VALUE MANAGEMENT
Devide the intervention into two phases, two typologies
The first phase can take place immediately and has an impact and contribution from the very beginning on
how user can experience the campus.
S W
LOCATION IN THE CITY LABIRINTIC CIRCULATION
O T
INTERNATIONAL THE FARTHERMOST CAMPUS
STUDENTS AND GUEST LECTURERS OF POLIMI
In our opinion a stong action, which can be realized easily and which would have an immediate positive feedback is the definition of a new way finding system. A simple
improvement on the circulation would have as a consequence an enahencement of the quality of all the spaces.
This could be the first step of a sequence of actions following a chronoprogram that along the year would leed to a great improvement of the life of the users of the
building. This management could be efficently ruled by a BIM software to be able to control all the variables and allow a coherent and organic itervention program.
CARS
MOTORCYCLES
AND BIKE
PARKING
WAYFINDING
MARKES
ENTRANCES OF
THE LIBRARY
POLIPRINT
SHOP
NEW PASSAGE
CREATED A
A LIGHT
GALLEY
STRUCTURE
AS PRINCIPAL
CORE OF THE
CAMPUS
RECEPTION
COVERED
STEPS
WAYFINDING
TOTEMS
The new circulation proposals conceives two main entrances: one for daily use and one to let students accede to the 24/7 open facilities, as the library.
The open spaces are considered as a strong potential which can be enhanced and work as a system. In fact, even if in winter the open spaces are not
so much used by the students, during the hot season they became foundamental comfort areas.
NIGHT ENTRANCE
24/7
ENTRANCE
WINTER SUMMER
POLIMI ADMINISTRATION
(Client)
DESIGN TEAM
Architects, Engeneers,
Landsdapers, Interior
Designers and Students of
Polimi
CONSTRUCTION COMPANY
FINAL USERS
Students, Professors,
Employees, Visitors, ...
EXTERNAL
STAKEHOLDERS
MUNICIPALITY OF MANTUA
LOMBARDY REGION
SCHEMATIC DESIGN
DESIGN DEVELOPMENT
ADMINISTRATION
CONTRACT/CONSTRUCTION
PROJECT DELIVERY
OCCUPANCY
MAINTEINANCE
5
HERITAGE
(Client)
POLIMI ADMINISTRATION
MUNICIPALITY OF MANTUA
LOMBARDY REGION
DONATORS
SPONSORS AND PRIVATE
EDUCATION
CONSTRUCTION COMPANY
ECONOMICAL GAIN
SUSTAINABILITY
COMMUNITY
PHASES
The first phase can take place immediately and give from the very beginning a relevant contribution in how users can experience the campus.
PHASE 1 PHASE 2
_Time table: change opening _Opening of the corridor between
hours the courtyards
_Way finding system _Outodoor light structure for
_Garden forniture (student-made) caffeteria
and open space connections _Technological upgrade of the
classroom facilities
USERS
FEEDBACK
Insufficient expert Missing facility When maintenance or repair is The needed intervetion
staff in more fields, manager with needed, is more of a patchwork, most of the cases is
than just technical general strategy rather than unified project outsourced to
maintenance and intervention contractors and
hygiene subcontractors, which
have norrow service field
ECONOMICAL WASTE IN
MANAGING STRUCTURES
Thermal Comfort
Air Quality
Lighting
Acoustic Quality
Class Layout
POE CLIENT
PROS CONS
FUNCTIONAL PROGRAM LACK OF SPECIFIC
COMPONENTS FOR HISTORICAL
EVALUATE POSSIBLE CHANGES BUILDINGS (MODELLING)
FOR OPTIMIZATION
LONGER MODELING PROCESS,
PROGRAMMED MAINTANENCE & LABOR WORK
COST TRACKING
BETTER TRAINED EMPLOYEES:
PRECISE 3D MODEL BU USING BUILD SKILL SET & EXPERIENCE
HIGH ACCURATE SURVEY TOOL ARE NEEDED
AS BASE FOR INTERVATIONS
STILL NOT COMPLETELY
META DATA ELABORATION RECOGNIZED OR APPRECIATED
BECAUSE NOT WELL KNOWN
ROOM BY ROOM ANALYSIS (M^2,
HEIGHT, ENERGY CONSUMPTION)