Vous êtes sur la page 1sur 3

CURRICULUM VITAE

ANIL SAINI
Gali No:-1, Rishi Colony Near New Subzi Mandi ,Sonipat (HR)
Phone: 9466517805,8384084760
E-mail: sainianil96@gmail.com

CAPABILITIES :-
• Time Condition Based Decision.
• Good Time Management.
• Effective Leadership Skill.

TOTAL EXPERIENCE :

• Having Experience in infrastructure projects for the construction of Flyover,


Bridge ,Railway over bridge (R.O.B), Post Stressing of PSC (i-Girder) , Launching of PSC
and RCC (i-Girder) on POT-PTFE and Elastomeric Bearing , Vehicle Underpass (VUP ) ,
Pedestrian Underpass (PUP) , Pipe culvert encasing and Box culvert Execution.

PROJECTS:-
1 :- Construction Of Four laning of NH72A Roorkee - Chutmalpur - Gagalhari section of NH73 in State
of Uttrakhand & uttar Pradesh.

Company :- KRC INFRA PROJECTS PVT.LTD


Responsibility :- Railway Over Bridge ( Pile Foundation, Pier Shaft, Pier cap, PSC I-Girder, Erection of
I-girder on Elastomeric Bearing, Pile load Test .)
Designation:- Structure Site Engineer.
Period :- August 2018 TO Current working.
Client :- NHAI (National Highway Authority of India).

2 :- Construction Of Four Laning of Nagina - Kashipur Section of National Highway -74 in


Uttarakhand and Uttar Pradesh on EPC Mode.

Company :- PNC INFRATECH LTD.


Responsibility :- Pipe laying and pipe culvert encasing , Box culvert , curtain wall .
Designation:- Structure Site Engineer.
Period :- MAY 2018 TO August 2018.
Client :- NHAI (National Highway Authority of India).
3:- Construction of 4-Lane Bypass starting chainage From KM 79.516 to 94.457 , Total Length
14.707,In State Of Uttar Pradesh at NH-28 ON EPC Mode

Company :- Gawar Construction LTD.


Responsibility :- Pile Foundation, Pier Shaft, Pier cap, PSC I-Girder, Post Tensioning of PSC i- girder
and Erection of girders.
Designation:- ASST. Structure Engineer.
Period :- DEC 2017 TO MAY 2018.
Client :- NHAI (National Highway Authority of India)

4 :- Construction Of Flyover For Interchange and Underpass (VUP , PUP ) at NH-8 For improvement of
Existing Junction Iffco Chowk ,In State Of Haryana (GURGAON) ON EPC Mode.

Company :- Gawar Construction LTD.


Responsibility :- Pile Foundation, Pier Shaft, Pier cap, PSC I-Girder, Erection of I-girder on
Elastomeric Bearing, Construction of Slab, and slab Load Test , Vehicle
Underpass (VUP), pedestrian Underpass ( PUP) .
Designation:- G.E.T.
Period :- DEC 2016 TO DEC 2017.
Client :- NHAI (National Highway Authority of India).

5 :- Four Lanning of Hisar To Dabwali Section of NH-10 , CHAINAGE From 227.000 to 314.660 With
Paved Shoulder in State Of Haryana.

Company :- Gawar Construction LTD.


Responsibility :- Construction of Pier and Pier Cap, Construction Of PSC & RCC girder, Post
Tensioning of PSC i-Girder.
Designation:- G.E.T
Period :- SEPT 2016 TO DEC 2016.
Client :- NHAI (National Highway Authority of India).

TECHNICAL QUALIFICATION:

• B Tech. in CIVIL ENGINEERING , from Deenbandhu Chhotu Ram University Of


Science & Technology(DCRUST) with “A” Grade.
• Senior Secondary, from Haryana Board Of School Education Bhiwani (H.B.S.E) with
80.2% marks.
OS (Operating System) / SOFTWARE :-

• Staad Pro. , Auto-cad


• MS-EXCLE

PERSONAL INFORMATION:

Marital Status Unmarried


Nationality Indian
Current Location Roorkee
Location Preference Anywhere in India
Reason For Change Knowledge growth
Notice Period Upto 15 day’s

DECLARATION

I hereby declare that all the above furnished particulars are true to the best of my knowledge
and belief.

DATE

PLACE
(ANIL SAINI)

Vous aimerez peut-être aussi