SPRINT INDEX

Date: Aug ‘2002 Page 50

Table of contents
Applications Page
- Table of allowable load class. ------------------------------------------------------------------------------ 51
- Basic anchor pattern: 8.0m staggered for unsheeted scaffold. ------------------------------------ 52
- Basic anchor pattern: 4.0m staggered for sheeted scaffold. --------------------------------------- 53
- Basic anchor pattern: 8.0m staggered for unsheeted scaffold
when using walk through frames. -------------------------------------------------------------------------- 54
- Basic anchor pattern: 4.0m staggered for sheeted scaffold,
when using walk through frames. -------------------------------------------------------------------------- 55
- Anchor pattern when using bridging beams. ------------------------------------------------------------ 56
- Use of anchor. --------------------------------------------------------------------------------------------------- 57
- Anchoring when using cantilever hop-up bracket 0.75m. -------------------------------------------- 58
- Anchoring when using hop-up brackets 0.75m (cantilever) and 0.34m. ------------------------- 59
- Height adjustment. --------------------------------------------------------------------------------------------- 60
- Positioning and horizontal locking of platforms. -------------------------------------------------------- 61
- Removing a platform. ------------------------------------------------------------------------------------------ 62
- Use of walk through frames (first anchor level at 4.20m height). ---------------------------------- 63
- Use of walk through frames (first anchor level at 2.20m height). ---------------------------------- 64
- Use of protection fan. ---------------------------------------------------------------------------------- ------- 65
- Roof protection scaffold. ------------------------------------------------------------------------------------- 66
- Corner solutions. ----------------------------------------------------------------------------------------------- 67
- Clearance within walk-through area. --------------------------------------------------------------------- 68
- Progressive erection and dismantling technique. ------------------------------------------------------ 69
- Nesting volume alu-plywood platforms. ------------------------------------------------------------------ 70

Loadings
- SPRINT 75 - Anchor Forces - Unsheeted Scaffold. ------------------------------------------- ------- 201A
- SPRINT 75 - Anchor Forces - Sheeted Scaffold With Nets. ---------------------------------------- 201B
- SPRINT 75 - Anchor Forces - Solid Sheeted Scaffold. --------------------------------------- ------- 201C
- SPRINT 75 - Anchor Pull Forces - Solid Sheeted Scaffold. ---------------------------------------- 201D
- SPRINT 75 - Maximum Allowable Building Heights For 8.0m Staggered Anchor Pattern. - 202
- SPRINT 75 - Maximum Allowable Building Heights For 4.0m Staggered Anchor Pattern. -- 203
- SPRINT 75 - Maximum Vertical Leg Load 8.0m Anchor Pattern. --------------------------------- 204
- SPRINT 75 - Maximum Vertical Leg Load 4.0m Anchor Pattern. --------------------------------- 205
- SPRINT 75 - Maximum Allowable Building Heights For 8.0m Staggered Anchor Pattern
(Guardrail Frames in Bottom Level). ------------------------------------------------------------------------ 206
- SPRINT 75 - Maximum Allowable Building Heights For 4.0m Staggered Anchor Pattern
(Guardrail Frames in Bottom Level). ------------------------------------------------------------------------ 207
- SPRINT 75 - Maximum Vertical Leg Load 8.0m Anchor Pattern
(Guardrail Frames in Bottom Level). ---------------------------------------------------------------- ------- 208
- SPRINT 75 - Maximum Vertical Leg Load 4.0m Anchor Pattern
(Guardrail Frames in Bottom Level). ------------------------------------------------------------------------ 209
- SPRINT 75 / SPRINT 109 - Bridging Beams Loadbearing Capacity. ---------------------------- 250
- SPRINT 75 / SPRINT 109 - Maximum Forces on Cantilever Hop-Up Bracket 0.75m. ------ 251
SPRINT INDEX

Date: Aug 2002 Page 50A

Table of contents (continued)

Applications Page
- SPRINT 109 - Basic Anchor Pattern - 8.0m Staggered For Unsheeted Scaffold. ------------- 1052
- SPRINT 109 - Basic Anchor Pattern - 4.0m Staggered For Sheeted Scaffold. ----------------- 1053
- SPRINT 109 - Basic Anchor Pattern - 8.0m Staggered For Unsheeted Scaffold When
Using Walk Through Frames. ------------------------------------------------------------------------------- 1054
- SPRINT 109 - Basic Anchor Pattern - 4.0m Staggered For Sheeted Scaffold When
Using Walk Through Frames. ------------------------------------------------------------------------------- 1055
- SPRINT 109 - Use of Walk Through Frames (First Anchor Level 4.20m/4.60m). ------------- 1063
- SPRINT 109 - Use of Walk Through Frames (First Anchor Level 2.20m/2.60m). ------------- 1064
- SPRINT 109 - Anchor Forces - into Facade, Solid Sheeted Scaffold. ---------------------------- 1201C

Sprint 75 Framed Facade


- SPRINT 75 Framed facade Introduction. --------------------------------------------------------------- 2001
- SPRINT 75 Framed facade Introduction. --------------------------------------------------------------- 2002
- SPRINT 75 Framed facade How to use. ---------------------------------------------------------------- 2003
- SPRINT 75 Framed facade How to use. ---------------------------------------------------------------- 2004
- SPRINT 75 Framed facade How to use. ---------------------------------------------------------------- 2005
- SPRINT 75 Framed facade How to use. ---------------------------------------------------------------- 2006
- SPRINT 75 Framed facade How to use. ---------------------------------------------------------------- 2007
- SPRINT 75 Framed facade V -Ties : Description. ---------------------------------------------------- 2008
- SPRINT 75 Framed facade Anchor Patterns. ---------------------------------------------------------- 2009
- SPRINT 75 Framed facade Allowable Safe Working Loads & Anchor Forces. --------------- 2010
- SPRINT 75 Framed facade Anchor Patterns. ---------------------------------------------------------- 2011
- SPRINT 75 Framed facade Allowable Safe Working Loads & Anchor Forces. --------------- 2012
- SPRINT 75 Framed facade Anchor Patterns. ---------------------------------------------------------- 2013
- SPRINT 75 Framed facade Allowable Safe Working Loads & Anchor Forces. ---------------- 2014
- SPRINT 75 Framed facade 750mm Hop-up Bracket. ------------------------------------------------ 2015
- SPRINT 75 Framed facade Anchor Patterns. ---------------------------------------------------------- 2016
- SPRINT 75 Framed facade Allowable Safe Working Loads & Anchor Forces
when using the walkthrough frame. ----------------------------------------------------------------------- 2017
- SPRINT 75 Framed facade Anchor Patterns. ---------------------------------------------------------- 2018
- SPRINT 75 Framed facade Allowable Safe Working Loads & Anchor Forces
when using the walkthrough frame. ----------------------------------------------------------------------- 2019
- SPRINT 75 Framed facade Anchor Patterns. ---------------------------------------------------------- 2020
- SPRINT 75 Framed facade Anchor Patterns. ---------------------------------------------------------- 2021
APPLICATIONS
SPRINT 75
Date: Dec ‘96 Page n°: 51

Table of allowable load class

Load class according to CEN HD1000 3

Allowable uniformly distributed load on total area of 2.00 kN/m2


platform.

Allowable concentrated load on arbitrary area 1.50 kN


500mm x 500mm

Allowable concentrated load on arbitrary area 1.00 kN


200mm x 200mm

Loadings above apply to all platform types e.g. alu-plywood or steel


platforms.
All information given in the datasheets is based on calculations with a
100% class 3 loading of one level, and a 50% class 3 loading of the level
directly below. (Load class 3. acc. CEN HD1000)
Data provided using windloads acc. DIN4420 Part 1.

© SGB
APPLICATIONS
SPRINT 75
Date: Dec ‘96 Page n°: 52

Basic anchor pattern: 8.0m staggered for unsheeted scaffold.

Platform Ladder platform


Single
guardrailpost

Frame

Diagonal
brace pin

Diagonal brace Guardrail


with coupler frame

= Anchorpoint

Guidance Notes:
- H = heights according to DIN4420: max. 24.0m.
- For other heights and configurations, contact SGB´s Technical Service .
- The four top lifts have to be secured against lifting by locking pins.
- Face bracing is required in one bay for every 5 bays.
- Stairway bays have to be anchored every 4.0m.

© SGB
APPLICATIONS
SPRINT 75
Date: Dec ‘95 Page n°: 53

Basic anchor pattern: 4.0m staggered for sheeted scaffold.


Single Platform Ladder platform
guardrailpost

Frame

Diagonal
brace pin

Diagonal brace Guardrail


with coupler frame

= Anchorpoint
Anchor attachment (A) Top View Alternative anchor attachment (B) Top View
If one coupler can´t be placed on frame-standard.

Coupler Class B EN74 Anchorplate Coupler Class B EN74

Coupler Class BB EN74

Guidance Notes:
- H = heights according to DIN4420: max. 24.0m.
- For other heights and configurations, contact SGB´s Technical Service.
- The four top lifts have to be secured against lifting by locking pins.
- Face bracing is required in one bay for every 5 bays.
- Stairway bays have to be anchored every 4.0m.

© SGB
APPLICATIONS
SPRINT 75
Date: Dec ‘95 Page n°: 54

Basic anchor pattern: 8.0m staggered for unsheeted


scaffold when using walk through frames.
VIEW A VIEW A
With hop-up bracket 0.34m

≤300 (Facade to platform) ≤300 (Facade to platform)

Guardrails
= Anchorpoint
Guidance Notes:
- H = heights according to DIN4420: max. 24.0m.
- Every 1.0gm frame, at second level, has to be braced perpendular to facade.
- For other heights and configurations, contact SGB´s Technical Service.
- The walk through frames may not be used in combination with bridging beams.
- Face bracing is required in one bay for every 5 bays.
- The four top lifts have to be secured against lifting by locking pins.
- At the level, below the top platform, every standard has to be anchored.
- Stairway bays have to be anchored every 4.0m.

© SGB
APPLICATIONS
SPRINT 75
Date: Dec ‘95 Page n°: 55

Basic anchor pattern: 4.0m staggered for sheeted


scaffold when using walk through frames.

Guardrails
= Anchorpoint Facade to
platform
Anchor attachment (A) Plan View Alternative anchor attachment (B) Plan View
If one coupler can´t be placed on frame-standard.

Coupler Class B EN74


Coupler Class B EN74 Anchorplate

Coupler Class BB EN74

Guidance Notes:
- H = heights according to DIN4420: max. 24.0m.
- Attachment of anchors to the frame-uprights must be done with two couplers; either two right angle couplers
Class B EN74 (A) or alternatively with one right angle coupler Class B EN74 conbined with another right angle
check coupler Class BB EN74 and an anchorplate, if one of the couplers can´t be located on the frame (B).
- The walk through frames may not be used in combination with bridging beams.
- Face bracing is required in one bay for every 5 bays.
- The four top lifts have to be secured against lifting by locking pins.
- Stairway bays have to be anchored every 4.0m.
- For other heights and configurations, contact SGB´s Technical Service.

© SGB
SPRINT 75 APPLICATIONS

SPRINT 109 Date: Dec ‘95 Page n°: 56

Anchor pattern when using bridging beams.


Diagonal brace
with coupler
Guardrails
SECTION A-A
Plan brace
(tube with couplers)

Bridging
beams

Bridging
beam SECTION B-B

Ledger brace
(tube with couplers)

Half coupler
base ledger
3.0m (SPRINT 75 only)

= Anchor point
•* = Anchor point may be omitted in most
SECTION C-C . structures if it can be shown not to be
Plan brace . required. (Required for DIN approval.)
(tube with couplers)

Frame

Plan brace
(tube with couplers)
Anchor

Anchor
Coupler bridging
beam

Ledger brace Ledger brace Bridging


(tube with couplers) (tube with couplers) beam

Guidance Notes:
- For an unsheeted scaffold the basic anchor pattern 8.0m staggered shall apply for the rest of the scaffold.
- For a sheeted scaffold the basic anchor pattern 4.0m staggered shall apply for the rest of the scaffold.
- Face bracing is required in one bay for every 5 bays.
- If on the standards, which limit the opening in the scaffold, no anchors can be placed, the frames must be braced
perpendicular to the facade.
- The top four lifts have to be secured against lifting by locking pins.
- Bays which are adjacent to the opening in the scaffold have to be braced parallel to the facade on the outsice
plane of the scaffold.
- Bridging beams may not be used in combination with walk through frames.

© SGB
SPRINT 75 APPLICATIONS

SPRINT 109 Date: Dec ‘96 Page n°: 57

Use of anchor.

Coupler Class B
EN74

Guidance Notes:
- The anchors must only be attached to rigid parts of the support structure. The safe anchor load is dependent on
the type of fixing, the facade/structure substrate material, depth of embedment of the fixing, etc.
- Anchors have to be built in at level of erection. When dismantling a scaffold, anchors may only be removed from
the highest level of dismantling (DIN 4420 Part 1 Section 8.2.2) on a progressive basis.
- When using sheeted scaffold, anchors have to be attached to frames with two couplers.

© SGB
101101101101
SPRINT 75 Applications
SPRINT 109 Date: August ‘98
o.
Page N 57A

Use of Raking Tubes

If it is not possible to anchor into the facade, raking tubes can be used to support a
maximum of 3 lifts. The frequency of the raking tubes should be at least the frequency of the
facade anchors they are replacing.

The raking tubes should


be external to the scaffold,
tied to the scaffold at the
level of the second lift.

Raking Tube: length should


not exceed 6.0m.
The scaffold should be butted
against the facade at the level
of the second lift.
The raking tube should be
at an angle no greater than
2 vertical to 1 horizontal.

The base of the raking tube


should be tied to the base The base of the raking tube
of the scaffold. should be well-founded with a
Baseplate on a Soleboard.
If it is not possible to butt the scaffold at the required level,
the raking tube (or a tube connected to the raking tube) Detail:
should be driven at least 1.25m into the ground. A cross-
tube at approx. 45° to the horizontal should also be driven
1.25m into the ground and connected to the raking tube.

Alternatively, kentledge
can be used.
Cross Tube

Alternative on
Hard Ground:

© SGB
SPRINT 75 APPLICATIONS

SPRINT 109 Date: Dec ‘95 Page n°: 58

Anchoring when using cantilever hop-up bracket 0.75m.


Facade to
platform
750/1090

Anchor

Cantilever hop-up
bracket 0.75m

Hop-up bracket
Facade to 0.34m
platform

Guidance Notes:
- Both the frame supporting the cantilever hop-up bracket 0.75m and the frame below, have to be anchored.
- Only one cantilever hop-up bracket 0.75m may be attached per section.

© SGB
SPRINT 75 APPLICATIONS

SPRINT 109 Date: Dec ‘95 Page n°: 59

Anchoring when using hop-up brackets


0.75m (cantilever) and 0.34m.

TOP VIEW Double anchor

Facade to
platform
750/1090

Double
anchor
DETAIL A

Cantilever hop-up
bracket 0.75m

Hop-up bracket
0.34m

Guidance Notes:
- Both the frame supporting the cantilever hop-up bracket 0.75m and the frame below, have to be anchored.
- Only one cantilever hop-up bracket 0.75m may be attached per section.

© SGB
APPLICATIONS
SPRINT 75
Date: Dec ‘95 Page n°: 60

Height adjustment

= Anchorpoint

1 = Platform
2 = Half coupler base ledger
3 = Frames for height adjustment
h = 1.0m/0.66m

Frame
1.0m/0.66m

Example base-level height adjustment

Guidance Notes:
- If frames 1.00m/0.66m for height adjustment are used, the first anchor level must be ≤4.00m.

© SGB
APPLICATIONS
SPRINT 75
Date: Dec ‘95 Page n°: 61

Positioning and horizontal locking of platforms.


TOP VIEW

Alu-plywood platform

Toeboard
Steel Steel
platform platform

SECTION A-A SECTION B-B

Alu-plywood Steel
platform platform

Guidance Notes:
- Platforms have to be positioned towards facade side, so that toeboard can be placed in the right position.
- Toeboards have to be placed with the steel attachment plates positioned towards outside plane of scaffold.

© SGB
APPLICATIONS
SPRINT 75
Date: Dec ‘95 Page n°: 62

Removing a platform.

Claw
Bottom
transom

Lift
platform.

Toptransom

Frame

Move platform
sideways so claw
is positioned
underneath
aperture in
bottomtransom.

Lift
platform.

Platform can be
removed.

Guidance Notes:
- Before removing a platform the toeboard has to be removed, which otherwise blocks the platform.
- Platforms are essential parts of the scaffold construction. It is FORBIDDEN to take out platforms without putting
back other stiffening elements, such as plan braces, except when (partially) dismantling the scaffold.

© SGB
APPLICATIONS
SPRINT 75
Date: Dec ‘95 Page n°: 63

Use of walk through frames (first anchor level 4.20m/4.60m).

PLAN VIEW

Planbrace
every 5th bay

Facade to
platform

Frame

Brace (tube
2000 Guard- with couplers)
rails

Planbrace

Diagonal brace
with coupler

2200/2600

Base
jack

Guidance Notes:
- Every 1.09m frame, at second level, has to be braced perpendular to facade.
- The walk through frames may not be used in combination with bridging beams.
- At the level, below the top platforms, every standard has to be anchored.

© SGB
APPLICATIONS
SPRINT 75
Date: Dec ‘95 Page n°: 64

Use of walk through frames (first anchor level 2.20m/2.60m).

PLAN VIEW

Planbrace
every 5th bay

Facade to
platform

Frame

2000 Guardrails
frame

Planbrace

Anchor with 2
half couplers
Class B EN74 Diagonal brace
with coupler
2200/2600

Base
jack

Guidance Notes:
- Every second walk through frame has to be anchored at 2.2m/2.6m height.
- The walk through frames may not be used in combination with bridging beams.
- At the level, below the top platforms, every standard has to be anchored.

© SGB
SPRINT 75 APPLICATIONS

SPRINT 109 Date: Dec ‘95 Page n°: 65

Use of protection fan

TOP VIEW

Fan connec-
tion spring Protection
shield

Brace (tube with couplers)


every 5th bay

Facade to
platform
750/1090

Frame

Guardrails

Fan support

Swivel coupler

Brace

Protection
shield Guard-
rails

DETAIL A
Anchor
tube

Guidance Notes:
- The frame supporting the protection fan and the frame below have to be anchored.
- Guardrails must be placed at protection fan level between workarea and the protection shield.

© SGB
SPRINT 75 APPLICATIONS

SPRINT 109 Date: Aug ‘96 Page n°: 66

Roof protection scaffold


Roof protection post with cantilever hop-up bracket
Facade to platform
Roof protec-
1090 tion post

Roof protec-
tion post

Anchoring acc. Anchor


normal anchor
patterns
Frame

Cantilever hop-up
Frame bracket 0.75m

Facade to
platform

Facade to Hop-up bracket 0.34m


Net acc. to platform
DIN 32.767

Single
guardrail

Toeboard
VIEW A Net attachment

Guidance Notes:
- The frame supporting the cantilever hop-up bracket and the frame below have to be anchored.

© SGB
APPLICATIONS
SPRINT 75
Date: Dec ‘95 Page n°: 67

Corner solutions

OUTHER CORNER SOLUTION

OUTHER CORNER SOLUTION INNER CORNER SOLUTION


TOP VIEW TOP VIEW

Tube with couplers Diagonal brace

alu ply-wood platform

Diagonal
brace

Anchor
Anchor

Guidance Notes:
- Anchors only shown for one level.

© SGB
APPLICATIONS
SPRINT 75
Date: Dec ‘95 Page n°: 68

Clearance within walk through area

© SGB
APPLICATIONS
SPRINT 75
Date: Dec ‘95 Page n°: 69

Progressive erection and dismantling technique

1. The possibility of taking platforms out of an 2. The left hand side of the scaffold can be
erected scaffold enables the scaffold to be dismantled, leaving the remaining
moved progressively along the facade. structure in position.

3. On the right hand side of the scaffold the 4. After completing the right hand side of the
same material can be re-erected without scaffold one has “moved” the scaffold along
the use of additional components. the facade, optimising the use of the Sprint
equipment

Guidance notes:
Due to the capability of removing platforms within an erected scaffold, parts of the structure can be
moved along the facade, this saving on the amount of material required for that face.

© SGB
APPLICATIONS
SPRINT 75
Date: Dec ‘95 Page n°: 70

Nesting volume of alu-plywood platforms

Platform stacked normally

Platform nested

Platform stacked normally Platform nested


TOP VIEW TOP VIEW

Guidance notes:
- E.g. 24 alu-platforms 3.0m - stacked V=3.58m3 ⇒ 20% volume reduction.
- nested V=2.84m3

© SGB
SPRINT 75 Loadings

Date: July ´96 Page n°: 201A

Anchor forces, unsheeted scaffold.


Building height = last scaffold level up to 24.0m
Scaffold Anchor Facade
configuration pattern open half open closed
⊥ // ⊥ // ⊥ //
Basic scaffold with 0.34m hop-up Uprights 8.0m (1) 5.0 1.4 3.9 1.4 1.6 1.4
brackets at facade side on every level Uprights 4.0m (2) 2.6 0.7 2.0 0.7 0.8 0.7
End uprights 4.0m 1.3 1.4 1.0 1.4 0.4 1.4
Uprights 8.0m (1) Not allowed
Stairway Uprights 4.0m (2) 2.7 1.4 2.1 1.4 1.1 1.4
End uprights 4.0m 1.6 0.8 1.2 0.8 0.5 0.8

Roof protection Top anchor (A) 1.0 2.8 1.0 2.8 1.1 2.8
scaffold with 0.75m
cantilever hop-up
bracket (top level) (A)
and 0.34m hop-up Bottom anchor 2.5 3.1 2.1 3.1 1.3 3.1
bracket (every level). (B) (B)

Level last scaffold Anchor 2.7 1.5 2.3 1.5 1.7 1.5
bays not anchored

Top anchor (A) 2.5 0.3 2.1 0.3 1.2 0.3


(A)

Protection fan
(B) Bottom anchor 3.0 0.3 2.6 0.3 1.7 0.3
(B)

Bridging beam
Outside anchor 1.7 0.6 1.5 0.6 0.9 0.6
(A)

(A) (A)
(B) Center anchor 0.6 0.6 0.5 0.6 0.2 0.6
(B)

Guidance Notes:
(1) - Anchor pattern 8.0m staggered.
(2) - Anchor pattern 4.0m staggered and not staggered.
This table is based on static calculations according German codes.
- Anchor forces in kN.
© SGB
SPRINT 75 Loadings

Date: July ´96 Page n°: 201B

Anchor forces, sheeted scaffold with nets.

Building height = last scaffold level up to 24.0m

Scaffold Anchor Facade


configuration pattern open half open closed
⊥ // ⊥ // ⊥ //
Basic scaffold with 0.34m hop- Uprights 8.0m (1) Not allowed
up brackets at facade side on Uprights 4.0m (2) 6.3 1.7 4.9 1.7 1.7 1.7
every level. End uprights 4.0m 1.6 1.7 1.2 1.7 0.5 1.7
Uprights 8.0m (1) Not allowed
Stairway. Uprights 4.0m (2) 6.5 1.7 4.9 1.7 1.8 1.7
End uprights 4.0m 3.3 1.7 2.5 1.7 0.9 1.7

Roof protection Top anchor 1.9 0.9 1.7 0.9 1.4 0.9
scaffold with (A)
0.75m cantilever (A)
hop-up bracket
(top level) and (B)
0.34m hop-up Bottom anchor 5.3 0.9 4.2 0.9 2.0 0.9
bracket (every (B)
level).

(A) Top anchor 5.3 0.7 4.3 0.7 1.9 0.7


(A)
Protection fan.
(B)
Bottom anchor 5.8 0.7 4.8 0.7 2.4 0.7
(B)

Guidance Notes:
(1) - Anchor pattern 8.0m staggered.
(2) - Anchor pattern 4.0m staggered and not staggered.
This table is based on static calculations according German codes.
- Anchor forces in kN.

© SGB
SPRINT 75 Loadings

Date: July ´96 Page n°: 201C

Anchor forces, solid sheeted scaffold.

Building height = last scaffold level up to 24.0m

Scaffold Anchor Facade


configuration pattern open half open closed
⊥ // ⊥ // ⊥ //
Basic scaffold with 0.34m hop- Uprights 8.0m (1) Not allowed
up brackets at facade side on Uprights 4.0m (2) 12.8 2.1 12.8 2.1 12.8 2.1
every level. End uprights 4.0m 3.2 2.1 3.2 2.1 3.2 2.1
Uprights 8.0m (1) Not allowed
Stairway. Uprights 4.0m (2) 12.8 2.1 12.8 2.1 12.8 2.1
End uprights 4.0m 6.4 2.1 6.4 2.1 6.4 2.1

Roof protection Top anchor 2.6 1.0 2.6 1.0 2.6 1.0
scaffold with (A)
0.75m cantilever (A)
hop-up bracket
(top level) and (B)
0.34m hop-up Bottom anchor 6.8 0.9 6.8 0.9 6.8 0.9
bracket (every (B)
level).

(A) Top anchor 10.2 0.8 10.2 0.8 10.2 0.8


(A)
Protection fan.
(B)
Bottom anchor 10.7 0.8 10.7 0.8 10.7 0.8
(B)

Guidance Notes:
(1) - Anchor pattern 8.0m staggered.
(2) - Anchor pattern 4.0m staggered and not staggered.
This table is based on static calculations according German codes.
- Anchor forces in kN.

© SGB
SPRINT 75 Loadings

Date: July ´96 Page n°: 201D

Anchor pull forces, solid sheeted scaffold.

Building height = last scaffold level up to 24.0m

Scaffold Anchor Facade


configuration pattern open half open closed
⊥ // ⊥ // ⊥ //
Basic scaffold with 0.34m hop- Uprights 8.0m (1) Not allowed
up brackets at facade side on Uprights 4.0m (2) 12.8 2.1 11.6 2.1 3.2 2.1
every level. End uprights 4.0m 3.2 2.1 2.9 2.1 0.8 2.1
Uprights 8.0m (1) Not allowed
Stairway. Uprights 4.0m (2) 12.8 2.1 11.6 2.1 3.2 2.1
End uprights 4.0m 3.2 2.1 2.9 2.1 0.8 2.1

Roof protection Top anchor 2.6 1.0 2.4 1.0 1.4 1.0
scaffold with (A)
0.75m cantilever (A)
hop-up bracket
(top level) and (B)
0.34m hop-up Bottom anchor 6.8 1.0 6.3 1.0 3.2 0.9
bracket (every (B)
level).

(A) Top anchor 10.2 0.8 9.3 0.8 3.0 0.8


(A)
Protection fan.
(B)
Bottom anchor 10.7 0.8 9.8 0.8 3.6 0.8
(B)

Guidance Notes:
(1) - Anchor pattern 8.0m staggered.
(2) - Anchor pattern 4.0m staggered and not staggered.
This table is based on static calculations according German codes.
- Anchor forces in kN.

© SGB
SPRINT 75 LOADINGS

Date: May ‘96 Page. n°: 202

Maximum allowable building heights for


8.0m staggered anchorpattern
Standard 8.0m staggered Alternative 8.0m staggered
anchor pattern anchor pattern

= Anchorpoint = Anchorpoint

Max. allowable building Standard 8.0m staggered Alternative 8.0m staggered


height in m. anchor pattern anchor pattern
Hop-up brackets 0.34m on Excluded Included Excluded Included
every level at facade side
Steel platforms 46 34 56 40
Alu-plywood platforms 68 46 72 52

Max. anchorforces in kN. Standard 8.0m staggered Alternative 8.0m staggered


anchor pattern anchor pattern
Hop-up brackets 0.34m Excluded Included Excluded Included
on every level at facade side
⊥ // ⊥ // ⊥ // ⊥ //
Steel platforms 6.2 1.9 6.6 2.2 5.3 1.9 5.9 2.3
Alu-plywood platforms 6.0 1.9 6.9 2.4 5.1 1.9 6.1 2.4

Guidance Notes:
This table is valid under the following assumptions:
− The scaffold is UNSHEETED.
− No (cantilever) hop-up brackets 0.75m, pedestrian frames, bridging beams, protection fans or roof
protection posts are used.
− 1.5 working lifts, loadclass 3 acc. CEN HD1000.
− Windloads acc. CEN HD1000.
− Anchors fixed to both standards see page 57.
− Maximum jack extension (35cm).
− Information compiled acc. German DIN design rules

© SGB
SPRINT 75 LOADINGS

Date: May ‘96 Page n°: 203

Maximum allowable building heights for


4.0m staggered anchor pattern
Standard 4.0m staggered Alternative 4.0m staggered
anchor pattern anchor pattern

= Anchorpoint = Anchorpoint

Max. allowable building Standard 4.0m staggered Alternative 4.0m staggered


height in m anchor pattern anchor pattern
Hop-up bracket 0.34m on
every level at facade side Excluded Included Excluded Included
Steel platforms 64 56 66 60
Alu-plywood platforms 88 72 92 74

Max. anchorforces in kN. Standard 4.0m Alternative 4.0m


staggered anchor pattern staggered anchor pattern
Hop-up brackets 0.34m on
every level at facade side Excluded Included Excluded Included
⊥ // ⊥ // ⊥ // ⊥ //
Steel platforms 4.2 1.1 4.6 1.3 3.8 1.0 3.9 1.4
Alu-plywood platforms 4.0 1.4 3.8 1.6 4.1 1.1 3.6 1.4

Guidance Notes:
This table is valid under the following assumptions:
− The scaffold is UNSHEETED.
− No (cantilever) hop-up brackets 0.75m, pedestrian frames, bridging beams, protection fans or roof
protection posts are used.
− 1.5 working lifts, loadclass 3 acc. CEN HD1000.
− Windloads acc. CEN HD1000.
− Anchors fixed to both standards see page 57.
− Maximum jack extension (35cm).
− Information compiled acc. German DIN design rules

© SGB
SPRINT 75 LOADINGS

Date: May ‘96 Page n°.: 204

Maximum vertical leg load 8.0m anchor pattern


Standard 8.0m staggered Alternative 8.0m staggered
anchor pattern anchor pattern

Weight distribution for each


extra lift above 8.0m height
Anchor Vertical loading as
r components percentage of
component weight
on inside on outside
leg leg
Horizontal
Outside guardrail 0% 100%
spring
stiffness Outside toeboard 0% 100%
Vertical diagonal 0% 50%
Platforms 50% 50%
Frame 50% 50%
Hop-up Anchor 25% 0%
bracket Inside guardrail 100% 0%
0.34m
Extra live load, hop-up incl. 67% 33%
Extra live load, hop-up 50% 50%
excl.
Hop-up 0.34m incl. decking 100% 0%

Maximum vertical leg load in kN


on top of 8.0m scaffold (Fv)
Standard 8.0m staggered Alternative 8.0m staggered
anchor pattern anchor pattern
Hop-up brackets 0.34m on Excluded Included Excluded Included
every level at facade side Fvo Fvi Fvo Fvi Fvo Fvi Fvo Fvi
Steel platforms 13 12 12 10 17 13 14 13
Alu-plywood platforms 16 13 14 12 17 14 15 14
The values for max. vertical leg load already included a loadfactor of 1.5

Guidance Notes:
This table is valid under the following assumptions:
− The scaffold is UNSHEETED.
− No (cantilever) hop-up brackets 0.75m, pedestrian frames, bridging beams, protection fans or roof
protection posts are used.
− 1.5 working lifts, loadclass 3 acc. CEN HD1000.
− Windloads acc. CEN HD1000.
− Anchors fixed to both standards see page 57.
− Maximum jack extension (35cm).
− Information compiled acc. German DIN design rules

© SGB
SPRINT 75 LOADINGS

Date: May ‘96 Page. n°: 205

Maximum vertical leg load 4.0m anchor pattern


Standard 4.0m staggered Alternative 4.0m staggered
anchor pattern anchor pattern
Weight distribution for each
extra lift above 8.0m height.
Vertical loading as
Anchor Components percentage of
component weight
on inside on outside
Horizontal leg leg
spring Guardrail 0% 100%
stiffness
Toeboard 0% 100%
Vertical diagonal 0% 50%
Platforms 50% 50%
Frame 50% 50%
Anchor 25% 0%
Hop-up Inside guardrail 100% 0%
bracket Extra live load, hop-up incl. 67% 33%
0.34m
Extra live load, hop-up 50% 50%
excl.
Hop-up 0.34m incl. decking 100% 0%

Maximum vertical leg load in kN on


top of 8.0m scaffold (Fv)
Standard 4.0m staggered Alternative 4.0m staggered
anchor pattern anchor pattern
Hop-up brackets 0.34m on Excluded Included Excluded Included
every level at facade side Fvo Fvi Fvo Fvi Fvo Fvi Fvo Fvi
Steel platforms 22 13 18 17 23 14 20 19
Alu-plywood platforms 24 14 20 19 25 14 21 20
The values for max. vertical leg load already included a loadfactor of 1.5

Guidance Notes:
This table is valid under the following assumptions:
− The scaffold is UNSHEETED.
− No (cantilever) hop-up brackets 0.75m, pedestrian frames, bridging beams, protection fans or roof
protection posts are used.
− 1.5 working lifts, loadclass 3 acc. CEN HD1000.
− Windloads acc. CEN HD1000.
− Anchors fixed to both standards see page 57.
− Maximum jack extension (35cm).
− Information compiled acc. German DIN design rules

© SGB
SPRINT 75 LOADINGS

Date: May ‘96 Page. n°: 206

Maximum allowable building heights for 8.0m staggered


anchorpattern (guardrailframes in bottomlevel).
Standard 8.0m staggered Alternative 8.0m staggered
anchor pattern anchor pattern

= Anchorpoint = Anchorpoint

Max. allowable building Standard 8.0m staggered Alternative 8.0m staggered


height in m. anchor pattern anchor pattern
Hop-up brackets 0.34m on Excluded Included Excluded Included
every level at facade side
Steel platforms 46 56
Alu-plywood platforms 68 72

Max. anchorforces in kN Standard 8.0m staggered Alternative 8.0m staggered


anchor pattern anchor pattern
Hop-up brackets 0.34m Excluded Included Excluded Included
on every level at facade side
⊥ // ⊥ // ⊥ // ⊥ //
Steel platforms 6.2 1.9 5.3 1.9
Alu-plywood platforms 6.0 1.9 5.2 1.9

Guidance Notes:
This table is valid under the following assumptions:
− The scaffold is UNSHEETED.
− No (cantilever) hop-up brackets 0.75m, pedestrian frames, bridging beams, protection fans or roof
protection posts are used.
− 1.5 working lifts, loadclass 3 acc. CEN HD1000.
− Windloads acc. CEN HD1000.
− Anchors fixed to both standards see page 57.
− Maximum jack extension (35cm).
− Information compiled acc. German DIN design rules

© SGB
SPRINT 75 LOADINGS

Date: May ‘96 Page n°: 207

Maximum allowable building heights for 4.0m staggered


anchor pattern (guardrailframes in bottom level)
Standard 4.0m staggered Alternative 4.0m staggered
anchor pattern anchor pattern

= Anchorpoint = Anchorpoint

Max. Allowable building Standard 4.0m staggered Alternative 4.0m staggered


height in m anchor pattern anchor pattern
Hop-up bracket 0.34m on
every level at facade side Excluded Included Excluded Included
Steel platforms 72 74
Alu-plywood platforms 102 104

Max. anchorforces in kN.. Standard 4.0m Alternative 4.0m


staggered anchor pattern staggered anchor pattern
Hop-up brackets 0.34m on
every level at facade side Excluded Included Excluded Included
⊥ // ⊥ // ⊥ // ⊥ //
Steel platforms 4.0 1.5 4.1 0.9
Alu-plywood platforms 4.0 1.9 3.9 1.1

Guidance Notes:
This table is valid under the following assumptions:
− The scaffold is UNSHEETED.
− No (cantilever) hop-up brackets 0.75m, pedestrian frames, bridging beams, protection fans or roof
protection posts are used.
− 1.5 working lifts, loadclass 3 acc. CEN HD1000.
− Windloads acc. CEN HD1000.
− Anchors fixed to both standards see page 57.
− Maximum jack extension (35cm).
− Information compiled acc. German DIN design rules

© SGB
SPRINT 75 LOADINGS

Date: May ‘96 Page n°.: 208

Maximum vertical leg load 8.0m anchor pattern


(guardrailframes in bottom level)
Standard 8.0m staggered Alternative 8.0m staggered
anchor pattern anchor pattern

Weight distribution for each


extra lift above 8.0m height
Anchor Vertical loading as
r components percentage of
component weight
on inside on outside
Horizontal
leg leg
spring
stiffness Outside guardrail 0% 100%
Outside toeboard 0% 100%
Vertical diagonal 0% 50%
Platforms 50% 50%
Frame 50% 50%
Hop-up Anchor 25% 0%
bracket Inside guardrail 100% 0%
0.34m
Extra live load, hop-up incl. 67% 33%
Extra live load, hop-up exc. 50% 50%
Hop-up 0.34m incl. decking 100% 0%

Maximum vertical leg load in kN


on top of 8.0m scaffold (Fv)
Standard 8.0m staggered Alternative 8.0m staggered
anchor pattern
Hop-up brackets 0.34m on Excluded Excluded Included
FvoFvi Fvi Fvo Fvo Fvi
1312 13
Alu-plywood platforms 13 17
The values for max. vertical leg load already included a loadfactor of 1.5.

Guidance Notes:
This table is valid under the following assumptions:
− The scaffold is UNSHEETED.
− No (cantilever) hop-up brackets 0.75m, pedestrian frames, bridging beams, protection fans or roof
protection posts are used.
− 1.5 working lifts, loadclass 3 acc. CEN HD1000.
− Windloads acc. CEN HD1000.
− Anchors fixed to both standards see page 57.
− Maximum jack extension (35cm).
− Information compiled acc. German DIN design rules

© SGB
SPRINT 75 LOADINGS

Date: May ‘96 Page. n°: 209

Maximum vertical leg load 4.0m anchor pattern


(guardrailframes in bottom level)
Standard 4.0m staggered Alternative 4.0m staggered
anchor pattern anchor pattern
Weight distribution for each
extra lift above 8.0m height.
Vertical loading as
Anchor Components percentage of
component weight
on inside on outside
Horizontal leg leg
spring Guardrail 0% 100%
stiffness
Toeboard 0% 100%
Vertical diagonal 0% 50%
Platforms 50% 50%
Frame 50% 50%
Anchor 25% 0%
Hop-up Inside guardrail 100% 0%
bracket Extra live load, hop-up incl. 67% 33%
0.34m
Extra live load, hop-up 50% 50%
excl.
Hop-up 0.34m incl. decking 100% 0%

Maximum vertical leg load in kN on


top of 8.0m scaffold (Fv)
Standard 4.0m staggered Alternative 4.0m staggered
anchor pattern anchor pattern
Hop-up brackets 0.34m on Excluded Included Excluded Included
every level at facade side Fvo Fvi Fvo Fvi Fvo Fvi Fvo Fvi
Steel platforms 25 15 25 15
Alu-plywood platforms 27 16 28 17
The values for max. vertical leg load already included a loadfactor of 1.5.

Guidance Notes:
This table is valid under the following assumptions:
− The scaffold is UNSHEETED.
− No (cantilever) hop-up brackets 0.75m, pedestrian frames, bridging beams, protection fans or roof
protection posts are used.
− 1.5 working lifts, loadclass 3 acc. CEN HD1000.
− Windloads acc. CEN HD1000.
− Anchors fixed to both standards see page 57.
− Maximum jack extension (35cm).
− Information compiled acc. German DIN design rules

© SGB
SPRINT 75 LOADINGS
SPRINT 109
Date: May ‘96 Page. n°: 250

Bridging beams loadbearing capacity

POINTLOAD in middle of top chord

Length Fmax Mmax Qmax f Fr


6.0m 18,34 27,96 9,47 22,61 7,16
5.0m 18,20 23,06 9,35 17,57 7,71
4.0m 22,10 22,30 11,25 11,89 8,81

UNIFORMLY DISTRIBUTED LOAD on top chord

Length qmax Mmax Qmax f Fr


6.0m 3,17 14,72 9,81 14,54 9,09
5.0m 3,30 10,63 8,50 10,06 8,98
4.0m 4,65 9,50 9,50 6,43 9,05

TWO POINTLOADS dividing top chord in three equal sections

Length Fmax Mmax Qmax f Fr


6.0m 10,17 20,79 10,47 20,03 7,99
5.0m 4,25 7,39 4,38 10,63 5,39
4.0m 5,64 7,72 5,84 7,14 6,36

THREE POINTLOADS dividing top chord in four equal sections

Length Fmax Mmax Qmax f Fr


6.0m 4,10 12,75 6,45 11,60 6,21
5.0m 6,15 15,40 9,48 13,73 8,48
4.0m 7,00 14,20 10,70 8,79 9,03

Guidance Notes:
Fmax (kN) = max. pointload(s) on top chord Calculation carried out with:
qmax (kN/m) = max. uniformly distributed load on top chord - Loadfactor = 1.5, materialfactor = 1.1
Mmax (kNm) = max. appearing moment of bridging beam - Max. stress in weld : 215 N/mm² (BS 5950 Part 1)
for specified loading - Coupler class A EN74
Qmax (kN) = max. appearing shear force of bridging - Own weight 0.1 kN/m
beam for specified loading
f (mm) = max. deflection in middle of bridging beam
for specified loading
Fr (kN) = vertical reaction force in coupler of bridging
beam for specified loading
The top chord of the bridging beam must be supported against buckling sideways every 1.50m by horizontal bracing (see data sheet 56).

© SGB
SPRINT 75 LOADINGS
SPRINT 109
Date: May ‘96 Page. n°: 251

Maximum forces on cantilever hop-up bracket 0.75m

Cantilever hop-up bracket 0.75m

Fvar

Max. allowable reactionforce (sliding force)

Coupler Freact. max. (kN)


Normal coupler 10.0
class A EN74

Freact

Fvar (kN) Loadclass 3 Loadclass 4


Normal coupler class A EN74 4.1 3.6

Guidance Notes:
If the loading is not determinated by the max. allowable sliding force of the bottom coupler,
then for loadclass 3; Fvar = 13.5 kN
loadclass 4: Fvar = 10.0 kN
Determining is then the connection brace to transomframe.

Note: - Working load is calculated as uniformly distributed load


- Class 3 : baylength 3.0m
Class 4 : baylength 2.5m

© SGB
APPLICATIONS
SPRINT 109
Date: Aug ‘96 Page n°: 1051

Table of allowable load class

Load class according to CEN HD1000 4

Allowable uniformly distributed load on total area of 3.00 kN/m2


platform.

Allowable concentrated load on arbitrary area 3.00 kN


500mm x 500mm

Allowable concentrated load on arbitrary area 1.00 kN


200mm x 200mm

Allowable partial load on partial area 0.4 x A*. 5.00 kN/m2

Loadings above apply to all platform types e.g. alu-plywood or steel


platforms.

* Load is uniformly distributed over an arbitrary single rectangular


portion (partial area) of the platform having an area equal to the
proportion of 0.4 times the total deck area, A.

© SGB
APPLICATIONS
SPRINT 109
Date: Aug ‘96 Page n°: 1052

Basic anchor pattern: 8.0m staggered for unsheeted scaffold.

Platform Ladder platform


Single
guardrail post

Frame

Diagonal
brace

Diagonal brace Guardrail


with coupler frame

= Anchor point

Guidance Notes:
- H = heights according to DIN4420: max. 24.0m.
- For other heights and configurations, contact SGB´s Technical Service .
- The four top lifts have to be secured against lifting by locking pins.
- Face bracing is required in one bay for every 5 bays.
- Stairway bays have to be anchored every 4.0m.

© SGB
APPLICATIONS
SPRINT 109
Date: Aug ‘96 Page n°: 1053

Basic anchor pattern: 4.0m staggered for sheeted scaffold.


Single Platform Ladder platform
guardrail post

Frame

Diagonal
brace

Diagonal brace Guardrail


with coupler frame

= Anchorpoint
Anchor attachment (A) Top View Alternative anchor attachment (B) Top View
If one coupler can´t be placed on frame-standard.

Coupler Class B EN74 Anchorplate Coupler Class B EN74

Coupler Class BB EN74

Guidance Notes:
- H = heights according to DIN4420: max. 24.0m.
- For other heights and configurations, contact SGB´s Technical Service.
- The four top lifts have to be secured against lifting by locking pins.
- Face bracing is required in one bay for every 5 bays.
- Stairway bays have to be anchored every 4.0m.

© SGB
APPLICATIONS
SPRINT 109
Date: Aug ‘96 Page n°: 1054

Basic anchor pattern: 8.0m staggered for unsheeted


scaffold when using walk through frames.
VIEW A VIEW A
With hop-up bracket 0.34m

≤300 (Facade to platform) ≤300 (Facade to platform)

Guardrails
= Anchorpoint
Guidance Notes:
- H = heights according to DIN4420: max. 24.0m.
- Every 1.0gm frame, at second level, has to be braced perpendular to facade.
- For other heights and configurations, contact SGB´s Technical Service.
- The walk through frames may not be used in combination with bridging beams.
- Face bracing is required in one bay for every 5 bays.
- The four top lifts have to be secured against lifting by locking pins.
- At the level, below the top platform, every standard has to be anchored.
- Stairway bays have to be anchored every 4.0m.

© SGB
APPLICATIONS
SPRINT 109
Date: Aug ‘96 Page n°: 1055

Basic anchor pattern: 4.0m staggered for sheeted


scaffold when using walk through frames.

Guardrails
= Anchorpoint Facade to
platform
Anchor attachment (A) Top View Alternative anchor attachment (B) Top View
If one coupler can´t be placed on frame-standard.

Coupler Class B EN74


Coupler Class B EN74 Anchorplate

Coupler Class BB EN74

Guidance Notes:
- H = heights according to DIN4420: max. 24.0m.
- Attachment of anchors to the frame-uprights must be done with two couplers; either two right angle couplers
Class B EN74 (A) or alternatively with one right angle coupler Class B EN74 conbined with another right angle
check coupler Class BB EN74 and an anchorplate, if one of the couplers can´t be located on the frame (B).
- The walk through frames may not be used in combination with bridging beams.
- Face bracing is required in one bay for every 5 bays.
- The four top lifts have to be secured against lifting by locking pins.
- Stairway bays have to be anchored every 4.0m.
- For other heights and configurations, contact SGB´s Technical Service.

© SGB
APPLICATIONS
SPRINT 109
Date: Aug ‘96 Page n°: 1063

Use of walk through frames (first anchor level 4.20m/4.60m)

PLAN VIEW

Plan brace Brace


every 5th bay (tube with couplers
Facade to
platform

Frame
Brace (tube
with couplers)
Guard-
rails

Planbrace

Diagonal brace
with coupler

Half coupler
base ledger

Guidance Notes:

- Every 1.09m frame, at second level, has to be braced perpendular to facade.


- The walk through frames may not be used in combination with bridging beams.
- At the level, below the top platforms, every standard has to be anchored.

© SGB
APPLICATIONS
SPRINT 109
Date: Aug ‘96 Page n°: 1064

Use of walk through frames (first anchor level 2.20m/2.60m)

PLAN VIEW

Planbrace
every 5th bay
Facade to
platform

Frame

Guardrail

Planbrace

Diagonal brace
with coupler

Half coupler
base ledger

GUIDANCE NOTES:
- Every second walk through frame has to be anchored at 2.2m/2.6m height.
- The walk through frames may not be used in combination with bridging beams.
- At the level, below the top platforms, every standard has to be anchored.
Loadings
SPRINT 109
Date: Nov ´97 Page n°: 1201C

Anchor forces - into facade, solid sheeted scaffold.

Building height = last scaffold level up to 24.0m


Scaffold Anchor Facade
configuration pattern half open closed
⊥ // ⊥ //
Basic scaffold with 0.34m hop- Uprights 8.0m (1) Not allowed
up brackets at facade side on Uprights 4.0m (2) 9.7
every level. End uprights 4.2
4.0m
Uprights 8.0m (1) Not allowed
Stairway. Uprights 4.0m (2) 4.9
End uprights 4.2
4.0m

Roof protection Top anchor 3.3


scaffold with (A)
0.75m cantilever(A)
hop-up bracket
(top level) and (B)
0.34m hop-up Bottom 6.8
bracket (every anchor (B)
level).

Level last scaffold bays not 4.9


anchored

Top anchor 6.9


(A) (A)
Protection fan.
(B) Bottom
anchor (B)

Bridging Beam

(A) (B) (A)

Guidance Notes:
(1) - Anchor pattern 8.0m staggered.
(2) - Anchor pattern 4.0m staggered and not staggered.
This table is based on static calculations according German codes.
- Anchor forces in kN.
SPRINT 75
Date: June ‘99 Page n°: 2001

Introduction

General

The following data sheets are for use with the SPRINT 75 framed facade access scaffold. It is intended that
these sheets (pages 2000 to 2021) will complement the existing datasheets. The rules for use generally
remain the same though some additional rules apply and the notes should be checked carefully when using
the load data on these sheets.

The Safe Working Loads are derived from a 3-D computer model using a finite element stuctural package.
The structures are analysed using a second order (p-delta) elastic analysis and the members checked to the
code requirements of EC3. All the requirements of prEN 12811 “Scaffolds - Performance requirements and
general design” have been adhered to. Allowances for sway inclinations between frames, sway inclinations
between jacks and frames, and bow (out of straightness) imperfections of frames has been accounted for in
the model in accordance with EC3 and prEN 12811.

The model is based on the SPRINT 3m bay.

Factors

Load factor : γf = 1.5 for all loading (dead load, live load, wind load, etc.)

Material factor : γm = 1.1 for all materials.

Materials
Frame verticals : S235 fy = 320N/mm2
Jacks : (Boulton Universal Jack) S275 fy = 374N/mm2

Loads

Windload : Two wind load cases are considered.


1. A “MAXIMUM” wind load case where a dynamic wind pressure of 600N/m2 is applied at
the base of the structure, increasing linearly to 770N/ m2 at 24m height.
2. A “WORKING” wind load case where 200N/ m2 is applied to the whole of the structure.

It should be stressed that the maximum windload applied is 770N/m2. Where the
allowable topload permits higher structures to be built it must be verified by the
designer that the maximum windload to the proposed structure is less than 770N/m2.

Alternatively the following guidelines may be applied for higher windloads;


• For windload above 770N/m2 and below 920 N/m2 the baylength should be reduced
to 2.5m maximum.
• For windload above 920N/m2 and below 1100N/m2 the baylength should be reduced
to 2.0m maximum.
• If the baylength cannot be reduced then the anchor pattern should be doubled to
account for windload upto 1100N/m2 maximum.

© SGB 2001.DOC
SPRINT 75
Date: June ‘99 Page n°: 2002

Introduction

Wind load Factors.


The following wind load factors have been applied;

Facade Sheeting Cs(perp) Cs(par) Cf(perp) Cf(par


porosity condtions
)
60% open Unsheeted 0.75 1.00 1.30 1.30
60% open Netted 0.75 1.00 0.60 0.30
60% open Sheeted 0.90 1.00 1.30 0.10
Closed Unsheeted 0.25 1.00 1.30 1.30
Closed Netted 0.25 1.00 0.60 0.30
Closed Sheeted - C 0.70 1.00 1.30 0.10
Closed Sheeted - T 0.25 1.00 1.30 0.10

In addition the value of Cs(perp) =1.00 has been taken for the end bays to account for higher
local windloads.

Imposed load : Load class 3 (2kN/ m2) is applied to one working level only at the most onerous level. (This
includes 100% loading at the worst level and 50% loading at the adjacent level. The load is
applied to both the main deck and the hop-up brackets (if present)).

Combinations : Both the “In Service” and “Out of Service” conditions have been analysed to determine the
worst condition. The combinations are taken from prEN12811 and are as follows;
In Service : Self weight
100% Class 3 load at most unfavourable deck level
50% Class 3 load at adjacent deck level
Working wind load
Out of Service : Self weight
35% Class 3 load at most unfavourable deck level
Maximum wind load

Parameters used

The model used was three dimensional and incorporated the following parameters;

Horizontal Stiffness: A linear stiffness of 0.025kN/mm (perpendicular)


A linear stiffness of 0.20kN/mm (parallel)

Imperfections: Frame inclination (parallel) = 0.0050


Frame inclination (perpendicular) = 0.0025
Jack inclination = 0.023
Bow imperfection = L/200

Code check: To EC3:Part 1.1 based on second order elastic analysis.


The resistance of the cross sections (in accordance with EC3:Part 1.1) is based on the
plastic resistance.

© SGB 2001.DOC
SPRINT 75
Date: June ‘99 Page n°:2003

How to use

General

The data sheets give allowable safe working loads that may be applied to a SPRINT structure for various
situations depending on the tie pattern, wind load conditions and the presence of hop-up brackets.
The load data is expressed as an allowable “Topload” and an allowable “Leg load”.
The “topload” is the SWL applied to a 24m structure ,already containing one working lift of 2kN/m2.
The “leg load” is the load in the base leg of the structure resulting from the “topload”, the self weight of the
24m structure and the imposed load from one working lift of 2kN/m2 to the 24m structure.
The figures make due allowance for the different load distribution from inside leg to outside leg and shows the
ratio of load distribution for each type of structure.

External and Internal Legs

Internal legs are defined as the legs nearest to the facade and the externals are the legs away from the
facade.
The calculations have been made to determine the maximum “Topload” that can be applied to a 24m high
structure. The “Topload” has been applied in a ratio applicable for the self weight of each type of structure.

The ratios used are as follows;

INTERNAL EXTERNAL INTERNAL EXTERNAL


STRUCTURE TYPE LEG LOAD LEG LOAD LEG LOAD LEG LOAD
MAIN DECKS STEEL MAIN DECKS ALU / PLY
Without hop - ups 36% 64% 31% 69%
340 hop - ups every lift 49% 51% 49% 51%
750 cantilever bracket one lift only 36% 64% 36% 64%

The designer should check the ratio of internal to external load for the structure in question and use the
allowable loads given for that situation.

Self Weight of components

The self weight of components used are as follows;

COMPONENT REF. No WEIGHT


2m Vertical Frame 587001 22.5kg
2.6m Walkthrough Frame 587015 32.5kg
3m Steel deck 587030 21.7kg
3m Aluminium / Plywood deck 587040 22.8kg
3m Double Guardrail frame 587060 12.0kg
3m Single Guardrail frame 587070 6.5kg
3m Toeboard 587100 10.0kg
340mm Hop-up bracket 587132 5.2kg
750mm Cantilever bracket 587130 11.8kg
Guardrail post 587150 4.2kg
Face brace for base level 587160 14.2kg
Standard face brace 587170 8.0kg

© SGB 2003.DOC
SPRINT 75
Date: June ‘99 Page n°:2004

How to use

Self Weight of 24m Systems

Using the above weights the self weight of each particular 24m structure is calculated as follows , for a 3m
bay;

TABLE A : 3m bay / Without hop-ups / main decks steel

Component Weight(kg) Nr. Load Int. (kN)Load ext. (kN)

2m vertical frame 22.5 12 1.32 1.32


3m steel decks (main) 21.7 24 2.55 2.55
3m double guardrail 12.0 13 0 1.53
3m toeboard 10.0 12 0 1.18
Face bracing (base level) 14.2 0.5 0 0.07
Standard face brace 8 5.5 0 0.43
3.88 7.09 Total = 10.97 kN

TABLE B : 3m bay / Without hop-ups / main decks alu/ply

Component Weight(kg) Nr. Load Int. (kN)Load ext. (kN)

2m vertical frame 22.5 12 1.32 1.32


3m alu/ply decks (main) 22.8 12 1.34 1.34
3m double guardrail 12.0 13 0 1.53
3m toeboard 10.0 12 0 1.18
Face bracing (base level) 14.2 0.5 0 0.07
Standard face brace 8 5.5 0 0.43
2.67 5.88 Total = 8.54 kN

TABLE C : 3m bay / 340 hop-ups every lift / main decks steel / hop-up decks steel

Component Weight(kg) Nr. Load Int. (kN)Load ext. (kN)

2m vertical frame 22.5 12 1.32 1.32


3m steel decks (main) 21.7 24 2.55 2.55
3m steel decks (hop-up) 21.7 12 2.55 0
340 hop-up 5.2 12 0.61
3m double guardrail 12.0 13 0 1.53
3m toeboard 10.0 12 0 1.18
Face bracing (base level) 14.2 0.5 0 0.07
Standard face brace 8 5.5 0 0.43
7.05 7.09 Total = 14.13 kN

© SGB 2003.DOC
SPRINT 75
Date: June ‘99 Page n°:2005

How to use

TABLE D : 3m bay / 340 hop-ups every lift / main decks alu/ply / hop-up decks steel

Component Weight(kg) Nr. Load Int. (kN)Load ext. (kN)

2m vertical frame 22.5 12 1.32 1.32


3m alu/ply decks (main) 22.8 12 1.34 1.34
3m steel decks (hop-up) 21.7 12 2.55 0
340 hop-up 5.2 12 0.61
3m double guardrail 12.0 13 0 1.53
3m toeboard 10.0 12 0 1.18
Face bracing (base level) 14.2 0.5 0 0.07
Standard face brace 8 5.5 0 0.43
5.83 5.88 Total = 11.71 kN

Example Calculation 1.

A SPRINT structure is required to the following specification;

Height = 44m
Maximum windload at 44m = 770N/m2
Facing condition = Unsheeted
Facade porosity = Closed
No walkthrough frame is required
One working level only
340 hop - ups to the inside leg only at every level.

Try ;
3m bay structure
alu/ply decks to main frame
steel decks to hop - ups

Note: In this case only one working level is specified (as used in the load tables) therefore only the allowable
topload needs to be investigated.

Height above 24m = 44 - 24 = 20m

Topload above 24m (from Table D above) = 20/24 x 5.83 = 4.9kN to internal leg
= 22/24 x 5.88 = 4.9kN to external leg

© SGB 2003.DOC
SPRINT 75
Date: June ‘99 Page n°:2006

How to use

The load data available gives the following options for this structure;

Page No. Anchor Pattern Topload Topload


internal leg external leg
2010 4m alternative staggered (with full 27kN 27kN
perimeter tied) anchor pattern.
2012 6m alternative staggered (with bottom tied 24kN 25kN
at 2m) anchor pattern.
2014 12m alternative staggered anchor pattern. 5kN 5kN

The 12m alternative staggered anchor pattern gives an allowable topload closest to , yet still greater than the
calculated topload for each leg and is therefore the most efficient anchor pattern.

Example Calculation 2.

A SPRINT structure is required to the following specification;

Height = 30m
Maximum windload at 30m = 770N/m2
Facing condition = Unsheeted
Facade porosity = 60% open
Walkthrough frame is required
Two working levels @ 2kN/m2
Without hop-up brackets

Try ;
3m bay structure
steel decks to main frame

Note: In this case two working levels are specified (different to the load tables which specify one working
level) therefore the additional imposed load should be added to the topload and the topload ratio calculated.

Height above 24m = 30 - 24 = 6m

Topload above 24m (from Table A above) = 6/24 x 3.88 = 1.0kN to internal leg
= 6/24 x 7.09 = 1.8kN to external leg

Topload from additional imposed load = 2 x 0.75 x 3 x 50% = 4.5kN to internal leg
= 4.5kN to external leg

Therefore total toploads are given as follows;


1.0 + 4.5 = 5.5kN to internal leg (45%)
1.8 + 4.5 = 6.3kN to external leg (55%)

© SGB 2003.DOC
SPRINT 75
Date: June ‘99 Page n°:2007

How to use

For this structure the topload ratio (int : ext) is 45% to 55%. Interpolating between the ratios given in the load
data gives the following options for this structure;

Page No. Anchor Pattern Topload Topload


internal leg external leg
2017 4m alternative staggered (with full 5kN 6.5kN
perimeter tied) anchor pattern.
2019 6m alternative staggered (with bottom tied 5kN 6.5kN
at 2m) anchor pattern.
2021 12m alternative staggered anchor pattern. 0kN 0kN

The 6m alternative staggered anchor pattern gives an allowable topload closest to , yet still greater than the
calculated topload for each leg and is therefore the most efficient anchor pattern.

© SGB 2003.DOC
SPRINT 75
Date: June ‘99 Page n°: 2008

V-Ties : Description
In the absence of ties being fully connected to both standards V-ties are required to give lateral (sideways)
support to the SPRINT structure.This allows all other ties on the structure to be connected to the inside
standard only.

A minimum of two v-ties per ten bays are required for every lift containing ties. For netted structures an
additional rule is required where the top row of ties requires three v-ties per ten bays.
So for example, a 12 bay structure will require (12/10 x 2 = 2.4) 3 v-ties for every lift containing ties.
If netted it will require (12/10 x 3 =3.6) 4 v-ties in the top row of ties.

The terms used to describe the tie forces given in the data sheets are further clarified as follows:

PLAN VIEW

V-Tie Normal Ties

FACADE

4 5 .0
°

Design fixing for


"max force at
V-Tie raker fixing"
Normal Tie

Design member and


fixing for "max anchor
Design member and Design member for force at Normal Tie
fixing for "max anchor "max force in location"
force at V-Tie location" V-Tie raker"

45.

The v - ties are present to give sideways restraint to the structure. It is possible that this restraint may be
provided by another means , for example a scaffold corner return. In this case an engineering judgement should
be made to check that the scaffold corner return will provide an equivalent restraint to the v - tie. The v - ties
may then be replaced by the scaffold corner return, as shown below;

Normal tie

V-ties are still


required at the
"free" end
Tube & fitting
tied to 3
standards

© SGB 2008.DOC
SPRINT 75
Date: June ‘99 Page n°: 2009

Anchor Patterns
4m staggered anchor pattern with perimeter fully tied
3rd v-tie required on netted structures only

Platform Ladder platform


Single
guardrailpost

1.0m
Frame

0.5m
Diagonal
brace pin

2.0m
Universal jack
(max ext 489mm)

3.0m
2.5m Guardrail frame
Normal 2.0m
Anchorpoint 1.5m Guardrail frame with inside single
guardrail at base lift only
V-Tie Jack bracing & base ledger
Anchorpoint (netted structures only)

Diagonal brace with coupler

Guidance Notes

To comply with the loadings given for this tie pattern;


- The structure is completely tied around the perimeter , the lowest ties being located at a maximum of 1 frame
above ground.
- The intermediate ties must be staggered over alternate standards and equally distributed with a maximum
vertical spacing of 4m.
- If all ties are connected to both standards then v - ties are not required.
- If ties are connected to the inside standard only then two v - ties must be placed in every tied lift per every ten
bays.
- The screw jack used is the boulton universal jack at maximum extension of 489mm.
- Face bracing must be placed at a minimum of one in every five bays.
- Additionally for netted structures:
- The top lift must contain a minimum of three v - ties per every ten bays. -
The jacks should be braced in the direction of the face bracing for extensions greater tham 150mm.

© SGB 2009.DOC
SPRINT 75
Date: June ‘99 Page n°: 2010

Allowable Safe Working Loads & anchor forces


4m alternative staggered (with full perimeter tied) anchor pattern

“normal” “v - tie”
anchors anchors
Max Max Max Max force
Structure Facade Topload Leg load Top load anchor anchor force in at raker
Type porosity Ratio (kN) (kN) force force at v- v-tie fixing
(int : ext) internal external internal external (normal tie raker (kN)
leg leg leg leg tie) location (kN)
(kN) (kN)
without Unsheeted 60% open 36 : 64 22 36 15 26 2.1(c) 3.2(c) 1.6(c) 1.2(t or c)
hop-ups facade 1.8(t) 2.9(t) 1.6(t) 1.2(shear)
50 : 50 33 35 25 25
without Unsheeted closed 36 : 64 23 38 16 28 1.4(c) 2.5(c) 1.6(c) 1.2(t or c)
hop-ups facade 1.1(t) 2.2(t) 1.6(t) 1.2(shear)
50 : 50 33 36 26 26
without Netted 60% open 36 : 64 12 17 5 7 4.6(c) 11.3(c) 9.4(c) 6.7(t or c)
hop-ups facade 4.5(t) 11.2(t) 9.4(t) 6.7(shear)
50 : 50 13 16 6 6
without Netted closed 36 : 64 12 19 5 9 3.0(c) 9.6(c) 9.4(c) 6.7(t or c)
hop-ups facade 2.8(t) 9.4(t) 9.4(t) 6.7(shear)
50 : 50 15 18 8 8
340 Unsheeted 60% open 2.1(c) 3.2(c) 1.6(c) 1.2(t or c)
hop-ups facade 49 : 51 39 36 25 25 1.9(t) 3.1(t) 1.6(t) 1.2(shear)
internal
340 Unsheeted closed 1.3(c) 2.5(c) 1.6(c) 1.2(t or c)
hop-ups facade 49 : 51 40 38 27 27 1.2(t) 2.3(t) 1.6(t) 1.2(shear)
internal
340 Netted 60% open 4.6(c) 11.3(c) 9.5(c) 6.7(t or c)
hop-ups facade 49 : 51 26 23 12 13 4.6(t) 11.3(t) 9.5(t) 6.7(shear)
internal
340 Netted closed 2.9(c) 9.6(c) 9.5(c) 6.7(t or c)
hop-ups facade 49 : 51 27 24 13 14 2.9(t) 9.6(t) 9.5(t) 6.7(shear)
internal
750 Unsheeted 60% open 36 : 64 16 31 9 16 2.9(c) 3.9(c) 1.6(c) 1.1(t or c)
cantilever facade 2.6(t) 3.6(t) 1.6(t) 1.1(shear)
bracket 50 : 50 20 28 13 13
external
750 Unsheeted closed 36 : 64 16 31 9 16 2.0(c) 3.1(c) 1.6(c) 1.1(t or c)
cantilever facade 2.1(t) 3.2(t) 1.6(t) 1.1(shear)
bracket 50 : 50 20 28 13 13
external
750 Netted 60% open 36 : 64 7 14 0 0 5.3(c) 11.9(c) 9.4(c) 6.6(t or c)
cantilever facade 5.0(t) 11.6(t) 9.4(t) 6.6(shear)
bracket 50 : 50 7 14 0 0
external
750 Netted closed 36 : 64 8 16 1 2 3.6(c) 10.2(c) 9.4(c) 6.6(t or c)
cantilever facade 3.5(t) 10.1(t) 9.4(t) 6.6(shear)
bracket 50 : 50 8 15 1 1
external
(Safe Working Loads in kN)
(Anchor forces are applicable for both topload ratios shown)
(340 hop-ups internal allows 340mm hop-up brackets to be fixed to every level)
(750 cantilever bracket external allows only one level to be fitted with 750mm cantilever brackets)

© SGB 2010.DOC
SPRINT 75
Date: June ‘99 Page n°: 2011

Anchor Patterns
6m staggered anchor pattern with bottom fully tied
3rd v-tie required on netted structures only

Platform Ladder platform

Single
guardrailpost

1.0m
Frame

0.5m
Diagonal
brace pin

2.0m

Universal jack
(max ext 489mm)

3.0m
2.5m Guardrail frame
Normal 2.0m
Anchorpoint 1.5m Guardrail frame with inside single
guardrail at base lift only
V-Tie Jack bracing & base ledger
Anchorpoint (netted structures only)

Diagonal brace with coupler

Guidance Notes

To comply with the loadings given for this tie pattern;


- The structure must be completly tied at the top of the first frame.
- The end runs must be tied at maximum of 4m spacing.
- The intermediate ties must be staggered over alternate standards and equally distributed with a maximum
vertical spacing of 6m.
- If all ties are connected to both standards then v - ties are not required.
- If ties are connected to the inside standard only then two v - ties must be placed in every tied lift per every ten
bays.
- The screw jack used is the boulton universal jack at maximum extension of 489mm.
- Face bracing must be placed at a minimum of one in every five bays.
- Additionally for netted structures:
- The top lift must contain a minimum of three v - ties per every ten bays.
- The jacks should be braced in the direction of the face bracing for extensions greater tham 150mm.

© SGB 2011.DOC
SPRINT 75
Date: June ‘99 Page n°: 2012

Allowable Safe Working Loads & anchor forces


6m alternative staggered (with bottom tied at 2m) anchor pattern

“normal” “v - tie”
anchors anchors
Max Max Max Max force
Structure Facade Topload Leg load Top load anchor anchor force in at raker
Type porosity Ratio (kN) (kN) force force at v-tie fixing
(int : ext) internal external internal externa (normal v-tie raker (kN)
leg leg leg l leg tie) location (kN)
(kN) (kN)
without Unsheeted 60% open 36 : 64 21 35 14 24 2.8(c) 3.9(c) 1.6(c) 1.2(t or c)
hop-ups facade 3.2(t) 4.2(t) 1.6(t) 1.2(shear)
50 : 50 29 32 22 22
without Unsheeted closed 36 : 64 23 38 16 28 1.8(c) 2.9(c) 1.6(c) 1.2(t or c)
hop-ups facade 1.4(t) 2.5(t) 1.6(t) 1.2(shear)
50 : 50 33 36 26 26
without Netted 60% open 36 : 64 NA NA NA NA NA NA NA NA
hop-ups facade
50 : 50 NA NA NA NA NA NA NA NA
without Netted closed 36 : 64 12 17 4 7 4.0(c) 10.7(c) 9.4(c) 6.7(t or c)
hop-ups facade 3.8(t) 10.5(t) 9.4(t) 6.7(shear)
50 : 50 13 16 6 6
340 Unsheeted 60% open 2.8(c) 3.9(c) 1.7(c) 1.2(t or c)
hop-ups facade 49 : 51 34 32 21 22 2.9(t) 4.1(t) 1.7(t) 1.2(shear)
internal
340 Unsheeted closed 1.7(c) 2.9(c) 1.7(c) 1.2(t or c)
hop-ups facade 49 : 51 37 35 24 25 1.5(t) 2.7(t) 1.7(t) 1.2(shear)
internal
340 Netted 60% open
hop-ups facade 49 : 51 NA NA NA NA NA NA NA NA
internal
340 Netted closed 4.0(c) 10.7(c) 9.5(c) 6.7(t or c)
hop-ups facade 49 : 51 22 19 8 8 4.0(t) 10.7(t) 9.5(t) 6.7(shear)
internal
750 Unsheeted 60% open 36 : 64 15 30 8 15 3.4(c) 4.4(c) 1.6(c) 1.1(t or c)
cantilever facade 4.3(t) 5.4(t) 1.6(t) 1.1(shear)
bracket 50 : 50 20 28 13 13
external
750 Unsheeted closed 36 : 64 16 31 9 16 2.3(c) 3.4(c) 1.6(c) 1.1(t or c)
cantilever facade 2.8(t) 3.9(t) 1.6(t) 1.1(shear)
bracket 50 : 50 20 28 13 13
external
750 Netted 60% open 36 : 64 NA NA NA NA NA NA NA NA
cantilever facade
bracket 50 : 50 NA NA NA NA NA NA NA NA
external
750 Netted closed 36 : 64 NA NA NA NA NA NA NA NA
cantilever facade
bracket 50 : 50 NA NA NA NA NA NA NA NA
external
(Safe Working Loads in kN)
(NA = Not Applicable, i.e. the structure fails at 24m height)
(Anchor forces are applicable for both topload ratios shown)
(340 hop-ups internal allows 340mm hop-up brackets to be fixed to every level)
(750 cantilever bracket external allows only one level to be fitted with 750mm cantilever brackets)

© SGB 2012.DOC
SPRINT 75
Date: June ‘99 Page n°: 2013

Anchor Patterns
12m staggered anchor pattern
3rd v-tie required on netted structures only

Platform Ladder platform

Single
guardrailpost

1.0m
Frame

0.5m
Diagonal
brace pin

2.0m

Universal jack
(max ext 489mm)

3.0m
2.5m Guardrail frame
Normal 2.0m
Anchorpoint 1.5m Guardrail frame with inside single
guardrail at base lift only
V-Tie Jack bracing & base ledger
Anchorpoint (netted structures only)

Diagonal brace with coupler

Guidance Notes

To comply with the loadings given for this tie pattern;


- The lowest ties are located at a maximum of 3 frames above ground.
- The end runs must be tied at maximum of 6m spacing.
- The top two lifts must contain at least five ties equally spaced per every ten bays, with a minimum of three ties
equally spaced in the top lift per every ten bays.
- The intermediate ties must be staggered over alternate standards and equally distributed with a maximum
vertical spacing of 12m.
- If all ties are connected to both standards then v - ties are not required.
- If ties are connected to the inside standard only then two v - ties must be placed in every tied lift per every ten
bays.
- The screw jack used is the boulton universal jack at maximum extension of 489mm.
- Face bracing must be placed at a minimum of one in every five bays.
- Additionally for netted structures:
- The top lift must contain a minimum of three v - ties per every ten bays.
- The jacks should be braced in the direction of the face bracing for extensions greater tham 150mm.

© SGB 2013.DOC
SPRINT 75
Date: June ‘99 Page n°: 2014

Allowable Safe Working Loads & anchor forces


12m alternative staggered anchor pattern

“Normal” “V - tie” anchors


anchors
Max Max Max Max force
Structure Facade Topload Leg load Top load anchor anchor force in at raker
Type porosity Ratio (kN) (kN) force force at v-tie fixing
(int : ext) internal external internal external (normal v-tie raker (kN)
leg leg leg leg tie) location (kN)
(kN) (kN)
without Unsheeted 60% open 36 : 64 7 10 0 0 5.1(c) 6.9(c) 2.6(c) 1.8(t or c)
hop-ups facade 4.6(t) 6.4(t) 2.6(t) 1.8(shear)
50 : 50 7 10 0 0
without Unsheeted closed 36 : 64 14 24 7 13 2.2(c) 4.1(c) 2.6(c) 1.8(t or c)
hop-ups facade 2.0(t) 3.8(t) 2.6(t) 1.8(shear)
50 : 50 18 21 11 11
340 Unsheeted 60% open 4.8(c) 6.8(c) 2.7(c) 1.9(t or c)
hop-ups facade 49 : 51 13 10 0 0 4.6(t) 6.5(t) 2.7(t) 1.9(shear)
internal
340 Unsheeted closed 2.2(c) 4.1(c) 2.7(c) 1.9(t or c)
hop-ups facade 49 : 51 18 15 5 5 2.1(t) 3.9(t) 2.7(t) 1.9(shear)
internal
750 Unsheeted 60% open 36 : 64 7 15 0 0 5.8(c) 7.5(c) 2.5(c) 1.8(t or c)
cantilever facade 6.2(t) 7.9(t) 2.5(t) 1.8(shear)
bracket 50 : 50 7 15 0 0
external
750 Unsheeted closed 36 : 64 9 19 2 4 2.9(c) 4.6(c) 2.5(c) 1.8(t or c)
cantilever facade 3.5(t) 5.2(t) 2.5(t) 1.8(shear)
bracket 50 : 50 9 17 2 2
external
(Safe Working Loads in kN)
(Anchor loads are applicable for both topload ratios shown)
(340 hop-ups internal allows 340mm hop-up brackets to be fixed to every level)
(750 cantilever bracket external allows only one level to be fitted with 750mm cantilever brackets)

© SGB 2014.DOC
SPRINT 75
Date: June ‘99 Page n°: 2015

750mm Hop-up bracket


All loads given are the Safe Working Loads in kN.
The data applies for structures with the imposed loading shown applied to one working level only.
The data applies for structures with the Boulton universal jack at the maximum extension of 489mm.
The tie patterns described are as shown on sheets 2009 , 2011 & 2013.
The dynamic wind pressure applied is 600N/m2 at base level increasing linearly to 770N/m2 at 24m height ,
with the following wind factors applied :

Cf(perp) Cs(perp) Cf(par) Cs(par)


Unsheeted 60% open facade 1.3 0.75 1.3 1.0
closed facade 1.3 0.25 1.3 1.0

The 750mm hop-up bracket should not be used on netted or sheeted SPRINT structures.
The loads below apply to structures with only one level of 750mm hop-ups per structure, applied at
any level and loaded with the imposed loading as shown.
The loads given are Safe Working Loads.

4m alternative staggered anchor pattern


“normal” “v - tie”
anchors anchors
Imposed Leg load Top load Max anchor Max anchor Max force Max force at
Structure Facade loading (kN) (kN) force force at v- in v-tie raker fixing
Type porosity (kN/m2) internal external internal external (normal tie) tie location raker (kN)
leg leg leg leg (kN) (kN) (kN)
Unsheeted 60% open 2.0 13 26 6 11 2.1(c) 3.2(c) 1.6(c) 1.2(t or c)
facade 4.8(t) 6.0(t) 1.6(t) 1.2(shear)
Unsheeted closed 2.0 12 24 5 9 1.4(c) 2.5(c) 1.6(c) 1.2(t or c)
facade 4.5(t) 5.6(t) 1.6(t) 1.2(shear)
6m staggered anchor pattern
“normal” “v - tie”
anchors anchors
Imposed Leg load Top load Max anchor Max anchor Max force Max force
Structure Facade loading (kN) (kN) force force at v-tie in v-tie at raker
Type porosity (kN/m2) internal external internal external (normal tie) location raker fixing
leg leg leg leg (kN) (kN) (kN) (kN)
Unsheeted 60% open 2.00 12 24 5 9 2.8(c) 3.9(c) 1.6(c) 1.2(t or c)
facade 0.75 14 28 9 18 5.3(t) 6.4(t) 1.6(t) 1.2(shear)
Unsheeted closed 2.00 13 25 6 11 1.8(c) 2.9(c) 1.6(c) 1.2(t or c)
facade 0.75 15 29 10 19 4.7(t) 5.0(t) 1.6(t) 1.2(shear)
12m staggered anchor pattern
“normal” “v - tie”
anchors anchors
Imposed Leg load Top load Max anchor Max anchor Max force Max force
Structure Facade loading (kN) (kN) force force at v-tie in v-tie at raker
Type porosity (kN/m2) internal external internal external (normal tie) location raker fixing
leg leg leg leg (kN) (kN) (kN) (kN)
Unsheeted 60% open 2.00 NA NA NA NA 5.1(c) 6.9(c) 2.6(c) 1.8(t or c)
facade 0.75 6 12 1 2 5.8(t) 6.6(t) 2.6(t) 1.8(shear)
Unsheeted closed 2.00 7 15 0 0 2.2(c) 4.1(c) 2.6(c) 1.8(t or c)
facade 4.9(t) 5.5(t) 2.6(t) 1.8(shear)
(Safe Working Loads in kN)

© SGB 2015.DOC
SPRINT 75
WALKTHROUGH Date: June ‘99 Page n°: 2016

Anchor Patterns
4m staggered anchor pattern with perimeter fully tied
3rd v-tie required on netted structures only

Platform Ladder platform


Single
guardrailpost

1.0m
Frame

0.5m
Diagonal
brace pin

2.0m
Plan brace

2.6m
Universal jack
(max ext 489mm)

3.0m
2.5m Guardrail frame
Normal 2.0m
Anchorpoint 1.5m Guardrail frame with inside single
guardrail at base lift only
V-Tie Jack bracing & base ledger
Anchorpoint (netted structures only)

Diagonal brace with coupler

Guidance Notes

To comply with the loadings given for this tie pattern;


- The structure is completely tied around the perimeter , the lowest ties being located at a maximum of 1 frame
above ground.
- The intermediate ties must be staggered over alternate standards and equally distributed with a maximum
vertical spacing of 4m.
- If all ties are connected to both standards then v - ties are not required.
- If ties are connected to the inside standard only then two v - ties must be placed in every tied lift per every ten
bays.
- The screw jack used is the boulton universal jack at maximum extension of 489mm.
- Face bracing must be placed at a minimum of one in every five bays.
- Additionally for netted structures:
- The top lift must contain a minimum of three v - ties per every ten bays. -
The jacks should be braced in the direction of the face bracing for extensions greater tham 150mm.

© SGB 2016.DOC
SPRINT 75
WALKTHROUGH Date: June ‘99 Page n°: 2017

Allowable Safe Working Loads & anchor forces


when using the walkthrough frame
4m alternative staggered (with full perimeter tied) anchor pattern

“normal” “v - tie”
anchors anchors
Max Max Max Max force
Structure Facade Topload Leg load Top load anchor anchor force in at raker
Type porosity Ratio (kN) (kN) force force at v-tie fixing
(int : ext) internal external internal external (normal v-tie raker (kN)
leg leg leg leg tie) location (kN)
(kN) (kN)
without Unsheeted 60% open 36 : 64 11 17 4 7 2.5(c) 3.2(c) 1.9(c) 1.4(t or c)
hop-ups facade 2.1(t) 3.5(t) 1.9(t) 1.4(shear)
50 : 50 13 16 6 6
without Unsheeted closed 36 : 64 11 17 4 7 1.7(c) 3.0(c) 1.9(c) 1.4(t or c)
hop-ups facade 1.3(t) 2.6(t) 1.9(t) 1.4(shear)
50 : 50 13 16 6 6
without Netted 60% open 36 : 64 10 16 3 6 5.5(c) 13.5(c) 11.2(c) 8.0(t or c)
hop-ups facade 5.5(t) 13.3(t) 11.2(t) 8.0(shear)
50 : 50 12 15 5 5
without Netted closed 36 : 64 10 16 3 6 3.6(c) 11.5(c) 11.2(c) 8.0(t or c)
hop-ups facade 3.4(t) 11.2(t) 11.2(t) 8.0(shear)
50 : 50 12 15 5 5
340 Unsheeted 60% open 2.5(c) 3.8(c) 1.9(c) 1.4(t or c)
hop-ups facade 49 : 51 25 23 12 12 2.4(t) 3.7(t) 1.9(t) 1.4(shear)
internal
340 Unsheeted closed 1.5(c) 2.9(c) 1.9(c) 1.4(t or c)
hop-ups facade 49 : 51 25 23 12 12 1.4(t) 2.7(t) 1.9(t) 1.4(shear)
internal
340 Netted 60% open 5.6(c) 13.4(c) 11.3(c) 8.0(t or c)
hop-ups facade 49 : 51 18 15 5 5 5.6(t) 13.4(t) 11.3(t) 8.0(shear)
internal
340 Netted closed 3.6(c) 11.6(c) 11.3(c) 8.0(t or c)
hop-ups facade 49 : 51 18 15 5 5 3.6(t) 11.6(t) 11.3(t) 8.0(shear)
internal
750 Unsheeted 60% open 36 : 64 13 27 6 12 3.6(c) 4.7(c) 1.9(c) 1.3(t or c)
cantilever facade 3.1(t) 4.3(t) 1.9(t) 1.3(shear)
bracket 50 : 50 17 25 10 10
external
750 Unsheeted closed 36 : 64 13 27 6 12 2.4(c) 3.7(c) 1.9(c) 1.3(t or c)
cantilever facade 2.5(t) 3.8(t) 1.9(t) 1.3(shear)
bracket 50 : 50 17 25 10 10
external
750 Netted 60% open 36 : 64 7 15 0 0 6.3(c) 14.4(c) 11.2(c) 8.0(t or c)
cantilever facade 6.0(t) 14.0(t) 11.2(t) 8.0(shear)
bracket 50 : 50 7 15 0 0
external
750 Netted closed 36 : 64 8 17 1 2 4.2(c) 12.4(c) 11.2(c) 8.0(t or c)
cantilever facade 4.1(t) 12.0(t) 11.2(t) 8.0(shear)
bracket 50 : 50 8 16 1 1
external
(Safe Working Loads in kN)
(NA = Not Applicable, i.e. the structure fails at 24m height)
(Anchor forces are applicable for both topload ratios shown)
(340 hop-ups internal allows 340mm hop-up brackets to be fixed to every level)
(750 cantilever bracket external allows only one level to be fitted with 750mm cantilever brackets)

© SGB 2017.DOC
SPRINT 75
WALKTHROUGH Date: June ‘99 Page n°: 2018

Anchor Patterns
6m staggered anchor pattern with bottom fully tied
3rd v-tie required on netted structures only

Platform Ladder platform

Single
guardrailpost

1.0m
Frame

0.5m
Diagonal
brace pin

Plan brace 2.0m


2.6m

Universal jack
(max ext 489mm)

3.0m
2.5m Guardrail frame
Normal 2.0m
Anchorpoint 1.5m Guardrail frame with inside single
guardrail at base lift only
V-Tie Jack bracing & base ledger
Anchorpoint (netted structures only)

Diagonal brace with coupler

Guidance Notes

To comply with the loadings given for this tie pattern;


- The structure must be completly tied at the top of the first frame.
- The end runs must be tied at maximum of 4m spacing.
- The intermediate ties must be staggered over alternate standards and equally distributed with a maximum
vertical spacing of 6m.
- If all ties are connected to both standards then v - ties are not required.
- If ties are connected to the inside standard only then two v - ties must be placed in every tied lift per every ten
bays.
- The screw jack used is the boulton universal jack at maximum extension of 489mm.
- Face bracing must be placed at a minimum of one in every five bays.
- Additionally for netted structures:
- The top lift must contain a minimum of three v - ties per every ten bays.
- The jacks should be braced in the direction of the face bracing for extensions greater tham 150mm.

© SGB 2018.DOC
SPRINT 75
WALKTHROUGH Date: June ‘99 Page n°: 2019

Allowable Safe Working Loads & anchor forces


when using the walkthrough frame
6m alternative staggered (with bottom tied at 2m) anchor pattern

“normal” “v - tie”
anchors anchors
Max Max Max Max force
Structure Facade Topload Leg load Top load anchor anchor force in at raker
Type porosity Ratio (kN) (kN) force force at v-tie fixing
(int : ext) internal external internal externa (normal v-tie raker (kN)
leg leg leg l leg tie) location (kN)
(kN) (kN)
without Unsheeted 60% open 36 : 64 11 17 4 7 3.4(c) 4.7(c) 1.9(c) 1.4(t or c)
hop-ups facade 3.8(t) 5.0(t) 1.9(t) 1.4(shear)
50 : 50 13 16 6 6
without Unsheeted closed 36 : 64 11 17 4 7 2.1(c) 3.5(c) 1.9(c) 1.4(t or c)
hop-ups facade 1.7(t) 3.0(t) 1.9(t) 1.4(shear)
50 : 50 13 16 6 6
without Netted 60% open 36 : 64 NA NA NA NA NA NA NA NA
hop-ups facade
50 : 50 NA NA NA NA NA NA NA NA
without Netted closed 36 : 64 11 17 4 7 4.8(c) 13.0(c) 11.3(c) 8.0(t or c)
hop-ups facade 4.6(t) 12.6(t) 11.3(t) 8.0(shear)
50 : 50 13 16 6 6
340 Unsheeted 60% open 3.4(c) 4.7(c) 1.9(c) 1.4(t or c)
hop-ups facade 49 : 51 25 23 12 12 3.8(t) 5.0(t) 1.9(t) 1.4(shear)
internal
340 Unsheeted closed 2.1(c) 3.5(c) 1.9(c) 1.4(t or c)
hop-ups facade 49 : 51 25 23 12 12 1.7(t) 3.0(t) 1.9(t) 1.4(shear)
internal
340 Netted 60% open
hop-ups facade 49 : 51 NA NA NA NA NA NA NA NA
internal
340 Netted closed 4.8(c) 13.0(c) 11.3(c) 8.0(t or c)
hop-ups facade 49 : 51 15 12 2 2 4.6(t) 12.6(t) 11.3(t) 8.0(shear)
internal
750 Unsheeted 60% open 36 : 64 13 27 6 12 4.1(c) 5.2(c) 1.9(c) 1.4(t or c)
cantilever facade 5.1(t) 7.1(t) 1.9(t) 1.4(shear)
bracket 50 : 50 17 25 10 10
external
750 Unsheeted closed 36 : 64 13 27 6 12 2.7(c) 4.1(c) 1.9(c) 1.4(t or c)
cantilever facade 3.4(t) 4.7(t) 1.9(t) 1.4(shear)
bracket 50 : 50 17 25 10 10
external
750 Netted 60% open 36 : 64 NA NA NA NA NA NA NA NA
cantilever facade
bracket 50 : 50 NA NA NA NA NA NA NA NA
external
750 Netted closed 36 : 64 NA NA NA NA NA NA NA NA
cantilever facade
bracket 50 : 50 NA NA NA NA NA NA NA NA
external
(Safe Working Loads in kN)
(NA = Not Applicable, i.e. the structure fails at 24m height)
(Anchor forces are applicable for both topload ratios shown)
(340 hop-ups internal allows 340mm hop-up brackets to be fixed to every level)
(750 cantilever bracket external allows only one level to be fitted with 750mm cantilever brackets)

© SGB 2019.DOC
SPRINT 75
WALKTHROUGH Date: June ‘99 Page n°: 2020

Anchor Patterns
12m staggered anchor pattern
3rd v-tie required on netted structures only

Platform Ladder platform

Single
guardrailpost

1.0m
Frame

0.5m
Diagonal
brace pin

2.0m
Vertical brace

2.6m
Plan brace

Universal jack
(max ext 489mm)

3.0m
2.5m Guardrail frame
Normal 2.0m
Anchorpoint 1.5m Guardrail frame with inside single
guardrail at base lift only
V-Tie Jack bracing & base ledger
Anchorpoint (netted structures only)

Diagonal brace with coupler

Guidance Notes

To comply with the loadings given for this tie pattern;


- The lowest ties are located at a maximum of 3 frames above ground.
- The end runs must be tied at maximum of 6m spacing.
- The top two lifts must contain at least five ties equally spaced per every ten bays, with a minimum of three ties
equally spaced in the top lift per every ten bays.
- The intermediate ties must be staggered over alternate standards and equally distributed with a maximum
vertical spacing of 12m.
- If all ties are connected to both standards then v - ties are not required.
- If ties are connected to the inside standard only then two v - ties must be placed in every tied lift per every ten
bays.
- The screw jack used is the boulton universal jack at maximum extension of 489mm.
- Face bracing must be placed at a minimum of one in every five bays.
- Additionally for netted structures:
- The top lift must contain a minimum of three v - ties per every ten bays.
- The jacks should be braced in the direction of the face bracing for extensions greater tham 150mm.

© SGB 2020.DOC
SPRINT 75
WALKTHROUGH Date: June ‘99 Page n°: 2021

Allowable Safe Working Loads & anchor forces


when using the walkthrough frame
12m alternative staggered anchor pattern

“normal” “v - tie”
anchors anchors
Max Max Max Max force
Structure Facade Topload Leg load Top load anchor anchor force in at raker
Type porosity Ratio (kN) (kN) force force at v-tie fixing
(int : ext) internal external internal external (normal v-tie raker (kN)
leg leg leg leg tie) location (kN)
(kN) (kN)
without Unsheeted 60% open 36 : 64 7 10 0 0 6.1(c) 8.3(c) 3.1(c) 2.2(t or c)
hop-ups facade 5.5(t) 7.3(t) 3.1(t) 2.2(shear)
50 : 50 7 10 0 0
without Unsheeted closed 36 : 64 10 16 3 6 2.7(c) 4.9(c) 3.1(c) 2.2(t or c)
hop-ups facade 2.4(t) 4.7(t) 3.1(t) 2.2(shear)
50 : 50 12 15 5 5
340 Unsheeted 60% open
hop-ups facade 49 : 51 NA NA NA NA NA NA NA NA
internal
340 Unsheeted closed 2.7(c) 4.9(c) 3.1(c) 2.2(t or c)
hop-ups facade 49 : 51 17 14 4 4 2.4(t) 4.7(t) 3.1(t) 2.2(shear)
internal
750 Unsheeted 60% open 36 : 64 NA NA NA NA NA NA NA NA
cantilever facade
bracket 50 : 50 NA NA NA NA NA NA NA NA
external
750 Unsheeted closed 36 : 64 7 15 0 0 3.6(c) 5.4(c) 3.0(c) 2.2(t or c)
cantilever facade 4.2(t) 6.3(t) 3.0(t) 2.2(shear)
bracket 50 : 50 7 15 0 0
external
(Safe Working Loads in kN)
(NA = Not Applicable, i.e. the structure fails at 24m height)
(Anchor forces are applicable for both topload ratios shown)
(340 hop-ups internal allows 340mm hop-up brackets to be fixed to every level)
(750 cantilever bracket external allows only one level to be fitted with 750mm cantilever brackets)

© SGB 2021.DOC