Vous êtes sur la page 1sur 29

PM Project Management - 31 July 2019 - v1.

Code Group Sub group Section Object


PM_10 10
PM_10_10 10 10
PM_10_10_60 10 10 60
PM_10_20 10 20
PM_10_20_07 10 20 07
PM_10_20_09 10 20 09
PM_10_20_14 10 20 14
PM_10_20_16 10 20 16
PM_10_20_17 10 20 17
PM_10_20_18 10 20 18
PM_10_20_24 10 20 24
PM_10_20_26 10 20 26
PM_10_20_30 10 20 30
PM_10_20_75 10 20 75
PM_10_20_82 10 20 82
PM_10_20_84 10 20 84
PM_10_20_86 10 20 86
PM_10_20_90 10 20 90
PM_10_20_92 10 20 92
PM_10_80 10 80
PM_10_80_10 10 80 10
PM_10_80_75 10 80 75
PM_10_80_80 10 80 80
PM_10_80_85 10 80 85
PM_30 30
PM_30_10 30 10
PM_30_10_15 30 10 15
PM_30_10_22 30 10 22
PM_30_10_28 30 10 28
PM_30_10_38 30 10 38
PM_30_10_39 30 10 39
PM_30_10_47 30 10 47
PM_30_10_58 30 10 58
PM_30_10_76 30 10 76
PM_30_10_80 30 10 80
PM_30_10_93 30 10 93
PM_30_20 30 20
PM_30_20_02 30 20 02
PM_30_20_10 30 20 10
PM_30_20_17 30 20 17
PM_30_20_24 30 20 24
PM_30_20_33 30 20 33
PM_30_20_35 30 20 35
PM_30_20_46 30 20 46
PM_30_20_89 30 20 89
PM_30_30 30 30
PM_30_30_10 30 30 10
PM_30_30_15 30 30 15
PM_30_30_23 30 30 23
PM_30_30_25 30 30 25
PM_30_30_26 30 30 26
PM_30_30_27 30 30 27
PM_30_30_28 30 30 28
PM_30_30_29 30 30 29
PM_30_30_30 30 30 30
PM_30_30_32 30 30 32
PM_30_30_39 30 30 39
PM_30_30_41 30 30 41
PM_30_30_45 30 30 45
PM_30_30_65 30 30 65
PM_30_30_72 30 30 72
PM_30_30_75 30 30 75
PM_30_30_78 30 30 78
PM_30_30_85 30 30 85
PM_30_30_87 30 30 87
PM_30_30_88 30 30 88
PM_30_30_96 30 30 96
PM_30_30_98 30 30 98
PM_30_40 30 40
PM_30_40_06 30 40 06
PM_30_40_10 30 40 10
PM_30_40_33 30 40 33
PM_30_40_36 30 40 36
PM_30_40_39 30 40 39
PM_30_40_46 30 40 46
PM_30_40_70 30 40 70
PM_30_40_92 30 40 92
PM_30_40_94 30 40 94
PM_35 35
PM_35_10 35 10
PM_35_10_13 35 10 13
PM_35_10_22 35 10 22
PM_35_10_25 35 10 25
PM_35_10_32 35 10 32
PM_35_10_47 35 10 47
PM_35_10_60 35 10 60
PM_35_10_65 35 10 65
PM_35_20 35 20
PM_35_20_03 35 20 03
PM_35_20_42 35 20 42
PM_35_20_62 35 20 62
PM_35_20_76 35 20 76
PM_35_20_80 35 20 80
PM_35_20_90 35 20 90
PM_35_20_96 35 20 96
PM_35_30 35 30
PM_35_30_04 35 30 04
PM_35_30_20 35 30 20
PM_35_30_24 35 30 24
PM_35_30_26 35 30 26
PM_35_30_28 35 30 28
PM_35_30_30 35 30 30
PM_35_30_70 35 30 70
PM_35_30_80 35 30 80
PM_35_30_85 35 30 85
PM_35_40 35 40
PM_35_40_03 35 40 03
PM_35_40_15 35 40 15
PM_35_40_30 35 40 30
PM_35_40_34 35 40 34
PM_35_40_72 35 40 72
PM_35_40_84 35 40 84
PM_35_40_96 35 40 96
PM_35_50 35 50
PM_35_50_01 35 50 01
PM_35_50_74 35 50 74
PM_35_60 35 60
PM_35_60_01 35 60 01
PM_35_60_03 35 60 03
PM_35_60_05 35 60 05
PM_35_60_95 35 60 95
PM_35_70 35 70
PM_35_70_05 35 70 05
PM_35_70_15 35 70 15
PM_35_70_17 35 70 17
PM_35_70_20 35 70 20
PM_35_70_36 35 70 36
PM_35_70_38 35 70 38
PM_35_70_46 35 70 46
PM_35_70_92 35 70 92
PM_35_70_94 35 70 94
PM_40 40
PM_40_30 40 30
PM_40_30_17 40 30 17
PM_40_30_20 40 30 20
PM_40_30_23 40 30 23
PM_40_30_24 40 30 24
PM_40_30_25 40 30 25
PM_40_30_26 40 30 26
PM_40_30_27 40 30 27
PM_40_30_34 40 30 34
PM_40_30_50 40 30 50
PM_40_30_52 40 30 52
PM_40_30_60 40 30 60
PM_40_30_63 40 30 63
PM_40_30_89 40 30 89
PM_40_40 40 40
PM_40_40_01 40 40 01
PM_40_40_02 40 40 02
PM_40_40_10 40 40 10
PM_40_40_15 40 40 15
PM_40_40_18 40 40 18
PM_40_40_22 40 40 22
PM_40_40_27 40 40 27
PM_40_40_34 40 40 34
PM_40_40_42 40 40 42
PM_40_40_50 40 40 50
PM_40_40_54 40 40 54
PM_40_40_75 40 40 75
PM_40_40_79 40 40 79
PM_40_40_88 40 40 88
PM_40_50 40 50
PM_40_50_03 40 50 03
PM_40_50_14 40 50 14
PM_40_50_16 40 50 16
PM_40_50_32 40 50 32
PM_40_50_37 40 50 37
PM_40_50_41 40 50 41
PM_40_50_47 40 50 47
PM_40_50_49 40 50 49
PM_40_50_60 40 50 60
PM_40_50_65 40 50 65
PM_40_50_67 40 50 67
PM_40_50_69 40 50 69
PM_40_60 40 60
PM_40_60_01 40 60 01
PM_40_60_02 40 60 02
PM_40_60_03 40 60 03
PM_40_60_05 40 60 05
PM_40_60_07 40 60 07
PM_40_60_08 40 60 08
PM_40_60_09 40 60 09
PM_40_60_12 40 60 12
PM_40_60_16 40 60 16
PM_40_60_18 40 60 18
PM_40_60_19 40 60 19
PM_40_60_20 40 60 20
PM_40_60_21 40 60 21
PM_40_60_22 40 60 22
PM_40_60_23 40 60 23
PM_40_60_27 40 60 27
PM_40_60_31 40 60 31
PM_40_60_41 40 60 41
PM_40_60_50 40 60 50
PM_40_60_62 40 60 62
PM_40_60_64 40 60 64
PM_40_60_70 40 60 70
PM_40_60_72 40 60 72
PM_40_60_85 40 60 85
PM_40_60_87 40 60 87
PM_40_60_89 40 60 89
PM_50 50
PM_50_30 50 30
PM_50_30_10 50 30 10
PM_50_30_12 50 30 12
PM_50_30_14 50 30 14
PM_50_30_16 50 30 16
PM_50_30_18 50 30 18
PM_50_30_26 50 30 26
PM_50_30_28 50 30 28
PM_50_30_29 50 30 29
PM_50_30_30 50 30 30
PM_50_30_40 50 30 40
PM_50_30_42 50 30 42
PM_50_30_60 50 30 60
PM_50_30_64 50 30 64
PM_50_30_66 50 30 66
PM_50_30_68 50 30 68
PM_50_30_70 50 30 70
PM_50_30_85 50 30 85
PM_50_30_96 50 30 96
PM_50_50 50 50
PM_50_50_01 50 50 01
PM_50_50_03 50 50 03
PM_50_50_05 50 50 05
PM_50_50_10 50 50 10
PM_50_50_15 50 50 15
PM_50_50_20 50 50 20
PM_50_50_25 50 50 25
PM_50_50_30 50 50 30
PM_50_50_35 50 50 35
PM_50_50_40 50 50 40
PM_50_50_45 50 50 45
PM_50_50_50 50 50 50
PM_50_50_55 50 50 55
PM_50_50_60 50 50 60
PM_50_50_65 50 50 65
PM_50_50_70 50 50 70
PM_50_50_75 50 50 75
PM_50_50_80 50 50 80
PM_50_50_85 50 50 85
PM_50_50_90 50 50 90
PM_55 55
PM_55_55 55 55
PM_55_55_70 55 55 70
PM_55_55_80 55 55 80
PM_55_55_90 55 55 90
PM_60 60
PM_60_10 60 10
PM_60_10_50 60 10 50
PM_60_10_52 60 10 52
PM_60_10_55 60 10 55
PM_60_10_58 60 10 58
PM_60_10_60 60 10 60
PM_60_10_65 60 10 65
PM_60_10_70 60 10 70
PM_60_10_75 60 10 75
PM_60_10_77 60 10 77
PM_60_10_80 60 10 80
PM_60_10_83 60 10 83
PM_60_10_85 60 10 85
PM_60_10_90 60 10 90
PM_60_10_95 60 10 95
PM_60_20 60 20
PM_60_20_15 60 20 15
PM_60_20_20 60 20 20
PM_60_20_55 60 20 55
PM_60_20_60 60 20 60
PM_60_20_62 60 20 62
PM_60_20_64 60 20 64
PM_60_20_65 60 20 65
PM_60_20_67 60 20 67
PM_60_20_79 60 20 79
PM_60_20_90 60 20 90
PM_60_20_95 60 20 95
PM_60_30 60 30
PM_60_30_05 60 30 05
PM_60_30_13 60 30 13
PM_60_30_15 60 30 15
PM_60_30_17 60 30 17
PM_60_30_19 60 30 19
PM_60_30_20 60 30 20
PM_60_30_22 60 30 22
PM_60_30_26 60 30 26
PM_60_30_28 60 30 28
PM_60_30_37 60 30 37
PM_60_30_40 60 30 40
PM_60_30_45 60 30 45
PM_60_30_47 60 30 47
PM_60_30_49 60 30 49
PM_60_30_51 60 30 51
PM_60_30_57 60 30 57
PM_60_30_66 60 30 66
PM_60_30_71 60 30 71
PM_60_30_73 60 30 73
PM_60_30_80 60 30 80
PM_60_40 60 40
PM_60_40_40 60 40 40
PM_60_40_50 60 40 50
PM_60_40_55 60 40 55
PM_60_40_58 60 40 58
PM_60_40_60 60 40 60
PM_60_50 60 50
PM_60_50_10 60 50 10
PM_60_50_12 60 50 12
PM_60_50_16 60 50 16
PM_60_50_17 60 50 17
PM_60_50_19 60 50 19
PM_60_50_23 60 50 23
PM_60_50_25 60 50 25
PM_60_50_27 60 50 27
PM_60_50_35 60 50 35
PM_60_50_37 60 50 37
PM_60_50_50 60 50 50
PM_60_50_58 60 50 58
PM_60_50_60 60 50 60
PM_60_50_62 60 50 62
PM_60_50_63 60 50 63
PM_60_50_69 60 50 69
PM_60_50_88 60 50 88
PM_60_50_90 60 50 90
PM_60_60 60 60
PM_60_60_15 60 60 15
PM_60_60_26 60 60 26
PM_60_60_40 60 60 40
PM_60_60_60 60 60 60
PM_60_60_65 60 60 65
PM_60_60_70 60 60 70
PM_60_60_75 60 60 75
PM_60_60_88 60 60 88
PM_60_60_90 60 60 90
PM_60_70 60 70
PM_60_70_17 60 70 17
PM_60_70_20 60 70 20
PM_60_70_25 60 70 25
PM_60_70_40 60 70 40
PM_60_70_60 60 70 60
PM_60_70_70 60 70 70
PM_60_70_72 60 70 72
PM_60_70_75 60 70 75
PM_60_70_80 60 70 80
PM_60_70_93 60 70 93
PM_60_70_95 60 70 95
PM_60_90 60 90
PM_60_90_40 60 90 40
PM_60_90_70 60 90 70
PM_70 70
PM_70_75 70 75
PM_70_75_02 70 75 02
PM_70_75_15 70 75 15
PM_70_75_27 70 75 27
PM_70_75_28 70 75 28
PM_70_75_30 70 75 30
PM_70_75_32 70 75 32
PM_70_75_36 70 75 36
PM_70_75_37 70 75 37
PM_70_75_47 70 75 47
PM_70_75_49 70 75 49
PM_70_75_65 70 75 65
PM_70_75_68 70 75 68
PM_70_75_85 70 75 85
PM_70_75_96 70 75 96
PM_70_80 70 80
PM_70_80_02 70 80 02
PM_70_80_15 70 80 15
PM_70_80_28 70 80 28
PM_70_80_30 70 80 30
PM_70_80_47 70 80 47
PM_70_80_48 70 80 48
PM_70_80_77 70 80 77
PM_70_80_85 70 80 85
PM_70_80_96 70 80 96
PM_70_85 70 85
PM_70_85_13 70 85 13
PM_70_85_20 70 85 20
PM_70_85_25 70 85 25
PM_70_85_30 70 85 30
PM_70_85_33 70 85 33
PM_70_85_35 70 85 35
PM_70_85_40 70 85 40
PM_70_85_45 70 85 45
PM_70_85_50 70 85 50
PM_70_85_52 70 85 52
PM_70_85_55 70 85 55
PM_70_85_60 70 85 60
PM_70_85_62 70 85 62
PM_70_85_64 70 85 64
PM_70_85_70 70 85 70
PM_70_85_83 70 85 83
PM_70_85_90 70 85 90
PM_70_85_96 70 85 96
PM_70_90 70 90
PM_70_90_04 70 90 04
PM_70_90_15 70 90 15
PM_70_90_27 70 90 27
PM_70_90_30 70 90 30
PM_70_90_46 70 90 46
PM_70_90_52 70 90 52
PM_70_90_68 70 90 68
PM_70_90_77 70 90 77
PM_70_90_79 70 90 79
PM_70_90_83 70 90 83
PM_70_95 70 95
PM_70_95_12 70 95 12
PM_70_95_20 70 95 20
PM_70_95_31 70 95 31
PM_70_95_33 70 95 33
PM_70_95_34 70 95 34
PM_70_95_58 70 95 58
PM_70_95_64 70 95 64
PM_70_95_66 70 95 66
PM_70_95_70 70 95 70
PM_80 80
PM_80_10 80 10
PM_80_10_05 80 10 05
PM_80_10_10 80 10 10
PM_80_10_25 80 10 25
PM_80_10_27 80 10 27
PM_80_10_30 80 10 30
PM_80_10_42 80 10 42
PM_80_10_50 80 10 50
PM_80_10_60 80 10 60
PM_80_10_63 80 10 63
PM_80_10_65 80 10 65
PM_80_30 80 30
PM_80_30_05 80 30 05
PM_80_30_30 80 30 30
PM_80_30_50 80 30 50
PM_80_30_60 80 30 60
PM_80_30_63 80 30 63
PM_80_30_70 80 30 70
PM_80_30_80 80 30 80
PM_80_30_90 80 30 90
PM_80_50 80 50
PM_80_50_20 80 50 20
PM_80_50_25 80 50 25
PM_80_50_30 80 50 30
PM_80_50_80 80 50 80
PM_80_60 80 60
PM_80_60_15 80 60 15
PM_80_60_30 80 60 30
PM_80_60_50 80 60 50
PM_80_60_60 80 60 60
PM_80_60_65 80 60 65
PM_80_60_70 80 60 70
Title
Project information
Project
Project description
Client requirements
Brief
Buildability statement
Community and tenant liaison plan
Construction industry registration scheme requirement
Core requirements statement
Cost benefit analysis
Employer's information requirement
Environmental policy
Feasibility study
Stakeholder engagement plan
Statement of requirement
Statement of security requirement
Sustainable development engagement plan
Technical statement of requirement (TSOR)
User requirement document
Space management requirements
Accommodation and layout plan
Space design
Space plan
Space standard
Site, ground and environmental information
Site survey information
Condition survey information
Dimensional information
Existing structure information
Hydraulic information
Hydrology information
Land registration information
Mapping information
Scan survey information
Site boundary information
Utilities and services survey information
Ground investigation reports
Archaeological survey report
Geological survey report
Contaminated land survey report
Underground services survey report
Geotechnical survey report
Ground investigation report
Land quality assessment report
Topographic survey report
Environmental information
Carbon calculation report
Coastal model
Drainage model
Ecology survey report
Environmental action report
Environmental impact report
Environmental survey report
Flood risk assessment report
Flood forecasting model
Fluvial flow model
Hydrological model
Integrated catchment model
Landscape model
Pluvial flow model
Road safety audit report
Seismic survey report
Site waste management plan
Sustainability information
Tidal information
Tidal and coastal boundary information
Water management information
Weather and climate information
Hazardous substances information
Asbestos survey report
Biological agents survey report
Gases survey report
Hazardous chemicals survey report
Heavy metals survey report
Lead survey report
Radioactive waste survey report
Unexploded ordnance survey report
Volatile organic compounds survey report
Project performance requirements
Quality and operational properties performance requirement
Comfort performance requirements
Design quality performance requirements
Durability performance requirements
Functional properties performance requirements
Life cycle performance requirements
Performance compliance requirements
Project context performance requirements
Structural performance requirements
Accidental loading performance requirements
Imposed loads performance requirements
Permanent loads performance requirements
Snow and ice load performance requirements
Structural design performance requirements
Thermal actions performance requirements
Wind loading performance requirements
Fire performance requirements
Automatic fire suppression performance requirements
Escape lighting performance requirements
Fire and rescue service requirements
Fire protection zone requirements
Fire resistance performance requirements
Fire safety performance requirements
Reaction to fire performance requirements
Spread of fire performance requirements
Structural fire performance requirements
Environment and sustainability performance requirements
Airtightness performance requirements
Condensation control performance requirements
Environmental scheme performance requirements
Habitat creation and protection requirements
Resistance to ground contaminants performance requirements
Sustainability performance requirements
Watertightness performance requirements
Safety performance requirements
Accessibility performance requirements
Security performance requirements
Acoustic performance requirements
Acoustic attenuation performance requirements
Acoustic diffusion performance requirements
Acoustic separation performance requirements
Vibration control performance requirements
Energy performance requirements
Air conditioning performance requirements
Chilled water performance requirements
Combustion appliance performance requirements
Daylight and shading performance requirements
Heating performance requirements
Hot and cold water supply performance requirements
Lighting performance requirements
Thermal transmittance performance requirements
Ventilation performance requirements
Design and approvals information
Design information
Concept analysis
Design calculations
Design philosophy statement
Design responsibility matrix
Developmental control plan
Energy strategy
Energy target
Graphical information
Management control plan
Mechanical, electrical, instrumentation, controls and automation (MEICA) design
Parametric information
Photorealistic visualization model
Technical information
Design drawings
2D plan drawings
3D plan drawings
Builders' work drawings
Co-ordination drawings
Cross-section drawings
Diagrammatical drawings
Elevation drawings
General Arrangement drawings
Isometric drawings
Manufacturer's drawings
Multi-view drawings
Schematic drawings
Sketch drawings
Technical design drawings
Approvals information
Approvals and assurance plan
Consent
Contribution agreement
Funding profile
Heritage registration
Internal approval
Land owner agreement
Letter of authority
Partnership agreement
Planning permission
Project board agreement
Project team agreement
Project information management information
4D programme federated model
5D cost federated model
6D handover sequence federated model
Activities terminology
Benefits realization plan
BIM execution plan
BIM maturity assessment report
Clash detection resolution report
COBie data sheet
Communications plan
Construction risk review
Contingency plan
Curriculum vitae (CV)
Data security policy
Description terminology
Electronic data interchange (EDI)
Federated coordination models
Information delivery plan
Master information delivery plan
Post occupancy evaluation
Pre-appointment BIM execution plan
Risk schedule
Risk and opportunities management plan
Stakeholder management plan
Task information delivery plan
Through-life management plan (TLMP)
Financial and commercial information
Economic viability information
Business case
Commercial compliance report
Commercial plan
Commercial strategy
Cost model and indicative costing
Earned value management report
Financial damage assessment
Financial strategy
Funding information
Initial planning estimate
Investment appraisal
Partnership funding report
Preliminary business case
Pre-tender estimate
Private-sector participation (PSP) evaluation report
Private-sector participation (PSP) financial close
Supply chain agreement
Whole life costing
Procurement and tendering information
Procurement strategy
Prior information notice
Advance procurement information
Tender enquiry
Tender invitation
Early contractor involvement information
Framework agreement information
Tender acceptance criteria
Tender document
Private-sector participation (PSP) tender
Tender clarification report
Tender instruction
Tender site visit strategy
Tender return
Tender assessment report
Tender evaluation report
Tender error resolution strategy
Tender acceptance report
Post-tender negotiation
Tender notification
Contract information
Contract
Services contract
Supplies contract
Works contract
Construction management information
Site information
Site access information
Site altitude
Site branding information
Site establishment information
Site grid reference
Site safety plan
Site services information
Site set-up information
Site security information
Surrounding land and building uses report
Temporary services information
Temporary works information
Temporary works impact report
Working area information
Project requirements
Completion work information
Concurrent work information
Nominated subcontractor or supplier work information
Pre-construction information
Pre-ordered items information
Prime cost item
Preparatory work information
Provisional item
Setting out methodology
Works by local authority information
Work by statutory undertakers information
Contract programme and progress
Actions log
Commissioning programme
Communications log
Consultation strategy
Contract administration information
Contract programme
Delivery risk review
Early warning notice
Exception report
Highlights report
Issues log
Limitations on method report
Limitations on sequence report
Limitations on timing report
Limitations on use of site report
Notice of commencement
Progress report
Request for information (RFI)
Responsible, accountable, consulted and informed (RACI) log
Stage end report
Meetings and records
Labour and equipment record
Meeting agenda
Meeting minutes
Progress photographs
Progress record
Contract cost management
Budget
Cash flow forecast
Compensation event
Completion certificate
Contract change to forecast
Cost estimate
Cost forecast
Cost information report
Fee note
Financial report
Milestone payment schedule
Order
Payment application
Payment certificate
Pricing document
Quotation
Technical query
Timesheet
Contract support information
Contacts list
Environmental protection information
Insurance policies and records
Site control and protection information
Site personnel records
Site records
Site safety information
Temporary services records
Temporary works records
Construction risk management
Construction phase health and safety plan
Demolition hazard report
Execution hazard report
Health and safety statement
Product hazard report
Site risk assessment
Site risk report
Site security policy
Social responsibility registration scheme
Vehicle safety report
Welfare responsibility registration scheme
Contract quality standards information
Site inspection report
Quality control and management report
Testing, commissioning and completion information
Testing information
Air distribution test report
Control system test report
Electrical installation test report
Emergency lighting installation test report
Fire protection installation test report
Gas installation certificate
Heating installation test report
High voltage electrical installation test report
Lifts test report
Lightning protection installation test report
Pressure system installation test report
Public health installation test report
Surveillance equipment installation test report
Water distribution installation test report
Commissioning information
Air distribution systems commissioning report
Control system commissioning report
Emergency lighting installation commissioning report
Fire system commissioning report
Lifts commissioning report
Lighting commissioning report
Security system commissioning report
Surveillance system installation commissioning report
Water distribution commissioning report
Completion information
Building manual
Defects rectification report
End user operating information
Final inspection report
Handover board record of acceptance for occupation
Handover strategy
Health and safety file
List of spares and consumables
Maintenance schedules
Manufacturer information
Operating instruction
Plant log book
Pre-handover plan
Project completion report
Remedial work completion report
Supplier directory
Training documentation
Works completion certificate
Record information
Architectural record drawings
Control system record drawings
Electrical systems record drawings
Fire system record drawings
Landscape record drawings
Mechanical systems record drawings
Public health system record drawings
Security system record drawings
Setting out records
Structural record drawings
Project assurance information
Compliance and certification documents
Design compliance review report
Fire safety acceptance certificate
Gateway review information
Governance strategy information
Option analysis support paper
Post-project evaluation information
Project Assurance Group (PAG) sign off
Risk potential assessment
Asset management information
Asset strategy, planning and management information
Asset guarantee and warranty information
Asset register
Energy performance certificate
Equipment schedule
Finishes information
Insurer's requirements
Maintenance requirement
Performance analysis
Plant and equipment service life report
Post-operational evaluation
Asset life cycle cost information
Acquisition costs
Finance charges information
Maintenance and repair cost information
Office services cost information
Operational cost information
Replacement cost information
Staff cost information
Utilities cost information
Emergency strategy information
Disaster recovery strategy
Disaster response strategy
Fire strategy
Security strategy
Asset risk management information
Compliance risk management information
Financial risk management information
Health and safety risk management information
Operational risk management information
Performance risk management information
Residual risk information
NBS Code NRM

00-70-70/230B Additional copies of drawings and schedules;

00-70-70/750D Design and production information;


00-40-70/190A Environmental policy;

00-05-10/105 Site information;

00-05-10/115 Utilities and services survey;


00-05-10/120 Ground information;

00-05-10/125 Ground investigation report;


00-05-10/130 Environmental information;

00-05-10/135 Ecology survey report;

00-60-70/190 Environmental assessment information;

00-05-10/140 Site waste management plan;


00-60-70/180 Sustainability assessment information;

00-05-10/145 Hazardous substances information;


00-05-10/150 Asbestos survey report;

00-05-10/155 Lead survey report;

05-20-60/130 Design quality;


05-20-60/200 Durability;
05-20-60/105 Functional and operational properties;
05-20-60/115 Life cycle of building;
05-20-60/145 Compliance with performance requirements;
05-20-60/100 Project context;

05-20-60/213 Accidental loading;


05-20-60/203 Permanent and imposed loads;
05-20-60/211 Loading for mechanical and electrical services;
05-20-60/207 Snow loading;
05-20-60/201 Structural design standards;
05-20-60/209 Thermal actions;
05-20-60/205 Wind actions;

05-20-60/264 Fire resistance – European classification;


05-20-60/259 Fire safety - special building types;
05-20-60/267 Reaction to fire – European classification;
05-20-60/265 Fire propagation and surface spread of flame – UK national classification;
05-20-60/269 Structural fire performance criteria;

05-20-60/239 Air permeability (Airtightness);


05-20-60/275 Control of condensation;
05-20-60/279 BREEAM;
05-20-05/215 Habitat creation outcomes;
05-20-60/273 Resistance to ground contaminants;
05-20-60/135 Sustainability;
05-20-60/271 Site preparation and resistance to moisture;

05-20-60/120 Accessibility;
05-20-60/125 Security and safety;

05-20-60/255 Weighted sound reduction index;


05-20-60/257 Weighted normalized flanking level difference;
05-20-60/247 Acoustic performance of healthcare buildings;

05-20-60/227 Design of air conditioning systems;

05-20-60/233 Design of heating systems;


05-20-60/277 Design of hot and cold water systems;

05-20-60/241 Thermal transmittance (U-value);


05-20-60/221 Design of ventilation systems for non-domestic buildings;

00-70-70/420A Design documents;

00-70-70/360 Design and management objectives statement;

00-60-70/170 Energy rating calculation;


00-70-70/140 Dimensions;

00-30-70/135 Project Team Agreement;

00-05-15/310 Activity terminology;

00-40-70/175 BIM Execution Plan (BEP);

00-70-70/100 Freedom of information;


00-05-15/210 Description terminology;
00-70-70/200A Electronic Data Interchange (EDI);

00-70-70/370 Information Release Schedule;

00-40-70/200 Supply chain agreements;

00-10-70/210 Advance procurement;


00-30-70/120 Preliminary Enquiry;
00-30-70/130 Tenders to be invited;

00-30-70/140 Framework Agreements;


00-30-70/165 Tender acceptance;
00-30-70/170 The Tender documents;

00-30-70/180 Tender queries;


00-30-70/190 Tender instructions;
00-30-70/220 Site visit;
00-30-70/230 Return of Tender;
00-30-70/310 Assessment;
00-30-70/320B Error resolution;

00-30-70/340 Post-Tender negotiations;


00-30-70/410 Notification to Tenderers;

00-20-70/A1000 Articles;

00-40-70/110B Access to the site;

00-40-70/790B Name boards and advertisements;

00-40-70/310 Health and Safety statement;

00-40-70/800 Temporary shoring;


00-40-70/600 Security – contract minimum requirement;

00-40-70/540A Lighting and power;


00-40-70/480 Parking;

00-40-70/130B Working area;

00-05-10/170 Preconstruction information;


00-70-70/710 Advance procurement;
00-60-70/600D Daywork charges;

00-10-70/310 Provisional sum for undefined work;


00-60-70/410 Setting out records;

00-50-70/695 METHOD AND SEQUENCE;

00-70-70/910 Performance testing programme;

00-70-70/780D Drawn and other information;


00-70-70/350C Programme;
00-50-70/780 Use or disposal of materials;

00-50-70/790 Working hours;

00-40-70/280A Commencement of work;


00-50-70/170A Progress report;

00-70-70/650 Sub subcontractors;

00-50-70/190 Photographs;
00-50-70/180 Contractor’s progress meetings;

00-70-70/270 Fluctuations;
00-40-70/160 Cash flow forecast;
00-70-70/730 Notification of compensation event;
00-60-70/630B Verification certificates;

00-70-70/740C Proposed instructions;

00-70-70/150 Rules of measurement;

00-70-70/280E Schedule of Rates;

00-40-70/170 Emergency contacts;


00-70-70/510 Environmental targets - report;
00-70-70/800D Insurance;
00-50-70/290A Occupied premises;

00-70-70/830B Climatic conditions - records;


00-50-70/540 Powder actuated fixing systems;
00-40-70/730A Mechanical plant – contract minimum requirement;

00-40-70/370B Safety and health plan construction phase;


00-40-70/350C Demolition hazards;
00-40-70/330D Health and safety hazards;
00-70-70/460 Health and safety statement;
00-40-70/360C Product hazards;

00-80-70/180A Security at completion;


00-40-70/210 Considerate Constructors Scheme;
00-40-70/225 Freight Vehicle safety requirements;
00-40-70/220 Constructing Better Health Scheme;

00-50-70/200B Employer's representatives' inspections;


00-60-70/110A Substitute products;

00-80-70/340 Information for commissioning of services;

00-80-70/240A The Building Manual;


00-60-70/540A Proposals for rectification of non-compliant products and executions;

00-70-70/890C Tests and inspection schedule;

00-80-70/150E Completion in sections or parts;


00-80-70/250B The Health and Safety File;
00-80-70/410B Tools and consumables;
00-60-70/570A Maintenance record sheets;
00-60-70/290B Manufacturer's recommendations and instructions;

00-80-70/200B Highway and sewer adoption;

00-70-70/530 Training policy;


00-80-70/100 Notice of completion;
00-60-70/220B Technical information;

00-60-70/440A Water regulations and byelaws notification;

00-60-70/520B Building energy rating;

00-70-70/920C Maintenance instructions and guarantees;

Vous aimerez peut-être aussi