CAMY PLANTS

R-600 Rabale MIDC, T.T.C. Industrial Area, Navi Mumbai-400701. INDIA.

SURFACE PREPARATION AND PAINTING INSPECTION REPORT

CLIENT M/s. GRASIM INDUSTRIES LTD. DATE 09.12.2019

INSP. BY. M/s. G.I.L EQPT. NAME BUBBLER TANK (Y-101)

P.O. NO. 7130013503 DT: 01.07.2019 DRG. NO. CP-GIL-19-63 SHEET: 01 REV: 03

WO .NO CP-15/2019 QTY NO 01 NO

PROJECT HYDROCHLORINATION TAG NO Y-101

SURFACE PREPARATION DETAIL

SURFACE
OPERATION ABRASSIVE TYPE DATE TIME R.H. TEMP. REMARK
FINISH

10 AM TO 12 PM VISUALY CHECKED
As per
BLASTING SAND 06.12.2019 & 65% 28ᴼC FOUND
SA 2.5
2 PM TO 4 PM SATISFACTORY

PAINT DETAIL

PRODUCT PRIMER / INTERMEDIATE / FINAL

TYPE INORGANIC ZINC SILICATE / EPOXY HB PAINT / ACRYLIC RESIN WITH URETHANE

BATCH NO. 1762/19-20 / 1721/19-20 / 1753/19-20


MAKE RAINBOW MAKE

PAINTING DETAIL FOR EXTERNAL SURFACE OF THE BUBBLER TANK

Paint DFT (Cum) in SURFACE


NO. COAT DATE TIME WBT RH% DEW POINT
Decription u TEMP.

ETHYL ZINC
UNDER COAT SILICATE 06.12.2019 4:00 PM 23ᴼC 63% 70-85 27ᴼC 25ᴼC
PRIMER

INTERMEDIATE EPOXY MIO (HB) 9 AM TO 5


07.12.2019 24ᴼC 63% 190-205 27ᴼC 24ᴼC
COAT BROWN PRIMER PM

P.U SMOKE GREY 9 AM TO 5


FINAL COAT 08.12.2019 24ᴼC 62% 275 - 95 27ᴼC 25ᴼC
PAINT PM

FINAL DFT FOUND IN A RANGE OF 275 TO 295 MICRONS

ENCLOSED PAINT TEST CERTIFICATES. 1)PRIMER TC NO : 1698/19-20 DT: 01.12.2019

REMARKS 2)INTERMEDIATE PAINT TC NO : 1698/19-20 DT: 01.12.2019

3)FINAL FINISH PAINT TC NO : 1698/19-20 DT: 01.12.2019

FOR CAMY PLANTS CLIENT /TPIA