Vous êtes sur la page 1sur 8

POLITEKNIK NEGERI BANDUNG - CIVIL ENGINEERING DEPARTMENT

SOIL TESTING LABORATORY


Jl. Geger Kalong Hilir, Desa Ciwaruga Bandung, Telp. 022 - 201 45 83
Project : Deain Detai Penyelidikan Air Tanah Check by : Setiono
Location : Jaya Wijaya Date : Nov 2019
Bor location : Kab Mapi No. Bor : BH 1
Density (g)

No. Sample UDS 1 DS 2 UDS 3 UDS 4 UDS 5


Depth : 2.50 - 3.00 8.00 - 8.50 15.00 - 15.50 20.00 - 20.50 25.00 - 25.50
No. 1 2 1 2 1 2 1 2 1 2
Wt of can (gr) 74,48 74,48 74,48 74,48 74,48 74,48 74,48 74,48 74,48 74,48
Wt of soil + can (gr) 206,72 208,43 227,67 229,96 226,44 227,34 228,99 230,07 227,05 230,35
Wt of soil (gr) 132,24 133,95 153,19 155,48 151,96 152,86 154,51 155,59 152,57 155,87
3
Vol of can (cm ) 85,34 85,34 85,34 85,34 85,34 85,34 85,34 85,34 85,34 85,34
3
Density (gr/cm ) 1,550 1,570 1,795 1,822 1,781 1,791 1,810 1,823 1,788 1,826
3
Ave of density (gr / cm ) 1,560 1,808 1,786 1,817 1,807
Water content (w)

No. Sample UDS 1 DS 2 UDS 3 UDS 4 UDS 5


Depth : 2.50 - 3.00 8.00 - 8.50 15.00 - 15.50 20.00 - 20.50 25.00 - 25.50
No. 1 2 1 2 1 2 1 2 1 2
Wt of can (gr) 4,08 4,11 4,57 8,50 4,71 4,13 4,30 4,12 4,08 4,15
Wt of wet soil + can (gr) 40,46 41,23 20,57 23,93 31,99 43,88 38,15 39,43 33,87 36,81
Wt of dry soil + can (gr) 35,41 36,01 19,07 22,52 26,36 35,55 29,82 30,52 27,81 30,23
Wt of moisture (gr) 5,05 5,22 1,50 1,41 5,63 8,33 8,33 8,91 6,06 6,58
Wt of dry soil (gr) 31,33 31,90 14,50 14,02 21,65 31,42 25,52 26,40 23,73 26,08
Water content (%) 16,12 16,36 10,34 10,06 26,00 26,51 32,64 33,75 25,54 25,23
Average (%) 16,24 10,20 26,26 33,20 25,38
Specific of gravity (Gs)

No. Sample UDS 1 DS 2 UDS 3 UDS 4 UDS 5


Depth : 2.50 - 3.00 8.00 - 8.50 15.00 - 15.50 20.00 - 20.50 25.00 - 25.50
No. 5 6 15 16 10 11 16 17 12 13
Wt of picnometer 31,54 31,29 31,77 35,17 26,92 31,66 31,55 33,45 29,90 32,30
Wt of picnometer + dry soil 39,17 38,87 42,26 44,24 36,04 40,39 38,74 38,68 37,77 41,84
Wt of picnometer + soil + water 85,60 85,69 87,72 90,83 82,63 87,14 85,42 85,57 84,76 87,84
Wt of picnometer + water 80,76 80,98 80,94 84,97 76,97 81,73 80,82 82,20 79,80 81,86
Wt of dry soil 7,63 7,58 10,49 9,07 9,12 8,73 7,19 5,23 7,87 9,54
Specific of gravity 2,735 2,641 2,827 2,826 2,636 2,630 2,776 2,812 2,704 2,680
Average 2,688 2,827 2,633 2,794 2,692
Temperature 26 26 26 26 26 26 26 26 26 26
Correction 0,9983 0,9983 0,9983 0,9983 0,9983 0,9983 0,9983 0,9983 0,9983 0,9983
Average of Gs 2,68 2,82 2,63 2,79 2,69
POLITEKNIK NEGERI BANDUNG - CIVIL ENGINEERING DEPARTMENT
SOIL TESTING LABORATORY
Jl. Geger Kalong Hilir, Desa Ciwaruga Bandung, Telp. 022 - 201 45 83
Project : Deain Detai Penyelidikan Air Tanah Check by : Setiono
Location : Jaya Wijaya Date : Nov 2019
Bor location : Kab Mapi No. Bor : BH 1

Atterberg Limits
No. Sample : UDS 1 DS 2

Depth : 2.50 - 3.00 8.00 - 8.50

Testing Liquid Limit (LL) Plastic Limit (PL) Liquid Limit (LL) Plastic Limit (PL)
No. 1 2 3 4 1 2 1 2 3 4 1 2

Wt of can 5,22 4,13 3,97 8,19 5,35 4,59 10,70 5,18 4,67 4,10 3,67 3,93
Wt of wet soil + can 17,10 16,24 18,46 21,44 11,94 10,81 22,67 17,43 16,42 18,94 11,31 11,96
Wt of dry soil + can 13,37 12,67 14,33 17,79 10,42 9,35 19,20 13,90 13,18 15,02 9,54 10,07
Wt of moisting 3,73 3,57 4,13 3,65 1,52 1,46 3,47 3,53 3,24 3,92 1,77 1,89
Wt. of dry soil 8,15 8,54 10,36 9,60 5,07 4,76 8,50 8,72 8,51 10,92 5,87 6,14
Water content 45,77 41,80 39,86 38,02 29,98 30,67 40,82 40,48 38,07 35,90 30,15 30,78
Average 30,33 30,47
Number of blow 9 19 30 41 10 18 29 39
Limit value LL = 48,75 PL = 30,33 LL = NP PL = NP

UDS 1 2.50 - 3.00 DS 2

Flow Curve
48

46
Water content [%]

44

42

40

38

36
1 10 100

Number of Blow

Plastic Limit (PL) = 30,33 % Plastic Limit (PL) = NP %


Liquid Limit (LL) = 48,75 % Liquid Limit (LL) = NP %
Plastic lndex (PI) = 18,43 % Plastic lndex (PI) = NP %
POLITEKNIK NEGERI BANDUNG - CIVIL ENGINEERING DEPARTMENT
SOIL TESTING LABORATORY
Jl. Geger Kalong Hilir, Desa Ciwaruga Bandung, Telp. 022 - 201 45 83

Project : Deain Detai Penyelidikan Air Tanah Check by : Setiono


Location : Jaya Wijaya Date : Nov 2019
Bor location : Kab Mapi No. Bor : BH 1

Grain Size Analysis


No. Sample : UDS 1 2.50 - 3.00 Sieve Wtotal : 100 gram

Sieve No. Diameter [mm] Wt. retained [gram] % Retained % passing

4 4,750 0,00 0,00 100,00


10 2,000 0,00 0,00 100,00
20 0,840 1,04 1,04 98,96
40 0,425 2,83 2,83 96,13
60 0,250 1,03 1,03 95,10
100 0,150 1,06 1,06 94,04
200 0,075 0,07 0,07 93,97 338,40
6,03 6,03 371,09

No. Sample : UDS 1 2.50 - 3.00 Hydrometer Wd = 32,69

Date Time Rh T C Rh + C Zr M D N N'


0 21 26 0 21,0 10,368 0,0125 0,0000 102,40 96,23
0,25 20,3 26 0 20,3 10,556 0,0125 0,0811 98,99 93,02
0,5 20 26 0 20,0 10,637 0,0125 0,0576 97,52 91,64
1 19,5 26 0 19,5 10,771 0,0125 0,0410 95,09 89,35
2 19 26 0 19,0 10,906 0,0125 0,0292 92,65 87,06
5 18 26 0 18,0 11,174 0,0125 0,0187 87,77 82,48
10 17 26 0 17,0 11,443 0,0125 0,0134 82,90 77,90
20 16 26 0 16,0 11,711 0,0125 0,0096 78,02 73,32
40 14 26 0 14,0 12,249 0,0125 0,0069 68,27 64,15
60 11 26 0 11,0 13,054 0,0125 0,0058 53,64 50,40
180 9 26 0 9,0 13,592 0,0125 0,0034 43,89 41,24
1140 2 26 0 2,0 15,472 0,0125 0,0015
0,00 9,75 9,16

Sand
Gravel

Clay Silt
F M C
100
90
80
70
60
% Finer

50
40
30
20
10
0
0,0001 0,001 0,01 0,1 1 10
Diameter [mm]
Gravel : 0,00 Sand : 6,03 Silt : 75,96 Clay : 18,01
POLITEKNIK NEGERI BANDUNG - CIVIL ENGINEERING DEPARTMENT
SOIL TESTING LABORATORY
Jl. Geger Kalong Hilir, Desa Ciwaruga Bandung, Telp. 022 - 201 45 83
Project : Deain Detai Penyelidikan Air Tanah Check by : Setiono
Location : Jaya Wijaya Date : Nov 2019
Bor location : Kab Mapi No. Bor : BH 1

Unconfined Compression Test


Sample No. / Depth UDS 1 2.50 - 3.00 DS 2 8.00 - 8.50
Time Strain Area Undisturbed Remoulded Undisturbed Remoulded
2 Ring P (kg) s (kg/cm2) Ring P (kg) s (kg/cm2) Ring P (kg) s (kg/cm2) Ring 2
P (kg) s (kg/cm )
t (mnt) e (%) A1 (cm )
0,00 0,00 11,341 0 0,000 0,000 4 0,728 0,064 0 0,000 0,000 0,000 0,000
0,50 0,50 11,398 6 1,092 0,096 8 1,456 0,128 0,000 0,000 0,000 0,000
1,00 1,00 11,456 14 2,548 0,222 11 2,002 0,175 0,000 0,000 0,000 0,000
1,50 1,50 11,514 17 3,094 0,269 14 2,548 0,221 0,000 0,000 0,000 0,000
2,00 2,00 11,573 20 3,640 0,315 22 4,004 0,346 0,000 0,000 0,000 0,000
2,50 2,50 11,632 33 6,006 0,516 30 5,460 0,469 0,000 0,000 0,000 0,000
3,00 3,00 11,692 46 8,372 0,716 43 7,826 0,669 0,000 0,000 0,000 0,000
4,00 4,00 11,814 72 13,104 1,109 50 9,100 0,770 0,000 0,000 0,000 0,000
5,00 5,00 11,938 86 15,652 1,311 55 10,010 0,838 0,000 0,000 0,000 0,000
6,00 6,00 12,065 91 16,562 1,373 58 10,556 0,875 0,000 0,000 0,000 0,000
7,00 7,00 12,195 93 16,926 1,388 60 10,920 0,895 0,000 0,000 0,000 0,000
8,00 8,00 12,327 95 17,290 1,403 50 9,100 0,738 0,000 0,000 0,000 0,000
9,00 9,00 12,463 85 15,470 1,241 0,000 0,000 0,000 0,000
10,00 10,00 12,601
11,00 11,00 12,743
12,00 12,00 12,888
13,00 13,00 13,036
14,00 14,00 13,187

qu max = 1,403 kg/cm2 q'u max = 0,895 kg/cm2 qu max = 0,000 kg/cm2 q'u max = 0,000 kg/cm2

Stress (s) - Strain (e) Curve


UDS 1 2.50 - 3.00 DS 2 8.00 - 8.50

1,60 1,00

1,40 0,90

0,80
1,20
0,70
s [kg/cm2]

s [kg/cm2]

1,00
0,60

0,80 0,50

0,60 0,40

0,30
0,40
Undisturbed
0,20
Undisturbed
0,20
Remoulded 0,10 Remoulded
0,00 0,00
0 2 4 6 8 10 12 14 16 0 2 4 6 8 10 12 14 16

e [%] e [%]

cu = 0,701 kg/cm2 S= s/s' = 1,566 cu = 0,000 kg/cm


2
S = s/s' = #DIV/0!
POLITEKNIK NEGERI BANDUNG - CIVIL ENGINEERING DEPARTMENT
SOIL TESTING LABORATORY
Jl. Geger Kalong Hilir, Desa Ciwaruga Bandung, Telp. 022 - 201 45 83

Triaxial - UU Test
Project : Deain Detai Penyelidikan Air Tanah Load ring 0,182 kg/div
Location : Jaya Wijaya Strain Rate : 0,760 mm/menit
Bor location : Kab Mapi Sample : d: 38,00 mm
Check by : Setiono h: 76,00 mm
Date : Nov 2019 A: 11,341 cm2
Sample No. UDS 1 Depth : 2.50 - 3.00
2 2
Time Strain Area s 3 = 0,50 kg/cm s 3 = 1,00 kg/cm
t e A1 Ring P Ds u Ds' Ring P Ds u Ds'
mnt % cm2 div kg (kg/cm2 div kg (kg/cm2
0,00 0,00 11,341 6 1,092 0,096 13 1,880 0,166
0,50 0,50 11,398 6,5 1,183 0,104 14 2,548 0,224
1,00 1,00 11,456 7 1,274 0,111 14,5 2,639 0,230
1,50 1,50 11,514 7,5 1,365 0,119 15 2,730 0,237
2,00 2,00 11,573 8 1,456 0,126 16 2,912 0,252
2,50 2,50 11,632 9 1,638 0,141 17 3,094 0,266
3,00 3,00 11,692 10 1,820 0,156 17,5 3,185 0,272
4,00 4,00 11,814 10,5 1,911 0,162 18 3,276 0,277
5,00 5,00 11,938 11 2,002 0,168 18,5 3,367 0,282
6,00 6,00 12,065 11,5 2,093 0,173 19 3,458 0,287
7,00 7,00 12,195 11,5 2,093 0,172 19 3,458 0,284
8,00 8,00 12,327 12 2,184 0,177 19 3,458 0,281
9,00 9,00 12,463 12 2,184 0,175
10,00 10,00 12,601 12 2,184 0,173
11,00 11,00 12,743
12,00 12,00 12,888
13,00 13,00 13,036
14,00 14,00 13,187
15,00 15,00 13,343
16,00 16,00 13,501
17,00 17,00 13,664
18,00 18,00 13,831
19,00 19,00 14,001
20,00 20,00 14,176
Max value = 0,177 Max value = 0,287

Graphic stress strain Mohr's circle

0,35 0,25
0,30 0,20
t [kg/cm2]

0,25 0,15
Ds [kg/cm2]

0,10
0,20
0,05
0,15
0,00
0,10 0,00 0,50 1,00 1,50 2,00 2,50
s 3 = 0,50 kg/cm2
0,05 s [kg/cm2]
s 3 = 1,00 kg/cm2

0,00
0 2 4 6 8 10 12 14 16 18
f= 5,59 o

e [%] c= 0,030 kg/cm2


POLITEKNIK NEGERI BANDUNG - CIVIL ENGINEERING DEPARTMENT
SOIL TESTING LABORATORY
Jl. Geger Kalong Hilir, Desa Ciwaruga Bandung, Telp. 022 - 201 45 83

Consolidation Test

Project : Deain Detai Penyelidikaninitial Ht (H0) :


Air Tanah 2,50 cm Initial Water content (wn) : 10,20
Location : Jaya Wijaya Diameter : 6,25 cm Water content (wa) : 31,79
Bor location: Kab Mapi Area (A) : 30,63 cm2 Dry weight (W s) = W / (1+wa) : 103,17
No. Sample : UDS 1 Weight (W) : 134,46 gr Ht of solids (Hs)=W s/(A*Gs*gw) : 1,194
Depth : 2.50 - 3.00 Gs : 2,82 Initial void ratio (eo)=(Ho-Hs)/Hs : 1,094
254,7 ######
dial read at Change in
Loads (s) DH total ave H De e t90 Cv Note
end samp (DH)
kg/cm2 cm cm cm cm second cm2/second

0 0,000 0,000 2,500 1,094


0,25 0,006 0,006 0,006 2,494 0,0050 1,089 851 0,0015 15,46
0,5 0,014 0,008 0,014 2,486 0,0117 1,083 708 0,0019 151,43
1 0,042 0,028 0,042 2,458 0,0352 1,059 584 0,0022 118,63
2 0,082 0,040 0,082 2,418 0,0687 1,026 444 0,0028
4 0,171 0,089 0,171 2,329 0,1433 0,951 501 0,0023
8 0,288 0,117 0,288 2,212 0,2413 0,853 710 0,0015
2 0,214 -0,074 0,214 2,286 0,1793 0,915
0,5 0,153 -0,061 0,153 2,347 0,1282 0,966
2,024E-03

1,15

1,10

1,05
Void Ratio (e)

1,00

0,95

0,90

0,85

0,80
0,1 1 10

Log P [kg/cm2]

Cc = (e1 - e2) / (log p2 - log p1) = 0,2866


POLITEKNIK NEGERI BANDUNG - CIVIL ENGINEERING DEPARTMENT
SOIL TESTING LABORATORY
Jl. Geger Kalong Hilir, Desa Ciwaruga Bandung, Telp. 022 - 201 45 83
Project : Deain Detai Penyelidikan Air Tanah Check by : Setiono
Location : Jaya Wijaya Date : Nov 2019
Bor location : Kab Mapi No. Bor : BH 1

Laboratory Test Resume


No. Sample UDS 1 DS 2 UDS 3 UDS 4 UDS 5

Depth 2.50 - 3.00 8.00 - 8.50 15.00 - 15.50 20.00 - 20.50 25.00 - 25.50

Index Properties symbol unit

1. Density g t/m3 - - 1,786 1,817 1,807


2. Water content w % 16,24 10,20 26,26 33,20 25,38
3. Specific of gravity Gs - 2,68 2,82 2,63 2,79 2,69
Void ratio e - - - 0,86 1,04 0,86
Porosity n - - - 0,46 0,51 0,46
Degree of saturation Sr % - - 80,42 88,61 78,89
4. Plastic limit PL % 30,33 NP 30,33 33,74 27,45
Liquid limit LL % 48,75 NP 48,75 42,31 43,90
Plasticity index PI % 18,43 NP 18,43 8,57 16,45
5. Grain size Gravel G % 0,00 21,61 0,00 19,98 0,00
Sand S % 6,03 77,49 0,39 4,27 0,23
Silt M % 75,96 0,90 68,27 75,75 99,77
Clay C % 18,01 0,00 31,34 0,00 0,00

Engineering properties

6, Unconfined qu kg\cm2 1,403 - 2,642 1,606 1,679


2
Compression Test qu' kg\cm 0,895 - 1,772 0,978 0,867
St - 1,566 - 1,491 1,642 1,938
cu kg\cm2 0,701 - 1,321 0,803 0,840
o
7, Triaxial - UU Test j 5,591 - 17,98 5,14 7,83
2
c kg\cm 0,030 - 0,56 0,71 0,64
o
8, Direct Shear Test j - - - - -
2
c kg\cm - - - - -
9, Consolidation Test Cc - 0,287 - 0,3218 0,189 0,261
Cv cm2/sec 2,024E-03 - 1,804E-03 1,784E-03 1,767E-03

Vous aimerez peut-être aussi