PROYECTO : Creacion del Cementerio Municipal de la Localidad de Islandia, Distrito De Yavari – pagina:
Mariscal Ramón Castilla – Loreto 1
1.- DIMENSIONAMIENTO
DATOS INICIALES :
FLUENCIA DEL ACERO CORRUGADO : fy = 4,200 Kg/cm2.
SOBRECARGA DE PISO : S/C = 300 Kg/m2. NTP E - 020
CAPACIDAD DE CARGA DEL SUELO : σt= 0.41 Kg/cm2.
RESISTENCIA DEL CONCRETO : F'c = 210 kg / cm2
PROFUNDIDAD DE LA CIMENTACION : Df= 1.5 m
PESO ESPECIFICO DEL SUELO DE RELLENO : = ﻻ 1,600 kg/m3
COLUMNA C-1 : 0.30 x 0.30 m2 P2 = 7.91 tn
COLUMNA C-3 : 0.30 x 0.30 m2 P1 = 7.91 tn
A. VIGA DE CONEXIÓN
h= L = 0.40 m
7
USAR VC = 0.30 x 0.40
b= P1 = 0.09 m
31 L
B. ZAPATA EXTERIOR
EN PLANTA
AZ = P = 1.92 m2 T = 1.3 S = S= 0.65 m
σn
T= 1.30 m
Wv = 0.29 tn/m
Rnu = 9.40 tn
C. ZAPATA INTERIOR
AZ = P = 1.68 m2 L= 1.30 USAR: 1.30 x 1.30 m
σn
Rnu = 9.40 tn
b= 30 cm
h= 40.00 cm Xo = 0.56 m < S = 0.65 m CONFORME
d= 33.00 cm
f'c= 210 kg/m2 Mu max = -1.02 tn-m
As = 0.91 cm2
0.40
3 Ø 1/2"
MEMORIA DE CALCULO VIGA DE CIMENTACION Y ZAPATAS
PROYECTO : Creacion del Cementerio Municipal de la Localidad de Islandia, Distrito De Yavari – pagina:
Mariscal Ramón Castilla – Loreto 2
T = 0.65 m
B = 1.30 m
f'c = 210 kg/cm2
Mu = 4.72 tn-m
Vc = 16.47 Tn > Vn
Vu = 5.06 Tn Vn = 5.96 Tn