POLBAN Quality System Garrett TPE331

[LOGO] INPECTION CHECKLIST Garrett AiResearch


Fuel Pump Assembly

Date Checked
Subject STATUS Comments
Checked by

5. Bolt 10-5-2019 Corelia & Bari 

10. Washer 10-5-2019 Corelia & Bari X Not Available


15. Bushing 10-5-2019 Corelia & Bari X Not Available


20. Bolt 10-5-2019 Corelia & Bari

Available in different
shape
25. Washer 10-5-2019 Corelia & Bari X Not Available
30. Clamp 10-5-2019 Corelia & Bari X Not Available
35. Bushing 10-5-2019 Corelia & Bari X Not Available

40. Bolt 10-5-2019 Corelia & Bari 

45. Washer 10-5-2019 Corelia & Bari X Not Available


50. Bushing 10-5-2019 Corelia & Bari X Not Available

65. Inlet temperature & pressure sensor 10-5-2019 Corelia & Bari 

Available in different
shape
75. Insulator 10-5-2019 Corelia & Bari X Not Accessable
80. Bolt 10-5-2019 Corelia & Bari 
85. Washer 10-5-2019 Corelia & Bari 
105. Bolt 10-5-2019 Corelia & Bari 
110. Support 10-5-2019 Corelia & Bari 
115. Nut 10-5-2019 Corelia & Bari 

120. Washer 10-5-2019 Corelia & Bari X Not Available

Verified/Approved by :

( )
ID : Page 1
POLBAN Quality System Garrett TPE331
[LOGO] INPECTION CHECKLIST Garrett AiResearch
Fuel Pump Assembly

125. Bolt 10-5-2019 Corelia & Bari 


135. Rivet 10-5-2019 Corelia & Bari

140. Nutplate 10-5-2019 Corelia & Bari X Not Available

145. Support Assy 10-5-2019 Corelia & Bari 

150. Nut 10-5-2019 Corelia & Bari 


155. Washer 10-5-2019 Corelia & Bari X Not Available

160. Drive Coupling 10-5-2019 Corelia & Bari 

Not Available/Not
165. Packing 10-5-2019 Corelia & Bari X
Accessable

170. Packing 10-5-2019 Corelia & Bari 

175. Fuel control unit, fuel pum assy


10-5-2019 Corelia & Bari 
and fuel pressurizing valve assy

*Note : Bolt (85 & 105) and Nut (150) are attached in the triangle plate, but our group did not take
the picture, because they were passed.

Verified/Approved by :

( )
ID : Page 2
POLBAN Quality System Garrett TPE331
[LOGO] INPECTION CHECKLIST Garrett AiResearch
Fuel Pump Assembly

Date
Subject Checked by STATUS Comments
Checked
A. Inspect fuel pump assembly:
1. Perform visual inspection of
bolt external and internal
splines for wear as follows:
a. Perform visual inspection
using strong light and 10x 14-5-2019 Corelia & Bari Done
magnification
b. Minor burnish maks and
discoloration are 14-5-2019 Corelia & Bari X (External splines)
acceptable
c. Spline teeth showing no
visible wear step when
viewed from end of spline 14-5-2019 Corelia & Bari Done
and parallel to spline teeth
are acceptable
d. All internal spline showing
wear pattern types C, D
and E, shall require further
14-5-2019 Corelia & Bari X
inspection using look/see
kit or equivalent
boroscope type instrument
e. Spline teeth wear in access
of 0.005 inch is caused for 14-5-2019 Corelia & Bari  (Internal splines)
replacement Acceptable
2. Perform dimensional
inspection of both internal and
external splines for wear as
follow:
a. Splnes with border line
wear conditions detected
during visual inspection
shall be replaced or (External splines)
dimentionally inspected
using a tool maker
14-5-2019 Corelia & Bari X
microscope or equivalent.
An impression mold
maybe required in
conjunction with the tool
maker microscope for
internal splines.
b. Defective internal splines
will require replacement of
the affected assembly coil
14-5-2019 Corelia & Bari 
pump assembly or fuel
pump assembly. If either
assembly is replaced, a (Internal splines)

Verified/Approved by :

( )
ID : Page 3
POLBAN Quality System Garrett TPE331
[LOGO] INPECTION CHECKLIST Garrett AiResearch
Fuel Pump Assembly

new drive coupling shall


be installed.
3. Prior to reintsallation of fuel
control unit, fuel pum
assembly, and fuel
pressurizing valve assembly,
14-5-2019 Corelia & Bari X Did not lubricate
lubricate drive coupling and
the fuel control and oil pump
splines in accordance with
removal/installation.
4. Check fuel control unit, check
fuel pump assembly, and fuel
pressurizing valve assembly
14-5-2019 Corelia & Bari X Did not testing
for security, loose fittings,
evidance of fuel leakage and
damage, refer to 72-00-00.
5. Inspect threaded parts for
crossed, galled and peened 14-5-2019 Corelia & Bari  Acceptable
threads.
6. Replace part that does not
meet inspection/check 14-5-2019 Corelia & Bari 
requirement.

Verified/Approved by :

( )