Vous êtes sur la page 1sur 1

GENERAL NOTES:

(1) Foundation of the structure is based on the assumed bearing capacity


of soil equal to 1.0 Ton/sq.ft .

#4@12"C/C

#4@12"C/C
#4@12"C/C
#4@12"C/C
(2) Structural concrete for columns, shear walls & Lift shall have minimum

#4@12"C/C

#4@12"C/C

4'
STAIR VOID STAIR VOID

4'

4'
G G STAIR VOID cylinder crushing strength at 28 days equal to 4000 psi while that for footings,
G

#4@9"C/C
beams,slabs strength at 28 days equal to 3000 psi.
R.W R.W R.W
G G

#4@12"C/C
B-1 B-1
C1 C2 C1
B-1 B-1 B-1 B-1
(3) Structural steel shall have minimum yield strength equal to 60,000psi.

#3@9"C/C
#3@9"C/C
#3@9"C/C
#4@7"C/C
R.W

R.W
It must be remembered that in slabs #3 bars shall be used of Grade 60.

B-2

B-2
LIFT

B-2
10'-9"

#4@7"C/C
10'-9"
#4@8"C/C

B-2

B-2
#4@8"C/C

B-2

B-2
It should be very clear that all steel shall be grade 60 deformrd steel.

10'-9"
B-2

B-2

B-2

B-2
10'-9"

10'-9"

B-2
#4@12"C/C CB-2 #4@12"C/C

B-2

B-2
R.W (4)Minimum clear cover to reinforcement shall be as under;

R.W

#3@9"C/C
#4@12"C/C

#3@9"C/C
#4@8"C/C #4@8"C/C
#4@12"C/C (a)Foundation = 2"
#4@12"C/C #4@8"C/C

#4@12"C/C
#3@9"C/C #4@8"C/C

#4@12"C/C

#4@12"C/C
#4@12"C/C (b)Beams and Columns = 1.5"
B-1 B-1
F F #4@7"C/C

#4@12"C/C

#4@12"C/C
B-1 B-1 (c) Slabs = 0.75"

#4@12"C/C

#4@12"C/C
C1 C1 C1 F B-1 B-1
F B-1 B-1 F

#4@7"C/C
(5) Dowel length for columns
#3@9"C/C (a) # 4 Bars = 26"

#4@7"C/C
#4@7"C/C
#4@12"C/C

#4@7"C/C
#4@12"C/C (b) # 5 Bars = 33"

#4@7"C/C
#3@9"C/C #3@9"C/C (c) # 6 Bars = 39"
14'

14'

B-2
#4@12"C/C #4@12"C/C
R.W

R.W

B-2

B-2
#3@9"C/C

#4@7"C/C
#4@12"C/C #4@7"C/C

CB-1

14'
R.W

14'

14'
B-2
#4@12"C/C #4@12"C/C

#4@7"C/C
#4@7"C/C
(d) # 8 Bars = 52"

CB-1
#4@12"C/C #4@12"C/C

CB-1

CB-1

B-2

B-2
B-2

B-2

B-2

B-2
(6) Overlaps for Top Beam Bars

R.W
#3@9"C/C #4@12"C/C #3@9"C/C #3@9"C/C
C1 C1 C1 ( a) # 4 Bars = 26"

#4@12"C/C

#4@12"C/C
#4@12"C/C

#4@12"C/C

#4@12"C/C
B-1
E E B-1 ( b) # 5 Bars = 33"

#4@12"C/C

#4@12"C/C
B-1 B-1
E B-1 B-1
E B-1 B-1 E ( c) # 6 Bars = 39"

#4@7"C/C
( d) # 8 Bars = 52"

#4@7"C/C
#4@12"C/C (7) Overlaps for Bottom Beam Bars

#4@7"C/C
and all Slab Bars:

#4@7"C/C
#4@7"C/C
#4@12"C/C #3@9"C/C #4@12"C/C

CB-1
16'-6"

16'-6"
#3@9"C/C ( a) # 3 Bars = 20"

B-2
#4@12"C/C
#4@7"C/C
R.W

R.W
#3@9"C/C

CB-1
B-2
16'-6"

B-2

B-2
CB-1

CB-1
B-2

B-2
16'-6"

16'-6"
B-2

B-2

B-2

B-2
( b) # 4 Bars = 26"

#4@7"C/C
#4@12"C/C
#3@9"C/C

#4@7"C/C
#4@12"C/C ( c) # 5 Bars = 33"

#4@7"C/C
#4@12"C/C #4@12"C/C #4@12"C/C

R.W

R.W
#4@12"C/C
( d) # 6 Bars = 39"
#3@9"C/C #3@9"C/C #3@9"C/C
C1 C1 C1 ( e) # 8 Bars = 52"
79'

79'
#4@12"C/C

87'
#4@12"C/C

87'

87'
D Notes:

#4@12"C/C
D

#4@12"C/C
B B B-1 B-1
D

#4@12"C/C

#4@12"C/C
D D

#4@12"C/C

#4@12"C/C
B-1 B-1 B-1 B-1 B-1 B-1 1. Coordinate Architectural Drawings with Structural Drawings.
2. The written dimensions for top slab reinforcement are from

R.W
#4@7"C/C
#4@12"C/C
#4@12"C/C face of beam.

#4@7"C/C
#4@7"C/C
#3@9"C/C 3. Tie bars for top slab reinforcement are #3@12"C/C.
1"

R.W

R.W

1"
#4@12"C/C

#4@7"C/C
#3@9"C/C

B-2
CB-1
14'-24

#4@12"C/C

14'-24
#3@9"C/C

B-2
1"
4. Top of all slab panels is at the same level.

B-2

B-2
CB-1
B-2

B-2

14'-24
1"

1"
B-2

B-2

B-2

B-2
CB-1

CB-1
#3@9"C/C

14'-24

14'-24
#4@7"C/C

#4@7"C/C
#4@12"C/C 5. 3 # 4 bars (Min. length 4'-0") shall be placed diagonally in

#4@7"C/C
#4@12"C/C

#4@7"C/C
#4@12"C/C
#3@9"C/C bottom at four corners of each duct.
#4@12"C/C #4@12"C/C #4@12"C/C #3@9"C/C 6. Provide 9" hook to all top slab reiforcement ending at beam.
#4@12"C/C #4@7"C/C
C1 C1 C1 #3@9"C/C 7. For Layout, location & size of services ducts , Arhitectural/

#4@12"C/C

#4@12"C/C
C C

#4@12"C/C
B-1 B-1 Electrical and Services/Plumbing Drawing shall be coordinated.

#4@12"C/C
C

#4@12"C/C
C C

#4@12"C/C
B-1 B-1 8. Provide additional slab bars at the end of ducts, equal to bars

R.W
B-1 B-1 B-1 B-1
being discontinuous due to ducts.

#4@7"C/C

#4@7"C/C
#3@9"C/C

#4@7"C/C

#4@7"C/C
#4@12"C/C
R.W

R.W
1"

#4@12"C/C

CB-1
4"

#4@7"C/C
12'-114

#4@12"C/C
12'-93

#4@12"C/C #4@12"C/C
R.W

#3@9"C/C

B-2
#4@12"C/C #4@12"C/C #4@12"C/C

CB-1
4" B-2
CB-1

CB-1

12'-93
4"

4"
B-2

B-2
12'-93

12'-93

B-2

B-2
#3@9"C/C #3@9"C/C
CERTIFICATES

B-2

B-2

B-2

B-2

#4@7"C/C
#4@12"C/C

#4@7"C/C
#3@9"C/C
#3@9"C/C #4@12"C/C #4@7"C/C
C1 C1 C1 #3@9"C/C #4@12"C/C
1. Soundness & Stability of the Structure is certified.
#4@12"C/C

#4@12"C/C

#4@12"C/C
#4@12"C/C
B B 2. Certified that all the sewer and strom water lines

#4@12"C/C
B-1 B-1

#4@12"C/C
B B-1 B-1 B B-1 B-1 B B-1 B-1 are effectivily connected to main lines.

R.W

#4@7"C/C
#4@7"C/C

#4@7"C/C
#3@9"C/C
R.W

R.W

#4@12"C/C
3. Certified that Ø3/4'' is effectivily connected

#4@7"C/C
#4@12"C/C
1"

10'-9"
10'-72

CB-2
#4@7"C/C
R.W

#4@12"C/C
#4@12"C/C
to main water supply line.

B-2
10'-9"
B-2

B-2
#3@9"C/C #3@9"C/C

10'-9"

10'-9"
B-2

#3@9"C/C

B-2

B-2
#4@7"C/C
B-2

B-2

B-2

B-2
#4@12"C/C

B-2
C1 C1 C1

B-2

B-2
#3@9"C/C #4@7"C/C
R.W R.W R.W PROPOSED COMMERCIAL BUILDING ON

#4@7"C/C
#3@9"C/C
A A Plot No CP-09 Block 'H' Soan Garden

#4@12"C/C
18'-3" 8'-9" 10'-6" A A A

#4@12"C/C
18'-3" 8'-9" 10'-6"
Housing Scheme Islamabad.

#4@12"C/C
#4@12"C/C

#4@12"C/C
37'-6"

4'
4'

4'
37'-6"
1 2 3 4
1 2 3 4 18'-3" 8'-9" 10'-6" 18'-3" 8'-9" 10'-6" 18'-3" 8'-9" 10'-6"
37'-6"
37'-6" 37'-6" OWNER:
1 1 2 Mr. Sajeel Imtiaz
LOWER GROUND COLUMN GRID LOCATION PLAN LOWER GROUND SLAB REINFORCEMENT PLAN 1 2 3 4 2 3 4 3 4
SCALE:1'=1/8" SCALE:1'=1/8"
MEZZANINE FLOOR SLAB REINFORCEMENT PLAN FIRST FLOOR SLAB REINFORCEMENT PLAN
GROUND FLOOR SLAB REINFORCEMENT PLAN SCALE:1'=1/8"
SCALE:1'=1/8" SCALE:1'=1/8" OWNER SIGN:

10 # 6
3 # 6+3 # 6 3#6 SUBMISSION DRAWING
3"

1'-6"
Ties
ENGINEER SIGNATURE :

1'-3"

1'-3"
#3@4"c/c
#3@8"c/c
3"

9" 3#6
9" 3 # 6+3 # 6
1'-6"
#4@12"C/C

#4@12"C/C

#4@12"C/C

#4@12"C/C
4'

Section B-1-A Section B-1-B


4'

STAIR VOID STAIR VOID

G #6@8"C/C Column C-1


G
#4@9"C/C

B-1 B-1 B-1 B-1 BEAM B-1

Ties # 3 @ 3" C/C


#3@9"C/C

#6@8"C/C
#3@9"C/C
#4@7"C/C

#4@8"C/C
B-2

B-2

#6@6"C/C Bw
#3@9"C/C
B-2

B-2

B-2

B-2
10'-9"

10'-9"

Basement FFL 3 # 5+2 # 5 3#5


B-2

B-2

#4@12"C/C 8#6

H/5
#4@8"C/C
#4@8"C/C
#4@8"C/C
#4@12"C/C #3@9"C/C #4@12"C/C 3"

Ties # 3 @ 8" C/C


3'-0"

1'-3"

1'-3"
#3@4"c/c
#4@12"C/C

1'-6"
#4@12"C/C

#4@12"C/C

#4@12"C/C

#3@8"c/c Ties
B-1 B-1
2'-0"

F F B-1 B-1
#4@7"C/C

12" 12" 12" 12"


3"
#4@7"C/C

PCC 1:4:8 9" 3#5


9" 3 # 5+2 # 5
#4@7"C/C

1'-6" 16'-0" 1'-6" 17'-0" 1'-6"

Ties # 3 @ 4" C/C


#3@9"C/C
B-2

Section B-2-A Section B-2-B


1'-0"
B-2
#4@7"C/C

#4@7"C/C

Dowel Length
14'

14'

#4@12"C/C #4@12"C/C
CB-1

#4@12"C/C
CB-1

37'-6" BEAM B-2


B-2

B-2

B-2

B-2

Column C-2

H
#3@9"C/C 3"
#3@9"C/C
Raft Section at B-B
#4@12"C/C
#4@12"C/C

Ties # 3 @ 8" C/C


#4@12"C/C

#4@12"C/C

B-1 B-1
E E B-1 B-1
9"
#3@6"c/c
3#6
#3@6"c/c
4#6
#4@7"C/C
#4@7"C/C

#3@9"C/C 9"
#4@7"C/C

9" 3#6
12" 4#6
9"

#4@7"C/C
CB-1
B-2

CB-1
B-2
16'-6"

Outer FFL
B-2

B-2

CB-1 CB-2
16'-6"

B-2

B-2
#4@7"C/C

H/5
#4@12"C/C
#3@9"C/C #3@12"C/C
#4@12"C/C #4@12"C/C

Ties # 3 @ 3" C/C


#3@9"C/C
#4@12"C/C #3@9"C/C
#4@12"C/C #4@12"C/C
Outer FFL
87'

87'

#3@8"c/cB/W #3@6"c/cB/W

D
#4@12"C/C

#4@12"C/C

D
#4@12"C/C

#4@12"C/C

B-1 B-1 B-1 B-1 #4@12"C/C #3@12"C/C

5"
#3@9"C/C
#4@7"C/C

#4@12"C/C #4@12"C/C
#4@7"C/C

H/5
#3@9"C/C
B-2

#3@9"C/C
1"

B-2
1"
B-2

B-2
CB-1
14'-24

B-2

B-2
CB-1
14'-24

#4@6"C/C
#4@7"C/C

#4@7"C/C

Ties # 3 @ 8" C/C


5'-6"

#4@12"C/C #3@5"c/c #3@5"c/c


#4@12"C/C #4@12"C/C

#3@9"C/C
#4@7"C/C 6'-0" #3@6"c/c #3@6"c/c
#6@8" c/c (Shorter bar)
#4@6"C/C Basement FFL
#4@12"C/C

#6@8" c/c (Longer bar)


#4@12"C/C

C B-1 B-1 C
5'-6"

B-1 B-1 #6@7" c/c (Shorter bar)

Ties # 3 @ 4" C/C


12" 12"
#6@7" c/c (Longer bar)

Dowel Length
#4@7"C/C

3'-6"

#3@9"C/C #3@8"c/c #3@8"c/c


2'-0"

#3@8"c/cB/W #3@6"c/cB/W
#4@9"C/C

H
#4@12"C/C #6@8" c/c (Shorter bar)
#3@9"C/C
6"

6"
CB-1
4"

CB-1
#4@7"C/C

4"
B-2
12'-93

Basement FFL 12" 12"


B-2

#6@8" c/c (Longer bar)


12'-93
B-2

B-2

B-2

B-2

9"
3"

#6@7" c/c (Shorter bar) PCC (1:4:8)


#4@7"C/C

12" 12"

Ties # 3 @ 8" C/C


#4@7"C/C

#6@7" c/c (Longer bar)


#4@12"C/C
#4@7"C/C RETAINING WALL-2 3" PCC (1:4:8)
3'-6"

#4@12"C/C
9" 10'-0"X5'-0" 9"
2'-0"

#4@12"C/C #4@12"C/C
#4@12"C/C

#4@12"C/C

12" 12"
#4@12"C/C

Under Ground Water Tank


B B-1 B-1 B
3"

B-1 B-1 PCC (1:4:8)


#4@7"C/C

#4@12"C/C RETAINING WALL-1


#4@7"C/C
#4@7"C/C

Notes
B-2

#3@9"C/C

H/5
10'-9"

B-2
10'-9"

9" 7'-6" 9"


B-2

1. Distribution bars shall be #3@8"c/c. 4"


B-2

B-2
#4@7"C/C

B-2

B-2

#3@6"c/cB/W

Ties # 3 @ 3" C/C


2. Number of steps & sizes shall be adjusted as per Architecture. 4#6
B-2

#4@12"C/C 4#6
#4@7"C/C
3. Waist Slab shall be 6" thick.
#3@9"C/C #3@9"C/C Basement FFL

A
#4@7"C/C

A #3@6"c/c #3@6"c/c
#4@12"C/C

#4@12"C/C
#4@12"C/C

#4@12"C/C
4'

4'

#3@8"c/c

As per Site
#4@6"c/c #4@6"c/c
4'-0"

#4@5"c/c
FFL 6"
18'-3" 8'-9" 10'-6" 18'-3" 8'-9" 10'-6"
12"

12"
37'-6" #3@9"C/C
37'-6" #3@8"c/c

#3@8"c/c #3@8"c/c #3@6"c/cB/W #4@6"c/cB/W

1 2 3 4 1 12" 12"
2 3 4 4#6
7"

#4@5"c/c 12" 12"


2'-0"
4#3
4#6
Typical Column Elevation
SECOND FLOOR SLAB REINFORCEMENT PLAN THIRD FLOOR SLAB REINFORCEMENT PLAN
12" 12"
2'-0"

Detail of Column Ties


SCALE:1'=1/8"
MUMTY SLAB REINFORCEMENT PLAN 3"
PCC (1:4:8)
3'-0" #3@6"c/c
SCALE:1'=1/8" SCALE:1'=1/8" Sectional Detail of Stairs
Foundation & Steps
Section at X-X
O.H W Tank

Vous aimerez peut-être aussi