Vous êtes sur la page 1sur 2

Q2

60 180 Load 940 Wh/day


100 150 contingency 1.15
640 320 load + contingency 1081 Wh/day
80 240 system effiency = 0.6
Sun hour 5
50 50 PV capacity 360 Wp
inverter efficiency 0.9 wiring factor = 0.97
Total: 930 W Total Energy: 940 wh Required Battery capacity = 310 AH
Total Current required 62 A
Using SolarWorld Sunmodule SW185,
Number of PV panels= 12.13979292 therefore provide 13 PV panels
PV in parallel =13/2 = 6.5 Provide 7
PV array = 7x185= 1295 Wp
Inverter size = 2 numbers x 930W

Q3
using Solar Sun module 270 mono solar , 270Wp, 60 cells per module
For 8.5m x 5.5m roof, maximum pv modules = 5 x5 arrays = 25 numbers PV modules.

Q4 Annual Energy Usage = 6000kWh Energy = Total solar Area x solar panel yield x Yearly Avg irradiation x Performance ratio
Yearly avg irradiation = 1638kWh/m2 Therefore Total solar area = 6000/ (16.1% x 1638 x 0.805)
Inverter eff = 0.96 28.26282677
Temp losses = 0.9 Numver of PV panel = 28.2/(1.675X1)
DC cable losses= 0.98 = 16.8 required 17 panels
AC cable losses= 0.99 Total Wp generated by 17 panels = 17 x270Wp = 4590 Wp
losses weak irradiation= 0.97
losses due to dust = 0.99 Inverter rating = 4590 x 0.8 = 3456 Wac
other losses = 1 Use 2 inverter = 3.6TL OUTD.
Performance ratio = 0.805

3 conditions which Grid Tied Inverter will stop operation:


(a) When the inverter detect no supply form the Grid
(b) When the sufficient PV dc voltage is detected to start the inverter
( c ) When the input current detected exceed the inverter input current rating.

Vous aimerez peut-être aussi