Vous êtes sur la page 1sur 8

JIGJIG UNIVERSITY CIVIL ENGINEERING OCT. 12.

2O17

FINAL INTERN SHIP REPORT

Declaration Page
It is well known that forth year students of civil engineering department were on practice
starting from February 11/2009 to June 11/2009. With this regard, student Mahary Aregay ,
ID no 0546/06 , has worked with orex construction for the given four months successfully.
And I hereby declare that this document is an authentic record of mine and all writings in this
document are performed by my effort exclusively.
Thus, we want to certify for his above statements and for he has successfully completed his
internship program.

JIGJIGA UNIVERSITY FINAL INTERNSHIP REPORT ORRIX CONSTRUCTION PLC


BY MAHARY AREGAY Page I
JIGJIG UNIVERSITY CIVIL ENGINEERING OCT. 12. 2O17

ACKNOLEDGMENT
I would like to thank God for his merciful and endless guidance through my life and for
giving me a supportive and loving family and friends that are always there through all my
success and failure, supporting, cherishing and lifting me up morally and financially

. My deepest gratitude goes to office design engineer walelegn


site engineer yoseph and site supervisor Mohamed
formal, zerhon & solomon
All my fiends& monitor elias
, thank JJU, college of engineering and Technology and office for giving me the chance to
take part in this internship program

JIGJIGA UNIVERSITY FINAL INTERNSHIP REPORT ORRIX CONSTRUCTION PLC


BY MAHARY AREGAY Page II
JIGJIG UNIVERSITY CIVIL ENGINEERING OCT. 12. 2O17

EXECUTIVE SAMMARY

This report is about the internship experience that we have under taken during the last
four months. The internship program is one of the main courses in Engineering faculty in
which special attention is given over the course to broaden the students mind with the
practical skills. For the last four months we’ve been working at Radar Construction Company
as an intern. We were acting as both office and site engineer in order to improve our practical
and theoretical skills. This program is prepared as a part of a new curriculum that allowed
students to have a chance to work at different companies and gain field experience and
knowledge that couldn’t be attained from the theoretical lectures.
This report contains several chapters that show and describe our overall duration at
Radar Construction Company and the benefits we got from the company. Each chapter
briefly describes and gives an overall view about the company and the experience we got
from the internship program.
Chapter one gives a brief history and background of Radar Construction Plc.
Including the objectives, mission, vision, goals, foundation for success and manpower. We
have also presented the flow chart of the organization with detail of each department.
Chapter two deals with the overall internship experience we had got. We have
explained all our observations and experience that we had got from Radar construction p.l.c
during our internship period.
Chapter three deals with the benefits we got from the internship program, in terms of
improving our practical skill, theoretical knowledge, interpersonal communication skill, team
playing skill, leadership skill, work ethics and entrepreneurship skill.
The final chapter, chapter four, contains our conclusion and recommendations for
improvement of works in the company. We have tried to put them as clear as possible and
made them straight enough. Well, hope you find our report more comprehensive and get all
the information you require.

JIGJIGA UNIVERSITY FINAL INTERNSHIP REPORT ORRIX CONSTRUCTION PLC


BY MAHARY AREGAY Page III
JIGJIG UNIVERSITY CIVIL ENGINEERING OCT. 12. 2O17

Table of content page


.Declaration........................................................................................................................I
Acknowledgment................................................................................................................II
executive summery...............................................................................................................III
Table of content
chapter one
background of the company.................................................................................................1
1.1 brief history of the company................................................................................................1
1.2 company police....................................................................................................................1
1.3 current location....................................................................................................................2
1.4 project contract date............................................................................................................2
1.5 the main product and services of the company...................................................................2
1.6 the main customer or user of the product.............................................................................2
chapter two.........................................................................................4
2. over all intern ship experience..........................................................................................5
2.1 how do i get to the company................................................................................................5
2.2 site observation.....................................................................................................................6
2.2.1 sub structure.....................................................................................................................7
2.2.2 preparation of the project site...........................................................................................7.
2.3 setting out...........................................................................................................................7
2.3.1 concrete work...................................................................................................................9
2.3.2 concrete preparation........................................................................................................12
2.3.3 batching f concrete..........................................................................................................13
2.3.4detail description of concrete work..................................................................................14
2.4 super structure....................................................................................................................17
2.4.1 form work for super structure..........................................................................................18
2.4.2 column work....................................................................................................................21
2.4.3 foundation.......................................................................................................................22
2.4.4 footing............................................................................................................................23
2.4.6 hard core.........................................................................................................................25
2.4.7 slab work........................................................................................................................25.
2.4.8 expansion joint .............................................................................................................26
2.4.9 scaffolding.....................................................................................................................27
2.4.10 slab work......................................................................................................................27
2.5 office work.........................................................................................................................31

chapter three
3.over all benefit gained......................................................................................................34
3.1 improved practical skill....................................................................................................34
3.2 upgrading practical knowledge....................................................................................... 34
3.3 upgrading interpersonal communication skill.................................................................35
3.4 improving team playing skill..........................................................................................35
3.5 leader ship skill...............................................................................................................35
3.6 upgrading work ethics...................................................................................................36
3.7 entrepreneur skill ship.................................................................................................36
chapter four
4.conclusion and recommendation........................................................................................38
JIGJIGA UNIVERSITY FINAL INTERNSHIP REPORT ORRIX CONSTRUCTION PLC
BY MAHARY AREGAY Page IV
JIGJIG UNIVERSITY CIVIL ENGINEERING OCT. 12. 2O17

4.1 conclusion...........................................................................................................................37
4.2
recommendations.................................................................................................................38
reference..........................................................................................................................39
appendices..........................................................................................................................40

JIGJIGA UNIVERSITY FINAL INTERNSHIP REPORT ORRIX CONSTRUCTION PLC


BY MAHARY AREGAY Page V
JIGJIG UNIVERSITY CIVIL ENGINEERING OCT. 12. 2O17

List of figures page


fig.1 setting out...........................................................................................................................8
fig.2 pit excavation..................................................................................................................9.
fig .3 measuring boxes.............................................................................................................14
fig.4 sand.................................................................................................................................15
fig .4 masonry wall..................................................................................................................16
fig .5 concrete mixer................................................................................................................17
fig.6 precast concrete spacer....................................................................................................18
fig.7 form work of super structure...........................................................................................19
fig.8 wooden form work prepared for stair..............................................................................20
fig.9 column construction.........................................................................................................22
fig.10 beam.............................................................................................................................24
fig.11 hard core.......................................................................................................................25
fig.12 slab for work..................................................................................................................26
fig.13 expansion joint...............................................................................................................27
fig.14 scaffolding.....................................................................................................................27
fig.15 vibrator..........................................................................................................................31

JIGJIGA UNIVERSITY FINAL INTERNSHIP REPORT ORRIX CONSTRUCTION PLC


BY MAHARY AREGAY Page VI
JIGJIG UNIVERSITY CIVIL ENGINEERING OCT. 12. 2O17

List of table page


Table 1.concrete mix.......................................................................................................17
2.bar schechule.......................................................................................................32

JIGJIGA UNIVERSITY FINAL INTERNSHIP REPORT ORRIX CONSTRUCTION PLC


BY MAHARY AREGAY Page VII
JIGJIG UNIVERSITY CIVIL ENGINEERING OCT. 12. 2O17

JIGJIGA UNIVERSITY FINAL INTERNSHIP REPORT ORRIX CONSTRUCTION PLC


BY MAHARY AREGAY Page VIII

Vous aimerez peut-être aussi