Structure Ref.No.

Outline Spec UoM Specification


1 Highways
1. Transportation
1. 1. Transporation of Bought out Earth for Embankment T-Km
1. 2. Transporation of Bought out Earth for SubGrade T-Km
1. 3. Transporation of Granular Backfilling Materials T-Km
1. 4. Transporation of Pond Ash T-Km
1. 5. Transporation of Boulder from Qquarry to Crusher T-Km
1. 6. Transporation Of GSB from Crusher / source to Site T-Km
1. 7. Transporation Of GSB from Yard to Site T-Km
1. 8. Transporation of WMM from CP to WMMP T-Km
1. 9. Transporation of WMM from WMMP to Site T-Km
1. 10. Transporation of Aggregate from CP to HMP T-Km
1. 11. Transporation of Bituminous Material from HMP to Site T-Km
1. 12. Transporation of Aggregate from CP to Batching Plant T-Km
1. 13. Transporation of Size Stone / Boulder for Pitching T-Km
1. 14. Transporation of Filter media from Source to Site T-Km
1. 15. Transporation of Concrete from BP to Site m3km
1. 16. Transportation for disposal of surplus earth and unservicble m3km
material
2. Earthworks and Site Clearance
2. 1. Labour Cost for Clearing and Grubing Hect
2. 2. Clearing and Grubing all Complete Hect
2. 3. Labour charges for Excavation in Soil m3
2. 4. Labour charges for Excavation in Marshy Soil m3
2. 5. Labour charges for Excavation in Soft Rock m3
2. 6. Labour charges for Excavation in Hard Rock m3
2. 7. Labour and Equipment charges for Excavation in Soil m3
2. 8. Labour and Equipment charges for Excavation in Marshy Soil m3

2. 9. Labour and Equipment charges for Excavation in Soft Rock m3

2. 10. Labour and Equipment charges for Excavation in Hard Rock m3

2. 11. Excavation in Soil all Complete m3


2. 12. Excavation in marshy Soil all Complete m3
2. 13. Excavation in Soft Rock all Complete m3
2. 14. Excavation in Hard Rock all Complete m3
2. 15. Labour charges for Construction of Embankment/Subgrade m3
with soil
2. 16. Labour charges for Construction of Embankment/Subgrade m3
with Fly Ash
2. 17. Labour and equipment charges for Construction of m3
Embankment/Subgrade with Soil
2. 18. Labour and equipment charges for Construction of m3
Embankment/Subgrade with Fly Ash
2. 19. Construction of Embankment with soil from excavated earth all m3
Complete
2. 20. Construction of Embankment with soil from Borrow earth all m3
Complete
2. 21. Construction of Embankment with Fly Ash all Complete m3
2. 22. Construction of Sub-Grade with Soil from excavated earth all m3
Complete
2. 23. Construction of Sub-Grade with Soil from borrow earth all m3
Complete
2. 24. Construction of Sub-Grade with Fly Ash all Complete m3
2. 25. Tree cutting and removal of Stumps above 300m upto 600mm m3

2. 26. Tree cutting and removal of Stumps above 600m upto 900mm m3

2. 27. Tree cutting and removal of Stumps above 900mm upto m3


1800mm
2. 28. Tree cutting and removal of Stumps above 1800mm m3
2. 29. Dismantling and removal of Brick/stone structures other than m3
cement mortar.
2. 30. Dismantling and removal of Plain Cement Concrete (PCC) m3

2. 31. Dismantling and removal of Reinforced Cement Concrete (RCC m3


of all grade)
2. 32. Dismantling and removal of Gurde Rail/Pedestrian railing Lm

2. 33. Dismantling and removal of Metal Beam Crash Barrier Lm


2. 34. Dismantling and removal of Kilometre/5th km stone including No
foundation concrete.
2. 35. Dismantling and removal of Hectometre/Boundary stone No
including foundation concrete.
2. 36. Dismantling and removal of Kerb Stone Lm
2. 37. Dismantling and removal of Fencing Lm
2. 38. Dismantling and removal of Pavement Bituminous courses m3

2. 39. Dismantling and removal of Non bituminous base/sub-base m3


courses
2. 40. Dismantling and removal of Sign Boards No
2. 41. Dismantling and removal of bill boards No
2. 42. Dismantling and removal of Stone pitching/brick/stone soiling m3

2. 43. Dismantling and removal of Boulder apron m3


2. 44. Dismantling and removal of Kutcha structure (Building, Temple m2
etc.), area of plinth
2. 45. Dismantling and removal of Pucca structure (Building, Temple m2
etc.) area of plinth
2. 46. Dismantling and removal of R.C.C. pipe up to 0.6m dia Lm
2. 47. Dismantling and removal of R.C.C. pipe up to 0.9m dia Lm
2. 48. Dismantling and removal of R.C.C. pipe up to 1.0m dia Lm
2. 49. Dismantling and removal of R.C.C. pipe up to 1.2m dia Lm
2. 50. Dismantling and removal of wearing coat deck slab of structure m2

2. 51. Dismantling and removal of Expansion Joint for structure Lm

2. 52. Shifting of Telephone Lines Lm


2. 53. Shifting of Low tension Electric Lines Lm
2. 54. Shifting of OFC Cables Lm
2. 55. Shifting of Water lines Lm
2. 56. Shifting of Gas Pipelines (encasing in concrete and protective Lm
measures)
2. 57. Shifting High tension Electric Lines Lm
2. 58. Shifting High Tension Towers No
2. 59. Shifting Electrical poles No
2. 60. Shifting of tube/bore well No
2. 61. Shifting of open well No
3. Pavement
3. 1. Labour and machinery Charges for Laying and Production GSB m3

3. 2. Labour and machinery Charges for Laying and Production m3


WMM
3. 3. Labour and machinery Charges for Laying and Production BC m3

3. 4. Labour and machinery Charges for Laying and Production BM m3

3. 5. Labour and machinery Charges for Laying and Production m3


DBM
3. 6. Labour and machinery Charges for Laying and Production DLC m3

3. 7. Labour and machinery Charges for Laying and Production PQC m3

3. 8. Labour and machinery Charges for Laying and Production m3


SDBC
3. 9. Labour and machinery Charges for Laying GSB m3
3. 10. Labour and machinery Charges for Laying WMM m3
3. 11. Labour and machinery Charges for Laying BC m3
3. 12. Labour and machinery Charges for Laying BM m3
3. 13. Labour and machinery Charges for Laying DBM m3
3. 14. Labour and machinery Charges for Laying DLC m3
3. 15. Labour and machinery Charges for Laying PQC m3
3. 16. Labour and machinery Charges for Laying SDBC m3
3. 17. Labour and machinery Charges for Milling m3
3. 18. Labour and machinery Charges for Primer Coat m3
3. 19. Labour and machinery Charges for Scarifying Existing Road m3

3. 20. Labour and machinery Charges for Tack Coat m3


3. 21. Labour Charges for Laying and Production GSB m3
3. 22. Labour Charges for Laying and Production WMM m3
3. 23. Labour Charges for Laying and Production BC m3
3. 24. Labour Charges for Laying and Production BM m3
3. 25. Labour Charges for Laying and Production DBM m3
3. 26. Labour Charges for Laying and Production DLC m3
3. 27. Labour Charges for Laying and Production PQC m3
3. 28. Labour Charges for Laying and Production SDBC m3
3. 29. Labour Charges for Laying GSB m3
3. 30. Labour Charges for Laying WMM m3
3. 31. Labour Charges for Laying BC m3
3. 32. Labour Charges for Laying BM m3
3. 33. Labour Charges for Laying DBM m3
3. 34. Labour Charges for Laying DLC m3
3. 35. Labour Charges for Laying PQC m3
3. 36. Labour Charges for Laying SDBC m3
3. 37. Labour Charges for Milling m3
3. 38. Labour Charges for Primer Coat m3
3. 39. Labour Charges for Scarifying Existing Road m3
3. 40. Labour Charges for Tack Coat m3
3. 41. Providing and Laying GSB all complete m3
3. 42. Providing and Laying WMM all complete m3
3. 43. Providing and Laying BC all complete m3
3. 44. Providing and Laying BM all complete m3
3. 45. Providing and Laying DBM all complete m3
3. 46. Providing and Laying DLC all complete m3
3. 47. Providing and Laying PQC all complete m3
3. 48. Providing and Laying SDBC all complete m3
3. 49. Milling all complete m3
3. 50. Primer Coat all complete m3
3. 51. Scarifying Existing Road all complete m3
3. 52. Tack Coat all complete m3
4. Structure
4. 1. Labour Cost for Excavation of Structure m3
4. 2. Excavation for Structure All Complete m3
4. 3. Labour cost for pouring of PCC in foundation m3
4. 4. Labour cost for pouring of PCC in other works m3
4. 5. Labour Cost for pouring of RCC in Foundation m3
4. 6. Labour Cost for pouring of RCC in Substructure m3
4. 7. Labour Cost for pouring of RCC in Superstructure m3
4. 8. Labour Cost for pouring of RCC in retaining wall and others thin m3
sections
4. 9. Labour cost for formworks at foundations m2
4. 10. Labour cost for formworks at substructures m2
4. 11. Labour cost for formworks at superstructures m2
4. 12. Labour Cost for formworks in retaining wall and others thin m2
sections
4. 13. Labour cost for fabrication and fixing of Rebar t
4. 14. labour cost for prestressing including tools and prestressing t
equipments
4. 15. labour cost for driving piles without equipments 1000 mm dia Lm

4. 16. labour cost for driving piles without equipments 1200 mm dia Lm

4. 17. labour cost for driving piles without equipments 1500 mm dia Lm

4. 18. labour cost for driving piles with equipments 1000mm dia Lm

4. 19. labour cost for driving piles with equipments 1200mm dia Lm

4. 20. labour cost for driving piles with equipments 1500mm dia Lm

4. 21. Sinking of Well all complete For 6.0m dia well Depth 0.00m to Lm
30.00m
4. 22. Sinking of Well all complete For 7.0m dia well Depth 0.00m to Lm
30.00m
4. 23. Sinking of Well all complete For 8.0m dia well Depth 0.00m to Lm
30.00m
4. 24. Sinking of Well all complete For 9.0m dia well Depth 0.00m to Lm
30.00m
4. 25. Sinking of Well all complete For 10.0m dia well Depth 0.00m to Lm
30.00m
4. 26. Sinking of Well all complete For 11.0m dia well Depth 0.00m to Lm
30.00m
4. 27. Sinking of Well all complete For 12.0m dia well Depth 0.00m to Lm
30.00m
4. 28. Labour cost for Precast RCC Girder m3
4. 29. Errection cost for Precast RCC girder m3
4. 30. Errection cost for Precast Segmental sections m3
4. 31. Fixing cost of POT-PTFE Bearing No
4. 32. Fixing cost of elastromeric Bearing cm3
4. 33. Fixing cost of expansion joint Lm
4. 34. Fixing cost of drainage Spout No
4. 35. Fixing cost of railing Lm
4. 36. Casing Charges for precast RE wall panel m2
4. 37. Errection Charges for precast RE wall panel m2
4. 38. Labour cost for laying Hume Pipe 900mm dia Lm
4. 39. Labour cost for laying Hume Pipe 1000mm dia Lm
4. 40. Labour cost for laying Hume Pipe 1200mm dia Lm
4. 41. Labour cost for laying filter media m3
4. 42. Labour cost for laying stone pitching m3
5. Drainage and Protective works
5. 1. Labour charges costruction of covered Drain Lm
5. 2. Labour charges costruction of Open Drain Lm
5. 3. Labour charges costruction of Precast Open Drain Lm
5. 4. Labour charges costruction of Precast Covered Drain Lm
5. 5. Labour charges Fixing MS gratings No
5. 6. Labour charges Construction of Inlet Chambers/Catchpit/Gully No
Pit etc
5. 7. Labour Charges for laying and jointing RCC Pipes of 150mm Lm
dia to dewater Catch Pit / median drain
5. 8. Labour Charges for laying and jointing RCC Pipes of 300mm Lm
dia to dewater Catch Pit / median drain
5. 9. Labour Charges for laying and jointing RCC Pipes of 450mm Lm
dia to dewater Catch Pit / median drain
5. 10. Labour Charges for laying and jointing RCC Pipes of 600mm Lm
dia to dewater Catch Pit / median drain
5. 11. Fixing of PVC pipe through footpath to discharge surface runoff Lm
to side drain
5. 12. Labour cost for laying stone pitching m3
5. 13. Labour cost for laying filter media m3
5. 14. Labour charges for Brick masonry for lined covered drains/ m3
head wall/ toe wall/ retaining walls etc
5. 15. Labour charges for Stone masonry for lined covered drains/ m3
head wall/ toe wall/ retaining walls etc
5. 16. Labour Charges for weep holes in toe/retaining walls No
5. 17. Labour Charges for Construction of energy decipating basin at No
toe of chute
5. 18. Labour Charges for Constructing Median Drain Lm
5. 19. Labour Charges forTurfing on Slope m2
5. 20. Turfing on Slope all complete m2
5. 21. Labour Charges for construction of rain water harvesting No
5. 22. Construction of rain water harvesting all complete No
5. 23. Providing and Laying of Guard Stone complete No
5. 24. Pavement marking with hot applied thermoplastic paints with m2
reflectorising glass beads all complete
5. 25. Painting all complete m2
5. 26. Supplying and Fixing of signage all complete of Circular 600 No
mm dia.
5. 27. Supplying and Fixing of signage all complete of Octagon 900 No
mm height (for “STOP”).
5. 28. Supplying and Fixing of signage all complete of Triangular 900 No
mm size (for “GIVE WAY”).
5. 29. Supplying and Fixing of signage all complete of Speed limit No
600mm dia
5. 30. Supplying and Fixing of signage all complete of No
Cautionary/Warning Signs-Triangular 900mm size
5. 31. Supplying and Fixing of signage all complete of Informatory No
Signs
5. 32. Supplying and Fixing of signage all complete of Direction signs No
1200 x 700 mm
5. 33. Supplying and Fixing of signage all complete of Reassurance No
signs 1200 x 1800mm
5. 34. Supplying and Fixing of signage all complete of Place No
Identification Signs 900x1200mm
5. 35. Supplying and Fixing of signage all complete of Truck Lay Bye No
signs 800x600
5. 36. Supplying and Fixing of signage all complete of Toll Booth No
Ahead signs 900x1200mm
5. 37. Supplying and Fixing of signage all complete of Facility and No
Other Useful information Signs 800x600mm
5. 38. Supplying and Fixing of signage all complete of Route Marker No
Signs
5. 39. Supplying and Fixing of signage all complete of NH Route No
marker signs of size 450x600mm
5. 40. Supplying and Fixing of signage all complete of retro- No
reflectorised road delineators
5. 41. Supplying and Fixing of signage all complete of Road way No
delineators.
5. 42. Supplying and Fixing of signage all complete of Hazard No
markers
5. 43. Supplying and Fixing of signage all complete of Object marker No

5. 44. Supplying and Fixing of signage all complete of Cats Eye No

5. 45. Supplying and fixing tubular gantry mounted overhead sign t


board including RCC M-30 foundations and reinforcement and
all incidental works complete of 4000 mm cantilever arm with
3500 mm x 1000 mm board
5. 46. Supplying and fixing tubular gantry mounted overhead sign t
board including RCC M-30 foundations and reinforcement and
all incidental works complete of 11,000 to 14250 mm single
span gantry with 8000 mm x 1000 mm board

5. 47. Labour Charges for laying I Kerb Lm


5. 48. Labour Charges for laying Kerb with channel Lm
5. 49. Providing and fixing reinforced cement concrete M-20 grade No
Hectometer stones all complete
5. 50. Providing and fixing reinforced cement concrete M-20 grade No
5th km. stones all complete.
5. 51. Providing and fixing reinforced cement concrete M-20 grade No
km. stones all complete.
5. 52. Providing and fixing reinforced cement concrete M-20 grade No
Guard stones all complete.
5. 53. Providing and fixing reinforced cement concrete M-20 grade No
Boundary stones all complete.
5. 54. Providing, fabricating and fixing Thrie Beam Metal Crash Lm
Barrier
5. 55. Providing, fabricating and fixing W shaped Metal beam Crash Lm
Barrier
5. 56. Providing and laying 25 mm thick precast cement concrete m2
chequered tiles of grade M-20 all complete
5. 57. Providing and installing Pedestrian Guard rail of G.I. pipes Lm

5. 58. Providing & fixing 19 degree tilted one-way road studs all No
complete
5. 59. Providing Highway Traffic Management System (HTMS) all No
complete
6. Highway Lighting
6. 1. Providing high mast lighting complete No
6. 2. Providing Double Arm street light complete No
6. 3. Providing Single Arm street light complete No
6. 4. Providing Concealed roof mounted lights for VUP, PUP, CUP No
and tunnel complete
6. 5. Providing Solar lights No
6. 6. Providing and fixing Cables, transformar, feeder piller and other km
required assesoris, coordination with service provider/Local
authority etc. complete.
7. Misc.
7. 1. providing and fixing Litter Bin No
7. 2. Plantation of trees No
7. 3. Turfing of embankment slopes, verge earthen shoulders and No
other locations
7. 4. Plantation of shrubs in central median No
7. 5. Construction of temporary diversion Lm
7. 6. Providing & fixing chain link fencing Lm
7. 7. Providing & fixing 1.2 meters high G.I. barbed wire fencing Lm