Package Area Wise Structure Name

0053 : Shelter for Acids


1340 : Polymerization Area
1350 : Concentration Area
2340 : Polymerization Area
P2 2350 : Concentration Area
Paving & Road + Retention Basin + Other Site Infrastructure P2
Pipe Support P2 Area
Piperacks Structure P2
CVL2 U/G Piping Networks + U/G Cable Trenches P2
1360 : Blends Area
1370 : Stripping Area
2360 : Blends Area
2370 : Stripping Area
P3
Paving & Road + Retention Basin + Other Site Infrastructure P3
Pipe Support P3 Area
Piperacks Structure P3
U/G Piping Networks + U/G Cable Trenches P3
SYNTHETIC RUBBER INDONESIA - U3 PROJECT
IKPT WORK NO. : 14122
CONTRACT NO. : AY3102
WORK TITLE : CIVIL WORKS - PACKAGE 2
CONTRACTOR : PT. SATYAMITRA SURYA PERKAS

PROGRESS CLAIM NO :2
FOR WORKDONE UP TO : APRIL 2016

GENERAL SUMMARY :

Bill Amount Percentage


Description
No. (IDR.) Completed

1 Progress Claim as of April 2016 29,997,307,490.74 41.86%

2 Deduct Previous Claim -29,410,758,507.25


(including In-Direct Work Price Adjustment)

3 Progress Claim This Month (2 - 3) 586,548,983.49

Less:
4 Retention 5% -29,327,449.17

5 Material Onsite (Rebar) 10% -58,654,898.35

6 Container Mobilization 10% -58,654,898.35

7 Amount Due (3 - 4 - 5 - 6) 439,911,737.62

7 Total Amount Due This Month 439911737.618251

454095803.xlsx General Summary


SYNTHETIC RUBBER INDONESIA - U3 PROJECT

IKPT WORK NO. : 14122

WORK TITLE : CIVIL WORKS - PACKAGE 2

CONTRACTOR : PT. SATYAMITRA SURYA PERKASA

Unit Rate Current Contract .


BoQ
BoQ Item Description Unit CVL2 . Quantity
Item Code CVL2 Price (IDR.)
(IDR.) . Previous
. -
EA EARTH WORK .
EA-1A Excavation by Equipment (D≦3.0M) M3 50,700.00 41,381.06 2,098,019,742.00 . 18,124.03
EA-1B Excavation by Equipment (D>3.0M) M3 71,200.00 1,327.80 94,539,360.00 . 307.48
EA-2A Backfilling (Excavated Soil) M3 56,900.00 26,626.22 1,515,031,918.00 . 11,493.87
EA-3B Disposal of Soil (Outside of Factory) M3 63,000.00 16,735.12 1,054,312,560.00 . 4,362.69
EA-4B Sand Filling for U/G Pipe M3 323,300.00 926.93 299,676,469.00 . 1,105.80
EA-4C Sand Filling for Tank FDN M3 323,300.00 476.39 154,016,887.00 . 238.04
BC BASE COURSE WORK . -
BC-1A Base Course for Sub-STR. M3 336,200.00 330.19 111,009,878.00 . 311.90
BC-3A Base Course for Concrete Road/Paving M3 336,200.00 1,149.08 386,320,696.00 . 1,554.03
BC-5A Crushed Stone Paving M3 343,600.00 260.99 89,676,164.00 . 84.20
RE RE-BAR WORK . -
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 9,780,400.00 1,134.33 11,094,201,132.00 . 574.54
RE-1B Re-Bar for Sub-STR. (Round) Ton 9,780,400.00 31.95 312,483,780.00 . -
RE-2A Re-Bar for Super-STR. (Deformed) Ton 10,106,800.00 240.16 2,427,249,088.00 . 234.41
RE-2B Re-Bar for Super-STR. (Round) Ton 10,106,800.00 17.01 171,916,668.00 . -
RE-3A Welded Wire Fabric Ton 10,405,600.00 30.78 320,284,368.00 . 48.87
AN ANCHORING & EMBEDDING WORK . -
AN-1A Anchor Box Nos 48,800.00 687.00 33,525,600.00 . 562.00
AN-2B Anchor Bolt W/O Template Setting Ton 12,300,000.00 9.95 122,385,000.00 . 6.82
AN-3B-1 Embedded Steel Supply & Setting(Carbon Steel) Ton 28,800,000.00 64.81 1,866,528,000.00 . 24.87
AN-4A Expansion Anchor (Hole-in Anchor) Nos 68,300.00 305.52 20,867,016.00 . 16.00
AN-4B Chemical Anchor Nos 189,200.00 305.52 57,804,384.00 . 112.00
AN-5A Plastic Pipe M -
JT JOINT WORK . -
JT-2A Expansion Joint for Dike/Pit M 281,400.00 126.77 35,673,078.00 . -
JT-3A Expansion Joint for Road/Paving M 242,300.00 227.49 55,120,827.00 . 557.67
JT-4A Water Stop Plate M 199,500.00 640.98 127,875,510.00 . 227.63
FM FORM WORK . -
FM-1A Form for Sub-STR. M2 155,400.00 22,896.79 3,558,161,166.00 . 12,042.19
FM-2A Form for Super-STR. M2 277,100.00 6,835.27 1,894,053,317.00 . 3,989.74
FM-2B Curved Form for Super-STR. M2 300,100.00 352.27 105,716,227.00 . 316.28
CO CONCRETE WORK .
CO-1A Leveling Concrete M3 728,200.00 869.35 633,060,670.00 . 437.91
CO-2A Concrete for Sub-STR. M3 737,100.00 9,657.23 7,118,344,233.00 . 4,810.84
CO-3A Concrete for Super-STR. M3 776,300.00 1,902.02 1,476,538,126.00 . 727.78
CO-4A Concrete for Slab-on-Grade M3 742,700.00 96.47 71,648,269.00 . -
CO-5A Concrete for Road/Paving M3 752,500.00 1,093.58 822,918,950.00 . 1,580.71
AS ASPHALT WORK . -
AS-2A Asphalt Concrete/Sand for Tank FDN M3 3,780,800.00 7.63 28,847,504.00 . 4.98
FP FIRE PROOFING WORK . -
FP-5A Fireproof Concrete Ton 1,070,800.00 11,115.08 11,902,027,664.00 . -
PP UNDERGROUND PIPE WORK . -
PP-1D Concrete Pipe d=400 M 476,800.00 20.90 9,965,120.00 . 31.25
PP-1E Concrete Pipe d=500 M 631,500.00 562.10 354,966,150.00 . -
PP-1F Concrete Pipe d=600 M 998,600.00 31.42 31,376,012.00 . 242.61
PP-1H Concrete Pipe d=800 M 1,676,100.00 8.94 14,984,334.00 . -
PP-1J Concrete Pipe d=1000 M 2,482,300.00 16.96 42,099,808.00 . -
PP-1L Concrete Pipe d=1200 M 3,829,000.00 9.58 36,681,820.00 . -
PP-2B-1 Plastic Pipe d=150 M 235,700.00 45.19 10,651,283.00 . -
PP-2B-2 Plastic Pipe d=200 M 371,300.00 36.19 13,437,347.00 . -
PC PRE-CAST CONCRETE UNIT WORK . -
PC-1A Pre-Cast Curbstone M 157,700.00 325.23 51,288,771.00 . 317.31
PL PLASTER WORK . -
PL-1B Surface Finish for Road/Paving M2 17,400.00 36,881.83 641,743,842.00 . 13,282.65
PL-3A Mortar Filling for Equipment Bed M3 10,785,900.00 45.42 489,895,578.00 . -
LN COATING & LINING WORK . -
LN-5D-1 Chemical Resistant Resin Coating (Epoxy) M2 300,000.00 980.97 294,291,000.00 . 723.84
LN-5E-1 Chemical Resistant Resin Lining (Epoxy) M2 1,112,500.00 1,306.55 1,453,536,875.00 . 421.86
ML METAL & PLASTIC WORK . -
ML-1B Roof Drain Nos 215,300.00 40.32 8,680,896.00 . -
ML-5B Grating Cover M2 158,800.00 815.96 129,574,448.00 . 546.28
ML-5C Checkered Plate Cover M2 323,400.00 97.04 31,382,736.00 . -
GR GREEN WORK . -
GR-1A Turfing M2 42,900.00 5,071.58 217,570,782.00 . -
EAW ADDITIONAL EARTH WORK .
EAW-3 Final Grading for Bare Area M2 18,400.00 2,138.19 39,342,696.00 .
ANA ADDITIONAL ANCHORING & EMBEDDING WORK .
ANA-1 Climbing Rung (Galvanized) Ton 29,614,400.00 1.70 50,344,480.00 . 0.11
ANA-2 Climbing Rung (Chemical Resistant) Ton 61,739,400.00 1.95 120,391,830.00 . 0.26
MLA ADDITIONAL METAL & PLASTIC WORK . -
MLA-1 Guard Post Ea 1,200,000.00 48.00 57,600,000.00 .
COA ADDITIONAL CONCRETE WORK . -
COA-5A Concrete Cover 150 thk. M3 3,823,300.00 26.76 102,311,508.00 .
COA-5B Concrete Cover 300 thk. M3 3,562,700.00 7.92 28,216,584.00 . -
BCA ADDITIONAL BASE COURSE WORK . -
BCA-1 Compacted Gravel M3 362,200.00 2,609.79 945,265,938.00 . -
PPX ADDITIONAL UNDERGROUND PIPE WORK . -
PPX-10A CS Pipe DN.100, For Vent Pipe M 93,800.00 8.80 825,440.00 . -
PPX-1-41 6" 150#RF Extended Operating Gate Valve With Up Right Indicator Pcs 264,200.00 8.50 2,245,700.00 . -
PPX-1-43 4" 150#RF Extended Operating Gate Valve With Up Right Indicator Ea 176,100.00 8.00 1,408,800.00 . -
PPX-2-1 Reducer 4"x6" (GRE) Ea 329,200.00 28.00 9,217,600.00 . -
PPX-2-2 45 deg Elbow 4" (GRE) Ea 246,900.00 31.00 7,653,900.00 . -
PPX-2-3 Tee Branch 4"x4"x4" (GRE) Ea 329,200.00 6.00 1,975,200.00 . -
PPX-2-4 45 deg Elbow 6" (GRE) Ea 329,200.00 19.00 6,254,800.00 . -
PPX-2-5 Tee Branch 6"x6"x6" (GRE) Ea 658,200.00 6.00 3,949,200.00 . -
PPX-2-6 Flange 4" 150#RF, GRE Ea 246,900.00 16.00 3,950,400.00 . -
PPX-2-7 Flange 6" 150#RF, GRE Ea 329,200.00 17.00 5,596,400.00 . -
PPX-2-8 Elbow 45deg ,CSP DN.200 Ea 411,400.00 2.00 822,800.00 . -
PPX-2A GRE Pipe d=100 M 108,500.00 254.65 27,629,525.00 . -
PPX-2B GRE Pipe d=150 M 156,800.00 226.81 35,563,808.00 . 56.27
PPX-2C GRE Pipe d=200 M 202,100.00 79.91 16,149,811.00 . 176.67
PPX-2D GRE Pipe d=250 M 247,400.00 28.65 7,088,010.00 . 159.29
PPX-2E GRE Pipe d=300 M 292,700.00 35.87 10,499,149.00 . 73.11
PPX-4-1 Pipe Sleeve DN150 (Carbon Steel) M 141,000.00 35.69 5,032,290.00 . -
PPX-4-2 Pipe Sleeve DN200 (Carbon Steel) M 187,900.00 6.96 1,307,784.00 . -
PPX-4-3 Pipe Sleeve DN250 (Carbon Steel) M 234,800.00 29.88 7,015,824.00 . -
PPX-5A Plastic Pipe DN.100 (PVC) for duct bank M 117,900.00 63.37 7,471,323.00 . -
PPX-5B Plastic Pipe DN.150 (PVC) for duct bank M 235,700.00 111.36 26,247,552.00 . -
PPX-6A Plastic Pipe (Inside Dia.50 mm), embedded M 58,000.00 315.28 18,286,240.00 . -
PPX-6F Plastic Pipe (Inside Dia.300 mm), embedded M 844,100.00 23.00 19,414,300.00 . -
PPX-8A Vent Pipe for Manhole Set 747,100.00 23.00 17,183,300.00 . 15.00
PPX-9A Carbon Steel Pipe d=200 M 187,900.00 74.34 13,968,486.00 . -
JTA ADDITIONAL JOINT WORK . -
JTA-5 Joint Works for RCP EA 68,100.00 415.00 28,261,500.00 .
LNA ADDITIONAL COATING & LINING WORK .
LNA-8 Polyethilene sheet M2 10,100.00 643.12 6,495,512.00 .
TLA ADDITIONAL CERAMIC TILE WORK .
TLA-2 Protective Tile M2 93,400.00 267.44 24,978,896.00 .
WVO 1 WORK VARIATION ORDER NO. 1
PPA-1C Concrete Pipe d=300 M 304,800.00 20.00 6,096,000.00 10.00
PP-1G Concrete Pipe d=700 M 1,406,600.00 100.00 140,660,000.00 100.00
WVO 2 WORK VARIATION ORDER NO. 2
COA-6A Concrete for Super-STR. (K-350) IKPT-SSP-L-0064 M3 890,550.00 272.05 242,274,106.30 272.05
AN-2A Anchor Bolt W/ Template Setting IKPT-SSP-L-0085 Ton 12,750,000.00 5.33 67,930,082.40
FM-1B Curved Form for Sub-STR. IKPT-SSP-L-0064 M2 263,500.00 36.29 9,561,201.62
EA-1C Excavation for Sewer by Hand IKPT-SSP-L-0085 M3 125,000.00 1,463.15 182,893,193.65
EAW-4 Backfilling and Compaction by Hand IKPT-SSP-L-0064 M3 58,950.00 621.73 36,651,051.45
COA-6C Concrete for Road/Paving (K-350) IKPT-SSP-L-0085 M3 802,500.00 253.62 203,533,350.28
JT-5A Isolation Joint IKPT-SSP-L-0095 M 112,250.00 5,431.73 609,711,749.83
REA-1 Warning Mesh IKPT-SSP-L-0095 M2 8,700.00 333.60 2,902,290.56
JTA-6 Sikaswell for joining RCP and Manhole IKPT-SSP-L-0095 Joint 700,000.00 20.00 14,000,000.00
.
.
.
.
SYNTHETIC RUBBER INDONESIA - U3 PROJECT .
.
IKPT WORK NO. : 14122 .
.
WORK TITLE : CIVIL WORKS - PACKAGE 2 .
.
CONTRACTOR : PT. SATYAMITRA SURYA PERKASA .
SUMMARY .
.
Unit Rate Current Contract .
BoQ
BoQ Item Description CVL2 Quantity
Item Code CVL2 Price (IDR.)
(IDR.) Previous

EA EARTH WORK .
EAW ADDITIONAL EARTH WORK .
BC BASE COURSE WORK .
RE RE-BAR WORK .
AN ANCHORING & EMBEDDING WORK .
JT JOINT WORK .
JTA ADDITIONAL JOINT WORK .
FM FORM WORK .
CO CONCRETE WORK .
COA ADDITIONAL CONCRETE WORK .
AS ASPHALT WORK .
PP UNDERGROUND PIPE WORK .
PC PRE-CAST CONCRETE UNIT WORK .
MA MASONRY WORK .
PL PLASTER WORK .
LN COATING & LINING WORK .
WP WATERPROOFING WORK .
ML METAL & PLASTIC WORK .
MLA ADDITIONAL METAL & PLASTIC WORK .
PPX ADDITIONAL UNDERGROUND PIPE WORK .
ANA ADDITIONAL ANCHORING & EMBEDDING WORK .
OT OTHER ITEMS .
WVO 1 WORK VARIATION ORDER NO. 1 .
WVO 2 WORK VARIATION ORDER NO. 2 .
WVO WORK VARIATION ORDER (TIC-PPC-G-130) .
PR PROVISIONAL RATE (Subject for Adjustment) .
.
TOTAL DIRECT COST 55551927639 .
WVO No. 1 146756000 .
SUB-TOTAL OF DIRECT COST 55698683639 . 78%
WVO No. 2 1369457026.10324 .
.
TOTAL INDIRECT COST 16108072361 . 22%
.
TOTAL COST (Direct + Indirect Cost) 71660000000 . 100%
MONTHLY WORKS VALUATION SHEET

CONTRACT NO. : AY3102

MONTH :October 2017

(Page of _ )

Value of Work Done


Quantity Value (IDR.)
This Month Cumulative Previous This Month Cumulative

-
(1,396.10) 16,727.93 918,888,232.05 (70,782,121.69) 848,106,110.36
(0.25) 307.23 21,892,290.31 (17,613.10) 21,874,677.21
(592.05) 10,901.82 654,001,393.15 (33,687,851.40) 620,313,541.75
1,498.69 5,861.39 274,849,685.53 94,417,621.07 369,267,306.60
1,105.80 357,505,821.36 - 357,505,821.36
- 238.04 76,959,455.03 - 76,959,455.03
- - - - -
- 311.90 104,859,149.43 - 104,859,149.43
5.46 1,559.49 522,464,295.97 1,835,065.33 524,299,361.30
56.13 140.33 28,931,051.28 19,287,367.52 48,218,418.80
- - - - -
2.95 577.49 5,619,272,022.59 28,805,883.29 5,648,077,905.88
- - - - -
- 234.41 2,369,165,199.04 - 2,369,165,199.04
- - - - -
0.49 49.36 508,486,924.24 5,136,231.56 513,623,155.79
- - - - -
10.00 572.00 27,425,600.00 488,000.00 27,913,600.00
0.48 7.30 83,930,343.27 5,912,073.72 89,842,416.99
0.26 25.13 716,185,299.93 7,476,495.62 723,661,795.54
- 16.00 1,092,800.00 - 1,092,800.00
- 112.00 21,190,400.00 - 21,190,400.00
- - - - -
- - - - -
56.85 56.85 - 15,997,590.00 15,997,590.00
5.63 563.30 135,122,814.05 1,364,876.91 136,487,690.96
63.01 290.64 45,412,185.00 12,570,495.00 57,982,680.00
- - - - -
(317.34) 11,724.85 1,871,355,718.26 (49,314,505.20) 1,822,041,213.06
- 3,989.74 1,105,557,990.47 - 1,105,557,990.47
- 316.28 94,914,637.31 - 94,914,637.31
-
6.94 444.85 318,888,463.13 5,051,381.04 323,939,844.17
14.58 4,825.42 3,546,069,924.00 10,745,739.12 3,556,815,663.12
- 727.78 564,975,636.61 - 564,975,636.61
- - - -
(237.66) 1,343.05 1,189,483,364.14 (178,837,161.18) 1,010,646,202.96
- - - - -
- 4.98 18,818,784.02 - 18,818,784.02
- - - - -
- - - - -
- - - - -
- 31.25 14,900,000.00 - 14,900,000.00
- - - - -
- 242.61 242,270,346.00 - 242,270,346.00
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
3.21 320.52 50,040,350.30 505,458.08 50,545,808.39
- - - - -
134.17 13,416.82 231,118,141.32 2,334,526.68 233,452,668.00
- - - - -
- - - - -
- 723.84 217,151,737.98 - 217,151,737.98
284.56 706.42 469,324,069.70 316,569,887.98 785,893,957.68
- - - - -
- - - - -
59.57 605.85 86,749,731.69 9,459,677.48 96,209,409.17
- - - - -
- - - - -
- - - - -
- - - - -
3,749.30 3,749.30 - 68,987,120.00 68,987,120.00
- - - - -
- 0.11 3,144,338.53 - 3,144,338.53
(0.00) 0.26 16,056,442.28 (175,586.85) 15,880,855.43
- - - - -
34.00 34.00 - 40,800,000.00 40,800,000.00
- - - - -
35.80 35.80 - 136,873,489.01 136,873,489.01
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
3.00 3.00 - 740,700.00 740,700.00
- - - - -
8.00 8.00 - 2,633,600.00 2,633,600.00
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- 56.27 8,823,779.94 - 8,823,779.94
- 176.67 35,705,007.00 - 35,705,007.00
- 159.29 39,408,346.00 - 39,408,346.00
- 73.11 21,399,297.00 - 21,399,297.00
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- 15.00 11,206,500.00 - 11,206,500.00
- - - - -
- - - - -
154.00 154.00 - 10,487,400.00 10,487,400.00
- - - - -
- - - - -
- - - - -
- - - - -
- -
- 10.00 3,048,000.00 - 3,048,000.00
- 100.00 140,660,000.00 - 140,660,000.00
- -
- 272.05 242,274,106.30 - 242,274,106.30
5.33 5.33 - 67,930,082.40 67,930,082.40
36.29 36.29 - 9,561,201.62 9,561,201.62
1,463.15 1,463.15 182,893,193.65 182,893,193.65
621.73 621.73 36,651,051.45 36,651,051.45
253.62 253.62 203,533,350.28 203,533,350.28
5,351.46 5,351.46 600,701,224.01 600,701,224.01
333.60 333.60 2,902,290.56 2,902,290.56
20.00 20.00 14,000,000.00 14,000,000.00
-
- - - -
MONTHLY WORKS VALUATION SHEET

CONTRACT NO. : AY3102

MONTH :October 2017

(Page of _ )

Value of Work Done


Quantity Value (IDR.)
This Month Cumulative Previous This Month Cumulative

2,304,096,877.43 (10,069,965.11) 2,294,026,912.32


- 68,987,120.00 68,987,120.00
656,254,496.68 21,122,432.85 677,376,929.53
8,496,924,145.87 33,942,114.84 8,530,866,260.71
849,824,443.20 13,876,569.34 863,701,012.53
180,534,999.05 29,932,961.91 210,467,960.96
- 10,487,400.00 10,487,400.00
3,071,828,346.04 (49,314,505.20) 3,022,513,840.84
5,619,417,387.88 (163,040,041.03) 5,456,377,346.86
- 136,873,489.01 136,873,489.01
18,818,784.02 - 18,818,784.02
257,170,346.00 - 257,170,346.00
50,040,350.30 505,458.08 50,545,808.39
- - -
231,118,141.32 2,334,526.68 233,452,668.00
686,475,807.68 316,569,887.98 1,003,045,695.66
- - -
86,749,731.69 9,459,677.48 96,209,409.17
- 40,800,000.00 40,800,000.00
116,542,929.94 3,374,300.00 119,917,229.94
19,200,780.81 (175,586.85) 19,025,193.96
10,964,100.00 - -
143,708,000.00 - 143,708,000.00
242,274,106.30 1,118,172,393.98 1,360,446,500.29
- - -
- - -

22655961667.9175 465665839.989173 23110663407.9067


143708000 0 143708000
22799669667.9175 465665839.989173 23254371407.9067
242274106.304056 1118172393.98394 1360446500.288

6611088839.33452 131847243.501884 6742936082.83641

29410758507.252 597513083.491 29997307490.743


SYNTHETIC RUBBER INDONESIA - U3 PROJECT

IKPT WORK NO. : 14122

WORK TITLE : CIVIL WORKS - PACKAGE 2

CONTRACTOR : PT. SATYAMITRA SURYA PERKASA

CIVIL 2
BoQ Previous
BoQ Item Description Unit
Item Code P2 P3

EA EARTH WORK
EA-1A Excavation by Equipment (D≦3.0M) M3 9,136.71 8,995.07
EA-1B Excavation by Equipment (D>3.0M) M3 293.15 14.33
EA-1D Scraping (D≦300MM) M2 0.00 0.00
EA-2A Backfilling (Excavated Soil) M3 6,095.45 5,398.42
EA-2B Backfilling (Purchased Soil) M3 0.00 0.00
EA-3A Disposal of Soil (Inside of Factory) M3 0.00 0.00
EA-3B Disposal of Soil (Outside of Factory) M3 2,380.78 1,981.92
EA-4A Sand Filling for Trench/Cable/Pit M3 0.00 0.00
EA-4B Sand Filling for U/G Pipe M3 493.74 612.06
EA-4C Sand Filling for Tank FDN M3 0.00 238.04
BC BASE COURSE WORK 0.00 0.00
BC-1A Base Course for Sub-STR. M3 311.90 0.00
BC-2A Base Course for Slab-on-Grade M3 0.00 0.00
BC-3A Base Course for Concrete Road/Paving M3 762.92 791.11
BC-3B Base Course for Asphalt Road/Paving M3 0.00 0.00
BC-4A Sub-Grade for Concrete Road/Paving M3 0.00 0.00
BC-4B Sub-Grade for Asphalt Road/Paving M3 0.00 0.00
BC-5A Crushed Stone Paving M3 64.70 19.50
RE RE-BAR WORK 0.00 0.00
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 303.15 271.40
RE-1B Re-Bar for Sub-STR. (Round) Ton 0.00 0.00
RE-2A Re-Bar for Super-STR. (Deformed) Ton 103.36 131.05
RE-2B Re-Bar for Super-STR. (Round) Ton 0.00 0.00
RE-3A Welded Wire Fabric Ton 23.93 24.93
AN ANCHORING & EMBEDDING WORK 0.00 0.00
AN-1A Anchor Box Nos 306.00 256.00
AN-2B Anchor Bolt W/O Template Setting Ton 1.84 4.98
AN-2C Anchor Bolt Supply & Setting Ton 0.00 0.00
AN-3A Embedded Steel Setting Ton 0.00 0.00
AN-3B-1 Embedded Steel Supply & Setting(Carbon Steel) Ton 18.31 6.55
AN-3B-2 Embedded Steel Supply & Setting(Stainless Steel) Ton 0.00 0.00
AN-4A Expansion Anchor (Hole-in Anchor) Nos 8.00 8.00
AN-4B Chemical Anchor Nos 16.00 96.00
AN-5A Plastic Pipe M 0.00 0.00
JT JOINT WORK 0.00 0.00
JT-1A Expansion Joint for BLDG M 0.00 0.00
JT-2A Expansion Joint for Dike/Pit M 0.00 0.00
JT-3A Expansion Joint for Road/Paving M 268.40 289.27

Summary QTY CVL2 19 454095803.xlsx


JT-4A Water Stop Plate M 126.41 101.22
FM FORM WORK 0.00 0.00
FM-1A Form for Sub-STR. M2 6,095.01 5,947.17
FM-2A Form for Super-STR. M2 2,199.53 1,790.22
FM-2B Curved Form for Super-STR. M2 0.00 316.28
CO CONCRETE WORK 0.00 0.00
CO-1A Leveling Concrete M3 200.33 237.58
CO-1B Lean Concrete M3 0.00 0.00
CO-2A Concrete for Sub-STR. M3 2,332.11 2,478.72
CO-3A Concrete for Super-STR. M3 428.03 299.75
CO-4A Concrete for Slab-on-Grade M3 0.00 0.00
CO-5A Concrete for Road/Paving M3 772.81 807.90
AS ASPHALT WORK 0.00 0.00
AS-2A Asphalt Concrete/Sand for Tank FDN M3 0.00 4.98
FP FIRE PROOFING WORK 0.00 0.00
FP-5A Fireproof Concrete Ton 0.00 0.00
PP UNDERGROUND PIPE WORK 0.00 0.00
PP-1D Concrete Pipe d=400 M 31.25 0.00
PP-1E Concrete Pipe d=500 M 0.00 0.00
PP-1F Concrete Pipe d=600 M 131.15 111.46
PP-1H Concrete Pipe d=800 M 0.00 0.00
PP-1J Concrete Pipe d=1000 M 0.00 0.00
PP-1L Concrete Pipe d=1200 M 0.00 0.00
PP-2B-1 Plastic Pipe d=150 M 0.00 0.00
PP-2B-2 Plastic Pipe d=200 M 0.00 0.00
PC PRE-CAST CONCRETE UNIT WORK 0.00 0.00
PC-1A Pre-Cast Curbstone M 126.77 190.54
PL PLASTER WORK 0.00 0.00
PL-1A Metal Trowel Finish for Floor M2 0.00 0.00
PL-1B Surface Finish for Road/Paving M2 6,390.10 6,892.55
PL-3A Mortar Filling for Equipment Bed M3 0.00 0.00
LN COATING & LINING WORK 0.00 0.00
LN-5D-1 Chemical Resistant Resin Coating (Epoxy) M2 292.66 431.18
LN-5D-2 Chemical Resistant Resin Coating (Vinylester) M2 0.00 0.00
LN-5E-1 Chemical Resistant Resin Lining (Epoxy) M2 177.11 244.76
LN-5E-2 Chemical Resistant Resin Lining (Vinylester) M2 0.00 0.00
ML METAL & PLASTIC WORK 0.00 0.00
ML-1A Floor Drain Nos 0.00 0.00
ML-1B Roof Drain Nos 0.00 0.00
ML-5B Grating Cover M2 348.52 197.77
ML-5C Checkered Plate Cover M2 0.00 0.00
GR GREEN WORK 0.00 0.00
GR-1A Turfing M2 0.00 0.00
EAW ADDITIONAL EARTH WORK 0.00 0.00
EAW-1 Earth Mound for Backfilling of Dry Butadiene Vessel M3 0.00 0.00
EAW-2 Earth Mound for Sand Filling of Dry Butadiene Vessel M3 0.00 0.00
EAW-3 Final Grading for Bare Area M2 0.00 0.00
ANA ADDITIONAL ANCHORING & EMBEDDING WORK 0.00 0.00
ANA-1 Climbing Rung (Galvanized) Ton 0.04 0.07
ANA-2 Climbing Rung (Chemical Resistant) Ton 0.12 0.14
MLA ADDITIONAL METAL & PLASTIC WORK 0.00 0.00
MLA-1 Guard Post Ea 18.00 16.00
COA ADDITIONAL CONCRETE WORK 0.00 0.00
COA-5A Concrete Cover 150 thk. M3 23.32 6.06
COA-5B Concrete Cover 300 thk. M3 0.00 0.00
BCA ADDITIONAL BASE COURSE WORK 0.00 0.00
Summary QTY CVL2Compacted Gravel
BCA-1 20 M3 0.00454095803.xlsx
0.00
PPX ADDITIONAL UNDERGROUND PIPE WORK 0.00 0.00
MONTHLY WORKS VALUATION SHEET

CONTRACT NO. : AY3102

MONTH :October 2017

(Page of )

Quantity of Work Done


Previous This Month Cumulative
Total P2 P3 Total P2 P3 Total

18,131.78 -852.29 -551.56 -1,403.85 8,284.42 8,443.51 16,727.93


307.48 0.00 -0.25 -0.25 293.15 14.08 307.23
0.00 0.00 0.00 0.00 0.00 0.00 0.00
11,493.87 -351.82 -240.23 -592.05 5,743.63 5,158.19 10,901.82
0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00
4,362.69 646.23 852.47 1,498.69 3,027.00 2,834.38 5,861.39
0.00 0.00 0.00 0.00 0.00 0.00 0.00
1,105.80 0.00 0.00 0.00 493.74 612.06 1,105.80
238.04 0.00 0.00 0.00 0.00 238.04 238.04
0.00 0.00 0.00 0.00 0.00 0.00 0.00
311.90 0.00 0.00 0.00 311.90 0.00 311.90
0.00 0.00 0.00 0.00 0.00 0.00 0.00
1,554.03 2.50 2.96 5.46 765.42 794.07 1,559.49
0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00
84.20 43.13 13.00 56.13 107.83 32.50 140.33
0.00 0.00 0.00 0.00 0.00 0.00 0.00
574.54 1.90 1.04 2.95 305.05 272.44 577.49
0.00 0.00 0.00 0.00 0.00 0.00 0.00
234.41 0.00 0.00 0.00 103.36 131.05 234.41
0.00 0.00 0.00 0.00 0.00 0.00 0.00
48.87 0.24 0.25 0.49 24.17 25.19 49.36
0.00 0.00 0.00 0.00 0.00
562.00 10.00 0.00 10.00 316.00 256.00 572.00
6.82 2.84 -2.36 0.48 4.68 2.62 7.30
0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00
24.87 0.20 0.06 0.26 18.51 6.62 25.13
0.00 0.00 0.00 0.00 0.00 0.00 0.00
16.00 0.00 0.00 0.00 8.00 8.00 16.00
112.00 0.00 0.00 0.00 16.00 96.00 112.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 56.85 0.00 56.85 56.85 0.00 56.85
557.67 2.71 2.92 5.63 271.11 292.19 563.30

Summary QTY CVL2 21 454095803.xlsx


227.63 21.00 42.01 63.01 147.41 143.23 290.64
0.00 0.00 0.00 0.00 0.00 0.00 0.00
12,042.19 -34.68 -282.66 -317.34 6,060.34 5,664.51 11,724.85
3,989.74 0.00 0.00 0.00 2,199.53 1,790.22 3,989.74
316.28 0.00 0.00 0.00 0.00 316.28 316.28
0.00 0.00 0.00 0.00 0.00 0.00 0.00
437.91 4.79 2.14 6.94 205.13 239.72 444.85
0.00 0.00 0.00 0.00 0.00 0.00 0.00
4,810.84 17.42 -2.84 14.58 2,349.54 2,475.88 4,825.42
727.78 0.00 0.00 0.00 428.03 299.75 727.78
0.00 0.00 0.00 0.00 0.00 0.00
1,580.71 -149.44 -88.22 -237.66 623.36 719.69 1,343.05
0.00 0.00 0.00 0.00 0.00 0.00 0.00
4.98 0.00 0.00 0.00 0.00 4.98 4.98
0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00
31.25 0.00 0.00 0.00 31.25 0.00 31.25
0.00 0.00 0.00 0.00 0.00 0.00 0.00
242.61 0.00 0.00 0.00 131.15 111.46 242.61
0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00
317.31 1.28 1.92 3.21 128.05 192.47 320.52
0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00
13,282.65 64.55 69.62 134.17 6,454.65 6,962.17 13,416.82
0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00
723.84 0.00 0.00 0.00 292.66 431.18 723.84
0.00 0.00 0.00 0.00 0.00 0.00 0.00
421.86 283.88 0.68 284.56 460.98 245.44 706.42
0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00
546.28 6.16 53.41 59.57 354.68 251.17 605.85
0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 3,749.30 3,749.30 0.00 3,749.30 3,749.30
0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.11 0.00 0.00 0.00 0.04 0.07 0.11
0.26 0.00 0.00 0.00 0.12 0.13 0.26
0.00 0.00 0.00 0.00 0.00 0.00 0.00
34.00 0.00 0.00 0.00 18.00 16.00 34.00
0.00 0.00
29.39 6.41 0.00 6.41 29.74 6.06 35.80
0.00 0.00 0.00
0.00 0.00 0.00
Summary QTY CVL2 0.00 22 0.00 0.00 454095803.xlsx
0.00 0.00 0.00
SYNTHETIC RUBBER INDONESIA - U3 PROJECT

IKPT WORK NO. : 14122

WORK TITLE : CIVIL WORKS - PACKAGE 2

CONTRACTOR : PT. SATYAMITRA SURYA PERKAS

CIVIL 2
BOQ Item BoQ Qty per
Description Report Ref. No. Unit
Code Drawing
P2
1 Pipe Rack Structure 02-1
EA EARTH WORK
EA-1A Excavation by Equipment (D≦3.0M) M³ 681.61
EA-2A Backfilling (Excavated Soil) M³ 491.72
EA-3B Disposal of Soil (Outside of Factory) M³ 189.89

RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 20.92

FM FORM WORK SSP-CVL2-FDN-PR02-1


FM-1A Form for Sub-STR. M² 345.24

CO CONCRETE WORK
CO-1A Leveling Concrete M³ 14.56
CO-2A Concrete for Sub-STR. M³ 164.01

AN ANCHORING & EMBEDDING WORK


AN-3B-1 Embedded Steel Supply & Setting(Carbon Ton 0.02
JT-5A Isolation Joint M 61.60

2 Pipe Rack Structure 02-2.1


EA EARTH WORK
EA-1A Excavation by Equipment (D≦3.0M) M³ 147.97
EA-2A Backfilling (Excavated Soil) M³ 96.54
EA-3B Disposal of Soil (Outside of Factory) M³ 51.42

RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 6.04
SSP-CVL2-FDN-PR02-2.1
FM FORM WORK
FM-1A Form for Sub-STR. M² 115.36

CO CONCRETE WORK
CO-1A Leveling Concrete M³ 3.60
SSP-CVL2-FDN-PR02-2.1

BOQ Item BoQ Qty per


Description Report Ref. No. Unit
Code Drawing
CO-2A Concrete for Sub-STR. M³ 43.71
JT-5A Isolation Joint M 22.40

3 POLYMERIZATION SEPARATION PIT (M6486.19)


EA EARTH WORK
EA-1A Excavation by Equipment (D≦3.0M) M³ 39.12
EA-2A Backfilling (Excavated Soil) M³ 12.50
EA-3B Disposal of Soil (Outside of Factory) M³ 26.62

RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.47
RE-2A Re-Bar for Super-STR. (Deformed) Ton 2.79

FM FORM WORK
FM-1A Form for Sub-STR. M² 70.16
FM-2A Form for Super-STR. M² 11.48
SSP-CVL2-PIT-M6486-19
CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.52
CO-2A Concrete for Sub-STR. M³ 3.60
CO-3A Concrete for Super-STR. M³ 12.13

JT JOINT WORK
JT-4A Water Stop Plate M 11.60

AN ANCHORING & EMBEDDING WORK


AN-3B-1 Embedded Steel Supply & Setting(Carbon Ton 0.07
ANA-1 Climbing Rung (Galvanized) Ton 0.04
LN-5E-1 Chemical Resistant Resin Lining (Epoxy) M² 40.87

4 POLYMERIZATION DRAIN DRUM (V6482.01)


EA EARTH WORK
EA-1A Excavation by Equipment (D≦3.0M) M³ 125.19
EA-1B Excavation by Equipment (D>3.0M) 44.46
EA-2A Backfilling (Excavated Soil) M³ 90.31
EA-3B Disposal of Soil (Outside of Factory) M³ 79.34

RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 1.71
RE-2A Re-Bar for Super-STR. (Deformed) Ton 5.68

FM FORM WORK
FM-1A Form for Sub-STR. M² 15.82
FM-2A Form for Super-STR. SSP-CVL2-PIT-V6482.01 M² 127.70

CO CONCRETE WORK
CO-1A Leveling Concrete M³ 1.07
CO-2A Concrete for Sub-STR. M³ 10.98
SSP-CVL2-PIT-V6482.01

BOQ Item BoQ Qty per


Description Report Ref. No. Unit
Code Drawing
CO-3A Concrete for Super-STR. M³ 24.95

JT JOINT WORK
JT-4A Water Stop Plate m 16.70

AN ANCHORING & EMBEDDING WORK


AN-1A Anchor Box Nos 4.00
AN-3B-1 Embedded Steel Supply & Setting(Carbon Ton 0.12

5 ACID DRAIN DRUM (V6484.01)


EA EARTH WORK
EA-1A Excavation by Equipment (D≦3.0M) M³ 155.70
EA-1B Excavation by Equipment (D>3.0M) M³ 84.51
EA-2A Backfilling (Excavated Soil) M³ 116.82
EA-3B Disposal of Soil (Outside of Factory) M³ 123.39

RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 2.20
RE-2A Re-Bar for Super-STR. (Deformed) Ton 6.97

FM FORM WORK
FM-1A Form for Sub-STR. M² 17.95
FM-2A Form for Super-STR. M² 165.04
SSP-CVL2-PIT-V6484.01
CO CONCRETE WORK
CO-1A Leveling Concrete M³ 1.44
CO-2A Concrete for Sub-STR. M³ 13.44
CO-3A Concrete for Super-STR. M³ 35.18

JT JOINT WORK
JT-4A Water Stop Plate M 19.60
JT-5A Isolation Joint M 53.20

AN ANCHORING & EMBEDDING WORK


AN-1A Anchor Box Nos 4.00
AN-3B-1 Embedded Steel Supply & Setting(Carbon Ton 0.09
ANA-1 Climbing Rung (Galvanized) Ton
BOQ Item BoQ Qty per
Description Report Ref. No. Unit
Code Drawing

6 CONCENTRATION DRAIN DRUM (V6483.01)


EA EARTH WORK
EA-1A Excavation by Equipment (D≦3.0M) M³ 205.73
EA-1B Excavation by Equipment (D>3.0M) M³ 138.33
EA-2A Backfilling (Excavated Soil) M³ 150.70
EA-3B Disposal of Soil (Outside of Factory) M³ 193.36

RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 4.35
RE-2A Re-Bar for Super-STR. (Deformed) Ton 6.53

FM FORM WORK
FM-1A Form for Sub-STR. M² 22.54
FM-2A Form for Super-STR. M² 216.34
SSP-CVL2-PIT-V6483.01
CO CONCRETE WORK
CO-1A Leveling Concrete M³ 2.06
CO-2A Concrete for Sub-STR. M³ 23.78
CO-3A Concrete for Super-STR. M³ 56.00

JT JOINT WORK
JT-4A Water Stop Plate M 20.10
JT-5A Isolation Joint M

AN ANCHORING & EMBEDDING WORK


AN-1A Anchor Box 4.00

7 DELTASTOP / EPISTOP DRAIN DRUM (V6485.01)


EA EARTH WORK
EA-1A Excavation by Equipment (D≦3.0M) M³ 118.99
EA-1B Excavation by Equipment (D>3.0M) M³ 18.24
EA-2A Backfilling (Excavated Soil) M³ 74.37
EA-3B Disposal of Soil (Outside of Factory) M³ 62.86

RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 1.53
RE-2A Re-Bar for Super-STR. (Deformed) Ton 4.56

FM FORM WORK
FM-1A Form for Sub-STR. M² 15.17
FM-2A Form for Super-STR. SSP-CVL2-PIT-V6485.01 M² 93.85

CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.99
CO-2A Concrete for Sub-STR. M³ 9.73
CO-3A Concrete for Super-STR. M³ 25.21

JT JOINT WORK
BOQ Item BoQ Qty per
Description Report Ref. No. Unit
Code Drawing
JT-4A Water Stop Plate M 16.01

AN ANCHORING & EMBEDDING WORK


AN-1A Anchor Box NOS 4.00

8 STR P2-1 1340 POLYMERIZATION STRUCTURE FOUNDATION


EA EARTH WORK
EA-1A Excavation by Equipment (D≦3.0M) M³ 158.80
EA-1B Excavation by Equipment (D>3.0M) M³ -
EA-2A Backfilling (Excavated Soil) M³ 402.50
EA-3B Disposal of Soil (Outside of Factory) M³ 141.13

CO CONCRETE WORK
CO-1A Leveling Concrete M³ 13.32
CO-2A Concrete for Sub-STR. M³ 120.61
CO-3A Concrete for Super-STR. M³ 123.88

FM FORM WORK
FM-1A Form for Sub-STR. SSP-CVL2-1340-STR P2-1 M² 125.66
FM-2A Form for Super-STR. M² 654.99

RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 27.57
RE-2A Re-Bar for Super-STR. (Deformed) Ton 43.39

BC BASE COURSE WORK


BC-1A Base Course for Sub-STR. M³ 57.11

AN ANCHORING & EMBEDDING WORK


AN-2B Anchor Bolt W/O Template Setting Ton 2.76
AN-3B-1 Embedded Steel Supply & Setting(Carbon Ton 8.89
JT-5A Isolation Joint 40.80

9 FOUNDATION V.6315.01 1340 POLYMERIZATION


CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.29
CO-2A Concrete for Sub-STR. M³ 3.29
CO-3A Concrete for Super-STR. M³

FM FORM WORK
SSP-CVL2-FDN-1340 - V.6315.01
FM-1A Form for Sub-STR. M² 15.54
FM-2A Form for Super-STR. M² -

RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.28
RE-2A Re-Bar for Super-STR. (Deformed) Ton -

AN ANCHORING & EMBEDDING WORK


AN-2B Anchor Bolt W/O Template Setting Ton 0.03
JT-5A Isolation Joint M 7.20
BOQ Item BoQ Qty per
Description Report Ref. No. Unit
Code Drawing

10 FOUNDATION V.6315.02 1340 POLYMERIZATION


CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.24
CO-2A Concrete for Sub-STR. M³ 2.67
CO-3A Concrete for Super-STR. M³ -

FM FORM WORK
SSP-CVL2-FDN-1340 - V.6315.02
FM-1A Form for Sub-STR. M² 13.89
FM-2A Form for Super-STR. M² -

RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.25
RE-2A Re-Bar for Super-STR. (Deformed) Ton -

AN ANCHORING & EMBEDDING WORK


AN-2B Anchor Bolt W/O Template Setting Ton 0.03
JT-5A Isolation Joint M 6.40

11 STR P2-2 1350 CONCENTRATION STRUCTURE FOUNDATION


EA EARTH WORK
EA-1A Excavation by Equipment (D≦3.0M) M³ 1,504.35
EA-1B Excavation by Equipment (D>3.0M) M³ -
EA-2A Backfilling (Excavated Soil) M³ 964.66
EA-3B Disposal of Soil (Outside of Factory) M³ 539.69

CO CONCRETE WORK
CO-1A Leveling Concrete M³ 28.56
CO-2A Concrete for Sub-STR. M³ 519.06
CO-3A Concrete for Super-STR. M³ 2.34

FM FORM WORK
FM-1A Form for Sub-STR. SSP-CVL2-FDN-STR P2-2 M² 283.65
FM-2A Form for Super-STR. M² 15.62

RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 82.95
RE-2A Re-Bar for Super-STR. (Deformed) Ton 0.69

BC BASE COURSE WORK


BC-1A Base Course for Sub-STR. M³ 254.79

AN ANCHORING & EMBEDDING WORK


AN-2B Anchor Bolt W/O Template Setting Ton 0.45
JT-5A Isolation Joint M 85.60

12 STR P2-3 1350 CONCENTRATION 1ST STAGE PRE-HEATER FOUNDATION


EA EARTH WORK
EA-1A Excavation by Equipment (D≦3.0M) M³ 79.79
EA-1B Excavation by Equipment (D>3.0M) M³ -
BOQ Item BoQ Qty per
Description Report Ref. No. Unit
Code Drawing
EA-2A Backfilling (Excavated Soil) M³ 60.97
EA-3B Disposal of Soil (Outside of Factory) M³ 18.82

CO CONCRETE WORK
CO-1A Leveling Concrete M³ 2.05
CO-2A Concrete for Sub-STR. M³ 18.01
CO-3A Concrete for Super-STR. M³ -
-
SSP-CVL2-FDN-P2-3
FM FORM WORK -
FM-1A Form for Sub-STR. M² 43.25
FM-2A Form for Super-STR. M² -
-
RE RE-BAR WORK -
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 1.71
RE-2A Re-Bar for Super-STR. (Deformed) Ton -

AN ANCHORING & EMBEDDING WORK


AN-2B Anchor Bolt W/O Template Setting Ton 0.08
JT-5A Isolation Joint M 2.72

13 FOUNDATION E.1352.01 A/B/D/E 1ST CONCENTRATION STAGE PRE-HEATER


EA EARTH WORK
EA-1A Excavation by Equipment (D≦3.0M) M³ 92.26
EA-1B Excavation by Equipment (D>3.0M) M³ -
EA-2A Backfilling (Excavated Soil) M³ 65.60
EA-3B Disposal of Soil (Outside of Factory) M³ 26.66

CO CONCRETE WORK
CO-1A Leveling Concrete M³ 2.16
CO-2A Concrete for Sub-STR. M³ 21.62
CO-3A Concrete for Super-STR. M³ 6.44
-
SSP-CVL2-FDN-E.1352.01
FM FORM WORK -
FM-1A Form for Sub-STR. M² 37.84
FM-2A Form for Super-STR. M² 52.80
-
RE RE-BAR WORK -
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 2.80
RE-2A Re-Bar for Super-STR. (Deformed) Ton 0.38

AN ANCHORING & EMBEDDING WORK


AN-1A Anchor Box Nos 16.00
JT-5A Isolation Joint M 20.80

14 STR P2-4 1350 CONCENTRATION 2ND STAGE PRE-HEATER FOUNDATION


EA EARTH WORK
EA-1A Excavation by Equipment (D≦3.0M) M³ 42.97
EA-1B Excavation by Equipment (D>3.0M) M³ -
BOQ Item BoQ Qty per
Description Report Ref. No. Unit
Code Drawing
EA-2A Backfilling (Excavated Soil) M³ 32.25
EA-3B Disposal of Soil (Outside of Factory) M³ 10.72

CO CONCRETE WORK
CO-1A Leveling Concrete M³ 1.05
CO-2A Concrete for Sub-STR. M³ 10.94
CO-3A Concrete for Super-STR. M³
-
SSP-CVL2-FDN-STR P2-4
FM FORM WORK -
FM-1A Form for Sub-STR. M² 32.04
FM-2A Form for Super-STR. M²

RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 1.64
RE-2A Re-Bar for Super-STR. (Deformed) Ton -

AN ANCHORING & EMBEDDING WORK


AN-2B Anchor Bolt W/O Template Setting Ton 0.05
JT-5A Isolation Joint M 12.00

15 FOUNDATION E.1352.02 A/B/C 2ND CONCENTRATION STAGE PRE-HEATER


EA EARTH WORK
EA-1A Excavation by Equipment (D≦3.0M) M³ 81.17
EA-1B Excavation by Equipment (D>3.0M) M³ -
EA-2A Backfilling (Excavated Soil) M³ 61.96
EA-3B Disposal of Soil (Outside of Factory) M³ 19.21

CO CONCRETE WORK
CO-1A Leveling Concrete M³ 1.59
CO-2A Concrete for Sub-STR. M³ 16.28
CO-3A Concrete for Super-STR. M³ 4.29
-
SSP-CVL2-FDN-E.1352.02
FM FORM WORK -
FM-1A Form for Sub-STR. M² 27.72
FM-2A Form for Super-STR. M² 39.66
-
RE RE-BAR WORK -
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 2.01
RE-2A Re-Bar for Super-STR. (Deformed) Ton 0.80

AN ANCHORING & EMBEDDING WORK


AN-1A Anchor Box Nos 12.00
JT-5A Isolation Joint M 15.00

16 STR P2-11 1350 CONCENTRATION PIPE SUPPORT STRUCTURE FOUNDATION


EA EARTH WORK
EA-1A Excavation by Equipment (D≦3.0M) M³ 55.55
EA-1B Excavation by Equipment (D>3.0M) M³ -
BOQ Item BoQ Qty per
Description Report Ref. No. Unit
Code Drawing
EA-2A Backfilling (Excavated Soil) M³ 41.84
EA-3B Disposal of Soil (Outside of Factory) M³ 13.72

CO CONCRETE WORK
CO-1A Leveling Concrete M³ 1.46
CO-2A Concrete for Sub-STR. M³ 13.22
CO-3A Concrete for Super-STR. M³
SSP-CVL2-FDN-STR P2-11
FM FORM WORK
FM-1A Form for Sub-STR. M² 29.53
FM-2A Form for Super-STR. M²

RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 1.25
RE-2A Re-Bar for Super-STR. (Deformed) Ton

AN ANCHORING & EMBEDDING WORK


AN-2B Anchor Bolt W/O Template Setting Ton 0.03
JT-5A Isolation Joint M 10.40

17 STR P2-5 2340 POLYMERIZATION STRUCTURE FOUNDATION


EA EARTH WORK
EA-1A Excavation by Equipment (D≦3.0M) M³ 222.68
EA-1B Excavation by Equipment (D>3.0M) M³ -
EA-2A Backfilling (Excavated Soil) M³ 173.11
EA-3B Disposal of Soil (Outside of Factory) M³ 49.58

CO CONCRETE WORK
CO-1A Leveling Concrete M³ 4.58
CO-2A Concrete for Sub-STR. M³ 40.58
CO-3A Concrete for Super-STR. M³ 59.14

FM FORM WORK
SSP-CVL2-FDN-STR P2-5
FM-1A Form for Sub-STR. M² 61.82
FM-2A Form for Super-STR. M² 319.54

RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 4.52
RE-2A Re-Bar for Super-STR. (Deformed) Ton 20.28

AN ANCHORING & EMBEDDING WORK


AN-2B Anchor Bolt W/O Template Setting Ton 0.22

AN ANCHORING & EMBEDDING WORK


AN-3B-1 Embedded Steel Supply & Setting(Carbon Ton 2.95
JT-5A Isolation Joint M 24.66

18 SUB PIPE PRE EPSISTOP FOUNDATION


EA EARTH WORK
BOQ Item BoQ Qty per
Description Report Ref. No. Unit
Code Drawing
EA-1A Excavation by Equipment (D≦3.0M) M³ 95.33
EA-1B Excavation by Equipment (D>3.0M) M³ -
EA-2A Backfilling (Excavated Soil) M³ 66.47
EA-3B Disposal of Soil (Outside of Factory) M³ 28.86

CO CONCRETE WORK
CO-1A Leveling Concrete M³ 2.63
CO-2A Concrete for Sub-STR. M³ 27.42
CO-3A Concrete for Super-STR. M³ -
SSP-CVL2-SP P2
FM FORM WORK
FM-1A Form for Sub-STR. M² 46.42
FM-2A Form for Super-STR. M² -

RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 1.75
RE-2A Re-Bar for Super-STR. (Deformed) Ton -

AN ANCHORING & EMBEDDING WORK


AN-2B Anchor Bolt W/O Template Setting Ton 0.05
JT-5A Isolation Joint M 2.12

19 P2- CMH01 AREA COC MAIN HOLE TYPE 2 PLAN, SECTION- A/B/C
EA EARTH WORK
EA-1A Excavation by Equipment (D≦3.0M) M³ 37.83
EA-1B Excavation by Equipment (D>3.0M) M³ -
EA-2A Backfilling (Excavated Soil) M³ 32.77
EA-3B Disposal of Soil (Outside of Factory) M³ 5.06

CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.41
CO-2A Concrete for Sub-STR. M³ 5.06
CO-3A Concrete for Super-STR. M³

FM FORM WORK
FM-1A Form for Sub-STR. SSP-CVL2-CMH01-P2C0C M² 27.56
FM-2A Form for Super-STR. M²

RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.57
RE-2A Re-Bar for Super-STR. (Deformed) Ton

JT JOINT WORK
JT-4A Water Stop Plate m 7.00

AN ANCHORING & EMBEDDING WORK


ANA-2 Climbing Rung (Chemical Resistant) Ton 0.01
LN-5E-1 Chemical Resistant Resin Lining (Epoxy) M² 9.14
PPX-8A Vent Pipe for Manhole Set 1.00
BOQ Item BoQ Qty per
Description Report Ref. No. Unit
Code Drawing

20 P2- CMH02 AREA COC MAIN HOLE TYPE 2 PLAN, SECTION- A/B/C
EA EARTH WORK
EA-1A Excavation by Equipment (D≦3.0M) M³ 37.83
EA-1B Excavation by Equipment (D>3.0M) M³ -
EA-2A Backfilling (Excavated Soil) M³ 32.77
EA-3B Disposal of Soil (Outside of Factory) M³ 5.06

CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.41
CO-2A Concrete for Sub-STR. M³ 1.53
CO-3A Concrete for Super-STR. M³

FM FORM WORK
FM-1A Form for Sub-STR. SSP-CVL2-CMH02-P2C0C M² 22.26
FM-2A Form for Super-STR. M²

RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.47
RE-2A Re-Bar for Super-STR. (Deformed) Ton

JT JOINT WORK
JT-4A Water Stop Plate m 7.00

AN ANCHORING & EMBEDDING WORK


ANA-2 Climbing Rung (Chemical Resistant) Ton 0.01
LN-5E-1 Chemical Resistant Resin Lining (Epoxy) M² 10.46
PPX-8A Vent Pipe for Manhole Set 1.00

21 FOUNDATION V.6416.01 POLYMERIZATION BLOWDOWN DRUM


EA EARTH WORK
EA-1A Excavation by Equipment (D≦3.0M) M³ 81.18
EA-1B Excavation by Equipment (D>3.0M) M³
EA-2A Backfilling (Excavated Soil) M³ 59.03
EA-3B Disposal of Soil (Outside of Factory) M³ 22.15

CO CONCRETE WORK
CO-1A Leveling Concrete M³ 1.15
CO-2A Concrete for Sub-STR. M³ 21.00
CO-3A Concrete for Super-STR. M³ 13.77
SSP-CVL2-FDN-2340 - V.6416.01
FM FORM WORK
FM-1A Form for Sub-STR. M² 19.00
FM-2A Form for Super-STR. M² 66.32

RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 1.04
RE-2A Re-Bar for Super-STR. (Deformed) Ton 2.51
BOQ Item BoQ Qty per
Description Report Ref. No. Unit
Code Drawing
AN ANCHORING & EMBEDDING WORK
AN-1A Anchor Box nos 8.00
JT-5A Isolation Joint M 8.07

22 STR P2-13 2350 PIPE SUPPORT STRUCTURE FOUNDATION


EA EARTH WORK
EA-1A Excavation by Equipment (D≦3.0M) M³ 74.26
EA-1B Excavation by Equipment (D>3.0M) M³ -
EA-2A Backfilling (Excavated Soil) M³ 56.34
EA-3B Disposal of Soil (Outside of Factory) M³ 17.91

CO CONCRETE WORK
CO-1A Leveling Concrete M³ 1.56
CO-2A Concrete for Sub-STR. M³ 17.31
CO-3A Concrete for Super-STR. M³

FM FORM WORK
FM-1A Form for Sub-STR. M² 36.09
SSP-CVL2-FDN-STR P2-13
FM-2A Form for Super-STR. M² -

RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 1.76
RE-2A Re-Bar for Super-STR. (Deformed) Ton -

JT JOINT WORK
JT-4A Water Stop Plate M
JT-5A Isolation Joint M 3.20

AN ANCHORING & EMBEDDING WORK


AN-2B Anchor Bolt W/O Template Setting Ton 0.03

23 STR P2-6 2350 CONCENTRATION STRUCTURE FOUNDATION


EA EARTH WORK
EA-1A Excavation by Equipment (D≦3.0M) M³ 864.30
EA-1B Excavation by Equipment (D>3.0M) M³
EA-2A Backfilling (Excavated Soil) M³ 591.13
EA-3B Disposal of Soil (Outside of Factory) M³ 273.17

CO CONCRETE WORK
CO-1A Leveling Concrete M³ 22.04
CO-2A Concrete for Sub-STR. M³ 259.79
CO-3A Concrete for Super-STR. M³
SSP-CVL2-FDN-STR P2-6
FM FORM WORK
FM-1A Form for Sub-STR. M² 244.33
FM-2A Form for Super-STR. M²

RE RE-BAR WORK
SSP-CVL2-FDN-STR P2-6

BOQ Item BoQ Qty per


Description Report Ref. No. Unit
Code Drawing
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 53.89
RE-2A Re-Bar for Super-STR. (Deformed) Ton

AN ANCHORING & EMBEDDING WORK


AN-2B Anchor Bolt W/O Template Setting Ton 0.36
JT-5A Isolation Joint M 10.89

24 STR P2-7 2350 CONCENTRATION 1ST STAGE PRE HEATER FOUNDATION


EA EARTH WORK
EA-1A Excavation by Equipment (D≦3.0M) M³ 106.82
EA-1B Excavation by Equipment (D>3.0M) M³ -
EA-2A Backfilling (Excavated Soil) M³ 77.40
EA-3B Disposal of Soil (Outside of Factory) M³ 29.42

CO CONCRETE WORK
CO-1A Leveling Concrete M³ 2.61
CO-2A Concrete for Sub-STR. M³ 28.74
CO-3A Concrete for Super-STR. M³
SSP-CVL2-FDN-STR P2-7
FM FORM WORK
FM-1A Form for Sub-STR. M² 59.16
FM-2A Form for Super-STR. M²

RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 2.10
RE-2A Re-Bar for Super-STR. (Deformed) Ton

AN ANCHORING & EMBEDDING WORK


AN-2B Anchor Bolt W/O Template Setting Ton 0.08
JT-5A Isolation Joint M 3.63

25 FOUNDATION T.6304.01 ANTI-OXIDANT STORAGE TANK


EA EARTH WORK
EA-1A Excavation by Equipment (D≦3.0M) M³ 15.42
EA-1B Excavation by Equipment (D>3.0M) M³
EA-2A Backfilling (Excavated Soil) M³ 3.35
EA-3B Disposal of Soil (Outside of Factory) M³ 12.07

CO CONCRETE WORK
CO-1A Leveling Concrete M³ 1.30
CO-2A Concrete for Sub-STR. M³ 67.38
CO-3A Concrete for Super-STR. M³
SSP-CVL2-FDN-1340-T6304.01
FM FORM WORK
FM-1A Form for Sub-STR. M² 49.91
FM-2A Form for Super-STR. M²

RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.82
SSP-CVL2-FDN-1340-T6304.01

BOQ Item BoQ Qty per


Description Report Ref. No. Unit
Code Drawing
RE-2A Re-Bar for Super-STR. (Deformed) Ton

AN ANCHORING & EMBEDDING WORK


AN-2B Anchor Bolt W/O Template Setting Ton 0.04
JT-5A Isolation Joint M 17.89

26 FOUNDATION V.2353.01 RECYCLE SOLVENT DRUM


EA EARTH WORK
EA-1A Excavation by Equipment (D≦3.0M) M³ 20.46
EA-1B Excavation by Equipment (D>3.0M) M³ -
EA-2A Backfilling (Excavated Soil) M³ 13.68
EA-3B Disposal of Soil (Outside of Factory) M³ 6.78

CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.52
CO-2A Concrete for Sub-STR. M³ 4.56
CO-3A Concrete for Super-STR. M³ 4.20
SSP-CVL2-FDN-2350 - V2353.01
RSD
FM FORM WORK
FM-1A Form for Sub-STR. M² 6.20
FM-2A Form for Super-STR. M² 21.74

RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.30
RE-2A Re-Bar for Super-STR. (Deformed) Ton 0.34

AN ANCHORING & EMBEDDING WORK


AN-1A Anchor Box Nos 4.00
JT-5A Isolation Joint M 8.80

27 SHELTER FOR ACID FOUNDATION


EA EARTH WORK
EA-1A Excavation by Equipment (D≦3.0M) M³ 270.29
EA-1B Excavation by Equipment (D>3.0M) M³ -
EA-2A Backfilling (Excavated Soil) M³ 206.31
EA-3B Disposal of Soil (Outside of Factory) M³ 63.98

CO CONCRETE WORK
CO-1A Leveling Concrete M³ 5.48
CO-2A Concrete for Sub-STR. M³ 58.49
CO-3A Concrete for Super-STR. M³ 2.07
SSP-CVL2-FDN-1340-SHELTER
FM FORM WORK
FM-1A Form for Sub-STR. M² 118.72
FM-2A Form for Super-STR. M² 16.56

RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 5.83
RE-2A Re-Bar for Super-STR. (Deformed) Ton 0.35
BOQ Item BoQ Qty per
Description Report Ref. No. Unit
Code Drawing

AN ANCHORING & EMBEDDING WORK


AN-2B Anchor Bolt W/O Template Setting Ton 0.03
JT-5A Isolation Joint M 37.20

28 FOUNDATION V.1353.01 RECYCLE SOLVENT DRUM


EA EARTH WORK
EA-1A Excavation by Equipment (D≦3.0M) M³ 29.67
EA-1B Excavation by Equipment (D>3.0M) M³ -
EA-2A Backfilling (Excavated Soil) M³ 19.86
EA-3B Disposal of Soil (Outside of Factory) M³ 9.80

CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.78
CO-2A Concrete for Sub-STR. M³ 7.02
CO-3A Concrete for Super-STR. M³ 4.94
SSP-CVL2-FDN-2350 - V1353.01
RSD
FM FORM WORK
FM-1A Form for Sub-STR. M² 7.90
FM-2A Form for Super-STR. M² 24.70

RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.52
RE-2A Re-Bar for Super-STR. (Deformed) Ton 0.42

AN ANCHORING & EMBEDDING WORK


AN-1A Anchor Box Nos 8.00
JT-5A Isolation Joint M 10.00
BOQ Item BoQ Qty per
Description Report Ref. No. Unit
Code Drawing
29 P2- AMH01 AREA COC MAIN HOLE TYPE 2 PLAN, SECTION- A/B
EA EARTH WORK
EA-1A Excavation by Equipment (D≦3.0M) M³ 49.95
EA-1B Excavation by Equipment (D>3.0M) M³ 3.80
EA-2A Backfilling (Excavated Soil) M³ 41.98
EA-3B Disposal of Soil (Outside of Factory) M³ 11.77

CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.49
CO-2A Concrete for Sub-STR. M³ 0.90
CO-3A Concrete for Super-STR. M³ 4.97

FM FORM WORK
FM-1A Form for Sub-STR. M² 3.70
FM-2A Form for Super-STR. SSP-CVL2-AMH01-P2C0C M² 37.12

RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.11
RE-2A Re-Bar for Super-STR. (Deformed) Ton 0.88

JT JOINT WORK
JT-4A Water Stop Plate m 7.60

AN ANCHORING & EMBEDDING WORK


ANA-2 Climbing Rung (Chemical Resistant) Ton 0.02

LN COATING & LINING WORK


LN-5E-1 Chemical Resistant Resin Lining (Epoxy) M² 17.51
PPX-8A Vent Pipe for Manhole Set 1.00
JTA-6 Sikaswell for joining RCP and Manhole Joint 3.00

30 P2- AMH02 AREA COC MAIN HOLE TYPE 2 PLAN, SECTION- A/B
EA EARTH WORK
EA-1A Excavation by Equipment (D≦3.0M) M³ 65.91
EA-1B Excavation by Equipment (D>3.0M) M³ 3.80
EA-2A Backfilling (Excavated Soil) M³ 57.94
EA-3B Disposal of Soil (Outside of Factory) M³ 11.77

CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.49
CO-2A Concrete for Sub-STR. M³ 0.74
CO-3A Concrete for Super-STR. M³ 5.05

FM FORM WORK
FM-1A Form for Sub-STR. M² 4.37
FM-2A Form for Super-STR. SSP-CVL2-AMH02-P2C0C M² 36.58

RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.11
RE-2A Re-Bar for Super-STR. (Deformed) Ton 0.88
SSP-CVL2-AMH02-P2C0C

BOQ Item BoQ Qty per


Description Report Ref. No. Unit
Code Drawing
JT JOINT WORK
JT-4A Water Stop Plate m 7.60

AN ANCHORING & EMBEDDING WORK


ANA-2 Climbing Rung (Chemical Resistant) Ton 0.02

LN COATING & LINING WORK


LN-5E-1 Chemical Resistant Resin Lining (Epoxy) M² 17.35
PPX-8A Vent Pipe for Manhole Set 1.00
JTA-6 Sikaswell for joining RCP and Manhole Joint 3.00

31 FOUNDATION P.1351.01 PRE-FLASHED SOLUTION DRUM


EA EARTH WORK
EA-1A Excavation by Equipment (D≦3.0M) M³ 6.94
EA-1B Excavation by Equipment (D>3.0M) M³ -
EA-2A Backfilling (Excavated Soil) M³ 2.49
EA-3B Disposal of Soil (Outside of Factory) M³ 4.45

CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.47
CO-2A Concrete for Sub-STR. M³ 13.98
CO-3A Concrete for Super-STR. M³ -
SSP-CVL2-FDN-1350 - P1351.01
FM FORM WORK PSD
FM-1A Form for Sub-STR. M² 24.12
FM-2A Form for Super-STR. M² -

RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.51
RE-2A Re-Bar for Super-STR. (Deformed) Ton

AN ANCHORING & EMBEDDING WORK


AN-1A Anchor Box Nos 6.00
JT-5A Isolation Joint M 14.21

32 FOUNDATION P.1351.02 PRE-FLASHED SOLUTION START UP PUPM


EA EARTH WORK
EA-1A Excavation by Equipment (D≦3.0M) M³ 3.55
EA-1B Excavation by Equipment (D>3.0M) M³ -
EA-2A Backfilling (Excavated Soil) M³ 1.57
EA-3B Disposal of Soil (Outside of Factory) M³ 1.98

CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.22
CO-2A Concrete for Sub-STR. M³ 3.78
CO-3A Concrete for Super-STR. M³ -
SSP-CVL2-FDN-1350 - P1351.02
FM FORM WORK
FM-1A Form for Sub-STR. M² 9.25
FM-2A Form for Super-STR. M² -
SSP-CVL2-FDN-1350 - P1351.02
BOQ Item BoQ Qty per
Description Report Ref. No. Unit
Code Drawing

RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.10
RE-2A Re-Bar for Super-STR. (Deformed) Ton

AN ANCHORING & EMBEDDING WORK


AN-1A Anchor Box Nos 6.00
JT-5A Isolation Joint M 8.60

33 FOUNDATION P.1352.01 A/B CONCENTRATED POLYMER SOLUTION PUPM (1ST STAGE)


EA EARTH WORK
EA-1A Excavation by Equipment (D≦3.0M) M³ 13.88
EA-1B Excavation by Equipment (D>3.0M) M³ -
EA-2A Backfilling (Excavated Soil) M³ 4.98
EA-3B Disposal of Soil (Outside of Factory) M³ 8.89

CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.94
CO-2A Concrete for Sub-STR. M³ 28.43
CO-3A Concrete for Super-STR. M³ -
SSP-CVL2-FDN-1350 - P1352.01
FM FORM WORK
FM-1A Form for Sub-STR. M² 49.05
FM-2A Form for Super-STR. M²

RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 1.02
RE-2A Re-Bar for Super-STR. (Deformed) Ton

AN ANCHORING & EMBEDDING WORK


AN-1A Anchor Box Nos 12.00
JT-5A Isolation Joint M 28.42

34 FOUNDATION P.1352.02 CONCENTRATED POLYMER SOLUTION PUPM (2ND STAGE)


EA EARTH WORK
EA-1A Excavation by Equipment (D≦3.0M) M³ 5.23
EA-1B Excavation by Equipment (D>3.0M) M³ -
EA-2A Backfilling (Excavated Soil) M³ 2.14
EA-3B Disposal of Soil (Outside of Factory) M³ 3.09

CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.34
CO-2A Concrete for Sub-STR. M³ 9.95
CO-3A Concrete for Super-STR. M³ -
SSP-CVL2-FDN-1350 - P1352.02
FM FORM WORK
FM-1A Form for Sub-STR. M² 20.72
FM-2A Form for Super-STR. M² -
SSP-CVL2-FDN-1350 - P1352.02

BOQ Item BoQ Qty per


Description Report Ref. No. Unit
Code Drawing
RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.46
RE-2A Re-Bar for Super-STR. (Deformed) Ton -

AN ANCHORING & EMBEDDING WORK


AN-1A Anchor Box Nos 6.00
JT-5A Isolation Joint M 12.00

35 FOUNDATION P.1352.03/04 CONCENTRATED POLYMER SOLUTION START UP PUMP


EA EARTH WORK
EA-1A Excavation by Equipment (D≦3.0M) M³ 7.11
EA-1B Excavation by Equipment (D>3.0M) M³ -
EA-2A Backfilling (Excavated Soil) M³ 3.14
EA-3B Disposal of Soil (Outside of Factory) M³ 3.96

CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.44
CO-2A Concrete for Sub-STR. M³ 7.57
CO-3A Concrete for Super-STR. M³ -
SSP-CVL2-FDN-1350 -
FM FORM WORK P1352.03/04
FM-1A Form for Sub-STR. M² 18.49
FM-2A Form for Super-STR. M² -

RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.20
RE-2A Re-Bar for Super-STR. (Deformed) Ton -

AN ANCHORING & EMBEDDING WORK


AN-1A Anchor Box Nos 12.00
JT-5A Isolation Joint M -

36 FOUNDATION E.2352.01 A/B 1ST CONCENTRATION STAGE PRE-HEATER


EA EARTH WORK
EA-1A Excavation by Equipment (D≦3.0M) M³ 42.30
EA-1B Excavation by Equipment (D>3.0M) M³ -
EA-2A Backfilling (Excavated Soil) M³ 32.06
EA-3B Disposal of Soil (Outside of Factory) M³ 10.24

CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.88
CO-2A Concrete for Sub-STR. M³ 8.13
CO-3A Concrete for Super-STR. M³ 2.79
SSP-CVL2-FDN-E.2352.01 A/B
FM FORM WORK
FM-1A Form for Sub-STR. M² 23.16
FM-2A Form for Super-STR. M² 20.55

RE RE-BAR WORK
SSP-CVL2-FDN-E.2352.01 A/B

BOQ Item BoQ Qty per


Description Report Ref. No. Unit
Code Drawing
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 1.01
RE-2A Re-Bar for Super-STR. (Deformed) Ton 0.57

AN ANCHORING & EMBEDDING WORK


AN-1A Anchor Box Nos 8.00
JT-5A Isolation Joint M 10.00

37 FOUNDATION E.2352.02 A/B 2ND CONCENTRATION STAGE PRE- HEATHER


EA EARTH WORK
EA-1A Excavation by Equipment (D≦3.0M) M³ 42.30
EA-1B Excavation by Equipment (D>3.0M) M³ -
EA-2A Backfilling (Excavated Soil) M³ 32.06
EA-3B Disposal of Soil (Outside of Factory) M³ 10.24

CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.88
CO-2A Concrete for Sub-STR. M³ 8.13
CO-3A Concrete for Super-STR. M³ 2.79
SSP-CVL2-FDN-E.2352.02 A/B
FM FORM WORK
FM-1A Form for Sub-STR. M² 23.16
FM-2A Form for Super-STR. M² 20.55

RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.95
RE-2A Re-Bar for Super-STR. (Deformed) Ton 0.45

AN ANCHORING & EMBEDDING WORK


AN-1A Anchor Box Nos 8.00
JT-5A Isolation Joint M 10.00

38 FOUNDATION P.1353.01 A/B RECYCLE SOLVENT PUPM


EA EARTH WORK
EA-1A Excavation by Equipment (D≦3.0M) M³ 6.14
EA-1B Excavation by Equipment (D>3.0M) M³ -
EA-2A Backfilling (Excavated Soil) M³ 2.76
EA-3B Disposal of Soil (Outside of Factory) M³ 3.38

CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.38
CO-2A Concrete for Sub-STR. M³ 6.45
CO-3A Concrete for Super-STR. M³ -
SSP-CVL2-FDN-1350 - P1353.01
FM FORM WORK A/B
FM-1A Form for Sub-STR. M² 15.91
FM-2A Form for Super-STR. M² -

RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.18
SSP-CVL2-FDN-1350 - P1353.01
A/B

BOQ Item BoQ Qty per


Description Report Ref. No. Unit
Code Drawing
RE-2A Re-Bar for Super-STR. (Deformed) Ton -

AN ANCHORING & EMBEDDING WORK


AN-1A Anchor Box Nos 12.00
JT-5A Isolation Joint M 14.80

39 FOUNDATION E.6323.02 MES INJECTION HEATHER


EA EARTH WORK
EA-1A Excavation by Equipment (D≦3.0M) M³ 19.27
EA-1B Excavation by Equipment (D>3.0M) M³ -
EA-2A Backfilling (Excavated Soil) M³ 16.26
EA-3B Disposal of Soil (Outside of Factory) M³ 3.01

CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.34
CO-2A Concrete for Sub-STR. M³ 2.26
CO-3A Concrete for Super-STR. M³ 1.03
SSP-CVL2-FDN-2350-E.6323.02
FM FORM WORK MEH
FM-1A Form for Sub-STR. M² 11.64
FM-2A Form for Super-STR. M² 9.02

RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.19
RE-2A Re-Bar for Super-STR. (Deformed) Ton 0.15

AN ANCHORING & EMBEDDING WORK


AN-1A Anchor Box Nos 4.00
JT-5A Isolation Joint M 4.00

40 FOUNDATION P.6416.01 POLYMERIZATION BLOWDOWN PUMP


EA EARTH WORK
EA-1A Excavation by Equipment (D≦3.0M) M³ 5.57
EA-1B Excavation by Equipment (D>3.0M) M³ -
EA-2A Backfilling (Excavated Soil) M³ 1.96
EA-3B Disposal of Soil (Outside of Factory) M³ 3.61

CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.38
CO-2A Concrete for Sub-STR. M³ 6.94
CO-3A Concrete for Super-STR. M³ -
SSP-CVL2-FDN-P.6416.01 PBP
FM FORM WORK
FM-1A Form for Sub-STR. M² 11.83
FM-2A Form for Super-STR. M² -

RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.15
RE-2A Re-Bar for Super-STR. (Deformed) Ton -
BOQ Item BoQ Qty per
Description Report Ref. No. Unit
Code Drawing

AN ANCHORING & EMBEDDING WORK


AN-1A Anchor Box Nos 4.00
JT-5A Isolation Joint M 11.00

41 FOUNDATION P.6304.02 A/B ANTIOXIDANT S TRANSFER PUMP


EA EARTH WORK
EA-1A Excavation by Equipment (D≦3.0M) M³ 3.17
EA-1B Excavation by Equipment (D>3.0M) M³ -
EA-2A Backfilling (Excavated Soil) M³ 1.80
EA-3B Disposal of Soil (Outside of Factory) M³ 1.37

CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.17
CO-2A Concrete for Sub-STR. M³ 2.60
CO-3A Concrete for Super-STR. M³
SSP-CVL2-FDN-1340 -
FM FORM WORK P.6304.02A/B
FM-1A Form for Sub-STR. M² 9.55
FM-2A Form for Super-STR. M²

RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.09
RE-2A Re-Bar for Super-STR. (Deformed) Ton -

AN ANCHORING & EMBEDDING WORK


AN-1A Anchor Box Nos 8.00
JT-5A Isolation Joint M 8.80

42 FOUNDATION V.6317.01 TIFANE MAKE-UP VESSEL


EA EARTH WORK
EA-1A Excavation by Equipment (D≦3.0M) M³ 4.63
EA-1B Excavation by Equipment (D>3.0M) M³ -
EA-2A Backfilling (Excavated Soil) M³ 2.12
EA-3B Disposal of Soil (Outside of Factory) M³ 2.51

CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.31
CO-2A Concrete for Sub-STR. M³ 2.66
CO-3A Concrete for Super-STR. M³
SSP-CVL2-FDN-V.6317.01
FM FORM WORK
FM-1A Form for Sub-STR. M² 8.50
FM-2A Form for Super-STR. M²

RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.23
RE-2A Re-Bar for Super-STR. (Deformed) Ton -
BOQ Item BoQ Qty per
Description Report Ref. No. Unit
Code Drawing
AN ANCHORING & EMBEDDING WORK
AN-2B Anchor Bolt W/O Template Setting Nos 0.01
JT-5A Isolation Joint M 7.20

43 FOUNDATION V.6318.01 EPITSTOP DAILY VESSEL


EA EARTH WORK
EA-1A Excavation by Equipment (D≦3.0M) M³ 2.66
EA-1B Excavation by Equipment (D>3.0M) M³ -
EA-2A Backfilling (Excavated Soil) M³ 1.22
EA-3B Disposal of Soil (Outside of Factory) M³ 1.44

CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.16
CO-2A Concrete for Sub-STR. M³ 2.75
CO-3A Concrete for Super-STR. M³
SSP-CVL2-FDN-V.6318.01
FM FORM WORK
FM-1A Form for Sub-STR. M² 6.88
FM-2A Form for Super-STR. M²

RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.11
RE-2A Re-Bar for Super-STR. (Deformed) Ton -

AN ANCHORING & EMBEDDING WORK


AN-2B Anchor Bolt W/O Template Setting Nos 0.004
JT-5A Isolation Joint M 6.40

44 FOUNDATION V.6318.02 EPITSTOP DAILY VESSEL


EA EARTH WORK
EA-1A Excavation by Equipment (D≦3.0M) M³ 1.99
EA-1B Excavation by Equipment (D>3.0M) M³ -
EA-2A Backfilling (Excavated Soil) M³ 1.03
EA-3B Disposal of Soil (Outside of Factory) M³ 0.96

CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.11
CO-2A Concrete for Sub-STR. M³ 1.82
CO-3A Concrete for Super-STR. M³
SSP-CVL2-FDN-V.6318.02
FM FORM WORK
FM-1A Form for Sub-STR. M² 5.59
FM-2A Form for Super-STR. M²

RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.09
RE-2A Re-Bar for Super-STR. (Deformed) Ton -

AN ANCHORING & EMBEDDING WORK


BOQ Item BoQ Qty per
Description Report Ref. No. Unit
Code Drawing
AN-2B Anchor Bolt W/O Template Setting Ton 0.004
JT-5A Isolation Joint M 5.20

45 FOUNDATION P.6317.02 A/B TIFANE INJECTION PUMP


EA EARTH WORK
EA-1A Excavation by Equipment (D≦3.0M) M³ 3.08
EA-1B Excavation by Equipment (D>3.0M) M³ -
EA-2A Backfilling (Excavated Soil) M³ 1.80
EA-3B Disposal of Soil (Outside of Factory) M³ 1.28

CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.16
CO-2A Concrete for Sub-STR. M³ 2.41
CO-3A Concrete for Super-STR. M³
SSP-CVL2-FDN-P.6317.02 A/B
FM FORM WORK
FM-1A Form for Sub-STR. M² 9.46
FM-2A Form for Super-STR. M²

RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.10
RE-2A Re-Bar for Super-STR. (Deformed) Ton -

AN ANCHORING & EMBEDDING WORK


AN-1A Anchor Box Nos 8.000
JT-5A Isolation Joint M 8.80

46 FOUNDATION V.6319.01 DELTASTOP MAKE-UP VESSEL


EA EARTH WORK
EA-1A Excavation by Equipment (D≦3.0M) M³ 2.54
EA-1B Excavation by Equipment (D>3.0M) M³ -
EA-2A Backfilling (Excavated Soil) M³ 1.19
EA-3B Disposal of Soil (Outside of Factory) M³ 1.35

CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.15
CO-2A Concrete for Sub-STR. M³ 2.58
CO-3A Concrete for Super-STR. M³
SSP-CVL2-FDN-V.6319.01
FM FORM WORK
FM-1A Form for Sub-STR. M² 6.67
FM-2A Form for Super-STR. M²

RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.11
RE-2A Re-Bar for Super-STR. (Deformed) Ton

AN ANCHORING & EMBEDDING WORK


AN-2B Anchor Bolt W/O Template Setting Ton 0.004
BOQ Item BoQ Qty per
Description Report Ref. No. Unit
Code Drawing
JT-5A Isolation Joint M 6.20

47 FOUNDATION P.6318.02 A/B EPSISTOP INJECTION PUMP


EA EARTH WORK
EA-1A Excavation by Equipment (D≦3.0M) M³ 3.08
EA-1B Excavation by Equipment (D>3.0M) M³ -
EA-2A Backfilling (Excavated Soil) M³ 1.80
EA-3B Disposal of Soil (Outside of Factory) M³ 1.28

CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.16
CO-2A Concrete for Sub-STR. M³ 2.41
CO-3A Concrete for Super-STR. M³
SSP-CVL2-FDN-P.6318.02 A/B
FM FORM WORK
FM-1A Form for Sub-STR. M² 9.46
FM-2A Form for Super-STR. M²

RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.09
RE-2A Re-Bar for Super-STR. (Deformed) Ton -

AN ANCHORING & EMBEDDING WORK


AN-1A Anchor Box Nos 8.000
JT-5A Isolation Joint M 8.80

48 FOUNDATION P.6319.02 A/B DELTA STOP INJECTION PUMP


EA EARTH WORK
EA-1A Excavation by Equipment (D≦3.0M) M³ 3.08
EA-1B Excavation by Equipment (D>3.0M) M³ -
EA-2A Backfilling (Excavated Soil) M³ 1.80
EA-3B Disposal of Soil (Outside of Factory) M³ 1.28

CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.16
CO-2A Concrete for Sub-STR. M³ 2.41
CO-3A Concrete for Super-STR. M³ -
SSP-CVL2-FDN-P.6319.02 A/B
FM FORM WORK
FM-1A Form for Sub-STR. M² 9.46
FM-2A Form for Super-STR. M² -

RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.09
RE-2A Re-Bar for Super-STR. (Deformed) Ton -

AN ANCHORING & EMBEDDING WORK


AN-1A Anchor Box Nos 8.00
JT-5A Isolation Joint M 8.80
BOQ Item BoQ Qty per
Description Report Ref. No. Unit
Code Drawing

49 FOUNDATION P.2353.01 A/B RECYCLE SOLVENT PUMP


EA EARTH WORK
EA-1A Excavation by Equipment (D≦3.0M) M³ 4.58
EA-1B Excavation by Equipment (D>3.0M) M³ -
EA-2A Backfilling (Excavated Soil) M³ 2.31
EA-3B Disposal of Soil (Outside of Factory) M³ 2.26

CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.26
CO-2A Concrete for Sub-STR. M³ 4.30
CO-3A Concrete for Super-STR. M³ -
SSP-CVL2-FDN-2350 - P2353.01
FM FORM WORK A/B RSP
FM-1A Form for Sub-STR. M² 12.90
FM-2A Form for Super-STR. M² -

RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.15
RE-2A Re-Bar for Super-STR. (Deformed) Ton -

AN ANCHORING & EMBEDDING WORK


AN-1A Anchor Box Nos 8.00
JT-5A Isolation Joint M 12.00

50 FOUNDATION P.2352.04 CONCENTRATED POLYMER SOLUTION START-UP PUMP (2nd STAGE)


EA EARTH WORK
EA-1A Excavation by Equipment (D≦3.0M) M³ 2.82
EA-1B Excavation by Equipment (D>3.0M) M³ -
EA-2A Backfilling (Excavated Soil) M³ 1.35
EA-3B Disposal of Soil (Outside of Factory) M³ 1.47

CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.17
CO-2A Concrete for Sub-STR. M³ 2.83
CO-3A Concrete for Super-STR. M³
SSP-CVL2-FDN-2350 - P2352.04
FM FORM WORK CPSP
FM-1A Form for Sub-STR. M² 7.85
FM-2A Form for Super-STR. M²

RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.11
RE-2A Re-Bar for Super-STR. (Deformed) Ton

AN ANCHORING & EMBEDDING WORK


AN-1A Anchor Box Nos 6.00
JT-5A Isolation Joint M 7.20
BOQ Item BoQ Qty per
Description Report Ref. No. Unit
Code Drawing

51 FOUNDATION P.2352.03 CONCENTRATED POLYMER SOLUTION START-UP PUMP (1st STAGE)


EA EARTH WORK
EA-1A Excavation by Equipment (D≦3.0M) M³ 3.45
EA-1B Excavation by Equipment (D>3.0M) M³ -
EA-2A Backfilling (Excavated Soil) M³ 1.56
EA-3B Disposal of Soil (Outside of Factory) M³ 1.89

CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.21
CO-2A Concrete for Sub-STR. M³ 3.61
CO-3A Concrete for Super-STR. M³
SSP-CVL2-FDN-2350 - P2352.03
FM FORM WORK CPSP
FM-1A Form for Sub-STR. M² 9.14
FM-2A Form for Super-STR. M²

RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.12
RE-2A Re-Bar for Super-STR. (Deformed) Ton

AN ANCHORING & EMBEDDING WORK


AN-1A Anchor Box Nos 6.00
JT-5A Isolation Joint M 8.50

52 FOUNDATION P.2352.02 CONCENTRATED POLYMER SOLUTION PUMP ( 2nd STAGE)


EA EARTH WORK
EA-1A Excavation by Equipment (D≦3.0M) M³ 5.64
EA-1B Excavation by Equipment (D>3.0M) M³ -
EA-2A Backfilling (Excavated Soil) M³ 2.19
EA-3B Disposal of Soil (Outside of Factory) M³ 3.45

CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.37
CO-2A Concrete for Sub-STR. M³ 10.68
CO-3A Concrete for Super-STR. M³
SSP-CVL2-FDN-2350 - P2352.02
FM FORM WORK CPSP
FM-1A Form for Sub-STR. M² 19.30
FM-2A Form for Super-STR. M²

RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.38
RE-2A Re-Bar for Super-STR. (Deformed) Ton

AN ANCHORING & EMBEDDING WORK


AN-1A Anchor Box Nos 6.00
JT-5A Isolation Joint M 12.31
BOQ Item BoQ Qty per
Description Report Ref. No. Unit
Code Drawing
53 FOUNDATION P.2352.01 A/B CONCENTRATED POLYMER SOLUTION PUMP ( 1st STAGE)
EA EARTH WORK
EA-1A Excavation by Equipment (D≦3.0M) M³ 10.62
EA-1B Excavation by Equipment (D>3.0M) M³ -
EA-2A Backfilling (Excavated Soil) M³ 4.36
EA-3B Disposal of Soil (Outside of Factory) M³ 6.26

CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.69
CO-2A Concrete for Sub-STR. M³ 19.59
CO-3A Concrete for Super-STR. M³
SSP-CVL2-FDN-2350 - P2352.01
FM FORM WORK A/B CPSP
FM-1A Form for Sub-STR. M² 39.19
FM-2A Form for Super-STR. M²

RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.88
RE-2A Re-Bar for Super-STR. (Deformed) Ton

AN ANCHORING & EMBEDDING WORK


AN-1A Anchor Box Nos 12.00
JT-5A Isolation Joint M 24.60

54 FOUNDATION P.2351.01 PRE-FLASHED SOLUTION PUMP


EA EARTH WORK
EA-1A Excavation by Equipment (D≦3.0M) M³ 5.31
EA-1B Excavation by Equipment (D>3.0M) M³ -
EA-2A Backfilling (Excavated Soil) M³ 2.18
EA-3B Disposal of Soil (Outside of Factory) M³ 3.13

CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.34
CO-2A Concrete for Sub-STR. M³ 9.60
CO-3A Concrete for Super-STR. M³
SSP-CVL2-FDN-2350 - P2351.01
FM FORM WORK A/B CPSP
FM-1A Form for Sub-STR. M² 19.20
FM-2A Form for Super-STR. M²

RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.45
RE-2A Re-Bar for Super-STR. (Deformed) Ton

AN ANCHORING & EMBEDDING WORK


AN-1A Anchor Box Nos 6.00
JT-5A Isolation Joint M 12.30

55 FOUNDATION P.2351.02 PRE- FLASHED SOLUTION START-UP PUMP


BOQ Item BoQ Qty per
Description Report Ref. No. Unit
Code Drawing
EA EARTH WORK
EA-1A Excavation by Equipment (D≦3.0M) M³ 3.27
EA-1B Excavation by Equipment (D>3.0M) M³ -
EA-2A Backfilling (Excavated Soil) M³ 1.48
EA-3B Disposal of Soil (Outside of Factory) M³ 1.80

CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.20
CO-2A Concrete for Sub-STR. M³ 3.43
CO-3A Concrete for Super-STR. M³
SSP-CVL2-FDN-2350 - P2351.02
FM FORM WORK CPSP
FM-1A Form for Sub-STR. M² 8.60
FM-2A Form for Super-STR. M²

RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.09
RE-2A Re-Bar for Super-STR. (Deformed) Ton

AN ANCHORING & EMBEDDING WORK


AN-1A Anchor Box Nos 6.00
JT-5A Isolation Joint M 8.00

56 CONCRETE DIKE FOR T6304.01


EA EARTH WORK
EA-1A Excavation by Equipment (D≦3.0M) M³ 98.24
EA-1B Excavation by Equipment (D>3.0M) M³ -
EA-2A Backfilling (Excavated Soil) M³ 65.47
EA-3B Disposal of Soil (Outside of Factory) M³ 33.31

CO CONCRETE WORK
CO-1A Leveling Concrete M³ 2.91
CO-2A Concrete for Sub-STR. M³ 20.59
CO-3A Concrete for Super-STR. M³ 31.02
SSP-CVL2-DIKE WALL-1340-
FM FORM WORK T6304.01
FM-1A Form for Sub-STR. M² 35.58
FM-2A Form for Super-STR. M² 206.82

RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 2.69
RE-2A Re-Bar for Super-STR. (Deformed) Ton 3.85

AN ANCHORING & EMBEDDING WORK


AN-3B-1 Embedded Steel Supply & Setting(Carbon Ste Nos 0.01
JT-2A Expansion Joint for Dike/Pit M 56.85

57 P2- FOUNDATION V.6328.01 WHITOX MAKE - UP VESSEL


EA EARTH WORK
BOQ Item BoQ Qty per
Description Report Ref. No. Unit
Code Drawing
EA-1A Excavation by Equipment (D≦3.0M) M³ 4.10
EA-1B Excavation by Equipment (D>3.0M) M³ -
EA-2A Backfilling (Excavated Soil) M³ 1.71
EA-3B Disposal of Soil (Outside of Factory) M³ 2.39

CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.28
CO-2A Concrete for Sub-STR. M³ 5.10
CO-3A Concrete for Super-STR. M³ -
SSP-CVL2-FDN-2340-V6328.01
FM FORM WORK
FM-1A Form for Sub-STR. M² 8.51
FM-2A Form for Super-STR. M² -

RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.19
RE-2A Re-Bar for Super-STR. (Deformed) Ton -

AN ANCHORING & EMBEDDING WORK


AN-2B Anchor Bolt W/O Template Setting Nos 0.01
JT-5A Isolation Joint M 9.48

58 FOUNDATION P.2342.01/02 1st & 2nd POLYMERIZATION REACTOR COOLING WATER PUMP
EA EARTH WORK
EA-1A Excavation by Equipment (D≦3.0M) M³ 5.74
EA-1B Excavation by Equipment (D>3.0M) M³ -
EA-2A Backfilling (Excavated Soil) M³ 2.63
EA-3B Disposal of Soil (Outside of Factory) M³ 3.11

CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.35
CO-2A Concrete for Sub-STR. M³ 5.93
CO-3A Concrete for Super-STR. M³
SSP-CVL2-FDN-2340 -
FM FORM WORK P2342.01 /02
FM-1A Form for Sub-STR. M² 15.05
FM-2A Form for Super-STR. M² -

RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.15
RE-2A Re-Bar for Super-STR. (Deformed) Ton -

AN ANCHORING & EMBEDDING WORK


AN-1A Anchor Box Nos 16.00
JT-5A Isolation Joint M 14.00

59 FOUNDATION E.2341.01 CHARGE HEADER EXCHANGER


EA EARTH WORK
EA-1A Excavation by Equipment (D≦3.0M) M³ 3.86
BOQ Item BoQ Qty per
Description Report Ref. No. Unit
Code Drawing
EA-1B Excavation by Equipment (D>3.0M) M³ -
EA-2A Backfilling (Excavated Soil) M³ 1.59
EA-3B Disposal of Soil (Outside of Factory) M³ 2.27

CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.25
CO-2A Concrete for Sub-STR. M³ 2.29
CO-3A Concrete for Super-STR. M³
SSP-CVL2-FDN-E.2341.01
FM FORM WORK
FM-1A Form for Sub-STR. M² 6.95
FM-2A Form for Super-STR. M²

RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.20
RE-2A Re-Bar for Super-STR. (Deformed) Ton -

AN ANCHORING & EMBEDDING WORK


AN-1A Anchor Box Nos 4.00
JT-5A Isolation Joint M 10.60

60 FOUNDATION P.1345.01/02 1st & 2nd POLYMERIZATION REACTOR COOLING WATER PUMP
EA EARTH WORK
EA-1A Excavation by Equipment (D≦3.0M) M³ 5.74
EA-1B Excavation by Equipment (D>3.0M) M³ -
EA-2A Backfilling (Excavated Soil) M³ 2.63
EA-3B Disposal of Soil (Outside of Factory) M³ 3.11

CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.35
CO-2A Concrete for Sub-STR. M³ 5.93
CO-3A Concrete for Super-STR. M³
SSP-CVL2-FDN-1340 -
FM FORM WORK P1345.01 /02
FM-1A Form for Sub-STR. M² 15.05
FM-2A Form for Super-STR. M²

RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.17
RE-2A Re-Bar for Super-STR. (Deformed) Ton

AN ANCHORING & EMBEDDING WORK


AN-1A Anchor Box Nos 16.00
JT-5A Isolation Joint M 14.00

61 FOUNDATION P.1342.01/02 1st & 2nd POLYMERIZATION REACTOR COOLING WATER PUMP
EA EARTH WORK
EA-1A Excavation by Equipment (D≦3.0M) M³ 5.64
EA-1B Excavation by Equipment (D>3.0M) M³ -
BOQ Item BoQ Qty per
Description Report Ref. No. Unit
Code Drawing
EA-2A Backfilling (Excavated Soil) M³ 2.60
EA-3B Disposal of Soil (Outside of Factory) M³ 3.04

CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.34
CO-2A Concrete for Sub-STR. M³ 5.81
CO-3A Concrete for Super-STR. M³
SSP-CVL2-FDN-1340 -
FM FORM WORK P1342.01 /02
FM-1A Form for Sub-STR. M² 14.84
FM-2A Form for Super-STR. M²

RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.16
RE-2A Re-Bar for Super-STR. (Deformed) Ton

AN ANCHORING & EMBEDDING WORK


AN-1A Anchor Box Nos 16.00
JT-5A Isolation Joint M 13.80

62 FOUNDATION E.1341.01 & E.1344.01 CHARGE HEADER EXCHANGER


EA EARTH WORK
EA-1A Excavation by Equipment (D≦3.0M) M³ 8.55
EA-1B Excavation by Equipment (D>3.0M) M³ -
EA-2A Backfilling (Excavated Soil) M³ 3.34
EA-3B Disposal of Soil (Outside of Factory) M³ 5.21

CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.56
CO-2A Concrete for Sub-STR. M³ 5.18
CO-3A Concrete for Super-STR. M³
SSP-CVL2-FDN-1340- E.1344.01
FM FORM WORK
FM-1A Form for Sub-STR. M² 14.41
FM-2A Form for Super-STR. M²

RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.43
RE-2A Re-Bar for Super-STR. (Deformed) Ton

AN ANCHORING & EMBEDDING WORK


AN-1A Anchor Box Nos 4.00
JT-5A Isolation Joint M 22.20

63 FOUNDATION WS.6315.01 ETASTOP WEIGHT SCALE


EA EARTH WORK
EA-1A Excavation by Equipment (D≦3.0M) M³ 4.63
EA-1B Excavation by Equipment (D>3.0M) M³
EA-2A Backfilling (Excavated Soil) M³ 2.24
BOQ Item BoQ Qty per
Description Report Ref. No. Unit
Code Drawing
EA-3B Disposal of Soil (Outside of Factory) M³ 2.39

CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.14
CO-2A Concrete for Sub-STR. M³ 3.15
CO-3A Concrete for Super-STR. M³
SSP-CVL2-FDN-1340 - P2352.04
FM FORM WORK CPSP
FM-1A Form for Sub-STR. M² 8.40
FM-2A Form for Super-STR. M²

RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.08
RE-2A Re-Bar for Super-STR. (Deformed) Ton

AN ANCHORING & EMBEDDING WORK


AN-1A Anchor Box Nos -
JT-5A Isolation Joint M 6.00
PL-2D Mortar Finish for FDN M² 2.25

64 FOUNDATION C.6417.01 ACID VAPOR SCRUBBER


EA EARTH WORK
EA-1A Excavation by Equipment (D≦3.0M) M³ 1.59
EA-1B Excavation by Equipment (D>3.0M) M³ -
EA-2A Backfilling (Excavated Soil) M³ 0.90
EA-3B Disposal of Soil (Outside of Factory) M³ 0.69

CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.08
CO-2A Concrete for Sub-STR. M³ 1.29
CO-3A Concrete for Super-STR. M³
SSP-CVL2-FDN-1340-C6417.01
FM FORM WORK
FM-1A Form for Sub-STR. M² 4.71
FM-2A Form for Super-STR. M²

RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.05
RE-2A Re-Bar for Super-STR. (Deformed) Ton

AN ANCHORING & EMBEDDING WORK


AN-2B Anchor Bolt W/O Template Setting Ton 0.003
JT-5A Isolation Joint M 4.40

65 P2- AOC JUNCTION BOX 23/24/25/26


EA EARTH WORK
EA-1A Excavation by Equipment (D≦3.0M) M³ 99.42
EA-1B Excavation by Equipment (D>3.0M) M³ -
EA-2A Backfilling (Excavated Soil) M³ 84.79
EA-3B Disposal of Soil (Outside of Factory) M³ 14.62
BOQ Item BoQ Qty per
Description Report Ref. No. Unit
Code Drawing

CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.51
CO-2A Concrete for Sub-STR. M³ 8.50
CO-3A Concrete for Super-STR. M³

FM FORM WORK
FM-1A Form for Sub-STR. M² 78.61
FM-2A Form for Super-STR. M²
SSP-CVL2-AOC-P2-A0C-JB
23/24/25/26
RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.73
RE-2A Re-Bar for Super-STR. (Deformed) Ton

JT JOINT WORK
JT-4A Water Stop Plate M 5.60
JT-5A Isolation Joint M 22.40

AN ANCHORING & EMBEDDING WORK


ANA-2 Climbing Rung (Chemical Resistant) Ton 0.042
AN-3B-1 Embedded Steel Supply & Setting(Carbon Ton -

LN COATING & LINING WORK


LN-5E-1 Chemical Resistant Resin Lining (Epoxy) M² 32.81

ML METAL & PLASTIC WORK


ML-5B Grating Cover M² 4.00

66 FOUNDATION ANALYZER HOUSE


EA EARTH WORK
EA-1A Excavation by Equipment (D≦3.0M) M³ 14.19
EA-1B Excavation by Equipment (D>3.0M) M³ -
EA-2A Backfilling (Excavated Soil) M³ 3.19
EA-3B Disposal of Soil (Outside of Factory) M³ 11.00

CO CONCRETE WORK
CO-1A Leveling Concrete M³ 1.09
CO-2A Concrete for Sub-STR. M³ 17.25
CO-3A Concrete for Super-STR. M³
SSP-CVL2-FDN-1350 -
FM FORM WORK ANALYZER HOUSE
FM-1A Form for Sub-STR. M² 16.27
FM-2A Form for Super-STR. M²

RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.54
RE-2A Re-Bar for Super-STR. (Deformed) Ton

AN ANCHORING & EMBEDDING WORK


AN-1A Anchor Box Nos 6.00
BOQ Item BoQ Qty per
Description Report Ref. No. Unit
Code Drawing
JT-5A Isolation Joint M 18.70

67 FOUNDATION V6474.02 BLADDER TANK


EA EARTH WORK
EA-1A Excavation by Equipment (D≦3.0M) M³ 3.17
EA-1B Excavation by Equipment (D>3.0M) M³ -
EA-2A Backfilling (Excavated Soil) M³ 1.35
EA-3B Disposal of Soil (Outside of Factory) M³ 1.82

CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.20
CO-2A Concrete for Sub-STR. M³ 3.47
CO-3A Concrete for Super-STR. M³
SSP-CVL2-FDN-1350 - V6474.02
FM FORM WORK
FM-1A Form for Sub-STR. M² 7.70
FM-2A Form for Super-STR. M²

RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.09
RE-2A Re-Bar for Super-STR. (Deformed) Ton

AN ANCHORING & EMBEDDING WORK


AN-1A Anchor Box Nos 4.00
JT-5A Isolation Joint M 7.20

68 FOUNDATION P6343.01 GPC VESSEL PUMP


EA EARTH WORK
EA-1A Excavation by Equipment (D≦3.0M) M³ 1.60
EA-1B Excavation by Equipment (D>3.0M) M³ -
EA-2A Backfilling (Excavated Soil) M³ 0.92
EA-3B Disposal of Soil (Outside of Factory) M³ 0.68

CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.08
CO-2A Concrete for Sub-STR. M³ 1.27
CO-3A Concrete for Super-STR. M³
SSP-CVL2-FDN-1350 - P6343.01
FM FORM WORK
FM-1A Form for Sub-STR. M² 4.82
FM-2A Form for Super-STR. M²

RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.05
RE-2A Re-Bar for Super-STR. (Deformed) Ton

AN ANCHORING & EMBEDDING WORK


AN-1A Anchor Box Nos 4.00
JT-5A Isolation Joint M 4.50
BOQ Item BoQ Qty per
Description Report Ref. No. Unit
Code Drawing

69 FOUNDATION P6315.01
EA EARTH WORK
EA-1A Excavation by Equipment (D≦3.0M) M³ 0.96
EA-1B Excavation by Equipment (D>3.0M) M³ -
EA-2A Backfilling (Excavated Soil) M³ 0.66
EA-3B Disposal of Soil (Outside of Factory) M³ 0.30

CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.04
CO-2A Concrete for Sub-STR. M³ 0.56
CO-3A Concrete for Super-STR. M³
SSP-CVL2-FDN-1340 - P6315.01
FM FORM WORK
FM-1A Form for Sub-STR. M² 3.12
FM-2A Form for Super-STR. M²

RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.03
RE-2A Re-Bar for Super-STR. (Deformed) Ton

AN ANCHORING & EMBEDDING WORK


AN-1A Anchor Box Nos 4.00
JT-5A Isolation Joint M 2.90

70 FOUNDATION P6315.02 A/B ETASTOP INJECTION PUMP


EA EARTH WORK
EA-1A Excavation by Equipment (D≦3.0M) M³ 3.23
EA-1B Excavation by Equipment (D>3.0M) M³ -
EA-2A Backfilling (Excavated Soil) M³ 1.82
EA-3B Disposal of Soil (Outside of Factory) M³ 1.41

CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.17
CO-2A Concrete for Sub-STR. M³ 3.02
CO-3A Concrete for Super-STR. M³
SSP-CVL2-FDN-1340 - P6315.02
FM FORM WORK A/B
FM-1A Form for Sub-STR. M² 10.88
FM-2A Form for Super-STR. M²

RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.09
RE-2A Re-Bar for Super-STR. (Deformed) Ton

AN ANCHORING & EMBEDDING WORK


AN-1A Anchor Box Nos 8.00
JT-5A Isolation Joint M 8.92
BOQ Item BoQ Qty per
Description Report Ref. No. Unit
Code Drawing

71 P2-VALVE BOX 01 TYPE 2


EA EARTH WORK
EA-1A Excavation by Equipment (D≦3.0M) M³ 22.08
EA-1B Excavation by Equipment (D>3.0M) M³ -
EA-2A Backfilling (Excavated Soil) M³ 16.07
EA-3B Disposal of Soil (Outside of Factory) M³ 6.01

CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.27
CO-2A Concrete for Sub-STR. M³ 3.42
CO-3A Concrete for Super-STR. M³

FM FORM WORK
SSP-CVL2-VB-P2VB-01
FM-1A Form for Sub-STR. M² 23.06
FM-2A Form for Super-STR. M²

RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 1.08
RE-2A Re-Bar for Super-STR. (Deformed) Ton

AN ANCHORING & EMBEDDING WORK


ANA-2 Climbing Rung (Chemical Resistant) Ton 0.01

LN COATING & LINING WORK


LN-5E-1 Chemical Resistant Resin Lining (Epoxy) M² 11.41
JT-5A Isolation Joint M 8.60
JT-4A Water Stop Plate M 3.30

72 P2- CATCH BASIN 01


EA EARTH WORK
EA-1A Excavation by Equipment (D≦3.0M) M³ 7.68
EA-1B Excavation by Equipment (D>3.0M) M³ -
EA-2A Backfilling (Excavated Soil) M³ 6.71
EA-3B Disposal of Soil (Outside of Factory) M³ 0.97

CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.07
CO-2A Concrete for Sub-STR. M³ 0.42
CO-3A Concrete for Super-STR. M³

FM FORM WORK
FM-1A Form for Sub-STR. M² 6.90
FM-2A Form for Super-STR. SSP-CVL2-CB-P2CB-01 M²

RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.06
RE-2A Re-Bar for Super-STR. (Deformed) Ton

AN ANCHORING & EMBEDDING WORK


SSP-CVL2-CB-P2CB-01

BOQ Item BoQ Qty per


Description Report Ref. No. Unit
Code Drawing
ANA-2 Climbing Rung (Chemical Resistant) Ton 0.00

LN COATING & LINING WORK


LN-5E-1 Chemical Resistant Resin Lining (Epoxy) M² 3.45

ML METAL & PLASTIC WORK


ML-5B Grating Cover Ton 0.64
JT-4A Water Stop Plate M 4.00

73 FOUNDATION V6343.01 GPC VESSEL


EA EARTH WORK
EA-1A Excavation by Equipment (D≦3.0M) M³ 2.66
EA-1B Excavation by Equipment (D>3.0M) M³ -
EA-2A Backfilling (Excavated Soil) M³ 1.22
EA-3B Disposal of Soil (Outside of Factory) M³ 1.44

CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.16
CO-2A Concrete for Sub-STR. M³ 2.74
CO-3A Concrete for Super-STR. M³
SSP-CVL2-FDN-1350 -V6343.01
FM FORM WORK
FM-1A Form for Sub-STR. M² 6.85
FM-2A Form for Super-STR. M²

RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.11
RE-2A Re-Bar for Super-STR. (Deformed) Ton

AN ANCHORING & EMBEDDING WORK


AN-2B Anchor Bolt W/O Template Setting Ton 0.02
JT-5A Isolation Joint M 6.40

74 P2- AMH03 AREA COC MAIN HOLE TYPE 2 PLAN, SECTION- A/B
EA EARTH WORK
EA-1A Excavation by Equipment (D≦3.0M) M³ 49.95
EA-1B Excavation by Equipment (D>3.0M) M³ 3.80
EA-2A Backfilling (Excavated Soil) M³ 41.98
EA-3B Disposal of Soil (Outside of Factory) M³ 11.77

CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.49
CO-2A Concrete for Sub-STR. M³ 0.90
CO-3A Concrete for Super-STR. M³ 4.98

FM FORM WORK
FM-1A Form for Sub-STR. M² 3.70
FM-2A Form for Super-STR. SSP-CVL2-AMH03-P2A0C M² 37.02

RE RE-BAR WORK
SSP-CVL2-AMH03-P2A0C
BOQ Item BoQ Qty per
Description Report Ref. No. Unit
Code Drawing
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.11
RE-2A Re-Bar for Super-STR. (Deformed) Ton 0.88

JT JOINT WORK
JT-4A Water Stop Plate m 7.60

AN ANCHORING & EMBEDDING WORK


ANA-2 Climbing Rung (Chemical Resistant) Ton 0.02

LN COATING & LINING WORK


LN-5E-1 Chemical Resistant Resin Lining (Epoxy) M² 17.63
PPX-8A Vent Pipe for Manhole Set 1.00
JTA-6 Sikaswell for joining RCP and Manhole Joint 2.00

75 P2-VALVE BOX 02 TYPE 2


EA EARTH WORK
EA-1A Excavation by Equipment (D≦3.0M) M³ 22.08
EA-1B Excavation by Equipment (D>3.0M) M³ -
EA-2A Backfilling (Excavated Soil) M³ 16.07
EA-3B Disposal of Soil (Outside of Factory) M³ 6.01

CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.27
CO-2A Concrete for Sub-STR. M³ 3.29
CO-3A Concrete for Super-STR. M³

FM FORM WORK
SSP-CVL2-VB-P2VB-02
FM-1A Form for Sub-STR. M² 22.65
FM-2A Form for Super-STR. M² -

RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 1.08
RE-2A Re-Bar for Super-STR. (Deformed) Ton

AN ANCHORING & EMBEDDING WORK


ANA-2 Climbing Rung (Chemical Resistant) Ton 0.01

LN COATING & LINING WORK


LN-5E-1 Chemical Resistant Resin Lining (Epoxy) M² 9.87
JT-5A Isolation Joint M 8.60
JT-4A Water Stop Plate M 3.30

76 P2- AOC JUNCTION BOX 13


EA EARTH WORK
EA-1A Excavation by Equipment (D≦3.0M) M³ 3.25
EA-1B Excavation by Equipment (D>3.0M) M³ -
EA-2A Backfilling (Excavated Soil) M³ 1.70
EA-3B Disposal of Soil (Outside of Factory) M³ 1.55
BOQ Item BoQ Qty per
Description Report Ref. No. Unit
Code Drawing
CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.11
CO-2A Concrete for Sub-STR. M³ 0.66
CO-3A Concrete for Super-STR. M³

FM FORM WORK
FM-1A Form for Sub-STR. M² 6.54
FM-2A Form for Super-STR. SSP-CVL2-AOC-P2-A0C-JB 13 M²

RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.08
RE-2A Re-Bar for Super-STR. (Deformed) Ton

AN ANCHORING & EMBEDDING WORK


ANA-2 Climbing Rung (Chemical Resistant) Ton 0.00

LN COATING & LINING WORK


LN-5E-1 Chemical Resistant Resin Lining (Epoxy) M² 3.60

ML METAL & PLASTIC WORK


ML-5B Grating Cover Ton 1.00
JT-4A Water Stop Plate M 5.20

77 P2- AOC JUNCTION BOX 19


EA EARTH WORK
EA-1A Excavation by Equipment (D≦3.0M) M³ 2.71
EA-1B Excavation by Equipment (D>3.0M) M³ -
EA-2A Backfilling (Excavated Soil) M³ 1.41
EA-3B Disposal of Soil (Outside of Factory) M³ 1.30

CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.11
CO-2A Concrete for Sub-STR. M³ 0.54
CO-3A Concrete for Super-STR. M³ -

FM FORM WORK
FM-1A Form for Sub-STR. M² 5.11
FM-2A Form for Super-STR. M²
SSP-CVL2-AOC-P2-A0C-JB 19
RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.07
RE-2A Re-Bar for Super-STR. (Deformed) Ton

AN ANCHORING & EMBEDDING WORK


ANA-2 Climbing Rung (Chemical Resistant) Ton 0.00

LN COATING & LINING WORK


LN-5E-1 Chemical Resistant Resin Lining (Epoxy) M² 3.00

ML METAL & PLASTIC WORK


BOQ Item BoQ Qty per
Description Report Ref. No. Unit
Code Drawing
ML-5B Grating Cover Ton 1.00
JT-4A Water Stop Plate M 5.20

78 P2- CONCRETE ENCASMENT PIPE DN - 200


EA EARTH WORK
EA-1A Excavation by Equipment (D≦3.0M) M³ 11.16
EA-1B Excavation by Equipment (D>3.0M) M³ -
EA-2A Backfilling (Excavated Soil) M³ 9.73
EA-3B Disposal of Soil (Outside of Factory) M³ 1.43

CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.18
CO-2A Concrete for Sub-STR. M³ -
CO-3A Concrete for Super-STR. SSP-CVL2-AOC-P2-C0C- CEP M³ -
COA-6A Concrete for Super-STR. (K-350) M³ 1.09

FM FORM WORK
FM-1A Form for Sub-STR. M² 5.00
FM-2A Form for Super-STR. M²

RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.08
RE-2A Re-Bar for Super-STR. (Deformed) Ton

79 FOUNDATION PIPE SUPPORT AROUND V.6416.01 POLYMERIZATION BLOWDOWN DRUM


EA EARTH WORK
EA-1A Excavation by Equipment (D≦3.0M) M³ 18.84
EA-1B Excavation by Equipment (D>3.0M) M³ -
EA-2A Backfilling (Excavated Soil) M³ 3.41
EA-3B Disposal of Soil (Outside of Factory) M³ 15.43

CO CONCRETE WORK
CO-1A Leveling Concrete M³ 1.83
CO-2A Concrete for Sub-STR. M³ 14.52
SSP-CVL2-FDN-2340 - PIPE
CO-3A Concrete for Super-STR. M³
SUPPORT V.6416.01
FM FORM WORK
FM-1A Form for Sub-STR. M² 15.26
FM-2A Form for Super-STR. M²

RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 1.89
RE-2A Re-Bar for Super-STR. (Deformed) Ton

AN ANCHORING & EMBEDDING WORK


AN-2B Anchor Bolt W/O Template Setting Nos 0.05
JT-5A Isolation Joint M -
BOQ Item BoQ Qty per
Description Report Ref. No. Unit
Code Drawing
80 FOUNDATION V6474.03 BLADDER TANK
EA EARTH WORK
EA-1A Excavation by Equipment (D≦3.0M) M³ 1.76
EA-1B Excavation by Equipment (D>3.0M) M³ -
EA-2A Backfilling (Excavated Soil) M³ 0.96
EA-3B Disposal of Soil (Outside of Factory) M³ 0.80

CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.10
CO-2A Concrete for Sub-STR. M³ 1.50
CO-3A Concrete for Super-STR. SSP-CVL2-FDN-1350 - V6474.03 M³

FM FORM WORK
FM-1A Form for Sub-STR. M² 5.14
FM-2A Form for Super-STR. M²

RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.05
RE-2A Re-Bar for Super-STR. (Deformed) Ton

AN ANCHORING & EMBEDDING WORK


AN-1A Anchor Box Nos 4.00
JT-5A Isolation Joint M 4.80

81 FOUNDATION LOCAL PLATFORM TIFANE, DELTASTOP AND WHITHOX


EA EARTH WORK
EA-1A Excavation by Equipment (D≦3.0M) M³ 31.07
EA-1B Excavation by Equipment (D>3.0M) M³ -
EA-2A Backfilling (Excavated Soil) M³ 13.66
EA-3B Disposal of Soil (Outside of Factory) M³ 17.41

CO CONCRETE WORK
CO-1A Leveling Concrete M³ 1.98
CO-2A Concrete for Sub-STR. M³ 17.82
SSP-CVL2-FDN-2340 - LOCAL
CO-3A Concrete for Super-STR. M³
PLATFROM TIFANE, DELTASTOP
FM FORM WORK
FM-1A Form for Sub-STR. M² 46.96
FM-2A Form for Super-STR. M²

RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 1.49
RE-2A Re-Bar for Super-STR. (Deformed) Ton

AN ANCHORING & EMBEDDING WORK


AN-2B Anchor Bolt W/O Template Setting Nos 0.04
JT-5A Isolation Joint M 18.77

82 ADDITIONAL UNDERGROUND PIPE WORK


BOQ Item BoQ Qty per
Description Report Ref. No. Unit
Code Drawing
EA-1A Excavation by Equipment (D≦3.0M) M³ 1,454.18
EA-2A Backfilling (Excavated Soil) M³ 886.35
EA-3B Disposal of Soil (Outside of Factory) M³ 83.47
EA-4B Sand Filling for U/G Pipe M³ 493.74
REA-1 Warning Mesh M² 136.31
PPX-2A GRE Pipe d=100 m -
PPX-2B GRE Pipe d=150 m 3.20
PPX-2C GRE Pipe d=200 m 43.00
PPX-2D GRE Pipe d=250 m 58.22
PPX-2E GRE Pipe d=300 m 71.61
UG PIPE P2
PP-1A Concrete Pipe d=100 m
PP-1B Concrete Pipe d=200 m
PPA-1C Concrete Pipe d=300 m -
PP-1D Concrete Pipe d=400 m 31.25
PP-1E Concrete Pipe d=500 m -
PP-1F Concrete Pipe d=600 m 131.15
PP-1G Concrete Pipe d=700 m -

LN-5D-1 Chemical Resistant Resin Coating (Epoxy M² 292.66


JTA-5 Joint Works for RCP EA 67.00

PPX-10A CS Pipe DN.100, For Vent Pipe M -


PPX-1-41 6" 150#RF Extended Operating Gate Valve With Up Right Indicator Pcs -
PPX-1-42 10" 150#RF Extended Operating Gate Valve With Up Right Indicator Pcs -
PPX-1-43 4" 150#RF Extended Operating Gate Valve With Up Right Indicator Ea -
PPX-2-1 Reducer 4"x6" (GRE) Ea -
PPX-2-10 Lateral Tee 6"x4" - Y Branch (GRE) Ea -
PPX-2-11 90 Deg Elbow 4" (GRE) Ea 1.00
PPX-2-12 45 deg Elbow 8" (GRE) Ea 2.00
PPX-2-13 Eccentric Reducer 4"x6" (GRE) Ea -
PPX-2-14 Lateral Tee 8"x6" Y-Branch (GRE) Ea -
PPX-2-15 Lateral Tee 4"x4" - Y Branch (GRE) Ea 1.00
PPX-2-16 45 deg Elbow 10" (GRE) Ea -
PPX-2-17 Lateral Tee 10"x8" - Y Branch (GRE) Ea -
PPX-2-18 Lateral tee 6"x6" - Y Branch (GRE) Ea -
PPX-2-2 45 deg Elbow 4" (GRE) Ea 1.00
PPX-2-3 Tee Branch 4"x4"x4" (GRE) Ea -
PPX-2-4 45 deg Elbow 6" (GRE) Ea -
PPX-2-5 Tee Branch 6"x6"x6" (GRE) Ea -
PPX-2-6 Flange 4" 150#RF, GRE Ea -
PPX-2-7 Flange 6" 150#RF, GRE Ea -
PPX-2-8 Elbow 45deg ,CSP DN.200 Ea -
PPX-2-9 Elbow 90deg ,CSP DN.200 Ea -

83 AOC U-DITCH WORK (P2 Area)

EA-1A Excavation by Equipment (D≦3.0M) M3 -


EA-1C Excavation for Sewer by Hand M3 775.82

AOC U-DITCH P2
BOQ Item BoQ Qty per
Description Report Ref. No. Unit
Code Drawing
EAW-4 Backfilling and Compaction by Hand M3 320.71
EA-3B Disposal of Soil (Outside of Factory) M3 455.11
FM-1A Form for Sub-STR. M2 2,454.01
AOC U-DITCH P2
CO-1A Leveling Concrete M3 38.56
CO-2A Concrete for Sub-STR. M3 270.47
COA-5A Concrete Cover 150 thk. M3 16.30
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 29.43
ML-5B Grating Cover M2 352.04
AN-3B-1 Embedded Steel Supply & Setting(Carbon Ton 4.04
LN-5E-1 Chemical Resistant Resin Lining (Epoxy) M² 283.88
JT-5A Isolation Joint M 1,268.09

84 ROAD & PAVING WORK (P2 Area)

EA-1A Excavation by Equipment (D≦3.0M) M3 239.91


EA-2A Backfilling (Excavated Soil) M3 -
EA-3B Disposal of Soil (Outside of Factory) M3 -
BC-3A Base Course for Concrete Road/Paving M3 765.42
BC-4A Sub-Grade for Concrete Road/Paving M3 -
BC-5A Crushed Stone Paving M3 107.83
FM-1A Form for Sub-STR. M2 -
RDPV P2
CO-5A Concrete for Road/Paving M3 623.36
COA-6C Concrete for Road/Paving (K-350) M3 157.25
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.15
RE-3A Welded Wire Fabric Ton 24.17
JT-3A Expansion Joint for Road/Paving M 271.11
PL-1B Surface Finish for Road/Paving M2 6,454.65
PC-1A Pre-Cast Curbstone M 128.05
LN-5E-1 Chemical Resistant Resin Lining (Epoxy) M2 169.01

85 LOCAL PLATFROM ETASTOP FOUNDATION 1340


EA EARTH WORK
EA-1A Excavation by Equipment (D≦3.0M) M³ 26.91
EA-1B Excavation by Equipment (D>3.0M) M³ -
EA-2A Backfilling (Excavated Soil) M³ 16.53
EA-3B Disposal of Soil (Outside of Factory) M³ 10.39

CO CONCRETE WORK
CO-1A Leveling Concrete M³ 1.17
CO-2A Concrete for Sub-STR. M³ 10.33
SSP-CVL2-LF- LOCAL
CO-3A Concrete for Super-STR. M³
PLATFROM FOUNDATION 1340
FM FORM WORK
FM-1A Form for Sub-STR. M² 35.49
FM-2A Form for Super-STR. M²

RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 1.01
RE-2A Re-Bar for Super-STR. (Deformed) Ton

AN ANCHORING & EMBEDDING WORK


BOQ Item BoQ Qty per
Description Report Ref. No. Unit
Code Drawing
AN-2B Anchor Bolt W/O Template Setting Nos 0.03
AN-3B-1 Embedded Steel Supply & Setting(Carbon Steel) Ton -
AN-4B Chemical Anchor Nos -
JT-5A Isolation Joint M 20.12

86 FOUNDATION PIPE SUPPORT AROUND POLYMERAZATION REACTOR 1340 R.1342.02/03 & R.1345.02/03
EA EARTH WORK
EA-1A Excavation by Equipment (D≦3.0M) M³ 42.84
EA-1B Excavation by Equipment (D>3.0M) M³ -
EA-2A Backfilling (Excavated Soil) M³ 23.03
EA-3B Disposal of Soil (Outside of Factory) M³ 19.81

CO CONCRETE WORK
CO-1A Leveling Concrete M³ 2.42
CO-2A Concrete for Sub-STR. M³ 19.52
SSP-CVL2-LF- R.1342.02/03
CO-3A Concrete for Super-STR. M³
1340
FM FORM WORK
FM-1A Form for Sub-STR. M² 57.88
FM-2A Form for Super-STR. M²

RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 1.92
RE-2A Re-Bar for Super-STR. (Deformed) Ton

AN ANCHORING & EMBEDDING WORK


AN-2B Anchor Bolt W/O Template Setting Nos -
AN-3B-1 Embedded Steel Supply & Setting(Carbon Steel) Ton 0.36
AN-4B Chemical Anchor Nos -
JT-5A Isolation Joint M 28.00

87 FOUNDATION PIPE SUPPORT AROUND ANTI- OXIDANT TRANSFER PUMP P6304.02 A/B (AG-24)
EA EARTH WORK
EA-1A Excavation by Equipment (D≦3.0M) M³ 31.39
EA-1B Excavation by Equipment (D>3.0M) M³ -
EA-2A Backfilling (Excavated Soil) M³ 19.96
EA-3B Disposal of Soil (Outside of Factory) M³ 11.43

CO CONCRETE WORK
CO-1A Leveling Concrete M³ 1.38
CO-2A Concrete for Sub-STR. M³ 11.69
CO-3A Concrete for Super-STR. M³
SSP-CVL2-LF -1340- AOTP
FM FORM WORK
P6304.02 A/B (AG-24)
FM-1A Form for Sub-STR. M² 38.82
FM-2A Form for Super-STR. M²

RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 1.09
RE-2A Re-Bar for Super-STR. (Deformed) Ton

AN ANCHORING & EMBEDDING WORK


BOQ Item BoQ Qty per
Description Report Ref. No. Unit
Code Drawing
AN-2B Anchor Bolt W/O Template Setting Nos 0.05
AN-3B-1 Embedded Steel Supply & Setting(Carbon Ton 0.03
AN-4B Chemical Anchor Nos -
JT-5A Isolation Joint M 22.00

88 FOUNDATION PIPE SUPPORT AROUND RECYCLE SOLVENT V.1353.01


EA EARTH WORK
EA-1A Excavation by Equipment (D≦3.0M) M³ 12.63
EA-1B Excavation by Equipment (D>3.0M) M³ -
EA-2A Backfilling (Excavated Soil) M³ 7.88
EA-3B Disposal of Soil (Outside of Factory) M³ 4.76

CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.67
CO-2A Concrete for Sub-STR. M³ 5.99
CO-3A Concrete for Super-STR. M³
SSP-CVL2-LF- 1350- ARS
FM FORM WORK
V.1353.01
FM-1A Form for Sub-STR. M² 30.21
FM-2A Form for Super-STR. M²

RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.68
RE-2A Re-Bar for Super-STR. (Deformed) Ton

AN ANCHORING & EMBEDDING WORK


AN-2B Anchor Bolt W/O Template Setting Nos 0.02
AN-3B-1 Embedded Steel Supply & Setting(Carbon Ton 0.06
AN-4B Chemical Anchor Nos -
JT-5A Isolation Joint M 26.80

89 FOUNDATION PIPE SUPPORT AROUND 1350 CONCENTRATION


EA EARTH WORK
EA-1A Excavation by Equipment (D≦3.0M) M³ 17.70
EA-1B Excavation by Equipment (D>3.0M) M³ -
EA-2A Backfilling (Excavated Soil) M³ 9.69
EA-3B Disposal of Soil (Outside of Factory) M³ 8.01

CO CONCRETE WORK
CO-1A Leveling Concrete M³ 1.08
CO-2A Concrete for Sub-STR. M³ 9.48
CO-3A Concrete for Super-STR. M³
SSP-CVL2-LF - 1350
FM FORM WORK
CONCENTRATION
FM-1A Form for Sub-STR. M² 26.58
FM-2A Form for Super-STR. M²

RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.83
RE-2A Re-Bar for Super-STR. (Deformed) Ton

AN ANCHORING & EMBEDDING WORK


BOQ Item BoQ Qty per
Description Report Ref. No. Unit
Code Drawing
AN-2B Anchor Bolt W/O Template Setting Nos 0.00
AN-3B-1 Embedded Steel Supply & Setting(Carbon Ton 0.26
AN-4B Chemical Anchor Nos -
JT-5A Isolation Joint M 18.00

90 FOUNDATION PIPE SUPPORT AROUND 2340 POLYMERIZATION


EA EARTH WORK
EA-1A Excavation by Equipment (D≦3.0M) M³ 22.14
EA-1B Excavation by Equipment (D>3.0M) M³ -
EA-2A Backfilling (Excavated Soil) M³ 14.99
EA-3B Disposal of Soil (Outside of Factory) M³ 7.15

CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.75
CO-2A Concrete for Sub-STR. M³ 15.97
CO-3A Concrete for Super-STR. M³
SSP-CVL2-LF- 2340
FM FORM WORK
POLYMERIZATION
FM-1A Form for Sub-STR. M² 19.46
FM-2A Form for Super-STR. M²

RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 1.71
RE-2A Re-Bar for Super-STR. (Deformed) Ton

AN ANCHORING & EMBEDDING WORK


AN-2B Anchor Bolt W/O Template Setting Nos 0.01
AN-3B-1 Embedded Steel Supply & Setting(Carbon Ton 0.17
AN-4B Chemical Anchor Nos -
JT-5A Isolation Joint M 10.60

91 FOUNDATION PIPE SUPPORT AROUND EPITSTOP, DELTASTOP AND WITHOX


EA EARTH WORK
EA-1A Excavation by Equipment (D≦3.0M) M³ 18.64
EA-1B Excavation by Equipment (D>3.0M) M³ -
EA-2A Backfilling (Excavated Soil) M³ 9.11
EA-3B Disposal of Soil (Outside of Factory) M³ 9.53

CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.98
CO-2A Concrete for Sub-STR. M³ 8.98
SSP-CVL2-LF -2340- EPITSOP,
CO-3A Concrete for Super-STR. M³
DELTASTOP AND WITHOX
FM FORM WORK
FM-1A Form for Sub-STR. M² 15.74
FM-2A Form for Super-STR. M²

RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.49
RE-2A Re-Bar for Super-STR. (Deformed) Ton

AN ANCHORING & EMBEDDING WORK


BOQ Item BoQ Qty per
Description Report Ref. No. Unit
Code Drawing
AN-2B Anchor Bolt W/O Template Setting Nos -
AN-3B-1 Embedded Steel Supply & Setting(Carbon Steel) Ton 0.02
AN-4B Chemical Anchor Nos -
JT-5A Isolation Joint M 3.60

92 FOUNDATION PIPE SUPPORT AROUND TIFANE


EA EARTH WORK
EA-1A Excavation by Equipment (D≦3.0M) M³ 0.59
EA-1B Excavation by Equipment (D>3.0M) M³ -
EA-2A Backfilling (Excavated Soil) M³ 0.35
EA-3B Disposal of Soil (Outside of Factory) M³ 0.24

CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.05
CO-2A Concrete for Sub-STR. M³ 0.21
SSP-CVL2-LF-2340- AROUND
CO-3A Concrete for Super-STR. M³
TIFANE
FM FORM WORK
FM-1A Form for Sub-STR. M² 1.20
FM-2A Form for Super-STR. M²

RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.04
RE-2A Re-Bar for Super-STR. (Deformed) Ton

AN ANCHORING & EMBEDDING WORK


AN-2B Anchor Bolt W/O Template Setting Nos 0.02
AN-3B-1 Embedded Steel Supply & Setting(Carbon Steel) Ton -
AN-4B Chemical Anchor Nos -
JT-5A Isolation Joint M 1.20

93 FOUNDATION PIPE SUPPORT AROUND RECYCLE SOLVENT STROGE V2353.01


EA EARTH WORK
EA-1A Excavation by Equipment (D≦3.0M) M³ 72.59
EA-1B Excavation by Equipment (D>3.0M) M³ -
EA-2A Backfilling (Excavated Soil) M³ 54.59
EA-3B Disposal of Soil (Outside of Factory) M³ 18.00

CO CONCRETE WORK
CO-1A Leveling Concrete M³ 2.26
CO-2A Concrete for Sub-STR. M³ 23.21
SSP-CVL2-LF -2350- ARSS
CO-3A Concrete for Super-STR. M³
V.2353.01
FM FORM WORK
FM-1A Form for Sub-STR. M² 62.90
FM-2A Form for Super-STR. M²

RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 2.12
RE-2A Re-Bar for Super-STR. (Deformed) Ton

AN ANCHORING & EMBEDDING WORK


BOQ Item BoQ Qty per
Description Report Ref. No. Unit
Code Drawing
AN-2B Anchor Bolt W/O Template Setting Nos 0.02
AN-3B-1 Embedded Steel Supply & Setting(Carbon Steel) Ton 0.06
AN-4B Chemical Anchor Nos -
JT-5A Isolation Joint M 27.60

94 FOUNDATION PIPE SUPPORT AROUND 2350 CONCENTRATION


EA EARTH WORK
EA-1A Excavation by Equipment (D≦3.0M) M³ 51.14
EA-1B Excavation by Equipment (D>3.0M) M³ -
EA-2A Backfilling (Excavated Soil) M³ 40.81
EA-3B Disposal of Soil (Outside of Factory) M³ 10.32

CO CONCRETE WORK
CO-1A Leveling Concrete M³ 1.37
CO-2A Concrete for Sub-STR. M³ 10.81
SSP-CVL2-LF -2350- 0.83
CO-3A Concrete for Super-STR. M³
CONCENTRATION
FM FORM WORK
FM-1A Form for Sub-STR. M² 33.66
FM-2A Form for Super-STR. M² 5.52

RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 1.06
RE-2A Re-Bar for Super-STR. (Deformed) Ton

AN ANCHORING & EMBEDDING WORK


AN-2B Anchor Bolt W/O Template Setting Nos -
AN-3B-1 Embedded Steel Supply & Setting(Carbon Steel) Ton 0.11
AN-4B Chemical Anchor Nos -
JT-5A Isolation Joint M 16.40

95 FOUNDATION PIPE SUPPORT AROUND V.6416.01 POLYMERAZITATION BLOWDOWN DRUM


EA EARTH WORK
EA-1A Excavation by Equipment (D≦3.0M) M³ 62.36
EA-1B Excavation by Equipment (D>3.0M) M³ -
EA-2A Backfilling (Excavated Soil) M³ 51.59
EA-3B Disposal of Soil (Outside of Factory) M³ 10.77

CO CONCRETE WORK
CO-1A Leveling Concrete M³ 1.25
CO-2A Concrete for Sub-STR. M³ 17.39
CO-3A Concrete for Super-STR. SSP-CVL2-LF -2350-V.6416.01 M³ -

FM FORM WORK
FM-1A Form for Sub-STR. M² 33.08
FM-2A Form for Super-STR. M² -

RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 1.47
RE-2A Re-Bar for Super-STR. (Deformed) Ton

AN ANCHORING & EMBEDDING WORK


BOQ Item BoQ Qty per
Description Report Ref. No. Unit
Code Drawing
AN-2B Anchor Bolt W/O Template Setting Nos 0.02
AN-3B-1 Embedded Steel Supply & Setting(Carbon Steel) Ton 0.19
AN-4B Chemical Anchor Nos -
JT-5A Isolation Joint M 14.60

96 FOUNDATION PIPE SUPPORT AROUND P2352.02/01AB, P2352.02/04


EA EARTH WORK
EA-1A Excavation by Equipment (D≦3.0M) M³ -
EA-1B Excavation by Equipment (D>3.0M) M³ -
EA-2A Backfilling (Excavated Soil) M³ -
EA-3B Disposal of Soil (Outside of Factory) M³ -

CO CONCRETE WORK
CO-1A Leveling Concrete M³ -
CO-2A Concrete for Sub-STR. M³ 11.45
SSP-CVL2-LF -2350- -
CO-3A Concrete for Super-STR. M³
P.2352.02/01 AB, P2352.02/04
FM FORM WORK
FM-1A Form for Sub-STR. M² 6.24
FM-2A Form for Super-STR. M² -

RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 1.04
RE-2A Re-Bar for Super-STR. (Deformed) Ton

AN ANCHORING & EMBEDDING WORK


AN-2B Anchor Bolt W/O Template Setting Nos -
AN-3B-1 Embedded Steel Supply & Setting(Carbon Steel) Ton 0.42
AN-4B Chemical Anchor Nos 16.00
JT-5A Isolation Joint M -

97 FOUNDATION PIPE SUPPORT AROUND V.6474.03 AREA


EA EARTH WORK
EA-1A Excavation by Equipment (D≦3.0M) M³ 34.44
EA-1B Excavation by Equipment (D>3.0M) M³ -
EA-2A Backfilling (Excavated Soil) M³ 25.54
EA-3B Disposal of Soil (Outside of Factory) M³ 8.90

CO CONCRETE WORK
CO-1A Leveling Concrete M³ 1.15
CO-2A Concrete for Sub-STR. M³ 10.04
CO-3A Concrete for Super-STR. SSP-CVL2-LF -2350- V.6474.03 M³ -

FM FORM WORK
FM-1A Form for Sub-STR. M² 25.58
FM-2A Form for Super-STR. M² -

RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.97
RE-2A Re-Bar for Super-STR. (Deformed) Ton

AN ANCHORING & EMBEDDING WORK


BOQ Item BoQ Qty per
Description Report Ref. No. Unit
Code Drawing
AN-2B Anchor Bolt W/O Template Setting Nos 0.04
AN-3B-1 Embedded Steel Supply & Setting(Carbon Steel) Ton -
AN-4B Chemical Anchor Nos -
JT-5A Isolation Joint M 10.00

98 CWS U-DITCH WORK (P2 Area)

EA-1A Excavation by Equipment (D≦3.0M) M3 -


EA-1C Excavation for Sewer by Hand M3 133.81
EAW-4 Backfilling and Compaction by Hand M3 60.89
EA-3B Disposal of Soil (Outside of Factory) M3 72.92
FM-1A Form for Sub-STR. M2 358.99
CWS U-DITCH P2
CO-1A Leveling Concrete M3 7.91
CO-2A Concrete for Sub-STR. M3 43.27
COA-5A Concrete Cover 150 thk. M3 13.43
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 6.08
ML-5B Grating Cover Ton -
AN-3B-1 Embedded Steel Supply & Setting(Carbon Ton -
JT-5A Isolation Joint M 246.60

99 FOUNDATION HVAC & AIR STACK


EA EARTH WORK
EA-1A Excavation by Equipment (D≦3.0M) M³ 4.27
EA-1B Excavation by Equipment (D>3.0M) M³ -
EA-2A Backfilling (Excavated Soil) M³ 1.65
EA-3B Disposal of Soil (Outside of Factory) M³ 2.63

CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.28
CO-2A Concrete for Sub-STR. M³ 4.08
SSP-CVL2-FDN-1350 - HVAC &
CO-3A Concrete for Super-STR. M³ -
AIR STACK
FM FORM WORK
FM-1A Form for Sub-STR. M² 7.88
FM-2A Form for Super-STR. M² -

RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.15
RE-2A Re-Bar for Super-STR. (Deformed) Ton

AN ANCHORING & EMBEDDING WORK


AN-1A Anchor Box Nos 6.00
AN-2B Anchor Bolt W/O Template Setting Ton 0.00
AN-4B Chemical Anchor Nos -
JT-5A Isolation Joint M 9.06

100 FOUNDATION PIPE SUPPORT AROUND ETASTOP CONTAINER


EA EARTH WORK
EA-1A Excavation by Equipment (D≦3.0M) M³ -
EA-1B Excavation by Equipment (D>3.0M) M³ -
EA-2A Backfilling (Excavated Soil) M³ -
EA-3B Disposal of Soil (Outside of Factory) M³ -

SSP-CVL2-LF-1340- ARROUND
BOQ Item BoQ Qty per
Description Report Ref. No. Unit
Code Drawing

CO CONCRETE WORK
CO-1A Leveling Concrete M³ -
CO-2A Concrete for Sub-STR. M³ 0.40
SSP-CVL2-LF-1340- ARROUND
CO-3A Concrete for Super-STR. M³
ETASTOP COUNTAINER
FM FORM WORK
FM-1A Form for Sub-STR. M² 4.28
FM-2A Form for Super-STR. M²

RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.09
RE-2A Re-Bar for Super-STR. (Deformed) Ton

AN ANCHORING & EMBEDDING WORK


AN-2B Anchor Bolt W/O Template Setting Nos
AN-3B-1 Embedded Steel Supply & Setting(Carbon Steel) Ton 0.02
AN-4B Chemical Anchor Nos -
JT-5A Isolation Joint M -

101 FOUNDATION PIPE SUPPORT AROUND ANTI-OXIDANT TRANSFER PUMP 6304.02 A/B
EA EARTH WORK
EA-1A Excavation by Equipment (D≦3.0M) M³ 2.50
EA-1B Excavation by Equipment (D>3.0M) M³ -
EA-2A Backfilling (Excavated Soil) M³ 2.50
EA-3B Disposal of Soil (Outside of Factory) M³ -

CO CONCRETE WORK
CO-1A Leveling Concrete M³ -
CO-2A Concrete for Sub-STR. M³ 4.37
SSP-CVL2-LF -1340- AOTP
CO-3A Concrete for Super-STR. M³
P6304.02 A/B
FM FORM WORK
FM-1A Form for Sub-STR. M² 5.20
FM-2A Form for Super-STR. M²

RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.73
RE-2A Re-Bar for Super-STR. (Deformed) Ton

AN ANCHORING & EMBEDDING WORK


AN-2B Anchor Bolt W/O Template Setting Nos 0.02
AN-3B-1 Embedded Steel Supply & Setting(Carbon Steel) Ton 0.01
AN-4B Chemical Anchor Nos -
JT-5A Isolation Joint M 3.20

102 FOUNDATION PIPE SUPPORT AROUND CHAGRE HEADER EXCANGER E. 1341.01 AND 1344.01
EA EARTH WORK
EA-1A Excavation by Equipment (D≦3.0M) M³ 6.40
EA-1B Excavation by Equipment (D>3.0M) M³ -
EA-2A Backfilling (Excavated Soil) M³ 6.40
EA-3B Disposal of Soil (Outside of Factory) M³ -

SSP-CVL2-LF -1340- ACHE


E1341.01 & 1344.01
BOQ Item BoQ Qty per
Description Report Ref. No. Unit
Code Drawing
CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.14
CO-2A Concrete for Sub-STR. M³ 5.64
SSP-CVL2-LF -1340- ACHE
CO-3A Concrete for Super-STR. M³
E1341.01 & 1344.01
FM FORM WORK
FM-1A Form for Sub-STR. M² 27.16
FM-2A Form for Super-STR. M²

RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.60
RE-2A Re-Bar for Super-STR. (Deformed) Ton

AN ANCHORING & EMBEDDING WORK


AN-2B Anchor Bolt W/O Template Setting Nos 0.01
AN-3B-1 Embedded Steel Supply & Setting(Carbon Steel) Ton 0.25
AN-4B Chemical Anchor Nos -
JT-5A Isolation Joint M 16.40

103 FOUNDATION PIPE SUPPORT AROUND 1350 CONCENTRATION AREA


EA EARTH WORK
EA-1A Excavation by Equipment (D≦3.0M) M³ 28.10
EA-1B Excavation by Equipment (D>3.0M) M³ -
EA-2A Backfilling (Excavated Soil) M³ 24.96
EA-3B Disposal of Soil (Outside of Factory) M³ 3.13

CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.63
CO-2A Concrete for Sub-STR. M³ 5.79
SSP-CVL2-LF -1350-
CO-3A Concrete for Super-STR. M³
CONCENTRATION AREA
FM FORM WORK
FM-1A Form for Sub-STR. M² 22.27
FM-2A Form for Super-STR. M²

RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.51
RE-2A Re-Bar for Super-STR. (Deformed) Ton

AN ANCHORING & EMBEDDING WORK


AN-2B Anchor Bolt W/O Template Setting Nos 0.04
AN-3B-1 Embedded Steel Supply & Setting(Carbon Steel) Ton 0.13
AN-4B Chemical Anchor Nos -
JT-5A Isolation Joint M 12.40

104 FOUNDATION PIPE SUPPORT AROUND 1350 CONCENTRATION (P2-1)


EA EARTH WORK
EA-1A Excavation by Equipment (D≦3.0M) M³ 11.85
EA-1B Excavation by Equipment (D>3.0M) M³ -
EA-2A Backfilling (Excavated Soil) M³ 6.78
EA-3B Disposal of Soil (Outside of Factory) M³ 5.07

CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.70
SSP-CVL2-LF - 1350
CONCENTRATION ( P2-1)
BOQ Item BoQ Qty per
Description Report Ref. No. Unit
Code Drawing
CO-2A Concrete for Sub-STR. M³ 9.77
SSP-CVL2-LF - 1350
CO-3A Concrete for Super-STR. M³
CONCENTRATION ( P2-1)
FM FORM WORK
FM-1A Form for Sub-STR. M² 32.73
FM-2A Form for Super-STR. M²

RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 1.15
RE-2A Re-Bar for Super-STR. (Deformed) Ton

AN ANCHORING & EMBEDDING WORK


AN-2B Anchor Bolt W/O Template Setting Nos 0.02
AN-3B-1 Embedded Steel Supply & Setting(Carbon Steel) Ton 0.25
AN-4B Chemical Anchor Nos -
JT-5A Isolation Joint M 14.20

105 FOUNDATION CABLE TRAY SUPPORT AROUND 2350 CONCENTRATION AREA


EA EARTH WORK
EA-1A Excavation by Equipment (D≦3.0M) M³ 1.35
EA-1B Excavation by Equipment (D>3.0M) M³ -
EA-2A Backfilling (Excavated Soil) M³ 0.58
EA-3B Disposal of Soil (Outside of Factory) M³ 0.77

CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.12
CO-2A Concrete for Sub-STR. M³ 1.00
SSP-CVL2-CT-2350- CABLE
CO-3A Concrete for Super-STR. M³
TRAY SUPPORT 2350
FM FORM WORK
FM-1A Form for Sub-STR. M² 5.68
FM-2A Form for Super-STR. M²

RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.12
RE-2A Re-Bar for Super-STR. (Deformed) Ton

AN ANCHORING & EMBEDDING WORK


AN-2B Anchor Bolt W/O Template Setting Nos 0.01
AN-3B-1 Embedded Steel Supply & Setting(Carbon Steel) Ton -
AN-4B Chemical Anchor Nos -
JT-5A Isolation Joint M 4.00

106 FOUNDATION PIPE SUPPORT AROUND 2350 CONCENTRATION STAGE PRE-HEATER


EA EARTH WORK
EA-1A Excavation by Equipment (D≦3.0M) M³ 0.51
EA-1B Excavation by Equipment (D>3.0M) M³ -
EA-2A Backfilling (Excavated Soil) M³ 0.27
EA-3B Disposal of Soil (Outside of Factory) M³ 0.24

CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.04
CO-2A Concrete for Sub-STR. M³ 0.41
SSP-CVL2-LF-2350- STAGE PRE-
HEATER
BOQ Item BoQ Qty per
Description Report Ref. No. Unit
Code Drawing
SSP-CVL2-LF-2350- STAGE PRE-
CO-3A Concrete for Super-STR. M³
HEATER
FM FORM WORK
FM-1A Form for Sub-STR. M² 2.67
FM-2A Form for Super-STR. M²

RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.16
RE-2A Re-Bar for Super-STR. (Deformed) Ton

AN ANCHORING & EMBEDDING WORK


AN-2B Anchor Bolt W/O Template Setting Nos 0.01
AN-3B-1 Embedded Steel Supply & Setting(Carbon Steel) Ton -
AN-4B Chemical Anchor Nos -
JT-5A Isolation Joint M 1.20

107 FOUNDATION PIPE SUPPORT 1st CONCENTRATION STAGE PRE-HEATER


EA EARTH WORK
EA-1A Excavation by Equipment (D≦3.0M) M³ -
EA-1B Excavation by Equipment (D>3.0M) M³ -
EA-2A Backfilling (Excavated Soil) M³ -
EA-3B Disposal of Soil (Outside of Factory) M³ -

CO CONCRETE WORK
CO-1A Leveling Concrete M³ -
CO-2A Concrete for Sub-STR. M³ 0.13
SSP-CVL2-LF-1352- STAGE PRE-
CO-3A Concrete for Super-STR. M³
HEATER
FM FORM WORK
FM-1A Form for Sub-STR. M² 0.80
FM-2A Form for Super-STR. M²

RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.06
RE-2A Re-Bar for Super-STR. (Deformed) Ton

AN ANCHORING & EMBEDDING WORK


AN-2B Anchor Bolt W/O Template Setting Nos -
AN-3B-1 Embedded Steel Supply & Setting(Carbon Steel) Ton -
AN-4B Chemical Anchor Nos -
JT-5A Isolation Joint M -

108 LIGHTING POLE FOUNDATION P2 AREA


EA EARTH WORK
EA-1A Excavation by Equipment (D≦3.0M) M³ 9.83
EA-1B Excavation by Equipment (D>3.0M) M³ -
EA-2A Backfilling (Excavated Soil) M³ 6.22
EA-3B Disposal of Soil (Outside of Factory) M³ 3.61

CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.25
CO-2A Concrete for Sub-STR. M³ 4.37
SSP-CVL2-LPF- P2- LIGHTING
CO-3A Concrete for Super-STR. M³
POLE FOUNDATION
BOQ Item BoQ Qty per
Description Report Ref.
SSP-CVL2-LPF- P2-No.
LIGHTING Unit
Code Drawing
POLE FOUNDATION
FM FORM WORK
FM-1A Form for Sub-STR. M² 19.76
FM-2A Form for Super-STR. M²

RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.22
RE-2A Re-Bar for Super-STR. (Deformed) Ton

AN ANCHORING & EMBEDDING WORK


AN-2B Anchor Bolt W/O Template Setting Nos -
AN-3B-1 Embedded Steel Supply & Setting(Carbon Steel) Ton -
AN-4B Chemical Anchor Nos

109 HOSE BOX FOUNDATION P2 AREA


EA EARTH WORK
EA-1A Excavation by Equipment (D≦3.0M) M³ 15.30
EA-1B Excavation by Equipment (D>3.0M) M³ -
EA-2A Backfilling (Excavated Soil) M³ 12.80
EA-3B Disposal of Soil (Outside of Factory) M³ 2.50

CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.52
CO-2A Concrete for Sub-STR. M³ 3.96
SSP-CVL2-HB- P2-HOSE BOX
CO-3A Concrete for Super-STR. M³
FOUNDATION P2 AREA
FM FORM WORK
FM-1A Form for Sub-STR. M² 20.40
FM-2A Form for Super-STR. M²

RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.30
RE-2A Re-Bar for Super-STR. (Deformed) Ton

AN ANCHORING & EMBEDDING WORK


AN-2B Anchor Bolt W/O Template Setting Nos -
AN-3B-1 Embedded Steel Supply & Setting(Carbon Steel) Ton -
AN-4B Chemical Anchor Nos -
JT-5A Isolation Joint M 34.00

110 GUARD POST P2 AREA


EA EARTH WORK
EA-1A Excavation by Equipment (D≦3.0M) M³ 9.72
EA-1B Excavation by Equipment (D>3.0M) M³ -
EA-2A Backfilling (Excavated Soil) M³ 9.72
EA-3B Disposal of Soil (Outside of Factory) M³ -

CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.20
CO-2A Concrete for Sub-STR. M³ 0.88
SSP-CVL2-GP- P2-GUARD POST
CO-3A Concrete for Super-STR. M³
P2 AREA
BOQ Item BoQ Qty per
Description ReportP2-GUARD
SSP-CVL2-GP- Ref. No. POST Unit
Code Drawing
P2 AREA
FM FORM WORK
FM-1A Form for Sub-STR. M² 11.76
FM-2A Form for Super-STR. M²

RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton -
RE-2A Re-Bar for Super-STR. (Deformed) Ton

AN ANCHORING & EMBEDDING WORK


AN-4A Expansion Anchor (Hole-in Anchor) Nos 8.00
MLA-1 Guard Post Ea 18.00
JT-5A Isolation Joint M 2.40

P3
1 Pipe Rack Structure 02-2
EA EARTH WORK
EA-1A Excavation by Equipment (D≦3.0M) M³ 258.94
EA-2A Backfilling (Excavated Soil) M³ 168.95
EA-3B Disposal of Soil (Outside of Factory) M³ 89.99

RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 10.57
SSP-CVL2-FDN-PR02-2.2
FM FORM WORK
FM-1A Form for Sub-STR. M² 201.88

CO CONCRETE WORK
CO-1A Leveling Concrete M³ 6.30
CO-2A Concrete for Sub-STR. M³ 76.49
CO-3A Concrete for Super-STR. M³
JT-5A Isolation Joint M 39.20

2 Pipe Rack Structure 02-3


EA EARTH WORK
EA-1A Excavation by Equipment (D≦3.0M) M³ 454.18
EA-2A Backfilling (Excavated Soil) M³ 301.33
EA-3B Disposal of Soil (Outside of Factory) M³ 152.85

RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 17.96
SSP-CVL2-FDN-PR02-3
FM FORM WORK
FM-1A Form for Sub-STR. M² 303.00

CO CONCRETE WORK
CO-1A Leveling Concrete M³ 11.34
CO-2A Concrete for Sub-STR. M³ 131.22
CO-3A Concrete for Super-STR. M³
JT-5A Isolation Joint M 56.00
BOQ Item BoQ Qty per
Description Report Ref. No. Unit
Code Drawing
3 BLENDING & CONCENTRATION SEPARATION PIT (M6486.20)
EA EARTH WORK
EA-1A Excavation by Equipment (D≦3.0M) M³ 97.02
EA-1B Excavation by Equipment (D>3.0M) M³ 4.85
EA-2A Backfilling (Excavated Soil) M³ 62.29
EA-3B Disposal of Soil (Outside of Factory) M³ 39.58

RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.63
RE-2A Re-Bar for Super-STR. (Deformed) Ton 3.44

FM FORM WORK
FM-1A Form for Sub-STR. M² 92.72
FM-2A Form for Super-STR. M² 13.75
SSP-CVL2-PIT-M6486-20
CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.71
CO-2A Concrete for Sub-STR. M³ 4.59
CO-3A Concrete for Super-STR. M³ 16.55

JT JOINT WORK
JT-4A Water Stop Plate m 14.40

AN ANCHORING & EMBEDDING WORK


AN-3B-1 Embedded Steel Supply & Setting(Carbon Ton 0.08

ANA ADDITIONAL ANCHORING & EMBED


ANA-1 Climbing Rung (Galvanized) Ton 0.04
LN-5E-1 Chemical Resistant Resin Lining (Epoxy) M² 56.05

4 STRIPPING SEPARATION PIT (M6486.21)


EA EARTH WORK
EA-1A Excavation by Equipment (D≦3.0M) M³ 83.22
EA-1B Excavation by Equipment (D>3.0M) M³ 1.39
EA-2A Backfilling (Excavated Soil) M³ 55.44
EA-3B Disposal of Soil (Outside of Factory) M³ 29.17

RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.48
RE-2A Re-Bar for Super-STR. (Deformed) Ton 2.97

FM FORM WORK
FM-1A Form for Sub-STR. M² 79.92
FM-2A Form for Super-STR. M² 9.83
SSP-CVL2-PIT-M6486-21
CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.55
CO-2A Concrete for Sub-STR. M³ 3.82
CO-3A Concrete for Super-STR. M³ 13.69

JT JOINT WORK
JT-4A Water Stop Plate m 12.80
BOQ Item BoQ Qty per
Description Report Ref. No. Unit
Code Drawing

AN ANCHORING & EMBEDDING WORK


AN-3B-1 Embedded Steel Supply & Setting(Carbon 0.07

ANA ADDITIONAL ANCHORING & EMBED


ANA-1 Climbing Rung (Galvanized) Ton 0.04
LN-5E-1 Chemical Resistant Resin Lining (Epoxy) M² 44.65

5 FOUNDATION T1374.01 CRUMBS SLURRY TANK


EA EARTH WORK
EA-1A Excavation by Equipment (D≦3.0M) M³ 83.86
EA-2A Backfilling (Excavated Soil) M³ 13.95
EA-3B Disposal of Soil (Outside of Factory) M³ 69.91
EA-4C Sand Filling for Tank FDN M³ 79.54

RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 1.30
RE-2A Re-Bar for Super-STR. (Deformed) Ton 2.85

FM FORM WORK SSP-CVL2-FDN-T1374.01


FM-1B Curved Form for Sub-STR. M² 12.10
FM-2B Curved Form for Super-STR. 105.43

CO CONCRETE WORK
CO-1A Leveling Concrete M³ 2.45
CO-2A Concrete for Sub-STR. M³ 23.28
CO-3A Concrete for Super-STR. M³ 26.36

AN ANCHORING & EMBEDDING WORK


AN-2B Anchor Bolt W/O Template Setting Ton 0.12

AS-2A Asphalt Concrete/Sand for Tank FDN M³ 1.66


JT-5A Isolation Joint M 23.56

6 FOUNDATION T1374.02 CRUMBS SLURRY TANK


EA EARTH WORK
EA-1A Excavation by Equipment (D≦3.0M) M³ 83.86
EA-2A Backfilling (Excavated Soil) M³ 13.95
EA-3B Disposal of Soil (Outside of Factory) M³ 69.91
EA-4C Sand Filling for Tank FDN M³ 79.54

RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 1.30
RE-2A Re-Bar for Super-STR. (Deformed) Ton 2.85

FM FORM WORK
FM-1B Curved Form for Sub-STR. SSP-CVL2-FDN-T1374.02 M² 12.10
FM-2B Curved Form for Super-STR. M² 105.43

CO CONCRETE WORK
CO-1A Leveling Concrete M³ 2.45
CO-2A Concrete for Sub-STR. M³ 23.28
CO-3A Concrete for Super-STR. 26.36
SSP-CVL2-FDN-T1374.02

BOQ Item BoQ Qty per


Description Report Ref. No. Unit
Code Drawing

AN ANCHORING & EMBEDDING WORK


AN-2B Anchor Bolt W/O Template Setting Ton 0.12

AS-2A Asphalt Concrete/Sand for Tank FDN M³ 1.66


JT-5A Isolation Joint M 7.50

7 FOUNDATION T2374.02 CRUMBS SLURRY TANK


EA EARTH WORK
EA-1A Excavation by Equipment (D≦3.0M) M³ 83.86
EA-2A Backfilling (Excavated Soil) M³ 13.95
EA-3B Disposal of Soil (Outside of Factory) M³ 69.91
EA-4C Sand Filling for Tank FDN M³ 78.96

RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 1.30
RE-2A Re-Bar for Super-STR. (Deformed) Ton 2.85

FM FORM WORK
FM-1B Curved Form for Sub-STR. SSP-CVL2-FDN-T2374.02 M² 12.10
FM-2B Curved Form for Super-STR. M² 105.43

CO CONCRETE WORK
CO-1A Leveling Concrete M³ 2.45
CO-2A Concrete for Sub-STR. M³ 23.28
CO-3A Concrete for Super-STR. M³ 26.36

AN ANCHORING & EMBEDDING WORK


AN-2B Anchor Bolt W/O Template Setting Nos 0.12

AS-2A Asphalt Concrete/Sand for Tank FDN M³ 1.66


JT-5A Isolation Joint M 23.56

8 STR P3-3 1370 STRIPPING STRUCTURE FOUNDATION


EA EARTH WORK
EA-1A Excavation by Equipment (D≦3.0M) M³ 696.95
EA-1B Excavation by Equipment (D>3.0M) M³ -
EA-2A Backfilling (Excavated Soil) M³ 512.87
EA-3B Disposal of Soil (Outside of Factory) M³ 184.08

RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 23.41
RE-2A Re-Bar for Super-STR. (Deformed) Ton -

FM FORM WORK
FM-1A Form for Sub-STR. M² 363.41
FM-2A Form for Super-STR. SSP-CVL2-FDN-P3-3 M² -

CO CONCRETE WORK
CO-1A Leveling Concrete M³ 17.40
CO-2A Concrete for Sub-STR. M³ 175.35
CO-3A Concrete for Super-STR. M³ -

JT JOINT WORK
BOQ Item BoQ Qty per
Description Report Ref. No. Unit
Code Drawing
JT-4A Water Stop Plate m -

AN ANCHORING & EMBEDDING WORK


AN-2B Anchor Bolt W/O Template Setting Ton 0.41
JT-5A Isolation Joint M 88.00

9 V1371.01/02/03 - FIRST/SECOND/THIRD STRIPPER FOUNDATION


EA EARTH WORK
EA-1A Excavation by Equipment (D≦3.0M) M³ 176.47
EA-1B Excavation by Equipment (D>3.0M) M³ -
EA-2A Backfilling (Excavated Soil) M³ 109.39
EA-3B Disposal of Soil (Outside of Factory) M³ 67.08

RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 8.12
RE-2A Re-Bar for Super-STR. (Deformed) Ton -

FM FORM WORK
FM-1A Form for Sub-STR. M² 132.31
FM-2A Form for Super-STR. SSP-CVL2-FDN-V1371 M²

CO CONCRETE WORK
CO-1A Leveling Concrete M³ 4.68
CO-2A Concrete for Sub-STR. M³ 68.21
CO-3A Concrete for Super-STR. M³

JT JOINT WORK
JT-4A Water Stop Plate m -

AN ANCHORING & EMBEDDING WORK


AN-2B Anchor Bolt W/O Template Setting Nos 0.29
JT-5A Isolation Joint M 63.20

10 V1372.01/02/03 - FIRST/SECOND/THIRD STRIPPER FOUNDATION


EA EARTH WORK
EA-1A Excavation by Equipment (D≦3.0M) M³ 176.47
EA-1B Excavation by Equipment (D>3.0M) M³ -
EA-2A Backfilling (Excavated Soil) M³ 109.39
EA-3B Disposal of Soil (Outside of Factory) M³ 67.08
EA-4C Sand Filling for Tank FDN M³ 63.20

RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 8.19
RE-2A Re-Bar for Super-STR. (Deformed) Ton -
SSP-CVL2-FDN-V1372
FM FORM WORK
FM-1A Form for Sub-STR. M² 132.31
FM-2A Form for Super-STR. M² -

CO CONCRETE WORK
CO-1A Leveling Concrete M³ 4.68
CO-2A Concrete for Sub-STR. M³ 68.21
CO-3A Concrete for Super-STR. M³ -
BOQ Item BoQ Qty per
Description Report Ref. No. Unit
Code Drawing

AN ANCHORING & EMBEDDING WORK


AN-2B Anchor Bolt W/O Template Setting Ton 0.29
JT-5A Isolation Joint M 63.20

11 STR - P3-1 - 1360 BLENDING EQUIPMENT SUPPORT STRUCTURE


EA EARTH WORK
EA-1A Excavation by Equipment (D≦3.0M) M³ 666.61
EA-1B Excavation by Equipment (D>3.0M) M³ -
EA-2A Backfilling (Excavated Soil) M³ 250.22
EA-3B Disposal of Soil (Outside of Factory) M³ 416.39

CO CONCRETE WORK
CO-1A Leveling Concrete M³ 18.13
CO-2A Concrete for Sub-STR. M³ 388.85
CO-3A Concrete for Super-STR. M³ 92.51
COA-6A Concrete for Super-STR. (K-350) M³ 147.33
SSP-CVL2-FDN 1360 - STR. P3-1
FM FORM WORK
FM-1A Form for Sub-STR. M² 99.22
FM-2A Form for Super-STR. M² 783.89

RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 46.42
RE-2A Re-Bar for Super-STR. (Deformed) Ton 59.00

AN ANCHORING & EMBEDDING WORK


AN-2A Anchor Bolt W/ Template Setting Ton 2.97
JT-5A Isolation Joint M 44.80

12 STR P3-8 2370 STRIPPING STRUCTURE FOUNDATION


EA EARTH WORK
EA-1A Excavation by Equipment (D≦3.0M) M³ 397.05
EA-1B Excavation by Equipment (D>3.0M) M³ -
EA-2A Backfilling (Excavated Soil) M³ 295.37
EA-3B Disposal of Soil (Outside of Factory) M³ 101.68

CO CONCRETE WORK
CO-1A Leveling Concrete M³ 9.62
CO-2A Concrete for Sub-STR. M³ 96.43
CO-3A Concrete for Super-STR. M³ -
SSP-CVL2-FDN-P3-8
FM FORM WORK
FM-1A Form for Sub-STR. M² 193.46
FM-2A Form for Super-STR. M² -

RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 12.90
RE-2A Re-Bar for Super-STR. (Deformed) Ton -

AN ANCHORING & EMBEDDING WORK


AN-2B Anchor Bolt W/O Template Setting Ton 0.23
JT-5A Isolation Joint M 50.80
BOQ Item BoQ Qty per
Description Report Ref. No. Unit
Code Drawing
13 V2371.01/02/03 - FIRST/SECOND/THIRD STRIPPER FOUNDATION
EA EARTH WORK
EA-1A Excavation by Equipment (D≦3.0M) M³ 176.47
EA-1B Excavation by Equipment (D>3.0M) M³
EA-2A Backfilling (Excavated Soil) M³ 109.61
EA-3B Disposal of Soil (Outside of Factory) M³ 66.86

CO CONCRETE WORK
CO-1A Leveling Concrete M³ 4.68
CO-2A Concrete for Sub-STR. M³ 67.86
CO-3A Concrete for Super-STR. M³ -
SSP-CVL2-FDN-V2371.01/02/03
FM FORM WORK
FM-1A Form for Sub-STR. M² 131.13
FM-2A Form for Super-STR. M² -

RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 8.19
RE-2A Re-Bar for Super-STR. (Deformed) Ton

AN ANCHORING & EMBEDDING WORK


AN-2B Anchor Bolt W/O Template Setting Ton 0.29
JT-5A Isolation Joint M 62.40

14 FOUNDATION V6415.01 STRIPPING KO DRUM


EA EARTH WORK
EA-1A Excavation by Equipment (D≦3.0M) M³ 30.69
EA-1B Excavation by Equipment (D>3.0M) M³
EA-2A Backfilling (Excavated Soil) M³ 21.87
EA-3B Disposal of Soil (Outside of Factory) M³ 8.82

CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.82
CO-2A Concrete for Sub-STR. M³ 8.82
CO-3A Concrete for Super-STR. M³ 8.14
SSP-CVL2-FDN-1370 - V.6415.01
FM FORM WORK
FM-1A Form for Sub-STR. M² 9.48
FM-2A Form for Super-STR. M² 44.30

RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.60
RE-2A Re-Bar for Super-STR. (Deformed) Ton 1.12

AN ANCHORING & EMBEDDING WORK


AN-1A Anchor Box Nos 8.00
JT-5A Isolation Joint M 9.80

15 STR P3-2 1360 BLENDING VALVE OPERATION PLATFORM FOUNDATION


EA EARTH WORK
EA-1A Excavation by Equipment (D≦3.0M) M³ 560.46
EA-1B Excavation by Equipment (D>3.0M) M³ -
EA-2A Backfilling (Excavated Soil) M³ 409.48
EA-3B Disposal of Soil (Outside of Factory) M³ 150.98

SSP-CVL2-FDN-STR P3-2
BOQ Item BoQ Qty per
Description Report Ref. No. Unit
Code Drawing

CO CONCRETE WORK
CO-1A Leveling Concrete M³ 13.89
CO-2A Concrete for Sub-STR. M³ 139.88
SSP-CVL2-FDN-STR P3-2
CO-3A Concrete for Super-STR. M³

FM FORM WORK
FM-1A Form for Sub-STR. M² 141.91
FM-2A Form for Super-STR. M² -

RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 18.58
RE-2A Re-Bar for Super-STR. (Deformed) Ton

AN ANCHORING & EMBEDDING WORK


AN-2B Anchor Bolt W/O Template Setting Ton 0.17
JT-5A Isolation Joint M 38.32

16 FOUNDATION V1373.01 STRIPPED VAPOR CONDENSATE DRUM


EA EARTH WORK
EA-1A Excavation by Equipment (D≦3.0M) M³ 31.15
EA-1B Excavation by Equipment (D>3.0M) M³
EA-2A Backfilling (Excavated Soil) M³ 22.63
EA-3B Disposal of Soil (Outside of Factory) M³ 8.52

CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.86
CO-2A Concrete for Sub-STR. M³ 8.52
CO-3A Concrete for Super-STR. M³ 7.22
SSP-CVL2-FDN-1370 - V.1373.01
FM FORM WORK
FM-1A Form for Sub-STR. M² 9.02
FM-2A Form for Super-STR. M² 36.99

RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 1.88
RE-2A Re-Bar for Super-STR. (Deformed) Ton 1.00

AN-1A Anchor Box Ton 8.00


JT-5A Isolation Joint M 13.60

17 FOUNDATION V2373.01 STRIPPED VAPOR CONDENSATE DRUM


EA EARTH WORK
EA-1A Excavation by Equipment (D≦3.0M) M³ 20.96
EA-1B Excavation by Equipment (D>3.0M) M³ -
EA-2A Backfilling (Excavated Soil) M³ 15.57
EA-3B Disposal of Soil (Outside of Factory) M³ 5.39

CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.56
CO-2A Concrete for Sub-STR. M³ 5.39
CO-3A Concrete for Super-STR. M³ 6.41
SSP-CVL2-FDN-1370 - V.2373.01
FM FORM WORK
BOQ Item SSP-CVL2-FDN-1370 - V.2373.01 BoQ Qty per
Description Report Ref. No. Unit
Code Drawing
FM-1A Form for Sub-STR. M² 6.99
FM-2A Form for Super-STR. M² 30.49

RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.82
RE-2A Re-Bar for Super-STR. (Deformed) Ton 0.52

AN-1A Anchor Box Ton 8.00


JT-5A Isolation Joint M 12.60

18 STR - P3-6 - 2360 BLENDING EQUIPMENT SUPPORT STRUCTURE


EA EARTH WORK
EA-1A Excavation by Equipment (D≦3.0M) M³ 609.47
EA-1B Excavation by Equipment (D>3.0M) M³ -
EA-2A Backfilling (Excavated Soil) M³ 320.06
EA-3B Disposal of Soil (Outside of Factory) M³ 289.42

CO CONCRETE WORK
CO-1A Leveling Concrete M³ 18.13
CO-2A Concrete for Sub-STR. M³ 282.80
CO-3A Concrete for Super-STR. M³ 52.13
COA-6A Concrete for Super-STR. (K-350) SSP-CVL2-FDN 2360 - STR. P3-6 M³ 121.53

FM FORM WORK
FM-1A Form for Sub-STR. M² 72.16
FM-2A Form for Super-STR. M² 672.34

RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 30.43
RE-2A Re-Bar for Super-STR. (Deformed) Ton 49.96

AN-2A Anchor Bolt W/ Template Setting Ton 2.36


JT-5A Isolation Joint M 33.60

19 STR P3-7 2360 BLENDING STRUCTURE FOUNDATION


EA EARTH WORK
EA-1A Excavation by Equipment (D≦3.0M) M³ 451.08
EA-1B Excavation by Equipment (D>3.0M) M³ -
EA-2A Backfilling (Excavated Soil) M³ 307.36
EA-3B Disposal of Soil (Outside of Factory) M³ 143.72

CO CONCRETE WORK
CO-1A Leveling Concrete M³ 13.22
CO-2A Concrete for Sub-STR. M³ 133.18
CO-3A Concrete for Super-STR. M³ -
SSP-CVL2-FDN-STR P3-7
FM FORM WORK
FM-1A Form for Sub-STR. M² 117.31
FM-2A Form for Super-STR. M²

RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 11.01
RE-2A Re-Bar for Super-STR. (Deformed) Ton -
BOQ Item BoQ Qty per
Description Report Ref. No. Unit
Code Drawing
AN-2B Anchor Bolt W/O Template Setting Ton 0.16
JT-5A Isolation Joint M 34.40

20 P3- CMH02 AREA COC MAIN HOLE TYPE 2 PLAN, SECTION- A/B/C
EA EARTH WORK
EA-1A Excavation by Equipment (D≦3.0M) M³ 14.31
EA-1B Excavation by Equipment (D>3.0M) M³ -
EA-2A Backfilling (Excavated Soil) M³ 10.23
EA-3B Disposal of Soil (Outside of Factory) M³ 4.08

CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.41
CO-2A Concrete for Sub-STR. M³ 3.30
CO-3A Concrete for Super-STR. M³

FM FORM WORK SSP-CVL2-CMH02-P3C0C


FM-1A Form for Sub-STR. M² 22.30
FM-2A Form for Super-STR. M²

RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.64
RE-2A Re-Bar for Super-STR. (Deformed) Ton

JT JOINT WORK
JT-4A Water Stop Plate M 16.01

ANA-2 Climbing Rung (Chemical Resistant) Ton 0.01

LN COATING & LINING WORK


LN-5E-1 Chemical Resistant Resin Lining (Epoxy) M² 8.94
PPX-8A Vent Pipe for Manhole Set 1.00
JT-5A Isolation Joint M

21 P3- FOUNDATION T.6306.01 TAMOL STORAGE TANK


EA EARTH WORK
EA-1A Excavation by Equipment (D≦3.0M) M³ 8.82
EA-1B Excavation by Equipment (D>3.0M) M³ -
EA-2A Backfilling (Excavated Soil) M³ 14.80
EA-3B Disposal of Soil (Outside of Factory) M³ 5.98

CO CONCRETE WORK
CO-1A Leveling Concrete M³ 7.93
CO-2A Concrete for Sub-STR. M³ 21.17
CO-3A Concrete for Super-STR. M³ -
SSP-CVL2-FDN-1370-T6306.01
FM FORM WORK
FM-1A Form for Sub-STR. M² 22.23
FM-2A Form for Super-STR. M² -

RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.39
RE-2A Re-Bar for Super-STR. (Deformed) Ton

AN-1A Anchor Box Nos 8.00


BOQ Item BoQ Qty per
Description Report Ref. No. Unit
Code Drawing
JT-5A Isolation Joint M 12.56

22 P3- FOUNDATION T.6307.01 SODA STORAGE TANK


EA EARTH WORK
EA-1A Excavation by Equipment (D≦3.0M) M³ 8.82
EA-1B Excavation by Equipment (D>3.0M) M³
EA-2A Backfilling (Excavated Soil) M³ 14.80
EA-3B Disposal of Soil (Outside of Factory) M³ 5.98

CO CONCRETE WORK
CO-1A Leveling Concrete M³ 7.93
CO-2A Concrete for Sub-STR. M³ 21.17
SSP-CVL2-FDN-1370-T6307.01
CO-3A Concrete for Super-STR. M³

FM FORM WORK
FM-1A Form for Sub-STR. M² 22.23
FM-2A Form for Super-STR. M²

RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.39
RE-2A Re-Bar for Super-STR. (Deformed) Ton

AN-1A Anchor Box Nos 8.00


JT-5A Isolation Joint M 12.56

23 P3- FOUNDATION T.6308.01 CaCl2 STORAGE TANK


EA EARTH WORK
EA-1A Excavation by Equipment (D≦3.0M) M³ 8.82
EA-1B Excavation by Equipment (D>3.0M) M³ -
EA-2A Backfilling (Excavated Soil) M³ 14.80
EA-3B Disposal of Soil (Outside of Factory) M³ 5.98

CO CONCRETE WORK
CO-1A Leveling Concrete M³ 7.93
CO-2A Concrete for Sub-STR. M³ 21.17
CO-3A Concrete for Super-STR. M³
SSP-CVL2-FDN-1370-T6308.01
FM FORM WORK
FM-1A Form for Sub-STR. M² 22.23
FM-2A Form for Super-STR. M²

RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.39
RE-2A Re-Bar for Super-STR. (Deformed) Ton

AN-1A Anchor Box Nos 8.00


JT-5A Isolation Joint M 12.56

24 P3- CMH03 AREA COC MAIN HOLE TYPE 2 PLAN, SECTION- A/B/C
EA EARTH WORK
EA-1A Excavation by Equipment (D≦3.0M) M³ 14.31
EA-1B Excavation by Equipment (D>3.0M) M³ -
EA-2A Backfilling (Excavated Soil) M³ 10.34
EA-3B Disposal of Soil (Outside of Factory) M³ 3.97
BOQ Item BoQ Qty per
Description Report Ref. No. Unit
Code Drawing

CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.41
CO-2A Concrete for Sub-STR. M³ 3.24
CO-3A Concrete for Super-STR. M³

FM FORM WORK SSP-CVL2-CMH03-P3C0C


FM-1A Form for Sub-STR. M² 21.80
FM-2A Form for Super-STR. M²

RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.64
RE-2A Re-Bar for Super-STR. (Deformed) Ton

JT JOINT WORK
JT-4A Water Stop Plate M 16.01

ANA-2 Climbing Rung (Chemical Resistant) Ton 0.01

LN COATING & LINING WORK


LN-5E-1 Chemical Resistant Resin Lining (Epoxy) M² 8.74
PPX-8A Vent Pipe for Manhole Set 1.00

25 STR P3-12 FOUNDATION


EA EARTH WORK
EA-1A Excavation by Equipment (D≦3.0M) M³ 47.04
EA-1B Excavation by Equipment (D>3.0M) M³ -
EA-2A Backfilling (Excavated Soil) M³ 39.30
EA-3B Disposal of Soil (Outside of Factory) M³ 7.74

CO CONCRETE WORK
CO-1A Leveling Concrete M³ 1.15
CO-2A Concrete for Sub-STR. M³ 9.31
CO-3A Concrete for Super-STR. M³
SSP-CVL2-FDN-2370 P3-12
FM FORM WORK
FM-1A Form for Sub-STR. M² 26.64
FM-2A Form for Super-STR. M²

RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 1.12
RE-2A Re-Bar for Super-STR. (Deformed) Ton

AN-2B Anchor Bolt W/O Template Setting Ton 0.01


JT-5A Isolation Joint M 8.00

26 STR P3-5 1370 FOUNDATION


EA EARTH WORK
EA-1A Excavation by Equipment (D≦3.0M) M³ 19.90
EA-1B Excavation by Equipment (D>3.0M) M³ -
EA-2A Backfilling (Excavated Soil) M³ 13.88
EA-3B Disposal of Soil (Outside of Factory) M³ 6.02
BOQ Item BoQ Qty per
Description Report Ref. No. Unit
Code Drawing

CO CONCRETE WORK
CO-1A Leveling Concrete M³ 2.55
CO-2A Concrete for Sub-STR. M³ 6.88
CO-3A Concrete for Super-STR. M³
SSP-CVL2-FDN-1370 P3-5
FM FORM WORK
FM-1A Form for Sub-STR. M² 30.37
FM-2A Form for Super-STR. M²

RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.67
RE-2A Re-Bar for Super-STR. (Deformed) Ton

AN-2B Anchor Bolt W/O Template Setting Ton 0.03


JT-5A Isolation Joint M 12.80

27 FOUNDATION P.1371.01/02/03 1st,2nd,3rd STRIPPER SLURRY PUMP


EA EARTH WORK
EA-1A Excavation by Equipment (D≦3.0M) M³ 6.01
EA-1B Excavation by Equipment (D>3.0M) M³ -
EA-2A Backfilling (Excavated Soil) M³ 3.18
EA-3B Disposal of Soil (Outside of Factory) M³ 2.83

CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.34
CO-2A Concrete for Sub-STR. M³ 5.36
CO-3A Concrete for Super-STR. SSP-CVL2-FDN-1370 - M³
P.1371.01/02/03
FM FORM WORK
FM-1A Form for Sub-STR. M² 17.42
FM-2A Form for Super-STR. M²

RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.18
RE-2A Re-Bar for Super-STR. (Deformed) Ton

AN-1A Anchor Box Nos 12.00


JT-5A Isolation Joint M 16.20

28 FOUNDATION P.1372.01/02/03 1st,2nd,3rd STRIPPER SLURRY PUMP


EA EARTH WORK
EA-1A Excavation by Equipment (D≦3.0M) M³ 6.01
EA-1B Excavation by Equipment (D>3.0M) M³ -
EA-2A Backfilling (Excavated Soil) M³ 3.18
EA-3B Disposal of Soil (Outside of Factory) M³ 2.83

CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.34
CO-2A Concrete for Sub-STR. M³ 5.36
CO-3A Concrete for Super-STR. SSP-CVL2-FDN-1370 - M³
P.1373.01/02/03
FM FORM WORK
FM-1A Form for Sub-STR. M² 17.42
SSP-CVL2-FDN-1370 -
P.1373.01/02/03
BOQ Item BoQ Qty per
Description Report Ref. No. Unit
Code Drawing
FM-2A Form for Super-STR. M²

RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.18
RE-2A Re-Bar for Super-STR. (Deformed) Ton

AN-1A Anchor Box Nos 12.00


JT-5A Isolation Joint M 16.20

29 FOUNDATION P.1373.01 A/B STRIPPED RECYCLE SOLVENT PUMP


EA EARTH WORK
EA-1A Excavation by Equipment (D≦3.0M) M³ 3.75
EA-1B Excavation by Equipment (D>3.0M) M³ -
EA-2A Backfilling (Excavated Soil) M³ 2.02
EA-3B Disposal of Soil (Outside of Factory) M³ 1.73

CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.21
CO-2A Concrete for Sub-STR. M³ 3.27
CO-3A Concrete for Super-STR. SSP-CVL2-FDN-1370 - P.1373.01 M³
A/B
FM FORM WORK
FM-1A Form for Sub-STR. M² 10.97
FM-2A Form for Super-STR. M²

RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.11
RE-2A Re-Bar for Super-STR. (Deformed) Ton

AN-1A Anchor Box Nos 8.00


JT-5A Isolation Joint M 10.20

30 FOUNDATION P.1373.03 3rd LUBE WATER PUMP


EA EARTH WORK
EA-1A Excavation by Equipment (D≦3.0M) M³ 1.94
EA-1B Excavation by Equipment (D>3.0M) M³ -
EA-2A Backfilling (Excavated Soil) M³ 0.36
EA-3B Disposal of Soil (Outside of Factory) M³ 0.89

CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.11
CO-2A Concrete for Sub-STR. M³ 1.69
CO-3A Concrete for Super-STR. M³
SSP-CVL2-FDN-1370 - P.1373.03
FM FORM WORK
FM-1A Form for Sub-STR. M² 5.70
FM-2A Form for Super-STR. M²

RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.06
RE-2A Re-Bar for Super-STR. (Deformed) Ton

AN-1A Anchor Box Nos 4.00


JT-5A Isolation Joint M 5.30
BOQ Item BoQ Qty per
Description Report Ref. No. Unit
Code Drawing

31 P3- CMH01 AREA COC MAIN HOLE TYPE 2 PLAN, SECTION- A/B
EA EARTH WORK
EA-1A Excavation by Equipment (D≦3.0M) M³ 14.31
EA-1B Excavation by Equipment (D>3.0M) M³ -
EA-2A Backfilling (Excavated Soil) M³ 11.58
EA-3B Disposal of Soil (Outside of Factory) M³ 2.73

CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.41
CO-2A Concrete for Sub-STR. M³ 2.56
CO-3A Concrete for Super-STR. M³
SSP-CVL2-CMH01-P3C0C
FM FORM WORK
FM-1A Form for Sub-STR. M² 16.38
FM-2A Form for Super-STR. M²

RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.51
RE-2A Re-Bar for Super-STR. (Deformed) Ton

ANA-2 Climbing Rung (Chemical Resistant) Nos 0.01

LN COATING & LINING WORK


LN-5E-1 Chemical Resistant Resin Lining (Epoxy) M² 6.58
PPX-8A Vent Pipe for Manhole Set 1.00
JT-4A Water Stop Plate M 6.00

32 P3- CMH05 AREA COC MAIN HOLE TYPE 2 PLAN, SECTION- A/B
EA EARTH WORK
EA-1A Excavation by Equipment (D≦3.0M) M³ 11.91
EA-1B Excavation by Equipment (D>3.0M) M³ -
EA-2A Backfilling (Excavated Soil) M³ 10.28
EA-3B Disposal of Soil (Outside of Factory) M³ 1.63

CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.38
CO-2A Concrete for Sub-STR. M³ 1.36
CO-3A Concrete for Super-STR. M³
SSP-CVL2-CMH05-P3C0C
FM FORM WORK
FM-1A Form for Sub-STR. M² 13.08
FM-2A Form for Super-STR. M²

RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.39
RE-2A Re-Bar for Super-STR. (Deformed) Ton

ANA-2 Climbing Rung (Chemical Resistant) Nos 0.005

LN COATING & LINING WORK


LN-5E-1 Chemical Resistant Resin Lining (Epoxy) M² 5.98
PPX-8A Vent Pipe for Manhole Set 1.00
BOQ Item BoQ Qty per
Description Report Ref. No. Unit
Code Drawing
JT-4A Water Stop Plate M 5.20

33 P3- AMH01 AREA COC MAIN HOLE TYPE 2 PLAN, SECTION- A/B
EA EARTH WORK
EA-1A Excavation by Equipment (D≦3.0M) M³ 49.08
EA-1B Excavation by Equipment (D>3.0M) M³ 2.40
EA-2A Backfilling (Excavated Soil) M³ 38.84
EA-3B Disposal of Soil (Outside of Factory) M³ 12.64

CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.27
CO-2A Concrete for Sub-STR. M³ 1.00
CO-3A Concrete for Super-STR. M³ 5.13

FM FORM WORK
FM-1A Form for Sub-STR. M² 3.80
FM-2A Form for Super-STR. M² 37.92
SSP-CVL2-AMH01-P3C0C
RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.13
RE-2A Re-Bar for Super-STR. (Deformed) Ton 0.80

JT JOINT WORK
JT-4A Water Stop Plate m 8.00

AN ANCHORING & EMBEDDING WORK


ANA-2 Climbing Rung (Chemical Resistant) Ton 0.01

LN COATING & LINING WORK


LN-5E-1 Chemical Resistant Resin Lining (Epoxy) M² 18.43
PPX-8A Vent Pipe for Manhole Set 1.00
JTA-6 Sikaswell for joining RCP and Manhole Joint 2.00

34 P3- CMH04 AREA COC MAIN HOLE TYPE 2 PLAN, SECTION- A/B/C
EA EARTH WORK
EA-1A Excavation by Equipment (D≦3.0M) M³ 37.83
EA-1B Excavation by Equipment (D>3.0M) M³ -
EA-2A Backfilling (Excavated Soil) M³ 33.86
EA-3B Disposal of Soil (Outside of Factory) M³ 3.97

CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.41
CO-2A Concrete for Sub-STR. M³ 2.73
CO-3A Concrete for Super-STR. M³
SSP-CVL2-CMH04-P3C0C
FM FORM WORK
FM-1A Form for Sub-STR. M² 20.37
FM-2A Form for Super-STR. M²

RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.58
RE-2A Re-Bar for Super-STR. (Deformed) Ton
BOQ Item BoQ Qty per
Description Report Ref. No. Unit
Code Drawing

ANA-2 Climbing Rung (Chemical Resistant) Nos 0.01

LN COATING & LINING WORK


LN-5E-1 Chemical Resistant Resin Lining (Epoxy) M² 8.73
PPX-8A Vent Pipe for Manhole Set 1.00
JT-4A Water Stop Plate M 16.01

35 P3- AMH04 AREA COC MAIN HOLE TYPE 2 PLAN, SECTION- A/B
EA EARTH WORK
EA-1A Excavation by Equipment (D≦3.0M) M³ 46.71
EA-1B Excavation by Equipment (D>3.0M) M³ 0.76
EA-2A Backfilling (Excavated Soil) M³ 36.42
EA-3B Disposal of Soil (Outside of Factory) M³ 11.05

CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.49
CO-2A Concrete for Sub-STR. M³ 0.90
CO-3A Concrete for Super-STR. M³ 4.65

FM FORM WORK
FM-1A Form for Sub-STR. M² 3.70
FM-2A Form for Super-STR. SSP-CVL2-AMH04-P3AOC M² 34.38

RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.11
RE-2A Re-Bar for Super-STR. (Deformed) Ton 0.83

JT JOINT WORK
JT-4A Water Stop Plate m 7.60

AN ANCHORING & EMBEDDING WORK


ANA-2 Climbing Rung (Chemical Resistant) Ton 0.01

LN COATING & LINING WORK


LN-5E-1 Chemical Resistant Resin Lining (Epoxy) M² 16.51
PPX-8A Vent Pipe for Manhole Set 1.00
JTA-6 Sikaswell for joining RCP and Manhole Joint 2.00

36 P3- AMH05 AREA COC MAIN HOLE TYPE 2 PLAN, SECTION- A/B
EA EARTH WORK
EA-1A Excavation by Equipment (D≦3.0M) M³ 46.71
EA-1B Excavation by Equipment (D>3.0M) M³ 1.52
EA-2A Backfilling (Excavated Soil) M³ 37.00
EA-3B Disposal of Soil (Outside of Factory) M³ 11.23

CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.49
CO-2A Concrete for Sub-STR. M³ 0.90
CO-3A Concrete for Super-STR. M³ 4.73

FM FORM WORK

SSP-CVL2-AMH05-P3AOC
BOQ Item BoQ Qty per
Description Report Ref. No. Unit
Code Drawing
FM-1A Form for Sub-STR. M² 3.70
FM-2A Form for Super-STR. SSP-CVL2-AMH05-P3AOC M² 35.04

RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.11
RE-2A Re-Bar for Super-STR. (Deformed) Ton 0.86

JT JOINT WORK
JT-4A Water Stop Plate m 7.60

AN ANCHORING & EMBEDDING WORK


ANA-2 Climbing Rung (Chemical Resistant) Ton 0.01

LN COATING & LINING WORK


LN-5E-1 Chemical Resistant Resin Lining (Epoxy) M² 16.79
PPX-8A Vent Pipe for Manhole Set 1.00
JTA-6 Sikaswell for joining RCP and Manhole Joint 3.00

37 FOUNDATION V.6412.01 OFF GAS K.O DRUM


EA EARTH WORK
EA-1A Excavation by Equipment (D≦3.0M) M³ 8.47
EA-1B Excavation by Equipment (D>3.0M) M³ -
EA-2A Backfilling (Excavated Soil) M³ 7.52
EA-3B Disposal of Soil (Outside of Factory) M³ 0.95

CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.14
CO-2A Concrete for Sub-STR. M³ 0.95
CO-3A Concrete for Super-STR. M³ 2.18
SSP-CVL2-FDN-2370 - V.6412.01
FM FORM WORK
FM-1A Form for Sub-STR. M² 5.19
FM-2A Form for Super-STR. M² 16.63

RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.14
RE-2A Re-Bar for Super-STR. (Deformed) Ton 0.35

AN-2B Anchor Bolt W/O Template Setting Ton 0.01


JT-5A Isolation Joint M 5.60

38 FOUNDATION P.2373.01 A/B STRIPPED RECYCLE SOLVENT PUMP


EA EARTH WORK
EA-1A Excavation by Equipment (D≦3.0M) M³ 3.19
EA-1B Excavation by Equipment (D>3.0M) M³ -
EA-2A Backfilling (Excavated Soil) M³ 1.83
EA-3B Disposal of Soil (Outside of Factory) M³ 1.36

CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.17
CO-2A Concrete for Sub-STR. M³ 2.56
CO-3A Concrete for Super-STR. SSP-CVL2-FDN-1370 - P.2373.01 M³ -
A/B
BOQ Item SSP-CVL2-FDN-1370 - P.2373.01 BoQ Qty per
Description Report Ref. No. Unit
Code A/B Drawing
FM FORM WORK
FM-1A Form for Sub-STR. M² 9.68
FM-2A Form for Super-STR. M² -

RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.08
RE-2A Re-Bar for Super-STR. (Deformed) Ton -

AN-1A Anchor Box Nos 8.00


JT-5A Isolation Joint M 9.00

39 FOUNDATION P.2373.03 LUBE WATER PUMP


EA EARTH WORK
EA-1A Excavation by Equipment (D≦3.0M) M³ 1.94
EA-1B Excavation by Equipment (D>3.0M) M³ -
EA-2A Backfilling (Excavated Soil) M³ 1.04
EA-3B Disposal of Soil (Outside of Factory) M³ 0.89

CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.11
CO-2A Concrete for Sub-STR. M³ 1.69
CO-3A Concrete for Super-STR. M³ -
SSP-CVL2-FDN-1370 - P.2373.03
FM FORM WORK
FM-1A Form for Sub-STR. M² 5.70
FM-2A Form for Super-STR. M² -

RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.06
RE-2A Re-Bar for Super-STR. (Deformed) Ton -

AN-1A Anchor Box Nos 4.00


JT-5A Isolation Joint M 5.30

40 FOUNDATION P.2371.01/02/03 1st/2nd/3rd STRIPPED SLURRY PUMP


EA EARTH WORK
EA-1A Excavation by Equipment (D≦3.0M) M³ 6.34
EA-1B Excavation by Equipment (D>3.0M) M³ -
EA-2A Backfilling (Excavated Soil) M³ 3.28
EA-3B Disposal of Soil (Outside of Factory) M³ 3.06

CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.36
CO-2A Concrete for Sub-STR. M³ 5.81
CO-3A Concrete for Super-STR. SSP-CVL2-FDN-2370 - M³
P.2371.01/02/03
FM FORM WORK
FM-1A Form for Sub-STR. M² 18.06
FM-2A Form for Super-STR. M²

RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.18
RE-2A Re-Bar for Super-STR. (Deformed) Ton
BOQ Item BoQ Qty per
Description Report Ref. No. Unit
Code Drawing
AN-1A Anchor Box Nos 12.00
JT-5A Isolation Joint M 16.80

41 P3- AMH03 AREA COC MAIN HOLE TYPE 2 PLAN, SECTION- A/B
EA EARTH WORK
EA-1A Excavation by Equipment (D≦3.0M) M³ 52.32
EA-1B Excavation by Equipment (D>3.0M) M³ 2.40
EA-2A Backfilling (Excavated Soil) M³ 42.08
EA-3B Disposal of Soil (Outside of Factory) M³ 12.64

CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.51
CO-2A Concrete for Sub-STR. M³ 1.00
CO-3A Concrete for Super-STR. M³ 5.20

FM FORM WORK
FM-1A Form for Sub-STR. M² 3.80
FM-2A Form for Super-STR. SSP-CVL2-AMH03-P3A0C M² 37.62

RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.13
RE-2A Re-Bar for Super-STR. (Deformed) Ton 0.80

JT JOINT WORK
JT-4A Water Stop Plate m 8.00

AN ANCHORING & EMBEDDING WORK


ANA-2 Climbing Rung (Chemical Resistant) Ton 0.02

LN COATING & LINING WORK


LN-5E-1 Chemical Resistant Resin Lining (Epoxy) M² 18.82
PPX-8A Vent Pipe for Manhole Set 1.00
JTA-6 Sikaswell for joining RCP and Manhole Joint 3.00
BOQ Item BoQ Qty per
Description Report Ref. No. Unit
Code Drawing
42 FOUNDATION P.1361.01 A/B EC POLYMER SOLUTION PUMP & P.1361.05 HC BLEND RECYCLING PUMP
EA EARTH WORK
EA-1A Excavation by Equipment (D≦3.0M) M³ 24.35
EA-1B Excavation by Equipment (D>3.0M) M³ -
EA-2A Backfilling (Excavated Soil) M³ 8.76
EA-3B Disposal of Soil (Outside of Factory) M³ 15.59

CO CONCRETE WORK
CO-1A Leveling Concrete M³ 1.64
CO-2A Concrete for Sub-STR. M³ 37.45
CO-3A Concrete for Super-STR. SSP-CVL2-FDN-1360 - M³
P.1361.01/05
FM FORM WORK
FM-1A Form for Sub-STR. M² 69.35
FM-2A Form for Super-STR. M²

RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.62
RE-2A Re-Bar for Super-STR. (Deformed) Ton

AN-1A Anchor Box Nos 30.00


JT-5A Isolation Joint M 40.80

43 FOUNDATION P.1361.02 BLEND RECYCLING PUMP


EA EARTH WORK
EA-1A Excavation by Equipment (D≦3.0M) M³ 4.45
EA-1B Excavation by Equipment (D>3.0M) M³ -
EA-2A Backfilling (Excavated Soil) M³ 2.18
EA-3B Disposal of Soil (Outside of Factory) M³ 2.26

CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.26
CO-2A Concrete for Sub-STR. M³ 4.31
CO-3A Concrete for Super-STR. M³
SSP-CVL2-FDN-1360 - P.1361.02
FM FORM WORK
FM-1A Form for Sub-STR. M² 12.05
FM-2A Form for Super-STR. M²

RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.14
RE-2A Re-Bar for Super-STR. (Deformed) Ton

AN-1A Anchor Box Nos 8.00


JT-5A Isolation Joint M 11.20

44 FOUNDATION P.1361.06 POLYMER SOLUTION PUMP


EA EARTH WORK
EA-1A Excavation by Equipment (D≦3.0M) M³ 3.55
EA-1B Excavation by Equipment (D>3.0M) M³ -
EA-2A Backfilling (Excavated Soil) M³ 1.57
EA-3B Disposal of Soil (Outside of Factory) M³ 1.98

CO CONCRETE WORK

SSP-CVL2-FDN-1360 - P.1361.06
BOQ Item BoQ Qty per
Description Report Ref. No. Unit
Code Drawing
CO-1A Leveling Concrete M³ 0.22
CO-2A Concrete for Sub-STR. M³ 5.23
CO-3A Concrete for Super-STR. M³
SSP-CVL2-FDN-1360 - P.1361.06
FM FORM WORK
FM-1A Form for Sub-STR. M² 12.77
FM-2A Form for Super-STR. M²

RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.11
RE-2A Re-Bar for Super-STR. (Deformed) Ton

AN-1A Anchor Box Nos 6.00


JT-5A Isolation Joint M 8.60

45 FOUNDATION P.2361.01 POLYMER SOLUTION PUMP


EA EARTH WORK
EA-1A Excavation by Equipment (D≦3.0M) M³ 8.15
EA-1B Excavation by Equipment (D>3.0M) M³ -
EA-2A Backfilling (Excavated Soil) M³ 2.94
EA-3B Disposal of Soil (Outside of Factory) M³ 5.22

CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.55
CO-2A Concrete for Sub-STR. M³ 12.28
CO-3A Concrete for Super-STR. M³
SSP-CVL2-FDN-2360 - P.2361.01
FM FORM WORK
FM-1A Form for Sub-STR. M² 15.44
FM-2A Form for Super-STR. M²

RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.24
RE-2A Re-Bar for Super-STR. (Deformed) Ton

AN-1A Anchor Box Nos 10.00


JT-5A Isolation Joint M 13.60

46 FOUNDATION P.2361.02 HS BLEND RECYCLING PUMP


EA EARTH WORK
EA-1A Excavation by Equipment (D≦3.0M) M³ 4.45
EA-1B Excavation by Equipment (D>3.0M) M³ -
EA-2A Backfilling (Excavated Soil) M³ 2.18
EA-3B Disposal of Soil (Outside of Factory) M³ 2.26

CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.26
CO-2A Concrete for Sub-STR. M³ 4.31
CO-3A Concrete for Super-STR. M³
SSP-CVL2-FDN-2360 - P.2361.02
FM FORM WORK
FM-1A Form for Sub-STR. M² 12.04
FM-2A Form for Super-STR. M²
SSP-CVL2-FDN-2360 - P.2361.02

BOQ Item BoQ Qty per


Description Report Ref. No. Unit
Code Drawing
RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.15
RE-2A Re-Bar for Super-STR. (Deformed) Ton

AN-1A Anchor Box Nos 10.00


JT-5A Isolation Joint M 11.20

47 FOUNDATION P.2361.05 HC BLENDING RECYCLING PUMP


EA EARTH WORK
EA-1A Excavation by Equipment (D≦3.0M) M³ 8.15
EA-1B Excavation by Equipment (D>3.0M) M³ -
EA-2A Backfilling (Excavated Soil) M³ 2.94
EA-3B Disposal of Soil (Outside of Factory) M³ 5.22

CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.55
CO-2A Concrete for Sub-STR. M³ 12.28
CO-3A Concrete for Super-STR. M³
SSP-CVL2-FDN-2360 - P.2361.05
FM FORM WORK
FM-1A Form for Sub-STR. M² 15.44
FM-2A Form for Super-STR. M²

RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.27
RE-2A Re-Bar for Super-STR. (Deformed) Ton

AN-1A Anchor Box Nos 10.00


JT-5A Isolation Joint M 28.75

48 FOUNDATION P.2361.06 POLYMER SOLUTION PUMP


EA EARTH WORK
EA-1A Excavation by Equipment (D≦3.0M) M³ 3.55
EA-1B Excavation by Equipment (D>3.0M) M³ -
EA-2A Backfilling (Excavated Soil) M³ 1.57
EA-3B Disposal of Soil (Outside of Factory) M³ 1.98

CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.22
CO-2A Concrete for Sub-STR. M³ 5.33
CO-3A Concrete for Super-STR. M³
SSP-CVL2-FDN-2360 - P.2361.06
FM FORM WORK
FM-1A Form for Sub-STR. M² 13.03
FM-2A Form for Super-STR. M²

RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.14
RE-2A Re-Bar for Super-STR. (Deformed) Ton

AN-1A Anchor Box Nos 6.00


JT-5A Isolation Joint M 8.60

49 FOUNDATION S.2361.01 POLYMER SOLUTION FILTER


BOQ Item BoQ Qty per
Description Report Ref. No. Unit
Code Drawing
EA EARTH WORK
EA-1A Excavation by Equipment (D≦3.0M) M³ 1.24
EA-1B Excavation by Equipment (D>3.0M) M³ -
EA-2A Backfilling (Excavated Soil) M³ 0.77
EA-3B Disposal of Soil (Outside of Factory) M³ 0.47

CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.06
CO-2A Concrete for Sub-STR. M³ 0.87
CO-3A Concrete for Super-STR. M³
SSP-CVL2-FDN-2360 - S.2361.01
FM FORM WORK
FM-1A Form for Sub-STR. M² 3.85
FM-2A Form for Super-STR. M²

RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.06
RE-2A Re-Bar for Super-STR. (Deformed) Ton

AN-2B Anchor Bolt W/O Template Setting Nos 0.004


JT-5A Isolation Joint M 3.60

50 FOUNDATION S.1361.01 POLYMER SOLUTION FILTER


EA EARTH WORK
EA-1A Excavation by Equipment (D≦3.0M) M³ 1.41
EA-1B Excavation by Equipment (D>3.0M) M³ -
EA-2A Backfilling (Excavated Soil) M³ 0.84
EA-3B Disposal of Soil (Outside of Factory) M³ 0.57

CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.07
CO-2A Concrete for Sub-STR. M³ 1.07
CO-3A Concrete for Super-STR. M³
SSP-CVL2-FDN-2360 - S.1361.01
FM FORM WORK
FM-1A Form for Sub-STR. M² 4.28
FM-2A Form for Super-STR. M²

RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.08
RE-2A Re-Bar for Super-STR. (Deformed) Ton

AN-2B Anchor Bolt W/O Template Setting Nos 0.004


JT-5A Isolation Joint M 4.000

51 FOUNDATION P.1374.01 CRUMBS SLURRY RECIRCULATING PUMP


EA EARTH WORK
EA-1A Excavation by Equipment (D≦3.0M) M³ 2.97
EA-1B Excavation by Equipment (D>3.0M) M³ -
EA-2A Backfilling (Excavated Soil) M³ 1.35
EA-3B Disposal of Soil (Outside of Factory) M³ 1.62

CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.18

SSP-CVL2-FDN-1370 - P.1374.01
BOQ Item BoQ Qty per
Description Report Ref. No. Unit
Code Drawing
CO-2A Concrete for Sub-STR. M³ 2.52
CO-3A Concrete for Super-STR. M³
SSP-CVL2-FDN-1370 - P.1374.01
FM FORM WORK
FM-1A Form for Sub-STR. M² 6.30
FM-2A Form for Super-STR. M²

RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.07
RE-2A Re-Bar for Super-STR. (Deformed) Ton

AN-1A Anchor Box Nos 4.00


JT-5A Isolation Joint M 7.20

52 FOUNDATION P.1374.02/03 CRUMBS SLURRY TRANSFER PUMP


EA EARTH WORK
EA-1A Excavation by Equipment (D≦3.0M) M³ 6.69
EA-1B Excavation by Equipment (D>3.0M) M³ -
EA-2A Backfilling (Excavated Soil) M³ 2.89
EA-3B Disposal of Soil (Outside of Factory) M³ 3.80

CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.42
CO-2A Concrete for Sub-STR. M³ 5.92
CO-3A Concrete for Super-STR. SSP-CVL2-FDN-1370 - M³
P.1374.02/03
FM FORM WORK
FM-1A Form for Sub-STR. M² 13.65
FM-2A Form for Super-STR. M²

RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.16
RE-2A Re-Bar for Super-STR. (Deformed) Ton

AN-1A Anchor Box Nos 8.00


JT-5A Isolation Joint M 15.60

53 FOUNDATION P.1374.04 CRUMBS SLURRY TRANSFER PUMP


EA EARTH WORK
EA-1A Excavation by Equipment (D≦3.0M) M³ 2.34
EA-1B Excavation by Equipment (D>3.0M) M³ -
EA-2A Backfilling (Excavated Soil) M³ 1.16
EA-3B Disposal of Soil (Outside of Factory) M³ 1.18

CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.14
CO-2A Concrete for Sub-STR. M³ 1.90
CO-3A Concrete for Super-STR. M³
SSP-CVL2-FDN-1370 - P.1374.04
FM FORM WORK
FM-1A Form for Sub-STR. M² 5.46
FM-2A Form for Super-STR. M²

RE RE-BAR WORK
SSP-CVL2-FDN-1370 - P.1374.04

BOQ Item BoQ Qty per


Description Report Ref. No. Unit
Code Drawing
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.06
RE-2A Re-Bar for Super-STR. (Deformed) Ton

AN-1A Anchor Box Nos 4.00


JT-5A Isolation Joint M 6.00

54 STR P3-4 1370 FOUNDATION


EA EARTH WORK
EA-1A Excavation by Equipment (D≦3.0M) M³ 146.94
EA-1B Excavation by Equipment (D>3.0M) M³ -
EA-2A Backfilling (Excavated Soil) M³ 116.20
EA-3B Disposal of Soil (Outside of Factory) M³ 30.74

CO CONCRETE WORK
CO-1A Leveling Concrete M³ 3.84
CO-2A Concrete for Sub-STR. M³ 32.41
CO-3A Concrete for Super-STR. M³
SSP-CVL2-FDN-1370 P3-4
FM FORM WORK
FM-1A Form for Sub-STR. M² 67.43
FM-2A Form for Super-STR. M²

RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 3.13
RE-2A Re-Bar for Super-STR. (Deformed) Ton

AN-2B Anchor Bolt W/O Template Setting Nos 0.05


JT-5A Isolation Joint M 21.60

55 FOUNDATION P.2374.02 CRUMBS SLURRY RECIRCULATING PUMP


EA EARTH WORK
EA-1A Excavation by Equipment (D≦3.0M) M³ 3.34
EA-1B Excavation by Equipment (D>3.0M) M³ -
EA-2A Backfilling (Excavated Soil) M³ 1.44
EA-3B Disposal of Soil (Outside of Factory) M³ 1.90

CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.21
CO-2A Concrete for Sub-STR. M³ 2.94
CO-3A Concrete for Super-STR. M³
SSP-CVL2-FDN-2370 - P.2374.02
FM FORM WORK
FM-1A Form for Sub-STR. M² 6.79
FM-2A Form for Super-STR. M²

RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.09
RE-2A Re-Bar for Super-STR. (Deformed) Ton

AN-1A Anchor Box Nos 4.00


JT-5A Isolation Joint M 7.80

56 FOUNDATION P.2374.04 CRUMBS SLURRY RECIRCULATING PUMP


EA EARTH WORK
BOQ Item BoQ Qty per
Description Report Ref. No. Unit
Code Drawing
EA-1A Excavation by Equipment (D≦3.0M) M³ 2.34
EA-1B Excavation by Equipment (D>3.0M) M³ -
EA-2A Backfilling (Excavated Soil) M³ 1.16
EA-3B Disposal of Soil (Outside of Factory) M³ 1.18

CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.14
CO-2A Concrete for Sub-STR. M³ 1.82
CO-3A Concrete for Super-STR. M³
SSP-CVL2-FDN-2370 - P.2374.04
FM FORM WORK
FM-1A Form for Sub-STR. M² 5.22
FM-2A Form for Super-STR. M²

RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.07
RE-2A Re-Bar for Super-STR. (Deformed) Ton

AN-1A Anchor Box Nos 4.00


JT-5A Isolation Joint M 6.00

57 FOUNDATION P.6306.01 TAMOL UNLOADING PUMP


EA EARTH WORK
EA-1A Excavation by Equipment (D≦3.0M) M³ 0.86
EA-1B Excavation by Equipment (D>3.0M) M³ -
EA-2A Backfilling (Excavated Soil) M³ 0.61
EA-3B Disposal of Soil (Outside of Factory) M³ 0.25

CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.04
CO-2A Concrete for Sub-STR. M³ 0.50
CO-3A Concrete for Super-STR. M³
SSP-CVL2-FDN-1370 - P.6306.01
FM FORM WORK
FM-1A Form for Sub-STR. M² 3.07
FM-2A Form for Super-STR. M²

RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.03
RE-2A Re-Bar for Super-STR. (Deformed) Ton

AN-1A Anchor Box Nos 4.00


JT-5A Isolation Joint M 2.60

58 FOUNDATION P.6306.02 A/B TAMOL TRANSFER PUMP


EA EARTH WORK
EA-1A Excavation by Equipment (D≦3.0M) M³ 1.72
EA-1B Excavation by Equipment (D>3.0M) M³ -
EA-2A Backfilling (Excavated Soil) M³ 1.22
EA-3B Disposal of Soil (Outside of Factory) M³ 0.49

CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.07
CO-2A Concrete for Sub-STR. M³ 0.97
SSP-CVL2-FDN-1370 - P.6306.02
A/B
BOQ Item BoQ Qty per
Description Report Ref. No. Unit
Code Drawing
CO-3A Concrete for Super-STR. SSP-CVL2-FDN-1370 - P.6306.02 M³
A/B
FM FORM WORK
FM-1A Form for Sub-STR. M² 5.98
FM-2A Form for Super-STR. M²

RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.06
RE-2A Re-Bar for Super-STR. (Deformed) Ton

AN-1A Anchor Box Nos 8.00


JT-5A Isolation Joint M 5.20

59 FOUNDATION P.6307.01 SODA UNLOADING PUMP


EA EARTH WORK
EA-1A Excavation by Equipment (D≦3.0M) M³ 0.86
EA-1B Excavation by Equipment (D>3.0M) M³ -
EA-2A Backfilling (Excavated Soil) M³ 0.61
EA-3B Disposal of Soil (Outside of Factory) M³ 0.25

CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.04
CO-2A Concrete for Sub-STR. M³ 0.50
CO-3A Concrete for Super-STR. M³
SSP-CVL2-FDN-1370 - P.6307.01
FM FORM WORK
FM-1A Form for Sub-STR. M² 3.07
FM-2A Form for Super-STR. M²

RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.03
RE-2A Re-Bar for Super-STR. (Deformed) Ton

AN-1A Anchor Box Nos 4.00


JT-5A Isolation Joint M 2.60

60 FOUNDATION P.6307.02 A/B SODA TRANSFER PUMP


EA EARTH WORK
EA-1A Excavation by Equipment (D≦3.0M) M³ 1.72
EA-1B Excavation by Equipment (D>3.0M) M³ -
EA-2A Backfilling (Excavated Soil) M³ 1.22
EA-3B Disposal of Soil (Outside of Factory) M³ 0.49

CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.07
CO-2A Concrete for Sub-STR. M³ 0.95
CO-3A Concrete for Super-STR. SSP-CVL2-FDN-1370 - P.6307.02 M³
A/B
FM FORM WORK
FM-1A Form for Sub-STR. M² 5.85
FM-2A Form for Super-STR. M²

RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.05
A/B

BOQ Item BoQ Qty per


Description Report Ref. No. Unit
Code Drawing
RE-2A Re-Bar for Super-STR. (Deformed) Ton

AN-1A Anchor Box Nos 8.00


JT-5A Isolation Joint M 5.20

61 FOUNDATION P.6308.01 CaCl2 TRANSFER PUMP


EA EARTH WORK
EA-1A Excavation by Equipment (D≦3.0M) M³ 0.86
EA-1B Excavation by Equipment (D>3.0M) M³ -
EA-2A Backfilling (Excavated Soil) M³ 0.61
EA-3B Disposal of Soil (Outside of Factory) M³ 0.25

CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.04
CO-2A Concrete for Sub-STR. M³ 0.51
CO-3A Concrete for Super-STR. M³
SSP-CVL2-FDN-1370 - P.6308.01
FM FORM WORK
FM-1A Form for Sub-STR. M² 3.12
FM-2A Form for Super-STR. M²

RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.03
RE-2A Re-Bar for Super-STR. (Deformed) Ton

AN-1A Anchor Box Nos 4.00


JT-5A Isolation Joint M 2.60

62 FOUNDATION P.6308.02 A/B CaCl2 TRANSFER PUMP


EA EARTH WORK
EA-1A Excavation by Equipment (D≦3.0M) M³ 1.72
EA-1B Excavation by Equipment (D>3.0M) M³ -
EA-2A Backfilling (Excavated Soil) M³ 1.22
EA-3B Disposal of Soil (Outside of Factory) M³ 0.49

CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.07
CO-2A Concrete for Sub-STR. M³ 0.97
CO-3A Concrete for Super-STR. SSP-CVL2-FDN-1370 - P.6308.02 M³
A/B
FM FORM WORK
FM-1A Form for Sub-STR. M² 5.98
FM-2A Form for Super-STR. M²

RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.06
RE-2A Re-Bar for Super-STR. (Deformed) Ton

AN-1A Anchor Box Nos 8.00


JT-5A Isolation Joint M 5.20

63 STR P3-10 FOUNDATION


EA EARTH WORK
EA-1A Excavation by Equipment (D≦3.0M) M³ 78.94
BOQ Item BoQ Qty per
Description Report Ref. No. Unit
Code Drawing
EA-1B Excavation by Equipment (D>3.0M) M³ -
EA-2A Backfilling (Excavated Soil) M³ 60.74
EA-3B Disposal of Soil (Outside of Factory) M³ 18.20

CO CONCRETE WORK
CO-1A Leveling Concrete M³ 1.85
CO-2A Concrete for Sub-STR. M³ 19.14
CO-3A Concrete for Super-STR. M³
SSP-CVL2-FDN-1370 P3-10
FM FORM WORK
FM-1A Form for Sub-STR. M² 49.12
FM-2A Form for Super-STR. M²

RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 1.44
RE-2A Re-Bar for Super-STR. (Deformed) Ton

AN-2B Anchor Bolt W/O Template Setting Ton 0.03


JT-5A Isolation Joint M 16.00

64 P3- AOC JUNCTION BOX 01/02


EA EARTH WORK
EA-1A Excavation by Equipment (D≦3.0M) M³ 33.71
EA-1B Excavation by Equipment (D>3.0M) M³ -
EA-2A Backfilling (Excavated Soil) M³ 31.31
EA-3B Disposal of Soil (Outside of Factory) M³ 2.40

CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.10
CO-2A Concrete for Sub-STR. M³ 1.90
CO-3A Concrete for Super-STR. M³

FM FORM WORK
FM-1A Form for Sub-STR. M² 18.62
FM-2A Form for Super-STR. M²

RE RE-BAR WORK SSP-CVL2-AOC-P3-A0C-JB 01/02


RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.20
RE-2A Re-Bar for Super-STR. (Deformed) Ton

JT JOINT WORK
JT-4A Water Stop Plate M 3.20

AN ANCHORING & EMBEDDING WORK


ANA-2 Climbing Rung (Chemical Resistant) Ton 0.017
AN-3B-1 Embedded Steel Supply & Setting(Carbon Ton -

LN COATING & LINING WORK


LN-5E-1 Chemical Resistant Resin Lining (Epoxy) M² 6.40

ML METAL & PLASTIC WORK


ML-5B Grating Cover M² 0.32
JT-5A Isolation Joint M 6.40
BOQ Item BoQ Qty per
Description Report Ref. No. Unit
Code Drawing
65 P3- AMH06 AREA COC MAIN HOLE TYPE 2 PLAN, SECTION- A/B
EA EARTH WORK
EA-1A Excavation by Equipment (D≦3.0M) M³ 46.71
EA-1B Excavation by Equipment (D>3.0M) M³ 0.76
EA-2A Backfilling (Excavated Soil) M³ 36.42
EA-3B Disposal of Soil (Outside of Factory) M³ 11.05

CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.49
CO-2A Concrete for Sub-STR. M³ 0.90
CO-3A Concrete for Super-STR. M³ 4.98

FM FORM WORK
FM-1A Form for Sub-STR. M² 3.70
FM-2A Form for Super-STR. SSP-CVL2-AMH06-P3AOC M² 37.02

RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.11
RE-2A Re-Bar for Super-STR. (Deformed) Ton 0.86

JT JOINT WORK
JT-4A Water Stop Plate M 7.60

AN ANCHORING & EMBEDDING WORK


ANA-2 Climbing Rung (Chemical Resistant) Ton 0.015

LN COATING & LINING WORK


LN-5E-1 Chemical Resistant Resin Lining (Epoxy) M² 17.63
PPX-8A Vent Pipe for Manhole Set 1.00
JT-5A Isolation Joint M 7.60
JTA-6 Sikaswell for joining RCP and Manhole Joint 2.00

66 STR P3-9 FOUNDATION SLURRY TANK STRUCTURE FOUNDATION


EA EARTH WORK
EA-1A Excavation by Equipment (D≦3.0M) M³ 73.59
EA-1B Excavation by Equipment (D>3.0M) M³ -
EA-2A Backfilling (Excavated Soil) M³ 53.93
EA-3B Disposal of Soil (Outside of Factory) M³ 19.66

CO CONCRETE WORK
CO-1A Leveling Concrete M³ 1.81
CO-2A Concrete for Sub-STR. M³ 18.93
CO-3A Concrete for Super-STR. M³
SSP-CVL2-FDN-2370 P3-9
FM FORM WORK
FM-1A Form for Sub-STR. M² 46.86
FM-2A Form for Super-STR. M²

RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 1.31
RE-2A Re-Bar for Super-STR. (Deformed) Ton

AN-2B Anchor Bolt W/O Template Setting Ton 0.04


JT-5A Isolation Joint M 14.40
BOQ Item BoQ Qty per
Description Report Ref. No. Unit
Code Drawing

67 CONCRETE DIKE FOR 1360 BLENDING AREA


EA EARTH WORK
EA-1A Excavation by Equipment (D≦3.0M) M³ 96.73
EA-1B Excavation by Equipment (D>3.0M) M³ -
EA-2A Backfilling (Excavated Soil) M³ 63.84
EA-3B Disposal of Soil (Outside of Factory) M³ 32.89

CO CONCRETE WORK
CO-1A Leveling Concrete M³ 5.32
CO-2A Concrete for Sub-STR. M³ 51.62
CO-3A Concrete for Super-STR. M³ -
SSP-CVL2-DIKE WALL-1360 -
FM FORM WORK BLENDING AREA
FM-1A Form for Sub-STR. M² 319.45
FM-2A Form for Super-STR. M² -

RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 6.97
RE-2A Re-Bar for Super-STR. (Deformed) Ton -

AN ANCHORING & EMBEDDING WORK


AN-3B-1 Embedded Steel Supply & Setting(Carbon Ste Nos 0.12
JT-5A Isolation Joint M 158.05

68 CONCRETE DIKE FOR 2360 BLENDING AREA


EA EARTH WORK
EA-1A Excavation by Equipment (D≦3.0M) M³ 110.63
EA-1B Excavation by Equipment (D>3.0M) M³ -
EA-2A Backfilling (Excavated Soil) M³ 65.22
EA-3B Disposal of Soil (Outside of Factory) M³ 45.40

CO CONCRETE WORK
CO-1A Leveling Concrete M³ 5.18
CO-2A Concrete for Sub-STR. M³ 61.61
CO-3A Concrete for Super-STR. M³ -
SSP-CVL2-DIKE WALL-2360 -
FM FORM WORK BLENDING AREA
FM-1A Form for Sub-STR. M² 302.32
FM-2A Form for Super-STR. M² -

RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 11.87
RE-2A Re-Bar for Super-STR. (Deformed) Ton -

AN ANCHORING & EMBEDDING WORK


AN-3B-1 Embedded Steel Supply & Setting(Carbon Ste Nos 0.09
JT-5A Isolation Joint M 140.50

69 P3- CATCH BASIN 01


EA EARTH WORK
EA-1A Excavation by Equipment (D≦3.0M) M³ 7.68
EA-1B Excavation by Equipment (D>3.0M) M³ -
BOQ Item BoQ Qty per
Description Report Ref. No. Unit
Code Drawing
EA-2A Backfilling (Excavated Soil) M³ 6.61
EA-3B Disposal of Soil (Outside of Factory) M³ 1.07

CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.07
CO-2A Concrete for Sub-STR. M³ 0.28
CO-3A Concrete for Super-STR. M³

FM FORM WORK
FM-1A Form for Sub-STR. M² 4.02
FM-2A Form for Super-STR. M²
SSP-CVL2-CB-P3CB-01
RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.04
RE-2A Re-Bar for Super-STR. (Deformed) Ton

AN ANCHORING & EMBEDDING WORK


ANA-2 Climbing Rung (Chemical Resistant) Ton 0.00
AN-3B-1 Embedded Steel Supply & Setting(Carbon Ton -

LN COATING & LINING WORK


LN-5E-1 Chemical Resistant Resin Lining (Epoxy) M² 2.17

ML METAL & PLASTIC WORK


ML-5B Grating Cover Ton 0.64
JT-4A Water Stop Plate M 4.00

70 P3- CATCH BASIN 02


EA EARTH WORK
EA-1A Excavation by Equipment (D≦3.0M) M³ 7.20
EA-1B Excavation by Equipment (D>3.0M) M³ -
EA-2A Backfilling (Excavated Soil) M³ 6.30
EA-3B Disposal of Soil (Outside of Factory) M³ 0.90

CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.06
CO-2A Concrete for Sub-STR. M³ 0.29
CO-3A Concrete for Super-STR. M³

FM FORM WORK
FM-1A Form for Sub-STR. M² 4.60
FM-2A Form for Super-STR. M²
SSP-CVL2-CB-P3CB-02
RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.05
RE-2A Re-Bar for Super-STR. (Deformed) Ton

AN ANCHORING & EMBEDDING WORK


ANA-2 Climbing Rung (Chemical Resistant) Ton 0.00
AN-3B-1 Embedded Steel Supply & Setting(Carbon Ton -

LN COATING & LINING WORK


BOQ Item BoQ Qty per
Description Report Ref. No. Unit
Code Drawing
LN-5E-1 Chemical Resistant Resin Lining (Epoxy) M² 2.27

ML METAL & PLASTIC WORK


ML-5B Grating Cover Ton 0.48
JT-4A Water Stop Plate M 5.60

71 P2- CONCRETE ENCASMENT PIPE DN - 200


EA EARTH WORK
EA-1A Excavation by Equipment (D≦3.0M) M³ 11.16
EA-1B Excavation by Equipment (D>3.0M) M³ -
EA-2A Backfilling (Excavated Soil) M³ 9.73
EA-3B Disposal of Soil (Outside of Factory) M³ 1.43

CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.18
CO-2A Concrete for Sub-STR. M³ -
CO-3A Concrete for Super-STR. M³
SSP-CVL2-AOC-P3-C0C- CEP DN
COA-6A Concrete for Super-STR. (K-350) M³ 1.09
200
FM FORM WORK
FM-1A Form for Sub-STR. M² 5.00
FM-2A Form for Super-STR. M²

RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.08
RE-2A Re-Bar for Super-STR. (Deformed) Ton

72 P3- CONCRETE ENCASMENT PIPE DN - 250


EA EARTH WORK
EA-1A Excavation by Equipment (D≦3.0M) M³ 11.16
EA-1B Excavation by Equipment (D>3.0M) M³ -
EA-2A Backfilling (Excavated Soil) M³ 9.73
EA-3B Disposal of Soil (Outside of Factory) M³ 1.43

CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.18
CO-2A Concrete for Sub-STR. M³ -
CO-3A Concrete for Super-STR. M³
SSP-CVL2-AOC-P3-C0C- CEP DN
COA-6A Concrete for Super-STR. (K-350) M³ 1.00
250
FM FORM WORK
FM-1A Form for Sub-STR. M² 5.00
FM-2A Form for Super-STR. M²

RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.08
BOQ Item BoQ Qty per
Description Report Ref. No. Unit
Code Drawing

73 ADDITIONAL UNDERGROUND PIPE WORK


EA-1A Excavation by Equipment (D≦3.0M) M³ 1,673.97
EA-2A Backfilling (Excavated Soil) M³ 969.98
EA-3B Disposal of Soil (Outside of Factory) M³ 105.51
EA-4B Sand Filling for U/G Pipe M³ 612.06
REA-1 Warning Mesh M² 197.29
PPX-2B GRE Pipe d=150 M 53.07
PPX-2C GRE Pipe d=200 M 133.67
PPX-2D GRE Pipe d=250 M 101.07
PPX-2E GRE Pipe d=300 M 1.50
UG PIPE P3
PP-1A Concrete Pipe d=100 M
PP-1B Concrete Pipe d=200 M
PPA-1C Concrete Pipe d=300 M 10.00
PP-1D Concrete Pipe d=400 M
PP-1E Concrete Pipe d=500 M -
PP-1F Concrete Pipe d=600 M 111.46
PP-1G Concrete Pipe d=700 M 100.00

LN-5D-1 Chemical Resistant Resin Coating (Epoxy M² 431.18


JTA-5 Joint Works for RCP EA 87.00

PPX-10A CS Pipe DN.100, For Vent Pipe M -


PPX-1-41 6" 150#RF Extended Operating Gate Valve With Up Right Indicator Pcs -
PPX-1-42 10" 150#RF Extended Operating Gate Valve With Up Right Indicator Pcs -
PPX-1-43 4" 150#RF Extended Operating Gate Valve With Up Right Indicator Ea -
PPX-2-1 Reducer 4"x6" (GRE) Ea -
PPX-2-10 Lateral Tee 6"x4" - Y Branch (GRE) Ea -
PPX-2-11 90 Deg Elbow 4" (GRE) Ea 6.00
PPX-2-12 45 deg Elbow 8" (GRE) Ea 13.00
PPX-2-13 Eccentric Reducer 4"x6" (GRE) Ea -
PPX-2-14 Lateral Tee 8"x6" Y-Branch (GRE) Ea 7.00
PPX-2-15 Lateral Tee 4"x4" - Y Branch (GRE) Ea -
PPX-2-16 45 deg Elbow 10" (GRE) Ea -
PPX-2-17 Lateral Tee 10"x8" - Y Branch (GRE) Ea -
PPX-2-18 Lateral tee 6"x6" - Y Branch (GRE) Ea -
PPX-2-2 45 deg Elbow 4" (GRE) Ea 2.00
PPX-2-3 Tee Branch 4"x4"x4" (GRE) Ea -
PPX-2-4 45 deg Elbow 6" (GRE) Ea 8.00
PPX-2-5 Tee Branch 6"x6"x6" (GRE) Ea -
PPX-2-6 Flange 4" 150#RF, GRE Ea -
PPX-2-7 Flange 6" 150#RF, GRE Ea -
PPX-2-8 Elbow 45deg ,CSP DN.200 Ea -
PPX-2-9 Elbow 90deg ,CSP DN.200 Ea -

74 AOC U-DITCH WORK (P3 Area)

EA-1A Excavation by Equipment (D≦3.0M) M3 -


EA-1C Excavation for Sewer by Hand M3 404.42
EAW-4 Backfilling and Compaction by Hand M3 172.53
EA-3B Disposal of Soil (Outside of Factory) M3 212.46
FM-1A Form for Sub-STR. M2 1,358.85
AOC U-DITCH P3
BOQ Item BoQ Qty per
Description Report Ref. No. Unit
Code Drawing
AOC U-DITCH P3
CO-1A Leveling Concrete M3 22.91
CO-2A Concrete for Sub-STR. M3 143.06
COA-5A Concrete Cover 150 thk. M3 0.42
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 14.63
ML-5B Grating Cover M2 215.86
AN-3B-1 Embedded Steel Supply & Setting(Carbon Ton 3.13
JT-5A Isolation Joint M 953.78

75 ROAD & PAVING WORK (P3 Area)

EA-1A Excavation by Equipment (D≦3.0M) M3 195.70


EA-2A Backfilling (Excavated Soil) M3 -
EA-3B Disposal of Soil (Outside of Factory) M3 -
BC-3A Base Course for Concrete Road/Paving M3 794.07
BC-4A Sub-Grade for Concrete Road/Paving M3 -
BC-5A Crushed Stone Paving M3 32.50
FM-1A Form for Sub-STR. M2 -
RDPV P3
CO-5A Concrete for Road/Paving M3 719.69
COA-6C Concrete for Road/Paving (K-350) M3 96.38
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.13
RE-3A Welded Wire Fabric Ton 25.19
JT-3A Expansion Joint for Road/Paving M 292.19
PL-1B Surface Finish for Road/Paving M2 6,962.17
PC-1A Pre-Cast Curbstone M 192.47
LN-5E-1 Chemical Resistant Resin Lining (Epoxy) M2 -
EAW-3 Final Grading for Bare Area M2 3,749.30

76 FOUNDATION PIPE SUPPORT ARROUND BLENDING V. 1361.02, V1361.03


EA EARTH WORK
EA-1A Excavation by Equipment (D≦3.0M) M³ -
EA-1B Excavation by Equipment (D>3.0M) M³ -
EA-2A Backfilling (Excavated Soil) M³ -
EA-3B Disposal of Soil (Outside of Factory) M³ -

CO CONCRETE WORK
CO-1A Leveling Concrete M³ -
CO-2A Concrete for Sub-STR. M³ 1.30
SSP-CVL2-LF- P3-1360-
CO-3A Concrete for Super-STR. M³
V,1361.02/03
FM FORM WORK
FM-1A Form for Sub-STR. M² 8.64
FM-2A Form for Super-STR. M²

RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.19
RE-2A Re-Bar for Super-STR. (Deformed) Ton

AN ANCHORING & EMBEDDING WORK


AN-2B Anchor Bolt W/O Template Setting Ton 0.02
AN-3B-1 Embedded Steel Supply & Setting(Carbon Steel) Ton -
AN-4B Chemical Anchor Nos 72.00
BOQ Item BoQ Qty per
Description Report Ref. No. Unit
Code Drawing
JT-5A Isolation Joint M 1.44

77 FOUNDATION PIPE SUPPORT ARROUND BLENDING V. 1361.01


EA EARTH WORK
EA-1A Excavation by Equipment (D≦3.0M) M³ -
EA-1B Excavation by Equipment (D>3.0M) M³ -
EA-2A Backfilling (Excavated Soil) M³ -
EA-3B Disposal of Soil (Outside of Factory) M³ -

CO CONCRETE WORK
CO-1A Leveling Concrete M³ -
CO-2A Concrete for Sub-STR. M³ 0.43
SSP-CVL2-LF- P3-1360-
CO-3A Concrete for Super-STR. M³
V.1361.01
FM FORM WORK
FM-1A Form for Sub-STR. M² 2.88
FM-2A Form for Super-STR. M²

RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.06
RE-2A Re-Bar for Super-STR. (Deformed) Ton

AN ANCHORING & EMBEDDING WORK


AN-2B Anchor Bolt W/O Template Setting Ton 0.01
AN-3B-1 Embedded Steel Supply & Setting(Carbon Steel) Ton -
AN-4B Chemical Anchor Nos 24.00
JT-5A Isolation Joint M 1.44

78 FOUNDATION PIPE SUPPORT AROUND BLENDING P1361.02,S1361.01,P1361.06,P1361.05,P1361.01A


EA EARTH WORK
EA-1A Excavation by Equipment (D≦3.0M) M³ 56.26
EA-1B Excavation by Equipment (D>3.0M) M³ -
EA-2A Backfilling (Excavated Soil) M³ 35.56
EA-3B Disposal of Soil (Outside of Factory) M³ 20.70

CO CONCRETE WORK
CO-1A Leveling Concrete M³ 2.02
CO-2A Concrete for Sub-STR. M³ 29.44
SSP-CVL2-LF -1360-
CO-3A Concrete for Super-STR. M³
P1361.01A/02/05/06,S1361
FM FORM WORK
FM-1A Form for Sub-STR. M² 47.59
FM-2A Form for Super-STR. M²

RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 2.42
RE-2A Re-Bar for Super-STR. (Deformed) Ton

AN ANCHORING & EMBEDDING WORK


AN-2B Anchor Bolt W/O Template Setting Ton 0.01
AN-3B-1 Embedded Steel Supply & Setting(Carbon Steel) Ton 0.63
AN-4B Chemical Anchor Nos -
BOQ Item BoQ Qty per
Description Report Ref. No. Unit
Code Drawing
JT-5A Isolation Joint M 19.70

79 FOUNDATION PIPE SUPPORT AROUND BLENDING P1361.01B, V6474.04


EA EARTH WORK
EA-1A Excavation by Equipment (D≦3.0M) M³ 30.37
EA-1B Excavation by Equipment (D>3.0M) M³ -
EA-2A Backfilling (Excavated Soil) M³ 17.99
EA-3B Disposal of Soil (Outside of Factory) M³ 12.38

CO CONCRETE WORK
CO-1A Leveling Concrete M³ 1.99
CO-2A Concrete for Sub-STR. M³ 11.23
SSP-CVL2-LF- 1360- P1361.01B,
CO-3A Concrete for Super-STR. M³
V6474.04
FM FORM WORK
FM-1A Form for Sub-STR. M² 28.41
FM-2A Form for Super-STR. M²

RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.92
RE-2A Re-Bar for Super-STR. (Deformed) Ton

AN ANCHORING & EMBEDDING WORK


AN-2B Anchor Bolt W/O Template Setting Ton 0.01
AN-3B-1 Embedded Steel Supply & Setting(Carbon Steel) Ton 0.20
AN-4B Chemical Anchor Nos -
JT-5A Isolation Joint M 16.20

80 FOUNDATION PIPE SUPPORT AROUND BLENDING P2361.05,P2361.02,S2361.01


EA EARTH WORK
EA-1A Excavation by Equipment (D≦3.0M) M³ 29.98
EA-1B Excavation by Equipment (D>3.0M) M³ -
EA-2A Backfilling (Excavated Soil) M³ 19.28
EA-3B Disposal of Soil (Outside of Factory) M³ 10.70

CO CONCRETE WORK
CO-1A Leveling Concrete M³ 1.33
CO-2A Concrete for Sub-STR. M³ 18.34
SSP-CVL2-LF- 1360 -
CO-3A Concrete for Super-STR. M³
P2361.05,P2361.02,S2361.01
FM FORM WORK
FM-1A Form for Sub-STR. M² 35.63
FM-2A Form for Super-STR. M²

RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 1.67
RE-2A Re-Bar for Super-STR. (Deformed) Ton

AN ANCHORING & EMBEDDING WORK


AN-2B Anchor Bolt W/O Template Setting Ton 0.01
AN-3B-1 Embedded Steel Supply & Setting(Carbon Steel) Ton 0.41
AN-4B Chemical Anchor Nos -
BOQ Item BoQ Qty per
Description Report Ref. No. Unit
Code Drawing
JT-5A Isolation Joint M 14.60

81 FOUNDATION PIPE SUPPORT AROUND BLENDING P2361.01, V6474.05


EA EARTH WORK
EA-1A Excavation by Equipment (D≦3.0M) M³ 34.44
EA-1B Excavation by Equipment (D>3.0M) M³ -
EA-2A Backfilling (Excavated Soil) M³ 22.10
EA-3B Disposal of Soil (Outside of Factory) M³ 12.34

CO CONCRETE WORK
CO-1A Leveling Concrete M³ 1.54
CO-2A Concrete for Sub-STR. M³ 13.95
SSP-CVL2-LF - 2360- P.2361.01,
CO-3A Concrete for Super-STR. M³
V6474.05
FM FORM WORK
FM-1A Form for Sub-STR. M² 33.31
FM-2A Form for Super-STR. M²

RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 1.33
RE-2A Re-Bar for Super-STR. (Deformed) Ton

AN ANCHORING & EMBEDDING WORK


AN-2B Anchor Bolt W/O Template Setting Ton 0.03
AN-3B-1 Embedded Steel Supply & Setting(Carbon Steel) Ton 0.13
AN-4B Chemical Anchor Nos -
JT-5A Isolation Joint M 21.60

82 FOUNDATION PIPE SUPPORT AROUND BLENDING V2361.01


EA EARTH WORK
EA-1A Excavation by Equipment (D≦3.0M) M³ -
EA-1B Excavation by Equipment (D>3.0M) M³ -
EA-2A Backfilling (Excavated Soil) M³ -
EA-3B Disposal of Soil (Outside of Factory) M³ -

CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.95
CO-2A Concrete for Sub-STR. M³ 2.15
CO-3A Concrete for Super-STR. SSP-CVL2-LF -2360- V.2361.01 M³

FM FORM WORK
FM-1A Form for Sub-STR. M² 6.30
FM-2A Form for Super-STR. M²

RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.51
RE-2A Re-Bar for Super-STR. (Deformed) Ton

AN ANCHORING & EMBEDDING WORK


AN-2B Anchor Bolt W/O Template Setting Ton 0.02
AN-3B-1 Embedded Steel Supply & Setting(Carbon Steel) Ton -
AN-4B Chemical Anchor Nos -
BOQ Item BoQ Qty per
Description Report Ref. No. Unit
Code Drawing
JT-5A Isolation Joint M -

83 FOUNDATION PIPE SUPPORT AROUND BLENDING V2361.02, V2361.03


EA EARTH WORK
EA-1A Excavation by Equipment (D≦3.0M) M³ -
EA-1B Excavation by Equipment (D>3.0M) M³ -
EA-2A Backfilling (Excavated Soil) M³ -
EA-3B Disposal of Soil (Outside of Factory) M³ -

CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.99
CO-2A Concrete for Sub-STR. M³ 1.90
SSP-CVL2-LF -2360-
CO-3A Concrete for Super-STR. M³
V.2361.02/03
FM FORM WORK
FM-1A Form for Sub-STR. M² 5.04
FM-2A Form for Super-STR. M²

RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.39
RE-2A Re-Bar for Super-STR. (Deformed) Ton

AN ANCHORING & EMBEDDING WORK


AN-2B Anchor Bolt W/O Template Setting Ton 0.02
AN-3B-1 Embedded Steel Supply & Setting(Carbon Steel) Ton -
AN-4B Chemical Anchor Nos -
JT-5A Isolation Joint M -

84 FOUNDATION PIPE SUPPORT AROUND 1370-STRIPPING AREA


EA EARTH WORK
EA-1A Excavation by Equipment (D≦3.0M) M³ 10.13
EA-1B Excavation by Equipment (D>3.0M) M³ -
EA-2A Backfilling (Excavated Soil) M³ 10.13
EA-3B Disposal of Soil (Outside of Factory) M³ -

CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.48
CO-2A Concrete for Sub-STR. M³ 2.83
SSP-CVL2-LF -1370- STRIPPING
CO-3A Concrete for Super-STR. M³
AREA
FM FORM WORK
FM-1A Form for Sub-STR. M² 8.45
FM-2A Form for Super-STR. M²

RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.24
RE-2A Re-Bar for Super-STR. (Deformed) Ton

AN ANCHORING & EMBEDDING WORK


AN-2B Anchor Bolt W/O Template Setting Ton 0.01
AN-3B-1 Embedded Steel Supply & Setting(Carbon Steel) Ton -
BOQ Item BoQ Qty per
Description Report Ref. No. Unit
Code Drawing
AN-4B Chemical Anchor Nos -
JT-5A Isolation Joint M 6.00
BOQ Item BoQ Qty per
Description Report Ref. No. Unit
Code Drawing
85 FOUNDATION PIPE SUPPORT AROUND STRIPPING P.1373.01 A/B, P 1373.03, V 1373.01
EA EARTH WORK
EA-1A Excavation by Equipment (D≦3.0M) M³ -
EA-1B Excavation by Equipment (D>3.0M) M³ -
EA-2A Backfilling (Excavated Soil) M³ -
EA-3B Disposal of Soil (Outside of Factory) M³ -

CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.60
CO-2A Concrete for Sub-STR. SSP-CVL2-LF -1370- STRIPPING M³ 1.16
CO-3A Concrete for Super-STR. P.1373.01 A/B, P 1373.03, V M³
1373.01
FM FORM WORK
FM-1A Form for Sub-STR. M² 5.36
FM-2A Form for Super-STR. M²

RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.26
RE-2A Re-Bar for Super-STR. (Deformed) Ton

AN ANCHORING & EMBEDDING WORK


AN-2B Anchor Bolt W/O Template Setting Ton -
AN-3B-1 Embedded Steel Supply & Setting(Carbon Steel) Ton 0.12
AN-4B Chemical Anchor Nos -
JT-5A Isolation Joint M -

86 FOUNDATION PIPE SUPPORT AROUND TAMOL


EA EARTH WORK
EA-1A Excavation by Equipment (D≦3.0M) M³ 31.37
EA-1B Excavation by Equipment (D>3.0M) M³ -
EA-2A Backfilling (Excavated Soil) M³ 24.88
EA-3B Disposal of Soil (Outside of Factory) M³ 6.49

CO CONCRETE WORK
CO-1A Leveling Concrete M³ 1.41
CO-2A Concrete for Sub-STR. M³ 9.24
CO-3A Concrete for Super-STR. SSP-CVL2-LF -1370- TAMOL M³

FM FORM WORK
FM-1A Form for Sub-STR. M² 43.66
FM-2A Form for Super-STR. M²

RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.80
RE-2A Re-Bar for Super-STR. (Deformed) Ton

AN ANCHORING & EMBEDDING WORK


AN-2B Anchor Bolt W/O Template Setting Ton 0.01
AN-3B-1 Embedded Steel Supply & Setting(Carbon Steel) Ton 0.19
AN-4B Chemical Anchor Nos -
JT-5A Isolation Joint M 39.70
BOQ Item BoQ Qty per
Description Report Ref. No. Unit
Code Drawing
87 FOUNDATION PIPE SUPPORT AROUND CRUMBS SLURRY U-3
EA EARTH WORK
EA-1A Excavation by Equipment (D≦3.0M) M³ 23.66
EA-1B Excavation by Equipment (D>3.0M) M³ -
EA-2A Backfilling (Excavated Soil) M³ 14.77
EA-3B Disposal of Soil (Outside of Factory) M³ 8.89

CO CONCRETE WORK
CO-1A Leveling Concrete M³ 1.26
CO-2A Concrete for Sub-STR. M³ 10.76
SSP-CVL2-LF -1370- CRUMBS
CO-3A Concrete for Super-STR. M³
SLURRY U-3
FM FORM WORK
FM-1A Form for Sub-STR. M² 27.08
FM-2A Form for Super-STR. M²

RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 1.19
RE-2A Re-Bar for Super-STR. (Deformed) Ton

AN ANCHORING & EMBEDDING WORK


AN-2B Anchor Bolt W/O Template Setting Ton 0.02
AN-3B-1 Embedded Steel Supply & Setting(Carbon Steel) Ton 0.18
AN-4B Chemical Anchor Nos -
JT-5A Isolation Joint M 10.80

88 FOUNDATION PIPE SUPPORT AROUND STRIPPING V.1372.01 /02/03


EA EARTH WORK
EA-1A Excavation by Equipment (D≦3.0M) M³ -
EA-1B Excavation by Equipment (D>3.0M) M³ -
EA-2A Backfilling (Excavated Soil) M³ -
EA-3B Disposal of Soil (Outside of Factory) M³ -

CO CONCRETE WORK
CO-1A Leveling Concrete M³ -
CO-2A Concrete for Sub-STR. M³ 4.90
SSP-CVL2-LF- 1370- STRIPPING
CO-3A Concrete for Super-STR. M³
V 1372.01/02/03
FM FORM WORK
FM-1A Form for Sub-STR. M² 14.50
FM-2A Form for Super-STR. M²

RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.68
RE-2A Re-Bar for Super-STR. (Deformed) Ton

AN ANCHORING & EMBEDDING WORK


AN-2B Anchor Bolt W/O Template Setting Ton 0.01
AN-3B-1 Embedded Steel Supply & Setting(Carbon Steel) Ton 0.24
AN-4B Chemical Anchor Nos -
JT-5A Isolation Joint M -
BOQ Item BoQ Qty per
Description Report Ref. No. Unit
Code Drawing
89 FOUNDATION PIPE SUPPORT AROUND STRIPPING V.1371.01 /02/03
EA EARTH WORK
EA-1A Excavation by Equipment (D≦3.0M) M³ -
EA-1B Excavation by Equipment (D>3.0M) M³ -
EA-2A Backfilling (Excavated Soil) M³ -
EA-3B Disposal of Soil (Outside of Factory) M³ -

CO CONCRETE WORK
CO-1A Leveling Concrete M³ -
CO-2A Concrete for Sub-STR. M³ 5.56
SSP-CVL2-LF- 1370- STRIPPING
CO-3A Concrete for Super-STR. M³
V 1371.01/02/03
FM FORM WORK
FM-1A Form for Sub-STR. M² 17.14
FM-2A Form for Super-STR. M²

RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.80
RE-2A Re-Bar for Super-STR. (Deformed) Ton

AN ANCHORING & EMBEDDING WORK


AN-2B Anchor Bolt W/O Template Setting Ton 0.01
AN-3B-1 Embedded Steel Supply & Setting(Carbon Steel) Ton -
AN-4B Chemical Anchor Nos -
JT-5A Isolation Joint M -

90 FOUNDATION PIPE SUPPORT AROUND STIPPING U.32 FIRE WATER LINE


EA EARTH WORK
EA-1A Excavation by Equipment (D≦3.0M) M³ 10.46
EA-1B Excavation by Equipment (D>3.0M) M³ -
EA-2A Backfilling (Excavated Soil) M³ 10.46
EA-3B Disposal of Soil (Outside of Factory) M³ -

CO CONCRETE WORK
CO-1A Leveling Concrete M³ 1.13
CO-2A Concrete for Sub-STR. M³ 6.02
SSP-CVL2-LF- 2370- STRIPPING
CO-3A Concrete for Super-STR. M³
U.32 WATER LINE
FM FORM WORK
FM-1A Form for Sub-STR. M² 22.81
FM-2A Form for Super-STR. M²

RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.35
RE-2A Re-Bar for Super-STR. (Deformed) Ton

AN ANCHORING & EMBEDDING WORK


AN-2B Anchor Bolt W/O Template Setting Ton 0.01
AN-3B-1 Embedded Steel Supply & Setting(Carbon Steel) Ton 0.03
AN-4B Chemical Anchor Nos -
JT-5A Isolation Joint M 12.20
BOQ Item BoQ Qty per
Description Report Ref. No. Unit
Code Drawing
91 FOUNDATION PIPE SUPPORT AROUND STRIPPING V.6412.01, V6415.01
EA EARTH WORK
EA-1A Excavation by Equipment (D≦3.0M) M³ -
EA-1B Excavation by Equipment (D>3.0M) M³ -
EA-2A Backfilling (Excavated Soil) M³ -
EA-3B Disposal of Soil (Outside of Factory) M³ -

CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.47
CO-2A Concrete for Sub-STR. M³ 0.90
SSP-CVL2-LF -2370- STRIPPING
CO-3A Concrete for Super-STR. M³
V.6412.01, V6415.01
FM FORM WORK
FM-1A Form for Sub-STR. M² 4.08
FM-2A Form for Super-STR. M²

RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.20
RE-2A Re-Bar for Super-STR. (Deformed) Ton

AN ANCHORING & EMBEDDING WORK


AN-2B Anchor Bolt W/O Template Setting Ton 0.01
AN-3B-1 Embedded Steel Supply & Setting(Carbon Steel) Ton 0.03
AN-4B Chemical Anchor Nos -
JT-5A Isolation Joint M -

92 FOUNDATION PIPE SUPPORT AROUND STRIPPING V.2373.01


EA EARTH WORK
EA-1A Excavation by Equipment (D≦3.0M) M³ 5.07
EA-1B Excavation by Equipment (D>3.0M) M³ -
EA-2A Backfilling (Excavated Soil) M³ 5.07
EA-3B Disposal of Soil (Outside of Factory) M³ -

CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.90
CO-2A Concrete for Sub-STR. M³ 2.61
SSP-CVL2-LF -2370- STRIPPING
CO-3A Concrete for Super-STR. M³
V.2373.01
FM FORM WORK
FM-1A Form for Sub-STR. M² 8.64
FM-2A Form for Super-STR. M²

RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.36
RE-2A Re-Bar for Super-STR. (Deformed) Ton

AN ANCHORING & EMBEDDING WORK


AN-2B Anchor Bolt W/O Template Setting Ton 0.01
AN-3B-1 Embedded Steel Supply & Setting(Carbon Steel) Ton 0.03
AN-4B Chemical Anchor Nos -
JT-5A Isolation Joint M 2.00
BOQ Item BoQ Qty per
Description Report Ref. No. Unit
Code Drawing
93 FOUNDATION PIPE SUPPORT AROUND STRIPPING V.2371.01/02/03
EA EARTH WORK
EA-1A Excavation by Equipment (D≦3.0M) M³ -
EA-1B Excavation by Equipment (D>3.0M) M³ -
EA-2A Backfilling (Excavated Soil) M³ -
EA-3B Disposal of Soil (Outside of Factory) M³ -

CO CONCRETE WORK
CO-1A Leveling Concrete M³ -
CO-2A Concrete for Sub-STR. M³ 5.43
SSP-CVL2-LF- 2370- STRIPPING
CO-3A Concrete for Super-STR. M³
V.2371.01/02/03
FM FORM WORK
FM-1A Form for Sub-STR. M² 16.14
FM-2A Form for Super-STR. M²

RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.47
RE-2A Re-Bar for Super-STR. (Deformed) Ton

AN ANCHORING & EMBEDDING WORK


AN-2B Anchor Bolt W/O Template Setting Ton 0.01
AN-3B-1 Embedded Steel Supply & Setting(Carbon Steel) Ton 0.29
AN-4B Chemical Anchor Nos -
JT-5A Isolation Joint M -

94 CWS U-DITCH WORK (P3 Area)

EA-1A Excavation by Equipment (D≦3.0M) M3 -


EA-1C Excavation for Sewer by Hand M3 149.09
EAW-4 Backfilling and Compaction by Hand M3 67.60
EA-3B Disposal of Soil (Outside of Factory) M3 81.49
FM-1A Form for Sub-STR. M2 411.07
CWS U-DITCH P3
CO-1A Leveling Concrete M3 9.09
CO-2A Concrete for Sub-STR. M3 42.34
COA-5A Concrete Cover 150 thk. M3 5.64
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 4.33
ML-5B Grating Cover M2 32.87
AN-3B-1 Embedded Steel Supply & Setting(Carbon Ton 0.50
JT-5A Isolation Joint M 94.00

95 FOUNDATION CABLE TRAY 2360 BLENDING AREA


EA EARTH WORK
EA-1A Excavation by Equipment (D≦3.0M) M³ 28.22
EA-1B Excavation by Equipment (D>3.0M) M³ -
EA-2A Backfilling (Excavated Soil) M³ 28.22
EA-3B Disposal of Soil (Outside of Factory) M³ -

CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.36
CO-2A Concrete for Sub-STR. M³ 4.13
SSP-CVL2-CT- P3-2360 AREA
CO-3A Concrete for Super-STR. M³
CABLE TRAY
BOQ Item BoQ Qty per
Description Report Ref.
SSP-CVL2-CT- No. AREA
P3-2360 Unit
Code Drawing
CABLE TRAY
FM FORM WORK
FM-1A Form for Sub-STR. M² 19.80
FM-2A Form for Super-STR. M²

RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.39
RE-2A Re-Bar for Super-STR. (Deformed) Ton

AN ANCHORING & EMBEDDING WORK


AN-2B Anchor Bolt W/O Template Setting Ton 0.01
AN-3B-1 Embedded Steel Supply & Setting(Carbon Steel) Ton -
AN-4B Chemical Anchor Nos -
JT-5A Isolation Joint M

96 FOUNDATION PIPE SUPPORT AROUND CRUMBS SLURRY U-32


EA EARTH WORK
EA-1A Excavation by Equipment (D≦3.0M) M³ -
EA-1B Excavation by Equipment (D>3.0M) M³ -
EA-2A Backfilling (Excavated Soil) M³ -
EA-3B Disposal of Soil (Outside of Factory) M³ -

CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.72
CO-2A Concrete for Sub-STR. M³ 2.38
SSP-CVL2-LF -2370- CRUMBS
CO-3A Concrete for Super-STR. M³
SLURRY U-32
FM FORM WORK
FM-1A Form for Sub-STR. M² 8.62
FM-2A Form for Super-STR. M²

RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.30
RE-2A Re-Bar for Super-STR. (Deformed) Ton

AN ANCHORING & EMBEDDING WORK


AN-2B Anchor Bolt W/O Template Setting Ton 0.02
AN-3B-1 Embedded Steel Supply & Setting(Carbon Steel) Ton 0.16
AN-4B Chemical Anchor Nos -
JT-5A Isolation Joint M -

97 P3- CATCH BASIN 01 (COC)


EA EARTH WORK
EA-1A Excavation by Equipment (D≦3.0M) M³ 10.83
EA-1B Excavation by Equipment (D>3.0M) M³ -
EA-2A Backfilling (Excavated Soil) M³ 8.94
EA-3B Disposal of Soil (Outside of Factory) M³ 1.89

CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.11
CO-2A Concrete for Sub-STR. M³ 1.25
CO-3A Concrete for Super-STR. M³

SSP-CVL2-CB-P3CB-01COC
BOQ Item BoQ Qty per
Description Report Ref. No. Unit
Code Drawing
FM FORM WORK
FM-1A Form for Sub-STR. M² 14.14
FM-2A Form for Super-STR. M²
SSP-CVL2-CB-P3CB-01COC
RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.13
RE-2A Re-Bar for Super-STR. (Deformed) Ton

AN ANCHORING & EMBEDDING WORK


ANA-2 Climbing Rung (Chemical Resistant) Ton 0.01
AN-3B-1 Embedded Steel Supply & Setting(Carbon Ton -

LN COATING & LINING WORK


LN-5E-1 Chemical Resistant Resin Lining (Epoxy) M² 6.73

ML METAL & PLASTIC WORK


ML-5B Grating Cover Ton 1.00
JT-4A Water Stop Plate M 5.20

98 LIGHTING POLE FOUNDATION P3 AREA


EA EARTH WORK
EA-1A Excavation by Equipment (D≦3.0M) M³ 7.37
EA-1B Excavation by Equipment (D>3.0M) M³ -
EA-2A Backfilling (Excavated Soil) M³ 4.66
EA-3B Disposal of Soil (Outside of Factory) M³ 2.71

CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.19
CO-2A Concrete for Sub-STR. SSP-CVL2-LPF- P3- LIGHTING M³ 3.28
CO-3A Concrete for Super-STR. POLE FOUNDATION M³

FM FORM WORK
FM-1A Form for Sub-STR. M² 14.82
FM-2A Form for Super-STR. M²

RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.17
RE-2A Re-Bar for Super-STR. (Deformed) Ton

99 HOSE BOX FOUNDATION P3 AREA


EA EARTH WORK
EA-1A Excavation by Equipment (D≦3.0M) M³ 16.74
EA-1B Excavation by Equipment (D>3.0M) M³ -
EA-2A Backfilling (Excavated Soil) M³ 14.01
EA-3B Disposal of Soil (Outside of Factory) M³ 2.73

CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.57
CO-2A Concrete for Sub-STR. M³ 4.32
SSP-CVL2-HB- P3-HOSE BOX
FOUNDATION P3 AREA
BOQ Item BoQ Qty per
Description Report Ref. No. Unit
Code Drawing
SSP-CVL2-HB- P3-HOSE BOX
CO-3A Concrete for Super-STR. M³
FOUNDATION P3 AREA
FM FORM WORK
FM-1A Form for Sub-STR. M² 22.32
FM-2A Form for Super-STR. M²

RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.38
RE-2A Re-Bar for Super-STR. (Deformed) Ton

JT-5A Isolation Joint M 37.20

100 GUARD POST P3 AREA


EA EARTH WORK
EA-1A Excavation by Equipment (D≦3.0M) M³ 8.51
EA-1B Excavation by Equipment (D>3.0M) M³ -
EA-2A Backfilling (Excavated Soil) M³ 8.51
EA-3B Disposal of Soil (Outside of Factory) M³ -

CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.18
CO-2A Concrete for Sub-STR. M³ 0.77
CO-3A Concrete for Super-STR. M³
SSP-CVL2-GP- P3-GUARD POST
FM FORM WORK
P3 AREA
FM-1A Form for Sub-STR. M² 10.32
FM-2A Form for Super-STR. M²

RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton -
RE-2A Re-Bar for Super-STR. (Deformed) Ton

AN ANCHORING & EMBEDDING WORK


AN-2B Anchor Bolt W/O Template Setting Ton -
AN-4A Expansion Anchor (Hole-in Anchor) Nos 8.00
MLA-1 Guard Post EA 16.00
JT-5A Isolation Joint M 2.40

101 FOUNDATION V6474.04 BLADDER TANK


EA EARTH WORK
EA-1A Excavation by Equipment (D≦3.0M) M³ 1.78
EA-1B Excavation by Equipment (D>3.0M) M³ -
EA-2A Backfilling (Excavated Soil) M³ 0.96
EA-3B Disposal of Soil (Outside of Factory) M³ 0.82

CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.10
CO-2A Concrete for Sub-STR. M³ 1.54
CO-3A Concrete for Super-STR. M³
SSP-CVL2-FDN-1360 - V6474.04
FM FORM WORK
FM-1A Form for Sub-STR. M² 5.14
FM-2A Form for Super-STR. M²
SSP-CVL2-FDN-1360 - V6474.04
BOQ Item BoQ Qty per
Description Report Ref. No. Unit
Code Drawing

RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.06
RE-2A Re-Bar for Super-STR. (Deformed) Ton

AN ANCHORING & EMBEDDING WORK


AN-1A Anchor Box Nos 4.00
JT-5A Isolation Joint M 4.80

102 FOUNDATION V6474.05 BLADDER TANK


EA EARTH WORK
EA-1A Excavation by Equipment (D≦3.0M) M³ 2.19
EA-1B Excavation by Equipment (D>3.0M) M³ -
EA-2A Backfilling (Excavated Soil) M³ 1.09
EA-3B Disposal of Soil (Outside of Factory) M³ 1.10

CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.13
CO-2A Concrete for Sub-STR. M³ 2.07
CO-3A Concrete for Super-STR. M³
SSP-CVL2-FDN-2360 - V6474.05
FM FORM WORK
FM-1A Form for Sub-STR. M² 5.99
FM-2A Form for Super-STR. M²

RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.06
RE-2A Re-Bar for Super-STR. (Deformed) Ton

AN ANCHORING & EMBEDDING WORK


AN-1A Anchor Box Nos 4.00
JT-5A Isolation Joint M 5.60
BOQ Item BoQ Qty per
Description Report Ref. No. Unit
Code Drawing
MONTHLY WORKS VALUATION SHEET

CONTRACT NO. : AY3102

MONTH :October 2017

Quantity of Work Done


Drawing No. Status *) Remarks
Previous This Month Cumulative

T 681.61 - 681.61
491.72 - 491.72
189.89 - 189.89

T 20.69 - 20.69
14122-ED-CO-CVL-DWG-STD-0105 Rev. 1,
14122-ED-CO-CVL-DWG-SSFD-2301 Rev. 1,
14122-ED-CO-CVL-DWG-SSFD-2201 Rev. 2,
14122-ED-CO-CVL-DWG-SSFD-2202 Rev. 2 T 345.24 - 345.24

T 14.56 - 14.56
164.01 - 164.01

0.02 - 0.02
61.60 61.60

T 147.97 - 147.97
96.54 - 96.54
51.42 - 51.42

14122-ED-CO-CVL-DWG-STD-0105 (Rev 3),


14122-ED-C0-CVL-DWG-SSFD-2201.(R2), T 5.94 0.10 6.04
14122-ED-C0-CVL-DWG-SSFD-2202.(R2)

T 115.36 - 115.36

T 3.60 - 3.60
14122-ED-CO-CVL-DWG-STD-0105 (Rev 3),
14122-ED-C0-CVL-DWG-SSFD-2201.(R2),
14122-ED-C0-CVL-DWG-SSFD-2202.(R2)

Quantity of Work Done


Drawing No. Status *) Remarks
Previous This Month Cumulative
43.71 - 43.71
22.40 22.40

39.12 - 39.12
12.50 - 12.50
26.62 - 26.62

0.47 - 0.47
2.79 - 2.79

70.16 - 70.16
11.48 - 11.48
14122-ED-P2-CVL-DWG-PTBN-0401.(R1)

0.52 - 0.52
3.60 - 3.60
12.13 - 12.13

11.60 - 11.60

0.07 - 0.07
0.04 - 0.04
40.87 - 40.87

125.19 - 125.19
44.46 - 44.46
90.31 - 90.31
79.34 - 79.34

1.71 - 1.71
5.68 - 5.68

15.82 - 15.82
1422-ED-P2-CVL-DWG-PTBN-1701 (REV 1) 127.70 - 127.70

1.07 - 1.07
10.98 - 10.98
1422-ED-P2-CVL-DWG-PTBN-1701 (REV 1)

Quantity of Work Done


Drawing No. Status *) Remarks
Previous This Month Cumulative
24.95 - 24.95

16.70 - 16.70

4.00 - 4.00
0.12 - 0.12

155.70 - 155.70
84.51 - 84.51
116.82 - 116.82
123.39 - 123.39

2.20 - 2.20
6.97 - 6.97

17.95 - 17.95
165.04 - 165.04
1422-ED-P2-CVL-DWG-PTBN-1901 (REV 1)

1.44 - 1.44
13.44 - 13.44
35.18 - 35.18

19.60 - 19.60
53.20 53.20

4.00 - 4.00
0.09 - 0.09
Quantity of Work Done
Drawing No. Status *) Remarks
Previous This Month Cumulative

205.73 - 205.73
138.33 - 138.33
150.70 - 150.70
193.36 - 193.36

4.35 - 4.35
6.53 - 6.53

22.54 - 22.54
216.34 - 216.34
1422-ED-P2-CVL-DWG-PTBN-1801 (REV 1)

2.06 - 2.06
23.78 - 23.78
56.00 - 56.00

20.10 - 20.10

4.00 - 4.00

118.99 - 118.99
18.24 - 18.24
74.37 - 74.37
62.86 - 62.86

1.53 - 1.53
4.56 - 4.56

15.17 - 15.17
1422-ED-P2-CVL-DWG-PTBN-2001 (REV 1) 93.85 - 93.85

0.99 - 0.99
9.73 - 9.73
25.21 - 25.21
Quantity of Work Done
Drawing No. Status *) Remarks
Previous This Month Cumulative
16.01 - 16.01

4.00 - 4.00

158.80 - 158.80
- - -
402.50 - 402.50
141.13 - 141.13

13.32 - 13.32
120.61 - 120.61
123.88 - 123.88

14122-ED-P2-CVL-DWG-SSFD-2201 s/d 2203 125.66 - 125.66


654.99 - 654.99

27.57 - 27.57
43.39 - 43.39

57.11 - 57.11

- 2.76 2.76
8.89 - 8.89
- 40.80 40.80

0.29 - 0.29
3.29 - 3.29
-

14122-ED-P2-CVL-DWG-EQFD-0050.(R1)
V6315.01 15.54 - 15.54
- - -

0.28 - 0.28
- - -

0.03 0.03
7.20 7.20
Quantity of Work Done
Drawing No. Status *) Remarks
Previous This Month Cumulative

0.24 - 0.24
2.67 - 2.67
- - -

14122-ED-P2-CVL-DWG-EQFD-0051.(R1)
V6315.02 13.89 - 13.89
- - -

0.25 - 0.25
- - -

0.03 0.03
6.40 6.40

1,504.35 - 1,504.35
- - -
964.66 - 964.66
539.69 - 539.69

28.56 - 28.56
519.06 - 519.06
2.34 - 2.34
- - -
- - -
14122-ED-P2-CVL-DWG-SSFD-2205 s/d 2210 283.65 - 283.65
15.62 - 15.62
- - -
- - -
82.95 - 82.95
0.69 - 0.69

254.79 - 254.79

0.45 - 0.45
85.60 85.60

79.79 - 79.79
- - -
Quantity of Work Done
Drawing No. Status *) Remarks
Previous This Month Cumulative
60.97 - 60.97
18.82 - 18.82

2.05 - 2.05
18.01 - 18.01
- - -
14122-ED-P2-CVL-DWG-SSFD-2230 (Rev 1) - - -
14122-ED-P2-CVL-DWG-STRC-0501.(R2) - - -
43.25 - 43.25
- - -
- - -
- - -
1.71 - 1.71
- - -

0.08 - 0.08
2.72 2.72

92.26 - 92.26
- - -
65.73 - 65.73
26.66 - 26.66

2.16 - 2.16
21.62 - 21.62
6.44 - 6.44
- - -
14122-ED-P3-CVL-DWG-SSFD-2209
- - -
37.84 - 37.84
52.80 - 52.80
- - -
- - -
2.80 - 2.80
0.38 - 0.38

16.00 - 16.00
20.80 20.80

42.97 - 42.97
- - -
Quantity of Work Done
Drawing No. Status *) Remarks
Previous This Month Cumulative
32.25 - 32.25
10.72 - 10.72

1.05 - 1.05
10.94 - 10.94
-
- - -
14122-ED-P2-CVL-DWG-SSFD-2235
- - -
32.04 - 32.04
-

1.64 - 1.64
- - -

0.05 - 0.05
12.00 12.00

81.17 - 81.17
- - -
61.96 - 61.96
19.21 - 19.21

1.59 - 1.59
16.28 - 16.28
4.29 - 4.29
- - -
14122-ED-P2-CVL-DWG-EQFD-0015
- - -
27.72 - 27.72
39.66 - 39.66
- - -
- - -
2.01 - 2.01
0.80 - 0.80

12.00 - 12.00
15.00 15.00

55.55 - 55.55
- - -
Quantity of Work Done
Drawing No. Status *) Remarks
Previous This Month Cumulative
41.84 - 41.84
13.72 - 13.72

1.46 - 1.46
13.22 - 13.22
-
-
14122-ED-P2-CVL-DWG-SSFD-2260
-
29.53 - 29.53
-
-
-
1.25 - 1.25
-

0.03 - 0.03
10.40 10.40

222.68 - 222.68
- - -
173.11 - 173.11
49.58 - 49.58

4.58 - 4.58
40.58 - 40.58
59.14 - 59.14

14122-ED-P2-CVL-DWG-SSFD-2215 (Rev 1)
61.82 - 61.82
319.54 - 319.54

4.52 - 4.52
20.28 - 20.28

0.22 - 0.22

2.95 - 2.95
24.66 24.66
Quantity of Work Done
Drawing No. Status *) Remarks
Previous This Month Cumulative
95.33 - 95.33
- - -
66.47 - 66.47
28.86 - 28.86

2.63 - 2.63
27.42 - 27.42
- - -
14122-ED-P2-CVL-DWG-SSFD-7001 (Rev 1)

46.42 - 46.42
- - -

1.75 - 1.75
- - -

0.05 - 0.05
2.12

37.83 - 37.83
- - -
32.77 - 32.77
5.06 - 5.06

0.18 0.24 0.41


5.33 (0.27) 5.06

14122-VD-P3-CVL-DWG-AY3102-001 (REV 1) 27.56 - 27.56


-

0.57 - 0.57
-

7.00 - 7.00

0.01 - 0.01
9.14 - 9.14
1.00 - 1.00
Quantity of Work Done
Drawing No. Status *) Remarks
Previous This Month Cumulative

37.83 - 37.83
- - -
32.77 - 32.77
- 5.06 5.06

0.18 0.24 0.41


1.80 (0.27) 1.53

14122-VD-P3-CVL-DWG-AY3102-001 (REV 1) 22.26 - 22.26

0.47 - 0.47

7.00 - 7.00

0.01 - 0.01
10.46 - 10.46
1.00 - 1.00

81.18 - 81.18
-
59.03 - 59.03
22.15 22.15

1.15 - 1.15
21.00 - 21.00
13.77 - 13.77
14122-ED-P2-CVL-DWG-EQFD-0010.(R1)
V6414.01
19.00 - 19.00
66.32 - 66.32

1.04 - 1.04
2.51 - 2.51
Quantity of Work Done
Drawing No. Status *) Remarks
Previous This Month Cumulative

8.00 - 8.00
8.07 8.07

74.26 - 74.26
- - -
56.34 - 56.34
- 17.91 17.91

1.56 - 1.56
17.31 - 17.31

36.09 - 36.09
14122-ED-P2-CVL-DWG-SSFD-2270 (Rev 1)
- - -

1.76 - 1.76
- - -

3.20 3.20

0.03 - 0.03

864.30 - 864.30
-
591.13 - 591.13
273.17

22.04 - 22.04
259.79 - 259.79

14122-ED-P2-CVL-DWG-SSFD-2219 (Rev 1)

244.33 - 244.33
14122-ED-P2-CVL-DWG-SSFD-2219 (Rev 1)

Quantity of Work Done


Drawing No. Status *) Remarks
Previous This Month Cumulative
53.89 - 53.89

0.36 - 0.36
10.89 10.89

106.82 - 106.82
-
77.40 - 77.40
29.42 29.42

2.61 - 2.61
28.74 - 28.74

14122-ED-P2-CVL-DWG-SSFD-2240 (Rev 1)

59.16 - 59.16

2.10 - 2.10

0.08 - 0.08
3.63 3.63

15.42 - 15.42
-
3.35 - 3.35
12.07 12.07

1.30 - 1.30
67.38 - 67.38

14122-ED-P2-CVL-DWG-EQFD-0053 (REV 1)

49.91 - 49.91

0.82 - 0.82
14122-ED-P2-CVL-DWG-EQFD-0053 (REV 1)

Quantity of Work Done


Drawing No. Status *) Remarks
Previous This Month Cumulative

0.04 - 0.04
17.89 17.89

20.46 - 20.46
-
13.68 - 13.68
6.78

0.52 - 0.52
4.56 - 4.56
4.20 - 4.20
14122-ED-P2-CVL-DWG-EQFD-0021.(R1)

6.20 - 6.20
21.74 - 21.74

0.30 - 0.30
0.34 - 0.34

4.00 - 4.00
8.80

270.29 - 270.29
-
206.31 - 206.31
63.98 63.98

5.48 - 5.48
58.49 - 58.49
2.07 - 2.07
14122-ED-P2-CVL-DWG-SSBG-1101 (Rev 1)

118.72 - 118.72
16.56 - 16.56

5.83 - 5.83
0.35 - 0.35
Quantity of Work Done
Drawing No. Status *) Remarks
Previous This Month Cumulative

0.03 - 0.03
37.20 37.20

29.67 - 29.67
-
19.86 - 19.86
9.80 9.80

0.78 - 0.78
7.02 - 7.02
4.94 - 4.94
14122-ED-P2-CVL-DWG-EQFD-0017.(R1)

7.90 - 7.90
24.70 - 24.70

0.52 - 0.52
0.42 - 0.42

8.00 - 8.00
10.00 10.00
Quantity of Work Done
Drawing No. Status *) Remarks
Previous This Month Cumulative

49.95 - 49.95
3.80 - 3.80
41.98 - 41.98
- 11.77 11.77

0.25 0.24 0.49


1.17 (0.27) 0.90
4.97 - 4.97

3.70 - 3.70
14122-VD-P2-CVL-DWG-AY3102-001 (REV 1) 37.12 - 37.12

0.11 - 0.11
0.88 0.88

7.60 - 7.60

0.02 - 0.02

17.51 - 17.51
1.00 - 1.00
3.00 3.00

65.91 - 65.91
3.80 - 3.80
57.94 - 57.94
- 11.77 11.77

0.25 0.24 0.49


1.01 (0.27) 0.74
5.05 - 5.05

4.37 - 4.37
14122-VD-P2-CVL-DWG-AY3102-001 (REV 1) 36.58 - 36.58

0.11 - 0.11
0.88 - 0.88
14122-VD-P2-CVL-DWG-AY3102-001 (REV 1)

Quantity of Work Done


Drawing No. Status *) Remarks
Previous This Month Cumulative

7.60 - 7.60

0.02 - 0.02

17.35 - 17.35
1.00 - 1.00
3.00 3.00

6.94 - 6.94
-
2.49 - 2.49
4.45 4.45

0.47 - 0.47
13.98 - 13.98

14122-ED-P2-CVL-DWG-EQFD-0035.(R1)

24.12 - 24.12

0.51 - 0.51

6.00 - 6.00
14.21 14.21

3.55 - 3.55

1.57 - 1.57
1.98

0.22 - 0.22
3.78 - 3.78

14122-ED-P2-CVL-DWG-EQFD-0036.(R1)

9.25 - 9.25
14122-ED-P2-CVL-DWG-EQFD-0036.(R1)
Quantity of Work Done
Drawing No. Status *) Remarks
Previous This Month Cumulative

0.10 - 0.10

6.00 - 6.00
8.60 8.60

13.88 - 13.88
-
4.98 - 4.98
8.89 8.89

0.94 - 0.94
28.43 - 28.43

14122-ED-P2-CVL-DWG-EQFD-0037.(R1)

49.05 - 49.05

1.02 - 1.02

12.00 - 12.00
28.42 28.42

5.23 - 5.23
-
2.14 - 2.14
3.09 3.09

0.34 - 0.34
9.95 - 9.95

14122-ED-P2-CVL-DWG-EQFD-0038.(R1)

20.72 - 20.72
14122-ED-P2-CVL-DWG-EQFD-0038.(R1)

Quantity of Work Done


Drawing No. Status *) Remarks
Previous This Month Cumulative

0.46 - 0.46

6.00 - 6.00
12.00 12.00

7.11 - 7.11
-
3.14 - 3.14
3.96 3.96

0.44 - 0.44
7.57 - 7.57

14122-ED-P2-CVL-DWG-EQFD-0033.(R1)

18.49 - 18.49

0.20 - 0.20

12.00 - 12.00
- -

42.30 - 42.30
-
32.06 - 32.06
10.24 10.24

0.88 - 0.88
8.13 - 8.13
2.79 - 2.79
14122-ED-P2-CVL-DWG-EQFD-0018(Rev 1)

23.16 23.16
20.55 20.55
14122-ED-P2-CVL-DWG-EQFD-0018(Rev 1)

Quantity of Work Done


Drawing No. Status *) Remarks
Previous This Month Cumulative
1.01 - 1.01
0.57 - 0.57

8.00 - 8.00
10.00 10.00

42.30 - 42.30
-
32.06 - 32.06
10.24 10.24

0.88 - 0.88
8.13 - 8.13
2.79 - 2.79
14122-ED-P2-CVL-DWG-EQFD-0019 (Rev 1)

23.16 - 23.16
20.55 - 20.55

0.95 - 0.95
0.45 - 0.45

8.00 - 8.00
10.00 10.00

6.14 - 6.14
-
2.76 - 2.76
3.38 3.38

0.378 - 0.38
6.45 - 6.45

14122-ED-P2-CVL-DWG-EQFD-0034.(R1)

15.91 - 15.91

0.18 - 0.18
14122-ED-P2-CVL-DWG-EQFD-0034.(R1)

Quantity of Work Done


Drawing No. Status *) Remarks
Previous This Month Cumulative

12.00 - 12.00
14.80 14.80

19.27 - 19.27
-
16.26 - 16.26
3.01 3.01

0.34 - 0.34
2.26 - 2.26
1.03 - 1.03
14122-ED-P2-CVL-DWG-EQFD-0016 (Rev 1)

11.64 - 11.64
9.02 - 9.02

0.19 - 0.19
0.15 - 0.15

4.00 - 4.00
4.00 4.00

5.57 - 5.57
-
1.96 - 1.96
3.61 3.61
-
-
0.38 - 0.38
6.94 - 6.94
-
-
14122-ED-P2-CVL-DWG-EQFD-0027 (Rev 1)
-
11.83 11.83
- -
-
-
0.15 - 0.15
-
Quantity of Work Done
Drawing No. Status *) Remarks
Previous This Month Cumulative
-
-
4.00 - 4.00
11.00 11.00

3.17 - 3.17
-
1.80 - 1.80
1.37 1.37
-
-
0.17 - 0.17
2.60 - 2.60
-
-
14122-ED-P2-CVL-DWG-EQFD-0058.(R1)
-
9.55 - 9.55
-
-
-
0.09 - 0.09
-
-
-
8.00 - 8.00
8.80 8.80

4.63 - 4.63
-
2.12 - 2.12
2.51 2.51
-
-
0.31 - 0.31
2.66 - 2.66
-
-
14122-ED-P2-CVL-DWG-EQFD-0054 (Rev 1)
-
8.50 - 8.50
-
-
-
0.23 - 0.23
- -
Quantity of Work Done
Drawing No. Status *) Remarks
Previous This Month Cumulative

0.01 - 0.01
7.20 7.20

2.66 - 2.66
-
1.22 - 1.22
1.44 1.44

0.16 - 0.16
2.75 - 2.75

14122-ED-P2-CVL-DWG-EQFD-0011.(R1)

6.88 - 6.88
-
-
-
0.11 - 0.11
-

0.00 - 0.004
6.400 6.40

1.99 - 1.99
-
1.03 - 1.03
0.96 0.96

0.11 - 0.11
1.82 - 1.82

14122-ED-P2-CVL-DWG-EQFD-0011.(R1)

5.59 - 5.59

0.09 - 0.09
-
Quantity of Work Done
Drawing No. Status *) Remarks
Previous This Month Cumulative
0.00 - 0.004
5.200 5.20

3.08 - 3.08
-
1.80 - 1.80
1.28 1.28
-
-
0.16 - 0.16
2.41 - 2.41
-
-
14122-ED-P2-CVL-DWG-EQFD-0030 (Rev 1)
-
9.46 - 9.46
-
-
-
0.10 - 0.10
-
-
-
8.00 - 8.00
8.80 8.80

2.54 - 2.54
-
1.19 - 1.19
1.35 1.35
-
-
0.15 - 0.15
2.58 - 2.58
-
-
14122-ED-P2-CVL-DWG-EQFD-0047.(R1)
-
6.67 - 6.67
-
-
-
0.11 - 0.11
-
-
-
0.00 - 0.004
Quantity of Work Done
Drawing No. Status *) Remarks
Previous This Month Cumulative
6.200 6.20

3.08 - 3.08
-
1.80 - 1.80
1.28 1.28
-
-
0.16 - 0.16
2.41 - 2.41
-
-
14122-ED-P2-CVL-DWG-EQFD-0028 (Rev 1)
-
9.46 - 9.46
-
-
-
0.09 - 0.09
-
-
-
8.00 - 8.00
8.80

3.08 - 3.08
- - -
1.80 - 1.80
1.28 - 1.28
-
-
0.16 - 0.16
2.41 - 2.41
- - -
-
14122-ED-P2-CVL-DWG-EQFD-0029 (Rev 1)
-
9.46 - 9.46
- - -
-
-
0.09 - 0.09
- - -
-
-
8.00 - 8.00
8.80 8.80
Quantity of Work Done
Drawing No. Status *) Remarks
Previous This Month Cumulative

4.58 - 4.58
- - -
2.31 - 2.31
2.26 - 2.26
-
-
0.26 - 0.26
4.30 - 4.30
- - -
-
14122-ED-P2-CVL-DWG-EQFD-0046.(R1)
-
12.90 - 12.90
- - -
-
-
0.15 - 0.15
- - -
-
-
8.00 - 8.00
12.00 12.00

T-UP PUMP (2nd STAGE)

2.82 - 2.82
-
1.35 - 1.35
1.47 1.47
-
-
0.17 - 0.17
2.83 - 2.83
-
-
14122-ED-P2-CVL-DWG-EQFD-0045.(R1)
-
7.85 - 7.85
-
-
-
0.11 - 0.11
-
-
-
6.00 - 6.00
7.20 7.20
Quantity of Work Done
Drawing No. Status *) Remarks
Previous This Month Cumulative

T-UP PUMP (1st STAGE)

3.45 - 3.45
-
1.56 - 1.56
1.89 1.89
-
-
0.21 - 0.21
3.61 - 3.61
-
-
14122-ED-P2-CVL-DWG-EQFD-0044.(R0)
-
9.14 - 9.14
-
-
-
0.12 - 0.12
-
-
-
6.00 - 6.00
8.50 8.50

5.64 - 5.64
-
2.19 - 2.19
3.45 3.45
-
-
0.37 - 0.37
10.68 - 10.68
-
-
14122-ED-P2-CVL-DWG-EQFD-0043.(R1)
-
19.30 - 19.30
-
-
-
0.38 - 0.38
-
-
-
6.00 - 6.00
12.31 12.31
Quantity of Work Done
Drawing No. Status *) Remarks
Previous This Month Cumulative

10.62 - 10.62
-
4.36 - 4.36
6.26 6.26
-
-
0.69 - 0.69
19.59 - 19.59
-
-
14122-ED-P2-CVL-DWG-EQFD-0042.(R1)
-
39.19 - 39.19
-
-
-
0.88 - 0.88
-
-
-
12.00 - 12.00
24.60 24.60

5.31 - 5.31
-
2.18 - 2.18
3.13 3.13
-
-
0.34 - 0.34
9.60 - 9.60
-
-
14122-ED-P2-CVL-DWG-EQFD-0041.(R1)
-
19.20 - 19.20
-
-
-
0.45 - 0.45
-
-
-
6.00 - 6.00
12.30 12.30
Quantity of Work Done
Drawing No. Status *) Remarks
Previous This Month Cumulative

3.27 - 3.27
-
1.48 - 1.48
1.80 1.80
-
-
0.20 - 0.20
3.43 - 3.43
-
-
14122-ED-P2-CVL-DWG-EQFD-0040.(R1)
-
8.60 - 8.60
-
-
-
0.09 - 0.09
-
-
-
6.00 - 6.00
8.00 8.00

98.24 - 98.24
-
65.47 - 65.47
33.31 33.31
-
-
2.91 - 2.91
20.59 - 20.59
31.02 - 31.02
-
14122-ED-P2-CVL-DWG-DIKE-1301 (Rev 2)
-
35.58 - 35.58
206.82 - 206.82
-
-
2.69 - 2.69
3.85 - 3.85
-
-
0.01 - 0.01
56.85 56.85
Quantity of Work Done
Drawing No. Status *) Remarks
Previous This Month Cumulative
4.10 - 4.10
-
1.71 - 1.71
2.39 2.39
-
-
0.28 - 0.28
5.10 - 5.10
-
-
14122-ED-P2-CVL-DWG-EQFD-0064 (REV 1)
-
8.51 - 8.51
- -
-
-
0.19 - 0.19
-
-
-
0.01 - 0.01
9.48 9.48

OLING WATER PUMP

5.74 - 5.74
-
2.63 - 2.63
3.11 3.11
-
-
0.35 - 0.35
5.93 - 5.93
-
-
14122-ED-P2-CVL-DWG-EQFD-0031.(R1)
-
15.05 - 15.05
-
-
-
0.15 - 0.15
-
-
-
16.00 - 16.00
14.00 14.00

3.86 - 3.86
Quantity of Work Done
Drawing No. Status *) Remarks
Previous This Month Cumulative
-
1.59 - 1.59
2.27 2.27
-
-
0.25 - 0.25
2.29 - 2.29
-
-
14122-ED-P2-CVL-DWG-EQFD-0031.(R1)
-
6.95 - 6.95
-
-
-
0.20 - 0.20
-
-
-
4.00 - 4.00
10.60 10.60

OLING WATER PUMP

5.74 - 5.74
- - -
2.63 - 2.63
3.11 - 3.11
-
-
0.35 - 0.35
5.93 - 5.93
-
-
14122-ED-P2-CVL-DWG-EQFD-0024.(R1)
-
15.05 - 15.05
-
-
-
0.17 - 0.17
-
-
-
16.00 - 16.00
14.00 14.00

OLING WATER PUMP

5.64 - 5.64
- - -
Quantity of Work Done
Drawing No. Status *) Remarks
Previous This Month Cumulative
2.60 - 2.60
- 3.04 3.04
-
-
0.34 - 0.34
5.81 - 5.81
- -
-
14122-ED-P2-CVL-DWG-EQFD-0022.(R1)
-
14.84 - 14.84
-
-
-
0.16 - 0.16
-
-
-
16.00 - 16.00
13.80 13.80

8.55 - 8.55
- - -
3.34 - 3.34
5.21 - 5.21
-
-
0.56 - 0.56
5.18 - 5.18
- - -
-
14122-ED-P2-CVL-DWG-EQFD-0001 (Rev 1)
-
14.41 - 14.41
-
-
-
0.43 - 0.43
-
-
-
4.00 - 4.00
22.20 22.20

4.63 - 4.63
-
2.24 - 2.24
Quantity of Work Done
Drawing No. Status *) Remarks
Previous This Month Cumulative
2.39 2.39
-
-
0.14 - 0.14
3.15 - 3.15

-
14122-ED-P2-CVL-DWG-EQFD-0062.(R1)
-
8.40 - 8.40
-
-
-
0.08 - 0.08
-
-
-
- - -
6.00 6.00
2.25 2.25

1.59 - 1.59
- - -
0.90 - 0.90
0.69 - 0.69
-
-
0.08 - 0.08
1.29 - 1.29

-
14122-ED-P2-CVL-DWG-EQFD-0048.(R1)
-
4.71 - 4.71
-
-
-
0.05 - 0.05
-
-
-
0.00 - 0.003
4.400 4.40

99.42 - 99.42
-
84.79 - 84.79
14.62 14.62
Quantity of Work Done
Drawing No. Status *) Remarks
Previous This Month Cumulative
-
-
0.51 - 0.51
8.50 - 8.50

-
-
78.61 - 78.61
-
-
14122-ED-CO-CVL-PTBN-0602 (REV 1) -
0.73 - 0.73
-

5.60 - 5.60
22.40 22.40
-
-
0.04 - 0.042
- - -

32.81 32.81

- -

14.19 - 14.19
-
3.19 - 3.19
11.00 11.00
-
-
1.09 - 1.09
17.25 - 17.25

-
14122-ED-P2-CVL-DWG-EQFD-0070.(R1)
-
16.27 - 16.27
-
-
-
0.54 - 0.54
-
-
-
6.00 - 6.00
Quantity of Work Done
Drawing No. Status *) Remarks
Previous This Month Cumulative
18.70 18.70

3.17 - 3.17
- - -
1.35 - 1.35
1.82 - 1.82
-
-
0.20 - 0.20
3.47 - 3.47

-
14122-ED-P2-CVL-DWG-EQFD-0003.(R1)
-
7.70 - 7.70
-
-
-
0.09 - 0.09
-
-
-
4.00 - 4.00
7.20 7.20

3.17 (1.57) 1.60


- - -
1.35 (0.43) 0.92
1.82 (1.14) 0.68
-
-
0.20 (0.12) 0.08
3.47 (2.19) 1.27

-
14122-ED-P2-CVL-DWG-EQFD-0026.(R1)
-
7.70 (2.89) 4.82
-
-
-
0.09 (0.04) 0.05
-
-
-
4.00 - 4.00
4.50 4.50
Quantity of Work Done
Drawing No. Status *) Remarks
Previous This Month Cumulative

0.96 - 0.96
- - -
0.66 - 0.66
0.30 - 0.30
-
-
0.04 - 0.04
0.56 - 0.56

-
14122-ED-P2-CVL-DWG-EQFD-0060.(R1)
-
3.12 - 3.12
-
-
-
0.03 - 0.03
-
-
-
4.00 - 4.00
2.90 2.90

3.17 0.06 3.23


- - -
1.35 0.47 1.82
1.82 (0.41) 1.41
-
-
0.20 (0.03) 0.17
3.47 (0.45) 3.02

-
14122-ED-P2-CVL-DWG-EQFD-0059.(R1)
-
7.70 3.18 10.88
-
-
-
0.09 0.00 0.09
-
-
-
4.00 4.00 8.00
8.92 8.92
Quantity of Work Done
Drawing No. Status *) Remarks
Previous This Month Cumulative

22.08 - 22.08
- - -
16.07 - 16.07
6.01 - 6.01
-
-
0.27 - 0.27
3.42 - 3.42

-
-
14122-ED-CO-CVL-DWG-PTBN-0702 (REV 2)
23.06 - 23.06
-
-
-
1.08 - 1.08
-
-
-
0.01 - 0.01
-
-
11.41 - 11.41
8.60 8.60
- 3.30 3.30

7.68 - 7.68
- - -
6.71 - 6.71
0.97 - 0.97
-
-
0.07 - 0.07
0.42 - 0.42

-
-
6.90 - 6.90
14122-ED-C0-CVL-DWG-PTBN-0601_R1 -
-
-
0.06 - 0.06
-
-
-
14122-ED-C0-CVL-DWG-PTBN-0601_R1

Quantity of Work Done


Drawing No. Status *) Remarks
Previous This Month Cumulative
0.00 - 0.00
-
-
3.45 - 3.45
-
-
0.64 0.64
- 4.00 4.00

2.66 - 2.66
- - -
1.22 - 1.22
1.44 - 1.44
-
-
0.16 - 0.16
2.74 - 2.74

-
14122-ED-P2-CVL-DWG-EQFD-0009.(R1)
-
6.85 - 6.85
-
-
-
0.11 - 0.11
-
-
-
0.02 - 0.02
6.40 6.40

49.95 - 49.95
- - -
41.98 - 41.98
11.77 - 11.77
-
-
0.25 0.24 0.49
1.17 (0.27) 0.90
4.98 4.98
-
-
3.70 - 3.70
14122-VD-P2-CVL-DWG-AY3102-001 (REV 1) 37.02 - 37.02
-
-
14122-VD-P2-CVL-DWG-AY3102-001 (REV 1)
Quantity of Work Done
Drawing No. Status *) Remarks
Previous This Month Cumulative
0.11 - 0.11
0.88 - 0.88

7.60 - 7.60
-
-
0.02 - 0.02

17.63 - 17.63
1.00 - 1.00
2.00 2.00

22.08 - 22.08
- - -
16.07 - 16.07
6.01 - 6.01
-
-
0.27 - 0.27
3.29 - 3.29

-
-
14122-ED-CO-CVL-DWG-PTBN-0702 (REV 2)
22.65 - 22.65

-
-
1.08 - 1.08
-
-
-
0.01 - 0.01

9.87 - 9.87
8.60 8.60
3.30 3.30

3.25 - 3.25
- - -
1.70 - 1.70
1.55 - 1.55
-
Quantity of Work Done
Drawing No. Status *) Remarks
Previous This Month Cumulative
-
0.11 - 0.11
0.66 - 0.66

-
-
6.54 - 6.54
14122-ED-CO-CVL-PTBN-0602 (REV 1) -
-
-
0.08 - 0.08
-
-
-
0.00 - 0.00

3.60 - 3.60

- 1.00 1.00
5.20 5.20

2.71 - 2.71
- - -
1.41 - 1.41
1.30 - 1.30
-
-
0.11 - 0.11
0.54 - 0.54
- -
-
-
5.11 - 5.11
-
14122-ED-CO-CVL-PTBN-0602 (REV 1)
-
-
0.07 - 0.07
-
-
-
0.00 - 0.00

3.00 3.00
Quantity of Work Done
Drawing No. Status *) Remarks
Previous This Month Cumulative
- 1.00 1.00
5.20 5.20

11.16 - 11.16
- - -
9.73 - 9.73
1.43 - 1.43
-
-
0.18 - 0.18
- - -
14122-ED-P2-CVL-DRSW-0401 (REV 2) - - -
1.09 - 1.09
-
-
5.00 - 5.00
-
-
-
0.08 - 0.08
-

18.84 - 18.84
- - -
3.41 - 3.41
15.43 - 15.43
-
-
1.83 - 1.83
14.52 - 14.52
14122-ED-P2-CVL-DWG-LOFD-5001.(R1)
V6414.01
-
-
15.26 - 15.26
-
-
-
1.89 - 1.89
-
-

0.05 - 0.05
- -
Quantity of Work Done
Drawing No. Status *) Remarks
Previous This Month Cumulative

1.76 - 1.76
- - -
0.96 - 0.96
0.80 0.80
-
-
0.10 - 0.10
1.50 - 1.50
14122-ED-P2-CVL-DWG-EQFD-0004.(R1)
-
-
5.14 - 5.14
-
-
-
0.05 - 0.05
-
-

4.00 - 4.00
4.80 4.80

31.07 - 31.07
- - -
13.66 - 13.66
17.41 - 17.41
-
-
1.98 1.98
17.82 - 17.82
14122-ED-C0-CVL-DWG-STRC-6015
-
-
46.96 - 46.96
-
-
-
1.49 - 1.49
-
-

0.04 - 0.04
18.77 18.77
Quantity of Work Done
Drawing No. Status *) Remarks
Previous This Month Cumulative
1,454.18 - 1,454.18
886.35 - 886.35
83.47 - 83.47
493.74 - 493.74
136.31 136.31
- -
3.20 3.20
43.00 43.00
58.22 58.22
71.61 71.61

- - -
31.25 - 31.25
- - -
131.15 - 131.15
- - -

292.66 - 292.66
67.00 - 67.00

- -
- -
- -
- -
- -
- -
1.00 1.00
2.00 2.00
- -
- -
1.00 1.00
- -
- -
- -
1.00 1.00
- -
- -
- -
- -
- -
- -
- -

775.41 (775.41) -
775.82 775.82
Quantity of Work Done
Drawing No. Status *) Remarks
Previous This Month Cumulative
320.71 320.71
454.84 0.27 455.11
2,428.60 25.41 2,454.01
38.17 0.39 38.56
267.70 2.77 270.47
16.14 0.16 16.30
29.14 0.29 29.43
348.52 3.52 352.04
4.00 0.04 4.04
- 283.88 283.88
1,268.09 1,268.09

237.51 2.40 239.91


- - -
- - -
762.92 2.50 765.42
- - -
64.70 43.13 107.83
215.10 (215.10) -
772.81 (149.44) 623.36
157.25 157.25
0.15 0.00 0.15
23.93 0.24 24.17
268.40 2.71 271.11
6,390.10 64.55 6,454.65
126.77 1.28 128.05
- - -

26.91 - 26.91
- - -
16.53 - 16.53
10.39 - 10.39

1.17 - 1.17
10.33 - 10.33
14122-ED-P2-CVL-DWG-SSFD-0011 (Rev 1)

35.49 - 35.49
-
-
-
1.01 - 1.01
-
-
Quantity of Work Done
Drawing No. Status *) Remarks
Previous This Month Cumulative
0.03 - 0.03
- -
- -
20.12 20.12

1340 R.1342.02/03 & R.1345.02/03

42.84 - 42.84
- - -
23.03 - 23.03
19.81 - 19.81

2.42 - 2.42
19.52 - 19.52
14122-ED-P2-CVL-DWG-LOFD-5025 (Rev 1)

57.88 - 57.88
-
-
-
1.92 - 1.92
-
-

- - -
0.36 - 0.36
- -
28.00 28.00

MP P6304.02 A/B (AG-24)

31.39 - 31.39
- - -
19.96 - 19.96
11.43 - 11.43

1.38 - 1.38
11.69 - 11.69

FOUNDATION PIPE SUPPORT AROUND


RECYCLE SOLVENT V.1353.01
38.82 - 38.82
-
-
-
1.09 - 1.09
-
-
Quantity of Work Done
Drawing No. Status *) Remarks
Previous This Month Cumulative
0.05 - 0.05
0.03 - 0.03
- - -
22.00 22.00

12.63 - 12.63
- - -
7.88 - 7.88
4.76 - 4.76

0.67 - 0.67
5.99 - 5.99

14122-ED-P2-CVL-DWG-LOFD-5035 (Rev 1)
30.21 - 30.21
-
-
-
0.68 - 0.68
-
-

0.02 - 0.02
0.06 - 0.06
- - -
26.80 26.80

17.70 - 17.70
- - -
9.69 - 9.69
8.01 - 8.01

1.08 - 1.08
9.48 - 9.48

14122-ED-P2-CVL-DWG-LOFD-5029 (Rev 1)
26.58 - 26.58
-
-
-
0.83 - 0.83
-
-
Quantity of Work Done
Drawing No. Status *) Remarks
Previous This Month Cumulative
0.00 - 0.00
0.26 - 0.26
- - -
18.00 18.00

22.14 - 22.14
- - -
14.99 - 14.99
7.15 - 7.15

0.75 - 0.75
15.97 - 15.97

14122-ED-P2-CVL-DWG-LOFD-5041 (Rev 1)
19.46 - 19.46
-
-
-
0.17 1.55 1.71
-
-

- 0.01 0.01
0.01 0.16 0.17
- - -
10.60

18.64 - 18.64
- - -
9.11 - 9.11
9.53 - 9.53

0.98 - 0.98
8.98 - 8.98
14122-ED-P2-CVL-DWG-LOFD-5039 (Rev 1)

15.74 - 15.74
-
-
-
0.49 - 0.49
-
-
Quantity of Work Done
Drawing No. Status *) Remarks
Previous This Month Cumulative
- - -
0.02 - 0.02
- - -
3.60 3.60

0.59 - 0.59
- - -
0.35 - 0.35
0.24 - 0.24

0.05 - 0.05
0.21 - 0.21
14122-ED-P2-CVL-DWG-LOFD-5055 (Rev 1)

1.20 - 1.20
-
-
-
0.04 - 0.04
-
-

0.02 - 0.02
- - -
- - -
1.20 1.20

72.59 - 72.59
- - -
54.59 - 54.59
18.00 - 18.00

2.26 - 2.26
23.21 - 23.21
14122-ED-P2-CVL-DWG-LOFD-5051 (Rev 1)

62.90 - 62.90
-
-
-
2.12 - 2.12
-
-
Quantity of Work Done
Drawing No. Status *) Remarks
Previous This Month Cumulative
0.02 - 0.02
0.06 - 0.06
- - -
27.60 27.60

51.14 - 51.14
- - -
40.81 - 40.81
10.32 - 10.32

1.37 - 1.37
10.81 - 10.81
14122-VD-P3-CVL-DWG-AY3102-001 (REV 1) 0.83 0.83

33.66 - 33.66
5.52 - 5.52
-
-
1.06 - 1.06
-
-

- - -
0.11 - 0.11
- - -
16.40 16.40

N BLOWDOWN DRUM

62.36 - 62.36
- - -
51.59 - 51.59
10.77 - 10.77

1.25 - 1.25
17.39 - 17.39
14122-ED-P2-CVL-DWG-LOFD-5045 (Rev ) - -

33.08 - 33.08
- - -
-
-
1.47 - 1.47
-
-
Quantity of Work Done
Drawing No. Status *) Remarks
Previous This Month Cumulative
- 0.02 0.02
0.19 - 0.19
- - -
14.60 14.60

- - -
- - -
- - -
- - -

- - -
11.45 - 11.45
14122-ED-P2-CVL-DWG-LOFD-5047 (Rev 2) - -

6.24 - 6.24
- - -
-
-
1.04 - 1.04
-
-

- - -
0.42 - 0.42
16.00 - 16.00
- -

34.44 - 34.44
- - -
25.54 - 25.54
8.90 - 8.90

1.15 - 1.15
10.04 - 10.04
14122-ED-P2-CVL-DWG-LOFD-5043 (Rev 1) - -

25.58 - 25.58
- - -
-
-
0.97 - 0.97
-
-
Quantity of Work Done
Drawing No. Status *) Remarks
Previous This Month Cumulative
0.04 - 0.04
- - -
- - -
10.00 10.00

77.76 (77.76) -
133.81 133.81
60.89 60.89
43.27 29.65 72.92
216.09 142.90 358.99
4.55 3.36 7.91
24.62 18.65 43.27
7.18 6.25 13.43
6.08 - 6.08
- - -
- - -
- 246.60 246.60

4.27 - 4.27
- - -
1.65 - 1.65
2.63 - 2.63

0.28 - 0.28
4.08 - 4.08
14122-ED-P2-CVL-DWG-EQFD-0072.(R1) - -

7.88 - 7.88
- - -
-
-
0.15 - 0.15
-
-

- 6.00 6.00
- 0.00 0.00
- - -
9.06 9.06

- - -
- - -
- - -
- - -

14122-ED-P2-CVL-DWG-LOFD-5053 (Rev 1)
Quantity of Work Done
Drawing No. Status *) Remarks
Previous This Month Cumulative

-
0.40 - 0.40
14122-ED-P2-CVL-DWG-LOFD-5053 (Rev 1) - -

4.28 - 4.28
- - -
-
-
0.09 - 0.09
-
-

- - -
0.02 - 0.02
- - -
- -

2.50 - 2.50
- - -
2.50 - 2.50
- - -

-
4.37 - 4.37
14122-ED-P2-CVL-DWG-LOFD-5021 (Rev 2) - -

5.20 - 5.20
- - -
-
-
0.73 - 0.73
-
-

0.02 - 0.02
0.01 - 0.01
- - -
3.20 3.20

E. 1341.01 AND 1344.01

6.40 - 6.40
- - -
6.40 - 6.40
- - -

14122-ED-P2-CVL-DWG-LOFD-5023 (Rev 1)
Quantity of Work Done
Drawing No. Status *) Remarks
Previous This Month Cumulative

0.14 - 0.14
5.64 - 5.64
14122-ED-P2-CVL-DWG-LOFD-5023 (Rev 1) - -

27.16 - 27.16
- - -
-
-
0.60 - 0.60
-
-

0.01 - 0.01
0.25 - 0.25
- - -
16.40 16.40

28.10 - 28.10
- - -
24.96 - 24.96
3.13 - 3.13

0.63 - 0.63
5.79 - 5.79
14122-ED-P2-CVL-DWG-LOFD-5031 (Rev 1) - -

22.27 - 22.27
- - -
-
-
0.51 - 0.51
-
-

0.04 - 0.04
0.13 - 0.13
- - -
12.40 12.40

11.85 - 11.85
- - -
6.78 - 6.78
5.07 - 5.07

0.70 - 0.70

14122-ED-P2-CVL-DWG-LOFD-5027 (Rev 1)
Quantity of Work Done
Drawing No. Status *) Remarks
Previous This Month Cumulative
9.77 - 9.77
14122-ED-P2-CVL-DWG-LOFD-5027 (Rev 1) - -

32.73 - 32.73
- - -
-
-
1.15 - 1.15
-
-

0.02 - 0.02
0.25 - 0.25
- - -
14.20 14.20

1.35 - 1.35
- - -
0.58 - 0.58
0.77 - 0.77

0.12 - 0.12
1.00 - 1.00
14122-ED-P2-CVL-DWG-LOFD-5016 (Rev 1) - -

5.68 - 5.68
- - -
-
-
0.12 - 0.12
-
-

0.01 - 0.01
- - -
- - -
4.00 4.00

0.51 - 0.51
- - -
0.27 - 0.27
0.24 - 0.24

0.04 - 0.04
0.41 - 0.41
14122-ED-P2-CVL-DWG-LOFD-5057 (Rev 1)
Quantity of Work Done
Drawing No. Status *) Remarks
Previous This Month Cumulative
14122-ED-P2-CVL-DWG-LOFD-5057 (Rev 1) - -

2.67 - 2.67
- - -
-
-
0.16 - 0.16
-
-

0.01 - 0.01
- - -
- - -
1.20 1.20

- - -
- - -
- - -
- - -

- - -
0.13 - 0.13
14122-ED-P2-CVL-DWG-LOFD-5058 (Rev 1) - -

0.80 - 0.80
- - -
-
-
0.06 - 0.06
-
-

- - -
- - -
- - -
- -

9.83 - 9.83
- - -
6.22 - 6.22
3.61 - 3.61

0.25 - 0.25
4.37 - 4.37
14122-ED-CO-CVL-STD-0309 (Rev 3) - -
Quantity of Work Done
Drawing No. Status *) Remarks
14122-ED-CO-CVL-STD-0309 (Rev 3) Previous This Month Cumulative

19.76 - 19.76
- - -
-
-
0.22 - 0.22
-
-

- - -
- - -
- - -

15.30 - 15.30
- - -
12.80 - 12.80
2.50 - 2.50

0.52 - 0.52
3.96 - 3.96
14122-ED-CO-CVL-DWG-LOFD-1106 (Rev 1) - -

20.40 - 20.40
- - -
-
-
0.30 - 0.30
-
-

- - -
- - -
- - -
34.00 34.00

9.72 - 9.72
- - -
9.72 - 9.72
- - -

0.20 - 0.20
0.88 - 0.88
14122-ED-CO-CVL-DWG-RDPV-0210 (Rev 6) - -
Quantity of Work Done
Drawing No. Status *) Remarks
14122-ED-CO-CVL-DWG-RDPV-0210 (Rev 6) Previous This Month Cumulative

11.76 - 11.76
- - -
-
-
- - -
-
-

8.00 - 8.00
18.00 - 18.00
2.40 2.40

T 258.94 - 258.94
168.95 - 168.95
T 89.99 - 89.99

14122-ED-CO-CVL-DWG-STD-0105 Rev. 1 T 10.57 - 10.57


14122-ED-CO-CVL-DWG-SSFD-2201 Rev. 2
14122-ED-CO-CVL-DWG-SSFD-2202 Rev. 2
T 201.88 - 201.88

T 6.30 - 6.30
T 76.49 - 76.49
T
39.20 39.20

T 454.18 - 454.18
301.33 - 301.33
T 152.85 - 152.85

14122-ED-CO-CVL-DWG-STD-0105 Rev. 1,
14122-ED-CO-CVL-DWG-SSFD-2301 Rev. 1, T 17.15 0.81 17.96
14122-ED-CO-CVL-DWG-SSFD-2302 Rev. 1,
ERI-CVL-SSFD-001
T 303.00 - 303.00

T 11.34 - 11.34
T 131.22 - 131.22
T
56.00 56.00
Quantity of Work Done
Drawing No. Status *) Remarks
Previous This Month Cumulative

97.02 - 97.02
4.85 - 4.85
62.29 - 62.29
39.58 - 39.58

0.63 - 0.63
3.44 - 3.44

92.72 - 92.72
13.75 - 13.75
14122-ED-P2-CVL-DWG-PTBN-0404 (Rev 1)

0.71 - 0.71
4.59 - 4.59
13.69 - 13.69

14.40 - 14.40

0.08 - 0.08

0.04 - 0.04
56.05 - 56.05

83.22 - 83.22
1.39 - 1.39
55.44 - 55.44
29.17 - 29.17

0.48 - 0.48
2.97 - 2.97

79.92 - 79.92
9.83 - 9.83
14122-ED-P3-CVL-DWG-PTBN-0401 (Rev 1)

0.55 - 0.55
3.82 - 3.82
13.69 - 13.69

12.80 - 12.80
Quantity of Work Done
Drawing No. Status *) Remarks
Previous This Month Cumulative

0.07 - 0.07

0.04 - 0.04
44.65 - 44.65

83.86 - 83.86
13.95 - 13.95
69.91 - 69.91
79.54 - 79.54

1.30 - 1.30
2.85 - 2.85

14122-ED-P3-CVL-DWG-EQFD-0010 (Rev 1)
12.10 - 12.10
105.43 - 105.43

2.45 - 2.45
23.28 - 23.28
26.36 - 26.36

0.12 - 0.12

1.66 - 1.66
23.56 23.56

83.86 - 83.86
13.95 - 13.95
69.91 - 69.91
79.54 - 79.54

1.30 - 1.30
2.85 - 2.85

14122-ED-P3-CVL-DWG-EQFD-0011 (Rev 1) 12.10 - 12.10


105.43 - 105.43

2.45 - 2.45
23.28 - 23.28
26.36 - 26.36
14122-ED-P3-CVL-DWG-EQFD-0011 (Rev 1)

Quantity of Work Done


Drawing No. Status *) Remarks
Previous This Month Cumulative

0.12 - 0.12

1.66 - 1.66
7.50 7.50

83.86 - 83.86
13.95 - 13.95
69.91 - 69.91
78.96 - 78.96

1.30 - 1.30
2.85 - 2.85

14122-ED-P3-CVL-DWG-EQFD-0046 (Rev 1) 12.10 - 12.10


105.43 - 105.43

2.45 - 2.45
23.28 - 23.28
26.36 - 26.36

0.12 - 0.12

1.66 - 1.66
23.56 23.56

1 696.95 - 696.95
- - -
1 512.87 - 512.87
1 184.08 - 184.08

23.35 - 23.35
- - -

363.41 - 363.41
14122-ED-P3-CVL-DWG-EQFD-0046 (Rev 1) - - -

1 17.40 - 17.40
1 175.35 - 175.35
- - -
Quantity of Work Done
Drawing No. Status *) Remarks
Previous This Month Cumulative
- - -

0.41 - 0.41
88.00 88.00

1 176.47 - 176.47
- - -
1 109.39 - 109.39
1 67.08 - 67.08

8.12 - 8.12
- - -

132.31 - 132.31
14122-ED-P3-CVL-DWG-EQFD-0046 (Rev 1) -

1 4.68 - 4.68
1 68.21 - 68.21
-

- - -

0.29 - 0.29
63.20 63.20

1 176.47 - 176.47
- - -
1 109.39 - 109.39
1 67.08 - 67.08
- - -

8.19 - 8.19
- - -
14122-ED-P3-CVL-DWG-EQFD-0046 (Rev 1)
132.31 - 132.31
- - -

1 4.68 - 4.68
1 68.21 - 68.21
- - -
Quantity of Work Done
Drawing No. Status *) Remarks
Previous This Month Cumulative

0.29 - 0.29
63.20 63.20

666.61 - 666.61
- - -
250.22 - 250.22
416.39 - 416.39

18.13 - 18.13
388.85 - 388.85
92.51 - 92.51
147.33 - 147.33
14122-ED-P3-CVL-DWG-SSFD-2201 &
2202
99.22 - 99.22
783.89 - 783.89

46.42 - 46.42
59.00 - 59.00

- 2.97 2.97
44.80 44.80

397.05 - 397.05
- - -
295.37 - 295.37
101.68 - 101.68

9.62 - 9.62
96.43 - 96.43
- - -
14122-ED-P3-CVL-DWG-SSFD-2223 s/d
2226
193.46 - 193.46
- - -

12.90 - 12.90
- - -

0.23 - 0.23
50.80 50.80
Quantity of Work Done
Drawing No. Status *) Remarks
Previous This Month Cumulative

176.47 - 176.47

109.61 - 109.61
66.86 66.86

4.68 - 4.68
67.86 - 67.86
- - -
14122-ED-P3-CVL-DWG-EQFD-0014 &
0015
131.13 - 131.13
- - -

8.19 - 8.19
- - -

0.29 - 0.29
62.40 62.40

30.69 - 30.69
- - -
21.87 - 21.87
8.82 - 8.82

0.82 - 0.82
8.82 - 8.82
8.14 - 8.14
14122-ED-P3-CVL-DWG-EQFD-0012

9.48 - 9.48
44.30 - 44.30

0.60 - 0.60
1.12 - 1.12

8.00 - 8.00
9.80 9.80

560.46 - 560.46
- - -
409.48 409.48
- 150.98 150.98

14122-ED-P3-CVL-DWG-SSFD-2205 s/d
2208
Quantity of Work Done
Drawing No. Status *) Remarks
Previous This Month Cumulative

13.89 - 13.89
14122-ED-P3-CVL-DWG-SSFD-2205 s/d 139.88 - 139.88
2208 -

141.91 - 141.91
- - -

18.64 - 18.64
-

0.17 - 0.17
38.32 38.32

31.15 - 31.15

22.63 - 22.63
8.52 - 8.52

0.86 - 0.86
8.52 - 8.52
7.22 - 7.22
14122-ED-P3-CVL-DWG-EQFD-0009

9.02 - 9.02
36.99 - 36.99

1.88 - 1.88
1.00 - 1.00

8.00 - 8.00
13.60 13.60

20.96 - 20.96
- - -
15.57 - 15.57
5.39 - 5.39

0.56 - 0.56
5.39 - 5.39
6.41 - 6.41
14122-ED-P3-CVL-DWG-EQFD-0016
14122-ED-P3-CVL-DWG-EQFD-0016 Quantity of Work Done
Drawing No. Status *) Remarks
Previous This Month Cumulative
6.99 - 6.99
30.49 - 30.49

0.82 - 0.82
0.52 - 0.52

8.00 - 8.00
12.60 12.60

609.47 - 609.47
- - -
320.06 - 320.06
- 289.42 289.42

18.13 - 18.13
282.80 - 282.80
52.13 - 52.13
14122-ED-P3-CVL-DWG-SSFD-2215
121.53 - 121.53
(Rev 1)

72.16 - 72.16
672.34 - 672.34

30.43 - 30.43
49.96 - 49.96

2.36 2.36
33.60 33.60

451.08 - 451.08
- - -
307.36 - 307.36
- 143.72 143.72

13.22 - 13.22
133.18 - 133.18
14122-ED-P3-CVL-DWG-SSFD-2205 - - -
(Rev 2)

117.31 - 117.31

11.01 - 11.01
- - -
Quantity of Work Done
Drawing No. Status *) Remarks
Previous This Month Cumulative
0.16 - 0.16
34.40 34.40

14.31 - 14.31
- - -
10.23 - 10.23
4.08 - 4.08

0.18 0.24 0.41


3.57 (0.27) 3.30

14122-ED-P3-CVL-DWG-AY3102-001
(REV 1)
22.30 - 22.30

0.64 - 0.64

16.01 - 16.01

0.01 - 0.01

8.94 - 8.94
1.00 - 1.00

8.82 - 8.82
- - -
14.8021738 - 14.80
- 5.98 5.98

7.93 - 7.93
21.17 - 21.17
14122-ED-P3-CVL-DWG-EQFD-0051 - - -
(REV 1)

22.23 - 22.23
- - -

0.39 - 0.39

8.00 - 8.00
Quantity of Work Done
Drawing No. Status *) Remarks
Previous This Month Cumulative
12.56 12.56

8.82 - 8.82
-
14.80 - 14.80
5.98 5.98

7.93 - 7.93
14122-ED-P3-CVL-DWG-EQFD-0050 21.17 - 21.17
(REV 1)

22.23 - 22.23

0.39 - 0.39

8.00 - 8.00
12.56 12.56

8.82 - 8.82
- - -
14.80 - 14.80
- 5.98 5.98

7.93 - 7.93
21.17 - 21.17
14122-ED-P3-CVL-DWG-EQFD-0052
(REV 1)

22.23 - 22.23

0.39 - 0.39

8.00 - 8.00
12.56 12.56

14.31 - 14.31
- - -
10.34 - 10.34
3.97 - 3.97
Quantity of Work Done
Drawing No. Status *) Remarks
Previous This Month Cumulative

0.18 0.24 0.41


3.51 (0.27) 3.24
-
14122-VD-P3-CVL-DWG-AY3102-001
(REV 1)
21.80 - 21.80
-

0.64 - 0.64
-

16.01 - 16.01

0.01 - 0.01

8.74 - 8.74
1.00 - 1.00

47.04 - 47.04
- - -
39.30 - 39.30
- 7.74 7.74

1.15 - 1.15
9.31 - 9.31
14122-ED-P3-CVL-DWG-SSFD-2251

26.64 - 26.64

1.12 - 1.12

0.01 - 0.01
8.00 8.00

19.90 - 19.90
- - -
13.88 - 13.88
- 6.02 6.02
Quantity of Work Done
Drawing No. Status *) Remarks
Previous This Month Cumulative

2.55 - 2.55
6.88 - 6.88
14122-ED-P3-CVL-DWG-SSFD-2235 (Rev 1)

30.37 - 30.37

0.67 - 0.67

0.03 - 0.03
12.80 12.80

6.01 - 6.01
- - -
3.18 - 3.18
- 2.83 2.83

0.34 - 0.34
5.36 - 5.36
14122-ED-P3-CVL-DWG-EQFD-0033.(R1)
P1371.01

17.42 - 17.42

0.18 - 0.18

12.00 - 12.00
16.20 16.20

6.01 - 6.01
- - -
3.18 - 3.18
- 2.83 2.83

0.34 - 0.34
5.36 - 5.36
14122-ED-P3-CVL-DWG-EQFD-0036.(R1)
P1372.01

17.42 - 17.42
14122-ED-P3-CVL-DWG-EQFD-0036.(R1)
P1372.01
Quantity of Work Done
Drawing No. Status *) Remarks
Previous This Month Cumulative

0.18 - 0.18

12.00 - 12.00
16.20 16.20

3.75 - 3.75
- - -
2.02 - 2.02
- 1.73 1.73

0.21 - 0.21
3.27 - 3.27
14122-ED-P3-CVL-DWG-EQFD-0026.(R1)
P1373.03

10.97 - 10.97

0.11 - 0.11

8.00 - 8.00
10.20 10.20

1.94 - 1.94
- - -
0.36 - 0.36
- 0.89 0.89

0.11 - 0.11
1.69 - 1.69
14122-ED-P3-CVL-DWG-EQFD-0026.(R1)
P1373.03

5.70 - 5.70

0.06 - 0.06

4.00 - 4.00
5.30 5.30
Quantity of Work Done
Drawing No. Status *) Remarks
Previous This Month Cumulative

14.31 - 14.31
- - -
11.58 - 11.58
- 2.73 2.73

0.18 0.24 0.41


2.83 (0.27) 2.56
14122-VD-P3-CVL-DWG-AY3102-001 (REV 1)

16.38 - 16.38

0.51 - 0.51

0.01 - 0.01

6.58 - 6.58
1.00 - 1.00
6.00 6.00

11.91 - 11.91
- - -
10.28 - 10.28
- 1.63 1.63

0.14 0.24 0.38


1.63 (0.27) 1.36
14122-VD-P3-CVL-DWG-AY3102-001 (REV 1)

13.08 - 13.08

0.39 - 0.39

0.00 - 0.005

5.98 - 5.98
1.00 - 1.00
Quantity of Work Done
Drawing No. Status *) Remarks
Previous This Month Cumulative
5.20 5.20

49.08 - 49.08
2.40 - 2.40
38.84 - 38.84
12.64 - 12.64

0.27 - 0.27
1.27 (0.27) 1.00
5.13 - 5.13

3.80 - 3.80
37.92 - 37.92
14122-VD-P3-CVL-DWG-AY3102-001 (REV 1)

0.13 - 0.13
0.80 - 0.80

8.00 - 8.00
-
-
0.01 - 0.01

18.43 - 18.43
1.00 - 1.00
2.00 2.00

37.83 - 37.83
- - -
33.86 - 33.86
- 3.97 3.97

0.18 0.24 0.41


3.00 (0.27) 2.73
14122-VD-P3-CVL-DWG-AY3102-001 (REV 1)

20.37 - 20.37

0.58 - 0.58
Quantity of Work Done
Drawing No. Status *) Remarks
Previous This Month Cumulative

0.01 - 0.01

8.73 - 8.73
1.00 - 1.00
16.01 16.01

46.71 - 46.71
0.76 - 0.76
36.42 - 36.42
11.05 - 11.05

0.25 0.24 0.49


1.17 (0.27) 0.90
4.65 - 4.65

3.70 - 3.70
14122-VD-P3-CVL-DWG-AY3102-001 (REV 1) 34.38 - 34.38

0.11 - 0.11
0.83 - 0.83

7.60 - 7.60
-
-
0.01 - 0.01

16.51 - 16.51
1.00 - 1.00
2.00 2.00

46.71 - 46.71
1.52 - 1.52
37.00 - 37.00
11.23 - 11.23

0.25 0.24 0.49


1.17 (0.27) 0.90
4.73 - 4.73

14122-VD-P3-CVL-DWG-AY3102-001 (REV 1)
Quantity of Work Done
Drawing No. Status *) Remarks
Previous This Month Cumulative
3.70 - 3.70
14122-VD-P3-CVL-DWG-AY3102-001 (REV 1) 35.04 - 35.04

0.11 - 0.11
0.86 - 0.86

7.60 - 7.60
-
-
0.01 - 0.01

16.79 - 16.79
1.00 - 1.00
3.00 3.00

8.47 - 8.47
- - -
7.52 - 7.52
- 0.95 0.95

0.14 - 0.14
0.95 - 0.95
2.18 2.18
14122-ED-P3-CVL-DWG-EQFD-0010

5.19 - 5.19
16.63 - 16.63

0.14 - 0.14
0.35 - 0.35

0.01 - 0.01
5.60 5.60

3.19 - 3.19
- - -
1.83 - 1.83
- 1.36 1.36

0.17 - 0.17
2.56 - 2.56
14122-ED-P3-CVL-DWG-EQFD-0031.(R1)
P2373.01 A/B
14122-ED-P3-CVL-DWG-EQFD-0031.(R1)
Quantity of Work Done
Drawing No. Status *) Remarks
P2373.01 A/B Previous This Month Cumulative

9.68 - 9.68

0.08 - 0.08
- - -

8.00 - 8.00
9.00 9.00

1.94 - 1.94
- - -
1.04 - 1.04
- 0.89 0.89

0.11 - 0.11
1.69 - 1.69
14122-ED-P3-CVL-DWG-EQFD-0030.(R1)
P2373.03

5.70 - 5.70

0.06 - 0.06
- - -

4.00 - 4.00
5.30 5.30

6.34 - 6.34
- - -
3.28 - 3.28
3.06 - 3.06

0.36 - 0.36
5.81 - 5.81
14122-ED-P3-CVL-DWG-EQFD-0043.(R1)
P2371.01 1st STRIPPED SLURRY PUMP

18.06 - 18.06

0.18 - 0.18
Quantity of Work Done
Drawing No. Status *) Remarks
Previous This Month Cumulative
12.00 - 12.00
16.80 16.80

52.32 - 52.32
2.40 - 2.40
42.08 - 42.08
12.64 - 12.64

0.27 0.24 0.51


1.27 (0.27) 1.00
5.20 - 5.20

3.80 - 3.80
14122-VD-P3-CVL-DWG-AY3102-001 (REV 1) 37.62 - 37.62

0.13 - 0.13
0.80 - 0.80

8.00 - 8.00
-
-
0.02 - 0.02

18.82 - 18.82
1.00 - 1.00
3.00 3.00
Quantity of Work Done
Drawing No. Status *) Remarks
Previous This Month Cumulative
05 HC BLEND RECYCLING PUMP

24.35 - 24.35
- - -
8.76 - 8.76
- 15.59 15.59

1.64 - 1.64
37.45 - 37.45
14122-ED-P3-CVL-DWG-EQFD-0020.(R1)

69.35 - 69.35

0.62 - 0.62

30.00 - 30.00
40.80 40.80

4.45 - 4.45
- - -
2.18 - 2.18
- 2.26 2.26

0.26 - 0.26
4.31 - 4.31
14122-ED-P3-CVL-DWG-EQFD-0019.(R1)

12.05 - 12.05

0.14 - 0.14

8.00 - 8.00
11.20 11.20

3.55 - 3.55
- - -
1.57 - 1.57
1.98 1.98

14122-ED-P3-CVL-DWG-EQFD-0021.(R1)
Quantity of Work Done
Drawing No. Status *) Remarks
Previous This Month Cumulative
0.22 - 0.22
5.23 - 5.23
14122-ED-P3-CVL-DWG-EQFD-0021.(R1)

12.77 - 12.77

0.11 - 0.11

6.00 - 6.00
8.60 8.60

8.15 - 8.15
-
2.94 - 2.94
5.22 5.22

0.55 - 0.55
12.28 - 12.28
14122-ED-P3-CVL-DWG-EQFD-0022.(R1)

15.44 - 15.44

0.24 - 0.24

10.00 - 10.00
13.60 13.60

4.45 - 4.45
-
2.18 - 2.18
2.26 2.26

0.26 - 0.26
4.31 - 4.31
-
14122-ED-P3-CVL-DWG-EQFD-0023.(R1)

12.04 - 12.04
14122-ED-P3-CVL-DWG-EQFD-0023.(R1)

Quantity of Work Done


Drawing No. Status *) Remarks
Previous This Month Cumulative

0.15 - 0.15

10.00 - 10.00
11.20 11.20

8.15 - 8.15
- - -
2.94 - 2.94
5.22 5.22

0.55 - 0.55
12.28 - 12.28
-
14122-ED-P3-CVL-DWG-EQFD-0024.(R1)

15.44 - 15.44

0.27 - 0.27

10.00 - 10.00
28.75 28.75

3.55 - 3.55
- - -
1.57 - 1.57
1.98 1.98

0.22 - 0.22
5.33 - 5.33
-
14122-ED-P3-CVL-DWG-EQFD-0025.(R1)

13.03 - 13.03

0.14 - 0.14

6.00 - 6.00
8.60 8.60
Quantity of Work Done
Drawing No. Status *) Remarks
Previous This Month Cumulative

1.24 - 1.24
- - -
0.77 - 0.77
0.47 0.47

0.06 - 0.06
0.87 - 0.87
-
14122-ED-P3-CVL-DWG-EQFD-0002.(R1)

3.85 - 3.85

0.06 - 0.06

0.00 - 0.004
3.60 3.60

1.41 - 1.41
-
0.84 - 0.84
0.57 0.57

0.07 - 0.07
1.07 - 1.07
-
14122-ED-P3-CVL-DWG-EQFD-0002.(R1)

4.28 - 4.28

0.08 - 0.08

0.00 - 0.004
4.000 4.000

2.97 - 2.97
- - -
1.35 - 1.35
1.62 1.62

0.18 - 0.18

14122-ED-P3-CVL-DWG-EQFD-0039.(R2)
Quantity of Work Done
Drawing No. Status *) Remarks
Previous This Month Cumulative
2.52 - 2.52
-
14122-ED-P3-CVL-DWG-EQFD-0039.(R2)

6.30 - 6.30

0.07 - 0.07

4.00 - 4.00
7.20 7.20

6.69 - 6.69
- - -
2.89 - 2.89
3.80 3.80

0.42 - 0.42
5.92 - 5.92
-
14122-ED-P3-CVL-DWG-EQFD-0040.(R1)

13.65 - 13.65

0.16 - 0.16

8.00 - 8.00
15.60 15.60

2.34 - 2.34
- - -
1.16 - 1.16
1.18 1.18

0.14 - 0.14
1.90 - 1.90
-
14122-ED-P3-CVL-DWG-EQFD-0042.(R1)

5.46 - 5.46
14122-ED-P3-CVL-DWG-EQFD-0042.(R1)

Quantity of Work Done


Drawing No. Status *) Remarks
Previous This Month Cumulative
0.06 - 0.06

4.00 - 4.00
6.00 6.00

146.94 - 146.94
- - -
116.20 - 116.20
30.74 30.74

3.84 - 3.84
32.41 - 32.41
-
14122-ED-P3-CVL-DWG-SSFD-2230 (Rev 1)

67.43 - 67.43

3.13 - 3.13

0.05 - 0.05
21.60 21.60

3.34 - 3.34
- - -
1.44 - 1.44
1.90 1.90

0.21 - 0.21
2.94 - 2.94
-
14122-ED-P3-CVL-DWG-EQFD-0028.(R1)

6.79 - 6.79

0.09 - 0.09

4.00 - 4.00
7.80 7.80
Quantity of Work Done
Drawing No. Status *) Remarks
Previous This Month Cumulative
2.34 - 2.34
0.25 (0.25) -
1.16 - 1.16
1.18 1.18

0.14 - 0.14
1.82 - 1.82
-
14122-ED-P3-CVL-DWG-EQFD-0029.(R1)

5.22 - 5.22

0.07 - 0.07

4.00 - 4.00
6.00 6.00

0.86 - 0.86
- - -
0.61 - 0.61
0.25 - 0.25

0.04 - 0.04
0.50 - 0.50
-
14122-ED-P3-CVL-DWG-EQFD-0048.(R1)

3.07 - 3.07

0.03 - 0.03

4.00 - 4.00
2.60 2.60

1.72 - 1.72
- - -
1.22 - 1.22
- 0.49 0.49

0.07 - 0.07
0.97 - 0.97
14122-ED-P3-CVL-DWG-EQFD-0055.(R1)
Quantity of Work Done
Drawing No. Status *) Remarks
Previous This Month Cumulative
-
14122-ED-P3-CVL-DWG-EQFD-0055.(R1)

5.98 - 5.98

0.06 - 0.06

8.00 - 8.00
5.20 5.20

0.86 - 0.86
-
0.61 - 0.61
- 0.25 0.25

0.04 - 0.04
0.50 - 0.50
-
14122-ED-P3-CVL-DWG-EQFD-0047.(R1)

3.07 - 3.07

0.03 - 0.03

4.00 - 4.00
2.60 2.60

1.72 - 1.72
- - -
1.22 - 1.22
0.49 - 0.49

0.07 - 0.07
0.95 - 0.95
-
14122-ED-P3-CVL-DWG-EQFD-0053.(R1)

5.85 - 5.85

0.05 - 0.05
14122-ED-P3-CVL-DWG-EQFD-0053.(R1)

Quantity of Work Done


Drawing No. Status *) Remarks
Previous This Month Cumulative

8.00 - 8.00
5.20 5.20

0.86 - 0.86
- - -
0.61 - 0.61
0.25 - 0.25

0.04 - 0.04
0.51 - 0.51
-
14122-ED-P3-CVL-DWG-EQFD-0053.(R1)

3.12 - 3.12

0.03 - 0.03

4.00 - 4.00
2.60 2.60

1.72 - 1.72
- - -
1.22 - 1.22
0.49 - 0.49

0.07 - 0.07
0.97 - 0.97
-
14122-ED-P3-CVL-DWG-EQFD-0054.(R1)

5.98 - 5.98

0.06 - 0.06

8.00 - 8.00
5.20 5.20

78.94 - 78.94
Quantity of Work Done
Drawing No. Status *) Remarks
Previous This Month Cumulative
- - -
60.74 - 60.74
- 18.20 18.20

1.85 - 1.85
19.14 - 19.14
-
14122-ED-P3-CVL-DWG-SSFD-2245

49.12 - 49.12

1.44 - 1.44

0.03 - 0.03
16.00 16.00

33.71 - 33.71
- - -
31.31 - 31.31
2.40 2.40

0.10 - 0.10
1.90 - 1.90
-

18.62 - 18.62

14122-ED-CO-CVL-PTBN-0603 (REV 1)
0.20 - 0.20

3.20 - 3.20
-
-
0.02 - 0.017
- - -

6.40 - 6.40

- 0.32 0.32
6.40 6.40
Quantity of Work Done
Drawing No. Status *) Remarks
Previous This Month Cumulative

46.71 - 46.71
0.76 - 0.76
36.42 - 36.42
11.05 - 11.05

0.25 0.24 0.49


1.17 (0.27) 0.90
4.98 - 4.98

3.70 - 3.70
14122-VD-P3-CVL-DWG-AY3102-001 (REV 1) 37.02 - 37.02

0.11 - 0.11
0.86 - 0.86

7.60 - 7.60
-
-
0.02 - 0.015

15.67 1.96 17.63


1.00 - 1.00
7.60 7.60
2.00 2.00

73.59 - 73.59
-
53.93 - 53.93
19.66 19.66

1.81 - 1.81
18.93 - 18.93
-
14122-ED-P3-CVL-DWG-SSFD-2240

46.86 - 46.86

1.31 - 1.31

0.04 - 0.04
14.40 14.40
Quantity of Work Done
Drawing No. Status *) Remarks
Previous This Month Cumulative

96.73 - 96.73
-
63.84 - 63.84
32.89 32.89
-
-
5.32 - 5.32
51.62 - 51.62
-
CONCRETE DIKE FOR 1360 BLENDING -
AREA -
319.45 - 319.45
- - -
-
-
6.97 - 6.97
- - -
-
-
0.12 - 0.12
158.05 158.05

110.63 - 110.63
- - -
65.22 - 65.22
45.40 - 45.40
-
-
5.18 - 5.18
61.61 - 61.61
- - -
-
14122-ED-P2-CVL-DWG-DIKE-1501 (Rev 2)
-
302.32 - 302.32
- - -
-
-
11.87 - 11.87
- - -
-
-
0.09 - 0.09
140.50 140.50

7.68 - 7.68
- - -
Quantity of Work Done
Drawing No. Status *) Remarks
Previous This Month Cumulative
6.71 (0.10) 6.61
0.97 0.10 1.07

0.07 - 0.07
0.42 (0.14) 0.28
-

6.90 (2.88) 4.02

14122-ED-CO-CVL-STD-0302 (REV 2)

0.06 (0.02) 0.04

-
-
0.00 (0.00) 0.00
- - -

3.45 (1.28) 2.17

0.64 0.64
4.00 4.00

7.20 - 7.20
- - -
6.30 - 6.30
0.90 - 0.90

0.06 - 0.06
0.29 - 0.29
-

4.60 - 4.60

14122-ED-CO-CVL-STD-0302 (REV 2)

0.05 - 0.05

-
-
0.00 - 0.00
- - -
Quantity of Work Done
Drawing No. Status *) Remarks
Previous This Month Cumulative
2.27 - 2.27

0.48 0.48
5.60 5.60

11.16 - 11.16
- - -
9.73 - 9.73
1.43 - 1.43

0.18 - 0.18
- - -
-
14122-ED-P2-CVL-DRSW-0401 (REV 2) 1.09 - 1.09

5.00 - 5.00

0.08 - 0.08

- - -

11.16 - 11.16
- - -
9.73 - 9.73
1.43 - 1.43

0.18 - 0.18
- - -
-
14122-ED-P2-CVL-DRSW-0401 (REV 2) 1.00 - 1.00

5.00 - 5.00

0.08 - 0.08
Quantity of Work Done
Drawing No. Status *) Remarks
Previous This Month Cumulative

1,673.97 - 1,673.97
969.98 - 969.98
105.51 - 105.51
612.06 - 612.06
197.29 197.29
53.07 - 53.07
133.67 - 133.67
101.07 - 101.07
1.50 - 1.50

- - -
- - -
10.00 - 10.00
- - -
- - -
111.46 - 111.46
100.00 - 100.00

431.18 - 431.18
87.00 - 87.00

- -
- -
- -
- -
- -
- -
6.00 6.00
13.00 13.00
- -
7.00 7.00
- -
- -
- -
- -
2.00 2.00
- -
8.00 8.00
- -
- -
- -
- -
- -

404.42 (404.42) -
404.42 404.42
172.53 172.53
212.46 - 212.46
1,358.85 - 1,358.85
Quantity of Work Done
Drawing No. Status *) Remarks
Previous This Month Cumulative
22.91 - 22.91
143.06 - 143.06
0.42 - 0.42
14.63 - 14.63
197.77 18.10 215.86
3.07 0.06 3.13
953.78 953.78

193.74 1.96 195.70


- - -
- - -
791.11 2.96 794.07
- - -
19.50 13.00 32.50
279.78 (279.78) -
807.90 (88.22) 719.69
96.38 96.38
0.12 0.00 0.13
24.93 0.25 25.19
289.27 2.92 292.19
6,892.55 69.62 6,962.17
190.54 1.92 192.47
- - -
3,749.30 3,749.30

- - -
- - -
- - -
- - -
-
-
- -
1.30 - 1.30
14122-ED-P3-CVL-DWG-SSFD-5021 (Rev 2)
-
-
8.64 - 8.64
-
-
-
0.19 - 0.19
-
-

0.02 - 0.02
- - -
72.00 - 72.00
Quantity of Work Done
Drawing No. Status *) Remarks
Previous This Month Cumulative
1.44 1.44

- - -
- - -
- - -
- - -
-
-

0.43 - 0.43
14122-ED-P3-CVL-DWG-SSFD-5023 (Rev 2)
-
-
2.88 - 2.88
-
-
-
0.06 - 0.06
-
-

0.01 - 0.01
- - -
24.00 - 24.00
1.44 1.44

,P1361.06,P1361.05,P1361.01A

56.26 - 56.26
- - -
35.56 - 35.56
20.70 - 20.70
-
-
2.02 2.02
29.44 - 29.44
14122-ED-P3-CVL-DWG-LOFD-5025 (Rev 1)
-
-
47.59 - 47.59
-
-
-
2.42 - 2.42
-
-

0.01 - 0.01
0.63 - 0.63
- - -
Quantity of Work Done
Drawing No. Status *) Remarks
Previous This Month Cumulative
19.70 19.70

30.37 - 30.37
- - -
17.99 - 17.99
12.38 - 12.38
-
-
1.99 - 1.99
11.23 - 11.23
14122-ED-P3-CVL-DWG-LOFD-5027 (Rev 1)
-
-
28.41 - 28.41
-
-
-
0.92 - 0.92
-
-

0.01 - 0.01
0.20 - 0.20
- - -
16.20 16.20

29.98 - 29.98
- - -
19.28 - 19.28
10.70 - 10.70
-
-
1.33 - 1.33
18.34 - 18.34
14122-ED-P3-CVL-DWG-LOFD-5035 (Rev 1)
-
-
35.63 - 35.63
-
-
-
1.67 - 1.67
-
-

0.01 - 0.01
0.41 - 0.41
- - -
Quantity of Work Done
Drawing No. Status *) Remarks
Previous This Month Cumulative
14.60 14.60

34.44 - 34.44
- - -
22.10 - 22.10
12.34 - 12.34
-
-
1.54 - 1.54
13.95 - 13.95
14122-ED-P3-CVL-DWG-LOFD-5033 (Rev 1)
-
-
33.31 - 33.31
-
-
-
1.33 - 1.33
-
-

0.03 - 0.03
0.13 - 0.13
- - -
21.60 21.60

- - -
- - -
- - -
- - -
-
-
0.95 - 0.95
2.15 - 2.15
14122-ED-P3-CVL-DWG-LOFD-5029 (Rev 1)
-
-
6.30 - 6.30
-
-
-
0.51 - 0.51
-
-

0.02 - 0.02
- - -
- - -
Quantity of Work Done
Drawing No. Status *) Remarks
Previous This Month Cumulative
- -

- - -
- - -
- - -
- - -
-
-
0.99 - 0.99
1.90 - 1.90
14122-ED-P3-CVL-DWG-LOFD-5031 (Rev 1)
-
-
5.04 - 5.04
-
-
-
0.39 - 0.39
-
-

0.02 - 0.02
- - -
- - -
- -

10.13 - 10.13
- - -
10.13 - 10.13
- - -
-
-
0.48 - 0.48
2.83 - 2.83
14122-ED-P3-CVL-DWG-LOFD-5059 (Rev 1)
-
-
8.45 - 8.45
-
-
-
0.24 - 0.24
-
-

0.01 - 0.01
- - -
Quantity of Work Done
Drawing No. Status *) Remarks
Previous This Month Cumulative
- - -
6.00 6.00
Quantity of Work Done
Drawing No. Status *) Remarks
Previous This Month Cumulative

- - -
- - -
- - -
- - -
-
-
0.60 - 0.60
1.16 - 1.16
14122-ED-P3-CVL-DWG-LOFD-5041 (Rev 1)
-
-
5.36 - 5.36
-
-
-
0.26 - 0.26
-
-

- - -
0.12 - 0.12
- - -
- -

31.37 - 31.37
- - -
24.88 - 24.88
6.49 - 6.49
-
-
1.41 - 1.41
9.24 - 9.24
14122-ED-P3-CVL-DWG-LOFD-5053 (Rev 1)
-
-
43.66 - 43.66
-
-
-
0.80 - 0.80
-
-

0.01 - 0.01
0.19 - 0.19
- - -
39.70 39.70
Quantity of Work Done
Drawing No. Status *) Remarks
Previous This Month Cumulative

23.66 - 23.66
- - -
14.77 - 14.77
8.89 - 8.89
-
-
1.26 - 1.26
10.76 - 10.76
14122-ED-P3-CVL-DWG-LOFD-5051 (Rev 1)
-
-
27.08 - 27.08
-
-
-
1.19 - 1.19
-
-

0.02 - 0.02
0.18 - 0.18
- - -
10.80 10.80

- - -
- - -
- - -
- - -
-
-
- - -
4.90 - 4.90
14122-ED-P3-CVL-DWG-LOFD-5039 (Rev 1)
-
-
14.50 - 14.50
-
-
-
0.68 - 0.68
-
-

0.01 - 0.01
0.24 - 0.24
- - -
- -
Quantity of Work Done
Drawing No. Status *) Remarks
Previous This Month Cumulative

- - -
- - -
- - -
- - -
-
-
- - -
5.56 - 5.56
14122-ED-P3-CVL-DWG-LOFD-5037 (Rev 1)
-
-
17.14 - 17.14
-
-
-
0.80 - 0.80
-
-

0.01 - 0.01
- - -
- - -
- -

10.46 - 10.46
- - -
10.46 - 10.46
- - -
-
-
1.13 - 1.13
6.02 - 6.02
14122-ED-P3-CVL-DWG-LOFD-5045 (Rev 1)
-
-
22.81 - 22.81
-
-
-
0.35 - 0.35
-
-

0.01 - 0.01
0.03 - 0.03
- - -
12.20 12.20
Quantity of Work Done
Drawing No. Status *) Remarks
Previous This Month Cumulative

- - -
- - -
- - -
- - -
-
-
0.47 - 0.47
0.90 - 0.90
14122-ED-P3-CVL-DWG-LOFD-5049 (Rev 1)
-
-
4.08 - 4.08
-
-
-
0.20 - 0.20
-
-

0.01 - 0.01
0.03 - 0.03
-
- -

5.07 - 5.07
- - -
5.07 - 5.07
- - -
-
-
0.90 - 0.90
2.61 - 2.61
14122-ED-P3-CVL-DWG-LOFD-5047 (Rev 1)
-
-
8.64 - 8.64
-
-
-
0.36 - 0.36
-
-

0.01 - 0.01
0.03 - 0.03
- - -
2.00 2.00
Quantity of Work Done
Drawing No. Status *) Remarks
Previous This Month Cumulative

- - -
- - -
- - -
- - -
-
-
- - -
5.43 - 5.43
14122-ED-P3-CVL-DWG-LOFD-5043 (Rev 1)
-
-
16.14 - 16.14
-
-
-
0.47 - 0.47
-
-

0.01 - 0.01
0.29 - 0.29
- - -
- -

149.09 (149.09) -
149.09 149.09
67.60 67.60
81.49 - 81.49
411.07 - 411.07
9.09 - 9.09
42.34 - 42.34
5.64 - 5.64
4.07 0.26 4.33
32.87 32.87
0.50 - 0.50
94.00 94.00

28.22 - 28.22
- - -
28.22 - 28.22
- - -
-
-
0.36 - 0.36
4.13 - 4.13
14122-ED-P3-CVL-DWG-LOFD-5011 (Rev 2)
Quantity of Work Done
Drawing No. Status *) Remarks
14122-ED-P3-CVL-DWG-LOFD-5011 (Rev 2) Previous This Month Cumulative
-
-
19.80 - 19.80
-
-
-
0.39 - 0.39
-
-

0.01 - 0.01
- - -
- - -

- - -
- - -
- - -
- - -
-
-
0.72 - 0.72
2.38 - 2.38
14122-ED-P3-CVL-DWG-LOFD-5055 (Rev 1)
-
-
8.62 - 8.62
-
-
-
0.30 - 0.30
-
-

0.02 - 0.02
0.16 - 0.16
- - -
- -

10.83 - 10.83
- - -
8.94 - 8.94
1.89 - 1.89
-
-
0.11 - 0.11
1.25 - 1.25
-
-

14122-ED-P3-CVL-DWG--DRSW-0401 (REV
3)
Quantity of Work Done
Drawing No. Status *) Remarks
Previous This Month Cumulative
-
14.14 - 14.14
14122-ED-P3-CVL-DWG--DRSW-0401 (REV -
3) -
-
0.13 - 0.13
-
-
-
0.01 - 0.01
-
-
-
6.73 - 6.73
-
-
- 1.00 1.00
5.20 5.20

7.37 - 7.37
- - -
4.66 - 4.66
2.71 - 2.71
-
-
0.19 - 0.19
3.28 - 3.28
14122-ED-CO-CVL-DWG-LOFD-2501 (Rev 1) -
-
-
14.82 - 14.82
-
-
-
0.17 - 0.17

16.74 - 16.74
- - -
14.01 - 14.01
2.73 - 2.73
-
-
0.57 - 0.57
4.32 - 4.32
14122-ED-CO-CVL-DWG-LOFD-1106 (Rev 1)
Quantity of Work Done
Drawing No. Status *) Remarks
Previous This Month Cumulative
14122-ED-CO-CVL-DWG-LOFD-1106 (Rev 1) -
-
-
22.32 - 22.32
-
-
-
0.38 - 0.38
-
-
37.20 37.20

8.51 - 8.51
- - -
8.51 - 8.51
- - -
-
-
0.18 - 0.18
0.77 - 0.77
14122-ED-CO-CVL-DWG-RDPV-0211 (Rev 6) -
-
-
10.32 - 10.32
-
-
-
-
-
-
-
-
8.00 - 8.00
16.00 - 16.00
2.40 2.40

1.78 - 1.78
- - -
0.96 - 0.96
0.82 - 0.82
-
-
0.10 - 0.10
1.54 - 1.54

-
14122-ED-P3-CVL-DWG-EQFD-0056.(R1)
-
5.14 - 5.14
-
14122-ED-P3-CVL-DWG-EQFD-0056.(R1)
Quantity of Work Done
Drawing No. Status *) Remarks
Previous This Month Cumulative
-
-
0.06 - 0.06
-
-
-
4.00 - 4.00
4.80 4.80

2.19 - 2.19
- - -
1.09 - 1.09
1.10 - 1.10
-
-
0.13 - 0.13
2.07 - 2.07

-
14122-ED-P3-CVL-DWG-EQFD-0057.(R1)
-
5.99 - 5.99
-
-
-
0.06 - 0.06
-
-
-
4.00 - 4.00
5.60 5.60

Prepared by: Reviewed by: Approved by:


SSP IKPT IKPT

Esti Widayanti Gatut WS


Quantity of Work Done
Drawing No. Status *) Remarks
Previous This Month Cumulative
Project Manager Civil Supt. CM
Progress per Item Calculation As of
CIVIL 2
CUMULATIVE QUANTITY
NO. AREA ITEM CODE WORK ITEM
Qty WidthDepth Length
A P2 - POLYMERIZATION AND CONCENTRATION AREA
1 PIPE RACK-02-1
Calculation Ref. No : SSP-CVL2-FDN-PR02-1

EA-1A Excavation by Equipment (D≦3.0M)


EA-1B Excavation by Equipment (D>3.0M)
EA-2A Backfilling (Excavated Soil)
EA-3B Disposal of Soil (Outside of Factory)
CO-1A Leveling Concrete
FM-1A Form for Sub-STR.
FM-2A Form for Super-STR.
CO-2A Concrete for Sub-STR.
CO-3A Concrete for Super-STR.
RE-1A Re-Bar for Sub-STR. (Deformed)
AN-3B-1 Embedded Steel Supply & Setting(Carbon Steel)
JT-5A Isolation Joint

2 PIPE RACK-02-2
Calculation Ref. No : SSP-CVL2-FDN-PR02-2.1

EA-1A Excavation by Equipment (D≦3.0M)


EA-2A Backfilling (Excavated Soil)
EA-3B Disposal of Soil (Outside of Factory)
CO-1A Leveling Concrete
FM-1A Form for Sub-STR.
FM-2A Form for Super-STR.
CO-2A Concrete for Sub-STR.
RE-1A Re-Bar for Sub-STR. (Deformed)
JT-5A Isolation Joint

3 POLYMERIZATION SEPARATION PIT (M6486.19)


Calculation Ref. No : SSP-CVL2-PIT-M6486-19

EA-1A Excavation by Equipment (D≦3.0M)


EA-2A Backfilling (Excavated Soil)
EA-3B Disposal of Soil (Outside of Factory)
CO-1A Leveling Concrete
FM-1A Form for Sub-STR.
FM-2A Form for Super-STR.
CO-2A Concrete for Sub-STR.
CO-3A Concrete for Super-STR.
RE-1A Re-Bar for Sub-STR. (Deformed)
RE-2A Re-Bar for Super-STR. (Deformed)
JT-4A Water Stop Plate
AN-3B-1 Embedded Steel Supply & Setting(Carbon Steel)
ANA-1 Climbing Rung (Galvanized)
LN-5E-1 Chemical Resistant Resin Lining (Epoxy)
JT-5A Isolation Joint

237 of 476
Progress per Item Calculation As of
CIVIL 2
CUMULATIVE QUANTITY
NO. AREA ITEM CODE WORK ITEM
Qty WidthDepth Length

4 POLYMERIZATION DRAIN DRUM (V6482.01)


Calculation Ref. No : SSP-CVL2-PIT-V6482.01

EA-1A Excavation by Equipment (D≦3.0M)


EA-1B Excavation by Equipment (D>3.0M)
EA-2A Backfilling (Excavated Soil)
EA-3B Disposal of Soil (Outside of Factory)
CO-1A Leveling Concrete
FM-1A Form for Sub-STR.
FM-2A Form for Super-STR.
CO-2A Concrete for Sub-STR.
CO-3A Concrete for Super-STR.
RE-1A Re-Bar for Sub-STR. (Deformed)
RE-2A Re-Bar for Super-STR. (Deformed)
JT-4A Water Stop Plate
AN-1A Anchor Box
AN-3B-1 Embedded Steel Supply & Setting(Carbon Steel)
JT-5A Isolation Joint

5 ACID DRAIN DRUM (V6484.01)


Calculation Ref. No : SSP-CVL2-PIT-V6484.01

EA-1A Excavation by Equipment (D≦3.0M)


EA-1B Excavation by Equipment (D>3.0M)
EA-2A Backfilling (Excavated Soil)
EA-3B Disposal of Soil (Outside of Factory)
CO-1A Leveling Concrete
FM-1A Form for Sub-STR.
FM-2A Form for Super-STR.
CO-2A Concrete for Sub-STR.
CO-3A Concrete for Super-STR.
RE-1A Re-Bar for Sub-STR. (Deformed)
RE-2A Re-Bar for Super-STR. (Deformed)
JT-4A Water Stop Plate
AN-1A Anchor Box
AN-3B-1 Embedded Steel Supply & Setting(Carbon Steel)
JT-5A Isolation Joint

6 CONCENTRATION DRAIN DRUM (V6483.01)


Calculation Ref. No : SSP-CVL2-PIT-V6483.01

EA-1A Excavation by Equipment (D≦3.0M)


EA-1B Excavation by Equipment (D>3.0M)
EA-2A Backfilling (Excavated Soil)
EA-3B Disposal of Soil (Outside of Factory)
CO-1A Leveling Concrete
FM-1A Form for Sub-STR.
FM-2A Form for Super-STR.

238 of 476
Progress per Item Calculation As of
CIVIL 2
CUMULATIVE QUANTITY
NO. AREA ITEM CODE WORK ITEM
Qty WidthDepth Length
CO-2A Concrete for Sub-STR.
CO-3A Concrete for Super-STR.
RE-1A Re-Bar for Sub-STR. (Deformed)
RE-2A Re-Bar for Super-STR. (Deformed)
JT-4A Water Stop Plate
AN-1A Anchor Box
JT-5A Isolation Joint

7 POLYMERIZATION DRAIN DRUM (V6485.01)


Calculation Ref. No : SSP-CVL2-PIT-V6485.01

EA-1A Excavation by Equipment (D≦3.0M)


EA-1B Excavation by Equipment (D>3.0M)
EA-2A Backfilling (Excavated Soil)
EA-3B Disposal of Soil (Outside of Factory)
CO-1A Leveling Concrete
FM-1A Form for Sub-STR.
FM-2A Form for Super-STR.
CO-2A Concrete for Sub-STR.
CO-3A Concrete for Super-STR.
RE-1A Re-Bar for Sub-STR. (Deformed)
RE-2A Re-Bar for Super-STR. (Deformed)
JT-4A Water Stop Plate
AN-1A Anchor Box
JT-5A Isolation Joint

8 STR P2-1 1340 POLYMERIZATION STRUCTURE FOUNDATION


Calculation Ref. No : SSP-CVL2-FDN-STR P2-1

EA-1A Excavation by Equipment (D≦3.0M)


EA-1B Excavation by Equipment (D>3.0M)
EA-2A Backfilling (Excavated Soil)
EA-3B Disposal of Soil (Outside of Factory)
CO-1A Leveling Concrete
FM-1A Form for Sub-STR.
FM-2A Form for Super-STR.
CO-2A Concrete for Sub-STR.
CO-3A Concrete for Super-STR.
RE-1A Re-Bar for Sub-STR. (Deformed)
RE-2A Re-Bar for Super-STR. (Deformed)
BC-1A Base Course for Sub-STR.
AN-2B Anchor Bolt W/O Template Setting
AN-3B-1 Embedded Steel Supply & Setting(Carbon Steel)
JT-5A Isolation Joint

9 V.6315.01 1340 POLYMERIZATION STRUCTURE FOUNDATION


Calculation Ref. No : SSP-CVL2-FDN-1340-V.6315.01

239 of 476
Progress per Item Calculation As of
CIVIL 2
CUMULATIVE QUANTITY
NO. AREA ITEM CODE WORK ITEM
Qty WidthDepth Length
EA-1A Excavation by Equipment (D≦3.0M)
EA-1B Excavation by Equipment (D>3.0M)
EA-2A Backfilling (Excavated Soil)
EA-3B Disposal of Soil (Outside of Factory)
CO-1A Leveling Concrete
FM-1A Form for Sub-STR.
FM-2A Form for Super-STR.
CO-2A Concrete for Sub-STR.
CO-3A Concrete for Super-STR.
RE-1A Re-Bar for Sub-STR. (Deformed)
RE-2A Re-Bar for Super-STR. (Deformed)
AN-2B Anchor Bolt W/O Template Setting
JT-5A Isolation Joint

10 V.6315.02 1340 POLYMERIZATION STRUCTURE FOUNDATION


Calculation Ref. No : SSP-CVL2-FDN-1340 - V.6315.02

EA-1A Excavation by Equipment (D≦3.0M)


EA-1B Excavation by Equipment (D>3.0M)
EA-2A Backfilling (Excavated Soil)
EA-3B Disposal of Soil (Outside of Factory)
CO-1A Leveling Concrete
FM-1A Form for Sub-STR.
FM-2A Form for Super-STR.
CO-2A Concrete for Sub-STR.
CO-3A Concrete for Super-STR.
RE-1A Re-Bar for Sub-STR. (Deformed)
RE-2A Re-Bar for Super-STR. (Deformed)
AN-2B Anchor Bolt W/O Template Setting
JT-5A Isolation Joint

11 STR P2-2 1350 CONCENTRATION STRUCTURE FOUNDATION


Calculation Ref. No : SSP-CVL2-FDN-STR P2-2

EA-1A Excavation by Equipment (D≦3.0M)


EA-1B Excavation by Equipment (D>3.0M)
EA-2A Backfilling (Excavated Soil)
EA-3B Disposal of Soil (Outside of Factory)
CO-1A Leveling Concrete
FM-1A Form for Sub-STR.
FM-2A Form for Super-STR.
CO-2A Concrete for Sub-STR.
CO-3A Concrete for Super-STR.
RE-1A Re-Bar for Sub-STR. (Deformed)
RE-2A Re-Bar for Super-STR. (Deformed)
BC-1A Base Course for Sub-STR.
AN-2B Anchor Bolt W/O Template Setting
PLA-6A Grouting (Non shrink)
JT-5A Isolation Joint

240 of 476
Progress per Item Calculation As of
CIVIL 2
CUMULATIVE QUANTITY
NO. AREA ITEM CODE WORK ITEM
Qty WidthDepth Length

12 STR P2-3 1350 CONCENTRATION 1 ST STAGE PRE-HEATER FOUNDATION


Calculation Ref. No : SSP-CVL2-FDN-STR P2-3

EA-1A Excavation by Equipment (D≦3.0M)


EA-1B Excavation by Equipment (D>3.0M)
EA-2A Backfilling (Excavated Soil)
EA-3B Disposal of Soil (Outside of Factory)
CO-1A Leveling Concrete
FM-1A Form for Sub-STR.
FM-2A Form for Super-STR.
CO-2A Concrete for Sub-STR.
CO-3A Concrete for Super-STR.
RE-1A Re-Bar for Sub-STR. (Deformed)
RE-2A Re-Bar for Super-STR. (Deformed)
AN-2B Anchor Bolt W/O Template Setting
PLA-6A Grouting (Non shrink)
JT-5A Isolation Joint

13 FOUNDATION E.1352.01 A/B/D/E 1 ST CONCENTRATION STAGE PRE-HEATER


Calculation Ref. No : SSP-CVL2-FDN-E.1352.01 A/B/D/E

EA-1A Excavation by Equipment (D≦3.0M)


EA-1B Excavation by Equipment (D>3.0M)
EA-2A Backfilling (Excavated Soil)
EA-3B Disposal of Soil (Outside of Factory)
CO-1A Leveling Concrete
FM-1A Form for Sub-STR.
FM-2A Form for Super-STR.
CO-2A Concrete for Sub-STR.
CO-3A Concrete for Super-STR.
RE-1A Re-Bar for Sub-STR. (Deformed)
RE-2A Re-Bar for Super-STR. (Deformed)
AN-1A Anchor Box
JT-5A Isolation Joint

14 STR P2-4 1350 CONCENTRATION 2 ND STAGE PRE-HEATER FOUNDATION


Calculation Ref. No : SSP-CVL2-FDN-STR P2-4

EA-1A Excavation by Equipment (D≦3.0M)


EA-1B Excavation by Equipment (D>3.0M)
EA-2A Backfilling (Excavated Soil)
EA-3B Disposal of Soil (Outside of Factory)
CO-1A Leveling Concrete
FM-1A Form for Sub-STR.
FM-2A Form for Super-STR.
CO-2A Concrete for Sub-STR.

241 of 476
Progress per Item Calculation As of
CIVIL 2
CUMULATIVE QUANTITY
NO. AREA ITEM CODE WORK ITEM
Qty WidthDepth Length
CO-3A Concrete for Super-STR.
RE-1A Re-Bar for Sub-STR. (Deformed)
RE-2A Re-Bar for Super-STR. (Deformed)
AN-2B Anchor Bolt W/O Template Setting
JT-5A Isolation Joint

15 FOUNDATION E.1352.02 A/B/C 2 ND CONCENTRATION STAGE PRE-HEATER


Calculation Ref. No : SSP-CVL2-FDN-E.1352.02 A/B/C

EA-1A Excavation by Equipment (D≦3.0M)


EA-1B Excavation by Equipment (D>3.0M)
EA-2A Backfilling (Excavated Soil)
EA-3B Disposal of Soil (Outside of Factory)
CO-1A Leveling Concrete
FM-1A Form for Sub-STR.
FM-2A Form for Super-STR.
CO-2A Concrete for Sub-STR.
CO-3A Concrete for Super-STR.
RE-1A Re-Bar for Sub-STR. (Deformed)
RE-2A Re-Bar for Super-STR. (Deformed)
AN-1A Anchor Box
JT-5A Isolation Joint

16 STR P2-11 1350 CONCENTRATION PIPE SUPPORT STRUCTURE FOUNDATION


Calculation Ref. No : SSP-CVL2-FDN-STR P2-11

EA-1A Excavation by Equipment (D≦3.0M)


EA-1B Excavation by Equipment (D>3.0M)
EA-2A Backfilling (Excavated Soil)
EA-3B Disposal of Soil (Outside of Factory)
CO-1A Leveling Concrete
FM-1A Form for Sub-STR.
FM-2A Form for Super-STR.
CO-2A Concrete for Sub-STR.
CO-3A Concrete for Super-STR.
RE-1A Re-Bar for Sub-STR. (Deformed)
RE-2A Re-Bar for Super-STR. (Deformed)
AN-2B Anchor Bolt W/O Template Setting
JT-5A Isolation Joint

17 STR P2-5 2340 POLYMERIZATION STRUCTURE FOUNDATION


Calculation Ref. No : SSP-CVL2-FDN-STR P2-5

EA-1A Excavation by Equipment (D≦3.0M)


EA-1B Excavation by Equipment (D>3.0M)
EA-2A Backfilling (Excavated Soil)
EA-3B Disposal of Soil (Outside of Factory)
CO-1A Leveling Concrete

242 of 476
Progress per Item Calculation As of
CIVIL 2
CUMULATIVE QUANTITY
NO. AREA ITEM CODE WORK ITEM
Qty WidthDepth Length
FM-1A Form for Sub-STR.
FM-2A Form for Super-STR.
CO-2A Concrete for Sub-STR.
CO-3A Concrete for Super-STR.
RE-1A Re-Bar for Sub-STR. (Deformed)
RE-2A Re-Bar for Super-STR. (Deformed)
AN-2B Anchor Bolt W/O Template Setting
AN-3B-1 Embedded Steel Supply & Setting(Carbon Steel)
JT-5A Isolation Joint

18 SUB PIPE PRE EPSISTOP FOUNDATION


Calculation Ref. No : SSP-CVL2-SP P2

EA-1A Excavation by Equipment (D≦3.0M)


EA-1B Excavation by Equipment (D>3.0M)
EA-2A Backfilling (Excavated Soil)
EA-3B Disposal of Soil (Outside of Factory)
CO-1A Leveling Concrete
FM-1A Form for Sub-STR.
FM-2A Form for Super-STR.
CO-2A Concrete for Sub-STR.
CO-3A Concrete for Super-STR.
RE-1A Re-Bar for Sub-STR. (Deformed)
RE-2A Re-Bar for Super-STR. (Deformed)
AN-2B Anchor Bolt W/O Template Setting
JT-5A Isolation Joint

19 P2- CMH01 AREA COC MAIN HOLE TYPE 2 PLAN, SECTION- A/B/C
Calculation Ref. No : SSP-CVL2-CMH01-P2C0C

EA-1A Excavation by Equipment (D≦3.0M)


EA-1B Excavation by Equipment (D>3.0M)
EA-2A Backfilling (Excavated Soil)
EA-3B Disposal of Soil (Outside of Factory)
CO-1A Leveling Concrete
FM-1A Form for Sub-STR.
FM-2A Form for Super-STR.
CO-2A Concrete for Sub-STR.
CO-3A Concrete for Super-STR.
RE-1A Re-Bar for Sub-STR. (Deformed)
RE-2A Re-Bar for Super-STR. (Deformed)
JT-4A Water Stop Plate
ANA-2 Climbing Rung (Chemical Resistant)
LN-5E-1 Chemical Resistant Resin Lining (Epoxy)
PPX-8A Vent Pipe for Manhole

20 P2- CMH02 AREA COC MAIN HOLE TYPE 2 PLAN, SECTION- A/B/C
Calculation Ref. No : SSP-CVL2-CMH02-P2C0C

243 of 476
Progress per Item Calculation As of
CIVIL 2
CUMULATIVE QUANTITY
NO. AREA ITEM CODE WORK ITEM
Qty WidthDepth Length

EA-1A Excavation by Equipment (D≦3.0M)


EA-1B Excavation by Equipment (D>3.0M)
EA-2A Backfilling (Excavated Soil)
EA-3B Disposal of Soil (Outside of Factory)
CO-1A Leveling Concrete
FM-1A Form for Sub-STR.
FM-2A Form for Super-STR.
CO-2A Concrete for Sub-STR.
CO-3A Concrete for Super-STR.
RE-1A Re-Bar for Sub-STR. (Deformed)
RE-2A Re-Bar for Super-STR. (Deformed)
JT-4A Water Stop Plate
ANA-2 Climbing Rung (Chemical Resistant)
LN-5E-1 Chemical Resistant Resin Lining (Epoxy)
PPX-8A Vent Pipe for Manhole

21 FOUNDATION V.6416.01 POLYMERIZATION BLOWDOWN DRUM


Calculation Ref. No : SSP-CVL2-2340-V6416.01

EA-1A Excavation by Equipment (D≦3.0M)


EA-1B Excavation by Equipment (D>3.0M)
EA-2A Backfilling (Excavated Soil)
EA-3B Disposal of Soil (Outside of Factory)
CO-1A Leveling Concrete
FM-1A Form for Sub-STR.
FM-2A Form for Super-STR.
CO-2A Concrete for Sub-STR.
CO-3A Concrete for Super-STR.
RE-1A Re-Bar for Sub-STR. (Deformed)
RE-2A Re-Bar for Super-STR. (Deformed)
AN-1A Anchor Box
JT-5A Isolation Joint

22 STR P2-13 2370 PIPE SUPPORT STRUCTURE FOUNDATION


Calculation Ref. No : SSP-CVL2-FDN-2370 P2-13

EA-1A Excavation by Equipment (D≦3.0M)


EA-1B Excavation by Equipment (D>3.0M)
EA-2A Backfilling (Excavated Soil)
EA-3B Disposal of Soil (Outside of Factory)
CO-1A Leveling Concrete
FM-1A Form for Sub-STR.
FM-2A Form for Super-STR.
CO-2A Concrete for Sub-STR.
CO-3A Concrete for Super-STR.
RE-1A Re-Bar for Sub-STR. (Deformed)
RE-2A Re-Bar for Super-STR. (Deformed)
AN-2B Anchor Bolt W/O Template Setting

244 of 476
Progress per Item Calculation As of
CIVIL 2
CUMULATIVE QUANTITY
NO. AREA ITEM CODE WORK ITEM
Qty WidthDepth Length
PLA-6A Grouting (Non shrink)
JT-5A Isolation Joint

23 STR P2-6 2350 CONCENTRATION STRUCTURE FOUNDATION


Calculation Ref. No : SSP-CVL2-FDN-STR P2-6

EA-1A Excavation by Equipment (D≦3.0M)


EA-1B Excavation by Equipment (D>3.0M)
EA-2A Backfilling (Excavated Soil)
EA-3B Disposal of Soil (Outside of Factory)
CO-1A Leveling Concrete
FM-1A Form for Sub-STR.
FM-2A Form for Super-STR.
CO-2A Concrete for Sub-STR.
CO-3A Concrete for Super-STR.
RE-1A Re-Bar for Sub-STR. (Deformed)
RE-2A Re-Bar for Super-STR. (Deformed)
AN-2B Anchor Bolt W/O Template Setting
JT-5A Isolation Joint

24 STR P2-7 2350 CONCENTRATION 1ST STAGE PRE HEATER FOUNDATION


Calculation Ref. No : SSP-CVL2-FDN-STR P2-7

EA-1A Excavation by Equipment (D≦3.0M)


EA-1B Excavation by Equipment (D>3.0M)
EA-2A Backfilling (Excavated Soil)
EA-3B Disposal of Soil (Outside of Factory)
CO-1A Leveling Concrete
FM-1A Form for Sub-STR.
FM-2A Form for Super-STR.
CO-2A Concrete for Sub-STR.
CO-3A Concrete for Super-STR.
RE-1A Re-Bar for Sub-STR. (Deformed)
RE-2A Re-Bar for Super-STR. (Deformed)
AN-2B Anchor Bolt W/O Template Setting
JT-5A Isolation Joint

25 FOUNDATION T.6304.01 ANTI-OXIDANT STORAGE TANK


Calculation Ref. No : SSP-CVL2-FDN-1340-T6304.01

EA-1A Excavation by Equipment (D≦3.0M)


EA-1B Excavation by Equipment (D>3.0M)
EA-2A Backfilling (Excavated Soil)
EA-3B Disposal of Soil (Outside of Factory)
CO-1A Leveling Concrete
FM-1A Form for Sub-STR.
FM-2A Form for Super-STR.
CO-2A Concrete for Sub-STR.

245 of 476
Progress per Item Calculation As of
CIVIL 2
CUMULATIVE QUANTITY
NO. AREA ITEM CODE WORK ITEM
Qty WidthDepth Length
CO-3A Concrete for Super-STR.
RE-1A Re-Bar for Sub-STR. (Deformed)
RE-2A Re-Bar for Super-STR. (Deformed)
AN-2B Anchor Bolt W/O Template Setting
JT-5A Isolation Joint

26 FOUNDATION V.2353.01 RECYCLE SOLVENT DRUM


Calculation Ref. No : SSP-CVL2-FDN-2350-V2353.01 RSD

EA-1A Excavation by Equipment (D≦3.0M)


EA-1B Excavation by Equipment (D>3.0M)
EA-2A Backfilling (Excavated Soil)
EA-3B Disposal of Soil (Outside of Factory)
CO-1A Leveling Concrete
FM-1A Form for Sub-STR.
FM-2A Form for Super-STR.
CO-2A Concrete for Sub-STR.
CO-3A Concrete for Super-STR.
RE-1A Re-Bar for Sub-STR. (Deformed)
RE-2A Re-Bar for Super-STR. (Deformed)
AN-1A Anchor Bolt W/O Template Setting
JT-5A Isolation Joint

27 SHELTER FOR ACID FOUNDATION


Calculation Ref. No : SSP-CVL2-FDN-1340-SHELTER

EA-1A Excavation by Equipment (D≦3.0M)


EA-1B Excavation by Equipment (D>3.0M)
EA-2A Backfilling (Excavated Soil)
EA-3B Disposal of Soil (Outside of Factory)
CO-1A Leveling Concrete
FM-1A Form for Sub-STR.
FM-2A Form for Super-STR.
CO-2A Concrete for Sub-STR.
CO-3A Concrete for Super-STR.
RE-1A Re-Bar for Sub-STR. (Deformed)
RE-2A Re-Bar for Super-STR. (Deformed)
AN-2B Anchor Bolt W/O Template Setting
JT-5A Isolation Joint

28 FOUNDATION V.1353.01 RECYCLE SOLVENT DRUM


Calculation Ref. No : SSP-CVL2-FDN-2350-V1353.01 RSD

EA-1A Excavation by Equipment (D≦3.0M)


EA-1B Excavation by Equipment (D>3.0M)
EA-2A Backfilling (Excavated Soil)
EA-3B Disposal of Soil (Outside of Factory)
CO-1A Leveling Concrete

246 of 476
Progress per Item Calculation As of
CIVIL 2
CUMULATIVE QUANTITY
NO. AREA ITEM CODE WORK ITEM
Qty WidthDepth Length
FM-1A Form for Sub-STR.
FM-2A Form for Super-STR.
CO-2A Concrete for Sub-STR.
CO-3A Concrete for Super-STR.
RE-1A Re-Bar for Sub-STR. (Deformed)
RE-2A Re-Bar for Super-STR. (Deformed)
AN-1A Anchor Bolt W/O Template Setting
JT-5A Isolation Joint

29 P2- AMH01 AREA COC MAIN HOLE TYPE 2 PLAN, SECTION- A/B
Calculation Ref. No : SSP-CVL2-AMH01-P2C0C

EA-1A Excavation by Equipment (D≦3.0M)


EA-1B Excavation by Equipment (D>3.0M)
EA-2A Backfilling (Excavated Soil)
EA-3B Disposal of Soil (Outside of Factory)
CO-1A Leveling Concrete
FM-1A Form for Sub-STR.
FM-2A Form for Super-STR.
CO-2A Concrete for Sub-STR.
CO-3A Concrete for Super-STR.
RE-1A Re-Bar for Sub-STR. (Deformed)
RE-2A Re-Bar for Super-STR. (Deformed)
JT-4A Water Stop Plate
ANA-2 Climbing Rung (Chemical Resistant)
LN-5E-1 Chemical Resistant Resin Lining (Epoxy)
PPX-8A Vent Pipe for Manhole
JTA-6 Sikaswell for joining RCP and Manhole

30 P2- AMH02 AREA COC MAIN HOLE TYPE 2 PLAN, SECTION- A/B
Calculation Ref. No : SSP-CVL2-AMH02-P2C0C

EA-1A Excavation by Equipment (D≦3.0M)


EA-1B Excavation by Equipment (D>3.0M)
EA-2A Backfilling (Excavated Soil)
EA-3B Disposal of Soil (Outside of Factory)
CO-1A Leveling Concrete
FM-1A Form for Sub-STR.
FM-2A Form for Super-STR.
CO-2A Concrete for Sub-STR.
CO-3A Concrete for Super-STR.
RE-1A Re-Bar for Sub-STR. (Deformed)
RE-2A Re-Bar for Super-STR. (Deformed)
JT-4A Water Stop Plate
ANA-2 Climbing Rung (Chemical Resistant)
LN-5E-1 Chemical Resistant Resin Lining (Epoxy)
PPX-8A Vent Pipe for Manhole
JTA-6 Sikaswell for joining RCP and Manhole

247 of 476
Progress per Item Calculation As of
CIVIL 2
CUMULATIVE QUANTITY
NO. AREA ITEM CODE WORK ITEM
Qty WidthDepth Length

31 FOUNDATION P.1351.01 PRE-FLASHED SOLUTION DRUM


Calculation Ref. No : SSP-CVL2-FDN-P.1351.01

EA-1A Excavation by Equipment (D≦3.0M)


EA-1B Excavation by Equipment (D>3.0M)
EA-2A Backfilling (Excavated Soil)
EA-3B Disposal of Soil (Outside of Factory)
CO-1A Leveling Concrete
FM-1A Form for Sub-STR.
FM-2A Form for Super-STR.
CO-2A Concrete for Sub-STR.
CO-3A Concrete for Super-STR.
RE-1A Re-Bar for Sub-STR. (Deformed)
RE-2A Re-Bar for Super-STR. (Deformed)
AN-1A Anchor Box
JT-5A Isolation Joint

32 FOUNDATION P.1351.02 PRE-FLASHED SOLUTION START UP PUPM


Calculation Ref. No : SSP-CVL2-FDN-P.1351.02

EA-1A Excavation by Equipment (D≦3.0M)


EA-1B Excavation by Equipment (D>3.0M)
EA-2A Backfilling (Excavated Soil)
EA-3B Disposal of Soil (Outside of Factory)
CO-1A Leveling Concrete
FM-1A Form for Sub-STR.
FM-2A Form for Super-STR.
CO-2A Concrete for Sub-STR.
CO-3A Concrete for Super-STR.
RE-1A Re-Bar for Sub-STR. (Deformed)
RE-2A Re-Bar for Super-STR. (Deformed)
AN-1A Anchor Box
JT-5A Isolation Joint

33 FOUNDATION P.1352.01 A/B CONCENTRATED POLYMER SOLUTION PUPM (1ST STAGE)


Calculation Ref. No : SSP-CVL2-FDN-P.1352.01

EA-1A Excavation by Equipment (D≦3.0M)


EA-1B Excavation by Equipment (D>3.0M)
EA-2A Backfilling (Excavated Soil)
EA-3B Disposal of Soil (Outside of Factory)
CO-1A Leveling Concrete
FM-1A Form for Sub-STR.
FM-2A Form for Super-STR.
CO-2A Concrete for Sub-STR.
CO-3A Concrete for Super-STR.
RE-1A Re-Bar for Sub-STR. (Deformed)
RE-2A Re-Bar for Super-STR. (Deformed)

248 of 476
Progress per Item Calculation As of
CIVIL 2
CUMULATIVE QUANTITY
NO. AREA ITEM CODE WORK ITEM
Qty WidthDepth Length
AN-1A Anchor Box
JT-5A Isolation Joint

34 FOUNDATION P.1352.02 CONCENTRATED POLYMER SOLUTION PUPM (2ND STAGE)


Calculation Ref. No : SSP-CVL2-FDN-P.1352.02

EA-1A Excavation by Equipment (D≦3.0M)


EA-1B Excavation by Equipment (D>3.0M)
EA-2A Backfilling (Excavated Soil)
EA-3B Disposal of Soil (Outside of Factory)
CO-1A Leveling Concrete
FM-1A Form for Sub-STR.
FM-2A Form for Super-STR.
CO-2A Concrete for Sub-STR.
CO-3A Concrete for Super-STR.
RE-1A Re-Bar for Sub-STR. (Deformed)
RE-2A Re-Bar for Super-STR. (Deformed)
AN-1A Anchor Box
JT-5A Isolation Joint

35 FOUNDATION P.1352.03/04 CONCENTRATED POLYMER SOLUTION START UP PUMP


Calculation Ref. No : SSP-CVL2-FDN-P.1352.03/04

EA-1A Excavation by Equipment (D≦3.0M)


EA-1B Excavation by Equipment (D>3.0M)
EA-2A Backfilling (Excavated Soil)
EA-3B Disposal of Soil (Outside of Factory)
CO-1A Leveling Concrete
FM-1A Form for Sub-STR.
FM-2A Form for Super-STR.
CO-2A Concrete for Sub-STR.
CO-3A Concrete for Super-STR.
RE-1A Re-Bar for Sub-STR. (Deformed)
RE-2A Re-Bar for Super-STR. (Deformed)
AN-1A Anchor Box
JT-5A Isolation Joint

36 FOUNDATION E.2352.01 A/B 1ST CONCENTRATION STAGE PRE-HEATER


Calculation Ref. No : SSP-CVL2-FDN-E.2352.01/02

EA-1A Excavation by Equipment (D≦3.0M)


EA-1B Excavation by Equipment (D>3.0M)
EA-2A Backfilling (Excavated Soil)
EA-3B Disposal of Soil (Outside of Factory)
CO-1A Leveling Concrete
FM-1A Form for Sub-STR.
FM-2A Form for Super-STR.
CO-2A Concrete for Sub-STR.

249 of 476
Progress per Item Calculation As of
CIVIL 2
CUMULATIVE QUANTITY
NO. AREA ITEM CODE WORK ITEM
Qty WidthDepth Length
CO-3A Concrete for Super-STR.
RE-1A Re-Bar for Sub-STR. (Deformed)
RE-2A Re-Bar for Super-STR. (Deformed)
AN-1A Anchor Box
JT-5A Isolation Joint

37 FOUNDATION E.2352.02 A/B 2ND CONCENTRATION STAGE PRE- HEATHER


Calculation Ref. No : SSP-CVL2-FDN-E.2352.02 A/B

EA-1A Excavation by Equipment (D≦3.0M)


EA-1B Excavation by Equipment (D>3.0M)
EA-2A Backfilling (Excavated Soil)
EA-3B Disposal of Soil (Outside of Factory)
CO-1A Leveling Concrete
FM-1A Form for Sub-STR.
FM-2A Form for Super-STR.
CO-2A Concrete for Sub-STR.
CO-3A Concrete for Super-STR.
RE-1A Re-Bar for Sub-STR. (Deformed)
RE-2A Re-Bar for Super-STR. (Deformed)
AN-1A Anchor Box
JT-5A Isolation Joint

250 of 476
Progress per Item Calculation As of
CIVIL 2
CUMULATIVE QUANTITY
NO. AREA ITEM CODE WORK ITEM
Qty WidthDepth Length
38 FOUNDATION P.1353.01 A/B RECYCLE SOLVENT PUPM
Calculation Ref. No : SSP-CVL2-FDN-P.1353.01 A/B

EA-1A Excavation by Equipment (D≦3.0M)


EA-1B Excavation by Equipment (D>3.0M)
EA-2A Backfilling (Excavated Soil)
EA-3B Disposal of Soil (Outside of Factory)
CO-1A Leveling Concrete
FM-1A Form for Sub-STR.
FM-2A Form for Super-STR.
CO-2A Concrete for Sub-STR.
CO-3A Concrete for Super-STR.
RE-1A Re-Bar for Sub-STR. (Deformed)
RE-2A Re-Bar for Super-STR. (Deformed)
AN-1A Anchor Box
JT-5A Isolation Joint

39 FOUNDATION E.6323.02 MES INJECTION HEATHER


Calculation Ref. No : SSP-CVL2-FDN-2350-E.6323.02 MEH

EA-1A Excavation by Equipment (D≦3.0M)


EA-1B Excavation by Equipment (D>3.0M)
EA-2A Backfilling (Excavated Soil)
EA-3B Disposal of Soil (Outside of Factory)
CO-1A Leveling Concrete
FM-1A Form for Sub-STR.
FM-2A Form for Super-STR.
CO-2A Concrete for Sub-STR.
CO-3A Concrete for Super-STR.
RE-1A Re-Bar for Sub-STR. (Deformed)
RE-2A Re-Bar for Super-STR. (Deformed)
AN-1A Anchor Box
JT-5A Isolation Joint

40 FOUNDATION P.6416.01 POLYMERIZATION BLOWDOWN PUMP


Calculation Ref. No : SSP-CVL2-FDN-P.6416.01 PBP

EA-1A Excavation by Equipment (D≦3.0M)


EA-1B Excavation by Equipment (D>3.0M)
EA-2A Backfilling (Excavated Soil)
EA-3B Disposal of Soil (Outside of Factory)
CO-1A Leveling Concrete
FM-1A Form for Sub-STR.
FM-2A Form for Super-STR.
CO-2A Concrete for Sub-STR.
CO-3A Concrete for Super-STR.
RE-1A Re-Bar for Sub-STR. (Deformed)
RE-2A Re-Bar for Super-STR. (Deformed)
AN-1A Anchor Box

251 of 476
Progress per Item Calculation As of
CIVIL 2
CUMULATIVE QUANTITY
NO. AREA ITEM CODE WORK ITEM
Qty WidthDepth Length
JT-5A Isolation Joint

41 FOUNDATION P.6304.02 A/B ANTIOXIDANT S TRANSFER PUMP


Calculation Ref. No : SSP-CVL2-FDN-1340 - P.6304.02A/B

EA-1A Excavation by Equipment (D≦3.0M)


EA-1B Excavation by Equipment (D>3.0M)
EA-2A Backfilling (Excavated Soil)
EA-3B Disposal of Soil (Outside of Factory)
CO-1A Leveling Concrete
FM-1A Form for Sub-STR.
FM-2A Form for Super-STR.
CO-2A Concrete for Sub-STR.
CO-3A Concrete for Super-STR.
RE-1A Re-Bar for Sub-STR. (Deformed)
RE-2A Re-Bar for Super-STR. (Deformed)
AN-1A Anchor Box
JT-5A Isolation Joint

42 FOUNDATION V.6317.01 TIFANE MAKE-UP VESSEL


Calculation Ref. No : SSP-CVL2-FDN-V.6317.01

EA-1A Excavation by Equipment (D≦3.0M)


EA-1B Excavation by Equipment (D>3.0M)
EA-2A Backfilling (Excavated Soil)
EA-3B Disposal of Soil (Outside of Factory)
CO-1A Leveling Concrete
FM-1A Form for Sub-STR.
FM-2A Form for Super-STR.
CO-2A Concrete for Sub-STR.
CO-3A Concrete for Super-STR.
RE-1A Re-Bar for Sub-STR. (Deformed)
RE-2A Re-Bar for Super-STR. (Deformed)
AN-2B Anchor Bolt W/O Template Setting
JT-5A Isolation Joint

43 FOUNDATION V.6318.01 EPITSTOP DAILY VESSEL


Calculation Ref. No : SSP-CVL2-FDN-V.6318.01

EA-1A Excavation by Equipment (D≦3.0M)


EA-1B Excavation by Equipment (D>3.0M)
EA-2A Backfilling (Excavated Soil)
EA-3B Disposal of Soil (Outside of Factory)
CO-1A Leveling Concrete
FM-1A Form for Sub-STR.
FM-2A Form for Super-STR.
CO-2A Concrete for Sub-STR.
CO-3A Concrete for Super-STR.

252 of 476
Progress per Item Calculation As of
CIVIL 2
CUMULATIVE QUANTITY
NO. AREA ITEM CODE WORK ITEM
Qty WidthDepth Length
RE-1A Re-Bar for Sub-STR. (Deformed)
RE-2A Re-Bar for Super-STR. (Deformed)
AN-2B Anchor Bolt W/O Template Setting
JT-5A Isolation Joint

44 FOUNDATION V.6318.02 EPITSTOP DAILY VESSEL


Calculation Ref. No : SSP-CVL2-FDN-V.6318.02

EA-1A Excavation by Equipment (D≦3.0M)


EA-1B Excavation by Equipment (D>3.0M)
EA-2A Backfilling (Excavated Soil)
EA-3B Disposal of Soil (Outside of Factory)
CO-1A Leveling Concrete
FM-1A Form for Sub-STR.
FM-2A Form for Super-STR.
CO-2A Concrete for Sub-STR.
CO-3A Concrete for Super-STR.
RE-1A Re-Bar for Sub-STR. (Deformed)
RE-2A Re-Bar for Super-STR. (Deformed)
AN-2B Anchor Bolt W/O Template Setting
PLA-6A Grouting (Non shrink)
JT-5A Isolation Joint

45 FOUNDATION P.6317.02 A/B TIFANE INJECTION PUMP


Calculation Ref. No : SSP-CVL2-FDN-P.6317.02 A/B

EA-1A Excavation by Equipment (D≦3.0M)


EA-1B Excavation by Equipment (D>3.0M)
EA-2A Backfilling (Excavated Soil)
EA-3B Disposal of Soil (Outside of Factory)
CO-1A Leveling Concrete
FM-1A Form for Sub-STR.
FM-2A Form for Super-STR.
CO-2A Concrete for Sub-STR.
CO-3A Concrete for Super-STR.
RE-1A Re-Bar for Sub-STR. (Deformed)
RE-2A Re-Bar for Super-STR. (Deformed)
AN-1A Anchor Box
PLA-6A Grouting (Non shrink)
JT-5A Isolation Joint

46 FOUNDATION V.6319.01 DELTASTOP MAKE-UP VESSEL


Calculation Ref. No : SSP-CVL2-FDN-V.6319.01

EA-1A Excavation by Equipment (D≦3.0M)


EA-1B Excavation by Equipment (D>3.0M)
EA-2A Backfilling (Excavated Soil)
EA-3B Disposal of Soil (Outside of Factory)

253 of 476
Progress per Item Calculation As of
CIVIL 2
CUMULATIVE QUANTITY
NO. AREA ITEM CODE WORK ITEM
Qty WidthDepth Length
CO-1A Leveling Concrete
FM-1A Form for Sub-STR.
FM-2A Form for Super-STR.
CO-2A Concrete for Sub-STR.
CO-3A Concrete for Super-STR.
RE-1A Re-Bar for Sub-STR. (Deformed)
RE-2A Re-Bar for Super-STR. (Deformed)
AN-2B Anchor Bolt W/O Template Setting
PLA-6A Grouting (Non shrink)
JT-5A Isolation Joint

47 FOUNDATION P.6318.02 A/B EPSISTOP INJECTION PUMP

254 of 476
Progress per Item Calculation As of
CIVIL 2
CUMULATIVE QUANTITY
NO. AREA ITEM CODE WORK ITEM
Qty WidthDepth Length
Calculation Ref. No : SSP-CVL2-FDN-P.6318.02 A/B

EA-1A Excavation by Equipment (D≦3.0M)


EA-1B Excavation by Equipment (D>3.0M)
EA-2A Backfilling (Excavated Soil)
EA-3B Disposal of Soil (Outside of Factory)
CO-1A Leveling Concrete
FM-1A Form for Sub-STR.
FM-2A Form for Super-STR.
CO-2A Concrete for Sub-STR.
CO-3A Concrete for Super-STR.
RE-1A Re-Bar for Sub-STR. (Deformed)
RE-2A Re-Bar for Super-STR. (Deformed)
AN-1A Anchor Box
PLA-6A Grouting (Non shrink)
JT-5A Isolation Joint

48 FOUNDATION P.6319.02 A/B DELTA STOP INJECTION PUMP


Calculation Ref. No : SSP-CVL2-FDN-P.6319.02 A/B

EA-1A Excavation by Equipment (D≦3.0M)


EA-1B Excavation by Equipment (D>3.0M)
EA-2A Backfilling (Excavated Soil)
EA-3B Disposal of Soil (Outside of Factory)
CO-1A Leveling Concrete
FM-1A Form for Sub-STR.
FM-2A Form for Super-STR.
CO-2A Concrete for Sub-STR.
CO-3A Concrete for Super-STR.
RE-1A Re-Bar for Sub-STR. (Deformed)
RE-2A Re-Bar for Super-STR. (Deformed)
AN-1A Anchor Box
PLA-6A Grouting (Non shrink)
JT-5A Isolation Joint

49 FOUNDATION P.2353.01 A/B RECYCLE SOLVENT PUMP


Calculation Ref. No : SSP-CVL2-FDN-2350 - P2353.01 A/B RSP

EA-1A Excavation by Equipment (D≦3.0M)


EA-1B Excavation by Equipment (D>3.0M)
EA-2A Backfilling (Excavated Soil)
EA-3B Disposal of Soil (Outside of Factory)
CO-1A Leveling Concrete
FM-1A Form for Sub-STR.
FM-2A Form for Super-STR.
CO-2A Concrete for Sub-STR.
CO-3A Concrete for Super-STR.
RE-1A Re-Bar for Sub-STR. (Deformed)

255 of 476
Progress per Item Calculation As of
CIVIL 2
CUMULATIVE QUANTITY
NO. AREA ITEM CODE WORK ITEM
Qty WidthDepth Length
RE-2A Re-Bar for Super-STR. (Deformed)
AN-1A Anchor Box
PLA-6A Grouting (Non shrink)
JT-5A Isolation Joint

50 FOUNDATION P.2352.04 CONCENTRATED POLYMER SOLUTION START-UP PUMP (2nd STAGE)


Calculation Ref. No : SSP-CVL2-FDN-2350 - P2352.04 CPSP

EA-1A Excavation by Equipment (D≦3.0M)


EA-1B Excavation by Equipment (D>3.0M)
EA-2A Backfilling (Excavated Soil)
EA-3B Disposal of Soil (Outside of Factory)
CO-1A Leveling Concrete
FM-1A Form for Sub-STR.
FM-2A Form for Super-STR.
CO-2A Concrete for Sub-STR.
CO-3A Concrete for Super-STR.
RE-1A Re-Bar for Sub-STR. (Deformed)
RE-2A Re-Bar for Super-STR. (Deformed)
AN-1A Anchor Box
PLA-6A Grouting (Non shrink)
JT-5A Isolation Joint

51 FOUNDATION P.2352.03 CONCENTRATED POLYMER SOLUTION START-UP PUMP (1st STAGE)


Calculation Ref. No : SSP-CVL2-FDN-2350 - P2352.03 CPSP

EA-1A Excavation by Equipment (D≦3.0M)


EA-1B Excavation by Equipment (D>3.0M)
EA-2A Backfilling (Excavated Soil)
EA-3B Disposal of Soil (Outside of Factory)
CO-1A Leveling Concrete
FM-1A Form for Sub-STR.
FM-2A Form for Super-STR.
CO-2A Concrete for Sub-STR.
CO-3A Concrete for Super-STR.
RE-1A Re-Bar for Sub-STR. (Deformed)
RE-2A Re-Bar for Super-STR. (Deformed)
AN-1A Anchor Box
PLA-6A Grouting (Non shrink)
JT-5A Isolation Joint

256 of 476
Progress per Item Calculation As of
CIVIL 2
CUMULATIVE QUANTITY
NO. AREA ITEM CODE WORK ITEM
Qty WidthDepth Length
52 FOUNDATION P.2352.02 CONCENTRATED POLYMER SOLUTION PUMP ( 2nd STAGE)
Calculation Ref. No : SSP-CVL2-FDN-2350 - P2352.02 CPSP

EA-1A Excavation by Equipment (D≦3.0M)


EA-1B Excavation by Equipment (D>3.0M)
EA-2A Backfilling (Excavated Soil)
EA-3B Disposal of Soil (Outside of Factory)
CO-1A Leveling Concrete
FM-1A Form for Sub-STR.
FM-2A Form for Super-STR.
CO-2A Concrete for Sub-STR.
CO-3A Concrete for Super-STR.
RE-1A Re-Bar for Sub-STR. (Deformed)
RE-2A Re-Bar for Super-STR. (Deformed)
AN-1A Anchor Box
PLA-6A Grouting (Non shrink)
JT-5A Isolation Joint

53 FOUNDATION P.2352.01 A/B CONCENTRATED POLYMER SOLUTION PUMP ( 1st STAGE)


Calculation Ref. No : SSP-CVL2-FDN-2350 - P2352.01 A/B CPSP

EA-1A Excavation by Equipment (D≦3.0M)


EA-1B Excavation by Equipment (D>3.0M)
EA-2A Backfilling (Excavated Soil)
EA-3B Disposal of Soil (Outside of Factory)
CO-1A Leveling Concrete
FM-1A Form for Sub-STR.
FM-2A Form for Super-STR.
CO-2A Concrete for Sub-STR.
CO-3A Concrete for Super-STR.
RE-1A Re-Bar for Sub-STR. (Deformed)
RE-2A Re-Bar for Super-STR. (Deformed)
AN-1A Anchor Box
PLA-6A Grouting (Non shrink)
JT-5A Isolation Joint

54 FOUNDATION P.2351.01 PRE-FLASHED SOLUTION PUMP


Calculation Ref. No : SSP-CVL2-FDN-2350 - P2351.01 A/B CPSP

EA-1A Excavation by Equipment (D≦3.0M)


EA-1B Excavation by Equipment (D>3.0M)
EA-2A Backfilling (Excavated Soil)
EA-3B Disposal of Soil (Outside of Factory)
CO-1A Leveling Concrete
FM-1A Form for Sub-STR.
FM-2A Form for Super-STR.
CO-2A Concrete for Sub-STR.
CO-3A Concrete for Super-STR.
RE-1A Re-Bar for Sub-STR. (Deformed)

257 of 476
Progress per Item Calculation As of
CIVIL 2
CUMULATIVE QUANTITY
NO. AREA ITEM CODE WORK ITEM
Qty WidthDepth Length
RE-2A Re-Bar for Super-STR. (Deformed)
AN-1A Anchor Box
PLA-6A Grouting (Non shrink)
JT-5A Isolation Joint

55 FOUNDATION P.2351.02 PRE- FLASHED SOLUTION START-UP PUMP


Calculation Ref. No : SSP-CVL2-FDN-2350 - P2351.02 CPSP

EA-1A Excavation by Equipment (D≦3.0M)


EA-1B Excavation by Equipment (D>3.0M)
EA-2A Backfilling (Excavated Soil)
EA-3B Disposal of Soil (Outside of Factory)
CO-1A Leveling Concrete
FM-1A Form for Sub-STR.
FM-2A Form for Super-STR.
CO-2A Concrete for Sub-STR.
CO-3A Concrete for Super-STR.
RE-1A Re-Bar for Sub-STR. (Deformed)
RE-2A Re-Bar for Super-STR. (Deformed)
AN-1A Anchor Box
PLA-6A Grouting (Non shrink)
JT-5A Isolation Joint

56 CONCRETE DIKE FOR T6304.01


Calculation Ref. No : SSP-CVL2-DIKE WALL-1340- T6304.01

EA-1A Excavation by Equipment (D≦3.0M)


EA-1B Excavation by Equipment (D>3.0M)
EA-2A Backfilling (Excavated Soil)
EA-3B Disposal of Soil (Outside of Factory)
CO-1A Leveling Concrete
FM-1A Form for Sub-STR.
FM-2A Form for Super-STR.
CO-2A Concrete for Sub-STR.
CO-3A Concrete for Super-STR.
RE-1A Re-Bar for Sub-STR. (Deformed)
RE-2A Re-Bar for Super-STR. (Deformed)
AN-3B-1 Embedded Steel Supply & Setting(Carbon Steel)
PLA-6A Grouting (Non shrink)
JT-2A Expansion Joint for Dike/Pit

57 P2- FOUNDATION V.6328.01 WHITOX MAKE - UP VESSEL


Calculation Ref. No : SSP-CVL2-FDN-2340-V6328.01

EA-1A Excavation by Equipment (D≦3.0M)


EA-1B Excavation by Equipment (D>3.0M)
EA-2A Backfilling (Excavated Soil)

258 of 476
Progress per Item Calculation As of
CIVIL 2
CUMULATIVE QUANTITY
NO. AREA ITEM CODE WORK ITEM
Qty WidthDepth Length
EA-3B Disposal of Soil (Outside of Factory)
CO-1A Leveling Concrete
FM-1A Form for Sub-STR.
FM-2A Form for Super-STR.
CO-2A Concrete for Sub-STR.
CO-3A Concrete for Super-STR.
RE-1A Re-Bar for Sub-STR. (Deformed)
RE-2A Re-Bar for Super-STR. (Deformed)
AN-2B Anchor Bolt W/O Template Setting
PLA-6A Grouting (Non shrink)
JT-5A Isolation Joint

58 FOUNDATION P.2342.01/02 1st & 2nd POLYMERIZATION REACTOR COOLING WATER PUMP
Calculation Ref. No : SSP-CVL2-FDN-2340 - P2342.01 /02

EA-1A Excavation by Equipment (D≦3.0M)


EA-1B Excavation by Equipment (D>3.0M)
EA-2A Backfilling (Excavated Soil)
EA-3B Disposal of Soil (Outside of Factory)
CO-1A Leveling Concrete
FM-1A Form for Sub-STR.
FM-2A Form for Super-STR.
CO-2A Concrete for Sub-STR.
CO-3A Concrete for Super-STR.
RE-1A Re-Bar for Sub-STR. (Deformed)
RE-2A Re-Bar for Super-STR. (Deformed)
AN-1A Anchor Box
PLA-6A Grouting (Non shrink)
JT-5A Isolation Joint

59 FOUNDATION E.2341.01 CHARGE HEADER EXCHANGER


Calculation Ref. No : SSP-CVL2-FDN-E.2341.01

EA-1A Excavation by Equipment (D≦3.0M)


EA-1B Excavation by Equipment (D>3.0M)
EA-2A Backfilling (Excavated Soil)
EA-3B Disposal of Soil (Outside of Factory)
CO-1A Leveling Concrete
FM-1A Form for Sub-STR.
FM-2A Form for Super-STR.
CO-2A Concrete for Sub-STR.
CO-3A Concrete for Super-STR.
RE-1A Re-Bar for Sub-STR. (Deformed)
RE-2A Re-Bar for Super-STR. (Deformed)
AN-1A Anchor Box
PLA-6A Grouting (Non shrink)
JT-5A Isolation Joint

259 of 476
Progress per Item Calculation As of
CIVIL 2
CUMULATIVE QUANTITY
NO. AREA ITEM CODE WORK ITEM
Qty WidthDepth Length
60 FOUNDATION P.1345.01/02 1st & 2nd POLYMERIZATION REACTOR COOLING WATER PUMP
Calculation Ref. No : SSP-CVL2-FDN-1340 - P1345.01 /02

EA-1A Excavation by Equipment (D≦3.0M)


EA-1B Excavation by Equipment (D>3.0M)
EA-2A Backfilling (Excavated Soil)
EA-3B Disposal of Soil (Outside of Factory)
CO-1A Leveling Concrete
FM-1A Form for Sub-STR.
FM-2A Form for Super-STR.
CO-2A Concrete for Sub-STR.
CO-3A Concrete for Super-STR.
RE-1A Re-Bar for Sub-STR. (Deformed)
RE-2A Re-Bar for Super-STR. (Deformed)
AN-1A Anchor Box
PLA-6A Grouting (Non shrink)
JT-5A Isolation Joint

61 FOUNDATION P.1342.01/02 1st & 2nd POLYMERIZATION REACTOR COOLING WATER PUMP
Calculation Ref. No : SSP-CVL2-FDN-1340 - P1342.01 /02

EA-1A Excavation by Equipment (D≦3.0M)


EA-1B Excavation by Equipment (D>3.0M)
EA-2A Backfilling (Excavated Soil)
EA-3B Disposal of Soil (Outside of Factory)
CO-1A Leveling Concrete
FM-1A Form for Sub-STR.
FM-2A Form for Super-STR.
CO-2A Concrete for Sub-STR.
CO-3A Concrete for Super-STR.
RE-1A Re-Bar for Sub-STR. (Deformed)
RE-2A Re-Bar for Super-STR. (Deformed)
AN-1A Anchor Box
PLA-6A Grouting (Non shrink)
JT-5A Isolation Joint

62 FOUNDATION E.1341.01 & E.1344.01 CHARGE HEADER EXCHANGER


Calculation Ref. No : SSP-CVL2-FDN-1340- E.1344.01

EA-1A Excavation by Equipment (D≦3.0M)


EA-1B Excavation by Equipment (D>3.0M)
EA-2A Backfilling (Excavated Soil)
EA-3B Disposal of Soil (Outside of Factory)
CO-1A Leveling Concrete
FM-1A Form for Sub-STR.
FM-2A Form for Super-STR.
CO-2A Concrete for Sub-STR.
CO-3A Concrete for Super-STR.
RE-1A Re-Bar for Sub-STR. (Deformed)

260 of 476
Progress per Item Calculation As of
CIVIL 2
CUMULATIVE QUANTITY
NO. AREA ITEM CODE WORK ITEM
Qty WidthDepth Length
RE-2A Re-Bar for Super-STR. (Deformed)
AN-1A Anchor Box
PLA-6A Grouting (Non shrink)
JT-5A Isolation Joint

63 FOUNDATION WS.6315.01 ETASTOP WEIGHT SCALE


Calculation Ref. No : SSP-CVL2-FDN-1340 - P2352.04 CPSP

EA-1A Excavation by Equipment (D≦3.0M)


EA-1B Excavation by Equipment (D>3.0M)
EA-2A Backfilling (Excavated Soil)
EA-3B Disposal of Soil (Outside of Factory)
CO-1A Leveling Concrete
FM-1A Form for Sub-STR.
FM-2A Form for Super-STR.
CO-2A Concrete for Sub-STR.
CO-3A Concrete for Super-STR.
RE-1A Re-Bar for Sub-STR. (Deformed)
RE-2A Re-Bar for Super-STR. (Deformed)
AN-2B Anchor Bolt W/O Template Setting
PLA-6A Grouting (Non shrink)
JT-5A Isolation Joint
PL-2D Mortar Finish for FDN

64 FOUNDATION C.6417.01 ACID VAPOR SCRUBBER


Calculation Ref. No : SSP-CVL2-FDN-1340-C6417.01

EA-1A Excavation by Equipment (D≦3.0M)


EA-1B Excavation by Equipment (D>3.0M)
EA-2A Backfilling (Excavated Soil)
EA-3B Disposal of Soil (Outside of Factory)
CO-1A Leveling Concrete
FM-1A Form for Sub-STR.
FM-2A Form for Super-STR.
CO-2A Concrete for Sub-STR.
CO-3A Concrete for Super-STR.
RE-1A Re-Bar for Sub-STR. (Deformed)
RE-2A Re-Bar for Super-STR. (Deformed)
AN-2B Anchor Bolt W/O Template Setting
PLA-6A Grouting (Non shrink)
JT-5A Isolation Joint

65 P2- AOC JUNCTION BOX 23/24/25/26


Calculation Ref. No : SSP-CVL2-AOC-P2-A0C-JB 23/24/25/26

EA-1A Excavation by Equipment (D≦3.0M)


EA-1B Excavation by Equipment (D>3.0M)
EA-2A Backfilling (Excavated Soil)

261 of 476
Progress per Item Calculation As of
CIVIL 2
CUMULATIVE QUANTITY
NO. AREA ITEM CODE WORK ITEM
Qty WidthDepth Length
EA-3B Disposal of Soil (Outside of Factory)
CO-1A Leveling Concrete
FM-1A Form for Sub-STR.
FM-2A Form for Super-STR.
CO-2A Concrete for Sub-STR.
CO-3A Concrete for Super-STR.
RE-1A Re-Bar for Sub-STR. (Deformed)
RE-2A Re-Bar for Super-STR. (Deformed)
JT-4A Water Stop Plate
ANA-2 Climbing Rung (Chemical Resistant)
LN-5E-1 Chemical Resistant Resin Lining (Epoxy)
ML-5B Grating Cover
AN-3B-1 Embedded Steel Supply & Setting(Carbon Steel)
JT-5A Isolation Joint

66 FOUNDATION ANALYZER HOUSE


Calculation Ref. No : SSP-CVL2-FDN-1350 - ANALYZER HOUSE

EA-1A Excavation by Equipment (D≦3.0M)


EA-1B Excavation by Equipment (D>3.0M)
EA-2A Backfilling (Excavated Soil)
EA-3B Disposal of Soil (Outside of Factory)
CO-1A Leveling Concrete
FM-1A Form for Sub-STR.
FM-2A Form for Super-STR.
CO-2A Concrete for Sub-STR.
CO-3A Concrete for Super-STR.
RE-1A Re-Bar for Sub-STR. (Deformed)
RE-2A Re-Bar for Super-STR. (Deformed)
AN-1A Anchor Box
JT-5A Isolation Joint

67 FOUNDATION V6474.02 BLADDER TANK


Calculation Ref. No : SSP-CVL2-FDN-1350 - V6474.02

EA-1A Excavation by Equipment (D≦3.0M)


EA-1B Excavation by Equipment (D>3.0M)
EA-2A Backfilling (Excavated Soil)
EA-3B Disposal of Soil (Outside of Factory)
CO-1A Leveling Concrete
FM-1A Form for Sub-STR.
FM-2A Form for Super-STR.
CO-2A Concrete for Sub-STR.
CO-3A Concrete for Super-STR.
RE-1A Re-Bar for Sub-STR. (Deformed)
RE-2A Re-Bar for Super-STR. (Deformed)
AN-1A Anchor Box
JT-5A Isolation Joint

262 of 476
Progress per Item Calculation As of
CIVIL 2
CUMULATIVE QUANTITY
NO. AREA ITEM CODE WORK ITEM
Qty WidthDepth Length

68 FOUNDATION P6343.01 GPC VESSEL PUMP


Calculation Ref. No : SSP-CVL2-FDN-1350 - P6343.01

EA-1A Excavation by Equipment (D≦3.0M)


EA-1B Excavation by Equipment (D>3.0M)
EA-2A Backfilling (Excavated Soil)
EA-3B Disposal of Soil (Outside of Factory)
CO-1A Leveling Concrete
FM-1A Form for Sub-STR.
FM-2A Form for Super-STR.
CO-2A Concrete for Sub-STR.
CO-3A Concrete for Super-STR.
RE-1A Re-Bar for Sub-STR. (Deformed)
RE-2A Re-Bar for Super-STR. (Deformed)
AN-1A Anchor Box
JT-5A Isolation Joint

69 FOUNDATION P6315.01
Calculation Ref. No : SSP-CVL2-FDN-1340 - P6315.01

EA-1A Excavation by Equipment (D≦3.0M)


EA-1B Excavation by Equipment (D>3.0M)
EA-2A Backfilling (Excavated Soil)
EA-3B Disposal of Soil (Outside of Factory)
CO-1A Leveling Concrete
FM-1A Form for Sub-STR.
FM-2A Form for Super-STR.
CO-2A Concrete for Sub-STR.
CO-3A Concrete for Super-STR.
RE-1A Re-Bar for Sub-STR. (Deformed)
RE-2A Re-Bar for Super-STR. (Deformed)
AN-1A Anchor Box
JT-5A Isolation Joint

70 FOUNDATION P6315.02 A/B ETASTOP INJECTION PUMP


Calculation Ref. No : SSP-CVL2-FDN-1340 - P6315.02 A/B

EA-1A Excavation by Equipment (D≦3.0M)


EA-1B Excavation by Equipment (D>3.0M)
EA-2A Backfilling (Excavated Soil)
EA-3B Disposal of Soil (Outside of Factory)
CO-1A Leveling Concrete
FM-1A Form for Sub-STR.
FM-2A Form for Super-STR.
CO-2A Concrete for Sub-STR.

263 of 476
Progress per Item Calculation As of
CIVIL 2
CUMULATIVE QUANTITY
NO. AREA ITEM CODE WORK ITEM
Qty WidthDepth Length
CO-3A Concrete for Super-STR.
RE-1A Re-Bar for Sub-STR. (Deformed)
RE-2A Re-Bar for Super-STR. (Deformed)
AN-1A Anchor Box
PLA-6A Grouting (Non shrink)
JT-5A Isolation Joint

71 P2-VALVE BOX 01 TYPE 2


Calculation Ref. No : SSP-CVL2-VB-P2VB-01

EA-1A Excavation by Equipment (D≦3.0M)


EA-1B Excavation by Equipment (D>3.0M)
EA-2A Backfilling (Excavated Soil)
EA-3B Disposal of Soil (Outside of Factory)
CO-1A Leveling Concrete
FM-1A Form for Sub-STR.
FM-2A Form for Super-STR.
CO-2A Concrete for Sub-STR.
CO-3A Concrete for Super-STR.
RE-1A Re-Bar for Sub-STR. (Deformed)
RE-2A Re-Bar for Super-STR. (Deformed)
ANA-2 Climbing Rung (Chemical Resistant)
LN-5E-1 Chemical Resistant Resin Lining (Epoxy)
JT-5A Isolation Joint
JT-4A Water Stop Plate

72 P2- CATCH BASIN 01


Calculation Ref. No : SSP-CVL2-CB-P2CB-01

EA-1A Excavation by Equipment (D≦3.0M)


EA-1B Excavation by Equipment (D>3.0M)
EA-2A Backfilling (Excavated Soil)
EA-3B Disposal of Soil (Outside of Factory)
CO-1A Leveling Concrete
FM-1A Form for Sub-STR.
FM-2A Form for Super-STR.
CO-2A Concrete for Sub-STR.
CO-3A Concrete for Super-STR.
RE-1A Re-Bar for Sub-STR. (Deformed)
RE-2A Re-Bar for Super-STR. (Deformed)
ANA-2 Climbing Rung (Chemical Resistant)
LN-5E-1 Chemical Resistant Resin Lining (Epoxy)
ML-5B Grating Cover
AN-3B-1 Embedded Steel Supply & Setting(Carbon Steel)
JT-5A Isolation Joint
JT-4A Water Stop Plate

264 of 476
Progress per Item Calculation As of
CIVIL 2
CUMULATIVE QUANTITY
NO. AREA ITEM CODE WORK ITEM
Qty WidthDepth Length
73 FOUNDATION V6343.01 GPC VESSEL
Calculation Ref. No : SSP-CVL2-FDN-1350 -V6343.01

EA-1A Excavation by Equipment (D≦3.0M)


EA-1B Excavation by Equipment (D>3.0M)
EA-2A Backfilling (Excavated Soil)
EA-3B Disposal of Soil (Outside of Factory)
CO-1A Leveling Concrete
FM-1A Form for Sub-STR.
FM-2A Form for Super-STR.
CO-2A Concrete for Sub-STR.
CO-3A Concrete for Super-STR.
RE-1A Re-Bar for Sub-STR. (Deformed)
RE-2A Re-Bar for Super-STR. (Deformed)
AN-2B Anchor Bolt W/O Template Setting
JT-5A Isolation Joint

74 P2- AMH03 AREA COC MAIN HOLE TYPE 2 PLAN, SECTION- A/B
Calculation Ref. No : SSP-CVL2-AMH03-P2A0C

EA-1A Excavation by Equipment (D≦3.0M)


EA-1B Excavation by Equipment (D>3.0M)
EA-2A Backfilling (Excavated Soil)
EA-3B Disposal of Soil (Outside of Factory)
CO-1A Leveling Concrete
FM-1A Form for Sub-STR.
FM-2A Form for Super-STR.
CO-2A Concrete for Sub-STR.
CO-3A Concrete for Super-STR.
RE-1A Re-Bar for Sub-STR. (Deformed)
RE-2A Re-Bar for Super-STR. (Deformed)
JT-4A Water Stop Plate
ANA-2 Climbing Rung (Chemical Resistant)
LN-5E-1 Chemical Resistant Resin Lining (Epoxy)
PPX-8A Vent Pipe for Manhole
JTA-6 Sikaswell for joining RCP and Manhole

75 P2-VALVE BOX 02 TYPE 2


Calculation Ref. No : SSP-CVL2-VB-P2VB-02

EA-1A Excavation by Equipment (D≦3.0M)


EA-1B Excavation by Equipment (D>3.0M)
EA-2A Backfilling (Excavated Soil)
EA-3B Disposal of Soil (Outside of Factory)
CO-1A Leveling Concrete
FM-1A Form for Sub-STR.
FM-2A Form for Super-STR.
CO-2A Concrete for Sub-STR.
CO-3A Concrete for Super-STR.

265 of 476
Progress per Item Calculation As of
CIVIL 2
CUMULATIVE QUANTITY
NO. AREA ITEM CODE WORK ITEM
Qty WidthDepth Length
RE-1A Re-Bar for Sub-STR. (Deformed)
RE-2A Re-Bar for Super-STR. (Deformed)
ANA-2 Climbing Rung (Chemical Resistant)
LN-5E-1 Chemical Resistant Resin Lining (Epoxy)
JT-5A Isolation Joint
JT-4A Water Stop Plate

76 P2- AOC JUNCTION BOX 13


Calculation Ref. No : SSP-CVL2-AOC-P2-A0C-JB 13

EA-1A Excavation by Equipment (D≦3.0M)


EA-1B Excavation by Equipment (D>3.0M)
EA-2A Backfilling (Excavated Soil)
EA-3B Disposal of Soil (Outside of Factory)
CO-1A Leveling Concrete
FM-1A Form for Sub-STR.
FM-2A Form for Super-STR.
CO-2A Concrete for Sub-STR.
CO-3A Concrete for Super-STR.
RE-1A Re-Bar for Sub-STR. (Deformed)
RE-2A Re-Bar for Super-STR. (Deformed)
ANA-2 Climbing Rung (Chemical Resistant)
LN-5E-1 Chemical Resistant Resin Lining (Epoxy)
ML-5B Grating Cover
AN-3B-1 Embedded Steel Supply & Setting(Carbon Steel)
JT-4A Water Stop Plate

77 P2- AOC JUNCTION BOX 19


Calculation Ref. No : SSP-CVL2-AOC-P2-A0C-JB 19

EA-1A Excavation by Equipment (D≦3.0M)


EA-1B Excavation by Equipment (D>3.0M)
EA-2A Backfilling (Excavated Soil)
EA-3B Disposal of Soil (Outside of Factory)
CO-1A Leveling Concrete
FM-1A Form for Sub-STR.
FM-2A Form for Super-STR.
CO-2A Concrete for Sub-STR.
CO-3A Concrete for Super-STR.
RE-1A Re-Bar for Sub-STR. (Deformed)
RE-2A Re-Bar for Super-STR. (Deformed)
ANA-2 Climbing Rung (Chemical Resistant)
LN-5E-1 Chemical Resistant Resin Lining (Epoxy)
ML-5B Grating Cover
AN-3B-1 Embedded Steel Supply & Setting(Carbon Steel)
JT-4A Water Stop Plate

78 P2- CONCRETE ENCASMENT PIPE DN - 200

266 of 476
Progress per Item Calculation As of
CIVIL 2
CUMULATIVE QUANTITY
NO. AREA ITEM CODE WORK ITEM
Qty WidthDepth Length
Calculation Ref. No : SSP-CVL2-AOC-P2-C0C- CEP

EA-1A Excavation by Equipment (D≦3.0M)


EA-1B Excavation by Equipment (D>3.0M)
EA-2A Backfilling (Excavated Soil)
EA-3B Disposal of Soil (Outside of Factory)
CO-1A Leveling Concrete
FM-1A Form for Sub-STR.
FM-2A Form for Super-STR.
CO-2A Concrete for Sub-STR.
CO-3A Concrete for Super-STR.
COA-6A Concrete for Super-STR. (K-350)
RE-1A Re-Bar for Sub-STR. (Deformed)
RE-2A Re-Bar for Super-STR. (Deformed)

79 FOUNDATION PIPE SUPPORT AROUND V.6416.01 POLYMERIZATION BLOWDOWN DRUM


Calculation Ref. No : SSP-CVL2-FDN-2340 - PIPE SUPPORT V.6416.01

EA-1A Excavation by Equipment (D≦3.0M)


EA-1B Excavation by Equipment (D>3.0M)
EA-2A Backfilling (Excavated Soil)
EA-3B Disposal of Soil (Outside of Factory)
CO-1A Leveling Concrete
FM-1A Form for Sub-STR.
FM-2A Form for Super-STR.
CO-2A Concrete for Sub-STR.
CO-3A Concrete for Super-STR.
RE-1A Re-Bar for Sub-STR. (Deformed)
RE-2A Re-Bar for Super-STR. (Deformed)
AN-2B Anchor Bolt W/O Template Setting
JT-5A Isolation Joint

80 FOUNDATION V6474.03 BLADDER TANK


Calculation Ref. No : SSP-CVL2-FDN-1350 - V6474.03

EA-1A Excavation by Equipment (D≦3.0M)


EA-1B Excavation by Equipment (D>3.0M)
EA-2A Backfilling (Excavated Soil)
EA-3B Disposal of Soil (Outside of Factory)
CO-1A Leveling Concrete
FM-1A Form for Sub-STR.
FM-2A Form for Super-STR.
CO-2A Concrete for Sub-STR.
CO-3A Concrete for Super-STR.
RE-1A Re-Bar for Sub-STR. (Deformed)
RE-2A Re-Bar for Super-STR. (Deformed)
AN-1A Anchor Box
JT-5A Isolation Joint

267 of 476
Progress per Item Calculation As of
CIVIL 2
CUMULATIVE QUANTITY
NO. AREA ITEM CODE WORK ITEM
Qty WidthDepth Length

81 FOUNDATION LOCAL PLATFORM TIFANE, DELTASTOP AND WHITHOX


Calculation Ref. No : SSP-CVL2-FDN-2340 - LOCAL PLATFROM TIFANE, DELTASTOP

EA-1A Excavation by Equipment (D≦3.0M)


EA-1B Excavation by Equipment (D>3.0M)
EA-2A Backfilling (Excavated Soil)
EA-3B Disposal of Soil (Outside of Factory)
CO-1A Leveling Concrete
FM-1A Form for Sub-STR.
FM-2A Form for Super-STR.
CO-2A Concrete for Sub-STR.
CO-3A Concrete for Super-STR.
RE-1A Re-Bar for Sub-STR. (Deformed)
RE-2A Re-Bar for Super-STR. (Deformed)
AN-2B Anchor Bolt W/O Template Setting
JT-5A Isolation Joint

82 UNDERGROUND PIPE WORK (P2 Area)

EA-1A Excavation by Equipment (D≦3.0M)


EA-2A Backfilling (Excavated Soil)
EA-3B Disposal of Soil (Outside of Factory)
EA-4B Sand Filling for U/G Pipe
REA-1 Warning Mesh
PPX-2A GRE Pipe d=100
PPX-2B GRE Pipe d=150
PPX-2C GRE Pipe d=200
PPX-2D GRE Pipe d=250
PPX-2E GRE Pipe d=300

PP-1A Concrete Pipe d=100


PP-1B Concrete Pipe d=200
PPA-1C Concrete Pipe d=300
PP-1D Concrete Pipe d=400
PP-1E Concrete Pipe d=500
PP-1F Concrete Pipe d=600
PP-1G Concrete Pipe d=700

LN-5D-1 Chemical Resistant Resin Coating (Epoxy)


JTA-5 Joint Works for RCP

PPX-10A CS Pipe DN.100, For Vent Pipe


PPX-1-41 6" 150#RF Extended Operating Gate Valve With Up Right Indicator
PPX-1-42 10" 150#RF Extended Operating Gate Valve With Up Right Indicator
PPX-1-43 4" 150#RF Extended Operating Gate Valve With Up Right Indicator
PPX-2-1 Reducer 4"x6" (GRE)
PPX-2-10 Lateral Tee 6"x4" - Y Branch (GRE)
PPX-2-11 90 Deg Elbow 4" (GRE)
PPX-2-12 45 deg Elbow 8" (GRE)

268 of 476
Progress per Item Calculation As of
CIVIL 2
CUMULATIVE QUANTITY
NO. AREA ITEM CODE WORK ITEM
Qty WidthDepth Length
PPX-2-13 Eccentric Reducer 4"x6" (GRE)
PPX-2-14 Lateral Tee 8"x6" Y-Branch (GRE)
PPX-2-15 Lateral Tee 4"x4" - Y Branch (GRE)
PPX-2-16 45 deg Elbow 10" (GRE)
PPX-2-17 Lateral Tee 10"x8" - Y Branch (GRE)
PPX-2-18 Lateral tee 6"x6" - Y Branch (GRE)
PPX-2-2 45 deg Elbow 4" (GRE)
PPX-2-3 Tee Branch 4"x4"x4" (GRE)
PPX-2-4 45 deg Elbow 6" (GRE)
PPX-2-5 Tee Branch 6"x6"x6" (GRE)
PPX-2-6 Flange 4" 150#RF, GRE
PPX-2-7 Flange 6" 150#RF, GRE
PPX-2-8 Elbow 45deg ,CSP DN.200
PPX-2-9 Elbow 90deg ,CSP DN.200

269 of 476
Progress per Item Calculation As of
CIVIL 2
CUMULATIVE QUANTITY
NO. AREA ITEM CODE WORK ITEM
Qty WidthDepth Length
83 AOC U-DITCH WORK (P2 Area)
Calculation Ref. No : SSP-CVL2-AOC- P2-AOC SEWER P2 AREA
EA-1A Excavation by Equipment (D≦3.0M)
EA-1C Excavation for Sewer by Hand
EAW-4 Backfilling and Compection by Hand
EA-3B Disposal of Soil (Outside of Factory)
FM-1A Form for Sub-STR.
CO-1A Leveling Concrete
CO-2A Concrete for Sub-STR.
COA-5A Concrete Cover 150 thk.
RE-1A Re-Bar for Sub-STR. (Deformed)
ML-5B Grating Cover
AN-3B-1 Embedded Steel Supply & Setting(Carbon Steel)
LN-5E-1 Chemical Resistant Resin Lining (Epoxy)
JT-5A Isolation Joint

84 ROAD & PAVING WORK (P2 Area)


Calculation Ref. No. : SSP Road & Paving P2 Area
EA-1A Excavation by Equipment (D≦3.0M)
EA-2A Backfilling (Excavated Soil)
EA-3B Disposal of Soil (Outside of Factory)
BC-3A Base Course for Concrete Road/Paving
BC-4A Sub-Grade for Concrete Road/Paving
BC-5A Crushed Stone Paving
FM-1A Form for Sub-STR.
CO-5A Concrete for Road/Paving
COA-6C Concrete for Road/Paving (K-350)
RE-1A Re-Bar for Sub-STR. (Deformed)
RE-3A Welded Wire Fabric
JT-3A Expansion Joint for Road/Paving
PL-1B Surface Finish for Road/Paving/Concrete Slab on grade
PC-1A Pre-Cast Curbstone
LN-5E-1 Chemical Resistant Resin Lining (Epoxy)

85 LOCAL PLATFROM ETASTOP FOUNDATION 1340


Calculation Ref. No : SSP-CVL2-LF- LOCAL PLATFROM FOUNDATION 1340

EA-1A Excavation by Equipment (D≦3.0M)


EA-1B Excavation by Equipment (D>3.0M)
EA-2A Backfilling (Excavated Soil)
EA-3B Disposal of Soil (Outside of Factory)
CO-1A Leveling Concrete
FM-1A Form for Sub-STR.
FM-2A Form for Super-STR.
CO-2A Concrete for Sub-STR.
CO-3A Concrete for Super-STR.
RE-1A Re-Bar for Sub-STR. (Deformed)
RE-2A Re-Bar for Super-STR. (Deformed)
AN-2B Anchor Bolt W/O Template Setting

270 of 476
Progress per Item Calculation As of
CIVIL 2
CUMULATIVE QUANTITY
NO. AREA ITEM CODE WORK ITEM
Qty WidthDepth Length
AN-3B-1 Embedded Steel Supply & Setting(Carbon Steel)
AN-4B Chemical Anchor
JT-5A Isolation Joint

86 FOUNDATION PIPE SUPPORT AROUND POLYMERAZATION REACTOR 1340 R.1342.02/03 & R.1345.02/03
Calculation Ref. No : SSP-CVL2-LF- R.1342.02/03 1340

EA-1A Excavation by Equipment (D≦3.0M)


EA-1B Excavation by Equipment (D>3.0M)
EA-2A Backfilling (Excavated Soil)
EA-3B Disposal of Soil (Outside of Factory)
CO-1A Leveling Concrete
FM-1A Form for Sub-STR.
FM-2A Form for Super-STR.
CO-2A Concrete for Sub-STR.
CO-3A Concrete for Super-STR.
RE-1A Re-Bar for Sub-STR. (Deformed)
RE-2A Re-Bar for Super-STR. (Deformed)
AN-2B Anchor Bolt W/O Template Setting
AN-3B-1 Embedded Steel Supply & Setting(Carbon Steel)
AN-4B Chemical Anchor
JT-5A Isolation Joint

87 FOUNDATION PIPE SUPPORT AROUND ANTI- OXIDANT TRANSFER PUMP P6304.02 A/B (AG-24)
Calculation Ref. No : SSP-CVL2-LF -1340- AOTP P6304.02 A/B (AG-24)

EA-1A Excavation by Equipment (D≦3.0M)


EA-1B Excavation by Equipment (D>3.0M)
EA-2A Backfilling (Excavated Soil)
EA-3B Disposal of Soil (Outside of Factory)
CO-1A Leveling Concrete
FM-1A Form for Sub-STR.
FM-2A Form for Super-STR.
CO-2A Concrete for Sub-STR.
CO-3A Concrete for Super-STR.
RE-1A Re-Bar for Sub-STR. (Deformed)
RE-2A Re-Bar for Super-STR. (Deformed)
AN-2B Anchor Bolt W/O Template Setting
AN-3B-1 Embedded Steel Supply & Setting(Carbon Steel)
AN-4B Chemical Anchor
JT-5A Isolation Joint

88 FOUNDATION PIPE SUPPORT AROUND RECYCLE SOLVENT V.1353.01


Calculation Ref. No : SSP-CVL2-LF- 1350- ARS V.1353.01

271 of 476
Progress per Item Calculation As of
CIVIL 2
CUMULATIVE QUANTITY
NO. AREA ITEM CODE WORK ITEM
Qty WidthDepth Length
EA-1A Excavation by Equipment (D≦3.0M)
EA-1B Excavation by Equipment (D>3.0M)
EA-2A Backfilling (Excavated Soil)
EA-3B Disposal of Soil (Outside of Factory)
CO-1A Leveling Concrete
FM-1A Form for Sub-STR.
FM-2A Form for Super-STR.
CO-2A Concrete for Sub-STR.
CO-3A Concrete for Super-STR.
RE-1A Re-Bar for Sub-STR. (Deformed)
RE-2A Re-Bar for Super-STR. (Deformed)
AN-2B Anchor Bolt W/O Template Setting
AN-3B-1 Embedded Steel Supply & Setting(Carbon Steel)
AN-4B Chemical Anchor
JT-5A Isolation Joint

89 FOUNDATION PIPE SUPPORT AROUND 1350 CONCENTRATION


Calculation Ref. No : SSP-CVL2-LF - 1350 CONCENTRATION

EA-1A Excavation by Equipment (D≦3.0M)


EA-1B Excavation by Equipment (D>3.0M)
EA-2A Backfilling (Excavated Soil)
EA-3B Disposal of Soil (Outside of Factory)
CO-1A Leveling Concrete
FM-1A Form for Sub-STR.
FM-2A Form for Super-STR.
CO-2A Concrete for Sub-STR.
CO-3A Concrete for Super-STR.
RE-1A Re-Bar for Sub-STR. (Deformed)
RE-2A Re-Bar for Super-STR. (Deformed)
AN-2B Anchor Bolt W/O Template Setting
AN-3B-1 Embedded Steel Supply & Setting(Carbon Steel)
AN-4B Chemical Anchor
JT-5A Isolation Joint

90 FOUNDATION PIPE SUPPORT AROUND 2340 POLYMERIZATION


Calculation Ref. No : SSP-CVL2-LF- 2340 POLYMERIZATION

EA-1A Excavation by Equipment (D≦3.0M)


EA-1B Excavation by Equipment (D>3.0M)
EA-2A Backfilling (Excavated Soil)
EA-3B Disposal of Soil (Outside of Factory)
CO-1A Leveling Concrete
FM-1A Form for Sub-STR.
FM-2A Form for Super-STR.
CO-2A Concrete for Sub-STR.
CO-3A Concrete for Super-STR.

272 of 476
Progress per Item Calculation As of
CIVIL 2
CUMULATIVE QUANTITY
NO. AREA ITEM CODE WORK ITEM
Qty WidthDepth Length
RE-1A Re-Bar for Sub-STR. (Deformed)
RE-2A Re-Bar for Super-STR. (Deformed)
AN-2B Anchor Bolt W/O Template Setting
AN-3B-1 Embedded Steel Supply & Setting(Carbon Steel)
AN-4B Chemical Anchor
JT-5A Isolation Joint

91 FOUNDATION PIPE SUPPORT AROUND EPITSTOP, DELTASTOP AND WITHOX


Calculation Ref. No : SSP-CVL2-LF -2340- EPITSOP, DELTASTOP AND WITHOX

EA-1A Excavation by Equipment (D≦3.0M)


EA-1B Excavation by Equipment (D>3.0M)
EA-2A Backfilling (Excavated Soil)
EA-3B Disposal of Soil (Outside of Factory)
CO-1A Leveling Concrete
FM-1A Form for Sub-STR.
FM-2A Form for Super-STR.
CO-2A Concrete for Sub-STR.
CO-3A Concrete for Super-STR.
RE-1A Re-Bar for Sub-STR. (Deformed)
RE-2A Re-Bar for Super-STR. (Deformed)
AN-2B Anchor Bolt W/O Template Setting
AN-3B-1 Embedded Steel Supply & Setting(Carbon Steel)
AN-4B Chemical Anchor
JT-5A Isolation Joint

92 FOUNDATION PIPE SUPPORT AROUND TIFANE


Calculation Ref. No : SSP-CVL2-LF-2340- AROUND TIFANE

EA-1A Excavation by Equipment (D≦3.0M)


EA-1B Excavation by Equipment (D>3.0M)
EA-2A Backfilling (Excavated Soil)
EA-3B Disposal of Soil (Outside of Factory)
CO-1A Leveling Concrete
FM-1A Form for Sub-STR.
FM-2A Form for Super-STR.
CO-2A Concrete for Sub-STR.
CO-3A Concrete for Super-STR.
RE-1A Re-Bar for Sub-STR. (Deformed)
RE-2A Re-Bar for Super-STR. (Deformed)
AN-2B Anchor Bolt W/O Template Setting
AN-3B-1 Embedded Steel Supply & Setting(Carbon Steel)
AN-4B Chemical Anchor
JT-5A Isolation Joint

273 of 476
Progress per Item Calculation As of
CIVIL 2
CUMULATIVE QUANTITY
NO. AREA ITEM CODE WORK ITEM
Qty WidthDepth Length
93 FOUNDATION PIPE SUPPORT AROUND RECYCLE SOLVENT STROGE V2353.01
Calculation Ref. No : SSP-CVL2-LF -2350- ARSS V.2353.01

EA-1A Excavation by Equipment (D≦3.0M)


EA-1B Excavation by Equipment (D>3.0M)
EA-2A Backfilling (Excavated Soil)
EA-3B Disposal of Soil (Outside of Factory)
CO-1A Leveling Concrete
FM-1A Form for Sub-STR.
FM-2A Form for Super-STR.
CO-2A Concrete for Sub-STR.
CO-3A Concrete for Super-STR.
RE-1A Re-Bar for Sub-STR. (Deformed)
RE-2A Re-Bar for Super-STR. (Deformed)
AN-2B Anchor Bolt W/O Template Setting
AN-3B-1 Embedded Steel Supply & Setting(Carbon Steel)
AN-4B Chemical Anchor
JT-5A Isolation Joint

94 FOUNDATION PIPE SUPPORT AROUND 2350 CONCENTRATION


Calculation Ref. No : SSP-CVL2-LF -2350- CONCENTRATION

EA-1A Excavation by Equipment (D≦3.0M)


EA-1B Excavation by Equipment (D>3.0M)
EA-2A Backfilling (Excavated Soil)
EA-3B Disposal of Soil (Outside of Factory)
CO-1A Leveling Concrete
FM-1A Form for Sub-STR.
FM-2A Form for Super-STR.
CO-2A Concrete for Sub-STR.
CO-3A Concrete for Super-STR.
RE-1A Re-Bar for Sub-STR. (Deformed)
RE-2A Re-Bar for Super-STR. (Deformed)
AN-2B Anchor Bolt W/O Template Setting
AN-3B-1 Embedded Steel Supply & Setting(Carbon Steel)
AN-4B Chemical Anchor
JT-5A Isolation Joint

95 FOUNDATION PIPE SUPPORT AROUND V.6416.01 POLYMERAZITATION BLOWDOWN DRUM


Calculation Ref. No : SSP-CVL2-LF -2350-V.6416.01

EA-1A Excavation by Equipment (D≦3.0M)


EA-1B Excavation by Equipment (D>3.0M)
EA-2A Backfilling (Excavated Soil)
EA-3B Disposal of Soil (Outside of Factory)
CO-1A Leveling Concrete
FM-1A Form for Sub-STR.

274 of 476
Progress per Item Calculation As of
CIVIL 2
CUMULATIVE QUANTITY
NO. AREA ITEM CODE WORK ITEM
Qty WidthDepth Length
FM-2A Form for Super-STR.
CO-2A Concrete for Sub-STR.
CO-3A Concrete for Super-STR.
RE-1A Re-Bar for Sub-STR. (Deformed)
RE-2A Re-Bar for Super-STR. (Deformed)
AN-2B Anchor Bolt W/O Template Setting
AN-3B-1 Embedded Steel Supply & Setting(Carbon Steel)
AN-4B Chemical Anchor
JT-5A Isolation Joint

96 FOUNDATION PIPE SUPPORT AROUND P2352.02/01AB, P2352.02/04


Calculation Ref. No : SSP-CVL2-LF -2350- P.2352.02/01 AB, P2352.02/04

EA-1A Excavation by Equipment (D≦3.0M)


EA-1B Excavation by Equipment (D>3.0M)
EA-2A Backfilling (Excavated Soil)
EA-3B Disposal of Soil (Outside of Factory)
CO-1A Leveling Concrete
FM-1A Form for Sub-STR.
FM-2A Form for Super-STR.
CO-2A Concrete for Sub-STR.
CO-3A Concrete for Super-STR.
RE-1A Re-Bar for Sub-STR. (Deformed)
RE-2A Re-Bar for Super-STR. (Deformed)
AN-2B Anchor Bolt W/O Template Setting
AN-3B-1 Embedded Steel Supply & Setting(Carbon Steel)
AN-4B Chemical Anchor
JT-5A Isolation Joint

97 FOUNDATION PIPE SUPPORT AROUND V.6474.03 AREA


Calculation Ref. No : SSP-CVL2-LF -2350- V.6474.03

EA-1A Excavation by Equipment (D≦3.0M)


EA-1B Excavation by Equipment (D>3.0M)
EA-2A Backfilling (Excavated Soil)
EA-3B Disposal of Soil (Outside of Factory)
CO-1A Leveling Concrete
FM-1A Form for Sub-STR.
FM-2A Form for Super-STR.
CO-2A Concrete for Sub-STR.
CO-3A Concrete for Super-STR.
RE-1A Re-Bar for Sub-STR. (Deformed)
RE-2A Re-Bar for Super-STR. (Deformed)
AN-2B Anchor Bolt W/O Template Setting
AN-3B-1 Embedded Steel Supply & Setting(Carbon Steel)
AN-4B Chemical Anchor
JT-5A Isolation Joint

275 of 476
Progress per Item Calculation As of
CIVIL 2
CUMULATIVE QUANTITY
NO. AREA ITEM CODE WORK ITEM
Qty WidthDepth Length

98 CWS U-DITCH WORK


Calculation Ref. No : SSP-CVL2-CWS- P2-CLEAN WATER SEWER P2 AREA
EA-1A Excavation by Equipment (D≦3.0M)
EA-1C Excavation for Sewer by Hand
EAW-4 Backfilling and Compection by Hand
EA-3B Disposal of Soil (Outside of Factory)
FM-1A Form for Sub-STR.
CO-1A Leveling Concrete
CO-2A Concrete for Sub-STR.
COA-5A Concrete Cover 150 thk.
RE-1A Re-Bar for Sub-STR. (Deformed)
ML-5B Grating Cover
AN-3B-1 Embedded Steel Supply & Setting(Carbon Steel)
JT-5A Isolation Joint

99 FOUNDATION HVAC & AIR STACK


Calculation Ref. No : SSP-CVL2-FDN-1350 - HVAC & AIR STACK

EA-1A Excavation by Equipment (D≦3.0M)


EA-1B Excavation by Equipment (D>3.0M)
EA-2A Backfilling (Excavated Soil)
EA-3B Disposal of Soil (Outside of Factory)
CO-1A Leveling Concrete
FM-1A Form for Sub-STR.
FM-2A Form for Super-STR.
CO-2A Concrete for Sub-STR.
CO-3A Concrete for Super-STR.
RE-1A Re-Bar for Sub-STR. (Deformed)
RE-2A Re-Bar for Super-STR. (Deformed)
AN-1A Anchor Box
AN-2B Anchor Bolt W/O Template Setting
AN-4B Chemical Anchor
JT-5A Isolation Joint

100 FOUNDATION PIPE SUPPORT AROUND ETASTOP CONTAINER


Calculation Ref. No : SSP-CVL2-LF-1340- ARROUND ETASTOP COUNTAINER

EA-1A Excavation by Equipment (D≦3.0M)


EA-1B Excavation by Equipment (D>3.0M)
EA-2A Backfilling (Excavated Soil)
EA-3B Disposal of Soil (Outside of Factory)
CO-1A Leveling Concrete
FM-1A Form for Sub-STR.
FM-2A Form for Super-STR.

276 of 476
Progress per Item Calculation As of
CIVIL 2
CUMULATIVE QUANTITY
NO. AREA ITEM CODE WORK ITEM
Qty WidthDepth Length
CO-2A Concrete for Sub-STR.
CO-3A Concrete for Super-STR.
RE-1A Re-Bar for Sub-STR. (Deformed)
RE-2A Re-Bar for Super-STR. (Deformed)
AN-2B Anchor Bolt W/O Template Setting
AN-3B-1 Embedded Steel Supply & Setting(Carbon Steel)
AN-4B Chemical Anchor
JT-5A Isolation Joint

101 FOUNDATION PIPE SUPPORT AROUND ANTI-OXIDANT TRANSFER PUMP 6304.02 A/B
Calculation Ref. No : SSP-CVL2-LF -1340- AOTP P6304.02 A/B

EA-1A Excavation by Equipment (D≦3.0M)


EA-1B Excavation by Equipment (D>3.0M)
EA-2A Backfilling (Excavated Soil)
EA-3B Disposal of Soil (Outside of Factory)
CO-1A Leveling Concrete
FM-1A Form for Sub-STR.
FM-2A Form for Super-STR.
CO-2A Concrete for Sub-STR.
CO-3A Concrete for Super-STR.
RE-1A Re-Bar for Sub-STR. (Deformed)
RE-2A Re-Bar for Super-STR. (Deformed)
AN-2B Anchor Bolt W/O Template Setting
AN-3B-1 Embedded Steel Supply & Setting(Carbon Steel)
AN-4B Chemical Anchor
JT-5A Isolation Joint

102 FOUNDATION PIPE SUPPORT AROUND CHAGRE HEADER EXCANGER E. 1341.01 AND 1344.01
Calculation Ref. No : SSP-CVL2-LF -1340- ACHE E1341.01 & 1344.01

EA-1A Excavation by Equipment (D≦3.0M)


EA-1B Excavation by Equipment (D>3.0M)
EA-2A Backfilling (Excavated Soil)
EA-3B Disposal of Soil (Outside of Factory)
CO-1A Leveling Concrete
FM-1A Form for Sub-STR.
FM-2A Form for Super-STR.
CO-2A Concrete for Sub-STR.
CO-3A Concrete for Super-STR.
RE-1A Re-Bar for Sub-STR. (Deformed)
RE-2A Re-Bar for Super-STR. (Deformed)
AN-2B Anchor Bolt W/O Template Setting
AN-3B-1 Embedded Steel Supply & Setting(Carbon Steel)
AN-4B Chemical Anchor
JT-5A Isolation Joint

103 FOUNDATION PIPE SUPPORT AROUND 1350 CONCENTRATION AREA

277 of 476
Progress per Item Calculation As of
CIVIL 2
CUMULATIVE QUANTITY
NO. AREA ITEM CODE WORK ITEM
Qty WidthDepth Length
Calculation Ref. No : SSP-CVL2-LF -1350- CONCENTRATION AREA

EA-1A Excavation by Equipment (D≦3.0M)


EA-1B Excavation by Equipment (D>3.0M)
EA-2A Backfilling (Excavated Soil)
EA-3B Disposal of Soil (Outside of Factory)
CO-1A Leveling Concrete
FM-1A Form for Sub-STR.
FM-2A Form for Super-STR.
CO-2A Concrete for Sub-STR.
CO-3A Concrete for Super-STR.
RE-1A Re-Bar for Sub-STR. (Deformed)
RE-2A Re-Bar for Super-STR. (Deformed)
AN-2B Anchor Bolt W/O Template Setting
AN-3B-1 Embedded Steel Supply & Setting(Carbon Steel)
AN-4B Chemical Anchor
JT-5A Isolation Joint

104 FOUNDATION PIPE SUPPORT AROUND 1350 CONCENTRATION (P2-1)


Calculation Ref. No : SSP-CVL2-LF - 1350 CONCENTRATION ( P2-1)

EA-1A Excavation by Equipment (D≦3.0M)


EA-1B Excavation by Equipment (D>3.0M)
EA-2A Backfilling (Excavated Soil)
EA-3B Disposal of Soil (Outside of Factory)
CO-1A Leveling Concrete
FM-1A Form for Sub-STR.
FM-2A Form for Super-STR.
CO-2A Concrete for Sub-STR.
CO-3A Concrete for Super-STR.
RE-1A Re-Bar for Sub-STR. (Deformed)
RE-2A Re-Bar for Super-STR. (Deformed)
AN-2B Anchor Bolt W/O Template Setting
AN-3B-1 Embedded Steel Supply & Setting(Carbon Steel)
AN-4B Chemical Anchor
JT-5A Isolation Joint

278 of 476
Progress per Item Calculation As of
CIVIL 2
CUMULATIVE QUANTITY
NO. AREA ITEM CODE WORK ITEM
Qty WidthDepth Length
105 FOUNDATION CABLE TRAY SUPPORT AROUND 2350 CONCENTRATION AREA
Calculation Ref. No : SSP-CVL2-CT-2350- CABLE TRAY SUPPORT 2350

EA-1A Excavation by Equipment (D≦3.0M)


EA-1B Excavation by Equipment (D>3.0M)
EA-2A Backfilling (Excavated Soil)
EA-3B Disposal of Soil (Outside of Factory)
CO-1A Leveling Concrete
FM-1A Form for Sub-STR.
FM-2A Form for Super-STR.
CO-2A Concrete for Sub-STR.
CO-3A Concrete for Super-STR.
RE-1A Re-Bar for Sub-STR. (Deformed)
RE-2A Re-Bar for Super-STR. (Deformed)
AN-2B Anchor Bolt W/O Template Setting
AN-3B-1 Embedded Steel Supply & Setting(Carbon Steel)
AN-4B Chemical Anchor
JT-5A Isolation Joint

106 FOUNDATION PIPE SUPPORT AROUND 2350 CONCENTRATION STAGE PRE-HEATER


Calculation Ref. No : SSP-CVL2-LF-2350- STAGE PRE-HEATER

EA-1A Excavation by Equipment (D≦3.0M)


EA-1B Excavation by Equipment (D>3.0M)
EA-2A Backfilling (Excavated Soil)
EA-3B Disposal of Soil (Outside of Factory)
CO-1A Leveling Concrete
FM-1A Form for Sub-STR.
FM-2A Form for Super-STR.
CO-2A Concrete for Sub-STR.
CO-3A Concrete for Super-STR.
RE-1A Re-Bar for Sub-STR. (Deformed)
RE-2A Re-Bar for Super-STR. (Deformed)
AN-2B Anchor Bolt W/O Template Setting
AN-3B-1 Embedded Steel Supply & Setting(Carbon Steel)
AN-4B Chemical Anchor
JT-5A Isolation Joint

107 FOUNDATION PIPE SUPPORT 1st CONCENTRATION STAGE PRE-HEATER


Calculation Ref. No : SSP-CVL2-LF-1352- STAGE PRE-HEATER

EA-1A Excavation by Equipment (D≦3.0M)


EA-1B Excavation by Equipment (D>3.0M)
EA-2A Backfilling (Excavated Soil)
EA-3B Disposal of Soil (Outside of Factory)
CO-1A Leveling Concrete
FM-1A Form for Sub-STR.
FM-2A Form for Super-STR.
CO-2A Concrete for Sub-STR.

279 of 476
Progress per Item Calculation As of
CIVIL 2
CUMULATIVE QUANTITY
NO. AREA ITEM CODE WORK ITEM
Qty WidthDepth Length
CO-3A Concrete for Super-STR.
RE-1A Re-Bar for Sub-STR. (Deformed)
RE-2A Re-Bar for Super-STR. (Deformed)
AN-2B Anchor Bolt W/O Template Setting
AN-3B-1 Embedded Steel Supply & Setting(Carbon Steel)
AN-4B Chemical Anchor
JT-5A Isolation Joint

108 LIGHTING POLE FOUNDATION P2 AREA


Calculation Ref. No : SSP-CVL2-LPF- P2- LIGHTING POLE FOUNDATION

EA-1A Excavation by Equipment (D≦3.0M)


EA-1B Excavation by Equipment (D>3.0M)
EA-2A Backfilling (Excavated Soil)
EA-3B Disposal of Soil (Outside of Factory)
CO-1A Leveling Concrete
FM-1A Form for Sub-STR.
FM-2A Form for Super-STR.
CO-2A Concrete for Sub-STR.
CO-3A Concrete for Super-STR.
RE-1A Re-Bar for Sub-STR. (Deformed)
RE-2A Re-Bar for Super-STR. (Deformed)
AN-2B Anchor Bolt W/O Template Setting
AN-3B-1 Embedded Steel Supply & Setting(Carbon Steel)
AN-4B Chemical Anchor
JT-5A Isolation Joint

109 HOSE BOX FOUNDATION P2 AREA


Calculation Ref. No : SSP-CVL2-HB- P2-HOSE BOX FOUNDATION P2 AREA

EA-1A Excavation by Equipment (D≦3.0M)


EA-1B Excavation by Equipment (D>3.0M)
EA-2A Backfilling (Excavated Soil)
EA-3B Disposal of Soil (Outside of Factory)
CO-1A Leveling Concrete
FM-1A Form for Sub-STR.
FM-2A Form for Super-STR.
CO-2A Concrete for Sub-STR.
CO-3A Concrete for Super-STR.
RE-1A Re-Bar for Sub-STR. (Deformed)
RE-2A Re-Bar for Super-STR. (Deformed)
AN-2B Anchor Bolt W/O Template Setting
AN-3B-1 Embedded Steel Supply & Setting(Carbon Steel)
AN-4B Chemical Anchor
JT-5A Isolation Joint

110 GUARD POST P2 AREA


Calculation Ref. No : SSP-CVL2-GP- P2-GUARD POST P2 AREA

280 of 476
Progress per Item Calculation As of
CIVIL 2
CUMULATIVE QUANTITY
NO. AREA ITEM CODE WORK ITEM
Qty WidthDepth Length

EA-1A Excavation by Equipment (D≦3.0M)


EA-1B Excavation by Equipment (D>3.0M)
EA-2A Backfilling (Excavated Soil)
EA-3B Disposal of Soil (Outside of Factory)
CO-1A Leveling Concrete
FM-1A Form for Sub-STR.
FM-2A Form for Super-STR.
CO-2A Concrete for Sub-STR.
CO-3A Concrete for Super-STR.
RE-1A Re-Bar for Sub-STR. (Deformed)
RE-2A Re-Bar for Super-STR. (Deformed)
AN-2B Anchor Bolt W/O Template Setting
AN-4A Expansion Anchor (Hole-in Anchor)
MLA-1 Guard Post
JT-5A Isolation Joint

281 of 476
25-Oct-17

CUMULATIVE QUANTITY
Quantity QTY PLAN

681.61 100% 681.61


- -
491.72 100% 491.72
189.89 100% 189.89
14.56 100% 14.56
345.24 100% 345.24
- -
164.01 100% 164.01
- -
20.69 99% 20.92
0.02 100% 0.02
61.60 100% 61.60

147.97 100% 147.97


96.54 100% 96.54
51.42 100% 51.42
3.60 100% 3.60
115.36 100% 115.36
- -
43.71 100% 43.71
6.04 100% 6.04
22.40 100% 22.40

39.12 100% 39.12


12.50 100% 12.50
26.62 100% 26.62
0.52 100% 0.52
70.16 100% 70.16
11.48 100% 11.48
3.60 100% 3.60
12.13 100% 12.13
0.47 100% 0.47
2.79 100% 2.79
11.60 100% 11.60
0.07 100% 0.07
0.04 100% 0.04
40.87 100% 40.87
-

282 of 476
25-Oct-17

CUMULATIVE QUANTITY
Quantity QTY PLAN

125.19 100% 125.19


44.46 100% 44.46
90.31 100% 90.31
79.34 100% 79.34
1.07 100% 1.07
15.82 100% 15.82
127.70 100% 127.70
10.98 100% 10.98
24.95 100% 24.95
1.71 100% 1.71
5.68 100% 5.68
16.70 100% 16.70
4.00 100% 4.00
0.12 100% 0.12
-

155.70 100% 155.70


84.51 100% 84.51
116.82 100% 116.82
123.39 100% 123.39
1.44 100% 1.44
17.95 100% 17.95
165.04 100% 165.04
13.44 100% 13.44
35.18 100% 35.18
2.20 100% 2.20
6.97 100% 6.97
19.60 100% 19.60
4.00 100% 4.00
0.09 100% 0.09
53.20 100% 53.20

205.73 100% 205.73


138.33 100% 138.33
150.70 100% 150.70
193.36 100% 193.36
2.06 100% 2.06
22.54 100% 22.54
216.34 100% 216.34

283 of 476
25-Oct-17

CUMULATIVE QUANTITY
Quantity QTY PLAN
23.78 100% 23.78
56.00 100% 56.00
4.35 100% 4.35
6.53 100% 6.53
20.10 100% 20.10
4.00 100% 4.00
-

118.99 100% 118.99


18.24 100% 18.24
74.37 100% 74.37
62.86 100% 62.86
0.99 100% 0.99
15.17 100% 15.17
93.85 100% 93.85
9.73 100% 9.73
25.21 100% 25.21
1.53 100% 1.53
4.56 100% 4.56
16.01 100% 16.01
4.00 100% 4.00
-

158.80 100% 158.80


-
402.50 100% 402.50
141.13 100% 141.13
13.32 100% 13.32
125.66 100% 125.66
654.99 100% 654.99
120.61 100% 120.61
123.88 100% 123.88
27.57 100% 27.57
43.39 100% 43.39
57.11 100% 57.11
2.76 100% 2.76
8.89 100% 8.89
40.80 100% 40.80

SSP-CVL2-FDN-1340 - V.6315.01

284 of 476
25-Oct-17

CUMULATIVE QUANTITY
Quantity QTY PLAN
-
-
-
-
0.29 100% 0.29
15.54 100% 15.54

3.29 100% 3.29

0.28 100% 0.28

0.03 100% 0.03


7.20 100% 7.20

SSP-CVL2-FDN-1340 - V.6315.02
-
-
-
-
0.24 100% 0.24
13.89 100% 13.89
-
2.67 100% 2.67
-
0.25 100% 0.25
-
0.03 100% 0.03
6.40 100% 6.40

1,504.35 100% 1,504.35


-
964.66 100% 964.66
539.69 100% 539.69
28.56 100% 28.56
283.65 100% 283.65
15.62 100% 15.62
519.06 100% 519.06
2.34 100% 2.34
82.95 100% 82.95
0.69 100% 0.69
254.79 100% 254.79
0.45 100% 0.45
-
85.60 100% 85.60

285 of 476
25-Oct-17

CUMULATIVE QUANTITY
Quantity QTY PLAN

79.79 100% 79.79


- -
60.97 100% 60.97
18.82 100% 18.82
2.05 100% 2.05
43.25 100% 43.25
-
18.01 100% 18.01
-
1.71 100% 1.71
- -
0.08 100% 0.08
-
2.72 100% 2.72

92.26 100% 92.26


-
65.73 100% 65.60
26.66 100% 26.66
2.16 100% 2.16
37.84 100% 37.84
52.80 100% 52.80
21.62 100% 21.62
6.44 100% 6.44
2.80 100% 2.80
0.38 100% 0.38
16.00 100% 16.00
20.80 100% 20.80

42.97 100% 42.97


-
32.25 100% 32.25
10.72 100% 10.72
1.05 100% 1.05
32.04 100% 32.04
- -
10.94 100% 10.94

286 of 476
25-Oct-17

CUMULATIVE QUANTITY
Quantity QTY PLAN
- -
1.64 100% 1.64
-
0.05 100% 0.05
12.00 100% 12.00

81.17 100% 81.17


- -
61.96 100% 61.96
19.21 100% 19.21
1.59 100% 1.59
27.72 100% 27.72
39.66 100% 39.66
16.28 100% 16.28
4.29 100% 4.29
2.01 100% 2.01
0.80 100% 0.80
12.00 100% 12.00
15.00 100% 15.00

55.55 100% 55.55


-
41.84 100% 41.84
13.72 100% 13.72
1.46 100% 1.46
29.53 100% 29.53
- -
13.22 100% 13.22
- -
1.25 100% 1.25
- -
0.03 100% 0.03
10.40 100% 10.40

222.68 100% 222.68


- -
173.11 100% 173.11
49.58 100% 49.58
4.58 100% 4.58

287 of 476
25-Oct-17

CUMULATIVE QUANTITY
Quantity QTY PLAN
61.82 100% 61.82
319.54 100% 319.54
40.58 100% 40.58
59.14 100% 59.14
4.52 100% 4.52
20.28 100% 20.28
0.22 100% 0.22
2.95 100% 2.95
24.66 100% 24.66

95.33 100% 95.33


- -
66.47 100% 66.47
28.86 100% 28.86
2.63 100% 2.63
46.42 100% 46.42
-
27.42 100% 27.42
-
1.75 100% 1.75
-
0.05 100% 0.05
2.12 100% 2.12

37.83 100% 37.83


- -
32.77 100% 32.77
5.06 100% 5.06
0.41 100% 0.41
27.56 100% 27.56
- -
5.06 100% 5.06
- -
0.57 100% 0.57
- -
7.00 100% 7.00
0.01 100% 0.01
9.14 100% 9.14
1.00 100% 1.00

288 of 476
25-Oct-17

CUMULATIVE QUANTITY
Quantity QTY PLAN

37.83 100% 37.83


- -
32.77 100% 32.77
5.06 100% 5.06
0.41 100% 0.41
22.26 100% 22.26
- -
1.53 100% 1.53
- -
0.47 100% 0.47
- -
7.00 100% 7.00
0.01 100% 0.01
10.46 100% 10.46
1.00 100% 1.00

SSP-CVL2-FDN-2340 - V.6416.01
81.18 100% 81.18
-
59.03 100% 59.03
22.15 100% 22.15
1.15 100% 1.15
19.00 100% 19.00
66.32 100% 66.32
21.00 100% 21.00
13.77 100% 13.77
1.04 100% 1.04
2.51 100% 2.51
8.00 100% 8.00
8.07 100% 8.07

74.26 100% 74.26


- -
56.34 100% 56.34
17.91 100% 17.91
1.56 100% 1.56
36.09 100% 36.09
- -
17.31 100% 17.31
- -
1.76 100% 1.76
-
0.03 100% 0.03

289 of 476
25-Oct-17

CUMULATIVE QUANTITY
Quantity QTY PLAN
-
3.20 100% 3.20

864.30 100% 864.30


- -
591.13 100% 591.13
273.17 100% 273.17
22.04 100% 22.04
244.33 100% 244.33
- -
259.79 100% 259.79
- -
53.89 100% 53.89
- -
0.36 100% 0.36
10.89 100% 10.89

106.82 100% 106.82


- -
77.40 100% 77.40
29.42 100% 29.42
2.61 100% 2.61
59.16 100% 59.16
- -
28.74 100% 28.74
- -
2.10 100% 2.10
- -
0.08 100% 0.08
3.63 100% 3.63

15.42 100% 15.42


- -
3.35 100% 3.35
12.07 100% 12.07
1.30 100% 1.30
49.91 100% 49.91
- -
67.38 100% 67.38

290 of 476
25-Oct-17

CUMULATIVE QUANTITY
Quantity QTY PLAN
- -
0.82 100% 0.82
- -
0.040 100% 0.04
17.89 100% 17.89

SSP-CVL2-FDN-2350 - V2353.01 RSD


20.46 100% 20.46
- -
13.68 100% 13.68
6.78 100% 6.78
0.52 100% 0.52
6.20 100% 6.20
21.74 100% 21.74
4.56 100% 4.56
4.20 100% 4.20
0.30 100% 0.30
0.34 100% 0.34
4.00 100% 4.00
8.80 100% 8.80

270.29 100% 270.29


- -
206.31 100% 206.31
63.98 100% 63.98
5.48 100% 5.48
118.72 100% 118.72
16.56 100% 16.56
58.49 100% 58.49
2.07 100% 2.07
5.83 100% 5.83
0.35 100% 0.35
0.03 100% 0.03
37.20 100% 37.20

SSP-CVL2-FDN-2350 - V1353.01 RSD


29.67 100% 29.67
- -
19.86 100% 19.86
9.80 100% 9.80
0.78 100% 0.78

291 of 476
25-Oct-17

CUMULATIVE QUANTITY
Quantity QTY PLAN
7.90 100% 7.90
24.70 100% 24.70
7.02 100% 7.02
4.94 100% 4.94
0.52 100% 0.52
0.42 100% 0.42
8.00 100% 8.00
10.00 100% 10.00

49.95 100% 49.95


3.80 100% 3.80
41.98 100% 41.98
11.77 100% 11.77
0.49 100% 0.49
3.70 100% 3.70
37.12 100% 37.12
0.90 100% 0.90
4.97 100% 4.97
0.11 100% 0.11
0.88 100% 0.88
7.60 100% 7.60
0.02 100% 0.02
17.51 100% 17.51
1.00 100% 1.00
3.00 100% 3.00

65.91 100% 65.91


3.80 100% 3.80
57.94 100% 57.94
11.77 100% 11.77
0.49 100% 0.49
4.37 100% 4.37
36.58 100% 36.58
0.74 100% 0.74
5.05 100% 5.05
0.11 100% 0.11
0.88 100% 0.88
7.60 100% 7.60
0.02 100% 0.02
17.35 100% 17.35
1.00 100% 1.00
3.00 100% 3.00

292 of 476
25-Oct-17

CUMULATIVE QUANTITY
Quantity QTY PLAN

SSP-CVL2-FDN-1350 - P1351.01 PSD


6.94 100% 6.94
- -
2.49 100% 2.49
4.45 100% 4.45
0.47 100% 0.47
24.12 100% 24.12
- -
13.98 100% 13.98
- -
0.51 100% 0.51
- -
6.0 100% 6.00
14.21 100% 14.21

SSP-CVL2-FDN-1350 - P1351.02
3.55 100% 3.55
- -
1.57 100% 1.57
1.98 100% 1.98
0.22 100% 0.22
9.25 100% 9.25
- -
3.78 100% 3.78
- -
0.10 100% 0.10
- -
6.00 100% 6.00
8.60 100% 8.60

SSP-CVL2-FDN-1350 - P1352.01
13.88 100% 13.88
- -
4.98 100% 4.98
8.89 100% 8.89
0.94 100% 0.94
49.05 100% 49.05
- -
28.43 100% 28.43
- -
1.02 100% 1.02
- -

293 of 476
25-Oct-17

CUMULATIVE QUANTITY
Quantity QTY PLAN
12.00 100% 12.00
28.42 100% 28.42

5.23 100% 5.23


- -
2.14 100% 2.14
3.09 100% 3.09
0.34 100% 0.34
20.72 100% 20.72
- -
9.95 100% 9.95
- -
0.46 100% 0.46
- -
6.00 100% 6.00
12.00 100% 12.00

SSP-CVL2-FDN-1350 - P1352.03/04
7.11 100% 7.11
- -
3.14 100% 3.14
3.96 100% 3.96
0.44 100% 0.44
18.49 100% 18.49
- -
7.57 100% 7.57
- -
0.20 100% 0.20
- -
12.00 100% 12.00
-

42.30 100% 42.30


- -
32.06 100% 32.06
10.24 100% 10.24
0.88 100% 0.88
23.16 100% 23.16
20.55 100% 20.55
8.13 100% 8.13

294 of 476
25-Oct-17

CUMULATIVE QUANTITY
Quantity QTY PLAN
2.79 100% 2.79
1.01 100% 1.01
0.57 100% 0.57
8.00 100% 8.00
10.00 100% 10.00

42.30 100% 42.30


- -
32.06 100% 32.06
10.24 100% 10.24
0.88 100% 0.88
23.16 100% 23.16
20.55 100% 20.55
8.13 100% 8.13
2.79 100% 2.79
0.95 100% 0.95
0.45 100% 0.45
8.00 100% 8.00
10.00 100% 10.00

295 of 476
25-Oct-17

CUMULATIVE QUANTITY
Quantity QTY PLAN

SSP-CVL2-FDN-1350 - P1353.01 A/B


6.14 100% 6.14
- -
2.76 100% 2.76
3.38 100% 3.38
0.38 100% 0.38
15.91 100% 15.91
- -
6.45 100% 6.45
- -
0.18 100% 0.18
- -
12.00 100% 12.00
14.80 100% 14.80

SSP-CVL2-FDN-2350-E.6323.02 MEH
19.27 100% 19.27
- -
16.26 100% 16.26
3.01 100% 3.01
0.34 100% 0.34
11.64 100% 11.64
9.02 100% 9.02
2.26 100% 2.26
1.03 100% 1.03
0.19 100% 0.19
0.15 100% 0.15
4.00 100% 4.00
4.00 100% 4.00

5.57 100% 5.57


- -
1.96 100% 1.96
3.61 100% 3.61
0.38 100% 0.38
11.83 100% 11.83
- -
6.94 100% 6.94
- -
0.15 100% 0.15
- -
4.00 100% 4.00

296 of 476
25-Oct-17

CUMULATIVE QUANTITY
Quantity QTY PLAN
11.00 100% 11.00

SSP-CVL2-FDN-1340 - P.6304.02A/B
3.17 100% 3.17
- -
1.80 100% 1.80
1.37 100% 1.37
0.17 100% 0.17
9.55 100% 9.55
- -
2.60 100% 2.60
- -
0.09 100% 0.09
- -
8.00 100% 8.00
8.80 100% 8.80

4.63 100% 4.63


- -
2.12 100% 2.12
2.51 100% 2.51
0.31 100% 0.31
8.50 100% 8.50
- -
2.66 100% 2.66
- -
0.23 100% 0.23
- -
0.01 100% 0.01
7.20 100% 7.20

2.66 100% 2.66


- -
1.22 100% 1.22
1.44 100% 1.44
0.16 100% 0.16
6.88 100% 6.88
- -
2.75 100% 2.75
- -

297 of 476
25-Oct-17

CUMULATIVE QUANTITY
Quantity QTY PLAN
0.11 100% 0.11
- -
0.004 100% 0.004
6.40 100% 6.40

1.99 100% 1.99


- -
1.03 100% 1.03
0.96 100% 0.96
0.11 100% 0.11
5.59 100% 5.59
- -
1.82 100% 1.82
- -
0.09 100% 0.09
- -
0.004 100% 0.004
-
5.20 100% 5.20

3.08 100% 3.08


- -
1.80 100% 1.80
1.28 100% 1.28
0.16 100% 0.16
9.46 100% 9.46
- -
2.41 100% 2.41
- -
0.10 100% 0.10
- -
8.00 100% 8.00
-
8.80 100% 8.80

2.54 100% 2.54


- -
1.19 100% 1.19
1.35 100% 1.35

298 of 476
25-Oct-17

CUMULATIVE QUANTITY
Quantity QTY PLAN
0.15 100% 0.15
6.67 100% 6.67
- -
2.58 100% 2.58
- -
0.11 100% 0.11
- -
0.004 100% 0.004
-
6.20 100% 6.20

299 of 476
25-Oct-17

CUMULATIVE QUANTITY
Quantity QTY PLAN

3.08 100% 3.08


- -
1.80 100% 1.80
1.28 100% 1.28
0.16 100% 0.16
9.46 100% 9.46
- -
2.41 100% 2.41
- -
0.09 100% 0.09
- -
8.00 100% 8.00
-
8.80 100% 8.80

3.08 100% 3.08


- -
1.80 100% 1.80
1.28 100% 1.28
0.16 100% 0.16
9.46 100% 9.46
- -
2.41 100% 2.41
- -
0.09 100% 0.09
- -
8.00 100% 8.00
-
8.80 100% 8.80

SSP-CVL2-FDN-2350 - P2353.01 A/B RSP


4.58 100% 4.58
- -
2.31 100% 2.31
2.26 100% 2.26
0.26 100% 0.26
12.90 100% 12.90
- -
4.30 100% 4.30
- -
0.15 100% 0.15

300 of 476
25-Oct-17

CUMULATIVE QUANTITY
Quantity QTY PLAN
- -
8.00 100% 8.00
-
12.00 100% 12.00

SSP-CVL2-FDN-2350 - P2352.04 CPSP


2.82 100% 2.82
- -
1.35 100% 1.35
1.47 100% 1.47
0.17 100% 0.17
7.85 100% 7.85
- -
2.83 100% 2.83
- -
0.11 100% 0.11
- -
6.00 100% 6.00
-
7.20 100% 7.20

SSP-CVL2-FDN-2350 - P2352.03 CPSP


3.45 100% 3.45
- -
1.56 100% 1.56
1.89 100% 1.89
0.21 100% 0.21
9.14 100% 9.14
- -
3.61 100% 3.61
- -
0.12 100% 0.12
- -
6.00 100% 6.00
-
8.50 100% 8.50

301 of 476
25-Oct-17

CUMULATIVE QUANTITY
Quantity QTY PLAN

SSP-CVL2-FDN-2350 - P2352.02 CPSP


5.64 100% 5.64
- -
2.19 100% 2.19
3.45 100% 3.45
0.37 100% 0.37
19.30 100% 19.30
- -
10.68 100% 10.68
- -
0.38 100% 0.38
- -
6.00 100% 6.00
-
12.31 100% 12.31

SSP-CVL2-FDN-2350 - P2352.01 A/B CPSP


10.62 100% 10.62
- -
4.36 100% 4.36
6.26 100% 6.26
0.69 100% 0.69
39.19 100% 39.19
- -
19.59 100% 19.59
- -
0.88 100% 0.88
- -
12.00 100% 12.00
-
24.60 100% 24.60

SSP-CVL2-FDN-2350 - P2351.01 A/B CPSP


5.31 100% 5.31
- -
2.18 100% 2.18
3.13 100% 3.13
0.34 100% 0.34
19.20 100% 19.20
- -
9.60 100% 9.60
- -
0.45 100% 0.45

302 of 476
25-Oct-17

CUMULATIVE QUANTITY
Quantity QTY PLAN
- -
6.00 100% 6.00
-
12.30 100% 12.30

SSP-CVL2-FDN-2350 - P2351.02 CPSP


3.27 100% 3.27
- -
1.48 100% 1.48
1.80 100% 1.80
0.20 100% 0.20
8.60 100% 8.60
- -
3.43 100% 3.43
- -
0.09 100% 0.09
- -
6.00 100% 6.00
-
8.00 100% 8.00

SSP-CVL2-DIKE WALL-1340- T6304.01


98.24 100% 98.24
- -
65.47 100% 65.47
33.31 100% 33.31
2.91 100% 2.91
35.58 100% 35.58
206.82 100% 206.82
20.59 100% 20.59
31.02 100% 31.02
2.69 100% 2.69
3.85 100% 3.85
0.01 100% 0.01
-
56.85 100% 56.85

4.10 100% 4.10


- -
1.71 100% 1.71

303 of 476
25-Oct-17

CUMULATIVE QUANTITY
Quantity QTY PLAN
2.39 100% 2.39
0.28 100% 0.28
8.51 100% 8.51
- -
5.10 100% 5.10
- -
0.19 100% 0.19
- -
0.01 100% 0.01
-
9.48 100% 9.48

SSP-CVL2-FDN-2340 - P2342.01 /02


5.74 100% 5.74
- -
2.63 100% 2.63
3.11 100% 3.11
0.35 100% 0.35
15.05 100% 15.05
- -
5.93 100% 5.93
- -
0.15 100% 0.15
- -
16.00 100% 16.00
-
14.00 100% 14.00

3.86 100% 3.86


- -
1.59 100% 1.59
2.27 100% 2.27
0.25 100% 0.25
6.95 100% 6.95
- -
2.29 100% 2.29
- -
0.20 100% 0.20
- -
4.00 100% 4.00
-
10.60 100% 10.60

304 of 476
25-Oct-17

CUMULATIVE QUANTITY
Quantity QTY PLAN

SSP-CVL2-FDN-1340 - P1345.01 /02


5.74 100% 5.74
- -
2.63 100% 2.63
3.11 100% 3.11
0.35 100% 0.35
15.05 100% 15.05
- -
5.93 100% 5.93
- -
0.17 100% 0.17
- -
16.00 100% 16.00
-
14.00 100% 14.00

SSP-CVL2-FDN-1340 - P1342.01 /02


5.64 100% 5.64
- -
2.60 100% 2.60
3.04 100% 3.04
0.34 100% 0.34
14.84 100% 14.84
- -
5.81 100% 5.81
- -
0.16 100% 0.16
- -
16.00 100% 16.00
-
13.80 100% 13.80

SSP-CVL2-FDN-1340- E.1344.01
8.55 100% 8.55
- -
3.34 100% 3.34
5.21 100% 5.21
0.56 100% 0.56
14.41 100% 14.41
- -
5.18 100% 5.18
- -
0.43 100% 0.43

305 of 476
25-Oct-17

CUMULATIVE QUANTITY
Quantity QTY PLAN
- -
4.00 100% 4.00
-
22.20 100% 22.20

SSP-CVL2-FDN-1340 - P2352.04 CPSP


4.63 100% 4.63
- -
2.24 100% 2.24
2.39 100% 2.39
0.14 100% 0.14
8.40 100% 8.40
- -
3.15 100% 3.15
- -
0.08 100% 0.08
- -
- -
- -
6.00 100% 6.00
2.25 100% 2.25

1.59 100% 1.59


-
0.90 100% 0.90
0.69 100% 0.69
0.08 100% 0.08
4.71 100% 4.71
-
1.29 100% 1.29
-
0.05 100% 0.05
-
0.003 100% 0.003
-
4.40 100% 4.40

SSP-CVL2-AOC-P2-A0C-JB 23/24/25/26
99.42 100% 99.42
- -
84.79 100% 84.79

306 of 476
25-Oct-17

CUMULATIVE QUANTITY
Quantity QTY PLAN
14.62 100% 14.62
0.51 100% 0.51
78.61 100% 78.61
- -
8.50 100% 8.50
- -
0.73 100% 0.73
-
5.60 100% 5.60
0.04 100% 0.04
32.81 100% 32.81
- 0% 4.00
- -
22.40 100% 22.40

SSP-CVL2-FDN-1350 - ANALYZER HOUSE


14.19 100% 14.19
-
3.19 100% 3.19
11.00 100% 11.00
1.09 100% 1.09
16.27 100% 16.27
-
17.25 100% 17.25
-
0.54 100% 0.54
-
6.00 100% 6.00
18.70 100% 18.70

3.17 100% 3.17


-
1.35 100% 1.35
1.82 100% 1.82
0.20 100% 0.20
7.70 100% 7.70
-
3.47 100% 3.47
-
0.09 100% 0.09
-
4.00 100% 4.00
7.20 100% 7.20

307 of 476
25-Oct-17

CUMULATIVE QUANTITY
Quantity QTY PLAN

1.60 100% 1.60


-
0.92 100% 0.92
0.68 100% 0.68
0.08 100% 0.08
4.82 100% 4.82
-
1.27 100% 1.27
-
0.05 100% 0.05
-
4.00 100% 4.00
4.50 100% 4.50

SSP-CVL2-FDN-1340 - P6315.01
0.96 100% 0.96
-
0.66 100% 0.66
0.30 100% 0.30
0.04 100% 0.04
3.12 100% 3.12
-
0.56 100% 0.56
-
0.03 100% 0.03
-
4.00 100% 4.00
2.90 100% 2.90

SSP-CVL2-FDN-1340 - P6315.02 A/B


3.23 100% 3.23
-
1.82 100% 1.82
1.41 100% 1.41
0.17 100% 0.17
10.88 100% 10.88
-
3.02 100% 3.02

308 of 476
25-Oct-17

CUMULATIVE QUANTITY
Quantity QTY PLAN
-
0.09 100% 0.09
-
8.00 100% 8.00
-
8.92 100% 8.92

22.08 100% 22.08


-
16.07 100% 16.07
6.01 100% 6.01
0.27 100% 0.27
23.06 100% 23.06
-
3.42 100% 3.42
-
1.08 100% 1.08
-
0.01 100% 0.01
11.41 100% 11.41
8.60 100% 8.60
3.30 100% 3.30

7.68 100% 7.68


-
6.71 100% 6.71
0.97 100% 0.97
0.07 100% 0.07
6.90 100% 6.90
-
0.42 100% 0.42
-
0.06 100% 0.06
-
0.00 100% 0.00
3.45 100% 3.45
0.64 100% 0.64
- -
-
4.00 100% 4.00

309 of 476
25-Oct-17

CUMULATIVE QUANTITY
Quantity QTY PLAN

2.66 100% 2.66


-
1.22 100% 1.22
1.44 100% 1.44
0.16 100% 0.16
6.85 100% 6.85
-
2.74 100% 2.74
-
0.11 100% 0.11
-
0.02 100% 0.02
6.40 100% 6.40

49.95 100% 49.95


3.80
41.98 100% 41.98
11.77 100% 11.77
0.49 100% 0.49
3.70 100% 3.70
37.02 100% 37.02
0.90 100% 0.90
4.98 100% 4.98
0.11 100% 0.11
0.88 100% 0.88
7.60 100% 7.60
0.02 100% 0.02
17.63 100% 17.63
1.00 100% 1.00
2.00 100% 2.00

22.08 100% 22.08


-
16.07 100% 16.07
6.01 100% 6.01
0.27 100% 0.27
22.65 100% 22.65
-
3.29 100% 3.29
-

310 of 476
25-Oct-17

CUMULATIVE QUANTITY
Quantity QTY PLAN
1.08 100% 1.08
-
0.01 100% 0.01
9.87 100% 9.87
8.60 100% 8.60
3.30 100% 3.30

3.25 100% 3.25


-
1.70 100% 1.70
1.55 100% 1.55
0.11 100% 0.11
6.54 100% 6.54
-
0.66 100% 0.66
-
0.08 100% 0.08
-
0.00 100% 0.00
3.60 100% 3.60
1.00 100% 1.00
- -
5.20 100% 5.20

2.71 100% 2.71


-
1.41 100% 1.41
1.30 100% 1.30
0.11 100% 0.11
5.11 100% 5.11
-
0.54 100% 0.54
-
0.07 100% 0.07
-
0.00 100% 0.00
3.00 100% 3.00
1.00 100% 1.00
- -
5.20 100% 5.20

311 of 476
25-Oct-17

CUMULATIVE QUANTITY
Quantity QTY PLAN

11.16 100% 11.16


-
9.73 100% 9.73
1.43 100% 1.43
0.18 100% 0.18
5.00 100% 5.00
-
-
-
1.09 100% 1.09
0.08 100% 0.08
-

SSP-CVL2-FDN-2340 - PIPE SUPPORT V.6416.01


18.84 100% 18.84
-
3.41 100% 3.41
15.43 100% 15.43
1.83 100% 1.83
15.26 100% 15.26
-
14.52 100% 14.52
- -
1.89 100% 1.89
-
0.05 100% 0.05
-

1.76 100% 1.76


-
0.96 100% 0.96
0.80 100% 0.80
0.10 100% 0.10
5.14 100% 5.14
-
1.50 100% 1.50
- -
0.05 100% 0.05
-
4.00 100% 4.00
4.80 100% 4.80

312 of 476
25-Oct-17

CUMULATIVE QUANTITY
Quantity QTY PLAN

SSP-CVL2-FDN-2340 - LOCAL PLATFROM TIFANE, DELTASTOP


31.07 100% 31.07
-
13.66 100% 13.66
17.41 100% 17.41
1.98 100% 1.98
46.96 100% 46.96
-
17.82 100% 17.82
- -
1.49 100% 1.49
-
0.04 100% 0.04
18.77 100% 18.77

1,454.18 100% 1,454.18


886.35 100% 886.35
83.47 100% 83.47
493.74 100% 493.74
136.31 100% 136.31
-
3.20 100% 3.20
43.00 100% 43.00
58.22 100% 58.22
71.61 100% 71.61

31.25 100% 31.25


-
131.15 100% 131.15

292.66 100% 292.66


67.00 100% 67.00

1.00 100% 1.00


2.00 100% 2.00

313 of 476
25-Oct-17

CUMULATIVE QUANTITY
Quantity QTY PLAN

1.00 100% 1.00

1.00 100% 1.00

314 of 476
25-Oct-17

CUMULATIVE QUANTITY
Quantity QTY PLAN

-
775.82 100% 775.82
320.71 100% 320.71
455.11 100% 455.11
2454.01 100% 2,454.01
38.56 100% 38.56
270.47 100% 270.47
16.30 100% 16.30
29.43 100% 29.43
352.04 100% 352.04
4.04 100% 4.04
283.88 100% 283.88
1,268.09 20% 1,268.09

239.91 100% 239.91


0% -
0% -
765.42 100% 765.42
0% -
107.83 100% 107.83
0%
623.36 100% 623.36
157.25 100% 157.25
0.15 100% 0.15
24.17 100% 24.17
271.11 100% 271.11
6454.65 100% 6,454.65
128.05 100% 128.05
- 169.01

SSP-CVL2-LF- LOCAL PLATFROM FOUNDATION 1340


26.91 100% 26.91
- -
16.53 100% 16.53
10.39 100% 10.39
1.17 100% 1.17
35.49 100% 35.49
- -
10.33 100% 10.33
- -
1.01 100% 1.01
- -
0.03 100% 0.03

315 of 476
25-Oct-17

CUMULATIVE QUANTITY
Quantity QTY PLAN
- -
- -
20.12 100% 20.12

LYMERAZATION REACTOR 1340 R.1342.02/03 & R.1345.02/03

SSP-CVL2-LF- R.1342.02/03 1340


42.84 100% 42.84
- -
23.03 100% 23.03
19.81 100% 19.81
2.42 100% 2.42
57.88 100% 57.88
- -
19.52 100% 19.52
- -
1.92 100% 1.92
- -
- -
0.36 100% 0.36
- -
28.00 100% 28.00

SSP-CVL2-LF -1340- AOTP P6304.02 A/B (AG-24)


31.39 100% 31.39
-
19.96 100% 19.96
11.43 100% 11.43
1.38 100% 1.38
38.82 100% 38.82
-
11.69 100% 11.69
-
1.09 100% 1.09
- -
0.05 100% 0.05
0.03 100% 0.03
-
22.00 100% 22.00

SSP-CVL2-LF- 1350- ARS V.1353.01

316 of 476
25-Oct-17

CUMULATIVE QUANTITY
Quantity QTY PLAN
12.63 100% 12.63
- -
7.88 100% 7.88
4.76 100% 4.76
0.67 100% 0.67
30.21 100% 30.21
- -
5.99 100% 5.99
- -
0.68 100% 0.68
- -
0.02 100% 0.02
0.06 100% 0.06
- -
26.80 100% 26.80

SSP-CVL2-LF - 1350 CONCENTRATION


17.70 100% 17.70
- -
9.69 100% 9.69
8.01 100% 8.01
1.08 100% 1.08
26.58 100% 26.58
- -
9.48 100% 9.48
- -
0.83 100% 0.83
- -
0.00 100% 0.00
0.26 100% 0.26
- -
18.00 100% 18.00

SSP-CVL2-LF- 2340 POLYMERIZATION


22.14 100% 22.14
- -
14.99 100% 14.99
7.15 100% 7.15
0.75 100% 0.75
19.46 100% 19.46
- -
15.97 100% 15.97
- -

317 of 476
25-Oct-17

CUMULATIVE QUANTITY
Quantity QTY PLAN
1.71 100% 1.71
- -
0.01 0.01
0.17 100% 0.17
- -
10.60 100% 10.60

SSP-CVL2-LF -2340- EPITSOP, DELTASTOP AND WITHOX


18.64 100% 18.64
- -
9.11 100% 9.11
9.53 100% 9.53
0.98 100% 0.98
15.74 100% 15.74
- -
8.98 100% 8.98
- -
0.49 100% 0.49
- -
- -
0.02 100% 0.02
- -
3.60 100% 3.60

SSP-CVL2-LF-2340- AROUND TIFANE


0.59 100% 0.59
- -
0.35 100% 0.35
0.24 100% 0.24
0.05 100% 0.05
1.20 100% 1.20
- -
0.21 100% 0.21
- -
0.04 100% 0.04
- -
0.02 100% 0.02
- -
- -
1.20 100% 1.20

318 of 476
25-Oct-17

CUMULATIVE QUANTITY
Quantity QTY PLAN

SSP-CVL2-LF -2350- ARSS V.2353.01


72.59 100% 72.59
- -
54.59 100% 54.59
18.00 100% 18.00
2.26 100% 2.26
62.90 100% 62.90
- -
23.21 100% 23.21
- -
2.12 100% 2.12
- -
0.02 100% 0.02
0.06 100% 0.06
- -
27.60 100% 27.60

SSP-CVL2-LF -2350- CONCENTRATION


51.14 100% 51.14
- -
40.81 100% 40.81
10.32 100% 10.32
1.37 100% 1.37
33.66 100% 33.66
5.52 100% 5.52
10.81 100% 10.81
0.83 100% 0.83
1.06 100% 1.06
- -
- -
0.11 100% 0.11
- -
16.40 100% 16.40

62.36 100% 62.36


- -
51.59 100% 51.59
10.77 100% 10.77
1.25 100% 1.25
33.08 100% 33.08

319 of 476
25-Oct-17

CUMULATIVE QUANTITY
Quantity QTY PLAN
-
17.39 100% 17.39
-
1.47 100% 1.47
- -
0.02 0.02
0.19 100% 0.19
- -
14.60 100% 14.60

SSP-CVL2-LF -2350- P.2352.02/01 AB, P2352.02/04


- -
- -
- -
-
- -
6.24 100% 6.24
- -
11.45 100% 11.45
- -
1.04 100% 1.04
- -
- -
0.42 100% 0.42
16.00 100% 16.00
-

34.44 100% 34.44


- -
25.54 100% 25.54
8.90 100% 8.90
1.15 100% 1.15
25.58 100% 25.58
- -
10.04 100% 10.04
- -
0.97 100% 0.97
- -
0.04 100% 0.04
- -
- -
10.00 100% 10.00

320 of 476
25-Oct-17

CUMULATIVE QUANTITY
Quantity QTY PLAN

- -
133.81 100% 133.811
60.89 100% 60.89
72.92 100% 72.92
358.99 100% 358.99
7.91 100% 7.91
43.27 100% 43.27
13.43 100% 13.43
6.08 100% 6.08
- -
- -
246.60 100% 246.60

SSP-CVL2-FDN-1350 - HVAC & AIR STACK


4.27 100% 4.27
- -
1.65 100% 1.65
2.63 100% 2.63
0.28 100% 0.28
7.88 100% 7.88
- -
4.08 100% 4.08
- -
0.15 100% 0.15
- -
6.00 100% 6.00
0.00 0.00
- -
9.06 100% 9.06

SSP-CVL2-LF-1340- ARROUND ETASTOP COUNTAINER


- -
- -
- -
-
- -
4.28 100% 4.28
- -

321 of 476
25-Oct-17

CUMULATIVE QUANTITY
Quantity QTY PLAN
0.40 100% 0.40
- -
0.09 100% 0.09
- -
- -
0.02 100% 0.02
- -
-

SSP-CVL2-LF -1340- AOTP P6304.02 A/B


2.50 100% 2.50
- -
2.50 100% 2.50
-
- -
5.20 100% 5.20
- -
4.37 100% 4.37
- -
0.73 100% 0.73
- -
0.02 100% 0.02
0.01 100% 0.01
- -
3.20 100% 3.20

SSP-CVL2-LF -1340- ACHE E1341.01 & 1344.01


6.40 100% 6.40
- -
6.40 100% 6.40
-
0.14 100% 0.14
27.16 100% 27.16
- -
5.64 100% 5.64
- -
0.60 100% 0.60
- -
0.01 100% 0.01
0.25 100% 0.25
- -
16.40 100% 16.40

322 of 476
25-Oct-17

CUMULATIVE QUANTITY
Quantity QTY PLAN

SSP-CVL2-LF -1350- CONCENTRATION AREA


28.10 100% 28.10
- -
24.96 100% 24.96
3.13 100% 3.13
0.63 100% 0.63
22.27 100% 22.27
- -
5.79 100% 5.79
- -
0.51 100% 0.51
- -
0.04 100% 0.04
0.13 100% 0.13
- -
12.40 100% 12.40

SSP-CVL2-LF - 1350 CONCENTRATION ( P2-1)


11.85 100% 11.85
- -
6.78 100% 6.78
5.07 100% 5.07
0.70 100% 0.70
32.73 100% 32.73
- -
9.77 100% 9.77
- -
1.15 100% 1.15
- -
0.02 100% 0.02
0.25 100% 0.25
- -
14.20 100% 14.20

323 of 476
25-Oct-17

CUMULATIVE QUANTITY
Quantity QTY PLAN

SSP-CVL2-CT-2350- CABLE TRAY SUPPORT 2350


1.35 100% 1.35
- -
0.58 100% 0.58
0.77 100% 0.77
0.12 100% 0.12
5.68 100% 5.68
- -
1.00 100% 1.00
- -
0.12 100% 0.12
- -
0.01 100% 0.01
- -
- -
4.00 100% 4.00

SSP-CVL2-LF-2350- STAGE PRE-HEATER


0.51 100% 0.51
- -
0.27 100% 0.27
0.24 100% 0.24
0.04 100% 0.04
2.67 100% 2.67
- -
0.41 100% 0.41
- -
0.16 100% 0.16
- -
0.01 100% 0.01
- -
- -
1.20 100% 1.20

SSP-CVL2-LF-1352- STAGE PRE-HEATER


- -
- -
- -
-
- -
0.80 100% 0.80
- -
0.13 100% 0.13

324 of 476
25-Oct-17

CUMULATIVE QUANTITY
Quantity QTY PLAN
- -
0.06 100% 0.06
- -
- -
- -
- -
-

SSP-CVL2-LPF- P2- LIGHTING POLE FOUNDATION


9.83 100% 9.83
- -
6.22 100% 6.22
3.61 100% 3.61
0.25 100% 0.25
19.76 100% 19.76
- -
4.37 100% 4.37
- -
0.22 100% 0.22
- -
- -
- -
- -
-

SSP-CVL2-HB- P2-HOSE BOX FOUNDATION P2 AREA


15.30 100% 15.30
- -
12.80 100% 12.80
2.50 100% 2.50
0.52 100% 0.52
20.40 100% 20.40
- -
3.96 100% 3.96
- -
0.30 100% 0.30
- -
- -
- -
- -
34.00 100% 34.00

325 of 476
25-Oct-17

CUMULATIVE QUANTITY
Quantity QTY PLAN
SSP-CVL2-GP- P2-GUARD POST P2 AREA
9.72 100% 9.72
- -
9.72 100% 9.72
-
0.20 100% 0.20
11.76 100% 11.76
- -
0.88 100% 0.88
- -
- -
- -
- -
8.00 100% 8.00
18.00 100% 18.00
2.40 100% 2.40

326 of 476
Progress per Item Calculation As of 25-Oct-17
CIVIL 2
CUMULATIVE QUANTITY
NO. AREA ITEM CODE WORK ITEM
Qty Width Depth Length Quantity
P3 - BLENDING AND STRIPPING AREA
1 PIPE RACK-02-2
Calculation Ref. No : SSP-CVL2-FDN-PR02-2
EA-1A Excavation by Equipment (D≦3.0M) 258.94
EA-2A Backfilling (Excavated Soil) 168.95
EA-3B Disposal of soil 89.99
CO-1A Levelling Concrete 6.30
FM-1A Form for Sub-STR 201.88
CO-2A Concrete for Sub-STR. 76.49
RE-1A Re-Bar for Sub-STR. (Deformed) 10.57
JT-5A Isolation Joint 39.20

2 PIPE RACK-02-3
Calculation Ref. No : SSP-CVL2-FDN-PR02-3
EA-1A Excavation by Equipment (D≦3.0M) 454.18
EA-2A Backfilling (Excavated Soil) 301.33
EA-3B Disposal of soil 152.85
CO-1A Levelling Concrete 11.34
FM-1A Form for Sub-STR 303.00
CO-2A Concrete for Sub-STR. 131.22
RE-1A Re-Bar for Sub-STR. (Deformed) 17.96
JT-5A Isolation Joint 56.00

3 BLENDING & CONCENTRATION SEPARATION PIT (M6486.20)


Calculation Ref. No : SSP-CVL2-PIT-M6486-20
EA-1A Excavation by Equipment (D>3.0M) 97.02
EA-1B Excavation by Equipment (D>3.0M) 4.85
EA-2A Backfilling (Excavated Soil) 62.29
EA-3B Disposal of Soil (Outside of Factory) 39.58
CO-1A Leveling Concrete 0.71
FM-1A Form for Sub-STR. 92.72
FM-2A Form for Super-STR. 13.75
CO-2A Concrete for Sub-STR. 4.59
CO-3A Concrete for Super-STR. 13.69
RE-1A Re-Bar for Sub-STR. (Deformed) 0.63
RE-2A Re-Bar for Super-STR. (Deformed) 3.44
JT-4A Water Stop Plate 14.40
AN-3B-1 Embedded Steel Supply & Setting(Carbon Steel) 0.08
ANA-1 Climbing Rung (Galvanized) 0.04
LN-5E-1 Chemical Resistant Resin Lining (Epoxy) 56.05
JT-5A Isolation Joint

4 STRIPPING SEPARATION PIT (M6486.21)


Calculation Ref. No : SSP-CVL2-PIT-M6486-21
EA-1A Excavation by Equipment (D≦3.0M) 83.22
EA-1B Excavation by Equipment (D>3.0M) 1.39
EA-2A Backfilling (Excavated Soil) 55.44
EA-3B Disposal of Soil (Outside of Factory) 29.17

327 of 476
Progress per Item Calculation As of 25-Oct-17
CIVIL 2
CUMULATIVE QUANTITY
NO. AREA ITEM CODE WORK ITEM
Qty Width Depth Length Quantity
CO-1A Leveling Concrete 0.55
FM-1A Form for Sub-STR. 79.92
FM-2A Form for Super-STR. 9.83
CO-2A Concrete for Sub-STR. 3.82
CO-3A Concrete for Super-STR. 13.69
RE-1A Re-Bar for Sub-STR. (Deformed) 0.48
RE-2A Re-Bar for Super-STR. (Deformed) 2.97
JT-4A Water Stop Plate 12.80
AN-3B-1 Embedded Steel Supply & Setting(Carbon Steel) 0.07
ANA-1 Climbing Rung (Galvanized) 0.04
LN-5E-1 Chemical Resistant Resin Lining (Epoxy) 44.65
JT-5A Isolation Joint

5 FOUNDATION T1374.01 CRUMBS SLURRY TANK


Calculation Ref. No : SSP-CVL2-FDN-T1374.01
EA-1A Excavation by Equipment (D≦3.0M) 83.86
EA-2A Backfilling (Excavated Soil) 13.95
EA-3B Disposal of Soil (Outside of Factory) 69.91
EA-4C Sand Filling for Tank FDN 79.54
CO-1A Leveling Concrete 2.45
FM-1B Curved Form for Sub-STR. 12.10
FM-2B Curved Form for Super-STR. 105.43
CO-2A Concrete for Sub-STR. 23.28
CO-3A Concrete for Super-STR. 26.36
RE-1A Re-Bar for Sub-STR. (Deformed) 1.30
RE-2A Re-Bar for Super-STR. (Deformed) 2.85
AS-2A Asphalt Concrete/Sand for Tank FDN 1.66
AN-2B Anchor Bolt W/O Template Setting 0.12
JT-5A Isolation Joint 23.56

6 FOUNDATION T1374.02 CRUMBS SLURRY TANK


Calculation Ref. No : SSP-CVL2-FDN-T1374.02

EA-1A Excavation by Equipment (D≦3.0M) 83.86


EA-2A Backfilling (Excavated Soil) 13.95

328 of 476
Progress per Item Calculation As of 25-Oct-17
CIVIL 2
CUMULATIVE QUANTITY
NO. AREA ITEM CODE WORK ITEM
Qty Width Depth Length Quantity
EA-3B Disposal of Soil (Outside of Factory) 69.91
EA-4C Sand Filling for Tank FDN 79.54
CO-1A Leveling Concrete 2.45
FM-1B Curved Form for Sub-STR. 12.10
FM-2B Curved Form for Super-STR. 105.43
CO-2A Concrete for Sub-STR. 23.28
CO-3A Concrete for Super-STR. 26.36
RE-1A Re-Bar for Sub-STR. (Deformed) 1.30
RE-2A Re-Bar for Super-STR. (Deformed) 2.85
AS-2A Asphalt Concrete/Sand for Tank FDN 1.66
AN-2B Anchor Bolt W/O Template Setting 0.12
JT-5A Isolation Joint 7.50

7 FOUNDATION T2374.02 CRUMBS SLURRY TANK


Calculation Ref. No : SSP-CVL2-FDN-T2374.02

EA-1A Excavation by Equipment (D≦3.0M) 83.86


EA-2A Backfilling (Excavated Soil) 13.95
EA-3B Disposal of Soil (Outside of Factory) 69.91
EA-4C Sand Filling for Tank FDN 78.96
CO-1A Leveling Concrete 2.45
FM-1B Curved Form for Sub-STR. 12.10
FM-2B Curved Form for Super-STR. 105.43
CO-2A Concrete for Sub-STR. 23.28
CO-3A Concrete for Super-STR. 26.36
RE-1A Re-Bar for Sub-STR. (Deformed) 1.30
RE-2A Re-Bar for Super-STR. (Deformed) 2.85
AS-2A Asphalt Concrete/Sand for Tank FDN 1.66
AN-2B Anchor Bolt W/O Template Setting 0.12
JT-5A Isolation Joint 23.56

8 STR P3-3 1370 STRIPPING STRUCTURE FOUNDATION


Calculation Ref. No : SSP-CVL2-FDN-P3-3

EA-1A Excavation by Equipment (D≦3.0M) 696.95


EA-1B Excavation by Equipment (D>3.0M) -
EA-2A Backfilling (Excavated Soil) 512.87
EA-3B Disposal of Soil (Outside of Factory) 184.08
CO-1A Leveling Concrete 17.40
FM-1A Form for Sub-STR. 363.41
FM-2A Form for Super-STR. -
CO-2A Concrete for Sub-STR. 175.35
CO-3A Concrete for Super-STR. -
RE-1A Re-Bar for Sub-STR. (Deformed) 23.35
RE-2A Re-Bar for Super-STR. (Deformed) -
AN-2B Anchor Bolt W/O Template Setting 0.41
JT-5A Isolation Joint 88.00

329 of 476
Progress per Item Calculation As of 25-Oct-17
CIVIL 2
CUMULATIVE QUANTITY
NO. AREA ITEM CODE WORK ITEM
Qty Width Depth Length Quantity
9 V1371.01/02/03 - FIRST/SECOND/THIRD STRIPPER FOUNDATION
Calculation Ref. No : SSP-CVL2-FDN-V1371

EA-1A Excavation by Equipment (D≦3.0M) 176.47


EA-1B Excavation by Equipment (D>3.0M)
EA-2A Backfilling (Excavated Soil) 109.39
EA-3B Disposal of Soil (Outside of Factory) 67.08
EA-4C Sand Filling for Tank FDN
CO-1A Leveling Concrete 4.68
FM-1A Form for Sub-STR. 132.31
FM-2A Form for Super-STR.
CO-2A Concrete for Sub-STR. 68.21
CO-3A Concrete for Super-STR.
RE-1A Re-Bar for Sub-STR. (Deformed) 8.12
RE-2A Re-Bar for Super-STR. (Deformed)
AN-2B Anchor Bolt W/O Template Setting 0.29
JT-5A Isolation Joint 63.20

10 V1372.01/02/03 - FIRST/SECOND/THIRD STRIPPER FOUNDATION


Calculation Ref. No : SSP-CVL2-FDN-V1372

EA-1A Excavation by Equipment (D≦3.0M) 176.47


EA-1B Excavation by Equipment (D>3.0M) -
EA-2A Backfilling (Excavated Soil) 109.39
EA-3B Disposal of Soil (Outside of Factory) 67.08
EA-4C Sand Filling for Tank FDN
CO-1A Leveling Concrete 4.68
FM-1A Form for Sub-STR. 132.31
FM-2A Form for Super-STR. -
CO-2A Concrete for Sub-STR. 68.21
CO-3A Concrete for Super-STR. -
RE-1A Re-Bar for Sub-STR. (Deformed) 8.19
RE-2A Re-Bar for Super-STR. (Deformed) -
AN-2B Anchor Bolt W/O Template Setting 0.29
JT-5A Isolation Joint 63.20

330 of 476
Progress per Item Calculation As of 25-Oct-17
CIVIL 2
CUMULATIVE QUANTITY
NO. AREA ITEM CODE WORK ITEM
Qty Width Depth Length Quantity
11 STR - P3-1 - 1360 BLENDING EQUIPMENT SUPPORT STRUCTURE
Calculation Ref. No : SSP-CVL2-FDN 1360 - STR. P3-1

EA-1A Excavation by Equipment (D≦3.0M) 666.61


EA-1B Excavation by Equipment (D>3.0M) -
EA-2A Backfilling (Excavated Soil) 250.22
EA-3B Disposal of Soil (Outside of Factory) 416.39
CO-1A Leveling Concrete 18.13
FM-1A Form for Sub-STR. 99.22
FM-2A Form for Super-STR. 783.89
CO-2A Concrete for Sub-STR. 388.85
CO-3A Concrete for Super-STR. 92.51
COA-6A Concrete for Super-STR. (K-350) 147.33
RE-1A Re-Bar for Sub-STR. (Deformed) 46.42
RE-2A Re-Bar for Super-STR. (Deformed) 59.00
AN-2A Anchor Bolt With Template Setting 2.97
JT-5A Isolation Joint 44.80

12 STR P3-8 2370 STRIPPING STRUCTURE FOUNDATION


Calculation Ref. No : SSP-CVL2-FDN-P3-8

EA-1A Excavation by Equipment (D≦3.0M) 397.05


EA-1B Excavation by Equipment (D>3.0M) -
EA-2A Backfilling (Excavated Soil) 295.37
EA-3B Disposal of Soil (Outside of Factory) 101.68
CO-1A Leveling Concrete 9.62
FM-1A Form for Sub-STR. 193.46
FM-2A Form for Super-STR.
CO-2A Concrete for Sub-STR. 96.43
CO-3A Concrete for Super-STR. -
RE-1A Re-Bar for Sub-STR. (Deformed) 12.90
RE-2A Re-Bar for Super-STR. (Deformed) -
AN-2B Anchor Bolt W/O Template Setting 0.23
JT-5A Isolation Joint 50.80

13 V2371.01/02/03 - FIRST/SECOND/THIRD STRIPPER FOUNDATION


Calculation Ref. No : SSP-CVL2-FDN-V2371.01/02/03

EA-1A Excavation by Equipment (D≦3.0M) 176.47


EA-1B Excavation by Equipment (D>3.0M)
EA-2A Backfilling (Excavated Soil) 109.61
EA-3B Disposal of Soil (Outside of Factory) 66.86
CO-1A Leveling Concrete 4.68
FM-1A Form for Sub-STR. 131.13
FM-2A Form for Super-STR.
CO-2A Concrete for Sub-STR. 67.86
CO-3A Concrete for Super-STR.
RE-1A Re-Bar for Sub-STR. (Deformed) 8.19
RE-2A Re-Bar for Super-STR. (Deformed) -

331 of 476
Progress per Item Calculation As of 25-Oct-17
CIVIL 2
CUMULATIVE QUANTITY
NO. AREA ITEM CODE WORK ITEM
Qty Width Depth Length Quantity
AN-2B Anchor Bolt W/O Template Setting 0.29
JT-5A Isolation Joint 62.40

14 FOUNDATION V6415.01 STRIPPING KO DRUM


Calculation Ref. No : SSP-CVL2-FDN-2370-V6415.01

EA-1A Excavation by Equipment (D≦3.0M) 30.69


EA-1B Excavation by Equipment (D>3.0M) -
EA-2A Backfilling (Excavated Soil) 21.87
EA-3B Disposal of Soil (Outside of Factory) 8.82
CO-1A Leveling Concrete 0.82
FM-1A Form for Sub-STR. 9.48
FM-2A Form for Super-STR. 44.30
CO-2A Concrete for Sub-STR. 8.82
CO-3A Concrete for Super-STR. 8.14
RE-1A Re-Bar for Sub-STR. (Deformed) 0.60
RE-2A Re-Bar for Super-STR. (Deformed) 1.12
AN-1A Anchor Box 8.00
JT-5A Isolation Joint 9.80

15 STR P3-2 1360 BLENDING VALVE OPERATION PLATFORM FOUNDATION


Calculation Ref. No : SSP-CVL2-FDN-STR P3-2

EA-1A Excavation by Equipment (D≦3.0M) 560.46


EA-1B Excavation by Equipment (D>3.0M)
EA-2A Backfilling (Excavated Soil) 409.48
EA-3B Disposal of Soil (Outside of Factory) 150.98
CO-1A Leveling Concrete 13.89
FM-1A Form for Sub-STR. 141.91
FM-2A Form for Super-STR. -
CO-2A Concrete for Sub-STR. 139.88
CO-3A Concrete for Super-STR. -
RE-1A Re-Bar for Sub-STR. (Deformed) 18.64
RE-2A Re-Bar for Super-STR. (Deformed)
AN-2B Anchor Bolt W/O Template Setting 0.17
JT-5A Isolation Joint 38.32

16 FOUNDATION V1373.01 STRIPPED VAPOR CONDENSATE DRUM


Calculation Ref. No : SSP-CVL2-FDN-V1373.01

EA-1A Excavation by Equipment (D≦3.0M) 31.15


EA-1B Excavation by Equipment (D>3.0M) -
EA-2A Backfilling (Excavated Soil) 22.63
EA-3B Disposal of Soil (Outside of Factory) 8.52
CO-1A Leveling Concrete 0.86
FM-1A Form for Sub-STR. 9.02
FM-2A Form for Super-STR. 36.99
CO-2A Concrete for Sub-STR. 8.52

332 of 476
Progress per Item Calculation As of 25-Oct-17
CIVIL 2
CUMULATIVE QUANTITY
NO. AREA ITEM CODE WORK ITEM
Qty Width Depth Length Quantity
CO-3A Concrete for Super-STR. 7.22
RE-1A Re-Bar for Sub-STR. (Deformed) 1.88
RE-2A Re-Bar for Super-STR. (Deformed) 1.00
AN-1A Anchor Box 8.00
JT-5A Isolation Joint 13.60

17 FOUNDATION V2373.01 STRIPPED VAPOR CONDENSATE DRUM


Calculation Ref. No : SSP-CVL2-FDN-V2373.01

EA-1A Excavation by Equipment (D≦3.0M) 20.96


EA-1B Excavation by Equipment (D>3.0M) -
EA-2A Backfilling (Excavated Soil) 15.57
EA-3B Disposal of Soil (Outside of Factory) 5.39
CO-1A Leveling Concrete 0.56
FM-1A Form for Sub-STR. 6.99
FM-2A Form for Super-STR. 30.49
CO-2A Concrete for Sub-STR. 5.39
CO-3A Concrete for Super-STR. 6.41
RE-1A Re-Bar for Sub-STR. (Deformed) 0.82
RE-2A Re-Bar for Super-STR. (Deformed) 0.52
AN-1A Anchor Box 8.00
JT-5A Isolation Joint 12.60

18 SSP-CVL2-FDN 2360 - STR. P3-6


Calculation Ref. No : SSP-CVL2-STR. P3-6

EA-1A Excavation by Equipment (D≦3.0M) 609.47


EA-1B Excavation by Equipment (D>3.0M) -
EA-2A Backfilling (Excavated Soil) 320.06
EA-3B Disposal of Soil (Outside of Factory) 289.42
CO-1A Leveling Concrete 18.13
FM-1A Form for Sub-STR. 72.16
FM-2A Form for Super-STR. 672.34
CO-2A Concrete for Sub-STR. 282.80
CO-3A Concrete for Super-STR. 52.13
COA-6A Concrete for Super-STR. (K-350) 121.53
RE-1A Re-Bar for Sub-STR. (Deformed) 30.43
RE-2A Re-Bar for Super-STR. (Deformed) 49.96
AN-2A Anchor Bolt With Template Setting 2.36
JT-5A Isolation Joint 33.60

19 SSP-CVL2-FDN-STR P3-7
Calculation Ref. No : SSP-CVL2-STR. P3-7

EA-1A Excavation by Equipment (D≦3.0M) 451.08


EA-1B Excavation by Equipment (D>3.0M) -
EA-2A Backfilling (Excavated Soil) 307.36
EA-3B Disposal of Soil (Outside of Factory) 143.72

333 of 476
Progress per Item Calculation As of 25-Oct-17
CIVIL 2
CUMULATIVE QUANTITY
NO. AREA ITEM CODE WORK ITEM
Qty Width Depth Length Quantity
CO-1A Leveling Concrete 13.22
FM-1A Form for Sub-STR. 117.31
FM-2A Form for Super-STR. -
CO-2A Concrete for Sub-STR. 133.18
CO-3A Concrete for Super-STR. -
RE-1A Re-Bar for Sub-STR. (Deformed) 11.01
RE-2A Re-Bar for Super-STR. (Deformed)
AN-2B Anchor Bolt W/O Template Setting 0.16
JT-5A Isolation Joint 34.40

20 SSP-CVL2-CMH02-P3C0C
Calculation Ref. No : SSP-CVL2-CMH02-P3C0C

EA-1A Excavation by Equipment (D≦3.0M) 14.31


EA-1B Excavation by Equipment (D>3.0M) -
EA-2A Backfilling (Excavated Soil) 10.23
EA-3B Disposal of Soil (Outside of Factory) 4.08
CO-1A Leveling Concrete 0.41
FM-1A Form for Sub-STR. 22.30
FM-2A Form for Super-STR. -
CO-2A Concrete for Sub-STR. 3.30
CO-3A Concrete for Super-STR. -
RE-1A Re-Bar for Sub-STR. (Deformed) 0.64
RE-2A Re-Bar for Super-STR. (Deformed) -
JT-4A Water Stop Plate 16.01
ANA-2 Climbing Rung (Chemical Resistant) 0.01
LN-5E-1 Chemical Resistant Resin Lining (Epoxy) 8.94
PPX-8A Vent Pipe for Manhole 1.00

21 P3- FOUNDATION T.6306.01 TAMOL STORAGE TANK


Calculation Ref. No : 'SSP-CVL2-FDN-1370-T6306.01

EA-1A Excavation by Equipment (D≦3.0M) 8.82


EA-1B Excavation by Equipment (D>3.0M) -
EA-2A Backfilling (Excavated Soil) 14.80
EA-3B Disposal of Soil (Outside of Factory) 5.98
CO-1A Leveling Concrete 7.93
FM-1A Form for Sub-STR. 22.23
FM-2A Form for Super-STR. -
CO-2A Concrete for Sub-STR. 21.17
CO-3A Concrete for Super-STR. -
RE-1A Re-Bar for Sub-STR. (Deformed) 0.39
RE-2A Re-Bar for Super-STR. (Deformed) -
AN-1A Anchor Box 8.00
JT-5A Isolation Joint 12.56

22 P3- FOUNDATION T.6307.01 SODA STORAGE TANK


Calculation Ref. No : 'SSP-CVL2-FDN-1370-T6307.01

334 of 476
Progress per Item Calculation As of 25-Oct-17
CIVIL 2
CUMULATIVE QUANTITY
NO. AREA ITEM CODE WORK ITEM
Qty Width Depth Length Quantity

EA-1A Excavation by Equipment (D≦3.0M) 8.82


EA-1B Excavation by Equipment (D>3.0M) -
EA-2A Backfilling (Excavated Soil) 14.80
EA-3B Disposal of Soil (Outside of Factory) 5.98
CO-1A Leveling Concrete 7.93
FM-1A Form for Sub-STR. 22.23
FM-2A Form for Super-STR. -
CO-2A Concrete for Sub-STR. 21.17
CO-3A Concrete for Super-STR. -
RE-1A Re-Bar for Sub-STR. (Deformed) 0.39
RE-2A Re-Bar for Super-STR. (Deformed) -
AN-1A Anchor Box 8.00
JT-5A Isolation Joint 12.56

23 P3- FOUNDATION T.6308.01 CaCl2 STORAGE TANK


Calculation Ref. No : 'SSP-CVL2-FDN-1370-T6308.01

EA-1A Excavation by Equipment (D≦3.0M) 8.82


EA-1B Excavation by Equipment (D>3.0M) -
EA-2A Backfilling (Excavated Soil) 14.80
EA-3B Disposal of Soil (Outside of Factory) 5.98
CO-1A Leveling Concrete 7.93
FM-1A Form for Sub-STR. 22.23
FM-2A Form for Super-STR. -
CO-2A Concrete for Sub-STR. 21.17
CO-3A Concrete for Super-STR. -
RE-1A Re-Bar for Sub-STR. (Deformed) 0.39
RE-2A Re-Bar for Super-STR. (Deformed) -
AN-1A Anchor Box 8.00
JT-5A Isolation Joint 12.56

24 P3- CMH03 AREA COC MAIN HOLE TYPE 2 PLAN, SECTION- A/B/C
Calculation Ref. No : 'SSP-CVL2-CMH03- P3COC

EA-1A Excavation by Equipment (D≦3.0M) 14.31


EA-1B Excavation by Equipment (D>3.0M) -
EA-2A Backfilling (Excavated Soil) 10.34
EA-3B Disposal of Soil (Outside of Factory) 3.97
CO-1A Leveling Concrete 0.41
FM-1A Form for Sub-STR. 21.80
FM-2A Form for Super-STR. -
CO-2A Concrete for Sub-STR. 3.24
CO-3A Concrete for Super-STR. -
RE-1A Re-Bar for Sub-STR. (Deformed) 0.64
RE-2A Re-Bar for Super-STR. (Deformed) -
JT-4A Water Stop Plate 16.01
ANA-2 Climbing Rung (Chemical Resistant) 0.01
LN-5E-1 Chemical Resistant Resin Lining (Epoxy) 8.74

335 of 476
Progress per Item Calculation As of 25-Oct-17
CIVIL 2
CUMULATIVE QUANTITY
NO. AREA ITEM CODE WORK ITEM
Qty Width Depth Length Quantity
PPX-8A Vent Pipe for Manhole 1.00

25 STR P3-12 FOUNDATION


Calculation Ref. No : 'SSP-CVL2-FDN-P3-12

EA-1A Excavation by Equipment (D≦3.0M) 47.04


EA-1B Excavation by Equipment (D>3.0M)
EA-2A Backfilling (Excavated Soil) 39.30
EA-3B Disposal of Soil (Outside of Factory) 7.74
CO-1A Leveling Concrete 1.15
FM-1A Form for Sub-STR. 26.64
FM-2A Form for Super-STR. -
CO-2A Concrete for Sub-STR. 9.31
CO-3A Concrete for Super-STR. -
RE-1A Re-Bar for Sub-STR. (Deformed) 1.12
RE-2A Re-Bar for Super-STR. (Deformed) -
AN-2B Anchor Bolt W/O Template Setting 0.01
JT-5A Isolation Joint 8.00

26 STR P3-5 1370 FOUNDATION


Calculation Ref. No : 'SSP-CVL2-FDN-1370 P3-5

EA-1A Excavation by Equipment (D≦3.0M) 19.90


EA-1B Excavation by Equipment (D>3.0M)
EA-2A Backfilling (Excavated Soil) 13.88
EA-3B Disposal of Soil (Outside of Factory) 6.02
CO-1A Leveling Concrete 2.55
FM-1A Form for Sub-STR. 30.37
FM-2A Form for Super-STR.
CO-2A Concrete for Sub-STR. 6.88
CO-3A Concrete for Super-STR.
RE-1A Re-Bar for Sub-STR. (Deformed) 0.67
RE-2A Re-Bar for Super-STR. (Deformed)
AN-2B Anchor Bolt W/O Template Setting 0.03
JT-5A Isolation Joint 12.80

27 FOUNDATION P.1371.01/02/03 1st,2nd,3rd STRIPPER SLURRY PUMP


Calculation Ref. No : 'SSP-CVL2-FDN-1370 P.1371.01/02/03

EA-1A Excavation by Equipment (D≦3.0M) 6.01


EA-1B Excavation by Equipment (D>3.0M)
EA-2A Backfilling (Excavated Soil) 3.18
EA-3B Disposal of Soil (Outside of Factory) 2.83
CO-1A Leveling Concrete 0.34
FM-1A Form for Sub-STR. 17.42
FM-2A Form for Super-STR.
CO-2A Concrete for Sub-STR. 5.36

336 of 476
Progress per Item Calculation As of 25-Oct-17
CIVIL 2
CUMULATIVE QUANTITY
NO. AREA ITEM CODE WORK ITEM
Qty Width Depth Length Quantity
CO-3A Concrete for Super-STR.
RE-1A Re-Bar for Sub-STR. (Deformed) 0.18
RE-2A Re-Bar for Super-STR. (Deformed)
AN-1A Anchor Box 12.00
JT-5A Isolation Joint 16.20

28 FOUNDATION P.1372.01/02/03 1st,2nd,3rd STRIPPER SLURRY PUMP


Calculation Ref. No : 'SSP-CVL2-FDN-1370 P.1372.01/02/03

EA-1A Excavation by Equipment (D≦3.0M) 6.01


EA-1B Excavation by Equipment (D>3.0M)
EA-2A Backfilling (Excavated Soil) 3.18
EA-3B Disposal of Soil (Outside of Factory) 2.83
CO-1A Leveling Concrete 0.34
FM-1A Form for Sub-STR. 17.42
FM-2A Form for Super-STR.
CO-2A Concrete for Sub-STR. 5.36
CO-3A Concrete for Super-STR.
RE-1A Re-Bar for Sub-STR. (Deformed) 0.18
RE-2A Re-Bar for Super-STR. (Deformed)
AN-1A Anchor Bolt W/O Template Setting 12.00
JT-5A Isolation Joint 16.20

29 FOUNDATION P.1373.01 A/B STRIPPED RECYCLE SOLVENT PUMP


Calculation Ref. No : 'SSP-CVL2-FDN-1370 P.1373.01 A/B

EA-1A Excavation by Equipment (D≦3.0M) 3.75


EA-1B Excavation by Equipment (D>3.0M)
EA-2A Backfilling (Excavated Soil) 2.02
EA-3B Disposal of Soil (Outside of Factory) 1.73
CO-1A Leveling Concrete 0.21
FM-1A Form for Sub-STR. 10.97
FM-2A Form for Super-STR.
CO-2A Concrete for Sub-STR. 3.27
CO-3A Concrete for Super-STR.
RE-1A Re-Bar for Sub-STR. (Deformed) 0.11
RE-2A Re-Bar for Super-STR. (Deformed)
AN-1A Anchor Bolt W/O Template Setting 8.00
JT-5A Isolation Joint 10.20

30 FOUNDATION P.1373.03 LUBE WATER PUMP


Calculation Ref. No : 'SSP-CVL2-FDN-1370 P.1373.03

EA-1A Excavation by Equipment (D≦3.0M) 1.94


EA-1B Excavation by Equipment (D>3.0M)
EA-2A Backfilling (Excavated Soil) 0.36
EA-3B Disposal of Soil (Outside of Factory) 0.89

337 of 476
Progress per Item Calculation As of 25-Oct-17
CIVIL 2
CUMULATIVE QUANTITY
NO. AREA ITEM CODE WORK ITEM
Qty Width Depth Length Quantity
CO-1A Leveling Concrete 0.11
FM-1A Form for Sub-STR. 5.70
FM-2A Form for Super-STR.
CO-2A Concrete for Sub-STR. 1.69
CO-3A Concrete for Super-STR.
RE-1A Re-Bar for Sub-STR. (Deformed) 0.06
RE-2A Re-Bar for Super-STR. (Deformed)
AN-1A Anchor Bolt W/O Template Setting 4.00
JT-5A Isolation Joint 5.30

31 P3- CMH01 AREA COC MAIN HOLE TYPE 2 PLAN, SECTION- A/B
Calculation Ref. No : 'SSP-CVL2-CMH01- P3COC

EA-1A Excavation by Equipment (D≦3.0M) 14.31


EA-1B Excavation by Equipment (D>3.0M)
EA-2A Backfilling (Excavated Soil) 11.58
EA-3B Disposal of Soil (Outside of Factory) 2.73
CO-1A Leveling Concrete 0.41
FM-1A Form for Sub-STR. 16.38
FM-2A Form for Super-STR.
CO-2A Concrete for Sub-STR. 2.56
CO-3A Concrete for Super-STR.
RE-1A Re-Bar for Sub-STR. (Deformed) 0.51
RE-2A Re-Bar for Super-STR. (Deformed)
ANA-2 Climbing Rung (Chemical Resistant) 0.01
LN-5E-1 Chemical Resistant Resin Lining (Epoxy) 6.58
PPX-8A Vent Pipe for Manhole 1.00
JT-5A Isolation Joint
JT-4A Water Stop Plate 6.00

32 P3- CMH05 AREA COC MAIN HOLE TYPE 2 PLAN, SECTION- A/B
Calculation Ref. No : 'SSP-CVL2-CMH05- P3COC

EA-1A Excavation by Equipment (D≦3.0M) 11.91


EA-1B Excavation by Equipment (D>3.0M)
EA-2A Backfilling (Excavated Soil) 10.28
EA-3B Disposal of Soil (Outside of Factory) 1.63
CO-1A Leveling Concrete 0.38
FM-1A Form for Sub-STR. 13.08
FM-2A Form for Super-STR.
CO-2A Concrete for Sub-STR. 1.36
CO-3A Concrete for Super-STR.
RE-1A Re-Bar for Sub-STR. (Deformed) 0.39
RE-2A Re-Bar for Super-STR. (Deformed)
ANA-2 Climbing Rung (Chemical Resistant) 0.005
LN-5E-1 Chemical Resistant Resin Lining (Epoxy) 5.985
PPX-8A Vent Pipe for Manhole 1.0
JT-5A Isolation Joint
JT-4A Water Stop Plate 5.2

338 of 476
Progress per Item Calculation As of 25-Oct-17
CIVIL 2
CUMULATIVE QUANTITY
NO. AREA ITEM CODE WORK ITEM
Qty Width Depth Length Quantity

33 P3- AMH01 AREA COC MAIN HOLE TYPE 2 PLAN, SECTION- A/B
Calculation Ref. No : 'SSP-CVL2-AMH01- P3COC

EA-1A Excavation by Equipment (D≦3.0M) 49.08


EA-1B Excavation by Equipment (D>3.0M) 2.40
EA-2A Backfilling (Excavated Soil) 38.84
EA-3B Disposal of Soil (Outside of Factory) 12.64
CO-1A Leveling Concrete 0.27
FM-1A Form for Sub-STR. 3.80
FM-2A Form for Super-STR. 37.92
CO-2A Concrete for Sub-STR. 1.00
CO-3A Concrete for Super-STR. 5.13
RE-1A Re-Bar for Sub-STR. (Deformed) 0.13
RE-2A Re-Bar for Super-STR. (Deformed) 0.80
JT-4A Water Stop Plate 8.00
ANA-2 Climbing Rung (Chemical Resistant) 0.01
LN-5E-1 Chemical Resistant Resin Lining (Epoxy) 18.43
PPX-8A Vent Pipe for Manhole 1.00
JT-5A Isolation Joint
JTA-6 Sikaswell for joining RCP and Manhole 2.00

34 P3- CMH04 AREA COC MAIN HOLE TYPE 2 PLAN, SECTION- A/B/C
Calculation Ref. No : 'SSP-CVL2-CMH04- P3COC

EA-1A Excavation by Equipment (D≦3.0M) 37.83


EA-1B Excavation by Equipment (D>3.0M)
EA-2A Backfilling (Excavated Soil) 33.86
EA-3B Disposal of Soil (Outside of Factory) 3.97
CO-1A Leveling Concrete 0.41
FM-1A Form for Sub-STR. 20.37
FM-2A Form for Super-STR.
CO-2A Concrete for Sub-STR. 2.73
CO-3A Concrete for Super-STR.
RE-1A Re-Bar for Sub-STR. (Deformed) 0.58
RE-2A Re-Bar for Super-STR. (Deformed)
ANA-2 Climbing Rung (Chemical Resistant) 0.01
LN-5E-1 Chemical Resistant Resin Lining (Epoxy) 8.73
PPX-8A Vent Pipe for Manhole 1.00
JT-5A Isolation Joint
JT-4A Water Stop Plate 16.01

35 P3- AMH04 AREA COC MAIN HOLE TYPE 2 PLAN, SECTION- A/B
Calculation Ref. No : 'SSP-CVL2-AMH04- P3COC

EA-1A Excavation by Equipment (D≦3.0M) 46.71


EA-1B Excavation by Equipment (D>3.0M) 0.76
EA-2A Backfilling (Excavated Soil) 36.42

339 of 476
Progress per Item Calculation As of 25-Oct-17
CIVIL 2
CUMULATIVE QUANTITY
NO. AREA ITEM CODE WORK ITEM
Qty Width Depth Length Quantity
EA-3B Disposal of Soil (Outside of Factory) 11.05
CO-1A Leveling Concrete 0.49
FM-1A Form for Sub-STR. 3.70
FM-2A Form for Super-STR. 34.38
CO-2A Concrete for Sub-STR. 0.90
CO-3A Concrete for Super-STR. 4.65
RE-1A Re-Bar for Sub-STR. (Deformed) 0.11
RE-2A Re-Bar for Super-STR. (Deformed) 0.83
JT-4A Water Stop Plate 7.60
ANA-2 Climbing Rung (Chemical Resistant) 0.01
LN-5E-1 Chemical Resistant Resin Lining (Epoxy) 16.51
PPX-8A Vent Pipe for Manhole 1.00
JT-5A Isolation Joint
JTA-6 Sikaswell for joining RCP and Manhole 2.00

36 P3- AMH05 AREA COC MAIN HOLE TYPE 2 PLAN, SECTION- A/B
Calculation Ref. No : 'SSP-CVL2-AMH05- P3COC

EA-1A Excavation by Equipment (D≦3.0M) 46.71


EA-1B Excavation by Equipment (D>3.0M) 1.52
EA-2A Backfilling (Excavated Soil) 37.00
EA-3B Disposal of Soil (Outside of Factory) 11.23
CO-1A Leveling Concrete 0.49
FM-1A Form for Sub-STR. 3.70
FM-2A Form for Super-STR. 35.04
CO-2A Concrete for Sub-STR. 0.90
CO-3A Concrete for Super-STR. 4.73
RE-1A Re-Bar for Sub-STR. (Deformed) 0.11
RE-2A Re-Bar for Super-STR. (Deformed) 0.86
JT-4A Water Stop Plate 7.60
ANA-2 Climbing Rung (Chemical Resistant) 0.01
LN-5E-1 Chemical Resistant Resin Lining (Epoxy) 16.79
PPX-8A Vent Pipe for Manhole 1.00
JT-5A Isolation Joint
JTA-6 Sikaswell for joining RCP and Manhole 3.00

37 FOUNDATION V.6412.01 OFF GAS K.O DRUM


Calculation Ref. No : 'SSP-CVL2-FDN-2370-V.6412.01

EA-1A Excavation by Equipment (D≦3.0M) 8.47


EA-1B Excavation by Equipment (D>3.0M)
EA-2A Backfilling (Excavated Soil) 7.52
EA-3B Disposal of Soil (Outside of Factory) 0.95
CO-1A Leveling Concrete 0.14
FM-1A Form for Sub-STR. 5.19
FM-2A Form for Super-STR. 16.63
CO-2A Concrete for Sub-STR. 0.95
CO-3A Concrete for Super-STR. 2.18
RE-1A Re-Bar for Sub-STR. (Deformed) 0.14

340 of 476
Progress per Item Calculation As of 25-Oct-17
CIVIL 2
CUMULATIVE QUANTITY
NO. AREA ITEM CODE WORK ITEM
Qty Width Depth Length Quantity
RE-2A Re-Bar for Super-STR. (Deformed) 0.35
AN-2B Anchor Bolt W/O Template Setting 0.01
JT-5A Isolation Joint 5.60

38 FOUNDATION P.2373.01 A/B STRIPPED RECYCLE SOLVENT PUMP


Calculation Ref. No : 'SSP-CVL2-FDN-1370-P.2373.01 A/B

EA-1A Excavation by Equipment (D≦3.0M) 3.19


EA-1B Excavation by Equipment (D>3.0M)
EA-2A Backfilling (Excavated Soil) 1.83
EA-3B Disposal of Soil (Outside of Factory) 1.36
CO-1A Leveling Concrete 0.17
FM-1A Form for Sub-STR. 9.68
FM-2A Form for Super-STR.
CO-2A Concrete for Sub-STR. 2.56
CO-3A Concrete for Super-STR.
RE-1A Re-Bar for Sub-STR. (Deformed) 0.08
RE-2A Re-Bar for Super-STR. (Deformed)
AN-1A Anchor Box 8.00
JT-5A Isolation Joint 9.00

39 FOUNDATION P.2373.03 LUBE WATER PUMP


Calculation Ref. No : 'SSP-CVL2-FDN-1370-P.2373.03

EA-1A Excavation by Equipment (D≦3.0M) 1.94


EA-1B Excavation by Equipment (D>3.0M)
EA-2A Backfilling (Excavated Soil) 1.04
EA-3B Disposal of Soil (Outside of Factory) 0.89
CO-1A Leveling Concrete 0.11
FM-1A Form for Sub-STR. 5.70
FM-2A Form for Super-STR.
CO-2A Concrete for Sub-STR. 1.69
CO-3A Concrete for Super-STR.
RE-1A Re-Bar for Sub-STR. (Deformed) 0.06
RE-2A Re-Bar for Super-STR. (Deformed)
AN-1A Anchor Box 4.00
JT-5A Isolation Joint 5.30

40 FOUNDATION P.2371.01/02/03 1st/2nd/3rd STRIPPED SLURRY PUMP


Calculation Ref. No : 'SSP-CVL2-FDN-1370-P.2371.01/02/03

EA-1A Excavation by Equipment (D≦3.0M) 6.34


EA-1B Excavation by Equipment (D>3.0M)
EA-2A Backfilling (Excavated Soil) 3.28
EA-3B Disposal of Soil (Outside of Factory) 3.06
CO-1A Leveling Concrete 0.36
FM-1A Form for Sub-STR. 18.06
FM-2A Form for Super-STR.

341 of 476
Progress per Item Calculation As of 25-Oct-17
CIVIL 2
CUMULATIVE QUANTITY
NO. AREA ITEM CODE WORK ITEM
Qty Width Depth Length Quantity
CO-2A Concrete for Sub-STR. 5.81
CO-3A Concrete for Super-STR.
RE-1A Re-Bar for Sub-STR. (Deformed) 0.18
RE-2A Re-Bar for Super-STR. (Deformed)
AN-1A Anchor Box 12.00
JT-5A Isolation Joint 16.80

41 P3- AMH03 AREA COC MAIN HOLE TYPE 2 PLAN, SECTION- A/B
Calculation Ref. No : 'SSP-CVL2-AMH03-P3C0C

EA-1A Excavation by Equipment (D≦3.0M) 52.32


EA-1B Excavation by Equipment (D>3.0M) 2.40
EA-2A Backfilling (Excavated Soil) 42.08
EA-3B Disposal of Soil (Outside of Factory) 12.64
CO-1A Leveling Concrete 0.51
FM-1A Form for Sub-STR. 3.80
FM-2A Form for Super-STR. 37.62
CO-2A Concrete for Sub-STR. 1.00
CO-3A Concrete for Super-STR. 5.20
RE-1A Re-Bar for Sub-STR. (Deformed) 0.13
RE-2A Re-Bar for Super-STR. (Deformed) 0.80
JT-4A Water Stop Plate 8.00
ANA-2 Climbing Rung (Chemical Resistant) 0.02
LN-5E-1 Chemical Resistant Resin Lining (Epoxy) 18.82
PPX-8A Vent Pipe for Manhole 1.00
JT-5A Isolation Joint
JTA-6 Sikaswell for joining RCP and Manhole 3.00

42 FOUNDATION P.1361.01 A/B EC POLYMER SOLUTION PUMP & P.1361.05 HC BLEND RECYCLING PUMP
Calculation Ref. No : 'SSP-CVL2-FDN-1370-P.1361.01A/B & 05

EA-1A Excavation by Equipment (D≦3.0M) 24.35


EA-1B Excavation by Equipment (D>3.0M)
EA-2A Backfilling (Excavated Soil) 8.76
EA-3B Disposal of Soil (Outside of Factory) 15.59
CO-1A Leveling Concrete 1.64
FM-1A Form for Sub-STR. 69.35
FM-2A Form for Super-STR.
CO-2A Concrete for Sub-STR. 37.45
CO-3A Concrete for Super-STR.
RE-1A Re-Bar for Sub-STR. (Deformed) 0.62
RE-2A Re-Bar for Super-STR. (Deformed)
AN-1A Anchor Box 30.00
PLA-6A Grouting (Non shrink)
JT-5A Isolation Joint 40.80

342 of 476
Progress per Item Calculation As of 25-Oct-17
CIVIL 2
CUMULATIVE QUANTITY
NO. AREA ITEM CODE WORK ITEM
Qty Width Depth Length Quantity
43 FOUNDATION P.1361.02 BLEND RECYCLING PUMP
Calculation Ref. No : 'SSP-CVL2-FDN-1370-P.1361.02

EA-1A Excavation by Equipment (D≦3.0M) 4.45


EA-1B Excavation by Equipment (D>3.0M)
EA-2A Backfilling (Excavated Soil) 2.18
EA-3B Disposal of Soil (Outside of Factory) 2.26
CO-1A Leveling Concrete 0.26
FM-1A Form for Sub-STR. 12.05
FM-2A Form for Super-STR.
CO-2A Concrete for Sub-STR. 4.31
CO-3A Concrete for Super-STR.
RE-1A Re-Bar for Sub-STR. (Deformed) 0.14
RE-2A Re-Bar for Super-STR. (Deformed)
AN-1A Anchor Box 8.00
PLA-6A Grouting (Non shrink)
JT-5A Isolation Joint 11.20

44 FOUNDATION P.1361.06 POLYMER SOLUTION PUMP


Calculation Ref. No : 'SSP-CVL2-FDN-1370-P.1361.06

EA-1A Excavation by Equipment (D≦3.0M) 3.55


EA-1B Excavation by Equipment (D>3.0M)
EA-2A Backfilling (Excavated Soil) 1.57
EA-3B Disposal of Soil (Outside of Factory) 1.98
CO-1A Leveling Concrete 0.22
FM-1A Form for Sub-STR. 12.77
FM-2A Form for Super-STR.
CO-2A Concrete for Sub-STR. 5.23
CO-3A Concrete for Super-STR.
RE-1A Re-Bar for Sub-STR. (Deformed) 0.11
RE-2A Re-Bar for Super-STR. (Deformed)
AN-1A Anchor Box 6.00
PLA-6A Grouting (Non shrink)
JT-5A Isolation Joint 8.60

45 FOUNDATION P.2361.01 POLYMER SOLUTION PUMP


Calculation Ref. No : 'SSP-CVL2-FDN-1370-P.1374.01

EA-1A Excavation by Equipment (D≦3.0M) 8.15


EA-1B Excavation by Equipment (D>3.0M)
EA-2A Backfilling (Excavated Soil) 2.94
EA-3B Disposal of Soil (Outside of Factory) 5.22
CO-1A Leveling Concrete 0.55
FM-1A Form for Sub-STR. 15.44
FM-2A Form for Super-STR.
CO-2A Concrete for Sub-STR. 12.28
CO-3A Concrete for Super-STR.

343 of 476
Progress per Item Calculation As of 25-Oct-17
CIVIL 2
CUMULATIVE QUANTITY
NO. AREA ITEM CODE WORK ITEM
Qty Width Depth Length Quantity
RE-1A Re-Bar for Sub-STR. (Deformed) 0.24
RE-2A Re-Bar for Super-STR. (Deformed)
AN-1A Anchor Box 10.00
PLA-6A Grouting (Non shrink)
JT-5A Isolation Joint 13.60

46 FOUNDATION P.2361.02 HS BLEND RECYCLING PUMP


Calculation Ref. No : 'SSP-CVL2-FDN-1370-P.1374.02/03

EA-1A Excavation by Equipment (D≦3.0M) 4.45


EA-1B Excavation by Equipment (D>3.0M)
EA-2A Backfilling (Excavated Soil) 2.18
EA-3B Disposal of Soil (Outside of Factory) 2.26
CO-1A Leveling Concrete 0.26
FM-1A Form for Sub-STR. 12.04
FM-2A Form for Super-STR.
CO-2A Concrete for Sub-STR. 4.31
CO-3A Concrete for Super-STR.
RE-1A Re-Bar for Sub-STR. (Deformed) 0.15
RE-2A Re-Bar for Super-STR. (Deformed)
AN-1A Anchor Box 10.00
PLA-6A Grouting (Non shrink)
JT-5A Isolation Joint 11.20

47 FOUNDATION P.2361.05 HC BLENDING RECYCLING PUMP


Calculation Ref. No : 'SSP-CVL2-FDN-1370-P.1374.04

EA-1A Excavation by Equipment (D≦3.0M) 8.15


EA-1B Excavation by Equipment (D>3.0M)
EA-2A Backfilling (Excavated Soil) 2.94
EA-3B Disposal of Soil (Outside of Factory) 5.22
CO-1A Leveling Concrete 0.55
FM-1A Form for Sub-STR. 15.44
FM-2A Form for Super-STR.
CO-2A Concrete for Sub-STR. 12.28
CO-3A Concrete for Super-STR.
RE-1A Re-Bar for Sub-STR. (Deformed) 0.27
RE-2A Re-Bar for Super-STR. (Deformed)
AN-1A Anchor Box 10.00
PLA-6A Grouting (Non shrink)
JT-5A Isolation Joint 28.75

48 FOUNDATION P.2361.06 POLYMER SOLUTION PUMP


Calculation Ref. No : 'SSP-CVL2-FDN-2360-P.2361.01

EA-1A Excavation by Equipment (D≦3.0M) 3.55


EA-1B Excavation by Equipment (D>3.0M)
EA-2A Backfilling (Excavated Soil) 1.57

344 of 476
Progress per Item Calculation As of 25-Oct-17
CIVIL 2
CUMULATIVE QUANTITY
NO. AREA ITEM CODE WORK ITEM
Qty Width Depth Length Quantity
EA-3B Disposal of Soil (Outside of Factory) 1.98
CO-1A Leveling Concrete 0.22
FM-1A Form for Sub-STR. 13.03
FM-2A Form for Super-STR.
CO-2A Concrete for Sub-STR. 5.33
CO-3A Concrete for Super-STR.
RE-1A Re-Bar for Sub-STR. (Deformed) 0.14
RE-2A Re-Bar for Super-STR. (Deformed)
AN-1A Anchor Box 6.00
PLA-6A Grouting (Non shrink)
JT-5A Isolation Joint 8.60

49 FOUNDATION S.2361.01 POLYMER SOLUTION FILTER


Calculation Ref. No : 'SSP-CVL2-FDN-2360-P.2361.02

EA-1A Excavation by Equipment (D≦3.0M) 1.24


EA-1B Excavation by Equipment (D>3.0M)
EA-2A Backfilling (Excavated Soil) 0.77
EA-3B Disposal of Soil (Outside of Factory) 0.47
CO-1A Leveling Concrete 0.06
FM-1A Form for Sub-STR. 3.85
FM-2A Form for Super-STR.
CO-2A Concrete for Sub-STR. 0.87
CO-3A Concrete for Super-STR.
RE-1A Re-Bar for Sub-STR. (Deformed) 0.06
RE-2A Re-Bar for Super-STR. (Deformed)
AN-2B Anchor Bolt W/O Template Setting 0.004
PLA-6A Grouting (Non shrink)
JT-5A Isolation Joint 3.60

50 FOUNDATION S.1361.01 POLYMER SOLUTION FILTER


Calculation Ref. No : 'SSP-CVL2-FDN-2360-P.2361.05

EA-1A Excavation by Equipment (D≦3.0M) 1.41


EA-1B Excavation by Equipment (D>3.0M)
EA-2A Backfilling (Excavated Soil) 0.84
EA-3B Disposal of Soil (Outside of Factory) 0.57
CO-1A Leveling Concrete 0.07
FM-1A Form for Sub-STR. 4.28
FM-2A Form for Super-STR.
CO-2A Concrete for Sub-STR. 1.07
CO-3A Concrete for Super-STR.
RE-1A Re-Bar for Sub-STR. (Deformed) 0.08
RE-2A Re-Bar for Super-STR. (Deformed)
AN-2B Anchor Bolt W/O Template Setting 0.004
PLA-6A Grouting (Non shrink)
JT-5A Isolation Joint 4.00

345 of 476
Progress per Item Calculation As of 25-Oct-17
CIVIL 2
CUMULATIVE QUANTITY
NO. AREA ITEM CODE WORK ITEM
Qty Width Depth Length Quantity
51 FOUNDATION P.1374.01 CRUMBS SLURRY RECIRCULATING PUMP
Calculation Ref. No : 'SSP-CVL2-FDN-2360-P.2361.06

EA-1A Excavation by Equipment (D≦3.0M) 2.97


EA-1B Excavation by Equipment (D>3.0M)
EA-2A Backfilling (Excavated Soil) 1.35
EA-3B Disposal of Soil (Outside of Factory) 1.62
CO-1A Leveling Concrete 0.18
FM-1A Form for Sub-STR. 6.30
FM-2A Form for Super-STR.
CO-2A Concrete for Sub-STR. 2.52
CO-3A Concrete for Super-STR.
RE-1A Re-Bar for Sub-STR. (Deformed) 0.07
RE-2A Re-Bar for Super-STR. (Deformed)
AN-1A Anchor Box 4.00
PLA-6A Grouting (Non shrink)
JT-5A Isolation Joint 7.20

52 FOUNDATION P.1374.02/03 CRUMBS SLURRY TRANSFER PUMP


Calculation Ref. No : 'SSP-CVL2-FDN-2360-S.2361.06

EA-1A Excavation by Equipment (D≦3.0M) 6.69


EA-1B Excavation by Equipment (D>3.0M)
EA-2A Backfilling (Excavated Soil) 2.89
EA-3B Disposal of Soil (Outside of Factory) 3.80
CO-1A Leveling Concrete 0.42
FM-1A Form for Sub-STR. 13.65
FM-2A Form for Super-STR.
CO-2A Concrete for Sub-STR. 5.92
CO-3A Concrete for Super-STR.
RE-1A Re-Bar for Sub-STR. (Deformed) 0.16
RE-2A Re-Bar for Super-STR. (Deformed)
AN-1A Anchor Box 8.00
PLA-6A Grouting (Non shrink)
JT-5A Isolation Joint 15.60

53 FOUNDATION P.1374.04 CRUMBS SLURRY TRANSFER PUMP


Calculation Ref. No : 'SSP-CVL2-FDN-1360-S.1361.01

EA-1A Excavation by Equipment (D≦3.0M) 2.34


EA-1B Excavation by Equipment (D>3.0M)
EA-2A Backfilling (Excavated Soil) 1.16
EA-3B Disposal of Soil (Outside of Factory) 1.18
CO-1A Leveling Concrete 0.14
FM-1A Form for Sub-STR. 5.46
FM-2A Form for Super-STR.
CO-2A Concrete for Sub-STR. 1.90
CO-3A Concrete for Super-STR.
RE-1A Re-Bar for Sub-STR. (Deformed) 0.06

346 of 476
Progress per Item Calculation As of 25-Oct-17
CIVIL 2
CUMULATIVE QUANTITY
NO. AREA ITEM CODE WORK ITEM
Qty Width Depth Length Quantity
RE-2A Re-Bar for Super-STR. (Deformed)
AN-1A Anchor Box 4.00
PLA-6A Grouting (Non shrink)
JT-5A Isolation Joint 6.00

54 STR P3-4 1370 FOUNDATION


Calculation Ref. No : 'SSP-CVL2-FDN-1370- P3-4

EA-1A Excavation by Equipment (D≦3.0M) 146.94


EA-1B Excavation by Equipment (D>3.0M)
EA-2A Backfilling (Excavated Soil) 116.20
EA-3B Disposal of Soil (Outside of Factory) 30.74
CO-1A Leveling Concrete 3.84
FM-1A Form for Sub-STR. 67.43
FM-2A Form for Super-STR.
CO-2A Concrete for Sub-STR. 32.41
CO-3A Concrete for Super-STR.
RE-1A Re-Bar for Sub-STR. (Deformed) 3.13
RE-2A Re-Bar for Super-STR. (Deformed)
AN-2B Anchor Bolt W/O Template Setting 0.05
PLA-6A Grouting (Non shrink)
JT-5A Isolation Joint 21.60

55 FOUNDATION P.2374.02 CRUMBS SLURRY RECIRCULATING PUMP


Calculation Ref. No : SSP-CVL2-FDN-2370 - P.2374.02

EA-1A Excavation by Equipment (D≦3.0M) 3.34


EA-1B Excavation by Equipment (D>3.0M)
EA-2A Backfilling (Excavated Soil) 1.44
EA-3B Disposal of Soil (Outside of Factory) 1.90
CO-1A Leveling Concrete 0.21
FM-1A Form for Sub-STR. 6.79
FM-2A Form for Super-STR.
CO-2A Concrete for Sub-STR. 2.94
CO-3A Concrete for Super-STR.
RE-1A Re-Bar for Sub-STR. (Deformed) 0.09
RE-2A Re-Bar for Super-STR. (Deformed)
AN-1A Anchor Box 4.00
PLA-6A Grouting (Non shrink)
JT-5A Isolation Joint 7.80

56 FOUNDATION P.2374.04 CRUMBS SLURRY RECIRCULATING PUMP


Calculation Ref. No : SSP-CVL2-FDN-2370 - P.2374.04

EA-1A Excavation by Equipment (D≦3.0M) 2.34


EA-1B Excavation by Equipment (D>3.0M)
EA-2A Backfilling (Excavated Soil) 1.16
EA-3B Disposal of Soil (Outside of Factory) 1.18

347 of 476
Progress per Item Calculation As of 25-Oct-17
CIVIL 2
CUMULATIVE QUANTITY
NO. AREA ITEM CODE WORK ITEM
Qty Width Depth Length Quantity
CO-1A Leveling Concrete 0.14
FM-1A Form for Sub-STR. 5.22
FM-2A Form for Super-STR.
CO-2A Concrete for Sub-STR. 1.82
CO-3A Concrete for Super-STR.
RE-1A Re-Bar for Sub-STR. (Deformed) 0.07
RE-2A Re-Bar for Super-STR. (Deformed)
AN-1A Anchor Box 4.00
PLA-6A Grouting (Non shrink)
JT-5A Isolation Joint 6.00

57 FOUNDATION P.6306.01 TAMOL UNLOADING PUMP


Calculation Ref. No : SSP-CVL2-FDN-1370 - P.6306.01

EA-1A Excavation by Equipment (D≦3.0M) 0.86


EA-1B Excavation by Equipment (D>3.0M)
EA-2A Backfilling (Excavated Soil) 0.61
EA-3B Disposal of Soil (Outside of Factory) 0.25
CO-1A Leveling Concrete 0.04
FM-1A Form for Sub-STR. 3.07
FM-2A Form for Super-STR.
CO-2A Concrete for Sub-STR. 0.50
CO-3A Concrete for Super-STR.
RE-1A Re-Bar for Sub-STR. (Deformed) 0.03
RE-2A Re-Bar for Super-STR. (Deformed)
AN-1A Anchor Box 4.00
PLA-6A Grouting (Non shrink)
JT-5A Isolation Joint 2.60

58 FOUNDATION P.6306.02 A/B TAMOL TRANSFER PUMP


Calculation Ref. No : SSP-CVL2-FDN-1370 - P.6306.02 A/B

EA-1A Excavation by Equipment (D≦3.0M) 1.72


EA-1B Excavation by Equipment (D>3.0M)
EA-2A Backfilling (Excavated Soil) 1.22
EA-3B Disposal of Soil (Outside of Factory) 0.49
CO-1A Leveling Concrete 0.07
FM-1A Form for Sub-STR. 5.98
FM-2A Form for Super-STR.
CO-2A Concrete for Sub-STR. 0.97
CO-3A Concrete for Super-STR.
RE-1A Re-Bar for Sub-STR. (Deformed) 0.06
RE-2A Re-Bar for Super-STR. (Deformed)
AN-1A Anchor Box 8.00
PLA-6A Grouting (Non shrink)
JT-5A Isolation Joint 5.20

59 FOUNDATION P.6307.01 SODA UNLOADING PUMP

348 of 476
Progress per Item Calculation As of 25-Oct-17
CIVIL 2
CUMULATIVE QUANTITY
NO. AREA ITEM CODE WORK ITEM
Qty Width Depth Length Quantity
Calculation Ref. No : SSP-CVL2-FDN-1370 - P.6307.01

EA-1A Excavation by Equipment (D≦3.0M) 0.86


EA-1B Excavation by Equipment (D>3.0M)
EA-2A Backfilling (Excavated Soil) 0.61
EA-3B Disposal of Soil (Outside of Factory) 0.25
CO-1A Leveling Concrete 0.04
FM-1A Form for Sub-STR. 3.07
FM-2A Form for Super-STR.
CO-2A Concrete for Sub-STR. 0.50
CO-3A Concrete for Super-STR.
RE-1A Re-Bar for Sub-STR. (Deformed) 0.03
RE-2A Re-Bar for Super-STR. (Deformed)
AN-1A Anchor Box 4.00
PLA-6A Grouting (Non shrink)
JT-5A Isolation Joint 2.60

60 FOUNDATION P.6307.02 A/B SODA TRANSFER PUMP


Calculation Ref. No : SSP-CVL2-FDN-1370 - P.6307.02 A/B

EA-1A Excavation by Equipment (D≦3.0M) 1.72


EA-1B Excavation by Equipment (D>3.0M)
EA-2A Backfilling (Excavated Soil) 1.22
EA-3B Disposal of Soil (Outside of Factory) 0.49
CO-1A Leveling Concrete 0.07
FM-1A Form for Sub-STR. 5.85
FM-2A Form for Super-STR.
CO-2A Concrete for Sub-STR. 0.95
CO-3A Concrete for Super-STR.
RE-1A Re-Bar for Sub-STR. (Deformed) 0.05
RE-2A Re-Bar for Super-STR. (Deformed)
AN-1A Anchor Box 8.00
PLA-6A Grouting (Non shrink)
JT-5A Isolation Joint 5.20

61 FOUNDATION P.6308.01 CaCl2 TRANSFER PUMP


Calculation Ref. No : SSP-CVL2-FDN-1370 - P.6308.01

EA-1A Excavation by Equipment (D≦3.0M) 0.86


EA-1B Excavation by Equipment (D>3.0M)
EA-2A Backfilling (Excavated Soil) 0.61
EA-3B Disposal of Soil (Outside of Factory) 0.25
CO-1A Leveling Concrete 0.04
FM-1A Form for Sub-STR. 3.12
FM-2A Form for Super-STR.
CO-2A Concrete for Sub-STR. 0.51
CO-3A Concrete for Super-STR.
RE-1A Re-Bar for Sub-STR. (Deformed) 0.03
RE-2A Re-Bar for Super-STR. (Deformed)

349 of 476
Progress per Item Calculation As of 25-Oct-17
CIVIL 2
CUMULATIVE QUANTITY
NO. AREA ITEM CODE WORK ITEM
Qty Width Depth Length Quantity
AN-1A Anchor Box 4.00
PLA-6A Grouting (Non shrink)
JT-5A Isolation Joint 2.60

62 FOUNDATION P.6308.02 A/B CaCl2 TRANSFER PUMP


Calculation Ref. No : SSP-CVL2-FDN-1370 - P.6308.02 A/B

EA-1A Excavation by Equipment (D≦3.0M) 1.72


EA-1B Excavation by Equipment (D>3.0M)
EA-2A Backfilling (Excavated Soil) 1.22
EA-3B Disposal of Soil (Outside of Factory) 0.49
CO-1A Leveling Concrete 0.07
FM-1A Form for Sub-STR. 5.98
FM-2A Form for Super-STR.
CO-2A Concrete for Sub-STR. 0.97
CO-3A Concrete for Super-STR.
RE-1A Re-Bar for Sub-STR. (Deformed) 0.06
RE-2A Re-Bar for Super-STR. (Deformed)
AN-1A Anchor Box 8.00
PLA-6A Grouting (Non shrink)
JT-5A Isolation Joint 5.20

63 STR P3-10 FOUNDATION


Calculation Ref. No : SSP-CVL2-FDN-1370 P3-10

EA-1A Excavation by Equipment (D≦3.0M) 78.94


EA-1B Excavation by Equipment (D>3.0M)
EA-2A Backfilling (Excavated Soil) 60.74
EA-3B Disposal of Soil (Outside of Factory) 18.20
CO-1A Leveling Concrete 1.85
FM-1A Form for Sub-STR. 49.12
FM-2A Form for Super-STR.
CO-2A Concrete for Sub-STR. 19.14
CO-3A Concrete for Super-STR.
RE-1A Re-Bar for Sub-STR. (Deformed) 1.44
RE-2A Re-Bar for Super-STR. (Deformed)
AN-2B Anchor Bolt W/O Template Setting 0.03
PLA-6A Grouting (Non shrink)
JT-5A Isolation Joint 16.00

64 P3- AOC JUNCTION BOX 01/02


Calculation Ref. No : SSP-CVL2-AOC-P3-A0C-JB 01/02

EA-1A Excavation by Equipment (D≦3.0M) 33.71


EA-1B Excavation by Equipment (D>3.0M)
EA-2A Backfilling (Excavated Soil) 31.31
EA-3B Disposal of Soil (Outside of Factory) 2.40
CO-1A Leveling Concrete 0.10

350 of 476
Progress per Item Calculation As of 25-Oct-17
CIVIL 2
CUMULATIVE QUANTITY
NO. AREA ITEM CODE WORK ITEM
Qty Width Depth Length Quantity
FM-1A Form for Sub-STR. 18.62
FM-2A Form for Super-STR.
CO-2A Concrete for Sub-STR. 1.90
CO-3A Concrete for Super-STR.
RE-1A Re-Bar for Sub-STR. (Deformed) 0.20
RE-2A Re-Bar for Super-STR. (Deformed)
JT-4A Water Stop Plate 3.20
ANA-2 Climbing Rung (Chemical Resistant) 0.02
LN-5E-1 Chemical Resistant Resin Lining (Epoxy) 6.40
ML-5B Grating Cover 0.32
AN-3B-1 Embedded Steel Supply & Setting(Carbon Steel) -
JT-5A Isolation Joint 6.40

65 P3- AMH06 AREA COC MAIN HOLE TYPE 2 PLAN, SECTION- A/B
Calculation Ref. No : 'SSP-CVL2-FDN-AMH03

EA-1A Excavation by Equipment (D≦3.0M) 46.71


EA-1B Excavation by Equipment (D>3.0M) 0.76
EA-2A Backfilling (Excavated Soil) 36.42
EA-3B Disposal of Soil (Outside of Factory) 11.05
CO-1A Leveling Concrete 0.49
FM-1A Form for Sub-STR. 3.70
FM-2A Form for Super-STR. 37.02
CO-2A Concrete for Sub-STR. 0.90
CO-3A Concrete for Super-STR. 4.98
RE-1A Re-Bar for Sub-STR. (Deformed) 0.11
RE-2A Re-Bar for Super-STR. (Deformed) 0.86
JT-4A Water Stop Plate 7.60
ANA-2 Climbing Rung (Chemical Resistant) 0.02
LN-5E-1 Chemical Resistant Resin Lining (Epoxy) 17.63
PPX-8A Vent Pipe for Manhole 1.00
JT-5A Isolation Joint 7.60
JTA-6 Sikaswell for joining RCP and Manhole 2.00

66 STR P3-9 FOUNDATION SLURRY TANK STRUCTURE FOUNDATION


Calculation Ref. No : SSP-CVL2-FDN-2370 P3-9

EA-1A Excavation by Equipment (D≦3.0M) 73.59


EA-1B Excavation by Equipment (D>3.0M)
EA-2A Backfilling (Excavated Soil) 53.93
EA-3B Disposal of Soil (Outside of Factory) 19.66
CO-1A Leveling Concrete 1.81
FM-1A Form for Sub-STR. 46.86
FM-2A Form for Super-STR.
CO-2A Concrete for Sub-STR. 18.93
CO-3A Concrete for Super-STR.
RE-1A Re-Bar for Sub-STR. (Deformed) 1.31
RE-2A Re-Bar for Super-STR. (Deformed)
AN-2B Anchor Bolt W/O Template Setting 0.04

351 of 476
Progress per Item Calculation As of 25-Oct-17
CIVIL 2
CUMULATIVE QUANTITY
NO. AREA ITEM CODE WORK ITEM
Qty Width Depth Length Quantity
PLA-6A Grouting (Non shrink)
JT-5A Isolation Joint 14.40

67 CONCRETE DIKE FOR 1360 BLENDING AREA


Calculation Ref. No : SSP-CVL2-DIKE WALL-1360 - BLENDING AREA

EA-1A Excavation by Equipment (D≦3.0M) 96.73


EA-1B Excavation by Equipment (D>3.0M)
EA-2A Backfilling (Excavated Soil) 63.84
EA-3B Disposal of Soil (Outside of Factory) 32.89
CO-1A Leveling Concrete 5.32
FM-1A Form for Sub-STR. 319.45
FM-2A Form for Super-STR.
CO-2A Concrete for Sub-STR. 51.62
CO-3A Concrete for Super-STR.
RE-1A Re-Bar for Sub-STR. (Deformed) 6.97
RE-2A Re-Bar for Super-STR. (Deformed)
AN-3B-1 Embedded Steel Supply & Setting(Carbon Steel) 0.12
PLA-6A Grouting (Non shrink)
JT-5A Isolation Joint 158.05

68 CONCRETE DIKE FOR 2360 BLENDING AREA


Calculation Ref. No : SSP-CVL2-DIKE WALL-2360 - BLENDING AREA

EA-1A Excavation by Equipment (D≦3.0M) 110.63


EA-1B Excavation by Equipment (D>3.0M)
EA-2A Backfilling (Excavated Soil) 65.22
EA-3B Disposal of Soil (Outside of Factory) 45.40
CO-1A Leveling Concrete 5.18
FM-1A Form for Sub-STR. 302.32
FM-2A Form for Super-STR.
CO-2A Concrete for Sub-STR. 61.61
CO-3A Concrete for Super-STR.
RE-1A Re-Bar for Sub-STR. (Deformed) 11.87
RE-2A Re-Bar for Super-STR. (Deformed)
AN-3B-1 Embedded Steel Supply & Setting(Carbon Steel) 0.09
JT-5A Isolation Joint 140.50

69 P3- CATCH BASIN 01


Calculation Ref. No : SSP-CVL2-CB-P3CB-01

EA-1A Excavation by Equipment (D≦3.0M) 7.68


EA-1B Excavation by Equipment (D>3.0M)
EA-2A Backfilling (Excavated Soil) 6.61
EA-3B Disposal of Soil (Outside of Factory) 1.07
CO-1A Leveling Concrete 0.07
FM-1A Form for Sub-STR. 4.02
FM-2A Form for Super-STR.

352 of 476
Progress per Item Calculation As of 25-Oct-17
CIVIL 2
CUMULATIVE QUANTITY
NO. AREA ITEM CODE WORK ITEM
Qty Width Depth Length Quantity
CO-2A Concrete for Sub-STR. 0.28
CO-3A Concrete for Super-STR.
RE-1A Re-Bar for Sub-STR. (Deformed) 0.04
RE-2A Re-Bar for Super-STR. (Deformed)
ANA-2 Climbing Rung (Chemical Resistant) 0.001
LN-5E-1 Chemical Resistant Resin Lining (Epoxy) 2.17
ML-5B Grating Cover 0.64
AN-3B-1 Embedded Steel Supply & Setting(Carbon Steel)
JT-5A Isolation Joint
JT-4A Water Stop Plate 4.00

70 P3- CATCH BASIN 02


Calculation Ref. No : SSP-CVL2-CB-P3CB-02

EA-1A Excavation by Equipment (D≦3.0M) 7.20


EA-1B Excavation by Equipment (D>3.0M)
EA-2A Backfilling (Excavated Soil) 6.30
EA-3B Disposal of Soil (Outside of Factory) 0.90
CO-1A Leveling Concrete 0.06
FM-1A Form for Sub-STR. 4.60
FM-2A Form for Super-STR.
CO-2A Concrete for Sub-STR. 0.29
CO-3A Concrete for Super-STR.
RE-1A Re-Bar for Sub-STR. (Deformed) 0.05
RE-2A Re-Bar for Super-STR. (Deformed)
ANA-2 Climbing Rung (Chemical Resistant) 0.003
LN-5E-1 Chemical Resistant Resin Lining (Epoxy) 2.27
ML-5B Grating Cover 0.48
AN-3B-1 Embedded Steel Supply & Setting(Carbon Steel)
JT-5A Isolation Joint
JT-4A Water Stop Plate 5.60

71 P2- CONCRETE ENCASMENT PIPE DN - 200


Calculation Ref. No : SSP-CVL2-AOC-P3-C0C- CEP DN 200

EA-1A Excavation by Equipment (D≦3.0M) 11.16


EA-1B Excavation by Equipment (D>3.0M)
EA-2A Backfilling (Excavated Soil) 9.73
EA-3B Disposal of Soil (Outside of Factory) 1.43
CO-1A Leveling Concrete 0.18
FM-1A Form for Sub-STR. 5.00
FM-2A Form for Super-STR.
CO-2A Concrete for Sub-STR.
CO-3A Concrete for Super-STR.
COA-6A Concrete for Super-STR. (K-350) 1.09
RE-1A Re-Bar for Sub-STR. (Deformed) 0.08
RE-2A Re-Bar for Super-STR. (Deformed)

353 of 476
Progress per Item Calculation As of 25-Oct-17
CIVIL 2
CUMULATIVE QUANTITY
NO. AREA ITEM CODE WORK ITEM
Qty Width Depth Length Quantity
72 P3- CONCRETE ENCASMENT PIPE DN - 250
Calculation Ref. No : SSP-CVL2-AOC-P3-C0C- CEP DN 250

EA-1A Excavation by Equipment (D≦3.0M) 11.16


EA-1B Excavation by Equipment (D>3.0M)
EA-2A Backfilling (Excavated Soil) 9.73
EA-3B Disposal of Soil (Outside of Factory) 1.43
CO-1A Leveling Concrete 0.18
FM-1A Form for Sub-STR. 5.00
FM-2A Form for Super-STR.
CO-2A Concrete for Sub-STR.
CO-3A Concrete for Super-STR.
COA-6A Concrete for Super-STR. (K-350) 1.00
RE-1A Re-Bar for Sub-STR. (Deformed) 0.08
RE-2A Re-Bar for Super-STR. (Deformed)

73 Under Ground Pipe

EA-1A Excavation by Equipment (D≦3.0M) 1,673.97


EA-2A Backfilling (Excavated Soil) 969.98
EA-3B Disposal of Soil (Outside of Factory) 105.51
EA-4B Sand Filling for U/G Pipe 612.06
REA-1 Warning Mesh 197.29
PPX-2B GRE Pipe d=150 53.07
PPX-2C GRE Pipe d=200 133.67
PPX-2D GRE Pipe d=250 101.07
PPX-2E GRE Pipe d=300 1.50

PP-1A Concrete Pipe d=100


PP-1B Concrete Pipe d=200
PPA-1C Concrete Pipe d=300 10.00
PP-1D Concrete Pipe d=400
PP-1E Concrete Pipe d=500 -
PP-1F Concrete Pipe d=600 111.46
PP-1G Concrete Pipe d=700 100.00

LN-5D-1 Chemical Resistant Resin Coating (Epoxy) 431.18


JTA-5 Joint Works for RCP 87.00

PPX-10A CS Pipe DN.100, For Vent Pipe


PPX-1-41 6" 150#RF Extended Operating Gate Valve With Up Right Indicator
PPX-1-42 10" 150#RF Extended Operating Gate Valve With Up Right Indicator
PPX-1-43 4" 150#RF Extended Operating Gate Valve With Up Right Indicator
PPX-2-1 Reducer 4"x6" (GRE)
PPX-2-10 Lateral Tee 6"x4" - Y Branch (GRE)
PPX-2-11 90 Deg Elbow 4" (GRE) 6.00
PPX-2-12 45 deg Elbow 8" (GRE) 13.00
PPX-2-13 Eccentric Reducer 4"x6" (GRE)
PPX-2-14 Lateral Tee 8"x6" Y-Branch (GRE) 7.00
PPX-2-15 Lateral Tee 4"x4" - Y Branch (GRE)

354 of 476
Progress per Item Calculation As of 25-Oct-17
CIVIL 2
CUMULATIVE QUANTITY
NO. AREA ITEM CODE WORK ITEM
Qty Width Depth Length Quantity
PPX-2-16 45 deg Elbow 10" (GRE)
PPX-2-17 Lateral Tee 10"x8" - Y Branch (GRE)
PPX-2-18 Lateral tee 6"x6" - Y Branch (GRE)
PPX-2-2 45 deg Elbow 4" (GRE) 2.00
PPX-2-3 Tee Branch 4"x4"x4" (GRE)
PPX-2-4 45 deg Elbow 6" (GRE) 8.00
PPX-2-5 Tee Branch 6"x6"x6" (GRE)
PPX-2-6 Flange 4" 150#RF, GRE
PPX-2-7 Flange 6" 150#RF, GRE
PPX-2-8 Elbow 45deg ,CSP DN.200
PPX-2-9 Elbow 90deg ,CSP DN.200

355 of 476
Progress per Item Calculation As of 25-Oct-17
CIVIL 2
CUMULATIVE QUANTITY
NO. AREA ITEM CODE WORK ITEM
Qty Width Depth Length Quantity
74 AOC U-DITCH WORK (P3 Area)
Calculation Ref. No. : SSP-CVL2-AOC- P3-AOC SEWER P3 AREA
EA-1A Excavation by Equipment (D≦3.0M) -
EA-1C Excavation for Sewer by Hand 404.42
EAW-4 Backfilling and Compaction by Hand 172.53
EA-3B Disposal of Soil (Outside of Factory) 212.46
FM-1A Form for Sub-STR. 1,358.85
CO-1A Leveling Concrete 22.91
CO-2A Concrete for Sub-STR. 143.06
COA-5A Concrete Cover 150 thk. 0.42
RE-1A Re-Bar for Sub-STR. (Deformed) 14.63
ML-5B Grating Cover 215.86
AN-3B-1 Embedded Steel Supply & Setting(Carbon Steel) 3.13
JT-5A Isolation Joint 953.78

75 ROAD & PAVING WORK (P3 Area)


Calculation Ref. No. : SSP Road & Paving P3 Area
EA-1A Excavation by Equipment (D≦3.0M) 195.70
EA-2A Backfilling (Excavated Soil)
EA-3B Disposal of Soil (Outside of Factory)
BC-3A Base Course for Concrete Road/Paving 794.07
BC-4A Sub-Grade for Concrete Road/Paving
BC-5A Crushed Stone Paving 32.50
FM-1A Form for Sub-STR.
CO-5A Concrete for Road/Paving 719.69
COA-6C Concrete for Road/Paving (K-350) 96.38
RE-1A Re-Bar for Sub-STR. (Deformed) 0.13
RE-3A Welded Wire Fabric 25.19
JT-3A Expansion Joint for Road/Paving 292.19
PL-1B Surface Finish for Road/Paving/Concrete Slab on grade 6,962.17
PC-1A Pre-Cast Curbstone 192.47
LN-5E-1 Chemical Resistant Resin Lining (Epoxy)
EAW-3 Final Grading for Bare Area 3,749.30

76 FOUNDATION PIPE SUPPORT ARROUND BLENDING V. 1361.02, V1361.03


Calculation Ref. No : SSP-CVL2-LF- P3-1360- V,1361.02/03

EA-1A Excavation by Equipment (D≦3.0M) -


EA-1B Excavation by Equipment (D>3.0M) -
EA-2A Backfilling (Excavated Soil) -
EA-3B Disposal of Soil (Outside of Factory)
CO-1A Leveling Concrete -
FM-1A Form for Sub-STR. 8.64
FM-2A Form for Super-STR. -
CO-2A Concrete for Sub-STR. 1.30
CO-3A Concrete for Super-STR. -
RE-1A Re-Bar for Sub-STR. (Deformed) 0.19
RE-2A Re-Bar for Super-STR. (Deformed) -
AN-2B Anchor Bolt W/O Template Setting 0.02

356 of 476
Progress per Item Calculation As of 25-Oct-17
CIVIL 2
CUMULATIVE QUANTITY
NO. AREA ITEM CODE WORK ITEM
Qty Width Depth Length Quantity
AN-3B-1 Embedded Steel Supply & Setting(Carbon Steel) -
AN-4B Chemical Anchor 72.00
JT-5A Isolation Joint 1.44

77 FOUNDATION PIPE SUPPORT ARROUND BLENDING V. 1361.01


Calculation Ref. No : SSP-CVL2-LF- P3-1360- V.1361.01

EA-1A Excavation by Equipment (D≦3.0M) -


EA-1B Excavation by Equipment (D>3.0M) -
EA-2A Backfilling (Excavated Soil) -
EA-3B Disposal of Soil (Outside of Factory)
CO-1A Leveling Concrete -
FM-1A Form for Sub-STR. 2.88
FM-2A Form for Super-STR. -
CO-2A Concrete for Sub-STR. 0.43
CO-3A Concrete for Super-STR. -
RE-1A Re-Bar for Sub-STR. (Deformed) 0.06
RE-2A Re-Bar for Super-STR. (Deformed) -
AN-2B Anchor Bolt W/O Template Setting 0.01
AN-3B-1 Embedded Steel Supply & Setting(Carbon Steel) -
AN-4B Chemical Anchor 24.00
JT-5A Isolation Joint 1.44

78 FOUNDATION PIPE SUPPORT AROUND BLENDING P1361.02,S1361.01,P1361.06,P1361.05,P1361.01A


Calculation Ref. No : SSP-CVL2-LF -1360- P1361.01A/02/05/06,S1361

EA-1A Excavation by Equipment (D≦3.0M) 56.26


EA-1B Excavation by Equipment (D>3.0M) -
EA-2A Backfilling (Excavated Soil) 35.56
EA-3B Disposal of Soil (Outside of Factory) 20.70
CO-1A Leveling Concrete 2.02
FM-1A Form for Sub-STR. 47.59
FM-2A Form for Super-STR. -
CO-2A Concrete for Sub-STR. 29.44
CO-3A Concrete for Super-STR. -
RE-1A Re-Bar for Sub-STR. (Deformed) 2.42
RE-2A Re-Bar for Super-STR. (Deformed) -
AN-2B Anchor Bolt W/O Template Setting 0.01
AN-3B-1 Embedded Steel Supply & Setting(Carbon Steel) 0.63
AN-4B Chemical Anchor -
JT-5A Isolation Joint 19.70

79 FOUNDATION PIPE SUPPORT AROUND BLENDING P1361.01B, V6474.04


Calculation Ref. No : SSP-CVL2-LF- 1360- P1361.01B, V6474.04

EA-1A Excavation by Equipment (D≦3.0M) 30.37


EA-1B Excavation by Equipment (D>3.0M) -
EA-2A Backfilling (Excavated Soil) 17.99

357 of 476
Progress per Item Calculation As of 25-Oct-17
CIVIL 2
CUMULATIVE QUANTITY
NO. AREA ITEM CODE WORK ITEM
Qty Width Depth Length Quantity
EA-3B Disposal of Soil (Outside of Factory) 12.38
CO-1A Leveling Concrete 1.99
FM-1A Form for Sub-STR. 28.41
FM-2A Form for Super-STR. -
CO-2A Concrete for Sub-STR. 11.23
CO-3A Concrete for Super-STR. -
RE-1A Re-Bar for Sub-STR. (Deformed) 0.92
RE-2A Re-Bar for Super-STR. (Deformed) -
AN-2B Anchor Bolt W/O Template Setting 0.01
AN-3B-1 Embedded Steel Supply & Setting(Carbon Steel) 0.20
AN-4B Chemical Anchor -
JT-5A Isolation Joint 16.20

80 FOUNDATION PIPE SUPPORT AROUND BLENDING P2361.05,P2361.02,S2361.01


Calculation Ref. No : SSP-CVL2-LF- 1360 - P2361.05,P2361.02,S2361.01

EA-1A Excavation by Equipment (D≦3.0M) 29.98


EA-1B Excavation by Equipment (D>3.0M) -
EA-2A Backfilling (Excavated Soil) 19.28
EA-3B Disposal of Soil (Outside of Factory) 10.70
CO-1A Leveling Concrete 1.33
FM-1A Form for Sub-STR. 35.63
FM-2A Form for Super-STR. -
CO-2A Concrete for Sub-STR. 18.34
CO-3A Concrete for Super-STR. -
RE-1A Re-Bar for Sub-STR. (Deformed) 1.67
RE-2A Re-Bar for Super-STR. (Deformed) -
AN-2B Anchor Bolt W/O Template Setting 0.01
AN-3B-1 Embedded Steel Supply & Setting(Carbon Steel) 0.41
AN-4B Chemical Anchor -
JT-5A Isolation Joint 14.60

81 FOUNDATION PIPE SUPPORT AROUND BLENDING P2361.01, V6474.05


Calculation Ref. No : SSP-CVL2-LF - 2360- P.2361.01, V6474.05

EA-1A Excavation by Equipment (D≦3.0M) 34.44


EA-1B Excavation by Equipment (D>3.0M) -
EA-2A Backfilling (Excavated Soil) 22.10
EA-3B Disposal of Soil (Outside of Factory) 12.34
CO-1A Leveling Concrete 1.54
FM-1A Form for Sub-STR. 33.31
FM-2A Form for Super-STR. -
CO-2A Concrete for Sub-STR. 13.95
CO-3A Concrete for Super-STR. -
RE-1A Re-Bar for Sub-STR. (Deformed) 1.33
RE-2A Re-Bar for Super-STR. (Deformed) -
AN-2B Anchor Bolt W/O Template Setting 0.03
AN-3B-1 Embedded Steel Supply & Setting(Carbon Steel) 0.13
AN-4B Chemical Anchor -

358 of 476
Progress per Item Calculation As of 25-Oct-17
CIVIL 2
CUMULATIVE QUANTITY
NO. AREA ITEM CODE WORK ITEM
Qty Width Depth Length Quantity
JT-5A Isolation Joint 21.60

82 FOUNDATION PIPE SUPPORT AROUND BLENDING V2361.01


Calculation Ref. No : SSP-CVL2-LF -2360- V.2361.01

EA-1A Excavation by Equipment (D≦3.0M) -


EA-1B Excavation by Equipment (D>3.0M) -
EA-2A Backfilling (Excavated Soil) -
EA-3B Disposal of Soil (Outside of Factory)
CO-1A Leveling Concrete 0.95
FM-1A Form for Sub-STR. 6.30
FM-2A Form for Super-STR. -
CO-2A Concrete for Sub-STR. 2.15
CO-3A Concrete for Super-STR. -
RE-1A Re-Bar for Sub-STR. (Deformed) 0.51
RE-2A Re-Bar for Super-STR. (Deformed) -
AN-2B Anchor Bolt W/O Template Setting 0.02
AN-3B-1 Embedded Steel Supply & Setting(Carbon Steel) -
AN-4B Chemical Anchor -
JT-5A Isolation Joint -

83 FOUNDATION PIPE SUPPORT AROUND BLENDING V2361.02, V2361.03


Calculation Ref. No : SSP-CVL2-LF -2360- V.2361.02/03

EA-1A Excavation by Equipment (D≦3.0M) -


EA-1B Excavation by Equipment (D>3.0M) -
EA-2A Backfilling (Excavated Soil) -
EA-3B Disposal of Soil (Outside of Factory)
CO-1A Leveling Concrete 0.99
FM-1A Form for Sub-STR. 5.04
FM-2A Form for Super-STR. -
CO-2A Concrete for Sub-STR. 1.90
CO-3A Concrete for Super-STR. -
RE-1A Re-Bar for Sub-STR. (Deformed) 0.39
RE-2A Re-Bar for Super-STR. (Deformed) -
AN-2B Anchor Bolt W/O Template Setting 0.02
AN-3B-1 Embedded Steel Supply & Setting(Carbon Steel) -
AN-4B Chemical Anchor -
JT-5A Isolation Joint -

84 FOUNDATION PIPE SUPPORT AROUND 1370-STRIPPING AREA


Calculation Ref. No : SSP-CVL2-LF -1370- STRIPPING AREA

EA-1A Excavation by Equipment (D≦3.0M) 10.13


EA-1B Excavation by Equipment (D>3.0M) -
EA-2A Backfilling (Excavated Soil) 10.13
EA-3B Disposal of Soil (Outside of Factory)
CO-1A Leveling Concrete 0.48

359 of 476
Progress per Item Calculation As of 25-Oct-17
CIVIL 2
CUMULATIVE QUANTITY
NO. AREA ITEM CODE WORK ITEM
Qty Width Depth Length Quantity
FM-1A Form for Sub-STR. 8.45
FM-2A Form for Super-STR. -
CO-2A Concrete for Sub-STR. 2.83
CO-3A Concrete for Super-STR. -
RE-1A Re-Bar for Sub-STR. (Deformed) 0.24
RE-2A Re-Bar for Super-STR. (Deformed) -
AN-2B Anchor Bolt W/O Template Setting 0.01
AN-3B-1 Embedded Steel Supply & Setting(Carbon Steel) -
AN-4B Chemical Anchor -
JT-5A Isolation Joint 6.00

85 FOUNDATION PIPE SUPPORT AROUND STRIPPING P.1373.01 A/B, P 1373.03, V 1373.01


Calculation Ref. No : SSP-CVL2-LF -1370- STRIPPING P.1373.01 A/B, P 1373.03, V 1373.01
SSP-CVL2-LF -1370- STRIPPI
EA-1A Excavation by Equipment (D≦3.0M) -
EA-1B Excavation by Equipment (D>3.0M) -
EA-2A Backfilling (Excavated Soil) -
EA-3B Disposal of Soil (Outside of Factory)
CO-1A Leveling Concrete 0.60
FM-1A Form for Sub-STR. 5.36
FM-2A Form for Super-STR. -
CO-2A Concrete for Sub-STR. 1.16
CO-3A Concrete for Super-STR. -
RE-1A Re-Bar for Sub-STR. (Deformed) 0.26
RE-2A Re-Bar for Super-STR. (Deformed) -
AN-2B Anchor Bolt W/O Template Setting -
AN-3B-1 Embedded Steel Supply & Setting(Carbon Steel) 0.12
AN-4B Chemical Anchor -
JT-5A Isolation Joint -

86 FOUNDATION PIPE SUPPORT AROUND TAMOL


Calculation Ref. No : SSP-CVL2-LF -1370- TAMOL

EA-1A Excavation by Equipment (D≦3.0M) 31.37


EA-1B Excavation by Equipment (D>3.0M) -
EA-2A Backfilling (Excavated Soil) 24.88
EA-3B Disposal of Soil (Outside of Factory) 6.49
CO-1A Leveling Concrete 1.41
FM-1A Form for Sub-STR. 43.66
FM-2A Form for Super-STR. -
CO-2A Concrete for Sub-STR. 9.24
CO-3A Concrete for Super-STR. -
RE-1A Re-Bar for Sub-STR. (Deformed) 0.80
RE-2A Re-Bar for Super-STR. (Deformed) -
AN-2B Anchor Bolt W/O Template Setting 0.01
AN-3B-1 Embedded Steel Supply & Setting(Carbon Steel) 0.19
AN-4B Chemical Anchor -
JT-5A Isolation Joint 39.70

360 of 476
Progress per Item Calculation As of 25-Oct-17
CIVIL 2
CUMULATIVE QUANTITY
NO. AREA ITEM CODE WORK ITEM
Qty Width Depth Length Quantity

87 FOUNDATION PIPE SUPPORT AROUND CRUMBS SLURRY U-3


Calculation Ref. No : SSP-CVL2-LF -1370- CRUMBS SLURRY U-3

EA-1A Excavation by Equipment (D≦3.0M) 23.66


EA-1B Excavation by Equipment (D>3.0M) -
EA-2A Backfilling (Excavated Soil) 14.77
EA-3B Disposal of Soil (Outside of Factory) 8.89
CO-1A Leveling Concrete 1.26
FM-1A Form for Sub-STR. 27.08
FM-2A Form for Super-STR. -
CO-2A Concrete for Sub-STR. 10.76
CO-3A Concrete for Super-STR. -
RE-1A Re-Bar for Sub-STR. (Deformed) 1.19
RE-2A Re-Bar for Super-STR. (Deformed) -
AN-2B Anchor Bolt W/O Template Setting 0.02
AN-3B-1 Embedded Steel Supply & Setting(Carbon Steel) 0.18
AN-4B Chemical Anchor -
JT-5A Isolation Joint 10.80

88 FOUNDATION PIPE SUPPORT AROUND STRIPPING V.1372.01 /02/03


Calculation Ref. No : SSP-CVL2-LF- 1370- STRIPPING V 1372.01/02/03

EA-1A Excavation by Equipment (D≦3.0M) -


EA-1B Excavation by Equipment (D>3.0M) -
EA-2A Backfilling (Excavated Soil) -
EA-3B Disposal of Soil (Outside of Factory)
CO-1A Leveling Concrete -
FM-1A Form for Sub-STR. 14.50
FM-2A Form for Super-STR. -
CO-2A Concrete for Sub-STR. 4.90
CO-3A Concrete for Super-STR. -
RE-1A Re-Bar for Sub-STR. (Deformed) 0.68
RE-2A Re-Bar for Super-STR. (Deformed) -
AN-2B Anchor Bolt W/O Template Setting 0.01
AN-3B-1 Embedded Steel Supply & Setting(Carbon Steel) 0.24
AN-4B Chemical Anchor -
JT-5A Isolation Joint -

89 FOUNDATION PIPE SUPPORT AROUND STRIPPING V.1371.01 /02/03


Calculation Ref. No : SSP-CVL2-LF- 1370- STRIPPING V 1371.01/02/03

EA-1A Excavation by Equipment (D≦3.0M) -


EA-1B Excavation by Equipment (D>3.0M) -
EA-2A Backfilling (Excavated Soil) -
EA-3B Disposal of Soil (Outside of Factory)
CO-1A Leveling Concrete -
FM-1A Form for Sub-STR. 17.14
FM-2A Form for Super-STR. -

361 of 476
Progress per Item Calculation As of 25-Oct-17
CIVIL 2
CUMULATIVE QUANTITY
NO. AREA ITEM CODE WORK ITEM
Qty Width Depth Length Quantity
CO-2A Concrete for Sub-STR. 5.56
CO-3A Concrete for Super-STR. -
RE-1A Re-Bar for Sub-STR. (Deformed) 0.80
RE-2A Re-Bar for Super-STR. (Deformed) -
AN-2B Anchor Bolt W/O Template Setting 0.01
AN-3B-1 Embedded Steel Supply & Setting(Carbon Steel) -
AN-4B Chemical Anchor -
JT-5A Isolation Joint -

90 FOUNDATION PIPE SUPPORT AROUND STIPPING U.32 FIRE WATER LINE


Calculation Ref. No : SSP-CVL2-LF- 2370- STRIPPING U.32 WATER LINE

EA-1A Excavation by Equipment (D≦3.0M) 10.46


EA-1B Excavation by Equipment (D>3.0M) -
EA-2A Backfilling (Excavated Soil) 10.46
EA-3B Disposal of Soil (Outside of Factory)
CO-1A Leveling Concrete 1.13
FM-1A Form for Sub-STR. 22.81
FM-2A Form for Super-STR. -
CO-2A Concrete for Sub-STR. 6.02
CO-3A Concrete for Super-STR. -
RE-1A Re-Bar for Sub-STR. (Deformed) 0.35
RE-2A Re-Bar for Super-STR. (Deformed) -
AN-2B Anchor Bolt W/O Template Setting 0.01
AN-3B-1 Embedded Steel Supply & Setting(Carbon Steel) 0.03
AN-4B Chemical Anchor -
JT-5A Isolation Joint 12.20

91 FOUNDATION PIPE SUPPORT AROUND STRIPPING V.6412.01, V6415.01


Calculation Ref. No : SSP-CVL2-LF -2370- STRIPPING V.6412.01, V6415.01

EA-1A Excavation by Equipment (D≦3.0M) -


EA-1B Excavation by Equipment (D>3.0M) -
EA-2A Backfilling (Excavated Soil) -
EA-3B Disposal of Soil (Outside of Factory)
CO-1A Leveling Concrete 0.47
FM-1A Form for Sub-STR. 4.08
FM-2A Form for Super-STR. -
CO-2A Concrete for Sub-STR. 0.90
CO-3A Concrete for Super-STR. -
RE-1A Re-Bar for Sub-STR. (Deformed) 0.20
RE-2A Re-Bar for Super-STR. (Deformed) -
AN-2B Anchor Bolt W/O Template Setting 0.01
AN-3B-1 Embedded Steel Supply & Setting(Carbon Steel) 0.03
AN-4B Chemical Anchor -
JT-5A Isolation Joint -

92 FOUNDATION PIPE SUPPORT AROUND STRIPPING V.2373.01

362 of 476
Progress per Item Calculation As of 25-Oct-17
CIVIL 2
CUMULATIVE QUANTITY
NO. AREA ITEM CODE WORK ITEM
Qty Width Depth Length Quantity
Calculation Ref. No : SSP-CVL2-LF -2370- STRIPPING V.2373.01

EA-1A Excavation by Equipment (D≦3.0M) 5.07


EA-1B Excavation by Equipment (D>3.0M) -
EA-2A Backfilling (Excavated Soil) 5.07
EA-3B Disposal of Soil (Outside of Factory)
CO-1A Leveling Concrete 0.90
FM-1A Form for Sub-STR. 8.64
FM-2A Form for Super-STR. -
CO-2A Concrete for Sub-STR. 2.61
CO-3A Concrete for Super-STR. -
RE-1A Re-Bar for Sub-STR. (Deformed) 0.36
RE-2A Re-Bar for Super-STR. (Deformed) -
AN-2B Anchor Bolt W/O Template Setting 0.01
AN-3B-1 Embedded Steel Supply & Setting(Carbon Steel) 0.03
AN-4B Chemical Anchor -
JT-5A Isolation Joint 2.00

93 FOUNDATION PIPE SUPPORT AROUND STRIPPING V.2371.01/02/03


Calculation Ref. No : SSP-CVL2-LF- 2370- STRIPPING V.2371.01/02/03

EA-1A Excavation by Equipment (D≦3.0M) -


EA-1B Excavation by Equipment (D>3.0M) -
EA-2A Backfilling (Excavated Soil) -
EA-3B Disposal of Soil (Outside of Factory)
CO-1A Leveling Concrete -
FM-1A Form for Sub-STR. 16.14
FM-2A Form for Super-STR. -
CO-2A Concrete for Sub-STR. 5.43
CO-3A Concrete for Super-STR. -
RE-1A Re-Bar for Sub-STR. (Deformed) 0.47
RE-2A Re-Bar for Super-STR. (Deformed) -
AN-2B Anchor Bolt W/O Template Setting 0.01
AN-3B-1 Embedded Steel Supply & Setting(Carbon Steel) 0.29
AN-4B Chemical Anchor -
JT-5A Isolation Joint -

94 CWS U-DITCH WORK (P3 Area)


Calculation Ref. No. : SSP-CVL2-CWS- P3-CLEAN WATER SEWER P3 AREA
EA-1A Excavation by Equipment (D≦3.0M) -
EA-1C Excavation for Sewer by Hand 149.09
EAW-4 Backfilling and Compaction by Hand 67.60
EA-3B Disposal of Soil (Outside of Factory) 81.49
FM-1A Form for Sub-STR. 411.07
CO-1A Leveling Concrete 9.09
CO-2A Concrete for Sub-STR. 42.34
COA-5A Concrete Cover 150 thk. 5.64
RE-1A Re-Bar for Sub-STR. (Deformed) 4.33
ML-5B Grating Cover 32.87

363 of 476
Progress per Item Calculation As of 25-Oct-17
CIVIL 2
CUMULATIVE QUANTITY
NO. AREA ITEM CODE WORK ITEM
Qty Width Depth Length Quantity
AN-3B-1 Embedded Steel Supply & Setting(Carbon Steel) 0.50
JT-5A Isolation Joint 94.00

95 FOUNDATION CABLE TRAY 2360 BLENDING AREA


Calculation Ref. No : SSP-CVL2-CT- P3-2360 AREA CABLE TRAY

EA-1A Excavation by Equipment (D≦3.0M) 28.22


EA-1B Excavation by Equipment (D>3.0M) -
EA-2A Backfilling (Excavated Soil) 28.22
EA-3B Disposal of Soil (Outside of Factory)
CO-1A Leveling Concrete 0.36
FM-1A Form for Sub-STR. 19.80
FM-2A Form for Super-STR. -
CO-2A Concrete for Sub-STR. 4.13
CO-3A Concrete for Super-STR. -
RE-1A Re-Bar for Sub-STR. (Deformed) 0.39
RE-2A Re-Bar for Super-STR. (Deformed) -
AN-2B Anchor Bolt W/O Template Setting 0.01
AN-3B-1 Embedded Steel Supply & Setting(Carbon Steel) -
AN-4B Chemical Anchor -
JT-5A Isolation Joint

96 FOUNDATION PIPE SUPPORT AROUND CRUMBS SLURRY U-32


Calculation Ref. No : SSP-CVL2-LF -2370- CRUMBS SLURRY U-32

EA-1A Excavation by Equipment (D≦3.0M) -


EA-1B Excavation by Equipment (D>3.0M) -
EA-2A Backfilling (Excavated Soil) -
EA-3B Disposal of Soil (Outside of Factory)
CO-1A Leveling Concrete 0.72
FM-1A Form for Sub-STR. 8.62
FM-2A Form for Super-STR. -
CO-2A Concrete for Sub-STR. 2.38
CO-3A Concrete for Super-STR. -
RE-1A Re-Bar for Sub-STR. (Deformed) 0.30
RE-2A Re-Bar for Super-STR. (Deformed) -
AN-2B Anchor Bolt W/O Template Setting 0.02
AN-3B-1 Embedded Steel Supply & Setting(Carbon Steel) 0.16
AN-4B Chemical Anchor -
JT-5A Isolation Joint -

97 P3- CATCH BASIN 01 (COC)


Calculation Ref. No : SSP-CVL2-CB-P3CB-01COC

EA-1A Excavation by Equipment (D≦3.0M) 10.83


EA-1B Excavation by Equipment (D>3.0M)
EA-2A Backfilling (Excavated Soil) 8.94
EA-3B Disposal of Soil (Outside of Factory) 1.89

364 of 476
Progress per Item Calculation As of 25-Oct-17
CIVIL 2
CUMULATIVE QUANTITY
NO. AREA ITEM CODE WORK ITEM
Qty Width Depth Length Quantity
CO-1A Leveling Concrete 0.11
FM-1A Form for Sub-STR. 14.14
FM-2A Form for Super-STR.
CO-2A Concrete for Sub-STR. 1.25
CO-3A Concrete for Super-STR.
RE-1A Re-Bar for Sub-STR. (Deformed) 0.13
RE-2A Re-Bar for Super-STR. (Deformed)
ANA-2 Climbing Rung (Chemical Resistant) 0.007
LN-5E-1 Chemical Resistant Resin Lining (Epoxy) 6.73
ML-5B Grating Cover 1.00
AN-3B-1 Embedded Steel Supply & Setting(Carbon Steel)
JT-5A Isolation Joint
JT-4A Water Stop Plate 5.20

98 LIGHTING POLE FOUNDATION P3 AREA


Calculation Ref. No : SSP-CVL2-LPF- P3- LIGHTING POLE FOUNDATION

EA-1A Excavation by Equipment (D≦3.0M) 7.37


EA-1B Excavation by Equipment (D>3.0M)
EA-2A Backfilling (Excavated Soil) 4.66
EA-3B Disposal of Soil (Outside of Factory) 2.71
CO-1A Leveling Concrete 0.19
FM-1A Form for Sub-STR. 14.82
FM-2A Form for Super-STR.
CO-2A Concrete for Sub-STR. 3.28
CO-3A Concrete for Super-STR.
RE-1A Re-Bar for Sub-STR. (Deformed) 0.17
RE-2A Re-Bar for Super-STR. (Deformed)
ANA-2 Climbing Rung (Chemical Resistant) -
LN-5E-1 Chemical Resistant Resin Lining (Epoxy) -
ML-5B Grating Cover -
AN-3B-1 Embedded Steel Supply & Setting(Carbon Steel)
JT-5A Isolation Joint

99 HOSE BOX FOUNDATION P3 AREA


Calculation Ref. No : SSP-CVL2-HB- P3-HOSE BOX FOUNDATION P3 AREA

EA-1A Excavation by Equipment (D≦3.0M) 16.74


EA-1B Excavation by Equipment (D>3.0M)
EA-2A Backfilling (Excavated Soil) 14.01
EA-3B Disposal of Soil (Outside of Factory) 2.73
CO-1A Leveling Concrete 0.57
FM-1A Form for Sub-STR. 22.32
FM-2A Form for Super-STR.
CO-2A Concrete for Sub-STR. 4.32
CO-3A Concrete for Super-STR.
RE-1A Re-Bar for Sub-STR. (Deformed) 0.38
RE-2A Re-Bar for Super-STR. (Deformed)
ML-5B Grating Cover -

365 of 476
Progress per Item Calculation As of 25-Oct-17
CIVIL 2
CUMULATIVE QUANTITY
NO. AREA ITEM CODE WORK ITEM
Qty Width Depth Length Quantity
AN-3B-1 Embedded Steel Supply & Setting(Carbon Steel)
JT-5A Isolation Joint 37.20

366 of 476
Progress per Item Calculation As of 25-Oct-17
CIVIL 2
CUMULATIVE QUANTITY
NO. AREA ITEM CODE WORK ITEM
Qty Width Depth Length Quantity
100 GUARD POST P3 AREA
Calculation Ref. No : SSP-CVL2-GP- P3-GUARD POST P3 AREA

EA-1A Excavation by Equipment (D≦3.0M) 8.51


EA-1B Excavation by Equipment (D>3.0M)
EA-2A Backfilling (Excavated Soil) 8.51
EA-3B Disposal of Soil (Outside of Factory)
CO-1A Leveling Concrete 0.18
FM-1A Form for Sub-STR. 10.32
FM-2A Form for Super-STR.
CO-2A Concrete for Sub-STR. 0.77
CO-3A Concrete for Super-STR.
RE-1A Re-Bar for Sub-STR. (Deformed)
RE-2A Re-Bar for Super-STR. (Deformed)
AN-4A Expansion Anchor (Hole-in Anchor) 8.00
MLA-1 Guard Post 16.00
JT-5A Isolation Joint 2.40

101 FOUNDATION V6474.04 BLADDER TANK


Calculation Ref. No : SSP-CVL2-FDN-1360 - V6474.04

EA-1A Excavation by Equipment (D≦3.0M) 1.78


EA-1B Excavation by Equipment (D>3.0M)
EA-2A Backfilling (Excavated Soil) 0.96
EA-3B Disposal of Soil (Outside of Factory) 0.82
CO-1A Leveling Concrete 0.10
FM-1A Form for Sub-STR. 5.14
FM-2A Form for Super-STR.
CO-2A Concrete for Sub-STR. 1.54
CO-3A Concrete for Super-STR.
RE-1A Re-Bar for Sub-STR. (Deformed) 0.06
RE-2A Re-Bar for Super-STR. (Deformed)
ML-5B Grating Cover -
AN-1A Anchor Box 4.00
JT-5A Isolation Joint 4.80

102 FOUNDATION V6474.05 BLADDER TANK


Calculation Ref. No : SSP-CVL2-FDN-2360 - V6474.05

EA-1A Excavation by Equipment (D≦3.0M) 2.19


EA-1B Excavation by Equipment (D>3.0M)
EA-2A Backfilling (Excavated Soil) 1.09
EA-3B Disposal of Soil (Outside of Factory) 1.10
CO-1A Leveling Concrete 0.13
FM-1A Form for Sub-STR. 5.99
FM-2A Form for Super-STR.
CO-2A Concrete for Sub-STR. 2.07
CO-3A Concrete for Super-STR.
RE-1A Re-Bar for Sub-STR. (Deformed) 0.06

367 of 476
Progress per Item Calculation As of 25-Oct-17
CIVIL 2
CUMULATIVE QUANTITY
NO. AREA ITEM CODE WORK ITEM
Qty Width Depth Length Quantity
RE-2A Re-Bar for Super-STR. (Deformed)
ML-5B Grating Cover -
AN-1A Anchor Box 4.00
JT-5A Isolation Joint 5.60

368 of 476
QTY PLAN

100% 258.94
100% 168.95
100% 89.99
100% 6.30
100% 201.88
100% 76.49
100% 10.57
100% 39.20

100% 454.18
100% 301.33
100% 152.85
100% 11.34
100% 303.00
100% 131.22
100% 17.96
100% 56.00

100% 97.02
100% 4.85
100% 62.29
100% 39.58
100% 0.71
100% 92.72
100% 13.75
100% 4.59
83% 16.55
100% 0.63
100% 3.44
100% 14.40
100% 0.08
100% 0.04
100% 56.05
-

100% 83.22
100% 1.39
100% 55.44
100% 29.17

369 of 476
QTY PLAN
100% 0.55
100% 79.92
100% 9.83
100% 3.82
100% 13.69
100% 0.48
100% 2.97
100% 12.80
100% 0.07
100% 0.04
100% 44.65
-

100% 83.86
100% 13.95
100% 69.91
100% 79.54
100% 2.45
100% 12.10
100% 105.43
100% 23.28
100% 26.36
100% 1.30
100% 2.85
100% 1.66
100% 0.12
100% 23.56

100% 83.86
100% 13.95

370 of 476
QTY PLAN
100% 69.91
100% 79.54
100% 2.45
100% 12.10
100% 105.43
100% 23.28
100% 26.36
100% 1.30
100% 2.85
100% 1.66
100% 0.12
100% 7.50

100% 83.86
100% 13.95
100% 69.91
100% 78.96
100% 2.45
100% 12.10
100% 105.43
100% 23.28
100% 26.36
100% 1.30
100% 2.85
100% 1.66
100% 0.12
100% 23.56

100% 696.95
-
100% 512.87
100% 184.08
100% 17.40
100% 363.41
-
100% 175.35
-
100% 23.41
-
100% 0.41
100% 88.00

371 of 476
QTY PLAN

100% 176.47
-
100% 109.39
100% 67.08
-
100% 4.68
100% 132.31
-
100% 68.21
-
100% 8.12
-
100% 0.29
100% 63.20

100% 176.47
-
100% 109.39
100% 67.08
63.20
100% 4.68
100% 132.31
-
100% 68.21
-
100% 8.19
-
100% 0.29
100% 63.20

372 of 476
QTY PLAN

100% 666.61
-
100% 250.22
100% 416.39
100% 18.13
100% 99.22
100% 783.89
100% 388.85
100% 92.51
100% 147.33
100% 46.42
100% 59.00
100% 2.97
100% 44.80

100% 397.05
-
100% 295.37
100% 101.68
100% 9.62
100% 193.46
-
100% 96.43
-
100% 12.90
-
100% 0.23
100% 50.80

100% 176.47
-
100% 109.61
100% 66.86
100% 4.68
100% 131.13
-
100% 67.86
-
100% 8.19
-

373 of 476
QTY PLAN
100% 0.29
100% 62.40

100% 30.69
-
100% 21.87
100% 8.82
100% 0.82
100% 9.48
100% 44.30
100% 8.82
100% 8.14
100% 0.60
100% 1.12
100% 8.00
100% 9.80

100% 560.46
-
100% 409.48
100% 150.98
100% 13.89
100% 141.91
-
100% 139.88
-
100% 18.58
-
100% 0.17
100% 38.32

100% 31.15
-
100% 22.63
100% 8.52
100% 0.86
100% 9.02
100% 36.99
100% 8.52

374 of 476
QTY PLAN
100% 7.22
100% 1.88
100% 1.00
100% 8.00
100% 13.60

100% 20.96
-
100% 15.57
100% 5.39
100% 0.56
100% 6.99
100% 30.49
100% 5.39
100% 6.41
100% 0.82
100% 0.52
100% 8.00
100% 12.60

100% 609.47
-
100% 320.06
100% 289.42
100% 18.13
100% 72.16
100% 672.34
100% 282.80
100% 52.13
100% 121.53
100% 30.43
100% 49.96
100% 2.36
100% 33.60

100% 451.08
-
100% 307.36
100% 143.72

375 of 476
QTY PLAN
100% 13.22
100% 117.31
-
100% 133.18
-
100% 11.01
-
100% 0.16
100% 34.40

100% 14.31
-
100% 10.23
100% 4.08
100% 0.41
100% 22.30
-
100% 3.30
-
100% 0.64
-
100% 16.01
100% 0.01
100% 8.94
100% 1.00

100% 8.82
-
100% 14.80
100% 5.98
100% 7.93
100% 22.23
-
100% 21.17
-
100% 0.39
-
100% 8.00
100% 12.56

376 of 476
QTY PLAN

100% 8.82
-
100% 14.80
100% 5.98
100% 7.93
100% 22.23
-
100% 21.17
-
100% 0.39
-
100% 8.00
100% 12.56

100% 8.82
-
100% 14.80
100% 5.98
100% 7.93
100% 22.23
-
100% 21.17
-
100% 0.39
-
100% 8.00
100% 12.56

100% 14.31
-
100% 10.34
100% 3.97
100% 0.41
100% 21.80
-
100% 3.24
-
100% 0.64
-
100% 16.01
100% 0.01
100% 8.74

377 of 476
QTY PLAN
100% 1.00

100% 47.04
-
100% 39.30
100% 7.74
100% 1.15
100% 26.64
-
100% 9.31
-
100% 1.12
-
100% 0.01
100% 8.00

100% 19.90
-
100% 13.88
100% 6.02
100% 2.55
100% 30.37
-
100% 6.88
-
100% 0.67
-
100% 0.03
100% 12.80

SSP-CVL2-FDN-1370 - P.1371.01/02/03
100% 6.01
-
100% 3.18
100% 2.83
100% 0.34
100% 17.42
-
100% 5.36

378 of 476
QTY PLAN
-
100% 0.18
-
100% 12.00
100% 16.20

SSP-CVL2-FDN-1370 - P.1373.01/02/03
100% 6.01
-
100% 3.18
100% 2.83
100% 0.34
100% 17.42
-
100% 5.36
-
100% 0.18
-
100% 12.00
100% 16.20

SSP-CVL2-FDN-1370 - P.1373.01 A/B


100% 3.75
-
100% 2.02
100% 1.73
100% 0.21
100% 10.97
-
100% 3.27
-
100% 0.11
-
100% 8.00
100% 10.20

100% 1.94
-
100% 0.36
100% 0.89

379 of 476
QTY PLAN
100% 0.11
100% 5.70
-
100% 1.69
-
100% 0.06
-
100% 4.00
100% 5.30

100% 14.31
-
100% 11.58
100% 2.73
100% 0.41
100% 16.38
-
100% 2.56
-
100% 0.51
-
100% 0.01
100% 6.58
100% 1.00
-
100% 6.00

100% 11.91
-
100% 10.28
100% 1.63
100% 0.38
100% 13.08
-
100% 1.36
-
100% 0.39
-
100% 0.005
100% 5.985
100% 1.00
-
100% 5.20

380 of 476
QTY PLAN

100% 49.08
100% 2.40
100% 38.84
100% 12.64
100% 0.27
100% 3.80
100% 37.92
100% 1.00
100% 5.13
100% 0.13
100% 0.80
100% 8.00
100% 0.01
100% 18.43
100% 1.00
-
100% 2.00

100% 37.83
-
100% 33.86
100% 3.97
100% 0.41
100% 20.37
-
100% 2.73
-
100% 0.58
-
100% 0.01
100% 8.73
100% 1.00
-
100% 16.01

100% 46.71
100% 0.76
100% 36.42

381 of 476
QTY PLAN
100% 11.05
100% 0.49
100% 3.70
100% 34.38
100% 0.90
100% 4.65
100% 0.11
100% 0.83
100% 7.60
100% 0.01
100% 16.51
100% 1.00
-
100% 2.00

100% 46.71
100% 1.52
100% 37.00
100% 11.23
100% 0.49
100% 3.70
100% 35.04
100% 0.90
100% 4.73
100% 0.11
100% 0.86
100% 7.60
100% 0.01
100% 16.79
100% 1.00
-
100% 3.00

100% 8.47
-
100% 7.52
100% 0.95
100% 0.14
100% 5.19
100% 16.63
100% 0.95
100% 2.18
100% 0.14

382 of 476
QTY PLAN
100% 0.35
100% 0.01
100% 5.60

SSP-CVL2-FDN-1370 - P.2373.01 A/B


100% 3.19
-
100% 1.83
100% 1.36
100% 0.17
100% 9.68
-
100% 2.56
-
100% 0.08
-
100% 8.00
100% 9.00

100% 1.94
-
100% 1.04
100% 0.89
100% 0.11
100% 5.70
-
100% 1.69
-
100% 0.06
-
100% 4.00
100% 5.30

SSP-CVL2-FDN-2370 - P.2371.01/02/03
100% 6.34
-
100% 3.28
100% 3.06
100% 0.36
100% 18.06
-

383 of 476
QTY PLAN
100% 5.81
-
100% 0.18
-
100% 12.00
100% 16.80

100% 52.32
100% 2.40
100% 42.08
100% 12.64
100% 0.51
100% 3.80
100% 37.62
100% 1.00
100% 5.20
100% 0.13
100% 0.80
100% 8.00
100% 0.02
100% 18.82
100% 1.00
-
100% 3.00

SSP-CVL2-FDN-1360 - P.1361.01/05
100% 24.35
-
100% 8.76
100% 15.59
100% 1.64
100% 69.35
-
100% 37.45
-
100% 0.62
-
100% 30.00
-
100% 40.80

384 of 476
QTY PLAN

100% 4.45
-
100% 2.18
100% 2.26
100% 0.26
100% 12.05
-
100% 4.31
-
100% 0.14
-
100% 8.00
-
100% 11.20

100% 3.55
-
100% 1.57
100% 1.98
100% 0.22
100% 12.77
-
100% 5.23
-
100% 0.11
-
100% 6.00
-
100% 8.60

100% 8.15
-
100% 2.94
100% 5.22
100% 0.55
100% 15.44
-
100% 12.28
-

385 of 476
QTY PLAN
100% 0.24
-
100% 10.00
-
100% 13.60

100% 4.45
-
100% 2.18
100% 2.26
100% 0.26
100% 12.04
-
100% 4.31
-
100% 0.15
-
100% 10.00
-
100% 11.20

100% 8.15
-
100% 2.94
100% 5.22
100% 0.55
100% 15.44
-
100% 12.28
-
100% 0.27
-
100% 10.00
-
100% 28.75

100% 3.55
-
100% 1.57

386 of 476
QTY PLAN
100% 1.98
100% 0.22
100% 13.03
-
100% 5.33
-
100% 0.14
-
100% 6.00
-
100% 8.60

100% 1.24
-
100% 0.77
100% 0.47
100% 0.06
100% 3.85
-
100% 0.87
-
100% 0.06
-
100% 0.004
-
100% 3.60

100% 1.41
-
100% 0.84
100% 0.57
100% 0.07
100% 4.28
-
100% 1.07
-
100% 0.08
-
100% 0.004
-
100% 4.00

387 of 476
QTY PLAN

100% 2.97
-
100% 1.35
100% 1.62
100% 0.18
100% 6.30
-
100% 2.52
-
100% 0.07
-
100% 4.00
-
100% 7.20

SSP-CVL2-FDN-1370 - P.1374.02/03
100% 6.69
-
100% 2.89
100% 3.80
100% 0.42
100% 13.65
-
100% 5.92
-
100% 0.16
-
100% 8.00
-
100% 15.60

100% 2.34
-
100% 1.16
100% 1.18
100% 0.14
100% 5.46
-
100% 1.90
-
100% 0.06

388 of 476
QTY PLAN
-
100% 4.00
-
100% 6.00

100% 146.94
-
100% 116.20
100% 30.74
100% 3.84
100% 67.43
-
100% 32.41
-
100% 3.13
-
100% 0.05
-
100% 21.60

100% 3.34
-
100% 1.44
100% 1.90
100% 0.21
100% 6.79
-
100% 2.94
-
100% 0.09
-
100% 4.00
-
100% 7.80

100% 2.34
-
100% 1.16
100% 1.18

389 of 476
QTY PLAN
100% 0.14
100% 5.22
-
100% 1.82
-
100% 0.07
-
100% 4.00
-
100% 6.00

100% 0.86
-
100% 0.61
100% 0.25
100% 0.04
100% 3.07
-
100% 0.50
-
100% 0.03
-
100% 4.00
-
100% 2.60

SSP-CVL2-FDN-1370 - P.6306.02 A/B


100% 1.72
-
100% 1.22
100% 0.49
100% 0.07
100% 5.98
-
100% 0.97
-
100% 0.06
-
100% 8.00
-
100% 5.20

390 of 476
QTY PLAN

100% 0.86
-
100% 0.61
100% 0.25
100% 0.04
100% 3.07
-
100% 0.50
-
100% 0.03
-
100% 4.00
-
100% 2.60

SSP-CVL2-FDN-1370 - P.6307.02 A/B


100% 1.72
-
100% 1.22
100% 0.49
100% 0.07
100% 5.85
-
100% 0.95
-
100% 0.05
-
100% 8.00
-
100% 5.20

100% 0.86
-
100% 0.61
100% 0.25
100% 0.04
100% 3.12
-
100% 0.51
-
100% 0.03
-

391 of 476
QTY PLAN
100% 4.00
-
100% 2.60

SSP-CVL2-FDN-1370 - P.6308.02 A/B


100% 1.72
-
100% 1.22
100% 0.49
100% 0.07
100% 5.98
-
100% 0.97
-
100% 0.06
-
100% 8.00
-
100% 5.20

100% 78.94
-
100% 60.74
100% 18.20
100% 1.85
100% 49.12
-
100% 19.14
-
100% 1.44
-
100% 0.03
-
100% 16.00

100% 33.71
-
100% 31.31
100% 2.40
100% 0.10

392 of 476
QTY PLAN
100% 18.62
-
100% 1.90
-
100% 0.20
-
100% 3.20
100% 0.02
100% 6.40
100% 0.32
-
100% 6.40

100% 46.71
100% 0.76
100% 36.42
100% 11.05
100% 0.49
100% 3.70
100% 37.02
100% 0.90
100% 4.98
100% 0.11
100% 0.86
100% 7.60
100% 0.02
100% 17.63
100% 1.00
100% 7.60
100% 2.00

100% 73.59
-
100% 53.93
100% 19.66
100% 1.81
100% 46.86
-
100% 18.93
-
100% 1.31
-
100% 0.04

393 of 476
QTY PLAN
-
100% 14.40

SSP-CVL2-DIKE WALL-1360 - BLENDING AREA


100% 96.73
-
100% 63.84
100% 32.89
100% 5.32
100% 319.45
-
100% 51.62
-
100% 6.97
-
100% 0.12
-
100% 158.05

SSP-CVL2-DIKE WALL-2360 - BLENDING AREA


100% 110.63
-
100% 65.22
100% 45.40
100% 5.18
100% 302.32
-
100% 61.61
-
100% 11.87
-
100% 0.09
140.50

100% 7.68
-
100% 6.61
100% 1.07
100% 0.07
100% 4.02
-

394 of 476
QTY PLAN
100% 0.28
-
100% 0.04
-
100% 0.001
100% 2.17
100% 0.64
-
-
100% 4.00

100% 7.20
-
100% 6.30
100% 0.90
100% 0.06
100% 4.60
-
100% 0.29
-
100% 0.05
-
100% 0.003
100% 2.27
100% 0.48
-
-
100% 5.60

SSP-CVL2-AOC-P3-C0C- CEP DN 200


100% 11.16
-
100% 9.73
100% 1.43
100% 0.18
100% 5.00
-
-
-
100% 1.09
100% 0.08
-

395 of 476
QTY PLAN

SSP-CVL2-AOC-P3-C0C- CEP DN 250


100% 11.16
-
100% 9.73
100% 1.43
100% 0.18
100% 5.00
-
-
-
100% 1.00
100% 0.08
-

100% 1,673.97
100% 969.98
100% 105.51
100% 612.06
100% 197.29
100% 53.07
100% 133.67
100% 101.07
100% 1.50

100% 10.00

-
100% 111.46
100% 100.00

100% 431.18
100% 87.00

100% 6.00
100% 13.00

100% 7.00

396 of 476
QTY PLAN

100% 2.00

100% 8.00

397 of 476
QTY PLAN

-
100% 404.42
100% 172.53
100% 212.46
100% 1,358.85
100% 22.91
100% 143.06
100% 0.42
100% 14.63
100% 215.86
100% 3.13
100% 953.78

100% 195.70
0% -
0% -
100% 794.07
0% -
100% 32.50
0%
100% 719.69
100% 96.38
100% 0.13
100% 25.19
100% 292.19
100% 6,962.17
100% 192.47
0% -
100% 3,749.30

SSP-CVL2-LF- P3-1360- V,1361.02/03


-
-
-
-
-
100% 8.64
-
100% 1.30
-
100% 0.19
-
100% 0.02

398 of 476
QTY PLAN
-
100% 72.00
100% 1.44

SSP-CVL2-LF- P3-1360- V.1361.01


-
-
-
-
-
100% 2.88
-
100% 0.43
-
100% 0.06
-
100% 0.01
-
100% 24.00
100% 1.44

SSP-CVL2-LF -1360- P1361.01A/02/05/06,S1361


100% 56.26
-
100% 35.56
100% 20.70
100% 2.02
100% 47.59
-
100% 29.44
-
100% 2.42
-
100% 0.01
100% 0.63
-
100% 19.70

SSP-CVL2-LF- 1360- P1361.01B, V6474.04


100% 30.37
-
100% 17.99

399 of 476
QTY PLAN
100% 12.38
100% 1.99
100% 28.41
-
100% 11.23
-
100% 0.92
-
100% 0.01
100% 0.20
-
100% 16.20

SSP-CVL2-LF- 1360 - P2361.05,P2361.02,S2361.01


100% 29.98
-
100% 19.28
100% 10.70
100% 1.33
100% 35.63
-
100% 18.34
-
100% 1.67
-
100% 0.01
100% 0.41
-
100% 14.60

SSP-CVL2-LF - 2360- P.2361.01, V6474.05


100% 34.44
-
100% 22.10
100% 12.34
100% 1.54
100% 33.31
-
100% 13.95
-
100% 1.33
-
100% 0.03
100% 0.13
-

400 of 476
QTY PLAN
100% 21.60

-
-
-
-
100% 0.95
100% 6.30
-
100% 2.15
-
100% 0.51
-
100% 0.02
-
-
#DIV/0! -

SSP-CVL2-LF -2360- V.2361.02/03


-
-
-
-
100% 0.99
100% 5.04
-
100% 1.90
-
100% 0.39
-
100% 0.02
-
-
#DIV/0! -

SSP-CVL2-LF -1370- STRIPPING AREA


100% 10.13
-
100% 10.13
-
100% 0.48

401 of 476
QTY PLAN
100% 8.45
-
100% 2.83
-
100% 0.24
-
100% 0.01
-
-
100% 6.00

SSP-CVL2-LF -1370- STRIPPING P.1373.01 A/B, P 1373.03, V 1373.01


-
-
-
-
100% 0.60
100% 5.36
-
100% 1.16
-
100% 0.26
-
-
100% 0.12
-
#DIV/0! -

100% 31.37
-
100% 24.88
100% 6.49
100% 1.41
100% 43.66
-
100% 9.24
-
100% 0.80
-
100% 0.01
100% 0.19
-
100% 39.70

402 of 476
QTY PLAN

SSP-CVL2-LF -1370- CRUMBS SLURRY U-3


100% 23.66
-
100% 14.77
100% 8.89
100% 1.26
100% 27.08
-
100% 10.76
-
100% 1.19
-
100% 0.02
100% 0.18
-
100% 10.80

SSP-CVL2-LF- 1370- STRIPPING V 1372.01/02/03


-
-
-
-
-
100% 14.50
-
100% 4.90
-
100% 0.68
-
100% 0.01
100% 0.24
-
#DIV/0! -

SSP-CVL2-LF- 1370- STRIPPING V 1371.01/02/03


-
-
-
-
-
100% 17.14
-

403 of 476
QTY PLAN
100% 5.56
-
100% 0.80
-
100% 0.01
-
-
#DIV/0! -

SSP-CVL2-LF- 2370- STRIPPING U.32 WATER LINE


100% 10.46
-
100% 10.46
-
100% 1.13
100% 22.81
-
100% 6.02
-
100% 0.35
-
100% 0.01
100% 0.03
-
100% 12.20

SSP-CVL2-LF -2370- STRIPPING V.6412.01, V6415.01


-
-
-
-
100% 0.47
100% 4.08
-
100% 0.90
-
100% 0.20
-
100% 0.01
100% 0.03
-
#DIV/0! -

404 of 476
QTY PLAN

SSP-CVL2-LF -2370- STRIPPING V.2373.01


100% 5.07
-
100% 5.07
-
100% 0.90
100% 8.64
-
100% 2.61
-
100% 0.36
-
100% 0.01
100% 0.03
-
100% 2.00

SSP-CVL2-LF- 2370- STRIPPING V.2371.01/02/03


-
-
-
-
-
100% 16.14
-
100% 5.43
-
100% 0.47
-
100% 0.01
100% 0.29
-
#DIV/0! -

-
100% 149.09
100% 67.60
100% 81.49
100% 411.07
100% 9.09
100% 42.34
100% 5.64
100% 4.33
100% 32.87

405 of 476
QTY PLAN
100% 0.50
100% 94.00

SSP-CVL2-CT- P3-2360 AREA CABLE TRAY


100% 28.22
-
100% 28.22
-
100% 0.36
100% 19.80
-
100% 4.13
-
100% 0.39
-
100% 0.01
-
-
-

SSP-CVL2-LF -2370- CRUMBS SLURRY U-32


-
-
-
-
100% 0.72
100% 8.62
-
100% 2.38
-
100% 0.30
-
100% 0.02
100% 0.16
-
-

100% 10.83
-
100% 8.94
100% 1.89

406 of 476
QTY PLAN
100% 0.11
100% 14.14
-
100% 1.25
-
100% 0.13
-
100% 0.01
100% 6.73
100% 1.00
-
-
100% 5.20

SSP-CVL2-LPF- P3- LIGHTING POLE FOUNDATION


100% 7.37
-
100% 4.66
100% 2.71
100% 0.19
100% 14.82
-
100% 3.28
-
100% 0.17
-
-
-
-
-
-

SSP-CVL2-HB- P3-HOSE BOX FOUNDATION P3 AREA


100% 16.74
-
100% 14.01
100% 2.73
100% 0.57
100% 22.32
-
100% 4.32
-
100% 0.38
-
-

407 of 476
QTY PLAN
-
100% 37.20

408 of 476
QTY PLAN

SSP-CVL2-GP- P3-GUARD POST P3 AREA


100% 8.51
-
100% 8.51
-
100% 0.18
100% 10.32
-
100% 0.77
-
-
-
100% 8.00
100% 16.00
100% 2.40

100% 1.78
-
100% 0.96
100% 0.82
100% 0.10
100% 5.14
-
100% 1.54
-
100% 0.06
-
-
100% 4.00
100% 4.80

100% 2.19
-
100% 1.09
100% 1.10
100% 0.13
100% 5.99
-
100% 2.07
-
100% 0.06

409 of 476
QTY PLAN
-
-
100% 4.00
100% 5.60

410 of 476
BESI BETON Ø BESI BETON Ð 9,461.65 5,631.02 M² M³ M¹ 0 #VALUE! Err:502 Err:502 Err:502 Err:502 #VALUE! #VALUE!
*
START DATE Fri, 03-Jan-2020
FINISH DATE
Calculation Data REVISION <0>
#VALUE! #VALUE! #VALUE! 9,461.65
SUB- REINFORCEMENT STATUS STRUCTURE NUMBER/ NO's LENGTH/ L WIDTH/ W HEIGHT / DEEP / THICK AREA(M²)/ Q VOLUME (M³)/ V
AREA FOR OTHER LOOKUP OVL TOTAL TOTAL SUM SUM PROGRESS
LIST BQ CODE TITL DIVISION MAJOR ITEM MINOR ITEM MTRL GROUP DESCRIPTION / MATERIAL UNIT FUNCTION AXIS BOC EL TOC EL NO DWG REV
FUNCTION FCTR
PROGRE FCTR TOTAL NO's
LENGTH WIDTH
TTL H/D/T
AREA M² VOL M³
QTTY
QTTY
WISE E ÐIA SPACE-A SPACE-B KG/ M¹ SS N-1 N-2 N-3 N-4 N-5 L-a L-b L-c L-d L-e L-f L-OVL W-1 W-2 W-3 W-4 H-1 H-2 H-3 H-4 Q-1 Q-2 Q-3 Q-4 V-1 V-2 V-3 V-4
A B C 0 -1 D TOTALE F G
TOTAL H I J J

5 7 10 12 13 14 15 16 17 18 19 20 21 22 23 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70
LIST AREA BQ CODESUB-TITLE DIVISION MAJOR ITEM MINOR ITEM MTRL GROUP DESCRIPTION / MATERIAL UNIT FUNCTION AXIS BOC EL TOC EL NO DWG REV for other lookup OVL ÐIA SPACING SPACING KG/ UNIT STATUS FCTR N-1 N-2 N-3 N-4 N-5 N-6 TOTAL NO's L-a L-b L-c L-d L-e L-f L-OVL SUM W-1 W-2 W-3 W-4 SUM H-1 H-2 H-3 H-4 SUM H/D/T A-1 A-2 A-3 A-4 SUM V-1 V-2 V-3 V-4 SUM TOTAL QTY PROGRESS
WISE function FCTR A B PROGRE LENGTH WIDTH AREA M² VOL M³ QTTY
SS
1.0001
1.0002 P2 CO-2A F1 FOUNDATION FOOT FDN F1 ( 3500L x 3500W x 500HCONCRETE CONCRETE M³ EL -2.150 EL -1.650 C0-CVL-DWG-SSFD-2101~21 REV 1 6 6 3.500 3.500 3.500 3.500 0.500 0.500 36.75 -
1.0003 P2 FM-1A F1 FOUNDATION FOOT FDN F1 ( 3500L x 3500W x 500HFORM WORK FORM WORK M² EL -2.150 EL -1.650 C0-CVL-DWG-SSFD-2101~21 REV 1 6 6 3.500 3.500 3.500 3.500 14.000 2.150 -1.650 0.500 42.00 -
1.0004 P2 RE-1A F1 FOUNDATION FOOT FDN F1 ( 3500L x 3500W x 500HREBAR REBAR Ð 13 TON TRANS, TOP C0-CVL-DWG-SSFD-2101~21 REV 1 13 0.150 1.040 0.001 6 24 144 3.400 0.350 0.350 4.100 0.61 -
1.0005 P2 RE-1A F1 FOUNDATION FOOT FDN F1 ( 3500L x 3500W x 500HREBAR REBAR Ð 16 TON TRANS, BOTT C0-CVL-DWG-SSFD-2101~21 REV 1 16 0.150 1.580 0.001 6 24 144 3.400 0.350 0.350 4.100 0.93 -
1.0006 P2 RE-1A F1 FOUNDATION FOOT FDN F1 ( 3500L x 3500W x 500HREBAR REBAR Ð 13 TON LONG, TOP C0-CVL-DWG-SSFD-2101~21 REV 1 13 0.150 1.040 0.001 6 24 144 3.400 0.350 0.350 4.100 0.61 -
1.0007 P2 RE-1A F1 FOUNDATION FOOT FDN F1 ( 3500L x 3500W x 500HREBAR REBAR Ð 16 TON LONG, BOTT C0-CVL-DWG-SSFD-2101~21 REV 1 16 0.150 1.580 0.001 6 24 144 3.400 0.350 0.350 4.100 0.93 -
1.0008 P2 RE-1A F1 FOUNDATION FOOT FDN F1 ( 3500L x 3500W x 500HREBAR REBAR Ð 13 TON TIE C0-CVL-DWG-SSFD-2101~21 REV 1 13 1.040 0.001 6 2 12 0.078 3.440 3.440 0.078 7.036 0.09 -
1.0009 P2 RE-1A F1 FOUNDATION FOOT FDN F1 ( 3500L x 3500W x 500HREBAR REBAR Ð 16 TON SUPPORT C0-CVL-DWG-SSFD-2101~21 REV 1 16 1.580 0.001 6 9 54 0.400 0.342 0.200 0.342 0.400 1.684 0.14 -
1.0009 P2 CO-2A F1 FOUNDATION SOCKET COLUMN-OUTER SC ( 1400L x 1400W) CONCRETE CONCRETE M³ EL -1.650 EL -0.600 C0-CVL-STD-0104 REV 1 6 6 1.400 1.400 1.400 1.400 1.650 -0.600 1.050 12.35 -
1.0010 P2 CO-2A F1 FOUNDATION SOCKET COLUMN-OUTER SC ( 700L x 700W) CONCRETE CONCRETE M³ EL -1.650 EL -0.600 C0-CVL-STD-0104 REV 1 6 -1 -6 0.700 0.700 0.700 0.700 1.650 -0.600 1.050 -3.09 -
1.0011 P2 FM-1A F1 FOUNDATION SOCKET COLUMN-OUTER SC ( 1400L x 1400W) FORM WORK FORM WORK M² EL -1.650 EL -0.600 C0-CVL-STD-0104 REV 1 6 6 1.400 1.400 1.400 1.400 5.600 1.650 -0.600 1.050 35.28 -
1.0012 P2 FM-1A F1 FOUNDATION SOCKET COLUMN-OUTER SC ( 700L x 700W) FORM WORK FORM WORK M² EL -1.650 EL -0.600 C0-CVL-STD-0104 REV 1 6 6 0.700 0.700 0.700 0.700 2.800 1.650 -0.600 1.050 17.64 -
1.0013 P2 RE-1A F1 FOUNDATION SOCKET COLUMN-OUTER SC ( 1400L x 1400W) REBAR REBAR Ð 19 TON VERT OUTER EL -2.150 EL -0.600 C0-CVL-STD-0104 REV 1 19 2.230 0.001 6 38 228 0.500 1.430 1.930 0.98 -
1.0014 P2 RE-1A F1 FOUNDATION SOCKET COLUMN-OUTER SC ( 1400L x 1400W) REBAR REBAR Ð 19 TON VERT INNER EL -2.150 EL -0.600 C0-CVL-STD-0104 REV 1 19 2.230 0.001 6 30 180 0.500 1.430 1.930 0.77 -
1.0015 P2 RE-1A F1 FOUNDATION SOCKET COLUMN-OUTER SC ( 1400L x 1400W) REBAR REBAR Ð 19 TON HORI OUTER C0-CVL-STD-0104 REV 1 19 2.230 0.001 6 5 2 60 0.114 1.300 0.250 1.300 0.250 0.114 3.328 0.45 -
1.0016 P2 RE-1A F1 FOUNDATION SOCKET COLUMN-OUTER SC ( 1400L x 1400W) REBAR REBAR Ð 19 TON HORI INNER C0-CVL-STD-0104 REV 1 19 2.230 0.001 6 5 2 60 0.114 1.300 0.250 1.300 0.250 0.114 3.328 0.45 -
1.0017 P2 RE-1A F1 FOUNDATION SOCKET COLUMN-OUTER SC ( 1400L x 1400W) REBAR REBAR Ð 19 TON ADD HORI UPPER C0-CVL-STD-0104 REV 1 19 2.230 0.001 6 2 2 24 0.800 0.800 0.04 -
1.0018 P2 RE-1A F1 FOUNDATION SOCKET COLUMN-OUTER SC ( 1400L x 1400W) REBAR REBAR Ð 10 TON CROSS TIE C0-CVL-STD-0104 REV 1 10 0.620 0.001 6 30 5 900 0.060 0.250 0.060 0.370 0.21 -
1.0019 P2 RE-1A F1 FOUNDATION SOCKET COLUMN-OUTER SC ( 1400L x 1400W) REBAR REBAR Ð 13 TON BOTTOM TIE C0-CVL-STD-0104 REV 1 13 1.040 0.001 6 2 12 0.078 1.300 1.300 1.300 1.300 0.078 5.356 0.07 -
1.0020 P2 CO-1A F1 FOUNDATION FOOT FDN F1 ( 3500L x 3500W x 500HPLAIN CONCRETE LEVELING CONCRETE T= 50 M³ EL -2.200 EL -2.150 C0-CVL-DWG-SSFD-2101~21 REV 1 SOIL DISPOSAL 6 6 3.500 0.200 3.700 3.500 0.200 3.700 2.200 -2.150 0.050 4.11 -
1.0021 P2 F1 FOUNDATION FOOT FDN SC ( 1400L x 1400W) EARTH WORK COMPACTIED SOIL 95% MAX DRY M² C0-CVL-DWG-SSFD-2101~21 REV 1 6 6 1.400 0.600 2.000 1.400 0.600 2.000 24.00 -
1.0022 P2 EA-1B F1 FOUNDATION FOOT FDN SC ( 1400L x 1400W) EARTH WORK EXCAVATION BY EQUIPMENT (D>3 M³ EL -2.200 EL -0.300 C0-CVL-DWG-SSFD-2101~21 REV 1 SOIL EXCAVATION 6 0 0 1.400 0.600 2.000 1.400 0.600 2.000 2.200 -0.300 - 1.900 - -
1.0023 P2 EA-1A F1 FOUNDATION FOOT FDN SC ( 1400L x 1400W) EARTH WORK EXCAVATION BY EQUIPMENT (D<=M³ EL -2.200 EL -0.300 C0-CVL-DWG-SSFD-2101~21 REV 1 SOIL EXCAVATION 6 6 1.400 0.600 2.000 1.400 0.600 2.000 2.200 -0.300 - 1.900 45.60 -
1.0024 P2 EA-3B F1 FOUNDATION FOOT FDN SC ( 1400L x 1400W) EARTH WORK SOIL DISPOSAL M³ DISPO: CONCRETE EL -2.150 EL -1.650 C0-CVL-DWG-SSFD-2101~21 REV 1 6 6 1.400 1.400 1.400 1.400 2.150 -1.650 0.500 5.88 -
1.0025 P2 EA-3B F1 FOUNDATION SOCKET COLUMN-OUTER SC ( 1400L x 1400W) EARTH WORK SOIL DISPOSAL M³ DISPO: CONCRETE EL -1.650 EL -0.600 C0-CVL-DWG-SSFD-2101~21 REV 1 6 6 1.400 1.400 1.400 1.400 1.650 -0.600 1.050 12.35 -
1.0026 P2 EA-3B F1 FOUNDATION FOOT FDN SC ( 1400L x 1400W) EARTH WORK SOIL DISPOSAL M³ DISPO: LC + SB C0-CVL-DWG-SSFD-2101~21 REV 1 1 1 4.107 4.107 4.11 -
1.0027 P2 EA-2A F1 FOUNDATION FOOT FDN SC ( 1400L x 1400W) EARTH WORK SOIL BACKFILL M³ C0-CVL-DWG-SSFD-2101~21 REV 1 1 1 45.600 -22.335 23.265 23.27 -
1.0028 P2 F1 FOUNDATION SOCKET COLUMN-INNER SO ( 700L x 700W) OTHERS SHEAR KEY 100x25 MM M C0-CVL-STD-0104 REV 1 6 5 30 0.700 0.700 0.700 0.700 2.800 84.00 -
1.0029 P2 CO-2A F1A FOUNDATION FOOT FDN F1A ( 3500L x 3500W x 500CONCRETE CONCRETE M³ EL -2.150 EL -1.650 C0-CVL-DWG-SSFD-2101~21 REV 1 1 3 3 3.500 3.500 3.500 3.500 0.500 0.500 18.38 18.38
1.0030 P2 FM-1A F1A FOUNDATION FOOT FDN F1A ( 3500L x 3500W x 500FORM WORK FORM WORK M² EL -2.150 EL -1.650 C0-CVL-DWG-SSFD-2101~21 REV 1 1 3 3 3.500 3.500 3.500 3.500 14.000 2.150 -1.650 0.500 21.00 21.00
1.0031 P2 RE-1A F1A FOUNDATION FOOT FDN F1A ( 3500L x 3500W x 500REBAR REBAR Ð 13 TON TRANS, TOP C0-CVL-DWG-SSFD-2101~21 REV 1 13 0.150 1.040 1 0.001 3 24 72 3.400 0.350 0.350 4.100 0.31 0.31
1.0032 P2 RE-1A F1A FOUNDATION FOOT FDN F1A ( 3500L x 3500W x 500REBAR REBAR Ð 16 TON TRANS, BOTT C0-CVL-DWG-SSFD-2101~21 REV 1 16 0.150 1.580 1 0.001 3 24 72 3.400 0.350 0.350 4.100 0.47 0.47
1.0033 P2 RE-1A F1A FOUNDATION FOOT FDN F1A ( 3500L x 3500W x 500REBAR REBAR Ð 13 TON LONG, TOP C0-CVL-DWG-SSFD-2101~21 REV 1 13 0.150 1.040 1 0.001 3 24 72 3.400 0.350 0.350 4.100 0.31 0.31
1.0034 P2 RE-1A F1A FOUNDATION FOOT FDN F1A ( 3500L x 3500W x 500REBAR REBAR Ð 16 TON LONG, BOTT C0-CVL-DWG-SSFD-2101~21 REV 1 16 0.150 1.580 1 0.001 3 24 72 3.400 0.350 0.350 4.100 0.47 0.47
1.0035 P2 RE-1A F1A FOUNDATION FOOT FDN F1A ( 3500L x 3500W x 500REBAR REBAR Ð 13 TON TIE C0-CVL-DWG-SSFD-2101~21 REV 1 13 1.040 1 0.001 3 2 6 0.078 3.440 3.440 0.078 7.036 0.04 0.04
1.0036 P2 RE-1A F1A FOUNDATION FOOT FDN F1A ( 3500L x 3500W x 500REBAR REBAR Ð 16 TON SUPPORT C0-CVL-DWG-SSFD-2101~21 REV 1 16 1.580 1 0.001 3 9 27 0.400 0.342 0.200 0.342 0.400 1.684 0.07 0.07
1.0036 P2 CO-2A F1A FOUNDATION SOCKET COLUMN-OUTER SC ( 1400L x 1400W) CONCRETE CONCRETE M³ EL -1.650 EL -0.600 C0-CVL-STD-0104 REV 1 1 3 3 1.400 1.400 1.400 1.400 1.650 -0.600 1.050 6.17 6.17
1.0037 P2 CO-2A F1A FOUNDATION SOCKET COLUMN-OUTER SC ( 700L x 700W) CONCRETE CONCRETE M³ EL -1.650 EL -0.600 C0-CVL-STD-0104 REV 1 1 3 -1 -3 0.700 0.700 0.700 0.700 1.650 -0.600 1.050 -1.54 -1.54
1.0038 P2 FM-1A F1A FOUNDATION SOCKET COLUMN-OUTER SC ( 1400L x 1400W) FORM WORK FORM WORK M² EL -1.650 EL -0.600 C0-CVL-STD-0104 REV 1 1 3 3 1.400 1.400 1.400 1.400 5.600 1.650 -0.600 1.050 17.64 17.64
1.0039 P2 FM-1A F1A FOUNDATION SOCKET COLUMN-OUTER SC ( 700L x 700W) FORM WORK FORM WORK M² EL -1.650 EL -0.600 C0-CVL-STD-0104 REV 1 1 3 3 0.700 0.700 0.700 0.700 2.800 1.650 -0.600 1.050 8.82 8.82
1.0040 P2 RE-1A F1A FOUNDATION SOCKET COLUMN-OUTER SC ( 1400L x 1400W) REBAR REBAR Ð 19 TON VERT OUTER EL -2.150 EL -0.600 C0-CVL-STD-0104 REV 1 19 2.230 1 0.001 3 38 114 0.500 1.430 1.930 0.49 0.49
1.0041 P2 RE-1A F1A FOUNDATION SOCKET COLUMN-OUTER SC ( 1400L x 1400W) REBAR REBAR Ð 19 TON VERT INNER EL -2.150 EL -0.600 C0-CVL-STD-0104 REV 1 19 2.230 1 0.001 3 30 90 0.500 1.430 1.930 0.39 0.39
1.0042 P2 RE-1A F1A FOUNDATION SOCKET COLUMN-OUTER SC ( 1400L x 1400W) REBAR REBAR Ð 19 TON HORI OUTER C0-CVL-STD-0104 REV 1 19 2.230 1 0.001 3 5 2 30 0.114 1.300 0.250 1.300 0.250 0.114 3.328 0.22 0.22
1.0043 P2 RE-1A F1A FOUNDATION SOCKET COLUMN-OUTER SC ( 1400L x 1400W) REBAR REBAR Ð 19 TON HORI INNER C0-CVL-STD-0104 REV 1 19 2.230 1 0.001 3 5 2 30 0.114 1.300 0.250 1.300 0.250 0.114 3.328 0.22 0.22
1.0044 P2 RE-1A F1A FOUNDATION SOCKET COLUMN-OUTER SC ( 1400L x 1400W) REBAR REBAR Ð 19 TON ADD HORI UPPER C0-CVL-STD-0104 REV 1 19 2.230 1 0.001 3 2 2 12 0.800 0.800 0.02 0.02
1.0045 P2 RE-1A F1A FOUNDATION SOCKET COLUMN-OUTER SC ( 1400L x 1400W) REBAR REBAR Ð 10 TON CROSS TIE C0-CVL-STD-0104 REV 1 10 0.620 1 0.001 3 30 5 450 0.060 0.250 0.060 0.370 0.10 0.10
1.0046 P2 RE-1A F1A FOUNDATION SOCKET COLUMN-OUTER SC ( 1400L x 1400W) REBAR REBAR Ð 13 TON BOTTOM TIE C0-CVL-STD-0104 REV 1 13 1.040 1 0.001 3 2 6 0.078 1.300 1.300 1.300 1.300 0.078 5.356 0.03 0.03
1.0047 P2 CO-1A F1A FOUNDATION FOOT FDN F1A ( 3500L x 3500W x 500PLAIN CONCRETE LEVELING CONCRETE T= 50 M³ EL -2.200 EL -2.150 C0-CVL-DWG-SSFD-2101~21 REV 1 SOIL DISPOSAL 1 3 3 3.500 0.200 3.700 3.500 0.200 3.700 2.200 -2.150 0.050 2.05 2.05
1.0048 P2 F1A FOUNDATION FOOT FDN F1A ( 3500L x 3500W x 500EARTH WORK COMPACTIED SOIL 95% MAX DRY M² C0-CVL-DWG-SSFD-2101~21 REV 1 1 3 3 3.500 0.600 4.100 3.500 0.600 4.100 50.43 50.43
1.0049 P2 EA-1B F1A FOUNDATION FOOT FDN F1A ( 3500L x 3500W x 500EARTH WORK EXCAVATION BY EQUIPMENT (D>2 M³ EL -2.200 EL -0.300 C0-CVL-DWG-SSFD-2101~21 REV 1 SOIL EXCAVATION 1 3 0 0 3.500 0.600 4.100 3.500 0.600 4.100 2.200 -0.300 - 1.900 - -
1.0050 P2 EA-1A F1A FOUNDATION FOOT FDN F1A ( 3500L x 3500W x 500EARTH WORK EXCAVATION BY EQUIPMENT (D<=M³ EL -2.200 EL -0.300 C0-CVL-DWG-SSFD-2101~21 REV 1 SOIL EXCAVATION 1 3 3 3.500 0.600 4.100 3.500 0.600 4.100 2.200 -0.300 - 1.900 95.82 95.82
1.0051 P2 EA-3B F1A FOUNDATION FOOT FDN F1A ( 3500L x 3500W x 500EARTH WORK SOIL DISPOSAL M³ DISPO: CONCRETE EL -2.150 EL -1.650 C0-CVL-DWG-SSFD-2101~21 REV 1 1 3 3 3.500 3.500 3.500 3.500 2.150 -1.650 0.500 18.38 18.38
1.0052 P2 EA-3B F1A FOUNDATION SOCKET COLUMN-OUTER SC ( 1400L x 1400W) EARTH WORK SOIL DISPOSAL M³ DISPO: CONCRETE EL -1.650 EL -0.600 C0-CVL-DWG-SSFD-2101~21 REV 1 1 3 3 1.400 1.400 1.400 1.400 1.650 -0.600 1.050 6.17 6.17
1.0053 P2 EA-3B F1A FOUNDATION FOOT FDN F1A ( 3500L x 3500W x 500EARTH WORK SOIL DISPOSAL M³ DISPO: LC + SB C0-CVL-DWG-SSFD-2101~21 REV 1 1 1 1 2.054 2.054 2.05 2.05
1.0054 P2 EA-2A F1A FOUNDATION FOOT FDN F1A ( 3500L x 3500W x 500EARTH WORK SOIL BACKFILL M³ C0-CVL-DWG-SSFD-2101~21 REV 1 1 1 1 95.817 -26.603 69.215 69.21 69.21
1.0055 P2 RE-1A F1A FOUNDATION FOOT FDN F1A ( 3500L x 3500W x 500REBAR REBAR Ð 16 TON LIFTING LUG C0-CVL-DWG-SSFD-2101~21 REV 1 16 1.580 1 0.001 3 4 12 0.600 0.525 0.150 0.525 0.600 2.400 0.05 0.05
1.0056 P2 SS-4A F1A FOUNDATION FOOT FDN F1A ( 3500L x 3500W x 500STEEL L 50x50x5 TON LIFTING LUG C0-CVL-DWG-SSFD-2101~21 REV 1 3.770 1 0.001 3 4 12 0.500 0.500 0.02 0.02
1.0057 P2 F1A FOUNDATION SOCKET COLUMN-INNER SO ( 700L x 700W) OTHERS SHEAR KEY 100x25 MM M C0-CVL-STD-0104 REV 1 1 3 5 15 0.700 0.700 0.700 0.700 2.800 42.00 42.00
1.0058 P2 CO-2A F2 FOUNDATION FOOT FDN F2 ( 3500L x 3500W x 500HCONCRETE CONCRETE M³ EL -2.150 EL -1.650 C0-CVL-DWG-SSFD-2101~21 REV 1 1 3 3 3.500 3.500 3.500 3.500 0.500 0.500 18.38 18.38
1.0059 P2 FM-1A F2 FOUNDATION FOOT FDN F2 ( 3500L x 3500W x 500HFORM WORK FORM WORK M² EL -2.150 EL -1.650 C0-CVL-DWG-SSFD-2101~21 REV 1 1 3 3 3.500 3.500 3.500 3.500 14.000 2.150 -1.650 0.500 21.00 21.00
1.0060 P2 RE-1A F2 FOUNDATION FOOT FDN F2 ( 3500L x 3500W x 500HREBAR REBAR Ð 13 TON TRANS, TOP C0-CVL-DWG-SSFD-2101~21 REV 1 13 0.150 1.040 1 0.001 3 24 72 3.400 0.350 0.350 4.100 0.31 0.31
1.0061 P2 RE-1A F2 FOUNDATION FOOT FDN F2 ( 3500L x 3500W x 500HREBAR REBAR Ð 16 TON TRANS, BOTT C0-CVL-DWG-SSFD-2101~21 REV 1 16 0.150 1.580 1 0.001 3 24 72 3.400 0.350 0.350 4.100 0.47 0.47
1.0062 P2 RE-1A F2 FOUNDATION FOOT FDN F2 ( 3500L x 3500W x 500HREBAR REBAR Ð 13 TON LONG, TOP C0-CVL-DWG-SSFD-2101~21 REV 1 13 0.150 1.040 1 0.001 3 24 72 3.400 0.350 0.350 4.100 0.31 0.31
1.0063 P2 RE-1A F2 FOUNDATION FOOT FDN F2 ( 3500L x 3500W x 500HREBAR REBAR Ð 16 TON LONG, BOTT C0-CVL-DWG-SSFD-2101~21 REV 1 16 0.150 1.580 1 0.001 3 24 72 3.400 0.350 0.350 4.100 0.47 0.47
1.0064 P2 RE-1A F2 FOUNDATION FOOT FDN F2 ( 3500L x 3500W x 500HREBAR REBAR Ð 13 TON TIE C0-CVL-DWG-SSFD-2101~21 REV 1 13 1.040 1 0.001 3 2 6 0.078 3.440 3.440 0.078 7.036 0.04 0.04
1.0065 P2 RE-1A F2 FOUNDATION FOOT FDN F2 ( 3500L x 3500W x 500HREBAR REBAR Ð 16 TON SUPPORT C0-CVL-DWG-SSFD-2101~21 REV 1 16 1.580 1 0.001 3 9 27 0.400 0.342 0.200 0.342 0.400 1.684 0.07 0.07
1.0065 P2 CO-2A F2 FOUNDATION SOCKET COLUMN-OUTER SC ( 1400L x 1400W) CONCRETE CONCRETE M³ EL -1.650 EL -0.600 C0-CVL-STD-0104 REV 1 3 3 1.400 1.400 1.400 1.400 1.650 -0.600 1.050 6.17 -
1.0066 P2 CO-2A F2 FOUNDATION SOCKET COLUMN-OUTER SC ( 700L x 700W) CONCRETE CONCRETE M³ EL -1.650 EL -0.600 C0-CVL-STD-0104 REV 1 3 -1 -3 0.700 0.700 0.700 0.700 1.650 -0.600 1.050 -1.54 -
1.0067 P2 FM-1A F2 FOUNDATION SOCKET COLUMN-OUTER SC ( 1400L x 1400W) FORM WORK FORM WORK M² EL -1.650 EL -0.600 C0-CVL-STD-0104 REV 1 3 3 1.400 1.400 1.400 1.400 5.600 1.650 -0.600 1.050 17.64 -
1.0068 P2 FM-1A F2 FOUNDATION SOCKET COLUMN-OUTER SC ( 700L x 700W) FORM WORK FORM WORK M² EL -1.650 EL -0.600 C0-CVL-STD-0104 REV 1 3 3 0.700 0.700 0.700 0.700 2.800 1.650 -0.600 1.050 8.82 -
1.0069 P2 RE-1A F2 FOUNDATION SOCKET COLUMN-OUTER SC ( 1400L x 1400W) REBAR REBAR Ð 19 TON VERT OUTER EL -2.150 EL -0.600 C0-CVL-STD-0104 REV 1 - 1 0.001 3 38 114 0.500 1.430 1.930 - -
1.0070 P2 RE-1A F2 FOUNDATION SOCKET COLUMN-OUTER SC ( 1400L x 1400W) REBAR REBAR Ð 19 TON VERT INNER EL -2.150 EL -0.600 C0-CVL-STD-0104 REV 1 19 2.230 1 0.001 3 30 90 0.500 1.430 1.930 0.39 0.39
1.0071 P2 RE-1A F2 FOUNDATION SOCKET COLUMN-OUTER SC ( 1400L x 1400W) REBAR REBAR Ð 19 TON HORI OUTER C0-CVL-STD-0104 REV 1 19 2.230 1 0.001 3 5 2 30 0.114 1.300 0.250 1.300 0.250 0.114 3.328 0.22 0.22
1.0072 P2 RE-1A F2 FOUNDATION SOCKET COLUMN-OUTER SC ( 1400L x 1400W) REBAR REBAR Ð 19 TON HORI INNER C0-CVL-STD-0104 REV 1 19 2.230 1 0.001 3 5 2 30 0.114 1.300 0.250 1.300 0.250 0.114 3.328 0.22 0.22
1.0073 P2 RE-1A F2 FOUNDATION SOCKET COLUMN-OUTER SC ( 1400L x 1400W) REBAR REBAR Ð 19 TON ADD HORI UPPER C0-CVL-STD-0104 REV 1 19 2.230 1 0.001 3 2 2 12 0.800 0.800 0.02 0.02
1.0074 P2 RE-1A F2 FOUNDATION SOCKET COLUMN-OUTER SC ( 1400L x 1400W) REBAR REBAR Ð 10 TON CROSS TIE C0-CVL-STD-0104 REV 1 10 0.620 1 0.001 3 30 5 450 0.060 0.250 0.060 0.370 0.10 0.10
1.0075 P2 RE-1A F2 FOUNDATION SOCKET COLUMN-OUTER SC ( 1400L x 1400W) REBAR REBAR Ð 13 TON BOTTOM TIE C0-CVL-STD-0104 REV 1 13 1.040 1 0.001 3 2 6 0.078 1.300 1.300 1.300 1.300 0.078 5.356 0.03 0.03
1.0076 P2 CO-1A F2 FOUNDATION FOOT FDN F2 ( 3500L x 3500W x 500HPLAIN CONCRETE LEVELING CONCRETE T= 50 M³ EL -2.200 EL -2.150 C0-CVL-DWG-SSFD-2101~21 REV 1 SOIL DISPOSAL 1 3 3 3.500 0.200 3.700 3.500 0.200 3.700 2.200 -2.150 0.050 2.05 2.05
1.0077 P2 F2 FOUNDATION FOOT FDN F2 ( 3500L x 3500W x 500HEARTH WORK COMPACTIED SOIL 95% MAX DRY M² C0-CVL-DWG-SSFD-2101~21 REV 1 1 3 3 3.500 0.600 4.100 3.500 0.600 4.100 50.43 50.43
1.0078 P2 EA-1B F2 FOUNDATION FOOT FDN F2 ( 3500L x 3500W x 500HEARTH WORK EXCAVATION BY EQUIPMENT (D>2 M³ EL -2.200 EL -0.300 C0-CVL-DWG-SSFD-2101~21 REV 1 SOIL EXCAVATION 1 3 0 0 3.500 0.600 4.100 3.500 0.600 4.100 2.200 -0.300 - 1.900 - -
1.0079 P2 EA-1A F2 FOUNDATION FOOT FDN F2 ( 3500L x 3500W x 500HEARTH WORK EXCAVATION BY EQUIPMENT (D<=M³ EL -2.200 EL -0.300 C0-CVL-DWG-SSFD-2101~21 REV 1 SOIL EXCAVATION 1 3 3 3.500 0.600 4.100 3.500 0.600 4.100 2.200 -0.300 - 1.900 95.82 95.82
1.0080 P2 EA-3B F2 FOUNDATION FOOT FDN F2 ( 3500L x 3500W x 500HEARTH WORK SOIL DISPOSAL M³ DISPO: CONCRETE EL -2.150 EL -1.650 C0-CVL-DWG-SSFD-2101~21 REV 1 1 3 3 3.500 3.500 3.500 3.500 2.150 -1.650 0.500 18.38 18.38
1.0081 P2 EA-3B F2 FOUNDATION SOCKET COLUMN-OUTER SC ( 1400L x 1400W) EARTH WORK SOIL DISPOSAL M³ DISPO: CONCRETE EL -1.650 EL -0.600 C0-CVL-DWG-SSFD-2101~21 REV 1 1 3 3 1.400 1.400 1.400 1.400 1.650 -0.600 1.050 6.17 6.17
1.0082 P2 EA-3B F2 FOUNDATION FOOT FDN F2 ( 3500L x 3500W x 500HEARTH WORK SOIL DISPOSAL M³ DISPO: LC + SB C0-CVL-DWG-SSFD-2101~21 REV 1 1 1 1 2.054 2.054 2.05 2.05
1.0083 P2 EA-2A F2 FOUNDATION FOOT FDN F2 ( 3500L x 3500W x 500HEARTH WORK SOIL BACKFILL M³ C0-CVL-DWG-SSFD-2101~21 REV 1 1 1 1 95.817 -26.603 69.215 69.21 69.21
1.0084 P2 F2 FOUNDATION SOCKET COLUMN-INNER SO ( 700L x 700W) OTHERS SHEAR KEY 100x25 MM M C0-CVL-STD-0104 REV 1 1 3 5 15 0.700 0.700 0.700 0.700 2.800 42.00 42.00
1.0085 P2 CO-2A F2 FOUNDATION FOOT FDN F2 ( 3500L x 3500W x 500HCONCRETE CONCRETE M³ EL -2.150 EL -1.650 C0-CVL-DWG-SSFD-2101~21 REV 1 1 6 6 3.500 3.500 3.500 3.500 0.500 0.500 36.75 36.75
1.0086 P2 FM-1A F2 FOUNDATION FOOT FDN F2 ( 3500L x 3500W x 500HFORM WORK FORM WORK M² EL -2.150 EL -1.650 C0-CVL-DWG-SSFD-2101~21 REV 1 1 6 6 3.500 3.500 3.500 3.500 14.000 2.150 -1.650 0.500 42.00 42.00
1.0087 P2 RE-1A F2 FOUNDATION FOOT FDN F2 ( 3500L x 3500W x 500HREBAR REBAR Ð 13 TON TRANS, TOP C0-CVL-DWG-SSFD-2101~21 REV 1 13 0.150 1.040 1 0.001 6 24 144 3.400 0.350 0.350 4.100 0.61 0.61
1.0088 P2 RE-1A F2 FOUNDATION FOOT FDN F2 ( 3500L x 3500W x 500HREBAR REBAR Ð 16 TON TRANS, BOTT C0-CVL-DWG-SSFD-2101~21 REV 1 16 0.150 1.580 1 0.001 6 24 144 3.400 0.350 0.350 4.100 0.93 0.93
1.0089 P2 RE-1A F2 FOUNDATION FOOT FDN F2 ( 3500L x 3500W x 500HREBAR REBAR Ð 13 TON LONG, TOP C0-CVL-DWG-SSFD-2101~21 REV 1 13 0.150 1.040 1 0.001 6 24 144 3.400 0.350 0.350 4.100 0.61 0.61
1.0090 P2 RE-1A F2 FOUNDATION FOOT FDN F2 ( 3500L x 3500W x 500HREBAR REBAR Ð 16 TON LONG, BOTT C0-CVL-DWG-SSFD-2101~21 REV 1 16 0.150 1.580 1 0.001 6 24 144 3.400 0.350 0.350 4.100 0.93 0.93
1.0091 P2 RE-1A F2 FOUNDATION FOOT FDN F2 ( 3500L x 3500W x 500HREBAR REBAR Ð 13 TON TIE C0-CVL-DWG-SSFD-2101~21 REV 1 13 1.040 1 0.001 6 2 12 0.078 3.440 3.440 0.078 7.036 0.09 0.09
1.0092 P2 RE-1A F2 FOUNDATION FOOT FDN F2 ( 3500L x 3500W x 500HREBAR REBAR Ð 16 TON SUPPORT C0-CVL-DWG-SSFD-2101~21 REV 1 16 1.580 1 0.001 6 9 54 0.400 0.342 0.200 0.342 0.400 1.684 0.14 0.14
1.0092 P2 CO-2A F2 FOUNDATION SOCKET COLUMN-OUTER SC ( 1400L x 1400W) CONCRETE CONCRETE M³ EL -1.650 EL -0.600 C0-CVL-STD-0104 REV 1 1 6 6 1.400 1.400 1.400 1.400 1.650 -0.600 1.050 12.35 12.35
1.0093 P2 CO-2A F2 FOUNDATION SOCKET COLUMN-OUTER SC ( 700L x 700W) CONCRETE CONCRETE M³ EL -1.650 EL -0.600 C0-CVL-STD-0104 REV 1 1 6 -1 -6 0.700 0.700 0.700 0.700 1.650 -0.600 1.050 -3.09 -3.09
1.0094 P2 FM-1A F2 FOUNDATION SOCKET COLUMN-OUTER SC ( 1400L x 1400W) FORM WORK FORM WORK M² EL -1.650 EL -0.600 C0-CVL-STD-0104 REV 1 1 6 6 1.400 1.400 1.400 1.400 5.600 1.650 -0.600 1.050 35.28 35.28
1.0095 P2 FM-1A F2 FOUNDATION SOCKET COLUMN-OUTER SC ( 700L x 700W) FORM WORK FORM WORK M² EL -1.650 EL -0.600 C0-CVL-STD-0104 REV 1 1 6 6 0.700 0.700 0.700 0.700 2.800 1.650 -0.600 1.050 17.64 17.64
1.0096 P2 RE-1A F2 FOUNDATION SOCKET COLUMN-OUTER SC ( 1400L x 1400W) REBAR REBAR Ð 19 TON VERT OUTER EL -2.150 EL -0.600 C0-CVL-STD-0104 REV 1 19 2.230 1 0.001 6 38 228 0.500 1.430 1.930 0.98 0.98
1.0097 P2 RE-1A F2 FOUNDATION SOCKET COLUMN-OUTER SC ( 1400L x 1400W) REBAR REBAR Ð 19 TON VERT INNER EL -2.150 EL -0.600 C0-CVL-STD-0104 REV 1 19 2.230 1 0.001 6 30 180 0.500 1.430 1.930 0.77 0.77
1.0098 P2 RE-1A F2 FOUNDATION SOCKET COLUMN-OUTER SC ( 1400L x 1400W) REBAR REBAR Ð 19 TON HORI OUTER C0-CVL-STD-0104 REV 1 19 2.230 1 0.001 6 5 2 60 0.114 1.300 0.250 1.300 0.250 0.114 3.328 0.45 0.45
1.0099 P2 RE-1A F2 FOUNDATION SOCKET COLUMN-OUTER SC ( 1400L x 1400W) REBAR REBAR Ð 19 TON HORI INNER C0-CVL-STD-0104 REV 1 19 2.230 1 0.001 6 5 2 60 0.114 1.300 0.250 1.300 0.250 0.114 3.328 0.45 0.45
1.0100 P2 RE-1A F2 FOUNDATION SOCKET COLUMN-OUTER SC ( 1400L x 1400W) REBAR REBAR Ð 19 TON ADD HORI UPPER C0-CVL-STD-0104 REV 1 19 2.230 1 0.001 6 2 2 24 0.800 0.800 0.04 0.04
1.0101 P2 RE-1A F2 FOUNDATION SOCKET COLUMN-OUTER SC ( 1400L x 1400W) REBAR REBAR Ð 10 TON CROSS TIE C0-CVL-STD-0104 REV 1 10 0.620 1 0.001 6 30 5 900 0.060 0.250 0.060 0.370 0.21 0.21
1.0102 P2 RE-1A F2 FOUNDATION SOCKET COLUMN-OUTER SC ( 1400L x 1400W) REBAR REBAR Ð 13 TON BOTTOM TIE C0-CVL-STD-0104 REV 1 13 1.040 1 0.001 6 2 12 0.078 1.300 1.300 1.300 1.300 0.078 5.356 0.07 0.07
1.0103 P2 CO-1A F2 FOUNDATION FOOT FDN F2 ( 3500L x 3500W x 500HPLAIN CONCRETE LEVELING CONCRETE T= 50 M³ EL -2.200 EL -2.150 C0-CVL-DWG-SSFD-2101~21 REV 1 SOIL DISPOSAL 1 6 6 3.500 0.200 3.700 3.500 0.200 3.700 2.200 -2.150 0.050 4.11 4.11
1.0104 P2 F2 FOUNDATION FOOT FDN F2 ( 3500L x 3500W x 500HEARTH WORK COMPACTIED SOIL 95% MAX DRY M² C0-CVL-DWG-SSFD-2101~21 REV 1 1 6 6 3.500 0.600 4.100 3.500 0.600 4.100 100.86 100.86
1.0105 P2 EA-1B F2 FOUNDATION FOOT FDN F2 ( 3500L x 3500W x 500HEARTH WORK EXCAVATION BY EQUIPMENT (D>3 M³ EL -2.200 EL -0.300 C0-CVL-DWG-SSFD-2101~21 REV 1 SOIL EXCAVATION 1 6 0 0 3.500 0.600 4.100 3.500 0.600 4.100 2.200 -0.300 - 1.900 - -
1.0106 P2 EA-1A F2 FOUNDATION FOOT FDN F2 ( 3500L x 3500W x 500HEARTH WORK EXCAVATION BY EQUIPMENT (D<=M³ EL -2.200 EL -0.300 C0-CVL-DWG-SSFD-2101~21 REV 1 SOIL EXCAVATION 1 6 6 3.500 0.600 4.100 3.500 0.600 4.100 2.200 -0.300 - 1.900 191.63 191.63
1.0107 P2 EA-3B F2 FOUNDATION FOOT FDN F2 ( 3500L x 3500W x 500HEARTH WORK SOIL DISPOSAL M³ DISPO: CONCRETE EL -2.150 EL -1.650 C0-CVL-DWG-SSFD-2101~21 REV 1 1 6 6 3.500 3.500 3.500 3.500 2.150 -1.650 0.500 36.75 36.75
1.0108 P2 EA-3B F2 FOUNDATION SOCKET COLUMN-OUTER SC ( 1400L x 1400W) EARTH WORK SOIL DISPOSAL M³ DISPO: CONCRETE EL -1.650 EL -0.600 C0-CVL-DWG-SSFD-2101~21 REV 1 1 6 6 1.400 1.400 1.400 1.400 1.650 -0.600 1.050 12.35 12.35
1.0109 P2 EA-3B F2 FOUNDATION FOOT FDN F2 ( 3500L x 3500W x 500HEARTH WORK SOIL DISPOSAL M³ DISPO: LC + SB C0-CVL-DWG-SSFD-2101~21 REV 1 1 1 1 4.107 4.107 4.11 4.11
1.0110 P2 EA-2A F2 FOUNDATION FOOT FDN F2 ( 3500L x 3500W x 500HEARTH WORK SOIL BACKFILL M³ C0-CVL-DWG-SSFD-2101~21 REV 1 1 1 1 191.634 -53.205 138.429 138.43 138.43
1.0111 P2 F2 FOUNDATION SOCKET COLUMN-INNER SO ( 700L x 700W) OTHERS SHEAR KEY 100x25 MM M C0-CVL-STD-0104 REV 1 1 6 5 30 0.700 0.700 0.700 0.700 2.800 84.00 84.00
1.0085 P2 CO-2A F3 FOUNDATION FOOT FDN F3 ( 3000L x 3300W x 500HCONCRETE CONCRETE M³ EL -2.150 EL -1.650 C0-CVL-DWG-SSFD-2101~21 REV 1 1 1 3.000 3.000 3.300 3.300 0.500 0.500 4.95 -
1.0086 P2 FM-1A F3 FOUNDATION FOOT FDN F3 ( 3000L x 3300W x 500HFORM WORK FORM WORK M² EL -2.150 EL -1.650 C0-CVL-DWG-SSFD-2101~21 REV 1 1 1 3.000 3.300 3.000 3.300 12.600 2.150 -1.650 0.500 6.30 -
1.0087 P2 RE-1A F3 FOUNDATION FOOT FDN F3 ( 3000L x 3300W x 500HREBAR REBAR Ð 13 TON TRANS, TOP C0-CVL-DWG-SSFD-2101~21 REV 1 13 0.150 1.040 0.001 1 22 22 2.900 0.350 0.350 3.600 0.08 -
1.0088 P2 RE-1A F3 FOUNDATION FOOT FDN F3 ( 3000L x 3300W x 500HREBAR REBAR Ð 16 TON TRANS, BOTT C0-CVL-DWG-SSFD-2101~21 REV 1 16 0.150 1.580 0.001 1 22 22 2.900 0.350 0.350 3.600 0.13 -
1.0089 P2 RE-1A F3 FOUNDATION FOOT FDN F3 ( 3000L x 3300W x 500HREBAR REBAR Ð 13 TON LONG, TOP C0-CVL-DWG-SSFD-2101~21 REV 1 13 0.150 1.040 0.001 1 20 20 3.200 0.350 0.350 3.900 0.08 -
1.0090 P2 RE-1A F3 FOUNDATION FOOT FDN F3 ( 3000L x 3300W x 500HREBAR REBAR Ð 16 TON LONG, BOTT C0-CVL-DWG-SSFD-2101~21 REV 1 16 0.150 1.580 0.001 1 20 20 3.200 0.350 0.350 3.900 0.12 -
1.0091 P2 RE-1A F3 FOUNDATION FOOT FDN F3 ( 3000L x 3300W x 500HREBAR REBAR Ð 13 TON TIE C0-CVL-DWG-SSFD-2101~21 REV 1 13 1.040 0.001 1 2 2 0.078 2.940 3.240 0.078 6.336 0.01 -
1.0092 P2 RE-1A F3 FOUNDATION FOOT FDN F3 ( 3000L x 3300W x 500HREBAR REBAR Ð 16 TON SUPPORT C0-CVL-DWG-SSFD-2101~21 REV 1 16 1.580 0.001 1 9 9 0.400 0.342 0.200 0.342 0.400 1.684 0.02 -
1.0092 P2 CO-2A F3 FOUNDATION SOCKET COLUMN-OUTER SC ( 1400L x 1400W) CONCRETE CONCRETE M³ EL -1.650 EL -0.600 C0-CVL-STD-0104 REV 1 1 1 1.400 1.400 1.400 1.400 1.650 -0.600 1.050 2.06 -
1.0093 P2 CO-2A F3 FOUNDATION SOCKET COLUMN-OUTER SC ( 700L x 700W) CONCRETE CONCRETE M³ EL -1.650 EL -0.600 C0-CVL-STD-0104 REV 1 1 -1 -1 0.700 0.700 0.700 0.700 1.650 -0.600 1.050 -0.51 -
1.0094 P2 FM-1A F3 FOUNDATION SOCKET COLUMN-OUTER SC ( 1400L x 1400W) FORM WORK FORM WORK M² EL -1.650 EL -0.600 C0-CVL-STD-0104 REV 1 1 1 1.400 1.400 1.400 1.400 5.600 1.650 -0.600 1.050 5.88 -
1.0095 P2 FM-1A F3 FOUNDATION SOCKET COLUMN-OUTER SC ( 700L x 700W) FORM WORK FORM WORK M² EL -1.650 EL -0.600 C0-CVL-STD-0104 REV 1 1 1 0.700 0.700 0.700 0.700 2.800 1.650 -0.600 1.050 2.94 -
1.0096 P2 RE-1A F3 FOUNDATION SOCKET COLUMN-OUTER SC ( 1400L x 1400W) REBAR REBAR Ð 19 TON VERT OUTER EL -2.150 EL -0.600 C0-CVL-STD-0104 REV 1 19 2.230 0.001 1 38 38 0.500 1.430 1.930 0.16 -
1.0097 P2 RE-1A F3 FOUNDATION SOCKET COLUMN-OUTER SC ( 1400L x 1400W) REBAR REBAR Ð 19 TON VERT INNER EL -2.150 EL -0.600 C0-CVL-STD-0104 REV 1 19 2.230 0.001 1 30 30 0.500 1.430 1.930 0.13 -
1.0098 P2 RE-1A F3 FOUNDATION SOCKET COLUMN-OUTER SC ( 1400L x 1400W) REBAR REBAR Ð 19 TON HORI OUTER C0-CVL-STD-0104 REV 1 19 2.230 0.001 1 5 2 10 0.114 1.300 0.250 1.300 0.250 0.114 3.328 0.07 -
1.0099 P2 RE-1A F3 FOUNDATION SOCKET COLUMN-OUTER SC ( 1400L x 1400W) REBAR REBAR Ð 19 TON HORI INNER C0-CVL-STD-0104 REV 1 19 2.230 0.001 1 5 2 10 0.114 1.300 0.250 1.300 0.250 0.114 3.328 0.07 -
1.0100 P2 RE-1A F3 FOUNDATION SOCKET COLUMN-OUTER SC ( 1400L x 1400W) REBAR REBAR Ð 19 TON ADD HORI UPPER C0-CVL-STD-0104 REV 1 19 2.230 0.001 1 2 2 4 0.800 0.800 0.01 -
1.0101 P2 RE-1A F3 FOUNDATION SOCKET COLUMN-OUTER SC ( 1400L x 1400W) REBAR REBAR Ð 10 TON CROSS TIE C0-CVL-STD-0104 REV 1 10 0.620 0.001 1 30 5 150 0.060 0.250 0.060 0.370 0.03 -
1.0102 P2 RE-1A F3 FOUNDATION SOCKET COLUMN-OUTER SC ( 1400L x 1400W) REBAR REBAR Ð 13 TON BOTTOM TIE C0-CVL-STD-0104 REV 1 13 1.040 0.001 1 2 2 0.078 1.300 1.300 1.300 1.300 0.078 5.356 0.01 -
1.0103 P2 CO-1A F3 FOUNDATION FOOT FDN F3 ( 3000L x 3300W x 500HPLAIN CONCRETE LEVELING CONCRETE T= 50 M³ EL -2.200 EL -2.150 C0-CVL-DWG-SSFD-2101~21 REV 1 SOIL DISPOSAL 1 1 3.000 0.200 3.200 3.300 0.200 3.500 2.200 -2.150 0.050 0.56 -
1.0104 P2 F3 FOUNDATION FOOT FDN F3 ( 3000L x 3300W x 500HEARTH WORK COMPACTIED SOIL 95% MAX DRY M² C0-CVL-DWG-SSFD-2101~21 REV 1 1 1 3.000 0.600 3.600 3.300 0.600 3.900 14.04 -
1.0105 P2 EA-1B F3 FOUNDATION FOOT FDN F3 ( 3000L x 3300W x 500HEARTH WORK EXCAVATION BY EQUIPMENT (D>3 M³ EL -2.200 EL -0.300 C0-CVL-DWG-SSFD-2101~21 REV 1 SOIL EXCAVATION 1 0 0 3.000 0.600 3.600 3.300 0.600 3.900 2.200 -0.300 - 1.900 - -
1.0106 P2 EA-1A F3 FOUNDATION FOOT FDN F3 ( 3000L x 3300W x 500HEARTH WORK EXCAVATION BY EQUIPMENT (D<=M³ EL -2.200 EL -0.300 C0-CVL-DWG-SSFD-2101~21 REV 1 SOIL EXCAVATION 1 1 3.000 0.600 3.600 3.300 0.600 3.900 2.200 -0.300 - 1.900 26.68 -
1.0107 P2 EA-3B F3 FOUNDATION FOOT FDN F3 ( 3000L x 3300W x 500HEARTH WORK SOIL DISPOSAL M³ DISPO: CONCRETE EL -2.150 EL -1.650 C0-CVL-DWG-SSFD-2101~21 REV 1 1 1 3.000 3.000 3.300 3.300 2.150 -1.650 0.500 4.95 -
1.0108 P2 EA-3B F3 FOUNDATION SOCKET COLUMN-OUTER SC ( 1400L x 1400W) EARTH WORK SOIL DISPOSAL M³ DISPO: CONCRETE EL -1.650 EL -0.600 C0-CVL-DWG-SSFD-2101~21 REV 1 1 1 1.400 1.400 1.400 1.400 1.650 -0.600 1.050 2.06 -
1.0109 P2 EA-3B F3 FOUNDATION FOOT FDN F3 ( 3000L x 3300W x 500HEARTH WORK SOIL DISPOSAL M³ DISPO: LC + SB C0-CVL-DWG-SSFD-2101~21 REV 1 1 1 0.560 0.560 0.56 -
1.0110 P2 EA-2A F3 FOUNDATION FOOT FDN F3 ( 3000L x 3300W x 500HEARTH WORK SOIL BACKFILL M³ C0-CVL-DWG-SSFD-2101~21 REV 1 1 1 26.676 -7.568 19.108 19.11 -
1.0111 P2 RE-1A F3 FOUNDATION FOOT FDN F3 ( 3000L x 3300W x 500HREBAR REBAR Ð 16 TON LIFTING LUG C0-CVL-DWG-SSFD-2101~21 REV 1 16 1.580 0.001 1 4 4 0.600 0.525 0.150 0.525 0.600 2.400 0.02 -
1.0112 P2 SS-4A F3 FOUNDATION FOOT FDN F3 ( 3000L x 3300W x 500HSTEEL L 50x50x5 TON LIFTING LUG C0-CVL-DWG-SSFD-2101~21 REV 1 3.770 0.001 1 4 4 0.500 0.500 0.01 -
1.0113 P2 F3 FOUNDATION SOCKET COLUMN-INNER SO ( 700L x 700W) OTHERS SHEAR KEY 100x25 MM M C0-CVL-STD-0104 REV 1 1 5 5 0.700 0.700 0.700 0.700 2.800 14.00 -
1.0114 P2 CO-2A F4 FOUNDATION FOOT FDN F4 ( 3000L x 3300W x 500HCONCRETE CONCRETE M³ EL -2.150 EL -1.650 C0-CVL-DWG-SSFD-2101~21 REV 1 1 1 3.000 3.000 3.300 3.300 0.500 0.500 4.95 -
1.0115 P2 FM-1A F4 FOUNDATION FOOT FDN F4 ( 3000L x 3300W x 500HFORM WORK FORM WORK M² EL -2.150 EL -1.650 C0-CVL-DWG-SSFD-2101~21 REV 1 1 1 3.000 3.300 3.000 3.300 12.600 2.150 -1.650 0.500 6.30 -
1.0116 P2 RE-1A F4 FOUNDATION FOOT FDN F4 ( 3000L x 3300W x 500HREBAR REBAR Ð 13 TON TRANS, TOP C0-CVL-DWG-SSFD-2101~21 REV 1 13 0.150 1.040 0.001 1 22 22 2.900 0.350 0.350 3.600 0.08 -
1.0117 P2 RE-1A F4 FOUNDATION FOOT FDN F4 ( 3000L x 3300W x 500HREBAR REBAR Ð 16 TON TRANS, BOTT C0-CVL-DWG-SSFD-2101~21 REV 1 16 0.150 1.580 0.001 1 22 22 2.900 0.350 0.350 3.600 0.13 -
1.0118 P2 RE-1A F4 FOUNDATION FOOT FDN F4 ( 3000L x 3300W x 500HREBAR REBAR Ð 13 TON LONG, TOP C0-CVL-DWG-SSFD-2101~21 REV 1 13 0.150 1.040 0.001 1 20 20 3.200 0.350 0.350 3.900 0.08 -
1.0119 P2 RE-1A F4 FOUNDATION FOOT FDN F4 ( 3000L x 3300W x 500HREBAR REBAR Ð 16 TON LONG, BOTT C0-CVL-DWG-SSFD-2101~21 REV 1 16 0.150 1.580 0.001 1 20 20 3.200 0.350 0.350 3.900 0.12 -
1.0120 P2 RE-1A F4 FOUNDATION FOOT FDN F4 ( 3000L x 3300W x 500HREBAR REBAR Ð 13 TON TIE C0-CVL-DWG-SSFD-2101~21 REV 1 13 1.040 0.001 1 2 2 0.078 2.940 3.240 0.078 6.336 0.01 -
1.0121 P2 RE-1A F4 FOUNDATION FOOT FDN F4 ( 3000L x 3300W x 500HREBAR REBAR Ð 16 TON SUPPORT C0-CVL-DWG-SSFD-2101~21 REV 1 16 1.580 0.001 1 9 9 0.400 0.342 0.200 0.342 0.400 1.684 0.02 -
1.0121 P2 CO-2A F4 FOUNDATION SOCKET COLUMN-OUTER SC ( 1400L x 1400W) CONCRETE CONCRETE M³ EL -1.650 EL -0.600 C0-CVL-STD-0104 REV 1 1 1 1.400 1.400 1.400 1.400 1.650 -0.600 1.050 2.06 -
1.0122 P2 CO-2A F4 FOUNDATION SOCKET COLUMN-OUTER SC ( 700L x 700W) CONCRETE CONCRETE M³ EL -1.650 EL -0.600 C0-CVL-STD-0104 REV 1 1 -1 -1 0.700 0.700 0.700 0.700 1.650 -0.600 1.050 -0.51 -
1.0123 P2 FM-1A F4 FOUNDATION SOCKET COLUMN-OUTER SC ( 1400L x 1400W) FORM WORK FORM WORK M² EL -1.650 EL -0.600 C0-CVL-STD-0104 REV 1 1 1 1.400 1.400 1.400 1.400 5.600 1.650 -0.600 1.050 5.88 -
1.0124 P2 FM-1A F4 FOUNDATION SOCKET COLUMN-OUTER SC ( 700L x 700W) FORM WORK FORM WORK M² EL -1.650 EL -0.600 C0-CVL-STD-0104 REV 1 1 1 0.700 0.700 0.700 0.700 2.800 1.650 -0.600 1.050 2.94 -
1.0125 P2 RE-1A F4 FOUNDATION SOCKET COLUMN-OUTER SC ( 1400L x 1400W) REBAR REBAR Ð 19 TON VERT OUTER EL -2.150 EL -0.600 C0-CVL-STD-0104 REV 1 19 2.230 0.001 1 38 38 0.500 1.430 1.930 0.16 -
1.0126 P2 RE-1A F4 FOUNDATION SOCKET COLUMN-OUTER SC ( 1400L x 1400W) REBAR REBAR Ð 19 TON VERT INNER EL -2.150 EL -0.600 C0-CVL-STD-0104 REV 1 19 2.230 0.001 1 30 30 0.500 1.430 1.930 0.13 -
1.0127 P2 RE-1A F4 FOUNDATION SOCKET COLUMN-OUTER SC ( 1400L x 1400W) REBAR REBAR Ð 19 TON HORI OUTER C0-CVL-STD-0104 REV 1 19 2.230 0.001 1 5 2 10 0.114 1.300 0.250 1.300 0.250 0.114 3.328 0.07 -
1.0128 P2 RE-1A F4 FOUNDATION SOCKET COLUMN-OUTER SC ( 1400L x 1400W) REBAR REBAR Ð 19 TON HORI INNER C0-CVL-STD-0104 REV 1 19 2.230 0.001 1 5 2 10 0.114 1.300 0.250 1.300 0.250 0.114 3.328 0.07 -
1.0129 P2 RE-1A F4 FOUNDATION SOCKET COLUMN-OUTER SC ( 1400L x 1400W) REBAR REBAR Ð 19 TON ADD HORI UPPER C0-CVL-STD-0104 REV 1 19 2.230 0.001 1 2 2 4 0.800 0.800 0.01 -
1.0130 P2 RE-1A F4 FOUNDATION SOCKET COLUMN-OUTER SC ( 1400L x 1400W) REBAR REBAR Ð 10 TON CROSS TIE C0-CVL-STD-0104 REV 1 10 0.620 0.001 1 30 5 150 0.060 0.250 0.060 0.370 0.03 -
1.0131 P2 RE-1A F4 FOUNDATION SOCKET COLUMN-OUTER SC ( 1400L x 1400W) REBAR REBAR Ð 13 TON BOTTOM TIE C0-CVL-STD-0104 REV 1 13 1.040 0.001 1 2 2 0.078 1.300 1.300 1.300 1.300 0.078 5.356 0.01 -
1.0132 P2 CO-1A F4 FOUNDATION FOOT FDN F4 ( 3000L x 3300W x 500HPLAIN CONCRETE LEVELING CONCRETE T= 50 M³ EL -2.200 EL -2.150 C0-CVL-DWG-SSFD-2101~21 REV 1 SOIL DISPOSAL 1 1 3.000 0.200 3.200 3.300 0.200 3.500 2.200 -2.150 0.050 0.56 -
1.0133 P2 F4 FOUNDATION FOOT FDN F4 ( 3000L x 3300W x 500HEARTH WORK COMPACTIED SOIL 95% MAX DRY M² C0-CVL-DWG-SSFD-2101~21 REV 1 1 1 3.000 0.600 3.600 3.300 0.600 3.900 14.04 -
1.0134 P2 EA-1B F4 FOUNDATION FOOT FDN F4 ( 3000L x 3300W x 500HEARTH WORK EXCAVATION BY EQUIPMENT (D>3 M³ EL -2.200 EL -0.300 C0-CVL-DWG-SSFD-2101~21 REV 1 SOIL EXCAVATION 1 0 0 3.000 0.600 3.600 3.300 0.600 3.900 2.200 -0.300 - 1.900 - -
1.0135 P2 EA-1A F4 FOUNDATION FOOT FDN F4 ( 3000L x 3300W x 500HEARTH WORK EXCAVATION BY EQUIPMENT (D<=M³ EL -2.200 EL -0.300 C0-CVL-DWG-SSFD-2101~21 REV 1 SOIL EXCAVATION 1 1 3.000 0.600 3.600 3.300 0.600 3.900 2.200 -0.300 - 1.900 26.68 -
1.0136 P2 EA-3B F4 FOUNDATION FOOT FDN F4 ( 3000L x 3300W x 500HEARTH WORK SOIL DISPOSAL M³ DISPO: CONCRETE EL -2.150 EL -1.650 C0-CVL-DWG-SSFD-2101~21 REV 1 1 1 3.000 3.000 3.300 3.300 2.150 -1.650 0.500 4.95 -
1.0137 P2 EA-3B F4 FOUNDATION SOCKET COLUMN-OUTER SC ( 1400L x 1400W) EARTH WORK SOIL DISPOSAL M³ DISPO: CONCRETE EL -1.650 EL -0.600 C0-CVL-DWG-SSFD-2101~21 REV 1 1 1 1.400 1.400 1.400 1.400 1.650 -0.600 1.050 2.06 -
1.0138 P2 EA-3B F4 FOUNDATION FOOT FDN F4 ( 3000L x 3300W x 500HEARTH WORK SOIL DISPOSAL M³ DISPO: LC + SB C0-CVL-DWG-SSFD-2101~21 REV 1 1 1 0.560 0.560 0.56 -
1.0139 P2 EA-2A F4 FOUNDATION FOOT FDN F4 ( 3000L x 3300W x 500HEARTH WORK SOIL BACKFILL M³ C0-CVL-DWG-SSFD-2101~21 REV 1 1 1 26.676 -7.568 19.108 19.11 -
1.0140 P2 F4 FOUNDATION SOCKET COLUMN-INNER SO ( 700L x 700W) OTHERS SHEAR KEY 100x25 MM M C0-CVL-STD-0104 REV 1 1 5 5 0.700 0.700 0.700 0.700 2.800 14.00 -
1.0141 P2 CO-2A F5 FOUNDATION FOOT FDN F5 ( 3000L x 3300W x 500HCONCRETE CONCRETE M³ EL -2.150 EL -1.650 C0-CVL-DWG-SSFD-2101~21 REV 1 1 1 3.000 3.000 3.300 3.300 0.500 0.500 4.95 -
1.0142 P2 FM-1A F5 FOUNDATION FOOT FDN F5 ( 3000L x 3300W x 500HFORM WORK FORM WORK M² EL -2.150 EL -1.650 C0-CVL-DWG-SSFD-2101~21 REV 1 1 1 3.000 3.300 3.000 3.300 12.600 2.150 -1.650 0.500 6.30 -
1.0143 P2 RE-1A F5 FOUNDATION FOOT FDN F5 ( 3000L x 3300W x 500HREBAR REBAR Ð 13 TON TRANS, TOP C0-CVL-DWG-SSFD-2101~21 REV 1 13 0.150 1.040 1 0.001 1 22 22 2.900 0.350 0.350 3.600 0.08 0.08
1.0144 P2 RE-1A F5 FOUNDATION FOOT FDN F5 ( 3000L x 3300W x 500HREBAR REBAR Ð 16 TON TRANS, BOTT C0-CVL-DWG-SSFD-2101~21 REV 1 16 0.150 1.580 1 0.001 1 22 22 2.900 0.350 0.350 3.600 0.13 0.13
1.0145 P2 RE-1A F5 FOUNDATION FOOT FDN F5 ( 3000L x 3300W x 500HREBAR REBAR Ð 13 TON LONG, TOP C0-CVL-DWG-SSFD-2101~21 REV 1 13 0.150 1.040 1 0.001 1 20 20 3.200 0.350 0.350 3.900 0.08 0.08
1.0146 P2 RE-1A F5 FOUNDATION FOOT FDN F5 ( 3000L x 3300W x 500HREBAR REBAR Ð 16 TON LONG, BOTT C0-CVL-DWG-SSFD-2101~21 REV 1 16 0.150 1.580 1 0.001 1 20 20 3.200 0.350 0.350 3.900 0.12 0.12
1.0147 P2 RE-1A F5 FOUNDATION FOOT FDN F5 ( 3000L x 3300W x 500HREBAR REBAR Ð 13 TON TIE C0-CVL-DWG-SSFD-2101~21 REV 1 13 1.040 1 0.001 1 2 2 0.078 2.940 3.240 0.078 6.336 0.01 0.01
1.0148 P2 RE-1A F5 FOUNDATION FOOT FDN F5 ( 3000L x 3300W x 500HREBAR REBAR Ð 16 TON SUPPORT C0-CVL-DWG-SSFD-2101~21 REV 1 16 1.580 1 0.001 1 9 9 0.400 0.342 0.200 0.342 0.400 1.684 0.02 0.02
1.0148 P2 CO-2A F5 FOUNDATION SOCKET COLUMN-OUTER SC ( 1400L x 1400W) CONCRETE CONCRETE M³ EL -1.650 EL -0.600 C0-CVL-STD-0104 REV 1 1 1 1.400 1.400 1.400 1.400 1.650 -0.600 1.050 2.06 -
1.0149 P2 CO-2A F5 FOUNDATION SOCKET COLUMN-OUTER SC ( 700L x 700W) CONCRETE CONCRETE M³ EL -1.650 EL -0.600 C0-CVL-STD-0104 REV 1 1 -1 -1 0.700 0.700 0.700 0.700 1.650 -0.600 1.050 -0.51 -
1.0150 P2 FM-1A F5 FOUNDATION SOCKET COLUMN-OUTER SC ( 1400L x 1400W) FORM WORK FORM WORK M² EL -1.650 EL -0.600 C0-CVL-STD-0104 REV 1 1 1 1.400 1.400 1.400 1.400 5.600 1.650 -0.600 1.050 5.88 -
1.0151 P2 FM-1A F5 FOUNDATION SOCKET COLUMN-OUTER SC ( 700L x 700W) FORM WORK FORM WORK M² EL -1.650 EL -0.600 C0-CVL-STD-0104 REV 1 1 1 0.700 0.700 0.700 0.700 2.800 1.650 -0.600 1.050 2.94 -
1.0152 P2 RE-1A F5 FOUNDATION SOCKET COLUMN-OUTER SC ( 1400L x 1400W) REBAR REBAR Ð 19 TON VERT OUTER EL -2.150 EL -0.600 C0-CVL-STD-0104 REV 1 19 2.230 0.001 1 38 38 0.500 1.430 1.930 0.16 -
1.0153 P2 RE-1A F5 FOUNDATION SOCKET COLUMN-OUTER SC ( 1400L x 1400W) REBAR REBAR Ð 19 TON VERT INNER EL -2.150 EL -0.600 C0-CVL-STD-0104 REV 1 19 2.230 0.001 1 30 30 0.500 1.430 1.930 0.13 -
1.0154 P2 RE-1A F5 FOUNDATION SOCKET COLUMN-OUTER SC ( 1400L x 1400W) REBAR REBAR Ð 19 TON HORI OUTER C0-CVL-STD-0104 REV 1 19 2.230 0.001 1 5 2 10 0.114 1.300 0.250 1.300 0.250 0.114 3.328 0.07 -
1.0155 P2 RE-1A F5 FOUNDATION SOCKET COLUMN-OUTER SC ( 1400L x 1400W) REBAR REBAR Ð 19 TON HORI INNER C0-CVL-STD-0104 REV 1 19 2.230 0.001 1 5 2 10 0.114 1.300 0.250 1.300 0.250 0.114 3.328 0.07 -
1.0156 P2 RE-1A F5 FOUNDATION SOCKET COLUMN-OUTER SC ( 1400L x 1400W) REBAR REBAR Ð 19 TON ADD HORI UPPER C0-CVL-STD-0104 REV 1 19 2.230 0.001 1 2 2 4 0.800 0.800 0.01 -

file:///conversion/tmp/scratch/454095803.xlsxPrinted: 01/03/2020 - 21:53:27 <EA>


1.0157 P2 RE-1A F5 FOUNDATION SOCKET COLUMN-OUTER SC ( 1400L x 1400W) REBAR REBAR Ð 10 TON CROSS TIE C0-CVL-STD-0104 REV 1 10 0.620 0.001 1 30 5 150 0.060 0.250 0.060 0.370 0.03 -
1.0158 P2 RE-1A F5 FOUNDATION SOCKET COLUMN-OUTER SC ( 1400L x 1400W) REBAR REBAR Ð 13 TON BOTTOM TIE C0-CVL-STD-0104 REV 1 13 1.040 0.001 1 2 2 0.078 1.300 1.300 1.300 1.300 0.078 5.356 0.01 -
1.0159 P2 CO-1A F5 FOUNDATION FOOT FDN F5 ( 3000L x 3300W x 500HPLAIN CONCRETE LEVELING CONCRETE T= 50 M³ EL -2.200 EL -2.150 C0-CVL-DWG-SSFD-2101~21 REV 1 SOIL DISPOSAL 1 1 3.000 0.200 3.200 3.300 0.200 3.500 2.200 -2.150 0.050 0.56 -
1.0160 P2 F5 FOUNDATION FOOT FDN F5 ( 3000L x 3300W x 500HEARTH WORK COMPACTIED SOIL 95% MAX DRY M² C0-CVL-DWG-SSFD-2101~21 REV 1 1 1 3.000 0.600 3.600 3.300 0.600 3.900 14.04 -
1.0161 P2 EA-1B F5 FOUNDATION FOOT FDN F5 ( 3000L x 3300W x 500HEARTH WORK EXCAVATION BY EQUIPMENT (D>3 M³ EL -2.200 EL -0.300 C0-CVL-DWG-SSFD-2101~21 REV 1 SOIL EXCAVATION 1 0 0 3.000 0.600 3.600 3.300 0.600 3.900 2.200 -0.300 - 1.900 - -
1.0162 P2 EA-1A F5 FOUNDATION FOOT FDN F5 ( 3000L x 3300W x 500HEARTH WORK EXCAVATION BY EQUIPMENT (D<=M³ EL -2.200 EL -0.300 C0-CVL-DWG-SSFD-2101~21 REV 1 SOIL EXCAVATION 1 1 3.000 0.600 3.600 3.300 0.600 3.900 2.200 -0.300 - 1.900 26.68 -
1.0163 P2 EA-3B F5 FOUNDATION FOOT FDN F5 ( 3000L x 3300W x 500HEARTH WORK SOIL DISPOSAL M³ DISPO: CONCRETE EL -2.150 EL -1.650 C0-CVL-DWG-SSFD-2101~21 REV 1 1 1 3.000 3.000 3.300 3.300 2.150 -1.650 0.500 4.95 -
1.0164 P2 EA-3B F5 FOUNDATION SOCKET COLUMN-OUTER SC ( 1400L x 1400W) EARTH WORK SOIL DISPOSAL M³ DISPO: CONCRETE EL -1.650 EL -0.600 C0-CVL-DWG-SSFD-2101~21 REV 1 1 1 1.400 1.400 1.400 1.400 1.650 -0.600 1.050 2.06 -
1.0165 P2 EA-3B F5 FOUNDATION FOOT FDN F5 ( 3000L x 3300W x 500HEARTH WORK SOIL DISPOSAL M³ DISPO: LC + SB C0-CVL-DWG-SSFD-2101~21 REV 1 1 1 0.560 0.560 0.56 -
1.0166 P2 EA-2A F5 FOUNDATION FOOT FDN F5 ( 3000L x 3300W x 500HEARTH WORK SOIL BACKFILL M³ C0-CVL-DWG-SSFD-2101~21 REV 1 1 1 26.676 -7.568 19.108 19.11 -
1.0167 P2 F5 FOUNDATION SOCKET COLUMN-INNER SO ( 700L x 700W) OTHERS SHEAR KEY 100x25 MM M C0-CVL-STD-0104 REV 1 1 5 5 0.700 0.700 0.700 0.700 2.800 14.00 -
1.0168 P2 CO-2A F6 FOUNDATION FOOT FDN F6 ( 3000L x 3300W x 500HCONCRETE CONCRETE M³ EL -2.150 EL -1.650 C0-CVL-DWG-SSFD-2101~21 REV 1 1 1 1 3.000 3.000 3.300 3.300 0.500 0.500 4.95 4.95
1.0169 P2 FM-1A F6 FOUNDATION FOOT FDN F6 ( 3000L x 3300W x 500HFORM WORK FORM WORK M² EL -2.150 EL -1.650 C0-CVL-DWG-SSFD-2101~21 REV 1 1 1 1 3.000 3.300 3.000 3.300 12.600 2.150 -1.650 0.500 6.30 6.30
1.0170 P2 RE-1A F6 FOUNDATION FOOT FDN F6 ( 3000L x 3300W x 500HREBAR REBAR Ð 13 TON TRANS, TOP C0-CVL-DWG-SSFD-2101~21 REV 1 13 0.150 1.040 1 0.001 1 22 22 2.900 0.350 0.350 3.600 0.08 0.08
1.0171 P2 RE-1A F6 FOUNDATION FOOT FDN F6 ( 3000L x 3300W x 500HREBAR REBAR Ð 16 TON TRANS, BOTT C0-CVL-DWG-SSFD-2101~21 REV 1 16 0.150 1.580 1 0.001 1 22 22 2.900 0.350 0.350 3.600 0.13 0.13
1.0172 P2 RE-1A F6 FOUNDATION FOOT FDN F6 ( 3000L x 3300W x 500HREBAR REBAR Ð 13 TON LONG, TOP C0-CVL-DWG-SSFD-2101~21 REV 1 13 0.150 1.040 1 0.001 1 20 20 3.200 0.350 0.350 3.900 0.08 0.08
1.0173 P2 RE-1A F6 FOUNDATION FOOT FDN F6 ( 3000L x 3300W x 500HREBAR REBAR Ð 16 TON LONG, BOTT C0-CVL-DWG-SSFD-2101~21 REV 1 16 0.150 1.580 1 0.001 1 20 20 3.200 0.350 0.350 3.900 0.12 0.12
1.0174 P2 RE-1A F6 FOUNDATION FOOT FDN F6 ( 3000L x 3300W x 500HREBAR REBAR Ð 13 TON TIE C0-CVL-DWG-SSFD-2101~21 REV 1 13 1.040 1 0.001 1 2 2 0.078 2.940 3.240 0.078 6.336 0.01 0.01
1.0175 P2 RE-1A F6 FOUNDATION FOOT FDN F6 ( 3000L x 3300W x 500HREBAR REBAR Ð 16 TON SUPPORT C0-CVL-DWG-SSFD-2101~21 REV 1 16 1.580 1 0.001 1 9 9 0.400 0.342 0.200 0.342 0.400 1.684 0.02 0.02
1.0175 P2 CO-2A F6 FOUNDATION SOCKET COLUMN-OUTER SC ( 1400L x 1400W) CONCRETE CONCRETE M³ EL -1.650 EL -0.600 C0-CVL-STD-0104 REV 1 1 1 1.400 1.400 1.400 1.400 1.650 -0.600 1.050 2.06 -
1.0176 P2 CO-2A F6 FOUNDATION SOCKET COLUMN-OUTER SC ( 700L x 700W) CONCRETE CONCRETE M³ EL -1.650 EL -0.600 C0-CVL-STD-0104 REV 1 1 -1 -1 0.700 0.700 0.700 0.700 1.650 -0.600 1.050 -0.51 -
1.0177 P2 FM-1A F6 FOUNDATION SOCKET COLUMN-OUTER SC ( 1400L x 1400W) FORM WORK FORM WORK M² EL -1.650 EL -0.600 C0-CVL-STD-0104 REV 1 1 1 1.400 1.400 1.400 1.400 5.600 1.650 -0.600 1.050 5.88 -
1.0178 P2 FM-1A F6 FOUNDATION SOCKET COLUMN-OUTER SC ( 700L x 700W) FORM WORK FORM WORK M² EL -1.650 EL -0.600 C0-CVL-STD-0104 REV 1 1 1 0.700 0.700 0.700 0.700 2.800 1.650 -0.600 1.050 2.94 -
1.0179 P2 RE-1A F6 FOUNDATION SOCKET COLUMN-OUTER SC ( 1400L x 1400W) REBAR REBAR Ð 19 TON VERT OUTER EL -2.150 EL -0.600 C0-CVL-STD-0104 REV 1 19 2.230 1 0.001 1 38 38 0.500 1.430 1.930 0.16 0.16
1.0180 P2 RE-1A F6 FOUNDATION SOCKET COLUMN-OUTER SC ( 1400L x 1400W) REBAR REBAR Ð 19 TON VERT INNER EL -2.150 EL -0.600 C0-CVL-STD-0104 REV 1 19 2.230 1 0.001 1 30 30 0.500 1.430 1.930 0.13 0.13
1.0181 P2 RE-1A F6 FOUNDATION SOCKET COLUMN-OUTER SC ( 1400L x 1400W) REBAR REBAR Ð 19 TON HORI OUTER C0-CVL-STD-0104 REV 1 19 2.230 1 0.001 1 5 2 10 0.114 1.300 0.250 1.300 0.250 0.114 3.328 0.07 0.07
1.0182 P2 RE-1A F6 FOUNDATION SOCKET COLUMN-OUTER SC ( 1400L x 1400W) REBAR REBAR Ð 19 TON HORI INNER C0-CVL-STD-0104 REV 1 19 2.230 1 0.001 1 5 2 10 0.114 1.300 0.250 1.300 0.250 0.114 3.328 0.07 0.07
1.0183 P2 RE-1A F6 FOUNDATION SOCKET COLUMN-OUTER SC ( 1400L x 1400W) REBAR REBAR Ð 19 TON ADD HORI UPPER C0-CVL-STD-0104 REV 1 19 2.230 1 0.001 1 2 2 4 0.800 0.800 0.01 0.01
1.0184 P2 RE-1A F6 FOUNDATION SOCKET COLUMN-OUTER SC ( 1400L x 1400W) REBAR REBAR Ð 10 TON CROSS TIE C0-CVL-STD-0104 REV 1 10 0.620 1 0.001 1 30 5 150 0.060 0.250 0.060 0.370 0.03 0.03
1.0185 P2 RE-1A F6 FOUNDATION SOCKET COLUMN-OUTER SC ( 1400L x 1400W) REBAR REBAR Ð 13 TON BOTTOM TIE C0-CVL-STD-0104 REV 1 13 1.040 1 0.001 1 2 2 0.078 1.300 1.300 1.300 1.300 0.078 5.356 0.01 0.01
1.0186 P2 CO-1A F6 FOUNDATION FOOT FDN F6 ( 3000L x 3300W x 500HPLAIN CONCRETE LEVELING CONCRETE T= 50 M³ EL -2.200 EL -2.150 C0-CVL-DWG-SSFD-2101~21 REV 1 SOIL DISPOSAL 1 1 1 3.000 0.200 3.200 3.300 0.200 3.500 2.200 -2.150 0.050 0.56 0.56
1.0187 P2 F6 FOUNDATION FOOT FDN F6 ( 3000L x 3300W x 500HEARTH WORK COMPACTIED SOIL 95% MAX DRY M² C0-CVL-DWG-SSFD-2101~21 REV 1 1 1 1 3.000 0.600 3.600 3.300 0.600 3.900 14.04 14.04
1.0188 P2 EA-1B F6 FOUNDATION FOOT FDN F6 ( 3000L x 3300W x 500HEARTH WORK EXCAVATION BY EQUIPMENT (D>3 M³ EL -2.200 EL -0.300 C0-CVL-DWG-SSFD-2101~21 REV 1 SOIL EXCAVATION 1 1 0 0 3.000 0.600 3.600 3.300 0.600 3.900 2.200 -0.300 - 1.900 - -
1.0189 P2 EA-1A F6 FOUNDATION FOOT FDN F6 ( 3000L x 3300W x 500HEARTH WORK EXCAVATION BY EQUIPMENT (D<=M³ EL -2.200 EL -0.300 C0-CVL-DWG-SSFD-2101~21 REV 1 SOIL EXCAVATION 1 1 1 3.000 0.600 3.600 3.300 0.600 3.900 2.200 -0.300 - 1.900 26.68 26.68
1.0190 P2 EA-3B F6 FOUNDATION FOOT FDN F6 ( 3000L x 3300W x 500HEARTH WORK SOIL DISPOSAL M³ DISPO: CONCRETE EL -2.150 EL -1.650 C0-CVL-DWG-SSFD-2101~21 REV 1 1 1 1 3.000 3.000 3.300 3.300 2.150 -1.650 0.500 4.95 4.95
1.0191 P2 EA-3B F6 FOUNDATION SOCKET COLUMN-OUTER SC ( 1400L x 1400W) EARTH WORK SOIL DISPOSAL M³ DISPO: CONCRETE EL -1.650 EL -0.600 C0-CVL-DWG-SSFD-2101~21 REV 1 1 1 1 1.400 1.400 1.400 1.400 1.650 -0.600 1.050 2.06 2.06
1.0192 P2 EA-3B F6 FOUNDATION FOOT FDN F6 ( 3000L x 3300W x 500HEARTH WORK SOIL DISPOSAL M³ DISPO: LC + SB C0-CVL-DWG-SSFD-2101~21 REV 1 1 1 1 0.560 0.560 0.56 0.56
1.0193 P2 EA-2A F6 FOUNDATION FOOT FDN F6 ( 3000L x 3300W x 500HEARTH WORK SOIL BACKFILL M³ C0-CVL-DWG-SSFD-2101~21 REV 1 1 1 26.676 -7.568 19.108 19.11 -
1.0194 P2 F6 FOUNDATION SOCKET COLUMN-INNER SO ( 700L x 700W) OTHERS SHEAR KEY 100x25 MM M C0-CVL-STD-0104 REV 1 1 5 5 0.700 0.700 0.700 0.700 2.800 14.00 -
1.0195 P2 CO-2A F1 FOUNDATION FOOT FDN F1 ( 2800L x 2800W x 500HCONCRETE CONCRETE M³ EL -1.850 EL -1.350 C0-CVL-DWG-SSFD-2201~21 REV 2 1 14 14 2.800 2.800 2.800 2.800 0.500 0.500 54.88 54.88
1.0196 P2 FM-1A F1 FOUNDATION FOOT FDN F1 ( 2800L x 2800W x 500HFORM WORK FORM WORK M² EL -1.850 EL -1.350 C0-CVL-DWG-SSFD-2201~21 REV 2 1 14 14 2.800 2.800 2.800 2.800 11.200 1.850 -1.350 0.500 78.40 78.40
1.0197 P2 RE-1A F1 FOUNDATION FOOT FDN F1 ( 2800L x 2800W x 500HREBAR REBAR Ð 13 TON TRANS, TOP C0-CVL-DWG-SSFD-2201~21 REV 2 13 0.200 1.040 1 0.001 14 15 210 2.700 0.350 0.350 3.400 0.74 0.74
1.0198 P2 RE-1A F1 FOUNDATION FOOT FDN F1 ( 2800L x 2800W x 500HREBAR REBAR Ð 16 TON TRANS, BOTT C0-CVL-DWG-SSFD-2201~21 REV 2 16 0.200 1.580 1 0.001 14 15 210 2.700 0.350 0.350 3.400 1.13 1.13
1.0199 P2 RE-1A F1 FOUNDATION FOOT FDN F1 ( 2800L x 2800W x 500HREBAR REBAR Ð 13 TON LONG, TOP C0-CVL-DWG-SSFD-2201~21 REV 2 13 0.200 1.040 1 0.001 14 15 210 2.700 0.350 0.350 3.400 0.74 0.74
1.0200 P2 RE-1A F1 FOUNDATION FOOT FDN F1 ( 2800L x 2800W x 500HREBAR REBAR Ð 16 TON LONG, BOTT C0-CVL-DWG-SSFD-2201~21 REV 2 16 0.200 1.580 1 0.001 14 15 210 2.700 0.350 0.350 3.400 1.13 1.13
1.0201 P2 RE-1A F1 FOUNDATION FOOT FDN F1 ( 2800L x 2800W x 500HREBAR REBAR Ð 13 TON TIE C0-CVL-DWG-SSFD-2201~21 REV 2 13 1.040 1 0.001 14 2 28 0.078 2.740 2.740 0.078 5.636 0.16 0.16
1.0202 P2 RE-1A F1 FOUNDATION FOOT FDN F1 ( 2800L x 2800W x 500HREBAR REBAR Ð 16 TON SUPPORT C0-CVL-DWG-SSFD-2201~21 REV 1 16 1.580 0.001 14 9 126 0.400 0.342 0.200 0.342 0.400 1.684 0.34 -
1.0202 P2 CO-2A F1 FOUNDATION SOCKET COLUMN-OUTER SC ( 1400L x 1400W) CONCRETE CONCRETE M³ EL -1.350 EL -0.300 C0-CVL-STD-0104 REV 1 1 14 14 1.400 1.400 1.400 1.400 1.350 -0.300 1.050 28.81 28.81
1.0203 P2 CO-2A F1 FOUNDATION SOCKET COLUMN-OUTER SC ( 700L x 700W) CONCRETE CONCRETE M³ EL -1.350 EL -0.300 C0-CVL-STD-0104 REV 1 1 14 -1 -14 0.700 0.700 0.700 0.700 1.350 -0.300 1.050 -7.20 -7.20
1.0204 P2 FM-1A F1 FOUNDATION SOCKET COLUMN-OUTER SC ( 1400L x 1400W) FORM WORK FORM WORK M² EL -1.350 EL -0.300 C0-CVL-STD-0104 REV 1 1 14 14 1.400 1.400 1.400 1.400 5.600 1.350 -0.300 1.050 82.32 82.32
1.0205 P2 FM-1A F1 FOUNDATION SOCKET COLUMN-OUTER SC ( 700L x 700W) FORM WORK FORM WORK M² EL -1.350 EL -0.300 C0-CVL-STD-0104 REV 1 1 14 14 0.700 0.700 0.700 0.700 2.800 1.350 -0.300 1.050 41.16 41.16
1.0206 P2 RE-1A F1 FOUNDATION SOCKET COLUMN-OUTER SC ( 1400L x 1400W) REBAR REBAR Ð 19 TON VERT OUTER EL -1.850 EL -0.300 C0-CVL-STD-0104 REV 1 19 2.230 1 0.001 14 38 532 0.500 1.430 1.930 2.29 2.29
1.0207 P2 RE-1A F1 FOUNDATION SOCKET COLUMN-OUTER SC ( 1400L x 1400W) REBAR REBAR Ð 19 TON VERT INNER EL -1.850 EL -0.300 C0-CVL-STD-0104 REV 1 19 2.230 1 0.001 14 30 420 0.500 1.430 1.930 1.81 1.81
1.0208 P2 RE-1A F1 FOUNDATION SOCKET COLUMN-OUTER SC ( 1400L x 1400W) REBAR REBAR Ð 19 TON HORI OUTER C0-CVL-STD-0104 REV 1 19 2.230 1 0.001 14 5 2 140 0.114 1.300 0.250 1.300 0.250 0.114 3.328 1.04 1.04
1.0209 P2 RE-1A F1 FOUNDATION SOCKET COLUMN-OUTER SC ( 1400L x 1400W) REBAR REBAR Ð 19 TON HORI INNER C0-CVL-STD-0104 REV 1 19 2.230 1 0.001 14 5 2 140 0.114 1.300 0.250 1.300 0.250 0.114 3.328 1.04 1.04
1.0210 P2 RE-1A F1 FOUNDATION SOCKET COLUMN-OUTER SC ( 1400L x 1400W) REBAR REBAR Ð 19 TON ADD HORI UPPER C0-CVL-STD-0104 REV 1 19 2.230 1 0.001 14 2 2 56 0.800 0.800 0.10 0.10
1.0211 P2 RE-1A F1 FOUNDATION SOCKET COLUMN-OUTER SC ( 1400L x 1400W) REBAR REBAR Ð 10 TON CROSS TIE C0-CVL-STD-0104 REV 1 10 0.620 1 0.001 14 30 5 2100 0.060 0.250 0.060 0.370 0.48 0.48
1.0212 P2 RE-1A F1 FOUNDATION SOCKET COLUMN-OUTER SC ( 1400L x 1400W) REBAR REBAR Ð 13 TON BOTTOM TIE C0-CVL-STD-0104 REV 1 13 1.040 1 0.001 14 2 28 0.078 1.300 1.300 1.300 1.300 0.078 5.356 0.16 0.16
1.0213 P2 CO-1A F1 FOUNDATION FOOT FDN F1 ( 2800L x 2800W x 500HPLAIN CONCRETE LEVELING CONCRETE T= 50 M³ EL -1.900 EL -1.850 C0-CVL-DWG-SSFD-2201~21 REV 2 SOIL DISPOSAL 1 14 14 2.800 0.200 3.000 2.800 0.200 3.000 1.900 -1.850 0.050 6.30 6.30
1.0214 P2 F1 FOUNDATION FOOT FDN F1 ( 2800L x 2800W x 500HEARTH WORK COMPACTIED SOIL 95% MAX DRY M² C0-CVL-DWG-SSFD-2201~21 REV 2 1 14 14 2.800 0.600 3.400 2.800 0.600 3.400 161.84 161.84
1.0215 P2 EA-1B F1 FOUNDATION FOOT FDN F1 ( 2800L x 2800W x 500HEARTH WORK EXCAVATION BY EQUIPMENT (D>3 M³ EL -1.900 EL -0.300 C0-CVL-DWG-SSFD-2201~21 REV 2 SOIL EXCAVATION 1 14 0 0 2.800 0.600 3.400 2.800 0.600 3.400 1.900 -0.300 - 1.600 - -
1.0216 P2 EA-1A F1 FOUNDATION FOOT FDN F1 ( 2800L x 2800W x 500HEARTH WORK EXCAVATION BY EQUIPMENT (D<=M³ EL -1.900 EL -0.300 C0-CVL-DWG-SSFD-2201~21 REV 2 SOIL EXCAVATION 1 14 14 2.800 0.600 3.400 2.800 0.600 3.400 1.900 -0.300 - 1.600 258.94 258.94
1.0217 P2 EA-3B F1 FOUNDATION FOOT FDN F1 ( 2800L x 2800W x 500HEARTH WORK SOIL DISPOSAL M³ DISPO: CONCRETE EL -1.850 EL -1.350 C0-CVL-DWG-SSFD-2201~21 REV 2 1 14 14 2.800 2.800 2.800 2.800 1.850 -1.350 0.500 54.88 54.88
1.0218 P2 EA-3B F1 FOUNDATION SOCKET COLUMN-OUTER SC ( 1400L x 1400W) EARTH WORK SOIL DISPOSAL M³ DISPO: CONCRETE EL -1.350 EL -0.300 C0-CVL-DWG-SSFD-2201~21 REV 2 1 14 14 1.400 1.400 1.400 1.400 1.350 -0.300 1.050 28.81 28.81
1.0219 P2 EA-3B F1 FOUNDATION FOOT FDN F1 ( 2800L x 2800W x 500HEARTH WORK SOIL DISPOSAL M³ DISPO: LC + SB C0-CVL-DWG-SSFD-2201~21 REV 2 1 1 1 6.300 6.300 6.30 6.30
1.0220 P2 EA-2A F1 FOUNDATION FOOT FDN F1 ( 2800L x 2800W x 500HEARTH WORK SOIL BACKFILL M³ C0-CVL-DWG-SSFD-2201~21 REV 2 1 1 1 258.944 -89.992 168.952 168.95 168.95
1.0221 P2 F1 FOUNDATION SOCKET COLUMN-INNER SO ( 700L x 700W) OTHERS SHEAR KEY 100x25 MM M C0-CVL-STD-0104 REV 1 1 14 5 70 0.700 0.700 0.700 0.700 2.800 196.00 196.00
1.0222 P2 CO-2A F2 FOUNDATION FOOT FDN F2 ( 2800L x 2800W x 500HCONCRETE CONCRETE M³ EL -1.850 EL -1.350 C0-CVL-DWG-SSFD-2201~21 REV 2 1 8 8 2.800 2.800 2.800 2.800 0.500 0.500 31.36 31.36
1.0223 P2 FM-1A F2 FOUNDATION FOOT FDN F2 ( 2800L x 2800W x 500HFORM WORK FORM WORK M² EL -1.850 EL -1.350 C0-CVL-DWG-SSFD-2201~21 REV 2 1 8 8 2.800 2.800 2.800 2.800 11.200 1.850 -1.350 0.500 44.80 44.80
1.0224 P2 RE-1A F2 FOUNDATION FOOT FDN F2 ( 2800L x 2800W x 500HREBAR REBAR Ð 13 TON TRANS, TOP C0-CVL-DWG-SSFD-2201~21 REV 2 13 0.150 1.040 1 0.001 8 19 152 2.700 0.350 0.350 3.400 0.54 0.54
1.0225 P2 RE-1A F2 FOUNDATION FOOT FDN F2 ( 2800L x 2800W x 500HREBAR REBAR Ð 16 TON TRANS, BOTT C0-CVL-DWG-SSFD-2201~21 REV 2 16 0.150 1.580 1 0.001 8 19 152 2.700 0.350 0.350 3.400 0.82 0.82
1.0226 P2 RE-1A F2 FOUNDATION FOOT FDN F2 ( 2800L x 2800W x 500HREBAR REBAR Ð 13 TON LONG, TOP C0-CVL-DWG-SSFD-2201~21 REV 2 13 0.150 1.040 1 0.001 8 19 152 2.700 0.350 0.350 3.400 0.54 0.54
1.0227 P2 RE-1A F2 FOUNDATION FOOT FDN F2 ( 2800L x 2800W x 500HREBAR REBAR Ð 16 TON LONG, BOTT C0-CVL-DWG-SSFD-2201~21 REV 2 16 0.150 1.580 1 0.001 8 19 152 2.700 0.350 0.350 3.400 0.82 0.82
1.0228 P2 RE-1A F2 FOUNDATION FOOT FDN F2 ( 2800L x 2800W x 500HREBAR REBAR Ð 13 TON TIE C0-CVL-DWG-SSFD-2201~21 REV 2 13 1.040 1 0.001 8 2 16 0.078 2.740 2.740 0.078 5.636 0.09 0.09
1.0229 P2 RE-1A F2 FOUNDATION FOOT FDN F2 ( 2800L x 2800W x 500HREBAR REBAR Ð 16 TON SUPPORT C0-CVL-DWG-SSFD-2201~21 REV 1 16 1.580 0.001 8 9 72 0.400 0.342 0.200 0.342 0.400 1.684 0.19 -
1.0229 P2 CO-2A F2 FOUNDATION SOCKET COLUMN-OUTER SC ( 1400L x 1400W) CONCRETE CONCRETE M³ EL -1.350 EL -0.300 C0-CVL-STD-0104 REV 1 1 8 8 1.400 1.400 1.400 1.400 1.350 -0.300 1.050 16.46 16.46
1.0230 P2 CO-2A F2 FOUNDATION SOCKET COLUMN-OUTER SC ( 700L x 700W) CONCRETE CONCRETE M³ EL -1.350 EL -0.300 C0-CVL-STD-0104 REV 1 1 8 -1 -8 0.700 0.700 0.700 0.700 1.350 -0.300 1.050 -4.12 -4.12
1.0231 P2 FM-1A F2 FOUNDATION SOCKET COLUMN-OUTER SC ( 1400L x 1400W) FORM WORK FORM WORK M² EL -1.350 EL -0.300 C0-CVL-STD-0104 REV 1 1 8 8 1.400 1.400 1.400 1.400 5.600 1.350 -0.300 1.050 47.04 47.04
1.0232 P2 FM-1A F2 FOUNDATION SOCKET COLUMN-OUTER SC ( 700L x 700W) FORM WORK FORM WORK M² EL -1.350 EL -0.300 C0-CVL-STD-0104 REV 1 1 8 8 0.700 0.700 0.700 0.700 2.800 1.350 -0.300 1.050 23.52 23.52
1.0233 P2 RE-1A F2 FOUNDATION SOCKET COLUMN-OUTER SC ( 1400L x 1400W) REBAR REBAR Ð 19 TON VERT OUTER EL -1.850 EL -0.300 C0-CVL-STD-0104 REV 1 19 2.230 1 0.001 8 38 304 0.500 1.430 1.930 1.31 1.31
1.0234 P2 RE-1A F2 FOUNDATION SOCKET COLUMN-OUTER SC ( 1400L x 1400W) REBAR REBAR Ð 19 TON VERT INNER EL -1.850 EL -0.300 C0-CVL-STD-0104 REV 1 19 2.230 1 0.001 8 30 240 0.500 1.430 1.930 1.03 1.03
1.0235 P2 RE-1A F2 FOUNDATION SOCKET COLUMN-OUTER SC ( 1400L x 1400W) REBAR REBAR Ð 19 TON HORI OUTER C0-CVL-STD-0104 REV 1 19 2.230 1 0.001 8 5 2 80 0.114 1.300 0.250 1.300 0.250 0.114 3.328 0.59 0.59
1.0236 P2 RE-1A F2 FOUNDATION SOCKET COLUMN-OUTER SC ( 1400L x 1400W) REBAR REBAR Ð 19 TON HORI INNER C0-CVL-STD-0104 REV 1 19 2.230 1 0.001 8 5 2 80 0.114 1.300 0.250 1.300 0.250 0.114 3.328 0.59 0.59
1.0237 P2 RE-1A F2 FOUNDATION SOCKET COLUMN-OUTER SC ( 1400L x 1400W) REBAR REBAR Ð 19 TON ADD HORI UPPER C0-CVL-STD-0104 REV 1 19 2.230 1 0.001 8 2 2 32 0.800 0.800 0.06 0.06
1.0238 P2 RE-1A F2 FOUNDATION SOCKET COLUMN-OUTER SC ( 1400L x 1400W) REBAR REBAR Ð 10 TON CROSS TIE C0-CVL-STD-0104 REV 1 10 0.620 1 0.001 8 30 5 1200 0.060 0.250 0.060 0.370 0.28 0.28
1.0239 P2 RE-1A F2 FOUNDATION SOCKET COLUMN-OUTER SC ( 1400L x 1400W) REBAR REBAR Ð 13 TON BOTTOM TIE C0-CVL-STD-0104 REV 1 13 1.040 1 0.001 8 2 16 0.078 1.300 1.300 1.300 1.300 0.078 5.356 0.09 0.09
1.0240 P2 CO-1A F2 FOUNDATION FOOT FDN F2 ( 2800L x 2800W x 500HPLAIN CONCRETE LEVELING CONCRETE T= 50 M³ EL -1.900 EL -1.850 C0-CVL-DWG-SSFD-2201~21 REV 2 SOIL DISPOSAL 1 8 8 2.800 0.200 3.000 2.800 0.200 3.000 1.900 -1.850 0.050 3.60 3.60
1.0241 P2 F2 FOUNDATION FOOT FDN F2 ( 2800L x 2800W x 500HEARTH WORK COMPACTIED SOIL 95% MAX DRY M² C0-CVL-DWG-SSFD-2201~21 REV 2 1 8 8 2.800 0.600 3.400 2.800 0.600 3.400 92.48 92.48
1.0242 P2 EA-1B F2 FOUNDATION FOOT FDN F2 ( 2800L x 2800W x 500HEARTH WORK EXCAVATION BY EQUIPMENT (D>3 M³ EL -1.900 EL -0.300 C0-CVL-DWG-SSFD-2201~21 REV 2 SOIL EXCAVATION 1 8 0 0 2.800 0.600 3.400 2.800 0.600 3.400 1.900 -0.300 - 1.600 - -
1.0243 P2 EA-1A F2 FOUNDATION FOOT FDN F2 ( 2800L x 2800W x 500HEARTH WORK EXCAVATION BY EQUIPMENT (D<=M³ EL -1.900 EL -0.300 C0-CVL-DWG-SSFD-2201~21 REV 2 SOIL EXCAVATION 1 8 8 2.800 0.600 3.400 2.800 0.600 3.400 1.900 -0.300 - 1.600 147.97 147.97
1.0244 P2 EA-3B F2 FOUNDATION FOOT FDN F2 ( 2800L x 2800W x 500HEARTH WORK SOIL DISPOSAL M³ DISPO: CONCRETE EL -1.850 EL -1.350 C0-CVL-DWG-SSFD-2201~21 REV 2 1 8 8 2.800 2.800 2.800 2.800 1.850 -1.350 0.500 31.36 31.36
1.0245 P2 EA-3B F2 FOUNDATION SOCKET COLUMN-OUTER SC ( 1400L x 1400W) EARTH WORK SOIL DISPOSAL M³ DISPO: CONCRETE EL -1.350 EL -0.300 C0-CVL-DWG-SSFD-2201~21 REV 2 1 8 8 1.400 1.400 1.400 1.400 1.350 -0.300 1.050 16.46 16.46
1.0246 P2 EA-3B F2 FOUNDATION FOOT FDN F2 ( 2800L x 2800W x 500HEARTH WORK SOIL DISPOSAL M³ DISPO: LC + SB C0-CVL-DWG-SSFD-2201~21 REV 2 1 1 1 3.600 3.600 3.60 3.60
1.0247 P2 EA-2A F2 FOUNDATION FOOT FDN F2 ( 2800L x 2800W x 500HEARTH WORK SOIL BACKFILL M³ C0-CVL-DWG-SSFD-2201~21 REV 2 1 1 1 147.968 -51.424 96.544 96.54 96.54
1.0248 P2 F2 FOUNDATION SOCKET COLUMN-INNER SO ( 700L x 700W) OTHERS SHEAR KEY 100x25 MM M C0-CVL-STD-0104 REV 1 1 8 5 40 0.700 0.700 0.700 0.700 2.800 112.00 112.00
1.0249 P2 CO-2A F1 FOUNDATION FOOT FDN F1 ( 3000L x 3000W x 500HCONCRETE CONCRETE M³ EL -2.150 EL -1.650 C0-CVL-DWG-SSFD-2301~23 REV 1 1 2 2 3.000 3.000 3.000 3.000 0.500 0.500 9.00 9.00
1.0250 P2 FM-1A F1 FOUNDATION FOOT FDN F1 ( 3000L x 3000W x 500HFORM WORK FORM WORK M² EL -2.150 EL -1.650 C0-CVL-DWG-SSFD-2301~23 REV 1 1 2 2 3.000 3.000 3.000 3.000 12.000 2.150 -1.650 0.500 12.00 12.00
1.0251 P2 RE-1A F1 FOUNDATION FOOT FDN F1 ( 3000L x 3000W x 500HREBAR REBAR Ð 13 TON TRANS, TOP C0-CVL-DWG-SSFD-2301~23 REV 1 13 0.150 1.040 1 0.001 2 20 40 2.900 0.350 0.350 3.600 0.15 0.15
1.0252 P2 RE-1A F1 FOUNDATION FOOT FDN F1 ( 3000L x 3000W x 500HREBAR REBAR Ð 16 TON TRANS, BOTT C0-CVL-DWG-SSFD-2301~23 REV 1 16 0.150 1.580 1 0.001 2 20 40 2.900 0.350 0.350 3.600 0.23 0.23
1.0253 P2 RE-1A F1 FOUNDATION FOOT FDN F1 ( 3000L x 3000W x 500HREBAR REBAR Ð 13 TON LONG, TOP C0-CVL-DWG-SSFD-2301~23 REV 1 13 0.150 1.040 1 0.001 2 20 40 2.900 0.350 0.350 3.600 0.15 0.15
1.0254 P2 RE-1A F1 FOUNDATION FOOT FDN F1 ( 3000L x 3000W x 500HREBAR REBAR Ð 16 TON LONG, BOTT C0-CVL-DWG-SSFD-2301~23 REV 1 16 0.150 1.580 1 0.001 2 20 40 2.900 0.350 0.350 3.600 0.23 0.23
1.0255 P2 RE-1A F1 FOUNDATION FOOT FDN F1 ( 3000L x 3000W x 500HREBAR REBAR Ð 13 TON TIE C0-CVL-DWG-SSFD-2301~23 REV 1 13 1.040 1 0.001 2 2 4 0.078 2.940 2.940 0.078 6.036 0.03 0.03
1.0256 P2 RE-1A F1 FOUNDATION FOOT FDN F1 ( 3000L x 3000W x 500HREBAR REBAR Ð 16 TON SUPPORT C0-CVL-DWG-SSFD-2301~23 REV 1 16 1.580 0.001 2 9 18 0.400 0.342 0.200 0.342 0.400 1.684 0.05 -
1.0256 P2 CO-2A F1 FOUNDATION SOCKET COLUMN-OUTER SC ( 1400L x 1400W) CONCRETE CONCRETE M³ EL -1.650 EL -0.600 C0-CVL-STD-0104 REV 1 1 2 2 1.400 1.400 1.400 1.400 1.650 -0.600 1.050 4.12 4.12
1.0257 P2 CO-2A F1 FOUNDATION SOCKET COLUMN-OUTER SC ( 700L x 700W) CONCRETE CONCRETE M³ EL -1.650 EL -0.600 C0-CVL-STD-0104 REV 1 1 2 -1 -2 0.700 0.700 0.700 0.700 1.650 -0.600 1.050 -1.03 -1.03
1.0258 P2 FM-1A F1 FOUNDATION SOCKET COLUMN-OUTER SC ( 1400L x 1400W) FORM WORK FORM WORK M² EL -1.650 EL -0.600 C0-CVL-STD-0104 REV 1 1 2 2 1.400 1.400 1.400 1.400 5.600 1.650 -0.600 1.050 11.76 11.76
1.0259 P2 FM-1A F1 FOUNDATION SOCKET COLUMN-OUTER SC ( 700L x 700W) FORM WORK FORM WORK M² EL -1.650 EL -0.600 C0-CVL-STD-0104 REV 1 1 2 2 0.700 0.700 0.700 0.700 2.800 1.650 -0.600 1.050 5.88 5.88
1.0260 P2 RE-1A F1 FOUNDATION SOCKET COLUMN-OUTER SC ( 1400L x 1400W) REBAR REBAR Ð 19 TON VERT OUTER EL -2.150 EL -0.600 C0-CVL-STD-0104 REV 1 19 2.230 1 0.001 2 38 76 0.500 1.430 1.930 0.33 0.33
1.0261 P2 RE-1A F1 FOUNDATION SOCKET COLUMN-OUTER SC ( 1400L x 1400W) REBAR REBAR Ð 19 TON VERT INNER EL -2.150 EL -0.600 C0-CVL-STD-0104 REV 1 19 2.230 1 0.001 2 30 60 0.500 1.430 1.930 0.26 0.26
1.0262 P2 RE-1A F1 FOUNDATION SOCKET COLUMN-OUTER SC ( 1400L x 1400W) REBAR REBAR Ð 19 TON HORI OUTER C0-CVL-STD-0104 REV 1 19 2.230 1 0.001 2 5 2 20 0.114 1.300 0.250 1.300 0.250 0.114 3.328 0.15 0.15
1.0263 P2 RE-1A F1 FOUNDATION SOCKET COLUMN-OUTER SC ( 1400L x 1400W) REBAR REBAR Ð 19 TON HORI INNER C0-CVL-STD-0104 REV 1 19 2.230 1 0.001 2 5 2 20 0.114 1.300 0.250 1.300 0.250 0.114 3.328 0.15 0.15
1.0264 P2 RE-1A F1 FOUNDATION SOCKET COLUMN-OUTER SC ( 1400L x 1400W) REBAR REBAR Ð 19 TON ADD HORI UPPER C0-CVL-STD-0104 REV 1 19 2.230 1 0.001 2 2 2 8 0.800 0.800 0.01 0.01
1.0265 P2 RE-1A F1 FOUNDATION SOCKET COLUMN-OUTER SC ( 1400L x 1400W) REBAR REBAR Ð 10 TON CROSS TIE C0-CVL-STD-0104 REV 1 10 0.620 1 0.001 2 30 5 300 0.060 0.250 0.060 0.370 0.07 0.07
1.0266 P2 RE-1A F1 FOUNDATION SOCKET COLUMN-OUTER SC ( 1400L x 1400W) REBAR REBAR Ð 13 TON BOTTOM TIE C0-CVL-STD-0104 REV 1 13 1.040 1 0.001 2 2 4 0.078 1.300 1.300 1.300 1.300 0.078 5.356 0.02 0.02
1.0267 P2 CO-1A F1 FOUNDATION FOOT FDN F1 ( 3000L x 3000W x 500HPLAIN CONCRETE LEVELING CONCRETE T= 50 M³ EL -2.200 EL -2.150 C0-CVL-DWG-SSFD-2301~23 REV 1 SOIL DISPOSAL 1 2 2 3.000 0.200 3.200 3.000 0.200 3.200 2.200 -2.150 0.050 1.02 1.02
1.0268 P2 F1 FOUNDATION FOOT FDN F1 ( 3000L x 3000W x 500HEARTH WORK COMPACTIED SOIL 95% MAX DRY M² C0-CVL-DWG-SSFD-2301~23 REV 1 1 2 2 3.000 0.600 3.600 3.000 0.600 3.600 25.92 25.92
1.0269 P2 EA-1B F1 FOUNDATION FOOT FDN F1 ( 3000L x 3000W x 500HEARTH WORK EXCAVATION BY EQUIPMENT (D>3 M³ EL -2.200 EL -0.300 C0-CVL-DWG-SSFD-2301~23 REV 1 SOIL EXCAVATION 1 2 0 0 3.000 0.600 3.600 3.000 0.600 3.600 2.200 -0.300 - 1.900 - -
1.0270 P2 EA-1A F1 FOUNDATION FOOT FDN F1 ( 3000L x 3000W x 500HEARTH WORK EXCAVATION BY EQUIPMENT (D<=M³ EL -2.200 EL -0.300 C0-CVL-DWG-SSFD-2301~23 REV 1 SOIL EXCAVATION 1 2 2 3.000 0.600 3.600 3.000 0.600 3.600 2.200 -0.300 - 1.900 49.25 49.25
1.0271 P2 EA-3B F1 FOUNDATION FOOT FDN F1 ( 3000L x 3000W x 500HEARTH WORK SOIL DISPOSAL M³ DISPO: CONCRETE EL -2.150 EL -1.650 C0-CVL-DWG-SSFD-2301~23 REV 1 1 2 2 3.000 3.000 3.000 3.000 2.150 -1.650 0.500 9.00 9.00
1.0272 P2 EA-3B F1 FOUNDATION SOCKET COLUMN-OUTER SC ( 1400L x 1400W) EARTH WORK SOIL DISPOSAL M³ DISPO: CONCRETE EL -1.650 EL -0.600 C0-CVL-DWG-SSFD-2301~23 REV 1 1 2 2 1.400 1.400 1.400 1.400 1.650 -0.600 1.050 4.12 4.12
1.0273 P2 EA-3B F1 FOUNDATION FOOT FDN F1 ( 3000L x 3000W x 500HEARTH WORK SOIL DISPOSAL M³ DISPO: LC + SB C0-CVL-DWG-SSFD-2301~23 REV 1 1 1 1 1.024 1.024 1.02 1.02
1.0274 P2 EA-2A F1 FOUNDATION FOOT FDN F1 ( 3000L x 3000W x 500HEARTH WORK SOIL BACKFILL M³ C0-CVL-DWG-SSFD-2301~23 REV 1 1 1 1 49.248 -14.140 35.108 35.11 35.11
1.0275 P2 F1 FOUNDATION SOCKET COLUMN-INNER SO ( 700L x 700W) OTHERS SHEAR KEY 100x25 MM M C0-CVL-STD-0104 REV 1 1 2 5 10 0.700 0.700 0.700 0.700 2.800 28.00 28.00
1.0276 P2 CO-2A F2 FOUNDATION FOOT FDN F2 ( 3000L x 3000W x 500HCONCRETE CONCRETE M³ EL -2.150 EL -1.650 C0-CVL-DWG-SSFD-2301~23 REV 1 1 2 2 3.000 3.000 3.000 3.000 0.500 0.500 9.00 9.00
1.0277 P2 FM-1A F2 FOUNDATION FOOT FDN F2 ( 3000L x 3000W x 500HFORM WORK FORM WORK M² EL -2.150 EL -1.650 C0-CVL-DWG-SSFD-2301~23 REV 1 1 2 2 3.000 3.000 3.000 3.000 12.000 2.150 -1.650 0.500 12.00 12.00
1.0278 P2 RE-1A F2 FOUNDATION FOOT FDN F2 ( 3000L x 3000W x 500HREBAR REBAR Ð 13 TON TRANS, TOP C0-CVL-DWG-SSFD-2301~23 REV 1 13 0.150 1.040 1 0.001 2 20 40 2.900 0.350 0.350 3.600 0.15 0.15
1.0279 P2 RE-1A F2 FOUNDATION FOOT FDN F2 ( 3000L x 3000W x 500HREBAR REBAR Ð 16 TON TRANS, BOTT C0-CVL-DWG-SSFD-2301~23 REV 1 16 0.150 1.580 1 0.001 2 20 40 2.900 0.350 0.350 3.600 0.23 0.23
1.0280 P2 RE-1A F2 FOUNDATION FOOT FDN F2 ( 3000L x 3000W x 500HREBAR REBAR Ð 13 TON LONG, TOP C0-CVL-DWG-SSFD-2301~23 REV 1 13 0.150 1.040 1 0.001 2 20 40 2.900 0.350 0.350 3.600 0.15 0.15
1.0281 P2 RE-1A F2 FOUNDATION FOOT FDN F2 ( 3000L x 3000W x 500HREBAR REBAR Ð 16 TON LONG, BOTT C0-CVL-DWG-SSFD-2301~23 REV 1 16 0.150 1.580 1 0.001 2 20 40 2.900 0.350 0.350 3.600 0.23 0.23
1.0282 P2 RE-1A F2 FOUNDATION FOOT FDN F2 ( 3000L x 3000W x 500HREBAR REBAR Ð 13 TON TIE C0-CVL-DWG-SSFD-2301~23 REV 1 13 1.040 1 0.001 2 2 4 0.078 2.940 2.940 0.078 6.036 0.03 0.03
1.0283 P2 RE-1A F2 FOUNDATION FOOT FDN F2 ( 3000L x 3000W x 500HREBAR REBAR Ð 16 TON SUPPORT C0-CVL-DWG-SSFD-2301~23 REV 1 16 1.580 0.001 2 9 18 0.400 0.342 0.200 0.342 0.400 1.684 0.05 -
1.0283 P2 CO-2A F2 FOUNDATION SOCKET COLUMN-OUTER SC ( 1400L x 1400W) CONCRETE CONCRETE M³ EL -1.650 EL -0.600 C0-CVL-STD-0104 REV 1 1 2 2 1.400 1.400 1.400 1.400 1.650 -0.600 1.050 4.12 4.12
1.0284 P2 CO-2A F2 FOUNDATION SOCKET COLUMN-OUTER SC ( 700L x 700W) CONCRETE CONCRETE M³ EL -1.650 EL -0.600 C0-CVL-STD-0104 REV 1 1 2 -1 -2 0.700 0.700 0.700 0.700 1.650 -0.600 1.050 -1.03 -1.03
1.0285 P2 FM-1A F2 FOUNDATION SOCKET COLUMN-OUTER SC ( 1400L x 1400W) FORM WORK FORM WORK M² EL -1.650 EL -0.600 C0-CVL-STD-0104 REV 1 1 2 2 1.400 1.400 1.400 1.400 5.600 1.650 -0.600 1.050 11.76 11.76
1.0286 P2 FM-1A F2 FOUNDATION SOCKET COLUMN-OUTER SC ( 700L x 700W) FORM WORK FORM WORK M² EL -1.650 EL -0.600 C0-CVL-STD-0104 REV 1 1 2 2 0.700 0.700 0.700 0.700 2.800 1.650 -0.600 1.050 5.88 5.88
1.0287 P2 RE-1A F2 FOUNDATION SOCKET COLUMN-OUTER SC ( 1400L x 1400W) REBAR REBAR Ð 19 TON VERT OUTER EL -2.150 EL -0.600 C0-CVL-STD-0104 REV 1 19 2.230 1 0.001 2 38 76 0.500 1.430 1.930 0.33 0.33
1.0288 P2 RE-1A F2 FOUNDATION SOCKET COLUMN-OUTER SC ( 1400L x 1400W) REBAR REBAR Ð 19 TON VERT INNER EL -2.150 EL -0.600 C0-CVL-STD-0104 REV 1 19 2.230 1 0.001 2 30 60 0.500 1.430 1.930 0.26 0.26
1.0289 P2 RE-1A F2 FOUNDATION SOCKET COLUMN-OUTER SC ( 1400L x 1400W) REBAR REBAR Ð 19 TON HORI OUTER C0-CVL-STD-0104 REV 1 19 2.230 1 0.001 2 5 2 20 0.114 1.300 0.250 1.300 0.250 0.114 3.328 0.15 0.15
1.0290 P2 RE-1A F2 FOUNDATION SOCKET COLUMN-OUTER SC ( 1400L x 1400W) REBAR REBAR Ð 19 TON HORI INNER C0-CVL-STD-0104 REV 1 19 2.230 1 0.001 2 5 2 20 0.114 1.300 0.250 1.300 0.250 0.114 3.328 0.15 0.15
1.0291 P2 RE-1A F2 FOUNDATION SOCKET COLUMN-OUTER SC ( 1400L x 1400W) REBAR REBAR Ð 19 TON ADD HORI UPPER C0-CVL-STD-0104 REV 1 19 2.230 1 0.001 2 2 2 8 0.800 0.800 0.01 0.01
1.0292 P2 RE-1A F2 FOUNDATION SOCKET COLUMN-OUTER SC ( 1400L x 1400W) REBAR REBAR Ð 10 TON CROSS TIE C0-CVL-STD-0104 REV 1 10 0.620 1 0.001 2 30 5 300 0.060 0.250 0.060 0.370 0.07 0.07
1.0293 P2 RE-1A F2 FOUNDATION SOCKET COLUMN-OUTER SC ( 1400L x 1400W) REBAR REBAR Ð 13 TON BOTTOM TIE C0-CVL-STD-0104 REV 1 13 1.040 1 0.001 2 2 4 0.078 1.300 1.300 1.300 1.300 0.078 5.356 0.02 0.02
1.0294 P2 CO-1A F2 FOUNDATION FOOT FDN F2 ( 3000L x 3000W x 500HPLAIN CONCRETE LEVELING CONCRETE T= 50 M³ EL -2.200 EL -2.150 C0-CVL-DWG-SSFD-2301~23 REV 1 SOIL DISPOSAL 1 2 2 3.000 0.200 3.200 3.000 0.200 3.200 2.200 -2.150 0.050 1.02 1.02
1.0295 P2 F2 FOUNDATION FOOT FDN F2 ( 3000L x 3000W x 500HEARTH WORK COMPACTIED SOIL 95% MAX DRY M² C0-CVL-DWG-SSFD-2301~23 REV 1 1 2 2 3.000 0.600 3.600 3.000 0.600 3.600 25.92 25.92
1.0296 P2 EA-1B F2 FOUNDATION FOOT FDN F2 ( 3000L x 3000W x 500HEARTH WORK EXCAVATION BY EQUIPMENT (D>3 M³ EL -2.200 EL -0.300 C0-CVL-DWG-SSFD-2301~23 REV 1 SOIL EXCAVATION 1 2 0 0 3.000 0.600 3.600 3.000 0.600 3.600 2.200 -0.300 - 1.900 - -
1.0297 P2 EA-1A F2 FOUNDATION FOOT FDN F2 ( 3000L x 3000W x 500HEARTH WORK EXCAVATION BY EQUIPMENT (D<=M³ EL -2.200 EL -0.300 C0-CVL-DWG-SSFD-2301~23 REV 1 SOIL EXCAVATION 1 2 2 3.000 0.600 3.600 3.000 0.600 3.600 2.200 -0.300 - 1.900 49.25 49.25
1.0298 P2 EA-3B F2 FOUNDATION FOOT FDN F2 ( 3000L x 3000W x 500HEARTH WORK SOIL DISPOSAL M³ DISPO: CONCRETE EL -2.150 EL -1.650 C0-CVL-DWG-SSFD-2301~23 REV 1 1 2 2 3.000 3.000 3.000 3.000 2.150 -1.650 0.500 9.00 9.00
1.0299 P2 EA-3B F2 FOUNDATION SOCKET COLUMN-OUTER SC ( 1400L x 1400W) EARTH WORK SOIL DISPOSAL M³ DISPO: CONCRETE EL -1.650 EL -0.600 C0-CVL-DWG-SSFD-2301~23 REV 1 1 2 2 1.400 1.400 1.400 1.400 1.650 -0.600 1.050 4.12 4.12
1.0300 P2 EA-3B F2 FOUNDATION FOOT FDN F2 ( 3000L x 3000W x 500HEARTH WORK SOIL DISPOSAL M³ DISPO: LC + SB C0-CVL-DWG-SSFD-2301~23 REV 1 1 1 1 1.024 1.024 1.02 1.02
1.0301 P2 EA-2A F2 FOUNDATION FOOT FDN F2 ( 3000L x 3000W x 500HEARTH WORK SOIL BACKFILL M³ C0-CVL-DWG-SSFD-2301~23 REV 1 1 1 1 49.248 -14.140 35.108 35.11 35.11
1.0302 P2 F2 FOUNDATION SOCKET COLUMN-INNER SO ( 700L x 700W) OTHERS SHEAR KEY 100x25 MM M C0-CVL-STD-0104 REV 1 1 2 5 10 0.700 0.700 0.700 0.700 2.800 28.00 28.00
1.0303 P2 CO-2A F3 FOUNDATION FOOT FDN F3 ( 3000L x 3000W x 500HCONCRETE CONCRETE M³ EL -2.150 EL -1.650 C0-CVL-DWG-SSFD-2301~23 REV 1 1 4 4 3.000 3.000 3.000 3.000 0.500 0.500 18.00 18.00
1.0304 P2 FM-1A F3 FOUNDATION FOOT FDN F3 ( 3000L x 3000W x 500HFORM WORK FORM WORK M² EL -2.150 EL -1.650 C0-CVL-DWG-SSFD-2301~23 REV 1 1 4 4 3.000 3.000 3.000 3.000 12.000 2.150 -1.650 0.500 24.00 24.00
1.0305 P2 RE-1A F3 FOUNDATION FOOT FDN F3 ( 3000L x 3000W x 500HREBAR REBAR Ð 13 TON TRANS, TOP C0-CVL-DWG-SSFD-2301~23 REV 1 13 0.150 1.040 1 0.001 4 20 80 2.900 0.350 0.350 3.600 0.30 0.30
1.0306 P2 RE-1A F3 FOUNDATION FOOT FDN F3 ( 3000L x 3000W x 500HREBAR REBAR Ð 16 TON TRANS, BOTT C0-CVL-DWG-SSFD-2301~23 REV 1 16 0.150 1.580 1 0.001 4 20 80 2.900 0.350 0.350 3.600 0.46 0.46
1.0307 P2 RE-1A F3 FOUNDATION FOOT FDN F3 ( 3000L x 3000W x 500HREBAR REBAR Ð 13 TON LONG, TOP C0-CVL-DWG-SSFD-2301~23 REV 1 13 0.150 1.040 1 0.001 4 20 80 2.900 0.350 0.350 3.600 0.30 0.30
1.0308 P2 RE-1A F3 FOUNDATION FOOT FDN F3 ( 3000L x 3000W x 500HREBAR REBAR Ð 16 TON LONG, BOTT C0-CVL-DWG-SSFD-2301~23 REV 1 16 0.150 1.580 1 0.001 4 20 80 2.900 0.350 0.350 3.600 0.46 0.46
1.0309 P2 RE-1A F3 FOUNDATION FOOT FDN F3 ( 3000L x 3000W x 500HREBAR REBAR Ð 13 TON TIE C0-CVL-DWG-SSFD-2301~23 REV 1 13 1.040 1 0.001 4 2 8 0.078 2.940 2.940 0.078 6.036 0.05 0.05
1.0310 P2 RE-1A F3 FOUNDATION FOOT FDN F3 ( 3000L x 3000W x 500HREBAR REBAR Ð 16 TON SUPPORT C0-CVL-DWG-SSFD-2301~23 REV 1 16 1.580 0.001 4 9 36 0.400 0.342 0.200 0.342 0.400 1.684 0.10 -
1.0310 P2 CO-2A F3 FOUNDATION SOCKET COLUMN-OUTER SC ( 1400L x 1400W) CONCRETE CONCRETE M³ EL -1.650 EL -0.600 C0-CVL-STD-0104 REV 1 1 4 4 1.400 1.400 1.400 1.400 1.650 -0.600 1.050 8.23 8.23
1.0311 P2 CO-2A F3 FOUNDATION SOCKET COLUMN-OUTER SC ( 700L x 700W) CONCRETE CONCRETE M³ EL -1.650 EL -0.600 C0-CVL-STD-0104 REV 1 1 4 -1 -4 0.700 0.700 0.700 0.700 1.650 -0.600 1.050 -2.06 -2.06
1.0312 P2 FM-1A F3 FOUNDATION SOCKET COLUMN-OUTER SC ( 1400L x 1400W) FORM WORK FORM WORK M² EL -1.650 EL -0.600 C0-CVL-STD-0104 REV 1 1 4 4 1.400 1.400 1.400 1.400 5.600 1.650 -0.600 1.050 23.52 23.52
1.0313 P2 FM-1A F3 FOUNDATION SOCKET COLUMN-OUTER SC ( 700L x 700W) FORM WORK FORM WORK M² EL -1.650 EL -0.600 C0-CVL-STD-0104 REV 1 1 4 4 0.700 0.700 0.700 0.700 2.800 1.650 -0.600 1.050 11.76 11.76
1.0314 P2 RE-1A F3 FOUNDATION SOCKET COLUMN-OUTER SC ( 1400L x 1400W) REBAR REBAR Ð 19 TON VERT OUTER EL -2.150 EL -0.600 C0-CVL-STD-0104 REV 1 19 2.230 1 0.001 4 38 152 0.500 1.430 1.930 0.65 0.65
1.0315 P2 RE-1A F3 FOUNDATION SOCKET COLUMN-OUTER SC ( 1400L x 1400W) REBAR REBAR Ð 19 TON VERT INNER EL -2.150 EL -0.600 C0-CVL-STD-0104 REV 1 19 2.230 1 0.001 4 30 120 0.500 1.430 1.930 0.52 0.52
1.0316 P2 RE-1A F3 FOUNDATION SOCKET COLUMN-OUTER SC ( 1400L x 1400W) REBAR REBAR Ð 19 TON HORI OUTER C0-CVL-STD-0104 REV 1 19 2.230 1 0.001 4 5 2 40 0.114 1.300 0.250 1.300 0.250 0.114 3.328 0.30 0.30
1.0317 P2 RE-1A F3 FOUNDATION SOCKET COLUMN-OUTER SC ( 1400L x 1400W) REBAR REBAR Ð 19 TON HORI INNER C0-CVL-STD-0104 REV 1 19 2.230 1 0.001 4 5 2 40 0.114 1.300 0.250 1.300 0.250 0.114 3.328 0.30 0.30
1.0318 P2 RE-1A F3 FOUNDATION SOCKET COLUMN-OUTER SC ( 1400L x 1400W) REBAR REBAR Ð 19 TON ADD HORI UPPER C0-CVL-STD-0104 REV 1 19 2.230 1 0.001 4 2 2 16 0.800 0.800 0.03 0.03
1.0319 P2 RE-1A F3 FOUNDATION SOCKET COLUMN-OUTER SC ( 1400L x 1400W) REBAR REBAR Ð 10 TON CROSS TIE C0-CVL-STD-0104 REV 1 10 0.620 1 0.001 4 30 5 600 0.060 0.250 0.060 0.370 0.14 0.14
1.0320 P2 RE-1A F3 FOUNDATION SOCKET COLUMN-OUTER SC ( 1400L x 1400W) REBAR REBAR Ð 13 TON BOTTOM TIE C0-CVL-STD-0104 REV 1 13 1.040 1 0.001 4 2 8 0.078 1.300 1.300 1.300 1.300 0.078 5.356 0.04 0.04
1.0321 P2 CO-1A F3 FOUNDATION FOOT FDN F3 ( 3000L x 3000W x 500HPLAIN CONCRETE LEVELING CONCRETE T= 50 M³ EL -2.200 EL -2.150 C0-CVL-DWG-SSFD-2301~23 REV 1 SOIL DISPOSAL 1 4 4 3.000 0.200 3.200 3.000 0.200 3.200 2.200 -2.150 0.050 2.05 2.05
1.0322 P2 F3 FOUNDATION FOOT FDN F3 ( 3000L x 3000W x 500HEARTH WORK COMPACTIED SOIL 95% MAX DRY M² C0-CVL-DWG-SSFD-2301~23 REV 1 1 4 4 3.000 0.600 3.600 3.000 0.600 3.600 51.84 51.84
1.0323 P2 EA-1B F3 FOUNDATION FOOT FDN F3 ( 3000L x 3000W x 500HEARTH WORK EXCAVATION BY EQUIPMENT (D>3 M³ EL -2.200 EL -0.300 C0-CVL-DWG-SSFD-2301~23 REV 1 SOIL EXCAVATION 1 4 0 0 3.000 0.600 3.600 3.000 0.600 3.600 2.200 -0.300 - 1.900 - -
1.0324 P2 EA-1A F3 FOUNDATION FOOT FDN F3 ( 3000L x 3000W x 500HEARTH WORK EXCAVATION BY EQUIPMENT (D<=M³ EL -2.200 EL -0.300 C0-CVL-DWG-SSFD-2301~23 REV 1 SOIL EXCAVATION 1 4 4 3.000 0.600 3.600 3.000 0.600 3.600 2.200 -0.300 - 1.900 98.50 98.50
1.0325 P2 EA-3B F3 FOUNDATION FOOT FDN F3 ( 3000L x 3000W x 500HEARTH WORK SOIL DISPOSAL M³ DISPO: CONCRETE EL -2.150 EL -1.650 C0-CVL-DWG-SSFD-2301~23 REV 1 1 4 4 3.000 3.000 3.000 3.000 2.150 -1.650 0.500 18.00 18.00
1.0326 P2 EA-3B F3 FOUNDATION SOCKET COLUMN-OUTER SC ( 1400L x 1400W) EARTH WORK SOIL DISPOSAL M³ DISPO: CONCRETE EL -1.650 EL -0.600 C0-CVL-DWG-SSFD-2301~23 REV 1 1 4 4 1.400 1.400 1.400 1.400 1.650 -0.600 1.050 8.23 8.23
1.0327 P2 EA-3B F3 FOUNDATION FOOT FDN F3 ( 3000L x 3000W x 500HEARTH WORK SOIL DISPOSAL M³ DISPO: LC + SB C0-CVL-DWG-SSFD-2301~23 REV 1 1 1 1 2.048 2.048 2.05 2.05
1.0328 P2 EA-2A F3 FOUNDATION FOOT FDN F3 ( 3000L x 3000W x 500HEARTH WORK SOIL BACKFILL M³ C0-CVL-DWG-SSFD-2301~23 REV 1 1 1 1 98.496 -28.280 70.216 70.22 70.22
1.0329 P2 F3 FOUNDATION SOCKET COLUMN-INNER SO ( 700L x 700W) OTHERS SHEAR KEY 100x25 MM M C0-CVL-STD-0104 REV 1 1 4 5 20 0.700 0.700 0.700 0.700 2.800 56.00 56.00
1.0330 P2 CO-2A F4 FOUNDATION FOOT FDN F4 ( 3300L x 3300W x 500HCONCRETE CONCRETE M³ EL -2.150 EL -1.650 C0-CVL-DWG-SSFD-2301~23 REV 1 1 6 6 3.300 3.300 3.300 3.300 0.500 0.500 32.67 32.67
1.0331 P2 FM-1A F4 FOUNDATION FOOT FDN F4 ( 3300L x 3300W x 500HFORM WORK FORM WORK M² EL -2.150 EL -1.650 C0-CVL-DWG-SSFD-2301~23 REV 1 1 6 6 3.300 3.300 3.300 3.300 13.200 2.150 -1.650 0.500 39.60 39.60
1.0332 P2 RE-1A F4 FOUNDATION FOOT FDN F4 ( 3300L x 3300W x 500HREBAR REBAR Ð 13 TON TRANS, TOP C0-CVL-DWG-SSFD-2301~23 REV 1 13 0.150 1.040 1 0.001 6 22 132 3.200 0.350 0.350 3.900 0.54 0.54
1.0333 P2 RE-1A F4 FOUNDATION FOOT FDN F4 ( 3300L x 3300W x 500HREBAR REBAR Ð 16 TON TRANS, BOTT C0-CVL-DWG-SSFD-2301~23 REV 1 16 0.150 1.580 1 0.001 6 22 132 3.200 0.350 0.350 3.900 0.81 0.81
1.0334 P2 RE-1A F4 FOUNDATION FOOT FDN F4 ( 3300L x 3300W x 500HREBAR REBAR Ð 13 TON LONG, TOP C0-CVL-DWG-SSFD-2301~23 REV 1 13 0.150 1.040 1 0.001 6 22 132 3.200 0.350 0.350 3.900 0.54 0.54
1.0335 P2 RE-1A F4 FOUNDATION FOOT FDN F4 ( 3300L x 3300W x 500HREBAR REBAR Ð 16 TON LONG, BOTT C0-CVL-DWG-SSFD-2301~23 REV 1 16 0.150 1.580 1 0.001 6 22 132 3.200 0.350 0.350 3.900 0.81 0.81
1.0336 P2 RE-1A F4 FOUNDATION FOOT FDN F4 ( 3300L x 3300W x 500HREBAR REBAR Ð 13 TON TIE C0-CVL-DWG-SSFD-2301~23 REV 1 13 1.040 1 0.001 6 2 12 0.078 3.240 3.240 0.078 6.636 0.08 0.08
1.0337 P2 RE-1A F4 FOUNDATION FOOT FDN F4 ( 3300L x 3300W x 500HREBAR REBAR Ð 16 TON SUPPORT C0-CVL-DWG-SSFD-2301~23 REV 1 16 1.580 0.001 6 9 54 0.400 0.342 0.200 0.342 0.400 1.684 0.14 -
1.0337 P2 CO-2A F4 FOUNDATION SOCKET COLUMN-OUTER SC ( 1400L x 1400W) CONCRETE CONCRETE M³ EL -1.650 EL -0.600 C0-CVL-STD-0104 REV 1 1 6 6 1.400 1.400 1.400 1.400 1.650 -0.600 1.050 12.35 12.35
1.0338 P2 CO-2A F4 FOUNDATION SOCKET COLUMN-OUTER SC ( 700L x 700W) CONCRETE CONCRETE M³ EL -1.650 EL -0.600 C0-CVL-STD-0104 REV 1 1 6 -1 -6 0.700 0.700 0.700 0.700 1.650 -0.600 1.050 -3.09 -3.09
1.0339 P2 FM-1A F4 FOUNDATION SOCKET COLUMN-OUTER SC ( 1400L x 1400W) FORM WORK FORM WORK M² EL -1.650 EL -0.600 C0-CVL-STD-0104 REV 1 1 6 6 1.400 1.400 1.400 1.400 5.600 1.650 -0.600 1.050 35.28 35.28
1.0340 P2 FM-1A F4 FOUNDATION SOCKET COLUMN-OUTER SC ( 700L x 700W) FORM WORK FORM WORK M² EL -1.650 EL -0.600 C0-CVL-STD-0104 REV 1 1 6 6 0.700 0.700 0.700 0.700 2.800 1.650 -0.600 1.050 17.64 17.64
1.0341 P2 RE-1A F4 FOUNDATION SOCKET COLUMN-OUTER SC ( 1400L x 1400W) REBAR REBAR Ð 19 TON VERT OUTER EL -2.150 EL -0.600 C0-CVL-STD-0104 REV 1 19 2.230 1 0.001 6 38 228 0.500 1.430 1.930 0.98 0.98
1.0342 P2 RE-1A F4 FOUNDATION SOCKET COLUMN-OUTER SC ( 1400L x 1400W) REBAR REBAR Ð 19 TON VERT INNER EL -2.150 EL -0.600 C0-CVL-STD-0104 REV 1 19 2.230 1 0.001 6 30 180 0.500 1.430 1.930 0.77 0.77
1.0343 P2 RE-1A F4 FOUNDATION SOCKET COLUMN-OUTER SC ( 1400L x 1400W) REBAR REBAR Ð 19 TON HORI OUTER C0-CVL-STD-0104 REV 1 19 2.230 1 0.001 6 5 2 60 0.114 1.300 0.250 1.300 0.250 0.114 3.328 0.45 0.45
1.0344 P2 RE-1A F4 FOUNDATION SOCKET COLUMN-OUTER SC ( 1400L x 1400W) REBAR REBAR Ð 19 TON HORI INNER C0-CVL-STD-0104 REV 1 19 2.230 1 0.001 6 5 2 60 0.114 1.300 0.250 1.300 0.250 0.114 3.328 0.45 0.45
1.0345 P2 RE-1A F4 FOUNDATION SOCKET COLUMN-OUTER SC ( 1400L x 1400W) REBAR REBAR Ð 19 TON ADD HORI UPPER C0-CVL-STD-0104 REV 1 19 2.230 1 0.001 6 2 2 24 0.800 0.800 0.04 0.04
1.0346 P2 RE-1A F4 FOUNDATION SOCKET COLUMN-OUTER SC ( 1400L x 1400W) REBAR REBAR Ð 10 TON CROSS TIE C0-CVL-STD-0104 REV 1 10 0.620 1 0.001 6 30 5 900 0.060 0.250 0.060 0.370 0.21 0.21
1.0347 P2 RE-1A F4 FOUNDATION SOCKET COLUMN-OUTER SC ( 1400L x 1400W) REBAR REBAR Ð 13 TON BOTTOM TIE C0-CVL-STD-0104 REV 1 13 1.040 1 0.001 6 2 12 0.078 1.300 1.300 1.300 1.300 0.078 5.356 0.07 0.07
1.0348 P2 CO-1A F4 FOUNDATION FOOT FDN F4 ( 3300L x 3300W x 500HPLAIN CONCRETE LEVELING CONCRETE T= 50 M³ EL -2.200 EL -2.150 C0-CVL-DWG-SSFD-2301~23 REV 1 SOIL DISPOSAL 1 6 6 3.300 0.200 3.500 3.300 0.200 3.500 2.200 -2.150 0.050 3.67 3.67
1.0349 P2 F4 FOUNDATION FOOT FDN F4 ( 3300L x 3300W x 500HEARTH WORK COMPACTIED SOIL 95% MAX DRY M² C0-CVL-DWG-SSFD-2301~23 REV 1 1 6 6 3.300 0.600 3.900 3.300 0.600 3.900 91.26 91.26
1.0350 P2 EA-1B F4 FOUNDATION FOOT FDN F4 ( 3300L x 3300W x 500HEARTH WORK EXCAVATION BY EQUIPMENT (D>3 M³ EL -2.200 EL -0.300 C0-CVL-DWG-SSFD-2301~23 REV 1 SOIL EXCAVATION 1 6 0 0 3.300 0.600 3.900 3.300 0.600 3.900 2.200 -0.300 - 1.900 - -
1.0351 P2 EA-1A F4 FOUNDATION FOOT FDN F4 ( 3300L x 3300W x 500HEARTH WORK EXCAVATION BY EQUIPMENT (D<=M³ EL -2.200 EL -0.300 C0-CVL-DWG-SSFD-2301~23 REV 1 SOIL EXCAVATION 1 6 6 3.300 0.600 3.900 3.300 0.600 3.900 2.200 -0.300 - 1.900 173.39 173.39
1.0352 P2 EA-3B F4 FOUNDATION FOOT FDN F4 ( 3300L x 3300W x 500HEARTH WORK SOIL DISPOSAL M³ DISPO: CONCRETE EL -2.150 EL -1.650 C0-CVL-DWG-SSFD-2301~23 REV 1 1 6 6 3.300 3.300 3.300 3.300 2.150 -1.650 0.500 32.67 32.67
1.0353 P2 EA-3B F4 FOUNDATION SOCKET COLUMN-OUTER SC ( 1400L x 1400W) EARTH WORK SOIL DISPOSAL M³ DISPO: CONCRETE EL -1.650 EL -0.600 C0-CVL-DWG-SSFD-2301~23 REV 1 1 6 6 1.400 1.400 1.400 1.400 1.650 -0.600 1.050 12.35 12.35

file:///conversion/tmp/scratch/454095803.xlsxPrinted: 01/03/2020 - 21:53:27 <EA>


1.0354 P2 EA-3B F4 FOUNDATION FOOT FDN F4 ( 3300L x 3300W x 500HEARTH WORK SOIL DISPOSAL M³ DISPO: LC + SB C0-CVL-DWG-SSFD-2301~23 REV 1 1 1 1 3.675 3.675 3.67 3.67
1.0355 P2 EA-2A F4 FOUNDATION FOOT FDN F4 ( 3300L x 3300W x 500HEARTH WORK SOIL BACKFILL M³ C0-CVL-DWG-SSFD-2301~23 REV 1 1 1 1 173.394 -48.693 124.701 124.70 124.70
1.0356 P2 F4 FOUNDATION SOCKET COLUMN-INNER SO ( 700L x 700W) OTHERS SHEAR KEY 100x25 MM M C0-CVL-STD-0104 REV 1 1 6 5 30 0.700 0.700 0.700 0.700 2.800 84.00 84.00
1.0357 P2 CO-2A F5 FOUNDATION FOOT FDN F5 ( 3300L x 3300W x 500HCONCRETE CONCRETE M³ EL -2.150 EL -1.650 C0-CVL-DWG-SSFD-2301~23 REV 1 1 6 6 3.300 3.300 3.300 3.300 0.500 0.500 32.67 32.67
1.0358 P2 FM-1A F5 FOUNDATION FOOT FDN F5 ( 3300L x 3300W x 500HFORM WORK FORM WORK M² EL -2.150 EL -1.650 C0-CVL-DWG-SSFD-2301~23 REV 1 1 6 6 3.300 3.300 3.300 3.300 13.200 2.150 -1.650 0.500 39.60 39.60
1.0359 P2 RE-1A F5 FOUNDATION FOOT FDN F5 ( 3300L x 3300W x 500HREBAR REBAR Ð 13 TON TRANS, TOP C0-CVL-DWG-SSFD-2301~23 REV 1 13 0.150 1.040 1 0.001 6 22 132 3.200 0.350 0.350 3.900 0.54 0.54
1.0360 P2 RE-1A F5 FOUNDATION FOOT FDN F5 ( 3300L x 3300W x 500HREBAR REBAR Ð 16 TON TRANS, BOTT C0-CVL-DWG-SSFD-2301~23 REV 1 16 0.150 1.580 1 0.001 6 22 132 3.200 0.350 0.350 3.900 0.81 0.81
1.0361 P2 RE-1A F5 FOUNDATION FOOT FDN F5 ( 3300L x 3300W x 500HREBAR REBAR Ð 13 TON LONG, TOP C0-CVL-DWG-SSFD-2301~23 REV 1 13 0.150 1.040 1 0.001 6 22 132 3.200 0.350 0.350 3.900 0.54 0.54
1.0362 P2 RE-1A F5 FOUNDATION FOOT FDN F5 ( 3300L x 3300W x 500HREBAR REBAR Ð 16 TON LONG, BOTT C0-CVL-DWG-SSFD-2301~23 REV 1 16 0.150 1.580 1 0.001 6 22 132 3.200 0.350 0.350 3.900 0.81 0.81
1.0363 P2 RE-1A F5 FOUNDATION FOOT FDN F5 ( 3300L x 3300W x 500HREBAR REBAR Ð 13 TON TIE C0-CVL-DWG-SSFD-2301~23 REV 1 13 1.040 1 0.001 6 2 12 0.078 3.240 3.240 0.078 6.636 0.08 0.08
1.0364 P2 RE-1A F5 FOUNDATION FOOT FDN F5 ( 3300L x 3300W x 500HREBAR REBAR Ð 16 TON SUPPORT C0-CVL-DWG-SSFD-2301~23 REV 1 16 1.580 0.001 6 9 54 0.400 0.342 0.200 0.342 0.400 1.684 0.14 -
1.0364 P2 CO-2A F5 FOUNDATION SOCKET COLUMN-OUTER SC ( 1400L x 1400W) CONCRETE CONCRETE M³ EL -1.650 EL -0.600 C0-CVL-STD-0104 REV 1 1 6 6 1.400 1.400 1.400 1.400 1.650 -0.600 1.050 12.35 12.35
1.0365 P2 CO-2A F5 FOUNDATION SOCKET COLUMN-OUTER SC ( 700L x 700W) CONCRETE CONCRETE M³ EL -1.650 EL -0.600 C0-CVL-STD-0104 REV 1 1 6 -1 -6 0.700 0.700 0.700 0.700 1.650 -0.600 1.050 -3.09 -3.09
1.0366 P2 FM-1A F5 FOUNDATION SOCKET COLUMN-OUTER SC ( 1400L x 1400W) FORM WORK FORM WORK M² EL -1.650 EL -0.600 C0-CVL-STD-0104 REV 1 1 6 6 1.400 1.400 1.400 1.400 5.600 1.650 -0.600 1.050 35.28 35.28
1.0367 P2 FM-1A F5 FOUNDATION SOCKET COLUMN-OUTER SC ( 700L x 700W) FORM WORK FORM WORK M² EL -1.650 EL -0.600 C0-CVL-STD-0104 REV 1 1 6 6 0.700 0.700 0.700 0.700 2.800 1.650 -0.600 1.050 17.64 17.64
1.0368 P2 RE-1A F5 FOUNDATION SOCKET COLUMN-OUTER SC ( 1400L x 1400W) REBAR REBAR Ð 19 TON VERT OUTER EL -2.150 EL -0.600 C0-CVL-STD-0104 REV 1 19 2.230 1 0.001 6 38 228 0.500 1.430 1.930 0.98 0.98
1.0369 P2 RE-1A F5 FOUNDATION SOCKET COLUMN-OUTER SC ( 1400L x 1400W) REBAR REBAR Ð 19 TON VERT INNER EL -2.150 EL -0.600 C0-CVL-STD-0104 REV 1 19 2.230 1 0.001 6 30 180 0.500 1.430 1.930 0.77 0.77
1.0370 P2 RE-1A F5 FOUNDATION SOCKET COLUMN-OUTER SC ( 1400L x 1400W) REBAR REBAR Ð 19 TON HORI OUTER C0-CVL-STD-0104 REV 1 19 2.230 1 0.001 6 5 2 60 0.114 1.300 0.250 1.300 0.250 0.114 3.328 0.45 0.45
1.0371 P2 RE-1A F5 FOUNDATION SOCKET COLUMN-OUTER SC ( 1400L x 1400W) REBAR REBAR Ð 19 TON HORI INNER C0-CVL-STD-0104 REV 1 19 2.230 1 0.001 6 5 2 60 0.114 1.300 0.250 1.300 0.250 0.114 3.328 0.45 0.45
1.0372 P2 RE-1A F5 FOUNDATION SOCKET COLUMN-OUTER SC ( 1400L x 1400W) REBAR REBAR Ð 19 TON ADD HORI UPPER C0-CVL-STD-0104 REV 1 19 2.230 1 0.001 6 2 2 24 0.800 0.800 0.04 0.04
1.0373 P2 RE-1A F5 FOUNDATION SOCKET COLUMN-OUTER SC ( 1400L x 1400W) REBAR REBAR Ð 10 TON CROSS TIE C0-CVL-STD-0104 REV 1 10 0.620 1 0.001 6 30 5 900 0.060 0.250 0.060 0.370 0.21 0.21
1.0374 P2 RE-1A F5 FOUNDATION SOCKET COLUMN-OUTER SC ( 1400L x 1400W) REBAR REBAR Ð 13 TON BOTTOM TIE C0-CVL-STD-0104 REV 1 13 1.040 1 0.001 6 2 12 0.078 1.300 1.300 1.300 1.300 0.078 5.356 0.07 0.07
1.0375 P2 CO-1A F5 FOUNDATION FOOT FDN F5 ( 3300L x 3300W x 500HPLAIN CONCRETE LEVELING CONCRETE T= 50 M³ EL -2.200 EL -2.150 C0-CVL-DWG-SSFD-2301~23 REV 1 SOIL DISPOSAL 1 6 6 3.300 0.200 3.500 3.300 0.200 3.500 2.200 -2.150 0.050 3.67 3.67
1.0376 P2 F5 FOUNDATION FOOT FDN F5 ( 3300L x 3300W x 500HEARTH WORK COMPACTIED SOIL 95% MAX DRY M² C0-CVL-DWG-SSFD-2301~23 REV 1 1 6 6 3.300 0.600 3.900 3.300 0.600 3.900 91.26 91.26
1.0377 P2 EA-1B F5 FOUNDATION FOOT FDN F5 ( 3300L x 3300W x 500HEARTH WORK EXCAVATION BY EQUIPMENT (D>3 M³ EL -2.200 EL -0.300 C0-CVL-DWG-SSFD-2301~23 REV 1 SOIL EXCAVATION 1 6 0 0 3.300 0.600 3.900 3.300 0.600 3.900 2.200 -0.300 - 1.900 - -
1.0378 P2 EA-1A F5 FOUNDATION FOOT FDN F5 ( 3300L x 3300W x 500HEARTH WORK EXCAVATION BY EQUIPMENT (D<=M³ EL -2.200 EL -0.300 C0-CVL-DWG-SSFD-2301~23 REV 1 SOIL EXCAVATION 1 6 6 3.300 0.600 3.900 3.300 0.600 3.900 2.200 -0.300 - 1.900 173.39 173.39
1.0379 P2 EA-3B F5 FOUNDATION FOOT FDN F5 ( 3300L x 3300W x 500HEARTH WORK SOIL DISPOSAL M³ DISPO: CONCRETE EL -2.150 EL -1.650 C0-CVL-DWG-SSFD-2301~23 REV 1 1 6 6 3.300 3.300 3.300 3.300 2.150 -1.650 0.500 32.67 32.67
1.0380 P2 EA-3B F5 FOUNDATION SOCKET COLUMN-OUTER SC ( 1400L x 1400W) EARTH WORK SOIL DISPOSAL M³ DISPO: CONCRETE EL -1.650 EL -0.600 C0-CVL-DWG-SSFD-2301~23 REV 1 1 6 6 1.400 1.400 1.400 1.400 1.650 -0.600 1.050 12.35 12.35
1.0381 P2 EA-3B F5 FOUNDATION FOOT FDN F5 ( 3300L x 3300W x 500HEARTH WORK SOIL DISPOSAL M³ DISPO: LC + SB C0-CVL-DWG-SSFD-2301~23 REV 1 1 1 1 3.675 3.675 3.67 3.67
1.0382 P2 EA-2A F5 FOUNDATION FOOT FDN F5 ( 3300L x 3300W x 500HEARTH WORK SOIL BACKFILL M³ C0-CVL-DWG-SSFD-2301~23 REV 1 1 1 1 173.394 -48.693 124.701 124.70 124.70
1.0383 P2 F5 FOUNDATION SOCKET COLUMN-INNER SO ( 700L x 700W) OTHERS SHEAR KEY 100x25 MM M C0-CVL-STD-0104 REV 1 1 6 5 30 0.700 0.700 0.700 0.700 2.800 84.00 84.00
1.0384 P2 CO-2A PIT ( FOUNDATION FOOT FDN BASE ( 4500L x 2000W x 4 CONCRETE CONCRETE M³ EL -3.200 EL -2.800 P2-CVL-DWG-PTBN-0401 REV 1 1 1 1 4.500 4.500 2.000 2.000 0.400 0.400 3.60 3.60
1.0385 P2 FM-1A PIT ( FOUNDATION FOOT FDN BASE ( 4500L x 2000W x 4 FORM WORK FORM WORK M² EL -3.200 EL -2.800 P2-CVL-DWG-PTBN-0401 REV 1 1 1 1 4.500 2.000 4.500 2.000 13.000 3.200 -2.800 0.400 5.20 5.20
1.0386 P2 RE-1A PIT ( FOUNDATION FOOT FDN BASE ( 4500L x 2000W x 4 REBAR REBAR Ð 16 TON LONG, TOP P2-CVL-DWG-PTBN-0401 REV 1 16 0.150 1.580 1 0.001 1 14 14 4.400 0.250 0.250 4.900 0.11 0.11
1.0387 P2 RE-1A PIT ( FOUNDATION FOOT FDN BASE ( 4500L x 2000W x 4 REBAR REBAR Ð 16 TON LONG, BOTT P2-CVL-DWG-PTBN-0401 REV 1 16 0.150 1.580 1 0.001 1 14 14 4.400 0.250 0.250 4.900 0.11 0.11
1.0388 P2 RE-1A PIT ( FOUNDATION FOOT FDN BASE ( 4500L x 2000W x 4 REBAR REBAR Ð 16 TON TRANS, TOP P2-CVL-DWG-PTBN-0401 REV 1 16 0.150 1.580 1 0.001 1 30 30 1.900 0.250 0.250 2.400 0.11 0.11
1.0389 P2 RE-1A PIT ( FOUNDATION FOOT FDN BASE ( 4500L x 2000W x 4 REBAR REBAR Ð 16 TON TRANS, BOTT P2-CVL-DWG-PTBN-0401 REV 1 16 0.150 1.580 1 0.001 1 30 30 1.900 0.250 0.250 2.400 0.11 0.11
1.0390 P2 RE-1A PIT ( FOUNDATION FOOT FDN BASE ( 4500L x 2000W x 4 REBAR REBAR Ð 16 TON TIE P2-CVL-DWG-PTBN-0401 REV 1 16 1.580 1 0.001 1 2 0 0 - -
1.0391 P2 CO-2A PIT ( FOUNDATION WALL OUTER ( 4500L x 2000W) CONCRETE CONCRETE M³ EL -2.800 EL ±0.000 P2-CVL-DWG-PTBN-0401 REV 1 1 1 4.500 4.500 2.000 2.000 2.800 - 2.800 25.20 -
1.0392 P2 CO-2A PIT ( FOUNDATION WALL INER ( 3800L x 1300W) CONCRETE CONCRETE M³ EL -2.800 EL ±0.000 P2-CVL-DWG-PTBN-0401 REV 1 1 -1 -1 3.800 3.800 1.300 1.300 2.800 - 2.800 -13.83 -
1.0393 P2 FM-1A PIT ( FOUNDATION WALL OUTER ( 4500L x 2000W) FORM WORK FORM WORK M² EL -2.800 EL ±0.000 P2-CVL-DWG-PTBN-0401 REV 1 1 1 4.500 2.000 4.500 2.000 13.000 2.800 - 2.800 36.40 -
1.0394 P2 FM-1A PIT ( FOUNDATION WALL INER ( 3800L x 1300W) FORM WORK FORM WORK M² EL -2.800 EL ±0.000 P2-CVL-DWG-PTBN-0401 REV 1 1 1 3.800 1.300 3.800 1.300 10.200 2.800 - 2.800 28.56 -
1.0395 P2 RE-1A PIT ( FOUNDATION WALL OUTER ( 4500L x 2000W) REBAR REBAR Ð 16 TON VERT OUTER EL -3.200 EL ±0.000 P2-CVL-DWG-PTBN-0401 REV 1 16 0.150 1.580 1 0.001 1 30 2 60 0.500 3.080 3.580 0.34 0.34
1.0396 P2 RE-1A PIT ( FOUNDATION WALL INER ( 3800L x 1300W) REBAR REBAR Ð 16 TON VERT OUTER EL -3.200 EL ±0.000 P2-CVL-DWG-PTBN-0401 REV 1 16 0.150 1.580 1 0.001 1 13 2 26 0.500 3.080 3.580 0.15 0.15
1.0396 P2 RE-1A PIT ( FOUNDATION WALL OUTER ( 4500L x 2000W) REBAR REBAR Ð 16 TON VERT INNER EL -3.200 EL ±0.000 P2-CVL-DWG-PTBN-0401 REV 1 16 0.150 1.580 1 0.001 1 27 2 54 0.500 3.080 3.580 0.31 0.31
1.0397 P2 RE-1A PIT ( FOUNDATION WALL INER ( 3800L x 1300W) REBAR REBAR Ð 16 TON VERT INNER EL -3.200 EL ±0.000 P2-CVL-DWG-PTBN-0401 REV 1 16 0.150 1.580 1 0.001 1 9 2 18 0.500 3.080 3.580 0.10 0.10
1.0397 P2 RE-1A PIT ( FOUNDATION WALL OUTER ( 4500L x 2000W) REBAR REBAR Ð 19 TON HORI OUTER EL -2.800 EL ±0.000 P2-CVL-DWG-PTBN-0401 REV 1 40 19 0.150 2.230 1 0.001 1 20 2 40 0.114 4.400 1.900 0.760 7.174 0.64 0.64
1.0398 P2 RE-1A PIT ( FOUNDATION WALL OUTER ( 4500L x 2000W) REBAR REBAR Ð 19 TON HORI INNER EL -2.800 EL ±0.000 P2-CVL-DWG-PTBN-0401 REV 1 19 0.150 2.230 1 0.001 1 20 2 40 0.114 4.400 0.114 4.628 0.41 0.41
1.0399 P2 RE-1A PIT ( FOUNDATION WALL OUTER ( 4500L x 2000W) REBAR REBAR Ð 19 TON HORI INNER EL -2.800 EL ±0.000 P2-CVL-DWG-PTBN-0401 REV 1 19 0.150 2.230 1 0.001 1 20 2 40 0.114 1.900 0.114 2.128 0.19 0.19
1.0400 P2 RE-1A PIT ( FOUNDATION WALL OUTER ( 4500L x 2000W) REBAR REBAR Ð 19 TON CORNER EL -2.800 EL ±0.000 P2-CVL-DWG-PTBN-0401 REV 1 19 0.150 2.230 1 0.001 1 20 4 80 0.250 0.617 0.250 1.117 0.20 0.20
1.0401 P2 RE-1A PIT ( FOUNDATION WALL OUTER ( 4500L x 2000W) REBAR REBAR Ð 19 TON P2-CVL-DWG-PTBN-0401 REV 1 19 2.230 1 0.001 1 0 0 - -
1.0402 P2 CO-1A PIT ( FOUNDATION FOOT FDN BASE ( 4500L x 2000W x 4 PLAIN CONCRETE LEVELING CONCRETE T= 50 M³ EL -3.250 EL -3.200 P2-CVL-DWG-PTBN-0401 REV 1 SOIL DISPOSAL 1 1 1 4.500 0.200 4.700 2.000 0.200 2.200 3.250 -3.200 0.050 0.52 0.52
1.0403 P2 PIT ( FOUNDATION FOOT FDN BASE ( 4500L x 2000W x 4 EARTH WORK COMPACTIED SOIL 95% MAX DRY M² P2-CVL-DWG-PTBN-0401 REV 1 1 1 1 4.500 0.600 5.100 2.000 0.600 2.600 13.26 13.26
1.0404 P2 EA-1B PIT ( FOUNDATION FOOT FDN BASE ( 4500L x 2000W x 4 EARTH WORK EXCAVATION BY EQUIPMENT (D>3 M³ EL -3.250 EL -0.300 P2-CVL-DWG-PTBN-0401 REV 1 SOIL EXCAVATION 1 1 0 0 4.500 0.600 5.100 2.000 0.600 2.600 3.250 -0.300 - 2.950 - -
1.0405 P2 EA-1A PIT ( FOUNDATION FOOT FDN BASE ( 4500L x 2000W x 4 EARTH WORK EXCAVATION BY EQUIPMENT (D<=M³ EL -3.250 EL -0.300 P2-CVL-DWG-PTBN-0401 REV 1 SOIL EXCAVATION 1 1 1 4.500 0.600 5.100 2.000 0.600 2.600 3.250 -0.300 - 2.950 39.12 39.12
1.0406 P2 EA-3B PIT ( FOUNDATION FOOT FDN BASE ( 4500L x 2000W x 4 EARTH WORK SOIL DISPOSAL M³ DISPO: CONCRETE EL -3.200 EL -2.800 P2-CVL-DWG-PTBN-0401 REV 1 1 1 4.500 4.500 2.000 2.000 3.200 -2.800 0.400 3.60 -
1.0407 P2 EA-3B PIT ( FOUNDATION WALL OUTER ( 4500L x 2000W) EARTH WORK SOIL DISPOSAL M³ DISPO: CONCRETE EL -2.800 EL -0.300 P2-CVL-DWG-PTBN-0401 REV 1 1 1 4.500 4.500 2.000 2.000 2.800 -0.300 2.500 22.50 -
1.0408 P2 EA-3B PIT ( FOUNDATION FOOT FDN BASE ( 4500L x 2000W x 4 EARTH WORK SOIL DISPOSAL M³ DISPO: LC + SB P2-CVL-DWG-PTBN-0401 REV 1 1 1 0.517 0.517 0.52 -
1.0409 P2 EA-2A PIT ( FOUNDATION FOOT FDN BASE ( 4500L x 2000W x 4 EARTH WORK SOIL BACKFILL M³ P2-CVL-DWG-PTBN-0401 REV 1 1 1 39.117 -26.617 12.500 12.50 -
1.0410 P2 CO-2A PIT ( FOUNDATION SEPARATOR WALL WALL T= 250 CONCRETE CONCRETE M³ EL -2.300 EL ±0.000 P2-CVL-DWG-PTBN-0401 REV 1 1 1 1.300 1.300 0.250 0.250 2.300 - 2.300 0.75 -
1.0411 P2 FM-1A PIT ( FOUNDATION SEPARATOR WALL WALL T= 250 FORM WORK FORM WORK M² WALL EL -2.300 EL ±0.000 P2-CVL-DWG-PTBN-0401 REV 1 1 2 2 1.300 1.300 2.300 - 2.300 5.98 -
1.0412 P2 FM-1A PIT ( FOUNDATION SEPARATOR WALL WALL T= 250 FORM WORK FORM WORK M² BOTTOM EL -2.300 P2-CVL-DWG-PTBN-0401 REV 1 1 1 1.300 1.300 0.250 0.250 0.33 -
1.0412 P2 RE-1A PIT ( FOUNDATION SEPARATOR WALL WALL T= 250 REBAR REBAR Ð 16 TON VERT EL -2.300 EL ±0.000 P2-CVL-DWG-PTBN-0401 REV 1 16 0.150 1.580 0.001 1 10 2 20 0.150 2.200 0.150 2.500 0.08 -
1.0413 P2 RE-1A PIT ( FOUNDATION SEPARATOR WALL WALL T= 250 REBAR REBAR Ð 16 TON HOR EL -2.300 EL ±0.000 P2-CVL-DWG-PTBN-0401 REV 1 16 0.150 1.580 0.001 1 16 2 32 0.150 1.900 0.150 2.200 0.11 -
1.0414 P2 CO-2A PIT ( FOUNDATION SEPARATOR WALL WALL T= 250 CONCRETE CONCRETE M³ EL -2.800 EL -1.700 P2-CVL-DWG-PTBN-0401 REV 1 1 1 1.300 1.300 0.250 0.250 2.800 -1.700 1.100 0.36 -
1.0415 P2 FM-1A PIT ( FOUNDATION SEPARATOR WALL WALL T= 250 FORM WORK FORM WORK M² WALL EL -2.800 EL -1.700 P2-CVL-DWG-PTBN-0401 REV 1 1 2 2 1.300 1.300 2.800 -1.700 1.100 2.86 -
1.0416 P2 RE-1A PIT ( FOUNDATION SEPARATOR WALL WALL T= 250 REBAR REBAR Ð 16 TON VERT EL -3.200 EL -1.700 P2-CVL-DWG-PTBN-0401 REV 1 16 0.150 1.580 0.001 1 10 2 20 0.250 1.400 0.150 1.800 0.06 -
1.0417 P2 RE-1A PIT ( FOUNDATION SEPARATOR WALL WALL T= 250 REBAR REBAR Ð 16 TON HOR EL -2.800 EL -1.700 P2-CVL-DWG-PTBN-0401 REV 1 16 0.150 1.580 0.001 1 8 2 16 0.150 1.900 0.150 2.200 0.06 -
1.0418 P2 JT-4A PIT ( FOUNDATION FOOT FDN BASE ( 4500L x 2000W x 4 OTHERS WATERSTOP PVC 200 MM M P2-CVL-DWG-PTBN-0401 REV 1 1 1 1 4.150 1.650 4.150 1.650 0.400 12.000 12.00 12.00
1.0419 P2 MLA-5D PIT ( FOUNDATION COVER COVER OTHERS REMOVABLE GRATING COVER 30 TM² P2-CVL-DWG-PTBN-0401 REV 1 1 1 1.300 0.100 1.400 1.300 0.100 1.400 1.96 -
1.0420 P2 MLA-5D PIT ( FOUNDATION COVER COVER OTHERS REMOVABLE GRATING COVER 30 TM² P2-CVL-DWG-PTBN-0401 REV 1 1 1 1.250 0.050 1.300 1.300 0.100 1.400 1.82 -
1.0421 P2 MLA-5D PIT ( FOUNDATION COVER COVER OTHERS REMOVABLE GRATING COVER 30 TM² P2-CVL-DWG-PTBN-0401 REV 1 1 1 1.000 0.050 1.050 1.300 0.100 1.400 1.47 -
1.0422 P2 SS-4A PIT ( FOUNDATION COVER COVER STEEL CORNER L 40x40x4 TON P2-CVL-DWG-PTBN-0401 REV 1 2.420 0.001 1 4 4 1.400 1.400 0.01 -
1.0423 P2 SS-4A PIT ( FOUNDATION COVER COVER STEEL CORNER L 40x40x4 TON P2-CVL-DWG-PTBN-0401 REV 1 2.420 0.001 1 2 2 1.400 1.400 0.01 -
1.0424 P2 SS-4A PIT ( FOUNDATION COVER COVER STEEL CORNER L 40x40x4 TON P2-CVL-DWG-PTBN-0401 REV 1 2.420 0.001 1 2 2 3.750 -1.400 2.350 0.01 -
1.0425 P2 ANA-2 PIT ( FOUNDATION COVER COVER STEEL CLIMBING RUNG Ø 16 RB TON EL -2.800 EL ±0.000 ED-CO-CVL-STD-0301 REV 1 0.300 1.580 0.001 1 9 2 18 1.400 1.400 0.04 -
1.0426 P2 PIT ( FOUNDATION COVER COVER BOLT ANCHOR BAR Ø10 x 150 LENGTH EA P2-CVL-DWG-PTBN-0401 REV 1 1 130 130 130.00 -
1.0427 P2 SS-4A PIT ( FOUNDATION COVER COVER STEEL C 100 GRATING TON P2-CVL-DWG-PTBN-0401 REV 1 9.370 0.001 1 1 1.300 1.300 0.01 -
1.0428 P2 SS-4A PIT ( FOUNDATION COVER COVER PLATE PLATE 12 TON BASE PL ED-CO-CVL-STD-0204 REV 1 12 94.200 0.001 1 2 2 0.070 0.070 0.120 0.120 0.00 -
1.0429 P2 SS-4A PIT ( FOUNDATION COVER COVER PLATE PLATE 9 TON ED-CO-CVL-STD-0211 REV 1 9 70.650 0.001 1 2 2 0.220 0.220 0.175 0.175 0.01 -
1.0430 P2 PIT ( FOUNDATION COVER COVER BOLT BOLT M20 EA ED-CO-CVL-STD-0211 REV 1 1 2 2 4 4.00 -
1.0431 P2 PIT ( FOUNDATION COVER COVER BOLT ANCHOR BAR Ø16 x 500 LENGTH EA ED-CO-CVL-STD-0211 REV 1 1 2 2 4 4.00 -
1.0432 P2 LN-5D-1 PIT ( FOUNDATION WALL INER ( 3800L x 1300W) OTHERS EPOXY COATING M² EL -2.800 EL ±0.000 P2-CVL-DWG-PTBN-0401 REV 1 1 1 3.800 1.300 3.800 1.300 10.200 2.800 - 2.800 28.56 -
1.0433 P2 LN-5D-1 PIT ( FOUNDATION WALL INER ( 3800L x 1300W) OTHERS EPOXY COATING M² WALL EL -2.300 EL ±0.000 P2-CVL-DWG-PTBN-0401 REV 1 1 2 2 1.300 1.300 2.300 - 2.300 5.98 -
1.0434 P2 LN-5D-1 PIT ( FOUNDATION WALL INER ( 3800L x 1300W) OTHERS EPOXY COATING M² WALL EL -2.800 EL -1.700 P2-CVL-DWG-PTBN-0401 REV 1 1 2 2 1.300 1.300 2.800 -1.700 1.100 2.86 -
1.0435 P2 LN-5D-1 PIT ( FOUNDATION FOOT FDN INER ( 3800L x 1300W) OTHERS EPOXY COATING M² P2-CVL-DWG-PTBN-0401 REV 1 1 1 3.800 3.800 1.300 1.300 4.94 -
1.0436 P2 CO-2A PIT ( FOUNDATION FOOT FDN BASE ( 5700L x 2200W x 4 CONCRETE CONCRETE M³ EL -3.400 EL -3.000 P2-CVL-DWG-PTBN-0404 REV 1 1 1 5.700 5.700 2.200 2.200 0.400 0.400 5.02 -
1.0437 P2 FM-1A PIT ( FOUNDATION FOOT FDN BASE ( 5700L x 2200W x 4 FORM WORK FORM WORK M² EL -3.400 EL -3.000 P2-CVL-DWG-PTBN-0404 REV 1 1 1 5.700 2.200 5.700 2.200 15.800 3.400 -3.000 0.400 6.32 -
1.0438 P2 RE-1A PIT ( FOUNDATION FOOT FDN BASE ( 5700L x 2200W x 4 REBAR REBAR Ð 16 TON LONG, TOP P2-CVL-DWG-PTBN-0404 REV 1 16 0.150 1.580 0.001 1 15 15 5.600 0.250 0.250 6.100 0.14 -
1.0439 P2 RE-1A PIT ( FOUNDATION FOOT FDN BASE ( 5700L x 2200W x 4 REBAR REBAR Ð 16 TON LONG, BOTT P2-CVL-DWG-PTBN-0404 REV 1 16 0.150 1.580 0.001 1 15 15 5.600 0.250 0.250 6.100 0.14 -
1.0440 P2 RE-1A PIT ( FOUNDATION FOOT FDN BASE ( 5700L x 2200W x 4 REBAR REBAR Ð 16 TON TRANS, TOP P2-CVL-DWG-PTBN-0404 REV 1 16 0.150 1.580 0.001 1 38 38 2.100 0.250 0.250 2.600 0.16 -
1.0441 P2 RE-1A PIT ( FOUNDATION FOOT FDN BASE ( 5700L x 2200W x 4 REBAR REBAR Ð 16 TON TRANS, BOTT P2-CVL-DWG-PTBN-0404 REV 1 16 0.150 1.580 0.001 1 38 38 2.100 0.250 0.250 2.600 0.16 -
1.0442 P2 RE-1A PIT ( FOUNDATION FOOT FDN BASE ( 5700L x 2200W x 4 REBAR REBAR Ð 16 TON TIE P2-CVL-DWG-PTBN-0404 REV 1 16 1.580 0.001 1 2 0 0 - -
1.0443 P2 CO-2A PIT ( FOUNDATION WALL OUTER ( 5700L x 2200W) CONCRETE CONCRETE M³ EL -3.000 EL ±0.000 P2-CVL-DWG-PTBN-0404 REV 1 1 1 5.700 5.700 2.200 2.200 3.000 - 3.000 37.62 -
1.0444 P2 CO-2A PIT ( FOUNDATION WALL INER ( 5000L x 1500W) CONCRETE CONCRETE M³ EL -3.000 EL ±0.000 P2-CVL-DWG-PTBN-0404 REV 1 1 -1 -1 5.000 5.000 1.500 1.500 3.000 - 3.000 -22.50 -
1.0445 P2 FM-1A PIT ( FOUNDATION WALL OUTER ( 5700L x 2200W) FORM WORK FORM WORK M² EL -3.000 EL ±0.000 P2-CVL-DWG-PTBN-0404 REV 1 1 1 5.700 2.200 5.700 2.200 15.800 3.000 - 3.000 47.40 -
1.0446 P2 FM-1A PIT ( FOUNDATION WALL INER ( 5000L x 1500W) FORM WORK FORM WORK M² EL -3.000 EL ±0.000 P2-CVL-DWG-PTBN-0404 REV 1 1 1 5.000 1.500 5.000 1.500 13.000 3.000 - 3.000 39.00 -
1.0447 P2 RE-1A PIT ( FOUNDATION WALL OUTER ( 5700L x 2200W) REBAR REBAR Ð 16 TON VERT OUTER EL -3.400 EL ±0.000 P2-CVL-DWG-PTBN-0404 REV 1 16 0.150 1.580 0.001 1 38 2 76 0.500 3.280 3.780 0.45 -
1.0448 P2 RE-1A PIT ( FOUNDATION WALL INER ( 5000L x 1500W) REBAR REBAR Ð 16 TON VERT OUTER EL -3.400 EL ±0.000 P2-CVL-DWG-PTBN-0404 REV 1 16 0.150 1.580 0.001 1 14 2 28 0.500 3.280 3.780 0.17 -
1.0448 P2 RE-1A PIT ( FOUNDATION WALL OUTER ( 5700L x 2200W) REBAR REBAR Ð 16 TON VERT INNER EL -3.400 EL ±0.000 P2-CVL-DWG-PTBN-0404 REV 1 16 0.150 1.580 0.001 1 35 2 70 0.500 3.280 3.780 0.42 -
1.0449 P2 RE-1A PIT ( FOUNDATION WALL INER ( 5000L x 1500W) REBAR REBAR Ð 16 TON VERT INNER EL -3.400 EL ±0.000 P2-CVL-DWG-PTBN-0404 REV 1 16 0.150 1.580 0.001 1 11 2 22 0.500 3.280 3.780 0.13 -
1.0449 P2 RE-1A PIT ( FOUNDATION WALL OUTER ( 5700L x 2200W) REBAR REBAR Ð 19 TON HORI OUTER EL -3.000 EL ±0.000 P2-CVL-DWG-PTBN-0404 REV 1 40 19 0.150 2.230 0.001 1 21 2 42 0.114 5.600 2.100 0.760 8.574 0.80 -
1.0450 P2 RE-1A PIT ( FOUNDATION WALL OUTER ( 5700L x 2200W) REBAR REBAR Ð 19 TON HORI INNER EL -3.000 EL ±0.000 P2-CVL-DWG-PTBN-0404 REV 1 19 0.150 2.230 0.001 1 21 2 42 0.114 5.600 0.114 5.828 0.55 -
1.0451 P2 RE-1A PIT ( FOUNDATION WALL OUTER ( 5700L x 2200W) REBAR REBAR Ð 19 TON HORI INNER EL -3.000 EL ±0.000 P2-CVL-DWG-PTBN-0404 REV 1 19 0.150 2.230 0.001 1 21 2 42 0.114 2.100 0.114 2.328 0.22 -
1.0452 P2 RE-1A PIT ( FOUNDATION WALL OUTER ( 5700L x 2200W) REBAR REBAR Ð 19 TON CORNER EL -3.000 EL ±0.000 P2-CVL-DWG-PTBN-0404 REV 1 19 0.150 2.230 0.001 1 21 4 84 0.250 0.617 0.250 1.117 0.21 -
1.0453 P2 RE-1A PIT ( FOUNDATION WALL OUTER ( 5700L x 2200W) REBAR REBAR Ð 19 TON P2-CVL-DWG-PTBN-0404 REV 1 19 2.230 0.001 1 0 0 - -
1.0454 P2 CO-1A PIT ( FOUNDATION FOOT FDN BASE ( 5700L x 2200W x 4 PLAIN CONCRETE LEVELING CONCRETE T= 50 M³ EL -3.450 EL -3.400 P2-CVL-DWG-PTBN-0404 REV 1 SOIL DISPOSAL 1 1 5.700 0.200 5.900 2.200 0.200 2.400 3.450 -3.400 0.050 0.71 -
1.0455 P2 PIT ( FOUNDATION FOOT FDN BASE ( 5700L x 2200W x 4 EARTH WORK COMPACTIED SOIL 95% MAX DRY M² P2-CVL-DWG-PTBN-0404 REV 1 1 1 5.700 0.600 6.300 2.200 0.600 2.800 17.64 -
1.0456 P2 EA-1B PIT ( FOUNDATION FOOT FDN BASE ( 5700L x 2200W x 4 EARTH WORK EXCAVATION BY EQUIPMENT (D>3 M³ EL -3.450 EL -0.300 P2-CVL-DWG-PTBN-0404 REV 1 SOIL EXCAVATION 1 1 1 5.700 2.000 7.700 2.200 2.000 4.200 3.450 -0.300 -3.000 0.150 4.85 -
1.0457 P2 EA-1A PIT ( FOUNDATION FOOT FDN BASE ( 5700L x 2200W x 4 EARTH WORK EXCAVATION BY EQUIPMENT (D<=M³ EL -3.450 EL -0.300 P2-CVL-DWG-PTBN-0404 REV 1 SOIL EXCAVATION 1 1 5.700 2.000 7.700 2.200 2.000 4.200 3.450 -0.300 -0.150 3.000 97.02 -
1.0458 P2 EA-3B PIT ( FOUNDATION FOOT FDN BASE ( 5700L x 2200W x 4 EARTH WORK SOIL DISPOSAL M³ DISPO: CONCRETE EL -3.400 EL -3.000 P2-CVL-DWG-PTBN-0404 REV 1 1 1 5.700 5.700 2.200 2.200 3.400 -3.000 0.400 5.02 -
1.0459 P2 EA-3B PIT ( FOUNDATION WALL OUTER ( 5700L x 2200W) EARTH WORK SOIL DISPOSAL M³ DISPO: CONCRETE EL -3.000 EL -0.300 P2-CVL-DWG-PTBN-0404 REV 1 1 1 5.700 5.700 2.200 2.200 3.000 -0.300 2.700 33.86 -
1.0460 P2 EA-3B PIT ( FOUNDATION FOOT FDN BASE ( 5700L x 2200W x 4 EARTH WORK SOIL DISPOSAL M³ DISPO: LC + SB P2-CVL-DWG-PTBN-0404 REV 1 1 1 0.708 0.708 0.71 -
1.0461 P2 EA-2A PIT ( FOUNDATION FOOT FDN BASE ( 5700L x 2200W x 4 EARTH WORK SOIL BACKFILL M³ P2-CVL-DWG-PTBN-0404 REV 1 1 1 101.871 -39.582 62.289 62.29 -
1.0462 P2 CO-2A PIT ( FOUNDATION SEPARATOR WALL WALL T= 250 CONCRETE CONCRETE M³ EL -2.500 EL ±0.000 P2-CVL-DWG-PTBN-0404 REV 1 1 1 1.300 1.300 0.250 0.250 2.500 - 2.500 0.81 -
1.0463 P2 FM-1A PIT ( FOUNDATION SEPARATOR WALL WALL T= 250 FORM WORK FORM WORK M² WALL EL -2.500 EL ±0.000 P2-CVL-DWG-PTBN-0404 REV 1 1 2 2 1.300 1.300 2.500 - 2.500 6.50 -
1.0464 P2 FM-1A PIT ( FOUNDATION SEPARATOR WALL WALL T= 250 FORM WORK FORM WORK M² BOTTOM EL -2.500 P2-CVL-DWG-PTBN-0404 REV 1 1 1 1.300 1.300 0.250 0.250 0.33 -
1.0464 P2 RE-1A PIT ( FOUNDATION SEPARATOR WALL WALL T= 250 REBAR REBAR Ð 16 TON VERT EL -2.500 EL ±0.000 P2-CVL-DWG-PTBN-0404 REV 1 16 0.150 1.580 0.001 1 10 2 20 0.150 2.400 0.150 2.700 0.09 -
1.0465 P2 RE-1A PIT ( FOUNDATION SEPARATOR WALL WALL T= 250 REBAR REBAR Ð 16 TON HOR EL -2.500 EL ±0.000 P2-CVL-DWG-PTBN-0404 REV 1 16 0.150 1.580 0.001 1 17 2 34 0.150 2.100 0.150 2.400 0.13 -
1.0466 P2 CO-2A PIT ( FOUNDATION SEPARATOR WALL WALL T= 250 CONCRETE CONCRETE M³ EL -3.000 EL -1.700 P2-CVL-DWG-PTBN-0404 REV 1 1 1 1.300 1.300 0.250 0.250 3.000 -1.700 1.300 0.42 -
1.0467 P2 FM-1A PIT ( FOUNDATION SEPARATOR WALL WALL T= 250 FORM WORK FORM WORK M² WALL EL -3.000 EL -1.700 P2-CVL-DWG-PTBN-0404 REV 1 1 2 2 1.300 1.300 3.000 -1.700 1.300 3.38 -
1.0468 P2 RE-1A PIT ( FOUNDATION SEPARATOR WALL WALL T= 250 REBAR REBAR Ð 16 TON VERT EL -3.400 EL -1.700 P2-CVL-DWG-PTBN-0404 REV 1 16 0.150 1.580 0.001 1 10 2 20 0.250 1.600 0.150 2.000 0.06 -
1.0469 P2 RE-1A PIT ( FOUNDATION SEPARATOR WALL WALL T= 250 REBAR REBAR Ð 16 TON HOR EL -3.000 EL -1.700 P2-CVL-DWG-PTBN-0404 REV 1 16 0.150 1.580 0.001 1 9 2 18 0.150 2.100 0.150 2.400 0.07 -
1.0470 P2 JT-4A PIT ( FOUNDATION FOOT FDN BASE ( 5700L x 2200W x 4 OTHERS WATERSTOP PVC 200 MM M P2-CVL-DWG-PTBN-0404 REV 1 1 1 5.350 1.850 5.350 1.850 0.400 14.800 14.80 -
1.0471 P2 MLA-5D PIT ( FOUNDATION COVER COVER OTHERS REMOVABLE GRATING COVER 30 TM² P2-CVL-DWG-PTBN-0404 REV 1 1 1 2.100 0.100 2.200 1.500 0.100 1.600 3.52 -
1.0472 P2 MLA-5D PIT ( FOUNDATION COVER COVER OTHERS REMOVABLE GRATING COVER 30 TM² P2-CVL-DWG-PTBN-0404 REV 1 1 1 1.800 0.050 1.850 1.500 0.100 1.600 2.96 -
1.0473 P2 MLA-5D PIT ( FOUNDATION COVER COVER OTHERS REMOVABLE GRATING COVER 30 TM² P2-CVL-DWG-PTBN-0404 REV 1 1 1 0.850 0.050 0.900 1.500 0.100 1.600 1.44 -
1.0474 P2 SS-4A PIT ( FOUNDATION COVER COVER STEEL CORNER L 40x40x4 TON P2-CVL-DWG-PTBN-0404 REV 1 2.420 0.001 1 4 4 1.600 1.600 0.02 -
1.0475 P2 SS-4A PIT ( FOUNDATION COVER COVER STEEL CORNER L 40x40x4 TON P2-CVL-DWG-PTBN-0404 REV 1 2.420 0.001 1 2 2 1.600 1.600 0.01 -
1.0476 P2 SS-4A PIT ( FOUNDATION COVER COVER STEEL CORNER L 40x40x4 TON P2-CVL-DWG-PTBN-0404 REV 1 2.420 0.001 1 2 2 4.950 -1.600 3.350 0.02 -
1.0477 P2 ANA-2 PIT ( FOUNDATION COVER COVER STEEL CLIMBING RUNG Ø 16 RB TON EL -3.000 EL ±0.000 ED-CO-CVL-STD-0301 REV 1 0.300 1.580 0.001 1 10 2 20 1.400 1.400 0.04 -
1.0478 P2 PIT ( FOUNDATION COVER COVER BOLT ANCHOR BAR Ø10 x 150 LENGTH EA P2-CVL-DWG-PTBN-0404 REV 1 1 142 142 142.00 -
1.0479 P2 SS-4A PIT ( FOUNDATION COVER COVER STEEL C 100 GRATING TON P2-CVL-DWG-PTBN-0404 REV 1 9.370 0.001 1 1 1.500 1.500 0.01 -
1.0480 P2 SS-4A PIT ( FOUNDATION COVER COVER PLATE PLATE 12 TON BASE PL ED-CO-CVL-STD-0204 REV 1 12 94.200 0.001 1 2 2 0.070 0.070 0.120 0.120 0.00 -
1.0481 P2 SS-4A PIT ( FOUNDATION COVER COVER PLATE PLATE 9 TON ED-CO-CVL-STD-0211 REV 1 9 70.650 0.001 1 2 2 0.220 0.220 0.175 0.175 0.01 -
1.0482 P2 PIT ( FOUNDATION COVER COVER BOLT BOLT M20 EA ED-CO-CVL-STD-0211 REV 1 1 2 2 4 4.00 -
1.0483 P2 PIT ( FOUNDATION COVER COVER BOLT ANCHOR BAR Ø16 x 500 LENGTH EA ED-CO-CVL-STD-0211 REV 1 1 2 2 4 4.00 -
1.0484 P2 LN-5D-1 PIT ( FOUNDATION WALL INER ( 5000L x 1500W) OTHERS EPOXY COATING M² WALL EL -3.000 EL ±0.000 P2-CVL-DWG-PTBN-0404 REV 1 1 1 5.000 1.500 5.000 1.500 13.000 3.000 - 3.000 39.00 -
1.0485 P2 LN-5D-1 PIT ( FOUNDATION WALL INER ( 5000L x 1500W) OTHERS EPOXY COATING M² WALL EL -2.500 EL ±0.000 P2-CVL-DWG-PTBN-0404 REV 1 1 2 2 1.500 1.500 2.500 - 2.500 7.50 -
1.0486 P2 LN-5D-1 PIT ( FOUNDATION WALL INER ( 5000L x 1500W) OTHERS EPOXY COATING M² WALL EL -3.000 EL -1.700 P2-CVL-DWG-PTBN-0404 REV 1 1 2 2 1.500 1.500 3.000 -1.700 1.300 3.90 -
1.0487 P2 LN-5D-1 PIT ( FOUNDATION FOOT FDN INER ( 5000L x 1500W) OTHERS EPOXY COATING M² BOTTOM P2-CVL-DWG-PTBN-0404 REV 1 1 1 5.000 5.000 1.500 1.500 7.50 -
1.0488 P3 CO-2A PIT ( FOUNDATION FOOT FDN BASE ( 5300L x 1800W x 4 CONCRETE CONCRETE M³ EL -3.300 EL -2.900 P3-CVL-DWG-PTBN-0401 REV 1 1 1 1 5.300 5.300 1.800 1.800 0.400 0.400 3.82 3.82
1.0489 P3 FM-1A PIT ( FOUNDATION FOOT FDN BASE ( 5300L x 1800W x 4 FORM WORK FORM WORK M² EL -3.300 EL -2.900 P3-CVL-DWG-PTBN-0401 REV 1 1 1 1 5.300 1.800 5.300 1.800 14.200 3.300 -2.900 0.400 5.68 5.68
1.0490 P3 RE-1A PIT ( FOUNDATION FOOT FDN BASE ( 5300L x 1800W x 4 REBAR REBAR Ð 16 TON LONG, TOP P3-CVL-DWG-PTBN-0401 REV 1 16 0.150 1.580 1 0.001 1 12 12 0.250 5.200 0.250 5.700 0.11 0.11
1.0491 P3 RE-1A PIT ( FOUNDATION FOOT FDN BASE ( 5300L x 1800W x 4 REBAR REBAR Ð 16 TON LONG, BOTT P3-CVL-DWG-PTBN-0401 REV 1 16 0.150 1.580 1 0.001 1 12 12 5.200 0.250 0.250 5.700 0.11 0.11
1.0492 P3 RE-1A PIT ( FOUNDATION FOOT FDN BASE ( 5300L x 1800W x 4 REBAR REBAR Ð 16 TON TRANS, TOP P3-CVL-DWG-PTBN-0401 REV 1 16 0.150 1.580 1 0.001 1 36 36 1.700 0.250 0.250 2.200 0.13 0.13
1.0493 P3 RE-1A PIT ( FOUNDATION FOOT FDN BASE ( 5300L x 1800W x 4 REBAR REBAR Ð 16 TON TRANS, BOTT P3-CVL-DWG-PTBN-0401 REV 1 16 0.150 1.580 1 0.001 1 36 36 1.700 0.250 0.250 2.200 0.13 0.13
1.0494 P3 RE-1A PIT ( FOUNDATION FOOT FDN BASE ( 5300L x 1800W x 4 REBAR REBAR Ð 16 TON TIE P3-CVL-DWG-PTBN-0401 REV 1 16 1.580 1 0.001 1 2 0 0 - -
1.0495 P3 CO-2A PIT ( FOUNDATION WALL OUTER ( 5300L x 1800W) CONCRETE CONCRETE M³ EL -2.900 EL ±0.000 P3-CVL-DWG-PTBN-0401 REV 1 1 1 5.300 5.300 1.800 1.800 2.900 - 2.900 27.67 -
1.0496 P3 CO-2A PIT ( FOUNDATION WALL INER ( 4600L x 1100W) CONCRETE CONCRETE M³ EL -2.900 EL ±0.000 P3-CVL-DWG-PTBN-0401 REV 1 1 -1 -1 4.600 4.600 1.100 1.100 2.900 - 2.900 -14.67 -
1.0497 P3 FM-1A PIT ( FOUNDATION WALL OUTER ( 5300L x 1800W) FORM WORK FORM WORK M² EL -2.900 EL ±0.000 P3-CVL-DWG-PTBN-0401 REV 1 1 1 5.300 1.800 5.300 1.800 14.200 2.900 - 2.900 41.18 -
1.0498 P3 FM-1A PIT ( FOUNDATION WALL INER ( 4600L x 1100W) FORM WORK FORM WORK M² EL -2.900 EL ±0.000 P3-CVL-DWG-PTBN-0401 REV 1 1 1 4.600 1.100 4.600 1.100 11.400 2.900 - 2.900 33.06 -
1.0499 P3 RE-1A PIT ( FOUNDATION WALL OUTER ( 5300L x 1800W) REBAR REBAR Ð 16 TON VERT OUTER EL -3.300 EL ±0.000 P3-CVL-DWG-PTBN-0401 REV 1 16 0.150 1.580 1 0.001 1 36 2 72 0.500 3.180 3.680 0.42 0.42
1.0500 P3 RE-1A PIT ( FOUNDATION WALL INER ( 4600L x 1100W) REBAR REBAR Ð 16 TON VERT OUTER EL -3.300 EL ±0.000 P3-CVL-DWG-PTBN-0401 REV 1 16 0.150 1.580 1 0.001 1 11 2 22 0.500 3.180 3.680 0.13 0.13
1.0500 P3 RE-1A PIT ( FOUNDATION WALL OUTER ( 5300L x 1800W) REBAR REBAR Ð 16 TON VERT INNER EL -3.300 EL ±0.000 P3-CVL-DWG-PTBN-0401 REV 1 16 0.150 1.580 1 0.001 1 32 2 64 0.500 3.180 3.680 0.37 0.37
1.0501 P3 RE-1A PIT ( FOUNDATION WALL INER ( 4600L x 1100W) REBAR REBAR Ð 16 TON VERT INNER EL -3.300 EL ±0.000
P3-CVL-DWG-PTBN-0401 REV 1 16 0.150 1.580 1 0.001 1 8 2 16 0.500 3.180 3.680 0.09 0.09
1.0501 P3 RE-1A PIT ( FOUNDATION WALL OUTER ( 5300L x 1800W) REBAR REBAR Ð 19 TON HORI OUTER EL -2.900 EL ±0.000
P3-CVL-DWG-PTBN-0401 REV 1 40 19 0.150 2.230 1 0.001 1 20 2 40 0.114 5.200 1.700 0.760 7.774 0.69 0.69
1.0502 P3 RE-1A PIT ( FOUNDATION WALL OUTER ( 5300L x 1800W) REBAR REBAR Ð 19 TON HORI INNER EL -2.900 EL ±0.000
P3-CVL-DWG-PTBN-0401 REV 1 19 0.150 2.230 1 0.001 1 20 2 40 0.114 5.200 0.114 5.428 0.48 0.48
1.0503 P3 RE-1A PIT ( FOUNDATION WALL OUTER ( 5300L x 1800W) REBAR REBAR Ð 19 TON HORI INNER EL -2.900 EL ±0.000
P3-CVL-DWG-PTBN-0401 REV 1 19 0.150 2.230 1 0.001 1 20 2 40 0.114 1.700 0.114 1.928 0.17 0.17
1.0504 P3 RE-1A PIT ( FOUNDATION WALL OUTER ( 5300L x 1800W) REBAR REBAR Ð 19 TON CORNER EL -2.900 EL ±0.000
P3-CVL-DWG-PTBN-0401 REV 1 19 0.150 2.230 1 0.001 1 20 4 80 0.250 0.617 0.250 1.117 0.20 0.20
1.0505 P3 RE-1A PIT ( FOUNDATION WALL OUTER ( 5300L x 1800W) REBAR REBAR Ð 19 TON P3-CVL-DWG-PTBN-0401 REV 1 19 2.230 1 0.001 1 0 0 - -
1.0506 P3 CO-1A PIT ( FOUNDATION FOOT FDN BASE ( 5300L x 1800W x 4 PLAIN CONCRETE LEVELING CONCRETE T= 50 M³ EL -3.350 EL -3.300 P3-CVL-DWG-PTBN-0401 REV 1 SOIL DISPOSAL 1 1 1 5.300 0.200 5.500 1.800 0.200 2.000 3.350 -3.300 0.050 0.55 0.55
1.0507 P3 PIT ( FOUNDATION FOOT FDN BASE ( 5300L x 1800W x 4 EARTH WORK COMPACTIED SOIL 95% MAX DRY M² P3-CVL-DWG-PTBN-0401 REV 1 1 1 1 5.300 0.600 5.900 1.800 0.600 2.400 14.16 14.16
1.0508 P3 EA-1B PIT ( FOUNDATION FOOT FDN BASE ( 5300L x 1800W x 4 EARTH WORK EXCAVATION BY EQUIPMENT (D>3 M³ EL -3.350 EL -0.300 P3-CVL-DWG-PTBN-0401 REV 1 SOIL EXCAVATION 1 1 1 1 5.300 2.000 7.300 1.800 2.000 3.800 3.350 -0.300 -3.000 0.050 1.39 1.39
1.0509 P3 EA-1A PIT ( FOUNDATION FOOT FDN BASE ( 5300L x 1800W x 4 EARTH WORK EXCAVATION BY EQUIPMENT (D<=M³ EL -3.350 EL -0.300 P3-CVL-DWG-PTBN-0401 REV 1 SOIL EXCAVATION 1 1 1 5.300 2.000 7.300 1.800 2.000 3.800 3.350 -0.300 -0.050 3.000 83.22 83.22
1.0510 P3 EA-3B PIT ( FOUNDATION FOOT FDN BASE ( 5300L x 1800W x 4 EARTH WORK SOIL DISPOSAL M³ DISPO: CONCRETE EL -3.300 EL -2.900 P3-CVL-DWG-PTBN-0401 REV 1 1 1 5.300 5.300 1.800 1.800 3.300 -2.900 0.400 3.82 -
1.0511 P3 EA-3B PIT ( FOUNDATION WALL OUTER ( 5300L x 1800W) EARTH WORK SOIL DISPOSAL M³ DISPO: CONCRETE EL -2.900 EL -0.300 P3-CVL-DWG-PTBN-0401 REV 1 1 1 5.300 5.300 1.800 1.800 2.900 -0.300 2.600 24.80 -
1.0512 P3 EA-3B PIT ( FOUNDATION FOOT FDN BASE ( 5300L x 1800W x 4 EARTH WORK SOIL DISPOSAL M³ DISPO: LC + SB P3-CVL-DWG-PTBN-0401 REV 1 1 1 0.550 0.550 0.55 -
1.0513 P3 EA-2A PIT ( FOUNDATION FOOT FDN BASE ( 5300L x 1800W x 4 EARTH WORK SOIL BACKFILL M³ P3-CVL-DWG-PTBN-0401 REV 1 1 1 84.607 -29.170 55.437 55.44 -
1.0514 P3 CO-2A PIT ( FOUNDATION SEPARATOR WALL WALL T= 250 CONCRETE CONCRETE M³ EL -2.400 EL ±0.000 P3-CVL-DWG-PTBN-0401 REV 1 1 1 1.300 1.300 0.250 0.250 2.400 - 2.400 0.78 -
1.0515 P3 FM-1A PIT ( FOUNDATION SEPARATOR WALL WALL T= 250 FORM WORK FORM WORK M² WALL EL -2.400 EL ±0.000 P3-CVL-DWG-PTBN-0401 REV 1 1 2 2 1.300 1.300 2.400 - 2.400 6.24 -
1.0516 P3 FM-1A PIT ( FOUNDATION SEPARATOR WALL WALL T= 250 FORM WORK FORM WORK M² BOTTOM EL -2.400 P3-CVL-DWG-PTBN-0401 REV 1 1 1 1.300 1.300 0.250 0.250 0.33 -
1.0516 P3 RE-1A PIT ( FOUNDATION SEPARATOR WALL WALL T= 250 REBAR REBAR Ð 16 TON VERT EL -2.400 EL ±0.000 P3-CVL-DWG-PTBN-0401 REV 1 16 0.150 1.580 0.001 1 10 2 20 0.150 2.300 0.150 2.600 0.08 -
1.0517 P3 RE-1A PIT ( FOUNDATION SEPARATOR WALL WALL T= 250 REBAR REBAR Ð 16 TON HOR EL -2.400 EL ±0.000 P3-CVL-DWG-PTBN-0401 REV 1 16 0.150 1.580 0.001 1 16 2 32 0.150 1.700 0.150 2.000 0.10 -
1.0518 P3 CO-2A PIT ( FOUNDATION SEPARATOR WALL WALL T= 250 CONCRETE CONCRETE M³ EL -2.900 EL -1.700 P3-CVL-DWG-PTBN-0401 REV 1 1 1 1.300 1.300 0.250 0.250 2.900 -1.700 1.200 0.39 -
1.0519 P3 FM-1A PIT ( FOUNDATION SEPARATOR WALL WALL T= 250 FORM WORK FORM WORK M² WALL EL -2.900 EL -1.700 P3-CVL-DWG-PTBN-0401 REV 1 1 2 2 1.300 1.300 2.900 -1.700 1.200 3.12 -
1.0520 P3 RE-1A PIT ( FOUNDATION SEPARATOR WALL WALL T= 250 REBAR REBAR Ð 16 TON VERT EL -3.300 EL -1.700 P3-CVL-DWG-PTBN-0401 REV 1 16 0.150 1.580 0.001 1 10 2 20 0.250 1.500 0.150 1.900 0.06 -
1.0521 P3 RE-1A PIT ( FOUNDATION SEPARATOR WALL WALL T= 250 REBAR REBAR Ð 16 TON HOR EL -2.900 EL -1.700 P3-CVL-DWG-PTBN-0401 REV 1 16 0.150 1.580 0.001 1 8 2 16 0.150 1.700 0.150 2.000 0.05 -
1.0522 P3 JT-4A PIT ( FOUNDATION FOOT FDN BASE ( 5300L x 1800W x 4 OTHERS WATERSTOP PVC 200 MM M P3-CVL-DWG-PTBN-0401 REV 1 1 1 1 4.950 1.450 4.950 1.450 0.400 13.200 13.20 13.20
1.0523 P3 MLA-5D PIT ( FOUNDATION COVER COVER OTHERS REMOVABLE GRATING COVER 30 TM² P3-CVL-DWG-PTBN-0401 REV 1 1 1 1.700 0.100 1.800 1.100 0.100 1.200 2.16 -
1.0524 P3 MLA-5D PIT ( FOUNDATION COVER COVER OTHERS REMOVABLE GRATING COVER 30 TM² P3-CVL-DWG-PTBN-0401 REV 1 1 1 1.670 0.050 1.720 1.100 0.100 1.200 2.06 -
1.0525 P3 MLA-5D PIT ( FOUNDATION COVER COVER OTHERS REMOVABLE GRATING COVER 30 TM² P3-CVL-DWG-PTBN-0401 REV 1 1 1 0.980 0.050 1.030 1.100 0.100 1.200 1.24 -
1.0526 P3 SS-4A PIT ( FOUNDATION COVER COVER STEEL CORNER L 40x40x4 TON P3-CVL-DWG-PTBN-0401 REV 1 2.420 0.001 1 4 4 1.200 1.200 0.01 -
1.0527 P3 SS-4A PIT ( FOUNDATION COVER COVER STEEL CORNER L 40x40x4 TON P3-CVL-DWG-PTBN-0401 REV 1 2.420 0.001 1 2 2 1.200 1.200 0.01 -
1.0528 P3 SS-4A PIT ( FOUNDATION COVER COVER STEEL CORNER L 40x40x4 TON P3-CVL-DWG-PTBN-0401 REV 1 2.420 0.001 1 2 2 4.550 -1.200 3.350 0.02 -
1.0529 P3 ANA-2 PIT ( FOUNDATION COVER COVER STEEL CLIMBING RUNG Ø 16 RB TON EL -2.900 EL ±0.000 ED-CO-CVL-STD-0301 REV 1 0.300 1.580 0.001 1 9 2 18 1.400 1.400 0.04 -
1.0530 P3 PIT ( FOUNDATION COVER COVER BOLT ANCHOR BAR Ø10 x 150 LENGTH EA P3-CVL-DWG-PTBN-0401 REV 1 1 118 118 118.00 -
1.0531 P3 SS-4A PIT ( FOUNDATION COVER COVER STEEL C 100 GRATING TON P3-CVL-DWG-PTBN-0401 REV 1 9.370 0.001 1 1 1.100 1.100 0.01 -
1.0532 P3 SS-4A PIT ( FOUNDATION COVER COVER PLATE PLATE 12 TON BASE PL ED-CO-CVL-STD-0204 REV 1 12 94.200 0.001 1 2 2 0.070 0.070 0.120 0.120 0.00 -
1.0533 P3 SS-4A PIT ( FOUNDATION COVER COVER PLATE PLATE 9 TON ED-CO-CVL-STD-0211 REV 1 9 70.650 0.001 1 2 2 0.220 0.220 0.175 0.175 0.01 -
1.0534 P3 PIT ( FOUNDATION COVER COVER BOLT BOLT M20 EA ED-CO-CVL-STD-0211 REV 1 1 2 2 4 4.00 -
1.0535 P3 PIT ( FOUNDATION COVER COVER BOLT ANCHOR BAR Ø16 x 500 LENGTH EA ED-CO-CVL-STD-0211 REV 1 1 2 2 4 4.00 -
1.0536 P3 LN-5D-1 PIT ( FOUNDATION WALL INER ( 4600L x 1100W) OTHERS EPOXY COATING M² WALL EL -2.900 EL ±0.000 P3-CVL-DWG-PTBN-0401 REV 1 1 1 4.600 1.100 4.600 1.100 11.400 2.900 - 2.900 33.06 -
1.0537 P3 LN-5D-1 PIT ( FOUNDATION WALL INER ( 4600L x 1100W) OTHERS EPOXY COATING M² WALL EL -2.400 EL ±0.000 P3-CVL-DWG-PTBN-0401 REV 1 1 2 2 1.100 1.100 2.400 - 2.400 5.28 -
1.0538 P3 LN-5D-1 PIT ( FOUNDATION WALL INER ( 4600L x 1100W) OTHERS EPOXY COATING M² WALL EL -2.900 EL -1.700 P3-CVL-DWG-PTBN-0401 REV 1 1 2 2 1.100 1.100 2.900 -1.700 1.200 2.64 -
1.0539 P3 LN-5D-1 PIT ( FOUNDATION FOOT FDN INER ( 4600L x 1100W) OTHERS EPOXY COATING M² BOTTOM P3-CVL-DWG-PTBN-0401 REV 1 1 1 4.600 4.600 1.100 1.100 5.06 -
1.0540 P3 CO-2A T237 FOUNDATION FOOT FDN BASE ( 7700DIA x 500THK ) CONCRETE CONCRETE M³ EL -1.800 EL -1.300 P3-CVL-DWG-EQFD-0046 REV 1 1 1 0.500 0.500 46.566 46.566 23.28 -
1.0541 P3 FM-1A T237 FOUNDATION FOOT FDN BASE ( 7700DIA x 500THK ) FORM WORK FORM WORK M² EL -1.800 EL -1.300 P3-CVL-DWG-EQFD-0046 REV 1 1 1 24.190 24.190 1.800 -1.300 0.500 12.10 -
1.0542 P3 RE-1A T237 FOUNDATION FOOT FDN BASE ( 7700DIA x 500THK ) REBAR REBAR Ð 13 TON TOP : LONG + TRANS P3-CVL-DWG-EQFD-0046 REV 1 13 1.040 0.001 1 2 2 4 0.350 7.596 0.350 8.296 0.03 -
1.0543 P3 RE-1A T237 FOUNDATION FOOT FDN BASE ( 7700DIA x 500THK ) REBAR REBAR Ð 13 TON TOP : LONG + TRANS P3-CVL-DWG-EQFD-0046 REV 1 13 1.040 0.001 1 2 2 4 0.350 7.567 0.350 8.267 0.03 -
1.0544 P3 RE-1A T237 FOUNDATION FOOT FDN BASE ( 7700DIA x 500THK ) REBAR REBAR Ð 13 TON TOP : LONG + TRANS P3-CVL-DWG-EQFD-0046 REV 1 13 1.040 0.001 1 2 2 4 0.350 7.509 0.350 8.209 0.03 -
1.0545 P3 RE-1A T237 FOUNDATION FOOT FDN BASE ( 7700DIA x 500THK ) REBAR REBAR Ð 13 TON TOP : LONG + TRANS P3-CVL-DWG-EQFD-0046 REV 1 13 1.040 0.001 1 2 2 4 0.350 7.420 0.350 8.120 0.03 -
1.0546 P3 RE-1A T237 FOUNDATION FOOT FDN BASE ( 7700DIA x 500THK ) REBAR REBAR Ð 13 TON TOP : LONG + TRANS P3-CVL-DWG-EQFD-0046 REV 1 13 1.040 0.001 1 2 2 4 0.350 7.300 0.350 8.000 0.03 -
1.0547 P3 RE-1A T237 FOUNDATION FOOT FDN BASE ( 7700DIA x 500THK ) REBAR REBAR Ð 13 TON TOP : LONG + TRANS P3-CVL-DWG-EQFD-0046 REV 1 13 1.040 0.001 1 2 2 4 0.350 7.147 0.350 7.847 0.03 -

file:///conversion/tmp/scratch/454095803.xlsxPrinted: 01/03/2020 - 21:53:28 <EA>


1.0548 P3 RE-1A T237 FOUNDATION FOOT FDN BASE ( 7700DIA x 500THK ) REBAR REBAR Ð 13 TON TOP : LONG + TRANS P3-CVL-DWG-EQFD-0046 REV 1 13 1.040 0.001 1 2 2 4 0.350 6.959 0.350 7.659 0.03 -
1.0549 P3 RE-1A T237 FOUNDATION FOOT FDN BASE ( 7700DIA x 500THK ) REBAR REBAR Ð 13 TON TOP : LONG + TRANS P3-CVL-DWG-EQFD-0046 REV 1 13 1.040 0.001 1 2 2 4 0.350 6.733 0.350 7.433 0.03 -
1.0550 P3 RE-1A T237 FOUNDATION FOOT FDN BASE ( 7700DIA x 500THK ) REBAR REBAR Ð 13 TON TOP : LONG + TRANS P3-CVL-DWG-EQFD-0046 REV 1 13 1.040 0.001 1 2 2 4 0.350 6.465 0.350 7.165 0.03 -
1.0551 P3 RE-1A T237 FOUNDATION FOOT FDN BASE ( 7700DIA x 500THK ) REBAR REBAR Ð 13 TON TOP : LONG + TRANS P3-CVL-DWG-EQFD-0046 REV 1 13 1.040 0.001 1 2 2 4 0.350 6.150 0.350 6.850 0.03 -
1.0552 P3 RE-1A T237 FOUNDATION FOOT FDN BASE ( 7700DIA x 500THK ) REBAR REBAR Ð 13 TON TOP : LONG + TRANS P3-CVL-DWG-EQFD-0046 REV 1 13 1.040 0.001 1 2 2 4 0.350 5.780 0.350 6.480 0.03 -
1.0553 P3 RE-1A T237 FOUNDATION FOOT FDN BASE ( 7700DIA x 500THK ) REBAR REBAR Ð 13 TON TOP : LONG + TRANS P3-CVL-DWG-EQFD-0046 REV 1 13 1.040 0.001 1 2 2 4 0.350 5.343 0.350 6.043 0.03 -
1.0554 P3 RE-1A T237 FOUNDATION FOOT FDN BASE ( 7700DIA x 500THK ) REBAR REBAR Ð 13 TON TOP : LONG + TRANS P3-CVL-DWG-EQFD-0046 REV 1 13 1.040 0.001 1 2 2 4 0.350 4.821 0.350 5.521 0.02 -
1.0555 P3 RE-1A T237 FOUNDATION FOOT FDN BASE ( 7700DIA x 500THK ) REBAR REBAR Ð 13 TON TOP : LONG + TRANS P3-CVL-DWG-EQFD-0046 REV 1 13 1.040 0.001 1 2 2 4 0.350 4.183 0.350 4.883 0.02 -
1.0556 P3 RE-1A T237 FOUNDATION FOOT FDN BASE ( 7700DIA x 500THK ) REBAR REBAR Ð 13 TON TOP : LONG + TRANS P3-CVL-DWG-EQFD-0046 REV 1 13 1.040 0.001 1 2 2 4 0.350 3.364 0.350 4.064 0.02 -
1.0557 P3 RE-1A T237 FOUNDATION FOOT FDN BASE ( 7700DIA x 500THK ) REBAR REBAR Ð 13 TON TOP : LONG + TRANS P3-CVL-DWG-EQFD-0046 REV 1 13 1.040 0.001 1 2 2 4 0.350 2.165 0.350 2.865 0.01 -
1.0558 P3 RE-1A T237 FOUNDATION FOOT FDN BASE ( 7700DIA x 500THK ) REBAR REBAR Ð 13 TON BOTT : LONG + TRANS P3-CVL-DWG-EQFD-0046 REV 1 13 1.040 0.001 1 2 2 4 0.350 7.596 0.350 8.296 0.03 -
1.0559 P3 RE-1A T237 FOUNDATION FOOT FDN BASE ( 7700DIA x 500THK ) REBAR REBAR Ð 13 TON BOTT : LONG + TRANS P3-CVL-DWG-EQFD-0046 REV 1 13 1.040 0.001 1 2 2 4 0.350 7.567 0.350 8.267 0.03 -
1.0560 P3 RE-1A T237 FOUNDATION FOOT FDN BASE ( 7700DIA x 500THK ) REBAR REBAR Ð 13 TON BOTT : LONG + TRANS P3-CVL-DWG-EQFD-0046 REV 1 13 1.040 0.001 1 2 2 4 0.350 7.509 0.350 8.209 0.03 -
1.0561 P3 RE-1A T237 FOUNDATION FOOT FDN BASE ( 7700DIA x 500THK ) REBAR REBAR Ð 13 TON BOTT : LONG + TRANS P3-CVL-DWG-EQFD-0046 REV 1 13 1.040 0.001 1 2 2 4 0.350 7.420 0.350 8.120 0.03 -
1.0562 P3 RE-1A T237 FOUNDATION FOOT FDN BASE ( 7700DIA x 500THK ) REBAR REBAR Ð 13 TON BOTT : LONG + TRANS P3-CVL-DWG-EQFD-0046 REV 1 13 1.040 0.001 1 2 2 4 0.350 7.300 0.350 8.000 0.03 -
1.0563 P3 RE-1A T237 FOUNDATION FOOT FDN BASE ( 7700DIA x 500THK ) REBAR REBAR Ð 13 TON BOTT : LONG + TRANS P3-CVL-DWG-EQFD-0046 REV 1 13 1.040 0.001 1 2 2 4 0.350 7.147 0.350 7.847 0.03 -
1.0564 P3 RE-1A T237 FOUNDATION FOOT FDN BASE ( 7700DIA x 500THK ) REBAR REBAR Ð 13 TON BOTT : LONG + TRANS P3-CVL-DWG-EQFD-0046 REV 1 13 1.040 0.001 1 2 2 4 0.350 6.959 0.350 7.659 0.03 -
1.0565 P3 RE-1A T237 FOUNDATION FOOT FDN BASE ( 7700DIA x 500THK ) REBAR REBAR Ð 13 TON BOTT : LONG + TRANS P3-CVL-DWG-EQFD-0046 REV 1 13 1.040 0.001 1 2 2 4 0.350 6.733 0.350 7.433 0.03 -
1.0566 P3 RE-1A T237 FOUNDATION FOOT FDN BASE ( 7700DIA x 500THK ) REBAR REBAR Ð 13 TON BOTT : LONG + TRANS P3-CVL-DWG-EQFD-0046 REV 1 13 1.040 0.001 1 2 2 4 0.350 6.465 0.350 7.165 0.03 -
1.0567 P3 RE-1A T237 FOUNDATION FOOT FDN BASE ( 7700DIA x 500THK ) REBAR REBAR Ð 13 TON BOTT : LONG + TRANS P3-CVL-DWG-EQFD-0046 REV 1 13 1.040 0.001 1 2 2 4 0.350 6.150 0.350 6.850 0.03 -
1.0568 P3 RE-1A T237 FOUNDATION FOOT FDN BASE ( 7700DIA x 500THK ) REBAR REBAR Ð 13 TON BOTT : LONG + TRANS P3-CVL-DWG-EQFD-0046 REV 1 13 1.040 0.001 1 2 2 4 0.350 5.780 0.350 6.480 0.03 -
1.0569 P3 RE-1A T237 FOUNDATION FOOT FDN BASE ( 7700DIA x 500THK ) REBAR REBAR Ð 13 TON BOTT : LONG + TRANS P3-CVL-DWG-EQFD-0046 REV 1 13 1.040 0.001 1 2 2 4 0.350 5.343 0.350 6.043 0.03 -
1.0570 P3 RE-1A T237 FOUNDATION FOOT FDN BASE ( 7700DIA x 500THK ) REBAR REBAR Ð 13 TON BOTT : LONG + TRANS P3-CVL-DWG-EQFD-0046 REV 1 13 1.040 0.001 1 2 2 4 0.350 4.821 0.350 5.521 0.02 -
1.0571 P3 RE-1A T237 FOUNDATION FOOT FDN BASE ( 7700DIA x 500THK ) REBAR REBAR Ð 13 TON BOTT : LONG + TRANS P3-CVL-DWG-EQFD-0046 REV 1 13 1.040 0.001 1 2 2 4 0.350 4.183 0.350 4.883 0.02 -
1.0572 P3 RE-1A T237 FOUNDATION FOOT FDN BASE ( 7700DIA x 500THK ) REBAR REBAR Ð 13 TON BOTT : LONG + TRANS P3-CVL-DWG-EQFD-0046 REV 1 13 1.040 0.001 1 2 2 4 0.350 3.364 0.350 4.064 0.02 -
1.0573 P3 RE-1A T237 FOUNDATION FOOT FDN BASE ( 7700DIA x 500THK ) REBAR REBAR Ð 13 TON BOTT : LONG + TRANS P3-CVL-DWG-EQFD-0046 REV 1 13 1.040 0.001 1 2 2 4 0.350 2.165 0.350 2.865 0.01 -
1.0574 P3 RE-1A T237 FOUNDATION FOOT FDN BASE ( 7700DIA x 500THK ) REBAR REBAR Ð 13 TON TIE P3-CVL-DWG-EQFD-0046 REV 1 40 13 1.040 0.001 1 1 23.876 0.520 1.040 25.436 0.03 -
1.0575 P3 RE-1A T237 FOUNDATION FOOT FDN BASE ( 7700DIA x 500THK ) REBAR REBAR Ð 13 TON SUPPORT P3-CVL-DWG-EQFD-0046 REV 1 13 1.040 0.001 1 47 47 0.300 0.348 0.200 0.348 0.300 1.496 0.07 -
1.0576 P3 CO-2A T237 FOUNDATION WALL OUTER ( 7500DIA x 2367H ) CONCRETE CONCRETE M³ EL -1.300 EL +1.067 P3-CVL-DWG-EQFD-0046 REV 1 1 1 2.367 2.367 44.179 44.179 104.57 -
1.0577 P3 CO-2A T237 FOUNDATION WALL INNER ( 6500DIA x 2367H ) CONCRETE CONCRETE M³ EL -1.300 EL +1.067 P3-CVL-DWG-EQFD-0046 REV 1 1 -1 -1 2.367 2.367 33.183 33.183 -78.54 -
1.0578 P3 FM-1A T237 FOUNDATION WALL OUTER ( 7500DIA x 2367H ) FORM WORK FORM WORK M² EL -1.300 EL +1.067 P3-CVL-DWG-EQFD-0046 REV 1 1 1 23.562 23.562 1.300 1.067 2.367 55.77 -
1.0579 P3 FM-1A T237 FOUNDATION WALL INNER ( 6500DIA x 2367H ) FORM WORK FORM WORK M² EL -1.300 EL +1.067 P3-CVL-DWG-EQFD-0046 REV 1 1 1 20.420 20.420 1.300 1.067 2.367 48.33 -
1.0580 P3 RE-1A T237 FOUNDATION WALL OUTER ( 7500DIA x 2367H ) REBAR REBAR Ð 19 TON VERT, OUTTER EL -1.800 EL +1.067 P3-CVL-DWG-EQFD-0046 REV 1 19 2.230 0.001 1 118 118 0.300 2.737 3.037 0.80 -
1.0581 P3 RE-1A T237 FOUNDATION WALL INNER ( 6500DIA x 2367H ) REBAR REBAR Ð 19 TON VERT, INNER EL -1.800 EL +1.067 P3-CVL-DWG-EQFD-0046 REV 1 19 2.230 0.001 1 118 118 0.300 2.737 3.037 0.80 -
1.0582 P3 RE-1A T237 FOUNDATION WALL INNER ( 6500DIA x 2367H ) REBAR REBAR Ð 13 TON TOP ONLY P3-CVL-DWG-EQFD-0046 REV 1 13 1.040 0.001 1 118 118 0.100 0.400 0.100 0.600 0.07 -
1.0583 P3 RE-1A T237 FOUNDATION WALL OUTER ( 7500DIA x 2367H ) REBAR REBAR Ð 13 TON HORI, HOOP P3-CVL-DWG-EQFD-0046 REV 1 40 13 1.040 0.001 1 12 12 23.248 0.520 1.040 24.808 0.31 -
1.0584 P3 RE-1A T237 FOUNDATION WALL INNER ( 6500DIA x 2367H ) REBAR REBAR Ð 13 TON HORI, HOOP P3-CVL-DWG-EQFD-0046 REV 1 40 13 1.040 0.001 1 12 12 20.735 0.520 0.520 21.775 0.27 -
1.0585 P3 CO-1A T237 FOUNDATION FOOT FDN BASE ( 7700DIA x 500THK ) PLAIN CONCRETE LEVELING CONCRETE T= 50 M³ EL -1.850 EL -1.800 P3-CVL-DWG-EQFD-0046 REV 1 SOIL DISPOSAL 1 1 1.850 -1.800 0.050 49.017 49.017 2.45 -
1.0586 P3 T237 FOUNDATION FOOT FDN BASE ( 7700DIA x 500THK ) EARTH WORK COMPACTIED SOIL 95% MAX DRY M² EL -1.850 EL -0.300 P3-CVL-DWG-EQFD-0046 REV 1 1 1 1.850 -0.300 1.550 49.017 49.017 75.98 -
1.0587 P3 EA-1B T237 FOUNDATION FOOT FDN BASE ( 7700DIA x 500THK ) EARTH WORK EXCAVATION BY EQUIPMENT (D>3 M³ EL -1.850 EL -0.300 P3-CVL-DWG-EQFD-0046 REV 1 SOIL EXCAVATION 1 0 0 1.850 -0.300 - 1.550 54.106 54.106 - -
1.0588 P3 EA-1A T237 FOUNDATION FOOT FDN BASE ( 7700DIA x 500THK ) EARTH WORK EXCAVATION BY EQUIPMENT (D<=M³ EL -1.850 EL -0.300 P3-CVL-DWG-EQFD-0046 REV 1 SOIL EXCAVATION 1 1 1.850 -0.300 - 1.550 54.106 54.106 83.86 -
1.0589 P3 EA-3B T237 FOUNDATION FOOT FDN BASE ( 7700DIA x 500THK ) EARTH WORK SOIL DISPOSAL M³ DISPO: CONCRETE EL -1.800 EL -1.300 P3-CVL-DWG-EQFD-0046 REV 1 1 1 1.800 -1.300 0.500 46.566 46.566 23.28 -
1.0590 P3 EA-3B T237 FOUNDATION FOOT FDN OUTER ( 7500DIA x 2367H ) EARTH WORK SOIL DISPOSAL M³ DISPO: CONCRETE EL -1.300 EL -0.300 P3-CVL-DWG-EQFD-0046 REV 1 1 1 1.300 -0.300 1.000 44.179 44.179 44.18 -
1.0591 P3 EA-3B T237 FOUNDATION FOOT FDN OUTER ( 7500DIA x 2367H ) EARTH WORK SOIL DISPOSAL M³ DISPO: LC + SB P3-CVL-DWG-EQFD-0046 REV 1 1 1 2.451 2.451 2.45 -
1.0592 P3 EA-2A T237 FOUNDATION FOOT FDN OUTER ( 7500DIA x 2367H ) EARTH WORK SOIL BACKFILL M³ P3-CVL-DWG-EQFD-0046 REV 1 1 1 83.864 -69.913 13.952 13.95 -
1.0593 P3 EA-4C T237 FOUNDATION FOOT FDN INNER ( 6500DIA x 2367H ) EARTH WORK SAND FILL M³ EL -1.300 EL +1.067 P3-CVL-DWG-EQFD-0046 REV 1 1 1 2.367 2.367 33.183 33.183 78.54 -
1.0594 P3 T237 FOUNDATION FOOT FDN INNER ( 6500DIA x 2367H ) OTHERS GROUTING 30 MM THK M³ P3-CVL-DWG-EQFD-0046 REV 1 1 1 0.030 0.030 44.179 -33.183 10.996 0.33 -
1.0595 P3 PB-40-14 T237 FOUNDATION FOOT FDN INNER ( 6500DIA x 2367H ) OTHERS PVC PIPE 2 INCH DIA M P3-CVL-DWG-EQFD-0046 REV 1 1 4 4 0.500 0.500 2.00 -
1.0596 P3 T237 FOUNDATION FOOT FDN INNER ( 6500DIA x 2367H ) OTHERS GRAVEL SIZE 4MM - 30MM M³ P3-CVL-DWG-EQFD-0046 REV 1 1 4 4 0.600 0.600 0.600 0.600 1.44 -
1.0597 P3 T237 FOUNDATION FOOT FDN INNER ( 6500DIA x 2367H ) OTHERS PALM FIBRE M³ P3-CVL-DWG-EQFD-0046 REV 1 1 4 4 0.200 0.200 0.200 0.200 0.16 -
1.0598 P3 T237 FOUNDATION FOOT FDN INNER ( 6500DIA x 2367H ) BOLT ANCHOR BOLT M24 (INSTALL ONLYEA P3-CVL-DWG-EQFD-0046 REV 1 1 48 48 48.00 -
1.0599 P3 CO-2A T137 FOUNDATION FOOT FDN BASE ( 7700DIA x 500THK ) CONCRETE CONCRETE M³ EL -1.800 EL -1.300 P3-CVL-DWG-EQFD-0010 REV 1 1 1 0.500 0.500 46.566 46.566 23.28 -
1.0600 P3 FM-1A T137 FOUNDATION FOOT FDN BASE ( 7700DIA x 500THK ) FORM WORK FORM WORK M² EL -1.800 EL -1.300 P3-CVL-DWG-EQFD-0010 REV 1 1 1 24.190 24.190 1.800 -1.300 0.500 12.10 -
1.0601 P3 RE-1A T137 FOUNDATION FOOT FDN BASE ( 7700DIA x 500THK ) REBAR REBAR Ð 13 TON TOP : LONG + TRANS P3-CVL-DWG-EQFD-0010 REV 1 13 1.040 0.001 1 2 2 4 0.350 - 0.350 0.700 0.00 -
1.0602 P3 RE-1A T137 FOUNDATION FOOT FDN BASE ( 7700DIA x 500THK ) REBAR REBAR Ð 13 TON TOP : LONG + TRANS P3-CVL-DWG-EQFD-0010 REV 1 13 1.040 0.001 1 2 2 4 0.350 - 0.350 0.700 0.00 -
1.0603 P3 RE-1A T137 FOUNDATION FOOT FDN BASE ( 7700DIA x 500THK ) REBAR REBAR Ð 13 TON TOP : LONG + TRANS P3-CVL-DWG-EQFD-0010 REV 1 13 1.040 0.001 1 2 2 4 0.350 - 0.350 0.700 0.00 -
1.0604 P3 RE-1A T137 FOUNDATION FOOT FDN BASE ( 7700DIA x 500THK ) REBAR REBAR Ð 13 TON TOP : LONG + TRANS P3-CVL-DWG-EQFD-0010 REV 1 13 1.040 0.001 1 2 2 4 0.350 - 0.350 0.700 0.00 -
1.0605 P3 RE-1A T137 FOUNDATION FOOT FDN BASE ( 7700DIA x 500THK ) REBAR REBAR Ð 13 TON TOP : LONG + TRANS P3-CVL-DWG-EQFD-0010 REV 1 13 1.040 0.001 1 2 2 4 0.350 - 0.350 0.700 0.00 -
1.0606 P3 RE-1A T137 FOUNDATION FOOT FDN BASE ( 7700DIA x 500THK ) REBAR REBAR Ð 13 TON TOP : LONG + TRANS P3-CVL-DWG-EQFD-0010 REV 1 13 1.040 0.001 1 2 2 4 0.350 - 0.350 0.700 0.00 -
1.0607 P3 RE-1A T137 FOUNDATION FOOT FDN BASE ( 7700DIA x 500THK ) REBAR REBAR Ð 13 TON TOP : LONG + TRANS P3-CVL-DWG-EQFD-0010 REV 1 13 1.040 0.001 1 2 2 4 0.350 - 0.350 0.700 0.00 -
1.0608 P3 RE-1A T137 FOUNDATION FOOT FDN BASE ( 7700DIA x 500THK ) REBAR REBAR Ð 13 TON TOP : LONG + TRANS P3-CVL-DWG-EQFD-0010 REV 1 13 1.040 0.001 1 2 2 4 0.350 - 0.350 0.700 0.00 -
1.0609 P3 RE-1A T137 FOUNDATION FOOT FDN BASE ( 7700DIA x 500THK ) REBAR REBAR Ð 13 TON TOP : LONG + TRANS P3-CVL-DWG-EQFD-0010 REV 1 13 1.040 0.001 1 2 2 4 0.350 - 0.350 0.700 0.00 -
1.0610 P3 RE-1A T137 FOUNDATION FOOT FDN BASE ( 7700DIA x 500THK ) REBAR REBAR Ð 13 TON TOP : LONG + TRANS P3-CVL-DWG-EQFD-0010 REV 1 13 1.040 0.001 1 2 2 4 0.350 - 0.350 0.700 0.00 -
1.0611 P3 RE-1A T137 FOUNDATION FOOT FDN BASE ( 7700DIA x 500THK ) REBAR REBAR Ð 13 TON TOP : LONG + TRANS P3-CVL-DWG-EQFD-0010 REV 1 13 1.040 0.001 1 2 2 4 0.350 - 0.350 0.700 0.00 -
1.0612 P3 RE-1A T137 FOUNDATION FOOT FDN BASE ( 7700DIA x 500THK ) REBAR REBAR Ð 13 TON TOP : LONG + TRANS P3-CVL-DWG-EQFD-0010 REV 1 13 1.040 0.001 1 2 2 4 0.350 - 0.350 0.700 0.00 -
1.0613 P3 RE-1A T137 FOUNDATION FOOT FDN BASE ( 7700DIA x 500THK ) REBAR REBAR Ð 13 TON TOP : LONG + TRANS P3-CVL-DWG-EQFD-0010 REV 1 13 1.040 0.001 1 2 2 4 0.350 - 0.350 0.700 0.00 -
1.0614 P3 RE-1A T137 FOUNDATION FOOT FDN BASE ( 7700DIA x 500THK ) REBAR REBAR Ð 13 TON TOP : LONG + TRANS P3-CVL-DWG-EQFD-0010 REV 1 13 1.040 0.001 1 2 2 4 0.350 - 0.350 0.700 0.00 -
1.0615 P3 RE-1A T137 FOUNDATION FOOT FDN BASE ( 7700DIA x 500THK ) REBAR REBAR Ð 13 TON TOP : LONG + TRANS P3-CVL-DWG-EQFD-0010 REV 1 13 1.040 0.001 1 2 2 4 0.350 - 0.350 0.700 0.00 -
1.0616 P3 RE-1A T137 FOUNDATION FOOT FDN BASE ( 7700DIA x 500THK ) REBAR REBAR Ð 13 TON TOP : LONG + TRANS P3-CVL-DWG-EQFD-0010 REV 1 13 1.040 0.001 1 2 2 4 0.350 - 0.350 0.700 0.00 -
1.0617 P3 RE-1A T137 FOUNDATION FOOT FDN BASE ( 7700DIA x 500THK ) REBAR REBAR Ð 13 TON BOTT : LONG + TRANS P3-CVL-DWG-EQFD-0010 REV 1 13 1.040 0.001 1 2 2 4 0.350 - 0.350 0.700 0.00 -
1.0618 P3 RE-1A T137 FOUNDATION FOOT FDN BASE ( 7700DIA x 500THK ) REBAR REBAR Ð 13 TON BOTT : LONG + TRANS P3-CVL-DWG-EQFD-0010 REV 1 13 1.040 0.001 1 2 2 4 0.350 - 0.350 0.700 0.00 -
1.0619 P3 RE-1A T137 FOUNDATION FOOT FDN BASE ( 7700DIA x 500THK ) REBAR REBAR Ð 13 TON BOTT : LONG + TRANS P3-CVL-DWG-EQFD-0010 REV 1 13 1.040 0.001 1 2 2 4 0.350 - 0.350 0.700 0.00 -
1.0620 P3 RE-1A T137 FOUNDATION FOOT FDN BASE ( 7700DIA x 500THK ) REBAR REBAR Ð 13 TON BOTT : LONG + TRANS P3-CVL-DWG-EQFD-0010 REV 1 13 1.040 0.001 1 2 2 4 0.350 - 0.350 0.700 0.00 -
1.0621 P3 RE-1A T137 FOUNDATION FOOT FDN BASE ( 7700DIA x 500THK ) REBAR REBAR Ð 13 TON BOTT : LONG + TRANS P3-CVL-DWG-EQFD-0010 REV 1 13 1.040 0.001 1 2 2 4 0.350 - 0.350 0.700 0.00 -
1.0622 P3 RE-1A T137 FOUNDATION FOOT FDN BASE ( 7700DIA x 500THK ) REBAR REBAR Ð 13 TON BOTT : LONG + TRANS P3-CVL-DWG-EQFD-0010 REV 1 13 1.040 0.001 1 2 2 4 0.350 - 0.350 0.700 0.00 -
1.0623 P3 RE-1A T137 FOUNDATION FOOT FDN BASE ( 7700DIA x 500THK ) REBAR REBAR Ð 13 TON BOTT : LONG + TRANS P3-CVL-DWG-EQFD-0010 REV 1 13 1.040 0.001 1 2 2 4 0.350 - 0.350 0.700 0.00 -
1.0624 P3 RE-1A T137 FOUNDATION FOOT FDN BASE ( 7700DIA x 500THK ) REBAR REBAR Ð 13 TON BOTT : LONG + TRANS P3-CVL-DWG-EQFD-0010 REV 1 13 1.040 0.001 1 2 2 4 0.350 - 0.350 0.700 0.00 -
1.0625 P3 RE-1A T137 FOUNDATION FOOT FDN BASE ( 7700DIA x 500THK ) REBAR REBAR Ð 13 TON BOTT : LONG + TRANS P3-CVL-DWG-EQFD-0010 REV 1 13 1.040 0.001 1 2 2 4 0.350 - 0.350 0.700 0.00 -
1.0626 P3 RE-1A T137 FOUNDATION FOOT FDN BASE ( 7700DIA x 500THK ) REBAR REBAR Ð 13 TON BOTT : LONG + TRANS P3-CVL-DWG-EQFD-0010 REV 1 13 1.040 0.001 1 2 2 4 0.350 - 0.350 0.700 0.00 -
1.0627 P3 RE-1A T137 FOUNDATION FOOT FDN BASE ( 7700DIA x 500THK ) REBAR REBAR Ð 13 TON BOTT : LONG + TRANS P3-CVL-DWG-EQFD-0010 REV 1 13 1.040 0.001 1 2 2 4 0.350 - 0.350 0.700 0.00 -
1.0628 P3 RE-1A T137 FOUNDATION FOOT FDN BASE ( 7700DIA x 500THK ) REBAR REBAR Ð 13 TON BOTT : LONG + TRANS P3-CVL-DWG-EQFD-0010 REV 1 13 1.040 0.001 1 2 2 4 0.350 - 0.350 0.700 0.00 -
1.0629 P3 RE-1A T137 FOUNDATION FOOT FDN BASE ( 7700DIA x 500THK ) REBAR REBAR Ð 13 TON BOTT : LONG + TRANS P3-CVL-DWG-EQFD-0010 REV 1 13 1.040 0.001 1 2 2 4 0.350 - 0.350 0.700 0.00 -
1.0630 P3 RE-1A T137 FOUNDATION FOOT FDN BASE ( 7700DIA x 500THK ) REBAR REBAR Ð 13 TON BOTT : LONG + TRANS P3-CVL-DWG-EQFD-0010 REV 1 13 1.040 0.001 1 2 2 4 0.350 - 0.350 0.700 0.00 -
1.0631 P3 RE-1A T137 FOUNDATION FOOT FDN BASE ( 7700DIA x 500THK ) REBAR REBAR Ð 13 TON BOTT : LONG + TRANS P3-CVL-DWG-EQFD-0010 REV 1 13 1.040 0.001 1 2 2 4 0.350 - 0.350 0.700 0.00 -
1.0632 P3 RE-1A T137 FOUNDATION FOOT FDN BASE ( 7700DIA x 500THK ) REBAR REBAR Ð 13 TON BOTT : LONG + TRANS P3-CVL-DWG-EQFD-0010 REV 1 13 1.040 0.001 1 2 2 4 0.350 - 0.350 0.700 0.00 -
1.0633 P3 RE-1A T137 FOUNDATION FOOT FDN BASE ( 7700DIA x 500THK ) REBAR REBAR Ð 13 TON TIE P3-CVL-DWG-EQFD-0010 REV 1 40 13 1.040 0.001 1 1 23.876 0.520 1.040 25.436 0.03 -
1.0634 P3 RE-1A T137 FOUNDATION FOOT FDN BASE ( 7700DIA x 500THK ) REBAR REBAR Ð 13 TON SUPPORT P3-CVL-DWG-EQFD-0010 REV 1 13 1.040 0.001 1 47 47 0.300 0.348 0.200 0.348 0.300 1.496 0.07 -
1.0635 P3 CO-2A T137 FOUNDATION WALL OUTER ( 7500DIA x 2367H ) CONCRETE CONCRETE M³ EL -1.300 EL +1.067 P3-CVL-DWG-EQFD-0046 REV 1 1 1 2.367 2.367 44.179 44.179 104.57 -
1.0636 P3 CO-2A T137 FOUNDATION WALL INNER ( 6500DIA x 2367H ) CONCRETE CONCRETE M³ EL -1.300 EL +1.067 P3-CVL-DWG-EQFD-0010 REV 1 1 -1 -1 2.367 2.367 33.183 33.183 -78.54 -
1.0637 P3 FM-1A T137 FOUNDATION WALL OUTER ( 7500DIA x 2367H ) FORM WORK FORM WORK M² EL -1.300 EL +1.067 P3-CVL-DWG-EQFD-0010 REV 1 1 1 23.562 23.562 1.300 1.067 2.367 55.77 -
1.0638 P3 FM-1A T137 FOUNDATION WALL INNER ( 6500DIA x 2367H ) FORM WORK FORM WORK M² EL -1.300 EL +1.067 P3-CVL-DWG-EQFD-0010 REV 1 1 1 20.420 20.420 1.300 1.067 2.367 48.33 -
1.0639 P3 RE-1A T137 FOUNDATION WALL OUTER ( 7500DIA x 2367H ) REBAR REBAR Ð 19 TON VERT, OUTTER EL -1.800 EL +1.067 P3-CVL-DWG-EQFD-0010 REV 1 19 2.230 0.001 1 118 118 0.300 2.737 3.037 0.80 -
1.0640 P3 RE-1A T137 FOUNDATION WALL INNER ( 6500DIA x 2367H ) REBAR REBAR Ð 19 TON VERT, INNER EL -1.800 EL +1.067 P3-CVL-DWG-EQFD-0010 REV 1 19 2.230 0.001 1 118 118 0.300 2.737 3.037 0.80 -
1.0641 P3 RE-1A T137 FOUNDATION WALL INNER ( 6500DIA x 2367H ) REBAR REBAR Ð 13 TON TOP ONLY P3-CVL-DWG-EQFD-0010 REV 1 13 1.040 0.001 1 118 118 0.100 0.400 0.100 0.600 0.07 -
1.0642 P3 RE-1A T137 FOUNDATION WALL OUTER ( 7500DIA x 2367H ) REBAR REBAR Ð 13 TON HORI, HOOP P3-CVL-DWG-EQFD-0010 REV 1 40 13 1.040 0.001 1 12 12 23.248 0.520 1.040 24.808 0.31 -
1.0643 P3 RE-1A T137 FOUNDATION WALL INNER ( 6500DIA x 2367H ) REBAR REBAR Ð 13 TON HORI, HOOP P3-CVL-DWG-EQFD-0010 REV 1 40 13 1.040 0.001 1 12 12 20.735 0.520 0.520 21.775 0.27 -
1.0644 P3 CO-1A T137 FOUNDATION FOOT FDN BASE ( 7700DIA x 500THK ) PLAIN CONCRETE LEVELING CONCRETE T= 50 M³ EL -1.850 EL -1.800 P3-CVL-DWG-EQFD-0010 REV 1 SOIL DISPOSAL 1 1 1.850 -1.800 0.050 49.017 49.017 2.45 -
1.0645 P3 T137 FOUNDATION FOOT FDN BASE ( 7700DIA x 500THK ) EARTH WORK COMPACTIED SOIL 95% MAX DRY M² EL -1.850 EL -0.300 P3-CVL-DWG-EQFD-0010 REV 1 1 1 1.850 -0.300 1.550 49.017 49.017 75.98 -
1.0646 P3 EA-1B T137 FOUNDATION FOOT FDN BASE ( 7700DIA x 500THK ) EARTH WORK EXCAVATION BY EQUIPMENT (D>3 M³ EL -1.850 EL -0.300 P3-CVL-DWG-EQFD-0010 REV 1 SOIL EXCAVATION 1 0 0 1.850 -0.300 - 1.550 54.106 54.106 - -
1.0647 P3 EA-1A T137 FOUNDATION FOOT FDN BASE ( 7700DIA x 500THK ) EARTH WORK EXCAVATION BY EQUIPMENT (D<=M³ EL -1.850 EL -0.300 P3-CVL-DWG-EQFD-0010 REV 1 SOIL EXCAVATION 1 1 1.850 -0.300 - 1.550 54.106 54.106 83.86 -
1.0648 P3 EA-3B T137 FOUNDATION FOOT FDN BASE ( 7700DIA x 500THK ) EARTH WORK SOIL DISPOSAL M³ DISPO: CONCRETE EL -1.800 EL -1.300 P3-CVL-DWG-EQFD-0010 REV 1 1 1 1.800 -1.300 0.500 46.566 46.566 23.28 -
1.0649 P3 EA-3B T137 FOUNDATION FOOT FDN OUTER ( 7500DIA x 2367H ) EARTH WORK SOIL DISPOSAL M³ DISPO: CONCRETE EL -1.300 EL -0.300 P3-CVL-DWG-EQFD-0010 REV 1 1 1 1.300 -0.300 1.000 44.179 44.179 44.18 -
1.0650 P3 EA-3B T137 FOUNDATION FOOT FDN OUTER ( 7500DIA x 2367H ) EARTH WORK SOIL DISPOSAL M³ DISPO: LC + SB P3-CVL-DWG-EQFD-0010 REV 1 1 1 2.451 2.451 2.45 -
1.0651 P3 EA-2A T137 FOUNDATION FOOT FDN OUTER ( 7500DIA x 2367H ) EARTH WORK SOIL BACKFILL M³ P3-CVL-DWG-EQFD-0010 REV 1 1 1 83.864 -69.913 13.952 13.95 -
1.0652 P3 EA-4C T137 FOUNDATION FOOT FDN INNER ( 6500DIA x 2367H ) EARTH WORK SAND FILL M³ EL -1.300 EL +1.067 P3-CVL-DWG-EQFD-0010 REV 1 1 1 2.367 2.367 33.183 33.183 78.54 -
1.0653 P3 T137 FOUNDATION FOOT FDN INNER ( 6500DIA x 2367H ) OTHERS GROUTING 30 MM THK M³ P3-CVL-DWG-EQFD-0010 REV 1 1 1 0.030 0.030 44.179 -33.183 10.996 0.33 -
1.0654 P3 PB-40-14 T137 FOUNDATION FOOT FDN INNER ( 6500DIA x 2367H ) OTHERS PVC PIPE 2 INCH DIA M P3-CVL-DWG-EQFD-0010 REV 1 1 4 4 0.500 0.500 2.00 -
1.0655 P3 T137 FOUNDATION FOOT FDN INNER ( 6500DIA x 2367H ) OTHERS GRAVEL SIZE 4MM - 30MM M³ P3-CVL-DWG-EQFD-0010 REV 1 1 4 4 0.600 0.600 0.600 0.600 1.44 -
1.0656 P3 T137 FOUNDATION FOOT FDN INNER ( 6500DIA x 2367H ) OTHERS PALM FIBRE M³ P3-CVL-DWG-EQFD-0010 REV 1 1 4 4 0.200 0.200 0.200 0.200 0.16 -
1.0657 P3 T137 FOUNDATION FOOT FDN INNER ( 6500DIA x 2367H ) BOLT ANCHOR BOLT M24 (INSTALL ONLYEA P3-CVL-DWG-EQFD-0010 REV 1 1 48 48 48.00 -
1.0658 P3 CO-2A T137 FOUNDATION FOOT FDN BASE ( 7700DIA x 500THK ) CONCRETE CONCRETE M³ EL -1.800 EL -1.300 P3-CVL-DWG-EQFD-0011 REV 1 1 1 0.500 0.500 46.566 46.566 23.28 -
1.0659 P3 FM-1A T137 FOUNDATION FOOT FDN BASE ( 7700DIA x 500THK ) FORM WORK FORM WORK M² EL -1.800 EL -1.300 P3-CVL-DWG-EQFD-0011 REV 1 1 1 24.190 24.190 1.800 -1.300 0.500 12.10 -
1.0660 P3 RE-1A T137 FOUNDATION FOOT FDN BASE ( 7700DIA x 500THK ) REBAR REBAR Ð 13 TON TOP : LONG + TRANS P3-CVL-DWG-EQFD-0011 REV 1 13 1.040 0.001 1 2 2 4 0.350 - 0.350 0.700 0.00 -
1.0661 P3 RE-1A T137 FOUNDATION FOOT FDN BASE ( 7700DIA x 500THK ) REBAR REBAR Ð 13 TON TOP : LONG + TRANS P3-CVL-DWG-EQFD-0011 REV 1 13 1.040 0.001 1 2 2 4 0.350 - 0.350 0.700 0.00 -
1.0662 P3 RE-1A T137 FOUNDATION FOOT FDN BASE ( 7700DIA x 500THK ) REBAR REBAR Ð 13 TON TOP : LONG + TRANS P3-CVL-DWG-EQFD-0011 REV 1 13 1.040 0.001 1 2 2 4 0.350 - 0.350 0.700 0.00 -
1.0663 P3 RE-1A T137 FOUNDATION FOOT FDN BASE ( 7700DIA x 500THK ) REBAR REBAR Ð 13 TON TOP : LONG + TRANS P3-CVL-DWG-EQFD-0011 REV 1 13 1.040 0.001 1 2 2 4 0.350 - 0.350 0.700 0.00 -
1.0664 P3 RE-1A T137 FOUNDATION FOOT FDN BASE ( 7700DIA x 500THK ) REBAR REBAR Ð 13 TON TOP : LONG + TRANS P3-CVL-DWG-EQFD-0011 REV 1 13 1.040 0.001 1 2 2 4 0.350 - 0.350 0.700 0.00 -
1.0665 P3 RE-1A T137 FOUNDATION FOOT FDN BASE ( 7700DIA x 500THK ) REBAR REBAR Ð 13 TON TOP : LONG + TRANS P3-CVL-DWG-EQFD-0011 REV 1 13 1.040 0.001 1 2 2 4 0.350 - 0.350 0.700 0.00 -
1.0666 P3 RE-1A T137 FOUNDATION FOOT FDN BASE ( 7700DIA x 500THK ) REBAR REBAR Ð 13 TON TOP : LONG + TRANS P3-CVL-DWG-EQFD-0011 REV 1 13 1.040 0.001 1 2 2 4 0.350 - 0.350 0.700 0.00 -
1.0667 P3 RE-1A T137 FOUNDATION FOOT FDN BASE ( 7700DIA x 500THK ) REBAR REBAR Ð 13 TON TOP : LONG + TRANS P3-CVL-DWG-EQFD-0011 REV 1 13 1.040 0.001 1 2 2 4 0.350 - 0.350 0.700 0.00 -
1.0668 P3 RE-1A T137 FOUNDATION FOOT FDN BASE ( 7700DIA x 500THK ) REBAR REBAR Ð 13 TON TOP : LONG + TRANS P3-CVL-DWG-EQFD-0011 REV 1 13 1.040 0.001 1 2 2 4 0.350 - 0.350 0.700 0.00 -
1.0669 P3 RE-1A T137 FOUNDATION FOOT FDN BASE ( 7700DIA x 500THK ) REBAR REBAR Ð 13 TON TOP : LONG + TRANS P3-CVL-DWG-EQFD-0011 REV 1 13 1.040 0.001 1 2 2 4 0.350 - 0.350 0.700 0.00 -
1.0670 P3 RE-1A T137 FOUNDATION FOOT FDN BASE ( 7700DIA x 500THK ) REBAR REBAR Ð 13 TON TOP : LONG + TRANS P3-CVL-DWG-EQFD-0011 REV 1 13 1.040 0.001 1 2 2 4 0.350 - 0.350 0.700 0.00 -
1.0671 P3 RE-1A T137 FOUNDATION FOOT FDN BASE ( 7700DIA x 500THK ) REBAR REBAR Ð 13 TON TOP : LONG + TRANS P3-CVL-DWG-EQFD-0011 REV 1 13 1.040 0.001 1 2 2 4 0.350 - 0.350 0.700 0.00 -
1.0672 P3 RE-1A T137 FOUNDATION FOOT FDN BASE ( 7700DIA x 500THK ) REBAR REBAR Ð 13 TON TOP : LONG + TRANS P3-CVL-DWG-EQFD-0011 REV 1 13 1.040 0.001 1 2 2 4 0.350 - 0.350 0.700 0.00 -
1.0673 P3 RE-1A T137 FOUNDATION FOOT FDN BASE ( 7700DIA x 500THK ) REBAR REBAR Ð 13 TON TOP : LONG + TRANS P3-CVL-DWG-EQFD-0011 REV 1 13 1.040 0.001 1 2 2 4 0.350 - 0.350 0.700 0.00 -
1.0674 P3 RE-1A T137 FOUNDATION FOOT FDN BASE ( 7700DIA x 500THK ) REBAR REBAR Ð 13 TON TOP : LONG + TRANS P3-CVL-DWG-EQFD-0011 REV 1 13 1.040 0.001 1 2 2 4 0.350 - 0.350 0.700 0.00 -
1.0675 P3 RE-1A T137 FOUNDATION FOOT FDN BASE ( 7700DIA x 500THK ) REBAR REBAR Ð 13 TON TOP : LONG + TRANS P3-CVL-DWG-EQFD-0011 REV 1 13 1.040 0.001 1 2 2 4 0.350 - 0.350 0.700 0.00 -
1.0676 P3 RE-1A T137 FOUNDATION FOOT FDN BASE ( 7700DIA x 500THK ) REBAR REBAR Ð 13 TON BOTT : LONG + TRANS P3-CVL-DWG-EQFD-0011 REV 1 13 1.040 0.001 1 2 2 4 0.350 - 0.350 0.700 0.00 -
1.0677 P3 RE-1A T137 FOUNDATION FOOT FDN BASE ( 7700DIA x 500THK ) REBAR REBAR Ð 13 TON BOTT : LONG + TRANS P3-CVL-DWG-EQFD-0011 REV 1 13 1.040 0.001 1 2 2 4 0.350 - 0.350 0.700 0.00 -
1.0678 P3 RE-1A T137 FOUNDATION FOOT FDN BASE ( 7700DIA x 500THK ) REBAR REBAR Ð 13 TON BOTT : LONG + TRANS P3-CVL-DWG-EQFD-0011 REV 1 13 1.040 0.001 1 2 2 4 0.350 - 0.350 0.700 0.00 -
1.0679 P3 RE-1A T137 FOUNDATION FOOT FDN BASE ( 7700DIA x 500THK ) REBAR REBAR Ð 13 TON BOTT : LONG + TRANS P3-CVL-DWG-EQFD-0011 REV 1 13 1.040 0.001 1 2 2 4 0.350 - 0.350 0.700 0.00 -
1.0680 P3 RE-1A T137 FOUNDATION FOOT FDN BASE ( 7700DIA x 500THK ) REBAR REBAR Ð 13 TON BOTT : LONG + TRANS P3-CVL-DWG-EQFD-0011 REV 1 13 1.040 0.001 1 2 2 4 0.350 - 0.350 0.700 0.00 -
1.0681 P3 RE-1A T137 FOUNDATION FOOT FDN BASE ( 7700DIA x 500THK ) REBAR REBAR Ð 13 TON BOTT : LONG + TRANS P3-CVL-DWG-EQFD-0011 REV 1 13 1.040 0.001 1 2 2 4 0.350 - 0.350 0.700 0.00 -
1.0682 P3 RE-1A T137 FOUNDATION FOOT FDN BASE ( 7700DIA x 500THK ) REBAR REBAR Ð 13 TON BOTT : LONG + TRANS P3-CVL-DWG-EQFD-0011 REV 1 13 1.040 0.001 1 2 2 4 0.350 - 0.350 0.700 0.00 -
1.0683 P3 RE-1A T137 FOUNDATION FOOT FDN BASE ( 7700DIA x 500THK ) REBAR REBAR Ð 13 TON BOTT : LONG + TRANS P3-CVL-DWG-EQFD-0011 REV 1 13 1.040 0.001 1 2 2 4 0.350 - 0.350 0.700 0.00 -
1.0684 P3 RE-1A T137 FOUNDATION FOOT FDN BASE ( 7700DIA x 500THK ) REBAR REBAR Ð 13 TON BOTT : LONG + TRANS P3-CVL-DWG-EQFD-0011 REV 1 13 1.040 0.001 1 2 2 4 0.350 - 0.350 0.700 0.00 -
1.0685 P3 RE-1A T137 FOUNDATION FOOT FDN BASE ( 7700DIA x 500THK ) REBAR REBAR Ð 13 TON BOTT : LONG + TRANS P3-CVL-DWG-EQFD-0011 REV 1 13 1.040 0.001 1 2 2 4 0.350 - 0.350 0.700 0.00 -
1.0686 P3 RE-1A T137 FOUNDATION FOOT FDN BASE ( 7700DIA x 500THK ) REBAR REBAR Ð 13 TON BOTT : LONG + TRANS P3-CVL-DWG-EQFD-0011 REV 1 13 1.040 0.001 1 2 2 4 0.350 - 0.350 0.700 0.00 -
1.0687 P3 RE-1A T137 FOUNDATION FOOT FDN BASE ( 7700DIA x 500THK ) REBAR REBAR Ð 13 TON BOTT : LONG + TRANS P3-CVL-DWG-EQFD-0011 REV 1 13 1.040 0.001 1 2 2 4 0.350 - 0.350 0.700 0.00 -
1.0688 P3 RE-1A T137 FOUNDATION FOOT FDN BASE ( 7700DIA x 500THK ) REBAR REBAR Ð 13 TON BOTT : LONG + TRANS P3-CVL-DWG-EQFD-0011 REV 1 13 1.040 0.001 1 2 2 4 0.350 - 0.350 0.700 0.00 -
1.0689 P3 RE-1A T137 FOUNDATION FOOT FDN BASE ( 7700DIA x 500THK ) REBAR REBAR Ð 13 TON BOTT : LONG + TRANS P3-CVL-DWG-EQFD-0011 REV 1 13 1.040 0.001 1 2 2 4 0.350 - 0.350 0.700 0.00 -
1.0690 P3 RE-1A T137 FOUNDATION FOOT FDN BASE ( 7700DIA x 500THK ) REBAR REBAR Ð 13 TON BOTT : LONG + TRANS P3-CVL-DWG-EQFD-0011 REV 1 13 1.040 0.001 1 2 2 4 0.350 - 0.350 0.700 0.00 -
1.0691 P3 RE-1A T137 FOUNDATION FOOT FDN BASE ( 7700DIA x 500THK ) REBAR REBAR Ð 13 TON BOTT : LONG + TRANS P3-CVL-DWG-EQFD-0011 REV 1 13 1.040 0.001 1 2 2 4 0.350 - 0.350 0.700 0.00 -
1.0692 P3 RE-1A T137 FOUNDATION FOOT FDN BASE ( 7700DIA x 500THK ) REBAR REBAR Ð 13 TON TIE P3-CVL-DWG-EQFD-0011 REV 1 40 13 1.040 0.001 1 1 23.876 0.520 1.040 25.436 0.03 -
1.0693 P3 RE-1A T137 FOUNDATION FOOT FDN BASE ( 7700DIA x 500THK ) REBAR REBAR Ð 13 TON SUPPORT P3-CVL-DWG-EQFD-0011 REV 1 13 1.040 0.001 1 47 47 0.300 0.348 0.200 0.348 0.300 1.496 0.07 -
1.0694 P3 CO-2A T137 FOUNDATION WALL OUTER ( 7500DIA x 2367H ) CONCRETE CONCRETE M³ EL -1.300 EL +1.067 P3-CVL-DWG-EQFD-0046 REV 1 1 1 2.367 2.367 44.179 44.179 104.57 -
1.0695 P3 CO-2A T137 FOUNDATION WALL INNER ( 6500DIA x 2367H ) CONCRETE CONCRETE M³ EL -1.300 EL +1.067 P3-CVL-DWG-EQFD-0011 REV 1 1 -1 -1 2.367 2.367 33.183 33.183 -78.54 -
1.0696 P3 FM-1A T137 FOUNDATION WALL OUTER ( 7500DIA x 2367H ) FORM WORK FORM WORK M² EL -1.300 EL +1.067 P3-CVL-DWG-EQFD-0011 REV 1 1 1 23.562 23.562 1.300 1.067 2.367 55.77 -
1.0697 P3 FM-1A T137 FOUNDATION WALL INNER ( 6500DIA x 2367H ) FORM WORK FORM WORK M² EL -1.300 EL +1.067 P3-CVL-DWG-EQFD-0011 REV 1 1 1 20.420 20.420 1.300 1.067 2.367 48.33 -
1.0698 P3 RE-1A T137 FOUNDATION WALL OUTER ( 7500DIA x 2367H ) REBAR REBAR Ð 19 TON VERT, OUTTER EL -1.800 EL +1.067 P3-CVL-DWG-EQFD-0011 REV 1 19 2.230 0.001 1 118 118 0.300 2.737 3.037 0.80 -
1.0699 P3 RE-1A T137 FOUNDATION WALL INNER ( 6500DIA x 2367H ) REBAR REBAR Ð 19 TON VERT, INNER EL -1.800 EL +1.067 P3-CVL-DWG-EQFD-0011 REV 1 19 2.230 0.001 1 118 118 0.300 2.737 3.037 0.80 -
1.0700 P3 RE-1A T137 FOUNDATION WALL INNER ( 6500DIA x 2367H ) REBAR REBAR Ð 13 TON TOP ONLY P3-CVL-DWG-EQFD-0011 REV 1 13 1.040 0.001 1 118 118 0.100 0.400 0.100 0.600 0.07 -
1.0701 P3 RE-1A T137 FOUNDATION WALL OUTER ( 7500DIA x 2367H ) REBAR REBAR Ð 13 TON HORI, HOOP P3-CVL-DWG-EQFD-0011 REV 1 40 13 1.040 0.001 1 12 12 23.248 0.520 1.040 24.808 0.31 -
1.0702 P3 RE-1A T137 FOUNDATION WALL INNER ( 6500DIA x 2367H ) REBAR REBAR Ð 13 TON HORI, HOOP P3-CVL-DWG-EQFD-0011 REV 1 40 13 1.040 0.001 1 12 12 20.735 0.520 0.520 21.775 0.27 -
1.0703 P3 CO-1A T137 FOUNDATION FOOT FDN BASE ( 7700DIA x 500THK ) PLAIN CONCRETE LEVELING CONCRETE T= 50 M³ EL -1.850 EL -1.800 P3-CVL-DWG-EQFD-0011 REV 1 SOIL DISPOSAL 1 1 1.850 -1.800 0.050 49.017 49.017 2.45 -
1.0704 P3 T137 FOUNDATION FOOT FDN BASE ( 7700DIA x 500THK ) EARTH WORK COMPACTIED SOIL 95% MAX DRY M² EL -1.850 EL -0.300 P3-CVL-DWG-EQFD-0011 REV 1 1 1 1.850 -0.300 1.550 49.017 49.017 75.98 -
1.0705 P3 EA-1B T137 FOUNDATION FOOT FDN BASE ( 7700DIA x 500THK ) EARTH WORK EXCAVATION BY EQUIPMENT (D>3 M³ EL -1.850 EL -0.300 P3-CVL-DWG-EQFD-0011 REV 1 SOIL EXCAVATION 1 0 0 1.850 -0.300 - 1.550 54.106 54.106 - -
1.0706 P3 EA-1A T137 FOUNDATION FOOT FDN BASE ( 7700DIA x 500THK ) EARTH WORK EXCAVATION BY EQUIPMENT (D<=M³ EL -1.850 EL -0.300 P3-CVL-DWG-EQFD-0011 REV 1 SOIL EXCAVATION 1 1 1.850 -0.300 - 1.550 54.106 54.106 83.86 -
1.0707 P3 EA-3B T137 FOUNDATION FOOT FDN BASE ( 7700DIA x 500THK ) EARTH WORK SOIL DISPOSAL M³ DISPO: CONCRETE EL -1.800 EL -1.300 P3-CVL-DWG-EQFD-0011 REV 1 1 1 1.800 -1.300 0.500 46.566 46.566 23.28 -
1.0708 P3 EA-3B T137 FOUNDATION FOOT FDN OUTER ( 7500DIA x 2367H ) EARTH WORK SOIL DISPOSAL M³ DISPO: CONCRETE EL -1.300 EL -0.300 P3-CVL-DWG-EQFD-0011 REV 1 1 1 1.300 -0.300 1.000 44.179 44.179 44.18 -
1.0709 P3 EA-3B T137 FOUNDATION FOOT FDN OUTER ( 7500DIA x 2367H ) EARTH WORK SOIL DISPOSAL M³ DISPO: LC + SB P3-CVL-DWG-EQFD-0011 REV 1 1 1 2.451 2.451 2.45 -
1.0710 P3 EA-2A T137 FOUNDATION FOOT FDN OUTER ( 7500DIA x 2367H ) EARTH WORK SOIL BACKFILL M³ P3-CVL-DWG-EQFD-0011 REV 1 1 1 83.864 -69.913 13.952 13.95 -
1.0711 P3 EA-4C T137 FOUNDATION FOOT FDN INNER ( 6500DIA x 2367H ) EARTH WORK SAND FILL M³ EL -1.300 EL +1.067 P3-CVL-DWG-EQFD-0011 REV 1 1 1 2.367 2.367 33.183 33.183 78.54 -
1.0712 P3 T137 FOUNDATION FOOT FDN INNER ( 6500DIA x 2367H ) OTHERS GROUTING 30 MM THK M³ P3-CVL-DWG-EQFD-0011 REV 1 1 1 0.030 0.030 44.179 -33.183 10.996 0.33 -
1.0713 P3 PB-40-14 T137 FOUNDATION FOOT FDN INNER ( 6500DIA x 2367H ) OTHERS PVC PIPE 2 INCH DIA M P3-CVL-DWG-EQFD-0011 REV 1 1 4 4 0.500 0.500 2.00 -
1.0714 P3 T137 FOUNDATION FOOT FDN INNER ( 6500DIA x 2367H ) OTHERS GRAVEL SIZE 4MM - 30MM M³ P3-CVL-DWG-EQFD-0011 REV 1 1 4 4 0.600 0.600 0.600 0.600 1.44 -
1.0715 P3 T137 FOUNDATION FOOT FDN INNER ( 6500DIA x 2367H ) OTHERS PALM FIBRE M³ P3-CVL-DWG-EQFD-0011 REV 1 1 4 4 0.200 0.200 0.200 0.200 0.16 -
1.0716 P3 T137 FOUNDATION FOOT FDN INNER ( 6500DIA x 2367H ) BOLT ANCHOR BOLT M24 (INSTALL ONLYEA P3-CVL-DWG-EQFD-0011 REV 1 1 48 48 48.00 -
1.0717 P3 CO-2A P237 FOUNDATION FOOT FDN FDN ( 2600L x 1300W x 87 CONCRETE CONCRETE M³ EL -0.800 EL +0.075 P3-CVL-DWG-SSFD-0028 REV 1 1 1 2.600 2.600 1.300 1.300 0.875 0.875 2.96 -
1.0718 P3 FM-1A P237 FOUNDATION FOOT FDN FDN ( 2600L x 1300W x 87 FORM WORK FORM WORK M² EL -0.800 EL +0.075 P3-CVL-DWG-SSFD-0028 REV 1 1 1 2.600 1.300 2.600 1.300 7.800 0.800 0.075 0.875 6.83 -
1.0719 P3 RE-1A P237 FOUNDATION FOOT FDN FDN ( 2600L x 1300W x 87 REBAR REBAR Ð 10 TON LONG, TOP P3-CVL-DWG-SSFD-0028 REV 1 10 0.250 0.620 0.001 1 6 6 2.500 0.520 0.520 3.539 0.01 -
1.0720 P3 RE-1A P237 FOUNDATION FOOT FDN FDN ( 2600L x 1300W x 87 REBAR REBAR Ð 10 TON LONG, BOTT P3-CVL-DWG-SSFD-0028 REV 1 10 0.250 0.620 0.001 1 6 6 2.500 0.520 0.520 3.539 0.01 -
1.0721 P3 RE-1A P237 FOUNDATION FOOT FDN FDN ( 2600L x 1300W x 87 REBAR REBAR Ð 10 TON TRANS, TOP P3-CVL-DWG-SSFD-0028 REV 1 10 0.250 0.620 0.001 1 11 11 1.200 0.520 0.520 2.239 0.02 -
1.0722 P3 RE-1A P237 FOUNDATION FOOT FDN FDN ( 2600L x 1300W x 87 REBAR REBAR Ð 10 TON TRANS, BOTT P3-CVL-DWG-SSFD-0028 REV 1 10 0.250 0.620 0.001 1 11 11 1.200 0.520 0.520 2.239 0.02 -
1.0723 P3 RE-1A P237 FOUNDATION FOOT FDN FDN ( 2600L x 1300W x 87 REBAR REBAR Ð 10 TON TIES P3-CVL-DWG-SSFD-0028 REV 1 10 0.620 0.001 1 5 5 0.060 2.540 1.240 2.540 1.240 0.060 7.680 0.02 -
1.0724 P3 RE-1A P237 FOUNDATION FOOT FDN FDN ( 2600L x 1300W x 87 REBAR REBAR Ð 10 TON SUPPORT P3-CVL-DWG-SSFD-0028 REV 1 10 0.620 0.001 1 2 2 0.300 0.720 0.200 0.720 0.300 2.240 0.00 -
1.0725 P3 CO-1A P237 FOUNDATION FOOT FDN FDN ( 2600L x 1300W x 87 PLAIN CONCRETE LEVELING CONCRETE T= 50 M³ EL -0.850 EL -0.800 P3-CVL-DWG-SSFD-0028 REV 1 SOIL DISPOSAL 1 1 2.600 0.200 2.800 1.300 0.200 1.500 0.850 -0.800 0.050 0.21 -
1.0726 P3 P237 FOUNDATION FOOT FDN FDN ( 2600L x 1300W x 87 EARTH WORK COMPACTIED SOIL 95% MAX DRY M² P3-CVL-DWG-SSFD-0028 REV 1 1 1 2.600 0.600 3.200 1.300 0.600 1.900 6.08 -
1.0727 P3 EA-1B P237 FOUNDATION FOOT FDN FDN ( 2600L x 1300W x 87 EARTH WORK EXCAVATION BY EQUIPMENT (D>3 M³ EL -0.850 EL -0.300 P3-CVL-DWG-SSFD-0028 REV 1 SOIL EXCAVATION 1 0 0 2.600 0.600 3.200 1.300 0.600 1.900 0.850 -0.300 - 0.550 - -
1.0728 P3 EA-1A P237 FOUNDATION FOOT FDN FDN ( 2600L x 1300W x 87 EARTH WORK EXCAVATION BY EQUIPMENT (D<=M³ EL -0.850 EL -0.300 P3-CVL-DWG-SSFD-0028 REV 1 SOIL EXCAVATION 1 1 2.600 0.600 3.200 1.300 0.600 1.900 0.850 -0.300 - 0.550 3.34 -
1.0729 P3 EA-3B P237 FOUNDATION FOOT FDN FDN ( 2600L x 1300W x 87 EARTH WORK SOIL DISPOSAL M³ DISPO: CONCRETE EL -0.800 EL -0.300 P3-CVL-DWG-SSFD-0028 REV 1 1 1 2.600 2.600 1.300 1.300 0.800 -0.300 0.500 1.69 -
1.0730 P3 EA-3B P237 FOUNDATION FOOT FDN FDN ( 2600L x 1300W x 87 EARTH WORK SOIL DISPOSAL M³ DISPO: LC + SB P3-CVL-DWG-SSFD-0028 REV 1 1 1 0.210 0.210 0.21 -
1.0731 P3 EA-2A P237 FOUNDATION FOOT FDN FDN ( 2600L x 1300W x 87 EARTH WORK SOIL BACKFILL M³ P3-CVL-DWG-SSFD-0028 REV 1 1 1 3.344 -1.900 1.444 1.44 -
1.0732 P3 AN-1A P237 FOUNDATION FOOT FDN FDN ( 2600L x 1300W x 87 OTHERS ANCHOR BOX (100 x 100 x 160 D EA P3-CVL-DWG-SSFD-0028 REV 1 1 4 4 4.00 -
1.0733 P3 CO-2A P237 FOUNDATION FOOT FDN FDN ( 1900L x 1100W x 87 CONCRETE CONCRETE M³ EL -0.800 EL +0.075 P3-CVL-DWG-SSFD-0029 REV 1 1 1 1.900 1.900 1.100 1.100 0.875 0.875 1.83 -
1.0734 P3 FM-1A P237 FOUNDATION FOOT FDN FDN ( 1900L x 1100W x 87 FORM WORK FORM WORK M² EL -0.800 EL +0.075 P3-CVL-DWG-SSFD-0029 REV 1 1 1 1.900 1.100 1.900 1.100 6.000 0.800 0.075 0.875 5.25 -
1.0735 P3 RE-1A P237 FOUNDATION FOOT FDN FDN ( 1900L x 1100W x 87 REBAR REBAR Ð 10 TON LONG, TOP P3-CVL-DWG-SSFD-0029 REV 1 10 0.250 0.620 0.001 1 5 5 1.800 0.520 0.520 2.839 0.01 -
1.0736 P3 RE-1A P237 FOUNDATION FOOT FDN FDN ( 1900L x 1100W x 87 REBAR REBAR Ð 10 TON LONG, BOTT P3-CVL-DWG-SSFD-0029 REV 1 10 0.250 0.620 0.001 1 5 5 1.800 0.520 0.520 2.839 0.01 -
1.0737 P3 RE-1A P237 FOUNDATION FOOT FDN FDN ( 1900L x 1100W x 87 REBAR REBAR Ð 10 TON TRANS, TOP P3-CVL-DWG-SSFD-0029 REV 1 10 0.225 0.620 0.001 1 9 9 1.000 0.520 0.520 2.039 0.01 -
1.0738 P3 RE-1A P237 FOUNDATION FOOT FDN FDN ( 1900L x 1100W x 87 REBAR REBAR Ð 10 TON TRANS, BOTT P3-CVL-DWG-SSFD-0029 REV 1 10 0.225 0.620 0.001 1 9 9 1.000 0.520 0.520 2.039 0.01 -
1.0739 P3 RE-1A P237 FOUNDATION FOOT FDN FDN ( 1900L x 1100W x 87 REBAR REBAR Ð 10 TON TIES P3-CVL-DWG-SSFD-0029 REV 1 10 0.620 0.001 1 5 5 0.060 1.840 1.040 1.840 1.040 0.060 5.880 0.02 -
1.0740 P3 RE-1A P237 FOUNDATION FOOT FDN FDN ( 1900L x 1100W x 87 REBAR REBAR Ð 10 TON SUPPORT P3-CVL-DWG-SSFD-0029 REV 1 10 0.620 0.001 1 2 2 0.300 0.720 0.200 0.720 0.300 2.240 0.00 -
1.0741 P3 CO-1A P237 FOUNDATION FOOT FDN FDN ( 1900L x 1100W x 87 PLAIN CONCRETE LEVELING CONCRETE T= 50 M³ EL -0.850 EL -0.800 P3-CVL-DWG-SSFD-0029 REV 1 SOIL DISPOSAL 1 1 1.900 0.200 2.100 1.100 0.200 1.300 0.850 -0.800 0.050 0.14 -
1.0742 P3 P237 FOUNDATION FOOT FDN FDN ( 1900L x 1100W x 87 EARTH WORK COMPACTIED SOIL 95% MAX DRY M² P3-CVL-DWG-SSFD-0029 REV 1 1 1 1.900 0.600 2.500 1.100 0.600 1.700 4.25 -
1.0743 P3 EA-1B P237 FOUNDATION FOOT FDN FDN ( 1900L x 1100W x 87 EARTH WORK EXCAVATION BY EQUIPMENT (D>3 M³ EL -0.850 EL -0.300 P3-CVL-DWG-SSFD-0029 REV 1 SOIL EXCAVATION 1 0 0 1.900 0.600 2.500 1.100 0.600 1.700 0.850 -0.300 - 0.550 - -
1.0744 P3 EA-1A P237 FOUNDATION FOOT FDN FDN ( 1900L x 1100W x 87 EARTH WORK EXCAVATION BY EQUIPMENT (D<=M³ EL -0.850 EL -0.300 P3-CVL-DWG-SSFD-0029 REV 1 SOIL EXCAVATION 1 1 1.900 0.600 2.500 1.100 0.600 1.700 0.850 -0.300 - 0.550 2.34 -
1.0745 P3 EA-3B P237 FOUNDATION FOOT FDN FDN ( 1900L x 1100W x 87 EARTH WORK SOIL DISPOSAL M³ DISPO: CONCRETE EL -0.800 EL -0.300 P3-CVL-DWG-SSFD-0029 REV 1 1 1 1.900 1.900 1.100 1.100 0.800 -0.300 0.500 1.05 -
1.0746 P3 EA-3B P237 FOUNDATION FOOT FDN FDN ( 1900L x 1100W x 87 EARTH WORK SOIL DISPOSAL M³ DISPO: LC + SB P3-CVL-DWG-SSFD-0029 REV 1 1 1 0.137 0.137 0.14 -
1.0747 P3 EA-2A P237 FOUNDATION FOOT FDN FDN ( 1900L x 1100W x 87 EARTH WORK SOIL BACKFILL M³ P3-CVL-DWG-SSFD-0029 REV 1 1 1 2.338 -1.182 1.156 1.16 -
1.0748 P3 AN-1A P237 FOUNDATION FOOT FDN FDN ( 1900L x 1100W x 87 OTHERS ANCHOR BOX (100 x 100 x 160 D EA P3-CVL-DWG-SSFD-0029 REV 1 1 4 4 4.00 -
1.0749 P3 CO-2A P137 FOUNDATION FOOT FDN FDN ( 2600L x 1300W x 87 CONCRETE CONCRETE M³ EL -0.800 EL +0.075 P3-CVL-DWG-SSFD-0040 REV 1 1 1 2.600 2.600 1.300 1.300 0.875 0.875 2.96 -
1.0750 P3 FM-1A P137 FOUNDATION FOOT FDN FDN ( 2600L x 1300W x 87 FORM WORK FORM WORK M² EL -0.800 EL +0.075 P3-CVL-DWG-SSFD-0040 REV 1 1 1 2.600 1.300 2.600 1.300 7.800 0.800 0.075 0.875 6.83 -
1.0751 P3 RE-1A P137 FOUNDATION FOOT FDN FDN ( 2600L x 1300W x 87 REBAR REBAR Ð 10 TON LONG, TOP P3-CVL-DWG-SSFD-0040 REV 1 10 0.250 0.620 0.001 1 6 6 2.500 0.520 0.520 3.539 0.01 -

file:///conversion/tmp/scratch/454095803.xlsxPrinted: 01/03/2020 - 21:53:28 <EA>


1.0752 P3 RE-1A P137 FOUNDATION FOOT FDN FDN ( 2600L x 1300W x 87 REBAR REBAR Ð 10 TON LONG, BOTT P3-CVL-DWG-SSFD-0040 REV 1 10 0.250 0.620 0.001 1 6 6 2.500 0.520 0.520 3.539 0.01 -
1.0753 P3 RE-1A P137 FOUNDATION FOOT FDN FDN ( 2600L x 1300W x 87 REBAR REBAR Ð 10 TON TRANS, TOP P3-CVL-DWG-SSFD-0040 REV 1 10 0.250 0.620 0.001 1 11 11 1.200 0.520 0.520 2.239 0.02 -
1.0754 P3 RE-1A P137 FOUNDATION FOOT FDN FDN ( 2600L x 1300W x 87 REBAR REBAR Ð 10 TON TRANS, BOTT P3-CVL-DWG-SSFD-0040 REV 1 10 0.250 0.620 0.001 1 11 11 1.200 0.520 0.520 2.239 0.02 -
1.0755 P3 RE-1A P137 FOUNDATION FOOT FDN FDN ( 2600L x 1300W x 87 REBAR REBAR Ð 10 TON TIES P3-CVL-DWG-SSFD-0040 REV 1 10 0.620 0.001 1 5 5 0.060 2.540 1.240 2.540 1.240 0.060 7.680 0.02 -
1.0756 P3 RE-1A P137 FOUNDATION FOOT FDN FDN ( 2600L x 1300W x 87 REBAR REBAR Ð 10 TON SUPPORT P3-CVL-DWG-SSFD-0040 REV 1 10 0.620 0.001 1 2 2 0.300 0.720 0.200 0.720 0.300 2.240 0.00 -
1.0757 P3 CO-1A P137 FOUNDATION FOOT FDN FDN ( 2600L x 1300W x 87 PLAIN CONCRETE LEVELING CONCRETE T= 50 M³ EL -0.850 EL -0.800 P3-CVL-DWG-SSFD-0040 REV 1 SOIL DISPOSAL 1 1 2.600 0.200 2.800 1.300 0.200 1.500 0.850 -0.800 0.050 0.21 -
1.0758 P3 P137 FOUNDATION FOOT FDN FDN ( 2600L x 1300W x 87 EARTH WORK COMPACTIED SOIL 95% MAX DRY M² P3-CVL-DWG-SSFD-0040 REV 1 1 1 2.600 0.600 3.200 1.300 0.600 1.900 6.08 -
1.0759 P3 EA-1B P137 FOUNDATION FOOT FDN FDN ( 2600L x 1300W x 87 EARTH WORK EXCAVATION BY EQUIPMENT (D>3 M³ EL -0.850 EL -0.300 P3-CVL-DWG-SSFD-0040 REV 1 SOIL EXCAVATION 1 0 0 2.600 0.600 3.200 1.300 0.600 1.900 0.850 -0.300 - 0.550 - -
1.0760 P3 EA-1A P137 FOUNDATION FOOT FDN FDN ( 2600L x 1300W x 87 EARTH WORK EXCAVATION BY EQUIPMENT (D<=M³ EL -0.850 EL -0.300 P3-CVL-DWG-SSFD-0040 REV 1 SOIL EXCAVATION 1 1 2.600 0.600 3.200 1.300 0.600 1.900 0.850 -0.300 - 0.550 3.34 -
1.0761 P3 EA-3B P137 FOUNDATION FOOT FDN FDN ( 2600L x 1300W x 87 EARTH WORK SOIL DISPOSAL M³ DISPO: CONCRETE EL -0.800 EL -0.300 P3-CVL-DWG-SSFD-0040 REV 1 1 1 2.600 2.600 1.300 1.300 0.800 -0.300 0.500 1.69 -
1.0762 P3 EA-3B P137 FOUNDATION FOOT FDN FDN ( 2600L x 1300W x 87 EARTH WORK SOIL DISPOSAL M³ DISPO: LC + SB P3-CVL-DWG-SSFD-0040 REV 1 1 1 0.210 0.210 0.21 -
1.0763 P3 EA-2A P137 FOUNDATION FOOT FDN FDN ( 2600L x 1300W x 87 EARTH WORK SOIL BACKFILL M³ P3-CVL-DWG-SSFD-0040 REV 1 1 1 3.344 -1.900 1.444 1.44 -
1.0764 P3 AN-1A P137 FOUNDATION FOOT FDN FDN ( 2600L x 1300W x 87 OTHERS ANCHOR BOX (100 x 100 x 160 D EA P3-CVL-DWG-SSFD-0040 REV 1 1 4 4 4.00 -
1.0765 P3 CO-2A P137 FOUNDATION FOOT FDN FDN ( 2600L x 1300W x 87 CONCRETE CONCRETE M³ EL -0.800 EL +0.075 P3-CVL-DWG-SSFD-0041 REV 1 1 1 2.600 2.600 1.300 1.300 0.875 0.875 2.96 -
1.0766 P3 FM-1A P137 FOUNDATION FOOT FDN FDN ( 2600L x 1300W x 87 FORM WORK FORM WORK M² EL -0.800 EL +0.075 P3-CVL-DWG-SSFD-0041 REV 1 1 1 2.600 1.300 2.600 1.300 7.800 0.800 0.075 0.875 6.83 -
1.0767 P3 RE-1A P137 FOUNDATION FOOT FDN FDN ( 2600L x 1300W x 87 REBAR REBAR Ð 10 TON LONG, TOP P3-CVL-DWG-SSFD-0041 REV 1 10 0.250 0.620 0.001 1 6 6 2.500 0.520 0.520 3.539 0.01 -
1.0768 P3 RE-1A P137 FOUNDATION FOOT FDN FDN ( 2600L x 1300W x 87 REBAR REBAR Ð 10 TON LONG, BOTT P3-CVL-DWG-SSFD-0041 REV 1 10 0.250 0.620 0.001 1 6 6 2.500 0.520 0.520 3.539 0.01 -
1.0769 P3 RE-1A P137 FOUNDATION FOOT FDN FDN ( 2600L x 1300W x 87 REBAR REBAR Ð 10 TON TRANS, TOP P3-CVL-DWG-SSFD-0041 REV 1 10 0.250 0.620 0.001 1 11 11 1.200 0.520 0.520 2.239 0.02 -
1.0770 P3 RE-1A P137 FOUNDATION FOOT FDN FDN ( 2600L x 1300W x 87 REBAR REBAR Ð 10 TON TRANS, BOTT P3-CVL-DWG-SSFD-0041 REV 1 10 0.250 0.620 0.001 1 11 11 1.200 0.520 0.520 2.239 0.02 -
1.0771 P3 RE-1A P137 FOUNDATION FOOT FDN FDN ( 2600L x 1300W x 87 REBAR REBAR Ð 10 TON TIES P3-CVL-DWG-SSFD-0041 REV 1 10 0.620 0.001 1 5 5 0.060 2.540 1.240 2.540 1.240 0.060 7.680 0.02 -
1.0772 P3 RE-1A P137 FOUNDATION FOOT FDN FDN ( 2600L x 1300W x 87 REBAR REBAR Ð 10 TON SUPPORT P3-CVL-DWG-SSFD-0041 REV 1 10 0.620 0.001 1 2 2 0.300 0.720 0.200 0.720 0.300 2.240 0.00 -
1.0773 P3 CO-1A P137 FOUNDATION FOOT FDN FDN ( 2600L x 1300W x 87 PLAIN CONCRETE LEVELING CONCRETE T= 50 M³ EL -0.850 EL -0.800 P3-CVL-DWG-SSFD-0041 REV 1 SOIL DISPOSAL 1 1 2.600 0.200 2.800 1.300 0.200 1.500 0.850 -0.800 0.050 0.21 -
1.0774 P3 P137 FOUNDATION FOOT FDN FDN ( 2600L x 1300W x 87 EARTH WORK COMPACTIED SOIL 95% MAX DRY M² P3-CVL-DWG-SSFD-0041 REV 1 1 1 2.600 0.600 3.200 1.300 0.600 1.900 6.08 -
1.0775 P3 EA-1B P137 FOUNDATION FOOT FDN FDN ( 2600L x 1300W x 87 EARTH WORK EXCAVATION BY EQUIPMENT (D>3 M³ EL -0.850 EL -0.300 P3-CVL-DWG-SSFD-0041 REV 1 SOIL EXCAVATION 1 0 0 2.600 0.600 3.200 1.300 0.600 1.900 0.850 -0.300 - 0.550 - -
1.0776 P3 EA-1A P137 FOUNDATION FOOT FDN FDN ( 2600L x 1300W x 87 EARTH WORK EXCAVATION BY EQUIPMENT (D<=M³ EL -0.850 EL -0.300 P3-CVL-DWG-SSFD-0041 REV 1 SOIL EXCAVATION 1 1 2.600 0.600 3.200 1.300 0.600 1.900 0.850 -0.300 - 0.550 3.34 -
1.0777 P3 EA-3B P137 FOUNDATION FOOT FDN FDN ( 2600L x 1300W x 87 EARTH WORK SOIL DISPOSAL M³ DISPO: CONCRETE EL -0.800 EL -0.300 P3-CVL-DWG-SSFD-0041 REV 1 1 1 2.600 2.600 1.300 1.300 0.800 -0.300 0.500 1.69 -
1.0778 P3 EA-3B P137 FOUNDATION FOOT FDN FDN ( 2600L x 1300W x 87 EARTH WORK SOIL DISPOSAL M³ DISPO: LC + SB P3-CVL-DWG-SSFD-0041 REV 1 1 1 0.210 0.210 0.21 -
1.0779 P3 EA-2A P137 FOUNDATION FOOT FDN FDN ( 2600L x 1300W x 87 EARTH WORK SOIL BACKFILL M³ P3-CVL-DWG-SSFD-0041 REV 1 1 1 3.344 -1.900 1.444 1.44 -
1.0780 P3 AN-1A P137 FOUNDATION FOOT FDN FDN ( 2600L x 1300W x 87 OTHERS ANCHOR BOX (100 x 100 x 160 D EA P3-CVL-DWG-SSFD-0041 REV 1 1 4 4 4.00 -
1.0781 P3 CO-2A P137 FOUNDATION FOOT FDN FDN ( 1900L x 1100W x 87 CONCRETE CONCRETE M³ EL -0.800 EL +0.075 P3-CVL-DWG-SSFD-0042 REV 1 1 1 1.900 1.900 1.100 1.100 0.875 0.875 1.83 -
1.0782 P3 FM-1A P137 FOUNDATION FOOT FDN FDN ( 1900L x 1100W x 87 FORM WORK FORM WORK M² EL -0.800 EL +0.075 P3-CVL-DWG-SSFD-0042 REV 1 1 1 1.900 1.100 1.900 1.100 6.000 0.800 0.075 0.875 5.25 -
1.0783 P3 RE-1A P137 FOUNDATION FOOT FDN FDN ( 1900L x 1100W x 87 REBAR REBAR Ð 10 TON LONG, TOP P3-CVL-DWG-SSFD-0042 REV 1 10 0.250 0.620 0.001 1 5 5 1.800 0.520 0.520 2.839 0.01 -
1.0784 P3 RE-1A P137 FOUNDATION FOOT FDN FDN ( 1900L x 1100W x 87 REBAR REBAR Ð 10 TON LONG, BOTT P3-CVL-DWG-SSFD-0042 REV 1 10 0.250 0.620 0.001 1 5 5 1.800 0.520 0.520 2.839 0.01 -
1.0785 P3 RE-1A P137 FOUNDATION FOOT FDN FDN ( 1900L x 1100W x 87 REBAR REBAR Ð 10 TON TRANS, TOP P3-CVL-DWG-SSFD-0042 REV 1 10 0.225 0.620 0.001 1 9 9 1.000 0.520 0.520 2.039 0.01 -
1.0786 P3 RE-1A P137 FOUNDATION FOOT FDN FDN ( 1900L x 1100W x 87 REBAR REBAR Ð 10 TON TRANS, BOTT P3-CVL-DWG-SSFD-0042 REV 1 10 0.225 0.620 0.001 1 9 9 1.000 0.520 0.520 2.039 0.01 -
1.0787 P3 RE-1A P137 FOUNDATION FOOT FDN FDN ( 1900L x 1100W x 87 REBAR REBAR Ð 10 TON TIES P3-CVL-DWG-SSFD-0042 REV 1 10 0.620 0.001 1 5 5 0.060 1.840 1.040 1.840 1.040 0.060 5.880 0.02 -
1.0788 P3 RE-1A P137 FOUNDATION FOOT FDN FDN ( 1900L x 1100W x 87 REBAR REBAR Ð 10 TON SUPPORT P3-CVL-DWG-SSFD-0042 REV 1 10 0.620 0.001 1 2 2 0.300 0.720 0.200 0.720 0.300 2.240 0.00 -
1.0789 P3 CO-1A P137 FOUNDATION FOOT FDN FDN ( 1900L x 1100W x 87 PLAIN CONCRETE LEVELING CONCRETE T= 50 M³ EL -0.850 EL -0.800 P3-CVL-DWG-SSFD-0042 REV 1 SOIL DISPOSAL 1 1 1.900 0.200 2.100 1.100 0.200 1.300 0.850 -0.800 0.050 0.14 -
1.0790 P3 P137 FOUNDATION FOOT FDN FDN ( 1900L x 1100W x 87 EARTH WORK COMPACTIED SOIL 95% MAX DRY M² P3-CVL-DWG-SSFD-0042 REV 1 1 1 1.900 0.600 2.500 1.100 0.600 1.700 4.25 -
1.0791 P3 EA-1B P137 FOUNDATION FOOT FDN FDN ( 1900L x 1100W x 87 EARTH WORK EXCAVATION BY EQUIPMENT (D>3 M³ EL -0.850 EL -0.300 P3-CVL-DWG-SSFD-0042 REV 1 SOIL EXCAVATION 1 0 0 1.900 0.600 2.500 1.100 0.600 1.700 0.850 -0.300 - 0.550 - -
1.0792 P3 EA-1A P137 FOUNDATION FOOT FDN FDN ( 1900L x 1100W x 87 EARTH WORK EXCAVATION BY EQUIPMENT (D<=M³ EL -0.850 EL -0.300 P3-CVL-DWG-SSFD-0042 REV 1 SOIL EXCAVATION 1 1 1.900 0.600 2.500 1.100 0.600 1.700 0.850 -0.300 - 0.550 2.34 -
1.0793 P3 EA-3B P137 FOUNDATION FOOT FDN FDN ( 1900L x 1100W x 87 EARTH WORK SOIL DISPOSAL M³ DISPO: CONCRETE EL -0.800 EL -0.300 P3-CVL-DWG-SSFD-0042 REV 1 1 1 1.900 1.900 1.100 1.100 0.800 -0.300 0.500 1.05 -
1.0794 P3 EA-3B P137 FOUNDATION FOOT FDN FDN ( 1900L x 1100W x 87 EARTH WORK SOIL DISPOSAL M³ DISPO: LC + SB P3-CVL-DWG-SSFD-0042 REV 1 1 1 0.137 0.137 0.14 -
1.0795 P3 EA-2A P137 FOUNDATION FOOT FDN FDN ( 1900L x 1100W x 87 EARTH WORK SOIL BACKFILL M³ P3-CVL-DWG-SSFD-0042 REV 1 1 1 2.338 -1.182 1.156 1.16 -
1.0796 P3 AN-1A P137 FOUNDATION FOOT FDN FDN ( 1900L x 1100W x 87 OTHERS ANCHOR BOX (100 x 100 x 160 D EA P3-CVL-DWG-SSFD-0042 REV 1 1 4 4 4.00 -
1.0797 P3 CO-2A P137 FOUNDATION FOOT FDN FDN ( 2400L x 1200W x 87 CONCRETE CONCRETE M³ EL -0.800 EL +0.075 P3-CVL-DWG-SSFD-0039 REV 1 1 1 2.400 2.400 1.200 1.200 0.875 0.875 2.52 -
1.0798 P3 FM-1A P137 FOUNDATION FOOT FDN FDN ( 2400L x 1200W x 87 FORM WORK FORM WORK M² EL -0.800 EL +0.075 P3-CVL-DWG-SSFD-0039 REV 1 1 1 2.400 1.200 2.400 1.200 7.200 0.800 0.075 0.875 6.30 -
1.0799 P3 RE-1A P137 FOUNDATION FOOT FDN FDN ( 2400L x 1200W x 87 REBAR REBAR Ð 10 TON LONG, TOP P3-CVL-DWG-SSFD-0039 REV 1 10 0.225 0.620 0.001 1 6 6 2.300 0.520 0.520 3.339 0.01 -
1.0800 P3 RE-1A P137 FOUNDATION FOOT FDN FDN ( 2400L x 1200W x 87 REBAR REBAR Ð 10 TON LONG, BOTT P3-CVL-DWG-SSFD-0039 REV 1 10 0.225 0.620 0.001 1 6 6 2.300 0.520 0.520 3.339 0.01 -
1.0801 P3 RE-1A P137 FOUNDATION FOOT FDN FDN ( 2400L x 1200W x 87 REBAR REBAR Ð 10 TON TRANS, TOP P3-CVL-DWG-SSFD-0039 REV 1 10 0.225 0.620 0.001 1 11 11 1.100 0.520 0.520 2.139 0.01 -
1.0802 P3 RE-1A P137 FOUNDATION FOOT FDN FDN ( 2400L x 1200W x 87 REBAR REBAR Ð 10 TON TRANS, BOTT P3-CVL-DWG-SSFD-0039 REV 1 10 0.225 0.620 0.001 1 11 11 1.100 0.520 0.520 2.139 0.01 -
1.0803 P3 RE-1A P137 FOUNDATION FOOT FDN FDN ( 2400L x 1200W x 87 REBAR REBAR Ð 10 TON TIES P3-CVL-DWG-SSFD-0039 REV 1 10 0.620 0.001 1 5 5 0.060 2.340 1.140 2.340 1.140 0.060 7.080 0.02 -
1.0804 P3 RE-1A P137 FOUNDATION FOOT FDN FDN ( 2400L x 1200W x 87 REBAR REBAR Ð 10 TON SUPPORT P3-CVL-DWG-SSFD-0039 REV 1 10 0.620 0.001 1 2 2 0.300 0.720 0.200 0.720 0.300 2.240 0.00 -
1.0805 P3 CO-1A P137 FOUNDATION FOOT FDN FDN ( 2400L x 1200W x 87 PLAIN CONCRETE LEVELING CONCRETE T= 50 M³ EL -0.850 EL -0.800 P3-CVL-DWG-SSFD-0039 REV 1 SOIL DISPOSAL 1 1 2.400 0.200 2.600 1.200 0.200 1.400 0.850 -0.800 0.050 0.18 -
1.0806 P3 P137 FOUNDATION FOOT FDN FDN ( 2400L x 1200W x 87 EARTH WORK COMPACTIED SOIL 95% MAX DRY M² P3-CVL-DWG-SSFD-0039 REV 1 1 1 2.400 0.600 3.000 1.200 0.600 1.800 5.40 -
1.0807 P3 EA-1B P137 FOUNDATION FOOT FDN FDN ( 2400L x 1200W x 87 EARTH WORK EXCAVATION BY EQUIPMENT (D>3 M³ EL -0.850 EL -0.300 P3-CVL-DWG-SSFD-0039 REV 1 SOIL EXCAVATION 1 0 0 2.400 0.600 3.000 1.200 0.600 1.800 0.850 -0.300 - 0.550 - -
1.0808 P3 EA-1A P137 FOUNDATION FOOT FDN FDN ( 2400L x 1200W x 87 EARTH WORK EXCAVATION BY EQUIPMENT (D<=M³ EL -0.850 EL -0.300 P3-CVL-DWG-SSFD-0039 REV 1 SOIL EXCAVATION 1 1 2.400 0.600 3.000 1.200 0.600 1.800 0.850 -0.300 - 0.550 2.97 -
1.0809 P3 EA-3B P137 FOUNDATION FOOT FDN FDN ( 2400L x 1200W x 87 EARTH WORK SOIL DISPOSAL M³ DISPO: CONCRETE EL -0.800 EL -0.300 P3-CVL-DWG-SSFD-0039 REV 1 1 1 2.400 2.400 1.200 1.200 0.800 -0.300 0.500 1.44 -
1.0810 P3 EA-3B P137 FOUNDATION FOOT FDN FDN ( 2400L x 1200W x 87 EARTH WORK SOIL DISPOSAL M³ DISPO: LC + SB P3-CVL-DWG-SSFD-0039 REV 1 1 1 0.182 0.182 0.18 -
1.0811 P3 EA-2A P137 FOUNDATION FOOT FDN FDN ( 2400L x 1200W x 87 EARTH WORK SOIL BACKFILL M³ P3-CVL-DWG-SSFD-0039 REV 1 1 1 2.970 -1.622 1.348 1.35 -
1.0812 P3 AN-1A P137 FOUNDATION FOOT FDN FDN ( 2400L x 1200W x 87 OTHERS ANCHOR BOX (100 x 100 x 160 D EA P3-CVL-DWG-SSFD-0039 REV 1 1 4 4 4.00 -
1.0813 P3 CO-2A P137 FOUNDATION FOOT FDN FDN ( 1750L x 950W x 107 CONCRETE CONCRETE M³ EL -0.800 EL +0.275 P3-CVL-DWG-SSFD-0036 REV 1 1 1 1.750 1.750 0.950 0.950 1.075 1.075 1.79 -
1.0814 P3 FM-1A P137 FOUNDATION FOOT FDN FDN ( 1750L x 950W x 107 FORM WORK FORM WORK M² EL -0.800 EL +0.275 P3-CVL-DWG-SSFD-0036 REV 1 1 1 1.750 0.950 1.750 0.950 5.400 0.800 0.275 1.075 5.81 -
1.0815 P3 RE-1A P137 FOUNDATION FOOT FDN FDN ( 1750L x 950W x 107 REBAR REBAR Ð 10 TON LONG, TOP P3-CVL-DWG-SSFD-0036 REV 1 10 0.225 0.620 0.001 1 5 5 1.650 0.653 0.653 2.956 0.01 -
1.0816 P3 RE-1A P137 FOUNDATION FOOT FDN FDN ( 1750L x 950W x 107 REBAR REBAR Ð 10 TON LONG, BOTT P3-CVL-DWG-SSFD-0036 REV 1 10 0.225 0.620 0.001 1 5 5 1.650 0.653 0.653 2.956 0.01 -
1.0817 P3 RE-1A P137 FOUNDATION FOOT FDN FDN ( 1750L x 950W x 107 REBAR REBAR Ð 10 TON TRANS, TOP P3-CVL-DWG-SSFD-0036 REV 1 10 0.225 0.620 0.001 1 8 8 0.850 0.653 0.653 2.156 0.01 -
1.0818 P3 RE-1A P137 FOUNDATION FOOT FDN FDN ( 1750L x 950W x 107 REBAR REBAR Ð 10 TON TRANS, BOTT P3-CVL-DWG-SSFD-0036 REV 1 10 0.225 0.620 0.001 1 8 8 0.850 0.653 0.653 2.156 0.01 -
1.0819 P3 RE-1A P137 FOUNDATION FOOT FDN FDN ( 1750L x 950W x 107 REBAR REBAR Ð 10 TON TIES P3-CVL-DWG-SSFD-0036 REV 1 10 0.620 0.001 1 5 5 0.060 1.690 0.890 1.690 0.890 0.060 5.280 0.02 -
1.0820 P3 RE-1A P137 FOUNDATION FOOT FDN FDN ( 1750L x 950W x 107 REBAR REBAR Ð 10 TON SUPPORT P3-CVL-DWG-SSFD-0036 REV 1 10 0.620 0.001 1 2 2 0.300 0.920 0.200 0.920 0.300 2.640 0.00 -
1.0821 P3 CO-1A P137 FOUNDATION FOOT FDN FDN ( 1750L x 950W x 107 PLAIN CONCRETE LEVELING CONCRETE T= 50 M³ EL -0.850 EL -0.800 P3-CVL-DWG-SSFD-0036 REV 1 SOIL DISPOSAL 1 1 1.750 0.200 1.950 0.950 0.200 1.150 0.850 -0.800 0.050 0.11 -
1.0822 P3 P137 FOUNDATION FOOT FDN FDN ( 1750L x 950W x 107 EARTH WORK COMPACTIED SOIL 95% MAX DRY M² P3-CVL-DWG-SSFD-0036 REV 1 1 1 1.750 0.600 2.350 0.950 0.600 1.550 3.64 -
1.0823 P3 EA-1B P137 FOUNDATION FOOT FDN FDN ( 1750L x 950W x 107 EARTH WORK EXCAVATION BY EQUIPMENT (D>3 M³ EL -0.850 EL -0.300 P3-CVL-DWG-SSFD-0036 REV 1 SOIL EXCAVATION 1 0 0 1.750 0.600 2.350 0.950 0.600 1.550 0.850 -0.300 - 0.550 - -
1.0824 P3 EA-1A P137 FOUNDATION FOOT FDN FDN ( 1750L x 950W x 107 EARTH WORK EXCAVATION BY EQUIPMENT (D<=M³ EL -0.850 EL -0.300 P3-CVL-DWG-SSFD-0036 REV 1 SOIL EXCAVATION 1 1 1.750 0.600 2.350 0.950 0.600 1.550 0.850 -0.300 - 0.550 2.00 -
1.0825 P3 EA-3B P137 FOUNDATION FOOT FDN FDN ( 1750L x 950W x 107 EARTH WORK SOIL DISPOSAL M³ DISPO: CONCRETE EL -0.800 EL -0.300 P3-CVL-DWG-SSFD-0036 REV 1 1 1 1.750 1.750 0.950 0.950 0.800 -0.300 0.500 0.83 -
1.0826 P3 EA-3B P137 FOUNDATION FOOT FDN FDN ( 1750L x 950W x 107 EARTH WORK SOIL DISPOSAL M³ DISPO: LC + SB P3-CVL-DWG-SSFD-0036 REV 1 1 1 0.112 0.112 0.11 -
1.0827 P3 EA-2A P137 FOUNDATION FOOT FDN FDN ( 1750L x 950W x 107 EARTH WORK SOIL BACKFILL M³ P3-CVL-DWG-SSFD-0036 REV 1 1 1 2.003 -0.943 1.060 1.06 -
1.0828 P3 AN-1A P137 FOUNDATION FOOT FDN FDN ( 1750L x 950W x 107 OTHERS ANCHOR BOX (100 x 100 x 160 D EA P3-CVL-DWG-SSFD-0036 REV 1 1 4 4 4.00 -
1.0829 P3 CO-2A P137 FOUNDATION FOOT FDN FDN ( 1750L x 950W x 107 CONCRETE CONCRETE M³ EL -0.800 EL +0.275 P3-CVL-DWG-SSFD-0037 REV 1 1 1 1.750 1.750 0.950 0.950 1.075 1.075 1.79 -
1.0830 P3 FM-1A P137 FOUNDATION FOOT FDN FDN ( 1750L x 950W x 107 FORM WORK FORM WORK M² EL -0.800 EL +0.275 P3-CVL-DWG-SSFD-0037 REV 1 1 1 1.750 0.950 1.750 0.950 5.400 0.800 0.275 1.075 5.81 -
1.0831 P3 RE-1A P137 FOUNDATION FOOT FDN FDN ( 1750L x 950W x 107 REBAR REBAR Ð 10 TON LONG, TOP P3-CVL-DWG-SSFD-0037 REV 1 10 0.225 0.620 0.001 1 5 5 1.650 0.653 0.653 2.956 0.01 -
1.0832 P3 RE-1A P137 FOUNDATION FOOT FDN FDN ( 1750L x 950W x 107 REBAR REBAR Ð 10 TON LONG, BOTT P3-CVL-DWG-SSFD-0037 REV 1 10 0.225 0.620 0.001 1 5 5 1.650 0.653 0.653 2.956 0.01 -
1.0833 P3 RE-1A P137 FOUNDATION FOOT FDN FDN ( 1750L x 950W x 107 REBAR REBAR Ð 10 TON TRANS, TOP P3-CVL-DWG-SSFD-0037 REV 1 10 0.225 0.620 0.001 1 8 8 0.850 0.653 0.653 2.156 0.01 -
1.0834 P3 RE-1A P137 FOUNDATION FOOT FDN FDN ( 1750L x 950W x 107 REBAR REBAR Ð 10 TON TRANS, BOTT P3-CVL-DWG-SSFD-0037 REV 1 10 0.225 0.620 0.001 1 8 8 0.850 0.653 0.653 2.156 0.01 -
1.0835 P3 RE-1A P137 FOUNDATION FOOT FDN FDN ( 1750L x 950W x 107 REBAR REBAR Ð 10 TON TIES P3-CVL-DWG-SSFD-0037 REV 1 10 0.620 0.001 1 5 5 0.060 1.690 0.890 1.690 0.890 0.060 5.280 0.02 -
1.0836 P3 RE-1A P137 FOUNDATION FOOT FDN FDN ( 1750L x 950W x 107 REBAR REBAR Ð 10 TON SUPPORT P3-CVL-DWG-SSFD-0037 REV 1 10 0.620 0.001 1 2 2 0.300 0.920 0.200 0.920 0.300 2.640 0.00 -
1.0837 P3 CO-1A P137 FOUNDATION FOOT FDN FDN ( 1750L x 950W x 107 PLAIN CONCRETE LEVELING CONCRETE T= 50 M³ EL -0.850 EL -0.800 P3-CVL-DWG-SSFD-0037 REV 1 SOIL DISPOSAL 1 1 1.750 0.200 1.950 0.950 0.200 1.150 0.850 -0.800 0.050 0.11 -
1.0838 P3 P137 FOUNDATION FOOT FDN FDN ( 1750L x 950W x 107 EARTH WORK COMPACTIED SOIL 95% MAX DRY M² P3-CVL-DWG-SSFD-0037 REV 1 1 1 1.750 0.600 2.350 0.950 0.600 1.550 3.64 -
1.0839 P3 EA-1B P137 FOUNDATION FOOT FDN FDN ( 1750L x 950W x 107 EARTH WORK EXCAVATION BY EQUIPMENT (D>3 M³ EL -0.850 EL -0.300 P3-CVL-DWG-SSFD-0037 REV 1 SOIL EXCAVATION 1 0 0 1.750 0.600 2.350 0.950 0.600 1.550 0.850 -0.300 - 0.550 - -
1.0840 P3 EA-1A P137 FOUNDATION FOOT FDN FDN ( 1750L x 950W x 107 EARTH WORK EXCAVATION BY EQUIPMENT (D<=M³ EL -0.850 EL -0.300 P3-CVL-DWG-SSFD-0037 REV 1 SOIL EXCAVATION 1 1 1.750 0.600 2.350 0.950 0.600 1.550 0.850 -0.300 - 0.550 2.00 -
1.0841 P3 EA-3B P137 FOUNDATION FOOT FDN FDN ( 1750L x 950W x 107 EARTH WORK SOIL DISPOSAL M³ DISPO: CONCRETE EL -0.800 EL -0.300 P3-CVL-DWG-SSFD-0037 REV 1 1 1 1.750 1.750 0.950 0.950 0.800 -0.300 0.500 0.83 -
1.0842 P3 EA-3B P137 FOUNDATION FOOT FDN FDN ( 1750L x 950W x 107 EARTH WORK SOIL DISPOSAL M³ DISPO: LC + SB P3-CVL-DWG-SSFD-0037 REV 1 1 1 0.112 0.112 0.11 -
1.0843 P3 EA-2A P137 FOUNDATION FOOT FDN FDN ( 1750L x 950W x 107 EARTH WORK SOIL BACKFILL M³ P3-CVL-DWG-SSFD-0037 REV 1 1 1 2.003 -0.943 1.060 1.06 -
1.0844 P3 AN-1A P137 FOUNDATION FOOT FDN FDN ( 1750L x 950W x 107 OTHERS ANCHOR BOX (100 x 100 x 160 D EA P3-CVL-DWG-SSFD-0037 REV 1 1 4 4 4.00 -
1.0845 P3 CO-2A P137 FOUNDATION FOOT FDN FDN ( 1750L x 950W x 107 CONCRETE CONCRETE M³ EL -0.800 EL +0.275 P3-CVL-DWG-SSFD-0038 REV 1 1 1 1.750 1.750 0.950 0.950 1.075 1.075 1.79 -
1.0846 P3 FM-1A P137 FOUNDATION FOOT FDN FDN ( 1750L x 950W x 107 FORM WORK FORM WORK M² EL -0.800 EL +0.275 P3-CVL-DWG-SSFD-0038 REV 1 1 1 1.750 0.950 1.750 0.950 5.400 0.800 0.275 1.075 5.81 -
1.0847 P3 RE-1A P137 FOUNDATION FOOT FDN FDN ( 1750L x 950W x 107 REBAR REBAR Ð 10 TON LONG, TOP P3-CVL-DWG-SSFD-0038 REV 1 10 0.225 0.620 0.001 1 5 5 1.650 0.653 0.653 2.956 0.01 -
1.0848 P3 RE-1A P137 FOUNDATION FOOT FDN FDN ( 1750L x 950W x 107 REBAR REBAR Ð 10 TON LONG, BOTT P3-CVL-DWG-SSFD-0038 REV 1 10 0.225 0.620 0.001 1 5 5 1.650 0.653 0.653 2.956 0.01 -
1.0849 P3 RE-1A P137 FOUNDATION FOOT FDN FDN ( 1750L x 950W x 107 REBAR REBAR Ð 10 TON TRANS, TOP P3-CVL-DWG-SSFD-0038 REV 1 10 0.225 0.620 0.001 1 8 8 0.850 0.653 0.653 2.156 0.01 -
1.0850 P3 RE-1A P137 FOUNDATION FOOT FDN FDN ( 1750L x 950W x 107 REBAR REBAR Ð 10 TON TRANS, BOTT P3-CVL-DWG-SSFD-0038 REV 1 10 0.225 0.620 0.001 1 8 8 0.850 0.653 0.653 2.156 0.01 -
1.0851 P3 RE-1A P137 FOUNDATION FOOT FDN FDN ( 1750L x 950W x 107 REBAR REBAR Ð 10 TON TIES P3-CVL-DWG-SSFD-0038 REV 1 10 0.620 0.001 1 5 5 0.060 1.690 0.890 1.690 0.890 0.060 5.280 0.02 -
1.0852 P3 RE-1A P137 FOUNDATION FOOT FDN FDN ( 1750L x 950W x 107 REBAR REBAR Ð 10 TON SUPPORT P3-CVL-DWG-SSFD-0038 REV 1 10 0.620 0.001 1 2 2 0.300 0.920 0.200 0.920 0.300 2.640 0.00 -
1.0853 P3 CO-1A P137 FOUNDATION FOOT FDN FDN ( 1750L x 950W x 107 PLAIN CONCRETE LEVELING CONCRETE T= 50 M³ EL -0.850 EL -0.800 P3-CVL-DWG-SSFD-0038 REV 1 SOIL DISPOSAL 1 1 1.750 0.200 1.950 0.950 0.200 1.150 0.850 -0.800 0.050 0.11 -
1.0854 P3 P137 FOUNDATION FOOT FDN FDN ( 1750L x 950W x 107 EARTH WORK COMPACTIED SOIL 95% MAX DRY M² P3-CVL-DWG-SSFD-0038 REV 1 1 1 1.750 0.600 2.350 0.950 0.600 1.550 3.64 -
1.0855 P3 EA-1B P137 FOUNDATION FOOT FDN FDN ( 1750L x 950W x 107 EARTH WORK EXCAVATION BY EQUIPMENT (D>3 M³ EL -0.850 EL -0.300 P3-CVL-DWG-SSFD-0038 REV 1 SOIL EXCAVATION 1 0 0 1.750 0.600 2.350 0.950 0.600 1.550 0.850 -0.300 - 0.550 - -
1.0856 P3 EA-1A P137 FOUNDATION FOOT FDN FDN ( 1750L x 950W x 107 EARTH WORK EXCAVATION BY EQUIPMENT (D<=M³ EL -0.850 EL -0.300 P3-CVL-DWG-SSFD-0038 REV 1 SOIL EXCAVATION 1 1 1.750 0.600 2.350 0.950 0.600 1.550 0.850 -0.300 - 0.550 2.00 -
1.0857 P3 EA-3B P137 FOUNDATION FOOT FDN FDN ( 1750L x 950W x 107 EARTH WORK SOIL DISPOSAL M³ DISPO: CONCRETE EL -0.800 EL -0.300 P3-CVL-DWG-SSFD-0038 REV 1 1 1 1.750 1.750 0.950 0.950 0.800 -0.300 0.500 0.83 -
1.0858 P3 EA-3B P137 FOUNDATION FOOT FDN FDN ( 1750L x 950W x 107 EARTH WORK SOIL DISPOSAL M³ DISPO: LC + SB P3-CVL-DWG-SSFD-0038 REV 1 1 1 0.112 0.112 0.11 -
1.0859 P3 EA-2A P137 FOUNDATION FOOT FDN FDN ( 1750L x 950W x 107 EARTH WORK SOIL BACKFILL M³ P3-CVL-DWG-SSFD-0038 REV 1 1 1 2.003 -0.943 1.060 1.06 -
1.0860 P3 AN-1A P137 FOUNDATION FOOT FDN FDN ( 1750L x 950W x 107 OTHERS ANCHOR BOX (100 x 100 x 160 D EA P3-CVL-DWG-SSFD-0038 REV 1 1 4 4 4.00 -
1.0861 0 - -
1.0862 0 - -
1.0863 0 - -
1.0864 0 - -
1.0865 0 - -
1.0866 0 - -
1.0867 0 - -
1.0868 0 - -
1.0869 0 - -
1.0870 0 - -
1.0871 0 - -
1.0872 0 - -
1.0873 0 - -
1.0874 0 - -
1.0875 0 - -
1.0876 0 - -
1.0877 0 - -
1.0878 0 - -
1.0879 0 - -
1.0880 0 - -
1.0881 0 - -
1.0882 0 - -
1.0883 0 - -
1.0884 0 - -
1.0885 0 - -
1.0886 0 - -
1.0887 0 - -
1.0888 0 - -
1.0889 0 - -
1.0890 0 - -
1.0891 0 - -
1.0892 0 - -
1.0893 0 - -
1.0894 0 - -
1.0895 0 - -
1.0896 0 - -
1.0897 0 - -
1.0898 0 - -
1.0899 0 - -
1.0900 0 - -
1.0901 0 - -
1.0902 0 - -
1.0903 0 - -
1.0904 0 - -
1.0905 0 - -
1.0906 0 - -
1.0907 0 - -
1.0908 0 - -
1.0909 0 - -
1.0910 0 - -
1.0911 0 - -
1.0912 0 - -
1.0913 0 - -
1.0914 0 - -
1.0915 0 - -
1.0916 0 - -
1.0917 0 - -
1.0918 0 - -
1.0919 0 - -
1.0920 0 - -
1.0921 0 - -
1.0922 #NAME? #NAME? 0 - -
1.0923 #NAME? #NAME? 0 - -
1.0924 #NAME? #NAME? 0 - -
1.0925 #NAME? #NAME? 0 - -
1.0926 #NAME? #NAME? 0 - -
1.0927 #NAME? #NAME? 0 - -
1.0928 #NAME? #NAME? 0 - -
1.0929 #NAME? #NAME? 0 - -
1.0930 #NAME? #NAME? 0 - -
1.0931 #NAME? #NAME? 0 - -
1.0932 #NAME? #NAME? 0 - -
1.0933 #NAME? #NAME? 0 - -
1.0934 #NAME? #NAME? 0 - -
1.0935 #NAME? #NAME? 0 - -
1.0936 #NAME? #NAME? 0 - -
1.0937 #NAME? #NAME? 0 - -
1.0938 #NAME? #NAME? 0 - -
1.0939 #NAME? #NAME? 0 - -
1.0940 #NAME? #NAME? 0 - -
1.0941 #NAME? #NAME? 0 - -
1.0942 #NAME? #NAME? 0 - -
1.0943 #NAME? #NAME? 0 - -
1.0944 #NAME? #NAME? 0 - -
1.0945 #NAME? #NAME? 0 - -
1.0946 #NAME? #NAME? 0 - -
1.0947 #NAME? #NAME? 0 - -
1.0948 #NAME? #NAME? 0 - -
1.0949 #NAME? #NAME? 0 - -
1.0950 #NAME? #NAME? 0 - -
1.0951 #NAME? #NAME? 0 - -
1.0952 #NAME? #NAME? 0 - -
1.0953 #NAME? #NAME? 0 - -
1.0954 #NAME? #NAME? 0 - -
1.0955 #NAME? #NAME? 0 - -

file:///conversion/tmp/scratch/454095803.xlsxPrinted: 01/03/2020 - 21:53:28 <EA>


1.0956 #NAME? #NAME? 0 - -
1.0957 #NAME? #NAME? 0 - -
1.0958 #NAME? #NAME? 0 - -
1.0959 #NAME? #NAME? 0 - -
1.0960 #NAME? #NAME? 0 - -
1.0961 #NAME? #NAME? 0 - -
1.0962 #NAME? #NAME? 0 - -
1.0963 #NAME? #NAME? 0 - -
1.0964 #NAME? #NAME? 0 - -
1.0965 #NAME? #NAME? 0 - -
1.0966 #NAME? #NAME? 0 - -
1.0967 #NAME? #NAME? 0 - -
1.0968 #NAME? #NAME? 0 - -
1.0969 #NAME? #NAME? 0 - -
1.0970 #NAME? #NAME? 0 - -
1.0971 #NAME? #NAME? 0 - -
1.0972 #NAME? #NAME? 0 - -
1.0973 #NAME? #NAME? 0 - -
1.0974 #NAME? #NAME? 0 - -
1.0975 #NAME? #NAME? 0 - -
1.0976 #NAME? #NAME? 0 - -
1.0977 #NAME? #NAME? 0 - -
1.0978 #NAME? #NAME? 0 - -
1.0979 #NAME? #NAME? 0 - -
1.0980 #NAME? #NAME? 0 - -
1.0981 #NAME? #NAME? 0 - -
1.0982 #NAME? #NAME? 0 - -
1.0983 #NAME? #NAME? 0 - -
1.0984 #NAME? #NAME? 0 - -
1.0985 #NAME? #NAME? 0 - -
1.0986 #NAME? #NAME? 0 - -
1.0987 #NAME? #NAME? 0 - -
1.0988 #NAME? #NAME? 0 - -
1.0989 #NAME? #NAME? 0 - -
1.0990 #NAME? #NAME? 0 - -
1.0991 #NAME? #NAME? 0 - -
1.0992 #NAME? #NAME? 0 - -
1.0993 #NAME? #NAME? 0 - -
1.0994 #NAME? #NAME? 0 - -
1.0995 #NAME? #NAME? 0 - -
1.0996 #NAME? #NAME? 0 - -
1.0997 #NAME? #NAME? 0 - -
1.0998 #NAME? #NAME? 0 - -
1.0999 #NAME? #NAME? 0 - -
1.1000 #NAME? #NAME? 0 - -
1.1001 #NAME? #NAME? 0 - -
1.1002 #NAME? #NAME? 0 - -
1.1003 #NAME? #NAME? 0 - -
1.1004 #NAME? #NAME? 0 - -
1.1005 #NAME? #NAME? 0 - -
1.1006 #NAME? #NAME? 0 - -
1.1007 #NAME? #NAME? 0 - -
1.1008 #NAME? #NAME? 0 - -
1.1009 #NAME? #NAME? 0 - -
1.1010 #NAME? #NAME? 0 - -
1.1011 #NAME? #NAME? 0 - -
1.1012 #NAME? #NAME? 0 - -
1.1013 #NAME? #NAME? 0 - -
1.1014 #NAME? #NAME? 0 - -
1.1015 #NAME? #NAME? 0 - -
1.1016 #NAME? #NAME? 0 - -
1.1017 #NAME? #NAME? 0 - -
1.1018 #NAME? #NAME? 0 - -
1.1019 #NAME? #NAME? 0 - -
1.1020 #NAME? #NAME? 0 - -
1.1021 #NAME? #NAME? 0 - -
1.1022 #NAME? #NAME? 0 - -
1.1023 #NAME? #NAME? 0 - -
1.1024 #NAME? #NAME? 0 - -
1.1025 #NAME? #NAME? 0 - -
1.1026 #NAME? #NAME? 0 - -
1.1027 #NAME? #NAME? 0 - -
1.1028 #NAME? #NAME? 0 - -
1.1029 #NAME? #NAME? 0 - -
1.1030 #NAME? #NAME? 0 - -
1.1031 #NAME? #NAME? 0 - -
1.1032 #NAME? #NAME? 0 - -
1.1033 #NAME? #NAME? 0 - -
1.1034 #NAME? #NAME? 0 - -
1.1035 #NAME? #NAME? 0 - -
1.1036 #NAME? #NAME? 0 - -
1.1037 #NAME? #NAME? 0 - -
1.1038 #NAME? #NAME? 0 - -
1.1039 #NAME? #NAME? 0 - -
1.1040 #NAME? #NAME? 0 - -
1.1041 #NAME? #NAME? 0 - -
1.1042 #NAME? #NAME? 0 - -
1.1043 #NAME? #NAME? 0 - -
1.1044 #NAME? #NAME? 0 - -
1.1045 #NAME? #NAME? 0 - -
1.1046 #NAME? #NAME? 0 - -
1.1047 #NAME? #NAME? 0 - -
1.1048 #NAME? #NAME? 0 - -
1.1049 #NAME? #NAME? 0 - -
1.1050 #NAME? #NAME? 0 - -
1.1051 #NAME? #NAME? 0 - -
1.1052 #NAME? #NAME? 0 - -
1.1053 #NAME? #NAME? 0 - -
1.1054 #NAME? #NAME? 0 - -
1.1055 #NAME? #NAME? 0 - -
1.1056 #NAME? #NAME? 0 - -
1.1057 #NAME? #NAME? 0 - -
1.1058 #NAME? #NAME? 0 - -
1.1059 #NAME? #NAME? 0 - -
1.1060 #NAME? #NAME? 0 - -
1.1061 #NAME? #NAME? 0 - -
1.1062 #NAME? #NAME? 0 - -
1.1063 #NAME? #NAME? 0 - -
1.1064 #NAME? #NAME? 0 - -
1.1065 #NAME? #NAME? 0 - -
1.1066 #NAME? #NAME? 0 - -
1.1067 #NAME? #NAME? 0 - -
1.1068 #NAME? #NAME? 0 - -
1.1069 #NAME? #NAME? 0 - -
1.1070 #NAME? #NAME? 0 - -
1.1071 #NAME? #NAME? 0 - -
1.1072 #NAME? #NAME? 0 - -
1.1073 #NAME? #NAME? 0 - -
1.1074 #NAME? #NAME? 0 - -
1.1075 #NAME? #NAME? 0 - -
1.1076 #NAME? #NAME? 0 - -
1.1077 #NAME? #NAME? 0 - -
1.1078 #NAME? #NAME? 0 - -
1.1079 #NAME? #NAME? 0 - -
1.1080 #NAME? #NAME? 0 - -
1.1081 #NAME? #NAME? 0 - -
1.1082 #NAME? #NAME? 0 - -
1.1083 #NAME? #NAME? 0 - -
1.1084 #NAME? #NAME? 0 - -
1.1085 #NAME? #NAME? 0 - -
1.1086 #NAME? #NAME? 0 - -
1.1087 #NAME? #NAME? 0 - -
1.1088 #NAME? #NAME? 0 - -
1.1089 #NAME? #NAME? 0 - -
1.1090 #NAME? #NAME? 0 - -
1.1091 #NAME? #NAME? 0 - -
1.1092 #NAME? #NAME? 0 - -
1.1093 #NAME? #NAME? 0 - -
1.1094 #NAME? #NAME? 0 - -
1.1095 #NAME? #NAME? 0 - -
1.1096 #NAME? #NAME? 0 - -
1.1097 #NAME? #NAME? 0 - -
1.1098 #NAME? #NAME? 0 - -
1.1099 #NAME? #NAME? 0 - -
1.1100 #NAME? #NAME? 0 - -
1.1101 #NAME? #NAME? 0 - -
1.1102 #NAME? #NAME? 0 - -
1.1103 #NAME? #NAME? 0 - -
1.1104 #NAME? #NAME? 0 - -
1.1105 #NAME? #NAME? 0 - -
1.1106 #NAME? #NAME? 0 - -
1.1107 #NAME? #NAME? 0 - -
1.1108 #NAME? #NAME? 0 - -
1.1109 #NAME? #NAME? 0 - -
1.1110 #NAME? #NAME? 0 - -
1.1111 #NAME? #NAME? 0 - -
1.1112 #NAME? #NAME? 0 - -
1.1113 #NAME? #NAME? 0 - -
1.1114 #NAME? #NAME? 0 - -
1.1115 #NAME? #NAME? 0 - -
1.1116 #NAME? #NAME? 0 - -
1.1117 #NAME? #NAME? 0 - -
1.1118 #NAME? #NAME? 0 - -
1.1119 #NAME? #NAME? 0 - -
1.1120 #NAME? #NAME? 0 - -
1.1121 #NAME? #NAME? 0 - -
1.1122 #NAME? #NAME? 0 - -
1.1123 #NAME? #NAME? 0 - -
1.1124 #NAME? #NAME? 0 - -
1.1125 #NAME? #NAME? 0 - -
1.1126 #NAME? #NAME? 0 - -
1.1127 #NAME? #NAME? 0 - -
1.1128 #NAME? #NAME? 0 - -
1.1129 #NAME? #NAME? 0 - -
1.1130 #NAME? #NAME? 0 - -
1.1131 #NAME? #NAME? 0 - -
1.1132 #NAME? #NAME? 0 - -
1.1133 #NAME? #NAME? 0 - -
1.1134 #NAME? #NAME? 0 - -
1.1135 #NAME? #NAME? 0 - -
1.1136 #NAME? #NAME? 0 - -
1.1137 #NAME? #NAME? 0 - -
1.1138 #NAME? #NAME? 0 - -
1.1139 #NAME? #NAME? 0 - -
1.1140 #NAME? #NAME? 0 - -
1.1141 #NAME? #NAME? 0 - -
1.1142 #NAME? #NAME? 0 - -
1.1143 #NAME? #NAME? 0 - -
1.1144 #NAME? #NAME? 0 - -
1.1145 #NAME? #NAME? 0 - -
1.1146 #NAME? #NAME? 0 - -
1.1147 #NAME? #NAME? 0 - -
1.1148 #NAME? #NAME? 0 - -
1.1149 #NAME? #NAME? 0 - -
1.1150 #NAME? #NAME? 0 - -
1.1151 #NAME? #NAME? 0 - -
1.1152 #NAME? #NAME? 0 - -
1.1153 #NAME? #NAME? 0 - -
1.1154 #NAME? #NAME? 0 - -
1.1155 #NAME? #NAME? 0 - -
1.1156 #NAME? #NAME? 0 - -
1.1157 #NAME? #NAME? 0 - -
1.1158 #NAME? #NAME? 0 - -
1.1159 #NAME? #NAME? 0 - -

file:///conversion/tmp/scratch/454095803.xlsxPrinted: 01/03/2020 - 21:53:29 <EA>


1.1160 #NAME? #NAME? 0 - -
1.1161 #NAME? #NAME? 0 - -
1.1162 #NAME? #NAME? 0 - -
1.1163 #NAME? #NAME? 0 - -
1.1164 #NAME? #NAME? 0 - -
1.1165 #NAME? #NAME? 0 - -
1.1166 #NAME? #NAME? 0 - -
1.1167 #NAME? #NAME? 0 - -
1.1168 #NAME? #NAME? 0 - -
1.1169 #NAME? #NAME? 0 - -
1.1170 #NAME? #NAME? 0 - -
1.1171 #NAME? #NAME? 0 - -
1.1172 #NAME? #NAME? 0 - -
1.1173 #NAME? #NAME? 0 - -
1.1174 #NAME? #NAME? 0 - -
1.1175 #NAME? #NAME? 0 - -
1.1176 #NAME? #NAME? 0 - -
1.1177 #NAME? #NAME? 0 - -
1.1178 #NAME? #NAME? 0 - -
1.1179 #NAME? #NAME? 0 - -
1.1180 #NAME? #NAME? 0 - -
1.1181 #NAME? #NAME? 0 - -
1.1182 #NAME? #NAME? 0 - -
1.1183 #NAME? #NAME? 0 - -
1.1184 #NAME? #NAME? 0 - -
1.1185 #NAME? #NAME? 0 - -
1.1186 #NAME? #NAME? 0 - -
1.1187 #NAME? #NAME? 0 - -
1.1188 #NAME? #NAME? 0 - -
1.1189 #NAME? #NAME? 0 - -
1.1190 #NAME? #NAME? 0 - -
1.1191 #NAME? #NAME? 0 - -
1.1192 #NAME? #NAME? 0 - -
1.1193 #NAME? #NAME? 0 - -
1.1194 #NAME? #NAME? 0 - -
1.1195 #NAME? #NAME? 0 - -
1.1196 #NAME? #NAME? 0 - -
1.1197 #NAME? #NAME? 0 - -
1.1198 #NAME? #NAME? 0 - -
1.1199 #NAME? #NAME? 0 - -
1.1200 #NAME? #NAME? 0 - -
1.1201 #NAME? #NAME? 0 - -
1.1202 #NAME? #NAME? 0 - -
1.1203 #NAME? #NAME? 0 - -
1.1204 #NAME? #NAME? 0 - -
1.1205 #NAME? #NAME? 0 - -
1.1206 #NAME? #NAME? 0 - -
1.1207 #NAME? #NAME? 0 - -
1.1208 #NAME? #NAME? 0 - -
1.1209 #NAME? #NAME? 0 - -
1.1210 #NAME? #NAME? 0 - -
1.1211 #NAME? #NAME? 0 - -
1.1212 #NAME? #NAME? 0 - -
1.1213 #NAME? #NAME? 0 - -
1.1214 #NAME? #NAME? 0 - -
1.1215 #NAME? #NAME? 0 - -
1.1216 #NAME? #NAME? 0 - -
1.1217 #NAME? #NAME? 0 - -
1.1218 #NAME? #NAME? 0 - -
1.1219 #NAME? #NAME? 0 - -
1.1220 #NAME? #NAME? 0 - -
1.1221 #NAME? #NAME? 0 - -
1.1222 #NAME? #NAME? 0 - -
1.1223 #NAME? #NAME? 0 - -
1.1224 #NAME? #NAME? 0 - -
1.1225 #NAME? #NAME? 0 - -
1.1226 #NAME? #NAME? 0 - -
1.1227 #NAME? #NAME? 0 - -
1.1228 #NAME? #NAME? 0 - -
1.1229 #NAME? #NAME? 0 - -
1.1230 #NAME? #NAME? 0 - -
1.1231 #NAME? #NAME? 0 - -
1.1232 #NAME? #NAME? 0 - -
1.1233 #NAME? #NAME? 0 - -
1.1234 #NAME? #NAME? 0 - -
1.1235 #NAME? #NAME? 0 - -
1.1236 #NAME? #NAME? 0 - -
1.1237 #NAME? #NAME? 0 - -
1.1238 #NAME? #NAME? 0 - -
1.1239 #NAME? #NAME? 0 - -
1.1240 #NAME? #NAME? 0 - -
1.1241 #NAME? #NAME? 0 - -
1.1242 #NAME? #NAME? 0 - -
1.1243 #NAME? #NAME? 0 - -
1.1244 #NAME? #NAME? 0 - -
1.1245 #NAME? #NAME? 0 - -
1.1246 #NAME? #NAME? 0 - -
1.1247 #NAME? #NAME? 0 - -
1.1248 #NAME? #NAME? 0 - -
1.1249 #NAME? #NAME? 0 - -
1.1250 #NAME? #NAME? 0 - -
1.1251 #NAME? #NAME? 0 - -
1.1252 #NAME? #NAME? 0 - -
1.1253 #NAME? #NAME? 0 - -
1.1254 #NAME? #NAME? 0 - -
1.1255 #NAME? #NAME? 0 - -
1.1256 #NAME? #NAME? 0 - -
1.1257 #NAME? #NAME? 0 - -
1.1258 #NAME? #NAME? 0 - -
1.1259 #NAME? #NAME? 0 - -
1.1260 #NAME? #NAME? 0 - -
1.1261 #NAME? #NAME? 0 - -
1.1262 #NAME? #NAME? 0 - -
1.1263 #NAME? #NAME? 0 - -
1.1264 #NAME? #NAME? 0 - -
1.1265 #NAME? #NAME? 0 - -
1.1266 #NAME? #NAME? 0 - -
1.1267 #NAME? #NAME? 0 - -
1.1268 #NAME? #NAME? 0 - -
1.1269 #NAME? #NAME? 0 - -
1.1270 #NAME? #NAME? 0 - -
1.1271 #NAME? #NAME? 0 - -
1.1272 #NAME? #NAME? 0 - -
1.1273 #NAME? #NAME? 0 - -
1.1274 #NAME? #NAME? 0 - -
1.1275 #NAME? #NAME? 0 - -
1.1276 #NAME? #NAME? 0 - -
1.1277 #NAME? #NAME? 0 - -
1.1278 #NAME? #NAME? 0 - -
1.1279 #NAME? #NAME? 0 - -
1.1280 #NAME? #NAME? 0 - -
1.1281 #NAME? #NAME? 0 - -
1.1282 #NAME? #NAME? 0 - -
1.1283 #NAME? #NAME? 0 - -
1.1284 #NAME? #NAME? 0 - -
1.1285 #NAME? #NAME? 0 - -
1.1286 #NAME? #NAME? 0 - -
1.1287 #NAME? #NAME? 0 - -
1.1288 #NAME? #NAME? 0 - -
1.1289 #NAME? #NAME? 0 - -
1.1290 #NAME? #NAME? 0 - -
1.1291 #NAME? #NAME? 0 - -
1.1292 #NAME? #NAME? 0 - -
1.1293 #NAME? #NAME? 0 - -
1.1294 #NAME? #NAME? 0 - -
1.1295 #NAME? #NAME? 0 - -
1.1296 #NAME? #NAME? 0 - -
1.1297 #NAME? #NAME? 0 - -
1.1298 #NAME? #NAME? 0 - -
1.1299 #NAME? #NAME? 0 - -
1.1300 #NAME? #NAME? 0 - -
1.1301 #NAME? #NAME? 0 - -
1.1302 #NAME? #NAME? 0 - -
1.1303 #NAME? #NAME? 0 - -
1.1304 #NAME? #NAME? 0 - -
1.1305 #NAME? #NAME? 0 - -
1.1306 #NAME? #NAME? 0 - -
1.1307 #NAME? #NAME? 0 - -
1.1308 #NAME? #NAME? 0 - -
1.1309 #NAME? #NAME? 0 - -
1.1310 #NAME? #NAME? 0 - -
1.1311 #NAME? #NAME? 0 - -
1.1312 #NAME? #NAME? 0 - -
1.1313 #NAME? #NAME? 0 - -
1.1314 #NAME? #NAME? 0 - -
1.1315 #NAME? #NAME? 0 - -
1.1316 #NAME? #NAME? 0 - -
1.1317 #NAME? #NAME? 0 - -
1.1318 #NAME? #NAME? 0 - -
1.1319 #NAME? #NAME? 0 - -
1.1320 #NAME? #NAME? 0 - -
1.1321 #NAME? #NAME? 0 - -
1.1322 #NAME? #NAME? 0 - -
1.1323 #NAME? #NAME? 0 - -
1.1324 #NAME? #NAME? 0 - -
1.1325 #NAME? #NAME? 0 - -
1.1326 #NAME? #NAME? 0 - -
1.1327 #NAME? #NAME? 0 - -
1.1328 #NAME? #NAME? 0 - -
1.1329 #NAME? #NAME? 0 - -
1.1330 #NAME? #NAME? 0 - -
1.1331 #NAME? #NAME? 0 - -
1.1332 #NAME? #NAME? 0 - -
1.1333 #NAME? #NAME? 0 - -
1.1334 #NAME? #NAME? 0 - -
1.1335 #NAME? #NAME? 0 - -
1.1336 #NAME? #NAME? 0 - -
1.1337 #NAME? #NAME? 0 - -
1.1338 #NAME? #NAME? 0 - -
1.1339 #NAME? #NAME? 0 - -
1.1340 #NAME? #NAME? 0 - -
1.1341 #NAME? #NAME? 0 - -
1.1342 #NAME? #NAME? 0 - -
1.1343 #NAME? #NAME? 0 - -
1.1344 #NAME? #NAME? 0 - -
1.1345 #NAME? #NAME? 0 - -
1.1346 #NAME? #NAME? 0 - -
1.1347 #NAME? #NAME? 0 - -
1.1348 #NAME? #NAME? 0 - -
1.1349 #NAME? #NAME? 0 - -
1.1350 #NAME? #NAME? 0 - -
1.1351 #NAME? #NAME? 0 - -
1.1352 #NAME? #NAME? 0 - -
1.1353 #NAME? #NAME? 0 - -
1.1354 #NAME? #NAME? 0 - -
1.1355 #NAME? #NAME? 0 - -
1.1356 #NAME? #NAME? 0 - -
1.1357 #NAME? #NAME? 0 - -
1.1358 #NAME? #NAME? 0 - -
1.1359 #NAME? #NAME? 0 - -
1.1360 #NAME? #NAME? 0 - -
1.1361 #NAME? #NAME? 0 - -
1.1362 #NAME? #NAME? 0 - -
1.1363 #NAME? #NAME? 0 - -

file:///conversion/tmp/scratch/454095803.xlsxPrinted: 01/03/2020 - 21:53:29 <EA>


1.1364 #NAME? #NAME? 0 - -
1.1365 #NAME? #NAME? 0 - -
1.1366 #NAME? #NAME? 0 - -
1.1367 #NAME? #NAME? 0 - -
1.1368 #NAME? #NAME? 0 - -
1.1369 #NAME? #NAME? 0 - -
1.1370 #NAME? #NAME? 0 - -
1.1371 #NAME? #NAME? 0 - -
1.1372 #NAME? #NAME? 0 - -
1.1373 #NAME? #NAME? 0 - -
1.1374 #NAME? #NAME? 0 - -
1.1375 #NAME? #NAME? 0 - -
1.1376 #NAME? #NAME? 0 - -
1.1377 #NAME? #NAME? 0 - -
1.1378 #NAME? #NAME? 0 - -
1.1379 #NAME? #NAME? 0 - -
1.1380 #NAME? #NAME? 0 - -
1.1381 #NAME? #NAME? 0 - -
1.1382 #NAME? #NAME? 0 - -
1.1383 #NAME? #NAME? 0 - -
1.1384 #NAME? #NAME? 0 - -
1.1385 #NAME? #NAME? 0 - -
1.1386 #NAME? #NAME? 0 - -
1.1387 #NAME? #NAME? 0 - -
1.1388 #NAME? #NAME? 0 - -
1.1389 #NAME? #NAME? 0 - -
1.1390 #NAME? #NAME? 0 - -
1.1391 #NAME? #NAME? 0 - -
1.1392 #NAME? #NAME? 0 - -
1.1393 #NAME? #NAME? 0 - -
1.1394 #NAME? #NAME? 0 - -
1.1395 #NAME? #NAME? 0 - -
1.1396 #NAME? #NAME? 0 - -
1.1397 #NAME? #NAME? 0 - -
1.1398 #NAME? #NAME? 0 - -
1.1399 #NAME? #NAME? 0 - -
1.1400 #NAME? #NAME? 0 - -
1.1401 #NAME? #NAME? 0 - -
1.1402 #NAME? #NAME? 0 - -
1.1403 #NAME? #NAME? 0 - -
1.1404 #NAME? #NAME? 0 - -
1.1405 #NAME? #NAME? 0 - -
1.1406 #NAME? #NAME? 0 - -
1.1407 #NAME? #NAME? 0 - -
1.1408 #NAME? #NAME? 0 - -
1.1409 #NAME? #NAME? 0 - -
1.1410 #NAME? #NAME? 0 - -
1.1411 #NAME? #NAME? 0 - -
1.1412 #NAME? #NAME? 0 - -
1.1413 #NAME? #NAME? 0 - -
1.1414 #NAME? #NAME? 0 - -
1.1415 #NAME? #NAME? 0 - -
1.1416 #NAME? #NAME? 0 - -
1.1417 #NAME? #NAME? 0 - -
1.1418 #NAME? #NAME? 0 - -
1.1419 #NAME? #NAME? 0 - -
1.1420 #NAME? #NAME? 0 - -
1.1421 #NAME? #NAME? 0 - -
1.1422 #NAME? #NAME? 0 - -
1.1423 #NAME? #NAME? 0 - -
1.1424 #NAME? #NAME? 0 - -
1.1425 #NAME? #NAME? 0 - -
1.1426 #NAME? #NAME? 0 - -
1.1427 #NAME? #NAME? 0 - -
1.1428 #NAME? #NAME? 0 - -
1.1429 #NAME? #NAME? 0 - -
1.1430 #NAME? #NAME? 0 - -
1.1431 #NAME? #NAME? 0 - -
1.1432 #NAME? #NAME? 0 - -
1.1433 #NAME? #NAME? 0 - -
1.1434 #NAME? #NAME? 0 - -
1.1435 #NAME? #NAME? 0 - -
1.1436 #NAME? #NAME? 0 - -
1.1437 #NAME? #NAME? 0 - -
1.1438 #NAME? #NAME? 0 - -
1.1439 #NAME? #NAME? 0 - -
1.1440 #NAME? #NAME? 0 - -
1.1441 #NAME? #NAME? 0 - -
1.1442 #NAME? #NAME? 0 - -
1.1443 #NAME? #NAME? 0 - -
1.1444 #NAME? #NAME? 0 - -
1.1445 #NAME? #NAME? 0 - -
1.1446 #NAME? #NAME? 0 - -
1.1447 #NAME? #NAME? 0 - -
1.1448 #NAME? #NAME? 0 - -
1.1449 #NAME? #NAME? 0 - -
1.1450 #NAME? #NAME? 0 - -
1.1451 #NAME? #NAME? 0 - -
1.1452 #NAME? #NAME? 0 - -
1.1453 #NAME? #NAME? 0 - -
1.1454 #NAME? #NAME? 0 - -
1.1455 #NAME? #NAME? 0 - -
1.1456 #NAME? #NAME? 0 - -
1.1457 #NAME? #NAME? 0 - -
1.1458 #NAME? #NAME? 0 - -
1.1459 #NAME? #NAME? 0 - -
1.1460 #NAME? #NAME? 0 - -
1.1461 #NAME? #NAME? 0 - -
1.1462 #NAME? #NAME? 0 - -
1.1463 #NAME? #NAME? 0 - -
1.1464 #NAME? #NAME? 0 - -
1.1465 #NAME? #NAME? 0 - -
1.1466 #NAME? #NAME? 0 - -
1.1467 #NAME? #NAME? 0 - -
1.1468 #NAME? #NAME? 0 - -
1.1469 #NAME? #NAME? 0 - -
1.1470 #NAME? #NAME? 0 - -
1.1471 #NAME? #NAME? 0 - -
1.1472 #NAME? #NAME? 0 - -
1.1473 #NAME? #NAME? 0 - -
1.1474 #NAME? #NAME? 0 - -
1.1475 #NAME? #NAME? 0 - -
1.1476 #NAME? #NAME? 0 - -
1.1477 #NAME? #NAME? 0 - -
1.1478 #NAME? #NAME? 0 - -
1.1479 #NAME? #NAME? 0 - -
1.1480 #NAME? #NAME? 0 - -
1.1481 #NAME? #NAME? 0 - -
1.1482 #NAME? #NAME? 0 - -
1.1483 #NAME? #NAME? 0 - -
1.1484 #NAME? #NAME? 0 - -
1.1485 #NAME? #NAME? 0 - -
1.1486 #NAME? #NAME? 0 - -
1.1487 #NAME? #NAME? 0 - -
1.1488 #NAME? #NAME? 0 - -
1.1489 #NAME? #NAME? 0 - -
1.1490 #NAME? #NAME? 0 - -
1.1491 #NAME? #NAME? 0 - -
1.1492 #NAME? #NAME? 0 - -
1.1493 #NAME? #NAME? 0 - -
1.1494 #NAME? #NAME? 0 - -
1.1495 #NAME? #NAME? 0 - -
1.1496 #NAME? #NAME? 0 - -
1.1497 #NAME? #NAME? 0 - -
1.1498 #NAME? #NAME? 0 - -
1.1499 #NAME? #NAME? 0 - -
1.1500 #NAME? #NAME? 0 - -
1.1501 #NAME? #NAME? 0 - -
1.1502 #NAME? #NAME? 0 - -
1.1503 #NAME? #NAME? 0 - -
1.1504 #NAME? #NAME? 0 - -
1.1505 #NAME? #NAME? 0 - -
1.1506 #NAME? #NAME? 0 - -
1.1507 #NAME? #NAME? 0 - -
1.1508 #NAME? #NAME? 0 - -
1.1509 #NAME? #NAME? 0 - -
1.1510 #NAME? #NAME? 0 - -
1.1511 #NAME? #NAME? 0 - -
1.1512 #NAME? #NAME? 0 - -
1.1513 #NAME? #NAME? 0 - -
1.1514 #NAME? #NAME? 0 - -
1.1515 #NAME? #NAME? 0 - -
1.1516 #NAME? #NAME? 0 - -
1.1517 #NAME? #NAME? 0 - -
1.1518 #NAME? #NAME? 0 - -
1.1519 #NAME? #NAME? 0 - -
1.1520 #NAME? #NAME? 0 - -
1.1521 #NAME? #NAME? 0 - -
1.1522 #NAME? #NAME? 0 - -
1.1523 #NAME? #NAME? 0 - -
1.1524 #NAME? #NAME? 0 - -
1.1525 #NAME? #NAME? 0 - -
1.1526 #NAME? #NAME? 0 - -
1.1527 #NAME? #NAME? 0 - -
1.1528 #NAME? #NAME? 0 - -
1.1529 #NAME? #NAME? 0 - -
1.1530 #NAME? #NAME? 0 - -
1.1531 #NAME? #NAME? 0 - -
1.1532 #NAME? #NAME? 0 - -
1.1533 #NAME? #NAME? 0 - -
1.1534 #NAME? #NAME? 0 - -
1.1535 #NAME? #NAME? 0 - -
1.1536 #NAME? #NAME? 0 - -
1.1537 #NAME? #NAME? 0 - -
1.1538 #NAME? #NAME? 0 - -
1.1539 #NAME? #NAME? 0 - -
1.1540 #NAME? #NAME? 0 - -
1.1541 #NAME? #NAME? 0 - -
1.1542 #NAME? #NAME? 0 - -
1.1543 #NAME? #NAME? 0 - -
1.1544 #NAME? #NAME? 0 - -
1.1545 #NAME? #NAME? 0 - -
1.1546 #NAME? #NAME? 0 - -
1.1547 #NAME? #NAME? 0 - -
1.1548 #NAME? #NAME? 0 - -
1.1549 #NAME? #NAME? 0 - -
1.1550 #NAME? #NAME? 0 - -
1.1551 #NAME? #NAME? 0 - -
1.1552 #NAME? #NAME? 0 - -
1.1553 #NAME? #NAME? 0 - -
1.1554 #NAME? #NAME? 0 - -
1.1555 #NAME? #NAME? 0 - -
1.1556 #NAME? #NAME? 0 - -
1.1557 #NAME? #NAME? 0 - -
1.1558 #NAME? #NAME? 0 - -
1.1559 #NAME? #NAME? 0 - -
1.1560 #NAME? #NAME? 0 - -
1.1561 #NAME? #NAME? 0 - -
1.1562 #NAME? #NAME? 0 - -
1.1563 #NAME? #NAME? 0 - -
1.1564 #NAME? #NAME? 0 - -
1.1565 #NAME? #NAME? 0 - -
1.1566 #NAME? #NAME? 0 - -
1.1567 #NAME? #NAME? 0 - -

file:///conversion/tmp/scratch/454095803.xlsxPrinted: 01/03/2020 - 21:53:29 <EA>


1.1568 #NAME? #NAME? 0 - -
1.1569 #NAME? #NAME? 0 - -
1.1570 #NAME? #NAME? 0 - -
1.1571 #NAME? #NAME? 0 - -
1.1572 #NAME? #NAME? 0 - -
1.1573 #NAME? #NAME? 0 - -
1.1574 #NAME? #NAME? 0 - -
1.1575 #NAME? #NAME? 0 - -
1.1576 #NAME? #NAME? 0 - -
1.1577 #NAME? #NAME? 0 - -
1.1578 #NAME? #NAME? 0 - -
1.1579 #NAME? #NAME? 0 - -
1.1580 #NAME? #NAME? 0 - -
1.1581 #NAME? #NAME? 0 - -
1.1582 #NAME? #NAME? 0 - -
1.1583 #NAME? #NAME? 0 - -
1.1584 #NAME? #NAME? 0 - -
1.1585 #NAME? #NAME? 0 - -
1.1586 #NAME? #NAME? 0 - -
1.1587 #NAME? #NAME? 0 - -
1.1588 #NAME? #NAME? 0 - -
1.1589 #NAME? #NAME? 0 - -
1.1590 #NAME? #NAME? 0 - -
1.1591 #NAME? #NAME? 0 - -
1.1592 #NAME? #NAME? 0 - -
1.1593 #NAME? #NAME? 0 - -
1.1594 #NAME? #NAME? 0 - -
1.1595 #NAME? #NAME? 0 - -
1.1596 #NAME? #NAME? 0 - -
1.1597 #NAME? #NAME? 0 - -
1.1598 #NAME? #NAME? 0 - -
1.1599 #NAME? #NAME? 0 - -
1.1600 #NAME? #NAME? 0 - -
1.1601 #NAME? #NAME? 0 - -
1.1602 #NAME? #NAME? 0 - -
1.1603 #NAME? #NAME? 0 - -
1.1604 #NAME? #NAME? 0 - -
1.1605 #NAME? #NAME? 0 - -
1.1606 #NAME? #NAME? 0 - -
1.1607 #NAME? #NAME? 0 - -
1.1608 #NAME? #NAME? 0 - -
1.1609 #NAME? #NAME? 0 - -
1.1610 #NAME? #NAME? 0 - -
1.1611 #NAME? #NAME? 0 - -
1.1612 #NAME? #NAME? 0 - -
1.1613 #NAME? #NAME? 0 - -
1.1614 #NAME? #NAME? 0 - -
1.1615 #NAME? #NAME? 0 - -
1.1616 #NAME? #NAME? 0 - -
1.1617 #NAME? #NAME? 0 - -
1.1618 #NAME? #NAME? 0 - -
1.1619 #NAME? #NAME? 0 - -
1.1620 #NAME? #NAME? 0 - -
1.1621 #NAME? #NAME? 0 - -
1.1622 #NAME? #NAME? 0 - -
1.1623 #NAME? #NAME? 0 - -
1.1624 #NAME? #NAME? 0 - -
1.1625 #NAME? #NAME? 0 - -
1.1626 #NAME? #NAME? 0 - -
1.1627 #NAME? #NAME? 0 - -
1.1628 #NAME? #NAME? 0 - -
1.1629 #NAME? #NAME? 0 - -
1.1630 #NAME? #NAME? 0 - -
1.1631 #NAME? #NAME? 0 - -
1.1632 #NAME? #NAME? 0 - -
1.1633 #NAME? #NAME? 0 - -
1.1634 #NAME? #NAME? 0 - -
1.1635 #NAME? #NAME? 0 - -
1.1636 #NAME? #NAME? 0 - -
1.1637 #NAME? #NAME? 0 - -
1.1638 #NAME? #NAME? 0 - -
1.1639 #NAME? #NAME? 0 - -
1.1640 #NAME? #NAME? 0 - -
1.1641 #NAME? #NAME? 0 - -
1.1642 #NAME? #NAME? 0 - -
1.1643 #NAME? #NAME? 0 - -
1.1644 #NAME? #NAME? 0 - -
1.1645 #NAME? #NAME? 0 - -
1.1646 #NAME? #NAME? 0 - -
1.1647 #NAME? #NAME? 0 - -
1.1648 #NAME? #NAME? 0 - -
1.1649 #NAME? #NAME? 0 - -
1.1650 #NAME? #NAME? 0 - -
1.1651 #NAME? #NAME? 0 - -
1.1652 #NAME? #NAME? 0 - -
1.1653 #NAME? #NAME? 0 - -
1.1654 #NAME? #NAME? 0 - -
1.1655 #NAME? #NAME? 0 - -
1.1656 #NAME? #NAME? 0 - -
1.1657 #NAME? #NAME? 0 - -
1.1658 #NAME? #NAME? 0 - -
1.1659 #NAME? #NAME? 0 - -
1.1660 #NAME? #NAME? 0 - -
1.1661 #NAME? #NAME? 0 - -
1.1662 #NAME? #NAME? 0 - -
1.1663 #NAME? #NAME? 0 - -
1.1664 #NAME? #NAME? 0 - -
1.1665 #NAME? #NAME? 0 - -
1.1666 #NAME? #NAME? 0 - -
1.1667 #NAME? #NAME? 0 - -
1.1668 #NAME? #NAME? 0 - -
1.1669 #NAME? #NAME? 0 - -
1.1670 #NAME? #NAME? 0 - -
1.1671 #NAME? #NAME? 0 - -
1.1672 #NAME? #NAME? 0 - -
1.1673 #NAME? #NAME? 0 - -
1.1674 #NAME? #NAME? 0 - -
1.1675 #NAME? #NAME? 0 - -
1.1676 #NAME? #NAME? 0 - -
1.1677 #NAME? #NAME? 0 - -
1.1678 #NAME? #NAME? 0 - -
1.1679 #NAME? #NAME? 0 - -
1.1680 #NAME? #NAME? 0 - -
1.1681 #NAME? #NAME? 0 - -
1.1682 #NAME? #NAME? 0 - -
1.1683 #NAME? #NAME? 0 - -
1.1684 #NAME? #NAME? 0 - -
1.1685 #NAME? #NAME? 0 - -
1.1686 #NAME? #NAME? 0 - -
1.1687 #NAME? #NAME? 0 - -
1.1688 #NAME? #NAME? 0 - -
1.1689 #NAME? #NAME? 0 - -
1.1690 #NAME? #NAME? 0 - -
1.1691 #NAME? #NAME? 0 - -
1.1692 #NAME? #NAME? 0 - -
1.1693 #NAME? #NAME? 0 - -
1.1694 #NAME? #NAME? 0 - -
1.1695 #NAME? #NAME? 0 - -
1.1696 #NAME? #NAME? 0 - -
1.1697 #NAME? #NAME? 0 - -
1.1698 #NAME? #NAME? 0 - -
1.1699 #NAME? #NAME? 0 - -
1.1700 #NAME? #NAME? 0 - -
1.1701 #NAME? #NAME? 0 - -
1.1702 #NAME? #NAME? 0 - -
1.1703 #NAME? #NAME? 0 - -
1.1704 #NAME? #NAME? 0 - -
1.1705 #NAME? #NAME? 0 - -
1.1706 #NAME? #NAME? 0 - -
1.1707 #NAME? #NAME? 0 - -
1.1708 #NAME? #NAME? 0 - -
1.1709 #NAME? #NAME? 0 - -
1.1710 #NAME? #NAME? 0 - -
1.1711 #NAME? #NAME? 0 - -
1.1712 #NAME? #NAME? 0 - -
1.1713 #NAME? #NAME? 0 - -
1.1714 #NAME? #NAME? 0 - -
1.1715 #NAME? #NAME? 0 - -
1.1716 #NAME? #NAME? 0 - -
1.1717 #NAME? #NAME? 0 - -
1.1718 #NAME? #NAME? 0 - -
1.1719 #NAME? #NAME? 0 - -
1.1720 #NAME? #NAME? 0 - -
1.1721 #NAME? #NAME? 0 - -
1.1722 #NAME? #NAME? 0 - -
1.1723 #NAME? #NAME? 0 - -
1.1724 #NAME? #NAME? 0 - -
1.1725 #NAME? #NAME? 0 - -
1.1726 #NAME? #NAME? 0 - -
1.1727 #NAME? #NAME? 0 - -
1.1728 #NAME? #NAME? 0 - -
1.1729 #NAME? #NAME? 0 - -
1.1730 #NAME? #NAME? 0 - -
1.1731 #NAME? #NAME? 0 - -
1.1732 #NAME? #NAME? 0 - -
1.1733 #NAME? #NAME? 0 - -
1.1734 #NAME? #NAME? 0 - -
1.1735 #NAME? #NAME? 0 - -
1.1736 #NAME? #NAME? 0 - -
1.1737 #NAME? #NAME? 0 - -
1.1738 #NAME? #NAME? 0 - -
1.1739 #NAME? #NAME? 0 - -
1.1740 #NAME? #NAME? 0 - -
1.1741 #NAME? #NAME? 0 - -
1.1742 #NAME? #NAME? 0 - -
1.1743 #NAME? #NAME? 0 - -
1.1744 #NAME? #NAME? 0 - -
1.1745 #NAME? #NAME? 0 - -
1.1746 #NAME? #NAME? 0 - -
1.1747 #NAME? #NAME? 0 - -
1.1748 #NAME? #NAME? 0 - -
1.1749 #NAME? #NAME? 0 - -
1.1750 #NAME? #NAME? 0 - -
1.1751 #NAME? #NAME? 0 - -
1.1752 #NAME? #NAME? 0 - -
1.1753 #NAME? #NAME? 0 - -
1.1754 #NAME? #NAME? 0 - -
1.1755 #NAME? #NAME? 0 - -
1.1756 #NAME? #NAME? 0 - -
1.1757 #NAME? #NAME? 0 - -
1.1758 #NAME? #NAME? 0 - -
1.1759 #NAME? #NAME? 0 - -
1.1760 #NAME? #NAME? 0 - -
1.1761 #NAME? #NAME? 0 - -
1.1762 #NAME? #NAME? 0 - -
1.1763 #NAME? #NAME? 0 - -
1.1764 #NAME? #NAME? 0 - -
1.1765 #NAME? #NAME? 0 - -
1.1766 #NAME? #NAME? 0 - -
1.1767 #NAME? #NAME? 0 - -
1.1768 #NAME? #NAME? 0 - -
1.1769 #NAME? #NAME? 0 - -
1.1770 #NAME? #NAME? 0 - -
1.1771 #NAME? #NAME? 0 - -

file:///conversion/tmp/scratch/454095803.xlsxPrinted: 01/03/2020 - 21:53:29 <EA>


1.1772 #NAME? #NAME? 0 - -
1.1773 #NAME? #NAME? 0 - -
1.1774 #NAME? #NAME? 0 - -
1.1775 #NAME? #NAME? 0 - -
1.1776 #NAME? #NAME? 0 - -
1.1777 #NAME? #NAME? 0 - -
1.1778 #NAME? #NAME? 0 - -
1.1779 #NAME? #NAME? 0 - -
1.1780 #NAME? #NAME? 0 - -
1.1781 #NAME? #NAME? 0 - -
1.1782 #NAME? #NAME? 0 - -
1.1783 #NAME? #NAME? 0 - -
1.1784 #NAME? #NAME? 0 - -
1.1785 #NAME? #NAME? 0 - -
1.1786 #NAME? #NAME? 0 - -
1.1787 #NAME? #NAME? 0 - -
1.1788 #NAME? #NAME? 0 - -
1.1789 #NAME? #NAME? 0 - -
1.1790 #NAME? #NAME? 0 - -
1.1791 #NAME? #NAME? 0 - -
1.1792 #NAME? #NAME? 0 - -
1.1793 #NAME? #NAME? 0 - -
1.1794 #NAME? #NAME? 0 - -
1.1795 #NAME? #NAME? 0 - -
1.1796 #NAME? #NAME? 0 - -
1.1797 #NAME? #NAME? 0 - -
1.1798 #NAME? #NAME? 0 - -
1.1799 #NAME? #NAME? 0 - -
1.1800 #NAME? #NAME? 0 - -
1.1801 #NAME? #NAME? 0 - -
1.1802 #NAME? #NAME? 0 - -
1.1803 #NAME? #NAME? 0 - -
1.1804 #NAME? #NAME? 0 - -
1.1805 #NAME? #NAME? 0 - -
1.1806 #NAME? #NAME? 0 - -
1.1807 #NAME? #NAME? 0 - -
1.1808 #NAME? #NAME? 0 - -
1.1809 #NAME? #NAME? 0 - -
1.1810 #NAME? #NAME? 0 - -
1.1811 #NAME? #NAME? 0 - -
1.1812 #NAME? #NAME? 0 - -
1.1813 #NAME? #NAME? 0 - -
1.1814 #NAME? #NAME? 0 - -
1.1815 #NAME? #NAME? 0 - -
1.1816 #NAME? #NAME? 0 - -
1.1817 #NAME? #NAME? 0 - -
1.1818 #NAME? #NAME? 0 - -
1.1819 #NAME? #NAME? 0 - -
1.1820 #NAME? #NAME? 0 - -
1.1821 #NAME? #NAME? 0 - -
1.1822 #NAME? #NAME? 0 - -
1.1823 #NAME? #NAME? 0 - -
1.1824 #NAME? #NAME? 0 - -
1.1825 #NAME? #NAME? 0 - -
1.1826 #NAME? #NAME? 0 - -
1.1827 #NAME? #NAME? 0 - -
1.1828 #NAME? #NAME? 0 - -
1.1829 #NAME? #NAME? 0 - -
1.1830 #NAME? #NAME? 0 - -
1.1831 #NAME? #NAME? 0 - -
1.1832 #NAME? #NAME? 0 - -
1.1833 #NAME? #NAME? 0 - -
1.1834 #NAME? #NAME? 0 - -
1.1835 #NAME? #NAME? 0 - -
1.1836 #NAME? #NAME? 0 - -
1.1837 #NAME? #NAME? 0 - -
1.1838 #NAME? #NAME? 0 - -
1.1839 #NAME? #NAME? 0 - -
1.1840 #NAME? #NAME? 0 - -
1.1841 #NAME? #NAME? 0 - -
1.1842 #NAME? #NAME? 0 - -
1.1843 #NAME? #NAME? 0 - -
1.1844 #NAME? #NAME? 0 - -
1.1845 #NAME? #NAME? 0 - -
1.1846 #NAME? #NAME? 0 - -
1.1847 #NAME? #NAME? 0 - -
1.1848 #NAME? #NAME? 0 - -
1.1849 #NAME? #NAME? 0 - -
1.1850 #NAME? #NAME? 0 - -
1.1851 #NAME? #NAME? 0 - -
1.1852 #NAME? #NAME? 0 - -
1.1853 #NAME? #NAME? 0 - -
1.1854 #NAME? #NAME? 0 - -
1.1855 #NAME? #NAME? 0 - -
1.1856 #NAME? #NAME? 0 - -
1.1857 #NAME? #NAME? 0 - -
1.1858 #NAME? #NAME? 0 - -
1.1859 #NAME? #NAME? 0 - -
1.1860 #NAME? #NAME? 0 - -
1.1861 #NAME? #NAME? 0 - -
1.1862 #NAME? #NAME? 0 - -
1.1863 #NAME? #NAME? 0 - -
1.1864 #NAME? #NAME? 0 - -
1.1865 #NAME? #NAME? 0 - -
1.1866 #NAME? #NAME? 0 - -
1.1867 #NAME? #NAME? 0 - -
1.1868 #NAME? #NAME? 0 - -
1.1869 #NAME? #NAME? 0 - -
1.1870 #NAME? #NAME? 0 - -
1.1871 #NAME? #NAME? 0 - -
1.1872 #NAME? #NAME? 0 - -
1.1873 #NAME? #NAME? 0 - -
1.1874 #NAME? #NAME? 0 - -
1.1875 #NAME? #NAME? 0 - -
1.1876 #NAME? #NAME? 0 - -
1.1877 #NAME? #NAME? 0 - -
1.1878 #NAME? #NAME? 0 - -
1.1879 #NAME? #NAME? 0 - -
1.1880 #NAME? #NAME? 0 - -
1.1881 #NAME? #NAME? 0 - -
1.1882 #NAME? #NAME? 0 - -
1.1883 #NAME? #NAME? 0 - -
1.1884 #NAME? #NAME? 0 - -
1.1885 #NAME? #NAME? 0 - -
1.1886 #NAME? #NAME? 0 - -
1.1887 #NAME? #NAME? 0 - -
1.1888 #NAME? #NAME? 0 - -
1.1889 #NAME? #NAME? 0 - -
1.1890 #NAME? #NAME? 0 - -
1.1891 #NAME? #NAME? 0 - -
1.1892 #NAME? #NAME? 0 - -
1.1893 #NAME? #NAME? 0 - -
1.1894 #NAME? #NAME? 0 - -
1.1895 #NAME? #NAME? 0 - -
1.1896 #NAME? #NAME? 0 - -
1.1897 #NAME? #NAME? 0 - -
1.1898 #NAME? #NAME? 0 - -
1.1899 #NAME? #NAME? 0 - -
1.1900 #NAME? #NAME? 0 - -
1.1901 #NAME? #NAME? 0 - -
1.1902 #NAME? #NAME? 0 - -
1.1903 #NAME? #NAME? 0 - -
1.1904 #NAME? #NAME? 0 - -
1.1905 #NAME? #NAME? 0 - -
1.1906 #NAME? #NAME? 0 - -
1.1907 #NAME? #NAME? 0 - -
1.1908 #NAME? #NAME? 0 - -
1.1909 #NAME? #NAME? 0 - -
1.1910 #NAME? #NAME? 0 - -
1.1911 #NAME? #NAME? 0 - -
1.1912 #NAME? #NAME? 0 - -
1.1913 #NAME? #NAME? 0 - -
1.1914 #NAME? #NAME? 0 - -
1.1915 #NAME? #NAME? 0 - -
1.1916 #NAME? #NAME? 0 - -
1.1917 #NAME? #NAME? 0 - -
1.1918 #NAME? #NAME? 0 - -
1.1919 #NAME? #NAME? 0 - -
1.1920 #NAME? #NAME? 0 - -
1.1921 #NAME? #NAME? 0 - -
1.1922 #NAME? #NAME? 0 - -
1.1923 #NAME? #NAME? 0 - -
1.1924 #NAME? #NAME? 0 - -
1.1925 #NAME? #NAME? 0 - -
1.1926 #NAME? #NAME? 0 - -
1.1927 #NAME? #NAME? 0 - -
1.1928 #NAME? #NAME? 0 - -
1.1929 #NAME? #NAME? 0 - -
1.1930 #NAME? #NAME? 0 - -
1.1931 #NAME? #NAME? 0 - -
1.1932 #NAME? #NAME? 0 - -
1.1933 #NAME? #NAME? 0 - -
1.1934 #NAME? #NAME? 0 - -
1.1935 #NAME? #NAME? 0 - -
1.1936 #NAME? #NAME? 0 - -
1.1937 #NAME? #NAME? 0 - -
1.1938 #NAME? #NAME? 0 - -
1.1939 #NAME? #NAME? 0 - -
1.1940 #NAME? #NAME? 0 - -
1.1941 #NAME? #NAME? 0 - -
1.1942 #NAME? #NAME? 0 - -
1.1943 #NAME? #NAME? 0 - -
1.1944 #NAME? #NAME? 0 - -
1.1945 #NAME? #NAME? 0 - -
1.1946 #NAME? #NAME? 0 - -
1.1947 #NAME? #NAME? 0 - -
1.1948 #NAME? #NAME? 0 - -
1.1949 #NAME? #NAME? 0 - -
1.1950 #NAME? #NAME? 0 - -
1.1951 #NAME? #NAME? 0 - -
1.1952 #NAME? #NAME? 0 - -
1.1953 #NAME? #NAME? 0 - -
1.1954 #NAME? #NAME? 0 - -
1.1955 #NAME? #NAME? 0 - -
1.1956 #NAME? #NAME? 0 - -
1.1957 #NAME? #NAME? 0 - -
1.1958 #NAME? #NAME? 0 - -
1.1959 #NAME? #NAME? 0 - -
1.1960 #NAME? #NAME? 0 - -
1.1961 #NAME? #NAME? 0 - -
1.1962 #NAME? #NAME? 0 - -
1.1963 #NAME? #NAME? 0 - -
1.1964 #NAME? #NAME? 0 - -
1.1965 #NAME? #NAME? 0 - -
1.1966 #NAME? #NAME? 0 - -
1.1967 #NAME? #NAME? 0 - -
1.1968 #NAME? #NAME? 0 - -
1.1969 #NAME? #NAME? 0 - -
1.1970 #NAME? #NAME? 0 - -
1.1971 #NAME? #NAME? 0 - -
1.1972 #NAME? #NAME? 0 - -
1.1973 #NAME? #NAME? 0 - -
1.1974 #NAME? #NAME? 0 - -
1.1975 #NAME? #NAME? 0 - -

file:///conversion/tmp/scratch/454095803.xlsxPrinted: 01/03/2020 - 21:53:29 <EA>


1.1976 #NAME? #NAME? 0 - -
1.1977 #NAME? #NAME? 0 - -
1.1978 #NAME? #NAME? 0 - -
1.1979 #NAME? #NAME? 0 - -
1.1980 #NAME? #NAME? 0 - -
1.1981 #NAME? #NAME? 0 - -
1.1982 #NAME? #NAME? 0 - -
1.1983 #NAME? #NAME? 0 - -
1.1984 #NAME? #NAME? 0 - -
1.1985 #NAME? #NAME? 0 - -
1.1986 #NAME? #NAME? 0 - -
1.1987 #NAME? #NAME? 0 - -
1.1988 #NAME? #NAME? 0 - -
1.1989 #NAME? #NAME? 0 - -
1.1990 #NAME? #NAME? 0 - -
1.1991 #NAME? #NAME? 0 - -
1.1992 #NAME? #NAME? 0 - -
1.1993 #NAME? #NAME? 0 - -
1.1994 #NAME? #NAME? 0 - -
1.1995 #NAME? #NAME? 0 - -
1.1996 #NAME? #NAME? 0 - -
1.1997 #NAME? #NAME? 0 - -
1.1998 #NAME? #NAME? 0 - -
1.1999 #NAME? #NAME? 0 - -
1.2000 #NAME? #NAME? 0 - -
1.2001 #NAME? #NAME? 0 - -
1.2002 #NAME? #NAME? 0 - -
1.2003 #NAME? #NAME? 0 - -
1.2004 #NAME? #NAME? 0 - -
1.2005 #NAME? #NAME? 0 - -
1.2006 #NAME? #NAME? 0 - -
1.2007 #NAME? #NAME? 0 - -
1.2008 #NAME? #NAME? 0 - -
1.2009 #NAME? #NAME? 0 - -
1.2010 #NAME? #NAME? 0 - -
1.2011 #NAME? #NAME? 0 - -
1.2012 #NAME? #NAME? 0 - -
1.2013 #NAME? #NAME? 0 - -
1.2014 #NAME? #NAME? 0 - -
1.2015 #NAME? #NAME? 0 - -
1.2016 #NAME? #NAME? 0 - -
1.2017 #NAME? #NAME? 0 - -
1.2018 #NAME? #NAME? 0 - -
1.2019 #NAME? #NAME? 0 - -
1.2020 #NAME? #NAME? 0 - -
1.2021 #NAME? #NAME? 0 - -
1.2022 #NAME? #NAME? 0 - -
1.2023 #NAME? #NAME? 0 - -
1.2024 #NAME? #NAME? 0 - -
1.2025 #NAME? #NAME? 0 - -
1.2026 #NAME? #NAME? 0 - -
1.2027 #NAME? #NAME? 0 - -
1.2028 #NAME? #NAME? 0 - -
1.2029 #NAME? #NAME? 0 - -
1.2030 #NAME? #NAME? 0 - -
1.2031 #NAME? #NAME? 0 - -
1.2032 #NAME? #NAME? 0 - -
1.2033 #NAME? #NAME? 0 - -
1.2034 #NAME? #NAME? 0 - -
1.2035 #NAME? #NAME? 0 - -
1.2036 #NAME? #NAME? 0 - -
1.2037 #NAME? #NAME? 0 - -
1.2038 #NAME? #NAME? 0 - -
1.2039 #NAME? #NAME? 0 - -
1.2040 #NAME? #NAME? 0 - -
1.2041 #NAME? #NAME? 0 - -
1.2042 #NAME? #NAME? 0 - -
1.2043 #NAME? #NAME? 0 - -
1.2044 #NAME? #NAME? 0 - -
1.2045 #NAME? #NAME? 0 - -
1.2046 #NAME? #NAME? 0 - -
1.2047 #NAME? #NAME? 0 - -
1.2048 #NAME? #NAME? 0 - -
1.2049 #NAME? #NAME? 0 - -
1.2050 #NAME? #NAME? 0 - -
1.2051 #NAME? #NAME? 0 - -
1.2052 #NAME? #NAME? 0 - -
1.2053 #NAME? #NAME? 0 - -
1.2054 #NAME? #NAME? 0 - -
1.2055 #NAME? #NAME? 0 - -
1.2056 #NAME? #NAME? 0 - -
1.2057 #NAME? #NAME? 0 - -
1.2058 #NAME? #NAME? 0 - -
1.2059 #NAME? #NAME? 0 - -
1.2060 #NAME? #NAME? 0 - -
1.2061 #NAME? #NAME? 0 - -
1.2062 #NAME? #NAME? 0 - -
1.2063 #NAME? #NAME? 0 - -
1.2064 #NAME? #NAME? 0 - -
1.2065 #NAME? #NAME? 0 - -
1.2066 #NAME? #NAME? 0 - -
1.2067 #NAME? #NAME? 0 - -
1.2068 #NAME? #NAME? 0 - -
1.2069 #NAME? #NAME? 0 - -
1.2070 #NAME? #NAME? 0 - -
1.2071 #NAME? #NAME? 0 - -
1.2072 #NAME? #NAME? 0 - -
1.2073 #NAME? #NAME? 0 - -
1.2074 #NAME? #NAME? 0 - -
1.2075 #NAME? #NAME? 0 - -
1.2076 #NAME? #NAME? 0 - -
1.2077 #NAME? #NAME? 0 - -
1.2078 #NAME? #NAME? 0 - -
1.2079 #NAME? #NAME? 0 - -
1.2080 #NAME? #NAME? 0 - -
1.2081 #NAME? #NAME? 0 - -
1.2082 #NAME? #NAME? 0 - -
1.2083 #NAME? #NAME? 0 - -
1.2084 #NAME? #NAME? 0 - -
1.2085 #NAME? #NAME? 0 - -
1.2086 #NAME? #NAME? 0 - -
1.2087 #NAME? #NAME? 0 - -
1.2088 #NAME? #NAME? 0 - -
1.2089 #NAME? #NAME? 0 - -
1.2090 #NAME? #NAME? 0 - -
1.2091 #NAME? #NAME? 0 - -
1.2092 #NAME? #NAME? 0 - -
1.2093 #NAME? #NAME? 0 - -
1.2094 #NAME? #NAME? 0 - -
1.2095 #NAME? #NAME? 0 - -
1.2096 #NAME? #NAME? 0 - -
1.2097 #NAME? #NAME? 0 - -
1.2098 #NAME? #NAME? 0 - -
1.2099 #NAME? #NAME? 0 - -
1.2100 #NAME? #NAME? 0 - -
1.2101 #NAME? #NAME? 0 - -
1.2102 #NAME? #NAME? 0 - -
1.2103 #NAME? #NAME? 0 - -
1.2104 #NAME? #NAME? 0 - -
1.2105 #NAME? #NAME? 0 - -
1.2106 #NAME? #NAME? 0 - -
1.2107 #NAME? #NAME? 0 - -
1.2108 #NAME? #NAME? 0 - -
1.2109 #NAME? #NAME? 0 - -
1.2110 #NAME? #NAME? 0 - -
1.2111 #NAME? #NAME? 0 - -
1.2112 #NAME? #NAME? 0 - -
1.2113 #NAME? #NAME? 0 - -
1.2114 #NAME? #NAME? 0 - -
1.2115 #NAME? #NAME? 0 - -
1.2116 #NAME? #NAME? 0 - -
1.2117 #NAME? #NAME? 0 - -
1.2118 #NAME? #NAME? 0 - -
1.2119 #NAME? #NAME? 0 - -
1.2120 #NAME? #NAME? 0 - -
1.2121 #NAME? #NAME? 0 - -
1.2122 #NAME? #NAME? 0 - -
1.2123 #NAME? #NAME? 0 - -
1.2124 #NAME? #NAME? 0 - -
1.2125 #NAME? #NAME? 0 - -
1.2126 #NAME? #NAME? 0 - -
1.2127 #NAME? #NAME? 0 - -
1.2128 #NAME? #NAME? 0 - -
1.2129 #NAME? #NAME? 0 - -
1.2130 #NAME? #NAME? 0 - -
1.2131 #NAME? #NAME? 0 - -
1.2132 #NAME? #NAME? 0 - -
1.2133 #NAME? #NAME? 0 - -
1.2134 #NAME? #NAME? 0 - -
1.2135 #NAME? #NAME? 0 - -
1.2136 #NAME? #NAME? 0 - -
1.2137 #NAME? #NAME? 0 - -
1.2138 #NAME? #NAME? 0 - -
1.2139 #NAME? #NAME? 0 - -
1.2140 #NAME? #NAME? 0 - -
1.2141 #NAME? #NAME? 0 - -
1.2142 #NAME? #NAME? 0 - -
1.2143 #NAME? #NAME? 0 - -
1.2144 #NAME? #NAME? 0 - -
1.2145 #NAME? #NAME? 0 - -
1.2146 #NAME? #NAME? 0 - -
1.2147 #NAME? #NAME? 0 - -
1.2148 #NAME? #NAME? 0 - -
1.2149 #NAME? #NAME? 0 - -
1.2150 #NAME? #NAME? 0 - -
1.2151 #NAME? #NAME? 0 - -
1.2152 #NAME? #NAME? 0 - -
1.2153 #NAME? #NAME? 0 - -
1.2154 #NAME? #NAME? 0 - -
1.2155 #NAME? #NAME? 0 - -
1.2156 #NAME? #NAME? 0 - -
1.2157 #NAME? #NAME? 0 - -
1.2158 #NAME? #NAME? 0 - -
1.2159 #NAME? #NAME? 0 - -
1.2160 #NAME? #NAME? 0 - -
1.2161 #NAME? #NAME? 0 - -
1.2162 #NAME? #NAME? 0 - -
1.2163 #NAME? #NAME? 0 - -
1.2164 #NAME? #NAME? 0 - -
1.2165 #NAME? #NAME? 0 - -
1.2166 #NAME? #NAME? 0 - -
1.2167 #NAME? #NAME? 0 - -
1.2168 #NAME? #NAME? 0 - -
1.2169 #NAME? #NAME? 0 - -
1.2170 #NAME? #NAME? 0 - -
1.2171 #NAME? #NAME? 0 - -
1.2172 #NAME? #NAME? 0 - -
1.2173 #NAME? #NAME? 0 - -
1.2174 #NAME? #NAME? 0 - -
1.2175 #NAME? #NAME? 0 - -
1.2176 #NAME? #NAME? 0 - -
1.2177 #NAME? #NAME? 0 - -
1.2178 #NAME? #NAME? 0 - -
1.2179 #NAME? #NAME? 0 - -

file:///conversion/tmp/scratch/454095803.xlsxPrinted: 01/03/2020 - 21:53:30 <EA>


1.2180 #NAME? #NAME? 0 - -
1.2181 #NAME? #NAME? 0 - -
1.2182 #NAME? #NAME? 0 - -
1.2183 #NAME? #NAME? 0 - -
1.2184 #NAME? #NAME? 0 - -
1.2185 #NAME? #NAME? 0 - -
1.2186 #NAME? #NAME? 0 - -
1.2187 #NAME? #NAME? 0 - -
1.2188 #NAME? #NAME? 0 - -
1.2189 #NAME? #NAME? 0 - -
1.2190 #NAME? #NAME? 0 - -
1.2191 #NAME? #NAME? 0 - -
1.2192 #NAME? #NAME? 0 - -
1.2193 #NAME? #NAME? 0 - -
1.2194 #NAME? #NAME? 0 - -
1.2195 #NAME? #NAME? 0 - -
1.2196 #NAME? #NAME? 0 - -
1.2197 #NAME? #NAME? 0 - -
1.2198 #NAME? #NAME? 0 - -
1.2199 #NAME? #NAME? 0 - -
1.2200 #NAME? #NAME? 0 - -
1.2201 #NAME? #NAME? 0 - -
1.2202 #NAME? #NAME? 0 - -
1.2203 #NAME? #NAME? 0 - -
1.2204 #NAME? #NAME? 0 - -
1.2205 #NAME? #NAME? 0 - -
1.2206 #NAME? #NAME? 0 - -
1.2207 #NAME? #NAME? 0 - -
1.2208 #NAME? #NAME? 0 - -
1.2209 #NAME? #NAME? 0 - -
1.2210 #NAME? #NAME? 0 - -
1.2211 #NAME? #NAME? 0 - -
1.2212 #NAME? #NAME? 0 - -
1.2213 #NAME? #NAME? 0 - -
1.2214 #NAME? #NAME? 0 - -
1.2215 #NAME? #NAME? 0 - -
1.2216 #NAME? #NAME? 0 - -
1.2217 #NAME? #NAME? 0 - -
1.2218 #NAME? #NAME? 0 - -
1.2219 #NAME? #NAME? 0 - -
1.2220 #NAME? #NAME? 0 - -
1.2221 #NAME? #NAME? 0 - -
1.2222 #NAME? #NAME? 0 - -
1.2223 #NAME? #NAME? 0 - -
1.2224 #NAME? #NAME? 0 - -
1.2225 #NAME? #NAME? 0 - -
1.2226 #NAME? #NAME? 0 - -
1.2227 #NAME? #NAME? 0 - -
1.2228 #NAME? #NAME? 0 - -
1.2229 #NAME? #NAME? 0 - -
1.2230 #NAME? #NAME? 0 - -
1.2231 #NAME? #NAME? 0 - -
1.2232 #NAME? #NAME? 0 - -
1.2233 #NAME? #NAME? 0 - -
1.2234 #NAME? #NAME? 0 - -
1.2235 #NAME? #NAME? 0 - -
1.2236 #NAME? #NAME? 0 - -
1.2237 #NAME? #NAME? 0 - -
1.2238 #NAME? #NAME? 0 - -
1.2239 #NAME? #NAME? 0 - -
1.2240 #NAME? #NAME? 0 - -
1.2241 #NAME? #NAME? 0 - -
1.2242 #NAME? #NAME? 0 - -
1.2243 #NAME? #NAME? 0 - -
1.2244 #NAME? #NAME? 0 - -
1.2245 #NAME? #NAME? 0 - -
1.2246 #NAME? #NAME? 0 - -
1.2247 #NAME? #NAME? 0 - -
1.2248 #NAME? #NAME? 0 - -
1.2249 #NAME? #NAME? 0 - -
1.2250 #NAME? #NAME? 0 - -
1.2251 #NAME? #NAME? 0 - -
1.2252 #NAME? #NAME? 0 - -
1.2253 #NAME? #NAME? 0 - -
1.2254 #NAME? #NAME? 0 - -
1.2255 #NAME? #NAME? 0 - -
1.2256 #NAME? #NAME? 0 - -
1.2257 #NAME? #NAME? 0 - -
1.2258 #NAME? #NAME? 0 - -
1.2259 #NAME? #NAME? 0 - -
1.2260 #NAME? #NAME? 0 - -
1.2261 #NAME? #NAME? 0 - -
1.2262 #NAME? #NAME? 0 - -
1.2263 #NAME? #NAME? 0 - -
1.2264 #NAME? #NAME? 0 - -
1.2265 #NAME? #NAME? 0 - -
1.2266 #NAME? #NAME? 0 - -
1.2267 #NAME? #NAME? 0 - -
1.2268 #NAME? #NAME? 0 - -
1.2269 #NAME? #NAME? 0 - -
1.2270 #NAME? #NAME? 0 - -
1.2271 #NAME? #NAME? 0 - -
1.2272 #NAME? #NAME? 0 - -
1.2273 #NAME? #NAME? 0 - -
1.2274 #NAME? #NAME? 0 - -
1.2275 #NAME? #NAME? 0 - -
1.2276 #NAME? #NAME? 0 - -
1.2277 #NAME? #NAME? 0 - -
1.2278 #NAME? #NAME? 0 - -
1.2279 #NAME? #NAME? 0 - -
1.2280 #NAME? #NAME? 0 - -
1.2281 #NAME? #NAME? 0 - -
1.2282 #NAME? #NAME? 0 - -
1.2283 #NAME? #NAME? 0 - -
1.2284 #NAME? #NAME? 0 - -
1.2285 #NAME? #NAME? 0 - -
1.2286 #NAME? #NAME? 0 - -
1.2287 #NAME? #NAME? 0 - -
1.2288 #NAME? #NAME? 0 - -
1.2289 #NAME? #NAME? 0 - -
1.2290 #NAME? #NAME? 0 - -
1.2291 #NAME? #NAME? 0 - -
1.2292 #NAME? #NAME? 0 - -
1.2293 #NAME? #NAME? 0 - -
1.2294 #NAME? #NAME? 0 - -
1.2295 #NAME? #NAME? 0 - -
1.2296 #NAME? #NAME? 0 - -
1.2297 #NAME? #NAME? 0 - -
1.2298 #NAME? #NAME? 0 - -
1.2299 #NAME? #NAME? 0 - -
1.2300 #NAME? #NAME? 0 - -
1.2301 #NAME? #NAME? 0 - -
1.2302 #NAME? #NAME? 0 - -
1.2303 #NAME? #NAME? 0 - -
1.2304 #NAME? #NAME? 0 - -
1.2305 #NAME? #NAME? 0 - -
1.2306 #NAME? #NAME? 0 - -
1.2307 #NAME? #NAME? 0 - -
1.2308 #NAME? #NAME? 0 - -
1.2309 #NAME? #NAME? 0 - -
1.2310 #NAME? #NAME? 0 - -
1.2311 #NAME? #NAME? 0 - -
1.2312 #NAME? #NAME? 0 - -
1.2313 #NAME? #NAME? 0 - -
1.2314 #NAME? #NAME? 0 - -
1.2315 #NAME? #NAME? 0 - -
1.2316 #NAME? #NAME? 0 - -
1.2317 #NAME? #NAME? 0 - -
1.2318 #NAME? #NAME? 0 - -
1.2319 #NAME? #NAME? 0 - -
1.2320 #NAME? #NAME? 0 - -
1.2321 #NAME? #NAME? 0 - -
1.2322 #NAME? #NAME? 0 - -
1.2323 #NAME? #NAME? 0 - -
1.2324 #NAME? #NAME? 0 - -
1.2325 #NAME? #NAME? 0 - -
1.2326 #NAME? #NAME? 0 - -
1.2327 #NAME? #NAME? 0 - -
1.2328 #NAME? #NAME? 0 - -
1.2329 #NAME? #NAME? 0 - -
1.2330 #NAME? #NAME? 0 - -
1.2331 #NAME? #NAME? 0 - -
1.2332 #NAME? #NAME? 0 - -
1.2333 #NAME? #NAME? 0 - -
1.2334 #NAME? #NAME? 0 - -
1.2335 #NAME? #NAME? 0 - -
1.2336 #NAME? #NAME? 0 - -
1.2337 #NAME? #NAME? 0 - -
1.2338 #NAME? #NAME? 0 - -
1.2339 #NAME? #NAME? 0 - -
1.2340 #NAME? #NAME? 0 - -
1.2341 #NAME? #NAME? 0 - -
1.2342 #NAME? #NAME? 0 - -
1.2343 #NAME? #NAME? 0 - -
1.2344 #NAME? #NAME? 0 - -
1.2345 #NAME? #NAME? 0 - -
1.2346 #NAME? #NAME? 0 - -
1.2347 #NAME? #NAME? 0 - -
1.2348 #NAME? #NAME? 0 - -
1.2349 #NAME? #NAME? 0 - -
1.2350 #NAME? #NAME? 0 - -
1.2351 #NAME? #NAME? 0 - -
1.2352 #NAME? #NAME? 0 - -
1.2353 #NAME? #NAME? 0 - -
1.2354 #NAME? #NAME? 0 - -
1.2355 #NAME? #NAME? 0 - -
1.2356 #NAME? #NAME? 0 - -
1.2357 #NAME? #NAME? 0 - -
1.2358 #NAME? #NAME? 0 - -
1.2359 #NAME? #NAME? 0 - -
1.2360 #NAME? #NAME? 0 - -
1.2361 #NAME? #NAME? 0 - -
1.2362 #NAME? #NAME? 0 - -
1.2363 #NAME? #NAME? 0 - -
1.2364 #NAME? #NAME? 0 - -
1.2365 #NAME? #NAME? 0 - -
1.2366 #NAME? #NAME? 0 - -
1.2367 #NAME? #NAME? 0 - -
1.2368 #NAME? #NAME? 0 - -
1.2369 #NAME? #NAME? 0 - -
1.2370 #NAME? #NAME? 0 - -
1.2371 #NAME? #NAME? 0 - -
1.2372 #NAME? #NAME? 0 - -
1.2373 #NAME? #NAME? 0 - -
1.2374 #NAME? #NAME? 0 - -
1.2375 #NAME? #NAME? 0 - -
1.2376 #NAME? #NAME? 0 - -
1.2377 #NAME? #NAME? 0 - -
1.2378 #NAME? #NAME? 0 - -
1.2379 #NAME? #NAME? 0 - -
1.2380 #NAME? #NAME? 0 - -
1.2381 #NAME? #NAME? 0 - -
1.2382 #NAME? #NAME? 0 - -
1.2383 #NAME? #NAME? 0 - -

file:///conversion/tmp/scratch/454095803.xlsxPrinted: 01/03/2020 - 21:53:30 <EA>


1.2384 #NAME? #NAME? 0 - -
1.2385 #NAME? #NAME? 0 - -
1.2386 #NAME? #NAME? 0 - -
1.2387 #NAME? #NAME? 0 - -
1.2388 #NAME? #NAME? 0 - -
1.2389 #NAME? #NAME? 0 - -
1.2390 #NAME? #NAME? 0 - -
1.2391 #NAME? #NAME? 0 - -
1.2392 #NAME? #NAME? 0 - -
1.2393 #NAME? #NAME? 0 - -
1.2394 #NAME? #NAME? 0 - -
1.2395 #NAME? #NAME? 0 - -
1.2396 #NAME? #NAME? 0 - -
1.2397 #NAME? #NAME? 0 - -
1.2398 #NAME? #NAME? 0 - -
1.2399 #NAME? #NAME? 0 - -
1.2400 #NAME? #NAME? 0 - -
1.2401 #NAME? #NAME? 0 - -
1.2402 #NAME? #NAME? 0 - -
1.2403 #NAME? #NAME? 0 - -
1.2404 #NAME? #NAME? 0 - -
1.2405 #NAME? #NAME? 0 - -
1.2406 #NAME? #NAME? 0 - -
1.2407 #NAME? #NAME? 0 - -
1.2408 #NAME? #NAME? 0 - -
1.2409 #NAME? #NAME? 0 - -
1.2410 #NAME? #NAME? 0 - -
1.2411 #NAME? #NAME? 0 - -
1.2412 #NAME? #NAME? 0 - -
1.2413 #NAME? #NAME? 0 - -
1.2414 #NAME? #NAME? 0 - -
1.2415 #NAME? #NAME? 0 - -
1.2416 #NAME? #NAME? 0 - -
1.2417 #NAME? #NAME? 0 - -
1.2418 #NAME? #NAME? 0 - -
1.2419 #NAME? #NAME? 0 - -
1.2420 #NAME? #NAME? 0 - -
1.2421 #NAME? #NAME? 0 - -
1.2422 #NAME? #NAME? 0 - -
1.2423 #NAME? #NAME? 0 - -
1.2424 #NAME? #NAME? 0 - -
1.2425 #NAME? #NAME? 0 - -
1.2426 #NAME? #NAME? 0 - -
1.2427 #NAME? #NAME? 0 - -
1.2428 #NAME? #NAME? 0 - -
1.2429 #NAME? #NAME? 0 - -
1.2430 #NAME? #NAME? 0 - -
1.2431 #NAME? #NAME? 0 - -
1.2432 #NAME? #NAME? 0 - -
1.2433 #NAME? #NAME? 0 - -
1.2434 #NAME? #NAME? 0 - -
1.2435 #NAME? #NAME? 0 - -
1.2436 #NAME? #NAME? 0 - -
1.2437 #NAME? #NAME? 0 - -
1.2438 #NAME? #NAME? 0 - -
1.2439 #NAME? #NAME? 0 - -
1.2440 #NAME? #NAME? 0 - -
1.2441 #NAME? #NAME? 0 - -
1.2442 #NAME? #NAME? 0 - -
1.2443 #NAME? #NAME? 0 - -
1.2444 #NAME? #NAME? 0 - -
1.2445 #NAME? #NAME? 0 - -
1.2446 #NAME? #NAME? 0 - -
1.2447 #NAME? #NAME? 0 - -
1.2448 #NAME? #NAME? 0 - -
1.2449 #NAME? #NAME? 0 - -
1.2450 #NAME? #NAME? 0 - -
1.2451 #NAME? #NAME? 0 - -
1.2452 #NAME? #NAME? 0 - -
1.2453 #NAME? #NAME? 0 - -
1.2454 #NAME? #NAME? 0 - -
1.2455 #NAME? #NAME? 0 - -
1.2456 #NAME? #NAME? 0 - -
1.2457 #NAME? #NAME? 0 - -
1.2458 #NAME? #NAME? 0 - -
1.2459 #NAME? #NAME? 0 - -
1.2460 #NAME? #NAME? 0 - -
1.2461 #NAME? #NAME? 0 - -
1.2462 #NAME? #NAME? 0 - -
1.2463 #NAME? #NAME? 0 - -
1.2464 #NAME? #NAME? 0 - -
1.2465 #NAME? #NAME? 0 - -
1.2466 #NAME? #NAME? 0 - -
1.2467 #NAME? #NAME? 0 - -
1.2468 #NAME? #NAME? 0 - -
1.2469 #NAME? #NAME? 0 - -
1.2470 #NAME? #NAME? 0 - -
1.2471 #NAME? #NAME? 0 - -
1.2472 #NAME? #NAME? 0 - -
1.2473 #NAME? #NAME? 0 - -
1.2474 #NAME? #NAME? 0 - -
1.2475 #NAME? #NAME? 0 - -
1.2476 #NAME? #NAME? 0 - -
1.2477 #NAME? #NAME? 0 - -
1.2478 #NAME? #NAME? 0 - -
1.2479 #NAME? #NAME? 0 - -
1.2480 #NAME? #NAME? 0 - -
1.2481 #NAME? #NAME? 0 - -
1.2482 #NAME? #NAME? 0 - -
1.2483 #NAME? #NAME? 0 - -
1.2484 #NAME? #NAME? 0 - -
1.2485 #NAME? #NAME? 0 - -
1.2486 #NAME? #NAME? 0 - -
1.2487 #NAME? #NAME? 0 - -
1.2488 #NAME? #NAME? 0 - -
1.2489 #NAME? #NAME? 0 - -
1.2490 #NAME? #NAME? 0 - -
1.2491 #NAME? #NAME? 0 - -
1.2492 #NAME? #NAME? 0 - -
1.2493 #NAME? #NAME? 0 - -
1.2494 #NAME? #NAME? 0 - -
1.2495 #NAME? #NAME? 0 - -
1.2496 #NAME? #NAME? 0 - -
1.2497 #NAME? #NAME? 0 - -
1.2498 #NAME? #NAME? 0 - -
1.2499 #NAME? #NAME? 0 - -
1.2500 #NAME? #NAME? 0 - -
1.2501 #NAME? #NAME? 0 - -
1.2502 #NAME? #NAME? 0 - -
1.2503 #NAME? #NAME? 0 - -
1.2504 #NAME? #NAME? 0 - -
1.2505 #NAME? #NAME? 0 - -
1.2506 #NAME? #NAME? 0 - -
1.2507 #NAME? #NAME? 0 - -
1.2508 #NAME? #NAME? 0 - -
1.2509 #NAME? #NAME? 0 - -
1.2510 #NAME? #NAME? 0 - -
1.2511 #NAME? #NAME? 0 - -
1.2512 #NAME? #NAME? 0 - -
1.2513 #NAME? #NAME? 0 - -
1.2514 #NAME? #NAME? 0 - -
1.2515 #NAME? #NAME? 0 - -
1.2516 #NAME? #NAME? 0 - -
1.2517 #NAME? #NAME? 0 - -
1.2518 #NAME? #NAME? 0 - -
1.2519 #NAME? #NAME? 0 - -
1.2520 #NAME? #NAME? 0 - -
1.2521 #NAME? #NAME? 0 - -
1.2522 #NAME? #NAME? 0 - -
1.2523 #NAME? #NAME? 0 - -
1.2524 #NAME? #NAME? 0 - -
1.2525 #NAME? #NAME? 0 - -
1.2526 #NAME? #NAME? 0 - -
1.2527 #NAME? #NAME? 0 - -
1.2528 #NAME? #NAME? 0 - -
1.2529 #NAME? #NAME? 0 - -
1.2530 #NAME? #NAME? 0 - -
1.2531 #NAME? #NAME? 0 - -
1.2532 #NAME? #NAME? 0 - -
1.2533 #NAME? #NAME? 0 - -
1.2534 #NAME? #NAME? 0 - -
1.2535 #NAME? #NAME? 0 - -
1.2536 #NAME? #NAME? 0 - -
1.2537 #NAME? #NAME? 0 - -
1.2538 #NAME? #NAME? 0 - -
1.2539 #NAME? #NAME? 0 - -
1.2540 #NAME? #NAME? 0 - -
1.2541 #NAME? #NAME? 0 - -
1.2542 #NAME? #NAME? 0 - -
1.2543 #NAME? #NAME? 0 - -
1.2544 #NAME? #NAME? 0 - -
1.2545 #NAME? #NAME? 0 - -
1.2546 #NAME? #NAME? 0 - -
1.2547 #NAME? #NAME? 0 - -
1.2548 #NAME? #NAME? 0 - -
1.2549 #NAME? #NAME? 0 - -
1.2550 #NAME? #NAME? 0 - -
1.2551 #NAME? #NAME? 0 - -
1.2552 #NAME? #NAME? 0 - -
1.2553 #NAME? #NAME? 0 - -
1.2554 #NAME? #NAME? 0 - -
1.2555 #NAME? #NAME? 0 - -
1.2556 #NAME? #NAME? 0 - -
1.2557 #NAME? #NAME? 0 - -
1.2558 #NAME? #NAME? 0 - -
1.2559 #NAME? #NAME? 0 - -
1.2560 #NAME? #NAME? 0 - -
1.2561 #NAME? #NAME? 0 - -
1.2562 #NAME? #NAME? 0 - -
1.2563 #NAME? #NAME? 0 - -
1.2564 #NAME? #NAME? 0 - -
1.2565 #NAME? #NAME? 0 - -
1.2566 #NAME? #NAME? 0 - -
1.2567 #NAME? #NAME? 0 - -
1.2568 #NAME? #NAME? 0 - -
1.2569 #NAME? #NAME? 0 - -
1.2570 #NAME? #NAME? 0 - -
1.2571 #NAME? #NAME? 0 - -
1.2572 #NAME? #NAME? 0 - -
1.2573 #NAME? #NAME? 0 - -
1.2574 #NAME? #NAME? 0 - -
1.2575 #NAME? #NAME? 0 - -
1.2576 #NAME? #NAME? 0 - -
1.2577 #NAME? #NAME? 0 - -
1.2578 #NAME? #NAME? 0 - -
1.2579 #NAME? #NAME? 0 - -
1.2580 #NAME? #NAME? 0 - -
1.2581 #NAME? #NAME? 0 - -
1.2582 #NAME? #NAME? 0 - -
1.2583 #NAME? #NAME? 0 - -
1.2584 #NAME? #NAME? 0 - -
1.2585 #NAME? #NAME? 0 - -
1.2586 #NAME? #NAME? 0 - -
1.2587 #NAME? #NAME? 0 - -

file:///conversion/tmp/scratch/454095803.xlsxPrinted: 01/03/2020 - 21:53:30 <EA>


1.2588 #NAME? #NAME? 0 - -
1.2589 #NAME? #NAME? 0 - -
1.2590 #NAME? #NAME? 0 - -
1.2591 #NAME? #NAME? 0 - -
1.2592 #NAME? #NAME? 0 - -
1.2593 #NAME? #NAME? 0 - -
1.2594 #NAME? #NAME? 0 - -
1.2595 #NAME? #NAME? 0 - -
1.2596 #NAME? #NAME? 0 - -
1.2597 #NAME? #NAME? 0 - -
1.2598 #NAME? #NAME? 0 - -
1.2599 #NAME? #NAME? 0 - -
1.2600 #NAME? #NAME? 0 - -
1.2601 #NAME? #NAME? 0 - -
1.2602 #NAME? #NAME? 0 - -
1.2603 #NAME? #NAME? 0 - -
1.2604 #NAME? #NAME? 0 - -
1.2605 #NAME? #NAME? 0 - -
1.2606 #NAME? #NAME? 0 - -
1.2607 #NAME? #NAME? 0 - -
1.2608 #NAME? #NAME? 0 - -
1.2609 #NAME? #NAME? 0 - -
1.2610 #NAME? #NAME? 0 - -
1.2611 #NAME? #NAME? 0 - -
1.2612 #NAME? #NAME? 0 - -
1.2613 #NAME? #NAME? 0 - -
1.2614 #NAME? #NAME? 0 - -
1.2615 #NAME? #NAME? 0 - -
1.2616 #NAME? #NAME? 0 - -
1.2617 #NAME? #NAME? 0 - -
1.2618 #NAME? #NAME? 0 - -
1.2619 #NAME? #NAME? 0 - -
1.2620 #NAME? #NAME? 0 - -
1.2621 #NAME? #NAME? 0 - -
1.2622 #NAME? #NAME? 0 - -
1.2623 #NAME? #NAME? 0 - -
1.2624 #NAME? #NAME? 0 - -
1.2625 #NAME? #NAME? 0 - -
1.2626 #NAME? #NAME? 0 - -
1.2627 #NAME? #NAME? 0 - -
1.2628 #NAME? #NAME? 0 - -
1.2629 #NAME? #NAME? 0 - -
1.2630 #NAME? #NAME? 0 - -
1.2631 #NAME? #NAME? 0 - -
1.2632 #NAME? #NAME? 0 - -
1.2633 #NAME? #NAME? 0 - -
1.2634 #NAME? #NAME? 0 - -
1.2635 #NAME? #NAME? 0 - -
1.2636 #NAME? #NAME? 0 - -
1.2637 #NAME? #NAME? 0 - -
1.2638 #NAME? #NAME? 0 - -
1.2639 #NAME? #NAME? 0 - -
1.2640 #NAME? #NAME? 0 - -
1.2641 #NAME? #NAME? 0 - -
1.2642 #NAME? #NAME? 0 - -
1.2643 #NAME? #NAME? 0 - -
1.2644 #NAME? #NAME? 0 - -
1.2645 #NAME? #NAME? 0 - -
1.2646 #NAME? #NAME? 0 - -
1.2647 #NAME? #NAME? 0 - -
1.2648 #NAME? #NAME? 0 - -
1.2649 #NAME? #NAME? 0 - -
1.2650 #NAME? #NAME? 0 - -
1.2651 #NAME? #NAME? 0 - -
1.2652 #NAME? #NAME? 0 - -
1.2653 #NAME? #NAME? 0 - -
1.2654 #NAME? #NAME? 0 - -
1.2655 #NAME? #NAME? 0 - -
1.2656 #NAME? #NAME? 0 - -
1.2657 #NAME? #NAME? 0 - -
1.2658 #NAME? #NAME? 0 - -
1.2659 #NAME? #NAME? 0 - -
1.2660 #NAME? #NAME? 0 - -
1.2661 #NAME? #NAME? 0 - -
1.2662 #NAME? #NAME? 0 - -
1.2663 #NAME? #NAME? 0 - -
1.2664 #NAME? #NAME? 0 - -
1.2665 #NAME? #NAME? 0 - -
1.2666 #NAME? #NAME? 0 - -
1.2667 #NAME? #NAME? 0 - -
1.2668 #NAME? #NAME? 0 - -
1.2669 #NAME? #NAME? 0 - -
1.2670 #NAME? #NAME? 0 - -
1.2671 #NAME? #NAME? 0 - -
1.2672 #NAME? #NAME? 0 - -
1.2673 #NAME? #NAME? 0 - -
1.2674 #NAME? #NAME? 0 - -
1.2675 #NAME? #NAME? 0 - -
1.2676 #NAME? #NAME? 0 - -
1.2677 #NAME? #NAME? 0 - -
1.2678 #NAME? #NAME? 0 - -
1.2679 #NAME? #NAME? 0 - -
1.2680 #NAME? #NAME? 0 - -
1.2681 #NAME? #NAME? 0 - -
1.2682 #NAME? #NAME? 0 - -
1.2683 #NAME? #NAME? 0 - -
1.2684 #NAME? #NAME? 0 - -
1.2685 #NAME? #NAME? 0 - -
1.2686 #NAME? #NAME? 0 - -
1.2687 #NAME? #NAME? 0 - -
1.2688 #NAME? #NAME? 0 - -
1.2689 #NAME? #NAME? 0 - -
1.2690 #NAME? #NAME? 0 - -
1.2691 #NAME? #NAME? 0 - -
1.2692 #NAME? #NAME? 0 - -
1.2693 #NAME? #NAME? 0 - -
1.2694 #NAME? #NAME? 0 - -
1.2695 #NAME? #NAME? 0 - -
1.2696 #NAME? #NAME? 0 - -
1.2697 #NAME? #NAME? 0 - -
1.2698 #NAME? #NAME? 0 - -
1.2699 #NAME? #NAME? 0 - -
1.2700 #NAME? #NAME? 0 - -
1.2701 #NAME? #NAME? 0 - -
1.2702 #NAME? #NAME? 0 - -
1.2703 #NAME? #NAME? 0 - -
1.2704 #NAME? #NAME? 0 - -
1.2705 #NAME? #NAME? 0 - -
1.2706 #NAME? #NAME? 0 - -
1.2707 #NAME? #NAME? 0 - -
1.2708 #NAME? #NAME? 0 - -
1.2709 #NAME? #NAME? 0 - -
1.2710 #NAME? #NAME? 0 - -
1.2711 #NAME? #NAME? 0 - -
1.2712 #NAME? #NAME? 0 - -
1.2713 #NAME? #NAME? 0 - -
1.2714 #NAME? #NAME? 0 - -
1.2715 #NAME? #NAME? 0 - -
1.2716 #NAME? #NAME? 0 - -
1.2717 #NAME? #NAME? 0 - -
1.2718 #NAME? #NAME? 0 - -
1.2719 #NAME? #NAME? 0 - -
1.2720 #NAME? #NAME? 0 - -
1.2721 #NAME? #NAME? 0 - -
1.2722 #NAME? #NAME? 0 - -
1.2723 #NAME? #NAME? 0 - -
1.2724 #NAME? #NAME? 0 - -
1.2725 #NAME? #NAME? 0 - -
1.2726 #NAME? #NAME? 0 - -
1.2727 #NAME? #NAME? 0 - -
1.2728 #NAME? #NAME? 0 - -
1.2729 #NAME? #NAME? 0 - -
1.2730 #NAME? #NAME? 0 - -
1.2731 #NAME? #NAME? 0 - -
1.2732 #NAME? #NAME? 0 - -
1.2733 #NAME? #NAME? 0 - -
1.2734 #NAME? #NAME? 0 - -
1.2735 #NAME? #NAME? 0 - -
1.2736 #NAME? #NAME? 0 - -
1.2737 #NAME? #NAME? 0 - -
1.2738 #NAME? #NAME? 0 - -
1.2739 #NAME? #NAME? 0 - -
1.2740 #NAME? #NAME? 0 - -
1.2741 #NAME? #NAME? 0 - -
1.2742 #NAME? #NAME? 0 - -
1.2743 #NAME? #NAME? 0 - -
1.2744 #NAME? #NAME? 0 - -
1.2745 #NAME? #NAME? 0 - -
1.2746 #NAME? #NAME? 0 - -
1.2747 #NAME? #NAME? 0 - -
1.2748 #NAME? #NAME? 0 - -
1.2749 #NAME? #NAME? 0 - -
1.2750 #NAME? #NAME? 0 - -
1.2751 #NAME? #NAME? 0 - -
1.2752 #NAME? #NAME? 0 - -
1.2753 #NAME? #NAME? 0 - -
1.2754 #NAME? #NAME? 0 - -
1.2755 #NAME? #NAME? 0 - -
1.2756 #NAME? #NAME? 0 - -
1.2757 #NAME? #NAME? 0 - -
1.2758 #NAME? #NAME? 0 - -
1.2759 #NAME? #NAME? 0 - -
1.2760 #NAME? #NAME? 0 - -
1.2761 #NAME? #NAME? 0 - -
1.2762 #NAME? #NAME? 0 - -
1.2763 #NAME? #NAME? 0 - -
1.2764 #NAME? #NAME? 0 - -
1.2765 #NAME? #NAME? 0 - -
1.2766 #NAME? #NAME? 0 - -
1.2767 #NAME? #NAME? 0 - -
1.2768 #NAME? #NAME? 0 - -
1.2769 #NAME? #NAME? 0 - -
1.2770 #NAME? #NAME? 0 - -
1.2771 #NAME? #NAME? 0 - -
1.2772 #NAME? #NAME? 0 - -
1.2773 #NAME? #NAME? 0 - -
1.2774 #NAME? #NAME? 0 - -
1.2775 #NAME? #NAME? 0 - -
1.2776 #NAME? #NAME? 0 - -
1.2777 #NAME? #NAME? 0 - -
1.2778 #NAME? #NAME? 0 - -
1.2779 #NAME? #NAME? 0 - -
1.2780 #NAME? #NAME? 0 - -
1.2781 #NAME? #NAME? 0 - -
1.2782 #NAME? #NAME? 0 - -
1.2783 #NAME? #NAME? 0 - -
1.2784 #NAME? #NAME? 0 - -
1.2785 #NAME? #NAME? 0 - -
1.2786 #NAME? #NAME? 0 - -
1.2787 #NAME? #NAME? 0 - -
1.2788 #NAME? #NAME? 0 - -
1.2789 #NAME? #NAME? 0 - -
1.2790 #NAME? #NAME? 0 - -
1.2791 #NAME? #NAME? 0 - -

file:///conversion/tmp/scratch/454095803.xlsxPrinted: 01/03/2020 - 21:53:30 <EA>


1.2792 #NAME? #NAME? 0 - -
1.2793 #NAME? #NAME? 0 - -
1.2794 #NAME? #NAME? 0 - -
1.2795 #NAME? #NAME? 0 - -
1.2796 #NAME? #NAME? 0 - -
1.2797 #NAME? #NAME? 0 - -
1.2798 #NAME? #NAME? 0 - -
1.2799 #NAME? #NAME? 0 - -
1.2800 #NAME? #NAME? 0 - -
1.2801 #NAME? #NAME? 0 - -
1.2802 #NAME? #NAME? 0 - -
1.2803 #NAME? #NAME? 0 - -
1.2804 #NAME? #NAME? 0 - -
1.2805 #NAME? #NAME? 0 - -
1.2806 #NAME? #NAME? 0 - -
1.2807 #NAME? #NAME? 0 - -
1.2808 #NAME? #NAME? 0 - -
1.2809 #NAME? #NAME? 0 - -
1.2810 #NAME? #NAME? 0 - -
1.2811 #NAME? #NAME? 0 - -
1.2812 #NAME? #NAME? 0 - -
1.2813 #NAME? #NAME? 0 - -
1.2814 #NAME? #NAME? 0 - -
1.2815 #NAME? #NAME? 0 - -
1.2816 #NAME? #NAME? 0 - -
1.2817 #NAME? #NAME? 0 - -
1.2818 #NAME? #NAME? 0 - -
1.2819 #NAME? #NAME? 0 - -
1.2820 #NAME? #NAME? 0 - -
1.2821 #NAME? #NAME? 0 - -
1.2822 #NAME? #NAME? 0 - -
1.2823 #NAME? #NAME? 0 - -
1.2824 #NAME? #NAME? 0 - -
1.2825 #NAME? #NAME? 0 - -
1.2826 #NAME? #NAME? 0 - -
1.2827 #NAME? #NAME? 0 - -
1.2828 #NAME? #NAME? 0 - -
1.2829 #NAME? #NAME? 0 - -
1.2830 #NAME? #NAME? 0 - -
1.2831 #NAME? #NAME? 0 - -
1.2832 #NAME? #NAME? 0 - -
1.2833 #NAME? #NAME? 0 - -
1.2834 #NAME? #NAME? 0 - -
1.2835 #NAME? #NAME? 0 - -
1.2836 #NAME? #NAME? 0 - -
1.2837 #NAME? #NAME? 0 - -
1.2838 #NAME? #NAME? 0 - -
1.2839 #NAME? #NAME? 0 - -
1.2840 #NAME? #NAME? 0 - -
1.2841 #NAME? #NAME? 0 - -
1.2842 #NAME? #NAME? 0 - -
1.2843 #NAME? #NAME? 0 - -
1.2844 #NAME? #NAME? 0 - -
1.2845 #NAME? #NAME? 0 - -
1.2846 #NAME? #NAME? 0 - -
1.2847 #NAME? #NAME? 0 - -
1.2848 #NAME? #NAME? 0 - -
1.2849 #NAME? #NAME? 0 - -
1.2850 #NAME? #NAME? 0 - -
1.2851 #NAME? #NAME? 0 - -
1.2852 #NAME? #NAME? 0 - -
1.2853 #NAME? #NAME? 0 - -
1.2854 #NAME? #NAME? 0 - -
1.2855 #NAME? #NAME? 0 - -
1.2856 #NAME? #NAME? 0 - -
1.2857 #NAME? #NAME? 0 - -
1.2858 #NAME? #NAME? 0 - -
1.2859 #NAME? #NAME? 0 - -
1.2860 #NAME? #NAME? 0 - -
1.2861 #NAME? #NAME? 0 - -
1.2862 #NAME? #NAME? 0 - -
1.2863 #NAME? #NAME? 0 - -
1.2864 #NAME? #NAME? 0 - -
1.2865 #NAME? #NAME? 0 - -
1.2866 #NAME? #NAME? 0 - -
1.2867 #NAME? #NAME? 0 - -
1.2868 #NAME? #NAME? 0 - -
1.2869 #NAME? #NAME? 0 - -
1.2870 #NAME? #NAME? 0 - -
1.2871 #NAME? #NAME? 0 - -
1.2872 #NAME? #NAME? 0 - -
1.2873 #NAME? #NAME? 0 - -
1.2874 #NAME? #NAME? 0 - -
1.2875 #NAME? #NAME? 0 - -
1.2876 #NAME? #NAME? 0 - -
1.2877 #NAME? #NAME? 0 - -
1.2878 #NAME? #NAME? 0 - -
1.2879 #NAME? #NAME? 0 - -
1.2880 #NAME? #NAME? 0 - -
1.2881 #NAME? #NAME? 0 - -
1.2882 #NAME? #NAME? 0 - -
1.2883 #NAME? #NAME? 0 - -
1.2884 #NAME? #NAME? 0 - -
1.2885 #NAME? #NAME? 0 - -
1.2886 #NAME? #NAME? 0 - -
1.2887 #NAME? #NAME? 0 - -
1.2888 #NAME? #NAME? 0 - -
1.2889 #NAME? #NAME? 0 - -
1.2890 #NAME? #NAME? 0 - -
1.2891 #NAME? #NAME? 0 - -
1.2892 #NAME? #NAME? 0 - -
1.2893 #NAME? #NAME? 0 - -
1.2894 #NAME? #NAME? 0 - -
1.2895 #NAME? #NAME? 0 - -
1.2896 #NAME? #NAME? 0 - -
1.2897 #NAME? #NAME? 0 - -
1.2898 #NAME? #NAME? 0 - -
1.2899 #NAME? #NAME? 0 - -
1.2900 #NAME? #NAME? 0 - -
1.2901 #NAME? #NAME? 0 - -
1.2902 #NAME? #NAME? 0 - -
1.2903 #NAME? #NAME? 0 - -
1.2904 #NAME? #NAME? 0 - -
1.2905 #NAME? #NAME? 0 - -
1.2906 #NAME? #NAME? 0 - -
1.2907 #NAME? #NAME? 0 - -
1.2908 #NAME? #NAME? 0 - -
1.2909 #NAME? #NAME? 0 - -
1.2910 #NAME? #NAME? 0 - -
1.2911 #NAME? #NAME? 0 - -
1.2912 #NAME? #NAME? 0 - -
1.2913 #NAME? #NAME? 0 - -
1.2914 #NAME? #NAME? 0 - -
1.2915 #NAME? #NAME? 0 - -
1.2916 #NAME? #NAME? 0 - -
1.2917 #NAME? #NAME? 0 - -
1.2918 #NAME? #NAME? 0 - -
1.2919 #NAME? #NAME? 0 - -
1.2920 #NAME? #NAME? 0 - -
1.2921 #NAME? #NAME? 0 - -
1.2922 #NAME? #NAME? 0 - -
1.2923 #NAME? #NAME? 0 - -
1.2924 #NAME? #NAME? 0 - -
1.2925 #NAME? #NAME? 0 - -
1.2926 #NAME? #NAME? 0 - -
1.2927 #NAME? #NAME? 0 - -
1.2928 #NAME? #NAME? 0 - -
1.2929 #NAME? #NAME? 0 - -
1.2930 #NAME? #NAME? 0 - -
1.2931 #NAME? #NAME? 0 - -
1.2932 #NAME? #NAME? 0 - -
1.2933 #NAME? #NAME? 0 - -
1.2934 #NAME? #NAME? 0 - -
1.2935 #NAME? #NAME? 0 - -
1.2936 #NAME? #NAME? 0 - -
1.2937 #NAME? #NAME? 0 - -
1.2938 #NAME? #NAME? 0 - -
1.2939 #NAME? #NAME? 0 - -
1.2940 #NAME? #NAME? 0 - -
1.2941 #NAME? #NAME? 0 - -
1.2942 #NAME? #NAME? 0 - -
1.2943 #NAME? #NAME? 0 - -
1.2944 #NAME? #NAME? 0 - -
1.2945 #NAME? #NAME? 0 - -
1.2946 #NAME? #NAME? 0 - -
1.2947 #NAME? #NAME? 0 - -
1.2948 #NAME? #NAME? 0 - -
1.2949 #NAME? #NAME? 0 - -
1.2950 #NAME? #NAME? 0 - -
1.2951 #NAME? #NAME? 0 - -
1.2952 #NAME? #NAME? 0 - -
1.2953 #NAME? #NAME? 0 - -
1.2954 #NAME? #NAME? 0 - -
1.2955 #NAME? #NAME? 0 - -
1.2956 #NAME? #NAME? 0 - -
1.2957 #NAME? #NAME? 0 - -
1.2958 #NAME? #NAME? 0 - -
1.2959 #NAME? #NAME? 0 - -
1.2960 #NAME? #NAME? 0 - -
1.2961 #NAME? #NAME? 0 - -
1.2962 #NAME? #NAME? 0 - -
1.2963 #NAME? #NAME? 0 - -
1.2964 #NAME? #NAME? 0 - -
1.2965 #NAME? #NAME? 0 - -
1.2966 #NAME? #NAME? 0 - -
1.2967 #NAME? #NAME? 0 - -
1.2968 #NAME? #NAME? 0 - -
1.2969 #NAME? #NAME? 0 - -
1.2970 #NAME? #NAME? 0 - -
1.2971 #NAME? #NAME? 0 - -
1.2972 #NAME? #NAME? 0 - -
1.2973 #NAME? #NAME? 0 - -
1.2974 #NAME? #NAME? 0 - -
1.2975 #NAME? #NAME? 0 - -
1.2976 #NAME? #NAME? 0 - -
1.2977 #NAME? #NAME? 0 - -
1.2978 #NAME? #NAME? 0 - -
1.2979 #NAME? #NAME? 0 - -
1.2980 #NAME? #NAME? 0 - -
1.2981 #NAME? #NAME? 0 - -
1.2982 #NAME? #NAME? 0 - -
1.2983 #NAME? #NAME? 0 - -
1.2984 #NAME? #NAME? 0 - -
1.2985 #NAME? #NAME? 0 - -
1.2986 #NAME? #NAME? 0 - -
1.2987 #NAME? #NAME? 0 - -
1.2988 #NAME? #NAME? 0 - -
1.2989 #NAME? #NAME? 0 - -
1.2990 #NAME? #NAME? 0 - -
1.2991 #NAME? #NAME? 0 - -
1.2992 #NAME? #NAME? 0 - -
1.2993 #NAME? #NAME? 0 - -
1.2994 #NAME? #NAME? 0 - -
1.2995 #NAME? #NAME? 0 - -

file:///conversion/tmp/scratch/454095803.xlsxPrinted: 01/03/2020 - 21:53:30 <EA>


1.2996 #NAME? #NAME? 0 - -
1.2997 #NAME? #NAME? 0 - -
1.2998 #NAME? #NAME? 0 - -
1.2999 #NAME? #NAME? 0 - -
1.3000 #NAME? #NAME? 0 - -
1.3001 #NAME? #NAME? 0 - -
1.3002 #NAME? #NAME? 0 - -
1.3003 #NAME? #NAME? 0 - -
1.3004 #NAME? #NAME? 0 - -
1.3005 #NAME? #NAME? 0 - -
1.3006 #NAME? #NAME? 0 - -
1.3007 #NAME? #NAME? 0 - -
1.3008 #NAME? #NAME? 0 - -
1.3009 #NAME? #NAME? 0 - -
1.3010 #NAME? #NAME? 0 - -
1.3011 #NAME? #NAME? 0 - -
1.3012 #NAME? #NAME? 0 - -
1.3013 #NAME? #NAME? 0 - -
1.3014 #NAME? #NAME? 0 - -
1.3015 #NAME? #NAME? 0 - -
1.3016 #NAME? #NAME? 0 - -
1.3017 #NAME? #NAME? 0 - -
1.3018 #NAME? #NAME? 0 - -
1.3019 #NAME? #NAME? 0 - -
1.3020 #NAME? #NAME? 0 - -
1.3021 #NAME? #NAME? 0 - -
1.3022 #NAME? #NAME? 0 - -
1.3023 #NAME? #NAME? 0 - -
1.3024 #NAME? #NAME? 0 - -
1.3025 #NAME? #NAME? 0 - -
1.3026 #NAME? #NAME? 0 - -
1.3027 #NAME? #NAME? 0 - -
1.3028 #NAME? #NAME? 0 - -
1.3029 #NAME? #NAME? 0 - -
1.3030 #NAME? #NAME? 0 - -
1.3031 #NAME? #NAME? 0 - -
1.3032 #NAME? #NAME? 0 - -
1.3033 #NAME? #NAME? 0 - -
1.3034 #NAME? #NAME? 0 - -
1.3035 #NAME? #NAME? 0 - -
1.3036 #NAME? #NAME? 0 - -
1.3037 #NAME? #NAME? 0 - -
1.3038 #NAME? #NAME? 0 - -
1.3039 #NAME? #NAME? 0 - -
1.3040 #NAME? #NAME? 0 - -
1.3041 #NAME? #NAME? 0 - -
1.3042 #NAME? #NAME? 0 - -
1.3043 #NAME? #NAME? 0 - -
1.3044 #NAME? #NAME? 0 - -
1.3045 #NAME? #NAME? 0 - -
1.3046 #NAME? #NAME? 0 - -
1.3047 #NAME? #NAME? 0 - -
1.3048 #NAME? #NAME? 0 - -
1.3049 #NAME? #NAME? 0 - -
1.3050 #NAME? #NAME? 0 - -
1.3051 #NAME? #NAME? 0 - -
1.3052 #NAME? #NAME? 0 - -
1.3053 #NAME? #NAME? 0 - -
1.3054 #NAME? #NAME? 0 - -
1.3055 #NAME? #NAME? 0 - -
1.3056 #NAME? #NAME? 0 - -
1.3057 #NAME? #NAME? 0 - -
1.3058 #NAME? #NAME? 0 - -
1.3059 #NAME? #NAME? 0 - -
1.3060 #NAME? #NAME? 0 - -
1.3061 #NAME? #NAME? 0 - -
1.3062 #NAME? #NAME? 0 - -
1.3063 #NAME? #NAME? 0 - -
1.3064 #NAME? #NAME? 0 - -
1.3065 #NAME? #NAME? 0 - -
1.3066 #NAME? #NAME? 0 - -
1.3067 #NAME? #NAME? 0 - -
1.3068 #NAME? #NAME? 0 - -
1.3069 #NAME? #NAME? 0 - -
1.3070 #NAME? #NAME? 0 - -
1.3071 #NAME? #NAME? 0 - -
1.3072 #NAME? #NAME? 0 - -
1.3073 #NAME? #NAME? 0 - -
1.3074 #NAME? #NAME? 0 - -
1.3075 #NAME? #NAME? 0 - -
1.3076 #NAME? #NAME? 0 - -
1.3077 #NAME? #NAME? 0 - -
1.3078 #NAME? #NAME? 0 - -
1.3079 #NAME? #NAME? 0 - -
1.3080 #NAME? #NAME? 0 - -
1.3081 #NAME? #NAME? 0 - -
1.3082 #NAME? #NAME? 0 - -
1.3083 #NAME? #NAME? 0 - -
1.3084 #NAME? #NAME? 0 - -
1.3085 #NAME? #NAME? 0 - -
1.3086 #NAME? #NAME? 0 - -
1.3087 #NAME? #NAME? 0 - -
1.3088 #NAME? #NAME? 0 - -
1.3089 #NAME? #NAME? 0 - -
1.3090 #NAME? #NAME? 0 - -
1.3091 #NAME? #NAME? 0 - -
1.3092 #NAME? #NAME? 0 - -
1.3093 #NAME? #NAME? 0 - -
1.3094 #NAME? #NAME? 0 - -
1.3095 #NAME? #NAME? 0 - -
1.3096 #NAME? #NAME? 0 - -
1.3097 #NAME? #NAME? 0 - -
1.3098 #NAME? #NAME? 0 - -
1.3099 #NAME? #NAME? 0 - -
1.3100 #NAME? #NAME? 0 - -
1.3101 #NAME? #NAME? 0 - -
1.3102 #NAME? #NAME? 0 - -
1.3103 #NAME? #NAME? 0 - -
1.3104 #NAME? #NAME? 0 - -
1.3105 #NAME? #NAME? 0 - -
1.3106 #NAME? #NAME? 0 - -
1.3107 #NAME? #NAME? 0 - -
1.3108 #NAME? #NAME? 0 - -
1.3109 #NAME? #NAME? 0 - -
1.3110 #NAME? #NAME? 0 - -
1.3111 #NAME? #NAME? 0 - -
1.3112 #NAME? #NAME? 0 - -
1.3113 #NAME? #NAME? 0 - -
1.3114 #NAME? #NAME? 0 - -
1.3115 #NAME? #NAME? 0 - -
1.3116 #NAME? #NAME? 0 - -
1.3117 #NAME? #NAME? 0 - -
1.3118 #NAME? #NAME? 0 - -
1.3119 #NAME? #NAME? 0 - -
1.3120 #NAME? #NAME? 0 - -
1.3121 #NAME? #NAME? 0 - -
1.3122 #NAME? #NAME? 0 - -
1.3123 #NAME? #NAME? 0 - -
1.3124 #NAME? #NAME? 0 - -
1.3125 #NAME? #NAME? 0 - -
1.3126 #NAME? #NAME? 0 - -
1.3127 #NAME? #NAME? 0 - -
1.3128 #NAME? #NAME? 0 - -
1.3129 #NAME? #NAME? 0 - -
1.3130 #NAME? #NAME? 0 - -
1.3131 #NAME? #NAME? 0 - -
1.3132 #NAME? #NAME? 0 - -
1.3133 #NAME? #NAME? 0 - -
1.3134 #NAME? #NAME? 0 - -
1.3135 #NAME? #NAME? 0 - -
1.3136 #NAME? #NAME? 0 - -
1.3137 #NAME? #NAME? 0 - -
1.3138 #NAME? #NAME? 0 - -
1.3139 #NAME? #NAME? 0 - -
1.3140 #NAME? #NAME? 0 - -
1.3141 #NAME? #NAME? 0 - -
1.3142 #NAME? #NAME? 0 - -
1.3143 #NAME? #NAME? 0 - -
1.3144 #NAME? #NAME? 0 - -
1.3145 #NAME? #NAME? 0 - -
1.3146 #NAME? #NAME? 0 - -
1.3147 #NAME? #NAME? 0 - -
1.3148 #NAME? #NAME? 0 - -
1.3149 #NAME? #NAME? 0 - -
1.3150 #NAME? #NAME? 0 - -
1.3151 #NAME? #NAME? 0 - -
1.3152 #NAME? #NAME? 0 - -
1.3153 #NAME? #NAME? 0 - -
1.3154 #NAME? #NAME? 0 - -
1.3155 #NAME? #NAME? 0 - -
1.3156 #NAME? #NAME? 0 - -
1.3157 #NAME? #NAME? 0 - -
1.3158 #NAME? #NAME? 0 - -
1.3159 #NAME? #NAME? 0 - -
1.3160 #NAME? #NAME? 0 - -
1.3161 #NAME? #NAME? 0 - -
1.3162 #NAME? #NAME? 0 - -
1.3163 #NAME? #NAME? 0 - -
1.3164 #NAME? #NAME? 0 - -
1.3165 #NAME? #NAME? 0 - -
1.3166 #NAME? #NAME? 0 - -
1.3167 #NAME? #NAME? 0 - -
1.3168 #NAME? #NAME? 0 - -
1.3169 #NAME? #NAME? 0 - -
1.3170 #NAME? #NAME? 0 - -
1.3171 #NAME? #NAME? 0 - -
1.3172 #NAME? #NAME? 0 - -
1.3173 #NAME? #NAME? 0 - -
1.3174 #NAME? #NAME? 0 - -
1.3175 #NAME? #NAME? 0 - -
1.3176 #NAME? #NAME? 0 - -
1.3177 #NAME? #NAME? 0 - -
1.3178 #NAME? #NAME? 0 - -
1.3179 #NAME? #NAME? 0 - -
1.3180 #NAME? #NAME? 0 - -
1.3181 #NAME? #NAME? 0 - -
1.3182 #NAME? #NAME? 0 - -
1.3183 #NAME? #NAME? 0 - -
1.3184 #NAME? #NAME? 0 - -
1.3185 #NAME? #NAME? 0 - -
1.3186 #NAME? #NAME? 0 - -
1.3187 #NAME? #NAME? 0 - -
1.3188 #NAME? #NAME? 0 - -
1.3189 #NAME? #NAME? 0 - -
1.3190 #NAME? #NAME? 0 - -
1.3191 #NAME? #NAME? 0 - -
1.3192 #NAME? #NAME? 0 - -
1.3193 #NAME? #NAME? 0 - -
1.3194 #NAME? #NAME? 0 - -
1.3195 #NAME? #NAME? 0 - -
1.3196 #NAME? #NAME? 0 - -
1.3197 #NAME? #NAME? 0 - -
1.3198 #NAME? #NAME? 0 - -
1.3199 #NAME? #NAME? 0 - -

file:///conversion/tmp/scratch/454095803.xlsxPrinted: 01/03/2020 - 21:53:31 <EA>


1.3200 #NAME? #NAME? 0 - -
1.3201 #NAME? #NAME? 0 - -
1.3202 #NAME? #NAME? 0 - -
1.3203 #NAME? #NAME? 0 - -
1.3204 #NAME? #NAME? 0 - -
1.3205 #NAME? #NAME? 0 - -
1.3206 #NAME? #NAME? 0 - -
1.3207 #NAME? #NAME? 0 - -
1.3208 #NAME? #NAME? 0 - -
1.3209 #NAME? #NAME? 0 - -
1.3210 #NAME? #NAME? 0 - -
1.3211 #NAME? #NAME? 0 - -
1.3212 #NAME? #NAME? 0 - -
1.3213 #NAME? #NAME? 0 - -
1.3214 #NAME? #NAME? 0 - -
1.3215 #NAME? #NAME? 0 - -
1.3216 #NAME? #NAME? 0 - -
1.3217 #NAME? #NAME? 0 - -
1.3218 #NAME? #NAME? 0 - -
1.3219 #NAME? #NAME? 0 - -
1.3220 #NAME? #NAME? 0 - -
1.3221 #NAME? #NAME? 0 - -
1.3222 #NAME? #NAME? 0 - -
1.3223 #NAME? #NAME? 0 - -
1.3224 #NAME? #NAME? 0 - -
1.3225 #NAME? #NAME? 0 - -
1.3226 #NAME? #NAME? 0 - -
1.3227 #NAME? #NAME? 0 - -
1.3228 #NAME? #NAME? 0 - -
1.3229 #NAME? #NAME? 0 - -
1.3230 #NAME? #NAME? 0 - -
1.3231 #NAME? #NAME? 0 - -
1.3232 #NAME? #NAME? 0 - -
1.3233 #NAME? #NAME? 0 - -
1.3234 #NAME? #NAME? 0 - -
1.3235 #NAME? #NAME? 0 - -
1.3236 #NAME? #NAME? 0 - -
1.3237 #NAME? #NAME? 0 - -
1.3238 #NAME? #NAME? 0 - -
1.3239 #NAME? #NAME? 0 - -
1.3240 #NAME? #NAME? 0 - -
1.3241 #NAME? #NAME? 0 - -
1.3242 #NAME? #NAME? 0 - -
1.3243 #NAME? #NAME? 0 - -
1.3244 #NAME? #NAME? 0 - -
1.3245 #NAME? #NAME? 0 - -
1.3246 #NAME? #NAME? 0 - -
1.3247 #NAME? #NAME? 0 - -
1.3248 #NAME? #NAME? 0 - -
1.3249 #NAME? #NAME? 0 - -
1.3250 #NAME? #NAME? 0 - -
1.3251 #NAME? #NAME? 0 - -
1.3252 #NAME? #NAME? 0 - -
1.3253 #NAME? #NAME? 0 - -
1.3254 #NAME? #NAME? 0 - -
1.3255 #NAME? #NAME? 0 - -
1.3256 #NAME? #NAME? 0 - -
1.3257 #NAME? #NAME? 0 - -
1.3258 #NAME? #NAME? 0 - -
1.3259 #NAME? #NAME? 0 - -
1.3260 #NAME? #NAME? 0 - -
1.3261 #NAME? #NAME? 0 - -
1.3262 #NAME? #NAME? 0 - -
1.3263 #NAME? #NAME? 0 - -
1.3264 #NAME? #NAME? 0 - -
1.3265 #NAME? #NAME? 0 - -
1.3266 #NAME? #NAME? 0 - -
1.3267 #NAME? #NAME? 0 - -
1.3268 #NAME? #NAME? 0 - -
1.3269 #NAME? #NAME? 0 - -
1.3270 #NAME? #NAME? 0 - -
1.3271 #NAME? #NAME? 0 - -
1.3272 #NAME? #NAME? 0 - -
1.3273 #NAME? #NAME? 0 - -
1.3274 #NAME? #NAME? 0 - -
1.3275 #NAME? #NAME? 0 - -
1.3276 #NAME? #NAME? 0 - -
1.3277 #NAME? #NAME? 0 - -
1.3278 #NAME? #NAME? 0 - -
1.3279 #NAME? #NAME? 0 - -
1.3280 #NAME? #NAME? 0 - -
1.3281 #NAME? #NAME? 0 - -
1.3282 #NAME? #NAME? 0 - -
1.3283 #NAME? #NAME? 0 - -
1.3284 #NAME? #NAME? 0 - -
1.3285 #NAME? #NAME? 0 - -
1.3286 #NAME? #NAME? 0 - -
1.3287 #NAME? #NAME? 0 - -
1.3288 #NAME? #NAME? 0 - -
1.3289 #NAME? #NAME? 0 - -
1.3290 #NAME? #NAME? 0 - -
1.3291 #NAME? #NAME? 0 - -
1.3292 #NAME? #NAME? 0 - -
1.3293 #NAME? #NAME? 0 - -
1.3294 #NAME? #NAME? 0 - -
1.3295 #NAME? #NAME? 0 - -
1.3296 #NAME? #NAME? 0 - -
1.3297 #NAME? #NAME? 0 - -
1.3298 #NAME? #NAME? 0 - -
1.3299 #NAME? #NAME? 0 - -
1.3300 #NAME? #NAME? 0 - -

5 7 10 12 13 14 15 16 17 18 19 20 21 22 23 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70

file:///conversion/tmp/scratch/454095803.xlsxPrinted: 01/03/2020 - 21:53:31 <EA>


Pipe
Code Item Code Description Unit

Sheet >>

EA EARTH WORK
EA-1A Excavation by Equipment (D≦3.0M) M3 1,542.69
EA-2A Backfilling (Excavated Soil) M3 1,058.54
EA-3B Disposal of Soil (Outside of Factory) M3 484.15
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 55.48
JT-4A Water Stop Plate M -
JT-5A Isolation Joint M 179.20
FM-1A Form for Sub-STR. M2 965.48
CO-1A Leveling Concrete M3 35.80
CO-2A Concrete for Sub-STR. M3 415.42
LN-5E-1 Chemical Resistant Resin Lining (Epoxy) M2 -
ANA-2 Climbing Rung (Chemical Resistant) Ton -
Pipe Rack
SSP-CVL2- SSP-CVL2-
SSP-CVL2- SSP-CVL2- SSP-CVL2- SSP-CVL2- SSP-CVL2- SSP-CVL2-
FDN-PR02- FDN-PR02-
FDN-PR02-1 FDN-PR02-3 PIT-M6486-19 PIT-V6482.01 PIT-V6484.01 PIT-V6483.01
2.1 2.2

1 2 1A 3 4 Sheet >> 1 2 3 4

681.61 147.97 258.94 454.18 5,281.84 39.12 125.19 155.70 205.73


491.72 96.54 168.95 301.33 3,924.60 12.50 90.31 116.82 150.70
189.89 51.42 89.99 152.85 2,039.57 26.62 79.34 123.39 193.36
20.92 6.04 10.57 17.96 224.28 0.47 1.71 2.20 4.35
- - - - 147.41 11.60 16.70 19.60 20.10
61.60 22.40 39.20 56.00 845.46 - - 53.20 -
345.24 115.36 201.88 303.00 2,247.18 70.16 15.82 17.95 22.54
14.56 3.60 6.30 11.34 123.37 0.52 1.07 1.44 2.06
164.01 43.71 76.49 131.22 1,636.30 3.60 10.98 13.44 23.78
- - - - 177.11 40.87 - - -
- - - - 0.12 - - - -

1,969.55 487.04 852.33 1,427.87 - 20,393.05 231.95 548.03 799.55 1,043.82


SSP-CVL2- SSP-CVL2- SSP-CVL2- SSP-CVL2- SSP-CVL2- SSP-CVL2- SSP-CVL2- SSP-CVL2-
SSP-CVL2- SSP-CVL2-
1340-STR P2- FDN-STR P2- FDN- FDN-STR P2- FDN- FDN-STR P2- FDN-1340 - FDN-1340 -
PIT-V6485.01 FDN-P2-3
1 2 E.1352.01 4 E.1352.02 11 V.6315.01 V.6315.02

5 6 7 8 9 10 11 12 13 14

118.99 158.80 1,504.35 92.26 42.97 81.17 55.55 - - 79.79


74.37 402.50 964.66 65.60 32.25 61.96 41.84 - - 60.97
62.86 141.13 539.69 26.66 10.72 19.21 13.72 - - 18.82
1.53 27.57 82.95 2.80 1.64 2.01 1.25 0.28 0.25 1.71
16.01 - - - - - - - - -
- 40.80 85.60 20.80 12.00 15.00 10.40 7.20 6.40 2.72
15.17 125.66 283.65 37.84 32.04 27.72 29.53 15.54 13.89 43.25
0.99 13.32 28.56 2.16 1.05 1.59 1.46 0.29 0.24 2.05
9.73 120.61 519.06 21.62 10.94 16.28 13.22 3.29 2.67 18.01
- - - - - - - - - -
- - - - - - - - - -

445.50 1,921.41 4,282.41 345.35 143.66 281.68 166.99 26.63 23.48 227.41
SSP-CVL2- SSP-CVL2- SSP-CVL2- SSP-CVL2- SSP-CVL2- SSP-CVL2-
SSP-CVL2-SP SSP-CVL2- SSP-CVL2-
FDN-STR P2- CMH01- FDN-2340 - FDN-STR P2- FDN-STR P2- FDN-1340-
P2 CMH02-P2C0C FDN-STR P2-7
5 P2C0C V.6416.01 13 6 T6304.01

15 16 17 18 19 20 21 22 23

222.68 95.33 37.83 37.83 81.18 74.26 864.30 106.82 15.42


173.11 66.47 32.77 32.77 59.03 56.34 591.13 77.40 3.35
49.58 28.86 5.06 5.06 22.15 17.91 273.17 29.42 12.07
4.52 1.75 0.57 0.47 1.04 1.76 53.89 2.10 0.82
- - 7.00 7.00 - - - - -
24.66 2.12 - - 8.07 3.20 10.89 3.63 17.89
61.82 46.42 27.56 22.26 19.00 36.09 244.33 59.16 49.91
4.58 2.63 0.41 0.41 1.15 1.56 22.04 2.61 1.30
40.58 27.42 5.06 1.53 21.00 17.31 259.79 28.74 67.38
- - 9.14 10.46 - - - - -
- - 0.01 0.01 - - - - -

983.67 271.04 126.40 118.81 303.22 208.46 2,319.90 309.96 168.17


SSP-CVL2- SSP-CVL2- SSP-CVL2- SSP-CVL2- SSP-CVL2- SSP-CVL2- SSP-CVL2-
SSP-CVL2- SSP-CVL2-
FDN-2350 - FDN-1340- FDN-2350 - FDN-1350 - FDN-1350 - FDN-1350 - FDN-1350 -
AMH01-P2C0C AMH02-P2C0C
V2353.01 RSD SHELTER V1353.01 RSD P1351.01 PSD P1351.02 P1352.01 P1352.02

24 25 26 27 28 29 30 31 32

20.46 270.29 29.67 49.95 65.91 6.94 3.55 13.88 5.23


13.68 206.31 19.86 41.98 57.94 2.49 1.57 4.98 2.14
6.78 63.98 9.80 11.77 11.77 4.45 1.98 8.89 3.09
0.30 5.83 0.52 0.11 0.11 0.51 0.10 1.02 0.46
- - - 7.60 7.60 - - - -
8.80 37.20 10.00 - - 14.21 8.60 28.42 12.00
6.20 118.72 7.90 3.70 4.37 24.12 9.25 49.05 20.72
0.52 5.48 0.78 0.49 0.49 0.47 0.22 0.94 0.34
4.56 58.49 7.02 0.90 0.74 13.98 3.78 28.43 9.95
- - - 17.51 17.35 - - - -
- - - 0.02 0.02 - - - -

91.57 785.30 123.61 184.81 216.62 73.16 35.06 147.63 59.93


SSP-CVL2- SSP-CVL2- SSP-CVL2- SSP-CVL2- SSP-CVL2- SSP-CVL2- SSP-CVL2-
SSP-CVL2- SSP-CVL2-
FDN-1350 - FDN-E.2352.01 FDN-E.2352.02 FDN-1350 - FDN-2350- FDN-P.6416.01 FDN-1340 -
FDN-V.6317.01 FDN-V.6318.01
P1352.03/04 A/B A/B P1353.01 A/B E.6323.02 MEH PBP P.6304.02A/B

33 34 35 36 37 38 39 40 41

7.11 42.30 42.30 6.14 19.27 5.57 3.17 4.63 2.66


3.14 32.06 32.06 2.76 16.26 1.96 1.80 2.12 1.22
3.96 10.24 10.24 3.38 3.01 3.61 1.37 2.51 1.44
0.20 1.01 0.95 0.18 0.19 0.15 0.09 0.23 0.11
- - - - - - - - -
- 10.00 10.00 14.80 4.00 11.00 8.80 7.20 6.40
18.49 23.16 23.16 15.91 11.64 11.83 9.55 8.50 6.88
0.44 0.88 0.88 0.38 0.34 0.38 0.17 0.31 0.16
7.57 8.13 8.13 6.45 2.26 6.94 2.60 2.66 2.75
- - - - - - - - -
- - - - - - - - -

52.91 159.70 159.52 61.99 71.15 45.43 35.55 28.17 21.63


Equipment Foundation and Structure (P2)
SSP-CVL2-
SSP-CVL2- SSP-CVL2- SSP-CVL2- SSP-CVL2- SSP-CVL2- SSP-CVL2-
SSP-CVL2- SSP-CVL2- FDN-2350 -
FDN-P.6317.02 FDN-P.6318.02 FDN-P.6319.02 FDN-2350 - FDN-2350 - FDN-2350 -
FDN-V.6318.02 FDN-V.6319.01 P2353.01 A/B
A/B A/B A/B P2352.04 CPSP P2352.03 CPSP P2352.02 CPSP
RSP
42 43 44 45 46 47 48 49 50

1.99 3.08 2.54 3.08 3.08 4.58 2.82 3.45 5.64


1.03 1.80 1.19 1.80 1.80 2.31 1.35 1.56 2.19
0.96 1.28 1.35 1.28 1.28 2.26 1.47 1.89 3.45
0.09 0.10 0.11 0.09 0.09 0.15 0.11 0.12 0.38
- - - - - - - - -
5.20 8.80 6.20 8.80 8.80 12.00 7.20 8.50 12.31
5.59 9.46 6.67 9.46 9.46 12.90 7.85 9.14 19.30
0.11 0.16 0.15 0.16 0.16 0.26 0.17 0.21 0.37
1.82 2.41 2.58 2.41 2.41 4.30 2.83 3.61 10.68
- - - - - - - - -
- - - - - - - - -

16.78 35.08 20.80 35.08 35.08 46.76 29.79 34.48 60.32


SSP-CVL2- SSP-CVL2-
SSP-CVL2- SSP-CVL2- SSP-CVL2- SSP-CVL2- SSP-CVL2- SSP-CVL2-
FDN-2350 - FDN-2350 - SSP-CVL2-
FDN-2350 - DIKE WALL- FDN-2340- FDN-2340 - FDN-1340 - FDN-1340 -
P2352.01 A/B P2351.01 A/B FDN-E.2341.01
P2351.02 CPSP 1340- T6304.01 V6328.01 P2342.01 /02 P1345.01 /02 P1342.01 /02
CPSP CPSP
51 52 53 54 55 56 57 58 59

10.62 5.31 3.27 98.24 4.10 5.74 3.86 5.74 5.64


4.36 2.18 1.48 65.47 1.71 2.63 1.59 2.63 2.60
6.26 3.13 1.80 33.31 2.39 3.11 2.27 3.11 3.04
0.88 0.45 0.09 2.69 0.19 0.15 0.20 0.17 0.16
- - - - - - - - -
24.60 12.30 8.00 - 9.48 14.00 10.60 14.00 13.80
39.19 19.20 8.60 35.58 8.51 15.05 6.95 15.05 14.84
0.69 0.34 0.20 2.91 0.28 0.35 0.25 0.35 0.34
19.59 9.60 3.43 20.59 5.10 5.93 2.29 5.93 5.81
- - - - - - - - -
- - - - - - - - -

118.19 58.51 32.87 557.33 31.77 62.97 32.01 62.98 62.23


SSP-CVL2-
SSP-CVL2- SSP-CVL2- SSP-CVL2- SSP-CVL2- SSP-CVL2- SSP-CVL2- SSP-CVL2- SSP-CVL2-
FDN-1350 -
FDN-1340- FDN-1340 - FDN-1340- AOC-P2-A0C- FDN-1350 - FDN-1350 - FDN-1340 - FDN-1340 -
ANALYZER
E.1344.01 P2352.04 CPSP C6417.01 JB 23/24/25/26 V6474.02 P6343.01 P6315.01 P6315.02 A/B
HOUSE
60 61 62 63 64 65 66 67 68

8.55 4.63 1.59 99.42 14.19 3.17 1.60 0.96 3.23


3.34 2.24 0.90 84.79 3.19 1.35 0.92 0.66 1.82
5.21 2.39 0.69 14.62 11.00 1.82 0.68 0.30 1.41
0.43 0.08 0.05 0.73 0.54 0.09 0.05 0.03 0.09
- - - 5.60 - - - - -
22.20 6.00 4.40 22.40 18.70 7.20 4.50 2.90 8.92
14.41 8.40 4.71 78.61 16.27 7.70 4.82 3.12 10.88
0.56 0.14 0.08 0.51 1.09 0.20 0.08 0.04 0.17
5.18 3.15 1.29 8.50 17.25 3.47 1.27 0.56 3.02
- - - 32.81 - - - - -
- - - 0.04 - - - - -

63.87 29.29 13.72 352.04 88.22 28.99 17.91 12.58 37.53


SSP-CVL2-
SSP-CVL2- SSP-CVL2- SSP-CVL2- SSP-CVL2-
SSP-CVL2-VB- SSP-CVL2-CB- SSP-CVL2- SSP-CVL2-VB- FDN-2340 -
FDN-1350 AOC-P2-A0C- AOC-P2-A0C- AOC-P2-C0C-
P2VB-01 P2CB-01 AMH03-P2A0C P2VB-02 PIPE SUPPORT
-V6343.01 JB 13 JB 19 CEP
V.6416.01
69 70 71 72 73 74 75 76 77

22.08 7.68 2.66 49.95 22.08 3.25 2.71 11.16 18.84


16.07 6.71 1.22 41.98 16.07 1.70 1.41 9.73 3.41
6.01 0.97 1.44 11.77 6.01 1.55 1.30 1.43 15.43
1.08 0.06 0.11 0.11 1.08 0.08 0.07 0.08 1.89
3.30 4.00 - 7.60 3.30 5.20 5.20 - -
8.60 - 6.40 - 8.60 - - - -
23.06 6.90 6.85 3.70 22.65 6.54 5.11 5.00 15.26
0.27 0.07 0.16 0.49 0.27 0.11 0.11 0.18 1.83
3.42 0.42 2.74 0.90 3.29 0.66 0.54 - 14.52
11.41 3.45 - 17.63 9.87 3.60 3.00 - -
0.01 0.00 - 0.02 0.01 0.00 0.00 - -

95.29 30.91 21.60 183.85 93.209 23.69 20.45 28.68 71.23


SSP-CVL2-
FDN-2340 - SSP-CVL2-
SSP-CVL2-
LOCAL FDN-1350 -
FDN-1350 -
PLATFROM HVAC & AIR
V6474.03
TIFANE, STACK
78 DELTASTOP
79 80

1.76 31.07 4.27


0.96 13.66 1.65
0.80 17.41 2.63
0.05 1.49 0.15
- - -
4.80 18.77 9.06
5.14 46.96 7.88
0.10 1.98 0.28
1.50 17.82 4.08
- - -
- - -

19.10 149.18 36.00 - - - - - -


SSP-CVL2- SSP-CVL2- SSP-CVL2-
SSP-CVL2- SSP-CVL2- SSP-CVL2- SSP-CVL2-
FDN- FDN- FDN-
PIT-M6486-20 PIT-M6486-21 FDN-P3-3 FDN-V1371
T1374.01 T1374.02 T2374.02

Sheet >> 1 2 3 4 5 6 7

5,568.16 97.02 83.22 83.86 83.86 83.86 696.95 176.47


3,502.29 62.29 55.44 13.95 13.95 13.95 512.87 109.39
2,115.15 39.58 29.17 69.91 69.91 69.91 184.08 67.08
210.77 0.63 0.48 1.30 1.30 1.30 23.41 8.12
143.23 14.40 12.80 - - - - -
1,299.79 - - 23.56 7.50 23.56 88.00 63.20
2,978.19 92.72 79.92 - - - 363.41 132.31
173.00 0.71 0.55 2.45 2.45 2.45 17.40 4.68
1,939.73 4.59 3.82 23.28 23.28 23.28 175.35 68.21
245.44 56.05 44.65 - - - - -
0.13 - - - - - - -

- 21,632.00 406.70 338.03 446.37 430.31 445.79 2,061.88 629.75


SSP-CVL2- SSP-CVL2- SSP-CVL2- SSP-CVL2- SSP-CVL2- SSP-CVL2-
SSP-CVL2- SSP-CVL2- SSP-CVL2-FDN-
FDN 1360 - FDN-1370 - FDN-STR P3- FDN-1370 - FDN-1370 - FDN 2360 -
FDN-V1372 FDN-P3-8 V2371.01/02/03
STR. P3-1 V.6415.01 2 V.1373.01 V.2373.01 STR. P3-6

8 9 10 11 12 13 14 15 16

176.47 666.61 397.05 176.47 30.69 560.46 31.15 20.96 609.47


109.39 250.22 295.37 109.61 21.87 409.48 22.63 15.57 320.06
67.08 416.39 101.68 66.86 8.82 150.98 8.52 5.39 289.42
8.19 46.42 12.90 8.19 0.60 18.58 1.88 0.82 30.43
- - - - - - - - -
63.20 44.80 50.80 62.40 9.80 38.32 13.60 12.60 33.60
132.31 99.22 193.46 131.13 9.48 141.91 9.02 6.99 72.16
4.68 18.13 9.62 4.68 0.82 13.89 0.86 0.56 18.13
68.21 388.85 96.43 67.86 8.82 139.88 8.52 5.39 282.80
- - - - - - - - -
- - - - - - - - -

693.02 3,016.33 1,157.54 627.49 152.44 1,473.66 149.40 113.71 2,554.38


SSP-CVL2-
SSP-CVL2- SSP-CVL2- SSP-CVL2- SSP-CVL2- SSP-CVL2- SSP-CVL2- SSP-CVL2-
SSP-CVL2-FDN- FDN-1370 -
CMH02- FDN-1370- FDN-1370- FDN-1370- CMH03- FDN-2370 FDN-1370
STR P3-7 P.1371.01/02/
P3C0C T6306.01 T6307.01 T6308.01 P3C0C P3-12 P3-5
03
17 18 19 20 21 22 23 24 25

451.08 14.31 8.82 8.82 8.82 14.31 47.04 19.90 6.01


307.36 10.23 14.80 14.80 14.80 10.34 39.30 13.88 3.18
143.72 4.08 5.98 5.98 5.98 3.97 7.74 6.02 2.83
11.01 0.64 0.39 0.39 0.39 0.64 1.12 0.67 0.18
- 16.01 - - - 16.01 - - -
34.40 - 12.56 12.56 12.56 - 8.00 12.80 16.20
117.31 22.30 22.23 22.23 22.23 21.80 26.64 30.37 17.42
13.22 0.41 7.93 7.93 7.93 0.41 1.15 2.55 0.34
133.18 3.30 21.17 21.17 21.17 3.24 9.31 6.88 5.36
- 8.94 - - - 8.74 - - -
- 0.01 - - - 0.01 - - -

1,211.44 81.23 101.88 101.89 101.89 80.47 140.32 93.09 63.51


SSP-CVL2-
SSP-CVL2- SSP-CVL2- SSP-CVL2- SSP-CVL2- SSP-CVL2- SSP-CVL2- SSP-CVL2- SSP-CVL2- SSP-CVL2-
FDN-1370 -
FDN-1370 - FDN-1370 - CMH01- CMH05- AMH01- CMH04- AMH04- AMH05- FDN-2370 -
P.1373.01/02/
P.1373.01 A/B P.1373.03 P3C0C P3C0C P3C0C P3C0C P3AOC P3AOC V.6412.01
03
26 27 28 29 30 31 32 33 34 35

6.01 3.75 1.94 14.31 11.91 49.08 37.83 46.71 46.71 8.47
3.18 2.02 0.36 11.58 10.28 38.84 33.86 36.42 37.00 7.52
2.83 1.73 0.89 2.73 1.63 12.64 3.97 11.05 11.23 0.95
0.18 0.11 0.06 0.51 0.39 0.13 0.58 0.11 0.11 0.14
- - - 6.00 5.20 8.00 16.01 7.60 7.60 -
16.20 10.20 5.30 - - - - - - 5.60
17.42 10.97 5.70 16.38 13.08 3.80 20.37 3.70 3.70 5.19
0.34 0.21 0.11 0.41 0.38 0.27 0.41 0.49 0.49 0.14
5.36 3.27 1.69 2.56 1.36 1.00 2.73 0.90 0.90 0.95
- - - 6.58 5.98 18.43 8.73 16.51 16.79 -
- - - 0.01 0.00 0.01 0.01 0.01 0.01 -

63.51 40.25 20.05 62.05 51.22 181.46 125.51 167.14 170.71 48.12
Equipment Foundation and Structure (P3)
SSP-CVL2-
SSP-CVL2- SSP-CVL2- SSP-CVL2- SSP-CVL2- SSP-CVL2- SSP-CVL2- SSP-CVL2- SSP-CVL2- SSP-CVL2-
FDN-2370 -
FDN-1370 - FDN-1370 - AMH03- FDN-1360 - FDN-1360 - FDN-1360 - FDN-2360 - FDN-2360 - FDN-2360 -
P.2371.01/02/
P.2373.01 A/B P.2373.03 P3A0C P.1361.01/05 P.1361.02 P.1361.06 P.2361.01 P.2361.02 P.2361.05
03
36 37 38 39 40 41 42 43 44 45

3.19 1.94 6.34 52.32 24.35 4.45 3.55 8.15 4.45 8.15
1.83 1.04 3.28 42.08 8.76 2.18 1.57 2.94 2.18 2.94
1.36 0.89 3.06 12.64 15.59 2.26 1.98 5.22 2.26 5.22
0.08 0.06 0.18 0.13 0.62 0.14 0.11 0.24 0.15 0.27
- - - 8.00 - - - - - -
9.00 5.30 16.80 - 40.80 11.20 8.60 13.60 11.20 28.75
9.68 5.70 18.06 3.80 69.35 12.05 12.77 15.44 12.04 15.44
0.17 0.11 0.36 0.51 1.64 0.26 0.22 0.55 0.26 0.55
2.56 1.69 5.81 1.00 37.45 4.31 5.23 12.28 4.31 12.28
- - - 18.82 - - - - - -
- - - 0.02 - - - - - -

35.86 20.73 65.88 189.34 228.57 44.85 40.03 68.41 46.84 83.59
SSP-CVL2- SSP-CVL2- SSP-CVL2- SSP-CVL2- SSP-CVL2- SSP-CVL2- SSP-CVL2- SSP-CVL2- SSP-CVL2- SSP-CVL2-
FDN-2360 - FDN-2360 - FDN-2360 - FDN-1370 - FDN-1370 - FDN-1370 - FDN-1370 FDN-2370 - FDN-2370 - FDN-1370 -
P.2361.06 S.2361.01 S.1361.01 P.1374.01 P.1374.02/03 P.1374.04 P3-4 P.2374.02 P.2374.04 P.6306.01

46 47 48 49 50 51 52 53 54 55

3.55 1.24 1.41 2.97 6.69 2.34 146.94 3.34 2.34 0.86
1.57 0.77 0.84 1.35 2.89 1.16 116.20 1.44 1.16 0.61
1.98 0.47 0.57 1.62 3.80 1.18 30.74 1.90 1.18 0.25
0.14 0.06 0.08 0.07 0.16 0.06 3.13 0.09 0.07 0.03
- - - - - - - - - -
8.60 3.60 4.00 7.20 15.60 6.00 21.60 7.80 6.00 2.60
13.03 3.85 4.28 6.30 13.65 5.46 67.43 6.79 5.22 3.07
0.22 0.06 0.07 0.18 0.42 0.14 3.84 0.21 0.14 0.04
5.33 0.87 1.07 2.52 5.92 1.90 32.41 2.94 1.82 0.50
- - - - - - - - - -
- - - - - - - - - -

40.43 10.92 12.32 26.21 57.12 22.24 422.35 28.52 21.92 11.95
SSP-CVL2-
SSP-CVL2- SSP-CVL2- SSP-CVL2- SSP-CVL2- SSP-CVL2- SSP-CVL2- SSP-CVL2- SSP-CVL2- SSP-CVL2- DIKE WALL-
FDN-1370 - FDN-1370 - FDN-1370 - FDN-1370 - FDN-1370 - FDN-1370 AOC-P3-A0C- AMH06- FDN-2370 1360 -
P.6306.02 A/B P.6307.01 P.6307.02 A/B P.6308.01 P.6308.02 A/B P3-10 JB 01/02 P3AOC P3-9 BLENDING
AREA
56 57 58 59 60 61 62 63 64 65

1.72 0.86 1.72 0.86 1.72 78.94 33.71 46.71 73.59 96.73
1.22 0.61 1.22 0.61 1.22 60.74 31.31 36.42 53.93 63.84
0.49 0.25 0.49 0.25 0.49 18.20 2.40 11.05 19.66 32.89
0.06 0.03 0.05 0.03 0.06 1.44 0.20 0.11 1.31 6.97
- - - - - - 3.20 7.60 - -
5.20 2.60 5.20 2.60 5.20 16.00 6.40 7.60 14.40 158.05
5.98 3.07 5.85 3.12 5.98 49.12 18.62 3.70 46.86 319.45
0.07 0.04 0.07 0.04 0.07 1.85 0.10 0.49 1.81 5.32
0.97 0.50 0.95 0.51 0.97 19.14 1.90 0.90 18.93 51.62
- - - - - - 6.40 17.63 - -
- - - - - - 0.02 0.02 - -

23.72 11.95 23.56 12.01 23.72 245.44 104.58 178.86 230.52 735.00
SSP-CVL2-
DIKE WALL- SSP-CVL2- SSP-CVL2- SSP-CVL2- SSP-CVL2- SSP-CVL2-
SSP-CVL2- SSP-CVL2-
2360 - AOC-P3-C0C- AOC-P3-C0C- CB-P3CB- FDN-1360 - FDN-2360 -
CB-P3CB-01 CB-P3CB-02
BLENDING CEP DN 200 CEP DN 250 01COC V6474.04 V6474.05
AREA
66 67 68 69 70 71 72 73

110.63 7.68 7.20 11.16 11.16 10.83 1.78 2.19


65.22 6.61 6.30 9.73 9.73 8.94 0.96 1.09
45.40 1.07 0.90 1.43 1.43 1.89 0.82 1.10
11.87 0.04 0.05 0.08 0.08 0.13 0.06 0.06
- 4.00 5.60 - - 5.20 - -
140.50 - - - - - 4.80 5.60
302.32 4.02 4.60 5.00 5.00 14.14 5.14 5.99
5.18 0.07 0.06 0.18 0.18 0.11 0.10 0.13
61.61 0.28 0.29 - - 1.25 1.54 2.07
- 2.17 2.27 - - 6.73 - -
- 0.00 0.00 - - 0.01 - -

742.81 26.59 27.75 28.68 28.59 50.23 19.19 22.23 - -


Lo
SSP-CVL2-
SSP-CVL2- SSP-CVL2-LF SSP-CVL2-
LF- LOCAL
LF- -1340- AOTP LF- 1350-
PLATFROM
R.1342.02/03 P6304.02 A/B ARS
FOUNDATION
1340 (AG-24) V.1353.01
1340
Sheet >> 1 2 3 4

478.91 26.91 42.84 31.39 12.63


344.28 16.53 23.03 19.96 7.88
134.63 10.39 19.81 11.43 4.76
18.37 1.01 1.92 1.09 0.68
- - - - -
286.72 20.12 28.00 22.00 26.80
539.55 35.49 57.88 38.82 30.21
17.13 1.17 2.42 1.38 0.67
191.78 10.33 19.52 11.69 5.99
- - - - -
- - - - -
976.19 121.97 216.17 154.63 97.69
1,749.62 121.97 216.17 154.63 97.69

- - - - - 2,062.34 121.97 195.77 137.83 89.69


Local Foundation (P2)
SSP-CVL2-LF SSP-CVL2-LF SSP-CVL2-
SSP-CVL2-LF SSP-CVL2- SSP-CVL2- SSP-CVL2-LF
-2340- SSP-CVL2-LF SSP-CVL2-LF -2350- SSP-CVL2-LF LF-1340-
- 1350 LF- 2340 LF-2340- -2350-
EPITSOP, -2350- ARSS -2350- P.2352.02/01 -2350- ARROUND
CONCENTRA POLYMERIZA AROUND CONCENTRA
DELTASTOP V.2353.01 V.6416.01 AB, V.6474.03 ETASTOP
TION TION TIFANE TION
AND WITHOX P2352.02/04 COUNTAINER
5 6 7 8 9 10 11 12 13 14

17.70 22.14 18.64 0.59 72.59 51.14 62.36 - 34.44 -


9.69 14.99 9.11 0.35 54.59 40.81 51.59 - 25.54 -
8.01 7.15 9.53 0.24 18.00 10.32 10.77 - 8.90 -
0.83 1.71 0.49 0.04 2.12 1.06 1.47 1.04 0.97 0.09
- - - - - - - - - -
18.00 10.60 3.60 1.20 27.60 16.40 14.60 - 10.00 -
26.58 19.46 15.74 1.20 62.90 33.66 33.08 6.24 25.58 4.28
1.08 0.75 0.98 0.05 2.26 1.37 1.25 - 1.15 -
9.48 15.97 8.98 0.21 23.21 10.81 17.39 11.45 10.04 0.40
- - - - - - - - - -
- - - - - - - - - -
98.62 111.53 70.28 3.89 273.46 172.04 204.72 67.55 118.65 11.99
109.11 111.53 70.28 3.89 273.46 172.04 204.72 67.55 118.65 11.99

91.62 92.93 67.08 3.89 263.34 172.04 192.72 35.15 116.65 4.79
SSP-CVL2- SSP-CVL2- SSP-CVL2- SSP-CVL2-
SSP-CVL2-LF SSP-CVL2-LF SSP-CVL2-LF SSP-CVL2- SSP-CVL2-
SSP-CVL2-LF CT-2350- LPF- P2- HB- P2-HOSE GP- P2-
-1340- ACHE -1350- - 1350 LF-2350- LF-1352-
-1340- AOTP CABLE TRAY LIGHTING BOX GUARD
E1341.01 & CONCENTRA CONCENTRA STAGE PRE- STAGE PRE-
P6304.02 A/B SUPPORT POLE FOUNDATION POST P2
1344.01 TION AREA TION ( P2-1) HEATER HEATER
2350 FOUNDATION P2 AREA AREA
15 16 17 18 19 20 21 22 23 24

2.50 6.40 28.10 11.85 1.35 0.51 - 9.83 15.30 9.72


2.50 6.40 24.96 6.78 0.58 0.27 - 6.22 12.80 9.72
- - 3.13 5.07 0.77 0.24 - 3.61 2.50 -
0.73 0.60 0.51 1.15 0.12 0.16 0.06 0.22 0.30 -
- - - - - - - - - -
3.20 16.40 12.40 14.20 4.00 1.20 - - 34.00 2.40
5.20 27.16 22.27 32.73 5.68 2.67 0.80 19.76 20.40 11.76
- 0.14 0.63 0.70 0.12 0.04 - 0.25 0.52 0.20
4.37 5.64 5.79 9.77 1.00 0.41 0.13 4.37 3.96 0.88
- - - - - - - - - -
- - - - - - - - - -
30.94 81.81 99.16 109.11 13.63 16.17 9.01 44.25 89.78 60.68
30.94 81.81 99.16 109.11 13.63 16.17 9.01 44.25 89.78 60.68

18.54 63.01 97.96 82.51 13.63 5.49 0.99 44.25 89.78 60.68
SSP-CVL2-LF SSP-CVL2-
SSP-CVL2- SSP-CVL2-
-1360- LF- 1360-
LF- P3-1360- LF- P3-1360-
P1361.01A/02 P1361.01B,
V,1361.02/03 V.1361.01
/05/06,S1361 V6474.04
Sheet >> 1 2 3 4

292.57 - - 56.26 30.37


215.64 - - 35.56 17.99
76.93 - - 20.70 12.38
14.07 0.19 0.06 2.42 0.92
- - - - -
185.28 1.44 1.44 19.70 16.20
411.52 8.64 2.88 47.59 28.41
17.09 - - 2.02 1.99
143.04 1.30 0.43 29.44 11.23
- - - - -
- - - - -

- - - - - 1,479.02 83.59 28.82 214.32 119.71


SSP-CVL2-LF Local Founda
SSP-CVL2- -1370-
SSP-CVL2-LF SSP-CVL2-LF SSP-CVL2-LF SSP-CVL2- SSP-CVL2-
LF- 1360 - SSP-CVL2-LF SSP-CVL2-LF STRIPPING
- 2360- -1370- SSP-CVL2-LF -1370- LF- 1370- LF- 1370-
P2361.05,P23 -2360- -2360- P.1373.01
P.2361.01, STRIPPING -1370- TAMOL CRUMBS STRIPPING V STRIPPING V
61.02,S2361.0 V.2361.01 V.2361.02/03 A/B, P
V6474.05 AREA SLURRY U-3 1372.01/02/03 1371.01/02/03
1 1373.03, V
5 6 7 8 9 10
1373.01 11 12 13 14

29.98 34.44 - - 10.13 - 31.37 23.66 - -


19.28 22.10 - - 10.13 - 24.88 14.77 - -
10.70 12.34 - - - - 6.49 8.89 - -
1.67 1.33 0.51 0.39 0.24 0.26 0.80 1.19 0.68 0.80
- - - - - - - - - -
14.60 21.60 - - 6.00 - 39.70 10.80 - -
35.63 33.31 6.30 5.04 8.45 5.36 43.66 27.08 14.50 17.14
1.33 1.54 0.95 0.99 0.48 0.60 1.41 1.26 - -
18.34 13.95 2.15 1.90 2.83 1.16 9.24 10.76 4.90 5.56
- - - - - - - - - -
- - - - - - - - - -

131.95 140.76 9.92 8.33 38.28 7.51 157.75 98.60 20.33 23.51
Local Foundation (P3)
SSP-CVL2- SSP-CVL2-LF SSP-CVL2- SSP-CVL2- SSP-CVL2- SSP-CVL2-
SSP-CVL2-LF SSP-CVL2- SSP-CVL2-LF
LF- 2370- -2370- LF- 2370- LPF- P3- HB- P3-HOSE GP- P3-
-2370- CT- P3-2360 -2370-
STRIPPING STRIPPING STRIPPING LIGHTING BOX GUARD
STRIPPING AREA CABLE CRUMBS
U.32 WATER V.6412.01, V.2371.01/02/ POLE FOUNDATION POST P3
V.2373.01 TRAY SLURRY U-32
LINE V6415.01 03 FOUNDATION P3 AREA AREA
15 16 17 18 19 20 21 22 23

10.46 - 5.07 - 28.22 - 7.37 16.74 8.51


10.46 - 5.07 - 28.22 - 4.66 14.01 8.51
- - - - - - 2.71 2.73 -
0.35 0.20 0.36 0.47 0.39 0.30 0.17 0.38 -
- - - - - - - - -
12.20 - 2.00 - - - - 37.20 2.40
22.81 4.08 8.64 16.14 19.80 8.62 14.82 22.32 10.32
1.13 0.47 0.90 - 0.36 0.72 0.19 0.57 0.18
6.02 0.90 2.61 5.43 4.13 2.38 3.28 4.32 0.77
- - - - - - - - -
- - - - - - - - -

63.45 5.69 24.69 22.34 81.13 12.19 33.19 98.26 54.68


6 7 8 9
10 1 2 1 2 3 4 1 2 3

-
-
-
4.77
-

23.63
4.90
56.14
-
-
1
5
8
32
52

54
61
63
179
338
List of Calculation
STR Name & File Name Sheet Calculation No
Pipe Rack
1. Pipe Rack 1 SSP-CVL2-FDN-PR02-1
2 SSP-CVL2-FDN-PR02-2.1
1A SSP-CVL2-FDN-PR02-2.2
3 SSP-CVL2-FDN-PR02-3
Equipment Foundation and Structure (P2)
2. STR&EQP FDN (P2) 1 SSP-CVL2-PIT-M6486-19
2 SSP-CVL2-PIT-V6482.01
3 SSP-CVL2-PIT-V6484.01
4 SSP-CVL2-PIT-V6483.01
5 SSP-CVL2-PIT-V6485.01
6 SSP-CVL2-1340-STR P2-1
7 SSP-CVL2-FDN-STR P2-2
8 SSP-CVL2-FDN-E.1352.01
9 SSP-CVL2-FDN-STR P2-4
10 SSP-CVL2-FDN-E.1352.02
11 SSP-CVL2-FDN-STR P2-11
12 SSP-CVL2-FDN-1340 - V.6315.01
13 SSP-CVL2-FDN-1340 - V.6315.02
14 SSP-CVL2-FDN-P2-3
15 SSP-CVL2-FDN-STR P2-5
16 SSP-CVL2-SP P2
17 SSP-CVL2-CMH01-P2C0C
18 SSP-CVL2-CMH02-P2C0C
19 SSP-CVL2-FDN-2340 - V.6416.01
20 SSP-CVL2-FDN-STR P2-13
21 SSP-CVL2-FDN-STR P2-6
22 SSP-CVL2-FDN-STR P2-7
23 SSP-CVL2-FDN-1340-T6304.01
24 SSP-CVL2-FDN-2350 - V2353.01 RSD
25 SSP-CVL2-FDN-1340-SHELTER
26 SSP-CVL2-FDN-2350 - V1353.01 RSD
27 SSP-CVL2-AMH01-P2C0C
28 SSP-CVL2-AMH02-P2C0C
29 SSP-CVL2-FDN-1350 - P1351.01 PSD
30 SSP-CVL2-FDN-1350 - P1351.02
31 SSP-CVL2-FDN-1350 - P1352.01
32 SSP-CVL2-FDN-1350 - P1352.02
33 SSP-CVL2-FDN-1350 - P1352.03/04
34 SSP-CVL2-FDN-E.2352.01 A/B
35 SSP-CVL2-FDN-E.2352.02 A/B
36 SSP-CVL2-FDN-1350 - P1353.01 A/B
37 SSP-CVL2-FDN-2350-E.6323.02 MEH
38 SSP-CVL2-FDN-P.6416.01 PBP
39 SSP-CVL2-FDN-1340 - P.6304.02A/B
40 SSP-CVL2-FDN-V.6317.01
41 SSP-CVL2-FDN-V.6318.01
42 SSP-CVL2-FDN-V.6318.02
43 SSP-CVL2-FDN-P.6317.02 A/B
44 SSP-CVL2-FDN-V.6319.01
45 SSP-CVL2-FDN-P.6318.02 A/B
46 SSP-CVL2-FDN-P.6319.02 A/B
47 SSP-CVL2-FDN-2350 - P2353.01 A/B RSP
48 SSP-CVL2-FDN-2350 - P2352.04 CPSP
49 SSP-CVL2-FDN-2350 - P2352.03 CPSP
50 SSP-CVL2-FDN-2350 - P2352.02 CPSP
51 SSP-CVL2-FDN-2350 - P2352.01 A/B CPSP
52 SSP-CVL2-FDN-2350 - P2351.01 A/B CPSP
53 SSP-CVL2-FDN-2350 - P2351.02 CPSP
54 SSP-CVL2-DIKE WALL-1340- T6304.01
55 SSP-CVL2-FDN-2340-V6328.01
56 SSP-CVL2-FDN-2340 - P2342.01 /02
57 SSP-CVL2-FDN-E.2341.01
58 SSP-CVL2-FDN-1340 - P1345.01 /02
59 SSP-CVL2-FDN-1340 - P1342.01 /02
60 SSP-CVL2-FDN-1340- E.1344.01
61 SSP-CVL2-FDN-1340 - P2352.04 CPSP
62 SSP-CVL2-FDN-1340-C6417.01
63 SSP-CVL2-AOC-P2-A0C-JB 23/24/25/26
64 SSP-CVL2-FDN-1350 - ANALYZER HOUSE
65 SSP-CVL2-FDN-1350 - V6474.02
66 SSP-CVL2-FDN-1350 - P6343.01
67 SSP-CVL2-FDN-1340 - P6315.01
68 SSP-CVL2-FDN-1340 - P6315.02 A/B
69 SSP-CVL2-VB-P2VB-01
70 SSP-CVL2-CB-P2CB-01
71 SSP-CVL2-FDN-1350 -V6343.01
72 SSP-CVL2-AMH03-P2A0C
73 SSP-CVL2-VB-P2VB-02
74 SSP-CVL2-AOC-P2-A0C-JB 13
75 SSP-CVL2-AOC-P2-A0C-JB 19
76 SSP-CVL2-AOC-P2-C0C- CEP
77 SSP-CVL2-FDN-2340 - PIPE SUPPORT V.6416.01
78 SSP-CVL2-FDN-1350 - V6474.03
79 SSP-CVL2-FDN-2340 - LOCAL PLATFROM TIFANE, DELTASTOP
80 SSP-CVL2-FDN-1350 - HVAC & AIR STACK
Equipment Foundation and Structure (P3)
3. STR&EQP FDN (P3) 1 SSP-CVL2-PIT-M6486-20
2 SSP-CVL2-PIT-M6486-21
3 SSP-CVL2-FDN-T1374.01
4 SSP-CVL2-FDN-T1374.02
5 SSP-CVL2-FDN-T2374.02
6 SSP-CVL2-FDN-P3-3
7 SSP-CVL2-FDN-V1371
8 SSP-CVL2-FDN-V1372
9 SSP-CVL2-FDN 1360 - STR. P3-1
10 SSP-CVL2-FDN-P3-8
11 SSP-CVL2-FDN-V2371.01/02/03
12 SSP-CVL2-FDN-1370 - V.6415.01
13 SSP-CVL2-FDN-STR P3-2
14 SSP-CVL2-FDN-1370 - V.1373.01
15 SSP-CVL2-FDN-1370 - V.2373.01
16 SSP-CVL2-FDN 2360 - STR. P3-6
17 SSP-CVL2-FDN-STR P3-7
18 SSP-CVL2-CMH02-P3C0C
19 SSP-CVL2-FDN-1370-T6306.01
20 SSP-CVL2-FDN-1370-T6307.01
21 SSP-CVL2-FDN-1370-T6308.01
22 SSP-CVL2-CMH03-P3C0C
23 SSP-CVL2-FDN-2370 P3-12
24 SSP-CVL2-FDN-1370 P3-5
25 SSP-CVL2-FDN-1370 - P.1371.01/02/03
26 SSP-CVL2-FDN-1370 - P.1373.01/02/03
27 SSP-CVL2-FDN-1370 - P.1373.01 A/B
28 SSP-CVL2-FDN-1370 - P.1373.03
29 SSP-CVL2-CMH01-P3C0C
30 SSP-CVL2-CMH05-P3C0C
31 SSP-CVL2-AMH01-P3C0C
32 SSP-CVL2-CMH04-P3C0C
33 SSP-CVL2-AMH04-P3AOC
34 SSP-CVL2-AMH05-P3AOC
35 SSP-CVL2-FDN-2370 - V.6412.01
36 SSP-CVL2-FDN-1370 - P.2373.01 A/B
37 SSP-CVL2-FDN-1370 - P.2373.03
38 SSP-CVL2-FDN-2370 - P.2371.01/02/03
39 SSP-CVL2-AMH03-P3A0C
40 SSP-CVL2-FDN-1360 - P.1361.01/05
41 SSP-CVL2-FDN-1360 - P.1361.02
42 SSP-CVL2-FDN-1360 - P.1361.06
43 SSP-CVL2-FDN-2360 - P.2361.01
44 SSP-CVL2-FDN-2360 - P.2361.02
45 SSP-CVL2-FDN-2360 - P.2361.05
46 SSP-CVL2-FDN-2360 - P.2361.06
47 SSP-CVL2-FDN-2360 - S.2361.01
48 SSP-CVL2-FDN-2360 - S.1361.01
49 SSP-CVL2-FDN-1370 - P.1374.01
50 SSP-CVL2-FDN-1370 - P.1374.02/03
51 SSP-CVL2-FDN-1370 - P.1374.04
52 SSP-CVL2-FDN-1370 P3-4
53 SSP-CVL2-FDN-2370 - P.2374.02
54 SSP-CVL2-FDN-2370 - P.2374.04
55 SSP-CVL2-FDN-1370 - P.6306.01
56 SSP-CVL2-FDN-1370 - P.6306.02 A/B
57 SSP-CVL2-FDN-1370 - P.6307.01
58 SSP-CVL2-FDN-1370 - P.6307.02 A/B
59 SSP-CVL2-FDN-1370 - P.6308.01
60 SSP-CVL2-FDN-1370 - P.6308.02 A/B
61 SSP-CVL2-FDN-1370 P3-10
62 SSP-CVL2-AOC-P3-A0C-JB 01/02
63 SSP-CVL2-AMH06-P3AOC
64 SSP-CVL2-FDN-2370 P3-9
65 SSP-CVL2-DIKE WALL-1360 - BLENDING AREA
66 SSP-CVL2-DIKE WALL-2360 - BLENDING AREA
67 SSP-CVL2-CB-P3CB-01
68 SSP-CVL2-CB-P3CB-02
69 SSP-CVL2-AOC-P3-C0C- CEP DN 200
70 SSP-CVL2-AOC-P3-C0C- CEP DN 250
71 SSP-CVL2-CB-P3CB-01COC
72 SSP-CVL2-FDN-1360 - V6474.04
73 SSP-CVL2-FDN-2360 - V6474.05

Local Foundation (P2)


4. LOCAL FDN (P2) 1 SSP-CVL2-LF- LOCAL PLATFROM FOUNDATION 1340
2 SSP-CVL2-LF- R.1342.02/03 1340
3 SSP-CVL2-LF -1340- AOTP P6304.02 A/B (AG-24)
4 SSP-CVL2-LF- 1350- ARS V.1353.01
5 SSP-CVL2-LF - 1350 CONCENTRATION
6 SSP-CVL2-LF- 2340 POLYMERIZATION
7 SSP-CVL2-LF -2340- EPITSOP, DELTASTOP AND WITHOX
8 SSP-CVL2-LF-2340- AROUND TIFANE
9 SSP-CVL2-LF -2350- ARSS V.2353.01
10 SSP-CVL2-LF -2350- CONCENTRATION
11 SSP-CVL2-LF -2350-V.6416.01
12 SSP-CVL2-LF -2350- P.2352.02/01 AB, P2352.02/04
13 SSP-CVL2-LF -2350- V.6474.03
14 SSP-CVL2-LF-1340- ARROUND ETASTOP COUNTAINER
15 SSP-CVL2-LF -1340- AOTP P6304.02 A/B
16 SSP-CVL2-LF -1340- ACHE E1341.01 & 1344.01
17 SSP-CVL2-LF -1350- CONCENTRATION AREA
18 SSP-CVL2-LF - 1350 CONCENTRATION ( P2-1)
19 SSP-CVL2-CT-2350- CABLE TRAY SUPPORT 2350
20 SSP-CVL2-LF-2350- STAGE PRE-HEATER
21 SSP-CVL2-LF-1352- STAGE PRE-HEATER
22 SSP-CVL2-LPF- P2- LIGHTING POLE FOUNDATION
23 SSP-CVL2-HB- P2-HOSE BOX FOUNDATION P2 AREA
24 SSP-CVL2-GP- P2-GUARD POST P2 AREA

Local Foundation (P3)


5. LOCAL FDN (P3) 1 SSP-CVL2-LF- P3-1360- V,1361.02/03
2 SSP-CVL2-LF- P3-1360- V.1361.01
3 SSP-CVL2-LF -1360- P1361.01A/02/05/06,S1361
4 SSP-CVL2-LF- 1360- P1361.01B, V6474.04
5 SSP-CVL2-LF- 1360 - P2361.05,P2361.02,S2361.01
6 SSP-CVL2-LF - 2360- P.2361.01, V6474.05
7 SSP-CVL2-LF -2360- V.2361.01
8 SSP-CVL2-LF -2360- V.2361.02/03
9 SSP-CVL2-LF -1370- STRIPPING AREA
10 SSP-CVL2-LF -1370- STRIPPING P.1373.01 A/B, P 1373.03, V 1
11 SSP-CVL2-LF -1370- TAMOL
12 SSP-CVL2-LF -1370- CRUMBS SLURRY U-3
13 SSP-CVL2-LF- 1370- STRIPPING V 1372.01/02/03
14 SSP-CVL2-LF- 1370- STRIPPING V 1371.01/02/03
15 SSP-CVL2-LF- 2370- STRIPPING U.32 WATER LINE
16 SSP-CVL2-LF -2370- STRIPPING V.6412.01, V6415.01
17 SSP-CVL2-LF -2370- STRIPPING V.2373.01
18 SSP-CVL2-LF- 2370- STRIPPING V.2371.01/02/03
19 SSP-CVL2-CT- P3-2360 AREA CABLE TRAY
20 SSP-CVL2-LF -2370- CRUMBS SLURRY U-32
21 SSP-CVL2-LPF- P3- LIGHTING POLE FOUNDATION
22 SSP-CVL2-HB- P3-HOSE BOX FOUNDATION P3 AREA
23 SSP-CVL2-GP- P3-GUARD POST P3 AREA
Description of Calculations

PIPE RACK 02-1


PIPE RACK 02-2
PIPE RACK 02-2
PIPE RACK 02-3

POLYMERIZATION SEPARATION PIT (M6486.19)


POLYMERIZATION DRAIN DRUM (V6482.01)
ACID DRAIN DRUM (V6484.01)
CONCENTRATION DRAIN DRUM (V6483.01)
DELTASTOP / EPISTOP DRAIN DRUM (V6485.01)
STR P2-1 1340 POLYMERIZATION STRUCTURE FOUNDATION
STR P2-2 1350 CONCENTRATION STRUCTURE FOUNDATION
FOUNDATION E.1352.01 - A/B/D/E 1st CONCENTRATION STAGE PRE-HEATER
STR P2-4 1350 CONCENTRATION 2ND STAGE PRE-HEATER FOUNDATION
FOUNDATION E.1352.02 - A/B/C 2nd CONCENTRATION STAGE PRE-HEATER
STR P2-11 1350 CONCENTRATION PIPE SUPPORT STRUCTURE FOUNDATION
FOUNDATION V.6315.01 ETASTOP MAKE-UP VESSEL
FOUNDATION V.6315.02 ETASTOP MAKE-UP VESSEL
STR P2-3 1350 CONCENTRATION 1ST STAGE PRE-HEATER FOUNDATION
STR P2-5 2340 POLYMERIZATION STRUCTURE FOUNDATION
SUB PIPE PRE EPSISTOP FOUNDATION
P2- CMH01 AREA COC MAIN HOLE TYPE 2 PLAN, SECTION- A/B/C
P2- CMH02 AREA COC MAIN HOLE TYPE 2 PLAN, SECTION- A/B/C
FOUNDATION V.6416.01 POLYMERIZATION BLOWDOWN DRUM
STR P2-13 2350 PIPE SUPPORT STRUCTURE FOUNDATION
STR P2-6 2350 CONCENTRATION STRUCTURE FOUNDATION
STR P2-7 2350 CONCENTRATION 1ST STAGE PRE HEATER FOUNDATION
P2- FOUNDATION T.6304.01 ANTI-OXIDANT STORAGE TANK
FOUNDATION V.2353.01 RECYCLE SOLVENT DRUM
SHELTER FOR ACID FOUNDATION
FOUNDATION V.1353.01 RECYCLE SOLVENT DRUM
P2- AMH01 AREA COC MAIN HOLE TYPE 2 PLAN, SECTION- A/B
P2- AMH02 AREA COC MAIN HOLE TYPE 2 PLAN, SECTION- A/B
FOUNDATION P.1351.01 PRE-FLASHED SOLUTION DRUM
FOUNDATION P.1351.02 PRE-FLASHED SOLUTION START UP PUPM
FOUNDATION P.1352.01 A/B CONCENTRATED POLYMER SOLUTION PUPM (1ST STAGE)
FOUNDATION P.1352.02 CONCENTRATED POLYMER SOLUTION PUPM (2ND STAGE)
FOUNDATION P.1352.03/04 CONCENTRATED POLYMER SOLUTION START UP PUMP
FOUNDATION E.2352.01 A/B 1ST CONCENTRATION STAGE PRE-HEATER
FOUNDATION E.2352.02 A/B 2ND CONCENTRATION STAGE PRE- HEATHER
FOUNDATION P.1353.01 A/B RECYCLE SOLVENT PUPM
FOUNDATION E.6323.02 MES INJECTION HEATHER
FOUNDATION P.6416.01 POLYMERIZATION BLOWDOWN PUMP
FOUNDATION P.6304.02 A/B ANTIOXIDANT S TRANSFER PUMP
FOUNDATION V.6317.01 TIFANE MAKE-UP VESSEL
FOUNDATION V.6318.01 EPITSTOP DAILY VESSEL
FOUNDATION V.6318.02 EPITSTOP DAILY VESSEL
FOUNDATION P.6317.02 A/B TIFANE INJECTION PUMP
FOUNDATION V.6319.01 DELTASTOP MAKE-UP VESSEL
FOUNDATION P.6318.02 A/B EPSISTOP INJECTION PUMP
FOUNDATION P.6319.02 A/B DELTA STOP INJECTION PUMP
FOUNDATION P.2353.01 A/B RECYCLE SOLVENT PUMP
FOUNDATION P.2352.04 CONCENTRATED POLYMER SOLUTION START-UP PUMP (2nd STAGE)
FOUNDATION P.2352.03 CONCENTRATED POLYMER SOLUTION START-UP PUMP (1st STAGE)
FOUNDATION P.2352.02 CONCENTRATED POLYMER SOLUTION PUMP ( 2nd STAGE)
FOUNDATION P.2352.01 A/B CONCENTRATED POLYMER SOLUTION PUMP ( 1st STAGE)
FOUNDATION P.2351.01 PRE-FLASHED SOLUTION PUMP
FOUNDATION P.2351.02 PRE- FLASHED SOLUTION START-UP PUMP
CONCRETE DIKE FOR T6304.01
P2- FOUNDATION V.6328.01 WHITOX MAKE - UP VESSEL
FOUNDATION P.2342.01/02 1st & 2nd POLYMERIZATION REACTOR COOLING WATER PUMP
FOUNDATION E.2341.01 CHARGE HEADER EXCHANGER
FOUNDATION P.1345.01/02 1st & 2nd POLYMERIZATION REACTOR COOLING WATER PUMP
FOUNDATION P.1342.01/02 1st & 2nd POLYMERIZATION REACTOR COOLING WATER PUMP
FOUNDATION E.1341.01 & E.1344.01 CHARGE HEADER EXCHANGER
FOUNDATION WS.6315.01 ETASTOP WEIGHT SCALE
FOUNDATION C.6417.01 ACID VAPOR SCRUBBER
P2- AOC JUNCTION BOX 23/24/25/26
FOUNDATION ANALYZER HOUSE
FOUNDATION V6474.02 BLADDER TANK
FOUNDATION P6343.01 GPC VESSEL PUMP
FOUNDATION P6315.01
FOUNDATION P6315.02 A/B ETASTOP INJECTION PUMP
P2-VALVE BOX 01 TYPE 2
P2- CATCH BASIN 01
FOUNDATION V6343.01 GPC VESSEL
P2- AMH03 AREA COC MAIN HOLE TYPE 2 PLAN, SECTION- A/B
P2-VALVE BOX 02 TYPE 2
P2- AOC JUNCTION BOX 13
P2- AOC JUNCTION BOX 19
P2- CONCRETE ENCASMENT PIPE DN - 200
FOUNDATION PIPE SUPPORT AROUND V.6416.01 POLYMERIZATION BLOWDOWN DRUM
FOUNDATION V6474.03 BLADDER TANK
FOUNDATION LOCAL PLATFORM TIFANE, DELTASTOP AND WHITHOX
FOUNDATION HVAC & AIR STACK
BLENDING & CONCENTRATION SEPARATION PIT (M6486.20)
STRIPPING SEPARATION PIT (M6486.21)
FOUNDATION T1374.01 CRUMBS SLURRY TANK
FOUNDATION T1374.02 CRUMBS SLURRY TANK
FOUNDATION T2374.02 CRUMBS SLURRY TANK
STR P3-3 1370 STRIPPING STRUCTURE FOUNDATION
V1371.01/02/03 - FIRST/SECOND/THIRD STRIPPER FOUNDATION
V1372.01/02/03 - FIRST/SECOND/THIRD STRIPPER FOUNDATION
STR - P3-1 - 1360 BLENDING EQUIPMENT SUPPORT STRUCTURE
STR P3-8 2370 STRIPPING STRUCTURE FOUNDATION
V2371.01/02/03 - FIRST/SECOND/THIRD STRIPPER FOUNDATION
FOUNDATION V.6415.01 STRIPPING K.O DRUM
STR P3-2 1360 BLENDING STRUCTURE FOUNDATION
FOUNDATION V.1373.01 STRIPPEDVAPOR CONDENSATE DRUM
FOUNDATION V.2373.01 STRIPPED VAPOR CONDENSATE DRUM
STR - P3-6 - 2360 BLENDING EQUIPMENT SUPPORT STRUCTURE
STR P3-7 2360 BLENDING STRUCTURE FOUNDATION
P3- CMH02 AREA COC MAIN HOLE TYPE 2 PLAN, SECTION- A/B/C
P3- FOUNDATION T.6306.01 TAMOL STORAGE TANK
P3- FOUNDATION T.6307.01 SODA STORAGE TANK
P3- FOUNDATION T.6308.01 CaCl2 STORAGE TANK
P3- CMH03 AREA COC MAIN HOLE TYPE 2 PLAN, SECTION- A/B/C
STR P3-12 FOUNDATION
STR P3-5 1370 FOUNDATION
FOUNDATION P.1371.01/02/03 1st,2nd,3rd STRIPPER SLURRY PUMP
FOUNDATION P.1372.01/02/03 1st,2nd,3rd STRIPPER SLURRY PUMP
FOUNDATION P.1373.01 A/B STRIPPED RECYCLE SOLVENT PUMP
FOUNDATION P.1373.03 3rd LUBE WATER PUMP
P3- CMH01 AREA COC MAIN HOLE TYPE 2 PLAN, SECTION- A/B
P3- CMH05 AREA COC MAIN HOLE TYPE 2 PLAN, SECTION- A/B
P3- AMH01 AREA COC MAIN HOLE TYPE 2 PLAN, SECTION- A/B
P3- CMH04 AREA COC MAIN HOLE TYPE 2 PLAN, SECTION- A/B/C
P3- AMH04 AREA COC MAIN HOLE TYPE 2 PLAN, SECTION- A/B
P3- AMH05 AREA COC MAIN HOLE TYPE 2 PLAN, SECTION- A/B
FOUNDATION V.6412.01 OFF GAS K.O DRUM
FOUNDATION P.2373.01 A/B STRIPPED RECYCLE SOLVENT PUMP
FOUNDATION P.2373.03 LUBE WATER PUMP
FOUNDATION P.2371.01/02/03 1st/2nd/3rd STRIPPED SLURRY PUMP
P3- AMH03 AREA COC MAIN HOLE TYPE 2 PLAN, SECTION- A/B
FOUNDATION P.1361.01 A/B EC POLYMER SOLUTION PUMP & P.1361.05 HC BLEND RECYCLING PUMP
FOUNDATION P.1361.02 BLEND RECYCLING PUMP
FOUNDATION P.1361.06 POLYMER SOLUTION PUMP
FOUNDATION P.2361.01 POLYMER SOLUTION PUMP
FOUNDATION P.2361.02 HS BLEND RECYCLING PUMP
FOUNDATION P.2361.05 HC BLENDING RECYCLING PUMP
FOUNDATION P.2361.06 POLYMER SOLUTION PUMP
FOUNDATION S.2361.01 POLYMER SOLUTION FILTER
FOUNDATION S.1361.01 POLYMER SOLUTION FILTER
FOUNDATION P.1374.01 CRUMBS SLURRY RECIRCULATING PUMP
FOUNDATION P.1374.02/03 CRUMBS SLURRY TRANSFER PUMP
FOUNDATION P.1374.04 CRUMBS SLURRY TRANSFER PUMP
STR P3-4 1370 FOUNDATION
FOUNDATION P.2374.02 CRUMBS SLURRY RECIRCULATING PUMP
FOUNDATION P.2374.04 CRUMBS SLURRY RECIRCULATING PUMP
FOUNDATION P.6306.01 TAMOL UNLOADING PUMP
FOUNDATION P.6306.02 A/B TAMOL TRANSFER PUMP
FOUNDATION P.6307.01 SODA UNLOADING PUMP
FOUNDATION P.6307.02 A/B SODA TRANSFER PUMP
FOUNDATION P.6308.01 CaCl2 TRANSFER PUMP
FOUNDATION P.6308.02 A/B CaCl2 TRANSFER PUMP
STR P3-10 FOUNDATION
P3- AOC JUNCTION BOX 01/02
P3- AMH06 AREA COC MAIN HOLE TYPE 2 PLAN, SECTION- A/B
STR P3-9 FOUNDATION SLURRY TANK STRUCTURE FOUNDATION
CONCRETE DIKE FOR 1360 BLENDING AREA
CONCRETE DIKE FOR 2360 BLENDING AREA
P3- CATCH BASIN 01
P3- CATCH BASIN 02
P2- CONCRETE ENCASMENT PIPE DN - 200
P3- CONCRETE ENCASMENT PIPE DN - 250
P3- CATCH BASIN 01 (COC)
FOUNDATION V6474.04 BLADDER TANK
FOUNDATION V6474.05 BLADDER TANK

LOCAL PLATFROM ETASTOP FOUNDATION 1340


FOUNDATION PIPE SUPPORT AROUND POLYMERAZATION REACTOR 1340 R.1342.02/03 & R.1345.02/03
FOUNDATION PIPE SUPPORT AROUND ANTI- OXIDANT TRANSFER PUMP P6304.02 A/B (AG-24)
FOUNDATION PIPE SUPPORT AROUND RECYCLE SOLVENT V.1353.01
FOUNDATION PIPE SUPPORT AROUND 1350 CONCENTRATION
FOUNDATION PIPE SUPPORT AROUND 2340 POLYMERIZATION
FOUNDATION PIPE SUPPORT AROUND EPITSTOP, DELTASTOP AND WITHOX
FOUNDATION PIPE SUPPORT AROUND TIFANE
FOUNDATION PIPE SUPPORT AROUND RECYCLE SOLVENT STROGE V2353.01
FOUNDATION PIPE SUPPORT AROUND 2350 CONCENTRATION
FOUNDATION PIPE SUPPORT AROUND V.6416.01 POLYMERAZITATION BLOWDOWN DRUM
FOUNDATION PIPE SUPPORT AROUND P2352.02/01AB, P2352.02/04
FOUNDATION PIPE SUPPORT AROUND V.6474.03 AREA
FOUNDATION PIPE SUPPORT AROUND ETASTOP CONTAINER
FOUNDATION PIPE SUPPORT AROUND ANTI-OXIDANT TRANSFER PUMP 6304.02 A/B
FOUNDATION PIPE SUPPORT AROUND CHAGRE HEADER EXCANGER E. 1341.01 AND 1344.01
FOUNDATION PIPE SUPPORT AROUND 1350 CONCENTRATION AREA
FOUNDATION PIPE SUPPORT AROUND 1350 CONCENTRATION (P2-1)
FOUNDATION CABLE TRAY SUPPORT AROUND 2350 CONCENTRATION AREA
FOUNDATION PIPE SUPPORT AROUND 2350 CONCENTRATION STAGE PRE-HEATER
FOUNDATION PIPE SUPPORT 1st CONCENTRATION STAGE PRE-HEATER
LIGHTING POLE FOUNDATION P2 AREA
HOSE BOX FOUNDATION P2 AREA
GUARD POST P2 AREA

FOUNDATION PIPE SUPPORT ARROUND BLENDING V. 1361.02, V1361.03


FOUNDATION PIPE SUPPORT ARROUND BLENDING V. 1361.01
FOUNDATION PIPE SUPPORT AROUND BLENDING P1361.02,S1361.01,P1361.06,P1361.05,P1361.01A
FOUNDATION PIPE SUPPORT AROUND BLENDING P1361.01B, V6474.04
FOUNDATION PIPE SUPPORT AROUND BLENDING P2361.05,P2361.02,S2361.01
FOUNDATION PIPE SUPPORT AROUND BLENDING P2361.01, V6474.05
FOUNDATION PIPE SUPPORT AROUND BLENDING V2361.01
FOUNDATION PIPE SUPPORT AROUND BLENDING V2361.02, V2361.03
FOUNDATION PIPE SUPPORT AROUND 1370-STRIPPING AREA
FOUNDATION PIPE SUPPORT AROUND STRIPPING P.1373.01 A/B, P 1373.03, V 1373.01
FOUNDATION PIPE SUPPORT AROUND TAMOL
FOUNDATION PIPE SUPPORT AROUND CRUMBS SLURRY U-3
FOUNDATION PIPE SUPPORT AROUND STRIPPING V.1372.01 /02/03
FOUNDATION PIPE SUPPORT AROUND STRIPPING V.1371.01 /02/03
FOUNDATION PIPE SUPPORT AROUND STIPPING U.32 FIRE WATER LINE
FOUNDATION PIPE SUPPORT AROUND STRIPPING V.6412.01, V6415.01
FOUNDATION PIPE SUPPORT AROUND STRIPPING V.2373.01
FOUNDATION PIPE SUPPORT AROUND STRIPPING V.2371.01/02/03
FOUNDATION CABLE TRAY 2360 BLENDING AREA
FOUNDATION PIPE SUPPORT AROUND CRUMBS SLURRY U-32
LIGHTING POLE FOUNDATION P3 AREA
HOSE BOX FOUNDATION P3 AREA
GUARD POST P3 AREA
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
1 SSP-CVL2-FDN-PR02-1 469,386,365.40
2 SSP-CVL2-FDN-PR02-2.1 130,567,618.78
3 SSP-CVL2-PIT-M6486-19 114,442,713.99
4 SSP-CVL2-PIT-V6482.01 166,736,866.70
5 SSP-CVL2-PIT-V6484.01 219,943,677.31
6 SSP-CVL2-PIT-V6483.01 279,797,378.65
7 SSP-CVL2-PIT-V6485.01 135,775,967.03
8 SSP-CVL2-1340-STR P2-1 1,457,654,774.91
9 SSP-CVL2-FDN-1340 - V.6315.01 8,926,629.12
10 SSP-CVL2-FDN-1340 - V.6315.02 7,839,692.33
11 SSP-CVL2-FDN-STR P2-2 1,537,864,153.23
12 SSP-CVL2-FDN-P2-3 48,234,684.76
13 SSP-CVL2-FDN-E.1352.01 87,422,439.16
14 SSP-CVL2-FDN-STR P2-4 36,558,655.53
15 SSP-CVL2-FDN-E.1352.02 70,626,079.45
16 SSP-CVL2-FDN-STR P2-11 35,213,823.94
17 SSP-CVL2-FDN-STR P2-5 541,327,042.08
18 SSP-CVL2-SP P2 57,782,861.13
19 SSP-CVL2-CMH01-P2C0C 30,746,419.99
20 SSP-CVL2-CMH02-P2C0C 27,865,233.39
21 SSP-CVL2-FDN-2340 - V.6416.01 94,123,459.57
22 SSP-CVL2-FDN-STR P2-13 45,509,238.77
23 SSP-CVL2-FDN-STR P2-6 872,941,662.73
24 SSP-CVL2-FDN-STR P2-7 65,915,142.68
25 SSP-CVL2-FDN-1340-T6304.01 70,641,318.58
26 SSP-CVL2-FDN-2350 - V2353.01 RSD 23,705,697.07
27 SSP-CVL2-FDN-1340-SHELTER 166,233,351.54
28 SSP-CVL2-FDN-2350 - V1353.01 RSD 31,676,982.29
29 SSP-CVL2-AMH01-P2C0C 56,427,037.32
30 SSP-CVL2-AMH02-P2C0C 57,933,843.25
31 SSP-CVL2-FDN-1350 - P1351.01 PSD 22,054,353.67
32 SSP-CVL2-FDN-1350 - P1351.02 7,058,661.35
33 SSP-CVL2-FDN-1350 - P1352.01 44,598,194.57
34 SSP-CVL2-FDN-1350 - P1352.02 17,553,817.39
35 SSP-CVL2-FDN-1350 - P1352.03/04 12,062,435.09
36 SSP-CVL2-FDN-E.2352.01 A/B 39,893,339.65
37 SSP-CVL2-FDN-E.2352.02 A/B 38,105,567.68
38 SSP-CVL2-FDN-1350 - P1353.01 A/B 12,155,087.96
39 SSP-CVL2-FDN-2350-E.6323.02 MEH 13,109,710.03
40 SSP-CVL2-FDN-P.6416.01 PBP 10,712,627.14
41 SSP-CVL2-FDN-1340 - P.6304.02A/B 6,173,782.76
42 SSP-CVL2-FDN-V.6317.01 7,198,629.91
43 SSP-CVL2-FDN-V.6318.01 5,366,702.56
44 SSP-CVL2-FDN-V.6318.02 3,996,048.30
45 SSP-CVL2-FDN-P.6317.02 A/B 6,013,994.16
46 SSP-CVL2-FDN-V.6319.01 5,123,340.10
47 SSP-CVL2-FDN-P.6318.02 A/B 5,966,089.76
48 SSP-CVL2-FDN-P.6319.02 A/B 5,966,089.76
49 SSP-CVL2-FDN-2350 - P2353.01 A/B RSP 9,047,761.16
50 SSP-CVL2-FDN-2350 - P2352.04 CPSP 5,901,531.61
51 SSP-CVL2-FDN-2350 - P2352.03 CPSP 7,056,006.20
52 SSP-CVL2-FDN-2350 - P2352.02 CPSP 17,169,925.52
53 SSP-CVL2-FDN-2350 - P2352.01 A/B CPSP 34,145,421.61
54 SSP-CVL2-FDN-2350 - P2351.01 A/B CPSP 16,971,231.86
55 SSP-CVL2-FDN-2350 - P2351.02 CPSP 6,492,369.27
56 SSP-CVL2-DIKE WALL-1340- T6304.01 196,434,313.33
57 SSP-CVL2-FDN-2340-V6328.01 8,789,574.44
58 SSP-CVL2-FDN-2340 - P2342.01 /02 11,470,086.46
59 SSP-CVL2-FDN-E.2341.01 6,702,022.20
60 SSP-CVL2-FDN-1340 - P1345.01 /02 11,570,897.94
61 SSP-CVL2-FDN-1340 - P1342.01 /02 11,390,452.07
62 SSP-CVL2-FDN-1340- E.1344.01 14,275,193.17
63 SSP-CVL2-FDN-1340 - P2352.04 CPSP 5,746,634.68
64 SSP-CVL2-FDN-1340-C6417.01 2,950,611.55
65 SSP-CVL2-AOC-P2-A0C-JB 23/24/25/26 79,506,257.47
66 SSP-CVL2-FDN-1350 - ANALYZER HOUSE 25,308,621.49
67 SSP-CVL2-FDN-1350 - V6474.02 6,104,902.30
68 SSP-CVL2-FDN-1350 - P6343.01 3,102,738.29
69 SSP-CVL2-FDN-1340 - P6315.01 1,865,567.13
70 SSP-CVL2-FDN-1340 - P6315.02 A/B 6,639,298.76
71 SSP-CVL2-VB-P2VB-01 33,860,820.72
72 SSP-CVL2-CB-P2CB-01 7,884,260.56
73 SSP-CVL2-FDN-1350 -V6343.01 5,534,853.10
74 SSP-CVL2-AMH03-P2A0C 55,642,059.33
75 SSP-CVL2-VB-P2VB-02 32,131,573.50
76 SSP-CVL2-AOC-P2-A0C-JB 13 8,114,775.42
77 SSP-CVL2-AOC-P2-A0C-JB 19 6,879,151.56
78 SSP-CVL2-AOC-P2-C0C- CEP 3,866,548.69
79 SSP-CVL2-FDN-2340 - PIPE SUPPORT V.6416.01 35,631,129.15
80 SSP-CVL2-FDN-1350 - V6474.03 3,434,249.54
81 SSP-CVL2-FDN-2340 - LOCAL PLATFROM TIFANE, DELTASTOP 42,424,918.62
82 UG PIPE P2 573,262,427.98
83 AOC U-DITCH P2 1,733,931,828.06
84 RDPV P2 1,353,066,961.80
85 SSP-CVL2-LF- LOCAL PLATFROM FOUNDATION 1340 29,434,700.78
86 SSP-CVL2-LF- R.1342.02/03 1340 62,146,500.14
87 SSP-CVL2-LF -1340- AOTP P6304.02 A/B (AG-24) 33,635,331.84
88 SSP-CVL2-LF- 1350- ARS V.1353.01 22,543,395.30
89 SSP-CVL2-LF - 1350 CONCENTRATION 31,426,450.51
90 SSP-CVL2-LF- 2340 POLYMERIZATION 40,614,315.78
91 SSP-CVL2-LF -2340- EPITSOP, DELTASTOP AND WITHOX 17,447,593.54
92 SSP-CVL2-LF-2340- AROUND TIFANE 1,172,044.19
93 SSP-CVL2-LF -2350- ARSS V.2353.01 62,272,825.96
94 SSP-CVL2-LF -2350- CONCENTRATION 37,334,623.47
95 SSP-CVL2-LF -2350-V.6416.01 47,324,569.72
96 SSP-CVL2-LF -2350- P.2352.02/01 AB, P2352.02/04 34,686,992.57
97 SSP-CVL2-LF -2350- V.6474.03 27,037,528.57
98 CWS U-DITCH P2 256,868,384.94
99 SSP-CVL2-FDN-1350 - HVAC & AIR STACK 7,759,286.50
100 SSP-CVL2-LF-1340- ARROUND ETASTOP COUNTAINER 2,399,444.29
101 SSP-CVL2-LF -1340- AOTP P6304.02 A/B 12,441,021.32
102 SSP-CVL2-LF -1340- ACHE E1341.01 & 1344.01 24,256,032.96
103 SSP-CVL2-LF -1350- CONCENTRATION AREA 21,775,458.73
104 SSP-CVL2-LF - 1350 CONCENTRATION ( P2-1) 34,222,203.76
105 SSP-CVL2-CT-2350- CABLE TRAY SUPPORT 2350 3,611,650.65
106 SSP-CVL2-LF-2350- STAGE PRE-HEATER 2,584,156.87
107 SSP-CVL2-LF-1352- STAGE PRE-HEATER 834,148.65
108 SSP-CVL2-LPF- P2- LIGHTING POLE FOUNDATION 9,676,612.32
109 SSP-CVL2-HB- P2-HOSE BOX FOUNDATION P2 AREA 14,923,588.83
110 SSP-CVL2-GP- P2-GUARD POST P2 AREA 26,084,938.20

1 SSP-CVL2-FDN-PR02-2.2 228,512,010.48
2 SSP-CVL2-FDN-PR02-3 383,813,965.39
3 SSP-CVL2-PIT-M6486-20 153,556,928.72
4 SSP-CVL2-PIT-M6486-21 128,236,386.56
5 SSP-CVL2-FDN-T1374.01 161,277,496.15
6 SSP-CVL2-FDN-T1374.02 159,474,113.02
7 SSP-CVL2-FDN-T2374.02 161,090,845.54
8 SSP-CVL2-FDN-P3-3 517,777,403.31
9 SSP-CVL2-FDN-V1371 183,738,706.99
10 SSP-CVL2-FDN-V1372 184,424,211.31
11 SSP-CVL2-FDN 1360 - STR. P3-1 1,902,964,702.22
12 SSP-CVL2-FDN-P3-8 286,149,741.70
13 SSP-CVL2-FDN-V2371.01/02/03 183,835,598.52
14 SSP-CVL2-FDN-1370 - V.6415.01 49,123,497.39
15 SSP-CVL2-FDN-STR P3-2 385,231,803.54
16 SSP-CVL2-FDN-1370 - V.1373.01 58,021,995.36
17 SSP-CVL2-FDN-1370 - V.2373.01 36,259,437.79
18 SSP-CVL2-FDN 2360 - STR. P3-6 1,471,578,593.95
19 SSP-CVL2-FDN-STR P3-7 288,916,934.44
20 SSP-CVL2-CMH02-P3C0C 28,367,412.41
21 SSP-CVL2-FDN-1370-T6306.01 32,120,082.91
22 SSP-CVL2-FDN-1370-T6307.01 32,125,847.90
23 SSP-CVL2-FDN-1370-T6308.01 32,125,847.90
24 SSP-CVL2-CMH03-P3C0C 28,020,457.41
25 SSP-CVL2-FDN-2370 P3-12 28,932,884.16
26 SSP-CVL2-FDN-1370 P3-5 22,181,517.55
27 SSP-CVL2-FDN-1370 - P.1371.01/02/03 11,688,531.96
28 SSP-CVL2-FDN-1370 - P.1373.01/02/03 11,688,531.96
29 SSP-CVL2-FDN-1370 - P.1373.01 A/B 7,265,717.51
30 SSP-CVL2-FDN-1370 - P.1373.03 3,741,523.89
31 SSP-CVL2-CMH01-P3C0C 20,844,954.33
32 SSP-CVL2-CMH05-P3C0C 17,131,331.61
33 SSP-CVL2-AMH01-P3C0C 56,029,132.19
34 SSP-CVL2-CMH04-P3C0C 29,394,067.29
35 SSP-CVL2-AMH04-P3AOC 52,314,061.82
36 SSP-CVL2-AMH05-P3AOC 53,919,074.96
37 SSP-CVL2-FDN-2370 - V.6412.01 14,502,439.61
38 SSP-CVL2-FDN-1370 - P.2373.01 A/B 6,050,361.84
39 SSP-CVL2-FDN-1370 - P.2373.03 3,780,230.11
40 SSP-CVL2-FDN-2370 - P.2371.01/02/03 12,278,483.40
41 SSP-CVL2-AMH03-P3A0C 57,807,343.48
42 SSP-CVL2-FDN-1360 - P.1361.01/05 54,413,180.97
43 SSP-CVL2-FDN-1360 - P.1361.02 8,772,401.58
44 SSP-CVL2-FDN-1360 - P.1361.06 8,701,795.20
45 SSP-CVL2-FDN-2360 - P.2361.01 17,105,565.33
46 SSP-CVL2-FDN-2360 - P.2361.02 8,898,015.28
47 SSP-CVL2-FDN-2360 - P.2361.05 19,126,117.84
48 SSP-CVL2-FDN-2360 - P.2361.06 9,118,431.31
49 SSP-CVL2-FDN-2360 - S.2361.01 2,470,241.88
50 SSP-CVL2-FDN-2360 - S.1361.01 2,966,798.74
51 SSP-CVL2-FDN-1370 - P.1374.01 5,011,987.20
52 SSP-CVL2-FDN-1370 - P.1374.02/03 11,273,377.94
53 SSP-CVL2-FDN-1370 - P.1374.04 4,110,746.78
54 SSP-CVL2-FDN-1370 P3-4 86,839,111.30
55 SSP-CVL2-FDN-2370 - P.2374.02 5,720,044.03
56 SSP-CVL2-FDN-2370 - P.2374.04 4,047,727.20
57 SSP-CVL2-FDN-1370 - P.6306.01 1,729,185.33
58 SSP-CVL2-FDN-1370 - P.6306.02 A/B 3,412,047.02
59 SSP-CVL2-FDN-1370 - P.6307.01 1,730,398.10
60 SSP-CVL2-FDN-1370 - P.6307.02 A/B 3,332,614.07
61 SSP-CVL2-FDN-1370 - P.6308.01 1,719,966.89
62 SSP-CVL2-FDN-1370 - P.6308.02 A/B 3,412,047.02
63 SSP-CVL2-FDN-1370 P3-10 47,876,107.35
64 SSP-CVL2-AOC-P3-A0C-JB 01/02 19,557,273.71
65 SSP-CVL2-AMH06-P3AOC 55,730,686.82
66 SSP-CVL2-FDN-2370 P3-9 45,508,958.93
67 SSP-CVL2-DIKE WALL-1360 - BLENDING AREA 191,660,213.65
68 SSP-CVL2-DIKE WALL-2360 - BLENDING AREA 242,672,089.26
69 SSP-CVL2-CB-P3CB-01 5,539,142.33
70 SSP-CVL2-CB-P3CB-02 6,115,964.32
71 SSP-CVL2-AOC-P3-C0C- CEP DN 200 3,866,548.69
72 SSP-CVL2-AOC-P3-C0C- CEP DN 250 3,787,862.10
73 UG PIPE P3 800,502,064.48
74 AOC U-DITCH P3 783,665,586.13
75 RDPV P3 1,461,534,132.53
76 SSP-CVL2-LF- P3-1360- V,1361.02/03 18,197,360.66
77 SSP-CVL2-LF- P3-1360- V.1361.01 6,188,100.12
78 SSP-CVL2-LF -1360- P1361.01A/02/05/06,S1361 80,860,264.58
79 SSP-CVL2-LF- 1360- P1361.01B, V6474.04 34,253,347.69
80 SSP-CVL2-LF- 1360 - P2361.05,P2361.02,S2361.01 53,237,863.42
81 SSP-CVL2-LF - 2360- P.2361.01, V6474.05 39,888,125.72
82 SSP-CVL2-LF -2360- V.2361.01 8,425,894.78
83 SSP-CVL2-LF -2360- V.2361.02/03 6,875,462.41
84 SSP-CVL2-LF -1370- STRIPPING AREA 7,958,527.06
85 SSP-CVL2-LF -1370- STRIPPING P.1373.01 A/B, P 1373.03, V 1373.01 8,222,783.43
86 SSP-CVL2-LF -1370- TAMOL 35,870,635.59
87 SSP-CVL2-LF -1370- CRUMBS SLURRY U-3 33,924,349.16
88 SSP-CVL2-LF- 1370- STRIPPING V 1372.01/02/03 19,557,102.23
89 SSP-CVL2-LF- 1370- STRIPPING V 1371.01/02/03 14,716,872.43
90 SSP-CVL2-LF- 2370- STRIPPING U.32 WATER LINE 15,558,852.20
91 SSP-CVL2-LF -2370- STRIPPING V.6412.01, V6415.01 4,505,319.97
92 SSP-CVL2-LF -2370- STRIPPING V.2373.01 9,099,923.77
93 SSP-CVL2-LF- 2370- STRIPPING V.2371.01/02/03 19,644,787.18
94 CWS U-DITCH P3 223,532,217.99
95 SSP-CVL2-CT- P3-2360 AREA CABLE TRAY 13,360,469.10
96 SSP-CVL2-LF -2370- CRUMBS SLURRY U-32 11,245,841.69
97 SSP-CVL2-CB-P3CB-01COC 14,778,327.47
98 SSP-CVL2-LPF- P3- LIGHTING POLE FOUNDATION 7,300,027.46 Muhamma
Nilainya be
99 SSP-CVL2-HB- P3-HOSE BOX FOUNDATION P3 AREA 16,729,635.43
summary.
100 SSP-CVL2-GP- P3-GUARD POST P3 AREA 23,232,616.40
101 SSP-CVL2-FDN-1360 - V6474.04 3,474,606.30
102 SSP-CVL2-FDN-2360 - V6474.05 4,205,894.55
24,614,817,908.19
Muhammad Naufal:
Nilainya berbeda dengan
summary.
CONTROL EDIT CONTROL PROGRESS PER BULAN (VALUE)
55551927639 SUB-TOTAL OF DIRECT COST 1 Bulan Previous This Month Cumulative Check
16108072361 TOTAL INDIRECT COST 1 Feb-March 2016 0 400987263.341 400987263.341 1
71660000000 TOTAL COST (Direct + Indirect Cost) 1 April 2016 400987263.341 806870029.11 1207857292.451 1
May 2016 1207857292.451 1024564037.454 2232421329.906 1
June 2016 2232421329.906 1540323762.933 3749494357.989 1
July 2016 3749494357.989 1060493589.932 4809987947.921 1
Aug 2016 4809987947.921 4243881789.843 9033868171.544 1
Sept 2016 9033868171.544 2839215380.61 11873083552.154 1
Oct 2016 11873083552.154 3550169726.711 15430902066.339 1
Nov 2016 15430902066.339 2451829078.225 17833289773.133 1
Des 2016 17833289773.133 2038340175.498 19871629948.63 1
Jan 2017 19871629948.63 1036598335.94 20922371581.471 1
Feb 2017 20922371581.471 1201523657.324 22123895238.795 1
Maret 2017 22123895238.795 2395223617.167 24519118855.962 1
April 2017 24519118855.962 1409256226.073 25928375082.035 1
May 2017 25928375082.035 1411585620.551 27339960702.586 1
June 2017 27339960702.586 728059034.613 28068019737.199 1
July 2017 28068019737.199 566358697.699 28634378434.899 1
Aug 2017 28634378434.899 605956925.213 29240335360.111 1
Sept 2017 29240335360.111 482948080.039 29723283440.15 0
Oct 2017 29410758507.252 597513083.491 29997307490.743 0

30391698111.767
Progress
0.56%
1.69% 1.126%
3.12% 1.430%
5.23% 2.117%
6.71% 1.480%
12.61% 5.894%
16.57% 3.962%
21.53% 4.965%
24.89% 3.352%
27.73% 2.844%
29.20% 1.466%
30.87% 1.677%
34.22% 3.342%
36.18% 1.967%
38.15% 1.970%
39.17% 1.016%
39.96% 0.790%
40.80% 0.846%
41.48% 0.674%
41.86% 0.382%