Vous êtes sur la page 1sur 4

Distinction between AC and DC parts only necessary for converter stations.

If only DC is used in a substation, there is no need to include this station in the report.

"Priority" = Importance for ABB; "Low" can be bundled if breakdown of single components is not achievable

Project Name Country* Equipment


Substation A Canada Civil Works
HVDC portion
SAS
Auxiliary trafo (MV/LV)
Battery sytem
LV Installation
MV AC GIS (17.5 - 52 kV)
HV AC GIS (52 - 170 kV)
Support structure
HV cable
Power Trafo (HV/MV)

*Sample values
tation in the report.

wn of single components is not achievable

Percentage of Project Scope


(value share of components of
complete prefab substation)* Responsible* Priority
A% End user Low
B% EPC Low
D% EPC High
E% EPC High
F% End user High
G% EPC Low
H% HV GIS Supplier High
I% HV GIS Supplier High
J% HV Trafo supplier Medium
K% HV Trafo supplier Medium
L% HV Trafo supplier Medium
Comment
Foundation/Fences/Buildings
Every DC specific component in an inverter station
Substation Automation System for AC part
Transformer for low voltage supply of relays, SAS, …
Backup Low Voltage DC supply of critical components (mostly switching devices, sometimes even SCADA)
Low voltage cabling works
Medium Voltage AC GIS (ideally incl. Number of Bays)
High Voltage AC GIS (ideally incl. Number of Bays)
Container/Skid/Trailer (if not applicable: 0%)
Cables for conventional AC Substation, HVDC gas insulated line for DC interconnector stations not necessary, see disclaimer
Step-up/Step-down Transformer
es even SCADA)

ons not necessary, see disclaimer in cell A1

Vous aimerez peut-être aussi