Vous êtes sur la page 1sur 4

LIST OF ABBREVIATIONS

AADT :- Annual Average Daily Traffic


DOR:SSRN :- Department of Road: Statistics of Strategic Road network
PCU :- Passenger Car Unit
PMDC :- Permanent Magnet Direct Current
SAE :- Society of Automated Engineers
LIST OF TABLES
Table 3.1: Component and Material Suggested.................................................................. 6
Table 3.4: Cost Estimation...................................................................................................10
LIST OF FIGURES
Figure 3.2: Workflow sequence...................................................................7
Figure 3.3: Design........................................................................................9
Figure 3.5: Gantt Chart............................................................................. 10
REFERENCE
 D.Venkata Rao, K.Prasada Rao, S.Chiranjeeva Rao and R.Umamaheswara Rao,
Design and Fabrication of Power generation System using Speed Breaker,
“International Journal Of Current Engineering And Technology”, 2014.
 S. Srivastava , A. Asthana, PRODUCE ELECTRICITY BY THE USE OF SPEED
BREAKERS, “Journal of Engineering Research and Studies”,2011.
 A. Pillai, S. Hirole, V. Patil, and S. S. Kulkarni, “Using Motion Simulation in CAD in
the Concept Design Phase for Harnessing Energy from Road Traffic”, International
Journal for Scientific Research & Development Vol. 4, Issue 10,

“Aswathaman.V”, “Priyadharshini.M”(2011) ‘Every speed breaker is now a source of
power’ ‘ International conference on Biology, Environment and Chemistry IPCBEE,
vol.IACSIT press Singapore
 https://www.chron.com/neighborhood/katy/news/article/Bragging-rights-or-
embarrassment-Katy-Freeway-at-6261429.php

Vous aimerez peut-être aussi