STERLING AND WILSON LIMITED ANNEXURE-B

PROJECT: 132 KV OUTDOOR SWITCHYARD, GAIL-VIJAIPUR


CLIENT: GAIL (India) Limited
CONSULTANT: ENGINEERS INDIA LIMITED
DOCUMENT NO.: SWL/GAIL/RELAY/06/F-1 Rev No.: R0 DATE: 22.10.2012

TRANSFORMER DIFFERENTIAL RELAY

1. Location : SUBSTATION-1 CONTROL ROOM

Feeder Name : 132/6.6KV TRANSFORMER-3 FEEDER

2. Equipment details:
Make GE
Type / Model no T60
SI. No. ABHC12000599
RATING 25MVA
VECTOR GROUP YNyn0
HV SIDE-1 CT Ratio 150/1 A
LV SIDE CT Ratio 2500/1 A
PT Ratio 132kV/√3:110V/√3

3. General Inspection : OK
4. Measurements:
INJECTED MEASURED PRIMARY CURRENT VALUES(A)
PHASE SECONDARY
CURRENT(A) HV SIDE LV SIDE
R-N 1∟0° 0.149∟0° 2502∟0° -
Y-N 1∟-120° 0.150∟-120° 2500∟-120° -
B-N 1∟1200° 0.149∟120° 2501∟120° -

5. DIFFERENTIAL PROTECTION TEST:

PICKUP TEST: SETTING: 0.2XF.L CURRENT

HV SIDE-1 LV SIDE
REF
PICKUP CURRENT(A) PICKUP CURRENT(A)
0.168 0.202
3-PH 0.168 0.202
0.168 0.202

SWL EIL/GAIL
Sign Sign

Name Name

Date Date
STERLING AND WILSON LIMITED ANNEXURE-B

PROJECT: 132 KV OUTDOOR SWITCHYARD, GAIL-VIJAIPUR


CLIENT: GAIL (India) Limited
CONSULTANT: ENGINEERS INDIA LIMITED
DOCUMENT NO.: SWL/GAIL/RELAY/06/F-1 Rev No.: R0 DATE: 22.10.2012

SINGLE PHASE PICKUP:

HV SIDE-1 LV SIDE
REF
PICKUP CURRENT(A) PICKUP CURRENT(A)
0.251 0.300
1-PH 0.250 0.301
0.251 0.300

STABILITY TEST
INJECTED CURRENTS(A) MEASURED VALUES STATUS
Ref
HV SIDE-1 LV SIDE Id Ir
R ph 0.728∟0° 0.874∟180° 0 0.873 RELAY STABLE
Y ph 0.728∟240° 0.874∟60° 0 0.873
B ph 0.728∟120° 0.874∟300° 0 0.873

TRIP TEST:

TIME STATUS
INJECTED CURRENTS(A) MEASURED VALUES
(ms)
Ref
HV SIDE-1 LV SIDE Id Ir

R ph 0.728∟0° 0.874∟0° 1.746 0.873 31.4 TRIP


Y ph 0.728∟240° 0.874∟240° 1.745 0.873
B ph 0.728∟120° 0.874∟120° 1.745 0 .873

SWL EIL/GAIL
Sign Sign

Name Name

Date Date
STERLING AND WILSON LIMITED ANNEXURE-B

PROJECT: 132 KV OUTDOOR SWITCHYARD, GAIL-VIJAIPUR


CLIENT: GAIL (India) Limited
CONSULTANT: ENGINEERS INDIA LIMITED
DOCUMENT NO.: SWL/GAIL/RELAY/06/F-1 Rev No.: R0 DATE: 22.10.2012

SLOPE TEST:

I Diff Initial point:

TIME STATUS
INJECTED CURRENTS(A) MEASURED VALUES
(ms)
Ref
HV SIDE-1 LV SIDE Id Ir
R ph 0.167∟0° 0 0.200 0.200 30.4 TRIP
Y ph 0.167∟240° 0 0.200 0.200
B ph 0.167∟120° 0 0.200 0.200

SLPOE:1 SETTING:m1=30%

0.5 times of full load current:

INJECTED CURRENTS(A) MEASURED VALUES STATUS


Ref
HV SIDE-1 LV SIDE Id1 Ir1

R ph 0.364∟0° 0.437∟180° 0 0.437 STABLE


Y ph 0.364∟240° 0.437∟60° 0 0.437
B ph 0.364∟120° 0.437∟300° 0 0.437
HV SIDE-1 LV SIDE Id2 Ir2
R ph 0.530∟0° 0.437∟180° 0.200 0.636 TRIP
Y ph 0.530∟240° 0.437∟60° 0.200 0.636 31.8 ms
B ph 0.530∟120° 0.437∟300° 0.200 0.636

SWL EIL/GAIL
Sign Sign

Name Name

Date Date
STERLING AND WILSON LIMITED ANNEXURE-B

PROJECT: 132 KV OUTDOOR SWITCHYARD, GAIL-VIJAIPUR


CLIENT: GAIL (India) Limited
CONSULTANT: ENGINEERS INDIA LIMITED
DOCUMENT NO.: SWL/GAIL/RELAY/06/F-1 Rev No.: R0 DATE: 22.10.2012

1x times of full load current:

INJECTED CURRENTS(A) MEASURED VALUES STATUS


Ref
HV SIDE-1 LV SIDE Id1 Ir1

R ph 0.728∟0° 0.874∟180° 0 0.874 STABLE


Y ph 0.728∟240° 0.874∟60° 0 0.874
B ph 0.728∟120° 0.874∟300° 0 0.874
HV SIDE-1 LV SIDE Id2 Ir2
R ph 1.040∟0° 0.874∟180° 0.374 1.248 TRIP
Y ph 1.040∟240° 0.874∟60° 0.374 1.248 28.0 ms
B ph 1.040∟120° 0.874∟300° 0.374 1.248

SLOPE=(0.374-0.2)/(1.248-0.636)=28.40 percent…

SLPOE:2 SETTING:m2=80%

INJECTED CURRENTS(A) MEASURED VALUES STATUS


Ref
HV SIDE-1 LV SIDE Id1 Ir1

R ph 1.820∟0° 2.185∟180° 0 2.183 stable


Y ph 1.820∟240° 2.185∟60° 0 2.183
B ph 1.820∟120° 2.185∟300° 0 2.183
HV SIDE-1 LV SIDE Id2 Ir2
R ph 9.090∟0° 2.185∟180° 8.725 11.350 TRIP
Y ph 9.090∟240° 2.185∟60° 8.725 11.350 24.50 ms
B ph 9.090∟120° 2.185∟300° 8.725 11.350

SWL EIL/GAIL
Sign Sign

Name Name

Date Date
STERLING AND WILSON LIMITED ANNEXURE-B

PROJECT: 132 KV OUTDOOR SWITCHYARD, GAIL-VIJAIPUR


CLIENT: GAIL (India) Limited
CONSULTANT: ENGINEERS INDIA LIMITED
DOCUMENT NO.: SWL/GAIL/RELAY/06/F-1 Rev No.: R0 DATE: 22.10.2012

INJECTED CURRENTS(A) MEASURED VALUES STATUS


Ref
HV SIDE-1 LV SIDE Id1 Ir1

R ph 2.184∟0° 2.622∟180° 0 2.620 stable


Y ph 2.184∟240° 2.622∟60° 0 2.620
B ph 2.184∟120° 2.622∟300° 0 2.620
HV SIDE-1 LV SIDE Id2 Ir2
R ph 10.90∟0° 2.622∟180° 10.461 13.083 TRIP
Y ph 10.90∟240° 2.622∟60° 10.461 13.083 26.90 ms
B ph 10.90∟120° 2.622∟300° 10.461 13.083

SLOPE=(10.461-8.725)/(13.083-11.350)=79.85percent…

6. INSTANTANEOUS DIFFERENTIAL:

SETTINGS :0.5 p.u. Time-0 sec

TIME STATUS
INJECTED CURRENTS(A) MEASURED VALUES
(ms)
Ref
HV SIDE-1 LV SIDE Id Ir
R ph 4.166∟0° 0 4.998 4.998 29.9 TRIP
Y ph 4.166∟240° 0 4.998 4.998
B ph 4.166∟120° 0 4.998 4.998

SWL EIL/GAIL
Sign Sign

Name Name

Date Date
STERLING AND WILSON LIMITED ANNEXURE-B

PROJECT: 132 KV OUTDOOR SWITCHYARD, GAIL-VIJAIPUR


CLIENT: GAIL (India) Limited
CONSULTANT: ENGINEERS INDIA LIMITED
DOCUMENT NO.: SWL/GAIL/RELAY/06/F-1 Rev No.: R0 DATE: 22.10.2012

7. HARMONICS TEST:4

2ND HARMONICS: SETTING: 20%


INJECTED CURRENTS(A)
PHASE STATUS
HV SIDE-1@50HZ LV SIDE@100HZ
R1,R2 0.728∟0° 0.218∟0° RELAY BLOCKING 2ND
Y1.Y2 0.728∟240° 0.218∟240° HORMONICS
29.9 %
B1,B2 0.728∟120° 0.218∟120°
R1,R2 0.728∟0° 0.131∟0°
Y1.Y2 0.728∟240° 0.131∟240° RELAY TRIP
B1,B2 0.728∟120° 0.131∟120° 18.1 %

8.SEF PROTECTION:
GROUND IOC

SET CURRENT SET TIME INJECTED OPERATED TIME


(A) (sec) CURRENT (A) (sec)

0.2 0.0 0.4

Note: SEF (stand by earth fault protection function disable as per the GAIL recommend)

9. Functional checks: (Whether Operational Checks OK / Not OK / Not Applicable)

1 Correct operation of LED OK


2 Correct operation of output contacts OK
3 Harmonic blocking checked OK
4 All Group functions checked OK
5 86 Master tripping were tested for all protection as well
as trouble relay operation.

10. Remarks : Relay found Healthy.

SWL EIL/GAIL
Sign Sign

Name Name

Date Date
STERLING AND WILSON LIMITED ANNEXURE-B

PROJECT: 132 KV OUTDOOR SWITCHYARD, GAIL-VIJAIPUR


CLIENT: GAIL (India) Limited
CONSULTANT: ENGINEERS INDIA LIMITED
DOCUMENT NO.: SWL/GAIL/RELAY/06/F-1 Rev No.: R0 DATE: 25.10.2012

132/6.6KV TRANSFORMER BAY DIRECTIONAL O/C & E/F PROTECTION RELAY

1. Location : SUBSTATION-1 CONTROL ROOM

Feeder Name : 25MVA 132/6.6KV TRANSFORMER FEEDER

2. Equipment details:
Make GE
Type / Model no F650
SI. No. 81.551.704 HW05
CT Ratio 150/1 A
PT RATIO 132KV/√3:110/√3V

3. General Inspection : OK

4.CURRENT Measurements:
1. PHASE CT

INJECTED MEASURED
Ref
CURRENT CURRENT RELAY CT
MODULE
PHASE AMPS KAMPS

R 1 ∟0° 0.149∟-359.7° B1-B2


Y 1 ∟-120° 0.149∟-119.7° B3-B4
B 1 ∟120° 0.149∟-239.7° B5-B6

2. REF CT

INJECTED MEASURED
Ref
CURRENT CURRENT RELAY CT
MODULE
PHASE AMPS KAMPS

REF CORE 1 ∟0° 0.149∟-359.7° B11-B12

SWL EIL/GAIL
Sign Sign

Name Name

Date Date
STERLING AND WILSON LIMITED ANNEXURE-B

PROJECT: 132 KV OUTDOOR SWITCHYARD, GAIL-VIJAIPUR


CLIENT: GAIL (India) Limited
CONSULTANT: ENGINEERS INDIA LIMITED
DOCUMENT NO.: SWL/GAIL/RELAY/06/F-1 Rev No.: R0 DATE: 25.10.2012

5. voltage measurements:

INJECTED MEASURED MEASURED


RELAY PT
PHASE VOLTAGE VOLTAGE(PH-PH) VOLTAGE (PH-N)
MODULE
VOLTS (KV) (KV)
RN 63.51∟0° 131.8 ∟-329.9° 76.20 ∟0° A5-A6

YN 63.51∟-120 131.7 ∟-89.4° 76.18 ∟-119.9° A7-A8

BN 63.51∟120 131.6∟-209.6° 76.18 ∟239.2° A9-A10

6. OVER CURRENT PROTECTION TEST:

PH TOC HIGH:
Stage-1 SET CURRENT=0.73A TMS-0.08 Sec Characteristic: IEC A CURVE

Set Pick-up Operating Time (sec) at multiple of PS


Phase TMS (Amps) 2xIs 5xIs 10xIs
Current(A)
R 0.73 0.08 0.742 0.835 0.369 0.250
Y 0.73 0.08 0.745 0.837 0.362 0.249
B 0.73 0.08 0.748 0.832 0.359 0.247
Expected Operating Time (Sec) 0.802 0.342 0.238

SWL EIL/GAIL
Sign Sign

Name Name

Date Date
STERLING AND WILSON LIMITED ANNEXURE-B

PROJECT: 132 KV OUTDOOR SWITCHYARD, GAIL-VIJAIPUR


CLIENT: GAIL (India) Limited
CONSULTANT: ENGINEERS INDIA LIMITED
DOCUMENT NO.: SWL/GAIL/RELAY/06/F-1 Rev No.: R0 DATE: 25.10.2012

Operating region: For RCA 45 deg, DIR-FWD.

PICK UP REGION: DROP OFF REGION:

R-ph : 40.50°-0°-230.50° R-ph : 45.50°-180°-225.50°

Y-ph: 110.0°-180°-290.0° Y-ph: 105.0°-0°-285.0°

B-ph: 160.0°-0°-349.50° B-ph: 165.0°-180°-344.50°

7. EARTH FALUT PROTECTION TEST:

NEUTRAL TOC:
Stage-1
I=0.2A TMS: 0.08Sec Characteristic: IDMT

Set Pick-up Operating Time (sec) at multiple of PS


Phase TMS (Amps) 2xIs 5xIs 10xIs
Current(A)
R-N 0.2 0.08 0.210 0.817 0.358 0.257
Y-N 0.2 0.08 0.209 0.815 0.348 0.249
B-N 0.2 0.08 0.210 0.819 0.339 0.241
Expected Operating Time (sec) 0.802 0.342 0.238

Operating region: FOR RCA : -15 deg, DIR-FWD.

PICK UP REGION: DROP OFF REGION:

70.50°-0°-260.50° 75.50°-180°-255.50°

SWL EIL/GAIL
Sign Sign

Name Name

Date Date
STERLING AND WILSON LIMITED ANNEXURE-B

PROJECT: 132 KV OUTDOOR SWITCHYARD, GAIL-VIJAIPUR


CLIENT: GAIL (India) Limited
CONSULTANT: ENGINEERS INDIA LIMITED
DOCUMENT NO.: SWL/GAIL/RELAY/06/F-1 Rev No.: R0 DATE: 25.10.2012

9.BREAKER FAIL:

Stage-1
BREAKER FAIL LOW SET : 2 AMPS.
SET TIME : 0.2 SEC
LBB INITIATION: F CARD INPUT F01

SET CURRENT SET TIME INJECTED OPERATED TIME


(A) (sec) CURRENT (A) (sec)

2.0 0.2 2.1 0.251

96 Relay Operation checked for LBB Protection.

10. REF PROTECTION:

SET CURRENT SET TIME INJECTED OPERATED TIME


(A) (sec) CURRENT (A) (sec)

0.1 0 0.2 0.192

11. Functional checks: (Whether Operational Checks OK / Not OK / Not Applicable)

1 Correct operation of LED OK


2 Correct operation of output contacts OK
3 86 & 96 relay operations are tested for all protection. OK

12. Remarks : Relay found Healthy.

SWL EIL/GAIL
Sign Sign

Name Name

Date Date
STERLING AND WILSON LIMITED ANNEXURE-B

PROJECT: 132 KV OUTDOOR SWITCHYARD, GAIL-VIJAIPUR


CLIENT: GAIL (India) Limited
CONSULTANT: ENGINEERS INDIA LIMITED
DOCUMENT NO.: SWL/GAIL/RELAY/06/F-1 Rev No.: R0 DATE: 25.10.2012

132KV INCOMING LINE FEEDER DIRECTIONAL O/C & E/F RELAY

1. Location : SUBSTATION-1 CONTROL ROOM

Feeder Name : 132 KV INCOMING LINE FEEDER

2. Equipment details:
Make GE
Type / Model no F650
SI. No. 81.551.703 HW:05
CT Ratio 150/1 A
PT RATIO 132KV/√3:110/√3V
3. General Inspection : OK

4. CURRENT Measurements:
1. PHASE CT
INJECTED MEASURED
Ref
CURRENT CURRENT RELAY CT
MODULE
PHASE AMPS KAMPS

R 1 ∟0° 0.149∟-359.7° B1-B2

Y 1 ∟-120° 0.149∟-119.7° B3-B4

B 1 ∟120° 0.149∟-239.7° B5-B6

5.voltage measurements:

INJECTED MEASURED MEASURED


RELAY PT
PHASE VOLTAGE VOLTAGE(PH-PH) VOLTAGE (PH-N)
MODULE
VOLTS (KV) (KV)

RN 63.51∟0° 131.8 ∟-329.9° 76.20 ∟0° A5-A6

YN 63.51∟-120 131.7 ∟-89.4° 76.18 ∟-119.9° A7-A8

BN 63.51∟120 131.6∟-209.6° 76.18 ∟239.2° A9-A10

SWL EIL/GAIL
Sign Sign

Name Name

Date Date
STERLING AND WILSON LIMITED ANNEXURE-B

PROJECT: 132 KV OUTDOOR SWITCHYARD, GAIL-VIJAIPUR


CLIENT: GAIL (India) Limited
CONSULTANT: ENGINEERS INDIA LIMITED
DOCUMENT NO.: SWL/GAIL/RELAY/06/F-1 Rev No.: R0 DATE: 25.10.2012

6. OVER CURRENT PROTECTION TEST:

PH TOC HIGH:
Stage-1 SET CURRENT=0.73A TMS-0.08 Sec Characteristic: IEC A CURVE
Set Pick-up Operating Time (sec) at multiple of PS
Phase TMS (Amps) 2xIs 5xIs 10xIs
Current(A)
R 0.73 0.08 0.744 0.835 0.369 0.250
Y 0.73 0.08 0.749 0.837 0.361 0.251
B 0.73 0.08 0.748 0.839 0.359 0.247
Expected Operating Time (Sec) 0.802 0.342 0.238

Operating region: For RCA 45 deg, DIR-FWD.

PICK UP REGION: DROP OFF REGION:

R-ph : 40.50°-0°-230.50° R-ph : 45.40°-180°-225.40°

Y-ph: 110.0°-180°-290.0° Y-ph: 105.0°-0°-285.0°

B-ph: 160.0°-0°-349.50° B-ph: 165°-180°-344.50°

7. EARTH FALUT PROTECTION TEST:

NEUTRAL TOC
Stage-1 I=0.2A TMS: 0.15Sec Characteristic: IDMT

Set Pick-up Operating Time (sec) at multiple of PS


Phase TMS (Amps) 2xIs 5xIs 10xIs
Current(A)
R-N 0.2 0.15 0.209 1.520 0.669 0.455
Y-N 0.2 0.15 0.210 1.525 0.671 0.460
B-N 0.2 0.15 0.209 1.527 0.670 0.457
Expected Operating Time (Sec) 1.504 0.642 0.446

SWL EIL/GAIL
Sign Sign

Name Name

Date Date
STERLING AND WILSON LIMITED ANNEXURE-B

PROJECT: 132 KV OUTDOOR SWITCHYARD, GAIL-VIJAIPUR


CLIENT: GAIL (India) Limited
CONSULTANT: ENGINEERS INDIA LIMITED
DOCUMENT NO.: SWL/GAIL/RELAY/06/F-1 Rev No.: R0 DATE: 25.10.2012

Operating region: FOR RCA -15 deg, DIR-FWD.

PICK UP REGION: DROP OFF REGION:

70.50°-0°-260.50° 75.50°-0°-255.50°

8.BREAKER FAIL:

Stage-1

BREAKER FAIL LOW SET: 2 AMPS.

SET TIME : 0.2 SEC

LBB INITIATION: F CARD INPUT F01

SET CURRENT SET TIME INJECTED OPERATED TIME


(A) (sec) CURRENT (A) (sec)

2.0 0.2 2.1 0.251

96 RELAY OPERATIONS WERE CHECKED WHILE OPERATION OF LBB PROTECTION

SWL EIL/GAIL
Sign Sign

Name Name

Date Date
STERLING AND WILSON LIMITED ANNEXURE-B

PROJECT: 132 KV OUTDOOR SWITCHYARD, GAIL-VIJAIPUR


CLIENT: GAIL (India) Limited
CONSULTANT: ENGINEERS INDIA LIMITED
DOCUMENT NO.: SWL/GAIL/RELAY/06/F-1 Rev No.: R0 DATE: 25.10.2012

9. PT FUSE FAIL:

PT FUSE FAIL CONDITIONS WERE CHECKED BY CUT ANY 1 PHASE VOLTAGE AS WELL AS
ANY 2 PHASE VOLTAGE.CORRESPONDING LEDS WERE CHECKED WHILE FUSE FAIL OPERATION.

NOTE:
IF ALL THE 3 PHASES ARE CUT OFF MEANS RELAY WILL SENSE IT IS A DEAD BUS.

10. Functional checks: (Whether Operational Checks OK / Not OK / Not Applicable)

1 Correct operation of LED OK

2 Correct operation of output contacts OK

3 Master tripping operation were checked for all protection OK

11. Remarks : Relay found Healthy.

SWL EIL/GAIL
Sign Sign

Name Name

Date Date
STERLING AND WILSON LIMITED ANNEXURE-B

PROJECT: 132 KV OUTDOOR SWITCHYARD, GAIL-VIJAIPUR


CLIENT: GAIL (India) Limited
CONSULTANT: ENGINEERS INDIA LIMITED
DOCUMENT NO.: SWL/GAIL/RELAY/06/F-1 Rev No.: R0 DATE: 17.10.2012

132KV BUS COUPLER NON-DIR O/C AND E/F RELAY

1. Location : SUBSTATION-1 CONTROL ROOM

Feeder Name : 132 KV BUS COUPLER FEEDER.

2. Equipment details:

Make GE
Type / Model no F650
SI. No. 81.556.591 HW05
CT Ratio 150/1 A
PT RATIO 132KV/√3:110V/√3

3. General Inspection : OK

4. CURRENT Measurements:
1. PHASE CT

INJECTED MEASURED
Ref
CURRENT CURRENT RELAY CT
MODULE
PHASE AMPS KAMPS

R 1 ∟0° 0.149∟-359.7° B1-B2


Y 1 ∟-120° 0.149∟-119.7° B3-B4
B 1 ∟120° 0.149∟-239.7° B5-B6

SWL EIL/GAIL

Sign Sign

Name Name

Date Date
STERLING AND WILSON LIMITED ANNEXURE-B

PROJECT: 132 KV OUTDOOR SWITCHYARD, GAIL-VIJAIPUR


CLIENT: GAIL (India) Limited
CONSULTANT: ENGINEERS INDIA LIMITED
DOCUMENT NO.: SWL/GAIL/RELAY/06/F-1 Rev No.: R0 DATE: 17.10.2012

5. voltage measurements:

INJECTED MEASURED MEASURED


RELAY PT
VOLTAGE VOLTAGE(PH-PH) VOLTAGE (PH-N)
PHASE MODULE
VOLTS KV KV
RN 63.51∟0° 131.8 ∟-329.9° 76.20 ∟0° A5-A6

YN 63.51∟-120 131.7 ∟-89.4° 76.18 ∟-119.9° A7-A8

BN 63.51∟120 131.6∟-209.6° 76.18 ∟239.2° A9-A10

6. OVER CURRENT PROTECTION TEST:

PH TOC HIGH:

Stage-1 SET CURRENT=0.73A TMS-0.08Sec Characteristic: IEC A CURVE

Pick-up Operating Time (sec) at multiple of PS


Set
Phase TMS (Amps) 2xIs 5xIs 10xIs
Current(A)
R 0.73 0.08 0.742 0.835 0.369 0.249
Y 0.73 0.08 0.745 0.836 0.365 0.245
B 0.73 0.08 0.748 0.832 0.361 0.250
Expected Operating Time (Sec) 0.802 0.342 0.238

SWL EIL/GAIL

Sign Sign

Name Name

Date Date
STERLING AND WILSON LIMITED ANNEXURE-B

PROJECT: 132 KV OUTDOOR SWITCHYARD, GAIL-VIJAIPUR


CLIENT: GAIL (India) Limited
CONSULTANT: ENGINEERS INDIA LIMITED
DOCUMENT NO.: SWL/GAIL/RELAY/06/F-1 Rev No.: R0 DATE: 17.10.2012

7. EARTH FALUT PROTECTION TEST:

NEUTRAL TOC:

Stage-1 I=0.2A TMS: 0.15Sec Characteristic: IEC A CURVE

Set Pick-up Operating Time (sec) at multiple of PS


Phase TMS (Amps) 2xIs 5xIs 10xIs
Current(A)
R-N 0.2 0.15 0.208 1.522 0.668 0.457
Y-N 0.2 0.15 0.210 1.525 0.671 0.460
B-N 0.2 0.15 0.209 1.527 0.670 0.455
Expected Operating Time (sec) 1.504 0.642 0.446

8. BREAKER FAIL:

Stage-1
BREAKER FAIL LOW SET : 2 AMPS.

SET TIME : 0.2 SEC

LBB INITIATION: F CARD INPUT F01

SET CURRENT SET TIME INJECTED OPERATED TIME


(A) (sec) CURRENT (A) (sec)

2.0 0.2 2.1 0.251

96 relay tripping were tested for LBB operation.

SWL EIL/GAIL

Sign Sign

Name Name

Date Date
STERLING AND WILSON LIMITED ANNEXURE-B

PROJECT: 132 KV OUTDOOR SWITCHYARD, GAIL-VIJAIPUR


CLIENT: GAIL (India) Limited
CONSULTANT: ENGINEERS INDIA LIMITED
DOCUMENT NO.: SWL/GAIL/RELAY/06/F-1 Rev No.: R0 DATE: 17.10.2012

9. Functional checks: (Whether Operational Checks OK / Not OK / Not Applicable)

1 Correct operation of LED OK


2 Correct operation of output contacts OK
3 86 Master relay tripping were tested for all protection OK

10. Remarks : Relay found Healthy.

SWL EIL/GAIL

Sign Sign

Name Name

Date Date
STERLING AND WILSON LIMITED ANNEXURE-B

PROJECT: 132 KV OUTDOOR SWITCHYARD, GAIL-VIJAIPUR


CLIENT: GAIL (India) Limited
CONSULTANT: ENGINEERS INDIA LIMITED
DOCUMENT NO.: SWL/GAIL/RELAY/06/F-1 Rev No.: R0 DATE: 27.10.2012

6.6 kV OUTGOING FEEDER NON-DIRECTIONAL O/C & E/F RELAY

1. Location : SUBSTATION-1 CONTROL ROOM

Feeder Name : 6.6 kV OUTGOING FEEDER

2. Equipment details:

Make GE
Type / Model no F650
SI. No. 81.540.901 HW:05
CT Ratio 2500/1 A
PT RATIO 6.6kV/√3:110/√3V

3. General Inspection : OK

4. CURRENT Measurements:
1. PHASE CT

INJECTED MEASURED
Ref
CURRENT CURRENT RELAY CT
MODULE
PHASE AMPS KAMPS

R 1 ∟0° 2.495∟-359.7° B1-B2


Y 1 ∟-120° 2.495∟-119.7° B3-B4
B 1 ∟120° 2.497∟-239.7° B5-B6

SWL EIL/GAIL
Sign Sign

Name Name

Date Date
STERLING AND WILSON LIMITED ANNEXURE-B

PROJECT: 132 KV OUTDOOR SWITCHYARD, GAIL-VIJAIPUR


CLIENT: GAIL (India) Limited
CONSULTANT: ENGINEERS INDIA LIMITED
DOCUMENT NO.: SWL/GAIL/RELAY/06/F-1 Rev No.: R0 DATE: 27.10.2012

5. VOLTAGE measurements:

MEASURED MEASURED
INJECTED VOLTAGE RELAY PT
VOLTAGE(PH-PH) VOLTAGE (PH-N)
PHASE VOLTS MODULE
KV KV
RN 63.51∟0° 6.580 ∟-329.9° 3.807 ∟0° A5-A6

YN 63.51∟-120 6.595 ∟-89.4° 3.808 ∟-119.9° A7-A8

BN 63.51∟120 6.619∟-209.6° 3.809 ∟239.2° A9-A10

6. OVER CURRENT PROTECTION TEST:

PH TOC HIGH: 50

Stage-1 SET CURRENT=1.0A TMS-0.08 Sec Characteristic: IEC A CURVE

Set Pick-up Operating Time (sec) at multiple of PS


Phase TMS (Amps) 2xIs 5xIs 10xIs
Current(A)
R 1.0 0.08 1.02 0.832 0.369 0.250
Y 1.0 0.08 1.05 0.835 0.366 0.255
B 1.0 0.08 1.02 0.831 0.362 0.252
Expected Operating Time (Sec) 0.802 0.342 0.238

SWL EIL/GAIL
Sign Sign

Name Name

Date Date
STERLING AND WILSON LIMITED ANNEXURE-B

PROJECT: 132 KV OUTDOOR SWITCHYARD, GAIL-VIJAIPUR


CLIENT: GAIL (India) Limited
CONSULTANT: ENGINEERS INDIA LIMITED
DOCUMENT NO.: SWL/GAIL/RELAY/06/F-1 Rev No.: R0 DATE: 27.10.2012

PH IOC HIGH: 51

Stage-1 SET CURRENT=20.0A SET TIME=0 sec

SET CURRENT SET TIME Injected Current Operated time


Ref
(Amps) (sec) (Amps) (sec)
R 20.0 0.0 20.10 0.040
Y 20.0 0.0 20.11 0.045
B 20.0 0.0 20.11 0.040

7. EARTH FALUT PROTECTION TEST:

NEUTRAL TOC:

Stage-1

I=0.1A TMS: 0.08 Sec Characteristic: IEC A CURVE

Set Pick-up Operating Time (sec) at multiple of PS


Phase TMS (Amps) 2xIs 5xIs 10xIs
Current(A)
R-N 0.1 0.08 0.12 0.837 0.369 0.260
Y-N 0.1 0.08 0.11 0.835 0.373 0.265
B-N 0.1 0.08 0.12 0.841 0.370 0.262
Expected Operating Time (Sec) 0.802 0.342 0.238

SWL EIL/GAIL
Sign Sign

Name Name

Date Date
STERLING AND WILSON LIMITED ANNEXURE-B

PROJECT: 132 KV OUTDOOR SWITCHYARD, GAIL-VIJAIPUR


CLIENT: GAIL (India) Limited
CONSULTANT: ENGINEERS INDIA LIMITED
DOCUMENT NO.: SWL/GAIL/RELAY/06/F-1 Rev No.: R0 DATE: 27.10.2012

8. SEF:

ISG:

Stage-1 SET CURRENT=0.1A SET TIME=0 sec

SET CURRENT SET TIME Injected Operated time


Ref
Amps sec Current Amps sec

ISG 0.1 0.0 0.2 0.038

9. Functional checks: (Whether Operational Checks OK / Not OK / Not Applicable)

1 Correct operation of LED OK


2 Correct operation of output contacts OK
3 86 Master relay tripping were tested for all protection OK

10. Remarks : Relay found Healthy.

SWL EIL/GAIL
Sign Sign

Name Name

Date Date
STERLING AND WILSON LIMITED ANNEXURE-B

PROJECT: 132 KV OUTDOOR SWITCHYARD, GAIL-VIJAIPUR


CLIENT: GAIL (India) Limited
CONSULTANT: ENGINEERS INDIA LIMITED
DOCUMENT NO.: SWL/GAIL/RELAY/06/F-1 Rev No.: R0 DATE: 27.10.2012

6.6 kV INCOMER FEEDER REF PROTECION RELAY

1. Location : SUBSTATION-1 CONTROL ROOM

Feeder Name : 6.6 kV INCOMER FEEDER

2. Equipment details:

Make GE
Type / Model no F650
SI. No. 81.603.001.HW:202
CT Ratio 2500/1 A

3. General Inspection : OK

4. CURRENT Measurements:
1. REF CT

INJECTED MEASURED
Ref
CURRENT CURRENT RELAY CT
MODULE
PHASE AMPS KAMPS

R 1 ∟0° 2.495∟-359.7° B09-B10

SWL EIL/GAIL
Sign Sign

Name Name

Date Date
STERLING AND WILSON LIMITED ANNEXURE-B

PROJECT: 132 KV OUTDOOR SWITCHYARD, GAIL-VIJAIPUR


CLIENT: GAIL (India) Limited
CONSULTANT: ENGINEERS INDIA LIMITED
DOCUMENT NO.: SWL/GAIL/RELAY/06/F-1 Rev No.: R0 DATE: 27.10.2012

5. REF:

IG: GROUND IOC:

Stage-1 SET CURRENT=0.1A SET TIME=0 sec

Injected
SET CURRENT SET TIME Operated time
Ref Current
(Amps) (Sec) (sec)
(Amps)
ISG 0.1 0.0 0.15 0.030

6. Functional checks: (Whether Operational Checks OK / Not OK / Not Applicable)

1 Correct operation of LED OK


2 Correct operation of output contacts OK
3 86 Master relay tripping were tested for all protection OK

7. Remarks : Relay found Healthy.

SWL EIL/GAIL
Sign Sign

Name Name

Date Date