-C 01 11.40 2.70 30.78
198.00.00 EJE D-D 01 4.55 2.70 12.29
199.00.00 EJE E-E 01 28.90 2.70 78.03
200.00.00 EJE1-1 SEGUNDO NIVEL 01 15.85 2.40 38.04
201.00.00 EJE2-2 SEGUNDO NIVEL 01 13.35 2.40 32.04
202.00.00 EJE 3-3 Y 3'-3' SEGUNDO NIVEL 01 11.83 2.40 28.39
203.00.00 EJE 4-4 SEGUNDO NIVEL 01 4.10 2.40 9.84
204.00.00 EJE 5-5 SEGUNDO NIVEL 01 11.83 2.40 28.39
205.00.00 EJE 6-6 SEGUNDO NIVEL 01 13.35 2.40 32.04
206.00.00 EJE 7-7 SEGUNDO NIVEL 01 15.85 2.40 38.04
207.00.00 EJE A-A SEGUNDO NIVEL 01 25.40 2.40 60.96
208.00.00 EJE B-B SEGUNDO NIVEL 01 14.40 2.40 34.56
209.00.00 EJE C-C SEGUNDO NIVEL 01 6.80 2.40 16.32
210.00.00 EJE D-D SEGUNDO NIVEL 01 0.00 2.40 0.00
211.00.00 EJE E-E SEGUNDO NIVEL 01 22.60 2.40 54.24
212.00.00 TARRAJEO EN EXTERIOR m2 356.60 356.60 m2
213.00.00 EJE 1-1 01 11.93 2.70 32.21
214.00.00 EJE 7-7 01 15.85 2.70 42.80
215.00.00 EJE A-A 01 4.55 2.70 12.29
216.00.00 EJE E-E 01 28.90 2.70 78.03
217.00.00 EJE 1-1 SEGUNDO NIVEL 01 15.85 2.40 38.04
218.00.00 EJE 7-7 SEGUNDO NIVEL 01 15.85 2.40 38.04
219.00.00 EJE A-A SEGUNDO NIVEL 01 25.40 2.40 60.96
220.00.00 EJE E-E SEGUNDO NIVEL 01 22.60 2.40 54.24
221.00.00 EN COLUMNAS
222.00.00 TARRAJEO DE COLUMNAS m2 232.05 232.05 m2
223.00.00 EJE1-1 10 5.10 0.40 20.40
224.00.00 EJE2-2 10 5.10 0.40 20.40
225.00.00 EJE 3-3 10 5.10 0.40 20.40
226.00.00 EJE 4-4 10 5.10 0.40 20.40
227.00.00 EJE 5-5 10 5.10 0.40 20.40
228.00.00 EJE 6-6 10 5.10 0.40 20.40
229.00.00 EJE 7-7 10 5.10 0.40 20.40
230.00.00 EJE A-A 14 5.10 0.25 17.85
231.00.00 EJE B-B 14 5.10 0.25 17.85
232.00.00 EJE C-C 14 5.10 0.25 17.85
233.00.00 EJE D-D 14 5.10 0.25 17.85
234.00.00 EJE E-E 14 5.10 0.25 17.85
235.00.00 VESTIDURA DE ARISTAS EN COLUMNAS m 1428 1428 m
236.00.00 EJE1-1 20 5.10 102.00
237.00.00 EJE2-2 20 5.10 102.00
238.00.00 EJE 3-3 20 5.10 102.00
239.00.00 EJE 4-4 20 5.10 102.00
240.00.00 EJE 5-5 20 5.10 102.00
241.00.00 EJE 6-6 20 5.10 102.00
242.00.00 EJE 7-7 20 5.10 102.00
243.00.00 EJE A-A 28 5.10 142.80
244.00.00 EJE B-B 28 5.10 142.80
245.00.00 EJE C-C 28 5.10 142.80
246.00.00 EJE D-D 28 5.10 142.80
247.00.00 EJE E-E 28 5.10 142.80
248.00.00 BRUÑAS EN COLUMNAS m 1428.00 1428.00 m
249.00.00 EJE1-1 20 5.10 102.00
250.00.00 EJE2-2 20 5.10 102.00
251.00.00 EJE 3-3 20 5.10 102.00
252.00.00 EJE 4-4 20 5.10 102.00
253.00.00 EJE 5-5 20 5.10 102.00
254.00.00 EJE 6-6 20 5.10 102.00
255.00.00 EJE 7-7 20 5.10 102.00
256.00.00 EJE A-A 28 5.10 142.80
257.00.00 EJE B-B 28 5.10 142.80
258.00.00 EJE C-C 28 5.10 142.80
259.00.00 EJE D-D 28 5.10 142.80
260.00.00 EJE E-E 28 5.10 142.80
261.00.00 EN VIGAS
262.00.00 TARRAJEO DE VIGAS m2 175.54 175.5405 m2
263.00.00 EJE1-1 02 11.93 0.50 11.93
264.00.00 EJE2-2 02 6.05 0.50 6.05
265.00.00 EJE 3-3 02 11.10 0.50 11.10
266.00.00 EJE 4-4 02 2.42 0.50 2.42
267.00.00 EJE 5-5 02 7.80 0.50 7.80
268.00.00 EJE 6-6 02 11.93 0.50 11.93
269.00.00 EJE 7-7 02 15.85 0.50 15.85
270.00.00 EJE A-A 02 4.55 0.50 4.55
271.00.00 EJE B-B 02 13.55 0.50 13.55
272.00.00 EJE C-C 02 11.40 0.50 11.40
273.00.00 EJE D-D 02 4.55 0.50 4.55
274.00.00 EJE E-E 02 28.90 0.50 28.90
275.00.00 EJE1-1 BASE 01 11.93 0.35 4.18
276.00.00 EJE2-2 BASE 01 6.05 0.35 2.12
277.00.00 EJE 3-3 BASE 01 11.10 0.35 3.89
278.00.00 EJE 4-4 BASE 01 2.42 0.35 0.85
279.00.00 EJE 5-5 BASE 01 7.80 0.35 2.73
280.00.00 EJE 6-6 BASE 01 11.93 0.35 4.18
281.00.00 EJE 7-7 BASE 01 15.85 0.35 5.55
282.00.00 EJE A-A BASE 01 4.55 0.35 1.59
283.00.00 EJE B-B BASE 01 13.55 0.35 4.74
284.00.00 EJE C-C BASE 01 11.40 0.35 3.99
285.00.00 EJE D-D BASE 01 4.55 0.35 1.59
286.00.00 EJE E-E BASE 01 28.90 0.35 10.12
287.00.00 VESTIDURA DE ARISTAS EN VIGAS m 260.06 260.06 m
288.00.00 EJE1-1 02 11.93 23.86
289.00.00 EJE2-2 02 6.05 12.10
290.00.00 EJE 3-3 02 11.10 22.20
291.00.00 EJE 4-4 02 2.42 4.84
292.00.00 EJE 5-5 02 7.80 15.60
293.00.00 EJE 6-6 02 11.93 23.86
294.00.00 EJE 7-7 02 15.85 31.70
295.00.00 EJE A-A 02 4.55 9.10
296.00.00 EJE B-B 02 13.55 27.10
297.00.00 EJE C-C 02 11.40 22.80
298.00.00 EJE D-D 02 4.55 9.10
299.00.00 EJE E-E 02 28.90 57.80
300.00.00 BRUÑAS EN VIGAS m 130.03 130.03 m
301.00.00 EJE1-1 01 11.93 11.93
302.00.00 EJE2-2 01 6.05 6.05
303.00.00 EJE 3-3 01 11.10 11.10
304.00.00 EJE 4-4 01 2.42 2.42
305.00.00 EJE 5-5 01 7.80 7.80
306.00.00 EJE 6-6 01 11.93 11.93
307.00.00 EJE 7-7 01 15.85 15.85
308.00.00 EJE A-A 01 4.55 4.55
309.00.00 EJE B-B 01 13.55 13.55
310.00.00 EJE C-C 01 11.40 11.40
311.00.00 EJE D-D 01 4.55 4.55
312.00.00 EJE E-E 01 28.90 28.90
313.00.00 VESTIDURA DE DERRAMES
314.00.00 VESTIDURA DE DERRAMES EN PUERTAS m 20.00 20.00 m
315.00.00 PUERTA DE 1M 12 1.00 12.00
316.00.00 PUERTA DE 1M SEGUNDO NIVEL 08 1.00 8.00
317.00.00 VESTIDURA DE DERRAMES EN VENTANAS m 32.00 32.00 m
318.00.00 VENTANAS DE 1.25M 10 1.00 10.00
319.00.00 VENTANAS DE 1.25M SEGUNDO NIVEL 22 1.00 22.00
320.00.00 CIELORRASOS
321.00.00 CIELO RASO INCL. VIGAS EMPOTRADAS C/MORTERO 1:5 X 1.5CM. m2 484.63 484.63 m2
322.00.00 01 27.15 17.85 484.63
323.00.00 CIELO RASOS DE SUPER BOARD E=6MM m2 484.63 484.63 m2
324.00.00 01 27.15 17.85 484.63
325.00.00 PISOS Y PAVIMENTOS
326.00.00 CONTRAPISO DE 48 MM. m2 484.6275 484.6275 m2
327.00.00 01 27.15 17.85 484.63
328.00.00 PISO DE PIEDRA m2 484.6275 484.6275 m2
329.00.00 01 27.15 17.85 484.63
330.00.00 PISO DE CERAMICO DE 40X40 CM m2 484.6275 484.6275 m2
331.00.00 01 27.15 17.85 484.63
332.00.00 PISO DE CEMENTO PULIDO CON OCRE E=2.5 CM m2 484.6275 484.6275 m2
333.00.00 01 27.15 17.85 484.63
334.00.00 PISO DE MADERA MACHIEMBRADA m2 484.6275 484.6275 m2
335.00.00 01 27.15 17.85 484.63
336.00.00 ZOCALOS Y CONTRAZOCALOS
337.00.00 ZOCALOS
338.00.00 ZOCALO DE MAYOLICA DE COLOR DE 20 X 30 CM m2 114.14 114.135 m2
339.00.00 EJE2-2 01 6.05 1.50 9.08
340.00.00 EJE 6-6 01 11.93 1.50 17.90
341.00.00 EJE C-C 01 11.40 1.50 17.10
342.00.00 EJE D-D 01 4.55 1.50 6.83
343.00.00 EJE 3-3 Y 3'-3' SEGUNDO NIVEL 01 11.83 1.50 17.75
344.00.00 EJE 4-4 SEGUNDO NIVEL 01 4.10 1.50 6.15
345.00.00 EJE 5-5 SEGUNDO NIVEL 01 11.83 1.50 17.75
346.00.00 EJE B-B SEGUNDO NIVEL 01 14.40 1.50 21.60
347.00.00 CONTRAZOCALOS
348.00.00 CONTRAZOCALO DE CEDRO DE 3/4* X 3* RODON 3/4" m 0.00 107.21 107.21 m
349.00.00 EJE1-1 01 11.93 11.93
350.00.00 EJE 3-3 Y 3'-3' 01 11.10 11.10
351.00.00 EJE 4-4 01 2.42 2.42
352.00.00 EJE 5-5 01 7.80 7.80
353.00.00 EJE 7-7 01 15.85 15.85
354.00.00 EJE C-C 01 11.40 11.40
355.00.00 EJE D-D 01 4.55 4.55
356.00.00 EJE 3-3 Y 3'-3' SEGUNDO NIVEL 01 11.83 11.83
357.00.00 EJE 4-4 SEGUNDO NIVEL 01 4.10 4.10
358.00.00 EJE 5-5 SEGUNDO NIVEL 01 11.83 11.83
359.00.00 EJE B-B SEGUNDO NIVEL 01 14.40 14.40
360.00.00 CONTRAZOCALO DE MAYOLICA 10 x 20 CM 1ERA m 76.09 76.09 m
361.00.00 EJE2-2 01 6.05 6.05
362.00.00 EJE 6-6 01 11.93 11.93
363.00.00 EJE C-C 01 11.40 11.40
364.00.00 EJE D-D 01 4.55 4.55
365.00.00 EJE 3-3 Y 3'-3' SEGUNDO NIVEL 01 11.83 11.83
366.00.00 EJE 4-4 SEGUNDO NIVEL 01 4.10 4.10
367.00.00 EJE 5-5 SEGUNDO NIVEL 01 11.83 11.83
368.00.00 EJE B-B SEGUNDO NIVEL 01 14.40 14.40
369.00.00 CARPINTERIA DE MADERA
370.00.00 PUERTAS
371.00.00 PUERTA DE MADERA TABLERO REBAJADO m2 0.00 44.00 44.00 m2
372.00.00 20 1.00 2.20 44.00
373.00.00 VENTANA DE MADERA CON HOJAS DE CEDRO m2 70.40 70.40 m2
374.00.00 32 1.00 2.20 70.40
375.00.00 CARPINTERIA METALICA
376.00.00 PUERTAS DE FIERRO
377.00.00 PUERTA METALICA m2 0.00 1.80 1.80 m2
378.00.00 DIVISION CON PANELES METALICOS EN SS.HH. m2 0.00 9.40 9.40 m2
379.00.00 CERRAJERIA
380.00.00 BISAGRAS
381.00.00 BISAGRA ALUMINIZADA CAPUCHINA DE 3* X 3* pza 0.00 126.00 126.00 pza
382.00.00 CERRADURAS
383.00.00 CERRADURA PARA PUERTA PRINCIPAL 03 GOLPES und 0.00 25.00 25.00 und
384.00.00 CERRADURA PARA PUERTA INTERIOR DE EMBUTIR und 0.00 13.00 13.00 und
385.00.00 VIDRIOS, CRISTALES Y SIMILARES
386.00.00 VIDRIO SEMIDOBLE. PROVISION Y COLOCACION EN VENTANAS FIERRO p2 0.00 465.00 465.00 p2
387.00.00 36 1.00 1.20 43.20
388.00.00 PINTURA
389.00.00 PINTURA EN MUROS INTERIORES CON LATEX m2 723.95 723.95 m2
390.00.00 EJE1-1 01 11.93 2.70 32.21
391.00.00 EJE2-2 01 6.05 2.70 16.34
392.00.00 EJE 3-3 Y 3'-3' 01 11.10 2.70 29.97
393.00.00 EJE 4-4 01 2.42 2.70 6.53
394.00.00 EJE 5-5 01 7.80 2.70 21.06
395.00.00 EJE 6-6 01 11.93 2.70 32.21
396.00.00 EJE 7-7 01 15.85 2.70 42.80
397.00.00 EJE A-A 01 4.55 2.70 12.29
398.00.00 EJE B-B 01 13.55 2.70 36.59
399.00.00 EJE C-C 01 11.40 2.70 30.78
400.00.00 EJE D-D 01 4.55 2.70 12.29
401.00.00 EJE E-E 01 28.90 2.70 78.03
402.00.00 EJE1-1 SEGUNDO NIVEL 01 15.85 2.40 38.04
403.00.00 EJE2-2 SEGUNDO NIVEL 01 13.35 2.40 32.04
404.00.00 EJE 3-3 Y 3'-3' SEGUNDO NIVEL 01 11.83 2.40 28.39
405.00.00 EJE 4-4 SEGUNDO NIVEL 01 4.10 2.40 9.84
406.00.00 EJE 5-5 SEGUNDO NIVEL 01 11.83 2.40 28.39
407.00.00 EJE 6-6 SEGUNDO NIVEL 01 13.35 2.40 32.04
408.00.00 EJE 7-7 SEGUNDO NIVEL 01 15.85 2.40 38.04
409.00.00 EJE A-A SEGUNDO NIVEL 01 25.40 2.40 60.96
410.00.00 EJE B-B SEGUNDO NIVEL 01 14.40 2.40 34.56
411.00.00 EJE C-C SEGUNDO NIVEL 01 6.80 2.40 16.32
412.00.00 EJE D-D SEGUNDO NIVEL 01 0.00 2.40 0.00
413.00.00 EJE E-E SEGUNDO NIVEL 01 22.60 2.40 54.24
414.00.00 PINTURA EN MUROS EXTERIORES CON LATEX m2 0.00 356.60 356.60 m2
415.00.00 EJE 1-1 01 11.93 2.70 32.21
416.00.00 EJE 7-7 01 15.85 2.70 42.80
417.00.00 EJE A-A 01 4.55 2.70 12.29
418.00.00 EJE E-E 01 28.90 2.70 78.03
419.00.00 EJE 1-1 SEGUNDO NIVEL 01 15.85 2.40 38.04
420.00.00 EJE 7-7 SEGUNDO NIVEL 01 15.85 2.40 38.04
421.00.00 EJE A-A SEGUNDO NIVEL 01 25.40 2.40 60.96
422.00.00 EJE E-E SEGUNDO NIVEL 01 22.60 2.40 54.24
423.00.00 PINTURA EN COLUMNAS AL LATEX m2 232.05 232.05 m2
424.00.00 EJE1-1 10 5.10 0.40 20.40
425.00.00 EJE2-2 10 5.10 0.40 20.40
426.00.00 EJE 3-3 10 5.10 0.40 20.40
427.00.00 EJE 4-4 10 5.10 0.40 20.40
428.00.00 EJE 5-5 10 5.10 0.40 20.40
429.00.00 EJE 6-6 10 5.10 0.40 20.40
430.00.00 EJE 7-7 10 5.10 0.40 20.40
431.00.00 EJE A-A 14 5.10 0.25 17.85
432.00.00 EJE B-B 14 5.10 0.25 17.85
433.00.00 EJE C-C 14 5.10 0.25 17.85
434.00.00 EJE D-D 14 5.10 0.25 17.85
435.00.00 EJE E-E 14 5.10 0.25 17.85
436.00.00 PINTURA EN VIGAS AL LATEX m2 175.54 175.54 m2
437.00.00 EJE1-1 02 11.93 0.50 11.93
438.00.00 EJE2-2 02 6.05 0.50 6.05
439.00.00 EJE 3-3 02 11.10 0.50 11.10
440.00.00 EJE 4-4 02 2.42 0.50 2.42
441.00.00 EJE 5-5 02 7.80 0.50 7.80
442.00.00 EJE 6-6 02 11.93 0.50 11.93
443.00.00 EJE 7-7 02 15.85 0.50 15.85
444.00.00 EJE A-A 02 4.55 0.50 4.55
445.00.00 EJE B-B 02 13.55 0.50 13.55
446.00.00 EJE C-C 02 11.40 0.50 11.40
447.00.00 EJE D-D 02 4.55 0.50 4.55
448.00.00 EJE E-E 02 28.90 0.50 28.90
449.00.00 EJE1-1 BASE 01 11.93 0.35 4.18
450.00.00 EJE2-2 BASE 01 6.05 0.35 2.12
451.00.00 EJE 3-3 BASE 01 11.10 0.35 3.89
452.00.00 EJE 4-4 BASE 01 2.42 0.35 0.85
453.00.00 EJE 5-5 BASE 01 7.80 0.35 2.73
454.00.00 EJE 6-6 BASE 01 11.93 0.35 4.18
455.00.00 EJE 7-7 BASE 01 15.85 0.35 5.55
456.00.00 EJE A-A BASE 01 4.55 0.35 1.59
457.00.00 EJE B-B BASE 01 13.55 0.35 4.74
458.00.00 EJE C-C BASE 01 11.40 0.35 3.99
459.00.00 EJE D-D BASE 01 4.55 0.35 1.59
460.00.00 EJE E-E BASE 01 28.90 0.35 10.12
461.00.00 PINTURA CIELO RASOS AL LATEX m2 484.63 484.63 m2
462.00.00 01 27.15 17.85 484.63
463.00.00 PINTURA EN CARPINTERIA METALICAS m2 1.80 1.80 m2
464.00.00 VARIOS, LIMPIEZA Y JARDINERIA
465.00.00 LIMPIEZA PERMANENTE DE OBRA GLB 1.00 1.00 GLB
466.00.00 LIMPIEZA FINAL GLB 1.00 1.00 GLB
467.00.00 APARATOS Y ACCESORIOS SANITARIOS
468.00.00 INODORO TANQUE BAJO C/GRIFERIA DE BRONCE (TORNADO O SIMILAR) und 13.00 13.00 und
469.00.00 LAVATORIO TIPO OVALIN und 2.00 2.00 und
470.00.00 LAVATORIOS DE PEDESTAL BLANCO pza 13.00 13.00 pza
471.00.00 URINARIOS DE LOZA DE PICO BLANCO pza 4.00 4.00 pza
472.00.00 COLOCACION DE APARATOS pza 32.00 32.00 pza
473.00.00 COLOCACION DE ACCESORIOS SANITARIOS pza 32.00 32.00 pza
474.00.00 INSTALACIONES SANITARIAS
475.00.00 SALIDA DE DESAGÜE pto 32.00 32.00 pto
476.00.00 SALIDA VENTILACION PVC SAL 2" pto 13.00 13.00 pto
477.00.00 TUBERIA PVC SAL 8" m 44.00 44.00 m
478.00.00 TUBERIA PVC SAL 4" m 28.00 28.00 m
479.00.00 TUBERIA DE PVC SAL 2" m 32.00 32.00 m
480.00.00 SUMIDERO DE BRONCE 2". PROVISION Y COLOCACION und 15.00 15.00 und
481.00.00 REGISTROS DE BRONCE DE 4" pza 15.00 15.00 pza
482.00.00 CAJA DE REGISTRO DE DESAGÜE 12' X 24" pza 8.00 8.00 pza
483.00.00 PRUEBAS DE TUBERIAS DESAGÜE INTERIOR GLB 1.00 1.00 GLB
484.00.00 SISTEMA DE AGUA FRIA Y CONTRA INCENDIO
485.00.00 SALIDA DE AGUA FRIA CON TUBERIA DE PVC-SAP 1/2' pto 32.00 32.00 pto
486.00.00 TUBERIA DE PVC O SIMILAR 1" m 45.00 45.00 m
487.00.00 RED DE DISTRIBUCION TUBERIA DE 1/2“ PVC-SAP m 26.00 26.00 m
488.00.00 VALVULA COMPUERTA DE BRONCE ROSCADA DE 1* und 15.00 15.00 und
489.00.00 VALVULAS DE COMPUERTA DE BRONCE DE 1/2" pza 1.00 1.00 pza
490.00.00 VALVULA CHECK DE 1/2’ und 1.00 1.00 und
491.00.00 PRUEBA HIDRAULICA + DESINFECCION GLB 1.00 1.00 GLB
492.00.00 TANQUE ELEVADO pza 3.00 3.00 pza
493.00.00 SISTEMA DE AGUA DE LLUVIA
494.00.00 TUBERIA PVC SAP 4“ m 160.80 160.80 m
495.00.00 TUBERIA PVC SAL 8" m 35.00 35.00 m
496.00.00 CAJA DE REGISTRO DE DESAGÜE 12' X 24" pza 8.00 8.00 pza
497.00.00 INSTALACIONES ELECTRICAS
498.00.00 SALIDA PARA CENTROS DE LUZ pto 80.00 80.00 pto
499.00.00 SALIDA PARA TOMACORRIENTE BIPOLAR DOBLE CON PVC pto 80.00 80.00 pto
500.00.00 TABLERO PRINCIPAL und 1.00 1.00 und
501.00.00 TABLERO DE DISTRIBUCION und 2.00 2.00 und
502.00.00 POZO PUESTA A TIERRA und 1.00 1.00 und
503.00.00 SALIDA PARA INTERCOMUNICADOR pto 1.00 1.00 pto
504.00.00 SALIDA PARA LAMPARAS DE EMERGENCIA und 10.00 10.00 und