Vous êtes sur la page 1sur 19

Jakarta-Bandung High-Speed Railway Project

Construction Survey and Stake out Record


No : …......................................................................
Nomor Bridge/Subgrade - Nomor Pier/Jenis
Constructor unit Location DK …............... Date Tanggal Pelaksanaan
Pekerjaan
Station setting

Station point X Y H

Back sight point 1 X Y H

Back sight point 2 X Y H

Design value (m) Measured value (m) Deviation(m)


Pt ID
X Y Z X Y Z △X △Y △Z

1 3 angka belakang koma


2 nilai kosong harus diisi 0.000 --> bukan strip (-)
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18

*Kalau muat Tampilkan, Kalau tidak muat tulis: See Attachment


Sche
matic
**Lampirkan juga layout Station Point dan Backsight Point yg Digunakan ada di mana dari posisi yang diukur di Layout Bored Pile

Conclusion:The measured result meet the requirements of the design specification.

Surveyor: Nama & TTD Calculator: Nama & TTD Reviewer: Nama & TTD
Jakarta-Bandung High-Speed Railway Project
Construction Survey and Stake out Record
No : …......................................................................

Nama Layout-nya

Conclusion:The measured result meet the requirements of the design specification.

Surveyor: Nama & TTD Calculator: Nama & TTD Reviewer: Nama & TTD
Jakarta-Bandung High-Speed Railway Project
Construction Survey and Stake out Record
No : …......................................................................

Constructor unit Nomor Bridge/Subgrade - Nomor Pier/Jenis Pekerjaan Location DK …................

Station setting

Station point X Y H

Back sight point 1 X Y H

Back sight point 2 X Y H

Design value (m) Measured value (m) Deviation(m)


Pt ID Date
X Y Z X Y Z △X △Y △Z

1 3 angka belakang koma Tanggal Pelaksanaan


2 nilai kosong harus diisi 0.000 --> bukan strip (-)

3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18

*Kalau muat Tampilkan, Kalau tidak muat tulis: See Attachment


Sche
matic
**Lampirkan juga layout Station Point dan Backsight Point yg Digunakan ada di mana dari posisi yang diukur di Layout Bored Pile

Conclusion:The measured result meet the requirements of the design specification.

Surveyor: Nama & TTD Calculator: Nama & TTD Reviewer: Nama & TTD
Jakarta-Bandung High-Speed Railway Project
Construction Survey and Stake out Record
No : …......................................................................

Nama Layout-nya

Conclusion:The measured result meet the requirements of the design specification.

Surveyor: Nama & TTD Calculator: Nama & TTD Reviewer: Nama & TTD
Jakarta-Bandung High-Speed Railway Project
Construction Survey and Stake out Record
No : …......................................................................

Constructor unit Bridge#.... - P…. / Bored Pile Location DK …................

Station setting

Station point X Y H

Back sight point 1 X Y H

Back sight point 2 X Y H

Design value (m) Measured value (m) Deviation(m)


Pt ID Date
X Y Z X Y Z △X △Y △Z

Sche
matic

Conclusion:The measured result meet the requirements of the design specification.

Surveyor: Nama & TTD Calculator: Nama & TTD Reviewer: Nama & TTD
Jakarta-Bandung High-Speed Railway Project
Construction Survey and Stake out Record
No : …......................................................................

Constructor unit Location

Station setting

Station point X Y H

Back sight point 1 X Y H

Back sight point 2 X Y H

Design value (m) Measured value (m) Deviation(m)


Pt ID Date
X Y Z X Y Z △X △Y △Z

4 8

3 7
Jakarta Bandung
Sche
matic
2 6

1 5

Conclusion:The measured result meet the requirements of the design specification.

Surveyor: Calculator: Reviewer:


Jakarta-Bandung High-Speed Railway Project
Construction Survey and Stake out Record
No : …......................................................................

Constructor unit Location

Station setting

Station point X Y H

Back sight point 1 X Y H

Back sight point 2 X Y H

Design value (m) Measured value (m) Deviation(m)


Pt ID Date
X Y Z X Y Z △X △Y △Z

2 5 8

Sche Jakarta Bandung


3 6
matic

1 4 7

Conclusion:The measured result meet the requirements of the design specification.

Surveyor: Calculator: Reviewer:


Jakarta-Bandung High-Speed Railway Project
Construction Survey and Stake out Record
No : …......................................................................

Constructor unit Location

Station setting

Station point X Y H

Back sight point 1 X Y H

Back sight point 2 X Y H

Design value (m) Measured value (m) Deviation(m)


Pt ID Date
X Y Z X Y Z △X △Y △Z

4 10
6
3 9
Sche Jakarta Bandung
matic
2 8
5
1 7

Conclusion:The measured result meet the requirements of the design specification.

Surveyor: Calculator: Reviewer:


Jakarta-Bandung High-Speed Railway Project
Construction Survey and Stake out Record
No : …......................................................................

Constructor unit Location

Station setting

Station point X Y H

Back sight point 1 X Y H

Back sight point 2 X Y H

Design value (m) Measured value (m) Deviation(m)


Pt ID Date
X Y Z X Y Z △X △Y △Z

4 11
7
3 10
Sche Jakarta Bandung
matic 6
2 9
5
1 8

Conclusion:The measured result meet the requirements of the design specification.

Surveyor: Calculator: Reviewer:


Jakarta-Bandung High-Speed Railway Project
Construction Survey and Stake out Record
No : …......................................................................

Constructor unit Location

Station setting

Station point X Y H

Back sight point 1 X Y H

Back sight point 2 X Y H

Design value (m) Measured value (m) Deviation(m)


Pt ID Date
X Y Z X Y Z △X △Y △Z

4 8 12

3 7 11
Sche Jakarta Bandung
matic
2 6 10

1 5 9

Conclusion:The measured result meet the requirements of the design specification.

Surveyor: Calculator: Reviewer:


Jakarta-Bandung High-Speed Railway Project
Construction Survey and Stake out Record
No : …......................................................................

Constructor unit Location

Station setting

Station point X Y H

Back sight point 1 X Y H

Back sight point 2 X Y H

Design value (m) Measured value (m) Deviation(m)


Pt ID Date
X Y Z X Y Z △X △Y △Z

6 12 18

5 11 17

Jakarta 4 10 16 Bandung
Sche
matic 3 9 15

2 8 14

1 7 13

Conclusion:The measured result meet the requirements of the design specification.

Surveyor: Calculator: Reviewer:


Jakarta-Bandung High-Speed Railway Project
Construction Survey and Stake out Record
No : …......................................................................

Constructor unit Location

Station setting

Station point X Y H

Back sight point 1 X Y H

Back sight point 2 X Y H

Design value (m) Measured value (m) Deviation(m)


Pt ID Date
X Y Z X Y Z △X △Y △Z

Bandung
8

0
1

1
1
7

2
1

Sche
matic
2

6
1

Jakarta

Conclusion:The measured result meet the requirements of the design specification.

Surveyor: Calculator: Reviewer:


Jakarta-Bandung High-Speed Railway Project
Construction Survey and Stake out Record
No : …......................................................................

Constructor unit Bridge#.... - P…. / Cushion Cap Location DK …............... Date Tanggal Pelaksanaan

Station setting

Station point X Y H

Back sight point 1 X Y H

Back sight point 2 X Y H

Design value (m) Measured value (m) Deviation(m)


Pt ID
X Y Z X Y Z △X △Y △Z
3 angka belakang koma
nilai kosong harus diisi 0.000 --> bukan strip (-)

PC2 PC3

Sche Jakarta Bandung


matic

PC1 PC4

Conclusion:The measured result meet the requirements of the design specification.

Surveyor: Calculator: Reviewer:


Jakarta-Bandung High-Speed Railway Project
Construction Survey and Stake out Record
No : …......................................................................

Constructor unit Bridge#.... - P…. / Pier Body Location DK …............... Date Tanggal Pelaksanaan

Station setting

Station point X Y H

Back sight point 1 X Y H

Back sight point 2 X Y H

Design value (m) Measured value (m) Deviation(m)


Pt ID
X Y Z X Y Z △X △Y △Z
3 angka belakang koma
nilai kosong harus diisi 0.000 --> bukan strip (-)

PB4

PB2 PB6

Jakarta Bandung
Sche
matic
PB1 PB5

PB3

PB1-PB6 will be measured on top surface of Cushion Cap

Conclusion:The measured result meet the requirements of the design specification.

Surveyor: Calculator: Reviewer:


Jakarta-Bandung High-Speed Railway Project
Construction Survey and Stake out Record
No : …......................................................................

Constructor unit Bridge#.... - P…. / Pier Head Location DK …............... Date Tanggal Pelaksanaan

Station setting

Station point X Y H

Back sight point 1 X Y H

Back sight point 2 X Y H

Design value (m) Measured value (m) Deviation(m)


Pt ID
X Y Z X Y Z △X △Y △Z

PD-L
PD-R

A1
A2
A3
A4
A5
A6
A7
A8
A9
A10
A11
A12
A13
A14
A15
A16

Sche
See Attachment
matic

Conclusion:The measured result meet the requirements of the design specification.

Surveyor: Calculator: Reviewer:


Jakarta-Bandung High-Speed Railway Project
Construction Survey and Stake out Record
No : …......................................................................

PD-L PD-R

Conclusion:-

Surveyor: Calculator: Reviewer:


Jakarta-Bandung High-Speed Railway Project
Construction Survey and Stake out Record
No : …......................................................................

Constructor unit Bridge#.... - JA or BA / Abutment Body Location DK …............... Date Tanggal Pelaksanaan

Station setting

Station point X Y H

Back sight point 1 X Y H

Back sight point 2 X Y H

Design value (m) Measured value (m) Deviation(m)


Pt ID
X Y Z X Y Z △X △Y △Z

AB1 3 angka belakang koma

AB2 nilai kosong harus diisi 0.000 --> bukan strip (-)

AB3-A
AB3-B
AB4-A
AB4-B
AB5
AB6

AB2 AB4 AB6

AB1 AB3

CL-AB

Schema Jakarta Bandung Jakarta Bandung


tic AB3

CL-PC
AB5

AB1 AB3 AB5

Conclusion:The measured result meet the requirements of the design specification.

Surveyor: Calculator: Reviewer:


Jakarta-Bandung High-Speed Railway Project
Construction Survey and Stake out Record
No : …......................................................................

Constructor unit Bridge#.... - JA or BA / Abutment Head Location DK …............... Date Tanggal Pelaksanaan

Station setting

Station point X Y H

Back sight point 1 X Y H

Back sight point 2 X Y H

Design value (m) Measured value (m) Deviation(m)


Pt ID
X Y Z X Y Z △X △Y △Z

PD-L
PD-R

A1
A2
A3
A4
A5
A6
A7
A8

Sche
See Attachment
matic

Conclusion:The measured result meet the requirements of the design specification.

Surveyor: Calculator: Reviewer:


Jakarta-Bandung High-Speed Railway Project
Construction Survey and Stake out Record
No : …......................................................................

Conclusion:-

Surveyor: Calculator: Reviewer:

Vous aimerez peut-être aussi