Vous êtes sur la page 1sur 3

76 Section VII Schedule of Requirements

LOT 2: 12 UNITS BULLDOZERS


PROPOSED EQUIPMENT:
SPECIFICATION OF THE EQUIPMENT STATEMENT OF COMPLIANCE
1. Weight 9,000 ~ 10,000 kg operation weight
4 cycle, Water-cooled, Diesel Engine, with or
Type
without Turbo Charger
Rated Output Not less than 74 kW/1,500~2,300 min-1
Cooling System Tropical Specification
2.Engine Electrical
Water & Dust-proof type
System/Devices
Emissions Control Minimum Tier 2 or equivalent
Fan Drive Type Hydraulic Type
Lubrication System Gear Pump, Force Lubrication
DC 24 V, Electrical Devices and Connectors should be Water & Dust-
3. Electrical System
proof type
4. Fuel Tank Capacity Not less than 150 lit.
5. Power Train Transmission Hydrostatic Transmission
6. Final Drive Two Stage Planetary Gear Integrated into Axial Piston Travel Motor
Joystick Control Fan All Directional
7. Steering System Type
Movement
Section VII. Schedule of Requirements 77
8.Under Carriage Type Rigid Type, Lubricated Track Roller
9. Hydraulic System Gear Pump or Variable Piston Pump
Type Power Angle & Power Tilt Dozer
10. Blade
Width not less than 2100 mm
Blade Size
Height not less than 600 mm
Canopy ROPS Canopy
11. Operator's
Compartment Control lever and Travel Control lever, Blade Control lever,
Pedal Brake, Pedals, Deceleration Pedal
Standard Tool Set with tool box or with tool bag
Warning System Horn, Back-up alarm
12. Accessories
Tachometer, Hour meter, Engine oil Pressure
Gauge, Engine oil Temperature Gauge, Water
Meter & Gauges
Temperature Gauge, Fuel Gauge, Hydraulic oil
Temperature Gauge
13. Painting Fully protected against corrosion & finished in Deep yellow
Machine Operation Manual for operator in
Operation Manual
English
Parts Catalogue Parts Catalogue in English
14. Manuals
Maintenance Manual Periodical Maintenance Manual in English
Repair Manual in English (Engine, Hydraulic
Repair Manual System, Travel System, Swing System,
Electrical System, Work Equipment)
Cutting Edge set
15. Spare Parts 1 set per machine
(with Bolt & Nut)
78 Section VII Schedule of Requirements
End Bit Set
1 sets per machine
(with Bolt & Nut )
24 months or 2,000 working hours, whichever comes first. The
Warranty warranty is to include the parts to be replaced, the cost of labor for such
intervention as well as transportation costs for parts and technicians
The Bid price is expected to include a full service maintenance contract
for three years to be counted as from the delivery date. The full service
Maintenance contract contract is especially a preventive maintenance scheme and includes
usage spare parts and broken spare parts as well as the cost of service
and repair at the indicated Project Sites.

Vous aimerez peut-être aussi