Reinforcement Scaffolds
Stair Towers
Work Platforms
Edition 06/2009
PERI GmbH
Formwork Scaffolding Engineering
P.O. Box 1264
89259 Weissenhorn
Germany
Tel +49 (0)73 09.9 50 - 0
Fax +49 (0)73 09.9 51- 0
info@peri.com
www.peri.com
Important notes:
Shoring 10
Reinforcement scaffold 14
Stair towers 16
Work platform 18
Versatile applications 20
PERI International 24
1
Handling an extremely wide range of scaffolding tasks
with only one system: PERI UP Rosett
2
Efficient reinforcement work and forming with
PERI UP scaffolding units at Daimler Chrysler´s
Van Technology Centre in Stuttgart, Germany.
Facade scaffold
Suspended scaffold
3
PERI UP Rosett
Fewer components = less investment costs
Standard UVR
Base Standard
UVB 24
4
PERI UP Rosett as:
Shoring
80%
Reinforcement
scaffold
73%
Stair tower
71%
Work platform
72%
5
PERI UP Rosett
Light – load-bearing – flexible – safe
Product advantages:
Easy assembly
0,
3,
3,00
75
00
1,
0,75 1,50
0,
05
75
0,75
1,50 3,00 The metric grid dimensions
of PERI UP allows optimal
adjustment of the scaffold
assembly. Thus, a 3 m bay
can be divided, for example,
into 2 x 1.50 m or 4 x 0.75 m
within the system itself
according to requirements.
6
The integrated protection against
Safety: lifting reduces the assembly
time and effort.
80 80
80 80
The shape of the rosette
prevents the standard
tubes from rolling away.
7
Criteria for smooth and
problem-free construction progress
Schedules for the realisation of efficient way possible whilst meet- With its latest material technology
building projects are becoming ing a wide range of requirements. and comprehensive service, PERI
increasingly tighter. Everyone makes a significant contribution by
involved has in mind to ensure the supporting the experts on site in
project is completed in the most order to successfully carry out and
complete construction projects:
The contractor - requires legal safeguards for material European constructional approval
usage (conformity with valid regula- for UP Rosett modular scaffolding.
tions)
Type Test
for PERI UP shoring.
8
Everything from one source
Materials and service
échafaudages
Approval of the German Institute French NF-symbol awarded Approved for use in Poland: Tested by the Swedish Materials
of Building technology by the AFNOR B-symbol Testing & Research Institute
9
PERI UP Rosett Shoring
Type-tested load-bearing capacity
Crosshead Spindle
Ledger
Standard
3,00
2,50
2,00
1,50
Base Standard
Adjustable Base
Plate 1,50
2,00
2,50
3,00
With only few different individual parts every The modular structure of UP Rosett allows opti-
shoring structure can be quickly assembled. mal adjustment of leg load-bearing capacities.
From the extensive programme of accesso- In 50 cm increments, up to 10 different towers
ries, decking levels for transporting materials for various applications are possible.
as well as access stairs can be integrated.
10
Per leg: 40.3 kN
(with wind: 30.5 kN)
21,89
Technical Approval
Z-8.22-863
Type-tested by the
LGA Bayern
21,89
1,33
Every height without exception between 1.33 m For each height, a permissible leg load of 40.3 kN
and 21.89 m can be reached. Accurate parts lists applies. Horizontal loads can also be transferred
are available for all scaffold structures. by means of standard diagonals.
11
PERI UP Rosett Shoring
Three-dimensional shoring structures
12
Movable units
for smooth construction progress
The high rigidity of the ledger con- Work platforms for handling the
nections maintains the form of even formwork offer a maximum in work-
very large PERI UP scaffold units ing safety. This is made possible by
when being moved by crane or on placing system decks inside the
castors. All standards are tension- shoring.
proof connected to each other.
Craneable
Fast transfer of a 15 m
long scaffold unit.
Mobile
Shoring with complete formwork
unit and working platform for a
beam being moved using a PERI
lift and transportation trolley
without the need of a crane.
Pulled
Load-bearing and torsion-resistant
PERI formwork and scaffolding unit
comprised of VARIO GT 24 and
PERI UP Rosett being pulled to the
next casting segment by means of
hydraulic cable winches.
13
PERI UP Rosett reinforcement scaffold
Safe conditions for forming, reinforcement and
concreting work
Application possibilities:
- placing of formwork ties
- closing the formwork
- reinforcement work
- concreting
14
PERI UP as reinforce-
ment scaffold
The tension-proof con-
nections allow the cran-
ing of complete units and
ensure smooth con-
struction progress.
15
PERI UP Rosett stair tower
Fast and convenient way to reach working areas
- stair guardrail
Plus Unit
Basic-P Unit
16
Stair towers with staircase
units in the same direction
is the preferred type for erecting and
offers additional working platforms.
2,50/3,00
An 18 m high PERI UP
Rosett stair tower with
staircase units in the same
direction for the construc-
tion of an administration
building.
17
PERI UP Rosett work platforms
For productive and safe working conditions
at all heights
Basic-T Unit
18
Work platforms with reduced
width working levels
Plus Unit
Basic-P Unit
19
PERI UP Rosett
The best solution for every application
PERI UP Rosett modular scaffold The multi-functional system for dif- PERI UP Rosett can be cost-effec-
provides the optimal solution for ferent types of work increases mate- tively used in many areas:
all applications. rial utilisation and saves additional
assembly time. - facade scaffolding
The flexibility of the scaffold system - assembly platforms
allows the use of same core compo- Thus, construction progress can be - shoring
nents for many other areas on all accelerated and building costs clear- - suspended scaffolds
construction sites. ly reduced. - scaffold bridges for power cables
20
Mobile PERI UP sus-
pended scaffolding
providing inexpensive
access to pier heads.
0
15,0
21
22
23
PERI International 42
19
20
22 32
34
18
38
11
52
6
21
01 PERI GmbH 1
5
Rudolf-Diesel-Strasse 17 46
89264 Weissenhorn
info @ peri.com 30
2
www.peri.com 3 16
13
29
28
9
53
24 48
4 41
61
12
33
24
44
36
43
7 23
50 51 10
37
39 40 57 54
49 60 56
47 59
58 35 55
63
14
15
62 26
27
31
45
25
25
PERI Product Range
Additional Systems
Plywood
Formwork Girders
Stopend Systems
Pallets
Transportation Containers
PERI GmbH
Formwork Scaffolding Engineering
P.O. Box 1264
89259 Weissenhorn
Germany
Tel +49 (0)73 09.9 50- 0
Fax +49 (0)73 09.9 51- 0
info@peri.com
www.peri.com