MAKE LIST

CLIENT:KRIBHCO
SYSTEM: GAS SUPPRESSION SYSTEM
TITAL: TECHNICAL DATA SHEET
VENDOR: PYROGUARD ENGINEERS
BOQ NO. DESCRIPTION UNIT

Supply installation testing & commissioning of UL (Underwriters


Laboratories) listed and The Petroleum and Explosives Safety Organisation
(PESO) Approved Cylinders, complete with UL listed valve assembly and
1 including supervisory switch connection for monitoring cylinder pressure,a
pressure guage with a safety burst disc ,electronic control head / Solenoid,
pressure operated control, head, flexible hose, strap, NRV and a safety cap. (all
accessories should be UL listed with UL marking and from same OEM)

Gas.(Quantity would be as per the volume given below and as per the UL
certification.) CLEAN AGENT (HFC 227ea) (UL Listed) with Zero Ozone
Depletion Potential(ODP), has appearance/colour: Colourless gas and has
citrus like odour. (Gas should be filled in UL listed and PESO Approved filling
station)

1.1 ROOM- (Vol-343 cu. Mtr) Set


2 X 120 Litres (Cylinder size as per manufacture's UL Listing) Cylinder filled
with HFC 227ea (190 kgs approx.)

Supplying installation testing and commissioning of Brass chrome plated steel


2 Discharge Nozzle (UL Listed) caliberated as per Computer Generated Results each
etc. as required.

Supply, installation, testing and commissioning of Piping with ASTM sch. 40


3 pipe as per design requirment complete with required welding work with Lot
Required sizes making good the damages etc as reqd.

Supplying fabrication and commissioning of Manifold complete for making


4 Job
header of gas cylinders.

B FIRE DETECTION AND ALARM SYSTEM

Providing & Fixing Gas Release Panel/Built in Module with 4-Zone Fire
detection and 2-Zone gas discharge module with binary switch timer for
1 Nos
release delay and potential free contact to relay "Gas Release" signal to main
panel (UL Listed)
2 Supply , Installation , Testing and Commissioning of smoke detector. Nos

3 Supply, Installation, Testing and Commissioning of Manual Call Point. Nos

4 Supply, Installation, Testing and Commissioning of Sounder. Nos

Supply, Installation, Testing and Commissioning of Manual Abort Station (Pull


5 Nos
Type)

Supply, installation, testing and commissioning of Manual Release Station


6 Nos
(Pull Type).
Photoluminiscent Gas Release caution sign board complete with fixing
7 Nos
arrangements

8 Providing Electric Gas Release caution sign boards(24 V DC) for approved locaNos

Supply, Installation, Testing and Commissioning of 2C x 1.5 sq.mm Fire


9 Mtr
Survival multistanded copper armoured cable.
IST

QUANTITY MAKE STATUS OK REMARKS


/NOT OK

OK

OK

1
EKC OK

SAFETY HI
TECH
6 OK

JINDAL
MAHARASHT
1 RA OK
SEEMLESS

JINDAL
MAHARASHT
1 RA OK
SEEMLESS

RAVEL

1 OK
39 RAVEL OK

1 RAVEL OK

1 RAVEL OK

1 RAVEL OK

1 RAVEL OK
2 OK

1 AGNI OK

500 EXCEL OK