Vous êtes sur la page 1sur 4

DEPARTMENT OF EDUCATION

Eastern Visayas Region


Inopacan National High School
Inopacan Leyte
S. Y. 2019-2020

CONTEXTUALIZED LEARNING COMPETENCY IN COMPUTER SYSTEM SERVICING 10


PERFORMANCE
WEEK # CONTENT CONTENT STANDARD LEARNING COMPETENCIES CODE
STANDARD
FIRST QUARTER:
WEEK 1  Types and parts of The learners demonstrate an The learners shall be able to 1.1 Plan unit assembly in the school e-classroom to TLE_IACSS9-12ICCS-
computers understanding of concepts and install and configure computer ensure OHS policies and procedures are Ia-e-28
 Computer operating systems principles in installing systems based on established followed in accordance with systems
 Windows / MAC OS X /Linux configuring computer systems. procedures and system requirements
 Peripheral devices requirements. 1.2 Prepare unit assembly to ensure school e-
 Computer systems design classroom rules anchored by the standard OHS
WEEK 2 & 3  Computer assembly policies and procedures are followed in
procedures accordance with systems requirements
 Power ON self-test and 1.3 Identify materials available in the Inopacan
basic-input-output-system market necessary to complete the work in
(BIOS) configuration accordance with established procedures and
procedures check against system requirements
WEEK 4  CMOS 1.4 Obtain materials available in the Inopacan market
 Motherboards necessary to complete the work in accordance
WEEK 5  Multimedia storage devices: with established procedures and check against
o Video cards system requirements
o Sound cards 1.5 Obtain tools, equipment and testing devices
Graphical user interface needed to carry out installation work available in
the Inopacan market in accordance with
established procedures and check for correct
operation and safety
1.6 Assemble computer hardware in the INHS E-
CLASSROOM in accordance with established
procedures and system requirements
1.7 Perform BIOS configuration in accordance with
hardware requirements
WEEK 6  Installers preparation and The learners demonstrate an The learners shall be able to TLE_IACSS9-12ICCS-
OS installation procedures understanding of concepts and install and configure computer If-j-29
WEEK 7  Application and principles in installing systems based on established 2.1 Create portable bootable devices such as flash
devices/drivers installation configuring computer systems. procedures and system drive, SD cards in accordance with software
procedures requirements. manufacturer instruction
WEEK 8  Desktop PC interface/ hook 2.2 Prepare customized installers such as CD and
up procedures DVD in accordance with software utilization
WEEK 9  Application packages and guide and end user agreement
use of application programs 2.3 Carry out installation of portable applications in
WEEK 10  Bootable devices accordance with software user guide and
o CD/DVD bootable software license available in the school e-
o USB bootable using classroom
Rufus software
o USB bootable using
diskpart/CMD
Software installers
SECOND QUARTER:
WEEK 1 – 5  Installation of Operating The learners demonstrate an The learners shall be able to 3.1 Install Operating System (OS) in accordance with TLE_IACSS9-12ICCS-
System understanding of concepts and install and configure computer established installation procedures and to IIa-j-30
o Windows Server principles in installing systems based on established comply with end-user requirements
2008/higher version configuring computer systems. procedures and system 3.2 Install peripherals/ devices in accordance with
o Windows XP/7/8/10 requirements. manufacturer’s instructions and/ or OS
installation procedures
WEEK 6 – 7  Install and configure of 3.3 Configure peripherals/ devices in the school e-
peripherals devices classroom in accordance with manufacturer’s
instructions and/ or OS installation procedures
WEEK 8 – 9  Install /Update Operating 3.4 Access OS and drivers updates/ patches in
system accordance with manufacturer’s
recommendations and requirements
WEEK 10  Checking of work 3.5 Install OS and drivers updates/ patches in
accordance with manufacturer’s
recommendations and requirements
3.6 Check the quality of the work undertaken in
accordance with established procedures

THIRD QUARTER:
WEEK 1  Installation of applications The learners demonstrate an The learners shall be able to 4.1 Install Application Software based on software TLE_IACSS9-12ICCS-
software with different understanding of concepts and install and configure computer installation guides, end-user requirements and IIIa-e-31
variations principles in installing systems based on established software license agreement
configuring computer systems. procedures and system 4.2 Carry out variation to application software in
WEEK 2  Software updates requirements. accordance to customer/ client requirements
WEEK 3  Virtualization software 4.3 Access software updates in accordance with
 Disk management software manufacturer’s recommendations and
requirements
WEEK 4  Antivirus / diagnostic software 4.4 Install software updates in accordance with
manufacturer’s recommendations and
requirements
WEEK 5  Device drivers
 Drivers/Software update
procedures
o Application software
license agreements
o Stress-testing
procedures
 - 5S and 3Rs environmental
policies

WEEK 6 & 7  Burning or testing installed 5.1 Test devices/ systems and/or installation to TLE_IACSS9-12ICCS-
equipment/devices determine whether it conforms to requirements IIIf-j-32
5.2 Conduct stress test to ensure reliability of
WEEK 8  Stress test equipment in accordance with manufacturer’s
o Processor instructions and system requirements
o Memory 5.3 Follow 5S and 3Rs according to environmental
o Hard Disk policies
o Video Card 5.4 Follow procedures in forwarding documentation
to appropriate personnel and/or authority on the
WEEK 9  5S and 3Rs environmental test conducted.
policies

WEEK 10  Reporting and documentation


procedures
FOURTH QUARTER:
WEEK 1  Computer network concepts The learners demonstrate an The learners shall be able to 1.1 Plan cable routes in accordance with network TLE_IACSS9-12SUCN-
understanding of concepts and set up computer networks design and actual installation site in the school IVa-j-33
principles in setting up computer based established procedures laboratory
WEEK 2 – 5  Network cable installation networks. and system requirements for 1.2 Determine cable routes in accordance with
 Copper cable splicing and hardware. network design and actual installation site
cable testing 1.3 Identify necessary network materials available in
 Fiber optic cables splicing Inopacan market in accordance with established
and installation requirements procedures and check against system
requirements
WEEK 6  Philippine Electrical Code 1.4 Obtain necessary network materials in
relevant to data connection accordance with established procedures and
check against system requirements
WEEK 7  OHS standards and 5S 1.5 Obtain tools, equipment, and testing devices in
principles accordance with established procedures
1.6 Check tools, equipment and testing devices in
WEEK 8  Practicing 3Rs (reduce, accordance with established procedures
reuse, recycle/recover) 1.7 Follow OHS policies
1.8 Use appropriate PPE
WEEK 9  3Rs environmental policies 1.9 Perform copper cable splicing based on
WEEK 10  Managing waste from Electronic Industries Alliance /
electrical and electronic Telecommunications Industry Association
equipment (WEEE) (EIA/TIA) standards
1.10 Install network cables and cable raceways in
accordance with established procedures and
installation requirements
1.11 Perform installation work and check for
unnecessary damage that has occurred and
complies with requirements
1.12 Follow OHS standards and 5S principles
according to enterprise requirements
1.13 Dispose excess components and materials
based on WEEE directives and 3Rs waste
management program
LESSON 8: INSTALLING AND CONFIGURING COMPUTER SYSTEMS (ICCS) LESSON 9: SETTING- UP COMPUTER NETWORKS (SUCN)
Learning Outcome 1 – Assemble Computer Hardware Learning Outcome 1 – Install Network Cables
Learning Outcome 2 – Prepare Installer
Learning Outcome 3 – Installing Operating System and Drivers for Peripherals / Devices
Learning Outcome 4 – Installing Application Software
Learning Outcome 5 – Conduct Testing and Documentation

Prepared by: Checked: Noted:


ARIEL L. BAGUIO JASMIN M. RAMIREZ ALEJANDRO P. RENOMERON
Teacher III/Subject Teacher Master Teacher I Secondary School Principal II

Vous aimerez peut-être aussi