Vous êtes sur la page 1sur 15

SHRIRAM EPC LTD.

DAILY PROGRESS REPORT


i Project Start Date:- 04.12.2018 CLIENT :-
ii Project End Date:- 03.09.2021 CONSULTANT:-
iii Project Name :- Dhanbad Water Supply Scheme Phase-I REPORT DATE:
iv Weather Report :- Sunny HOLIDAY
MAN POWER - MACHINE - MATERIAL DESCRIPTION
Manpower Strength Machine Description Materia
Manpower Opening
No. of Labour Machine Description Qty Working Material
Balance
i Skilled 8 JCB 4 2 Cement (Bag) 1130
ii Un-Skilled 15 Hydra 2 1 Sand (m³) 100
iii Surveyor 8 JCB Breaker 3 0 Aggregate (m³) 36
iv - - Tractor 4 1 Steel (MT) 9.120
Truck 1 1
Mixer Machine 1 0
Total 31 Total 15 5
1.Rising & Gravity Mains.
Supply Details Laying Details
Sl No Description of Works Pipe Size BOQ Qty.
Previous Today Cumulative Previous Today
100 mm Dia 0 - - - - -
150 mm Dia 0 - - - - -
200 mm Dia 0 - - - - -
250 mm Dia 580 - - - - -
Supply, Laying,Testing and
Commissioning of Clear 300 mm Dia 5618 - - - - -
1 Water Rising and Gravity 350 mm Dia 1587 - - - - -
Main Pipelines(DI-K9)
400 mm Dia 8417 - - - - -
450 mm Dia 1839 - - - - -
500 mm Dia 3347 - - - - -
600 mm Dia 4,426 - - - - -
Total Length 25,814 0 0 0 0 0
2. Distribution Pipelines(19 Zones)
SHRIRAM EPC LTD.
Supply Details Laying Details
Sl No Description of Works Pipe Size BOQ Qty.
Previous Today Cumulative Previous Today
100 mm Dia 284712 150302.0 0 150302 8217.91 257.22
150 mm Dia 42521 - - - - -
200 mm Dia 19597 - - - - -
250 mm Dia 9897 - - - - -
Supply, Laying,Testing and 300 mm Dia 9443 - - - - -
Commissioning of 350 mm Dia 4523 - - - - -
1 Distribution Pipelines(DI-K7) 400 mm Dia 4469
Total Nos. of Zone- 19 - - - - -
450 mm Dia 1513 - - - - -
500 mm Dia 2854 - - - - -
600 mm Dia 295 - - - - -
Total Length 379824 150302 0 150302 8217.91 257.22
Earthwork in excavation (As per I.S 3114 /
1965 for laying of different types and sizes
of pipes so as Description
to give one ofmeter
Worksaverage BOQ Qty. Previous Today Cumulative
Earthwork
cover forover in excavation
the socket of of foundation
2 Extra
trenches earthwork
of toewall, in allpipe
spillway,
with
kindshead disposal
of soil for
regulator 220849.04 5177.2833 162.0486 5339.3319
of
eachexcavated
additional earthlift within
of 1m orinitial
part lead
thereofand
intake well and outlet etc.as per design
3 lift
over asthe
section
perinitial
specification
in ordinary lift ofor1.5m andas
soft
direction
rock per(vide
of 191.38
Engineer-in-Charge
specification and (b)
direction As per
ofandclassification
Engineer-in-
classification
of soil item -B of soil item-C) disposal of
4 Charge. 24538.78
soil (beyond 50 M away from the edge of
the trenches)
Supplying toolswith andinitial
cutting leadroadofas150 wellMrestoring the same as
and initial lift of 1.5
per specification and direction of E/I.m as per
specification
Pucca Road (Except and direction
black topofonly E/Itaken
(where out
blasting
5 Water is
materialbound not required).
to be used)macadam for cutting
road (takenroad asout per 11245.47
Dismantling
requirement.
material will plain
be cementfor
used) or lime
cutting concrete
road
Providing
6 work coarse clean sand in filling in 17492.96
as perincluding
foundationrequirement stacking
trenches and serviceable
inmaking
orstacks plinth good the
including
materials in countable
same. and watering in layers not within 15
7 ramming 1936.72 105 0 105
meter leadPCC
Providing and M-150
disposalinofnominal un-serviceable mix of
exceeding
Providing 150mm
designation thick75A withone all leads
brick and
flat
8 materials
(1:2:4) in with all leadswith
foundation all complete
approved as per 1811.77
lifts
solingincluding
directionjointof costwith
filled
E/I of all materials,
local sand labour,
including
quality
royalty
9 cost of stones
and taxes taxes,
of watering, chips
all complete 20 mm
royalty,asallper to 6
completemm 24156.94
size graded
Earthwork
building
as per in and
back
specification
building clean
filling
specificationand coarse
the sand
trenches
direction
and of
E/IFM
ofinafter
direction of
Providing
10 laying coarse
2.5 todifferent clean sand in filling
(mode
E/I.
foundationof3.0 including
measurementtypes and
trenches
screening,
sizes ofshuttering,
incompacted
orexcavation
pipes with
volume) 3623.54
mixingremoved
earth cement concrete
during inplinth
mixerincluding
and
within
11 ramming inand 225339.07 5104.80 159.78 5264.58
placinglead
initial andwatering
position,lift as in specification
vibrating,
per layers not and
striking,
exceeding
curing, taxes 150mmand thick
royalty with
all all
completeleads and
as per
12 design of Engineer -in- charge (for 31335.48
lifts including
building cost
specification
classification of soilofitemall
and materials,
& B ) labour,
Adirection of E/I
royalty and taxes all complete as per
building specification and direction of E/I
(mode of measurement compacted volume)
SHRIRAM EPC LTD.
13 Fittings & Specials 429000.4 655 0 655
SHRIRAM EPC LTD.
3. Consumer Survey
SL No. Description Units BOQ Quantity Previous Today Cumulative Remarks

Consumer Survey Sample 55245 33216 220 33436

4. ELEVATED SERVICE RESERVOIR


ESR-3
ESR-1 ESR-4 ESR-5 ESR-6
ESR-2 (13 Lakh Litre)
(18 Lakh Litre) (17 Lakh Litre) (24.5 Lakh Litre) (24 Lakh Litre)
Sl No Description Units (21 Lakh Litre) Tetulmari near
Chatabad near Jila Parishad Gadeyriya WTP JMADA
Liloro Asthan sarswati sisu
Jamia Masjid Bhandardih Plant Officer Colony
mandir

1 soil analysis (SBC ) Job Completed Completed Completed Completed Completed Completed

2 Excavation Job - Completed Completed - Completed -

3 Anti-termite Spray Job - Completed Completed - 4 Nos Completed -

4 PCC Job - Completed Completed - 4 Nos Completed -

5 RCC work in foundation Job - Completed - - - -

6
1st half of staging height Job - 15% Completed ` - - -
including room roof slab
Balance staging botton
7 dome circular beam , head job - - - - - -
beam and conical wall

8 Vertical Side Wall job - - - - - -

9 Top dome job - - - - - -

10
C.I/D.I pipe fitting of inlet job - - - - - -
valve
11
Fixing of C.I , D/F pipes job - - - - - -
specials and sluice valve
SHRIRAM EPC LTD.
Fixing of MS Ladders ,
12 railling,lightning arrester, job - - - - - -
and water level indicator
Wood work, Brick work
13 and steel work in door and job - - - - - -
windows
Snowcem/painting ,white
14 washing, colour, washing job - - - - - -
etc
Testing of full hydraulic
15 structure of elevated water job - - - - - -
tank

16
Commissioning and Trail job - - - - - -
run
SHRIRAM EPC LTD.
5. Compound Wall
SL No. Description Units BOQ Quantity Previous Today Cumulative Rem
1 Excavation m 3
352.64 226.6 0.0 226.6
2 Removal of Unserviceable Soil m3 222.72 203.9 0.0 203.9
3 PCC-M 15 m 3
68.05 23.6 0.0 23.6
4 RCC- M 20 work in foundation m3 163.95 20.6 0.0 20.6
5 Steel Consumption MT 16.39 3.73 0.0 3.73
6 Brick Work m3 197.97 70.3 0.0 70.3
7 Plaster m² 1741.55 232.3 0.0 232.3
6. House Service Connections
SL No. Description No of Quantity Previous Today Cumulative Rem
1 House Service Connections 55245
AM EPC LTD.
Date 10/29/2019
JUIDCO Ltd.
NJS Engineers India Pvt. Ltd.
10/30/2019
-
ACHINE - MATERIAL DESCRIPTION
Material Details
Received Issued Balance

2250 1120 1130


185 85 100
156 121 36
23.400 14.280 9.120

Laying Details
Remarks
Cumulative
-
-
-
-
-
-
-
-
-
-
0
AM EPC LTD.
Laying Details
Remarks
Cumulative
8475.13 -
-
-
-
-
-
-
-
-
-
8475.13
Cumulative
5339.3319

105

5264.58
AM EPC LTD.
655
AM EPC LTD.

Remarks

ESR-7 ESR-8
(18 Lakh Litre) (20.5 Lakh Litre)
JMADA JMADA
Officer Colony Officer Colony

Completed Completed

- -

- -

- -

- -

- -

- -

- -

- -

- -

- -
AM EPC LTD.
- -

- -

- -

- -

- -
AM EPC LTD.

Remarks

Remarks
MATERIALS DETAILS FOR JUIDCO
SL. CEMENT SAND AGGREGATE 8 MM 10 MM
SITE
NO. PUR USED PUR USED PUR USED PUR USED PUR
1 Near Talab,Chattabad Masjid Road
2 Way to Lilori Sthal,Opposite Lilori Park 1800 680 140.28 53 98.44 78 1.5 0.8 3.5
Near Sarsawati Shisu Mandir,
3 70 5 3 8 7
Tetulmari(Baba Chowk)
4 Near Chetudih Malkera Road,Chhatabad
In & Around Gareriya Water Treatment
5 15 1 1
Plant
6 At Chottaputki near B.C.C.L Project office.
7 At Chottaputki near B.C.C.L Project office.
Proposed Sahid Bhagat Singh Colony,
8 Matkuriya
Near Sarsawati Shisu Mandir,
3 450 355 40 29 50 35 1.5 1.3 0.5
Tetulmari(Baba Chowk) Boundry Wall

TOTAL 2250 1120 185 85 156 121 3 2 4

BALANCE 1130 100 36 1.0 1.7


O
10 MM 12 MM 16 MM 20 MM
USED PUR USED PUR USED PUR USED

2 3.45 2.6 4.5 3.5 4 1.8


2.05

0.3 2.2 1.9 0.2 0.15 0 0

2 8 4 5 4 4 2

1.7 3.3 1 2
Laying Details as on date
Date Today Cumulative Area
8/19/2019 16.5 16.5 Zone-1
8/20/2019 55 71.5 Zone-1
8/22/2019 82.5 154 Zone-1
8/23/2019 165 319 Zone-1
8/24/2019 38.5 357.5 Zone-1
8/26/2019 77 434.5 Zone-1
8/27/2019 148.5 583 Zone-1
8/28/2019 109.5 692.5 Zone-1

Vous aimerez peut-être aussi