Vous êtes sur la page 1sur 105

<table style='width:300px;'><tr><td style='text-align:center; background-

color:#ffecd3; font-weight:bold;border-top:1px solid #000000; border-left:1px solid


#000000;border-right:1px solid #000000;'>IRR BHK Delivery Analysis
</td></tr><tr><td style='text-align:center; background-color:#ffecd3; font-
weight:bold;border-top:1px solid #000000; border-left:1px solid #000000;border-
right:1px solid #000000;'> From :
06/12/2019&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;To :
06/12/2019</td></tr><tr><td style='text-align:center; background-color:#ffecd3;
font-weight:bold;border-top:1px solid #000000; border-left:1px solid
#000000;border-right:1px solid #000000;'> Order Type : IRR&BHK</td></tr><tr><td
style='text-align:center; background-color:#ffecd3; font-weight:bold;border-top:1px
solid #000000; border-left:1px solid #000000;border-right:1px solid #000000;'>
District : JAYASHANKAR BHUPALPALLY</td></tr><tr><td style='text-align:center;
background-color:#ffecd3; font-weight:bold;border-top:1px solid #000000; border-
left:1px solid #000000;border-right:1px solid #000000;'> StockYard :MAHADEVPUR IRR
PACK 2</td></tr><tr><td><style> .totext_css { mso-number-format:\@; } table
th{background-color:#c3c1c1;} </style><div><table cellspacing="0" border="1"
id="ctl00_ccMain_grdCustomer" style="width:100%;border-collapse:collapse;"><tr
class="GridviewScrollHeader"><th align="center"
scope="col">S.No<br/><br/>[1]</th><th align="center" scope="col">Order ID
<br/><br/>[2]</th><th align="center" scope="col">Order Date<br/><br/>[3]</th><th
align="center" scope="col">Delivered Date<br/><br/>[4]</th><th align="center"
scope="col">Customer Name<br/><br/>[5]</th><th align="center" scope="col">Mobile
Number<br/><br/>[6]</th><th align="center" scope="col">Delivery
Address<br/><br/>[7]</th><th align="center" scope="col">Delivery
District<br/><br/>[8]</th><th align="center" scope="col">Delivery
Mandal<br/><br/>[9]</th><th align="center" scope="col">Delivery
Village<br/><br/>[10]</th><th align="center" scope="col">Delivery
Street<br/><br/>[11]</th><th align="center" scope="col">Delivery
House<br/><br/>[12]</th><th align="center" scope="col">Delivery
PinCode<br/><br/>[13]</th><th align="center" scope="col">Driver
Name<br/><br/>[14]</th><th align="center" scope="col">Driver
Mobile<br/><br/>[15]</th><th align="center" scope="col">Vehicle
No<br/><br/>[16]</th><th align="center" scope="col">Transit Pass
No<br/><br/>[17]</th><th align="center" scope="col">Order Quantity(Cu
M)<br/><br/>[18]</th><th align="center" scope="col">Delivered Quantity<br/>(Cu
M)<br/>[19]</th></tr><tr class="GridviewScrollItem"><td align="center"
style="background-color:#EFEFEF;">1 </td><td
align="left" style="background-color:#EFEFEF;">IRR001121
</td><td align="left">06-12-2019 14:53:49
</td><td align="left">06-12-2019 16:37:53
</td><td align="left">Executive engineer
</td><td align="left">9704678233 </td><td
align="left">To the Investigation, Design and execution of tunnel of minimum 600 M
internal diameter or 560 m ’D’ shaped with carrying capacity of 496 Cumecs water
from Bheemghanpur tank to ramappa tank and construction of Head regulator at the
entrance portal of tunnel including civil Electro-Mechanical & hydro mechanical
instrumentation, auxiliary, misc equipment and SCADA communication system at
pumping station in Warangal District </td><td
align="left">WARANGAL URBAN </td><td
align="left">Khila Warangal </td><td
align="left">Khila Warangal </td><td
align="left">entrance portal </td><td
align="left">const of head regulator at the
</td><td align="left">506004 </td><td
align="left">RAMESH </td><td
align="left">8790934204 </td><td
align="left">TS03UC4527 </td><td
align="left">TRAN8A35B1AB </td><td
align="right">10,000.00 </td><td
align="right">20.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">2
</td><td align="left" style="background-color:#EFEFEF;">IRR001114
</td><td align="left">03-12-2019 15:45:58
</td><td align="left">06-12-2019 16:35:46
</td><td align="left">L Satyavardhan EE </td><td
align="left">9494306757 </td><td align="left">To
kaleshwaram project falling in the limits of Kudurupally (V) (Mahadevpur-VI),
Mahadevapur (M) JB District to the works of Package-8 of Link-II, Kaleshwaram
project. </td><td align="left">KARIMNAGAR
</td><td align="left">Choppadandi </td><td
align="left">Choppadandi </td><td
align="left">Link-II,Kaleshwaramp </td><td
align="left">to the works of Package-8 of
</td><td align="left">505415 </td><td
align="left">BIXAPATHI </td><td
align="left">9989663678 </td><td
align="left">TS08UE0899 </td><td
align="left">TRAN2D84334A </td><td
align="right">5,000.00 </td><td
align="right">20.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">3
</td><td align="left" style="background-color:#EFEFEF;">IRR001115
</td><td align="left">03-12-2019 15:49:49
</td><td align="left">06-12-2019 16:35:14
</td><td align="left">L Satyavardhan EE </td><td
align="left">9494306757 </td><td align="left">To
the formation of Sri Komaravelli Mallanna Sagar Reservoir with a capacity of 50 TMC
and the formation of Sri Komaravelli Mallanna sagar Reservoir with a capacity of 50
TMC and the formation of Earth bund with all its associated components for Reach-3
from Km 12.8OO to 16.700 and adjoining with Reach-2 at Km 12.8OO near Laxmapur (V),
Thoguta (M), Siddipet District. </td><td
align="left">SIDDIPET </td><td
align="left">Thoguta </td><td
align="left">Thoguta </td><td
align="left">allanna Sagar Reserv </td><td
align="left">formation of Sri Komaravelli M
</td><td align="left">502372 </td><td
align="left">GOPAL </td><td
align="left">9381781030 </td><td
align="left">TS08UD5556 </td><td
align="left">TRANFB86FE15 </td><td
align="right">10,000.00 </td><td
align="right">20.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">4
</td><td align="left" style="background-color:#EFEFEF;">IRR001114
</td><td align="left">03-12-2019 15:45:58
</td><td align="left">06-12-2019 16:33:59
</td><td align="left">L Satyavardhan EE </td><td
align="left">9494306757 </td><td align="left">To
kaleshwaram project falling in the limits of Kudurupally (V) (Mahadevpur-VI),
Mahadevapur (M) JB District to the works of Package-8 of Link-II, Kaleshwaram
project. </td><td align="left">KARIMNAGAR
</td><td align="left">Choppadandi </td><td
align="left">Choppadandi </td><td
align="left">Link-II,Kaleshwaramp </td><td
align="left">to the works of Package-8 of
</td><td align="left">505415 </td><td
align="left">HAMJAD </td><td
align="left">7671911251 </td><td
align="left">TS03UB2669 </td><td
align="left">TRAN83F685DD </td><td
align="right">5,000.00 </td><td
align="right">16.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">5
</td><td align="left" style="background-color:#EFEFEF;">IRR001113
</td><td align="left">29-11-2019 15:45:45
</td><td align="left">06-12-2019 16:32:47
</td><td align="left">L Satyavardhan EE </td><td
align="left">9494306757
</td><td align="left">Formation of sri komaravelli mallanna
sagar reservoir with a capacity of 50 TMC and the formation of sri Komaravelli
Mallanna sagar reservoir with a capacity of 50 TMC and the formation of earth bund
with all its associated components for Reach-3 from Km 12.800 to 16.700 and
adjoining with Reach-4 at km 16.700 near Laxmapur (V) Thoguta (M) Siddipet District
</td><td align="left">SIDDIPET </td><td
align="left">Thoguta </td><td
align="left">Thoguta </td><td
align="left">&formation of earthb </td><td
align="left">Sri Komaravelli Mallannasagar
</td><td align="left">502372 </td><td
align="left">SAMPATH </td><td
align="left">9515420363 </td><td
align="left">TS19T1566 </td><td
align="left">TRAN9D116F48 </td><td
align="right">10,000.00 </td><td
align="right">20.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">6
</td><td align="left" style="background-color:#EFEFEF;">IRR001121
</td><td align="left">06-12-2019 14:53:49
</td><td align="left">06-12-2019 16:32:28
</td><td align="left">Executive engineer
</td><td align="left">9704678233 </td><td
align="left">To the Investigation, Design and execution of tunnel of minimum 600 M
internal diameter or 560 m ’D’ shaped with carrying capacity of 496 Cumecs water
from Bheemghanpur tank to ramappa tank and construction of Head regulator at the
entrance portal of tunnel including civil Electro-Mechanical & hydro mechanical
instrumentation, auxiliary, misc equipment and SCADA communication system at
pumping station in Warangal District </td><td
align="left">WARANGAL URBAN </td><td
align="left">Khila Warangal </td><td
align="left">Khila Warangal </td><td
align="left">entrance portal </td><td
align="left">const of head regulator at the
</td><td align="left">506004 </td><td
align="left">SAMMAIAH </td><td
align="left">9959568027 </td><td
align="left">AP15TC0045 </td><td
align="left">TRAN45E5314E </td><td
align="right">10,000.00 </td><td
align="right">16.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">7
</td><td align="left" style="background-color:#EFEFEF;">IRR001067
</td><td align="left">19-09-2019 12:35:27
</td><td align="left">06-12-2019 16:30:52
</td><td align="left">EXECUTIVE ENGINEER
</td><td align="left">8919822252 </td><td
align="left">to investigation, design and execution of tunnel of minimum 6.00 M
internal diameter with carrying capacity of 49.6 cumecs water from Ramappa tank to
Dharmasagar tank and construction of head regulator at the entrance portal of
tunnel including civil. Electro mechanical & Hydro Mechanical, Instrumentation,
Auxiliary. Miscellaneous equipment and SCADA system at pumping station in Warangal
district now modified as laying of 3 m dia of 3 rows pipeline instead of Tunnel in
Warangal District </td><td align="left">WARANGAL
URBAN </td><td align="left">Khila Warangal
</td><td align="left">Khila Warangal </td><td
align="left">6.00 M internal diam </td><td
align="left">execution of tunnel of minimum
</td><td align="left">506002 </td><td
align="left">RAJU </td><td
align="left">9505612116 </td><td
align="left">TS24T0639 </td><td
align="left">TRAN4F9397BA </td><td
align="right">10,000.00 </td><td
align="right">16.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">8
</td><td align="left" style="background-color:#EFEFEF;">IRR001110
</td><td align="left">22-11-2019 12:33:06
</td><td align="left">06-12-2019 16:30:47
</td><td align="left">EXECUTIVE ENGINEER
</td><td align="left">8919822252 </td><td
align="left">To the investigation, design and execution of lift scheme from
Thotapally Reservoir to Gouravelly Reservoir including tunnel and other allied
works near Regonda(V). Husnabad(M), Karimnagar(D)
</td><td align="left">KARIMNAGAR </td><td
align="left">Karimnagar </td><td
align="left">Hasnapur (Submerged) </td><td
align="left">tunnel &other allied </td><td
align="left">Gouravelly Reservoir inclg
</td><td align="left">505001 </td><td
align="left">VIKRAM </td><td
align="left">7893234234 </td><td
align="left">AP36TA5559 </td><td
align="left">TRANF1C5E61B </td><td
align="right">5,000.00 </td><td
align="right">16.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">9
</td><td align="left" style="background-color:#EFEFEF;">IRR001067
</td><td align="left">19-09-2019 12:35:27
</td><td align="left">06-12-2019 16:30:09
</td><td align="left">EXECUTIVE ENGINEER
</td><td align="left">8919822252 </td><td
align="left">to investigation, design and execution of tunnel of minimum 6.00 M
internal diameter with carrying capacity of 49.6 cumecs water from Ramappa tank to
Dharmasagar tank and construction of head regulator at the entrance portal of
tunnel including civil. Electro mechanical & Hydro Mechanical, Instrumentation,
Auxiliary. Miscellaneous equipment and SCADA system at pumping station in Warangal
district now modified as laying of 3 m dia of 3 rows pipeline instead of Tunnel in
Warangal District </td><td align="left">WARANGAL
URBAN </td><td align="left">Khila Warangal
</td><td align="left">Khila Warangal </td><td
align="left">6.00 M internal diam </td><td
align="left">execution of tunnel of minimum
</td><td align="left">506002 </td><td
align="left">DILLEP </td><td
align="left">8897087386 </td><td
align="left">TS24T2889 </td><td
align="left">TRANFD137C4E </td><td
align="right">10,000.00 </td><td
align="right">16.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">10
</td><td align="left" style="background-color:#EFEFEF;">IRR001114
</td><td align="left">03-12-2019 15:45:58
</td><td align="left">06-12-2019 16:28:46
</td><td align="left">L Satyavardhan EE </td><td
align="left">9494306757 </td><td align="left">To
kaleshwaram project falling in the limits of Kudurupally (V) (Mahadevpur-VI),
Mahadevapur (M) JB District to the works of Package-8 of Link-II, Kaleshwaram
project. </td><td align="left">KARIMNAGAR
</td><td align="left">Choppadandi </td><td
align="left">Choppadandi </td><td
align="left">Link-II,Kaleshwaramp </td><td
align="left">to the works of Package-8 of
</td><td align="left">505415 </td><td
align="left">HARESH </td><td
align="left">6304599856
</td><td align="left">TS03UC0279
</td><td align="left">TRAN49B3E169 </td><td
align="right">5,000.00 </td><td
align="right">20.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">11
</td><td align="left" style="background-color:#EFEFEF;">IRR001113
</td><td align="left">29-11-2019 15:45:45
</td><td align="left">06-12-2019 16:27:26
</td><td align="left">L Satyavardhan EE </td><td
align="left">9494306757 </td><td
align="left">Formation of sri komaravelli mallanna sagar reservoir with a capacity
of 50 TMC and the formation of sri Komaravelli Mallanna sagar reservoir with a
capacity of 50 TMC and the formation of earth bund with all its associated
components for Reach-3 from Km 12.800 to 16.700 and adjoining with Reach-4 at km
16.700 near Laxmapur (V) Thoguta (M) Siddipet District
</td><td align="left">SIDDIPET </td><td
align="left">Thoguta </td><td
align="left">Thoguta </td><td
align="left">&formation of earthb </td><td
align="left">Sri Komaravelli Mallannasagar
</td><td align="left">502372 </td><td
align="left">POSHAM </td><td
align="left">8499999527 </td><td
align="left">TS19T4329 </td><td
align="left">TRAN3B5A3E46 </td><td
align="right">10,000.00 </td><td
align="right">20.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">12
</td><td align="left" style="background-color:#EFEFEF;">IRR001054
</td><td align="left">03-09-2019 13:33:24
</td><td align="left">06-12-2019 16:27:20
</td><td align="left">EXECUTIVE ENGINEER
</td><td align="left">8919822252 </td><td
align="left">To Sri komaravelli Mallanna Sagar, Reach No.4, Thoguta (V&M) Siddipet
District </td><td align="left">SIDDIPET
</td><td align="left">Thoguta </td><td
align="left">Thoguta </td><td align="left">Reach
No.4 </td><td align="left">Sri komaravelli
Mallanna Saga </td><td align="left">502372
</td><td align="left">MOHAN </td><td
align="left">9866885897 </td><td
align="left">AP29V8828 </td><td
align="left">TRANF2767A43 </td><td
align="right">10,000.00 </td><td
align="right">16.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">13
</td><td align="left" style="background-color:#EFEFEF;">IRR001115
</td><td align="left">03-12-2019 15:49:49
</td><td align="left">06-12-2019 16:25:07
</td><td align="left">L Satyavardhan EE </td><td
align="left">9494306757 </td><td align="left">To
the formation of Sri Komaravelli Mallanna Sagar Reservoir with a capacity of 50 TMC
and the formation of Sri Komaravelli Mallanna sagar Reservoir with a capacity of 50
TMC and the formation of Earth bund with all its associated components for Reach-3
from Km 12.8OO to 16.700 and adjoining with Reach-2 at Km 12.8OO near Laxmapur (V),
Thoguta (M), Siddipet District. </td><td
align="left">SIDDIPET </td><td
align="left">Thoguta </td><td
align="left">Thoguta </td><td
align="left">allanna Sagar Reserv </td><td
align="left">formation of Sri Komaravelli M
</td><td align="left">502372 </td><td
align="left">SWAMY </td><td
align="left">9951810023 </td><td
align="left">TS08UA5819 </td><td
align="left">TRAN9BA1E594 </td><td
align="right">10,000.00 </td><td
align="right">16.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">14
</td><td align="left" style="background-color:#EFEFEF;">IRR001122
</td><td align="left">06-12-2019 15:01:45
</td><td align="left">06-12-2019 16:21:29
</td><td align="left">Executive engineer
</td><td align="left">9704678266 </td><td
align="left">To the investigation, design and execution of tunnel of minimum 6.00 M
internal diameter with carrying capacity of 49.6 cumecs water from ramappa tank to
dharmasagar tank and construction of head regulator at the entrance portal of
tunnel including civil. Electro mechanical & hydro mechanical, instrumentation,
Auxiliary. Miscellaneous equipment and SCADA system at pumping station in Warangal
district now modified as laying of 3m dia of 3 rows pipeline instead of tunnel in
Warangal district. </td><td
align="left">WARANGAL URBAN </td><td
align="left">Hanamkonda </td><td
align="left">Hanamkonda </td><td align="left">at
the entrance port </td><td align="left">const of
head regulator </td><td align="left">506001
</td><td align="left">JEEVAN </td><td
align="left">9638527410 </td><td
align="left">TS35T0010 </td><td
align="left">TRANA4884848 </td><td
align="right">10,000.00 </td><td
align="right">16.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">15
</td><td align="left" style="background-color:#EFEFEF;">IRR001122
</td><td align="left">06-12-2019 15:01:45
</td><td align="left">06-12-2019 16:20:41
</td><td align="left">Executive engineer
</td><td align="left">9704678266 </td><td
align="left">To the investigation, design and execution of tunnel of minimum 6.00 M
internal diameter with carrying capacity of 49.6 cumecs water from ramappa tank to
dharmasagar tank and construction of head regulator at the entrance portal of
tunnel including civil. Electro mechanical & hydro mechanical, instrumentation,
Auxiliary. Miscellaneous equipment and SCADA system at pumping station in Warangal
district now modified as laying of 3m dia of 3 rows pipeline instead of tunnel in
Warangal district. </td><td
align="left">WARANGAL URBAN </td><td
align="left">Hanamkonda </td><td
align="left">Hanamkonda </td><td align="left">at
the entrance port </td><td align="left">const of
head regulator </td><td align="left">506001
</td><td align="left">YAKUB </td><td
align="left">9382074852 </td><td
align="left">TS35T0011 </td><td
align="left">TRAN65B6BDFC </td><td
align="right">10,000.00 </td><td
align="right">16.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">16
</td><td align="left" style="background-color:#EFEFEF;">IRR001054
</td><td align="left">03-09-2019 13:33:24
</td><td align="left">06-12-2019 16:19:06
</td><td align="left">EXECUTIVE ENGINEER
</td><td align="left">8919822252 </td><td
align="left">To Sri komaravelli Mallanna Sagar, Reach No.4, Thoguta (V&M) Siddipet
District </td><td align="left">SIDDIPET
</td><td align="left">Thoguta
</td><td align="left">Thoguta
</td><td align="left">Reach No.4 </td><td
align="left">Sri komaravelli Mallanna Saga
</td><td align="left">502372 </td><td
align="left">YADAGIRI </td><td
align="left">9346067775 </td><td
align="left">TS08UE9017 </td><td
align="left">TRANC36C749E </td><td
align="right">10,000.00 </td><td
align="right">16.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">17
</td><td align="left" style="background-color:#EFEFEF;">IRR000951
</td><td align="left">15-07-2019 16:38:18
</td><td align="left">06-12-2019 16:17:24
</td><td align="left">Executive engineer
</td><td align="left">8919822252 </td><td
align="left">For the works of package 5 of SRSP phase-II near Regonda (V)- Husnabad
(M) Karimnagar District </td><td
align="left">KARIMNAGAR </td><td
align="left">Karimnagar </td><td
align="left">Karimnagar </td><td
align="left">SRSP phase-II </td><td
align="left">For the works of package 5 </td><td
align="left">505001 </td><td align="left">BABU
</td><td align="left">9492012024 </td><td
align="left">TS03UB6332 </td><td
align="left">TRAN4ACCFEAC </td><td
align="right">15,000.00 </td><td
align="right">16.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">18
</td><td align="left" style="background-color:#EFEFEF;">IRR001110
</td><td align="left">22-11-2019 12:33:06
</td><td align="left">06-12-2019 16:13:58
</td><td align="left">EXECUTIVE ENGINEER
</td><td align="left">8919822252 </td><td
align="left">To the investigation, design and execution of lift scheme from
Thotapally Reservoir to Gouravelly Reservoir including tunnel and other allied
works near Regonda(V). Husnabad(M), Karimnagar(D)
</td><td align="left">KARIMNAGAR </td><td
align="left">Karimnagar </td><td
align="left">Hasnapur (Submerged) </td><td
align="left">tunnel &other allied </td><td
align="left">Gouravelly Reservoir inclg
</td><td align="left">505001 </td><td
align="left">RAMESH </td><td
align="left">6300578939 </td><td
align="left">TS04UA3997 </td><td
align="left">TRANDA7C8143 </td><td
align="right">5,000.00 </td><td
align="right">16.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">19
</td><td align="left" style="background-color:#EFEFEF;">IRR001113
</td><td align="left">29-11-2019 15:45:45
</td><td align="left">06-12-2019 16:12:48
</td><td align="left">L Satyavardhan EE </td><td
align="left">9494306757 </td><td
align="left">Formation of sri komaravelli mallanna sagar reservoir with a capacity
of 50 TMC and the formation of sri Komaravelli Mallanna sagar reservoir with a
capacity of 50 TMC and the formation of earth bund with all its associated
components for Reach-3 from Km 12.800 to 16.700 and adjoining with Reach-4 at km
16.700 near Laxmapur (V) Thoguta (M) Siddipet District
</td><td align="left">SIDDIPET </td><td
align="left">Thoguta </td><td
align="left">Thoguta </td><td
align="left">&formation of earthb </td><td
align="left">Sri Komaravelli Mallannasagar
</td><td align="left">502372 </td><td
align="left">JANARDHAN </td><td
align="left">9849774280 </td><td
align="left">TS04UB5209 </td><td
align="left">TRAN2474F121 </td><td
align="right">10,000.00 </td><td
align="right">20.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">20
</td><td align="left" style="background-color:#EFEFEF;">IRR001113
</td><td align="left">29-11-2019 15:45:45
</td><td align="left">06-12-2019 16:11:37
</td><td align="left">L Satyavardhan EE </td><td
align="left">9494306757 </td><td
align="left">Formation of sri komaravelli mallanna sagar reservoir with a capacity
of 50 TMC and the formation of sri Komaravelli Mallanna sagar reservoir with a
capacity of 50 TMC and the formation of earth bund with all its associated
components for Reach-3 from Km 12.800 to 16.700 and adjoining with Reach-4 at km
16.700 near Laxmapur (V) Thoguta (M) Siddipet District
</td><td align="left">SIDDIPET </td><td
align="left">Thoguta </td><td
align="left">Thoguta </td><td
align="left">&formation of earthb </td><td
align="left">Sri Komaravelli Mallannasagar
</td><td align="left">502372 </td><td
align="left">SRINU </td><td
align="left">8297386051 </td><td
align="left">TS08UD2734 </td><td
align="left">TRAN7D2898D5 </td><td
align="right">10,000.00 </td><td
align="right">16.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">21
</td><td align="left" style="background-color:#EFEFEF;">IRR000936
</td><td align="left">08-07-2019 15:27:34
</td><td align="left">06-12-2019 16:11:35
</td><td align="left">Executive Engineer
</td><td align="left">8919822252 </td><td
align="left">to Sri Komaravelli Mallanna Sagar Reservoir Reach-2, Vemulaghat (V)
Thogutta (M) Siddipet District. </td><td
align="left">SIDDIPET </td><td
align="left">Thoguta </td><td
align="left">Vemulaghat </td><td
align="left">Reservoir Reach-2 </td><td
align="left">Sri Komaravelli Mallanna Sagar
</td><td align="left">502372 </td><td
align="left">SURESH </td><td
align="left">9573382222 </td><td
align="left">TS07UH2222 </td><td
align="left">TRAN59789DA7 </td><td
align="right">20,000.00 </td><td
align="right">20.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">22
</td><td align="left" style="background-color:#EFEFEF;">IRR000951
</td><td align="left">15-07-2019 16:38:18
</td><td align="left">06-12-2019 16:07:37
</td><td align="left">Executive engineer
</td><td align="left">8919822252 </td><td
align="left">For the works of package 5 of SRSP phase-II near Regonda (V)- Husnabad
(M) Karimnagar District </td><td
align="left">KARIMNAGAR </td><td
align="left">Karimnagar </td><td
align="left">Karimnagar </td><td
align="left">SRSP phase-II </td><td
align="left">For
the works of package 5 </td><td
align="left">505001 </td><td
align="left">CHANKRI </td><td
align="left">9014308839 </td><td
align="left">TS03UB6999 </td><td
align="left">TRAN94EB5629 </td><td
align="right">15,000.00 </td><td
align="right">20.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">23
</td><td align="left" style="background-color:#EFEFEF;">IRR001113
</td><td align="left">29-11-2019 15:45:45
</td><td align="left">06-12-2019 15:49:42
</td><td align="left">L Satyavardhan EE </td><td
align="left">9494306757 </td><td
align="left">Formation of sri komaravelli mallanna sagar reservoir with a capacity
of 50 TMC and the formation of sri Komaravelli Mallanna sagar reservoir with a
capacity of 50 TMC and the formation of earth bund with all its associated
components for Reach-3 from Km 12.800 to 16.700 and adjoining with Reach-4 at km
16.700 near Laxmapur (V) Thoguta (M) Siddipet District
</td><td align="left">SIDDIPET </td><td
align="left">Thoguta </td><td
align="left">Thoguta </td><td
align="left">&formation of earthb </td><td
align="left">Sri Komaravelli Mallannasagar
</td><td align="left">502372 </td><td
align="left">MALLESH </td><td
align="left">9346322856 </td><td
align="left">TS02UB3024 </td><td
align="left">TRANFB466FB8 </td><td
align="right">10,000.00 </td><td
align="right">20.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">24
</td><td align="left" style="background-color:#EFEFEF;">IRR001113
</td><td align="left">29-11-2019 15:45:45
</td><td align="left">06-12-2019 15:40:22
</td><td align="left">L Satyavardhan EE </td><td
align="left">9494306757 </td><td
align="left">Formation of sri komaravelli mallanna sagar reservoir with a capacity
of 50 TMC and the formation of sri Komaravelli Mallanna sagar reservoir with a
capacity of 50 TMC and the formation of earth bund with all its associated
components for Reach-3 from Km 12.800 to 16.700 and adjoining with Reach-4 at km
16.700 near Laxmapur (V) Thoguta (M) Siddipet District
</td><td align="left">SIDDIPET </td><td
align="left">Thoguta </td><td
align="left">Thoguta </td><td
align="left">&formation of earthb </td><td
align="left">Sri Komaravelli Mallannasagar
</td><td align="left">502372 </td><td
align="left">SATHISH </td><td
align="left">9533399282 </td><td
align="left">TS19T4566 </td><td
align="left">TRAN4BF4AF58 </td><td
align="right">10,000.00 </td><td
align="right">20.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">25
</td><td align="left" style="background-color:#EFEFEF;">IRR001113
</td><td align="left">29-11-2019 15:45:45
</td><td align="left">06-12-2019 15:39:16
</td><td align="left">L Satyavardhan EE </td><td
align="left">9494306757 </td><td
align="left">Formation of sri komaravelli mallanna sagar reservoir with a capacity
of 50 TMC and the formation of sri Komaravelli Mallanna sagar reservoir with a
capacity of 50 TMC and the formation of earth bund with all its associated
components for Reach-3 from Km 12.800 to 16.700 and adjoining with Reach-4 at km
16.700 near Laxmapur (V) Thoguta (M) Siddipet District
</td><td align="left">SIDDIPET </td><td
align="left">Thoguta </td><td
align="left">Thoguta </td><td
align="left">&formation of earthb </td><td
align="left">Sri Komaravelli Mallannasagar
</td><td align="left">502372 </td><td
align="left">SAMPATH </td><td
align="left">8374787848 </td><td
align="left">AP36TB6222 </td><td
align="left">TRAN4D6BFDC6 </td><td
align="right">10,000.00 </td><td
align="right">16.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">26
</td><td align="left" style="background-color:#EFEFEF;">IRR001113
</td><td align="left">29-11-2019 15:45:45
</td><td align="left">06-12-2019 15:38:42
</td><td align="left">L Satyavardhan EE </td><td
align="left">9494306757 </td><td
align="left">Formation of sri komaravelli mallanna sagar reservoir with a capacity
of 50 TMC and the formation of sri Komaravelli Mallanna sagar reservoir with a
capacity of 50 TMC and the formation of earth bund with all its associated
components for Reach-3 from Km 12.800 to 16.700 and adjoining with Reach-4 at km
16.700 near Laxmapur (V) Thoguta (M) Siddipet District
</td><td align="left">SIDDIPET </td><td
align="left">Thoguta </td><td
align="left">Thoguta </td><td
align="left">&formation of earthb </td><td
align="left">Sri Komaravelli Mallannasagar
</td><td align="left">502372 </td><td
align="left">AKILL </td><td
align="left">8499999353 </td><td
align="left">TS03UB2424 </td><td
align="left">TRANF4DE684B </td><td
align="right">10,000.00 </td><td
align="right">20.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">27
</td><td align="left" style="background-color:#EFEFEF;">IRR001113
</td><td align="left">29-11-2019 15:45:45
</td><td align="left">06-12-2019 15:38:01
</td><td align="left">L Satyavardhan EE </td><td
align="left">9494306757 </td><td
align="left">Formation of sri komaravelli mallanna sagar reservoir with a capacity
of 50 TMC and the formation of sri Komaravelli Mallanna sagar reservoir with a
capacity of 50 TMC and the formation of earth bund with all its associated
components for Reach-3 from Km 12.800 to 16.700 and adjoining with Reach-4 at km
16.700 near Laxmapur (V) Thoguta (M) Siddipet District
</td><td align="left">SIDDIPET </td><td
align="left">Thoguta </td><td
align="left">Thoguta </td><td
align="left">&formation of earthb </td><td
align="left">Sri Komaravelli Mallannasagar
</td><td align="left">502372 </td><td
align="left">RAMESH </td><td
align="left">6301615656 </td><td
align="left">TS19T3799 </td><td
align="left">TRANCEF3F7D2 </td><td
align="right">10,000.00 </td><td
align="right">20.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">28
</td><td align="left" style="background-color:#EFEFEF;">IRR001113
</td><td align="left">29-11-2019 15:45:45
</td><td align="left">06-12-2019 15:36:57
</td><td align="left">L Satyavardhan EE </td><td
align="left">9494306757
</td><td align="left">Formation of sri komaravelli
mallanna sagar reservoir with a capacity of 50 TMC and the formation of sri
Komaravelli Mallanna sagar reservoir with a capacity of 50 TMC and the formation of
earth bund with all its associated components for Reach-3 from Km 12.800 to 16.700
and adjoining with Reach-4 at km 16.700 near Laxmapur (V) Thoguta (M) Siddipet
District </td><td align="left">SIDDIPET
</td><td align="left">Thoguta </td><td
align="left">Thoguta </td><td
align="left">&formation of earthb </td><td
align="left">Sri Komaravelli Mallannasagar
</td><td align="left">502372 </td><td
align="left">SRINU </td><td
align="left">9652052242 </td><td
align="left">TS19T1515 </td><td
align="left">TRAN985B28C6 </td><td
align="right">10,000.00 </td><td
align="right">20.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">29
</td><td align="left" style="background-color:#EFEFEF;">IRR001113
</td><td align="left">29-11-2019 15:45:45
</td><td align="left">06-12-2019 15:36:55
</td><td align="left">L Satyavardhan EE </td><td
align="left">9494306757 </td><td
align="left">Formation of sri komaravelli mallanna sagar reservoir with a capacity
of 50 TMC and the formation of sri Komaravelli Mallanna sagar reservoir with a
capacity of 50 TMC and the formation of earth bund with all its associated
components for Reach-3 from Km 12.800 to 16.700 and adjoining with Reach-4 at km
16.700 near Laxmapur (V) Thoguta (M) Siddipet District
</td><td align="left">SIDDIPET </td><td
align="left">Thoguta </td><td
align="left">Thoguta </td><td
align="left">&formation of earthb </td><td
align="left">Sri Komaravelli Mallannasagar
</td><td align="left">502372 </td><td
align="left">RAJU </td><td
align="left">9640736831 </td><td
align="left">TS04UB9330 </td><td
align="left">TRAN13648247 </td><td
align="right">10,000.00 </td><td
align="right">16.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">30
</td><td align="left" style="background-color:#EFEFEF;">IRR001113
</td><td align="left">29-11-2019 15:45:45
</td><td align="left">06-12-2019 15:35:00
</td><td align="left">L Satyavardhan EE </td><td
align="left">9494306757 </td><td
align="left">Formation of sri komaravelli mallanna sagar reservoir with a capacity
of 50 TMC and the formation of sri Komaravelli Mallanna sagar reservoir with a
capacity of 50 TMC and the formation of earth bund with all its associated
components for Reach-3 from Km 12.800 to 16.700 and adjoining with Reach-4 at km
16.700 near Laxmapur (V) Thoguta (M) Siddipet District
</td><td align="left">SIDDIPET </td><td
align="left">Thoguta </td><td
align="left">Thoguta </td><td
align="left">&formation of earthb </td><td
align="left">Sri Komaravelli Mallannasagar
</td><td align="left">502372 </td><td
align="left">RAJASHEKAR </td><td
align="left">9390595639 </td><td
align="left">TS19T0963 </td><td
align="left">TRANC7ED1238 </td><td
align="right">10,000.00 </td><td
align="right">20.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">31
</td><td align="left" style="background-color:#EFEFEF;">IRR001113
</td><td align="left">29-11-2019 15:45:45
</td><td align="left">06-12-2019 15:32:39
</td><td align="left">L Satyavardhan EE </td><td
align="left">9494306757 </td><td
align="left">Formation of sri komaravelli mallanna sagar reservoir with a capacity
of 50 TMC and the formation of sri Komaravelli Mallanna sagar reservoir with a
capacity of 50 TMC and the formation of earth bund with all its associated
components for Reach-3 from Km 12.800 to 16.700 and adjoining with Reach-4 at km
16.700 near Laxmapur (V) Thoguta (M) Siddipet District
</td><td align="left">SIDDIPET </td><td
align="left">Thoguta </td><td
align="left">Thoguta </td><td
align="left">&formation of earthb </td><td
align="left">Sri Komaravelli Mallannasagar
</td><td align="left">502372 </td><td
align="left">RAJESH </td><td
align="left">9652487926 </td><td
align="left">TS19T8649 </td><td
align="left">TRAN89849AB1 </td><td
align="right">10,000.00 </td><td
align="right">20.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">32
</td><td align="left" style="background-color:#EFEFEF;">IRR001113
</td><td align="left">29-11-2019 15:45:45
</td><td align="left">06-12-2019 15:32:08
</td><td align="left">L Satyavardhan EE </td><td
align="left">9494306757 </td><td
align="left">Formation of sri komaravelli mallanna sagar reservoir with a capacity
of 50 TMC and the formation of sri Komaravelli Mallanna sagar reservoir with a
capacity of 50 TMC and the formation of earth bund with all its associated
components for Reach-3 from Km 12.800 to 16.700 and adjoining with Reach-4 at km
16.700 near Laxmapur (V) Thoguta (M) Siddipet District
</td><td align="left">SIDDIPET </td><td
align="left">Thoguta </td><td
align="left">Thoguta </td><td
align="left">&formation of earthb </td><td
align="left">Sri Komaravelli Mallannasagar
</td><td align="left">502372 </td><td
align="left">MADHU </td><td
align="left">9573054544 </td><td
align="left">TS19T6579 </td><td
align="left">TRAN84A2228C </td><td
align="right">10,000.00 </td><td
align="right">20.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">33
</td><td align="left" style="background-color:#EFEFEF;">IRR000936
</td><td align="left">08-07-2019 15:27:34
</td><td align="left">06-12-2019 15:31:07
</td><td align="left">Executive Engineer
</td><td align="left">8919822252 </td><td
align="left">to Sri Komaravelli Mallanna Sagar Reservoir Reach-2, Vemulaghat (V)
Thogutta (M) Siddipet District. </td><td
align="left">SIDDIPET </td><td
align="left">Thoguta </td><td
align="left">Vemulaghat </td><td
align="left">Reservoir Reach-2 </td><td
align="left">Sri Komaravelli Mallanna Sagar
</td><td align="left">502372 </td><td
align="left">DAYAKAR </td><td
align="left">9441007228 </td><td
align="left">TS07UG2817 </td><td
align="left">TRAN3DBBB391 </td><td
align="right">20,000.00 </td><td
align="right">20.00 </td></tr><tr
class="GridviewScrollItem"><td
align="center" style="background-color:#EFEFEF;">34
</td><td align="left" style="background-color:#EFEFEF;">IRR001113
</td><td align="left">29-11-2019 15:45:45
</td><td align="left">06-12-2019 15:27:12
</td><td align="left">L Satyavardhan EE </td><td
align="left">9494306757 </td><td
align="left">Formation of sri komaravelli mallanna sagar reservoir with a capacity
of 50 TMC and the formation of sri Komaravelli Mallanna sagar reservoir with a
capacity of 50 TMC and the formation of earth bund with all its associated
components for Reach-3 from Km 12.800 to 16.700 and adjoining with Reach-4 at km
16.700 near Laxmapur (V) Thoguta (M) Siddipet District
</td><td align="left">SIDDIPET </td><td
align="left">Thoguta </td><td
align="left">Thoguta </td><td
align="left">&formation of earthb </td><td
align="left">Sri Komaravelli Mallannasagar
</td><td align="left">502372 </td><td
align="left">RAJU </td><td
align="left">8374750548 </td><td
align="left">TS19T4913 </td><td
align="left">TRAN49C2347C </td><td
align="right">10,000.00 </td><td
align="right">20.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">35
</td><td align="left" style="background-color:#EFEFEF;">IRR000936
</td><td align="left">08-07-2019 15:27:34
</td><td align="left">06-12-2019 15:26:19
</td><td align="left">Executive Engineer
</td><td align="left">8919822252 </td><td
align="left">to Sri Komaravelli Mallanna Sagar Reservoir Reach-2, Vemulaghat (V)
Thogutta (M) Siddipet District. </td><td
align="left">SIDDIPET </td><td
align="left">Thoguta </td><td
align="left">Vemulaghat </td><td
align="left">Reservoir Reach-2 </td><td
align="left">Sri Komaravelli Mallanna Sagar
</td><td align="left">502372 </td><td
align="left">RAJANNA </td><td
align="left">7013292851 </td><td
align="left">TS08UE1147 </td><td
align="left">TRAN9E41C377 </td><td
align="right">20,000.00 </td><td
align="right">20.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">36
</td><td align="left" style="background-color:#EFEFEF;">IRR000872
</td><td align="left">13-06-2019 14:36:50
</td><td align="left">06-12-2019 15:14:04
</td><td align="left">Executive engineer
</td><td align="left">8919822252 </td><td
align="left">To de-silting area to Konayamakula lift irrigation scheme works in
erstwhile Warangal District </td><td
align="left">WARANGAL URBAN </td><td
align="left">Khila Warangal </td><td
align="left">Khila Warangal </td><td
align="left">scheme works </td><td
align="left">Konayamakula lift irrigation
</td><td align="left">506002 </td><td
align="left">RAJASHEKAR </td><td
align="left">9381719972 </td><td
align="left">AP15TB2589 </td><td
align="left">TRAND6659272 </td><td
align="right">6,000.00 </td><td
align="right">16.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">37
</td><td align="left" style="background-color:#EFEFEF;">IRR000896
</td><td align="left">29-06-2019 13:49:22
</td><td align="left">06-12-2019 15:09:26
</td><td align="left">Executive Engineer
</td><td align="left">8919822252 </td><td
align="left">De-silting area of Annaram Barrage located in Godavari river,
Jayashankar Bhupalpally District to Sri Komaravelli Mallanna Sagar, Reservoir
Reach-3, Laxmapur (V) Thogutta (M) Siddipet District
</td><td align="left">SIDDIPET </td><td
align="left">Thoguta </td><td
align="left">Thoguta </td><td
align="left">Reservoir Reach-3 </td><td
align="left">Sri Komaravelli Mallanna Sagar
</td><td align="left">502372 </td><td
align="left">RAMULU </td><td
align="left">8466944009 </td><td
align="left">TS36T5679 </td><td
align="left">TRAN588D3153 </td><td
align="right">10,000.00 </td><td
align="right">20.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">38
</td><td align="left" style="background-color:#EFEFEF;">IRR000936
</td><td align="left">08-07-2019 15:27:34
</td><td align="left">06-12-2019 15:07:25
</td><td align="left">Executive Engineer
</td><td align="left">8919822252 </td><td
align="left">to Sri Komaravelli Mallanna Sagar Reservoir Reach-2, Vemulaghat (V)
Thogutta (M) Siddipet District. </td><td
align="left">SIDDIPET </td><td
align="left">Thoguta </td><td
align="left">Vemulaghat </td><td
align="left">Reservoir Reach-2 </td><td
align="left">Sri Komaravelli Mallanna Sagar
</td><td align="left">502372 </td><td
align="left">FAROK </td><td
align="left">9949609712 </td><td
align="left">AP01Y0649 </td><td
align="left">TRANE3FF6315 </td><td
align="right">20,000.00 </td><td
align="right">16.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">39
</td><td align="left" style="background-color:#EFEFEF;">IRR001113
</td><td align="left">29-11-2019 15:45:45
</td><td align="left">06-12-2019 15:05:45
</td><td align="left">L Satyavardhan EE </td><td
align="left">9494306757 </td><td
align="left">Formation of sri komaravelli mallanna sagar reservoir with a capacity
of 50 TMC and the formation of sri Komaravelli Mallanna sagar reservoir with a
capacity of 50 TMC and the formation of earth bund with all its associated
components for Reach-3 from Km 12.800 to 16.700 and adjoining with Reach-4 at km
16.700 near Laxmapur (V) Thoguta (M) Siddipet District
</td><td align="left">SIDDIPET </td><td
align="left">Thoguta </td><td
align="left">Thoguta </td><td
align="left">&formation of earthb </td><td
align="left">Sri Komaravelli Mallannasagar
</td><td align="left">502372 </td><td
align="left">UMAMAHESH </td><td
align="left">9618323775 </td><td
align="left">TS02UB5589 </td><td
align="left">TRANB1DCE92B </td><td
align="right">10,000.00 </td><td
align="right">20.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">40
</td><td align="left" style="background-color:#EFEFEF;">IRR000936
</td><td
align="left">08-07-2019 15:27:34 </td><td
align="left">06-12-2019 15:04:11 </td><td
align="left">Executive Engineer </td><td
align="left">8919822252 </td><td align="left">to
Sri Komaravelli Mallanna Sagar Reservoir Reach-2, Vemulaghat (V) Thogutta (M)
Siddipet District. </td><td
align="left">SIDDIPET </td><td
align="left">Thoguta </td><td
align="left">Vemulaghat </td><td
align="left">Reservoir Reach-2 </td><td
align="left">Sri Komaravelli Mallanna Sagar
</td><td align="left">502372 </td><td
align="left">ABILASH </td><td
align="left">6305899961 </td><td
align="left">TS07UF1111 </td><td
align="left">TRAN2464CDAB </td><td
align="right">20,000.00 </td><td
align="right">20.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">41
</td><td align="left" style="background-color:#EFEFEF;">IRR001113
</td><td align="left">29-11-2019 15:45:45
</td><td align="left">06-12-2019 15:04:00
</td><td align="left">L Satyavardhan EE </td><td
align="left">9494306757 </td><td
align="left">Formation of sri komaravelli mallanna sagar reservoir with a capacity
of 50 TMC and the formation of sri Komaravelli Mallanna sagar reservoir with a
capacity of 50 TMC and the formation of earth bund with all its associated
components for Reach-3 from Km 12.800 to 16.700 and adjoining with Reach-4 at km
16.700 near Laxmapur (V) Thoguta (M) Siddipet District
</td><td align="left">SIDDIPET </td><td
align="left">Thoguta </td><td
align="left">Thoguta </td><td
align="left">&formation of earthb </td><td
align="left">Sri Komaravelli Mallannasagar
</td><td align="left">502372 </td><td
align="left">SRINIVAS </td><td
align="left">7569903609 </td><td
align="left">AP01Y8799 </td><td
align="left">TRANBDC9F841 </td><td
align="right">10,000.00 </td><td
align="right">16.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">42
</td><td align="left" style="background-color:#EFEFEF;">IRR001114
</td><td align="left">03-12-2019 15:45:58
</td><td align="left">06-12-2019 15:03:05
</td><td align="left">L Satyavardhan EE </td><td
align="left">9494306757 </td><td align="left">To
kaleshwaram project falling in the limits of Kudurupally (V) (Mahadevpur-VI),
Mahadevapur (M) JB District to the works of Package-8 of Link-II, Kaleshwaram
project. </td><td align="left">KARIMNAGAR
</td><td align="left">Choppadandi </td><td
align="left">Choppadandi </td><td
align="left">Link-II,Kaleshwaramp </td><td
align="left">to the works of Package-8 of
</td><td align="left">505415 </td><td
align="left">PARMESH </td><td
align="left">9949540736 </td><td
align="left">TS08UA8333 </td><td
align="left">TRANDF9E62B1 </td><td
align="right">5,000.00 </td><td
align="right">16.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">43
</td><td align="left" style="background-color:#EFEFEF;">IRR001113
</td><td align="left">29-11-2019 15:45:45
</td><td align="left">06-12-2019 15:02:21
</td><td align="left">L Satyavardhan EE </td><td
align="left">9494306757 </td><td
align="left">Formation of sri komaravelli mallanna sagar reservoir with a capacity
of 50 TMC and the formation of sri Komaravelli Mallanna sagar reservoir with a
capacity of 50 TMC and the formation of earth bund with all its associated
components for Reach-3 from Km 12.800 to 16.700 and adjoining with Reach-4 at km
16.700 near Laxmapur (V) Thoguta (M) Siddipet District
</td><td align="left">SIDDIPET </td><td
align="left">Thoguta </td><td
align="left">Thoguta </td><td
align="left">&formation of earthb </td><td
align="left">Sri Komaravelli Mallannasagar
</td><td align="left">502372 </td><td
align="left">SANJEEV </td><td
align="left">9000122464 </td><td
align="left">TS22T2566 </td><td
align="left">TRAN65F1B898 </td><td
align="right">10,000.00 </td><td
align="right">20.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">44
</td><td align="left" style="background-color:#EFEFEF;">IRR001113
</td><td align="left">29-11-2019 15:45:45
</td><td align="left">06-12-2019 15:02:01
</td><td align="left">L Satyavardhan EE </td><td
align="left">9494306757 </td><td
align="left">Formation of sri komaravelli mallanna sagar reservoir with a capacity
of 50 TMC and the formation of sri Komaravelli Mallanna sagar reservoir with a
capacity of 50 TMC and the formation of earth bund with all its associated
components for Reach-3 from Km 12.800 to 16.700 and adjoining with Reach-4 at km
16.700 near Laxmapur (V) Thoguta (M) Siddipet District
</td><td align="left">SIDDIPET </td><td
align="left">Thoguta </td><td
align="left">Thoguta </td><td
align="left">&formation of earthb </td><td
align="left">Sri Komaravelli Mallannasagar
</td><td align="left">502372 </td><td
align="left">SATHISH </td><td
align="left">9701909132 </td><td
align="left">TS19T6939 </td><td
align="left">TRAN3B47134A </td><td
align="right">10,000.00 </td><td
align="right">20.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">45
</td><td align="left" style="background-color:#EFEFEF;">IRR000896
</td><td align="left">29-06-2019 13:49:22
</td><td align="left">06-12-2019 15:00:59
</td><td align="left">Executive Engineer
</td><td align="left">8919822252 </td><td
align="left">De-silting area of Annaram Barrage located in Godavari river,
Jayashankar Bhupalpally District to Sri Komaravelli Mallanna Sagar, Reservoir
Reach-3, Laxmapur (V) Thogutta (M) Siddipet District
</td><td align="left">SIDDIPET </td><td
align="left">Thoguta </td><td
align="left">Thoguta </td><td
align="left">Reservoir Reach-3 </td><td
align="left">Sri Komaravelli Mallanna Sagar
</td><td align="left">502372 </td><td
align="left">SUBASH </td><td
align="left">6303084043 </td><td
align="left">AP01Y6097 </td><td
align="left">TRAN62B28EDA </td><td
align="right">10,000.00 </td><td
align="right">16.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">46
</td><td align="left" style="background-
color:#EFEFEF;">IRR000936 </td><td
align="left">08-07-2019 15:27:34 </td><td
align="left">06-12-2019 15:00:37 </td><td
align="left">Executive Engineer </td><td
align="left">8919822252 </td><td align="left">to
Sri Komaravelli Mallanna Sagar Reservoir Reach-2, Vemulaghat (V) Thogutta (M)
Siddipet District. </td><td
align="left">SIDDIPET </td><td
align="left">Thoguta </td><td
align="left">Vemulaghat </td><td
align="left">Reservoir Reach-2 </td><td
align="left">Sri Komaravelli Mallanna Sagar
</td><td align="left">502372 </td><td
align="left">INTHIYAZ </td><td
align="left">9182235736 </td><td
align="left">TS08UF6359 </td><td
align="left">TRAN85D442DB </td><td
align="right">20,000.00 </td><td
align="right">20.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">47
</td><td align="left" style="background-color:#EFEFEF;">IRR001114
</td><td align="left">03-12-2019 15:45:58
</td><td align="left">06-12-2019 14:59:39
</td><td align="left">L Satyavardhan EE </td><td
align="left">9494306757 </td><td align="left">To
kaleshwaram project falling in the limits of Kudurupally (V) (Mahadevpur-VI),
Mahadevapur (M) JB District to the works of Package-8 of Link-II, Kaleshwaram
project. </td><td align="left">KARIMNAGAR
</td><td align="left">Choppadandi </td><td
align="left">Choppadandi </td><td
align="left">Link-II,Kaleshwaramp </td><td
align="left">to the works of Package-8 of
</td><td align="left">505415 </td><td
align="left">ODELU </td><td
align="left">9493189548 </td><td
align="left">TS04UB3309 </td><td
align="left">TRANE1854C85 </td><td
align="right">5,000.00 </td><td
align="right">16.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">48
</td><td align="left" style="background-color:#EFEFEF;">IRR001054
</td><td align="left">03-09-2019 13:33:24
</td><td align="left">06-12-2019 14:59:06
</td><td align="left">EXECUTIVE ENGINEER
</td><td align="left">8919822252 </td><td
align="left">To Sri komaravelli Mallanna Sagar, Reach No.4, Thoguta (V&M) Siddipet
District </td><td align="left">SIDDIPET
</td><td align="left">Thoguta </td><td
align="left">Thoguta </td><td align="left">Reach
No.4 </td><td align="left">Sri komaravelli
Mallanna Saga </td><td align="left">502372
</td><td align="left">KONDAL </td><td
align="left">9666307389 </td><td
align="left">AP24TA3678 </td><td
align="left">TRAN3747F24C </td><td
align="right">10,000.00 </td><td
align="right">16.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">49
</td><td align="left" style="background-color:#EFEFEF;">IRR001115
</td><td align="left">03-12-2019 15:49:49
</td><td align="left">06-12-2019 14:58:18
</td><td align="left">L Satyavardhan EE </td><td
align="left">9494306757 </td><td align="left">To
the formation of Sri Komaravelli Mallanna Sagar Reservoir with a capacity of 50 TMC
and the formation of Sri Komaravelli Mallanna sagar Reservoir with a capacity of 50
TMC and the formation of Earth bund with all its associated components for Reach-3
from Km 12.8OO to 16.700 and adjoining with Reach-2 at Km 12.8OO near Laxmapur (V),
Thoguta (M), Siddipet District. </td><td
align="left">SIDDIPET </td><td
align="left">Thoguta </td><td
align="left">Thoguta </td><td
align="left">allanna Sagar Reserv </td><td
align="left">formation of Sri Komaravelli M
</td><td align="left">502372 </td><td
align="left">LALU </td><td
align="left">9346565803 </td><td
align="left">TS07UG2939 </td><td
align="left">TRAN38C488F1 </td><td
align="right">10,000.00 </td><td
align="right">20.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">50
</td><td align="left" style="background-color:#EFEFEF;">IRR001054
</td><td align="left">03-09-2019 13:33:24
</td><td align="left">06-12-2019 14:57:52
</td><td align="left">EXECUTIVE ENGINEER
</td><td align="left">8919822252 </td><td
align="left">To Sri komaravelli Mallanna Sagar, Reach No.4, Thoguta (V&M) Siddipet
District </td><td align="left">SIDDIPET
</td><td align="left">Thoguta </td><td
align="left">Thoguta </td><td align="left">Reach
No.4 </td><td align="left">Sri komaravelli
Mallanna Saga </td><td align="left">502372
</td><td align="left">SURESH </td><td
align="left">9912430976 </td><td
align="left">TS30T0873 </td><td
align="left">TRANE94A1244 </td><td
align="right">10,000.00 </td><td
align="right">16.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">51
</td><td align="left" style="background-color:#EFEFEF;">IRR000936
</td><td align="left">08-07-2019 15:27:34
</td><td align="left">06-12-2019 14:56:35
</td><td align="left">Executive Engineer
</td><td align="left">8919822252 </td><td
align="left">to Sri Komaravelli Mallanna Sagar Reservoir Reach-2, Vemulaghat (V)
Thogutta (M) Siddipet District. </td><td
align="left">SIDDIPET </td><td
align="left">Thoguta </td><td
align="left">Vemulaghat </td><td
align="left">Reservoir Reach-2 </td><td
align="left">Sri Komaravelli Mallanna Sagar
</td><td align="left">502372 </td><td
align="left">UPENDHRA </td><td
align="left">9000699814 </td><td
align="left">TS08UH0039 </td><td
align="left">TRAN7B48884A </td><td
align="right">20,000.00 </td><td
align="right">20.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">52
</td><td align="left" style="background-color:#EFEFEF;">IRR001054
</td><td align="left">03-09-2019 13:33:24
</td><td align="left">06-12-2019 14:54:40
</td><td align="left">EXECUTIVE ENGINEER
</td><td align="left">8919822252 </td><td
align="left">To Sri komaravelli Mallanna Sagar, Reach No.4, Thoguta (V&M) Siddipet
District
</td><td align="left">SIDDIPET
</td><td align="left">Thoguta </td><td
align="left">Thoguta </td><td align="left">Reach
No.4 </td><td align="left">Sri komaravelli
Mallanna Saga </td><td align="left">502372
</td><td align="left">RAJU </td><td
align="left">6303633747 </td><td
align="left">TS08UE8459 </td><td
align="left">TRAN1285F2BC </td><td
align="right">10,000.00 </td><td
align="right">16.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">53
</td><td align="left" style="background-color:#EFEFEF;">IRR001110
</td><td align="left">22-11-2019 12:33:06
</td><td align="left">06-12-2019 14:54:25
</td><td align="left">EXECUTIVE ENGINEER
</td><td align="left">8919822252 </td><td
align="left">To the investigation, design and execution of lift scheme from
Thotapally Reservoir to Gouravelly Reservoir including tunnel and other allied
works near Regonda(V). Husnabad(M), Karimnagar(D)
</td><td align="left">KARIMNAGAR </td><td
align="left">Karimnagar </td><td
align="left">Hasnapur (Submerged) </td><td
align="left">tunnel &other allied </td><td
align="left">Gouravelly Reservoir inclg
</td><td align="left">505001 </td><td
align="left">ADITHIAH </td><td
align="left">8074309008 </td><td
align="left">TS04UB9329 </td><td
align="left">TRAN47CAB65E </td><td
align="right">5,000.00 </td><td
align="right">16.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">54
</td><td align="left" style="background-color:#EFEFEF;">IRR001110
</td><td align="left">22-11-2019 12:33:06
</td><td align="left">06-12-2019 14:52:38
</td><td align="left">EXECUTIVE ENGINEER
</td><td align="left">8919822252 </td><td
align="left">To the investigation, design and execution of lift scheme from
Thotapally Reservoir to Gouravelly Reservoir including tunnel and other allied
works near Regonda(V). Husnabad(M), Karimnagar(D)
</td><td align="left">KARIMNAGAR </td><td
align="left">Karimnagar </td><td
align="left">Hasnapur (Submerged) </td><td
align="left">tunnel &other allied </td><td
align="left">Gouravelly Reservoir inclg
</td><td align="left">505001 </td><td
align="left">RAMAKANTH </td><td
align="left">8379753503 </td><td
align="left">TS25T2445 </td><td
align="left">TRANCF94D562 </td><td
align="right">5,000.00 </td><td
align="right">16.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">55
</td><td align="left" style="background-color:#EFEFEF;">IRR000936
</td><td align="left">08-07-2019 15:27:34
</td><td align="left">06-12-2019 14:51:47
</td><td align="left">Executive Engineer
</td><td align="left">8919822252 </td><td
align="left">to Sri Komaravelli Mallanna Sagar Reservoir Reach-2, Vemulaghat (V)
Thogutta (M) Siddipet District. </td><td
align="left">SIDDIPET </td><td
align="left">Thoguta </td><td
align="left">Vemulaghat </td><td
align="left">Reservoir Reach-2 </td><td
align="left">Sri Komaravelli Mallanna Sagar
</td><td align="left">502372 </td><td
align="left">KRISHNA </td><td
align="left">6302571168 </td><td
align="left">TS08UD0888 </td><td
align="left">TRAN444AFBA8 </td><td
align="right">20,000.00 </td><td
align="right">20.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">56
</td><td align="left" style="background-color:#EFEFEF;">IRR001114
</td><td align="left">03-12-2019 15:45:58
</td><td align="left">06-12-2019 14:51:14
</td><td align="left">L Satyavardhan EE </td><td
align="left">9494306757 </td><td align="left">To
kaleshwaram project falling in the limits of Kudurupally (V) (Mahadevpur-VI),
Mahadevapur (M) JB District to the works of Package-8 of Link-II, Kaleshwaram
project. </td><td align="left">KARIMNAGAR
</td><td align="left">Choppadandi </td><td
align="left">Choppadandi </td><td
align="left">Link-II,Kaleshwaramp </td><td
align="left">to the works of Package-8 of
</td><td align="left">505415 </td><td
align="left">KUMAR </td><td
align="left">9618327571 </td><td
align="left">AP36Y5259 </td><td
align="left">TRAN7E32A11C </td><td
align="right">5,000.00 </td><td
align="right">16.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">57
</td><td align="left" style="background-color:#EFEFEF;">IRR001114
</td><td align="left">03-12-2019 15:45:58
</td><td align="left">06-12-2019 14:50:16
</td><td align="left">L Satyavardhan EE </td><td
align="left">9494306757 </td><td align="left">To
kaleshwaram project falling in the limits of Kudurupally (V) (Mahadevpur-VI),
Mahadevapur (M) JB District to the works of Package-8 of Link-II, Kaleshwaram
project. </td><td align="left">KARIMNAGAR
</td><td align="left">Choppadandi </td><td
align="left">Choppadandi </td><td
align="left">Link-II,Kaleshwaramp </td><td
align="left">to the works of Package-8 of
</td><td align="left">505415 </td><td
align="left">KRISHNA </td><td
align="left">7337050354 </td><td
align="left">TS25T0866 </td><td
align="left">TRAN3B8CD42C </td><td
align="right">5,000.00 </td><td
align="right">16.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">58
</td><td align="left" style="background-color:#EFEFEF;">IRR001113
</td><td align="left">29-11-2019 15:45:45
</td><td align="left">06-12-2019 14:50:00
</td><td align="left">L Satyavardhan EE </td><td
align="left">9494306757 </td><td
align="left">Formation of sri komaravelli mallanna sagar reservoir with a capacity
of 50 TMC and the formation of sri Komaravelli Mallanna sagar reservoir with a
capacity of 50 TMC and the formation of earth bund with all its associated
components for Reach-3 from Km 12.800 to 16.700 and adjoining with Reach-4 at km
16.700 near Laxmapur (V) Thoguta (M) Siddipet District
</td><td align="left">SIDDIPET </td><td
align="left">Thoguta </td><td
align="left">Thoguta
</td><td align="left">&formation of earthb
</td><td align="left">Sri Komaravelli Mallannasagar
</td><td align="left">502372 </td><td
align="left">MADHU </td><td
align="left">6302726057 </td><td
align="left">TS22T2567 </td><td
align="left">TRANB524A537 </td><td
align="right">10,000.00 </td><td
align="right">20.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">59
</td><td align="left" style="background-color:#EFEFEF;">IRR000936
</td><td align="left">08-07-2019 15:27:34
</td><td align="left">06-12-2019 14:47:51
</td><td align="left">Executive Engineer
</td><td align="left">8919822252 </td><td
align="left">to Sri Komaravelli Mallanna Sagar Reservoir Reach-2, Vemulaghat (V)
Thogutta (M) Siddipet District. </td><td
align="left">SIDDIPET </td><td
align="left">Thoguta </td><td
align="left">Vemulaghat </td><td
align="left">Reservoir Reach-2 </td><td
align="left">Sri Komaravelli Mallanna Sagar
</td><td align="left">502372 </td><td
align="left">GOPAL </td><td
align="left">9866344399 </td><td
align="left">TS02UC4848 </td><td
align="left">TRAN4993EB86 </td><td
align="right">20,000.00 </td><td
align="right">20.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">60
</td><td align="left" style="background-color:#EFEFEF;">IRR001054
</td><td align="left">03-09-2019 13:33:24
</td><td align="left">06-12-2019 14:46:46
</td><td align="left">EXECUTIVE ENGINEER
</td><td align="left">8919822252 </td><td
align="left">To Sri komaravelli Mallanna Sagar, Reach No.4, Thoguta (V&M) Siddipet
District </td><td align="left">SIDDIPET
</td><td align="left">Thoguta </td><td
align="left">Thoguta </td><td align="left">Reach
No.4 </td><td align="left">Sri komaravelli
Mallanna Saga </td><td align="left">502372
</td><td align="left">SAMBAIAH </td><td
align="left">9494792622 </td><td
align="left">TS08UA4145 </td><td
align="left">TRANE34A15FB </td><td
align="right">10,000.00 </td><td
align="right">16.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">61
</td><td align="left" style="background-color:#EFEFEF;">IRR000896
</td><td align="left">29-06-2019 13:49:22
</td><td align="left">06-12-2019 14:45:52
</td><td align="left">Executive Engineer
</td><td align="left">8919822252 </td><td
align="left">De-silting area of Annaram Barrage located in Godavari river,
Jayashankar Bhupalpally District to Sri Komaravelli Mallanna Sagar, Reservoir
Reach-3, Laxmapur (V) Thogutta (M) Siddipet District
</td><td align="left">SIDDIPET </td><td
align="left">Thoguta </td><td
align="left">Thoguta </td><td
align="left">Reservoir Reach-3 </td><td
align="left">Sri Komaravelli Mallanna Sagar
</td><td align="left">502372 </td><td
align="left">RAUFF </td><td
align="left">9652056486 </td><td
align="left">AP29TC1115 </td><td
align="left">TRANBD41A419 </td><td
align="right">10,000.00 </td><td
align="right">16.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">62
</td><td align="left" style="background-color:#EFEFEF;">IRR000936
</td><td align="left">08-07-2019 15:27:34
</td><td align="left">06-12-2019 14:45:08
</td><td align="left">Executive Engineer
</td><td align="left">8919822252 </td><td
align="left">to Sri Komaravelli Mallanna Sagar Reservoir Reach-2, Vemulaghat (V)
Thogutta (M) Siddipet District. </td><td
align="left">SIDDIPET </td><td
align="left">Thoguta </td><td
align="left">Vemulaghat </td><td
align="left">Reservoir Reach-2 </td><td
align="left">Sri Komaravelli Mallanna Sagar
</td><td align="left">502372 </td><td
align="left">RAJU </td><td
align="left">9866777557 </td><td
align="left">TS08UF8888 </td><td
align="left">TRAN4DA85B94 </td><td
align="right">20,000.00 </td><td
align="right">20.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">63
</td><td align="left" style="background-color:#EFEFEF;">IRR000896
</td><td align="left">29-06-2019 13:49:22
</td><td align="left">06-12-2019 14:43:25
</td><td align="left">Executive Engineer
</td><td align="left">8919822252 </td><td
align="left">De-silting area of Annaram Barrage located in Godavari river,
Jayashankar Bhupalpally District to Sri Komaravelli Mallanna Sagar, Reservoir
Reach-3, Laxmapur (V) Thogutta (M) Siddipet District
</td><td align="left">SIDDIPET </td><td
align="left">Thoguta </td><td
align="left">Thoguta </td><td
align="left">Reservoir Reach-3 </td><td
align="left">Sri Komaravelli Mallanna Sagar
</td><td align="left">502372 </td><td
align="left">MALLESH </td><td
align="left">9618096389 </td><td
align="left">TS07UF9459 </td><td
align="left">TRAN551A859B </td><td
align="right">10,000.00 </td><td
align="right">20.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">64
</td><td align="left" style="background-color:#EFEFEF;">IRR001113
</td><td align="left">29-11-2019 15:45:45
</td><td align="left">06-12-2019 14:42:49
</td><td align="left">L Satyavardhan EE </td><td
align="left">9494306757 </td><td
align="left">Formation of sri komaravelli mallanna sagar reservoir with a capacity
of 50 TMC and the formation of sri Komaravelli Mallanna sagar reservoir with a
capacity of 50 TMC and the formation of earth bund with all its associated
components for Reach-3 from Km 12.800 to 16.700 and adjoining with Reach-4 at km
16.700 near Laxmapur (V) Thoguta (M) Siddipet District
</td><td align="left">SIDDIPET </td><td
align="left">Thoguta </td><td
align="left">Thoguta </td><td
align="left">&formation of earthb </td><td
align="left">Sri Komaravelli Mallannasagar
</td><td align="left">502372 </td><td
align="left">SHENKAR </td><td
align="left">8185977622 </td><td
align="left">TS03UB1986 </td><td
align="left">TRAN8CDD8A6E </td><td
align="right">10,000.00 </td><td
align="right">16.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">65
</td><td align="left" style="background-color:#EFEFEF;">IRR001113
</td><td align="left">29-11-2019 15:45:45
</td><td align="left">06-12-2019 14:41:59
</td><td align="left">L Satyavardhan EE </td><td
align="left">9494306757 </td><td
align="left">Formation of sri komaravelli mallanna sagar reservoir with a capacity
of 50 TMC and the formation of sri Komaravelli Mallanna sagar reservoir with a
capacity of 50 TMC and the formation of earth bund with all its associated
components for Reach-3 from Km 12.800 to 16.700 and adjoining with Reach-4 at km
16.700 near Laxmapur (V) Thoguta (M) Siddipet District
</td><td align="left">SIDDIPET </td><td
align="left">Thoguta </td><td
align="left">Thoguta </td><td
align="left">&formation of earthb </td><td
align="left">Sri Komaravelli Mallannasagar
</td><td align="left">502372 </td><td
align="left">KUMAR </td><td
align="left">9698971089 </td><td
align="left">TS03UB6786 </td><td
align="left">TRANB4F34485 </td><td
align="right">10,000.00 </td><td
align="right">20.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">66
</td><td align="left" style="background-color:#EFEFEF;">IRR001114
</td><td align="left">03-12-2019 15:45:58
</td><td align="left">06-12-2019 14:41:45
</td><td align="left">L Satyavardhan EE </td><td
align="left">9494306757 </td><td align="left">To
kaleshwaram project falling in the limits of Kudurupally (V) (Mahadevpur-VI),
Mahadevapur (M) JB District to the works of Package-8 of Link-II, Kaleshwaram
project. </td><td align="left">KARIMNAGAR
</td><td align="left">Choppadandi </td><td
align="left">Choppadandi </td><td
align="left">Link-II,Kaleshwaramp </td><td
align="left">to the works of Package-8 of
</td><td align="left">505415 </td><td
align="left">RAMULU </td><td
align="left">8374945877 </td><td
align="left">TS30T0899 </td><td
align="left">TRAN118F1E9D </td><td
align="right">5,000.00 </td><td
align="right">16.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">67
</td><td align="left" style="background-color:#EFEFEF;">IRR001067
</td><td align="left">19-09-2019 12:35:27
</td><td align="left">06-12-2019 14:40:55
</td><td align="left">EXECUTIVE ENGINEER
</td><td align="left">8919822252 </td><td
align="left">to investigation, design and execution of tunnel of minimum 6.00 M
internal diameter with carrying capacity of 49.6 cumecs water from Ramappa tank to
Dharmasagar tank and construction of head regulator at the entrance portal of
tunnel including civil. Electro mechanical & Hydro Mechanical, Instrumentation,
Auxiliary. Miscellaneous equipment and SCADA system at pumping station in Warangal
district now modified as laying of 3 m dia of 3 rows pipeline instead of Tunnel in
Warangal District </td><td align="left">WARANGAL
URBAN </td><td align="left">Khila Warangal
</td><td align="left">Khila Warangal </td><td
align="left">6.00 M internal diam </td><td
align="left">execution of tunnel of minimum
</td><td align="left">506002 </td><td
align="left">SRINU </td><td
align="left">9786769416 </td><td
align="left">TN73L7930 </td><td
align="left">TRANE33FEEF4 </td><td
align="right">10,000.00 </td><td
align="right">12.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">68
</td><td align="left" style="background-color:#EFEFEF;">IRR001113
</td><td align="left">29-11-2019 15:45:45
</td><td align="left">06-12-2019 14:40:14
</td><td align="left">L Satyavardhan EE </td><td
align="left">9494306757 </td><td
align="left">Formation of sri komaravelli mallanna sagar reservoir with a capacity
of 50 TMC and the formation of sri Komaravelli Mallanna sagar reservoir with a
capacity of 50 TMC and the formation of earth bund with all its associated
components for Reach-3 from Km 12.800 to 16.700 and adjoining with Reach-4 at km
16.700 near Laxmapur (V) Thoguta (M) Siddipet District
</td><td align="left">SIDDIPET </td><td
align="left">Thoguta </td><td
align="left">Thoguta </td><td
align="left">&formation of earthb </td><td
align="left">Sri Komaravelli Mallannasagar
</td><td align="left">502372 </td><td
align="left">MALLESH </td><td
align="left">7396695217 </td><td
align="left">TS15UC4151 </td><td
align="left">TRANB5879BC1 </td><td
align="right">10,000.00 </td><td
align="right">20.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">69
</td><td align="left" style="background-color:#EFEFEF;">IRR001113
</td><td align="left">29-11-2019 15:45:45
</td><td align="left">06-12-2019 14:39:28
</td><td align="left">L Satyavardhan EE </td><td
align="left">9494306757 </td><td
align="left">Formation of sri komaravelli mallanna sagar reservoir with a capacity
of 50 TMC and the formation of sri Komaravelli Mallanna sagar reservoir with a
capacity of 50 TMC and the formation of earth bund with all its associated
components for Reach-3 from Km 12.800 to 16.700 and adjoining with Reach-4 at km
16.700 near Laxmapur (V) Thoguta (M) Siddipet District
</td><td align="left">SIDDIPET </td><td
align="left">Thoguta </td><td
align="left">Thoguta </td><td
align="left">&formation of earthb </td><td
align="left">Sri Komaravelli Mallannasagar
</td><td align="left">502372 </td><td
align="left">RAVI </td><td
align="left">8555919719 </td><td
align="left">TS19T0786 </td><td
align="left">TRAN172C68C6 </td><td
align="right">10,000.00 </td><td
align="right">20.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">70
</td><td align="left" style="background-color:#EFEFEF;">IRR001113
</td><td align="left">29-11-2019 15:45:45
</td><td align="left">06-12-2019 14:38:11
</td><td align="left">L Satyavardhan EE </td><td
align="left">9494306757 </td><td
align="left">Formation of sri komaravelli mallanna sagar reservoir with a capacity
of 50 TMC and the formation of sri Komaravelli Mallanna sagar reservoir with a
capacity of 50 TMC and the formation of earth bund with all its associated
components for Reach-3 from
Km 12.800 to 16.700 and adjoining with Reach-4 at km 16.700 near Laxmapur (V)
Thoguta (M) Siddipet District </td><td
align="left">SIDDIPET </td><td
align="left">Thoguta </td><td
align="left">Thoguta </td><td
align="left">&formation of earthb </td><td
align="left">Sri Komaravelli Mallannasagar
</td><td align="left">502372 </td><td
align="left">NAGAIAH </td><td
align="left">8639295266 </td><td
align="left">TS25T2565 </td><td
align="left">TRANA18386C7 </td><td
align="right">10,000.00 </td><td
align="right">16.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">71
</td><td align="left" style="background-color:#EFEFEF;">IRR001113
</td><td align="left">29-11-2019 15:45:45
</td><td align="left">06-12-2019 14:37:57
</td><td align="left">L Satyavardhan EE </td><td
align="left">9494306757 </td><td
align="left">Formation of sri komaravelli mallanna sagar reservoir with a capacity
of 50 TMC and the formation of sri Komaravelli Mallanna sagar reservoir with a
capacity of 50 TMC and the formation of earth bund with all its associated
components for Reach-3 from Km 12.800 to 16.700 and adjoining with Reach-4 at km
16.700 near Laxmapur (V) Thoguta (M) Siddipet District
</td><td align="left">SIDDIPET </td><td
align="left">Thoguta </td><td
align="left">Thoguta </td><td
align="left">&formation of earthb </td><td
align="left">Sri Komaravelli Mallannasagar
</td><td align="left">502372 </td><td
align="left">RAMULU </td><td
align="left">9951721089 </td><td
align="left">TS36T6499 </td><td
align="left">TRAN4F52494E </td><td
align="right">10,000.00 </td><td
align="right">20.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">72
</td><td align="left" style="background-color:#EFEFEF;">IRR000896
</td><td align="left">29-06-2019 13:49:22
</td><td align="left">06-12-2019 14:37:20
</td><td align="left">Executive Engineer
</td><td align="left">8919822252 </td><td
align="left">De-silting area of Annaram Barrage located in Godavari river,
Jayashankar Bhupalpally District to Sri Komaravelli Mallanna Sagar, Reservoir
Reach-3, Laxmapur (V) Thogutta (M) Siddipet District
</td><td align="left">SIDDIPET </td><td
align="left">Thoguta </td><td
align="left">Thoguta </td><td
align="left">Reservoir Reach-3 </td><td
align="left">Sri Komaravelli Mallanna Sagar
</td><td align="left">502372 </td><td
align="left">SAIEDHULU </td><td
align="left">8498094221 </td><td
align="left">TS36T4689 </td><td
align="left">TRAN66BF8D2A </td><td
align="right">10,000.00 </td><td
align="right">20.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">73
</td><td align="left" style="background-color:#EFEFEF;">IRR001114
</td><td align="left">03-12-2019 15:45:58
</td><td align="left">06-12-2019 14:34:48
</td><td align="left">L Satyavardhan EE </td><td
align="left">9494306757 </td><td align="left">To
kaleshwaram project falling in the limits of Kudurupally (V) (Mahadevpur-VI),
Mahadevapur (M) JB District to the works of Package-8 of Link-II, Kaleshwaram
project. </td><td align="left">KARIMNAGAR
</td><td align="left">Choppadandi </td><td
align="left">Choppadandi </td><td
align="left">Link-II,Kaleshwaramp </td><td
align="left">to the works of Package-8 of
</td><td align="left">505415 </td><td
align="left">AJAD </td><td
align="left">9347023305 </td><td
align="left">TS25T3679 </td><td
align="left">TRAN1D291A11 </td><td
align="right">5,000.00 </td><td
align="right">20.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">74
</td><td align="left" style="background-color:#EFEFEF;">IRR001114
</td><td align="left">03-12-2019 15:45:58
</td><td align="left">06-12-2019 14:34:03
</td><td align="left">L Satyavardhan EE </td><td
align="left">9494306757 </td><td align="left">To
kaleshwaram project falling in the limits of Kudurupally (V) (Mahadevpur-VI),
Mahadevapur (M) JB District to the works of Package-8 of Link-II, Kaleshwaram
project. </td><td align="left">KARIMNAGAR
</td><td align="left">Choppadandi </td><td
align="left">Choppadandi </td><td
align="left">Link-II,Kaleshwaramp </td><td
align="left">to the works of Package-8 of
</td><td align="left">505415 </td><td
align="left">RAJU </td><td
align="left">9666363507 </td><td
align="left">AP36TB1998 </td><td
align="left">TRAN43E4671E </td><td
align="right">5,000.00 </td><td
align="right">20.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">75
</td><td align="left" style="background-color:#EFEFEF;">IRR000896
</td><td align="left">29-06-2019 13:49:22
</td><td align="left">06-12-2019 13:43:47
</td><td align="left">Executive Engineer
</td><td align="left">8919822252 </td><td
align="left">De-silting area of Annaram Barrage located in Godavari river,
Jayashankar Bhupalpally District to Sri Komaravelli Mallanna Sagar, Reservoir
Reach-3, Laxmapur (V) Thogutta (M) Siddipet District
</td><td align="left">SIDDIPET </td><td
align="left">Thoguta </td><td
align="left">Thoguta </td><td
align="left">Reservoir Reach-3 </td><td
align="left">Sri Komaravelli Mallanna Sagar
</td><td align="left">502372 </td><td
align="left">PASHA </td><td
align="left">9666665039 </td><td
align="left">TS07UF0639 </td><td
align="left">TRANCBEF4A22 </td><td
align="right">10,000.00 </td><td
align="right">20.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">76
</td><td align="left" style="background-color:#EFEFEF;">IRR001114
</td><td align="left">03-12-2019 15:45:58
</td><td align="left">06-12-2019 13:42:28
</td><td align="left">L Satyavardhan EE </td><td
align="left">9494306757 </td><td align="left">To
kaleshwaram project falling in the limits of Kudurupally (V) (Mahadevpur-VI),
Mahadevapur (M) JB District to the works of Package-8 of Link-II, Kaleshwaram
project. </td><td align="left">KARIMNAGAR
</td><td align="left">Choppadandi
</td><td align="left">Choppadandi </td><td
align="left">Link-II,Kaleshwaramp </td><td
align="left">to the works of Package-8 of
</td><td align="left">505415 </td><td
align="left">ASHOK </td><td
align="left">9490296692 </td><td
align="left">TS02UA6799 </td><td
align="left">TRAN9DB15424 </td><td
align="right">5,000.00 </td><td
align="right">16.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">77
</td><td align="left" style="background-color:#EFEFEF;">IRR000936
</td><td align="left">08-07-2019 15:27:34
</td><td align="left">06-12-2019 13:42:18
</td><td align="left">Executive Engineer
</td><td align="left">8919822252 </td><td
align="left">to Sri Komaravelli Mallanna Sagar Reservoir Reach-2, Vemulaghat (V)
Thogutta (M) Siddipet District. </td><td
align="left">SIDDIPET </td><td
align="left">Thoguta </td><td
align="left">Vemulaghat </td><td
align="left">Reservoir Reach-2 </td><td
align="left">Sri Komaravelli Mallanna Sagar
</td><td align="left">502372 </td><td
align="left">SRINU </td><td
align="left">7330895013 </td><td
align="left">TS08UD6369 </td><td
align="left">TRAN5F68655A </td><td
align="right">20,000.00 </td><td
align="right">20.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">78
</td><td align="left" style="background-color:#EFEFEF;">IRR001114
</td><td align="left">03-12-2019 15:45:58
</td><td align="left">06-12-2019 13:40:36
</td><td align="left">L Satyavardhan EE </td><td
align="left">9494306757 </td><td align="left">To
kaleshwaram project falling in the limits of Kudurupally (V) (Mahadevpur-VI),
Mahadevapur (M) JB District to the works of Package-8 of Link-II, Kaleshwaram
project. </td><td align="left">KARIMNAGAR
</td><td align="left">Choppadandi </td><td
align="left">Choppadandi </td><td
align="left">Link-II,Kaleshwaramp </td><td
align="left">to the works of Package-8 of
</td><td align="left">505415 </td><td
align="left">VIJAY </td><td
align="left">9121967372 </td><td
align="left">TS03UB2369 </td><td
align="left">TRANFAADA78F </td><td
align="right">5,000.00 </td><td
align="right">16.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">79
</td><td align="left" style="background-color:#EFEFEF;">IRR001114
</td><td align="left">03-12-2019 15:45:58
</td><td align="left">06-12-2019 13:40:07
</td><td align="left">L Satyavardhan EE </td><td
align="left">9494306757 </td><td align="left">To
kaleshwaram project falling in the limits of Kudurupally (V) (Mahadevpur-VI),
Mahadevapur (M) JB District to the works of Package-8 of Link-II, Kaleshwaram
project. </td><td align="left">KARIMNAGAR
</td><td align="left">Choppadandi </td><td
align="left">Choppadandi </td><td
align="left">Link-II,Kaleshwaramp </td><td
align="left">to the works of Package-8 of
</td><td align="left">505415 </td><td
align="left">RAVI </td><td
align="left">9959253066 </td><td
align="left">AP37TB3456 </td><td
align="left">TRAN42BB5547 </td><td
align="right">5,000.00 </td><td
align="right">16.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">80
</td><td align="left" style="background-color:#EFEFEF;">IRR001114
</td><td align="left">03-12-2019 15:45:58
</td><td align="left">06-12-2019 13:38:40
</td><td align="left">L Satyavardhan EE </td><td
align="left">9494306757 </td><td align="left">To
kaleshwaram project falling in the limits of Kudurupally (V) (Mahadevpur-VI),
Mahadevapur (M) JB District to the works of Package-8 of Link-II, Kaleshwaram
project. </td><td align="left">KARIMNAGAR
</td><td align="left">Choppadandi </td><td
align="left">Choppadandi </td><td
align="left">Link-II,Kaleshwaramp </td><td
align="left">to the works of Package-8 of
</td><td align="left">505415 </td><td
align="left">MAHENDER </td><td
align="left">6305618586 </td><td
align="left">AP36TA4445 </td><td
align="left">TRANA3C3F868 </td><td
align="right">5,000.00 </td><td
align="right">16.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">81
</td><td align="left" style="background-color:#EFEFEF;">IRR000936
</td><td align="left">08-07-2019 15:27:34
</td><td align="left">06-12-2019 13:37:19
</td><td align="left">Executive Engineer
</td><td align="left">8919822252 </td><td
align="left">to Sri Komaravelli Mallanna Sagar Reservoir Reach-2, Vemulaghat (V)
Thogutta (M) Siddipet District. </td><td
align="left">SIDDIPET </td><td
align="left">Thoguta </td><td
align="left">Vemulaghat </td><td
align="left">Reservoir Reach-2 </td><td
align="left">Sri Komaravelli Mallanna Sagar
</td><td align="left">502372 </td><td
align="left">KOLU </td><td
align="left">8897279191 </td><td
align="left">TS22T5998 </td><td
align="left">TRAN7D4FB5D4 </td><td
align="right">20,000.00 </td><td
align="right">20.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">82
</td><td align="left" style="background-color:#EFEFEF;">IRR001114
</td><td align="left">03-12-2019 15:45:58
</td><td align="left">06-12-2019 13:37:02
</td><td align="left">L Satyavardhan EE </td><td
align="left">9494306757 </td><td align="left">To
kaleshwaram project falling in the limits of Kudurupally (V) (Mahadevpur-VI),
Mahadevapur (M) JB District to the works of Package-8 of Link-II, Kaleshwaram
project. </td><td align="left">KARIMNAGAR
</td><td align="left">Choppadandi </td><td
align="left">Choppadandi </td><td
align="left">Link-II,Kaleshwaramp </td><td
align="left">to the works of Package-8 of
</td><td align="left">505415 </td><td
align="left">ASHOK </td><td
align="left">9866265155
</td><td align="left">AP36Y9495
</td><td align="left">TRAN74BB4234 </td><td
align="right">5,000.00 </td><td
align="right">16.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">83
</td><td align="left" style="background-color:#EFEFEF;">IRR001114
</td><td align="left">03-12-2019 15:45:58
</td><td align="left">06-12-2019 13:35:23
</td><td align="left">L Satyavardhan EE </td><td
align="left">9494306757 </td><td align="left">To
kaleshwaram project falling in the limits of Kudurupally (V) (Mahadevpur-VI),
Mahadevapur (M) JB District to the works of Package-8 of Link-II, Kaleshwaram
project. </td><td align="left">KARIMNAGAR
</td><td align="left">Choppadandi </td><td
align="left">Choppadandi </td><td
align="left">Link-II,Kaleshwaramp </td><td
align="left">to the works of Package-8 of
</td><td align="left">505415 </td><td
align="left">NAGARAJU </td><td
align="left">8790352554 </td><td
align="left">AP36Y4059 </td><td
align="left">TRAN48712441 </td><td
align="right">5,000.00 </td><td
align="right">16.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">84
</td><td align="left" style="background-color:#EFEFEF;">IRR000936
</td><td align="left">08-07-2019 15:27:34
</td><td align="left">06-12-2019 13:35:19
</td><td align="left">Executive Engineer
</td><td align="left">8919822252 </td><td
align="left">to Sri Komaravelli Mallanna Sagar Reservoir Reach-2, Vemulaghat (V)
Thogutta (M) Siddipet District. </td><td
align="left">SIDDIPET </td><td
align="left">Thoguta </td><td
align="left">Vemulaghat </td><td
align="left">Reservoir Reach-2 </td><td
align="left">Sri Komaravelli Mallanna Sagar
</td><td align="left">502372 </td><td
align="left">GOPI </td><td
align="left">8466817085 </td><td
align="left">TS02UA6803 </td><td
align="left">TRAN5418F522 </td><td
align="right">20,000.00 </td><td
align="right">16.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">85
</td><td align="left" style="background-color:#EFEFEF;">IRR001113
</td><td align="left">29-11-2019 15:45:45
</td><td align="left">06-12-2019 13:33:09
</td><td align="left">L Satyavardhan EE </td><td
align="left">9494306757 </td><td
align="left">Formation of sri komaravelli mallanna sagar reservoir with a capacity
of 50 TMC and the formation of sri Komaravelli Mallanna sagar reservoir with a
capacity of 50 TMC and the formation of earth bund with all its associated
components for Reach-3 from Km 12.800 to 16.700 and adjoining with Reach-4 at km
16.700 near Laxmapur (V) Thoguta (M) Siddipet District
</td><td align="left">SIDDIPET </td><td
align="left">Thoguta </td><td
align="left">Thoguta </td><td
align="left">&formation of earthb </td><td
align="left">Sri Komaravelli Mallannasagar
</td><td align="left">502372 </td><td
align="left">SHANKAR </td><td
align="left">9652340150 </td><td
align="left">TS25T2619 </td><td
align="left">TRANC6214949 </td><td
align="right">10,000.00 </td><td
align="right">16.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">86
</td><td align="left" style="background-color:#EFEFEF;">IRR001114
</td><td align="left">03-12-2019 15:45:58
</td><td align="left">06-12-2019 13:32:40
</td><td align="left">L Satyavardhan EE </td><td
align="left">9494306757 </td><td align="left">To
kaleshwaram project falling in the limits of Kudurupally (V) (Mahadevpur-VI),
Mahadevapur (M) JB District to the works of Package-8 of Link-II, Kaleshwaram
project. </td><td align="left">KARIMNAGAR
</td><td align="left">Choppadandi </td><td
align="left">Choppadandi </td><td
align="left">Link-II,Kaleshwaramp </td><td
align="left">to the works of Package-8 of
</td><td align="left">505415 </td><td
align="left">MADHU </td><td
align="left">9010023160 </td><td
align="left">TS03UB6629 </td><td
align="left">TRAN3BFDA691 </td><td
align="right">5,000.00 </td><td
align="right">16.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">87
</td><td align="left" style="background-color:#EFEFEF;">IRR001111
</td><td align="left">25-11-2019 15:22:45
</td><td align="left">06-12-2019 13:30:37
</td><td align="left">L Satyavardhan EE </td><td
align="left">9494306757 </td><td
align="left">Formation of sri komaravelli mallanna sagar reservoir with a capacity
of 50 TMC and the formation of sri Komaravelli Mallanna sagar reservoir with a
capacity of 50 TMC and the formation of earth bund with all its associated
components for Reach-3 from Km 12.800 to 16.700 and adjoining with Reach-4 at km
16.700 near Laxmapur (V) Thoguta (M) Siddipet District
</td><td align="left">SIDDIPET </td><td
align="left">Thoguta </td><td
align="left">Thoguta </td><td
align="left">&formation of earthb </td><td
align="left">Sri Komaravelli Mallannasagar
</td><td align="left">502372 </td><td
align="left">RAMESH </td><td
align="left">7675840468 </td><td
align="left">AP24Y6975 </td><td
align="left">TRAN941612B9 </td><td
align="right">15,000.00 </td><td
align="right">16.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">88
</td><td align="left" style="background-color:#EFEFEF;">IRR001113
</td><td align="left">29-11-2019 15:45:45
</td><td align="left">06-12-2019 13:28:18
</td><td align="left">L Satyavardhan EE </td><td
align="left">9494306757 </td><td
align="left">Formation of sri komaravelli mallanna sagar reservoir with a capacity
of 50 TMC and the formation of sri Komaravelli Mallanna sagar reservoir with a
capacity of 50 TMC and the formation of earth bund with all its associated
components for Reach-3 from Km 12.800 to 16.700 and adjoining with Reach-4 at km
16.700 near Laxmapur (V) Thoguta (M) Siddipet District
</td><td align="left">SIDDIPET </td><td
align="left">Thoguta </td><td
align="left">Thoguta </td><td
align="left">&formation of earthb </td><td
align="left">Sri Komaravelli Mallannasagar
</td><td align="left">502372
</td><td align="left">SANTHOSH </td><td
align="left">7075466548 </td><td
align="left">TS25T2717 </td><td
align="left">TRANAFC35A6B </td><td
align="right">10,000.00 </td><td
align="right">16.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">89
</td><td align="left" style="background-color:#EFEFEF;">IRR001032
</td><td align="left">17-08-2019 15:12:07
</td><td align="left">06-12-2019 13:24:01
</td><td align="left">K Sai Babu,EEI & CADD
</td><td align="left">9704678233 </td><td
align="left">To investigation, design and execution of tunnel of minimum 6.00 M
internal diameter or 5.60 M ‘D’ shaped with carrying capacity of 49.6 cumecs water
from Bheem Ghanpur tank to Ramappa tank and construction of Head Regulator at the
entrance portal of Tunnel including civil. Electro Mechanical & Hydro Mechanical,
Instrumentation, Auxiliary. Miscellaneous equipment and SCADA communication system
at pumping station now modified as laying of 3m dia of 3 rows pipeline instead of
Tunnel in Warangal District. </td><td
align="left">WARANGAL URBAN </td><td
align="left">Khila Warangal </td><td
align="left">Khila Warangal </td><td
align="left">entrance portal </td><td
align="left">const of head regulator at the
</td><td align="left">506002 </td><td
align="left">SADHAIAH </td><td
align="left">6309646628 </td><td
align="left">AP36TB2466 </td><td
align="left">TRANEB2AD748 </td><td
align="right">2,000.00 </td><td
align="right">16.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">90
</td><td align="left" style="background-color:#EFEFEF;">IRR000896
</td><td align="left">29-06-2019 13:49:22
</td><td align="left">06-12-2019 13:22:19
</td><td align="left">Executive Engineer
</td><td align="left">8919822252 </td><td
align="left">De-silting area of Annaram Barrage located in Godavari river,
Jayashankar Bhupalpally District to Sri Komaravelli Mallanna Sagar, Reservoir
Reach-3, Laxmapur (V) Thogutta (M) Siddipet District
</td><td align="left">SIDDIPET </td><td
align="left">Thoguta </td><td
align="left">Thoguta </td><td
align="left">Reservoir Reach-3 </td><td
align="left">Sri Komaravelli Mallanna Sagar
</td><td align="left">502372 </td><td
align="left">RAMESH </td><td
align="left">9908299624 </td><td
align="left">TS07UH3366 </td><td
align="left">TRAN7BB42F8F </td><td
align="right">10,000.00 </td><td
align="right">20.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">91
</td><td align="left" style="background-color:#EFEFEF;">IRR000896
</td><td align="left">29-06-2019 13:49:22
</td><td align="left">06-12-2019 13:20:58
</td><td align="left">Executive Engineer
</td><td align="left">8919822252 </td><td
align="left">De-silting area of Annaram Barrage located in Godavari river,
Jayashankar Bhupalpally District to Sri Komaravelli Mallanna Sagar, Reservoir
Reach-3, Laxmapur (V) Thogutta (M) Siddipet District
</td><td align="left">SIDDIPET </td><td
align="left">Thoguta </td><td
align="left">Thoguta </td><td
align="left">Reservoir Reach-3 </td><td
align="left">Sri Komaravelli Mallanna Sagar
</td><td align="left">502372 </td><td
align="left">SADHANDHAM </td><td
align="left">9849038458 </td><td
align="left">TS22T2862 </td><td
align="left">TRAN278338D3 </td><td
align="right">10,000.00 </td><td
align="right">20.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">92
</td><td align="left" style="background-color:#EFEFEF;">IRR000896
</td><td align="left">29-06-2019 13:49:22
</td><td align="left">06-12-2019 13:20:53
</td><td align="left">Executive Engineer
</td><td align="left">8919822252 </td><td
align="left">De-silting area of Annaram Barrage located in Godavari river,
Jayashankar Bhupalpally District to Sri Komaravelli Mallanna Sagar, Reservoir
Reach-3, Laxmapur (V) Thogutta (M) Siddipet District
</td><td align="left">SIDDIPET </td><td
align="left">Thoguta </td><td
align="left">Thoguta </td><td
align="left">Reservoir Reach-3 </td><td
align="left">Sri Komaravelli Mallanna Sagar
</td><td align="left">502372 </td><td
align="left">NARASIMHAREDDY </td><td
align="left">6304434412 </td><td
align="left">TS22T4200 </td><td
align="left">TRAN1CAA1349 </td><td
align="right">10,000.00 </td><td
align="right">20.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">93
</td><td align="left" style="background-color:#EFEFEF;">IRR001115
</td><td align="left">03-12-2019 15:49:49
</td><td align="left">06-12-2019 13:18:18
</td><td align="left">L Satyavardhan EE </td><td
align="left">9494306757 </td><td align="left">To
the formation of Sri Komaravelli Mallanna Sagar Reservoir with a capacity of 50 TMC
and the formation of Sri Komaravelli Mallanna sagar Reservoir with a capacity of 50
TMC and the formation of Earth bund with all its associated components for Reach-3
from Km 12.8OO to 16.700 and adjoining with Reach-2 at Km 12.8OO near Laxmapur (V),
Thoguta (M), Siddipet District. </td><td
align="left">SIDDIPET </td><td
align="left">Thoguta </td><td
align="left">Thoguta </td><td
align="left">allanna Sagar Reserv </td><td
align="left">formation of Sri Komaravelli M
</td><td align="left">502372 </td><td
align="left">NAGESH </td><td
align="left">9951044422 </td><td
align="left">AP01Y3555 </td><td
align="left">TRAN975BCFD7 </td><td
align="right">10,000.00 </td><td
align="right">16.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">94
</td><td align="left" style="background-color:#EFEFEF;">IRR001110
</td><td align="left">22-11-2019 12:33:06
</td><td align="left">06-12-2019 13:16:46
</td><td align="left">EXECUTIVE ENGINEER
</td><td align="left">8919822252 </td><td
align="left">To the investigation, design and execution of lift scheme from
Thotapally Reservoir to Gouravelly Reservoir including tunnel and other allied
works near Regonda(V). Husnabad(M), Karimnagar(D)
</td><td align="left">KARIMNAGAR </td><td
align="left">Karimnagar </td><td
align="left">Hasnapur
(Submerged) </td><td align="left">tunnel &other
allied </td><td align="left">Gouravelly
Reservoir inclg </td><td align="left">505001
</td><td align="left">BAPU </td><td
align="left">9949175316 </td><td
align="left">TS22T3699 </td><td
align="left">TRAN24C2C7D4 </td><td
align="right">5,000.00 </td><td
align="right">16.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">95
</td><td align="left" style="background-color:#EFEFEF;">IRR000896
</td><td align="left">29-06-2019 13:49:22
</td><td align="left">06-12-2019 13:15:53
</td><td align="left">Executive Engineer
</td><td align="left">8919822252 </td><td
align="left">De-silting area of Annaram Barrage located in Godavari river,
Jayashankar Bhupalpally District to Sri Komaravelli Mallanna Sagar, Reservoir
Reach-3, Laxmapur (V) Thogutta (M) Siddipet District
</td><td align="left">SIDDIPET </td><td
align="left">Thoguta </td><td
align="left">Thoguta </td><td
align="left">Reservoir Reach-3 </td><td
align="left">Sri Komaravelli Mallanna Sagar
</td><td align="left">502372 </td><td
align="left">SRIRAMULU </td><td
align="left">9912295990 </td><td
align="left">AP28TA7521 </td><td
align="left">TRAN4888A33A </td><td
align="right">10,000.00 </td><td
align="right">16.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">96
</td><td align="left" style="background-color:#EFEFEF;">IRR001111
</td><td align="left">25-11-2019 15:22:45
</td><td align="left">06-12-2019 13:14:35
</td><td align="left">L Satyavardhan EE </td><td
align="left">9494306757 </td><td
align="left">Formation of sri komaravelli mallanna sagar reservoir with a capacity
of 50 TMC and the formation of sri Komaravelli Mallanna sagar reservoir with a
capacity of 50 TMC and the formation of earth bund with all its associated
components for Reach-3 from Km 12.800 to 16.700 and adjoining with Reach-4 at km
16.700 near Laxmapur (V) Thoguta (M) Siddipet District
</td><td align="left">SIDDIPET </td><td
align="left">Thoguta </td><td
align="left">Thoguta </td><td
align="left">&formation of earthb </td><td
align="left">Sri Komaravelli Mallannasagar
</td><td align="left">502372 </td><td
align="left">RAJAMOULI </td><td
align="left">7702438469 </td><td
align="left">TS25T3159 </td><td
align="left">TRAN487C5469 </td><td
align="right">15,000.00 </td><td
align="right">20.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">97
</td><td align="left" style="background-color:#EFEFEF;">IRR001110
</td><td align="left">22-11-2019 12:33:06
</td><td align="left">06-12-2019 13:14:04
</td><td align="left">EXECUTIVE ENGINEER
</td><td align="left">8919822252 </td><td
align="left">To the investigation, design and execution of lift scheme from
Thotapally Reservoir to Gouravelly Reservoir including tunnel and other allied
works near Regonda(V). Husnabad(M), Karimnagar(D)
</td><td align="left">KARIMNAGAR </td><td
align="left">Karimnagar </td><td
align="left">Hasnapur (Submerged) </td><td
align="left">tunnel &other allied </td><td
align="left">Gouravelly Reservoir inclg
</td><td align="left">505001 </td><td
align="left">KRISHNA </td><td
align="left">9989323133 </td><td
align="left">TS19T7352 </td><td
align="left">TRAN4496546F </td><td
align="right">5,000.00 </td><td
align="right">20.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">98
</td><td align="left" style="background-color:#EFEFEF;">IRR000936
</td><td align="left">08-07-2019 15:27:34
</td><td align="left">06-12-2019 13:12:50
</td><td align="left">Executive Engineer
</td><td align="left">8919822252 </td><td
align="left">to Sri Komaravelli Mallanna Sagar Reservoir Reach-2, Vemulaghat (V)
Thogutta (M) Siddipet District. </td><td
align="left">SIDDIPET </td><td
align="left">Thoguta </td><td
align="left">Vemulaghat </td><td
align="left">Reservoir Reach-2 </td><td
align="left">Sri Komaravelli Mallanna Sagar
</td><td align="left">502372 </td><td
align="left">SIRAJ </td><td
align="left">9948343522 </td><td
align="left">AP15TC6612 </td><td
align="left">TRAN14CD4448 </td><td
align="right">20,000.00 </td><td
align="right">16.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">99
</td><td align="left" style="background-color:#EFEFEF;">IRR000896
</td><td align="left">29-06-2019 13:49:22
</td><td align="left">06-12-2019 13:10:41
</td><td align="left">Executive Engineer
</td><td align="left">8919822252 </td><td
align="left">De-silting area of Annaram Barrage located in Godavari river,
Jayashankar Bhupalpally District to Sri Komaravelli Mallanna Sagar, Reservoir
Reach-3, Laxmapur (V) Thogutta (M) Siddipet District
</td><td align="left">SIDDIPET </td><td
align="left">Thoguta </td><td
align="left">Thoguta </td><td
align="left">Reservoir Reach-3 </td><td
align="left">Sri Komaravelli Mallanna Sagar
</td><td align="left">502372 </td><td
align="left">SAMMAIAH </td><td
align="left">9885369524 </td><td
align="left">TS22T2706 </td><td
align="left">TRANE485AA45 </td><td
align="right">10,000.00 </td><td
align="right">20.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">100
</td><td align="left" style="background-color:#EFEFEF;">IRR000951
</td><td align="left">15-07-2019 16:38:18
</td><td align="left">06-12-2019 13:09:19
</td><td align="left">Executive engineer
</td><td align="left">8919822252 </td><td
align="left">For the works of package 5 of SRSP phase-II near Regonda (V)- Husnabad
(M) Karimnagar District </td><td
align="left">KARIMNAGAR </td><td
align="left">Karimnagar </td><td
align="left">Karimnagar </td><td
align="left">SRSP phase-II </td><td
align="left">For the works of package 5 </td><td
align="left">505001
</td><td align="left">BHANU </td><td
align="left">9618974022 </td><td
align="left">TS25T2439 </td><td
align="left">TRANAFE52EA2 </td><td
align="right">15,000.00 </td><td
align="right">20.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">101
</td><td align="left" style="background-color:#EFEFEF;">IRR001114
</td><td align="left">03-12-2019 15:45:58
</td><td align="left">06-12-2019 13:07:44
</td><td align="left">L Satyavardhan EE </td><td
align="left">9494306757 </td><td align="left">To
kaleshwaram project falling in the limits of Kudurupally (V) (Mahadevpur-VI),
Mahadevapur (M) JB District to the works of Package-8 of Link-II, Kaleshwaram
project. </td><td align="left">KARIMNAGAR
</td><td align="left">Choppadandi </td><td
align="left">Choppadandi </td><td
align="left">Link-II,Kaleshwaramp </td><td
align="left">to the works of Package-8 of
</td><td align="left">505415 </td><td
align="left">NARESH </td><td
align="left">8688340255 </td><td
align="left">TS03UC0657 </td><td
align="left">TRAN721C18B2 </td><td
align="right">5,000.00 </td><td
align="right">20.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">102
</td><td align="left" style="background-color:#EFEFEF;">IRR001114
</td><td align="left">03-12-2019 15:45:58
</td><td align="left">06-12-2019 13:04:51
</td><td align="left">L Satyavardhan EE </td><td
align="left">9494306757 </td><td align="left">To
kaleshwaram project falling in the limits of Kudurupally (V) (Mahadevpur-VI),
Mahadevapur (M) JB District to the works of Package-8 of Link-II, Kaleshwaram
project. </td><td align="left">KARIMNAGAR
</td><td align="left">Choppadandi </td><td
align="left">Choppadandi </td><td
align="left">Link-II,Kaleshwaramp </td><td
align="left">to the works of Package-8 of
</td><td align="left">505415 </td><td
align="left">NARESH </td><td
align="left">9666205559 </td><td
align="left">TS25T2446 </td><td
align="left">TRAN1A47CB66 </td><td
align="right">5,000.00 </td><td
align="right">20.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">103
</td><td align="left" style="background-color:#EFEFEF;">IRR000936
</td><td align="left">08-07-2019 15:27:34
</td><td align="left">06-12-2019 13:02:53
</td><td align="left">Executive Engineer
</td><td align="left">8919822252 </td><td
align="left">to Sri Komaravelli Mallanna Sagar Reservoir Reach-2, Vemulaghat (V)
Thogutta (M) Siddipet District. </td><td
align="left">SIDDIPET </td><td
align="left">Thoguta </td><td
align="left">Vemulaghat </td><td
align="left">Reservoir Reach-2 </td><td
align="left">Sri Komaravelli Mallanna Sagar
</td><td align="left">502372 </td><td
align="left">NARSIMHA </td><td
align="left">7893313780 </td><td
align="left">TS08UD3889 </td><td
align="left">TRAN4CBF2E84 </td><td
align="right">20,000.00 </td><td
align="right">16.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">104
</td><td align="left" style="background-color:#EFEFEF;">IRR001111
</td><td align="left">25-11-2019 15:22:45
</td><td align="left">06-12-2019 13:01:22
</td><td align="left">L Satyavardhan EE </td><td
align="left">9494306757 </td><td
align="left">Formation of sri komaravelli mallanna sagar reservoir with a capacity
of 50 TMC and the formation of sri Komaravelli Mallanna sagar reservoir with a
capacity of 50 TMC and the formation of earth bund with all its associated
components for Reach-3 from Km 12.800 to 16.700 and adjoining with Reach-4 at km
16.700 near Laxmapur (V) Thoguta (M) Siddipet District
</td><td align="left">SIDDIPET </td><td
align="left">Thoguta </td><td
align="left">Thoguta </td><td
align="left">&formation of earthb </td><td
align="left">Sri Komaravelli Mallannasagar
</td><td align="left">502372 </td><td
align="left">MADHAV </td><td
align="left">7288031625 </td><td
align="left">TS03UC4201 </td><td
align="left">TRAND8694CB4 </td><td
align="right">15,000.00 </td><td
align="right">20.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">105
</td><td align="left" style="background-color:#EFEFEF;">IRR001032
</td><td align="left">17-08-2019 15:12:07
</td><td align="left">06-12-2019 12:59:52
</td><td align="left">K Sai Babu,EEI & CADD
</td><td align="left">9704678233 </td><td
align="left">To investigation, design and execution of tunnel of minimum 6.00 M
internal diameter or 5.60 M ‘D’ shaped with carrying capacity of 49.6 cumecs water
from Bheem Ghanpur tank to Ramappa tank and construction of Head Regulator at the
entrance portal of Tunnel including civil. Electro Mechanical & Hydro Mechanical,
Instrumentation, Auxiliary. Miscellaneous equipment and SCADA communication system
at pumping station now modified as laying of 3m dia of 3 rows pipeline instead of
Tunnel in Warangal District. </td><td
align="left">WARANGAL URBAN </td><td
align="left">Khila Warangal </td><td
align="left">Khila Warangal </td><td
align="left">entrance portal </td><td
align="left">const of head regulator at the
</td><td align="left">506002 </td><td
align="left">KUMAR </td><td
align="left">9666198832 </td><td
align="left">AP29TB1953 </td><td
align="left">TRAN71853FC2 </td><td
align="right">2,000.00 </td><td
align="right">16.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">106
</td><td align="left" style="background-color:#EFEFEF;">IRR001032
</td><td align="left">17-08-2019 15:12:07
</td><td align="left">06-12-2019 12:58:27
</td><td align="left">K Sai Babu,EEI & CADD
</td><td align="left">9704678233 </td><td
align="left">To investigation, design and execution of tunnel of minimum 6.00 M
internal diameter or 5.60 M ‘D’ shaped with carrying capacity of 49.6 cumecs water
from Bheem Ghanpur tank to Ramappa tank and construction of Head Regulator at the
entrance portal of Tunnel including civil. Electro Mechanical & Hydro Mechanical,
Instrumentation, Auxiliary. Miscellaneous equipment and SCADA communication system
at pumping station now modified as laying of 3m dia of 3 rows pipeline instead of
Tunnel in Warangal District.
</td><td align="left">WARANGAL URBAN
</td><td align="left">Khila Warangal </td><td
align="left">Khila Warangal </td><td
align="left">entrance portal </td><td
align="left">const of head regulator at the
</td><td align="left">506002 </td><td
align="left">SHEKAR </td><td
align="left">6301421562 </td><td
align="left">TS05UB2233 </td><td
align="left">TRAN458DC9E4 </td><td
align="right">2,000.00 </td><td
align="right">16.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">107
</td><td align="left" style="background-color:#EFEFEF;">IRR001114
</td><td align="left">03-12-2019 15:45:58
</td><td align="left">06-12-2019 12:57:21
</td><td align="left">L Satyavardhan EE </td><td
align="left">9494306757 </td><td align="left">To
kaleshwaram project falling in the limits of Kudurupally (V) (Mahadevpur-VI),
Mahadevapur (M) JB District to the works of Package-8 of Link-II, Kaleshwaram
project. </td><td align="left">KARIMNAGAR
</td><td align="left">Choppadandi </td><td
align="left">Choppadandi </td><td
align="left">Link-II,Kaleshwaramp </td><td
align="left">to the works of Package-8 of
</td><td align="left">505415 </td><td
align="left">SURESH </td><td
align="left">9440415133 </td><td
align="left">AP20TB5497 </td><td
align="left">TRAN711ADDC4 </td><td
align="right">5,000.00 </td><td
align="right">16.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">108
</td><td align="left" style="background-color:#EFEFEF;">IRR001113
</td><td align="left">29-11-2019 15:45:45
</td><td align="left">06-12-2019 12:56:09
</td><td align="left">L Satyavardhan EE </td><td
align="left">9494306757 </td><td
align="left">Formation of sri komaravelli mallanna sagar reservoir with a capacity
of 50 TMC and the formation of sri Komaravelli Mallanna sagar reservoir with a
capacity of 50 TMC and the formation of earth bund with all its associated
components for Reach-3 from Km 12.800 to 16.700 and adjoining with Reach-4 at km
16.700 near Laxmapur (V) Thoguta (M) Siddipet District
</td><td align="left">SIDDIPET </td><td
align="left">Thoguta </td><td
align="left">Thoguta </td><td
align="left">&formation of earthb </td><td
align="left">Sri Komaravelli Mallannasagar
</td><td align="left">502372 </td><td
align="left">LAXMAN </td><td
align="left">9908555120 </td><td
align="left">TS19T3114 </td><td
align="left">TRAN3C8C4BF4 </td><td
align="right">10,000.00 </td><td
align="right">16.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">109
</td><td align="left" style="background-color:#EFEFEF;">IRR000936
</td><td align="left">08-07-2019 15:27:34
</td><td align="left">06-12-2019 12:54:34
</td><td align="left">Executive Engineer
</td><td align="left">8919822252 </td><td
align="left">to Sri Komaravelli Mallanna Sagar Reservoir Reach-2, Vemulaghat (V)
Thogutta (M) Siddipet District. </td><td
align="left">SIDDIPET </td><td
align="left">Thoguta </td><td
align="left">Vemulaghat </td><td
align="left">Reservoir Reach-2 </td><td
align="left">Sri Komaravelli Mallanna Sagar
</td><td align="left">502372 </td><td
align="left">KALNN </td><td
align="left">8790567801 </td><td
align="left">MH46BB1824 </td><td
align="left">TRAN63B46B47 </td><td
align="right">20,000.00 </td><td
align="right">20.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">110
</td><td align="left" style="background-color:#EFEFEF;">IRR001111
</td><td align="left">25-11-2019 15:22:45
</td><td align="left">06-12-2019 12:54:08
</td><td align="left">L Satyavardhan EE </td><td
align="left">9494306757 </td><td
align="left">Formation of sri komaravelli mallanna sagar reservoir with a capacity
of 50 TMC and the formation of sri Komaravelli Mallanna sagar reservoir with a
capacity of 50 TMC and the formation of earth bund with all its associated
components for Reach-3 from Km 12.800 to 16.700 and adjoining with Reach-4 at km
16.700 near Laxmapur (V) Thoguta (M) Siddipet District
</td><td align="left">SIDDIPET </td><td
align="left">Thoguta </td><td
align="left">Thoguta </td><td
align="left">&formation of earthb </td><td
align="left">Sri Komaravelli Mallannasagar
</td><td align="left">502372 </td><td
align="left">NAGARAJU </td><td
align="left">9866860727 </td><td
align="left">TS20T0547 </td><td
align="left">TRAN4E4AC241 </td><td
align="right">15,000.00 </td><td
align="right">20.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">111
</td><td align="left" style="background-color:#EFEFEF;">IRR001032
</td><td align="left">17-08-2019 15:12:07
</td><td align="left">06-12-2019 12:50:38
</td><td align="left">K Sai Babu,EEI & CADD
</td><td align="left">9704678233 </td><td
align="left">To investigation, design and execution of tunnel of minimum 6.00 M
internal diameter or 5.60 M ‘D’ shaped with carrying capacity of 49.6 cumecs water
from Bheem Ghanpur tank to Ramappa tank and construction of Head Regulator at the
entrance portal of Tunnel including civil. Electro Mechanical & Hydro Mechanical,
Instrumentation, Auxiliary. Miscellaneous equipment and SCADA communication system
at pumping station now modified as laying of 3m dia of 3 rows pipeline instead of
Tunnel in Warangal District. </td><td
align="left">WARANGAL URBAN </td><td
align="left">Khila Warangal </td><td
align="left">Khila Warangal </td><td
align="left">entrance portal </td><td
align="left">const of head regulator at the
</td><td align="left">506002 </td><td
align="left">RANJITH </td><td
align="left">8897728246 </td><td
align="left">TS02UA6317 </td><td
align="left">TRAN7472A4FF </td><td
align="right">2,000.00 </td><td
align="right">16.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">112
</td><td align="left" style="background-color:#EFEFEF;">IRR000936
</td><td align="left">08-07-2019 15:27:34
</td><td align="left">06-12-2019 12:49:04
</td><td align="left">Executive Engineer
</td><td align="left">8919822252
</td><td align="left">to Sri Komaravelli Mallanna Sagar Reservoir Reach-2,
Vemulaghat (V) Thogutta (M) Siddipet District.
</td><td align="left">SIDDIPET </td><td
align="left">Thoguta </td><td
align="left">Vemulaghat </td><td
align="left">Reservoir Reach-2 </td><td
align="left">Sri Komaravelli Mallanna Sagar
</td><td align="left">502372 </td><td
align="left">HUSSEN </td><td
align="left">9985787595 </td><td
align="left">AP07TF1199 </td><td
align="left">TRAN4B91CDE8 </td><td
align="right">20,000.00 </td><td
align="right">20.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">113
</td><td align="left" style="background-color:#EFEFEF;">IRR000896
</td><td align="left">29-06-2019 13:49:22
</td><td align="left">06-12-2019 12:46:57
</td><td align="left">Executive Engineer
</td><td align="left">8919822252 </td><td
align="left">De-silting area of Annaram Barrage located in Godavari river,
Jayashankar Bhupalpally District to Sri Komaravelli Mallanna Sagar, Reservoir
Reach-3, Laxmapur (V) Thogutta (M) Siddipet District
</td><td align="left">SIDDIPET </td><td
align="left">Thoguta </td><td
align="left">Thoguta </td><td
align="left">Reservoir Reach-3 </td><td
align="left">Sri Komaravelli Mallanna Sagar
</td><td align="left">502372 </td><td
align="left">VIKAS </td><td
align="left">8374509244 </td><td
align="left">AP29TB2189 </td><td
align="left">TRANF4C6374B </td><td
align="right">10,000.00 </td><td
align="right">16.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">114
</td><td align="left" style="background-color:#EFEFEF;">IRR001114
</td><td align="left">03-12-2019 15:45:58
</td><td align="left">06-12-2019 12:45:20
</td><td align="left">L Satyavardhan EE </td><td
align="left">9494306757 </td><td align="left">To
kaleshwaram project falling in the limits of Kudurupally (V) (Mahadevpur-VI),
Mahadevapur (M) JB District to the works of Package-8 of Link-II, Kaleshwaram
project. </td><td align="left">KARIMNAGAR
</td><td align="left">Choppadandi </td><td
align="left">Choppadandi </td><td
align="left">Link-II,Kaleshwaramp </td><td
align="left">to the works of Package-8 of
</td><td align="left">505415 </td><td
align="left">RAMU </td><td
align="left">9010813131 </td><td
align="left">TS01UB4278 </td><td
align="left">TRAN44451B34 </td><td
align="right">5,000.00 </td><td
align="right">20.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">115
</td><td align="left" style="background-color:#EFEFEF;">IRR000951
</td><td align="left">15-07-2019 16:38:18
</td><td align="left">06-12-2019 12:44:10
</td><td align="left">Executive engineer
</td><td align="left">8919822252 </td><td
align="left">For the works of package 5 of SRSP phase-II near Regonda (V)- Husnabad
(M) Karimnagar District </td><td
align="left">KARIMNAGAR </td><td
align="left">Karimnagar </td><td
align="left">Karimnagar </td><td
align="left">SRSP phase-II </td><td
align="left">For the works of package 5 </td><td
align="left">505001 </td><td
align="left">SAMPATH </td><td
align="left">9166239909 </td><td
align="left">TS25T0989 </td><td
align="left">TRAN4451D82C </td><td
align="right">15,000.00 </td><td
align="right">16.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">116
</td><td align="left" style="background-color:#EFEFEF;">IRR000891
</td><td align="left">21-06-2019 11:04:12
</td><td align="left">06-12-2019 12:42:12
</td><td align="left">Executive Engineer
</td><td align="left">8919822252 </td><td
align="left">de-silting area of Annaram Barrage located in Godavari river,
Jayashankar Bhupalpally District to formation of earth bund with all its associated
components for Reach-3 from km 12.800 to km 16.700 along with its structures and
adjoining with Reach-4 at km 16.700 near Thoguta (V&M), Siddipet District
</td><td align="left">SIDDIPET </td><td
align="left">Thoguta </td><td
align="left">Thoguta </td><td align="left">all
its ass cmpts </td><td align="left">formation of
earth bund with </td><td align="left">502372
</td><td align="left">PRABAKAR </td><td
align="left">9676220501 </td><td
align="left">TS08UF6899 </td><td
align="left">TRAN7C9DB1DC </td><td
align="right">35,000.00 </td><td
align="right">20.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">117
</td><td align="left" style="background-color:#EFEFEF;">IRR000936
</td><td align="left">08-07-2019 15:27:34
</td><td align="left">06-12-2019 12:41:39
</td><td align="left">Executive Engineer
</td><td align="left">8919822252 </td><td
align="left">to Sri Komaravelli Mallanna Sagar Reservoir Reach-2, Vemulaghat (V)
Thogutta (M) Siddipet District. </td><td
align="left">SIDDIPET </td><td
align="left">Thoguta </td><td
align="left">Vemulaghat </td><td
align="left">Reservoir Reach-2 </td><td
align="left">Sri Komaravelli Mallanna Sagar
</td><td align="left">502372 </td><td
align="left">SWAMY </td><td
align="left">9702568618 </td><td
align="left">TS08UD5589 </td><td
align="left">TRAN825FC8BF </td><td
align="right">20,000.00 </td><td
align="right">20.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">118
</td><td align="left" style="background-color:#EFEFEF;">IRR000891
</td><td align="left">21-06-2019 11:04:12
</td><td align="left">06-12-2019 12:40:19
</td><td align="left">Executive Engineer
</td><td align="left">8919822252 </td><td
align="left">de-silting area of Annaram Barrage located in Godavari river,
Jayashankar Bhupalpally District to formation of earth bund with all its associated
components for Reach-3 from km 12.800 to km 16.700 along with its structures and
adjoining with Reach-4 at km 16.700 near Thoguta (V&M), Siddipet District
</td><td align="left">SIDDIPET
</td><td align="left">Thoguta </td><td
align="left">Thoguta </td><td align="left">all
its ass cmpts </td><td align="left">formation of
earth bund with </td><td align="left">502372
</td><td align="left">AYYUB </td><td
align="left">7875322386 </td><td
align="left">TS07UH3333 </td><td
align="left">TRANB5CF579D </td><td
align="right">35,000.00 </td><td
align="right">20.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">119
</td><td align="left" style="background-color:#EFEFEF;">IRR001115
</td><td align="left">03-12-2019 15:49:49
</td><td align="left">06-12-2019 12:40:07
</td><td align="left">L Satyavardhan EE </td><td
align="left">9494306757 </td><td align="left">To
the formation of Sri Komaravelli Mallanna Sagar Reservoir with a capacity of 50 TMC
and the formation of Sri Komaravelli Mallanna sagar Reservoir with a capacity of 50
TMC and the formation of Earth bund with all its associated components for Reach-3
from Km 12.8OO to 16.700 and adjoining with Reach-2 at Km 12.8OO near Laxmapur (V),
Thoguta (M), Siddipet District. </td><td
align="left">SIDDIPET </td><td
align="left">Thoguta </td><td
align="left">Thoguta </td><td
align="left">allanna Sagar Reserv </td><td
align="left">formation of Sri Komaravelli M
</td><td align="left">502372 </td><td
align="left">IRSHAD </td><td
align="left">7095543059 </td><td
align="left">TS35T5778 </td><td
align="left">TRAN8464536E </td><td
align="right">10,000.00 </td><td
align="right">20.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">120
</td><td align="left" style="background-color:#EFEFEF;">IRR000951
</td><td align="left">15-07-2019 16:38:18
</td><td align="left">06-12-2019 12:38:48
</td><td align="left">Executive engineer
</td><td align="left">8919822252 </td><td
align="left">For the works of package 5 of SRSP phase-II near Regonda (V)- Husnabad
(M) Karimnagar District </td><td
align="left">KARIMNAGAR </td><td
align="left">Karimnagar </td><td
align="left">Karimnagar </td><td
align="left">SRSP phase-II </td><td
align="left">For the works of package 5 </td><td
align="left">505001 </td><td
align="left">PRASANATH </td><td
align="left">9010925181 </td><td
align="left">TS25T2999 </td><td
align="left">TRANDC2224CD </td><td
align="right">15,000.00 </td><td
align="right">20.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">121
</td><td align="left" style="background-color:#EFEFEF;">IRR000891
</td><td align="left">21-06-2019 11:04:12
</td><td align="left">06-12-2019 12:38:41
</td><td align="left">Executive Engineer
</td><td align="left">8919822252 </td><td
align="left">de-silting area of Annaram Barrage located in Godavari river,
Jayashankar Bhupalpally District to formation of earth bund with all its associated
components for Reach-3 from km 12.800 to km 16.700 along with its structures and
adjoining with Reach-4 at km 16.700 near Thoguta (V&M), Siddipet District
</td><td align="left">SIDDIPET </td><td
align="left">Thoguta </td><td
align="left">Thoguta </td><td align="left">all
its ass cmpts </td><td align="left">formation of
earth bund with </td><td align="left">502372
</td><td align="left">ASHOK </td><td
align="left">9908773759 </td><td
align="left">TS08UF5999 </td><td
align="left">TRANFE82EC79 </td><td
align="right">35,000.00 </td><td
align="right">20.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">122
</td><td align="left" style="background-color:#EFEFEF;">IRR001111
</td><td align="left">25-11-2019 15:22:45
</td><td align="left">06-12-2019 12:37:24
</td><td align="left">L Satyavardhan EE </td><td
align="left">9494306757 </td><td
align="left">Formation of sri komaravelli mallanna sagar reservoir with a capacity
of 50 TMC and the formation of sri Komaravelli Mallanna sagar reservoir with a
capacity of 50 TMC and the formation of earth bund with all its associated
components for Reach-3 from Km 12.800 to 16.700 and adjoining with Reach-4 at km
16.700 near Laxmapur (V) Thoguta (M) Siddipet District
</td><td align="left">SIDDIPET </td><td
align="left">Thoguta </td><td
align="left">Thoguta </td><td
align="left">&formation of earthb </td><td
align="left">Sri Komaravelli Mallannasagar
</td><td align="left">502372 </td><td
align="left">MOHAN </td><td
align="left">9959932106 </td><td
align="left">TS02UB1827 </td><td
align="left">TRAND863844D </td><td
align="right">15,000.00 </td><td
align="right">20.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">123
</td><td align="left" style="background-color:#EFEFEF;">IRR000891
</td><td align="left">21-06-2019 11:04:12
</td><td align="left">06-12-2019 12:37:21
</td><td align="left">Executive Engineer
</td><td align="left">8919822252 </td><td
align="left">de-silting area of Annaram Barrage located in Godavari river,
Jayashankar Bhupalpally District to formation of earth bund with all its associated
components for Reach-3 from km 12.800 to km 16.700 along with its structures and
adjoining with Reach-4 at km 16.700 near Thoguta (V&M), Siddipet District
</td><td align="left">SIDDIPET </td><td
align="left">Thoguta </td><td
align="left">Thoguta </td><td align="left">all
its ass cmpts </td><td align="left">formation of
earth bund with </td><td align="left">502372
</td><td align="left">MOULANA </td><td
align="left">7095224490 </td><td
align="left">TS08UD5678 </td><td
align="left">TRANFE3E8A13 </td><td
align="right">35,000.00 </td><td
align="right">20.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">124
</td><td align="left" style="background-color:#EFEFEF;">IRR001111
</td><td align="left">25-11-2019 15:22:45
</td><td align="left">06-12-2019 12:36:07
</td><td align="left">L Satyavardhan EE </td><td
align="left">9494306757 </td><td
align="left">Formation of sri
komaravelli mallanna sagar reservoir with a capacity of 50 TMC and the formation
of sri Komaravelli Mallanna sagar reservoir with a capacity of 50 TMC and the
formation of earth bund with all its associated components for Reach-3 from Km
12.800 to 16.700 and adjoining with Reach-4 at km 16.700 near Laxmapur (V) Thoguta
(M) Siddipet District </td><td
align="left">SIDDIPET </td><td
align="left">Thoguta </td><td
align="left">Thoguta </td><td
align="left">&formation of earthb </td><td
align="left">Sri Komaravelli Mallannasagar
</td><td align="left">502372 </td><td
align="left">RAJU </td><td
align="left">9381483447 </td><td
align="left">TS02UC3502 </td><td
align="left">TRAN1884A674 </td><td
align="right">15,000.00 </td><td
align="right">22.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">125
</td><td align="left" style="background-color:#EFEFEF;">IRR000891
</td><td align="left">21-06-2019 11:04:12
</td><td align="left">06-12-2019 12:35:49
</td><td align="left">Executive Engineer
</td><td align="left">8919822252 </td><td
align="left">de-silting area of Annaram Barrage located in Godavari river,
Jayashankar Bhupalpally District to formation of earth bund with all its associated
components for Reach-3 from km 12.800 to km 16.700 along with its structures and
adjoining with Reach-4 at km 16.700 near Thoguta (V&M), Siddipet District
</td><td align="left">SIDDIPET </td><td
align="left">Thoguta </td><td
align="left">Thoguta </td><td align="left">all
its ass cmpts </td><td align="left">formation of
earth bund with </td><td align="left">502372
</td><td align="left">KARAN </td><td
align="left">9284141099 </td><td
align="left">AP16TE5589 </td><td
align="left">TRAN7191EC84 </td><td
align="right">35,000.00 </td><td
align="right">20.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">126
</td><td align="left" style="background-color:#EFEFEF;">IRR000891
</td><td align="left">21-06-2019 11:04:12
</td><td align="left">06-12-2019 12:34:25
</td><td align="left">Executive Engineer
</td><td align="left">8919822252 </td><td
align="left">de-silting area of Annaram Barrage located in Godavari river,
Jayashankar Bhupalpally District to formation of earth bund with all its associated
components for Reach-3 from km 12.800 to km 16.700 along with its structures and
adjoining with Reach-4 at km 16.700 near Thoguta (V&M), Siddipet District
</td><td align="left">SIDDIPET </td><td
align="left">Thoguta </td><td
align="left">Thoguta </td><td align="left">all
its ass cmpts </td><td align="left">formation of
earth bund with </td><td align="left">502372
</td><td align="left">DEEP </td><td
align="left">8491893735 </td><td
align="left">TS07UH3339 </td><td
align="left">TRAND12647D3 </td><td
align="right">35,000.00 </td><td
align="right">20.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">127
</td><td align="left" style="background-color:#EFEFEF;">IRR001113
</td><td align="left">29-11-2019 15:45:45
</td><td align="left">06-12-2019 12:34:05
</td><td align="left">L Satyavardhan EE </td><td
align="left">9494306757 </td><td
align="left">Formation of sri komaravelli mallanna sagar reservoir with a capacity
of 50 TMC and the formation of sri Komaravelli Mallanna sagar reservoir with a
capacity of 50 TMC and the formation of earth bund with all its associated
components for Reach-3 from Km 12.800 to 16.700 and adjoining with Reach-4 at km
16.700 near Laxmapur (V) Thoguta (M) Siddipet District
</td><td align="left">SIDDIPET </td><td
align="left">Thoguta </td><td
align="left">Thoguta </td><td
align="left">&formation of earthb </td><td
align="left">Sri Komaravelli Mallannasagar
</td><td align="left">502372 </td><td
align="left">ANIL </td><td
align="left">9676872952 </td><td
align="left">TS19T3123 </td><td
align="left">TRAN4D4E1FD6 </td><td
align="right">10,000.00 </td><td
align="right">16.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">128
</td><td align="left" style="background-color:#EFEFEF;">IRR000891
</td><td align="left">21-06-2019 11:04:12
</td><td align="left">06-12-2019 12:32:47
</td><td align="left">Executive Engineer
</td><td align="left">8919822252 </td><td
align="left">de-silting area of Annaram Barrage located in Godavari river,
Jayashankar Bhupalpally District to formation of earth bund with all its associated
components for Reach-3 from km 12.800 to km 16.700 along with its structures and
adjoining with Reach-4 at km 16.700 near Thoguta (V&M), Siddipet District
</td><td align="left">SIDDIPET </td><td
align="left">Thoguta </td><td
align="left">Thoguta </td><td align="left">all
its ass cmpts </td><td align="left">formation of
earth bund with </td><td align="left">502372
</td><td align="left">LINGASWAMY </td><td
align="left">8185848281 </td><td
align="left">TS07UF3333 </td><td
align="left">TRAN9B5B1281 </td><td
align="right">35,000.00 </td><td
align="right">20.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">129
</td><td align="left" style="background-color:#EFEFEF;">IRR001114
</td><td align="left">03-12-2019 15:45:58
</td><td align="left">06-12-2019 12:31:38
</td><td align="left">L Satyavardhan EE </td><td
align="left">9494306757 </td><td align="left">To
kaleshwaram project falling in the limits of Kudurupally (V) (Mahadevpur-VI),
Mahadevapur (M) JB District to the works of Package-8 of Link-II, Kaleshwaram
project. </td><td align="left">KARIMNAGAR
</td><td align="left">Choppadandi </td><td
align="left">Choppadandi </td><td
align="left">Link-II,Kaleshwaramp </td><td
align="left">to the works of Package-8 of
</td><td align="left">505415 </td><td
align="left">BILLSINGH </td><td
align="left">9912937653 </td><td
align="left">TS03UB3888 </td><td
align="left">TRAN895B7841 </td><td
align="right">5,000.00 </td><td
align="right">16.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">130
</td><td align="left" style="background-color:#EFEFEF;">IRR000891
</td><td align="left">21-06-2019 11:04:12
</td><td align="left">06-12-2019 12:31:07
</td><td align="left">Executive Engineer
</td><td align="left">8919822252 </td><td
align="left">de-silting area of Annaram Barrage located in Godavari river,
Jayashankar Bhupalpally District to formation of earth bund with all its associated
components for Reach-3 from km 12.800 to km 16.700 along with its structures and
adjoining with Reach-4 at km 16.700 near Thoguta (V&M), Siddipet District
</td><td align="left">SIDDIPET </td><td
align="left">Thoguta </td><td
align="left">Thoguta </td><td align="left">all
its ass cmpts </td><td align="left">formation of
earth bund with </td><td align="left">502372
</td><td align="left">SATAIAH </td><td
align="left">9010480869 </td><td
align="left">AP02TE2989 </td><td
align="left">TRAN8EBAB445 </td><td
align="right">35,000.00 </td><td
align="right">16.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">131
</td><td align="left" style="background-color:#EFEFEF;">IRR000951
</td><td align="left">15-07-2019 16:38:18
</td><td align="left">06-12-2019 12:29:43
</td><td align="left">Executive engineer
</td><td align="left">8919822252 </td><td
align="left">For the works of package 5 of SRSP phase-II near Regonda (V)- Husnabad
(M) Karimnagar District </td><td
align="left">KARIMNAGAR </td><td
align="left">Karimnagar </td><td
align="left">Karimnagar </td><td
align="left">SRSP phase-II </td><td
align="left">For the works of package 5 </td><td
align="left">505001 </td><td
align="left">SATHYAM </td><td
align="left">8332050286 </td><td
align="left">TS03UA1599 </td><td
align="left">TRANAA441E18 </td><td
align="right">15,000.00 </td><td
align="right">16.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">132
</td><td align="left" style="background-color:#EFEFEF;">IRR000891
</td><td align="left">21-06-2019 11:04:12
</td><td align="left">06-12-2019 12:29:07
</td><td align="left">Executive Engineer
</td><td align="left">8919822252 </td><td
align="left">de-silting area of Annaram Barrage located in Godavari river,
Jayashankar Bhupalpally District to formation of earth bund with all its associated
components for Reach-3 from km 12.800 to km 16.700 along with its structures and
adjoining with Reach-4 at km 16.700 near Thoguta (V&M), Siddipet District
</td><td align="left">SIDDIPET </td><td
align="left">Thoguta </td><td
align="left">Thoguta </td><td align="left">all
its ass cmpts </td><td align="left">formation of
earth bund with </td><td align="left">502372
</td><td align="left">ASHOK </td><td
align="left">9949466122 </td><td
align="left">TS05UC9149 </td><td
align="left">TRANBF38497B </td><td
align="right">35,000.00 </td><td
align="right">16.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">133
</td><td align="left" style="background-color:#EFEFEF;">IRR001114
</td><td align="left">03-12-2019 15:45:58
</td><td align="left">06-12-2019 12:28:03
</td><td align="left">L Satyavardhan EE </td><td
align="left">9494306757 </td><td align="left">To
kaleshwaram project falling in the limits of Kudurupally (V) (Mahadevpur-VI),
Mahadevapur (M) JB District to the works of Package-8 of Link-II, Kaleshwaram
project. </td><td align="left">KARIMNAGAR
</td><td align="left">Choppadandi </td><td
align="left">Choppadandi </td><td
align="left">Link-II,Kaleshwaramp </td><td
align="left">to the works of Package-8 of
</td><td align="left">505415 </td><td
align="left">RAVI </td><td
align="left">6301528927 </td><td
align="left">TS19T4106 </td><td
align="left">TRANCA962622 </td><td
align="right">5,000.00 </td><td
align="right">16.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">134
</td><td align="left" style="background-color:#EFEFEF;">IRR000891
</td><td align="left">21-06-2019 11:04:12
</td><td align="left">06-12-2019 12:27:32
</td><td align="left">Executive Engineer
</td><td align="left">8919822252 </td><td
align="left">de-silting area of Annaram Barrage located in Godavari river,
Jayashankar Bhupalpally District to formation of earth bund with all its associated
components for Reach-3 from km 12.800 to km 16.700 along with its structures and
adjoining with Reach-4 at km 16.700 near Thoguta (V&M), Siddipet District
</td><td align="left">SIDDIPET </td><td
align="left">Thoguta </td><td
align="left">Thoguta </td><td align="left">all
its ass cmpts </td><td align="left">formation of
earth bund with </td><td align="left">502372
</td><td align="left">SRISAILAM </td><td
align="left">9010100122 </td><td
align="left">TS05UD1229 </td><td
align="left">TRAN1952C537 </td><td
align="right">35,000.00 </td><td
align="right">16.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">135
</td><td align="left" style="background-color:#EFEFEF;">IRR001114
</td><td align="left">03-12-2019 15:45:58
</td><td align="left">06-12-2019 12:24:58
</td><td align="left">L Satyavardhan EE </td><td
align="left">9494306757 </td><td align="left">To
kaleshwaram project falling in the limits of Kudurupally (V) (Mahadevpur-VI),
Mahadevapur (M) JB District to the works of Package-8 of Link-II, Kaleshwaram
project. </td><td align="left">KARIMNAGAR
</td><td align="left">Choppadandi </td><td
align="left">Choppadandi </td><td
align="left">Link-II,Kaleshwaramp </td><td
align="left">to the works of Package-8 of
</td><td align="left">505415 </td><td
align="left">YADAYYA </td><td
align="left">9666836308 </td><td
align="left">TS08UA2358 </td><td
align="left">TRAN7CA3F45A </td><td
align="right">5,000.00 </td><td
align="right">16.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">136
</td><td align="left" style="background-color:#EFEFEF;">IRR001114
</td><td align="left">03-12-2019
15:45:58 </td><td align="left">06-12-2019
12:23:36 </td><td align="left">L Satyavardhan EE
</td><td align="left">9494306757 </td><td
align="left">To kaleshwaram project falling in the limits of Kudurupally (V)
(Mahadevpur-VI), Mahadevapur (M) JB District to the works of Package-8 of Link-II,
Kaleshwaram project. </td><td
align="left">KARIMNAGAR </td><td
align="left">Choppadandi </td><td
align="left">Choppadandi </td><td
align="left">Link-II,Kaleshwaramp </td><td
align="left">to the works of Package-8 of
</td><td align="left">505415 </td><td
align="left">NARENDHAR </td><td
align="left">8498008585 </td><td
align="left">TS30T1889 </td><td
align="left">TRAN75F64479 </td><td
align="right">5,000.00 </td><td
align="right">16.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">137
</td><td align="left" style="background-color:#EFEFEF;">IRR000936
</td><td align="left">08-07-2019 15:27:34
</td><td align="left">06-12-2019 12:21:42
</td><td align="left">Executive Engineer
</td><td align="left">8919822252 </td><td
align="left">to Sri Komaravelli Mallanna Sagar Reservoir Reach-2, Vemulaghat (V)
Thogutta (M) Siddipet District. </td><td
align="left">SIDDIPET </td><td
align="left">Thoguta </td><td
align="left">Vemulaghat </td><td
align="left">Reservoir Reach-2 </td><td
align="left">Sri Komaravelli Mallanna Sagar
</td><td align="left">502372 </td><td
align="left">GOUSE </td><td
align="left">9391496868 </td><td
align="left">TS08UD0567 </td><td
align="left">TRANA3B2E9B4 </td><td
align="right">20,000.00 </td><td
align="right">20.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">138
</td><td align="left" style="background-color:#EFEFEF;">IRR000748
</td><td align="left">08-03-2019 12:12:27
</td><td align="left">06-12-2019 12:19:20
</td><td align="left">Executive Engineer
</td><td align="left">8919822252 </td><td
align="left">To the construction of Ramayampet canal including Distributory network
for irrigating an ayacut of 41,203 Acres of CM and CD works of Kondapochamma sagar.
</td><td align="left">SIDDIPET </td><td
align="left">Gajwel </td><td align="left">Gajwel
</td><td align="left">Distributory network
</td><td align="left">const of Ramayampet canal incl
</td><td align="left">502372 </td><td
align="left">SHEKAR </td><td
align="left">9440736975 </td><td
align="left">TS08UF9594 </td><td
align="left">TRAN181F59AF </td><td
align="right">10,000.00 </td><td
align="right">16.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">139
</td><td align="left" style="background-color:#EFEFEF;">IRR001111
</td><td align="left">25-11-2019 15:22:45
</td><td align="left">06-12-2019 12:19:17
</td><td align="left">L Satyavardhan EE </td><td
align="left">9494306757 </td><td
align="left">Formation of sri komaravelli mallanna sagar reservoir with a capacity
of 50 TMC and the formation of sri Komaravelli Mallanna sagar reservoir with a
capacity of 50 TMC and the formation of earth bund with all its associated
components for Reach-3 from Km 12.800 to 16.700 and adjoining with Reach-4 at km
16.700 near Laxmapur (V) Thoguta (M) Siddipet District
</td><td align="left">SIDDIPET </td><td
align="left">Thoguta </td><td
align="left">Thoguta </td><td
align="left">&formation of earthb </td><td
align="left">Sri Komaravelli Mallannasagar
</td><td align="left">502372 </td><td
align="left">SAI </td><td
align="left">9010403255 </td><td
align="left">TS02UB1881 </td><td
align="left">TRAN671EA68E </td><td
align="right">15,000.00 </td><td
align="right">20.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">140
</td><td align="left" style="background-color:#EFEFEF;">IRR001111
</td><td align="left">25-11-2019 15:22:45
</td><td align="left">06-12-2019 12:17:18
</td><td align="left">L Satyavardhan EE </td><td
align="left">9494306757 </td><td
align="left">Formation of sri komaravelli mallanna sagar reservoir with a capacity
of 50 TMC and the formation of sri Komaravelli Mallanna sagar reservoir with a
capacity of 50 TMC and the formation of earth bund with all its associated
components for Reach-3 from Km 12.800 to 16.700 and adjoining with Reach-4 at km
16.700 near Laxmapur (V) Thoguta (M) Siddipet District
</td><td align="left">SIDDIPET </td><td
align="left">Thoguta </td><td
align="left">Thoguta </td><td
align="left">&formation of earthb </td><td
align="left">Sri Komaravelli Mallannasagar
</td><td align="left">502372 </td><td
align="left">SRINIVAS </td><td
align="left">9659952281 </td><td
align="left">TS19T3177 </td><td
align="left">TRAN1C54FF4A </td><td
align="right">15,000.00 </td><td
align="right">16.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">141
</td><td align="left" style="background-color:#EFEFEF;">IRR000896
</td><td align="left">29-06-2019 13:49:22
</td><td align="left">06-12-2019 12:15:23
</td><td align="left">Executive Engineer
</td><td align="left">8919822252 </td><td
align="left">De-silting area of Annaram Barrage located in Godavari river,
Jayashankar Bhupalpally District to Sri Komaravelli Mallanna Sagar, Reservoir
Reach-3, Laxmapur (V) Thogutta (M) Siddipet District
</td><td align="left">SIDDIPET </td><td
align="left">Thoguta </td><td
align="left">Thoguta </td><td
align="left">Reservoir Reach-3 </td><td
align="left">Sri Komaravelli Mallanna Sagar
</td><td align="left">502372 </td><td
align="left">SATHISH </td><td
align="left">7083949358 </td><td
align="left">TS16UB9099 </td><td
align="left">TRAN7F15E2FF </td><td
align="right">10,000.00 </td><td
align="right">20.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">142
</td><td align="left" style="background-color:#EFEFEF;">IRR001114
</td><td align="left">03-12-2019 15:45:58
</td><td align="left">06-12-2019
12:12:48 </td><td align="left">L Satyavardhan
EE </td><td align="left">9494306757
</td><td align="left">To kaleshwaram project falling in the limits of Kudurupally
(V) (Mahadevpur-VI), Mahadevapur (M) JB District to the works of Package-8 of Link-
II, Kaleshwaram project. </td><td
align="left">KARIMNAGAR </td><td
align="left">Choppadandi </td><td
align="left">Choppadandi </td><td
align="left">Link-II,Kaleshwaramp </td><td
align="left">to the works of Package-8 of
</td><td align="left">505415 </td><td
align="left">THIRUPATHI REDDY </td><td
align="left">7093042324 </td><td
align="left">TS25T1269 </td><td
align="left">TRAN319FB277 </td><td
align="right">5,000.00 </td><td
align="right">16.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">143
</td><td align="left" style="background-color:#EFEFEF;">IRR001114
</td><td align="left">03-12-2019 15:45:58
</td><td align="left">06-12-2019 12:11:54
</td><td align="left">L Satyavardhan EE </td><td
align="left">9494306757 </td><td align="left">To
kaleshwaram project falling in the limits of Kudurupally (V) (Mahadevpur-VI),
Mahadevapur (M) JB District to the works of Package-8 of Link-II, Kaleshwaram
project. </td><td align="left">KARIMNAGAR
</td><td align="left">Choppadandi </td><td
align="left">Choppadandi </td><td
align="left">Link-II,Kaleshwaramp </td><td
align="left">to the works of Package-8 of
</td><td align="left">505415 </td><td
align="left">SRINU </td><td
align="left">7036378595 </td><td
align="left">TS08UA8999 </td><td
align="left">TRAN13414231 </td><td
align="right">5,000.00 </td><td
align="right">16.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">144
</td><td align="left" style="background-color:#EFEFEF;">IRR000936
</td><td align="left">08-07-2019 15:27:34
</td><td align="left">06-12-2019 12:11:02
</td><td align="left">Executive Engineer
</td><td align="left">8919822252 </td><td
align="left">to Sri Komaravelli Mallanna Sagar Reservoir Reach-2, Vemulaghat (V)
Thogutta (M) Siddipet District. </td><td
align="left">SIDDIPET </td><td
align="left">Thoguta </td><td
align="left">Vemulaghat </td><td
align="left">Reservoir Reach-2 </td><td
align="left">Sri Komaravelli Mallanna Sagar
</td><td align="left">502372 </td><td
align="left">RAJUKUMAR </td><td
align="left">8121221867 </td><td
align="left">TS02UB9990 </td><td
align="left">TRAN944415D3 </td><td
align="right">20,000.00 </td><td
align="right">20.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">145
</td><td align="left" style="background-color:#EFEFEF;">IRR001111
</td><td align="left">25-11-2019 15:22:45
</td><td align="left">06-12-2019 12:10:11
</td><td align="left">L Satyavardhan EE </td><td
align="left">9494306757 </td><td
align="left">Formation of sri komaravelli mallanna sagar reservoir with a capacity
of 50 TMC and the formation of sri Komaravelli Mallanna sagar reservoir with a
capacity of 50 TMC and the formation of earth bund with all its associated
components for Reach-3 from Km 12.800 to 16.700 and adjoining with Reach-4 at km
16.700 near Laxmapur (V) Thoguta (M) Siddipet District
</td><td align="left">SIDDIPET </td><td
align="left">Thoguta </td><td
align="left">Thoguta </td><td
align="left">&formation of earthb </td><td
align="left">Sri Komaravelli Mallannasagar
</td><td align="left">502372 </td><td
align="left">SRINIVAS </td><td
align="left">7780293957 </td><td
align="left">TS02UB1407 </td><td
align="left">TRAND46496AE </td><td
align="right">15,000.00 </td><td
align="right">20.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">146
</td><td align="left" style="background-color:#EFEFEF;">IRR000951
</td><td align="left">15-07-2019 16:38:18
</td><td align="left">06-12-2019 12:08:51
</td><td align="left">Executive engineer
</td><td align="left">8919822252 </td><td
align="left">For the works of package 5 of SRSP phase-II near Regonda (V)- Husnabad
(M) Karimnagar District </td><td
align="left">KARIMNAGAR </td><td
align="left">Karimnagar </td><td
align="left">Karimnagar </td><td
align="left">SRSP phase-II </td><td
align="left">For the works of package 5 </td><td
align="left">505001 </td><td
align="left">LINGAMURTHI </td><td
align="left">9963026774 </td><td
align="left">TS03UA4299 </td><td
align="left">TRAN14386AB5 </td><td
align="right">15,000.00 </td><td
align="right">16.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">147
</td><td align="left" style="background-color:#EFEFEF;">IRR001111
</td><td align="left">25-11-2019 15:22:45
</td><td align="left">06-12-2019 12:07:45
</td><td align="left">L Satyavardhan EE </td><td
align="left">9494306757 </td><td
align="left">Formation of sri komaravelli mallanna sagar reservoir with a capacity
of 50 TMC and the formation of sri Komaravelli Mallanna sagar reservoir with a
capacity of 50 TMC and the formation of earth bund with all its associated
components for Reach-3 from Km 12.800 to 16.700 and adjoining with Reach-4 at km
16.700 near Laxmapur (V) Thoguta (M) Siddipet District
</td><td align="left">SIDDIPET </td><td
align="left">Thoguta </td><td
align="left">Thoguta </td><td
align="left">&formation of earthb </td><td
align="left">Sri Komaravelli Mallannasagar
</td><td align="left">502372 </td><td
align="left">SRINIVAS </td><td
align="left">9849998634 </td><td
align="left">TS19T1827 </td><td
align="left">TRAN47A2D614 </td><td
align="right">15,000.00 </td><td
align="right">20.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">148
</td><td align="left" style="background-color:#EFEFEF;">IRR001115
</td><td align="left">03-12-2019 15:49:49
</td><td align="left">06-12-2019 12:05:56
</td><td align="left">L Satyavardhan EE </td><td
align="left">9494306757 </td><td
align="left">To the formation of Sri Komaravelli Mallanna Sagar Reservoir with a
capacity of 50 TMC and the formation of Sri Komaravelli Mallanna sagar Reservoir
with a capacity of 50 TMC and the formation of Earth bund with all its associated
components for Reach-3 from Km 12.8OO to 16.700 and adjoining with Reach-2 at Km
12.8OO near Laxmapur (V), Thoguta (M), Siddipet District.
</td><td align="left">SIDDIPET </td><td
align="left">Thoguta </td><td
align="left">Thoguta </td><td
align="left">allanna Sagar Reserv </td><td
align="left">formation of Sri Komaravelli M
</td><td align="left">502372 </td><td
align="left">SRIRAJU </td><td
align="left">9948485228 </td><td
align="left">TS36T5259 </td><td
align="left">TRAN5E7862E4 </td><td
align="right">10,000.00 </td><td
align="right">20.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">149
</td><td align="left" style="background-color:#EFEFEF;">IRR000936
</td><td align="left">08-07-2019 15:27:34
</td><td align="left">06-12-2019 12:04:53
</td><td align="left">Executive Engineer
</td><td align="left">8919822252 </td><td
align="left">to Sri Komaravelli Mallanna Sagar Reservoir Reach-2, Vemulaghat (V)
Thogutta (M) Siddipet District. </td><td
align="left">SIDDIPET </td><td
align="left">Thoguta </td><td
align="left">Vemulaghat </td><td
align="left">Reservoir Reach-2 </td><td
align="left">Sri Komaravelli Mallanna Sagar
</td><td align="left">502372 </td><td
align="left">SRINU </td><td
align="left">6300841561 </td><td
align="left">TS08UF9999 </td><td
align="left">TRAN92C36AE7 </td><td
align="right">20,000.00 </td><td
align="right">20.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">150
</td><td align="left" style="background-color:#EFEFEF;">IRR001054
</td><td align="left">03-09-2019 13:33:24
</td><td align="left">06-12-2019 12:04:22
</td><td align="left">EXECUTIVE ENGINEER
</td><td align="left">8919822252 </td><td
align="left">To Sri komaravelli Mallanna Sagar, Reach No.4, Thoguta (V&M) Siddipet
District </td><td align="left">SIDDIPET
</td><td align="left">Thoguta </td><td
align="left">Thoguta </td><td align="left">Reach
No.4 </td><td align="left">Sri komaravelli
Mallanna Saga </td><td align="left">502372
</td><td align="left">SANTHOSH </td><td
align="left">9542513047 </td><td
align="left">TS08UA2150 </td><td
align="left">TRAND44555DA </td><td
align="right">10,000.00 </td><td
align="right">16.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">151
</td><td align="left" style="background-color:#EFEFEF;">IRR001111
</td><td align="left">25-11-2019 15:22:45
</td><td align="left">06-12-2019 12:03:07
</td><td align="left">L Satyavardhan EE </td><td
align="left">9494306757 </td><td
align="left">Formation of sri komaravelli mallanna sagar reservoir with a capacity
of 50 TMC and the formation of sri Komaravelli Mallanna sagar reservoir with a
capacity of 50 TMC and the formation of earth bund with all its associated
components for Reach-3 from Km 12.800 to 16.700 and adjoining with Reach-4 at km
16.700 near Laxmapur (V) Thoguta (M) Siddipet District
</td><td align="left">SIDDIPET </td><td
align="left">Thoguta </td><td
align="left">Thoguta </td><td
align="left">&formation of earthb </td><td
align="left">Sri Komaravelli Mallannasagar
</td><td align="left">502372 </td><td
align="left">SRINU </td><td
align="left">8978368341 </td><td
align="left">TS02UB6444 </td><td
align="left">TRANA17FC5D2 </td><td
align="right">15,000.00 </td><td
align="right">20.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">152
</td><td align="left" style="background-color:#EFEFEF;">BHK000824
</td><td align="left">07-05-2019 15:58:03
</td><td align="left">06-12-2019 12:02:36
</td><td align="left">Executive engineer
</td><td align="left">8978026758 </td><td
align="left">Construction (40 Nos) of G+1 pattern 2BHK houses at Thurkapally (V&M)
of Alair Assembly Constituency </td><td
align="left">MEDCHAL </td><td
align="left">Shamirpet </td><td
align="left">Turkapally </td><td
align="left">Alair AssemblyC </td><td
align="left">Const of 2BHK G+1 pattern </td><td
align="left">508112 </td><td align="left">LAXMAN
</td><td align="left">9912292827 </td><td
align="left">TS05UA5418 </td><td
align="left">TRAN74145C2B </td><td
align="right">1,000.00 </td><td
align="right">16.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">153
</td><td align="left" style="background-color:#EFEFEF;">IRR001111
</td><td align="left">25-11-2019 15:22:45
</td><td align="left">06-12-2019 12:01:25
</td><td align="left">L Satyavardhan EE </td><td
align="left">9494306757 </td><td
align="left">Formation of sri komaravelli mallanna sagar reservoir with a capacity
of 50 TMC and the formation of sri Komaravelli Mallanna sagar reservoir with a
capacity of 50 TMC and the formation of earth bund with all its associated
components for Reach-3 from Km 12.800 to 16.700 and adjoining with Reach-4 at km
16.700 near Laxmapur (V) Thoguta (M) Siddipet District
</td><td align="left">SIDDIPET </td><td
align="left">Thoguta </td><td
align="left">Thoguta </td><td
align="left">&formation of earthb </td><td
align="left">Sri Komaravelli Mallannasagar
</td><td align="left">502372 </td><td
align="left">SRIKANTH </td><td
align="left">8374470623 </td><td
align="left">TS19T3132 </td><td
align="left">TRAN6BCBF6B4 </td><td
align="right">15,000.00 </td><td
align="right">16.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">154
</td><td align="left" style="background-color:#EFEFEF;">IRR001114
</td><td align="left">03-12-2019 15:45:58
</td><td align="left">06-12-2019 12:00:08
</td><td align="left">L Satyavardhan EE </td><td
align="left">9494306757
</td><td align="left">To kaleshwaram project falling in the limits of
Kudurupally (V) (Mahadevpur-VI), Mahadevapur (M) JB District to the works of
Package-8 of Link-II, Kaleshwaram project.
</td><td align="left">KARIMNAGAR </td><td
align="left">Choppadandi </td><td
align="left">Choppadandi </td><td
align="left">Link-II,Kaleshwaramp </td><td
align="left">to the works of Package-8 of
</td><td align="left">505415 </td><td
align="left">RAJU </td><td
align="left">6300426400 </td><td
align="left">TS03UA8379 </td><td
align="left">TRAN8AC659BC </td><td
align="right">5,000.00 </td><td
align="right">20.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">155
</td><td align="left" style="background-color:#EFEFEF;">IRR001115
</td><td align="left">03-12-2019 15:49:49
</td><td align="left">06-12-2019 11:56:40
</td><td align="left">L Satyavardhan EE </td><td
align="left">9494306757 </td><td align="left">To
the formation of Sri Komaravelli Mallanna Sagar Reservoir with a capacity of 50 TMC
and the formation of Sri Komaravelli Mallanna sagar Reservoir with a capacity of 50
TMC and the formation of Earth bund with all its associated components for Reach-3
from Km 12.8OO to 16.700 and adjoining with Reach-2 at Km 12.8OO near Laxmapur (V),
Thoguta (M), Siddipet District. </td><td
align="left">SIDDIPET </td><td
align="left">Thoguta </td><td
align="left">Thoguta </td><td
align="left">allanna Sagar Reserv </td><td
align="left">formation of Sri Komaravelli M
</td><td align="left">502372 </td><td
align="left">SWAMY </td><td
align="left">9949715353 </td><td
align="left">TS35T4276 </td><td
align="left">TRAN9828D978 </td><td
align="right">10,000.00 </td><td
align="right">20.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">156
</td><td align="left" style="background-color:#EFEFEF;">IRR000936
</td><td align="left">08-07-2019 15:27:34
</td><td align="left">06-12-2019 11:55:36
</td><td align="left">Executive Engineer
</td><td align="left">8919822252 </td><td
align="left">to Sri Komaravelli Mallanna Sagar Reservoir Reach-2, Vemulaghat (V)
Thogutta (M) Siddipet District. </td><td
align="left">SIDDIPET </td><td
align="left">Thoguta </td><td
align="left">Vemulaghat </td><td
align="left">Reservoir Reach-2 </td><td
align="left">Sri Komaravelli Mallanna Sagar
</td><td align="left">502372 </td><td
align="left">RAJU </td><td
align="left">9908860185 </td><td
align="left">TS08UH2359 </td><td
align="left">TRAN7896DDF4 </td><td
align="right">20,000.00 </td><td
align="right">22.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">157
</td><td align="left" style="background-color:#EFEFEF;">IRR001111
</td><td align="left">25-11-2019 15:22:45
</td><td align="left">06-12-2019 11:54:38
</td><td align="left">L Satyavardhan EE </td><td
align="left">9494306757 </td><td
align="left">Formation of sri komaravelli mallanna sagar reservoir with a capacity
of 50 TMC and the formation of sri Komaravelli Mallanna sagar reservoir with a
capacity of 50 TMC and the formation of earth bund with all its associated
components for Reach-3 from Km 12.800 to 16.700 and adjoining with Reach-4 at km
16.700 near Laxmapur (V) Thoguta (M) Siddipet District
</td><td align="left">SIDDIPET </td><td
align="left">Thoguta </td><td
align="left">Thoguta </td><td
align="left">&formation of earthb </td><td
align="left">Sri Komaravelli Mallannasagar
</td><td align="left">502372 </td><td
align="left">SADHAIAH </td><td
align="left">9849564114 </td><td
align="left">TS19T6768 </td><td
align="left">TRAN9B928674 </td><td
align="right">15,000.00 </td><td
align="right">20.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">158
</td><td align="left" style="background-color:#EFEFEF;">IRR001115
</td><td align="left">03-12-2019 15:49:49
</td><td align="left">06-12-2019 11:52:55
</td><td align="left">L Satyavardhan EE </td><td
align="left">9494306757 </td><td align="left">To
the formation of Sri Komaravelli Mallanna Sagar Reservoir with a capacity of 50 TMC
and the formation of Sri Komaravelli Mallanna sagar Reservoir with a capacity of 50
TMC and the formation of Earth bund with all its associated components for Reach-3
from Km 12.8OO to 16.700 and adjoining with Reach-2 at Km 12.8OO near Laxmapur (V),
Thoguta (M), Siddipet District. </td><td
align="left">SIDDIPET </td><td
align="left">Thoguta </td><td
align="left">Thoguta </td><td
align="left">allanna Sagar Reserv </td><td
align="left">formation of Sri Komaravelli M
</td><td align="left">502372 </td><td
align="left">JANAIAH </td><td
align="left">9000738085 </td><td
align="left">TS08UF4555 </td><td
align="left">TRANB8367AC7 </td><td
align="right">10,000.00 </td><td
align="right">20.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">159
</td><td align="left" style="background-color:#EFEFEF;">IRR000936
</td><td align="left">08-07-2019 15:27:34
</td><td align="left">06-12-2019 11:51:48
</td><td align="left">Executive Engineer
</td><td align="left">8919822252 </td><td
align="left">to Sri Komaravelli Mallanna Sagar Reservoir Reach-2, Vemulaghat (V)
Thogutta (M) Siddipet District. </td><td
align="left">SIDDIPET </td><td
align="left">Thoguta </td><td
align="left">Vemulaghat </td><td
align="left">Reservoir Reach-2 </td><td
align="left">Sri Komaravelli Mallanna Sagar
</td><td align="left">502372 </td><td
align="left">KURMURTHI </td><td
align="left">9000704098 </td><td
align="left">TS08UD5679 </td><td
align="left">TRAN13DE8143 </td><td
align="right">20,000.00 </td><td
align="right">20.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">160
</td><td align="left" style="background-color:#EFEFEF;">IRR001114
</td><td align="left">03-12-2019 15:45:58
</td><td align="left">06-12-2019 11:51:47
</td><td align="left">L Satyavardhan EE
</td><td align="left">9494306757
</td><td align="left">To kaleshwaram project falling in the limits of Kudurupally
(V) (Mahadevpur-VI), Mahadevapur (M) JB District to the works of Package-8 of Link-
II, Kaleshwaram project. </td><td
align="left">KARIMNAGAR </td><td
align="left">Choppadandi </td><td
align="left">Choppadandi </td><td
align="left">Link-II,Kaleshwaramp </td><td
align="left">to the works of Package-8 of
</td><td align="left">505415 </td><td
align="left">SRIKANTH </td><td
align="left">9553653869 </td><td
align="left">TS03UB8599 </td><td
align="left">TRANE9F4E5B5 </td><td
align="right">5,000.00 </td><td
align="right">16.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">161
</td><td align="left" style="background-color:#EFEFEF;">IRR000936
</td><td align="left">08-07-2019 15:27:34
</td><td align="left">06-12-2019 11:51:06
</td><td align="left">Executive Engineer
</td><td align="left">8919822252 </td><td
align="left">to Sri Komaravelli Mallanna Sagar Reservoir Reach-2, Vemulaghat (V)
Thogutta (M) Siddipet District. </td><td
align="left">SIDDIPET </td><td
align="left">Thoguta </td><td
align="left">Vemulaghat </td><td
align="left">Reservoir Reach-2 </td><td
align="left">Sri Komaravelli Mallanna Sagar
</td><td align="left">502372 </td><td
align="left">SRINU </td><td
align="left">9912532261 </td><td
align="left">TS08UD9459 </td><td
align="left">TRAN3ACB448F </td><td
align="right">20,000.00 </td><td
align="right">20.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">162
</td><td align="left" style="background-color:#EFEFEF;">IRR000936
</td><td align="left">08-07-2019 15:27:34
</td><td align="left">06-12-2019 11:50:27
</td><td align="left">Executive Engineer
</td><td align="left">8919822252 </td><td
align="left">to Sri Komaravelli Mallanna Sagar Reservoir Reach-2, Vemulaghat (V)
Thogutta (M) Siddipet District. </td><td
align="left">SIDDIPET </td><td
align="left">Thoguta </td><td
align="left">Vemulaghat </td><td
align="left">Reservoir Reach-2 </td><td
align="left">Sri Komaravelli Mallanna Sagar
</td><td align="left">502372 </td><td
align="left">BALAIAH </td><td
align="left">9948476495 </td><td
align="left">TS08UD1449 </td><td
align="left">TRAN5ECC7961 </td><td
align="right">20,000.00 </td><td
align="right">20.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">163
</td><td align="left" style="background-color:#EFEFEF;">IRR001111
</td><td align="left">25-11-2019 15:22:45
</td><td align="left">06-12-2019 11:49:34
</td><td align="left">L Satyavardhan EE </td><td
align="left">9494306757 </td><td
align="left">Formation of sri komaravelli mallanna sagar reservoir with a capacity
of 50 TMC and the formation of sri Komaravelli Mallanna sagar reservoir with a
capacity of 50 TMC and the formation of earth bund with all its associated
components for Reach-3 from Km 12.800 to 16.700 and adjoining with Reach-4 at km
16.700 near Laxmapur (V) Thoguta (M) Siddipet District
</td><td align="left">SIDDIPET </td><td
align="left">Thoguta </td><td
align="left">Thoguta </td><td
align="left">&formation of earthb </td><td
align="left">Sri Komaravelli Mallannasagar
</td><td align="left">502372 </td><td
align="left">RAVI </td><td
align="left">8331021130 </td><td
align="left">TS02UB1241 </td><td
align="left">TRANF91C6781 </td><td
align="right">15,000.00 </td><td
align="right">20.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">164
</td><td align="left" style="background-color:#EFEFEF;">IRR001114
</td><td align="left">03-12-2019 15:45:58
</td><td align="left">06-12-2019 11:48:31
</td><td align="left">L Satyavardhan EE </td><td
align="left">9494306757 </td><td align="left">To
kaleshwaram project falling in the limits of Kudurupally (V) (Mahadevpur-VI),
Mahadevapur (M) JB District to the works of Package-8 of Link-II, Kaleshwaram
project. </td><td align="left">KARIMNAGAR
</td><td align="left">Choppadandi </td><td
align="left">Choppadandi </td><td
align="left">Link-II,Kaleshwaramp </td><td
align="left">to the works of Package-8 of
</td><td align="left">505415 </td><td
align="left">DURGAIAH </td><td
align="left">8374478412 </td><td
align="left">AP07TF0026 </td><td
align="left">TRANC4DF6A48 </td><td
align="right">5,000.00 </td><td
align="right">16.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">165
</td><td align="left" style="background-color:#EFEFEF;">IRR001111
</td><td align="left">25-11-2019 15:22:45
</td><td align="left">06-12-2019 11:47:38
</td><td align="left">L Satyavardhan EE </td><td
align="left">9494306757 </td><td
align="left">Formation of sri komaravelli mallanna sagar reservoir with a capacity
of 50 TMC and the formation of sri Komaravelli Mallanna sagar reservoir with a
capacity of 50 TMC and the formation of earth bund with all its associated
components for Reach-3 from Km 12.800 to 16.700 and adjoining with Reach-4 at km
16.700 near Laxmapur (V) Thoguta (M) Siddipet District
</td><td align="left">SIDDIPET </td><td
align="left">Thoguta </td><td
align="left">Thoguta </td><td
align="left">&formation of earthb </td><td
align="left">Sri Komaravelli Mallannasagar
</td><td align="left">502372 </td><td
align="left">LAXMAN </td><td
align="left">9630741085 </td><td
align="left">TS36T1001 </td><td
align="left">TRAN7559C2E2 </td><td
align="right">15,000.00 </td><td
align="right">20.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">166
</td><td align="left" style="background-color:#EFEFEF;">IRR001111
</td><td align="left">25-11-2019 15:22:45
</td><td align="left">06-12-2019 11:46:56
</td><td align="left">L Satyavardhan EE </td><td
align="left">9494306757 </td><td
align="left">Formation of sri komaravelli
mallanna sagar reservoir with a capacity of 50 TMC and the formation of sri
Komaravelli Mallanna sagar reservoir with a capacity of 50 TMC and the formation of
earth bund with all its associated components for Reach-3 from Km 12.800 to 16.700
and adjoining with Reach-4 at km 16.700 near Laxmapur (V) Thoguta (M) Siddipet
District </td><td align="left">SIDDIPET
</td><td align="left">Thoguta </td><td
align="left">Thoguta </td><td
align="left">&formation of earthb </td><td
align="left">Sri Komaravelli Mallannasagar
</td><td align="left">502372 </td><td
align="left">RAMASWAMY </td><td
align="left">9621463084 </td><td
align="left">TS08UA9666 </td><td
align="left">TRANBBC743A4 </td><td
align="right">15,000.00 </td><td
align="right">16.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">167
</td><td align="left" style="background-color:#EFEFEF;">IRR001054
</td><td align="left">03-09-2019 13:33:24
</td><td align="left">06-12-2019 11:46:01
</td><td align="left">EXECUTIVE ENGINEER
</td><td align="left">8919822252 </td><td
align="left">To Sri komaravelli Mallanna Sagar, Reach No.4, Thoguta (V&M) Siddipet
District </td><td align="left">SIDDIPET
</td><td align="left">Thoguta </td><td
align="left">Thoguta </td><td align="left">Reach
No.4 </td><td align="left">Sri komaravelli
Mallanna Saga </td><td align="left">502372
</td><td align="left">SRINIVAS </td><td
align="left">6303633747 </td><td
align="left">TS08UE1169 </td><td
align="left">TRANF97EBE4A </td><td
align="right">10,000.00 </td><td
align="right">16.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">168
</td><td align="left" style="background-color:#EFEFEF;">IRR001054
</td><td align="left">03-09-2019 13:33:24
</td><td align="left">06-12-2019 11:45:11
</td><td align="left">EXECUTIVE ENGINEER
</td><td align="left">8919822252 </td><td
align="left">To Sri komaravelli Mallanna Sagar, Reach No.4, Thoguta (V&M) Siddipet
District </td><td align="left">SIDDIPET
</td><td align="left">Thoguta </td><td
align="left">Thoguta </td><td align="left">Reach
No.4 </td><td align="left">Sri komaravelli
Mallanna Saga </td><td align="left">502372
</td><td align="left">RAJU </td><td
align="left">9912217463 </td><td
align="left">TS08UE1888 </td><td
align="left">TRANC7A2A616 </td><td
align="right">10,000.00 </td><td
align="right">16.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">169
</td><td align="left" style="background-color:#EFEFEF;">IRR000951
</td><td align="left">15-07-2019 16:38:18
</td><td align="left">06-12-2019 11:42:34
</td><td align="left">Executive engineer
</td><td align="left">8919822252 </td><td
align="left">For the works of package 5 of SRSP phase-II near Regonda (V)- Husnabad
(M) Karimnagar District </td><td
align="left">KARIMNAGAR </td><td
align="left">Karimnagar </td><td
align="left">Karimnagar </td><td
align="left">SRSP phase-II </td><td
align="left">For the works of package 5 </td><td
align="left">505001 </td><td align="left">AJAY
</td><td align="left">8464929516 </td><td
align="left">TS07UB9007 </td><td
align="left">TRAN17E9775A </td><td
align="right">15,000.00 </td><td
align="right">16.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">170
</td><td align="left" style="background-color:#EFEFEF;">IRR001111
</td><td align="left">25-11-2019 15:22:45
</td><td align="left">06-12-2019 11:35:34
</td><td align="left">L Satyavardhan EE </td><td
align="left">9494306757 </td><td
align="left">Formation of sri komaravelli mallanna sagar reservoir with a capacity
of 50 TMC and the formation of sri Komaravelli Mallanna sagar reservoir with a
capacity of 50 TMC and the formation of earth bund with all its associated
components for Reach-3 from Km 12.800 to 16.700 and adjoining with Reach-4 at km
16.700 near Laxmapur (V) Thoguta (M) Siddipet District
</td><td align="left">SIDDIPET </td><td
align="left">Thoguta </td><td
align="left">Thoguta </td><td
align="left">&formation of earthb </td><td
align="left">Sri Komaravelli Mallannasagar
</td><td align="left">502372 </td><td
align="left">SRIKANTH </td><td
align="left">7447077727 </td><td
align="left">TS22T4419 </td><td
align="left">TRANFE64D914 </td><td
align="right">15,000.00 </td><td
align="right">20.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">171
</td><td align="left" style="background-color:#EFEFEF;">IRR000951
</td><td align="left">15-07-2019 16:38:18
</td><td align="left">06-12-2019 11:32:51
</td><td align="left">Executive engineer
</td><td align="left">8919822252 </td><td
align="left">For the works of package 5 of SRSP phase-II near Regonda (V)- Husnabad
(M) Karimnagar District </td><td
align="left">KARIMNAGAR </td><td
align="left">Karimnagar </td><td
align="left">Karimnagar </td><td
align="left">SRSP phase-II </td><td
align="left">For the works of package 5 </td><td
align="left">505001 </td><td
align="left">SRINIVAS </td><td
align="left">9704217144 </td><td
align="left">TS25T1555 </td><td
align="left">TRAN4AC4395C </td><td
align="right">15,000.00 </td><td
align="right">20.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">172
</td><td align="left" style="background-color:#EFEFEF;">IRR000936
</td><td align="left">08-07-2019 15:27:34
</td><td align="left">06-12-2019 11:31:42
</td><td align="left">Executive Engineer
</td><td align="left">8919822252 </td><td
align="left">to Sri Komaravelli Mallanna Sagar Reservoir Reach-2, Vemulaghat (V)
Thogutta (M) Siddipet District. </td><td
align="left">SIDDIPET </td><td
align="left">Thoguta </td><td
align="left">Vemulaghat </td><td
align="left">Reservoir Reach-2
</td><td align="left">Sri Komaravelli Mallanna Sagar
</td><td align="left">502372 </td><td
align="left">PARSHURAM </td><td
align="left">7892661195 </td><td
align="left">TS07UH1111 </td><td
align="left">TRANA4875C54 </td><td
align="right">20,000.00 </td><td
align="right">20.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">173
</td><td align="left" style="background-color:#EFEFEF;">IRR000936
</td><td align="left">08-07-2019 15:27:34
</td><td align="left">06-12-2019 11:29:10
</td><td align="left">Executive Engineer
</td><td align="left">8919822252 </td><td
align="left">to Sri Komaravelli Mallanna Sagar Reservoir Reach-2, Vemulaghat (V)
Thogutta (M) Siddipet District. </td><td
align="left">SIDDIPET </td><td
align="left">Thoguta </td><td
align="left">Vemulaghat </td><td
align="left">Reservoir Reach-2 </td><td
align="left">Sri Komaravelli Mallanna Sagar
</td><td align="left">502372 </td><td
align="left">REDDY </td><td
align="left">9182489050 </td><td
align="left">TS07UF6666 </td><td
align="left">TRAN832B2545 </td><td
align="right">20,000.00 </td><td
align="right">20.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">174
</td><td align="left" style="background-color:#EFEFEF;">IRR000936
</td><td align="left">08-07-2019 15:27:34
</td><td align="left">06-12-2019 11:28:11
</td><td align="left">Executive Engineer
</td><td align="left">8919822252 </td><td
align="left">to Sri Komaravelli Mallanna Sagar Reservoir Reach-2, Vemulaghat (V)
Thogutta (M) Siddipet District. </td><td
align="left">SIDDIPET </td><td
align="left">Thoguta </td><td
align="left">Vemulaghat </td><td
align="left">Reservoir Reach-2 </td><td
align="left">Sri Komaravelli Mallanna Sagar
</td><td align="left">502372 </td><td
align="left">NARSIMHA </td><td
align="left">9951873553 </td><td
align="left">TS08UF6759 </td><td
align="left">TRAN63FE6458 </td><td
align="right">20,000.00 </td><td
align="right">20.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">175
</td><td align="left" style="background-color:#EFEFEF;">IRR001111
</td><td align="left">25-11-2019 15:22:45
</td><td align="left">06-12-2019 11:26:51
</td><td align="left">L Satyavardhan EE </td><td
align="left">9494306757 </td><td
align="left">Formation of sri komaravelli mallanna sagar reservoir with a capacity
of 50 TMC and the formation of sri Komaravelli Mallanna sagar reservoir with a
capacity of 50 TMC and the formation of earth bund with all its associated
components for Reach-3 from Km 12.800 to 16.700 and adjoining with Reach-4 at km
16.700 near Laxmapur (V) Thoguta (M) Siddipet District
</td><td align="left">SIDDIPET </td><td
align="left">Thoguta </td><td
align="left">Thoguta </td><td
align="left">&formation of earthb </td><td
align="left">Sri Komaravelli Mallannasagar
</td><td align="left">502372 </td><td
align="left">SRINIVAS </td><td
align="left">8008483382 </td><td
align="left">TS20T0556 </td><td
align="left">TRAN2EEA3A34 </td><td
align="right">15,000.00 </td><td
align="right">20.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">176
</td><td align="left" style="background-color:#EFEFEF;">IRR000891
</td><td align="left">21-06-2019 11:04:12
</td><td align="left">06-12-2019 11:24:50
</td><td align="left">Executive Engineer
</td><td align="left">8919822252 </td><td
align="left">de-silting area of Annaram Barrage located in Godavari river,
Jayashankar Bhupalpally District to formation of earth bund with all its associated
components for Reach-3 from km 12.800 to km 16.700 along with its structures and
adjoining with Reach-4 at km 16.700 near Thoguta (V&M), Siddipet District
</td><td align="left">SIDDIPET </td><td
align="left">Thoguta </td><td
align="left">Thoguta </td><td align="left">all
its ass cmpts </td><td align="left">formation of
earth bund with </td><td align="left">502372
</td><td align="left">HAREN </td><td
align="left">9912111446 </td><td
align="left">AP27TU2869 </td><td
align="left">TRAN7D9F313B </td><td
align="right">35,000.00 </td><td
align="right">16.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">177
</td><td align="left" style="background-color:#EFEFEF;">IRR000891
</td><td align="left">21-06-2019 11:04:12
</td><td align="left">06-12-2019 11:24:13
</td><td align="left">Executive Engineer
</td><td align="left">8919822252 </td><td
align="left">de-silting area of Annaram Barrage located in Godavari river,
Jayashankar Bhupalpally District to formation of earth bund with all its associated
components for Reach-3 from km 12.800 to km 16.700 along with its structures and
adjoining with Reach-4 at km 16.700 near Thoguta (V&M), Siddipet District
</td><td align="left">SIDDIPET </td><td
align="left">Thoguta </td><td
align="left">Thoguta </td><td align="left">all
its ass cmpts </td><td align="left">formation of
earth bund with </td><td align="left">502372
</td><td align="left">PALAIAH </td><td
align="left">6306478428 </td><td
align="left">TS07UE1999 </td><td
align="left">TRAN9485CA49 </td><td
align="right">35,000.00 </td><td
align="right">16.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">178
</td><td align="left" style="background-color:#EFEFEF;">IRR000891
</td><td align="left">21-06-2019 11:04:12
</td><td align="left">06-12-2019 11:23:33
</td><td align="left">Executive Engineer
</td><td align="left">8919822252 </td><td
align="left">de-silting area of Annaram Barrage located in Godavari river,
Jayashankar Bhupalpally District to formation of earth bund with all its associated
components for Reach-3 from km 12.800 to km 16.700 along with its structures and
adjoining with Reach-4 at km 16.700 near Thoguta (V&M), Siddipet District
</td><td align="left">SIDDIPET </td><td
align="left">Thoguta </td><td
align="left">Thoguta
</td><td align="left">all its ass cmpts
</td><td align="left">formation of earth bund with
</td><td align="left">502372 </td><td
align="left">THIRUPATHI </td><td
align="left">9440321116 </td><td
align="left">TS07UH0999 </td><td
align="left">TRANF4515321 </td><td
align="right">35,000.00 </td><td
align="right">20.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">179
</td><td align="left" style="background-color:#EFEFEF;">IRR000891
</td><td align="left">21-06-2019 11:04:12
</td><td align="left">06-12-2019 11:22:59
</td><td align="left">Executive Engineer
</td><td align="left">8919822252 </td><td
align="left">de-silting area of Annaram Barrage located in Godavari river,
Jayashankar Bhupalpally District to formation of earth bund with all its associated
components for Reach-3 from km 12.800 to km 16.700 along with its structures and
adjoining with Reach-4 at km 16.700 near Thoguta (V&M), Siddipet District
</td><td align="left">SIDDIPET </td><td
align="left">Thoguta </td><td
align="left">Thoguta </td><td align="left">all
its ass cmpts </td><td align="left">formation of
earth bund with </td><td align="left">502372
</td><td align="left">RAJU </td><td
align="left">9948792256 </td><td
align="left">TS07UG4546 </td><td
align="left">TRANCA14944D </td><td
align="right">35,000.00 </td><td
align="right">20.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">180
</td><td align="left" style="background-color:#EFEFEF;">IRR000891
</td><td align="left">21-06-2019 11:04:12
</td><td align="left">06-12-2019 11:22:11
</td><td align="left">Executive Engineer
</td><td align="left">8919822252 </td><td
align="left">de-silting area of Annaram Barrage located in Godavari river,
Jayashankar Bhupalpally District to formation of earth bund with all its associated
components for Reach-3 from km 12.800 to km 16.700 along with its structures and
adjoining with Reach-4 at km 16.700 near Thoguta (V&M), Siddipet District
</td><td align="left">SIDDIPET </td><td
align="left">Thoguta </td><td
align="left">Thoguta </td><td align="left">all
its ass cmpts </td><td align="left">formation of
earth bund with </td><td align="left">502372
</td><td align="left">SAIEDHULU </td><td
align="left">9942309072 </td><td
align="left">TS07UE7929 </td><td
align="left">TRANB2D367C2 </td><td
align="right">35,000.00 </td><td
align="right">20.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">181
</td><td align="left" style="background-color:#EFEFEF;">IRR000891
</td><td align="left">21-06-2019 11:04:12
</td><td align="left">06-12-2019 11:21:32
</td><td align="left">Executive Engineer
</td><td align="left">8919822252 </td><td
align="left">de-silting area of Annaram Barrage located in Godavari river,
Jayashankar Bhupalpally District to formation of earth bund with all its associated
components for Reach-3 from km 12.800 to km 16.700 along with its structures and
adjoining with Reach-4 at km 16.700 near Thoguta (V&M), Siddipet District
</td><td align="left">SIDDIPET </td><td
align="left">Thoguta </td><td
align="left">Thoguta </td><td align="left">all
its ass cmpts </td><td align="left">formation of
earth bund with </td><td align="left">502372
</td><td align="left">BURAN </td><td
align="left">9959748384 </td><td
align="left">TS08UB4104 </td><td
align="left">TRAN25835483 </td><td
align="right">35,000.00 </td><td
align="right">16.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">182
</td><td align="left" style="background-color:#EFEFEF;">IRR000891
</td><td align="left">21-06-2019 11:04:12
</td><td align="left">06-12-2019 11:20:58
</td><td align="left">Executive Engineer
</td><td align="left">8919822252 </td><td
align="left">de-silting area of Annaram Barrage located in Godavari river,
Jayashankar Bhupalpally District to formation of earth bund with all its associated
components for Reach-3 from km 12.800 to km 16.700 along with its structures and
adjoining with Reach-4 at km 16.700 near Thoguta (V&M), Siddipet District
</td><td align="left">SIDDIPET </td><td
align="left">Thoguta </td><td
align="left">Thoguta </td><td align="left">all
its ass cmpts </td><td align="left">formation of
earth bund with </td><td align="left">502372
</td><td align="left">GIRISH </td><td
align="left">8121916616 </td><td
align="left">TS07UE9618 </td><td
align="left">TRAN15444841 </td><td
align="right">35,000.00 </td><td
align="right">20.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">183
</td><td align="left" style="background-color:#EFEFEF;">IRR000891
</td><td align="left">21-06-2019 11:04:12
</td><td align="left">06-12-2019 11:20:07
</td><td align="left">Executive Engineer
</td><td align="left">8919822252 </td><td
align="left">de-silting area of Annaram Barrage located in Godavari river,
Jayashankar Bhupalpally District to formation of earth bund with all its associated
components for Reach-3 from km 12.800 to km 16.700 along with its structures and
adjoining with Reach-4 at km 16.700 near Thoguta (V&M), Siddipet District
</td><td align="left">SIDDIPET </td><td
align="left">Thoguta </td><td
align="left">Thoguta </td><td align="left">all
its ass cmpts </td><td align="left">formation of
earth bund with </td><td align="left">502372
</td><td align="left">YADHAIAH </td><td
align="left">9908021197 </td><td
align="left">TS07UG2929 </td><td
align="left">TRAN812D9611 </td><td
align="right">35,000.00 </td><td
align="right">20.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">184
</td><td align="left" style="background-color:#EFEFEF;">IRR000891
</td><td align="left">21-06-2019 11:04:12
</td><td align="left">06-12-2019 11:19:29
</td><td align="left">Executive Engineer
</td><td align="left">8919822252 </td><td
align="left">de-silting area of Annaram Barrage located in Godavari river,
Jayashankar Bhupalpally District to formation of earth bund with all its associated
components for Reach-3 from km 12.800 to km 16.700 along with its structures and
adjoining with Reach-4 at km 16.700 near Thoguta (V&M), Siddipet District
</td><td align="left">SIDDIPET </td><td
align="left">Thoguta </td><td
align="left">Thoguta </td><td align="left">all
its ass cmpts </td><td align="left">formation of
earth bund with </td><td align="left">502372
</td><td align="left">PURUSOTHAM </td><td
align="left">9177518808 </td><td
align="left">AP04TT6291 </td><td
align="left">TRANCACC44D3 </td><td
align="right">35,000.00 </td><td
align="right">16.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">185
</td><td align="left" style="background-color:#EFEFEF;">IRR000891
</td><td align="left">21-06-2019 11:04:12
</td><td align="left">06-12-2019 11:18:54
</td><td align="left">Executive Engineer
</td><td align="left">8919822252 </td><td
align="left">de-silting area of Annaram Barrage located in Godavari river,
Jayashankar Bhupalpally District to formation of earth bund with all its associated
components for Reach-3 from km 12.800 to km 16.700 along with its structures and
adjoining with Reach-4 at km 16.700 near Thoguta (V&M), Siddipet District
</td><td align="left">SIDDIPET </td><td
align="left">Thoguta </td><td
align="left">Thoguta </td><td align="left">all
its ass cmpts </td><td align="left">formation of
earth bund with </td><td align="left">502372
</td><td align="left">YADHAGIRI </td><td
align="left">9704782139 </td><td
align="left">TS07UG2626 </td><td
align="left">TRAN24BE437B </td><td
align="right">35,000.00 </td><td
align="right">20.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">186
</td><td align="left" style="background-color:#EFEFEF;">IRR001032
</td><td align="left">17-08-2019 15:12:07
</td><td align="left">06-12-2019 11:17:31
</td><td align="left">K Sai Babu,EEI & CADD
</td><td align="left">9704678233 </td><td
align="left">To investigation, design and execution of tunnel of minimum 6.00 M
internal diameter or 5.60 M ‘D’ shaped with carrying capacity of 49.6 cumecs water
from Bheem Ghanpur tank to Ramappa tank and construction of Head Regulator at the
entrance portal of Tunnel including civil. Electro Mechanical & Hydro Mechanical,
Instrumentation, Auxiliary. Miscellaneous equipment and SCADA communication system
at pumping station now modified as laying of 3m dia of 3 rows pipeline instead of
Tunnel in Warangal District. </td><td
align="left">WARANGAL URBAN </td><td
align="left">Khila Warangal </td><td
align="left">Khila Warangal </td><td
align="left">entrance portal </td><td
align="left">const of head regulator at the
</td><td align="left">506002 </td><td
align="left">RAJARAM </td><td
align="left">9866843462 </td><td
align="left">AP36TA9786 </td><td
align="left">TRAN2FA57883 </td><td
align="right">2,000.00 </td><td
align="right">16.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">187
</td><td align="left" style="background-color:#EFEFEF;">IRR001114
</td><td align="left">03-12-2019 15:45:58
</td><td align="left">06-12-2019 11:16:42
</td><td align="left">L Satyavardhan EE </td><td
align="left">9494306757 </td><td align="left">To
kaleshwaram project falling in the limits of Kudurupally (V) (Mahadevpur-VI),
Mahadevapur (M) JB District to the works of Package-8 of Link-II, Kaleshwaram
project. </td><td align="left">KARIMNAGAR
</td><td align="left">Choppadandi </td><td
align="left">Choppadandi </td><td
align="left">Link-II,Kaleshwaramp </td><td
align="left">to the works of Package-8 of
</td><td align="left">505415 </td><td
align="left">BUCHI REDDY </td><td
align="left">9849471594 </td><td
align="left">TS03UA9969 </td><td
align="left">TRAN4D1127FA </td><td
align="right">5,000.00 </td><td
align="right">16.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">188
</td><td align="left" style="background-color:#EFEFEF;">IRR000872
</td><td align="left">13-06-2019 14:36:50
</td><td align="left">06-12-2019 11:15:05
</td><td align="left">Executive engineer
</td><td align="left">8919822252 </td><td
align="left">To de-silting area to Konayamakula lift irrigation scheme works in
erstwhile Warangal District </td><td
align="left">WARANGAL URBAN </td><td
align="left">Khila Warangal </td><td
align="left">Khila Warangal </td><td
align="left">scheme works </td><td
align="left">Konayamakula lift irrigation
</td><td align="left">506002 </td><td
align="left">ramesh </td><td
align="left">7032322182 </td><td
align="left">TS25T1266 </td><td
align="left">TRAN3CEDC864 </td><td
align="right">6,000.00 </td><td
align="right">16.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">189
</td><td align="left" style="background-color:#EFEFEF;">IRR001114
</td><td align="left">03-12-2019 15:45:58
</td><td align="left">06-12-2019 11:13:42
</td><td align="left">L Satyavardhan EE </td><td
align="left">9494306757 </td><td align="left">To
kaleshwaram project falling in the limits of Kudurupally (V) (Mahadevpur-VI),
Mahadevapur (M) JB District to the works of Package-8 of Link-II, Kaleshwaram
project. </td><td align="left">KARIMNAGAR
</td><td align="left">Choppadandi </td><td
align="left">Choppadandi </td><td
align="left">Link-II,Kaleshwaramp </td><td
align="left">to the works of Package-8 of
</td><td align="left">505415 </td><td
align="left">EALLAIAH </td><td
align="left">9493741809 </td><td
align="left">AP07TA3546 </td><td
align="left">TRANA4ECAC9B </td><td
align="right">5,000.00 </td><td
align="right">16.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">190
</td><td align="left" style="background-color:#EFEFEF;">IRR001114
</td><td align="left">03-12-2019 15:45:58
</td><td align="left">06-12-2019 11:11:58
</td><td align="left">L Satyavardhan EE </td><td
align="left">9494306757
</td><td align="left">To kaleshwaram project falling in the
limits of Kudurupally (V) (Mahadevpur-VI), Mahadevapur (M) JB District to the works
of Package-8 of Link-II, Kaleshwaram project.
</td><td align="left">KARIMNAGAR </td><td
align="left">Choppadandi </td><td
align="left">Choppadandi </td><td
align="left">Link-II,Kaleshwaramp </td><td
align="left">to the works of Package-8 of
</td><td align="left">505415 </td><td
align="left">AIELAIAH </td><td
align="left">9676412257 </td><td
align="left">TS03UC0234 </td><td
align="left">TRANB7442768 </td><td
align="right">5,000.00 </td><td
align="right">20.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">191
</td><td align="left" style="background-color:#EFEFEF;">IRR000896
</td><td align="left">29-06-2019 13:49:22
</td><td align="left">06-12-2019 11:10:44
</td><td align="left">Executive Engineer
</td><td align="left">8919822252 </td><td
align="left">De-silting area of Annaram Barrage located in Godavari river,
Jayashankar Bhupalpally District to Sri Komaravelli Mallanna Sagar, Reservoir
Reach-3, Laxmapur (V) Thogutta (M) Siddipet District
</td><td align="left">SIDDIPET </td><td
align="left">Thoguta </td><td
align="left">Thoguta </td><td
align="left">Reservoir Reach-3 </td><td
align="left">Sri Komaravelli Mallanna Sagar
</td><td align="left">502372 </td><td
align="left">GOPAL </td><td
align="left">8185903317 </td><td
align="left">TS07UF6399 </td><td
align="left">TRAN97B43479 </td><td
align="right">10,000.00 </td><td
align="right">20.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">192
</td><td align="left" style="background-color:#EFEFEF;">IRR001111
</td><td align="left">25-11-2019 15:22:45
</td><td align="left">06-12-2019 11:08:46
</td><td align="left">L Satyavardhan EE </td><td
align="left">9494306757 </td><td
align="left">Formation of sri komaravelli mallanna sagar reservoir with a capacity
of 50 TMC and the formation of sri Komaravelli Mallanna sagar reservoir with a
capacity of 50 TMC and the formation of earth bund with all its associated
components for Reach-3 from Km 12.800 to 16.700 and adjoining with Reach-4 at km
16.700 near Laxmapur (V) Thoguta (M) Siddipet District
</td><td align="left">SIDDIPET </td><td
align="left">Thoguta </td><td
align="left">Thoguta </td><td
align="left">&formation of earthb </td><td
align="left">Sri Komaravelli Mallannasagar
</td><td align="left">502372 </td><td
align="left">SURESH </td><td
align="left">9989179981 </td><td
align="left">TS19T4479 </td><td
align="left">TRAN5637716B </td><td
align="right">15,000.00 </td><td
align="right">20.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">193
</td><td align="left" style="background-color:#EFEFEF;">IRR001114
</td><td align="left">03-12-2019 15:45:58
</td><td align="left">06-12-2019 11:08:02
</td><td align="left">L Satyavardhan EE </td><td
align="left">9494306757 </td><td align="left">To
kaleshwaram project falling in the limits of Kudurupally (V) (Mahadevpur-VI),
Mahadevapur (M) JB District to the works of Package-8 of Link-II, Kaleshwaram
project. </td><td align="left">KARIMNAGAR
</td><td align="left">Choppadandi </td><td
align="left">Choppadandi </td><td
align="left">Link-II,Kaleshwaramp </td><td
align="left">to the works of Package-8 of
</td><td align="left">505415 </td><td
align="left">SRINU </td><td
align="left">9989145419 </td><td
align="left">TS03UC3579 </td><td
align="left">TRAN64F48AEF </td><td
align="right">5,000.00 </td><td
align="right">20.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">194
</td><td align="left" style="background-color:#EFEFEF;">IRR001114
</td><td align="left">03-12-2019 15:45:58
</td><td align="left">06-12-2019 11:07:12
</td><td align="left">L Satyavardhan EE </td><td
align="left">9494306757 </td><td align="left">To
kaleshwaram project falling in the limits of Kudurupally (V) (Mahadevpur-VI),
Mahadevapur (M) JB District to the works of Package-8 of Link-II, Kaleshwaram
project. </td><td align="left">KARIMNAGAR
</td><td align="left">Choppadandi </td><td
align="left">Choppadandi </td><td
align="left">Link-II,Kaleshwaramp </td><td
align="left">to the works of Package-8 of
</td><td align="left">505415 </td><td
align="left">RAMESH </td><td
align="left">9573333859 </td><td
align="left">TS03UB7447 </td><td
align="left">TRANBDCACE79 </td><td
align="right">5,000.00 </td><td
align="right">16.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">195
</td><td align="left" style="background-color:#EFEFEF;">IRR001114
</td><td align="left">03-12-2019 15:45:58
</td><td align="left">06-12-2019 11:06:27
</td><td align="left">L Satyavardhan EE </td><td
align="left">9494306757 </td><td align="left">To
kaleshwaram project falling in the limits of Kudurupally (V) (Mahadevpur-VI),
Mahadevapur (M) JB District to the works of Package-8 of Link-II, Kaleshwaram
project. </td><td align="left">KARIMNAGAR
</td><td align="left">Choppadandi </td><td
align="left">Choppadandi </td><td
align="left">Link-II,Kaleshwaramp </td><td
align="left">to the works of Package-8 of
</td><td align="left">505415 </td><td
align="left">RAJU </td><td
align="left">9492501835 </td><td
align="left">TS03UB3579 </td><td
align="left">TRAN741442F5 </td><td
align="right">5,000.00 </td><td
align="right">16.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">196
</td><td align="left" style="background-color:#EFEFEF;">IRR000936
</td><td align="left">08-07-2019 15:27:34
</td><td align="left">06-12-2019 11:04:48
</td><td align="left">Executive Engineer
</td><td align="left">8919822252 </td><td
align="left">to Sri Komaravelli Mallanna Sagar Reservoir Reach-2, Vemulaghat (V)
Thogutta (M) Siddipet District.
</td><td align="left">SIDDIPET
</td><td align="left">Thoguta </td><td
align="left">Vemulaghat </td><td
align="left">Reservoir Reach-2 </td><td
align="left">Sri Komaravelli Mallanna Sagar
</td><td align="left">502372 </td><td
align="left">RAJASHEKAR </td><td
align="left">9550237363 </td><td
align="left">TS02UB0818 </td><td
align="left">TRAN1448C94D </td><td
align="right">20,000.00 </td><td
align="right">20.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">197
</td><td align="left" style="background-color:#EFEFEF;">IRR001115
</td><td align="left">03-12-2019 15:49:49
</td><td align="left">06-12-2019 11:03:55
</td><td align="left">L Satyavardhan EE </td><td
align="left">9494306757 </td><td align="left">To
the formation of Sri Komaravelli Mallanna Sagar Reservoir with a capacity of 50 TMC
and the formation of Sri Komaravelli Mallanna sagar Reservoir with a capacity of 50
TMC and the formation of Earth bund with all its associated components for Reach-3
from Km 12.8OO to 16.700 and adjoining with Reach-2 at Km 12.8OO near Laxmapur (V),
Thoguta (M), Siddipet District. </td><td
align="left">SIDDIPET </td><td
align="left">Thoguta </td><td
align="left">Thoguta </td><td
align="left">allanna Sagar Reserv </td><td
align="left">formation of Sri Komaravelli M
</td><td align="left">502372 </td><td
align="left">SHENKAR </td><td
align="left">6300628319 </td><td
align="left">TS07UG2227 </td><td
align="left">TRAN9E226764 </td><td
align="right">10,000.00 </td><td
align="right">20.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">198
</td><td align="left" style="background-color:#EFEFEF;">IRR000951
</td><td align="left">15-07-2019 16:38:18
</td><td align="left">06-12-2019 11:01:07
</td><td align="left">Executive engineer
</td><td align="left">8919822252 </td><td
align="left">For the works of package 5 of SRSP phase-II near Regonda (V)- Husnabad
(M) Karimnagar District </td><td
align="left">KARIMNAGAR </td><td
align="left">Karimnagar </td><td
align="left">Karimnagar </td><td
align="left">SRSP phase-II </td><td
align="left">For the works of package 5 </td><td
align="left">505001 </td><td align="left">NAVEEN
</td><td align="left">9381324312 </td><td
align="left">TS25T2898 </td><td
align="left">TRAND6E754BC </td><td
align="right">15,000.00 </td><td
align="right">16.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">199
</td><td align="left" style="background-color:#EFEFEF;">IRR000936
</td><td align="left">08-07-2019 15:27:34
</td><td align="left">06-12-2019 11:00:09
</td><td align="left">Executive Engineer
</td><td align="left">8919822252 </td><td
align="left">to Sri Komaravelli Mallanna Sagar Reservoir Reach-2, Vemulaghat (V)
Thogutta (M) Siddipet District. </td><td
align="left">SIDDIPET </td><td
align="left">Thoguta </td><td
align="left">Vemulaghat </td><td
align="left">Reservoir Reach-2 </td><td
align="left">Sri Komaravelli Mallanna Sagar
</td><td align="left">502372 </td><td
align="left">RAMARAJU </td><td
align="left">9010056041 </td><td
align="left">TS08UD5499 </td><td
align="left">TRAN66C4C4EA </td><td
align="right">20,000.00 </td><td
align="right">20.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">200
</td><td align="left" style="background-color:#EFEFEF;">IRR001111
</td><td align="left">25-11-2019 15:22:45
</td><td align="left">06-12-2019 10:59:15
</td><td align="left">L Satyavardhan EE </td><td
align="left">9494306757 </td><td
align="left">Formation of sri komaravelli mallanna sagar reservoir with a capacity
of 50 TMC and the formation of sri Komaravelli Mallanna sagar reservoir with a
capacity of 50 TMC and the formation of earth bund with all its associated
components for Reach-3 from Km 12.800 to 16.700 and adjoining with Reach-4 at km
16.700 near Laxmapur (V) Thoguta (M) Siddipet District
</td><td align="left">SIDDIPET </td><td
align="left">Thoguta </td><td
align="left">Thoguta </td><td
align="left">&formation of earthb </td><td
align="left">Sri Komaravelli Mallannasagar
</td><td align="left">502372 </td><td
align="left">SATHYAM </td><td
align="left">9849857952 </td><td
align="left">TS02UB1278 </td><td
align="left">TRANCAB2D124 </td><td
align="right">15,000.00 </td><td
align="right">20.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">201
</td><td align="left" style="background-color:#EFEFEF;">IRR001105
</td><td align="left">19-11-2019 15:34:10
</td><td align="left">06-12-2019 10:58:22
</td><td align="left">EXECUTIVE ENGINEER
</td><td align="left">8919822252 </td><td
align="left">To remodeling the canal DBM-48 (from Km 0.000 to Km 83.200) for
construction of CC lining works at Parvathagiri (V&M), Warangal Rural District
</td><td align="left">WARANGAL RURAL </td><td
align="left">Parvathagiri </td><td
align="left">Parvathagiri </td><td
align="left">const of CC lining </td><td
align="left">To remodeling the canal DBM-48
</td><td align="left">506365 </td><td
align="left">DASHTHAGIRI </td><td
align="left">9948732421 </td><td
align="left">AP37TA4569 </td><td
align="left">TRAN44E3B6D3 </td><td
align="right">3,000.00 </td><td
align="right">16.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">202
</td><td align="left" style="background-color:#EFEFEF;">IRR001114
</td><td align="left">03-12-2019 15:45:58
</td><td align="left">06-12-2019 10:56:30
</td><td align="left">L Satyavardhan EE </td><td
align="left">9494306757 </td><td align="left">To
kaleshwaram project falling in the limits of Kudurupally (V) (Mahadevpur-VI),
Mahadevapur (M) JB District to the works of Package-8 of Link-II, Kaleshwaram
project. </td><td align="left">KARIMNAGAR
</td><td align="left">Choppadandi
</td><td align="left">Choppadandi
</td><td align="left">Link-II,Kaleshwaramp
</td><td align="left">to the works of Package-8 of
</td><td align="left">505415 </td><td
align="left">PASHA </td><td
align="left">9502181446 </td><td
align="left">TS03UC3578 </td><td
align="left">TRANFD77AFA9 </td><td
align="right">5,000.00 </td><td
align="right">20.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">203
</td><td align="left" style="background-color:#EFEFEF;">IRR000896
</td><td align="left">29-06-2019 13:49:22
</td><td align="left">06-12-2019 10:55:39
</td><td align="left">Executive Engineer
</td><td align="left">8919822252 </td><td
align="left">De-silting area of Annaram Barrage located in Godavari river,
Jayashankar Bhupalpally District to Sri Komaravelli Mallanna Sagar, Reservoir
Reach-3, Laxmapur (V) Thogutta (M) Siddipet District
</td><td align="left">SIDDIPET </td><td
align="left">Thoguta </td><td
align="left">Thoguta </td><td
align="left">Reservoir Reach-3 </td><td
align="left">Sri Komaravelli Mallanna Sagar
</td><td align="left">502372 </td><td
align="left">KAMLESH </td><td
align="left">7484002081 </td><td
align="left">AP29TA9348 </td><td
align="left">TRAN47493512 </td><td
align="right">10,000.00 </td><td
align="right">16.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">204
</td><td align="left" style="background-color:#EFEFEF;">IRR000896
</td><td align="left">29-06-2019 13:49:22
</td><td align="left">06-12-2019 10:53:24
</td><td align="left">Executive Engineer
</td><td align="left">8919822252 </td><td
align="left">De-silting area of Annaram Barrage located in Godavari river,
Jayashankar Bhupalpally District to Sri Komaravelli Mallanna Sagar, Reservoir
Reach-3, Laxmapur (V) Thogutta (M) Siddipet District
</td><td align="left">SIDDIPET </td><td
align="left">Thoguta </td><td
align="left">Thoguta </td><td
align="left">Reservoir Reach-3 </td><td
align="left">Sri Komaravelli Mallanna Sagar
</td><td align="left">502372 </td><td
align="left">SHIVA </td><td
align="left">9640746292 </td><td
align="left">TS05UC3039 </td><td
align="left">TRAN72121EB6 </td><td
align="right">10,000.00 </td><td
align="right">16.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">205
</td><td align="left" style="background-color:#EFEFEF;">IRR000936
</td><td align="left">08-07-2019 15:27:34
</td><td align="left">06-12-2019 10:52:37
</td><td align="left">Executive Engineer
</td><td align="left">8919822252 </td><td
align="left">to Sri Komaravelli Mallanna Sagar Reservoir Reach-2, Vemulaghat (V)
Thogutta (M) Siddipet District. </td><td
align="left">SIDDIPET </td><td
align="left">Thoguta </td><td
align="left">Vemulaghat </td><td
align="left">Reservoir Reach-2 </td><td
align="left">Sri Komaravelli Mallanna Sagar
</td><td align="left">502372 </td><td
align="left">VENKATESH </td><td
align="left">9550210803 </td><td
align="left">TS07UG5355 </td><td
align="left">TRANA79A9484 </td><td
align="right">20,000.00 </td><td
align="right">22.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">206
</td><td align="left" style="background-color:#EFEFEF;">IRR000936
</td><td align="left">08-07-2019 15:27:34
</td><td align="left">06-12-2019 10:51:48
</td><td align="left">Executive Engineer
</td><td align="left">8919822252 </td><td
align="left">to Sri Komaravelli Mallanna Sagar Reservoir Reach-2, Vemulaghat (V)
Thogutta (M) Siddipet District. </td><td
align="left">SIDDIPET </td><td
align="left">Thoguta </td><td
align="left">Vemulaghat </td><td
align="left">Reservoir Reach-2 </td><td
align="left">Sri Komaravelli Mallanna Sagar
</td><td align="left">502372 </td><td
align="left">GANESH </td><td
align="left">9553939470 </td><td
align="left">TS08UD3359 </td><td
align="left">TRANBF3B4351 </td><td
align="right">20,000.00 </td><td
align="right">20.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">207
</td><td align="left" style="background-color:#EFEFEF;">IRR000936
</td><td align="left">08-07-2019 15:27:34
</td><td align="left">06-12-2019 10:51:03
</td><td align="left">Executive Engineer
</td><td align="left">8919822252 </td><td
align="left">to Sri Komaravelli Mallanna Sagar Reservoir Reach-2, Vemulaghat (V)
Thogutta (M) Siddipet District. </td><td
align="left">SIDDIPET </td><td
align="left">Thoguta </td><td
align="left">Vemulaghat </td><td
align="left">Reservoir Reach-2 </td><td
align="left">Sri Komaravelli Mallanna Sagar
</td><td align="left">502372 </td><td
align="left">NAGARJUNA </td><td
align="left">9182077723 </td><td
align="left">TS08UF6599 </td><td
align="left">TRAN354F1F97 </td><td
align="right">20,000.00 </td><td
align="right">20.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">208
</td><td align="left" style="background-color:#EFEFEF;">IRR001114
</td><td align="left">03-12-2019 15:45:58
</td><td align="left">06-12-2019 10:49:25
</td><td align="left">L Satyavardhan EE </td><td
align="left">9494306757 </td><td align="left">To
kaleshwaram project falling in the limits of Kudurupally (V) (Mahadevpur-VI),
Mahadevapur (M) JB District to the works of Package-8 of Link-II, Kaleshwaram
project. </td><td align="left">KARIMNAGAR
</td><td align="left">Choppadandi </td><td
align="left">Choppadandi </td><td
align="left">Link-II,Kaleshwaramp </td><td
align="left">to the works of Package-8 of
</td><td align="left">505415 </td><td
align="left">ODELU </td><td
align="left">9666963423 </td><td
align="left">TS03UC3456 </td><td
align="left">TRAN797AD5FC
</td><td align="right">5,000.00
</td><td align="right">20.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">209
</td><td align="left" style="background-color:#EFEFEF;">IRR000936
</td><td align="left">08-07-2019 15:27:34
</td><td align="left">06-12-2019 10:47:13
</td><td align="left">Executive Engineer
</td><td align="left">8919822252 </td><td
align="left">to Sri Komaravelli Mallanna Sagar Reservoir Reach-2, Vemulaghat (V)
Thogutta (M) Siddipet District. </td><td
align="left">SIDDIPET </td><td
align="left">Thoguta </td><td
align="left">Vemulaghat </td><td
align="left">Reservoir Reach-2 </td><td
align="left">Sri Komaravelli Mallanna Sagar
</td><td align="left">502372 </td><td
align="left">MOOSA </td><td
align="left">7416829579 </td><td
align="left">TS02UC3803 </td><td
align="left">TRANC67F8FB2 </td><td
align="right">20,000.00 </td><td
align="right">20.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">210
</td><td align="left" style="background-color:#EFEFEF;">IRR000936
</td><td align="left">08-07-2019 15:27:34
</td><td align="left">06-12-2019 10:46:29
</td><td align="left">Executive Engineer
</td><td align="left">8919822252 </td><td
align="left">to Sri Komaravelli Mallanna Sagar Reservoir Reach-2, Vemulaghat (V)
Thogutta (M) Siddipet District. </td><td
align="left">SIDDIPET </td><td
align="left">Thoguta </td><td
align="left">Vemulaghat </td><td
align="left">Reservoir Reach-2 </td><td
align="left">Sri Komaravelli Mallanna Sagar
</td><td align="left">502372 </td><td
align="left">RAVI </td><td
align="left">8688225157 </td><td
align="left">TS08UD4779 </td><td
align="left">TRANECB44CFF </td><td
align="right">20,000.00 </td><td
align="right">20.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">211
</td><td align="left" style="background-color:#EFEFEF;">IRR000936
</td><td align="left">08-07-2019 15:27:34
</td><td align="left">06-12-2019 10:45:52
</td><td align="left">Executive Engineer
</td><td align="left">8919822252 </td><td
align="left">to Sri Komaravelli Mallanna Sagar Reservoir Reach-2, Vemulaghat (V)
Thogutta (M) Siddipet District. </td><td
align="left">SIDDIPET </td><td
align="left">Thoguta </td><td
align="left">Vemulaghat </td><td
align="left">Reservoir Reach-2 </td><td
align="left">Sri Komaravelli Mallanna Sagar
</td><td align="left">502372 </td><td
align="left">RAJU </td><td
align="left">9951833256 </td><td
align="left">TS22T5767 </td><td
align="left">TRAN45194DC8 </td><td
align="right">20,000.00 </td><td
align="right">20.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">212
</td><td align="left" style="background-color:#EFEFEF;">IRR001114
</td><td align="left">03-12-2019 15:45:58
</td><td align="left">06-12-2019 10:45:08
</td><td align="left">L Satyavardhan EE </td><td
align="left">9494306757 </td><td align="left">To
kaleshwaram project falling in the limits of Kudurupally (V) (Mahadevpur-VI),
Mahadevapur (M) JB District to the works of Package-8 of Link-II, Kaleshwaram
project. </td><td align="left">KARIMNAGAR
</td><td align="left">Choppadandi </td><td
align="left">Choppadandi </td><td
align="left">Link-II,Kaleshwaramp </td><td
align="left">to the works of Package-8 of
</td><td align="left">505415 </td><td
align="left">VENKATESH </td><td
align="left">9848284148 </td><td
align="left">TS30T3555 </td><td
align="left">TRAN14D88CAB </td><td
align="right">5,000.00 </td><td
align="right">20.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">213
</td><td align="left" style="background-color:#EFEFEF;">IRR001111
</td><td align="left">25-11-2019 15:22:45
</td><td align="left">06-12-2019 10:44:23
</td><td align="left">L Satyavardhan EE </td><td
align="left">9494306757 </td><td
align="left">Formation of sri komaravelli mallanna sagar reservoir with a capacity
of 50 TMC and the formation of sri Komaravelli Mallanna sagar reservoir with a
capacity of 50 TMC and the formation of earth bund with all its associated
components for Reach-3 from Km 12.800 to 16.700 and adjoining with Reach-4 at km
16.700 near Laxmapur (V) Thoguta (M) Siddipet District
</td><td align="left">SIDDIPET </td><td
align="left">Thoguta </td><td
align="left">Thoguta </td><td
align="left">&formation of earthb </td><td
align="left">Sri Komaravelli Mallannasagar
</td><td align="left">502372 </td><td
align="left">RAKESH </td><td
align="left">9963725041 </td><td
align="left">TS03UC1257 </td><td
align="left">TRANEF761253 </td><td
align="right">15,000.00 </td><td
align="right">20.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">214
</td><td align="left" style="background-color:#EFEFEF;">IRR001114
</td><td align="left">03-12-2019 15:45:58
</td><td align="left">06-12-2019 10:43:37
</td><td align="left">L Satyavardhan EE </td><td
align="left">9494306757 </td><td align="left">To
kaleshwaram project falling in the limits of Kudurupally (V) (Mahadevpur-VI),
Mahadevapur (M) JB District to the works of Package-8 of Link-II, Kaleshwaram
project. </td><td align="left">KARIMNAGAR
</td><td align="left">Choppadandi </td><td
align="left">Choppadandi </td><td
align="left">Link-II,Kaleshwaramp </td><td
align="left">to the works of Package-8 of
</td><td align="left">505415 </td><td
align="left">RAJAK </td><td
align="left">8106427231 </td><td
align="left">TS08UE1448 </td><td
align="left">TRANDAC74946 </td><td
align="right">5,000.00 </td><td
align="right">20.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">215
</td><td align="left" style="background-color:#EFEFEF;">IRR000936
</td><td align="left">08-07-2019 15:27:34
</td><td align="left">06-12-2019 10:42:13
</td><td align="left">Executive Engineer
</td><td align="left">8919822252 </td><td
align="left">to Sri Komaravelli Mallanna Sagar Reservoir Reach-2, Vemulaghat (V)
Thogutta (M) Siddipet District. </td><td
align="left">SIDDIPET </td><td
align="left">Thoguta </td><td
align="left">Vemulaghat </td><td
align="left">Reservoir Reach-2 </td><td
align="left">Sri Komaravelli Mallanna Sagar
</td><td align="left">502372 </td><td
align="left">YADHAGIRI </td><td
align="left">9885501113 </td><td
align="left">TS07UG4356 </td><td
align="left">TRANB76846F4 </td><td
align="right">20,000.00 </td><td
align="right">20.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">216
</td><td align="left" style="background-color:#EFEFEF;">IRR000936
</td><td align="left">08-07-2019 15:27:34
</td><td align="left">06-12-2019 10:41:22
</td><td align="left">Executive Engineer
</td><td align="left">8919822252 </td><td
align="left">to Sri Komaravelli Mallanna Sagar Reservoir Reach-2, Vemulaghat (V)
Thogutta (M) Siddipet District. </td><td
align="left">SIDDIPET </td><td
align="left">Thoguta </td><td
align="left">Vemulaghat </td><td
align="left">Reservoir Reach-2 </td><td
align="left">Sri Komaravelli Mallanna Sagar
</td><td align="left">502372 </td><td
align="left">ASHOK </td><td
align="left">7095013346 </td><td
align="left">TS07UG4365 </td><td
align="left">TRAN88E2CD2C </td><td
align="right">20,000.00 </td><td
align="right">20.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">217
</td><td align="left" style="background-color:#EFEFEF;">IRR001032
</td><td align="left">17-08-2019 15:12:07
</td><td align="left">06-12-2019 10:40:25
</td><td align="left">K Sai Babu,EEI & CADD
</td><td align="left">9704678233 </td><td
align="left">To investigation, design and execution of tunnel of minimum 6.00 M
internal diameter or 5.60 M ‘D’ shaped with carrying capacity of 49.6 cumecs water
from Bheem Ghanpur tank to Ramappa tank and construction of Head Regulator at the
entrance portal of Tunnel including civil. Electro Mechanical & Hydro Mechanical,
Instrumentation, Auxiliary. Miscellaneous equipment and SCADA communication system
at pumping station now modified as laying of 3m dia of 3 rows pipeline instead of
Tunnel in Warangal District. </td><td
align="left">WARANGAL URBAN </td><td
align="left">Khila Warangal </td><td
align="left">Khila Warangal </td><td
align="left">entrance portal </td><td
align="left">const of head regulator at the
</td><td align="left">506002 </td><td
align="left">MALLESH </td><td
align="left">9441728015 </td><td
align="left">AP35W0159 </td><td
align="left">TRANA2414ADA </td><td
align="right">2,000.00 </td><td
align="right">16.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">218
</td><td align="left" style="background-color:#EFEFEF;">IRR000896
</td><td align="left">29-06-2019 13:49:22
</td><td align="left">06-12-2019 10:38:22
</td><td align="left">Executive Engineer
</td><td align="left">8919822252 </td><td
align="left">De-silting area of Annaram Barrage located in Godavari river,
Jayashankar Bhupalpally District to Sri Komaravelli Mallanna Sagar, Reservoir
Reach-3, Laxmapur (V) Thogutta (M) Siddipet District
</td><td align="left">SIDDIPET </td><td
align="left">Thoguta </td><td
align="left">Thoguta </td><td
align="left">Reservoir Reach-3 </td><td
align="left">Sri Komaravelli Mallanna Sagar
</td><td align="left">502372 </td><td
align="left">ASHOK </td><td
align="left">9848770595 </td><td
align="left">TS05UC2929 </td><td
align="left">TRAN9D88F486 </td><td
align="right">10,000.00 </td><td
align="right">20.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">219
</td><td align="left" style="background-color:#EFEFEF;">IRR001032
</td><td align="left">17-08-2019 15:12:07
</td><td align="left">06-12-2019 10:36:07
</td><td align="left">K Sai Babu,EEI & CADD
</td><td align="left">9704678233 </td><td
align="left">To investigation, design and execution of tunnel of minimum 6.00 M
internal diameter or 5.60 M ‘D’ shaped with carrying capacity of 49.6 cumecs water
from Bheem Ghanpur tank to Ramappa tank and construction of Head Regulator at the
entrance portal of Tunnel including civil. Electro Mechanical & Hydro Mechanical,
Instrumentation, Auxiliary. Miscellaneous equipment and SCADA communication system
at pumping station now modified as laying of 3m dia of 3 rows pipeline instead of
Tunnel in Warangal District. </td><td
align="left">WARANGAL URBAN </td><td
align="left">Khila Warangal </td><td
align="left">Khila Warangal </td><td
align="left">entrance portal </td><td
align="left">const of head regulator at the
</td><td align="left">506002 </td><td
align="left">YADHAGIRI </td><td
align="left">9912227112 </td><td
align="left">AP16TB9059 </td><td
align="left">TRAN3F282F57 </td><td
align="right">2,000.00 </td><td
align="right">16.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">220
</td><td align="left" style="background-color:#EFEFEF;">IRRSPL000966
</td><td align="left">24-05-2019 13:33:12
</td><td align="left">06-12-2019 10:34:13
</td><td align="left">Executive Engineer
</td><td align="left">9494306757 </td><td
align="left">The formation of earth bund with all its associated components for
Reach-4 for Km 16.700 to Km 22.900 along with its structures and adjoining with the
Reach-3 at Km 6.700 and Saddle bund of Km length of Thougutta (V&M), Siddipet
District. </td><td align="left">SIDDIPET
</td><td align="left">Thoguta </td><td
align="left">Thoguta </td><td align="left">Km
16.700 to Km 22.9 </td><td align="left">The
formation of earth bund </td><td
align="left">502372 </td><td
align="left">BIXAPATHI </td><td
align="left">9014147158 </td><td
align="left">TS26T4244 </td><td
align="left">TRAN9FD4FB98 </td><td
align="right">1,780.00 </td><td
align="right">20.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">221
</td><td align="left" style="background-color:#EFEFEF;">IRR000872
</td><td align="left">13-06-2019 14:36:50
</td><td align="left">06-12-2019 10:32:48
</td><td align="left">Executive engineer
</td><td align="left">8919822252 </td><td
align="left">To de-silting area to Konayamakula lift irrigation scheme works in
erstwhile Warangal District </td><td
align="left">WARANGAL URBAN </td><td
align="left">Khila Warangal </td><td
align="left">Khila Warangal </td><td
align="left">scheme works </td><td
align="left">Konayamakula lift irrigation
</td><td align="left">506002 </td><td
align="left">RAMESH </td><td
align="left">6303503417 </td><td
align="left">AP16TY5546 </td><td
align="left">TRAN464B46B4 </td><td
align="right">6,000.00 </td><td
align="right">16.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">222
</td><td align="left" style="background-color:#EFEFEF;">IRR000936
</td><td align="left">08-07-2019 15:27:34
</td><td align="left">06-12-2019 10:26:02
</td><td align="left">Executive Engineer
</td><td align="left">8919822252 </td><td
align="left">to Sri Komaravelli Mallanna Sagar Reservoir Reach-2, Vemulaghat (V)
Thogutta (M) Siddipet District. </td><td
align="left">SIDDIPET </td><td
align="left">Thoguta </td><td
align="left">Vemulaghat </td><td
align="left">Reservoir Reach-2 </td><td
align="left">Sri Komaravelli Mallanna Sagar
</td><td align="left">502372 </td><td
align="left">CHANDHU </td><td
align="left">9542295159 </td><td
align="left">TS07UF0064 </td><td
align="left">TRANDB43669A </td><td
align="right">20,000.00 </td><td
align="right">20.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">223
</td><td align="left" style="background-color:#EFEFEF;">IRR000896
</td><td align="left">29-06-2019 13:49:22
</td><td align="left">06-12-2019 10:24:46
</td><td align="left">Executive Engineer
</td><td align="left">8919822252 </td><td
align="left">De-silting area of Annaram Barrage located in Godavari river,
Jayashankar Bhupalpally District to Sri Komaravelli Mallanna Sagar, Reservoir
Reach-3, Laxmapur (V) Thogutta (M) Siddipet District
</td><td align="left">SIDDIPET </td><td
align="left">Thoguta </td><td
align="left">Thoguta </td><td
align="left">Reservoir Reach-3 </td><td
align="left">Sri Komaravelli Mallanna Sagar
</td><td align="left">502372 </td><td
align="left">SATHISH </td><td
align="left">9553332523 </td><td
align="left">TS02UC1332 </td><td
align="left">TRANF9282AE5 </td><td
align="right">10,000.00 </td><td
align="right">20.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">224
</td><td align="left" style="background-color:#EFEFEF;">IRR000896
</td><td align="left">29-06-2019 13:49:22
</td><td align="left">06-12-2019 10:23:41
</td><td align="left">Executive Engineer
</td><td align="left">8919822252 </td><td
align="left">De-silting area of Annaram Barrage located in Godavari river,
Jayashankar Bhupalpally District to Sri Komaravelli Mallanna Sagar, Reservoir
Reach-3, Laxmapur (V) Thogutta (M) Siddipet District
</td><td align="left">SIDDIPET </td><td
align="left">Thoguta </td><td
align="left">Thoguta </td><td
align="left">Reservoir Reach-3 </td><td
align="left">Sri Komaravelli Mallanna Sagar
</td><td align="left">502372 </td><td
align="left">MOEN </td><td
align="left">7893347432 </td><td
align="left">TS08UD9977 </td><td
align="left">TRANF7EDDE64 </td><td
align="right">10,000.00 </td><td
align="right">20.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">225
</td><td align="left" style="background-color:#EFEFEF;">IRR000896
</td><td align="left">29-06-2019 13:49:22
</td><td align="left">06-12-2019 10:22:56
</td><td align="left">Executive Engineer
</td><td align="left">8919822252 </td><td
align="left">De-silting area of Annaram Barrage located in Godavari river,
Jayashankar Bhupalpally District to Sri Komaravelli Mallanna Sagar, Reservoir
Reach-3, Laxmapur (V) Thogutta (M) Siddipet District
</td><td align="left">SIDDIPET </td><td
align="left">Thoguta </td><td
align="left">Thoguta </td><td
align="left">Reservoir Reach-3 </td><td
align="left">Sri Komaravelli Mallanna Sagar
</td><td align="left">502372 </td><td
align="left">BHASKAR </td><td
align="left">6302253823 </td><td
align="left">TS08UF9333 </td><td
align="left">TRAN2E7634CA </td><td
align="right">10,000.00 </td><td
align="right">16.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">226
</td><td align="left" style="background-color:#EFEFEF;">IRR000936
</td><td align="left">08-07-2019 15:27:34
</td><td align="left">06-12-2019 10:21:42
</td><td align="left">Executive Engineer
</td><td align="left">8919822252 </td><td
align="left">to Sri Komaravelli Mallanna Sagar Reservoir Reach-2, Vemulaghat (V)
Thogutta (M) Siddipet District. </td><td
align="left">SIDDIPET </td><td
align="left">Thoguta </td><td
align="left">Vemulaghat </td><td
align="left">Reservoir Reach-2 </td><td
align="left">Sri Komaravelli Mallanna Sagar
</td><td align="left">502372 </td><td
align="left">B N REDDY </td><td
align="left">9573362222 </td><td
align="left">TS07UF2222 </td><td
align="left">TRAN328C8BED </td><td
align="right">20,000.00 </td><td
align="right">20.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">227
</td><td align="left" style="background-color:#EFEFEF;">IRR000951
</td><td align="left">15-07-2019 16:38:18
</td><td align="left">06-12-2019 10:16:58
</td><td align="left">Executive engineer
</td><td
align="left">8919822252 </td><td
align="left">For the works of package 5 of SRSP phase-II near Regonda (V)- Husnabad
(M) Karimnagar District </td><td
align="left">KARIMNAGAR </td><td
align="left">Karimnagar </td><td
align="left">Karimnagar </td><td
align="left">SRSP phase-II </td><td
align="left">For the works of package 5 </td><td
align="left">505001 </td><td
align="left">SHANKER </td><td
align="left">9502938320 </td><td
align="left">TS25T3435 </td><td
align="left">TRAN319DE4B1 </td><td
align="right">15,000.00 </td><td
align="right">20.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">228
</td><td align="left" style="background-color:#EFEFEF;">IRR000896
</td><td align="left">29-06-2019 13:49:22
</td><td align="left">06-12-2019 10:16:49
</td><td align="left">Executive Engineer
</td><td align="left">8919822252 </td><td
align="left">De-silting area of Annaram Barrage located in Godavari river,
Jayashankar Bhupalpally District to Sri Komaravelli Mallanna Sagar, Reservoir
Reach-3, Laxmapur (V) Thogutta (M) Siddipet District
</td><td align="left">SIDDIPET </td><td
align="left">Thoguta </td><td
align="left">Thoguta </td><td
align="left">Reservoir Reach-3 </td><td
align="left">Sri Komaravelli Mallanna Sagar
</td><td align="left">502372 </td><td
align="left">VENKATESH </td><td
align="left">6369481627 </td><td
align="left">TS08UD6879 </td><td
align="left">TRAN59FC8E9E </td><td
align="right">10,000.00 </td><td
align="right">16.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">229
</td><td align="left" style="background-color:#EFEFEF;">IRR000951
</td><td align="left">15-07-2019 16:38:18
</td><td align="left">06-12-2019 10:16:14
</td><td align="left">Executive engineer
</td><td align="left">8919822252 </td><td
align="left">For the works of package 5 of SRSP phase-II near Regonda (V)- Husnabad
(M) Karimnagar District </td><td
align="left">KARIMNAGAR </td><td
align="left">Karimnagar </td><td
align="left">Karimnagar </td><td
align="left">SRSP phase-II </td><td
align="left">For the works of package 5 </td><td
align="left">505001 </td><td
align="left">SHANKER </td><td
align="left">9989528122 </td><td
align="left">TS25T1455 </td><td
align="left">TRAN77777E47 </td><td
align="right">15,000.00 </td><td
align="right">20.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">230
</td><td align="left" style="background-color:#EFEFEF;">IRR001111
</td><td align="left">25-11-2019 15:22:45
</td><td align="left">06-12-2019 10:15:09
</td><td align="left">L Satyavardhan EE </td><td
align="left">9494306757 </td><td
align="left">Formation of sri komaravelli mallanna sagar reservoir with a capacity
of 50 TMC and the formation of sri Komaravelli Mallanna sagar reservoir with a
capacity of 50 TMC and the formation of earth bund with all its associated
components for Reach-3 from Km 12.800 to 16.700 and adjoining with Reach-4 at km
16.700 near Laxmapur (V) Thoguta (M) Siddipet District
</td><td align="left">SIDDIPET </td><td
align="left">Thoguta </td><td
align="left">Thoguta </td><td
align="left">&formation of earthb </td><td
align="left">Sri Komaravelli Mallannasagar
</td><td align="left">502372 </td><td
align="left">DEVAIAH </td><td
align="left">7893244784 </td><td
align="left">TS02UB1836 </td><td
align="left">TRAN583B8948 </td><td
align="right">15,000.00 </td><td
align="right">20.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">231
</td><td align="left" style="background-color:#EFEFEF;">IRR001111
</td><td align="left">25-11-2019 15:22:45
</td><td align="left">06-12-2019 10:14:13
</td><td align="left">L Satyavardhan EE </td><td
align="left">9494306757 </td><td
align="left">Formation of sri komaravelli mallanna sagar reservoir with a capacity
of 50 TMC and the formation of sri Komaravelli Mallanna sagar reservoir with a
capacity of 50 TMC and the formation of earth bund with all its associated
components for Reach-3 from Km 12.800 to 16.700 and adjoining with Reach-4 at km
16.700 near Laxmapur (V) Thoguta (M) Siddipet District
</td><td align="left">SIDDIPET </td><td
align="left">Thoguta </td><td
align="left">Thoguta </td><td
align="left">&formation of earthb </td><td
align="left">Sri Komaravelli Mallannasagar
</td><td align="left">502372 </td><td
align="left">KRISHNA </td><td
align="left">8142010097 </td><td
align="left">TS02UB1845 </td><td
align="left">TRAN1C8A7B84 </td><td
align="right">15,000.00 </td><td
align="right">20.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">232
</td><td align="left" style="background-color:#EFEFEF;">IRR001115
</td><td align="left">03-12-2019 15:49:49
</td><td align="left">06-12-2019 10:10:55
</td><td align="left">L Satyavardhan EE </td><td
align="left">9494306757 </td><td align="left">To
the formation of Sri Komaravelli Mallanna Sagar Reservoir with a capacity of 50 TMC
and the formation of Sri Komaravelli Mallanna sagar Reservoir with a capacity of 50
TMC and the formation of Earth bund with all its associated components for Reach-3
from Km 12.8OO to 16.700 and adjoining with Reach-2 at Km 12.8OO near Laxmapur (V),
Thoguta (M), Siddipet District. </td><td
align="left">SIDDIPET </td><td
align="left">Thoguta </td><td
align="left">Thoguta </td><td
align="left">allanna Sagar Reserv </td><td
align="left">formation of Sri Komaravelli M
</td><td align="left">502372 </td><td
align="left">KARUNAKAR REDDY </td><td
align="left">9666080440 </td><td
align="left">TS08UE5625 </td><td
align="left">TRAN6A3A1414 </td><td
align="right">10,000.00 </td><td
align="right">20.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">233
</td><td align="left" style="background-color:#EFEFEF;">IRR001114
</td><td align="left">03-12-2019 15:45:58
</td><td align="left">06-12-2019 10:09:30
</td><td
align="left">L Satyavardhan EE </td><td
align="left">9494306757 </td><td align="left">To
kaleshwaram project falling in the limits of Kudurupally (V) (Mahadevpur-VI),
Mahadevapur (M) JB District to the works of Package-8 of Link-II, Kaleshwaram
project. </td><td align="left">KARIMNAGAR
</td><td align="left">Choppadandi </td><td
align="left">Choppadandi </td><td
align="left">Link-II,Kaleshwaramp </td><td
align="left">to the works of Package-8 of
</td><td align="left">505415 </td><td
align="left">KOTI </td><td
align="left">9573753008 </td><td
align="left">TS30T3599 </td><td
align="left">TRAN2E8945C3 </td><td
align="right">5,000.00 </td><td
align="right">20.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">234
</td><td align="left" style="background-color:#EFEFEF;">IRR000951
</td><td align="left">15-07-2019 16:38:18
</td><td align="left">06-12-2019 10:06:00
</td><td align="left">Executive engineer
</td><td align="left">8919822252 </td><td
align="left">For the works of package 5 of SRSP phase-II near Regonda (V)- Husnabad
(M) Karimnagar District </td><td
align="left">KARIMNAGAR </td><td
align="left">Karimnagar </td><td
align="left">Karimnagar </td><td
align="left">SRSP phase-II </td><td
align="left">For the works of package 5 </td><td
align="left">505001 </td><td align="left">SHEKAR
</td><td align="left">9949313464 </td><td
align="left">TS03UB0969 </td><td
align="left">TRAN1574BEB4 </td><td
align="right">15,000.00 </td><td
align="right">16.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">235
</td><td align="left" style="background-color:#EFEFEF;">IRRSPL000966
</td><td align="left">24-05-2019 13:33:12
</td><td align="left">06-12-2019 10:05:14
</td><td align="left">Executive Engineer
</td><td align="left">9494306757 </td><td
align="left">The formation of earth bund with all its associated components for
Reach-4 for Km 16.700 to Km 22.900 along with its structures and adjoining with the
Reach-3 at Km 6.700 and Saddle bund of Km length of Thougutta (V&M), Siddipet
District. </td><td align="left">SIDDIPET
</td><td align="left">Thoguta </td><td
align="left">Thoguta </td><td align="left">Km
16.700 to Km 22.9 </td><td align="left">The
formation of earth bund </td><td
align="left">502372 </td><td
align="left">SUSANTH </td><td
align="left">9178217056 </td><td
align="left">TS03UC1626 </td><td
align="left">TRAN7FFDC721 </td><td
align="right">1,780.00 </td><td
align="right">20.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">236
</td><td align="left" style="background-color:#EFEFEF;">IRR001110
</td><td align="left">22-11-2019 12:33:06
</td><td align="left">06-12-2019 10:03:54
</td><td align="left">EXECUTIVE ENGINEER
</td><td align="left">8919822252 </td><td
align="left">To the investigation, design and execution of lift scheme from
Thotapally Reservoir to Gouravelly Reservoir including tunnel and other allied
works near Regonda(V). Husnabad(M), Karimnagar(D)
</td><td align="left">KARIMNAGAR </td><td
align="left">Karimnagar </td><td
align="left">Hasnapur (Submerged) </td><td
align="left">tunnel &other allied </td><td
align="left">Gouravelly Reservoir inclg
</td><td align="left">505001 </td><td
align="left">THIRUMAL </td><td
align="left">8179590528 </td><td
align="left">TS04UB9328 </td><td
align="left">TRAN9193EEE9 </td><td
align="right">5,000.00 </td><td
align="right">16.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">237
</td><td align="left" style="background-color:#EFEFEF;">IRR000936
</td><td align="left">08-07-2019 15:27:34
</td><td align="left">06-12-2019 10:03:48
</td><td align="left">Executive Engineer
</td><td align="left">8919822252 </td><td
align="left">to Sri Komaravelli Mallanna Sagar Reservoir Reach-2, Vemulaghat (V)
Thogutta (M) Siddipet District. </td><td
align="left">SIDDIPET </td><td
align="left">Thoguta </td><td
align="left">Vemulaghat </td><td
align="left">Reservoir Reach-2 </td><td
align="left">Sri Komaravelli Mallanna Sagar
</td><td align="left">502372 </td><td
align="left">ANANDH </td><td
align="left">9000907783 </td><td
align="left">AP01Y9774 </td><td
align="left">TRANB428C2E3 </td><td
align="right">20,000.00 </td><td
align="right">16.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">238
</td><td align="left" style="background-color:#EFEFEF;">IRR000936
</td><td align="left">08-07-2019 15:27:34
</td><td align="left">06-12-2019 10:02:20
</td><td align="left">Executive Engineer
</td><td align="left">8919822252 </td><td
align="left">to Sri Komaravelli Mallanna Sagar Reservoir Reach-2, Vemulaghat (V)
Thogutta (M) Siddipet District. </td><td
align="left">SIDDIPET </td><td
align="left">Thoguta </td><td
align="left">Vemulaghat </td><td
align="left">Reservoir Reach-2 </td><td
align="left">Sri Komaravelli Mallanna Sagar
</td><td align="left">502372 </td><td
align="left">SAMPATH </td><td
align="left">7730819221 </td><td
align="left">TS02UB1998 </td><td
align="left">TRAN923FC94D </td><td
align="right">20,000.00 </td><td
align="right">16.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">239
</td><td align="left" style="background-color:#EFEFEF;">IRR001111
</td><td align="left">25-11-2019 15:22:45
</td><td align="left">06-12-2019 10:02:09
</td><td align="left">L Satyavardhan EE </td><td
align="left">9494306757 </td><td
align="left">Formation of sri komaravelli mallanna sagar reservoir with a capacity
of 50 TMC and the formation of sri Komaravelli Mallanna sagar reservoir with a
capacity of 50 TMC and the formation of earth bund with all its associated
components for Reach-3 from Km 12.800 to 16.700 and adjoining with Reach-4 at km
16.700 near Laxmapur (V)
Thoguta (M) Siddipet District </td><td
align="left">SIDDIPET </td><td
align="left">Thoguta </td><td
align="left">Thoguta </td><td
align="left">&formation of earthb </td><td
align="left">Sri Komaravelli Mallannasagar
</td><td align="left">502372 </td><td
align="left">KUMAR </td><td
align="left">9849202865 </td><td
align="left">TS22T6689 </td><td
align="left">TRAN18BD48C2 </td><td
align="right">15,000.00 </td><td
align="right">20.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">240
</td><td align="left" style="background-color:#EFEFEF;">IRR001115
</td><td align="left">03-12-2019 15:49:49
</td><td align="left">06-12-2019 10:00:53
</td><td align="left">L Satyavardhan EE </td><td
align="left">9494306757 </td><td align="left">To
the formation of Sri Komaravelli Mallanna Sagar Reservoir with a capacity of 50 TMC
and the formation of Sri Komaravelli Mallanna sagar Reservoir with a capacity of 50
TMC and the formation of Earth bund with all its associated components for Reach-3
from Km 12.8OO to 16.700 and adjoining with Reach-2 at Km 12.8OO near Laxmapur (V),
Thoguta (M), Siddipet District. </td><td
align="left">SIDDIPET </td><td
align="left">Thoguta </td><td
align="left">Thoguta </td><td
align="left">allanna Sagar Reserv </td><td
align="left">formation of Sri Komaravelli M
</td><td align="left">502372 </td><td
align="left">SAMPATH </td><td
align="left">8498821663 </td><td
align="left">TS02UC0103 </td><td
align="left">TRAN5D1873D3 </td><td
align="right">10,000.00 </td><td
align="right">20.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">241
</td><td align="left" style="background-color:#EFEFEF;">IRR000951
</td><td align="left">15-07-2019 16:38:18
</td><td align="left">06-12-2019 10:00:01
</td><td align="left">Executive engineer
</td><td align="left">8919822252 </td><td
align="left">For the works of package 5 of SRSP phase-II near Regonda (V)- Husnabad
(M) Karimnagar District </td><td
align="left">KARIMNAGAR </td><td
align="left">Karimnagar </td><td
align="left">Karimnagar </td><td
align="left">SRSP phase-II </td><td
align="left">For the works of package 5 </td><td
align="left">505001 </td><td
align="left">RAMANAKAR </td><td
align="left">7095972357 </td><td
align="left">TS03UB2888 </td><td
align="left">TRAN8A2BC444 </td><td
align="right">15,000.00 </td><td
align="right">16.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">242
</td><td align="left" style="background-color:#EFEFEF;">IRR000761
</td><td align="left">26-03-2019 15:20:18
</td><td align="left">06-12-2019 09:59:01
</td><td align="left">Executive Engineer
</td><td align="left">8919822252 </td><td
align="left">To Execution work of Package-11, lift irrigation scheme for drawing
/lifting of 88.24 TMC of water from Anantagiri Reservoir to new reservoir at
Imambad (V), Siddipet (D) by water conveyer system with all associated components
of SKM sagar. </td><td align="left">SIDDIPET
</td><td align="left">Siddipet (Urban) </td><td
align="left">Siddipet (M + OG) </td><td
align="left">ervoir ofImambad (V) </td><td
align="left">Anantagiri Reservoir to newres
</td><td align="left">502276 </td><td
align="left">VIJENDER </td><td
align="left">9014696143 </td><td
align="left">TS25T3249 </td><td
align="left">TRAN4734598D </td><td
align="right">50,000.00 </td><td
align="right">20.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">243
</td><td align="left" style="background-color:#EFEFEF;">IRRSPL000966
</td><td align="left">24-05-2019 13:33:12
</td><td align="left">06-12-2019 09:58:45
</td><td align="left">Executive Engineer
</td><td align="left">9494306757 </td><td
align="left">The formation of earth bund with all its associated components for
Reach-4 for Km 16.700 to Km 22.900 along with its structures and adjoining with the
Reach-3 at Km 6.700 and Saddle bund of Km length of Thougutta (V&M), Siddipet
District. </td><td align="left">SIDDIPET
</td><td align="left">Thoguta </td><td
align="left">Thoguta </td><td align="left">Km
16.700 to Km 22.9 </td><td align="left">The
formation of earth bund </td><td
align="left">502372 </td><td align="left">HUSSIN
</td><td align="left">8008802889 </td><td
align="left">TS26T4767 </td><td
align="left">TRANFA6A659F </td><td
align="right">1,780.00 </td><td
align="right">20.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">244
</td><td align="left" style="background-color:#EFEFEF;">IRR000951
</td><td align="left">15-07-2019 16:38:18
</td><td align="left">06-12-2019 09:58:07
</td><td align="left">Executive engineer
</td><td align="left">8919822252 </td><td
align="left">For the works of package 5 of SRSP phase-II near Regonda (V)- Husnabad
(M) Karimnagar District </td><td
align="left">KARIMNAGAR </td><td
align="left">Karimnagar </td><td
align="left">Karimnagar </td><td
align="left">SRSP phase-II </td><td
align="left">For the works of package 5 </td><td
align="left">505001 </td><td
align="left">DEVENDER </td><td
align="left">9652916399 </td><td
align="left">TS03UB5599 </td><td
align="left">TRAN869BE982 </td><td
align="right">15,000.00 </td><td
align="right">20.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">245
</td><td align="left" style="background-color:#EFEFEF;">IRRSPL000966
</td><td align="left">24-05-2019 13:33:12
</td><td align="left">06-12-2019 09:56:55
</td><td align="left">Executive Engineer
</td><td align="left">9494306757 </td><td
align="left">The formation of earth bund with all its associated components for
Reach-4 for Km 16.700 to Km 22.900 along with its structures and adjoining with the
Reach-3 at Km 6.700 and Saddle bund of Km length of Thougutta (V&M), Siddipet
District. </td><td align="left">SIDDIPET
</td><td align="left">Thoguta
</td><td align="left">Thoguta </td><td
align="left">Km 16.700 to Km 22.9 </td><td
align="left">The formation of earth bund
</td><td align="left">502372 </td><td
align="left">LAXMAN </td><td
align="left">8096043618 </td><td
align="left">TS03UC2121 </td><td
align="left">TRAN9A4E496D </td><td
align="right">1,780.00 </td><td
align="right">20.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">246
</td><td align="left" style="background-color:#EFEFEF;">IRR000936
</td><td align="left">08-07-2019 15:27:34
</td><td align="left">06-12-2019 09:56:49
</td><td align="left">Executive Engineer
</td><td align="left">8919822252 </td><td
align="left">to Sri Komaravelli Mallanna Sagar Reservoir Reach-2, Vemulaghat (V)
Thogutta (M) Siddipet District. </td><td
align="left">SIDDIPET </td><td
align="left">Thoguta </td><td
align="left">Vemulaghat </td><td
align="left">Reservoir Reach-2 </td><td
align="left">Sri Komaravelli Mallanna Sagar
</td><td align="left">502372 </td><td
align="left">SANJEEVAREDDY </td><td
align="left">7032053010 </td><td
align="left">TS07UJ0906 </td><td
align="left">TRAN444B6F2A </td><td
align="right">20,000.00 </td><td
align="right">22.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">247
</td><td align="left" style="background-color:#EFEFEF;">IRRSPL000966
</td><td align="left">24-05-2019 13:33:12
</td><td align="left">06-12-2019 09:55:45
</td><td align="left">Executive Engineer
</td><td align="left">9494306757 </td><td
align="left">The formation of earth bund with all its associated components for
Reach-4 for Km 16.700 to Km 22.900 along with its structures and adjoining with the
Reach-3 at Km 6.700 and Saddle bund of Km length of Thougutta (V&M), Siddipet
District. </td><td align="left">SIDDIPET
</td><td align="left">Thoguta </td><td
align="left">Thoguta </td><td align="left">Km
16.700 to Km 22.9 </td><td align="left">The
formation of earth bund </td><td
align="left">502372 </td><td align="left">NILA
</td><td align="left">9337899219 </td><td
align="left">TS03UC2112 </td><td
align="left">TRAN4C7E3CB2 </td><td
align="right">1,780.00 </td><td
align="right">20.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">248
</td><td align="left" style="background-color:#EFEFEF;">IRRSPL000966
</td><td align="left">24-05-2019 13:33:12
</td><td align="left">06-12-2019 09:54:39
</td><td align="left">Executive Engineer
</td><td align="left">9494306757 </td><td
align="left">The formation of earth bund with all its associated components for
Reach-4 for Km 16.700 to Km 22.900 along with its structures and adjoining with the
Reach-3 at Km 6.700 and Saddle bund of Km length of Thougutta (V&M), Siddipet
District. </td><td align="left">SIDDIPET
</td><td align="left">Thoguta </td><td
align="left">Thoguta </td><td align="left">Km
16.700 to Km 22.9 </td><td align="left">The
formation of earth bund </td><td
align="left">502372 </td><td
align="left">JASBEER </td><td
align="left">7008263781 </td><td
align="left">TS03UC1661 </td><td
align="left">TRANEEEB99F1 </td><td
align="right">1,780.00 </td><td
align="right">20.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">249
</td><td align="left" style="background-color:#EFEFEF;">IRR000761
</td><td align="left">26-03-2019 15:20:18
</td><td align="left">06-12-2019 09:54:10
</td><td align="left">Executive Engineer
</td><td align="left">8919822252 </td><td
align="left">To Execution work of Package-11, lift irrigation scheme for drawing
/lifting of 88.24 TMC of water from Anantagiri Reservoir to new reservoir at
Imambad (V), Siddipet (D) by water conveyer system with all associated components
of SKM sagar. </td><td align="left">SIDDIPET
</td><td align="left">Siddipet (Urban) </td><td
align="left">Siddipet (M + OG) </td><td
align="left">ervoir ofImambad (V) </td><td
align="left">Anantagiri Reservoir to newres
</td><td align="left">502276 </td><td
align="left">DAS </td><td
align="left">7671073813 </td><td
align="left">TS19T4544 </td><td
align="left">TRAN65EF78B6 </td><td
align="right">50,000.00 </td><td
align="right">20.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">250
</td><td align="left" style="background-color:#EFEFEF;">IRR001054
</td><td align="left">03-09-2019 13:33:24
</td><td align="left">06-12-2019 09:53:01
</td><td align="left">EXECUTIVE ENGINEER
</td><td align="left">8919822252 </td><td
align="left">To Sri komaravelli Mallanna Sagar, Reach No.4, Thoguta (V&M) Siddipet
District </td><td align="left">SIDDIPET
</td><td align="left">Thoguta </td><td
align="left">Thoguta </td><td align="left">Reach
No.4 </td><td align="left">Sri komaravelli
Mallanna Saga </td><td align="left">502372
</td><td align="left">RAVI </td><td
align="left">8106438891 </td><td
align="left">TS22T1799 </td><td
align="left">TRAN691673F7 </td><td
align="right">10,000.00 </td><td
align="right">20.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">251
</td><td align="left" style="background-color:#EFEFEF;">IRR001054
</td><td align="left">03-09-2019 13:33:24
</td><td align="left">06-12-2019 09:51:41
</td><td align="left">EXECUTIVE ENGINEER
</td><td align="left">8919822252 </td><td
align="left">To Sri komaravelli Mallanna Sagar, Reach No.4, Thoguta (V&M) Siddipet
District </td><td align="left">SIDDIPET
</td><td align="left">Thoguta </td><td
align="left">Thoguta </td><td align="left">Reach
No.4 </td><td align="left">Sri komaravelli
Mallanna Saga </td><td align="left">502372
</td><td align="left">SWAMY
</td><td align="left">8186850482
</td><td align="left">TS22T2399 </td><td
align="left">TRANCD114C89 </td><td
align="right">10,000.00 </td><td
align="right">20.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">252
</td><td align="left" style="background-color:#EFEFEF;">IRR001054
</td><td align="left">03-09-2019 13:33:24
</td><td align="left">06-12-2019 09:49:37
</td><td align="left">EXECUTIVE ENGINEER
</td><td align="left">8919822252 </td><td
align="left">To Sri komaravelli Mallanna Sagar, Reach No.4, Thoguta (V&M) Siddipet
District </td><td align="left">SIDDIPET
</td><td align="left">Thoguta </td><td
align="left">Thoguta </td><td align="left">Reach
No.4 </td><td align="left">Sri komaravelli
Mallanna Saga </td><td align="left">502372
</td><td align="left">NAGARAJU </td><td
align="left">9391769242 </td><td
align="left">TS22T2199 </td><td
align="left">TRANB1AE35F8 </td><td
align="right">10,000.00 </td><td
align="right">20.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">253
</td><td align="left" style="background-color:#EFEFEF;">IRR000761
</td><td align="left">26-03-2019 15:20:18
</td><td align="left">06-12-2019 09:48:13
</td><td align="left">Executive Engineer
</td><td align="left">8919822252 </td><td
align="left">To Execution work of Package-11, lift irrigation scheme for drawing
/lifting of 88.24 TMC of water from Anantagiri Reservoir to new reservoir at
Imambad (V), Siddipet (D) by water conveyer system with all associated components
of SKM sagar. </td><td align="left">SIDDIPET
</td><td align="left">Siddipet (Urban) </td><td
align="left">Siddipet (M + OG) </td><td
align="left">ervoir ofImambad (V) </td><td
align="left">Anantagiri Reservoir to newres
</td><td align="left">502276 </td><td
align="left">DURGARAJ </td><td
align="left">9908566141 </td><td
align="left">TS25T1444 </td><td
align="left">TRANFE5E63DF </td><td
align="right">50,000.00 </td><td
align="right">20.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">254
</td><td align="left" style="background-color:#EFEFEF;">IRR001105
</td><td align="left">19-11-2019 15:34:10
</td><td align="left">06-12-2019 09:46:26
</td><td align="left">EXECUTIVE ENGINEER
</td><td align="left">8919822252 </td><td
align="left">To remodeling the canal DBM-48 (from Km 0.000 to Km 83.200) for
construction of CC lining works at Parvathagiri (V&M), Warangal Rural District
</td><td align="left">WARANGAL RURAL </td><td
align="left">Parvathagiri </td><td
align="left">Parvathagiri </td><td
align="left">const of CC lining </td><td
align="left">To remodeling the canal DBM-48
</td><td align="left">506365 </td><td
align="left">CHANDU </td><td
align="left">9676501348 </td><td
align="left">TS03UB9378 </td><td
align="left">TRAN464E7FD6 </td><td
align="right">3,000.00 </td><td
align="right">20.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">255
</td><td align="left" style="background-color:#EFEFEF;">IRR001111
</td><td align="left">25-11-2019 15:22:45
</td><td align="left">06-12-2019 09:45:34
</td><td align="left">L Satyavardhan EE </td><td
align="left">9494306757 </td><td
align="left">Formation of sri komaravelli mallanna sagar reservoir with a capacity
of 50 TMC and the formation of sri Komaravelli Mallanna sagar reservoir with a
capacity of 50 TMC and the formation of earth bund with all its associated
components for Reach-3 from Km 12.800 to 16.700 and adjoining with Reach-4 at km
16.700 near Laxmapur (V) Thoguta (M) Siddipet District
</td><td align="left">SIDDIPET </td><td
align="left">Thoguta </td><td
align="left">Thoguta </td><td
align="left">&formation of earthb </td><td
align="left">Sri Komaravelli Mallannasagar
</td><td align="left">502372 </td><td
align="left">RAVI </td><td
align="left">9533761134 </td><td
align="left">AP01Y8299 </td><td
align="left">TRANB9BCCC1A </td><td
align="right">15,000.00 </td><td
align="right">16.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">256
</td><td align="left" style="background-color:#EFEFEF;">IRR000951
</td><td align="left">15-07-2019 16:38:18
</td><td align="left">06-12-2019 09:44:33
</td><td align="left">Executive engineer
</td><td align="left">8919822252 </td><td
align="left">For the works of package 5 of SRSP phase-II near Regonda (V)- Husnabad
(M) Karimnagar District </td><td
align="left">KARIMNAGAR </td><td
align="left">Karimnagar </td><td
align="left">Karimnagar </td><td
align="left">SRSP phase-II </td><td
align="left">For the works of package 5 </td><td
align="left">505001 </td><td
align="left">SAMPATH </td><td
align="left">8106292415 </td><td
align="left">TS03UA8989 </td><td
align="left">TRANF6573AC4 </td><td
align="right">15,000.00 </td><td
align="right">16.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">257
</td><td align="left" style="background-color:#EFEFEF;">IRR001111
</td><td align="left">25-11-2019 15:22:45
</td><td align="left">06-12-2019 09:43:39
</td><td align="left">L Satyavardhan EE </td><td
align="left">9494306757 </td><td
align="left">Formation of sri komaravelli mallanna sagar reservoir with a capacity
of 50 TMC and the formation of sri Komaravelli Mallanna sagar reservoir with a
capacity of 50 TMC and the formation of earth bund with all its associated
components for Reach-3 from Km 12.800 to 16.700 and adjoining with Reach-4 at km
16.700 near Laxmapur (V) Thoguta (M) Siddipet District
</td><td align="left">SIDDIPET </td><td
align="left">Thoguta </td><td
align="left">Thoguta </td><td
align="left">&formation of earthb </td><td
align="left">Sri Komaravelli Mallannasagar
</td><td align="left">502372 </td><td
align="left">CHANDPASHA </td><td
align="left">8179993422 </td><td
align="left">TS03UB6699
</td><td align="left">TRAN285D712A
</td><td align="right">15,000.00 </td><td
align="right">20.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">258
</td><td align="left" style="background-color:#EFEFEF;">IRR001099
</td><td align="left">14-11-2019 17:03:44
</td><td align="left">06-12-2019 09:42:13
</td><td align="left">EXECUTIVE ENGINEER
</td><td align="left">8919822252 </td><td
align="left">construction of CM and CD works including lining up to 1 cumec
discharge from 0.000 to 22.500 tail and including its minors and sub-minors of 4L
distributary on RFMC of RS Ghanpur reservoir works executed in erstwhile Warangal
District </td><td align="left">JANGAON
</td><td align="left">Palakurthy </td><td
align="left">Palakurthi </td><td
align="left">lining up to 1 cumec </td><td
align="left">const of CM and CD works inclg
</td><td align="left">506317 </td><td
align="left">SURESHBABU </td><td
align="left">7671933075 </td><td
align="left">TS03UB9789 </td><td
align="left">TRAN9842284C </td><td
align="right">5,000.00 </td><td
align="right">20.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">259
</td><td align="left" style="background-color:#EFEFEF;">IRR001111
</td><td align="left">25-11-2019 15:22:45
</td><td align="left">06-12-2019 09:41:33
</td><td align="left">L Satyavardhan EE </td><td
align="left">9494306757 </td><td
align="left">Formation of sri komaravelli mallanna sagar reservoir with a capacity
of 50 TMC and the formation of sri Komaravelli Mallanna sagar reservoir with a
capacity of 50 TMC and the formation of earth bund with all its associated
components for Reach-3 from Km 12.800 to 16.700 and adjoining with Reach-4 at km
16.700 near Laxmapur (V) Thoguta (M) Siddipet District
</td><td align="left">SIDDIPET </td><td
align="left">Thoguta </td><td
align="left">Thoguta </td><td
align="left">&formation of earthb </td><td
align="left">Sri Komaravelli Mallannasagar
</td><td align="left">502372 </td><td
align="left">MALLESH </td><td
align="left">7893642671 </td><td
align="left">TS19T8469 </td><td
align="left">TRAN483FB524 </td><td
align="right">15,000.00 </td><td
align="right">20.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">260
</td><td align="left" style="background-color:#EFEFEF;">IRR001111
</td><td align="left">25-11-2019 15:22:45
</td><td align="left">06-12-2019 09:40:45
</td><td align="left">L Satyavardhan EE </td><td
align="left">9494306757 </td><td
align="left">Formation of sri komaravelli mallanna sagar reservoir with a capacity
of 50 TMC and the formation of sri Komaravelli Mallanna sagar reservoir with a
capacity of 50 TMC and the formation of earth bund with all its associated
components for Reach-3 from Km 12.800 to 16.700 and adjoining with Reach-4 at km
16.700 near Laxmapur (V) Thoguta (M) Siddipet District
</td><td align="left">SIDDIPET </td><td
align="left">Thoguta </td><td
align="left">Thoguta </td><td
align="left">&formation of earthb </td><td
align="left">Sri Komaravelli Mallannasagar
</td><td align="left">502372 </td><td
align="left">RAMBABU </td><td
align="left">6300815143 </td><td
align="left">TS19T6566 </td><td
align="left">TRANFFBA8244 </td><td
align="right">15,000.00 </td><td
align="right">20.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">261
</td><td align="left" style="background-color:#EFEFEF;">IRR001114
</td><td align="left">03-12-2019 15:45:58
</td><td align="left">06-12-2019 09:39:17
</td><td align="left">L Satyavardhan EE </td><td
align="left">9494306757 </td><td align="left">To
kaleshwaram project falling in the limits of Kudurupally (V) (Mahadevpur-VI),
Mahadevapur (M) JB District to the works of Package-8 of Link-II, Kaleshwaram
project. </td><td align="left">KARIMNAGAR
</td><td align="left">Choppadandi </td><td
align="left">Choppadandi </td><td
align="left">Link-II,Kaleshwaramp </td><td
align="left">to the works of Package-8 of
</td><td align="left">505415 </td><td
align="left">SURESH </td><td
align="left">7330795009 </td><td
align="left">TS08UG2228 </td><td
align="left">TRAN439C1247 </td><td
align="right">5,000.00 </td><td
align="right">22.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">262
</td><td align="left" style="background-color:#EFEFEF;">IRR000951
</td><td align="left">15-07-2019 16:38:18
</td><td align="left">06-12-2019 09:38:07
</td><td align="left">Executive engineer
</td><td align="left">8919822252 </td><td
align="left">For the works of package 5 of SRSP phase-II near Regonda (V)- Husnabad
(M) Karimnagar District </td><td
align="left">KARIMNAGAR </td><td
align="left">Karimnagar </td><td
align="left">Karimnagar </td><td
align="left">SRSP phase-II </td><td
align="left">For the works of package 5 </td><td
align="left">505001 </td><td align="left">VIKRAM
</td><td align="left">9553828579 </td><td
align="left">TS25T2389 </td><td
align="left">TRAN2A4B6FB4 </td><td
align="right">15,000.00 </td><td
align="right">20.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">263
</td><td align="left" style="background-color:#EFEFEF;">IRR001115
</td><td align="left">03-12-2019 15:49:49
</td><td align="left">06-12-2019 09:37:07
</td><td align="left">L Satyavardhan EE </td><td
align="left">9494306757 </td><td align="left">To
the formation of Sri Komaravelli Mallanna Sagar Reservoir with a capacity of 50 TMC
and the formation of Sri Komaravelli Mallanna sagar Reservoir with a capacity of 50
TMC and the formation of Earth bund with all its associated components for Reach-3
from Km 12.8OO to 16.700 and adjoining with Reach-2 at Km 12.8OO near Laxmapur (V),
Thoguta (M), Siddipet District. </td><td
align="left">SIDDIPET </td><td
align="left">Thoguta </td><td
align="left">Thoguta </td><td
align="left">allanna Sagar Reserv </td><td
align="left">formation of Sri Komaravelli M
</td><td align="left">502372
</td><td align="left">RAJU
</td><td align="left">9963897465 </td><td
align="left">TS08UF0649 </td><td
align="left">TRAN8941C5EC </td><td
align="right">10,000.00 </td><td
align="right">20.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">264
</td><td align="left" style="background-color:#EFEFEF;">IRR000936
</td><td align="left">08-07-2019 15:27:34
</td><td align="left">06-12-2019 09:36:02
</td><td align="left">Executive Engineer
</td><td align="left">8919822252 </td><td
align="left">to Sri Komaravelli Mallanna Sagar Reservoir Reach-2, Vemulaghat (V)
Thogutta (M) Siddipet District. </td><td
align="left">SIDDIPET </td><td
align="left">Thoguta </td><td
align="left">Vemulaghat </td><td
align="left">Reservoir Reach-2 </td><td
align="left">Sri Komaravelli Mallanna Sagar
</td><td align="left">502372 </td><td
align="left">RAJU </td><td
align="left">8688460919 </td><td
align="left">TS08UF6666 </td><td
align="left">TRAN9E3D4F9C </td><td
align="right">20,000.00 </td><td
align="right">20.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">265
</td><td align="left" style="background-color:#EFEFEF;">IRR000761
</td><td align="left">26-03-2019 15:20:18
</td><td align="left">06-12-2019 09:35:03
</td><td align="left">Executive Engineer
</td><td align="left">8919822252 </td><td
align="left">To Execution work of Package-11, lift irrigation scheme for drawing
/lifting of 88.24 TMC of water from Anantagiri Reservoir to new reservoir at
Imambad (V), Siddipet (D) by water conveyer system with all associated components
of SKM sagar. </td><td align="left">SIDDIPET
</td><td align="left">Siddipet (Urban) </td><td
align="left">Siddipet (M + OG) </td><td
align="left">ervoir ofImambad (V) </td><td
align="left">Anantagiri Reservoir to newres
</td><td align="left">502276 </td><td
align="left">NARESH </td><td
align="left">7730990426 </td><td
align="left">TS22T0841 </td><td
align="left">TRAN48D688FB </td><td
align="right">50,000.00 </td><td
align="right">20.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">266
</td><td align="left" style="background-color:#EFEFEF;">IRR000761
</td><td align="left">26-03-2019 15:20:18
</td><td align="left">06-12-2019 09:34:22
</td><td align="left">Executive Engineer
</td><td align="left">8919822252 </td><td
align="left">To Execution work of Package-11, lift irrigation scheme for drawing
/lifting of 88.24 TMC of water from Anantagiri Reservoir to new reservoir at
Imambad (V), Siddipet (D) by water conveyer system with all associated components
of SKM sagar. </td><td align="left">SIDDIPET
</td><td align="left">Siddipet (Urban) </td><td
align="left">Siddipet (M + OG) </td><td
align="left">ervoir ofImambad (V) </td><td
align="left">Anantagiri Reservoir to newres
</td><td align="left">502276 </td><td
align="left">RAJALINGU </td><td
align="left">9032748186 </td><td
align="left">TS22T0398 </td><td
align="left">TRANB83F64CA </td><td
align="right">50,000.00 </td><td
align="right">16.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">267
</td><td align="left" style="background-color:#EFEFEF;">IRR000951
</td><td align="left">15-07-2019 16:38:18
</td><td align="left">06-12-2019 09:30:54
</td><td align="left">Executive engineer
</td><td align="left">8919822252 </td><td
align="left">For the works of package 5 of SRSP phase-II near Regonda (V)- Husnabad
(M) Karimnagar District </td><td
align="left">KARIMNAGAR </td><td
align="left">Karimnagar </td><td
align="left">Karimnagar </td><td
align="left">SRSP phase-II </td><td
align="left">For the works of package 5 </td><td
align="left">505001 </td><td align="left">ODHELU
</td><td align="left">8096993648 </td><td
align="left">TS25T1536 </td><td
align="left">TRAN46866DFE </td><td
align="right">15,000.00 </td><td
align="right">16.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">268
</td><td align="left" style="background-color:#EFEFEF;">IRR000761
</td><td align="left">26-03-2019 15:20:18
</td><td align="left">06-12-2019 09:29:30
</td><td align="left">Executive Engineer
</td><td align="left">8919822252 </td><td
align="left">To Execution work of Package-11, lift irrigation scheme for drawing
/lifting of 88.24 TMC of water from Anantagiri Reservoir to new reservoir at
Imambad (V), Siddipet (D) by water conveyer system with all associated components
of SKM sagar. </td><td align="left">SIDDIPET
</td><td align="left">Siddipet (Urban) </td><td
align="left">Siddipet (M + OG) </td><td
align="left">ervoir ofImambad (V) </td><td
align="left">Anantagiri Reservoir to newres
</td><td align="left">502276 </td><td
align="left">RAJENDER </td><td
align="left">8790348452 </td><td
align="left">TS22T0397 </td><td
align="left">TRAND734654F </td><td
align="right">50,000.00 </td><td
align="right">16.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">269
</td><td align="left" style="background-color:#EFEFEF;">IRR001111
</td><td align="left">25-11-2019 15:22:45
</td><td align="left">06-12-2019 09:28:37
</td><td align="left">L Satyavardhan EE </td><td
align="left">9494306757 </td><td
align="left">Formation of sri komaravelli mallanna sagar reservoir with a capacity
of 50 TMC and the formation of sri Komaravelli Mallanna sagar reservoir with a
capacity of 50 TMC and the formation of earth bund with all its associated
components for Reach-3 from Km 12.800 to 16.700 and adjoining with Reach-4 at km
16.700 near Laxmapur (V) Thoguta (M) Siddipet District
</td><td align="left">SIDDIPET </td><td
align="left">Thoguta </td><td
align="left">Thoguta </td><td
align="left">&formation of earthb </td><td
align="left">Sri Komaravelli Mallannasagar
</td><td align="left">502372 </td><td
align="left">RAJESHAM
</td><td align="left">9000538072
</td><td align="left">TS19T6688 </td><td
align="left">TRAN52D7C64D </td><td
align="right">15,000.00 </td><td
align="right">16.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">270
</td><td align="left" style="background-color:#EFEFEF;">IRR000936
</td><td align="left">08-07-2019 15:27:34
</td><td align="left">06-12-2019 09:27:57
</td><td align="left">Executive Engineer
</td><td align="left">8919822252 </td><td
align="left">to Sri Komaravelli Mallanna Sagar Reservoir Reach-2, Vemulaghat (V)
Thogutta (M) Siddipet District. </td><td
align="left">SIDDIPET </td><td
align="left">Thoguta </td><td
align="left">Vemulaghat </td><td
align="left">Reservoir Reach-2 </td><td
align="left">Sri Komaravelli Mallanna Sagar
</td><td align="left">502372 </td><td
align="left">MALLESH </td><td
align="left">9000088781 </td><td
align="left">TS08UH1559 </td><td
align="left">TRAN414EA5E4 </td><td
align="right">20,000.00 </td><td
align="right">22.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">271
</td><td align="left" style="background-color:#EFEFEF;">IRR001111
</td><td align="left">25-11-2019 15:22:45
</td><td align="left">06-12-2019 09:27:48
</td><td align="left">L Satyavardhan EE </td><td
align="left">9494306757 </td><td
align="left">Formation of sri komaravelli mallanna sagar reservoir with a capacity
of 50 TMC and the formation of sri Komaravelli Mallanna sagar reservoir with a
capacity of 50 TMC and the formation of earth bund with all its associated
components for Reach-3 from Km 12.800 to 16.700 and adjoining with Reach-4 at km
16.700 near Laxmapur (V) Thoguta (M) Siddipet District
</td><td align="left">SIDDIPET </td><td
align="left">Thoguta </td><td
align="left">Thoguta </td><td
align="left">&formation of earthb </td><td
align="left">Sri Komaravelli Mallannasagar
</td><td align="left">502372 </td><td
align="left">PRASHANTH </td><td
align="left">8184888360 </td><td
align="left">TS03UB2226 </td><td
align="left">TRANB8BB4B68 </td><td
align="right">15,000.00 </td><td
align="right">20.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">272
</td><td align="left" style="background-color:#EFEFEF;">IRR000936
</td><td align="left">08-07-2019 15:27:34
</td><td align="left">06-12-2019 09:26:46
</td><td align="left">Executive Engineer
</td><td align="left">8919822252 </td><td
align="left">to Sri Komaravelli Mallanna Sagar Reservoir Reach-2, Vemulaghat (V)
Thogutta (M) Siddipet District. </td><td
align="left">SIDDIPET </td><td
align="left">Thoguta </td><td
align="left">Vemulaghat </td><td
align="left">Reservoir Reach-2 </td><td
align="left">Sri Komaravelli Mallanna Sagar
</td><td align="left">502372 </td><td
align="left">THIRUPATHI </td><td
align="left">9573457545 </td><td
align="left">TS22T6667 </td><td
align="left">TRANE49286A4 </td><td
align="right">20,000.00 </td><td
align="right">20.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">273
</td><td align="left" style="background-color:#EFEFEF;">IRR001105
</td><td align="left">19-11-2019 15:34:10
</td><td align="left">06-12-2019 09:22:08
</td><td align="left">EXECUTIVE ENGINEER
</td><td align="left">8919822252 </td><td
align="left">To remodeling the canal DBM-48 (from Km 0.000 to Km 83.200) for
construction of CC lining works at Parvathagiri (V&M), Warangal Rural District
</td><td align="left">WARANGAL RURAL </td><td
align="left">Parvathagiri </td><td
align="left">Parvathagiri </td><td
align="left">const of CC lining </td><td
align="left">To remodeling the canal DBM-48
</td><td align="left">506365 </td><td
align="left">MADHU </td><td
align="left">9963211584 </td><td
align="left">TS25T2233 </td><td
align="left">TRANF2987E4E </td><td
align="right">3,000.00 </td><td
align="right">20.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">274
</td><td align="left" style="background-color:#EFEFEF;">IRR001105
</td><td align="left">19-11-2019 15:34:10
</td><td align="left">06-12-2019 09:20:39
</td><td align="left">EXECUTIVE ENGINEER
</td><td align="left">8919822252 </td><td
align="left">To remodeling the canal DBM-48 (from Km 0.000 to Km 83.200) for
construction of CC lining works at Parvathagiri (V&M), Warangal Rural District
</td><td align="left">WARANGAL RURAL </td><td
align="left">Parvathagiri </td><td
align="left">Parvathagiri </td><td
align="left">const of CC lining </td><td
align="left">To remodeling the canal DBM-48
</td><td align="left">506365 </td><td
align="left">VIJAY </td><td
align="left">9949670200 </td><td
align="left">TS22T2929 </td><td
align="left">TRAN6EBAE6F6 </td><td
align="right">3,000.00 </td><td
align="right">20.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">275
</td><td align="left" style="background-color:#EFEFEF;">IRR001111
</td><td align="left">25-11-2019 15:22:45
</td><td align="left">06-12-2019 09:20:04
</td><td align="left">L Satyavardhan EE </td><td
align="left">9494306757 </td><td
align="left">Formation of sri komaravelli mallanna sagar reservoir with a capacity
of 50 TMC and the formation of sri Komaravelli Mallanna sagar reservoir with a
capacity of 50 TMC and the formation of earth bund with all its associated
components for Reach-3 from Km 12.800 to 16.700 and adjoining with Reach-4 at km
16.700 near Laxmapur (V) Thoguta (M) Siddipet District
</td><td align="left">SIDDIPET </td><td
align="left">Thoguta </td><td
align="left">Thoguta </td><td
align="left">&formation of earthb </td><td
align="left">Sri Komaravelli Mallannasagar
</td><td align="left">502372 </td><td
align="left">SRINIVAS </td><td
align="left">9963723751 </td><td
align="left">TS22T6399 </td><td
align="left">TRAN2571C893 </td><td
align="right">15,000.00 </td><td
align="right">20.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">276
</td><td align="left" style="background-color:#EFEFEF;">IRR000936
</td><td align="left">08-07-2019 15:27:34
</td><td align="left">06-12-2019 09:18:39
</td><td align="left">Executive Engineer
</td><td align="left">8919822252 </td><td
align="left">to Sri Komaravelli Mallanna Sagar Reservoir Reach-2, Vemulaghat (V)
Thogutta (M) Siddipet District. </td><td
align="left">SIDDIPET </td><td
align="left">Thoguta </td><td
align="left">Vemulaghat </td><td
align="left">Reservoir Reach-2 </td><td
align="left">Sri Komaravelli Mallanna Sagar
</td><td align="left">502372 </td><td
align="left">MD BADRUDDIN </td><td
align="left">9908784904 </td><td
align="left">TS04UA2399 </td><td
align="left">TRAND3CAA6E5 </td><td
align="right">20,000.00 </td><td
align="right">16.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">277
</td><td align="left" style="background-color:#EFEFEF;">IRR000761
</td><td align="left">26-03-2019 15:20:18
</td><td align="left">06-12-2019 09:16:43
</td><td align="left">Executive Engineer
</td><td align="left">8919822252 </td><td
align="left">To Execution work of Package-11, lift irrigation scheme for drawing
/lifting of 88.24 TMC of water from Anantagiri Reservoir to new reservoir at
Imambad (V), Siddipet (D) by water conveyer system with all associated components
of SKM sagar. </td><td align="left">SIDDIPET
</td><td align="left">Siddipet (Urban) </td><td
align="left">Siddipet (M + OG) </td><td
align="left">ervoir ofImambad (V) </td><td
align="left">Anantagiri Reservoir to newres
</td><td align="left">502276 </td><td
align="left">ANAND </td><td
align="left">9553036616 </td><td
align="left">TS22T0395 </td><td
align="left">TRANC1FA1238 </td><td
align="right">50,000.00 </td><td
align="right">16.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">278
</td><td align="left" style="background-color:#EFEFEF;">IRR001114
</td><td align="left">03-12-2019 15:45:58
</td><td align="left">06-12-2019 09:14:00
</td><td align="left">L Satyavardhan EE </td><td
align="left">9494306757 </td><td align="left">To
kaleshwaram project falling in the limits of Kudurupally (V) (Mahadevpur-VI),
Mahadevapur (M) JB District to the works of Package-8 of Link-II, Kaleshwaram
project. </td><td align="left">KARIMNAGAR
</td><td align="left">Choppadandi </td><td
align="left">Choppadandi </td><td
align="left">Link-II,Kaleshwaramp </td><td
align="left">to the works of Package-8 of
</td><td align="left">505415 </td><td
align="left">JHAHIR </td><td
align="left">8978536105 </td><td
align="left">TS25T1516 </td><td
align="left">TRANA9CF6B69 </td><td
align="right">5,000.00 </td><td
align="right">20.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">279
</td><td align="left" style="background-color:#EFEFEF;">IRR001111
</td><td align="left">25-11-2019 15:22:45
</td><td align="left">06-12-2019 09:11:43
</td><td align="left">L Satyavardhan EE </td><td
align="left">9494306757 </td><td
align="left">Formation of sri komaravelli mallanna sagar reservoir with a capacity
of 50 TMC and the formation of sri Komaravelli Mallanna sagar reservoir with a
capacity of 50 TMC and the formation of earth bund with all its associated
components for Reach-3 from Km 12.800 to 16.700 and adjoining with Reach-4 at km
16.700 near Laxmapur (V) Thoguta (M) Siddipet District
</td><td align="left">SIDDIPET </td><td
align="left">Thoguta </td><td
align="left">Thoguta </td><td
align="left">&formation of earthb </td><td
align="left">Sri Komaravelli Mallannasagar
</td><td align="left">502372 </td><td
align="left">VINAY </td><td
align="left">8309725362 </td><td
align="left">TS02UB0741 </td><td
align="left">TRAN5B712BF7 </td><td
align="right">15,000.00 </td><td
align="right">20.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">280
</td><td align="left" style="background-color:#EFEFEF;">IRR000936
</td><td align="left">08-07-2019 15:27:34
</td><td align="left">06-12-2019 09:09:32
</td><td align="left">Executive Engineer
</td><td align="left">8919822252 </td><td
align="left">to Sri Komaravelli Mallanna Sagar Reservoir Reach-2, Vemulaghat (V)
Thogutta (M) Siddipet District. </td><td
align="left">SIDDIPET </td><td
align="left">Thoguta </td><td
align="left">Vemulaghat </td><td
align="left">Reservoir Reach-2 </td><td
align="left">Sri Komaravelli Mallanna Sagar
</td><td align="left">502372 </td><td
align="left">USHEN </td><td
align="left">9989534011 </td><td
align="left">TS36T3833 </td><td
align="left">TRANE7A3F882 </td><td
align="right">20,000.00 </td><td
align="right">20.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">281
</td><td align="left" style="background-color:#EFEFEF;">IRR000936
</td><td align="left">08-07-2019 15:27:34
</td><td align="left">06-12-2019 09:06:51
</td><td align="left">Executive Engineer
</td><td align="left">8919822252 </td><td
align="left">to Sri Komaravelli Mallanna Sagar Reservoir Reach-2, Vemulaghat (V)
Thogutta (M) Siddipet District. </td><td
align="left">SIDDIPET </td><td
align="left">Thoguta </td><td
align="left">Vemulaghat </td><td
align="left">Reservoir Reach-2 </td><td
align="left">Sri Komaravelli Mallanna Sagar
</td><td align="left">502372 </td><td
align="left">PAJIRU </td><td
align="left">9959181521 </td><td
align="left">AP16TY6722 </td><td
align="left">TRAN4F49D459 </td><td
align="right">20,000.00 </td><td
align="right">16.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">282
</td><td align="left" style="background-
color:#EFEFEF;">IRR000936 </td><td
align="left">08-07-2019 15:27:34 </td><td
align="left">06-12-2019 09:04:48 </td><td
align="left">Executive Engineer </td><td
align="left">8919822252 </td><td align="left">to
Sri Komaravelli Mallanna Sagar Reservoir Reach-2, Vemulaghat (V) Thogutta (M)
Siddipet District. </td><td
align="left">SIDDIPET </td><td
align="left">Thoguta </td><td
align="left">Vemulaghat </td><td
align="left">Reservoir Reach-2 </td><td
align="left">Sri Komaravelli Mallanna Sagar
</td><td align="left">502372 </td><td
align="left">MUNNA </td><td
align="left">9010049484 </td><td
align="left">AP37TA4500 </td><td
align="left">TRAN487E432B </td><td
align="right">20,000.00 </td><td
align="right">16.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">283
</td><td align="left" style="background-color:#EFEFEF;">IRR000761
</td><td align="left">26-03-2019 15:20:18
</td><td align="left">06-12-2019 09:02:01
</td><td align="left">Executive Engineer
</td><td align="left">8919822252 </td><td
align="left">To Execution work of Package-11, lift irrigation scheme for drawing
/lifting of 88.24 TMC of water from Anantagiri Reservoir to new reservoir at
Imambad (V), Siddipet (D) by water conveyer system with all associated components
of SKM sagar. </td><td align="left">SIDDIPET
</td><td align="left">Siddipet (Urban) </td><td
align="left">Siddipet (M + OG) </td><td
align="left">ervoir ofImambad (V) </td><td
align="left">Anantagiri Reservoir to newres
</td><td align="left">502276 </td><td
align="left">KISHAN </td><td
align="left">9701079714 </td><td
align="left">AP05TA5864 </td><td
align="left">TRAND9D7DE51 </td><td
align="right">50,000.00 </td><td
align="right">16.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">284
</td><td align="left" style="background-color:#EFEFEF;">IRR000761
</td><td align="left">26-03-2019 15:20:18
</td><td align="left">06-12-2019 08:59:45
</td><td align="left">Executive Engineer
</td><td align="left">8919822252 </td><td
align="left">To Execution work of Package-11, lift irrigation scheme for drawing
/lifting of 88.24 TMC of water from Anantagiri Reservoir to new reservoir at
Imambad (V), Siddipet (D) by water conveyer system with all associated components
of SKM sagar. </td><td align="left">SIDDIPET
</td><td align="left">Siddipet (Urban) </td><td
align="left">Siddipet (M + OG) </td><td
align="left">ervoir ofImambad (V) </td><td
align="left">Anantagiri Reservoir to newres
</td><td align="left">502276 </td><td
align="left">MADHU </td><td
align="left">7893685067 </td><td
align="left">TS25T2232 </td><td
align="left">TRAN4F541BA1 </td><td
align="right">50,000.00 </td><td
align="right">16.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">285
</td><td align="left" style="background-color:#EFEFEF;">IRR000761
</td><td align="left">26-03-2019 15:20:18
</td><td align="left">06-12-2019 08:58:22
</td><td align="left">Executive Engineer
</td><td align="left">8919822252 </td><td
align="left">To Execution work of Package-11, lift irrigation scheme for drawing
/lifting of 88.24 TMC of water from Anantagiri Reservoir to new reservoir at
Imambad (V), Siddipet (D) by water conveyer system with all associated components
of SKM sagar. </td><td align="left">SIDDIPET
</td><td align="left">Siddipet (Urban) </td><td
align="left">Siddipet (M + OG) </td><td
align="left">ervoir ofImambad (V) </td><td
align="left">Anantagiri Reservoir to newres
</td><td align="left">502276 </td><td
align="left">RANJITH </td><td
align="left">7702496356 </td><td
align="left">TS22T0396 </td><td
align="left">TRANB9F67179 </td><td
align="right">50,000.00 </td><td
align="right">16.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">286
</td><td align="left" style="background-color:#EFEFEF;">IRR000761
</td><td align="left">26-03-2019 15:20:18
</td><td align="left">06-12-2019 08:55:46
</td><td align="left">Executive Engineer
</td><td align="left">8919822252 </td><td
align="left">To Execution work of Package-11, lift irrigation scheme for drawing
/lifting of 88.24 TMC of water from Anantagiri Reservoir to new reservoir at
Imambad (V), Siddipet (D) by water conveyer system with all associated components
of SKM sagar. </td><td align="left">SIDDIPET
</td><td align="left">Siddipet (Urban) </td><td
align="left">Siddipet (M + OG) </td><td
align="left">ervoir ofImambad (V) </td><td
align="left">Anantagiri Reservoir to newres
</td><td align="left">502276 </td><td
align="left">VENKATESH </td><td
align="left">9666432951 </td><td
align="left">TS25T3239 </td><td
align="left">TRAND2C7F4D7 </td><td
align="right">50,000.00 </td><td
align="right">20.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">287
</td><td align="left" style="background-color:#EFEFEF;">IRR001114
</td><td align="left">03-12-2019 15:45:58
</td><td align="left">06-12-2019 08:48:07
</td><td align="left">L Satyavardhan EE </td><td
align="left">9494306757 </td><td align="left">To
kaleshwaram project falling in the limits of Kudurupally (V) (Mahadevpur-VI),
Mahadevapur (M) JB District to the works of Package-8 of Link-II, Kaleshwaram
project. </td><td align="left">KARIMNAGAR
</td><td align="left">Choppadandi </td><td
align="left">Choppadandi </td><td
align="left">Link-II,Kaleshwaramp </td><td
align="left">to the works of Package-8 of
</td><td align="left">505415 </td><td
align="left">SAMMAIAH </td><td
align="left">9381196109 </td><td
align="left">TS03UA4488 </td><td
align="left">TRANDD541C4F </td><td
align="right">5,000.00 </td><td
align="right">16.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">288
</td><td align="left" style="background-color:#EFEFEF;">IRR001115
</td><td align="left">03-12-2019 15:49:49
</td><td align="left">06-12-2019 08:42:31
</td><td align="left">L Satyavardhan EE </td><td
align="left">9494306757 </td><td align="left">To
the formation of Sri Komaravelli Mallanna Sagar Reservoir with a capacity of 50 TMC
and the formation of Sri Komaravelli Mallanna sagar Reservoir with a capacity of 50
TMC and the formation of Earth bund with all its associated components for Reach-3
from Km 12.8OO to 16.700 and adjoining with Reach-2 at Km 12.8OO near Laxmapur (V),
Thoguta (M), Siddipet District. </td><td
align="left">SIDDIPET </td><td
align="left">Thoguta </td><td
align="left">Thoguta </td><td
align="left">allanna Sagar Reserv </td><td
align="left">formation of Sri Komaravelli M
</td><td align="left">502372 </td><td
align="left">BABA </td><td
align="left">9966638148 </td><td
align="left">TS07UG2525 </td><td
align="left">TRAN945499AC </td><td
align="right">10,000.00 </td><td
align="right">20.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">289
</td><td align="left" style="background-color:#EFEFEF;">IRR001111
</td><td align="left">25-11-2019 15:22:45
</td><td align="left">06-12-2019 08:40:23
</td><td align="left">L Satyavardhan EE </td><td
align="left">9494306757 </td><td
align="left">Formation of sri komaravelli mallanna sagar reservoir with a capacity
of 50 TMC and the formation of sri Komaravelli Mallanna sagar reservoir with a
capacity of 50 TMC and the formation of earth bund with all its associated
components for Reach-3 from Km 12.800 to 16.700 and adjoining with Reach-4 at km
16.700 near Laxmapur (V) Thoguta (M) Siddipet District
</td><td align="left">SIDDIPET </td><td
align="left">Thoguta </td><td
align="left">Thoguta </td><td
align="left">&formation of earthb </td><td
align="left">Sri Komaravelli Mallannasagar
</td><td align="left">502372 </td><td
align="left">AMID </td><td
align="left">7995235153 </td><td
align="left">TS02UC0009 </td><td
align="left">TRANB32496C1 </td><td
align="right">15,000.00 </td><td
align="right">20.00 </td></tr><tr
class="GridviewScrollItem"><td align="center" style="background-color:#EFEFEF;">290
</td><td align="left" style="background-color:#EFEFEF;">IRR001111
</td><td align="left">25-11-2019 15:22:45
</td><td align="left">06-12-2019 08:38:14
</td><td align="left">L Satyavardhan EE </td><td
align="left">9494306757 </td><td
align="left">Formation of sri komaravelli mallanna sagar reservoir with a capacity
of 50 TMC and the formation of sri Komaravelli Mallanna sagar reservoir with a
capacity of 50 TMC and the formation of earth bund with all its associated
components for Reach-3 from Km 12.800 to 16.700 and adjoining with Reach-4 at km
16.700 near Laxmapur (V) Thoguta (M) Siddipet District
</td><td align="left">SIDDIPET </td><td
align="left">Thoguta </td><td
align="left">Thoguta </td><td
align="left">&formation of earthb </td><td
align="left">Sri Komaravelli Mallannasagar
</td><td align="left">502372 </td><td
align="left">RAVI </td><td
align="left">8897111133 </td><td
align="left">AP15TC3524 </td><td
align="left">TRAND6FCA72A </td><td
align="right">15,000.00 </td><td
align="right">20.00 </td></tr><tr
class="GridviewScrollFoooter"><td>&nbsp;</td><td
align="left">Total</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td>
<td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbs
p;</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td><td>&nbsp;</td><
td align="right">&nbsp;</td><td align="right">5,332.00</td></tr></table></div>

Vous aimerez peut-être aussi