Vous êtes sur la page 1sur 2
[RESPONAE| Sau ann ‘Shaybah NGL Recovery & Utilities Facilities Project [ro + haybuhNOL Recovery & Utes Facies Projet TRANSMITTAL NO. = P2TSESA2778 [ATTN 5 Me Husam A AlSabtI/ Project Manager TRANSMITTAL DATE : 20san-5 RESPONSE \FRom —: mr Seo Jong:na/ Project Manag rare arene \sicne By 08 No. 0.2420 CONTRACT NO, Projot Wanagertat ss coe COREVIEW APPROVAL © INFORMATION leoNsrRUCTON FINAL DOC. [SUBJECT = Submission of Resume 7 instrument Technicians for Aramco Approval CleWiL GPPNG GNECHANICAL Ww QVGC CINSULATION CIMVACCISLECTRICAL C INSTALMENT OBUILDWNG OMSE STRUCTURAL PRE-COMDASSIONING lReceser Dare: ACKNOWLEDGED BY INCASE OF ~ FOR APPROVAL" OOCUMENTS, PLEASE RETURN COPY OF TRANSMITTAL WITH YOUR APPROVAL STATUS |W coDe couumn usina FoLLoWc copes : APPROVED B= APPROVED WITH MINOR COMMENT TR: APPROVED WITH COMMENTS NNT ACCEPTABLE F__+ NOT SUBJECT FOR APPROVAL D__: CORRECT a RESUSMUT "RODTIONAL REWARKS BY CONTRACTOR "ADDITIONAL REWARKS BY RECIPIENT | ter we DOCUMENT LIST [tached Reply Shoot © Yos No Rev a | Review sea, 0c. no. red MENT TLE ra a Nm : Renae Tinton is § eee 1p Ream 8) 17 FEB 2015 1TFEB 2015 © = NGL Recovery & Utities Division INSPECTION DEPARTMENT Southern Area Project Inspection Division Shaybah Project Inspection Section (ShPIS) Tel: 578-3728, Fax: 578-3646 DOCUMEN’ REVIEW RESPONSE [— REQUEST (] ID/ISAPID/ShPIS/LOG No. 14338-15 TO STATUS NAME: Mr. Husam A. Sabti, Project Manager DEPARTMENT: _ Shaybah NGL Project Department “| SASS comet ADDRESS: Bidg. 200 Temporary SAPMT Site Office 3: Sidon owes a — ” = Seeman we comms) TEL: +966 3.678-7200 Fax: BJO CONTRACTOR PROJECT DESCRIPTION 10-00167-0002 ‘Samsung ‘Shaybah NGL Recovery Facilities and Utiities-Package # 2 DOCUMENT DESCRIPTION: — i 2 Submission of Resume 7 Instrument Technicians fo Aramco Approval Comments ‘The following Instrumentation Technician as listed on below table have been interviewed with respect to their respective Vas attached onto Transmittal # P2-T-SS-SA-2778 and approved them accordingly to perform tests and calibrations for instrumentations on aforementioned project (Bl). Henceforth, ShPIS reserves the right to revoke the approval at any time during construction stage of the project if their performance shows unsatisfactory. [ane Na Patton caper + | Mohammad Ansan Ansar instrumentation Technician Samsung “2 | Monarnmad Shanabudain instrumentation Technician Samsung 3. | Mohammad Shafquat Al Instrumentation Technician Samsung 4 | Mohammad Jami Ahmad | on Technician Samsung 5 | Moharnmed Shabbir Al | Samsung 5 | Mohammad Khushal Malick | Semeur | 7 _| Shahzada Farid | ‘Samsung Reviewedlinirviewed by: M. Nashim Khan Guilles Brousseau — Fleld Supervisor ‘ShPIS-SNGLR&U- Tel: 578-1101 Cex: [ 0 Flo aa - ‘Saudi Aramco: Company General Use

Vous aimerez peut-être aussi