#4@12"C/C
#4@12"C/C
#4@12"C/C
#4@12"C/C
(2) Structural concrete for columns, shear walls & Lift shall have minimum
#4@12"C/C
#4@12"C/C
4'
STAIR VOID STAIR VOID
4'
4'
G G STAIR VOID cylinder crushing strength at 28 days equal to 4000 psi while that for footings,
G
#4@9"C/C
beams,slabs strength at 28 days equal to 3000 psi.
R.W R.W R.W
G G
#4@12"C/C
B-1 B-1
C1 C2 C1
B-1 B-1 B-1 B-1
(3) Structural steel shall have minimum yield strength equal to 60,000psi.
#3@9"C/C
#3@9"C/C
#3@9"C/C
#4@7"C/C
R.W
R.W
It must be remembered that in slabs #3 bars shall be used of Grade 60.
B-2
B-2
LIFT
B-2
10'-9"
#4@7"C/C
10'-9"
#4@8"C/C
B-2
B-2
#4@8"C/C
B-2
B-2
It should be very clear that all steel shall be grade 60 deformrd steel.
10'-9"
B-2
B-2
B-2
B-2
10'-9"
10'-9"
B-2
#4@12"C/C CB-2 #4@12"C/C
B-2
B-2
R.W (4)Minimum clear cover to reinforcement shall be as under;
R.W
#3@9"C/C
#4@12"C/C
#3@9"C/C
#4@8"C/C #4@8"C/C
#4@12"C/C (a)Foundation = 2"
#4@12"C/C #4@8"C/C
#4@12"C/C
#3@9"C/C #4@8"C/C
#4@12"C/C
#4@12"C/C
#4@12"C/C (b)Beams and Columns = 1.5"
B-1 B-1
F F #4@7"C/C
#4@12"C/C
#4@12"C/C
B-1 B-1 (c) Slabs = 0.75"
#4@12"C/C
#4@12"C/C
C1 C1 C1 F B-1 B-1
F B-1 B-1 F
#4@7"C/C
(5) Dowel length for columns
#3@9"C/C (a) # 4 Bars = 26"
#4@7"C/C
#4@7"C/C
#4@12"C/C
#4@7"C/C
#4@12"C/C (b) # 5 Bars = 33"
#4@7"C/C
#3@9"C/C #3@9"C/C (c) # 6 Bars = 39"
14'
14'
B-2
#4@12"C/C #4@12"C/C
R.W
R.W
B-2
B-2
#3@9"C/C
#4@7"C/C
#4@12"C/C #4@7"C/C
CB-1
14'
R.W
14'
14'
B-2
#4@12"C/C #4@12"C/C
#4@7"C/C
#4@7"C/C
(d) # 8 Bars = 52"
CB-1
#4@12"C/C #4@12"C/C
CB-1
CB-1
B-2
B-2
B-2
B-2
B-2
B-2
(6) Overlaps for Top Beam Bars
R.W
#3@9"C/C #4@12"C/C #3@9"C/C #3@9"C/C
C1 C1 C1 ( a) # 4 Bars = 26"
#4@12"C/C
#4@12"C/C
#4@12"C/C
#4@12"C/C
#4@12"C/C
B-1
E E B-1 ( b) # 5 Bars = 33"
#4@12"C/C
#4@12"C/C
B-1 B-1
E B-1 B-1
E B-1 B-1 E ( c) # 6 Bars = 39"
#4@7"C/C
( d) # 8 Bars = 52"
#4@7"C/C
#4@12"C/C (7) Overlaps for Bottom Beam Bars
#4@7"C/C
and all Slab Bars:
#4@7"C/C
#4@7"C/C
#4@12"C/C #3@9"C/C #4@12"C/C
CB-1
16'-6"
16'-6"
#3@9"C/C ( a) # 3 Bars = 20"
B-2
#4@12"C/C
#4@7"C/C
R.W
R.W
#3@9"C/C
CB-1
B-2
16'-6"
B-2
B-2
CB-1
CB-1
B-2
B-2
16'-6"
16'-6"
B-2
B-2
B-2
B-2
( b) # 4 Bars = 26"
#4@7"C/C
#4@12"C/C
#3@9"C/C
#4@7"C/C
#4@12"C/C ( c) # 5 Bars = 33"
#4@7"C/C
#4@12"C/C #4@12"C/C #4@12"C/C
R.W
R.W
#4@12"C/C
( d) # 6 Bars = 39"
#3@9"C/C #3@9"C/C #3@9"C/C
C1 C1 C1 ( e) # 8 Bars = 52"
79'
79'
#4@12"C/C
87'
#4@12"C/C
87'
87'
D Notes:
#4@12"C/C
D
#4@12"C/C
B B B-1 B-1
D
#4@12"C/C
#4@12"C/C
D D
#4@12"C/C
#4@12"C/C
B-1 B-1 B-1 B-1 B-1 B-1 1. Coordinate Architectural Drawings with Structural Drawings.
2. The written dimensions for top slab reinforcement are from
R.W
#4@7"C/C
#4@12"C/C
#4@12"C/C face of beam.
#4@7"C/C
#4@7"C/C
#3@9"C/C 3. Tie bars for top slab reinforcement are #3@12"C/C.
1"
R.W
R.W
1"
#4@12"C/C
#4@7"C/C
#3@9"C/C
B-2
CB-1
14'-24
#4@12"C/C
14'-24
#3@9"C/C
B-2
1"
4. Top of all slab panels is at the same level.
B-2
B-2
CB-1
B-2
B-2
14'-24
1"
1"
B-2
B-2
B-2
B-2
CB-1
CB-1
#3@9"C/C
14'-24
14'-24
#4@7"C/C
#4@7"C/C
#4@12"C/C 5. 3 # 4 bars (Min. length 4'-0") shall be placed diagonally in
#4@7"C/C
#4@12"C/C
#4@7"C/C
#4@12"C/C
#3@9"C/C bottom at four corners of each duct.
#4@12"C/C #4@12"C/C #4@12"C/C #3@9"C/C 6. Provide 9" hook to all top slab reiforcement ending at beam.
#4@12"C/C #4@7"C/C
C1 C1 C1 #3@9"C/C 7. For Layout, location & size of services ducts , Arhitectural/
#4@12"C/C
#4@12"C/C
C C
#4@12"C/C
B-1 B-1 Electrical and Services/Plumbing Drawing shall be coordinated.
#4@12"C/C
C
#4@12"C/C
C C
#4@12"C/C
B-1 B-1 8. Provide additional slab bars at the end of ducts, equal to bars
R.W
B-1 B-1 B-1 B-1
being discontinuous due to ducts.
#4@7"C/C
#4@7"C/C
#3@9"C/C
#4@7"C/C
#4@7"C/C
#4@12"C/C
R.W
R.W
1"
#4@12"C/C
CB-1
4"
#4@7"C/C
12'-114
#4@12"C/C
12'-93
#4@12"C/C #4@12"C/C
R.W
#3@9"C/C
B-2
#4@12"C/C #4@12"C/C #4@12"C/C
CB-1
4" B-2
CB-1
CB-1
12'-93
4"
4"
B-2
B-2
12'-93
12'-93
B-2
B-2
#3@9"C/C #3@9"C/C
CERTIFICATES
B-2
B-2
B-2
B-2
#4@7"C/C
#4@12"C/C
#4@7"C/C
#3@9"C/C
#3@9"C/C #4@12"C/C #4@7"C/C
C1 C1 C1 #3@9"C/C #4@12"C/C
1. Soundness & Stability of the Structure is certified.
#4@12"C/C
#4@12"C/C
#4@12"C/C
#4@12"C/C
B B 2. Certified that all the sewer and strom water lines
#4@12"C/C
B-1 B-1
#4@12"C/C
B B-1 B-1 B B-1 B-1 B B-1 B-1 are effectivily connected to main lines.
R.W
#4@7"C/C
#4@7"C/C
#4@7"C/C
#3@9"C/C
R.W
R.W
#4@12"C/C
3. Certified that Ø3/4'' is effectivily connected
#4@7"C/C
#4@12"C/C
1"
10'-9"
10'-72
CB-2
#4@7"C/C
R.W
#4@12"C/C
#4@12"C/C
to main water supply line.
B-2
10'-9"
B-2
B-2
#3@9"C/C #3@9"C/C
10'-9"
10'-9"
B-2
#3@9"C/C
B-2
B-2
#4@7"C/C
B-2
B-2
B-2
B-2
#4@12"C/C
B-2
C1 C1 C1
B-2
B-2
#3@9"C/C #4@7"C/C
R.W R.W R.W PROPOSED COMMERCIAL BUILDING ON
#4@7"C/C
#3@9"C/C
A A Plot No CP-09 Block 'H' Soan Garden
#4@12"C/C
18'-3" 8'-9" 10'-6" A A A
#4@12"C/C
18'-3" 8'-9" 10'-6"
Housing Scheme Islamabad.
#4@12"C/C
#4@12"C/C
#4@12"C/C
37'-6"
4'
4'
4'
37'-6"
1 2 3 4
1 2 3 4 18'-3" 8'-9" 10'-6" 18'-3" 8'-9" 10'-6" 18'-3" 8'-9" 10'-6"
37'-6"
37'-6" 37'-6" OWNER:
1 1 2 Mr. Sajeel Imtiaz
LOWER GROUND COLUMN GRID LOCATION PLAN LOWER GROUND SLAB REINFORCEMENT PLAN 1 2 3 4 2 3 4 3 4
SCALE:1'=1/8" SCALE:1'=1/8"
MEZZANINE FLOOR SLAB REINFORCEMENT PLAN FIRST FLOOR SLAB REINFORCEMENT PLAN
GROUND FLOOR SLAB REINFORCEMENT PLAN SCALE:1'=1/8"
SCALE:1'=1/8" SCALE:1'=1/8" OWNER SIGN:
10 # 6
3 # 6+3 # 6 3#6 SUBMISSION DRAWING
3"
1'-6"
Ties
ENGINEER SIGNATURE :
1'-3"
1'-3"
#3@4"c/c
#3@8"c/c
3"
9" 3#6
9" 3 # 6+3 # 6
1'-6"
#4@12"C/C
#4@12"C/C
#4@12"C/C
#4@12"C/C
4'
#6@8"C/C
#3@9"C/C
#4@7"C/C
#4@8"C/C
B-2
B-2
#6@6"C/C Bw
#3@9"C/C
B-2
B-2
B-2
B-2
10'-9"
10'-9"
B-2
#4@12"C/C 8#6
H/5
#4@8"C/C
#4@8"C/C
#4@8"C/C
#4@12"C/C #3@9"C/C #4@12"C/C 3"
1'-3"
1'-3"
#3@4"c/c
#4@12"C/C
1'-6"
#4@12"C/C
#4@12"C/C
#4@12"C/C
#3@8"c/c Ties
B-1 B-1
2'-0"
F F B-1 B-1
#4@7"C/C
#4@7"C/C
Dowel Length
14'
14'
#4@12"C/C #4@12"C/C
CB-1
#4@12"C/C
CB-1
B-2
B-2
B-2
Column C-2
H
#3@9"C/C 3"
#3@9"C/C
Raft Section at B-B
#4@12"C/C
#4@12"C/C
#4@12"C/C
B-1 B-1
E E B-1 B-1
9"
#3@6"c/c
3#6
#3@6"c/c
4#6
#4@7"C/C
#4@7"C/C
#3@9"C/C 9"
#4@7"C/C
9" 3#6
12" 4#6
9"
#4@7"C/C
CB-1
B-2
CB-1
B-2
16'-6"
Outer FFL
B-2
B-2
CB-1 CB-2
16'-6"
B-2
B-2
#4@7"C/C
H/5
#4@12"C/C
#3@9"C/C #3@12"C/C
#4@12"C/C #4@12"C/C
87'
#3@8"c/cB/W #3@6"c/cB/W
D
#4@12"C/C
#4@12"C/C
D
#4@12"C/C
#4@12"C/C
5"
#3@9"C/C
#4@7"C/C
#4@12"C/C #4@12"C/C
#4@7"C/C
H/5
#3@9"C/C
B-2
#3@9"C/C
1"
B-2
1"
B-2
B-2
CB-1
14'-24
B-2
B-2
CB-1
14'-24
#4@6"C/C
#4@7"C/C
#4@7"C/C
#3@9"C/C
#4@7"C/C 6'-0" #3@6"c/c #3@6"c/c
#6@8" c/c (Shorter bar)
#4@6"C/C Basement FFL
#4@12"C/C
C B-1 B-1 C
5'-6"
Dowel Length
#4@7"C/C
3'-6"
#3@8"c/cB/W #3@6"c/cB/W
#4@9"C/C
H
#4@12"C/C #6@8" c/c (Shorter bar)
#3@9"C/C
6"
6"
CB-1
4"
CB-1
#4@7"C/C
4"
B-2
12'-93
B-2
B-2
B-2
9"
3"
12" 12"
#4@12"C/C
9" 10'-0"X5'-0" 9"
2'-0"
#4@12"C/C #4@12"C/C
#4@12"C/C
#4@12"C/C
12" 12"
#4@12"C/C
Notes
B-2
#3@9"C/C
H/5
10'-9"
B-2
10'-9"
B-2
#4@7"C/C
B-2
B-2
#3@6"c/cB/W
#4@12"C/C 4#6
#4@7"C/C
3. Waist Slab shall be 6" thick.
#3@9"C/C #3@9"C/C Basement FFL
A
#4@7"C/C
A #3@6"c/c #3@6"c/c
#4@12"C/C
#4@12"C/C
#4@12"C/C
#4@12"C/C
4'
4'
#3@8"c/c
As per Site
#4@6"c/c #4@6"c/c
4'-0"
#4@5"c/c
FFL 6"
18'-3" 8'-9" 10'-6" 18'-3" 8'-9" 10'-6"
12"
12"
37'-6" #3@9"C/C
37'-6" #3@8"c/c
1 2 3 4 1 12" 12"
2 3 4 4#6
7"