PROGRESS CLAIM NO :2
FOR WORKDONE UP TO : APRIL 2016
GENERAL SUMMARY :
Less:
4 Retention 5% -29,327,449.17
EA EARTH WORK .
EAW ADDITIONAL EARTH WORK .
BC BASE COURSE WORK .
RE RE-BAR WORK .
AN ANCHORING & EMBEDDING WORK .
JT JOINT WORK .
JTA ADDITIONAL JOINT WORK .
FM FORM WORK .
CO CONCRETE WORK .
COA ADDITIONAL CONCRETE WORK .
AS ASPHALT WORK .
PP UNDERGROUND PIPE WORK .
PC PRE-CAST CONCRETE UNIT WORK .
MA MASONRY WORK .
PL PLASTER WORK .
LN COATING & LINING WORK .
WP WATERPROOFING WORK .
ML METAL & PLASTIC WORK .
MLA ADDITIONAL METAL & PLASTIC WORK .
PPX ADDITIONAL UNDERGROUND PIPE WORK .
ANA ADDITIONAL ANCHORING & EMBEDDING WORK .
OT OTHER ITEMS .
WVO 1 WORK VARIATION ORDER NO. 1 .
WVO 2 WORK VARIATION ORDER NO. 2 .
WVO WORK VARIATION ORDER (TIC-PPC-G-130) .
PR PROVISIONAL RATE (Subject for Adjustment) .
.
TOTAL DIRECT COST 55551927639 .
WVO No. 1 146756000 .
SUB-TOTAL OF DIRECT COST 55698683639 . 78%
WVO No. 2 1369457026.10324 .
.
TOTAL INDIRECT COST 16108072361 . 22%
.
TOTAL COST (Direct + Indirect Cost) 71660000000 . 100%
MONTHLY WORKS VALUATION SHEET
(Page of _ )
-
(1,396.10) 16,727.93 918,888,232.05 (70,782,121.69) 848,106,110.36
(0.25) 307.23 21,892,290.31 (17,613.10) 21,874,677.21
(592.05) 10,901.82 654,001,393.15 (33,687,851.40) 620,313,541.75
1,498.69 5,861.39 274,849,685.53 94,417,621.07 369,267,306.60
1,105.80 357,505,821.36 - 357,505,821.36
- 238.04 76,959,455.03 - 76,959,455.03
- - - - -
- 311.90 104,859,149.43 - 104,859,149.43
5.46 1,559.49 522,464,295.97 1,835,065.33 524,299,361.30
56.13 140.33 28,931,051.28 19,287,367.52 48,218,418.80
- - - - -
2.95 577.49 5,619,272,022.59 28,805,883.29 5,648,077,905.88
- - - - -
- 234.41 2,369,165,199.04 - 2,369,165,199.04
- - - - -
0.49 49.36 508,486,924.24 5,136,231.56 513,623,155.79
- - - - -
10.00 572.00 27,425,600.00 488,000.00 27,913,600.00
0.48 7.30 83,930,343.27 5,912,073.72 89,842,416.99
0.26 25.13 716,185,299.93 7,476,495.62 723,661,795.54
- 16.00 1,092,800.00 - 1,092,800.00
- 112.00 21,190,400.00 - 21,190,400.00
- - - - -
- - - - -
56.85 56.85 - 15,997,590.00 15,997,590.00
5.63 563.30 135,122,814.05 1,364,876.91 136,487,690.96
63.01 290.64 45,412,185.00 12,570,495.00 57,982,680.00
- - - - -
(317.34) 11,724.85 1,871,355,718.26 (49,314,505.20) 1,822,041,213.06
- 3,989.74 1,105,557,990.47 - 1,105,557,990.47
- 316.28 94,914,637.31 - 94,914,637.31
-
6.94 444.85 318,888,463.13 5,051,381.04 323,939,844.17
14.58 4,825.42 3,546,069,924.00 10,745,739.12 3,556,815,663.12
- 727.78 564,975,636.61 - 564,975,636.61
- - - -
(237.66) 1,343.05 1,189,483,364.14 (178,837,161.18) 1,010,646,202.96
- - - - -
- 4.98 18,818,784.02 - 18,818,784.02
- - - - -
- - - - -
- - - - -
- 31.25 14,900,000.00 - 14,900,000.00
- - - - -
- 242.61 242,270,346.00 - 242,270,346.00
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
3.21 320.52 50,040,350.30 505,458.08 50,545,808.39
- - - - -
134.17 13,416.82 231,118,141.32 2,334,526.68 233,452,668.00
- - - - -
- - - - -
- 723.84 217,151,737.98 - 217,151,737.98
284.56 706.42 469,324,069.70 316,569,887.98 785,893,957.68
- - - - -
- - - - -
59.57 605.85 86,749,731.69 9,459,677.48 96,209,409.17
- - - - -
- - - - -
- - - - -
- - - - -
3,749.30 3,749.30 - 68,987,120.00 68,987,120.00
- - - - -
- 0.11 3,144,338.53 - 3,144,338.53
(0.00) 0.26 16,056,442.28 (175,586.85) 15,880,855.43
- - - - -
34.00 34.00 - 40,800,000.00 40,800,000.00
- - - - -
35.80 35.80 - 136,873,489.01 136,873,489.01
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
3.00 3.00 - 740,700.00 740,700.00
- - - - -
8.00 8.00 - 2,633,600.00 2,633,600.00
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- 56.27 8,823,779.94 - 8,823,779.94
- 176.67 35,705,007.00 - 35,705,007.00
- 159.29 39,408,346.00 - 39,408,346.00
- 73.11 21,399,297.00 - 21,399,297.00
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- 15.00 11,206,500.00 - 11,206,500.00
- - - - -
- - - - -
154.00 154.00 - 10,487,400.00 10,487,400.00
- - - - -
- - - - -
- - - - -
- - - - -
- -
- 10.00 3,048,000.00 - 3,048,000.00
- 100.00 140,660,000.00 - 140,660,000.00
- -
- 272.05 242,274,106.30 - 242,274,106.30
5.33 5.33 - 67,930,082.40 67,930,082.40
36.29 36.29 - 9,561,201.62 9,561,201.62
1,463.15 1,463.15 182,893,193.65 182,893,193.65
621.73 621.73 36,651,051.45 36,651,051.45
253.62 253.62 203,533,350.28 203,533,350.28
5,351.46 5,351.46 600,701,224.01 600,701,224.01
333.60 333.60 2,902,290.56 2,902,290.56
20.00 20.00 14,000,000.00 14,000,000.00
-
- - - -
MONTHLY WORKS VALUATION SHEET
(Page of _ )
CIVIL 2
BoQ Previous
BoQ Item Description Unit
Item Code P2 P3
EA EARTH WORK
EA-1A Excavation by Equipment (D≦3.0M) M3 9,136.71 8,995.07
EA-1B Excavation by Equipment (D>3.0M) M3 293.15 14.33
EA-1D Scraping (D≦300MM) M2 0.00 0.00
EA-2A Backfilling (Excavated Soil) M3 6,095.45 5,398.42
EA-2B Backfilling (Purchased Soil) M3 0.00 0.00
EA-3A Disposal of Soil (Inside of Factory) M3 0.00 0.00
EA-3B Disposal of Soil (Outside of Factory) M3 2,380.78 1,981.92
EA-4A Sand Filling for Trench/Cable/Pit M3 0.00 0.00
EA-4B Sand Filling for U/G Pipe M3 493.74 612.06
EA-4C Sand Filling for Tank FDN M3 0.00 238.04
BC BASE COURSE WORK 0.00 0.00
BC-1A Base Course for Sub-STR. M3 311.90 0.00
BC-2A Base Course for Slab-on-Grade M3 0.00 0.00
BC-3A Base Course for Concrete Road/Paving M3 762.92 791.11
BC-3B Base Course for Asphalt Road/Paving M3 0.00 0.00
BC-4A Sub-Grade for Concrete Road/Paving M3 0.00 0.00
BC-4B Sub-Grade for Asphalt Road/Paving M3 0.00 0.00
BC-5A Crushed Stone Paving M3 64.70 19.50
RE RE-BAR WORK 0.00 0.00
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 303.15 271.40
RE-1B Re-Bar for Sub-STR. (Round) Ton 0.00 0.00
RE-2A Re-Bar for Super-STR. (Deformed) Ton 103.36 131.05
RE-2B Re-Bar for Super-STR. (Round) Ton 0.00 0.00
RE-3A Welded Wire Fabric Ton 23.93 24.93
AN ANCHORING & EMBEDDING WORK 0.00 0.00
AN-1A Anchor Box Nos 306.00 256.00
AN-2B Anchor Bolt W/O Template Setting Ton 1.84 4.98
AN-2C Anchor Bolt Supply & Setting Ton 0.00 0.00
AN-3A Embedded Steel Setting Ton 0.00 0.00
AN-3B-1 Embedded Steel Supply & Setting(Carbon Steel) Ton 18.31 6.55
AN-3B-2 Embedded Steel Supply & Setting(Stainless Steel) Ton 0.00 0.00
AN-4A Expansion Anchor (Hole-in Anchor) Nos 8.00 8.00
AN-4B Chemical Anchor Nos 16.00 96.00
AN-5A Plastic Pipe M 0.00 0.00
JT JOINT WORK 0.00 0.00
JT-1A Expansion Joint for BLDG M 0.00 0.00
JT-2A Expansion Joint for Dike/Pit M 0.00 0.00
JT-3A Expansion Joint for Road/Paving M 268.40 289.27
(Page of )
CIVIL 2
BOQ Item BoQ Qty per
Description Report Ref. No. Unit
Code Drawing
P2
1 Pipe Rack Structure 02-1
EA EARTH WORK
EA-1A Excavation by Equipment (D≦3.0M) M³ 681.61
EA-2A Backfilling (Excavated Soil) M³ 491.72
EA-3B Disposal of Soil (Outside of Factory) M³ 189.89
RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 20.92
CO CONCRETE WORK
CO-1A Leveling Concrete M³ 14.56
CO-2A Concrete for Sub-STR. M³ 164.01
RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 6.04
SSP-CVL2-FDN-PR02-2.1
FM FORM WORK
FM-1A Form for Sub-STR. M² 115.36
CO CONCRETE WORK
CO-1A Leveling Concrete M³ 3.60
SSP-CVL2-FDN-PR02-2.1
RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.47
RE-2A Re-Bar for Super-STR. (Deformed) Ton 2.79
FM FORM WORK
FM-1A Form for Sub-STR. M² 70.16
FM-2A Form for Super-STR. M² 11.48
SSP-CVL2-PIT-M6486-19
CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.52
CO-2A Concrete for Sub-STR. M³ 3.60
CO-3A Concrete for Super-STR. M³ 12.13
JT JOINT WORK
JT-4A Water Stop Plate M 11.60
RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 1.71
RE-2A Re-Bar for Super-STR. (Deformed) Ton 5.68
FM FORM WORK
FM-1A Form for Sub-STR. M² 15.82
FM-2A Form for Super-STR. SSP-CVL2-PIT-V6482.01 M² 127.70
CO CONCRETE WORK
CO-1A Leveling Concrete M³ 1.07
CO-2A Concrete for Sub-STR. M³ 10.98
SSP-CVL2-PIT-V6482.01
JT JOINT WORK
JT-4A Water Stop Plate m 16.70
RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 2.20
RE-2A Re-Bar for Super-STR. (Deformed) Ton 6.97
FM FORM WORK
FM-1A Form for Sub-STR. M² 17.95
FM-2A Form for Super-STR. M² 165.04
SSP-CVL2-PIT-V6484.01
CO CONCRETE WORK
CO-1A Leveling Concrete M³ 1.44
CO-2A Concrete for Sub-STR. M³ 13.44
CO-3A Concrete for Super-STR. M³ 35.18
JT JOINT WORK
JT-4A Water Stop Plate M 19.60
JT-5A Isolation Joint M 53.20
RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 4.35
RE-2A Re-Bar for Super-STR. (Deformed) Ton 6.53
FM FORM WORK
FM-1A Form for Sub-STR. M² 22.54
FM-2A Form for Super-STR. M² 216.34
SSP-CVL2-PIT-V6483.01
CO CONCRETE WORK
CO-1A Leveling Concrete M³ 2.06
CO-2A Concrete for Sub-STR. M³ 23.78
CO-3A Concrete for Super-STR. M³ 56.00
JT JOINT WORK
JT-4A Water Stop Plate M 20.10
JT-5A Isolation Joint M
RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 1.53
RE-2A Re-Bar for Super-STR. (Deformed) Ton 4.56
FM FORM WORK
FM-1A Form for Sub-STR. M² 15.17
FM-2A Form for Super-STR. SSP-CVL2-PIT-V6485.01 M² 93.85
CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.99
CO-2A Concrete for Sub-STR. M³ 9.73
CO-3A Concrete for Super-STR. M³ 25.21
JT JOINT WORK
BOQ Item BoQ Qty per
Description Report Ref. No. Unit
Code Drawing
JT-4A Water Stop Plate M 16.01
CO CONCRETE WORK
CO-1A Leveling Concrete M³ 13.32
CO-2A Concrete for Sub-STR. M³ 120.61
CO-3A Concrete for Super-STR. M³ 123.88
FM FORM WORK
FM-1A Form for Sub-STR. SSP-CVL2-1340-STR P2-1 M² 125.66
FM-2A Form for Super-STR. M² 654.99
RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 27.57
RE-2A Re-Bar for Super-STR. (Deformed) Ton 43.39
FM FORM WORK
SSP-CVL2-FDN-1340 - V.6315.01
FM-1A Form for Sub-STR. M² 15.54
FM-2A Form for Super-STR. M² -
RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.28
RE-2A Re-Bar for Super-STR. (Deformed) Ton -
FM FORM WORK
SSP-CVL2-FDN-1340 - V.6315.02
FM-1A Form for Sub-STR. M² 13.89
FM-2A Form for Super-STR. M² -
RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.25
RE-2A Re-Bar for Super-STR. (Deformed) Ton -
CO CONCRETE WORK
CO-1A Leveling Concrete M³ 28.56
CO-2A Concrete for Sub-STR. M³ 519.06
CO-3A Concrete for Super-STR. M³ 2.34
FM FORM WORK
FM-1A Form for Sub-STR. SSP-CVL2-FDN-STR P2-2 M² 283.65
FM-2A Form for Super-STR. M² 15.62
RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 82.95
RE-2A Re-Bar for Super-STR. (Deformed) Ton 0.69
CO CONCRETE WORK
CO-1A Leveling Concrete M³ 2.05
CO-2A Concrete for Sub-STR. M³ 18.01
CO-3A Concrete for Super-STR. M³ -
-
SSP-CVL2-FDN-P2-3
FM FORM WORK -
FM-1A Form for Sub-STR. M² 43.25
FM-2A Form for Super-STR. M² -
-
RE RE-BAR WORK -
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 1.71
RE-2A Re-Bar for Super-STR. (Deformed) Ton -
CO CONCRETE WORK
CO-1A Leveling Concrete M³ 2.16
CO-2A Concrete for Sub-STR. M³ 21.62
CO-3A Concrete for Super-STR. M³ 6.44
-
SSP-CVL2-FDN-E.1352.01
FM FORM WORK -
FM-1A Form for Sub-STR. M² 37.84
FM-2A Form for Super-STR. M² 52.80
-
RE RE-BAR WORK -
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 2.80
RE-2A Re-Bar for Super-STR. (Deformed) Ton 0.38
CO CONCRETE WORK
CO-1A Leveling Concrete M³ 1.05
CO-2A Concrete for Sub-STR. M³ 10.94
CO-3A Concrete for Super-STR. M³
-
SSP-CVL2-FDN-STR P2-4
FM FORM WORK -
FM-1A Form for Sub-STR. M² 32.04
FM-2A Form for Super-STR. M²
RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 1.64
RE-2A Re-Bar for Super-STR. (Deformed) Ton -
CO CONCRETE WORK
CO-1A Leveling Concrete M³ 1.59
CO-2A Concrete for Sub-STR. M³ 16.28
CO-3A Concrete for Super-STR. M³ 4.29
-
SSP-CVL2-FDN-E.1352.02
FM FORM WORK -
FM-1A Form for Sub-STR. M² 27.72
FM-2A Form for Super-STR. M² 39.66
-
RE RE-BAR WORK -
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 2.01
RE-2A Re-Bar for Super-STR. (Deformed) Ton 0.80
CO CONCRETE WORK
CO-1A Leveling Concrete M³ 1.46
CO-2A Concrete for Sub-STR. M³ 13.22
CO-3A Concrete for Super-STR. M³
SSP-CVL2-FDN-STR P2-11
FM FORM WORK
FM-1A Form for Sub-STR. M² 29.53
FM-2A Form for Super-STR. M²
RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 1.25
RE-2A Re-Bar for Super-STR. (Deformed) Ton
CO CONCRETE WORK
CO-1A Leveling Concrete M³ 4.58
CO-2A Concrete for Sub-STR. M³ 40.58
CO-3A Concrete for Super-STR. M³ 59.14
FM FORM WORK
SSP-CVL2-FDN-STR P2-5
FM-1A Form for Sub-STR. M² 61.82
FM-2A Form for Super-STR. M² 319.54
RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 4.52
RE-2A Re-Bar for Super-STR. (Deformed) Ton 20.28
CO CONCRETE WORK
CO-1A Leveling Concrete M³ 2.63
CO-2A Concrete for Sub-STR. M³ 27.42
CO-3A Concrete for Super-STR. M³ -
SSP-CVL2-SP P2
FM FORM WORK
FM-1A Form for Sub-STR. M² 46.42
FM-2A Form for Super-STR. M² -
RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 1.75
RE-2A Re-Bar for Super-STR. (Deformed) Ton -
19 P2- CMH01 AREA COC MAIN HOLE TYPE 2 PLAN, SECTION- A/B/C
EA EARTH WORK
EA-1A Excavation by Equipment (D≦3.0M) M³ 37.83
EA-1B Excavation by Equipment (D>3.0M) M³ -
EA-2A Backfilling (Excavated Soil) M³ 32.77
EA-3B Disposal of Soil (Outside of Factory) M³ 5.06
CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.41
CO-2A Concrete for Sub-STR. M³ 5.06
CO-3A Concrete for Super-STR. M³
FM FORM WORK
FM-1A Form for Sub-STR. SSP-CVL2-CMH01-P2C0C M² 27.56
FM-2A Form for Super-STR. M²
RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.57
RE-2A Re-Bar for Super-STR. (Deformed) Ton
JT JOINT WORK
JT-4A Water Stop Plate m 7.00
20 P2- CMH02 AREA COC MAIN HOLE TYPE 2 PLAN, SECTION- A/B/C
EA EARTH WORK
EA-1A Excavation by Equipment (D≦3.0M) M³ 37.83
EA-1B Excavation by Equipment (D>3.0M) M³ -
EA-2A Backfilling (Excavated Soil) M³ 32.77
EA-3B Disposal of Soil (Outside of Factory) M³ 5.06
CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.41
CO-2A Concrete for Sub-STR. M³ 1.53
CO-3A Concrete for Super-STR. M³
FM FORM WORK
FM-1A Form for Sub-STR. SSP-CVL2-CMH02-P2C0C M² 22.26
FM-2A Form for Super-STR. M²
RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.47
RE-2A Re-Bar for Super-STR. (Deformed) Ton
JT JOINT WORK
JT-4A Water Stop Plate m 7.00
CO CONCRETE WORK
CO-1A Leveling Concrete M³ 1.15
CO-2A Concrete for Sub-STR. M³ 21.00
CO-3A Concrete for Super-STR. M³ 13.77
SSP-CVL2-FDN-2340 - V.6416.01
FM FORM WORK
FM-1A Form for Sub-STR. M² 19.00
FM-2A Form for Super-STR. M² 66.32
RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 1.04
RE-2A Re-Bar for Super-STR. (Deformed) Ton 2.51
BOQ Item BoQ Qty per
Description Report Ref. No. Unit
Code Drawing
AN ANCHORING & EMBEDDING WORK
AN-1A Anchor Box nos 8.00
JT-5A Isolation Joint M 8.07
CO CONCRETE WORK
CO-1A Leveling Concrete M³ 1.56
CO-2A Concrete for Sub-STR. M³ 17.31
CO-3A Concrete for Super-STR. M³
FM FORM WORK
FM-1A Form for Sub-STR. M² 36.09
SSP-CVL2-FDN-STR P2-13
FM-2A Form for Super-STR. M² -
RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 1.76
RE-2A Re-Bar for Super-STR. (Deformed) Ton -
JT JOINT WORK
JT-4A Water Stop Plate M
JT-5A Isolation Joint M 3.20
CO CONCRETE WORK
CO-1A Leveling Concrete M³ 22.04
CO-2A Concrete for Sub-STR. M³ 259.79
CO-3A Concrete for Super-STR. M³
SSP-CVL2-FDN-STR P2-6
FM FORM WORK
FM-1A Form for Sub-STR. M² 244.33
FM-2A Form for Super-STR. M²
RE RE-BAR WORK
SSP-CVL2-FDN-STR P2-6
CO CONCRETE WORK
CO-1A Leveling Concrete M³ 2.61
CO-2A Concrete for Sub-STR. M³ 28.74
CO-3A Concrete for Super-STR. M³
SSP-CVL2-FDN-STR P2-7
FM FORM WORK
FM-1A Form for Sub-STR. M² 59.16
FM-2A Form for Super-STR. M²
RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 2.10
RE-2A Re-Bar for Super-STR. (Deformed) Ton
CO CONCRETE WORK
CO-1A Leveling Concrete M³ 1.30
CO-2A Concrete for Sub-STR. M³ 67.38
CO-3A Concrete for Super-STR. M³
SSP-CVL2-FDN-1340-T6304.01
FM FORM WORK
FM-1A Form for Sub-STR. M² 49.91
FM-2A Form for Super-STR. M²
RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.82
SSP-CVL2-FDN-1340-T6304.01
CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.52
CO-2A Concrete for Sub-STR. M³ 4.56
CO-3A Concrete for Super-STR. M³ 4.20
SSP-CVL2-FDN-2350 - V2353.01
RSD
FM FORM WORK
FM-1A Form for Sub-STR. M² 6.20
FM-2A Form for Super-STR. M² 21.74
RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.30
RE-2A Re-Bar for Super-STR. (Deformed) Ton 0.34
CO CONCRETE WORK
CO-1A Leveling Concrete M³ 5.48
CO-2A Concrete for Sub-STR. M³ 58.49
CO-3A Concrete for Super-STR. M³ 2.07
SSP-CVL2-FDN-1340-SHELTER
FM FORM WORK
FM-1A Form for Sub-STR. M² 118.72
FM-2A Form for Super-STR. M² 16.56
RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 5.83
RE-2A Re-Bar for Super-STR. (Deformed) Ton 0.35
BOQ Item BoQ Qty per
Description Report Ref. No. Unit
Code Drawing
CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.78
CO-2A Concrete for Sub-STR. M³ 7.02
CO-3A Concrete for Super-STR. M³ 4.94
SSP-CVL2-FDN-2350 - V1353.01
RSD
FM FORM WORK
FM-1A Form for Sub-STR. M² 7.90
FM-2A Form for Super-STR. M² 24.70
RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.52
RE-2A Re-Bar for Super-STR. (Deformed) Ton 0.42
CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.49
CO-2A Concrete for Sub-STR. M³ 0.90
CO-3A Concrete for Super-STR. M³ 4.97
FM FORM WORK
FM-1A Form for Sub-STR. M² 3.70
FM-2A Form for Super-STR. SSP-CVL2-AMH01-P2C0C M² 37.12
RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.11
RE-2A Re-Bar for Super-STR. (Deformed) Ton 0.88
JT JOINT WORK
JT-4A Water Stop Plate m 7.60
30 P2- AMH02 AREA COC MAIN HOLE TYPE 2 PLAN, SECTION- A/B
EA EARTH WORK
EA-1A Excavation by Equipment (D≦3.0M) M³ 65.91
EA-1B Excavation by Equipment (D>3.0M) M³ 3.80
EA-2A Backfilling (Excavated Soil) M³ 57.94
EA-3B Disposal of Soil (Outside of Factory) M³ 11.77
CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.49
CO-2A Concrete for Sub-STR. M³ 0.74
CO-3A Concrete for Super-STR. M³ 5.05
FM FORM WORK
FM-1A Form for Sub-STR. M² 4.37
FM-2A Form for Super-STR. SSP-CVL2-AMH02-P2C0C M² 36.58
RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.11
RE-2A Re-Bar for Super-STR. (Deformed) Ton 0.88
SSP-CVL2-AMH02-P2C0C
CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.47
CO-2A Concrete for Sub-STR. M³ 13.98
CO-3A Concrete for Super-STR. M³ -
SSP-CVL2-FDN-1350 - P1351.01
FM FORM WORK PSD
FM-1A Form for Sub-STR. M² 24.12
FM-2A Form for Super-STR. M² -
RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.51
RE-2A Re-Bar for Super-STR. (Deformed) Ton
CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.22
CO-2A Concrete for Sub-STR. M³ 3.78
CO-3A Concrete for Super-STR. M³ -
SSP-CVL2-FDN-1350 - P1351.02
FM FORM WORK
FM-1A Form for Sub-STR. M² 9.25
FM-2A Form for Super-STR. M² -
SSP-CVL2-FDN-1350 - P1351.02
BOQ Item BoQ Qty per
Description Report Ref. No. Unit
Code Drawing
RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.10
RE-2A Re-Bar for Super-STR. (Deformed) Ton
CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.94
CO-2A Concrete for Sub-STR. M³ 28.43
CO-3A Concrete for Super-STR. M³ -
SSP-CVL2-FDN-1350 - P1352.01
FM FORM WORK
FM-1A Form for Sub-STR. M² 49.05
FM-2A Form for Super-STR. M²
RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 1.02
RE-2A Re-Bar for Super-STR. (Deformed) Ton
CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.34
CO-2A Concrete for Sub-STR. M³ 9.95
CO-3A Concrete for Super-STR. M³ -
SSP-CVL2-FDN-1350 - P1352.02
FM FORM WORK
FM-1A Form for Sub-STR. M² 20.72
FM-2A Form for Super-STR. M² -
SSP-CVL2-FDN-1350 - P1352.02
CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.44
CO-2A Concrete for Sub-STR. M³ 7.57
CO-3A Concrete for Super-STR. M³ -
SSP-CVL2-FDN-1350 -
FM FORM WORK P1352.03/04
FM-1A Form for Sub-STR. M² 18.49
FM-2A Form for Super-STR. M² -
RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.20
RE-2A Re-Bar for Super-STR. (Deformed) Ton -
CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.88
CO-2A Concrete for Sub-STR. M³ 8.13
CO-3A Concrete for Super-STR. M³ 2.79
SSP-CVL2-FDN-E.2352.01 A/B
FM FORM WORK
FM-1A Form for Sub-STR. M² 23.16
FM-2A Form for Super-STR. M² 20.55
RE RE-BAR WORK
SSP-CVL2-FDN-E.2352.01 A/B
CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.88
CO-2A Concrete for Sub-STR. M³ 8.13
CO-3A Concrete for Super-STR. M³ 2.79
SSP-CVL2-FDN-E.2352.02 A/B
FM FORM WORK
FM-1A Form for Sub-STR. M² 23.16
FM-2A Form for Super-STR. M² 20.55
RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.95
RE-2A Re-Bar for Super-STR. (Deformed) Ton 0.45
CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.38
CO-2A Concrete for Sub-STR. M³ 6.45
CO-3A Concrete for Super-STR. M³ -
SSP-CVL2-FDN-1350 - P1353.01
FM FORM WORK A/B
FM-1A Form for Sub-STR. M² 15.91
FM-2A Form for Super-STR. M² -
RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.18
SSP-CVL2-FDN-1350 - P1353.01
A/B
CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.34
CO-2A Concrete for Sub-STR. M³ 2.26
CO-3A Concrete for Super-STR. M³ 1.03
SSP-CVL2-FDN-2350-E.6323.02
FM FORM WORK MEH
FM-1A Form for Sub-STR. M² 11.64
FM-2A Form for Super-STR. M² 9.02
RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.19
RE-2A Re-Bar for Super-STR. (Deformed) Ton 0.15
CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.38
CO-2A Concrete for Sub-STR. M³ 6.94
CO-3A Concrete for Super-STR. M³ -
SSP-CVL2-FDN-P.6416.01 PBP
FM FORM WORK
FM-1A Form for Sub-STR. M² 11.83
FM-2A Form for Super-STR. M² -
RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.15
RE-2A Re-Bar for Super-STR. (Deformed) Ton -
BOQ Item BoQ Qty per
Description Report Ref. No. Unit
Code Drawing
CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.17
CO-2A Concrete for Sub-STR. M³ 2.60
CO-3A Concrete for Super-STR. M³
SSP-CVL2-FDN-1340 -
FM FORM WORK P.6304.02A/B
FM-1A Form for Sub-STR. M² 9.55
FM-2A Form for Super-STR. M²
RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.09
RE-2A Re-Bar for Super-STR. (Deformed) Ton -
CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.31
CO-2A Concrete for Sub-STR. M³ 2.66
CO-3A Concrete for Super-STR. M³
SSP-CVL2-FDN-V.6317.01
FM FORM WORK
FM-1A Form for Sub-STR. M² 8.50
FM-2A Form for Super-STR. M²
RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.23
RE-2A Re-Bar for Super-STR. (Deformed) Ton -
BOQ Item BoQ Qty per
Description Report Ref. No. Unit
Code Drawing
AN ANCHORING & EMBEDDING WORK
AN-2B Anchor Bolt W/O Template Setting Nos 0.01
JT-5A Isolation Joint M 7.20
CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.16
CO-2A Concrete for Sub-STR. M³ 2.75
CO-3A Concrete for Super-STR. M³
SSP-CVL2-FDN-V.6318.01
FM FORM WORK
FM-1A Form for Sub-STR. M² 6.88
FM-2A Form for Super-STR. M²
RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.11
RE-2A Re-Bar for Super-STR. (Deformed) Ton -
CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.11
CO-2A Concrete for Sub-STR. M³ 1.82
CO-3A Concrete for Super-STR. M³
SSP-CVL2-FDN-V.6318.02
FM FORM WORK
FM-1A Form for Sub-STR. M² 5.59
FM-2A Form for Super-STR. M²
RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.09
RE-2A Re-Bar for Super-STR. (Deformed) Ton -
CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.16
CO-2A Concrete for Sub-STR. M³ 2.41
CO-3A Concrete for Super-STR. M³
SSP-CVL2-FDN-P.6317.02 A/B
FM FORM WORK
FM-1A Form for Sub-STR. M² 9.46
FM-2A Form for Super-STR. M²
RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.10
RE-2A Re-Bar for Super-STR. (Deformed) Ton -
CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.15
CO-2A Concrete for Sub-STR. M³ 2.58
CO-3A Concrete for Super-STR. M³
SSP-CVL2-FDN-V.6319.01
FM FORM WORK
FM-1A Form for Sub-STR. M² 6.67
FM-2A Form for Super-STR. M²
RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.11
RE-2A Re-Bar for Super-STR. (Deformed) Ton
CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.16
CO-2A Concrete for Sub-STR. M³ 2.41
CO-3A Concrete for Super-STR. M³
SSP-CVL2-FDN-P.6318.02 A/B
FM FORM WORK
FM-1A Form for Sub-STR. M² 9.46
FM-2A Form for Super-STR. M²
RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.09
RE-2A Re-Bar for Super-STR. (Deformed) Ton -
CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.16
CO-2A Concrete for Sub-STR. M³ 2.41
CO-3A Concrete for Super-STR. M³ -
SSP-CVL2-FDN-P.6319.02 A/B
FM FORM WORK
FM-1A Form for Sub-STR. M² 9.46
FM-2A Form for Super-STR. M² -
RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.09
RE-2A Re-Bar for Super-STR. (Deformed) Ton -
CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.26
CO-2A Concrete for Sub-STR. M³ 4.30
CO-3A Concrete for Super-STR. M³ -
SSP-CVL2-FDN-2350 - P2353.01
FM FORM WORK A/B RSP
FM-1A Form for Sub-STR. M² 12.90
FM-2A Form for Super-STR. M² -
RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.15
RE-2A Re-Bar for Super-STR. (Deformed) Ton -
CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.17
CO-2A Concrete for Sub-STR. M³ 2.83
CO-3A Concrete for Super-STR. M³
SSP-CVL2-FDN-2350 - P2352.04
FM FORM WORK CPSP
FM-1A Form for Sub-STR. M² 7.85
FM-2A Form for Super-STR. M²
RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.11
RE-2A Re-Bar for Super-STR. (Deformed) Ton
CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.21
CO-2A Concrete for Sub-STR. M³ 3.61
CO-3A Concrete for Super-STR. M³
SSP-CVL2-FDN-2350 - P2352.03
FM FORM WORK CPSP
FM-1A Form for Sub-STR. M² 9.14
FM-2A Form for Super-STR. M²
RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.12
RE-2A Re-Bar for Super-STR. (Deformed) Ton
CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.37
CO-2A Concrete for Sub-STR. M³ 10.68
CO-3A Concrete for Super-STR. M³
SSP-CVL2-FDN-2350 - P2352.02
FM FORM WORK CPSP
FM-1A Form for Sub-STR. M² 19.30
FM-2A Form for Super-STR. M²
RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.38
RE-2A Re-Bar for Super-STR. (Deformed) Ton
CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.69
CO-2A Concrete for Sub-STR. M³ 19.59
CO-3A Concrete for Super-STR. M³
SSP-CVL2-FDN-2350 - P2352.01
FM FORM WORK A/B CPSP
FM-1A Form for Sub-STR. M² 39.19
FM-2A Form for Super-STR. M²
RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.88
RE-2A Re-Bar for Super-STR. (Deformed) Ton
CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.34
CO-2A Concrete for Sub-STR. M³ 9.60
CO-3A Concrete for Super-STR. M³
SSP-CVL2-FDN-2350 - P2351.01
FM FORM WORK A/B CPSP
FM-1A Form for Sub-STR. M² 19.20
FM-2A Form for Super-STR. M²
RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.45
RE-2A Re-Bar for Super-STR. (Deformed) Ton
CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.20
CO-2A Concrete for Sub-STR. M³ 3.43
CO-3A Concrete for Super-STR. M³
SSP-CVL2-FDN-2350 - P2351.02
FM FORM WORK CPSP
FM-1A Form for Sub-STR. M² 8.60
FM-2A Form for Super-STR. M²
RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.09
RE-2A Re-Bar for Super-STR. (Deformed) Ton
CO CONCRETE WORK
CO-1A Leveling Concrete M³ 2.91
CO-2A Concrete for Sub-STR. M³ 20.59
CO-3A Concrete for Super-STR. M³ 31.02
SSP-CVL2-DIKE WALL-1340-
FM FORM WORK T6304.01
FM-1A Form for Sub-STR. M² 35.58
FM-2A Form for Super-STR. M² 206.82
RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 2.69
RE-2A Re-Bar for Super-STR. (Deformed) Ton 3.85
CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.28
CO-2A Concrete for Sub-STR. M³ 5.10
CO-3A Concrete for Super-STR. M³ -
SSP-CVL2-FDN-2340-V6328.01
FM FORM WORK
FM-1A Form for Sub-STR. M² 8.51
FM-2A Form for Super-STR. M² -
RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.19
RE-2A Re-Bar for Super-STR. (Deformed) Ton -
58 FOUNDATION P.2342.01/02 1st & 2nd POLYMERIZATION REACTOR COOLING WATER PUMP
EA EARTH WORK
EA-1A Excavation by Equipment (D≦3.0M) M³ 5.74
EA-1B Excavation by Equipment (D>3.0M) M³ -
EA-2A Backfilling (Excavated Soil) M³ 2.63
EA-3B Disposal of Soil (Outside of Factory) M³ 3.11
CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.35
CO-2A Concrete for Sub-STR. M³ 5.93
CO-3A Concrete for Super-STR. M³
SSP-CVL2-FDN-2340 -
FM FORM WORK P2342.01 /02
FM-1A Form for Sub-STR. M² 15.05
FM-2A Form for Super-STR. M² -
RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.15
RE-2A Re-Bar for Super-STR. (Deformed) Ton -
CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.25
CO-2A Concrete for Sub-STR. M³ 2.29
CO-3A Concrete for Super-STR. M³
SSP-CVL2-FDN-E.2341.01
FM FORM WORK
FM-1A Form for Sub-STR. M² 6.95
FM-2A Form for Super-STR. M²
RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.20
RE-2A Re-Bar for Super-STR. (Deformed) Ton -
60 FOUNDATION P.1345.01/02 1st & 2nd POLYMERIZATION REACTOR COOLING WATER PUMP
EA EARTH WORK
EA-1A Excavation by Equipment (D≦3.0M) M³ 5.74
EA-1B Excavation by Equipment (D>3.0M) M³ -
EA-2A Backfilling (Excavated Soil) M³ 2.63
EA-3B Disposal of Soil (Outside of Factory) M³ 3.11
CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.35
CO-2A Concrete for Sub-STR. M³ 5.93
CO-3A Concrete for Super-STR. M³
SSP-CVL2-FDN-1340 -
FM FORM WORK P1345.01 /02
FM-1A Form for Sub-STR. M² 15.05
FM-2A Form for Super-STR. M²
RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.17
RE-2A Re-Bar for Super-STR. (Deformed) Ton
61 FOUNDATION P.1342.01/02 1st & 2nd POLYMERIZATION REACTOR COOLING WATER PUMP
EA EARTH WORK
EA-1A Excavation by Equipment (D≦3.0M) M³ 5.64
EA-1B Excavation by Equipment (D>3.0M) M³ -
BOQ Item BoQ Qty per
Description Report Ref. No. Unit
Code Drawing
EA-2A Backfilling (Excavated Soil) M³ 2.60
EA-3B Disposal of Soil (Outside of Factory) M³ 3.04
CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.34
CO-2A Concrete for Sub-STR. M³ 5.81
CO-3A Concrete for Super-STR. M³
SSP-CVL2-FDN-1340 -
FM FORM WORK P1342.01 /02
FM-1A Form for Sub-STR. M² 14.84
FM-2A Form for Super-STR. M²
RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.16
RE-2A Re-Bar for Super-STR. (Deformed) Ton
CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.56
CO-2A Concrete for Sub-STR. M³ 5.18
CO-3A Concrete for Super-STR. M³
SSP-CVL2-FDN-1340- E.1344.01
FM FORM WORK
FM-1A Form for Sub-STR. M² 14.41
FM-2A Form for Super-STR. M²
RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.43
RE-2A Re-Bar for Super-STR. (Deformed) Ton
CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.14
CO-2A Concrete for Sub-STR. M³ 3.15
CO-3A Concrete for Super-STR. M³
SSP-CVL2-FDN-1340 - P2352.04
FM FORM WORK CPSP
FM-1A Form for Sub-STR. M² 8.40
FM-2A Form for Super-STR. M²
RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.08
RE-2A Re-Bar for Super-STR. (Deformed) Ton
CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.08
CO-2A Concrete for Sub-STR. M³ 1.29
CO-3A Concrete for Super-STR. M³
SSP-CVL2-FDN-1340-C6417.01
FM FORM WORK
FM-1A Form for Sub-STR. M² 4.71
FM-2A Form for Super-STR. M²
RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.05
RE-2A Re-Bar for Super-STR. (Deformed) Ton
CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.51
CO-2A Concrete for Sub-STR. M³ 8.50
CO-3A Concrete for Super-STR. M³
FM FORM WORK
FM-1A Form for Sub-STR. M² 78.61
FM-2A Form for Super-STR. M²
SSP-CVL2-AOC-P2-A0C-JB
23/24/25/26
RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.73
RE-2A Re-Bar for Super-STR. (Deformed) Ton
JT JOINT WORK
JT-4A Water Stop Plate M 5.60
JT-5A Isolation Joint M 22.40
CO CONCRETE WORK
CO-1A Leveling Concrete M³ 1.09
CO-2A Concrete for Sub-STR. M³ 17.25
CO-3A Concrete for Super-STR. M³
SSP-CVL2-FDN-1350 -
FM FORM WORK ANALYZER HOUSE
FM-1A Form for Sub-STR. M² 16.27
FM-2A Form for Super-STR. M²
RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.54
RE-2A Re-Bar for Super-STR. (Deformed) Ton
CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.20
CO-2A Concrete for Sub-STR. M³ 3.47
CO-3A Concrete for Super-STR. M³
SSP-CVL2-FDN-1350 - V6474.02
FM FORM WORK
FM-1A Form for Sub-STR. M² 7.70
FM-2A Form for Super-STR. M²
RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.09
RE-2A Re-Bar for Super-STR. (Deformed) Ton
CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.08
CO-2A Concrete for Sub-STR. M³ 1.27
CO-3A Concrete for Super-STR. M³
SSP-CVL2-FDN-1350 - P6343.01
FM FORM WORK
FM-1A Form for Sub-STR. M² 4.82
FM-2A Form for Super-STR. M²
RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.05
RE-2A Re-Bar for Super-STR. (Deformed) Ton
69 FOUNDATION P6315.01
EA EARTH WORK
EA-1A Excavation by Equipment (D≦3.0M) M³ 0.96
EA-1B Excavation by Equipment (D>3.0M) M³ -
EA-2A Backfilling (Excavated Soil) M³ 0.66
EA-3B Disposal of Soil (Outside of Factory) M³ 0.30
CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.04
CO-2A Concrete for Sub-STR. M³ 0.56
CO-3A Concrete for Super-STR. M³
SSP-CVL2-FDN-1340 - P6315.01
FM FORM WORK
FM-1A Form for Sub-STR. M² 3.12
FM-2A Form for Super-STR. M²
RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.03
RE-2A Re-Bar for Super-STR. (Deformed) Ton
CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.17
CO-2A Concrete for Sub-STR. M³ 3.02
CO-3A Concrete for Super-STR. M³
SSP-CVL2-FDN-1340 - P6315.02
FM FORM WORK A/B
FM-1A Form for Sub-STR. M² 10.88
FM-2A Form for Super-STR. M²
RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.09
RE-2A Re-Bar for Super-STR. (Deformed) Ton
CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.27
CO-2A Concrete for Sub-STR. M³ 3.42
CO-3A Concrete for Super-STR. M³
FM FORM WORK
SSP-CVL2-VB-P2VB-01
FM-1A Form for Sub-STR. M² 23.06
FM-2A Form for Super-STR. M²
RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 1.08
RE-2A Re-Bar for Super-STR. (Deformed) Ton
CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.07
CO-2A Concrete for Sub-STR. M³ 0.42
CO-3A Concrete for Super-STR. M³
FM FORM WORK
FM-1A Form for Sub-STR. M² 6.90
FM-2A Form for Super-STR. SSP-CVL2-CB-P2CB-01 M²
RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.06
RE-2A Re-Bar for Super-STR. (Deformed) Ton
CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.16
CO-2A Concrete for Sub-STR. M³ 2.74
CO-3A Concrete for Super-STR. M³
SSP-CVL2-FDN-1350 -V6343.01
FM FORM WORK
FM-1A Form for Sub-STR. M² 6.85
FM-2A Form for Super-STR. M²
RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.11
RE-2A Re-Bar for Super-STR. (Deformed) Ton
74 P2- AMH03 AREA COC MAIN HOLE TYPE 2 PLAN, SECTION- A/B
EA EARTH WORK
EA-1A Excavation by Equipment (D≦3.0M) M³ 49.95
EA-1B Excavation by Equipment (D>3.0M) M³ 3.80
EA-2A Backfilling (Excavated Soil) M³ 41.98
EA-3B Disposal of Soil (Outside of Factory) M³ 11.77
CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.49
CO-2A Concrete for Sub-STR. M³ 0.90
CO-3A Concrete for Super-STR. M³ 4.98
FM FORM WORK
FM-1A Form for Sub-STR. M² 3.70
FM-2A Form for Super-STR. SSP-CVL2-AMH03-P2A0C M² 37.02
RE RE-BAR WORK
SSP-CVL2-AMH03-P2A0C
BOQ Item BoQ Qty per
Description Report Ref. No. Unit
Code Drawing
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.11
RE-2A Re-Bar for Super-STR. (Deformed) Ton 0.88
JT JOINT WORK
JT-4A Water Stop Plate m 7.60
CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.27
CO-2A Concrete for Sub-STR. M³ 3.29
CO-3A Concrete for Super-STR. M³
FM FORM WORK
SSP-CVL2-VB-P2VB-02
FM-1A Form for Sub-STR. M² 22.65
FM-2A Form for Super-STR. M² -
RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 1.08
RE-2A Re-Bar for Super-STR. (Deformed) Ton
FM FORM WORK
FM-1A Form for Sub-STR. M² 6.54
FM-2A Form for Super-STR. SSP-CVL2-AOC-P2-A0C-JB 13 M²
RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.08
RE-2A Re-Bar for Super-STR. (Deformed) Ton
CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.11
CO-2A Concrete for Sub-STR. M³ 0.54
CO-3A Concrete for Super-STR. M³ -
FM FORM WORK
FM-1A Form for Sub-STR. M² 5.11
FM-2A Form for Super-STR. M²
SSP-CVL2-AOC-P2-A0C-JB 19
RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.07
RE-2A Re-Bar for Super-STR. (Deformed) Ton
CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.18
CO-2A Concrete for Sub-STR. M³ -
CO-3A Concrete for Super-STR. SSP-CVL2-AOC-P2-C0C- CEP M³ -
COA-6A Concrete for Super-STR. (K-350) M³ 1.09
FM FORM WORK
FM-1A Form for Sub-STR. M² 5.00
FM-2A Form for Super-STR. M²
RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.08
RE-2A Re-Bar for Super-STR. (Deformed) Ton
CO CONCRETE WORK
CO-1A Leveling Concrete M³ 1.83
CO-2A Concrete for Sub-STR. M³ 14.52
SSP-CVL2-FDN-2340 - PIPE
CO-3A Concrete for Super-STR. M³
SUPPORT V.6416.01
FM FORM WORK
FM-1A Form for Sub-STR. M² 15.26
FM-2A Form for Super-STR. M²
RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 1.89
RE-2A Re-Bar for Super-STR. (Deformed) Ton
CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.10
CO-2A Concrete for Sub-STR. M³ 1.50
CO-3A Concrete for Super-STR. SSP-CVL2-FDN-1350 - V6474.03 M³
FM FORM WORK
FM-1A Form for Sub-STR. M² 5.14
FM-2A Form for Super-STR. M²
RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.05
RE-2A Re-Bar for Super-STR. (Deformed) Ton
CO CONCRETE WORK
CO-1A Leveling Concrete M³ 1.98
CO-2A Concrete for Sub-STR. M³ 17.82
SSP-CVL2-FDN-2340 - LOCAL
CO-3A Concrete for Super-STR. M³
PLATFROM TIFANE, DELTASTOP
FM FORM WORK
FM-1A Form for Sub-STR. M² 46.96
FM-2A Form for Super-STR. M²
RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 1.49
RE-2A Re-Bar for Super-STR. (Deformed) Ton
AOC U-DITCH P2
BOQ Item BoQ Qty per
Description Report Ref. No. Unit
Code Drawing
EAW-4 Backfilling and Compaction by Hand M3 320.71
EA-3B Disposal of Soil (Outside of Factory) M3 455.11
FM-1A Form for Sub-STR. M2 2,454.01
AOC U-DITCH P2
CO-1A Leveling Concrete M3 38.56
CO-2A Concrete for Sub-STR. M3 270.47
COA-5A Concrete Cover 150 thk. M3 16.30
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 29.43
ML-5B Grating Cover M2 352.04
AN-3B-1 Embedded Steel Supply & Setting(Carbon Ton 4.04
LN-5E-1 Chemical Resistant Resin Lining (Epoxy) M² 283.88
JT-5A Isolation Joint M 1,268.09
CO CONCRETE WORK
CO-1A Leveling Concrete M³ 1.17
CO-2A Concrete for Sub-STR. M³ 10.33
SSP-CVL2-LF- LOCAL
CO-3A Concrete for Super-STR. M³
PLATFROM FOUNDATION 1340
FM FORM WORK
FM-1A Form for Sub-STR. M² 35.49
FM-2A Form for Super-STR. M²
RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 1.01
RE-2A Re-Bar for Super-STR. (Deformed) Ton
86 FOUNDATION PIPE SUPPORT AROUND POLYMERAZATION REACTOR 1340 R.1342.02/03 & R.1345.02/03
EA EARTH WORK
EA-1A Excavation by Equipment (D≦3.0M) M³ 42.84
EA-1B Excavation by Equipment (D>3.0M) M³ -
EA-2A Backfilling (Excavated Soil) M³ 23.03
EA-3B Disposal of Soil (Outside of Factory) M³ 19.81
CO CONCRETE WORK
CO-1A Leveling Concrete M³ 2.42
CO-2A Concrete for Sub-STR. M³ 19.52
SSP-CVL2-LF- R.1342.02/03
CO-3A Concrete for Super-STR. M³
1340
FM FORM WORK
FM-1A Form for Sub-STR. M² 57.88
FM-2A Form for Super-STR. M²
RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 1.92
RE-2A Re-Bar for Super-STR. (Deformed) Ton
87 FOUNDATION PIPE SUPPORT AROUND ANTI- OXIDANT TRANSFER PUMP P6304.02 A/B (AG-24)
EA EARTH WORK
EA-1A Excavation by Equipment (D≦3.0M) M³ 31.39
EA-1B Excavation by Equipment (D>3.0M) M³ -
EA-2A Backfilling (Excavated Soil) M³ 19.96
EA-3B Disposal of Soil (Outside of Factory) M³ 11.43
CO CONCRETE WORK
CO-1A Leveling Concrete M³ 1.38
CO-2A Concrete for Sub-STR. M³ 11.69
CO-3A Concrete for Super-STR. M³
SSP-CVL2-LF -1340- AOTP
FM FORM WORK
P6304.02 A/B (AG-24)
FM-1A Form for Sub-STR. M² 38.82
FM-2A Form for Super-STR. M²
RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 1.09
RE-2A Re-Bar for Super-STR. (Deformed) Ton
CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.67
CO-2A Concrete for Sub-STR. M³ 5.99
CO-3A Concrete for Super-STR. M³
SSP-CVL2-LF- 1350- ARS
FM FORM WORK
V.1353.01
FM-1A Form for Sub-STR. M² 30.21
FM-2A Form for Super-STR. M²
RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.68
RE-2A Re-Bar for Super-STR. (Deformed) Ton
CO CONCRETE WORK
CO-1A Leveling Concrete M³ 1.08
CO-2A Concrete for Sub-STR. M³ 9.48
CO-3A Concrete for Super-STR. M³
SSP-CVL2-LF - 1350
FM FORM WORK
CONCENTRATION
FM-1A Form for Sub-STR. M² 26.58
FM-2A Form for Super-STR. M²
RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.83
RE-2A Re-Bar for Super-STR. (Deformed) Ton
CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.75
CO-2A Concrete for Sub-STR. M³ 15.97
CO-3A Concrete for Super-STR. M³
SSP-CVL2-LF- 2340
FM FORM WORK
POLYMERIZATION
FM-1A Form for Sub-STR. M² 19.46
FM-2A Form for Super-STR. M²
RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 1.71
RE-2A Re-Bar for Super-STR. (Deformed) Ton
CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.98
CO-2A Concrete for Sub-STR. M³ 8.98
SSP-CVL2-LF -2340- EPITSOP,
CO-3A Concrete for Super-STR. M³
DELTASTOP AND WITHOX
FM FORM WORK
FM-1A Form for Sub-STR. M² 15.74
FM-2A Form for Super-STR. M²
RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.49
RE-2A Re-Bar for Super-STR. (Deformed) Ton
CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.05
CO-2A Concrete for Sub-STR. M³ 0.21
SSP-CVL2-LF-2340- AROUND
CO-3A Concrete for Super-STR. M³
TIFANE
FM FORM WORK
FM-1A Form for Sub-STR. M² 1.20
FM-2A Form for Super-STR. M²
RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.04
RE-2A Re-Bar for Super-STR. (Deformed) Ton
CO CONCRETE WORK
CO-1A Leveling Concrete M³ 2.26
CO-2A Concrete for Sub-STR. M³ 23.21
SSP-CVL2-LF -2350- ARSS
CO-3A Concrete for Super-STR. M³
V.2353.01
FM FORM WORK
FM-1A Form for Sub-STR. M² 62.90
FM-2A Form for Super-STR. M²
RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 2.12
RE-2A Re-Bar for Super-STR. (Deformed) Ton
CO CONCRETE WORK
CO-1A Leveling Concrete M³ 1.37
CO-2A Concrete for Sub-STR. M³ 10.81
SSP-CVL2-LF -2350- 0.83
CO-3A Concrete for Super-STR. M³
CONCENTRATION
FM FORM WORK
FM-1A Form for Sub-STR. M² 33.66
FM-2A Form for Super-STR. M² 5.52
RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 1.06
RE-2A Re-Bar for Super-STR. (Deformed) Ton
CO CONCRETE WORK
CO-1A Leveling Concrete M³ 1.25
CO-2A Concrete for Sub-STR. M³ 17.39
CO-3A Concrete for Super-STR. SSP-CVL2-LF -2350-V.6416.01 M³ -
FM FORM WORK
FM-1A Form for Sub-STR. M² 33.08
FM-2A Form for Super-STR. M² -
RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 1.47
RE-2A Re-Bar for Super-STR. (Deformed) Ton
CO CONCRETE WORK
CO-1A Leveling Concrete M³ -
CO-2A Concrete for Sub-STR. M³ 11.45
SSP-CVL2-LF -2350- -
CO-3A Concrete for Super-STR. M³
P.2352.02/01 AB, P2352.02/04
FM FORM WORK
FM-1A Form for Sub-STR. M² 6.24
FM-2A Form for Super-STR. M² -
RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 1.04
RE-2A Re-Bar for Super-STR. (Deformed) Ton
CO CONCRETE WORK
CO-1A Leveling Concrete M³ 1.15
CO-2A Concrete for Sub-STR. M³ 10.04
CO-3A Concrete for Super-STR. SSP-CVL2-LF -2350- V.6474.03 M³ -
FM FORM WORK
FM-1A Form for Sub-STR. M² 25.58
FM-2A Form for Super-STR. M² -
RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.97
RE-2A Re-Bar for Super-STR. (Deformed) Ton
CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.28
CO-2A Concrete for Sub-STR. M³ 4.08
SSP-CVL2-FDN-1350 - HVAC &
CO-3A Concrete for Super-STR. M³ -
AIR STACK
FM FORM WORK
FM-1A Form for Sub-STR. M² 7.88
FM-2A Form for Super-STR. M² -
RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.15
RE-2A Re-Bar for Super-STR. (Deformed) Ton
SSP-CVL2-LF-1340- ARROUND
BOQ Item BoQ Qty per
Description Report Ref. No. Unit
Code Drawing
CO CONCRETE WORK
CO-1A Leveling Concrete M³ -
CO-2A Concrete for Sub-STR. M³ 0.40
SSP-CVL2-LF-1340- ARROUND
CO-3A Concrete for Super-STR. M³
ETASTOP COUNTAINER
FM FORM WORK
FM-1A Form for Sub-STR. M² 4.28
FM-2A Form for Super-STR. M²
RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.09
RE-2A Re-Bar for Super-STR. (Deformed) Ton
101 FOUNDATION PIPE SUPPORT AROUND ANTI-OXIDANT TRANSFER PUMP 6304.02 A/B
EA EARTH WORK
EA-1A Excavation by Equipment (D≦3.0M) M³ 2.50
EA-1B Excavation by Equipment (D>3.0M) M³ -
EA-2A Backfilling (Excavated Soil) M³ 2.50
EA-3B Disposal of Soil (Outside of Factory) M³ -
CO CONCRETE WORK
CO-1A Leveling Concrete M³ -
CO-2A Concrete for Sub-STR. M³ 4.37
SSP-CVL2-LF -1340- AOTP
CO-3A Concrete for Super-STR. M³
P6304.02 A/B
FM FORM WORK
FM-1A Form for Sub-STR. M² 5.20
FM-2A Form for Super-STR. M²
RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.73
RE-2A Re-Bar for Super-STR. (Deformed) Ton
102 FOUNDATION PIPE SUPPORT AROUND CHAGRE HEADER EXCANGER E. 1341.01 AND 1344.01
EA EARTH WORK
EA-1A Excavation by Equipment (D≦3.0M) M³ 6.40
EA-1B Excavation by Equipment (D>3.0M) M³ -
EA-2A Backfilling (Excavated Soil) M³ 6.40
EA-3B Disposal of Soil (Outside of Factory) M³ -
RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.60
RE-2A Re-Bar for Super-STR. (Deformed) Ton
CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.63
CO-2A Concrete for Sub-STR. M³ 5.79
SSP-CVL2-LF -1350-
CO-3A Concrete for Super-STR. M³
CONCENTRATION AREA
FM FORM WORK
FM-1A Form for Sub-STR. M² 22.27
FM-2A Form for Super-STR. M²
RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.51
RE-2A Re-Bar for Super-STR. (Deformed) Ton
CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.70
SSP-CVL2-LF - 1350
CONCENTRATION ( P2-1)
BOQ Item BoQ Qty per
Description Report Ref. No. Unit
Code Drawing
CO-2A Concrete for Sub-STR. M³ 9.77
SSP-CVL2-LF - 1350
CO-3A Concrete for Super-STR. M³
CONCENTRATION ( P2-1)
FM FORM WORK
FM-1A Form for Sub-STR. M² 32.73
FM-2A Form for Super-STR. M²
RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 1.15
RE-2A Re-Bar for Super-STR. (Deformed) Ton
CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.12
CO-2A Concrete for Sub-STR. M³ 1.00
SSP-CVL2-CT-2350- CABLE
CO-3A Concrete for Super-STR. M³
TRAY SUPPORT 2350
FM FORM WORK
FM-1A Form for Sub-STR. M² 5.68
FM-2A Form for Super-STR. M²
RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.12
RE-2A Re-Bar for Super-STR. (Deformed) Ton
CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.04
CO-2A Concrete for Sub-STR. M³ 0.41
SSP-CVL2-LF-2350- STAGE PRE-
HEATER
BOQ Item BoQ Qty per
Description Report Ref. No. Unit
Code Drawing
SSP-CVL2-LF-2350- STAGE PRE-
CO-3A Concrete for Super-STR. M³
HEATER
FM FORM WORK
FM-1A Form for Sub-STR. M² 2.67
FM-2A Form for Super-STR. M²
RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.16
RE-2A Re-Bar for Super-STR. (Deformed) Ton
CO CONCRETE WORK
CO-1A Leveling Concrete M³ -
CO-2A Concrete for Sub-STR. M³ 0.13
SSP-CVL2-LF-1352- STAGE PRE-
CO-3A Concrete for Super-STR. M³
HEATER
FM FORM WORK
FM-1A Form for Sub-STR. M² 0.80
FM-2A Form for Super-STR. M²
RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.06
RE-2A Re-Bar for Super-STR. (Deformed) Ton
CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.25
CO-2A Concrete for Sub-STR. M³ 4.37
SSP-CVL2-LPF- P2- LIGHTING
CO-3A Concrete for Super-STR. M³
POLE FOUNDATION
BOQ Item BoQ Qty per
Description Report Ref.
SSP-CVL2-LPF- P2-No.
LIGHTING Unit
Code Drawing
POLE FOUNDATION
FM FORM WORK
FM-1A Form for Sub-STR. M² 19.76
FM-2A Form for Super-STR. M²
RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.22
RE-2A Re-Bar for Super-STR. (Deformed) Ton
CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.52
CO-2A Concrete for Sub-STR. M³ 3.96
SSP-CVL2-HB- P2-HOSE BOX
CO-3A Concrete for Super-STR. M³
FOUNDATION P2 AREA
FM FORM WORK
FM-1A Form for Sub-STR. M² 20.40
FM-2A Form for Super-STR. M²
RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.30
RE-2A Re-Bar for Super-STR. (Deformed) Ton
CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.20
CO-2A Concrete for Sub-STR. M³ 0.88
SSP-CVL2-GP- P2-GUARD POST
CO-3A Concrete for Super-STR. M³
P2 AREA
BOQ Item BoQ Qty per
Description ReportP2-GUARD
SSP-CVL2-GP- Ref. No. POST Unit
Code Drawing
P2 AREA
FM FORM WORK
FM-1A Form for Sub-STR. M² 11.76
FM-2A Form for Super-STR. M²
RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton -
RE-2A Re-Bar for Super-STR. (Deformed) Ton
P3
1 Pipe Rack Structure 02-2
EA EARTH WORK
EA-1A Excavation by Equipment (D≦3.0M) M³ 258.94
EA-2A Backfilling (Excavated Soil) M³ 168.95
EA-3B Disposal of Soil (Outside of Factory) M³ 89.99
RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 10.57
SSP-CVL2-FDN-PR02-2.2
FM FORM WORK
FM-1A Form for Sub-STR. M² 201.88
CO CONCRETE WORK
CO-1A Leveling Concrete M³ 6.30
CO-2A Concrete for Sub-STR. M³ 76.49
CO-3A Concrete for Super-STR. M³
JT-5A Isolation Joint M 39.20
RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 17.96
SSP-CVL2-FDN-PR02-3
FM FORM WORK
FM-1A Form for Sub-STR. M² 303.00
CO CONCRETE WORK
CO-1A Leveling Concrete M³ 11.34
CO-2A Concrete for Sub-STR. M³ 131.22
CO-3A Concrete for Super-STR. M³
JT-5A Isolation Joint M 56.00
BOQ Item BoQ Qty per
Description Report Ref. No. Unit
Code Drawing
3 BLENDING & CONCENTRATION SEPARATION PIT (M6486.20)
EA EARTH WORK
EA-1A Excavation by Equipment (D≦3.0M) M³ 97.02
EA-1B Excavation by Equipment (D>3.0M) M³ 4.85
EA-2A Backfilling (Excavated Soil) M³ 62.29
EA-3B Disposal of Soil (Outside of Factory) M³ 39.58
RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.63
RE-2A Re-Bar for Super-STR. (Deformed) Ton 3.44
FM FORM WORK
FM-1A Form for Sub-STR. M² 92.72
FM-2A Form for Super-STR. M² 13.75
SSP-CVL2-PIT-M6486-20
CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.71
CO-2A Concrete for Sub-STR. M³ 4.59
CO-3A Concrete for Super-STR. M³ 16.55
JT JOINT WORK
JT-4A Water Stop Plate m 14.40
RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.48
RE-2A Re-Bar for Super-STR. (Deformed) Ton 2.97
FM FORM WORK
FM-1A Form for Sub-STR. M² 79.92
FM-2A Form for Super-STR. M² 9.83
SSP-CVL2-PIT-M6486-21
CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.55
CO-2A Concrete for Sub-STR. M³ 3.82
CO-3A Concrete for Super-STR. M³ 13.69
JT JOINT WORK
JT-4A Water Stop Plate m 12.80
BOQ Item BoQ Qty per
Description Report Ref. No. Unit
Code Drawing
RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 1.30
RE-2A Re-Bar for Super-STR. (Deformed) Ton 2.85
CO CONCRETE WORK
CO-1A Leveling Concrete M³ 2.45
CO-2A Concrete for Sub-STR. M³ 23.28
CO-3A Concrete for Super-STR. M³ 26.36
RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 1.30
RE-2A Re-Bar for Super-STR. (Deformed) Ton 2.85
FM FORM WORK
FM-1B Curved Form for Sub-STR. SSP-CVL2-FDN-T1374.02 M² 12.10
FM-2B Curved Form for Super-STR. M² 105.43
CO CONCRETE WORK
CO-1A Leveling Concrete M³ 2.45
CO-2A Concrete for Sub-STR. M³ 23.28
CO-3A Concrete for Super-STR. 26.36
SSP-CVL2-FDN-T1374.02
RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 1.30
RE-2A Re-Bar for Super-STR. (Deformed) Ton 2.85
FM FORM WORK
FM-1B Curved Form for Sub-STR. SSP-CVL2-FDN-T2374.02 M² 12.10
FM-2B Curved Form for Super-STR. M² 105.43
CO CONCRETE WORK
CO-1A Leveling Concrete M³ 2.45
CO-2A Concrete for Sub-STR. M³ 23.28
CO-3A Concrete for Super-STR. M³ 26.36
RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 23.41
RE-2A Re-Bar for Super-STR. (Deformed) Ton -
FM FORM WORK
FM-1A Form for Sub-STR. M² 363.41
FM-2A Form for Super-STR. SSP-CVL2-FDN-P3-3 M² -
CO CONCRETE WORK
CO-1A Leveling Concrete M³ 17.40
CO-2A Concrete for Sub-STR. M³ 175.35
CO-3A Concrete for Super-STR. M³ -
JT JOINT WORK
BOQ Item BoQ Qty per
Description Report Ref. No. Unit
Code Drawing
JT-4A Water Stop Plate m -
RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 8.12
RE-2A Re-Bar for Super-STR. (Deformed) Ton -
FM FORM WORK
FM-1A Form for Sub-STR. M² 132.31
FM-2A Form for Super-STR. SSP-CVL2-FDN-V1371 M²
CO CONCRETE WORK
CO-1A Leveling Concrete M³ 4.68
CO-2A Concrete for Sub-STR. M³ 68.21
CO-3A Concrete for Super-STR. M³
JT JOINT WORK
JT-4A Water Stop Plate m -
RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 8.19
RE-2A Re-Bar for Super-STR. (Deformed) Ton -
SSP-CVL2-FDN-V1372
FM FORM WORK
FM-1A Form for Sub-STR. M² 132.31
FM-2A Form for Super-STR. M² -
CO CONCRETE WORK
CO-1A Leveling Concrete M³ 4.68
CO-2A Concrete for Sub-STR. M³ 68.21
CO-3A Concrete for Super-STR. M³ -
BOQ Item BoQ Qty per
Description Report Ref. No. Unit
Code Drawing
CO CONCRETE WORK
CO-1A Leveling Concrete M³ 18.13
CO-2A Concrete for Sub-STR. M³ 388.85
CO-3A Concrete for Super-STR. M³ 92.51
COA-6A Concrete for Super-STR. (K-350) M³ 147.33
SSP-CVL2-FDN 1360 - STR. P3-1
FM FORM WORK
FM-1A Form for Sub-STR. M² 99.22
FM-2A Form for Super-STR. M² 783.89
RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 46.42
RE-2A Re-Bar for Super-STR. (Deformed) Ton 59.00
CO CONCRETE WORK
CO-1A Leveling Concrete M³ 9.62
CO-2A Concrete for Sub-STR. M³ 96.43
CO-3A Concrete for Super-STR. M³ -
SSP-CVL2-FDN-P3-8
FM FORM WORK
FM-1A Form for Sub-STR. M² 193.46
FM-2A Form for Super-STR. M² -
RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 12.90
RE-2A Re-Bar for Super-STR. (Deformed) Ton -
CO CONCRETE WORK
CO-1A Leveling Concrete M³ 4.68
CO-2A Concrete for Sub-STR. M³ 67.86
CO-3A Concrete for Super-STR. M³ -
SSP-CVL2-FDN-V2371.01/02/03
FM FORM WORK
FM-1A Form for Sub-STR. M² 131.13
FM-2A Form for Super-STR. M² -
RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 8.19
RE-2A Re-Bar for Super-STR. (Deformed) Ton
CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.82
CO-2A Concrete for Sub-STR. M³ 8.82
CO-3A Concrete for Super-STR. M³ 8.14
SSP-CVL2-FDN-1370 - V.6415.01
FM FORM WORK
FM-1A Form for Sub-STR. M² 9.48
FM-2A Form for Super-STR. M² 44.30
RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.60
RE-2A Re-Bar for Super-STR. (Deformed) Ton 1.12
SSP-CVL2-FDN-STR P3-2
BOQ Item BoQ Qty per
Description Report Ref. No. Unit
Code Drawing
CO CONCRETE WORK
CO-1A Leveling Concrete M³ 13.89
CO-2A Concrete for Sub-STR. M³ 139.88
SSP-CVL2-FDN-STR P3-2
CO-3A Concrete for Super-STR. M³
FM FORM WORK
FM-1A Form for Sub-STR. M² 141.91
FM-2A Form for Super-STR. M² -
RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 18.58
RE-2A Re-Bar for Super-STR. (Deformed) Ton
CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.86
CO-2A Concrete for Sub-STR. M³ 8.52
CO-3A Concrete for Super-STR. M³ 7.22
SSP-CVL2-FDN-1370 - V.1373.01
FM FORM WORK
FM-1A Form for Sub-STR. M² 9.02
FM-2A Form for Super-STR. M² 36.99
RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 1.88
RE-2A Re-Bar for Super-STR. (Deformed) Ton 1.00
CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.56
CO-2A Concrete for Sub-STR. M³ 5.39
CO-3A Concrete for Super-STR. M³ 6.41
SSP-CVL2-FDN-1370 - V.2373.01
FM FORM WORK
BOQ Item SSP-CVL2-FDN-1370 - V.2373.01 BoQ Qty per
Description Report Ref. No. Unit
Code Drawing
FM-1A Form for Sub-STR. M² 6.99
FM-2A Form for Super-STR. M² 30.49
RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.82
RE-2A Re-Bar for Super-STR. (Deformed) Ton 0.52
CO CONCRETE WORK
CO-1A Leveling Concrete M³ 18.13
CO-2A Concrete for Sub-STR. M³ 282.80
CO-3A Concrete for Super-STR. M³ 52.13
COA-6A Concrete for Super-STR. (K-350) SSP-CVL2-FDN 2360 - STR. P3-6 M³ 121.53
FM FORM WORK
FM-1A Form for Sub-STR. M² 72.16
FM-2A Form for Super-STR. M² 672.34
RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 30.43
RE-2A Re-Bar for Super-STR. (Deformed) Ton 49.96
CO CONCRETE WORK
CO-1A Leveling Concrete M³ 13.22
CO-2A Concrete for Sub-STR. M³ 133.18
CO-3A Concrete for Super-STR. M³ -
SSP-CVL2-FDN-STR P3-7
FM FORM WORK
FM-1A Form for Sub-STR. M² 117.31
FM-2A Form for Super-STR. M²
RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 11.01
RE-2A Re-Bar for Super-STR. (Deformed) Ton -
BOQ Item BoQ Qty per
Description Report Ref. No. Unit
Code Drawing
AN-2B Anchor Bolt W/O Template Setting Ton 0.16
JT-5A Isolation Joint M 34.40
20 P3- CMH02 AREA COC MAIN HOLE TYPE 2 PLAN, SECTION- A/B/C
EA EARTH WORK
EA-1A Excavation by Equipment (D≦3.0M) M³ 14.31
EA-1B Excavation by Equipment (D>3.0M) M³ -
EA-2A Backfilling (Excavated Soil) M³ 10.23
EA-3B Disposal of Soil (Outside of Factory) M³ 4.08
CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.41
CO-2A Concrete for Sub-STR. M³ 3.30
CO-3A Concrete for Super-STR. M³
RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.64
RE-2A Re-Bar for Super-STR. (Deformed) Ton
JT JOINT WORK
JT-4A Water Stop Plate M 16.01
CO CONCRETE WORK
CO-1A Leveling Concrete M³ 7.93
CO-2A Concrete for Sub-STR. M³ 21.17
CO-3A Concrete for Super-STR. M³ -
SSP-CVL2-FDN-1370-T6306.01
FM FORM WORK
FM-1A Form for Sub-STR. M² 22.23
FM-2A Form for Super-STR. M² -
RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.39
RE-2A Re-Bar for Super-STR. (Deformed) Ton
CO CONCRETE WORK
CO-1A Leveling Concrete M³ 7.93
CO-2A Concrete for Sub-STR. M³ 21.17
SSP-CVL2-FDN-1370-T6307.01
CO-3A Concrete for Super-STR. M³
FM FORM WORK
FM-1A Form for Sub-STR. M² 22.23
FM-2A Form for Super-STR. M²
RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.39
RE-2A Re-Bar for Super-STR. (Deformed) Ton
CO CONCRETE WORK
CO-1A Leveling Concrete M³ 7.93
CO-2A Concrete for Sub-STR. M³ 21.17
CO-3A Concrete for Super-STR. M³
SSP-CVL2-FDN-1370-T6308.01
FM FORM WORK
FM-1A Form for Sub-STR. M² 22.23
FM-2A Form for Super-STR. M²
RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.39
RE-2A Re-Bar for Super-STR. (Deformed) Ton
24 P3- CMH03 AREA COC MAIN HOLE TYPE 2 PLAN, SECTION- A/B/C
EA EARTH WORK
EA-1A Excavation by Equipment (D≦3.0M) M³ 14.31
EA-1B Excavation by Equipment (D>3.0M) M³ -
EA-2A Backfilling (Excavated Soil) M³ 10.34
EA-3B Disposal of Soil (Outside of Factory) M³ 3.97
BOQ Item BoQ Qty per
Description Report Ref. No. Unit
Code Drawing
CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.41
CO-2A Concrete for Sub-STR. M³ 3.24
CO-3A Concrete for Super-STR. M³
RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.64
RE-2A Re-Bar for Super-STR. (Deformed) Ton
JT JOINT WORK
JT-4A Water Stop Plate M 16.01
CO CONCRETE WORK
CO-1A Leveling Concrete M³ 1.15
CO-2A Concrete for Sub-STR. M³ 9.31
CO-3A Concrete for Super-STR. M³
SSP-CVL2-FDN-2370 P3-12
FM FORM WORK
FM-1A Form for Sub-STR. M² 26.64
FM-2A Form for Super-STR. M²
RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 1.12
RE-2A Re-Bar for Super-STR. (Deformed) Ton
CO CONCRETE WORK
CO-1A Leveling Concrete M³ 2.55
CO-2A Concrete for Sub-STR. M³ 6.88
CO-3A Concrete for Super-STR. M³
SSP-CVL2-FDN-1370 P3-5
FM FORM WORK
FM-1A Form for Sub-STR. M² 30.37
FM-2A Form for Super-STR. M²
RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.67
RE-2A Re-Bar for Super-STR. (Deformed) Ton
CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.34
CO-2A Concrete for Sub-STR. M³ 5.36
CO-3A Concrete for Super-STR. SSP-CVL2-FDN-1370 - M³
P.1371.01/02/03
FM FORM WORK
FM-1A Form for Sub-STR. M² 17.42
FM-2A Form for Super-STR. M²
RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.18
RE-2A Re-Bar for Super-STR. (Deformed) Ton
CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.34
CO-2A Concrete for Sub-STR. M³ 5.36
CO-3A Concrete for Super-STR. SSP-CVL2-FDN-1370 - M³
P.1373.01/02/03
FM FORM WORK
FM-1A Form for Sub-STR. M² 17.42
SSP-CVL2-FDN-1370 -
P.1373.01/02/03
BOQ Item BoQ Qty per
Description Report Ref. No. Unit
Code Drawing
FM-2A Form for Super-STR. M²
RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.18
RE-2A Re-Bar for Super-STR. (Deformed) Ton
CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.21
CO-2A Concrete for Sub-STR. M³ 3.27
CO-3A Concrete for Super-STR. SSP-CVL2-FDN-1370 - P.1373.01 M³
A/B
FM FORM WORK
FM-1A Form for Sub-STR. M² 10.97
FM-2A Form for Super-STR. M²
RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.11
RE-2A Re-Bar for Super-STR. (Deformed) Ton
CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.11
CO-2A Concrete for Sub-STR. M³ 1.69
CO-3A Concrete for Super-STR. M³
SSP-CVL2-FDN-1370 - P.1373.03
FM FORM WORK
FM-1A Form for Sub-STR. M² 5.70
FM-2A Form for Super-STR. M²
RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.06
RE-2A Re-Bar for Super-STR. (Deformed) Ton
31 P3- CMH01 AREA COC MAIN HOLE TYPE 2 PLAN, SECTION- A/B
EA EARTH WORK
EA-1A Excavation by Equipment (D≦3.0M) M³ 14.31
EA-1B Excavation by Equipment (D>3.0M) M³ -
EA-2A Backfilling (Excavated Soil) M³ 11.58
EA-3B Disposal of Soil (Outside of Factory) M³ 2.73
CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.41
CO-2A Concrete for Sub-STR. M³ 2.56
CO-3A Concrete for Super-STR. M³
SSP-CVL2-CMH01-P3C0C
FM FORM WORK
FM-1A Form for Sub-STR. M² 16.38
FM-2A Form for Super-STR. M²
RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.51
RE-2A Re-Bar for Super-STR. (Deformed) Ton
32 P3- CMH05 AREA COC MAIN HOLE TYPE 2 PLAN, SECTION- A/B
EA EARTH WORK
EA-1A Excavation by Equipment (D≦3.0M) M³ 11.91
EA-1B Excavation by Equipment (D>3.0M) M³ -
EA-2A Backfilling (Excavated Soil) M³ 10.28
EA-3B Disposal of Soil (Outside of Factory) M³ 1.63
CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.38
CO-2A Concrete for Sub-STR. M³ 1.36
CO-3A Concrete for Super-STR. M³
SSP-CVL2-CMH05-P3C0C
FM FORM WORK
FM-1A Form for Sub-STR. M² 13.08
FM-2A Form for Super-STR. M²
RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.39
RE-2A Re-Bar for Super-STR. (Deformed) Ton
33 P3- AMH01 AREA COC MAIN HOLE TYPE 2 PLAN, SECTION- A/B
EA EARTH WORK
EA-1A Excavation by Equipment (D≦3.0M) M³ 49.08
EA-1B Excavation by Equipment (D>3.0M) M³ 2.40
EA-2A Backfilling (Excavated Soil) M³ 38.84
EA-3B Disposal of Soil (Outside of Factory) M³ 12.64
CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.27
CO-2A Concrete for Sub-STR. M³ 1.00
CO-3A Concrete for Super-STR. M³ 5.13
FM FORM WORK
FM-1A Form for Sub-STR. M² 3.80
FM-2A Form for Super-STR. M² 37.92
SSP-CVL2-AMH01-P3C0C
RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.13
RE-2A Re-Bar for Super-STR. (Deformed) Ton 0.80
JT JOINT WORK
JT-4A Water Stop Plate m 8.00
34 P3- CMH04 AREA COC MAIN HOLE TYPE 2 PLAN, SECTION- A/B/C
EA EARTH WORK
EA-1A Excavation by Equipment (D≦3.0M) M³ 37.83
EA-1B Excavation by Equipment (D>3.0M) M³ -
EA-2A Backfilling (Excavated Soil) M³ 33.86
EA-3B Disposal of Soil (Outside of Factory) M³ 3.97
CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.41
CO-2A Concrete for Sub-STR. M³ 2.73
CO-3A Concrete for Super-STR. M³
SSP-CVL2-CMH04-P3C0C
FM FORM WORK
FM-1A Form for Sub-STR. M² 20.37
FM-2A Form for Super-STR. M²
RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.58
RE-2A Re-Bar for Super-STR. (Deformed) Ton
BOQ Item BoQ Qty per
Description Report Ref. No. Unit
Code Drawing
35 P3- AMH04 AREA COC MAIN HOLE TYPE 2 PLAN, SECTION- A/B
EA EARTH WORK
EA-1A Excavation by Equipment (D≦3.0M) M³ 46.71
EA-1B Excavation by Equipment (D>3.0M) M³ 0.76
EA-2A Backfilling (Excavated Soil) M³ 36.42
EA-3B Disposal of Soil (Outside of Factory) M³ 11.05
CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.49
CO-2A Concrete for Sub-STR. M³ 0.90
CO-3A Concrete for Super-STR. M³ 4.65
FM FORM WORK
FM-1A Form for Sub-STR. M² 3.70
FM-2A Form for Super-STR. SSP-CVL2-AMH04-P3AOC M² 34.38
RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.11
RE-2A Re-Bar for Super-STR. (Deformed) Ton 0.83
JT JOINT WORK
JT-4A Water Stop Plate m 7.60
36 P3- AMH05 AREA COC MAIN HOLE TYPE 2 PLAN, SECTION- A/B
EA EARTH WORK
EA-1A Excavation by Equipment (D≦3.0M) M³ 46.71
EA-1B Excavation by Equipment (D>3.0M) M³ 1.52
EA-2A Backfilling (Excavated Soil) M³ 37.00
EA-3B Disposal of Soil (Outside of Factory) M³ 11.23
CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.49
CO-2A Concrete for Sub-STR. M³ 0.90
CO-3A Concrete for Super-STR. M³ 4.73
FM FORM WORK
SSP-CVL2-AMH05-P3AOC
BOQ Item BoQ Qty per
Description Report Ref. No. Unit
Code Drawing
FM-1A Form for Sub-STR. M² 3.70
FM-2A Form for Super-STR. SSP-CVL2-AMH05-P3AOC M² 35.04
RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.11
RE-2A Re-Bar for Super-STR. (Deformed) Ton 0.86
JT JOINT WORK
JT-4A Water Stop Plate m 7.60
CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.14
CO-2A Concrete for Sub-STR. M³ 0.95
CO-3A Concrete for Super-STR. M³ 2.18
SSP-CVL2-FDN-2370 - V.6412.01
FM FORM WORK
FM-1A Form for Sub-STR. M² 5.19
FM-2A Form for Super-STR. M² 16.63
RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.14
RE-2A Re-Bar for Super-STR. (Deformed) Ton 0.35
CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.17
CO-2A Concrete for Sub-STR. M³ 2.56
CO-3A Concrete for Super-STR. SSP-CVL2-FDN-1370 - P.2373.01 M³ -
A/B
BOQ Item SSP-CVL2-FDN-1370 - P.2373.01 BoQ Qty per
Description Report Ref. No. Unit
Code A/B Drawing
FM FORM WORK
FM-1A Form for Sub-STR. M² 9.68
FM-2A Form for Super-STR. M² -
RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.08
RE-2A Re-Bar for Super-STR. (Deformed) Ton -
CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.11
CO-2A Concrete for Sub-STR. M³ 1.69
CO-3A Concrete for Super-STR. M³ -
SSP-CVL2-FDN-1370 - P.2373.03
FM FORM WORK
FM-1A Form for Sub-STR. M² 5.70
FM-2A Form for Super-STR. M² -
RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.06
RE-2A Re-Bar for Super-STR. (Deformed) Ton -
CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.36
CO-2A Concrete for Sub-STR. M³ 5.81
CO-3A Concrete for Super-STR. SSP-CVL2-FDN-2370 - M³
P.2371.01/02/03
FM FORM WORK
FM-1A Form for Sub-STR. M² 18.06
FM-2A Form for Super-STR. M²
RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.18
RE-2A Re-Bar for Super-STR. (Deformed) Ton
BOQ Item BoQ Qty per
Description Report Ref. No. Unit
Code Drawing
AN-1A Anchor Box Nos 12.00
JT-5A Isolation Joint M 16.80
41 P3- AMH03 AREA COC MAIN HOLE TYPE 2 PLAN, SECTION- A/B
EA EARTH WORK
EA-1A Excavation by Equipment (D≦3.0M) M³ 52.32
EA-1B Excavation by Equipment (D>3.0M) M³ 2.40
EA-2A Backfilling (Excavated Soil) M³ 42.08
EA-3B Disposal of Soil (Outside of Factory) M³ 12.64
CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.51
CO-2A Concrete for Sub-STR. M³ 1.00
CO-3A Concrete for Super-STR. M³ 5.20
FM FORM WORK
FM-1A Form for Sub-STR. M² 3.80
FM-2A Form for Super-STR. SSP-CVL2-AMH03-P3A0C M² 37.62
RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.13
RE-2A Re-Bar for Super-STR. (Deformed) Ton 0.80
JT JOINT WORK
JT-4A Water Stop Plate m 8.00
CO CONCRETE WORK
CO-1A Leveling Concrete M³ 1.64
CO-2A Concrete for Sub-STR. M³ 37.45
CO-3A Concrete for Super-STR. SSP-CVL2-FDN-1360 - M³
P.1361.01/05
FM FORM WORK
FM-1A Form for Sub-STR. M² 69.35
FM-2A Form for Super-STR. M²
RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.62
RE-2A Re-Bar for Super-STR. (Deformed) Ton
CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.26
CO-2A Concrete for Sub-STR. M³ 4.31
CO-3A Concrete for Super-STR. M³
SSP-CVL2-FDN-1360 - P.1361.02
FM FORM WORK
FM-1A Form for Sub-STR. M² 12.05
FM-2A Form for Super-STR. M²
RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.14
RE-2A Re-Bar for Super-STR. (Deformed) Ton
CO CONCRETE WORK
SSP-CVL2-FDN-1360 - P.1361.06
BOQ Item BoQ Qty per
Description Report Ref. No. Unit
Code Drawing
CO-1A Leveling Concrete M³ 0.22
CO-2A Concrete for Sub-STR. M³ 5.23
CO-3A Concrete for Super-STR. M³
SSP-CVL2-FDN-1360 - P.1361.06
FM FORM WORK
FM-1A Form for Sub-STR. M² 12.77
FM-2A Form for Super-STR. M²
RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.11
RE-2A Re-Bar for Super-STR. (Deformed) Ton
CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.55
CO-2A Concrete for Sub-STR. M³ 12.28
CO-3A Concrete for Super-STR. M³
SSP-CVL2-FDN-2360 - P.2361.01
FM FORM WORK
FM-1A Form for Sub-STR. M² 15.44
FM-2A Form for Super-STR. M²
RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.24
RE-2A Re-Bar for Super-STR. (Deformed) Ton
CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.26
CO-2A Concrete for Sub-STR. M³ 4.31
CO-3A Concrete for Super-STR. M³
SSP-CVL2-FDN-2360 - P.2361.02
FM FORM WORK
FM-1A Form for Sub-STR. M² 12.04
FM-2A Form for Super-STR. M²
SSP-CVL2-FDN-2360 - P.2361.02
CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.55
CO-2A Concrete for Sub-STR. M³ 12.28
CO-3A Concrete for Super-STR. M³
SSP-CVL2-FDN-2360 - P.2361.05
FM FORM WORK
FM-1A Form for Sub-STR. M² 15.44
FM-2A Form for Super-STR. M²
RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.27
RE-2A Re-Bar for Super-STR. (Deformed) Ton
CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.22
CO-2A Concrete for Sub-STR. M³ 5.33
CO-3A Concrete for Super-STR. M³
SSP-CVL2-FDN-2360 - P.2361.06
FM FORM WORK
FM-1A Form for Sub-STR. M² 13.03
FM-2A Form for Super-STR. M²
RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.14
RE-2A Re-Bar for Super-STR. (Deformed) Ton
CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.06
CO-2A Concrete for Sub-STR. M³ 0.87
CO-3A Concrete for Super-STR. M³
SSP-CVL2-FDN-2360 - S.2361.01
FM FORM WORK
FM-1A Form for Sub-STR. M² 3.85
FM-2A Form for Super-STR. M²
RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.06
RE-2A Re-Bar for Super-STR. (Deformed) Ton
CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.07
CO-2A Concrete for Sub-STR. M³ 1.07
CO-3A Concrete for Super-STR. M³
SSP-CVL2-FDN-2360 - S.1361.01
FM FORM WORK
FM-1A Form for Sub-STR. M² 4.28
FM-2A Form for Super-STR. M²
RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.08
RE-2A Re-Bar for Super-STR. (Deformed) Ton
CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.18
SSP-CVL2-FDN-1370 - P.1374.01
BOQ Item BoQ Qty per
Description Report Ref. No. Unit
Code Drawing
CO-2A Concrete for Sub-STR. M³ 2.52
CO-3A Concrete for Super-STR. M³
SSP-CVL2-FDN-1370 - P.1374.01
FM FORM WORK
FM-1A Form for Sub-STR. M² 6.30
FM-2A Form for Super-STR. M²
RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.07
RE-2A Re-Bar for Super-STR. (Deformed) Ton
CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.42
CO-2A Concrete for Sub-STR. M³ 5.92
CO-3A Concrete for Super-STR. SSP-CVL2-FDN-1370 - M³
P.1374.02/03
FM FORM WORK
FM-1A Form for Sub-STR. M² 13.65
FM-2A Form for Super-STR. M²
RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.16
RE-2A Re-Bar for Super-STR. (Deformed) Ton
CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.14
CO-2A Concrete for Sub-STR. M³ 1.90
CO-3A Concrete for Super-STR. M³
SSP-CVL2-FDN-1370 - P.1374.04
FM FORM WORK
FM-1A Form for Sub-STR. M² 5.46
FM-2A Form for Super-STR. M²
RE RE-BAR WORK
SSP-CVL2-FDN-1370 - P.1374.04
CO CONCRETE WORK
CO-1A Leveling Concrete M³ 3.84
CO-2A Concrete for Sub-STR. M³ 32.41
CO-3A Concrete for Super-STR. M³
SSP-CVL2-FDN-1370 P3-4
FM FORM WORK
FM-1A Form for Sub-STR. M² 67.43
FM-2A Form for Super-STR. M²
RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 3.13
RE-2A Re-Bar for Super-STR. (Deformed) Ton
CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.21
CO-2A Concrete for Sub-STR. M³ 2.94
CO-3A Concrete for Super-STR. M³
SSP-CVL2-FDN-2370 - P.2374.02
FM FORM WORK
FM-1A Form for Sub-STR. M² 6.79
FM-2A Form for Super-STR. M²
RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.09
RE-2A Re-Bar for Super-STR. (Deformed) Ton
CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.14
CO-2A Concrete for Sub-STR. M³ 1.82
CO-3A Concrete for Super-STR. M³
SSP-CVL2-FDN-2370 - P.2374.04
FM FORM WORK
FM-1A Form for Sub-STR. M² 5.22
FM-2A Form for Super-STR. M²
RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.07
RE-2A Re-Bar for Super-STR. (Deformed) Ton
CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.04
CO-2A Concrete for Sub-STR. M³ 0.50
CO-3A Concrete for Super-STR. M³
SSP-CVL2-FDN-1370 - P.6306.01
FM FORM WORK
FM-1A Form for Sub-STR. M² 3.07
FM-2A Form for Super-STR. M²
RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.03
RE-2A Re-Bar for Super-STR. (Deformed) Ton
CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.07
CO-2A Concrete for Sub-STR. M³ 0.97
SSP-CVL2-FDN-1370 - P.6306.02
A/B
BOQ Item BoQ Qty per
Description Report Ref. No. Unit
Code Drawing
CO-3A Concrete for Super-STR. SSP-CVL2-FDN-1370 - P.6306.02 M³
A/B
FM FORM WORK
FM-1A Form for Sub-STR. M² 5.98
FM-2A Form for Super-STR. M²
RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.06
RE-2A Re-Bar for Super-STR. (Deformed) Ton
CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.04
CO-2A Concrete for Sub-STR. M³ 0.50
CO-3A Concrete for Super-STR. M³
SSP-CVL2-FDN-1370 - P.6307.01
FM FORM WORK
FM-1A Form for Sub-STR. M² 3.07
FM-2A Form for Super-STR. M²
RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.03
RE-2A Re-Bar for Super-STR. (Deformed) Ton
CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.07
CO-2A Concrete for Sub-STR. M³ 0.95
CO-3A Concrete for Super-STR. SSP-CVL2-FDN-1370 - P.6307.02 M³
A/B
FM FORM WORK
FM-1A Form for Sub-STR. M² 5.85
FM-2A Form for Super-STR. M²
RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.05
A/B
CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.04
CO-2A Concrete for Sub-STR. M³ 0.51
CO-3A Concrete for Super-STR. M³
SSP-CVL2-FDN-1370 - P.6308.01
FM FORM WORK
FM-1A Form for Sub-STR. M² 3.12
FM-2A Form for Super-STR. M²
RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.03
RE-2A Re-Bar for Super-STR. (Deformed) Ton
CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.07
CO-2A Concrete for Sub-STR. M³ 0.97
CO-3A Concrete for Super-STR. SSP-CVL2-FDN-1370 - P.6308.02 M³
A/B
FM FORM WORK
FM-1A Form for Sub-STR. M² 5.98
FM-2A Form for Super-STR. M²
RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.06
RE-2A Re-Bar for Super-STR. (Deformed) Ton
CO CONCRETE WORK
CO-1A Leveling Concrete M³ 1.85
CO-2A Concrete for Sub-STR. M³ 19.14
CO-3A Concrete for Super-STR. M³
SSP-CVL2-FDN-1370 P3-10
FM FORM WORK
FM-1A Form for Sub-STR. M² 49.12
FM-2A Form for Super-STR. M²
RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 1.44
RE-2A Re-Bar for Super-STR. (Deformed) Ton
CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.10
CO-2A Concrete for Sub-STR. M³ 1.90
CO-3A Concrete for Super-STR. M³
FM FORM WORK
FM-1A Form for Sub-STR. M² 18.62
FM-2A Form for Super-STR. M²
JT JOINT WORK
JT-4A Water Stop Plate M 3.20
CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.49
CO-2A Concrete for Sub-STR. M³ 0.90
CO-3A Concrete for Super-STR. M³ 4.98
FM FORM WORK
FM-1A Form for Sub-STR. M² 3.70
FM-2A Form for Super-STR. SSP-CVL2-AMH06-P3AOC M² 37.02
RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.11
RE-2A Re-Bar for Super-STR. (Deformed) Ton 0.86
JT JOINT WORK
JT-4A Water Stop Plate M 7.60
CO CONCRETE WORK
CO-1A Leveling Concrete M³ 1.81
CO-2A Concrete for Sub-STR. M³ 18.93
CO-3A Concrete for Super-STR. M³
SSP-CVL2-FDN-2370 P3-9
FM FORM WORK
FM-1A Form for Sub-STR. M² 46.86
FM-2A Form for Super-STR. M²
RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 1.31
RE-2A Re-Bar for Super-STR. (Deformed) Ton
CO CONCRETE WORK
CO-1A Leveling Concrete M³ 5.32
CO-2A Concrete for Sub-STR. M³ 51.62
CO-3A Concrete for Super-STR. M³ -
SSP-CVL2-DIKE WALL-1360 -
FM FORM WORK BLENDING AREA
FM-1A Form for Sub-STR. M² 319.45
FM-2A Form for Super-STR. M² -
RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 6.97
RE-2A Re-Bar for Super-STR. (Deformed) Ton -
CO CONCRETE WORK
CO-1A Leveling Concrete M³ 5.18
CO-2A Concrete for Sub-STR. M³ 61.61
CO-3A Concrete for Super-STR. M³ -
SSP-CVL2-DIKE WALL-2360 -
FM FORM WORK BLENDING AREA
FM-1A Form for Sub-STR. M² 302.32
FM-2A Form for Super-STR. M² -
RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 11.87
RE-2A Re-Bar for Super-STR. (Deformed) Ton -
CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.07
CO-2A Concrete for Sub-STR. M³ 0.28
CO-3A Concrete for Super-STR. M³
FM FORM WORK
FM-1A Form for Sub-STR. M² 4.02
FM-2A Form for Super-STR. M²
SSP-CVL2-CB-P3CB-01
RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.04
RE-2A Re-Bar for Super-STR. (Deformed) Ton
CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.06
CO-2A Concrete for Sub-STR. M³ 0.29
CO-3A Concrete for Super-STR. M³
FM FORM WORK
FM-1A Form for Sub-STR. M² 4.60
FM-2A Form for Super-STR. M²
SSP-CVL2-CB-P3CB-02
RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.05
RE-2A Re-Bar for Super-STR. (Deformed) Ton
CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.18
CO-2A Concrete for Sub-STR. M³ -
CO-3A Concrete for Super-STR. M³
SSP-CVL2-AOC-P3-C0C- CEP DN
COA-6A Concrete for Super-STR. (K-350) M³ 1.09
200
FM FORM WORK
FM-1A Form for Sub-STR. M² 5.00
FM-2A Form for Super-STR. M²
RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.08
RE-2A Re-Bar for Super-STR. (Deformed) Ton
CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.18
CO-2A Concrete for Sub-STR. M³ -
CO-3A Concrete for Super-STR. M³
SSP-CVL2-AOC-P3-C0C- CEP DN
COA-6A Concrete for Super-STR. (K-350) M³ 1.00
250
FM FORM WORK
FM-1A Form for Sub-STR. M² 5.00
FM-2A Form for Super-STR. M²
RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.08
BOQ Item BoQ Qty per
Description Report Ref. No. Unit
Code Drawing
CO CONCRETE WORK
CO-1A Leveling Concrete M³ -
CO-2A Concrete for Sub-STR. M³ 1.30
SSP-CVL2-LF- P3-1360-
CO-3A Concrete for Super-STR. M³
V,1361.02/03
FM FORM WORK
FM-1A Form for Sub-STR. M² 8.64
FM-2A Form for Super-STR. M²
RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.19
RE-2A Re-Bar for Super-STR. (Deformed) Ton
CO CONCRETE WORK
CO-1A Leveling Concrete M³ -
CO-2A Concrete for Sub-STR. M³ 0.43
SSP-CVL2-LF- P3-1360-
CO-3A Concrete for Super-STR. M³
V.1361.01
FM FORM WORK
FM-1A Form for Sub-STR. M² 2.88
FM-2A Form for Super-STR. M²
RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.06
RE-2A Re-Bar for Super-STR. (Deformed) Ton
CO CONCRETE WORK
CO-1A Leveling Concrete M³ 2.02
CO-2A Concrete for Sub-STR. M³ 29.44
SSP-CVL2-LF -1360-
CO-3A Concrete for Super-STR. M³
P1361.01A/02/05/06,S1361
FM FORM WORK
FM-1A Form for Sub-STR. M² 47.59
FM-2A Form for Super-STR. M²
RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 2.42
RE-2A Re-Bar for Super-STR. (Deformed) Ton
CO CONCRETE WORK
CO-1A Leveling Concrete M³ 1.99
CO-2A Concrete for Sub-STR. M³ 11.23
SSP-CVL2-LF- 1360- P1361.01B,
CO-3A Concrete for Super-STR. M³
V6474.04
FM FORM WORK
FM-1A Form for Sub-STR. M² 28.41
FM-2A Form for Super-STR. M²
RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.92
RE-2A Re-Bar for Super-STR. (Deformed) Ton
CO CONCRETE WORK
CO-1A Leveling Concrete M³ 1.33
CO-2A Concrete for Sub-STR. M³ 18.34
SSP-CVL2-LF- 1360 -
CO-3A Concrete for Super-STR. M³
P2361.05,P2361.02,S2361.01
FM FORM WORK
FM-1A Form for Sub-STR. M² 35.63
FM-2A Form for Super-STR. M²
RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 1.67
RE-2A Re-Bar for Super-STR. (Deformed) Ton
CO CONCRETE WORK
CO-1A Leveling Concrete M³ 1.54
CO-2A Concrete for Sub-STR. M³ 13.95
SSP-CVL2-LF - 2360- P.2361.01,
CO-3A Concrete for Super-STR. M³
V6474.05
FM FORM WORK
FM-1A Form for Sub-STR. M² 33.31
FM-2A Form for Super-STR. M²
RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 1.33
RE-2A Re-Bar for Super-STR. (Deformed) Ton
CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.95
CO-2A Concrete for Sub-STR. M³ 2.15
CO-3A Concrete for Super-STR. SSP-CVL2-LF -2360- V.2361.01 M³
FM FORM WORK
FM-1A Form for Sub-STR. M² 6.30
FM-2A Form for Super-STR. M²
RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.51
RE-2A Re-Bar for Super-STR. (Deformed) Ton
CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.99
CO-2A Concrete for Sub-STR. M³ 1.90
SSP-CVL2-LF -2360-
CO-3A Concrete for Super-STR. M³
V.2361.02/03
FM FORM WORK
FM-1A Form for Sub-STR. M² 5.04
FM-2A Form for Super-STR. M²
RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.39
RE-2A Re-Bar for Super-STR. (Deformed) Ton
CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.48
CO-2A Concrete for Sub-STR. M³ 2.83
SSP-CVL2-LF -1370- STRIPPING
CO-3A Concrete for Super-STR. M³
AREA
FM FORM WORK
FM-1A Form for Sub-STR. M² 8.45
FM-2A Form for Super-STR. M²
RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.24
RE-2A Re-Bar for Super-STR. (Deformed) Ton
CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.60
CO-2A Concrete for Sub-STR. SSP-CVL2-LF -1370- STRIPPING M³ 1.16
CO-3A Concrete for Super-STR. P.1373.01 A/B, P 1373.03, V M³
1373.01
FM FORM WORK
FM-1A Form for Sub-STR. M² 5.36
FM-2A Form for Super-STR. M²
RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.26
RE-2A Re-Bar for Super-STR. (Deformed) Ton
CO CONCRETE WORK
CO-1A Leveling Concrete M³ 1.41
CO-2A Concrete for Sub-STR. M³ 9.24
CO-3A Concrete for Super-STR. SSP-CVL2-LF -1370- TAMOL M³
FM FORM WORK
FM-1A Form for Sub-STR. M² 43.66
FM-2A Form for Super-STR. M²
RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.80
RE-2A Re-Bar for Super-STR. (Deformed) Ton
CO CONCRETE WORK
CO-1A Leveling Concrete M³ 1.26
CO-2A Concrete for Sub-STR. M³ 10.76
SSP-CVL2-LF -1370- CRUMBS
CO-3A Concrete for Super-STR. M³
SLURRY U-3
FM FORM WORK
FM-1A Form for Sub-STR. M² 27.08
FM-2A Form for Super-STR. M²
RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 1.19
RE-2A Re-Bar for Super-STR. (Deformed) Ton
CO CONCRETE WORK
CO-1A Leveling Concrete M³ -
CO-2A Concrete for Sub-STR. M³ 4.90
SSP-CVL2-LF- 1370- STRIPPING
CO-3A Concrete for Super-STR. M³
V 1372.01/02/03
FM FORM WORK
FM-1A Form for Sub-STR. M² 14.50
FM-2A Form for Super-STR. M²
RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.68
RE-2A Re-Bar for Super-STR. (Deformed) Ton
CO CONCRETE WORK
CO-1A Leveling Concrete M³ -
CO-2A Concrete for Sub-STR. M³ 5.56
SSP-CVL2-LF- 1370- STRIPPING
CO-3A Concrete for Super-STR. M³
V 1371.01/02/03
FM FORM WORK
FM-1A Form for Sub-STR. M² 17.14
FM-2A Form for Super-STR. M²
RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.80
RE-2A Re-Bar for Super-STR. (Deformed) Ton
CO CONCRETE WORK
CO-1A Leveling Concrete M³ 1.13
CO-2A Concrete for Sub-STR. M³ 6.02
SSP-CVL2-LF- 2370- STRIPPING
CO-3A Concrete for Super-STR. M³
U.32 WATER LINE
FM FORM WORK
FM-1A Form for Sub-STR. M² 22.81
FM-2A Form for Super-STR. M²
RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.35
RE-2A Re-Bar for Super-STR. (Deformed) Ton
CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.47
CO-2A Concrete for Sub-STR. M³ 0.90
SSP-CVL2-LF -2370- STRIPPING
CO-3A Concrete for Super-STR. M³
V.6412.01, V6415.01
FM FORM WORK
FM-1A Form for Sub-STR. M² 4.08
FM-2A Form for Super-STR. M²
RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.20
RE-2A Re-Bar for Super-STR. (Deformed) Ton
CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.90
CO-2A Concrete for Sub-STR. M³ 2.61
SSP-CVL2-LF -2370- STRIPPING
CO-3A Concrete for Super-STR. M³
V.2373.01
FM FORM WORK
FM-1A Form for Sub-STR. M² 8.64
FM-2A Form for Super-STR. M²
RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.36
RE-2A Re-Bar for Super-STR. (Deformed) Ton
CO CONCRETE WORK
CO-1A Leveling Concrete M³ -
CO-2A Concrete for Sub-STR. M³ 5.43
SSP-CVL2-LF- 2370- STRIPPING
CO-3A Concrete for Super-STR. M³
V.2371.01/02/03
FM FORM WORK
FM-1A Form for Sub-STR. M² 16.14
FM-2A Form for Super-STR. M²
RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.47
RE-2A Re-Bar for Super-STR. (Deformed) Ton
CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.36
CO-2A Concrete for Sub-STR. M³ 4.13
SSP-CVL2-CT- P3-2360 AREA
CO-3A Concrete for Super-STR. M³
CABLE TRAY
BOQ Item BoQ Qty per
Description Report Ref.
SSP-CVL2-CT- No. AREA
P3-2360 Unit
Code Drawing
CABLE TRAY
FM FORM WORK
FM-1A Form for Sub-STR. M² 19.80
FM-2A Form for Super-STR. M²
RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.39
RE-2A Re-Bar for Super-STR. (Deformed) Ton
CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.72
CO-2A Concrete for Sub-STR. M³ 2.38
SSP-CVL2-LF -2370- CRUMBS
CO-3A Concrete for Super-STR. M³
SLURRY U-32
FM FORM WORK
FM-1A Form for Sub-STR. M² 8.62
FM-2A Form for Super-STR. M²
RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.30
RE-2A Re-Bar for Super-STR. (Deformed) Ton
CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.11
CO-2A Concrete for Sub-STR. M³ 1.25
CO-3A Concrete for Super-STR. M³
SSP-CVL2-CB-P3CB-01COC
BOQ Item BoQ Qty per
Description Report Ref. No. Unit
Code Drawing
FM FORM WORK
FM-1A Form for Sub-STR. M² 14.14
FM-2A Form for Super-STR. M²
SSP-CVL2-CB-P3CB-01COC
RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.13
RE-2A Re-Bar for Super-STR. (Deformed) Ton
CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.19
CO-2A Concrete for Sub-STR. SSP-CVL2-LPF- P3- LIGHTING M³ 3.28
CO-3A Concrete for Super-STR. POLE FOUNDATION M³
FM FORM WORK
FM-1A Form for Sub-STR. M² 14.82
FM-2A Form for Super-STR. M²
RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.17
RE-2A Re-Bar for Super-STR. (Deformed) Ton
CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.57
CO-2A Concrete for Sub-STR. M³ 4.32
SSP-CVL2-HB- P3-HOSE BOX
FOUNDATION P3 AREA
BOQ Item BoQ Qty per
Description Report Ref. No. Unit
Code Drawing
SSP-CVL2-HB- P3-HOSE BOX
CO-3A Concrete for Super-STR. M³
FOUNDATION P3 AREA
FM FORM WORK
FM-1A Form for Sub-STR. M² 22.32
FM-2A Form for Super-STR. M²
RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.38
RE-2A Re-Bar for Super-STR. (Deformed) Ton
CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.18
CO-2A Concrete for Sub-STR. M³ 0.77
CO-3A Concrete for Super-STR. M³
SSP-CVL2-GP- P3-GUARD POST
FM FORM WORK
P3 AREA
FM-1A Form for Sub-STR. M² 10.32
FM-2A Form for Super-STR. M²
RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton -
RE-2A Re-Bar for Super-STR. (Deformed) Ton
CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.10
CO-2A Concrete for Sub-STR. M³ 1.54
CO-3A Concrete for Super-STR. M³
SSP-CVL2-FDN-1360 - V6474.04
FM FORM WORK
FM-1A Form for Sub-STR. M² 5.14
FM-2A Form for Super-STR. M²
SSP-CVL2-FDN-1360 - V6474.04
BOQ Item BoQ Qty per
Description Report Ref. No. Unit
Code Drawing
RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.06
RE-2A Re-Bar for Super-STR. (Deformed) Ton
CO CONCRETE WORK
CO-1A Leveling Concrete M³ 0.13
CO-2A Concrete for Sub-STR. M³ 2.07
CO-3A Concrete for Super-STR. M³
SSP-CVL2-FDN-2360 - V6474.05
FM FORM WORK
FM-1A Form for Sub-STR. M² 5.99
FM-2A Form for Super-STR. M²
RE RE-BAR WORK
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 0.06
RE-2A Re-Bar for Super-STR. (Deformed) Ton
T 681.61 - 681.61
491.72 - 491.72
189.89 - 189.89
T 20.69 - 20.69
14122-ED-CO-CVL-DWG-STD-0105 Rev. 1,
14122-ED-CO-CVL-DWG-SSFD-2301 Rev. 1,
14122-ED-CO-CVL-DWG-SSFD-2201 Rev. 2,
14122-ED-CO-CVL-DWG-SSFD-2202 Rev. 2 T 345.24 - 345.24
T 14.56 - 14.56
164.01 - 164.01
0.02 - 0.02
61.60 61.60
T 147.97 - 147.97
96.54 - 96.54
51.42 - 51.42
T 115.36 - 115.36
T 3.60 - 3.60
14122-ED-CO-CVL-DWG-STD-0105 (Rev 3),
14122-ED-C0-CVL-DWG-SSFD-2201.(R2),
14122-ED-C0-CVL-DWG-SSFD-2202.(R2)
39.12 - 39.12
12.50 - 12.50
26.62 - 26.62
0.47 - 0.47
2.79 - 2.79
70.16 - 70.16
11.48 - 11.48
14122-ED-P2-CVL-DWG-PTBN-0401.(R1)
0.52 - 0.52
3.60 - 3.60
12.13 - 12.13
11.60 - 11.60
0.07 - 0.07
0.04 - 0.04
40.87 - 40.87
125.19 - 125.19
44.46 - 44.46
90.31 - 90.31
79.34 - 79.34
1.71 - 1.71
5.68 - 5.68
15.82 - 15.82
1422-ED-P2-CVL-DWG-PTBN-1701 (REV 1) 127.70 - 127.70
1.07 - 1.07
10.98 - 10.98
1422-ED-P2-CVL-DWG-PTBN-1701 (REV 1)
16.70 - 16.70
4.00 - 4.00
0.12 - 0.12
155.70 - 155.70
84.51 - 84.51
116.82 - 116.82
123.39 - 123.39
2.20 - 2.20
6.97 - 6.97
17.95 - 17.95
165.04 - 165.04
1422-ED-P2-CVL-DWG-PTBN-1901 (REV 1)
1.44 - 1.44
13.44 - 13.44
35.18 - 35.18
19.60 - 19.60
53.20 53.20
4.00 - 4.00
0.09 - 0.09
Quantity of Work Done
Drawing No. Status *) Remarks
Previous This Month Cumulative
205.73 - 205.73
138.33 - 138.33
150.70 - 150.70
193.36 - 193.36
4.35 - 4.35
6.53 - 6.53
22.54 - 22.54
216.34 - 216.34
1422-ED-P2-CVL-DWG-PTBN-1801 (REV 1)
2.06 - 2.06
23.78 - 23.78
56.00 - 56.00
20.10 - 20.10
4.00 - 4.00
118.99 - 118.99
18.24 - 18.24
74.37 - 74.37
62.86 - 62.86
1.53 - 1.53
4.56 - 4.56
15.17 - 15.17
1422-ED-P2-CVL-DWG-PTBN-2001 (REV 1) 93.85 - 93.85
0.99 - 0.99
9.73 - 9.73
25.21 - 25.21
Quantity of Work Done
Drawing No. Status *) Remarks
Previous This Month Cumulative
16.01 - 16.01
4.00 - 4.00
158.80 - 158.80
- - -
402.50 - 402.50
141.13 - 141.13
13.32 - 13.32
120.61 - 120.61
123.88 - 123.88
27.57 - 27.57
43.39 - 43.39
57.11 - 57.11
- 2.76 2.76
8.89 - 8.89
- 40.80 40.80
0.29 - 0.29
3.29 - 3.29
-
14122-ED-P2-CVL-DWG-EQFD-0050.(R1)
V6315.01 15.54 - 15.54
- - -
0.28 - 0.28
- - -
0.03 0.03
7.20 7.20
Quantity of Work Done
Drawing No. Status *) Remarks
Previous This Month Cumulative
0.24 - 0.24
2.67 - 2.67
- - -
14122-ED-P2-CVL-DWG-EQFD-0051.(R1)
V6315.02 13.89 - 13.89
- - -
0.25 - 0.25
- - -
0.03 0.03
6.40 6.40
1,504.35 - 1,504.35
- - -
964.66 - 964.66
539.69 - 539.69
28.56 - 28.56
519.06 - 519.06
2.34 - 2.34
- - -
- - -
14122-ED-P2-CVL-DWG-SSFD-2205 s/d 2210 283.65 - 283.65
15.62 - 15.62
- - -
- - -
82.95 - 82.95
0.69 - 0.69
254.79 - 254.79
0.45 - 0.45
85.60 85.60
79.79 - 79.79
- - -
Quantity of Work Done
Drawing No. Status *) Remarks
Previous This Month Cumulative
60.97 - 60.97
18.82 - 18.82
2.05 - 2.05
18.01 - 18.01
- - -
14122-ED-P2-CVL-DWG-SSFD-2230 (Rev 1) - - -
14122-ED-P2-CVL-DWG-STRC-0501.(R2) - - -
43.25 - 43.25
- - -
- - -
- - -
1.71 - 1.71
- - -
0.08 - 0.08
2.72 2.72
92.26 - 92.26
- - -
65.73 - 65.73
26.66 - 26.66
2.16 - 2.16
21.62 - 21.62
6.44 - 6.44
- - -
14122-ED-P3-CVL-DWG-SSFD-2209
- - -
37.84 - 37.84
52.80 - 52.80
- - -
- - -
2.80 - 2.80
0.38 - 0.38
16.00 - 16.00
20.80 20.80
42.97 - 42.97
- - -
Quantity of Work Done
Drawing No. Status *) Remarks
Previous This Month Cumulative
32.25 - 32.25
10.72 - 10.72
1.05 - 1.05
10.94 - 10.94
-
- - -
14122-ED-P2-CVL-DWG-SSFD-2235
- - -
32.04 - 32.04
-
1.64 - 1.64
- - -
0.05 - 0.05
12.00 12.00
81.17 - 81.17
- - -
61.96 - 61.96
19.21 - 19.21
1.59 - 1.59
16.28 - 16.28
4.29 - 4.29
- - -
14122-ED-P2-CVL-DWG-EQFD-0015
- - -
27.72 - 27.72
39.66 - 39.66
- - -
- - -
2.01 - 2.01
0.80 - 0.80
12.00 - 12.00
15.00 15.00
55.55 - 55.55
- - -
Quantity of Work Done
Drawing No. Status *) Remarks
Previous This Month Cumulative
41.84 - 41.84
13.72 - 13.72
1.46 - 1.46
13.22 - 13.22
-
-
14122-ED-P2-CVL-DWG-SSFD-2260
-
29.53 - 29.53
-
-
-
1.25 - 1.25
-
0.03 - 0.03
10.40 10.40
222.68 - 222.68
- - -
173.11 - 173.11
49.58 - 49.58
4.58 - 4.58
40.58 - 40.58
59.14 - 59.14
14122-ED-P2-CVL-DWG-SSFD-2215 (Rev 1)
61.82 - 61.82
319.54 - 319.54
4.52 - 4.52
20.28 - 20.28
0.22 - 0.22
2.95 - 2.95
24.66 24.66
Quantity of Work Done
Drawing No. Status *) Remarks
Previous This Month Cumulative
95.33 - 95.33
- - -
66.47 - 66.47
28.86 - 28.86
2.63 - 2.63
27.42 - 27.42
- - -
14122-ED-P2-CVL-DWG-SSFD-7001 (Rev 1)
46.42 - 46.42
- - -
1.75 - 1.75
- - -
0.05 - 0.05
2.12
37.83 - 37.83
- - -
32.77 - 32.77
5.06 - 5.06
0.57 - 0.57
-
7.00 - 7.00
0.01 - 0.01
9.14 - 9.14
1.00 - 1.00
Quantity of Work Done
Drawing No. Status *) Remarks
Previous This Month Cumulative
37.83 - 37.83
- - -
32.77 - 32.77
- 5.06 5.06
0.47 - 0.47
7.00 - 7.00
0.01 - 0.01
10.46 - 10.46
1.00 - 1.00
81.18 - 81.18
-
59.03 - 59.03
22.15 22.15
1.15 - 1.15
21.00 - 21.00
13.77 - 13.77
14122-ED-P2-CVL-DWG-EQFD-0010.(R1)
V6414.01
19.00 - 19.00
66.32 - 66.32
1.04 - 1.04
2.51 - 2.51
Quantity of Work Done
Drawing No. Status *) Remarks
Previous This Month Cumulative
8.00 - 8.00
8.07 8.07
74.26 - 74.26
- - -
56.34 - 56.34
- 17.91 17.91
1.56 - 1.56
17.31 - 17.31
36.09 - 36.09
14122-ED-P2-CVL-DWG-SSFD-2270 (Rev 1)
- - -
1.76 - 1.76
- - -
3.20 3.20
0.03 - 0.03
864.30 - 864.30
-
591.13 - 591.13
273.17
22.04 - 22.04
259.79 - 259.79
14122-ED-P2-CVL-DWG-SSFD-2219 (Rev 1)
244.33 - 244.33
14122-ED-P2-CVL-DWG-SSFD-2219 (Rev 1)
0.36 - 0.36
10.89 10.89
106.82 - 106.82
-
77.40 - 77.40
29.42 29.42
2.61 - 2.61
28.74 - 28.74
14122-ED-P2-CVL-DWG-SSFD-2240 (Rev 1)
59.16 - 59.16
2.10 - 2.10
0.08 - 0.08
3.63 3.63
15.42 - 15.42
-
3.35 - 3.35
12.07 12.07
1.30 - 1.30
67.38 - 67.38
14122-ED-P2-CVL-DWG-EQFD-0053 (REV 1)
49.91 - 49.91
0.82 - 0.82
14122-ED-P2-CVL-DWG-EQFD-0053 (REV 1)
0.04 - 0.04
17.89 17.89
20.46 - 20.46
-
13.68 - 13.68
6.78
0.52 - 0.52
4.56 - 4.56
4.20 - 4.20
14122-ED-P2-CVL-DWG-EQFD-0021.(R1)
6.20 - 6.20
21.74 - 21.74
0.30 - 0.30
0.34 - 0.34
4.00 - 4.00
8.80
270.29 - 270.29
-
206.31 - 206.31
63.98 63.98
5.48 - 5.48
58.49 - 58.49
2.07 - 2.07
14122-ED-P2-CVL-DWG-SSBG-1101 (Rev 1)
118.72 - 118.72
16.56 - 16.56
5.83 - 5.83
0.35 - 0.35
Quantity of Work Done
Drawing No. Status *) Remarks
Previous This Month Cumulative
0.03 - 0.03
37.20 37.20
29.67 - 29.67
-
19.86 - 19.86
9.80 9.80
0.78 - 0.78
7.02 - 7.02
4.94 - 4.94
14122-ED-P2-CVL-DWG-EQFD-0017.(R1)
7.90 - 7.90
24.70 - 24.70
0.52 - 0.52
0.42 - 0.42
8.00 - 8.00
10.00 10.00
Quantity of Work Done
Drawing No. Status *) Remarks
Previous This Month Cumulative
49.95 - 49.95
3.80 - 3.80
41.98 - 41.98
- 11.77 11.77
3.70 - 3.70
14122-VD-P2-CVL-DWG-AY3102-001 (REV 1) 37.12 - 37.12
0.11 - 0.11
0.88 0.88
7.60 - 7.60
0.02 - 0.02
17.51 - 17.51
1.00 - 1.00
3.00 3.00
65.91 - 65.91
3.80 - 3.80
57.94 - 57.94
- 11.77 11.77
4.37 - 4.37
14122-VD-P2-CVL-DWG-AY3102-001 (REV 1) 36.58 - 36.58
0.11 - 0.11
0.88 - 0.88
14122-VD-P2-CVL-DWG-AY3102-001 (REV 1)
7.60 - 7.60
0.02 - 0.02
17.35 - 17.35
1.00 - 1.00
3.00 3.00
6.94 - 6.94
-
2.49 - 2.49
4.45 4.45
0.47 - 0.47
13.98 - 13.98
14122-ED-P2-CVL-DWG-EQFD-0035.(R1)
24.12 - 24.12
0.51 - 0.51
6.00 - 6.00
14.21 14.21
3.55 - 3.55
1.57 - 1.57
1.98
0.22 - 0.22
3.78 - 3.78
14122-ED-P2-CVL-DWG-EQFD-0036.(R1)
9.25 - 9.25
14122-ED-P2-CVL-DWG-EQFD-0036.(R1)
Quantity of Work Done
Drawing No. Status *) Remarks
Previous This Month Cumulative
0.10 - 0.10
6.00 - 6.00
8.60 8.60
13.88 - 13.88
-
4.98 - 4.98
8.89 8.89
0.94 - 0.94
28.43 - 28.43
14122-ED-P2-CVL-DWG-EQFD-0037.(R1)
49.05 - 49.05
1.02 - 1.02
12.00 - 12.00
28.42 28.42
5.23 - 5.23
-
2.14 - 2.14
3.09 3.09
0.34 - 0.34
9.95 - 9.95
14122-ED-P2-CVL-DWG-EQFD-0038.(R1)
20.72 - 20.72
14122-ED-P2-CVL-DWG-EQFD-0038.(R1)
0.46 - 0.46
6.00 - 6.00
12.00 12.00
7.11 - 7.11
-
3.14 - 3.14
3.96 3.96
0.44 - 0.44
7.57 - 7.57
14122-ED-P2-CVL-DWG-EQFD-0033.(R1)
18.49 - 18.49
0.20 - 0.20
12.00 - 12.00
- -
42.30 - 42.30
-
32.06 - 32.06
10.24 10.24
0.88 - 0.88
8.13 - 8.13
2.79 - 2.79
14122-ED-P2-CVL-DWG-EQFD-0018(Rev 1)
23.16 23.16
20.55 20.55
14122-ED-P2-CVL-DWG-EQFD-0018(Rev 1)
8.00 - 8.00
10.00 10.00
42.30 - 42.30
-
32.06 - 32.06
10.24 10.24
0.88 - 0.88
8.13 - 8.13
2.79 - 2.79
14122-ED-P2-CVL-DWG-EQFD-0019 (Rev 1)
23.16 - 23.16
20.55 - 20.55
0.95 - 0.95
0.45 - 0.45
8.00 - 8.00
10.00 10.00
6.14 - 6.14
-
2.76 - 2.76
3.38 3.38
0.378 - 0.38
6.45 - 6.45
14122-ED-P2-CVL-DWG-EQFD-0034.(R1)
15.91 - 15.91
0.18 - 0.18
14122-ED-P2-CVL-DWG-EQFD-0034.(R1)
12.00 - 12.00
14.80 14.80
19.27 - 19.27
-
16.26 - 16.26
3.01 3.01
0.34 - 0.34
2.26 - 2.26
1.03 - 1.03
14122-ED-P2-CVL-DWG-EQFD-0016 (Rev 1)
11.64 - 11.64
9.02 - 9.02
0.19 - 0.19
0.15 - 0.15
4.00 - 4.00
4.00 4.00
5.57 - 5.57
-
1.96 - 1.96
3.61 3.61
-
-
0.38 - 0.38
6.94 - 6.94
-
-
14122-ED-P2-CVL-DWG-EQFD-0027 (Rev 1)
-
11.83 11.83
- -
-
-
0.15 - 0.15
-
Quantity of Work Done
Drawing No. Status *) Remarks
Previous This Month Cumulative
-
-
4.00 - 4.00
11.00 11.00
3.17 - 3.17
-
1.80 - 1.80
1.37 1.37
-
-
0.17 - 0.17
2.60 - 2.60
-
-
14122-ED-P2-CVL-DWG-EQFD-0058.(R1)
-
9.55 - 9.55
-
-
-
0.09 - 0.09
-
-
-
8.00 - 8.00
8.80 8.80
4.63 - 4.63
-
2.12 - 2.12
2.51 2.51
-
-
0.31 - 0.31
2.66 - 2.66
-
-
14122-ED-P2-CVL-DWG-EQFD-0054 (Rev 1)
-
8.50 - 8.50
-
-
-
0.23 - 0.23
- -
Quantity of Work Done
Drawing No. Status *) Remarks
Previous This Month Cumulative
0.01 - 0.01
7.20 7.20
2.66 - 2.66
-
1.22 - 1.22
1.44 1.44
0.16 - 0.16
2.75 - 2.75
14122-ED-P2-CVL-DWG-EQFD-0011.(R1)
6.88 - 6.88
-
-
-
0.11 - 0.11
-
0.00 - 0.004
6.400 6.40
1.99 - 1.99
-
1.03 - 1.03
0.96 0.96
0.11 - 0.11
1.82 - 1.82
14122-ED-P2-CVL-DWG-EQFD-0011.(R1)
5.59 - 5.59
0.09 - 0.09
-
Quantity of Work Done
Drawing No. Status *) Remarks
Previous This Month Cumulative
0.00 - 0.004
5.200 5.20
3.08 - 3.08
-
1.80 - 1.80
1.28 1.28
-
-
0.16 - 0.16
2.41 - 2.41
-
-
14122-ED-P2-CVL-DWG-EQFD-0030 (Rev 1)
-
9.46 - 9.46
-
-
-
0.10 - 0.10
-
-
-
8.00 - 8.00
8.80 8.80
2.54 - 2.54
-
1.19 - 1.19
1.35 1.35
-
-
0.15 - 0.15
2.58 - 2.58
-
-
14122-ED-P2-CVL-DWG-EQFD-0047.(R1)
-
6.67 - 6.67
-
-
-
0.11 - 0.11
-
-
-
0.00 - 0.004
Quantity of Work Done
Drawing No. Status *) Remarks
Previous This Month Cumulative
6.200 6.20
3.08 - 3.08
-
1.80 - 1.80
1.28 1.28
-
-
0.16 - 0.16
2.41 - 2.41
-
-
14122-ED-P2-CVL-DWG-EQFD-0028 (Rev 1)
-
9.46 - 9.46
-
-
-
0.09 - 0.09
-
-
-
8.00 - 8.00
8.80
3.08 - 3.08
- - -
1.80 - 1.80
1.28 - 1.28
-
-
0.16 - 0.16
2.41 - 2.41
- - -
-
14122-ED-P2-CVL-DWG-EQFD-0029 (Rev 1)
-
9.46 - 9.46
- - -
-
-
0.09 - 0.09
- - -
-
-
8.00 - 8.00
8.80 8.80
Quantity of Work Done
Drawing No. Status *) Remarks
Previous This Month Cumulative
4.58 - 4.58
- - -
2.31 - 2.31
2.26 - 2.26
-
-
0.26 - 0.26
4.30 - 4.30
- - -
-
14122-ED-P2-CVL-DWG-EQFD-0046.(R1)
-
12.90 - 12.90
- - -
-
-
0.15 - 0.15
- - -
-
-
8.00 - 8.00
12.00 12.00
2.82 - 2.82
-
1.35 - 1.35
1.47 1.47
-
-
0.17 - 0.17
2.83 - 2.83
-
-
14122-ED-P2-CVL-DWG-EQFD-0045.(R1)
-
7.85 - 7.85
-
-
-
0.11 - 0.11
-
-
-
6.00 - 6.00
7.20 7.20
Quantity of Work Done
Drawing No. Status *) Remarks
Previous This Month Cumulative
3.45 - 3.45
-
1.56 - 1.56
1.89 1.89
-
-
0.21 - 0.21
3.61 - 3.61
-
-
14122-ED-P2-CVL-DWG-EQFD-0044.(R0)
-
9.14 - 9.14
-
-
-
0.12 - 0.12
-
-
-
6.00 - 6.00
8.50 8.50
5.64 - 5.64
-
2.19 - 2.19
3.45 3.45
-
-
0.37 - 0.37
10.68 - 10.68
-
-
14122-ED-P2-CVL-DWG-EQFD-0043.(R1)
-
19.30 - 19.30
-
-
-
0.38 - 0.38
-
-
-
6.00 - 6.00
12.31 12.31
Quantity of Work Done
Drawing No. Status *) Remarks
Previous This Month Cumulative
10.62 - 10.62
-
4.36 - 4.36
6.26 6.26
-
-
0.69 - 0.69
19.59 - 19.59
-
-
14122-ED-P2-CVL-DWG-EQFD-0042.(R1)
-
39.19 - 39.19
-
-
-
0.88 - 0.88
-
-
-
12.00 - 12.00
24.60 24.60
5.31 - 5.31
-
2.18 - 2.18
3.13 3.13
-
-
0.34 - 0.34
9.60 - 9.60
-
-
14122-ED-P2-CVL-DWG-EQFD-0041.(R1)
-
19.20 - 19.20
-
-
-
0.45 - 0.45
-
-
-
6.00 - 6.00
12.30 12.30
Quantity of Work Done
Drawing No. Status *) Remarks
Previous This Month Cumulative
3.27 - 3.27
-
1.48 - 1.48
1.80 1.80
-
-
0.20 - 0.20
3.43 - 3.43
-
-
14122-ED-P2-CVL-DWG-EQFD-0040.(R1)
-
8.60 - 8.60
-
-
-
0.09 - 0.09
-
-
-
6.00 - 6.00
8.00 8.00
98.24 - 98.24
-
65.47 - 65.47
33.31 33.31
-
-
2.91 - 2.91
20.59 - 20.59
31.02 - 31.02
-
14122-ED-P2-CVL-DWG-DIKE-1301 (Rev 2)
-
35.58 - 35.58
206.82 - 206.82
-
-
2.69 - 2.69
3.85 - 3.85
-
-
0.01 - 0.01
56.85 56.85
Quantity of Work Done
Drawing No. Status *) Remarks
Previous This Month Cumulative
4.10 - 4.10
-
1.71 - 1.71
2.39 2.39
-
-
0.28 - 0.28
5.10 - 5.10
-
-
14122-ED-P2-CVL-DWG-EQFD-0064 (REV 1)
-
8.51 - 8.51
- -
-
-
0.19 - 0.19
-
-
-
0.01 - 0.01
9.48 9.48
5.74 - 5.74
-
2.63 - 2.63
3.11 3.11
-
-
0.35 - 0.35
5.93 - 5.93
-
-
14122-ED-P2-CVL-DWG-EQFD-0031.(R1)
-
15.05 - 15.05
-
-
-
0.15 - 0.15
-
-
-
16.00 - 16.00
14.00 14.00
3.86 - 3.86
Quantity of Work Done
Drawing No. Status *) Remarks
Previous This Month Cumulative
-
1.59 - 1.59
2.27 2.27
-
-
0.25 - 0.25
2.29 - 2.29
-
-
14122-ED-P2-CVL-DWG-EQFD-0031.(R1)
-
6.95 - 6.95
-
-
-
0.20 - 0.20
-
-
-
4.00 - 4.00
10.60 10.60
5.74 - 5.74
- - -
2.63 - 2.63
3.11 - 3.11
-
-
0.35 - 0.35
5.93 - 5.93
-
-
14122-ED-P2-CVL-DWG-EQFD-0024.(R1)
-
15.05 - 15.05
-
-
-
0.17 - 0.17
-
-
-
16.00 - 16.00
14.00 14.00
5.64 - 5.64
- - -
Quantity of Work Done
Drawing No. Status *) Remarks
Previous This Month Cumulative
2.60 - 2.60
- 3.04 3.04
-
-
0.34 - 0.34
5.81 - 5.81
- -
-
14122-ED-P2-CVL-DWG-EQFD-0022.(R1)
-
14.84 - 14.84
-
-
-
0.16 - 0.16
-
-
-
16.00 - 16.00
13.80 13.80
8.55 - 8.55
- - -
3.34 - 3.34
5.21 - 5.21
-
-
0.56 - 0.56
5.18 - 5.18
- - -
-
14122-ED-P2-CVL-DWG-EQFD-0001 (Rev 1)
-
14.41 - 14.41
-
-
-
0.43 - 0.43
-
-
-
4.00 - 4.00
22.20 22.20
4.63 - 4.63
-
2.24 - 2.24
Quantity of Work Done
Drawing No. Status *) Remarks
Previous This Month Cumulative
2.39 2.39
-
-
0.14 - 0.14
3.15 - 3.15
-
14122-ED-P2-CVL-DWG-EQFD-0062.(R1)
-
8.40 - 8.40
-
-
-
0.08 - 0.08
-
-
-
- - -
6.00 6.00
2.25 2.25
1.59 - 1.59
- - -
0.90 - 0.90
0.69 - 0.69
-
-
0.08 - 0.08
1.29 - 1.29
-
14122-ED-P2-CVL-DWG-EQFD-0048.(R1)
-
4.71 - 4.71
-
-
-
0.05 - 0.05
-
-
-
0.00 - 0.003
4.400 4.40
99.42 - 99.42
-
84.79 - 84.79
14.62 14.62
Quantity of Work Done
Drawing No. Status *) Remarks
Previous This Month Cumulative
-
-
0.51 - 0.51
8.50 - 8.50
-
-
78.61 - 78.61
-
-
14122-ED-CO-CVL-PTBN-0602 (REV 1) -
0.73 - 0.73
-
5.60 - 5.60
22.40 22.40
-
-
0.04 - 0.042
- - -
32.81 32.81
- -
14.19 - 14.19
-
3.19 - 3.19
11.00 11.00
-
-
1.09 - 1.09
17.25 - 17.25
-
14122-ED-P2-CVL-DWG-EQFD-0070.(R1)
-
16.27 - 16.27
-
-
-
0.54 - 0.54
-
-
-
6.00 - 6.00
Quantity of Work Done
Drawing No. Status *) Remarks
Previous This Month Cumulative
18.70 18.70
3.17 - 3.17
- - -
1.35 - 1.35
1.82 - 1.82
-
-
0.20 - 0.20
3.47 - 3.47
-
14122-ED-P2-CVL-DWG-EQFD-0003.(R1)
-
7.70 - 7.70
-
-
-
0.09 - 0.09
-
-
-
4.00 - 4.00
7.20 7.20
-
14122-ED-P2-CVL-DWG-EQFD-0026.(R1)
-
7.70 (2.89) 4.82
-
-
-
0.09 (0.04) 0.05
-
-
-
4.00 - 4.00
4.50 4.50
Quantity of Work Done
Drawing No. Status *) Remarks
Previous This Month Cumulative
0.96 - 0.96
- - -
0.66 - 0.66
0.30 - 0.30
-
-
0.04 - 0.04
0.56 - 0.56
-
14122-ED-P2-CVL-DWG-EQFD-0060.(R1)
-
3.12 - 3.12
-
-
-
0.03 - 0.03
-
-
-
4.00 - 4.00
2.90 2.90
-
14122-ED-P2-CVL-DWG-EQFD-0059.(R1)
-
7.70 3.18 10.88
-
-
-
0.09 0.00 0.09
-
-
-
4.00 4.00 8.00
8.92 8.92
Quantity of Work Done
Drawing No. Status *) Remarks
Previous This Month Cumulative
22.08 - 22.08
- - -
16.07 - 16.07
6.01 - 6.01
-
-
0.27 - 0.27
3.42 - 3.42
-
-
14122-ED-CO-CVL-DWG-PTBN-0702 (REV 2)
23.06 - 23.06
-
-
-
1.08 - 1.08
-
-
-
0.01 - 0.01
-
-
11.41 - 11.41
8.60 8.60
- 3.30 3.30
7.68 - 7.68
- - -
6.71 - 6.71
0.97 - 0.97
-
-
0.07 - 0.07
0.42 - 0.42
-
-
6.90 - 6.90
14122-ED-C0-CVL-DWG-PTBN-0601_R1 -
-
-
0.06 - 0.06
-
-
-
14122-ED-C0-CVL-DWG-PTBN-0601_R1
2.66 - 2.66
- - -
1.22 - 1.22
1.44 - 1.44
-
-
0.16 - 0.16
2.74 - 2.74
-
14122-ED-P2-CVL-DWG-EQFD-0009.(R1)
-
6.85 - 6.85
-
-
-
0.11 - 0.11
-
-
-
0.02 - 0.02
6.40 6.40
49.95 - 49.95
- - -
41.98 - 41.98
11.77 - 11.77
-
-
0.25 0.24 0.49
1.17 (0.27) 0.90
4.98 4.98
-
-
3.70 - 3.70
14122-VD-P2-CVL-DWG-AY3102-001 (REV 1) 37.02 - 37.02
-
-
14122-VD-P2-CVL-DWG-AY3102-001 (REV 1)
Quantity of Work Done
Drawing No. Status *) Remarks
Previous This Month Cumulative
0.11 - 0.11
0.88 - 0.88
7.60 - 7.60
-
-
0.02 - 0.02
17.63 - 17.63
1.00 - 1.00
2.00 2.00
22.08 - 22.08
- - -
16.07 - 16.07
6.01 - 6.01
-
-
0.27 - 0.27
3.29 - 3.29
-
-
14122-ED-CO-CVL-DWG-PTBN-0702 (REV 2)
22.65 - 22.65
-
-
1.08 - 1.08
-
-
-
0.01 - 0.01
9.87 - 9.87
8.60 8.60
3.30 3.30
3.25 - 3.25
- - -
1.70 - 1.70
1.55 - 1.55
-
Quantity of Work Done
Drawing No. Status *) Remarks
Previous This Month Cumulative
-
0.11 - 0.11
0.66 - 0.66
-
-
6.54 - 6.54
14122-ED-CO-CVL-PTBN-0602 (REV 1) -
-
-
0.08 - 0.08
-
-
-
0.00 - 0.00
3.60 - 3.60
- 1.00 1.00
5.20 5.20
2.71 - 2.71
- - -
1.41 - 1.41
1.30 - 1.30
-
-
0.11 - 0.11
0.54 - 0.54
- -
-
-
5.11 - 5.11
-
14122-ED-CO-CVL-PTBN-0602 (REV 1)
-
-
0.07 - 0.07
-
-
-
0.00 - 0.00
3.00 3.00
Quantity of Work Done
Drawing No. Status *) Remarks
Previous This Month Cumulative
- 1.00 1.00
5.20 5.20
11.16 - 11.16
- - -
9.73 - 9.73
1.43 - 1.43
-
-
0.18 - 0.18
- - -
14122-ED-P2-CVL-DRSW-0401 (REV 2) - - -
1.09 - 1.09
-
-
5.00 - 5.00
-
-
-
0.08 - 0.08
-
18.84 - 18.84
- - -
3.41 - 3.41
15.43 - 15.43
-
-
1.83 - 1.83
14.52 - 14.52
14122-ED-P2-CVL-DWG-LOFD-5001.(R1)
V6414.01
-
-
15.26 - 15.26
-
-
-
1.89 - 1.89
-
-
0.05 - 0.05
- -
Quantity of Work Done
Drawing No. Status *) Remarks
Previous This Month Cumulative
1.76 - 1.76
- - -
0.96 - 0.96
0.80 0.80
-
-
0.10 - 0.10
1.50 - 1.50
14122-ED-P2-CVL-DWG-EQFD-0004.(R1)
-
-
5.14 - 5.14
-
-
-
0.05 - 0.05
-
-
4.00 - 4.00
4.80 4.80
31.07 - 31.07
- - -
13.66 - 13.66
17.41 - 17.41
-
-
1.98 1.98
17.82 - 17.82
14122-ED-C0-CVL-DWG-STRC-6015
-
-
46.96 - 46.96
-
-
-
1.49 - 1.49
-
-
0.04 - 0.04
18.77 18.77
Quantity of Work Done
Drawing No. Status *) Remarks
Previous This Month Cumulative
1,454.18 - 1,454.18
886.35 - 886.35
83.47 - 83.47
493.74 - 493.74
136.31 136.31
- -
3.20 3.20
43.00 43.00
58.22 58.22
71.61 71.61
- - -
31.25 - 31.25
- - -
131.15 - 131.15
- - -
292.66 - 292.66
67.00 - 67.00
- -
- -
- -
- -
- -
- -
1.00 1.00
2.00 2.00
- -
- -
1.00 1.00
- -
- -
- -
1.00 1.00
- -
- -
- -
- -
- -
- -
- -
775.41 (775.41) -
775.82 775.82
Quantity of Work Done
Drawing No. Status *) Remarks
Previous This Month Cumulative
320.71 320.71
454.84 0.27 455.11
2,428.60 25.41 2,454.01
38.17 0.39 38.56
267.70 2.77 270.47
16.14 0.16 16.30
29.14 0.29 29.43
348.52 3.52 352.04
4.00 0.04 4.04
- 283.88 283.88
1,268.09 1,268.09
26.91 - 26.91
- - -
16.53 - 16.53
10.39 - 10.39
1.17 - 1.17
10.33 - 10.33
14122-ED-P2-CVL-DWG-SSFD-0011 (Rev 1)
35.49 - 35.49
-
-
-
1.01 - 1.01
-
-
Quantity of Work Done
Drawing No. Status *) Remarks
Previous This Month Cumulative
0.03 - 0.03
- -
- -
20.12 20.12
42.84 - 42.84
- - -
23.03 - 23.03
19.81 - 19.81
2.42 - 2.42
19.52 - 19.52
14122-ED-P2-CVL-DWG-LOFD-5025 (Rev 1)
57.88 - 57.88
-
-
-
1.92 - 1.92
-
-
- - -
0.36 - 0.36
- -
28.00 28.00
31.39 - 31.39
- - -
19.96 - 19.96
11.43 - 11.43
1.38 - 1.38
11.69 - 11.69
12.63 - 12.63
- - -
7.88 - 7.88
4.76 - 4.76
0.67 - 0.67
5.99 - 5.99
14122-ED-P2-CVL-DWG-LOFD-5035 (Rev 1)
30.21 - 30.21
-
-
-
0.68 - 0.68
-
-
0.02 - 0.02
0.06 - 0.06
- - -
26.80 26.80
17.70 - 17.70
- - -
9.69 - 9.69
8.01 - 8.01
1.08 - 1.08
9.48 - 9.48
14122-ED-P2-CVL-DWG-LOFD-5029 (Rev 1)
26.58 - 26.58
-
-
-
0.83 - 0.83
-
-
Quantity of Work Done
Drawing No. Status *) Remarks
Previous This Month Cumulative
0.00 - 0.00
0.26 - 0.26
- - -
18.00 18.00
22.14 - 22.14
- - -
14.99 - 14.99
7.15 - 7.15
0.75 - 0.75
15.97 - 15.97
14122-ED-P2-CVL-DWG-LOFD-5041 (Rev 1)
19.46 - 19.46
-
-
-
0.17 1.55 1.71
-
-
- 0.01 0.01
0.01 0.16 0.17
- - -
10.60
18.64 - 18.64
- - -
9.11 - 9.11
9.53 - 9.53
0.98 - 0.98
8.98 - 8.98
14122-ED-P2-CVL-DWG-LOFD-5039 (Rev 1)
15.74 - 15.74
-
-
-
0.49 - 0.49
-
-
Quantity of Work Done
Drawing No. Status *) Remarks
Previous This Month Cumulative
- - -
0.02 - 0.02
- - -
3.60 3.60
0.59 - 0.59
- - -
0.35 - 0.35
0.24 - 0.24
0.05 - 0.05
0.21 - 0.21
14122-ED-P2-CVL-DWG-LOFD-5055 (Rev 1)
1.20 - 1.20
-
-
-
0.04 - 0.04
-
-
0.02 - 0.02
- - -
- - -
1.20 1.20
72.59 - 72.59
- - -
54.59 - 54.59
18.00 - 18.00
2.26 - 2.26
23.21 - 23.21
14122-ED-P2-CVL-DWG-LOFD-5051 (Rev 1)
62.90 - 62.90
-
-
-
2.12 - 2.12
-
-
Quantity of Work Done
Drawing No. Status *) Remarks
Previous This Month Cumulative
0.02 - 0.02
0.06 - 0.06
- - -
27.60 27.60
51.14 - 51.14
- - -
40.81 - 40.81
10.32 - 10.32
1.37 - 1.37
10.81 - 10.81
14122-VD-P3-CVL-DWG-AY3102-001 (REV 1) 0.83 0.83
33.66 - 33.66
5.52 - 5.52
-
-
1.06 - 1.06
-
-
- - -
0.11 - 0.11
- - -
16.40 16.40
N BLOWDOWN DRUM
62.36 - 62.36
- - -
51.59 - 51.59
10.77 - 10.77
1.25 - 1.25
17.39 - 17.39
14122-ED-P2-CVL-DWG-LOFD-5045 (Rev ) - -
33.08 - 33.08
- - -
-
-
1.47 - 1.47
-
-
Quantity of Work Done
Drawing No. Status *) Remarks
Previous This Month Cumulative
- 0.02 0.02
0.19 - 0.19
- - -
14.60 14.60
- - -
- - -
- - -
- - -
- - -
11.45 - 11.45
14122-ED-P2-CVL-DWG-LOFD-5047 (Rev 2) - -
6.24 - 6.24
- - -
-
-
1.04 - 1.04
-
-
- - -
0.42 - 0.42
16.00 - 16.00
- -
34.44 - 34.44
- - -
25.54 - 25.54
8.90 - 8.90
1.15 - 1.15
10.04 - 10.04
14122-ED-P2-CVL-DWG-LOFD-5043 (Rev 1) - -
25.58 - 25.58
- - -
-
-
0.97 - 0.97
-
-
Quantity of Work Done
Drawing No. Status *) Remarks
Previous This Month Cumulative
0.04 - 0.04
- - -
- - -
10.00 10.00
77.76 (77.76) -
133.81 133.81
60.89 60.89
43.27 29.65 72.92
216.09 142.90 358.99
4.55 3.36 7.91
24.62 18.65 43.27
7.18 6.25 13.43
6.08 - 6.08
- - -
- - -
- 246.60 246.60
4.27 - 4.27
- - -
1.65 - 1.65
2.63 - 2.63
0.28 - 0.28
4.08 - 4.08
14122-ED-P2-CVL-DWG-EQFD-0072.(R1) - -
7.88 - 7.88
- - -
-
-
0.15 - 0.15
-
-
- 6.00 6.00
- 0.00 0.00
- - -
9.06 9.06
- - -
- - -
- - -
- - -
14122-ED-P2-CVL-DWG-LOFD-5053 (Rev 1)
Quantity of Work Done
Drawing No. Status *) Remarks
Previous This Month Cumulative
-
0.40 - 0.40
14122-ED-P2-CVL-DWG-LOFD-5053 (Rev 1) - -
4.28 - 4.28
- - -
-
-
0.09 - 0.09
-
-
- - -
0.02 - 0.02
- - -
- -
2.50 - 2.50
- - -
2.50 - 2.50
- - -
-
4.37 - 4.37
14122-ED-P2-CVL-DWG-LOFD-5021 (Rev 2) - -
5.20 - 5.20
- - -
-
-
0.73 - 0.73
-
-
0.02 - 0.02
0.01 - 0.01
- - -
3.20 3.20
6.40 - 6.40
- - -
6.40 - 6.40
- - -
14122-ED-P2-CVL-DWG-LOFD-5023 (Rev 1)
Quantity of Work Done
Drawing No. Status *) Remarks
Previous This Month Cumulative
0.14 - 0.14
5.64 - 5.64
14122-ED-P2-CVL-DWG-LOFD-5023 (Rev 1) - -
27.16 - 27.16
- - -
-
-
0.60 - 0.60
-
-
0.01 - 0.01
0.25 - 0.25
- - -
16.40 16.40
28.10 - 28.10
- - -
24.96 - 24.96
3.13 - 3.13
0.63 - 0.63
5.79 - 5.79
14122-ED-P2-CVL-DWG-LOFD-5031 (Rev 1) - -
22.27 - 22.27
- - -
-
-
0.51 - 0.51
-
-
0.04 - 0.04
0.13 - 0.13
- - -
12.40 12.40
11.85 - 11.85
- - -
6.78 - 6.78
5.07 - 5.07
0.70 - 0.70
14122-ED-P2-CVL-DWG-LOFD-5027 (Rev 1)
Quantity of Work Done
Drawing No. Status *) Remarks
Previous This Month Cumulative
9.77 - 9.77
14122-ED-P2-CVL-DWG-LOFD-5027 (Rev 1) - -
32.73 - 32.73
- - -
-
-
1.15 - 1.15
-
-
0.02 - 0.02
0.25 - 0.25
- - -
14.20 14.20
1.35 - 1.35
- - -
0.58 - 0.58
0.77 - 0.77
0.12 - 0.12
1.00 - 1.00
14122-ED-P2-CVL-DWG-LOFD-5016 (Rev 1) - -
5.68 - 5.68
- - -
-
-
0.12 - 0.12
-
-
0.01 - 0.01
- - -
- - -
4.00 4.00
0.51 - 0.51
- - -
0.27 - 0.27
0.24 - 0.24
0.04 - 0.04
0.41 - 0.41
14122-ED-P2-CVL-DWG-LOFD-5057 (Rev 1)
Quantity of Work Done
Drawing No. Status *) Remarks
Previous This Month Cumulative
14122-ED-P2-CVL-DWG-LOFD-5057 (Rev 1) - -
2.67 - 2.67
- - -
-
-
0.16 - 0.16
-
-
0.01 - 0.01
- - -
- - -
1.20 1.20
- - -
- - -
- - -
- - -
- - -
0.13 - 0.13
14122-ED-P2-CVL-DWG-LOFD-5058 (Rev 1) - -
0.80 - 0.80
- - -
-
-
0.06 - 0.06
-
-
- - -
- - -
- - -
- -
9.83 - 9.83
- - -
6.22 - 6.22
3.61 - 3.61
0.25 - 0.25
4.37 - 4.37
14122-ED-CO-CVL-STD-0309 (Rev 3) - -
Quantity of Work Done
Drawing No. Status *) Remarks
14122-ED-CO-CVL-STD-0309 (Rev 3) Previous This Month Cumulative
19.76 - 19.76
- - -
-
-
0.22 - 0.22
-
-
- - -
- - -
- - -
15.30 - 15.30
- - -
12.80 - 12.80
2.50 - 2.50
0.52 - 0.52
3.96 - 3.96
14122-ED-CO-CVL-DWG-LOFD-1106 (Rev 1) - -
20.40 - 20.40
- - -
-
-
0.30 - 0.30
-
-
- - -
- - -
- - -
34.00 34.00
9.72 - 9.72
- - -
9.72 - 9.72
- - -
0.20 - 0.20
0.88 - 0.88
14122-ED-CO-CVL-DWG-RDPV-0210 (Rev 6) - -
Quantity of Work Done
Drawing No. Status *) Remarks
14122-ED-CO-CVL-DWG-RDPV-0210 (Rev 6) Previous This Month Cumulative
11.76 - 11.76
- - -
-
-
- - -
-
-
8.00 - 8.00
18.00 - 18.00
2.40 2.40
T 258.94 - 258.94
168.95 - 168.95
T 89.99 - 89.99
T 6.30 - 6.30
T 76.49 - 76.49
T
39.20 39.20
T 454.18 - 454.18
301.33 - 301.33
T 152.85 - 152.85
14122-ED-CO-CVL-DWG-STD-0105 Rev. 1,
14122-ED-CO-CVL-DWG-SSFD-2301 Rev. 1, T 17.15 0.81 17.96
14122-ED-CO-CVL-DWG-SSFD-2302 Rev. 1,
ERI-CVL-SSFD-001
T 303.00 - 303.00
T 11.34 - 11.34
T 131.22 - 131.22
T
56.00 56.00
Quantity of Work Done
Drawing No. Status *) Remarks
Previous This Month Cumulative
97.02 - 97.02
4.85 - 4.85
62.29 - 62.29
39.58 - 39.58
0.63 - 0.63
3.44 - 3.44
92.72 - 92.72
13.75 - 13.75
14122-ED-P2-CVL-DWG-PTBN-0404 (Rev 1)
0.71 - 0.71
4.59 - 4.59
13.69 - 13.69
14.40 - 14.40
0.08 - 0.08
0.04 - 0.04
56.05 - 56.05
83.22 - 83.22
1.39 - 1.39
55.44 - 55.44
29.17 - 29.17
0.48 - 0.48
2.97 - 2.97
79.92 - 79.92
9.83 - 9.83
14122-ED-P3-CVL-DWG-PTBN-0401 (Rev 1)
0.55 - 0.55
3.82 - 3.82
13.69 - 13.69
12.80 - 12.80
Quantity of Work Done
Drawing No. Status *) Remarks
Previous This Month Cumulative
0.07 - 0.07
0.04 - 0.04
44.65 - 44.65
83.86 - 83.86
13.95 - 13.95
69.91 - 69.91
79.54 - 79.54
1.30 - 1.30
2.85 - 2.85
14122-ED-P3-CVL-DWG-EQFD-0010 (Rev 1)
12.10 - 12.10
105.43 - 105.43
2.45 - 2.45
23.28 - 23.28
26.36 - 26.36
0.12 - 0.12
1.66 - 1.66
23.56 23.56
83.86 - 83.86
13.95 - 13.95
69.91 - 69.91
79.54 - 79.54
1.30 - 1.30
2.85 - 2.85
2.45 - 2.45
23.28 - 23.28
26.36 - 26.36
14122-ED-P3-CVL-DWG-EQFD-0011 (Rev 1)
0.12 - 0.12
1.66 - 1.66
7.50 7.50
83.86 - 83.86
13.95 - 13.95
69.91 - 69.91
78.96 - 78.96
1.30 - 1.30
2.85 - 2.85
2.45 - 2.45
23.28 - 23.28
26.36 - 26.36
0.12 - 0.12
1.66 - 1.66
23.56 23.56
1 696.95 - 696.95
- - -
1 512.87 - 512.87
1 184.08 - 184.08
23.35 - 23.35
- - -
363.41 - 363.41
14122-ED-P3-CVL-DWG-EQFD-0046 (Rev 1) - - -
1 17.40 - 17.40
1 175.35 - 175.35
- - -
Quantity of Work Done
Drawing No. Status *) Remarks
Previous This Month Cumulative
- - -
0.41 - 0.41
88.00 88.00
1 176.47 - 176.47
- - -
1 109.39 - 109.39
1 67.08 - 67.08
8.12 - 8.12
- - -
132.31 - 132.31
14122-ED-P3-CVL-DWG-EQFD-0046 (Rev 1) -
1 4.68 - 4.68
1 68.21 - 68.21
-
- - -
0.29 - 0.29
63.20 63.20
1 176.47 - 176.47
- - -
1 109.39 - 109.39
1 67.08 - 67.08
- - -
8.19 - 8.19
- - -
14122-ED-P3-CVL-DWG-EQFD-0046 (Rev 1)
132.31 - 132.31
- - -
1 4.68 - 4.68
1 68.21 - 68.21
- - -
Quantity of Work Done
Drawing No. Status *) Remarks
Previous This Month Cumulative
0.29 - 0.29
63.20 63.20
666.61 - 666.61
- - -
250.22 - 250.22
416.39 - 416.39
18.13 - 18.13
388.85 - 388.85
92.51 - 92.51
147.33 - 147.33
14122-ED-P3-CVL-DWG-SSFD-2201 &
2202
99.22 - 99.22
783.89 - 783.89
46.42 - 46.42
59.00 - 59.00
- 2.97 2.97
44.80 44.80
397.05 - 397.05
- - -
295.37 - 295.37
101.68 - 101.68
9.62 - 9.62
96.43 - 96.43
- - -
14122-ED-P3-CVL-DWG-SSFD-2223 s/d
2226
193.46 - 193.46
- - -
12.90 - 12.90
- - -
0.23 - 0.23
50.80 50.80
Quantity of Work Done
Drawing No. Status *) Remarks
Previous This Month Cumulative
176.47 - 176.47
109.61 - 109.61
66.86 66.86
4.68 - 4.68
67.86 - 67.86
- - -
14122-ED-P3-CVL-DWG-EQFD-0014 &
0015
131.13 - 131.13
- - -
8.19 - 8.19
- - -
0.29 - 0.29
62.40 62.40
30.69 - 30.69
- - -
21.87 - 21.87
8.82 - 8.82
0.82 - 0.82
8.82 - 8.82
8.14 - 8.14
14122-ED-P3-CVL-DWG-EQFD-0012
9.48 - 9.48
44.30 - 44.30
0.60 - 0.60
1.12 - 1.12
8.00 - 8.00
9.80 9.80
560.46 - 560.46
- - -
409.48 409.48
- 150.98 150.98
14122-ED-P3-CVL-DWG-SSFD-2205 s/d
2208
Quantity of Work Done
Drawing No. Status *) Remarks
Previous This Month Cumulative
13.89 - 13.89
14122-ED-P3-CVL-DWG-SSFD-2205 s/d 139.88 - 139.88
2208 -
141.91 - 141.91
- - -
18.64 - 18.64
-
0.17 - 0.17
38.32 38.32
31.15 - 31.15
22.63 - 22.63
8.52 - 8.52
0.86 - 0.86
8.52 - 8.52
7.22 - 7.22
14122-ED-P3-CVL-DWG-EQFD-0009
9.02 - 9.02
36.99 - 36.99
1.88 - 1.88
1.00 - 1.00
8.00 - 8.00
13.60 13.60
20.96 - 20.96
- - -
15.57 - 15.57
5.39 - 5.39
0.56 - 0.56
5.39 - 5.39
6.41 - 6.41
14122-ED-P3-CVL-DWG-EQFD-0016
14122-ED-P3-CVL-DWG-EQFD-0016 Quantity of Work Done
Drawing No. Status *) Remarks
Previous This Month Cumulative
6.99 - 6.99
30.49 - 30.49
0.82 - 0.82
0.52 - 0.52
8.00 - 8.00
12.60 12.60
609.47 - 609.47
- - -
320.06 - 320.06
- 289.42 289.42
18.13 - 18.13
282.80 - 282.80
52.13 - 52.13
14122-ED-P3-CVL-DWG-SSFD-2215
121.53 - 121.53
(Rev 1)
72.16 - 72.16
672.34 - 672.34
30.43 - 30.43
49.96 - 49.96
2.36 2.36
33.60 33.60
451.08 - 451.08
- - -
307.36 - 307.36
- 143.72 143.72
13.22 - 13.22
133.18 - 133.18
14122-ED-P3-CVL-DWG-SSFD-2205 - - -
(Rev 2)
117.31 - 117.31
11.01 - 11.01
- - -
Quantity of Work Done
Drawing No. Status *) Remarks
Previous This Month Cumulative
0.16 - 0.16
34.40 34.40
14.31 - 14.31
- - -
10.23 - 10.23
4.08 - 4.08
14122-ED-P3-CVL-DWG-AY3102-001
(REV 1)
22.30 - 22.30
0.64 - 0.64
16.01 - 16.01
0.01 - 0.01
8.94 - 8.94
1.00 - 1.00
8.82 - 8.82
- - -
14.8021738 - 14.80
- 5.98 5.98
7.93 - 7.93
21.17 - 21.17
14122-ED-P3-CVL-DWG-EQFD-0051 - - -
(REV 1)
22.23 - 22.23
- - -
0.39 - 0.39
8.00 - 8.00
Quantity of Work Done
Drawing No. Status *) Remarks
Previous This Month Cumulative
12.56 12.56
8.82 - 8.82
-
14.80 - 14.80
5.98 5.98
7.93 - 7.93
14122-ED-P3-CVL-DWG-EQFD-0050 21.17 - 21.17
(REV 1)
22.23 - 22.23
0.39 - 0.39
8.00 - 8.00
12.56 12.56
8.82 - 8.82
- - -
14.80 - 14.80
- 5.98 5.98
7.93 - 7.93
21.17 - 21.17
14122-ED-P3-CVL-DWG-EQFD-0052
(REV 1)
22.23 - 22.23
0.39 - 0.39
8.00 - 8.00
12.56 12.56
14.31 - 14.31
- - -
10.34 - 10.34
3.97 - 3.97
Quantity of Work Done
Drawing No. Status *) Remarks
Previous This Month Cumulative
0.64 - 0.64
-
16.01 - 16.01
0.01 - 0.01
8.74 - 8.74
1.00 - 1.00
47.04 - 47.04
- - -
39.30 - 39.30
- 7.74 7.74
1.15 - 1.15
9.31 - 9.31
14122-ED-P3-CVL-DWG-SSFD-2251
26.64 - 26.64
1.12 - 1.12
0.01 - 0.01
8.00 8.00
19.90 - 19.90
- - -
13.88 - 13.88
- 6.02 6.02
Quantity of Work Done
Drawing No. Status *) Remarks
Previous This Month Cumulative
2.55 - 2.55
6.88 - 6.88
14122-ED-P3-CVL-DWG-SSFD-2235 (Rev 1)
30.37 - 30.37
0.67 - 0.67
0.03 - 0.03
12.80 12.80
6.01 - 6.01
- - -
3.18 - 3.18
- 2.83 2.83
0.34 - 0.34
5.36 - 5.36
14122-ED-P3-CVL-DWG-EQFD-0033.(R1)
P1371.01
17.42 - 17.42
0.18 - 0.18
12.00 - 12.00
16.20 16.20
6.01 - 6.01
- - -
3.18 - 3.18
- 2.83 2.83
0.34 - 0.34
5.36 - 5.36
14122-ED-P3-CVL-DWG-EQFD-0036.(R1)
P1372.01
17.42 - 17.42
14122-ED-P3-CVL-DWG-EQFD-0036.(R1)
P1372.01
Quantity of Work Done
Drawing No. Status *) Remarks
Previous This Month Cumulative
0.18 - 0.18
12.00 - 12.00
16.20 16.20
3.75 - 3.75
- - -
2.02 - 2.02
- 1.73 1.73
0.21 - 0.21
3.27 - 3.27
14122-ED-P3-CVL-DWG-EQFD-0026.(R1)
P1373.03
10.97 - 10.97
0.11 - 0.11
8.00 - 8.00
10.20 10.20
1.94 - 1.94
- - -
0.36 - 0.36
- 0.89 0.89
0.11 - 0.11
1.69 - 1.69
14122-ED-P3-CVL-DWG-EQFD-0026.(R1)
P1373.03
5.70 - 5.70
0.06 - 0.06
4.00 - 4.00
5.30 5.30
Quantity of Work Done
Drawing No. Status *) Remarks
Previous This Month Cumulative
14.31 - 14.31
- - -
11.58 - 11.58
- 2.73 2.73
16.38 - 16.38
0.51 - 0.51
0.01 - 0.01
6.58 - 6.58
1.00 - 1.00
6.00 6.00
11.91 - 11.91
- - -
10.28 - 10.28
- 1.63 1.63
13.08 - 13.08
0.39 - 0.39
0.00 - 0.005
5.98 - 5.98
1.00 - 1.00
Quantity of Work Done
Drawing No. Status *) Remarks
Previous This Month Cumulative
5.20 5.20
49.08 - 49.08
2.40 - 2.40
38.84 - 38.84
12.64 - 12.64
0.27 - 0.27
1.27 (0.27) 1.00
5.13 - 5.13
3.80 - 3.80
37.92 - 37.92
14122-VD-P3-CVL-DWG-AY3102-001 (REV 1)
0.13 - 0.13
0.80 - 0.80
8.00 - 8.00
-
-
0.01 - 0.01
18.43 - 18.43
1.00 - 1.00
2.00 2.00
37.83 - 37.83
- - -
33.86 - 33.86
- 3.97 3.97
20.37 - 20.37
0.58 - 0.58
Quantity of Work Done
Drawing No. Status *) Remarks
Previous This Month Cumulative
0.01 - 0.01
8.73 - 8.73
1.00 - 1.00
16.01 16.01
46.71 - 46.71
0.76 - 0.76
36.42 - 36.42
11.05 - 11.05
3.70 - 3.70
14122-VD-P3-CVL-DWG-AY3102-001 (REV 1) 34.38 - 34.38
0.11 - 0.11
0.83 - 0.83
7.60 - 7.60
-
-
0.01 - 0.01
16.51 - 16.51
1.00 - 1.00
2.00 2.00
46.71 - 46.71
1.52 - 1.52
37.00 - 37.00
11.23 - 11.23
14122-VD-P3-CVL-DWG-AY3102-001 (REV 1)
Quantity of Work Done
Drawing No. Status *) Remarks
Previous This Month Cumulative
3.70 - 3.70
14122-VD-P3-CVL-DWG-AY3102-001 (REV 1) 35.04 - 35.04
0.11 - 0.11
0.86 - 0.86
7.60 - 7.60
-
-
0.01 - 0.01
16.79 - 16.79
1.00 - 1.00
3.00 3.00
8.47 - 8.47
- - -
7.52 - 7.52
- 0.95 0.95
0.14 - 0.14
0.95 - 0.95
2.18 2.18
14122-ED-P3-CVL-DWG-EQFD-0010
5.19 - 5.19
16.63 - 16.63
0.14 - 0.14
0.35 - 0.35
0.01 - 0.01
5.60 5.60
3.19 - 3.19
- - -
1.83 - 1.83
- 1.36 1.36
0.17 - 0.17
2.56 - 2.56
14122-ED-P3-CVL-DWG-EQFD-0031.(R1)
P2373.01 A/B
14122-ED-P3-CVL-DWG-EQFD-0031.(R1)
Quantity of Work Done
Drawing No. Status *) Remarks
P2373.01 A/B Previous This Month Cumulative
9.68 - 9.68
0.08 - 0.08
- - -
8.00 - 8.00
9.00 9.00
1.94 - 1.94
- - -
1.04 - 1.04
- 0.89 0.89
0.11 - 0.11
1.69 - 1.69
14122-ED-P3-CVL-DWG-EQFD-0030.(R1)
P2373.03
5.70 - 5.70
0.06 - 0.06
- - -
4.00 - 4.00
5.30 5.30
6.34 - 6.34
- - -
3.28 - 3.28
3.06 - 3.06
0.36 - 0.36
5.81 - 5.81
14122-ED-P3-CVL-DWG-EQFD-0043.(R1)
P2371.01 1st STRIPPED SLURRY PUMP
18.06 - 18.06
0.18 - 0.18
Quantity of Work Done
Drawing No. Status *) Remarks
Previous This Month Cumulative
12.00 - 12.00
16.80 16.80
52.32 - 52.32
2.40 - 2.40
42.08 - 42.08
12.64 - 12.64
3.80 - 3.80
14122-VD-P3-CVL-DWG-AY3102-001 (REV 1) 37.62 - 37.62
0.13 - 0.13
0.80 - 0.80
8.00 - 8.00
-
-
0.02 - 0.02
18.82 - 18.82
1.00 - 1.00
3.00 3.00
Quantity of Work Done
Drawing No. Status *) Remarks
Previous This Month Cumulative
05 HC BLEND RECYCLING PUMP
24.35 - 24.35
- - -
8.76 - 8.76
- 15.59 15.59
1.64 - 1.64
37.45 - 37.45
14122-ED-P3-CVL-DWG-EQFD-0020.(R1)
69.35 - 69.35
0.62 - 0.62
30.00 - 30.00
40.80 40.80
4.45 - 4.45
- - -
2.18 - 2.18
- 2.26 2.26
0.26 - 0.26
4.31 - 4.31
14122-ED-P3-CVL-DWG-EQFD-0019.(R1)
12.05 - 12.05
0.14 - 0.14
8.00 - 8.00
11.20 11.20
3.55 - 3.55
- - -
1.57 - 1.57
1.98 1.98
14122-ED-P3-CVL-DWG-EQFD-0021.(R1)
Quantity of Work Done
Drawing No. Status *) Remarks
Previous This Month Cumulative
0.22 - 0.22
5.23 - 5.23
14122-ED-P3-CVL-DWG-EQFD-0021.(R1)
12.77 - 12.77
0.11 - 0.11
6.00 - 6.00
8.60 8.60
8.15 - 8.15
-
2.94 - 2.94
5.22 5.22
0.55 - 0.55
12.28 - 12.28
14122-ED-P3-CVL-DWG-EQFD-0022.(R1)
15.44 - 15.44
0.24 - 0.24
10.00 - 10.00
13.60 13.60
4.45 - 4.45
-
2.18 - 2.18
2.26 2.26
0.26 - 0.26
4.31 - 4.31
-
14122-ED-P3-CVL-DWG-EQFD-0023.(R1)
12.04 - 12.04
14122-ED-P3-CVL-DWG-EQFD-0023.(R1)
0.15 - 0.15
10.00 - 10.00
11.20 11.20
8.15 - 8.15
- - -
2.94 - 2.94
5.22 5.22
0.55 - 0.55
12.28 - 12.28
-
14122-ED-P3-CVL-DWG-EQFD-0024.(R1)
15.44 - 15.44
0.27 - 0.27
10.00 - 10.00
28.75 28.75
3.55 - 3.55
- - -
1.57 - 1.57
1.98 1.98
0.22 - 0.22
5.33 - 5.33
-
14122-ED-P3-CVL-DWG-EQFD-0025.(R1)
13.03 - 13.03
0.14 - 0.14
6.00 - 6.00
8.60 8.60
Quantity of Work Done
Drawing No. Status *) Remarks
Previous This Month Cumulative
1.24 - 1.24
- - -
0.77 - 0.77
0.47 0.47
0.06 - 0.06
0.87 - 0.87
-
14122-ED-P3-CVL-DWG-EQFD-0002.(R1)
3.85 - 3.85
0.06 - 0.06
0.00 - 0.004
3.60 3.60
1.41 - 1.41
-
0.84 - 0.84
0.57 0.57
0.07 - 0.07
1.07 - 1.07
-
14122-ED-P3-CVL-DWG-EQFD-0002.(R1)
4.28 - 4.28
0.08 - 0.08
0.00 - 0.004
4.000 4.000
2.97 - 2.97
- - -
1.35 - 1.35
1.62 1.62
0.18 - 0.18
14122-ED-P3-CVL-DWG-EQFD-0039.(R2)
Quantity of Work Done
Drawing No. Status *) Remarks
Previous This Month Cumulative
2.52 - 2.52
-
14122-ED-P3-CVL-DWG-EQFD-0039.(R2)
6.30 - 6.30
0.07 - 0.07
4.00 - 4.00
7.20 7.20
6.69 - 6.69
- - -
2.89 - 2.89
3.80 3.80
0.42 - 0.42
5.92 - 5.92
-
14122-ED-P3-CVL-DWG-EQFD-0040.(R1)
13.65 - 13.65
0.16 - 0.16
8.00 - 8.00
15.60 15.60
2.34 - 2.34
- - -
1.16 - 1.16
1.18 1.18
0.14 - 0.14
1.90 - 1.90
-
14122-ED-P3-CVL-DWG-EQFD-0042.(R1)
5.46 - 5.46
14122-ED-P3-CVL-DWG-EQFD-0042.(R1)
4.00 - 4.00
6.00 6.00
146.94 - 146.94
- - -
116.20 - 116.20
30.74 30.74
3.84 - 3.84
32.41 - 32.41
-
14122-ED-P3-CVL-DWG-SSFD-2230 (Rev 1)
67.43 - 67.43
3.13 - 3.13
0.05 - 0.05
21.60 21.60
3.34 - 3.34
- - -
1.44 - 1.44
1.90 1.90
0.21 - 0.21
2.94 - 2.94
-
14122-ED-P3-CVL-DWG-EQFD-0028.(R1)
6.79 - 6.79
0.09 - 0.09
4.00 - 4.00
7.80 7.80
Quantity of Work Done
Drawing No. Status *) Remarks
Previous This Month Cumulative
2.34 - 2.34
0.25 (0.25) -
1.16 - 1.16
1.18 1.18
0.14 - 0.14
1.82 - 1.82
-
14122-ED-P3-CVL-DWG-EQFD-0029.(R1)
5.22 - 5.22
0.07 - 0.07
4.00 - 4.00
6.00 6.00
0.86 - 0.86
- - -
0.61 - 0.61
0.25 - 0.25
0.04 - 0.04
0.50 - 0.50
-
14122-ED-P3-CVL-DWG-EQFD-0048.(R1)
3.07 - 3.07
0.03 - 0.03
4.00 - 4.00
2.60 2.60
1.72 - 1.72
- - -
1.22 - 1.22
- 0.49 0.49
0.07 - 0.07
0.97 - 0.97
14122-ED-P3-CVL-DWG-EQFD-0055.(R1)
Quantity of Work Done
Drawing No. Status *) Remarks
Previous This Month Cumulative
-
14122-ED-P3-CVL-DWG-EQFD-0055.(R1)
5.98 - 5.98
0.06 - 0.06
8.00 - 8.00
5.20 5.20
0.86 - 0.86
-
0.61 - 0.61
- 0.25 0.25
0.04 - 0.04
0.50 - 0.50
-
14122-ED-P3-CVL-DWG-EQFD-0047.(R1)
3.07 - 3.07
0.03 - 0.03
4.00 - 4.00
2.60 2.60
1.72 - 1.72
- - -
1.22 - 1.22
0.49 - 0.49
0.07 - 0.07
0.95 - 0.95
-
14122-ED-P3-CVL-DWG-EQFD-0053.(R1)
5.85 - 5.85
0.05 - 0.05
14122-ED-P3-CVL-DWG-EQFD-0053.(R1)
8.00 - 8.00
5.20 5.20
0.86 - 0.86
- - -
0.61 - 0.61
0.25 - 0.25
0.04 - 0.04
0.51 - 0.51
-
14122-ED-P3-CVL-DWG-EQFD-0053.(R1)
3.12 - 3.12
0.03 - 0.03
4.00 - 4.00
2.60 2.60
1.72 - 1.72
- - -
1.22 - 1.22
0.49 - 0.49
0.07 - 0.07
0.97 - 0.97
-
14122-ED-P3-CVL-DWG-EQFD-0054.(R1)
5.98 - 5.98
0.06 - 0.06
8.00 - 8.00
5.20 5.20
78.94 - 78.94
Quantity of Work Done
Drawing No. Status *) Remarks
Previous This Month Cumulative
- - -
60.74 - 60.74
- 18.20 18.20
1.85 - 1.85
19.14 - 19.14
-
14122-ED-P3-CVL-DWG-SSFD-2245
49.12 - 49.12
1.44 - 1.44
0.03 - 0.03
16.00 16.00
33.71 - 33.71
- - -
31.31 - 31.31
2.40 2.40
0.10 - 0.10
1.90 - 1.90
-
18.62 - 18.62
14122-ED-CO-CVL-PTBN-0603 (REV 1)
0.20 - 0.20
3.20 - 3.20
-
-
0.02 - 0.017
- - -
6.40 - 6.40
- 0.32 0.32
6.40 6.40
Quantity of Work Done
Drawing No. Status *) Remarks
Previous This Month Cumulative
46.71 - 46.71
0.76 - 0.76
36.42 - 36.42
11.05 - 11.05
3.70 - 3.70
14122-VD-P3-CVL-DWG-AY3102-001 (REV 1) 37.02 - 37.02
0.11 - 0.11
0.86 - 0.86
7.60 - 7.60
-
-
0.02 - 0.015
73.59 - 73.59
-
53.93 - 53.93
19.66 19.66
1.81 - 1.81
18.93 - 18.93
-
14122-ED-P3-CVL-DWG-SSFD-2240
46.86 - 46.86
1.31 - 1.31
0.04 - 0.04
14.40 14.40
Quantity of Work Done
Drawing No. Status *) Remarks
Previous This Month Cumulative
96.73 - 96.73
-
63.84 - 63.84
32.89 32.89
-
-
5.32 - 5.32
51.62 - 51.62
-
CONCRETE DIKE FOR 1360 BLENDING -
AREA -
319.45 - 319.45
- - -
-
-
6.97 - 6.97
- - -
-
-
0.12 - 0.12
158.05 158.05
110.63 - 110.63
- - -
65.22 - 65.22
45.40 - 45.40
-
-
5.18 - 5.18
61.61 - 61.61
- - -
-
14122-ED-P2-CVL-DWG-DIKE-1501 (Rev 2)
-
302.32 - 302.32
- - -
-
-
11.87 - 11.87
- - -
-
-
0.09 - 0.09
140.50 140.50
7.68 - 7.68
- - -
Quantity of Work Done
Drawing No. Status *) Remarks
Previous This Month Cumulative
6.71 (0.10) 6.61
0.97 0.10 1.07
0.07 - 0.07
0.42 (0.14) 0.28
-
14122-ED-CO-CVL-STD-0302 (REV 2)
-
-
0.00 (0.00) 0.00
- - -
0.64 0.64
4.00 4.00
7.20 - 7.20
- - -
6.30 - 6.30
0.90 - 0.90
0.06 - 0.06
0.29 - 0.29
-
4.60 - 4.60
14122-ED-CO-CVL-STD-0302 (REV 2)
0.05 - 0.05
-
-
0.00 - 0.00
- - -
Quantity of Work Done
Drawing No. Status *) Remarks
Previous This Month Cumulative
2.27 - 2.27
0.48 0.48
5.60 5.60
11.16 - 11.16
- - -
9.73 - 9.73
1.43 - 1.43
0.18 - 0.18
- - -
-
14122-ED-P2-CVL-DRSW-0401 (REV 2) 1.09 - 1.09
5.00 - 5.00
0.08 - 0.08
- - -
11.16 - 11.16
- - -
9.73 - 9.73
1.43 - 1.43
0.18 - 0.18
- - -
-
14122-ED-P2-CVL-DRSW-0401 (REV 2) 1.00 - 1.00
5.00 - 5.00
0.08 - 0.08
Quantity of Work Done
Drawing No. Status *) Remarks
Previous This Month Cumulative
1,673.97 - 1,673.97
969.98 - 969.98
105.51 - 105.51
612.06 - 612.06
197.29 197.29
53.07 - 53.07
133.67 - 133.67
101.07 - 101.07
1.50 - 1.50
- - -
- - -
10.00 - 10.00
- - -
- - -
111.46 - 111.46
100.00 - 100.00
431.18 - 431.18
87.00 - 87.00
- -
- -
- -
- -
- -
- -
6.00 6.00
13.00 13.00
- -
7.00 7.00
- -
- -
- -
- -
2.00 2.00
- -
8.00 8.00
- -
- -
- -
- -
- -
404.42 (404.42) -
404.42 404.42
172.53 172.53
212.46 - 212.46
1,358.85 - 1,358.85
Quantity of Work Done
Drawing No. Status *) Remarks
Previous This Month Cumulative
22.91 - 22.91
143.06 - 143.06
0.42 - 0.42
14.63 - 14.63
197.77 18.10 215.86
3.07 0.06 3.13
953.78 953.78
- - -
- - -
- - -
- - -
-
-
- -
1.30 - 1.30
14122-ED-P3-CVL-DWG-SSFD-5021 (Rev 2)
-
-
8.64 - 8.64
-
-
-
0.19 - 0.19
-
-
0.02 - 0.02
- - -
72.00 - 72.00
Quantity of Work Done
Drawing No. Status *) Remarks
Previous This Month Cumulative
1.44 1.44
- - -
- - -
- - -
- - -
-
-
0.43 - 0.43
14122-ED-P3-CVL-DWG-SSFD-5023 (Rev 2)
-
-
2.88 - 2.88
-
-
-
0.06 - 0.06
-
-
0.01 - 0.01
- - -
24.00 - 24.00
1.44 1.44
,P1361.06,P1361.05,P1361.01A
56.26 - 56.26
- - -
35.56 - 35.56
20.70 - 20.70
-
-
2.02 2.02
29.44 - 29.44
14122-ED-P3-CVL-DWG-LOFD-5025 (Rev 1)
-
-
47.59 - 47.59
-
-
-
2.42 - 2.42
-
-
0.01 - 0.01
0.63 - 0.63
- - -
Quantity of Work Done
Drawing No. Status *) Remarks
Previous This Month Cumulative
19.70 19.70
30.37 - 30.37
- - -
17.99 - 17.99
12.38 - 12.38
-
-
1.99 - 1.99
11.23 - 11.23
14122-ED-P3-CVL-DWG-LOFD-5027 (Rev 1)
-
-
28.41 - 28.41
-
-
-
0.92 - 0.92
-
-
0.01 - 0.01
0.20 - 0.20
- - -
16.20 16.20
29.98 - 29.98
- - -
19.28 - 19.28
10.70 - 10.70
-
-
1.33 - 1.33
18.34 - 18.34
14122-ED-P3-CVL-DWG-LOFD-5035 (Rev 1)
-
-
35.63 - 35.63
-
-
-
1.67 - 1.67
-
-
0.01 - 0.01
0.41 - 0.41
- - -
Quantity of Work Done
Drawing No. Status *) Remarks
Previous This Month Cumulative
14.60 14.60
34.44 - 34.44
- - -
22.10 - 22.10
12.34 - 12.34
-
-
1.54 - 1.54
13.95 - 13.95
14122-ED-P3-CVL-DWG-LOFD-5033 (Rev 1)
-
-
33.31 - 33.31
-
-
-
1.33 - 1.33
-
-
0.03 - 0.03
0.13 - 0.13
- - -
21.60 21.60
- - -
- - -
- - -
- - -
-
-
0.95 - 0.95
2.15 - 2.15
14122-ED-P3-CVL-DWG-LOFD-5029 (Rev 1)
-
-
6.30 - 6.30
-
-
-
0.51 - 0.51
-
-
0.02 - 0.02
- - -
- - -
Quantity of Work Done
Drawing No. Status *) Remarks
Previous This Month Cumulative
- -
- - -
- - -
- - -
- - -
-
-
0.99 - 0.99
1.90 - 1.90
14122-ED-P3-CVL-DWG-LOFD-5031 (Rev 1)
-
-
5.04 - 5.04
-
-
-
0.39 - 0.39
-
-
0.02 - 0.02
- - -
- - -
- -
10.13 - 10.13
- - -
10.13 - 10.13
- - -
-
-
0.48 - 0.48
2.83 - 2.83
14122-ED-P3-CVL-DWG-LOFD-5059 (Rev 1)
-
-
8.45 - 8.45
-
-
-
0.24 - 0.24
-
-
0.01 - 0.01
- - -
Quantity of Work Done
Drawing No. Status *) Remarks
Previous This Month Cumulative
- - -
6.00 6.00
Quantity of Work Done
Drawing No. Status *) Remarks
Previous This Month Cumulative
- - -
- - -
- - -
- - -
-
-
0.60 - 0.60
1.16 - 1.16
14122-ED-P3-CVL-DWG-LOFD-5041 (Rev 1)
-
-
5.36 - 5.36
-
-
-
0.26 - 0.26
-
-
- - -
0.12 - 0.12
- - -
- -
31.37 - 31.37
- - -
24.88 - 24.88
6.49 - 6.49
-
-
1.41 - 1.41
9.24 - 9.24
14122-ED-P3-CVL-DWG-LOFD-5053 (Rev 1)
-
-
43.66 - 43.66
-
-
-
0.80 - 0.80
-
-
0.01 - 0.01
0.19 - 0.19
- - -
39.70 39.70
Quantity of Work Done
Drawing No. Status *) Remarks
Previous This Month Cumulative
23.66 - 23.66
- - -
14.77 - 14.77
8.89 - 8.89
-
-
1.26 - 1.26
10.76 - 10.76
14122-ED-P3-CVL-DWG-LOFD-5051 (Rev 1)
-
-
27.08 - 27.08
-
-
-
1.19 - 1.19
-
-
0.02 - 0.02
0.18 - 0.18
- - -
10.80 10.80
- - -
- - -
- - -
- - -
-
-
- - -
4.90 - 4.90
14122-ED-P3-CVL-DWG-LOFD-5039 (Rev 1)
-
-
14.50 - 14.50
-
-
-
0.68 - 0.68
-
-
0.01 - 0.01
0.24 - 0.24
- - -
- -
Quantity of Work Done
Drawing No. Status *) Remarks
Previous This Month Cumulative
- - -
- - -
- - -
- - -
-
-
- - -
5.56 - 5.56
14122-ED-P3-CVL-DWG-LOFD-5037 (Rev 1)
-
-
17.14 - 17.14
-
-
-
0.80 - 0.80
-
-
0.01 - 0.01
- - -
- - -
- -
10.46 - 10.46
- - -
10.46 - 10.46
- - -
-
-
1.13 - 1.13
6.02 - 6.02
14122-ED-P3-CVL-DWG-LOFD-5045 (Rev 1)
-
-
22.81 - 22.81
-
-
-
0.35 - 0.35
-
-
0.01 - 0.01
0.03 - 0.03
- - -
12.20 12.20
Quantity of Work Done
Drawing No. Status *) Remarks
Previous This Month Cumulative
- - -
- - -
- - -
- - -
-
-
0.47 - 0.47
0.90 - 0.90
14122-ED-P3-CVL-DWG-LOFD-5049 (Rev 1)
-
-
4.08 - 4.08
-
-
-
0.20 - 0.20
-
-
0.01 - 0.01
0.03 - 0.03
-
- -
5.07 - 5.07
- - -
5.07 - 5.07
- - -
-
-
0.90 - 0.90
2.61 - 2.61
14122-ED-P3-CVL-DWG-LOFD-5047 (Rev 1)
-
-
8.64 - 8.64
-
-
-
0.36 - 0.36
-
-
0.01 - 0.01
0.03 - 0.03
- - -
2.00 2.00
Quantity of Work Done
Drawing No. Status *) Remarks
Previous This Month Cumulative
- - -
- - -
- - -
- - -
-
-
- - -
5.43 - 5.43
14122-ED-P3-CVL-DWG-LOFD-5043 (Rev 1)
-
-
16.14 - 16.14
-
-
-
0.47 - 0.47
-
-
0.01 - 0.01
0.29 - 0.29
- - -
- -
149.09 (149.09) -
149.09 149.09
67.60 67.60
81.49 - 81.49
411.07 - 411.07
9.09 - 9.09
42.34 - 42.34
5.64 - 5.64
4.07 0.26 4.33
32.87 32.87
0.50 - 0.50
94.00 94.00
28.22 - 28.22
- - -
28.22 - 28.22
- - -
-
-
0.36 - 0.36
4.13 - 4.13
14122-ED-P3-CVL-DWG-LOFD-5011 (Rev 2)
Quantity of Work Done
Drawing No. Status *) Remarks
14122-ED-P3-CVL-DWG-LOFD-5011 (Rev 2) Previous This Month Cumulative
-
-
19.80 - 19.80
-
-
-
0.39 - 0.39
-
-
0.01 - 0.01
- - -
- - -
- - -
- - -
- - -
- - -
-
-
0.72 - 0.72
2.38 - 2.38
14122-ED-P3-CVL-DWG-LOFD-5055 (Rev 1)
-
-
8.62 - 8.62
-
-
-
0.30 - 0.30
-
-
0.02 - 0.02
0.16 - 0.16
- - -
- -
10.83 - 10.83
- - -
8.94 - 8.94
1.89 - 1.89
-
-
0.11 - 0.11
1.25 - 1.25
-
-
14122-ED-P3-CVL-DWG--DRSW-0401 (REV
3)
Quantity of Work Done
Drawing No. Status *) Remarks
Previous This Month Cumulative
-
14.14 - 14.14
14122-ED-P3-CVL-DWG--DRSW-0401 (REV -
3) -
-
0.13 - 0.13
-
-
-
0.01 - 0.01
-
-
-
6.73 - 6.73
-
-
- 1.00 1.00
5.20 5.20
7.37 - 7.37
- - -
4.66 - 4.66
2.71 - 2.71
-
-
0.19 - 0.19
3.28 - 3.28
14122-ED-CO-CVL-DWG-LOFD-2501 (Rev 1) -
-
-
14.82 - 14.82
-
-
-
0.17 - 0.17
16.74 - 16.74
- - -
14.01 - 14.01
2.73 - 2.73
-
-
0.57 - 0.57
4.32 - 4.32
14122-ED-CO-CVL-DWG-LOFD-1106 (Rev 1)
Quantity of Work Done
Drawing No. Status *) Remarks
Previous This Month Cumulative
14122-ED-CO-CVL-DWG-LOFD-1106 (Rev 1) -
-
-
22.32 - 22.32
-
-
-
0.38 - 0.38
-
-
37.20 37.20
8.51 - 8.51
- - -
8.51 - 8.51
- - -
-
-
0.18 - 0.18
0.77 - 0.77
14122-ED-CO-CVL-DWG-RDPV-0211 (Rev 6) -
-
-
10.32 - 10.32
-
-
-
-
-
-
-
-
8.00 - 8.00
16.00 - 16.00
2.40 2.40
1.78 - 1.78
- - -
0.96 - 0.96
0.82 - 0.82
-
-
0.10 - 0.10
1.54 - 1.54
-
14122-ED-P3-CVL-DWG-EQFD-0056.(R1)
-
5.14 - 5.14
-
14122-ED-P3-CVL-DWG-EQFD-0056.(R1)
Quantity of Work Done
Drawing No. Status *) Remarks
Previous This Month Cumulative
-
-
0.06 - 0.06
-
-
-
4.00 - 4.00
4.80 4.80
2.19 - 2.19
- - -
1.09 - 1.09
1.10 - 1.10
-
-
0.13 - 0.13
2.07 - 2.07
-
14122-ED-P3-CVL-DWG-EQFD-0057.(R1)
-
5.99 - 5.99
-
-
-
0.06 - 0.06
-
-
-
4.00 - 4.00
5.60 5.60
2 PIPE RACK-02-2
Calculation Ref. No : SSP-CVL2-FDN-PR02-2.1
237 of 476
Progress per Item Calculation As of
CIVIL 2
CUMULATIVE QUANTITY
NO. AREA ITEM CODE WORK ITEM
Qty WidthDepth Length
238 of 476
Progress per Item Calculation As of
CIVIL 2
CUMULATIVE QUANTITY
NO. AREA ITEM CODE WORK ITEM
Qty WidthDepth Length
CO-2A Concrete for Sub-STR.
CO-3A Concrete for Super-STR.
RE-1A Re-Bar for Sub-STR. (Deformed)
RE-2A Re-Bar for Super-STR. (Deformed)
JT-4A Water Stop Plate
AN-1A Anchor Box
JT-5A Isolation Joint
239 of 476
Progress per Item Calculation As of
CIVIL 2
CUMULATIVE QUANTITY
NO. AREA ITEM CODE WORK ITEM
Qty WidthDepth Length
EA-1A Excavation by Equipment (D≦3.0M)
EA-1B Excavation by Equipment (D>3.0M)
EA-2A Backfilling (Excavated Soil)
EA-3B Disposal of Soil (Outside of Factory)
CO-1A Leveling Concrete
FM-1A Form for Sub-STR.
FM-2A Form for Super-STR.
CO-2A Concrete for Sub-STR.
CO-3A Concrete for Super-STR.
RE-1A Re-Bar for Sub-STR. (Deformed)
RE-2A Re-Bar for Super-STR. (Deformed)
AN-2B Anchor Bolt W/O Template Setting
JT-5A Isolation Joint
240 of 476
Progress per Item Calculation As of
CIVIL 2
CUMULATIVE QUANTITY
NO. AREA ITEM CODE WORK ITEM
Qty WidthDepth Length
241 of 476
Progress per Item Calculation As of
CIVIL 2
CUMULATIVE QUANTITY
NO. AREA ITEM CODE WORK ITEM
Qty WidthDepth Length
CO-3A Concrete for Super-STR.
RE-1A Re-Bar for Sub-STR. (Deformed)
RE-2A Re-Bar for Super-STR. (Deformed)
AN-2B Anchor Bolt W/O Template Setting
JT-5A Isolation Joint
242 of 476
Progress per Item Calculation As of
CIVIL 2
CUMULATIVE QUANTITY
NO. AREA ITEM CODE WORK ITEM
Qty WidthDepth Length
FM-1A Form for Sub-STR.
FM-2A Form for Super-STR.
CO-2A Concrete for Sub-STR.
CO-3A Concrete for Super-STR.
RE-1A Re-Bar for Sub-STR. (Deformed)
RE-2A Re-Bar for Super-STR. (Deformed)
AN-2B Anchor Bolt W/O Template Setting
AN-3B-1 Embedded Steel Supply & Setting(Carbon Steel)
JT-5A Isolation Joint
19 P2- CMH01 AREA COC MAIN HOLE TYPE 2 PLAN, SECTION- A/B/C
Calculation Ref. No : SSP-CVL2-CMH01-P2C0C
20 P2- CMH02 AREA COC MAIN HOLE TYPE 2 PLAN, SECTION- A/B/C
Calculation Ref. No : SSP-CVL2-CMH02-P2C0C
243 of 476
Progress per Item Calculation As of
CIVIL 2
CUMULATIVE QUANTITY
NO. AREA ITEM CODE WORK ITEM
Qty WidthDepth Length
244 of 476
Progress per Item Calculation As of
CIVIL 2
CUMULATIVE QUANTITY
NO. AREA ITEM CODE WORK ITEM
Qty WidthDepth Length
PLA-6A Grouting (Non shrink)
JT-5A Isolation Joint
245 of 476
Progress per Item Calculation As of
CIVIL 2
CUMULATIVE QUANTITY
NO. AREA ITEM CODE WORK ITEM
Qty WidthDepth Length
CO-3A Concrete for Super-STR.
RE-1A Re-Bar for Sub-STR. (Deformed)
RE-2A Re-Bar for Super-STR. (Deformed)
AN-2B Anchor Bolt W/O Template Setting
JT-5A Isolation Joint
246 of 476
Progress per Item Calculation As of
CIVIL 2
CUMULATIVE QUANTITY
NO. AREA ITEM CODE WORK ITEM
Qty WidthDepth Length
FM-1A Form for Sub-STR.
FM-2A Form for Super-STR.
CO-2A Concrete for Sub-STR.
CO-3A Concrete for Super-STR.
RE-1A Re-Bar for Sub-STR. (Deformed)
RE-2A Re-Bar for Super-STR. (Deformed)
AN-1A Anchor Bolt W/O Template Setting
JT-5A Isolation Joint
29 P2- AMH01 AREA COC MAIN HOLE TYPE 2 PLAN, SECTION- A/B
Calculation Ref. No : SSP-CVL2-AMH01-P2C0C
30 P2- AMH02 AREA COC MAIN HOLE TYPE 2 PLAN, SECTION- A/B
Calculation Ref. No : SSP-CVL2-AMH02-P2C0C
247 of 476
Progress per Item Calculation As of
CIVIL 2
CUMULATIVE QUANTITY
NO. AREA ITEM CODE WORK ITEM
Qty WidthDepth Length
248 of 476
Progress per Item Calculation As of
CIVIL 2
CUMULATIVE QUANTITY
NO. AREA ITEM CODE WORK ITEM
Qty WidthDepth Length
AN-1A Anchor Box
JT-5A Isolation Joint
249 of 476
Progress per Item Calculation As of
CIVIL 2
CUMULATIVE QUANTITY
NO. AREA ITEM CODE WORK ITEM
Qty WidthDepth Length
CO-3A Concrete for Super-STR.
RE-1A Re-Bar for Sub-STR. (Deformed)
RE-2A Re-Bar for Super-STR. (Deformed)
AN-1A Anchor Box
JT-5A Isolation Joint
250 of 476
Progress per Item Calculation As of
CIVIL 2
CUMULATIVE QUANTITY
NO. AREA ITEM CODE WORK ITEM
Qty WidthDepth Length
38 FOUNDATION P.1353.01 A/B RECYCLE SOLVENT PUPM
Calculation Ref. No : SSP-CVL2-FDN-P.1353.01 A/B
251 of 476
Progress per Item Calculation As of
CIVIL 2
CUMULATIVE QUANTITY
NO. AREA ITEM CODE WORK ITEM
Qty WidthDepth Length
JT-5A Isolation Joint
252 of 476
Progress per Item Calculation As of
CIVIL 2
CUMULATIVE QUANTITY
NO. AREA ITEM CODE WORK ITEM
Qty WidthDepth Length
RE-1A Re-Bar for Sub-STR. (Deformed)
RE-2A Re-Bar for Super-STR. (Deformed)
AN-2B Anchor Bolt W/O Template Setting
JT-5A Isolation Joint
253 of 476
Progress per Item Calculation As of
CIVIL 2
CUMULATIVE QUANTITY
NO. AREA ITEM CODE WORK ITEM
Qty WidthDepth Length
CO-1A Leveling Concrete
FM-1A Form for Sub-STR.
FM-2A Form for Super-STR.
CO-2A Concrete for Sub-STR.
CO-3A Concrete for Super-STR.
RE-1A Re-Bar for Sub-STR. (Deformed)
RE-2A Re-Bar for Super-STR. (Deformed)
AN-2B Anchor Bolt W/O Template Setting
PLA-6A Grouting (Non shrink)
JT-5A Isolation Joint
254 of 476
Progress per Item Calculation As of
CIVIL 2
CUMULATIVE QUANTITY
NO. AREA ITEM CODE WORK ITEM
Qty WidthDepth Length
Calculation Ref. No : SSP-CVL2-FDN-P.6318.02 A/B
255 of 476
Progress per Item Calculation As of
CIVIL 2
CUMULATIVE QUANTITY
NO. AREA ITEM CODE WORK ITEM
Qty WidthDepth Length
RE-2A Re-Bar for Super-STR. (Deformed)
AN-1A Anchor Box
PLA-6A Grouting (Non shrink)
JT-5A Isolation Joint
256 of 476
Progress per Item Calculation As of
CIVIL 2
CUMULATIVE QUANTITY
NO. AREA ITEM CODE WORK ITEM
Qty WidthDepth Length
52 FOUNDATION P.2352.02 CONCENTRATED POLYMER SOLUTION PUMP ( 2nd STAGE)
Calculation Ref. No : SSP-CVL2-FDN-2350 - P2352.02 CPSP
257 of 476
Progress per Item Calculation As of
CIVIL 2
CUMULATIVE QUANTITY
NO. AREA ITEM CODE WORK ITEM
Qty WidthDepth Length
RE-2A Re-Bar for Super-STR. (Deformed)
AN-1A Anchor Box
PLA-6A Grouting (Non shrink)
JT-5A Isolation Joint
258 of 476
Progress per Item Calculation As of
CIVIL 2
CUMULATIVE QUANTITY
NO. AREA ITEM CODE WORK ITEM
Qty WidthDepth Length
EA-3B Disposal of Soil (Outside of Factory)
CO-1A Leveling Concrete
FM-1A Form for Sub-STR.
FM-2A Form for Super-STR.
CO-2A Concrete for Sub-STR.
CO-3A Concrete for Super-STR.
RE-1A Re-Bar for Sub-STR. (Deformed)
RE-2A Re-Bar for Super-STR. (Deformed)
AN-2B Anchor Bolt W/O Template Setting
PLA-6A Grouting (Non shrink)
JT-5A Isolation Joint
58 FOUNDATION P.2342.01/02 1st & 2nd POLYMERIZATION REACTOR COOLING WATER PUMP
Calculation Ref. No : SSP-CVL2-FDN-2340 - P2342.01 /02
259 of 476
Progress per Item Calculation As of
CIVIL 2
CUMULATIVE QUANTITY
NO. AREA ITEM CODE WORK ITEM
Qty WidthDepth Length
60 FOUNDATION P.1345.01/02 1st & 2nd POLYMERIZATION REACTOR COOLING WATER PUMP
Calculation Ref. No : SSP-CVL2-FDN-1340 - P1345.01 /02
61 FOUNDATION P.1342.01/02 1st & 2nd POLYMERIZATION REACTOR COOLING WATER PUMP
Calculation Ref. No : SSP-CVL2-FDN-1340 - P1342.01 /02
260 of 476
Progress per Item Calculation As of
CIVIL 2
CUMULATIVE QUANTITY
NO. AREA ITEM CODE WORK ITEM
Qty WidthDepth Length
RE-2A Re-Bar for Super-STR. (Deformed)
AN-1A Anchor Box
PLA-6A Grouting (Non shrink)
JT-5A Isolation Joint
261 of 476
Progress per Item Calculation As of
CIVIL 2
CUMULATIVE QUANTITY
NO. AREA ITEM CODE WORK ITEM
Qty WidthDepth Length
EA-3B Disposal of Soil (Outside of Factory)
CO-1A Leveling Concrete
FM-1A Form for Sub-STR.
FM-2A Form for Super-STR.
CO-2A Concrete for Sub-STR.
CO-3A Concrete for Super-STR.
RE-1A Re-Bar for Sub-STR. (Deformed)
RE-2A Re-Bar for Super-STR. (Deformed)
JT-4A Water Stop Plate
ANA-2 Climbing Rung (Chemical Resistant)
LN-5E-1 Chemical Resistant Resin Lining (Epoxy)
ML-5B Grating Cover
AN-3B-1 Embedded Steel Supply & Setting(Carbon Steel)
JT-5A Isolation Joint
262 of 476
Progress per Item Calculation As of
CIVIL 2
CUMULATIVE QUANTITY
NO. AREA ITEM CODE WORK ITEM
Qty WidthDepth Length
69 FOUNDATION P6315.01
Calculation Ref. No : SSP-CVL2-FDN-1340 - P6315.01
263 of 476
Progress per Item Calculation As of
CIVIL 2
CUMULATIVE QUANTITY
NO. AREA ITEM CODE WORK ITEM
Qty WidthDepth Length
CO-3A Concrete for Super-STR.
RE-1A Re-Bar for Sub-STR. (Deformed)
RE-2A Re-Bar for Super-STR. (Deformed)
AN-1A Anchor Box
PLA-6A Grouting (Non shrink)
JT-5A Isolation Joint
264 of 476
Progress per Item Calculation As of
CIVIL 2
CUMULATIVE QUANTITY
NO. AREA ITEM CODE WORK ITEM
Qty WidthDepth Length
73 FOUNDATION V6343.01 GPC VESSEL
Calculation Ref. No : SSP-CVL2-FDN-1350 -V6343.01
74 P2- AMH03 AREA COC MAIN HOLE TYPE 2 PLAN, SECTION- A/B
Calculation Ref. No : SSP-CVL2-AMH03-P2A0C
265 of 476
Progress per Item Calculation As of
CIVIL 2
CUMULATIVE QUANTITY
NO. AREA ITEM CODE WORK ITEM
Qty WidthDepth Length
RE-1A Re-Bar for Sub-STR. (Deformed)
RE-2A Re-Bar for Super-STR. (Deformed)
ANA-2 Climbing Rung (Chemical Resistant)
LN-5E-1 Chemical Resistant Resin Lining (Epoxy)
JT-5A Isolation Joint
JT-4A Water Stop Plate
266 of 476
Progress per Item Calculation As of
CIVIL 2
CUMULATIVE QUANTITY
NO. AREA ITEM CODE WORK ITEM
Qty WidthDepth Length
Calculation Ref. No : SSP-CVL2-AOC-P2-C0C- CEP
267 of 476
Progress per Item Calculation As of
CIVIL 2
CUMULATIVE QUANTITY
NO. AREA ITEM CODE WORK ITEM
Qty WidthDepth Length
268 of 476
Progress per Item Calculation As of
CIVIL 2
CUMULATIVE QUANTITY
NO. AREA ITEM CODE WORK ITEM
Qty WidthDepth Length
PPX-2-13 Eccentric Reducer 4"x6" (GRE)
PPX-2-14 Lateral Tee 8"x6" Y-Branch (GRE)
PPX-2-15 Lateral Tee 4"x4" - Y Branch (GRE)
PPX-2-16 45 deg Elbow 10" (GRE)
PPX-2-17 Lateral Tee 10"x8" - Y Branch (GRE)
PPX-2-18 Lateral tee 6"x6" - Y Branch (GRE)
PPX-2-2 45 deg Elbow 4" (GRE)
PPX-2-3 Tee Branch 4"x4"x4" (GRE)
PPX-2-4 45 deg Elbow 6" (GRE)
PPX-2-5 Tee Branch 6"x6"x6" (GRE)
PPX-2-6 Flange 4" 150#RF, GRE
PPX-2-7 Flange 6" 150#RF, GRE
PPX-2-8 Elbow 45deg ,CSP DN.200
PPX-2-9 Elbow 90deg ,CSP DN.200
269 of 476
Progress per Item Calculation As of
CIVIL 2
CUMULATIVE QUANTITY
NO. AREA ITEM CODE WORK ITEM
Qty WidthDepth Length
83 AOC U-DITCH WORK (P2 Area)
Calculation Ref. No : SSP-CVL2-AOC- P2-AOC SEWER P2 AREA
EA-1A Excavation by Equipment (D≦3.0M)
EA-1C Excavation for Sewer by Hand
EAW-4 Backfilling and Compection by Hand
EA-3B Disposal of Soil (Outside of Factory)
FM-1A Form for Sub-STR.
CO-1A Leveling Concrete
CO-2A Concrete for Sub-STR.
COA-5A Concrete Cover 150 thk.
RE-1A Re-Bar for Sub-STR. (Deformed)
ML-5B Grating Cover
AN-3B-1 Embedded Steel Supply & Setting(Carbon Steel)
LN-5E-1 Chemical Resistant Resin Lining (Epoxy)
JT-5A Isolation Joint
270 of 476
Progress per Item Calculation As of
CIVIL 2
CUMULATIVE QUANTITY
NO. AREA ITEM CODE WORK ITEM
Qty WidthDepth Length
AN-3B-1 Embedded Steel Supply & Setting(Carbon Steel)
AN-4B Chemical Anchor
JT-5A Isolation Joint
86 FOUNDATION PIPE SUPPORT AROUND POLYMERAZATION REACTOR 1340 R.1342.02/03 & R.1345.02/03
Calculation Ref. No : SSP-CVL2-LF- R.1342.02/03 1340
87 FOUNDATION PIPE SUPPORT AROUND ANTI- OXIDANT TRANSFER PUMP P6304.02 A/B (AG-24)
Calculation Ref. No : SSP-CVL2-LF -1340- AOTP P6304.02 A/B (AG-24)
271 of 476
Progress per Item Calculation As of
CIVIL 2
CUMULATIVE QUANTITY
NO. AREA ITEM CODE WORK ITEM
Qty WidthDepth Length
EA-1A Excavation by Equipment (D≦3.0M)
EA-1B Excavation by Equipment (D>3.0M)
EA-2A Backfilling (Excavated Soil)
EA-3B Disposal of Soil (Outside of Factory)
CO-1A Leveling Concrete
FM-1A Form for Sub-STR.
FM-2A Form for Super-STR.
CO-2A Concrete for Sub-STR.
CO-3A Concrete for Super-STR.
RE-1A Re-Bar for Sub-STR. (Deformed)
RE-2A Re-Bar for Super-STR. (Deformed)
AN-2B Anchor Bolt W/O Template Setting
AN-3B-1 Embedded Steel Supply & Setting(Carbon Steel)
AN-4B Chemical Anchor
JT-5A Isolation Joint
272 of 476
Progress per Item Calculation As of
CIVIL 2
CUMULATIVE QUANTITY
NO. AREA ITEM CODE WORK ITEM
Qty WidthDepth Length
RE-1A Re-Bar for Sub-STR. (Deformed)
RE-2A Re-Bar for Super-STR. (Deformed)
AN-2B Anchor Bolt W/O Template Setting
AN-3B-1 Embedded Steel Supply & Setting(Carbon Steel)
AN-4B Chemical Anchor
JT-5A Isolation Joint
273 of 476
Progress per Item Calculation As of
CIVIL 2
CUMULATIVE QUANTITY
NO. AREA ITEM CODE WORK ITEM
Qty WidthDepth Length
93 FOUNDATION PIPE SUPPORT AROUND RECYCLE SOLVENT STROGE V2353.01
Calculation Ref. No : SSP-CVL2-LF -2350- ARSS V.2353.01
274 of 476
Progress per Item Calculation As of
CIVIL 2
CUMULATIVE QUANTITY
NO. AREA ITEM CODE WORK ITEM
Qty WidthDepth Length
FM-2A Form for Super-STR.
CO-2A Concrete for Sub-STR.
CO-3A Concrete for Super-STR.
RE-1A Re-Bar for Sub-STR. (Deformed)
RE-2A Re-Bar for Super-STR. (Deformed)
AN-2B Anchor Bolt W/O Template Setting
AN-3B-1 Embedded Steel Supply & Setting(Carbon Steel)
AN-4B Chemical Anchor
JT-5A Isolation Joint
275 of 476
Progress per Item Calculation As of
CIVIL 2
CUMULATIVE QUANTITY
NO. AREA ITEM CODE WORK ITEM
Qty WidthDepth Length
276 of 476
Progress per Item Calculation As of
CIVIL 2
CUMULATIVE QUANTITY
NO. AREA ITEM CODE WORK ITEM
Qty WidthDepth Length
CO-2A Concrete for Sub-STR.
CO-3A Concrete for Super-STR.
RE-1A Re-Bar for Sub-STR. (Deformed)
RE-2A Re-Bar for Super-STR. (Deformed)
AN-2B Anchor Bolt W/O Template Setting
AN-3B-1 Embedded Steel Supply & Setting(Carbon Steel)
AN-4B Chemical Anchor
JT-5A Isolation Joint
101 FOUNDATION PIPE SUPPORT AROUND ANTI-OXIDANT TRANSFER PUMP 6304.02 A/B
Calculation Ref. No : SSP-CVL2-LF -1340- AOTP P6304.02 A/B
102 FOUNDATION PIPE SUPPORT AROUND CHAGRE HEADER EXCANGER E. 1341.01 AND 1344.01
Calculation Ref. No : SSP-CVL2-LF -1340- ACHE E1341.01 & 1344.01
277 of 476
Progress per Item Calculation As of
CIVIL 2
CUMULATIVE QUANTITY
NO. AREA ITEM CODE WORK ITEM
Qty WidthDepth Length
Calculation Ref. No : SSP-CVL2-LF -1350- CONCENTRATION AREA
278 of 476
Progress per Item Calculation As of
CIVIL 2
CUMULATIVE QUANTITY
NO. AREA ITEM CODE WORK ITEM
Qty WidthDepth Length
105 FOUNDATION CABLE TRAY SUPPORT AROUND 2350 CONCENTRATION AREA
Calculation Ref. No : SSP-CVL2-CT-2350- CABLE TRAY SUPPORT 2350
279 of 476
Progress per Item Calculation As of
CIVIL 2
CUMULATIVE QUANTITY
NO. AREA ITEM CODE WORK ITEM
Qty WidthDepth Length
CO-3A Concrete for Super-STR.
RE-1A Re-Bar for Sub-STR. (Deformed)
RE-2A Re-Bar for Super-STR. (Deformed)
AN-2B Anchor Bolt W/O Template Setting
AN-3B-1 Embedded Steel Supply & Setting(Carbon Steel)
AN-4B Chemical Anchor
JT-5A Isolation Joint
280 of 476
Progress per Item Calculation As of
CIVIL 2
CUMULATIVE QUANTITY
NO. AREA ITEM CODE WORK ITEM
Qty WidthDepth Length
281 of 476
25-Oct-17
CUMULATIVE QUANTITY
Quantity QTY PLAN
282 of 476
25-Oct-17
CUMULATIVE QUANTITY
Quantity QTY PLAN
283 of 476
25-Oct-17
CUMULATIVE QUANTITY
Quantity QTY PLAN
23.78 100% 23.78
56.00 100% 56.00
4.35 100% 4.35
6.53 100% 6.53
20.10 100% 20.10
4.00 100% 4.00
-
SSP-CVL2-FDN-1340 - V.6315.01
284 of 476
25-Oct-17
CUMULATIVE QUANTITY
Quantity QTY PLAN
-
-
-
-
0.29 100% 0.29
15.54 100% 15.54
SSP-CVL2-FDN-1340 - V.6315.02
-
-
-
-
0.24 100% 0.24
13.89 100% 13.89
-
2.67 100% 2.67
-
0.25 100% 0.25
-
0.03 100% 0.03
6.40 100% 6.40
285 of 476
25-Oct-17
CUMULATIVE QUANTITY
Quantity QTY PLAN
286 of 476
25-Oct-17
CUMULATIVE QUANTITY
Quantity QTY PLAN
- -
1.64 100% 1.64
-
0.05 100% 0.05
12.00 100% 12.00
287 of 476
25-Oct-17
CUMULATIVE QUANTITY
Quantity QTY PLAN
61.82 100% 61.82
319.54 100% 319.54
40.58 100% 40.58
59.14 100% 59.14
4.52 100% 4.52
20.28 100% 20.28
0.22 100% 0.22
2.95 100% 2.95
24.66 100% 24.66
288 of 476
25-Oct-17
CUMULATIVE QUANTITY
Quantity QTY PLAN
SSP-CVL2-FDN-2340 - V.6416.01
81.18 100% 81.18
-
59.03 100% 59.03
22.15 100% 22.15
1.15 100% 1.15
19.00 100% 19.00
66.32 100% 66.32
21.00 100% 21.00
13.77 100% 13.77
1.04 100% 1.04
2.51 100% 2.51
8.00 100% 8.00
8.07 100% 8.07
289 of 476
25-Oct-17
CUMULATIVE QUANTITY
Quantity QTY PLAN
-
3.20 100% 3.20
290 of 476
25-Oct-17
CUMULATIVE QUANTITY
Quantity QTY PLAN
- -
0.82 100% 0.82
- -
0.040 100% 0.04
17.89 100% 17.89
291 of 476
25-Oct-17
CUMULATIVE QUANTITY
Quantity QTY PLAN
7.90 100% 7.90
24.70 100% 24.70
7.02 100% 7.02
4.94 100% 4.94
0.52 100% 0.52
0.42 100% 0.42
8.00 100% 8.00
10.00 100% 10.00
292 of 476
25-Oct-17
CUMULATIVE QUANTITY
Quantity QTY PLAN
SSP-CVL2-FDN-1350 - P1351.02
3.55 100% 3.55
- -
1.57 100% 1.57
1.98 100% 1.98
0.22 100% 0.22
9.25 100% 9.25
- -
3.78 100% 3.78
- -
0.10 100% 0.10
- -
6.00 100% 6.00
8.60 100% 8.60
SSP-CVL2-FDN-1350 - P1352.01
13.88 100% 13.88
- -
4.98 100% 4.98
8.89 100% 8.89
0.94 100% 0.94
49.05 100% 49.05
- -
28.43 100% 28.43
- -
1.02 100% 1.02
- -
293 of 476
25-Oct-17
CUMULATIVE QUANTITY
Quantity QTY PLAN
12.00 100% 12.00
28.42 100% 28.42
SSP-CVL2-FDN-1350 - P1352.03/04
7.11 100% 7.11
- -
3.14 100% 3.14
3.96 100% 3.96
0.44 100% 0.44
18.49 100% 18.49
- -
7.57 100% 7.57
- -
0.20 100% 0.20
- -
12.00 100% 12.00
-
294 of 476
25-Oct-17
CUMULATIVE QUANTITY
Quantity QTY PLAN
2.79 100% 2.79
1.01 100% 1.01
0.57 100% 0.57
8.00 100% 8.00
10.00 100% 10.00
295 of 476
25-Oct-17
CUMULATIVE QUANTITY
Quantity QTY PLAN
SSP-CVL2-FDN-2350-E.6323.02 MEH
19.27 100% 19.27
- -
16.26 100% 16.26
3.01 100% 3.01
0.34 100% 0.34
11.64 100% 11.64
9.02 100% 9.02
2.26 100% 2.26
1.03 100% 1.03
0.19 100% 0.19
0.15 100% 0.15
4.00 100% 4.00
4.00 100% 4.00
296 of 476
25-Oct-17
CUMULATIVE QUANTITY
Quantity QTY PLAN
11.00 100% 11.00
SSP-CVL2-FDN-1340 - P.6304.02A/B
3.17 100% 3.17
- -
1.80 100% 1.80
1.37 100% 1.37
0.17 100% 0.17
9.55 100% 9.55
- -
2.60 100% 2.60
- -
0.09 100% 0.09
- -
8.00 100% 8.00
8.80 100% 8.80
297 of 476
25-Oct-17
CUMULATIVE QUANTITY
Quantity QTY PLAN
0.11 100% 0.11
- -
0.004 100% 0.004
6.40 100% 6.40
298 of 476
25-Oct-17
CUMULATIVE QUANTITY
Quantity QTY PLAN
0.15 100% 0.15
6.67 100% 6.67
- -
2.58 100% 2.58
- -
0.11 100% 0.11
- -
0.004 100% 0.004
-
6.20 100% 6.20
299 of 476
25-Oct-17
CUMULATIVE QUANTITY
Quantity QTY PLAN
300 of 476
25-Oct-17
CUMULATIVE QUANTITY
Quantity QTY PLAN
- -
8.00 100% 8.00
-
12.00 100% 12.00
301 of 476
25-Oct-17
CUMULATIVE QUANTITY
Quantity QTY PLAN
302 of 476
25-Oct-17
CUMULATIVE QUANTITY
Quantity QTY PLAN
- -
6.00 100% 6.00
-
12.30 100% 12.30
303 of 476
25-Oct-17
CUMULATIVE QUANTITY
Quantity QTY PLAN
2.39 100% 2.39
0.28 100% 0.28
8.51 100% 8.51
- -
5.10 100% 5.10
- -
0.19 100% 0.19
- -
0.01 100% 0.01
-
9.48 100% 9.48
304 of 476
25-Oct-17
CUMULATIVE QUANTITY
Quantity QTY PLAN
SSP-CVL2-FDN-1340- E.1344.01
8.55 100% 8.55
- -
3.34 100% 3.34
5.21 100% 5.21
0.56 100% 0.56
14.41 100% 14.41
- -
5.18 100% 5.18
- -
0.43 100% 0.43
305 of 476
25-Oct-17
CUMULATIVE QUANTITY
Quantity QTY PLAN
- -
4.00 100% 4.00
-
22.20 100% 22.20
SSP-CVL2-AOC-P2-A0C-JB 23/24/25/26
99.42 100% 99.42
- -
84.79 100% 84.79
306 of 476
25-Oct-17
CUMULATIVE QUANTITY
Quantity QTY PLAN
14.62 100% 14.62
0.51 100% 0.51
78.61 100% 78.61
- -
8.50 100% 8.50
- -
0.73 100% 0.73
-
5.60 100% 5.60
0.04 100% 0.04
32.81 100% 32.81
- 0% 4.00
- -
22.40 100% 22.40
307 of 476
25-Oct-17
CUMULATIVE QUANTITY
Quantity QTY PLAN
SSP-CVL2-FDN-1340 - P6315.01
0.96 100% 0.96
-
0.66 100% 0.66
0.30 100% 0.30
0.04 100% 0.04
3.12 100% 3.12
-
0.56 100% 0.56
-
0.03 100% 0.03
-
4.00 100% 4.00
2.90 100% 2.90
308 of 476
25-Oct-17
CUMULATIVE QUANTITY
Quantity QTY PLAN
-
0.09 100% 0.09
-
8.00 100% 8.00
-
8.92 100% 8.92
309 of 476
25-Oct-17
CUMULATIVE QUANTITY
Quantity QTY PLAN
310 of 476
25-Oct-17
CUMULATIVE QUANTITY
Quantity QTY PLAN
1.08 100% 1.08
-
0.01 100% 0.01
9.87 100% 9.87
8.60 100% 8.60
3.30 100% 3.30
311 of 476
25-Oct-17
CUMULATIVE QUANTITY
Quantity QTY PLAN
312 of 476
25-Oct-17
CUMULATIVE QUANTITY
Quantity QTY PLAN
313 of 476
25-Oct-17
CUMULATIVE QUANTITY
Quantity QTY PLAN
314 of 476
25-Oct-17
CUMULATIVE QUANTITY
Quantity QTY PLAN
-
775.82 100% 775.82
320.71 100% 320.71
455.11 100% 455.11
2454.01 100% 2,454.01
38.56 100% 38.56
270.47 100% 270.47
16.30 100% 16.30
29.43 100% 29.43
352.04 100% 352.04
4.04 100% 4.04
283.88 100% 283.88
1,268.09 20% 1,268.09
315 of 476
25-Oct-17
CUMULATIVE QUANTITY
Quantity QTY PLAN
- -
- -
20.12 100% 20.12
316 of 476
25-Oct-17
CUMULATIVE QUANTITY
Quantity QTY PLAN
12.63 100% 12.63
- -
7.88 100% 7.88
4.76 100% 4.76
0.67 100% 0.67
30.21 100% 30.21
- -
5.99 100% 5.99
- -
0.68 100% 0.68
- -
0.02 100% 0.02
0.06 100% 0.06
- -
26.80 100% 26.80
317 of 476
25-Oct-17
CUMULATIVE QUANTITY
Quantity QTY PLAN
1.71 100% 1.71
- -
0.01 0.01
0.17 100% 0.17
- -
10.60 100% 10.60
318 of 476
25-Oct-17
CUMULATIVE QUANTITY
Quantity QTY PLAN
319 of 476
25-Oct-17
CUMULATIVE QUANTITY
Quantity QTY PLAN
-
17.39 100% 17.39
-
1.47 100% 1.47
- -
0.02 0.02
0.19 100% 0.19
- -
14.60 100% 14.60
320 of 476
25-Oct-17
CUMULATIVE QUANTITY
Quantity QTY PLAN
- -
133.81 100% 133.811
60.89 100% 60.89
72.92 100% 72.92
358.99 100% 358.99
7.91 100% 7.91
43.27 100% 43.27
13.43 100% 13.43
6.08 100% 6.08
- -
- -
246.60 100% 246.60
321 of 476
25-Oct-17
CUMULATIVE QUANTITY
Quantity QTY PLAN
0.40 100% 0.40
- -
0.09 100% 0.09
- -
- -
0.02 100% 0.02
- -
-
322 of 476
25-Oct-17
CUMULATIVE QUANTITY
Quantity QTY PLAN
323 of 476
25-Oct-17
CUMULATIVE QUANTITY
Quantity QTY PLAN
324 of 476
25-Oct-17
CUMULATIVE QUANTITY
Quantity QTY PLAN
- -
0.06 100% 0.06
- -
- -
- -
- -
-
325 of 476
25-Oct-17
CUMULATIVE QUANTITY
Quantity QTY PLAN
SSP-CVL2-GP- P2-GUARD POST P2 AREA
9.72 100% 9.72
- -
9.72 100% 9.72
-
0.20 100% 0.20
11.76 100% 11.76
- -
0.88 100% 0.88
- -
- -
- -
- -
8.00 100% 8.00
18.00 100% 18.00
2.40 100% 2.40
326 of 476
Progress per Item Calculation As of 25-Oct-17
CIVIL 2
CUMULATIVE QUANTITY
NO. AREA ITEM CODE WORK ITEM
Qty Width Depth Length Quantity
P3 - BLENDING AND STRIPPING AREA
1 PIPE RACK-02-2
Calculation Ref. No : SSP-CVL2-FDN-PR02-2
EA-1A Excavation by Equipment (D≦3.0M) 258.94
EA-2A Backfilling (Excavated Soil) 168.95
EA-3B Disposal of soil 89.99
CO-1A Levelling Concrete 6.30
FM-1A Form for Sub-STR 201.88
CO-2A Concrete for Sub-STR. 76.49
RE-1A Re-Bar for Sub-STR. (Deformed) 10.57
JT-5A Isolation Joint 39.20
2 PIPE RACK-02-3
Calculation Ref. No : SSP-CVL2-FDN-PR02-3
EA-1A Excavation by Equipment (D≦3.0M) 454.18
EA-2A Backfilling (Excavated Soil) 301.33
EA-3B Disposal of soil 152.85
CO-1A Levelling Concrete 11.34
FM-1A Form for Sub-STR 303.00
CO-2A Concrete for Sub-STR. 131.22
RE-1A Re-Bar for Sub-STR. (Deformed) 17.96
JT-5A Isolation Joint 56.00
327 of 476
Progress per Item Calculation As of 25-Oct-17
CIVIL 2
CUMULATIVE QUANTITY
NO. AREA ITEM CODE WORK ITEM
Qty Width Depth Length Quantity
CO-1A Leveling Concrete 0.55
FM-1A Form for Sub-STR. 79.92
FM-2A Form for Super-STR. 9.83
CO-2A Concrete for Sub-STR. 3.82
CO-3A Concrete for Super-STR. 13.69
RE-1A Re-Bar for Sub-STR. (Deformed) 0.48
RE-2A Re-Bar for Super-STR. (Deformed) 2.97
JT-4A Water Stop Plate 12.80
AN-3B-1 Embedded Steel Supply & Setting(Carbon Steel) 0.07
ANA-1 Climbing Rung (Galvanized) 0.04
LN-5E-1 Chemical Resistant Resin Lining (Epoxy) 44.65
JT-5A Isolation Joint
328 of 476
Progress per Item Calculation As of 25-Oct-17
CIVIL 2
CUMULATIVE QUANTITY
NO. AREA ITEM CODE WORK ITEM
Qty Width Depth Length Quantity
EA-3B Disposal of Soil (Outside of Factory) 69.91
EA-4C Sand Filling for Tank FDN 79.54
CO-1A Leveling Concrete 2.45
FM-1B Curved Form for Sub-STR. 12.10
FM-2B Curved Form for Super-STR. 105.43
CO-2A Concrete for Sub-STR. 23.28
CO-3A Concrete for Super-STR. 26.36
RE-1A Re-Bar for Sub-STR. (Deformed) 1.30
RE-2A Re-Bar for Super-STR. (Deformed) 2.85
AS-2A Asphalt Concrete/Sand for Tank FDN 1.66
AN-2B Anchor Bolt W/O Template Setting 0.12
JT-5A Isolation Joint 7.50
329 of 476
Progress per Item Calculation As of 25-Oct-17
CIVIL 2
CUMULATIVE QUANTITY
NO. AREA ITEM CODE WORK ITEM
Qty Width Depth Length Quantity
9 V1371.01/02/03 - FIRST/SECOND/THIRD STRIPPER FOUNDATION
Calculation Ref. No : SSP-CVL2-FDN-V1371
330 of 476
Progress per Item Calculation As of 25-Oct-17
CIVIL 2
CUMULATIVE QUANTITY
NO. AREA ITEM CODE WORK ITEM
Qty Width Depth Length Quantity
11 STR - P3-1 - 1360 BLENDING EQUIPMENT SUPPORT STRUCTURE
Calculation Ref. No : SSP-CVL2-FDN 1360 - STR. P3-1
331 of 476
Progress per Item Calculation As of 25-Oct-17
CIVIL 2
CUMULATIVE QUANTITY
NO. AREA ITEM CODE WORK ITEM
Qty Width Depth Length Quantity
AN-2B Anchor Bolt W/O Template Setting 0.29
JT-5A Isolation Joint 62.40
332 of 476
Progress per Item Calculation As of 25-Oct-17
CIVIL 2
CUMULATIVE QUANTITY
NO. AREA ITEM CODE WORK ITEM
Qty Width Depth Length Quantity
CO-3A Concrete for Super-STR. 7.22
RE-1A Re-Bar for Sub-STR. (Deformed) 1.88
RE-2A Re-Bar for Super-STR. (Deformed) 1.00
AN-1A Anchor Box 8.00
JT-5A Isolation Joint 13.60
19 SSP-CVL2-FDN-STR P3-7
Calculation Ref. No : SSP-CVL2-STR. P3-7
333 of 476
Progress per Item Calculation As of 25-Oct-17
CIVIL 2
CUMULATIVE QUANTITY
NO. AREA ITEM CODE WORK ITEM
Qty Width Depth Length Quantity
CO-1A Leveling Concrete 13.22
FM-1A Form for Sub-STR. 117.31
FM-2A Form for Super-STR. -
CO-2A Concrete for Sub-STR. 133.18
CO-3A Concrete for Super-STR. -
RE-1A Re-Bar for Sub-STR. (Deformed) 11.01
RE-2A Re-Bar for Super-STR. (Deformed)
AN-2B Anchor Bolt W/O Template Setting 0.16
JT-5A Isolation Joint 34.40
20 SSP-CVL2-CMH02-P3C0C
Calculation Ref. No : SSP-CVL2-CMH02-P3C0C
334 of 476
Progress per Item Calculation As of 25-Oct-17
CIVIL 2
CUMULATIVE QUANTITY
NO. AREA ITEM CODE WORK ITEM
Qty Width Depth Length Quantity
24 P3- CMH03 AREA COC MAIN HOLE TYPE 2 PLAN, SECTION- A/B/C
Calculation Ref. No : 'SSP-CVL2-CMH03- P3COC
335 of 476
Progress per Item Calculation As of 25-Oct-17
CIVIL 2
CUMULATIVE QUANTITY
NO. AREA ITEM CODE WORK ITEM
Qty Width Depth Length Quantity
PPX-8A Vent Pipe for Manhole 1.00
336 of 476
Progress per Item Calculation As of 25-Oct-17
CIVIL 2
CUMULATIVE QUANTITY
NO. AREA ITEM CODE WORK ITEM
Qty Width Depth Length Quantity
CO-3A Concrete for Super-STR.
RE-1A Re-Bar for Sub-STR. (Deformed) 0.18
RE-2A Re-Bar for Super-STR. (Deformed)
AN-1A Anchor Box 12.00
JT-5A Isolation Joint 16.20
337 of 476
Progress per Item Calculation As of 25-Oct-17
CIVIL 2
CUMULATIVE QUANTITY
NO. AREA ITEM CODE WORK ITEM
Qty Width Depth Length Quantity
CO-1A Leveling Concrete 0.11
FM-1A Form for Sub-STR. 5.70
FM-2A Form for Super-STR.
CO-2A Concrete for Sub-STR. 1.69
CO-3A Concrete for Super-STR.
RE-1A Re-Bar for Sub-STR. (Deformed) 0.06
RE-2A Re-Bar for Super-STR. (Deformed)
AN-1A Anchor Bolt W/O Template Setting 4.00
JT-5A Isolation Joint 5.30
31 P3- CMH01 AREA COC MAIN HOLE TYPE 2 PLAN, SECTION- A/B
Calculation Ref. No : 'SSP-CVL2-CMH01- P3COC
32 P3- CMH05 AREA COC MAIN HOLE TYPE 2 PLAN, SECTION- A/B
Calculation Ref. No : 'SSP-CVL2-CMH05- P3COC
338 of 476
Progress per Item Calculation As of 25-Oct-17
CIVIL 2
CUMULATIVE QUANTITY
NO. AREA ITEM CODE WORK ITEM
Qty Width Depth Length Quantity
33 P3- AMH01 AREA COC MAIN HOLE TYPE 2 PLAN, SECTION- A/B
Calculation Ref. No : 'SSP-CVL2-AMH01- P3COC
34 P3- CMH04 AREA COC MAIN HOLE TYPE 2 PLAN, SECTION- A/B/C
Calculation Ref. No : 'SSP-CVL2-CMH04- P3COC
35 P3- AMH04 AREA COC MAIN HOLE TYPE 2 PLAN, SECTION- A/B
Calculation Ref. No : 'SSP-CVL2-AMH04- P3COC
339 of 476
Progress per Item Calculation As of 25-Oct-17
CIVIL 2
CUMULATIVE QUANTITY
NO. AREA ITEM CODE WORK ITEM
Qty Width Depth Length Quantity
EA-3B Disposal of Soil (Outside of Factory) 11.05
CO-1A Leveling Concrete 0.49
FM-1A Form for Sub-STR. 3.70
FM-2A Form for Super-STR. 34.38
CO-2A Concrete for Sub-STR. 0.90
CO-3A Concrete for Super-STR. 4.65
RE-1A Re-Bar for Sub-STR. (Deformed) 0.11
RE-2A Re-Bar for Super-STR. (Deformed) 0.83
JT-4A Water Stop Plate 7.60
ANA-2 Climbing Rung (Chemical Resistant) 0.01
LN-5E-1 Chemical Resistant Resin Lining (Epoxy) 16.51
PPX-8A Vent Pipe for Manhole 1.00
JT-5A Isolation Joint
JTA-6 Sikaswell for joining RCP and Manhole 2.00
36 P3- AMH05 AREA COC MAIN HOLE TYPE 2 PLAN, SECTION- A/B
Calculation Ref. No : 'SSP-CVL2-AMH05- P3COC
340 of 476
Progress per Item Calculation As of 25-Oct-17
CIVIL 2
CUMULATIVE QUANTITY
NO. AREA ITEM CODE WORK ITEM
Qty Width Depth Length Quantity
RE-2A Re-Bar for Super-STR. (Deformed) 0.35
AN-2B Anchor Bolt W/O Template Setting 0.01
JT-5A Isolation Joint 5.60
341 of 476
Progress per Item Calculation As of 25-Oct-17
CIVIL 2
CUMULATIVE QUANTITY
NO. AREA ITEM CODE WORK ITEM
Qty Width Depth Length Quantity
CO-2A Concrete for Sub-STR. 5.81
CO-3A Concrete for Super-STR.
RE-1A Re-Bar for Sub-STR. (Deformed) 0.18
RE-2A Re-Bar for Super-STR. (Deformed)
AN-1A Anchor Box 12.00
JT-5A Isolation Joint 16.80
41 P3- AMH03 AREA COC MAIN HOLE TYPE 2 PLAN, SECTION- A/B
Calculation Ref. No : 'SSP-CVL2-AMH03-P3C0C
42 FOUNDATION P.1361.01 A/B EC POLYMER SOLUTION PUMP & P.1361.05 HC BLEND RECYCLING PUMP
Calculation Ref. No : 'SSP-CVL2-FDN-1370-P.1361.01A/B & 05
342 of 476
Progress per Item Calculation As of 25-Oct-17
CIVIL 2
CUMULATIVE QUANTITY
NO. AREA ITEM CODE WORK ITEM
Qty Width Depth Length Quantity
43 FOUNDATION P.1361.02 BLEND RECYCLING PUMP
Calculation Ref. No : 'SSP-CVL2-FDN-1370-P.1361.02
343 of 476
Progress per Item Calculation As of 25-Oct-17
CIVIL 2
CUMULATIVE QUANTITY
NO. AREA ITEM CODE WORK ITEM
Qty Width Depth Length Quantity
RE-1A Re-Bar for Sub-STR. (Deformed) 0.24
RE-2A Re-Bar for Super-STR. (Deformed)
AN-1A Anchor Box 10.00
PLA-6A Grouting (Non shrink)
JT-5A Isolation Joint 13.60
344 of 476
Progress per Item Calculation As of 25-Oct-17
CIVIL 2
CUMULATIVE QUANTITY
NO. AREA ITEM CODE WORK ITEM
Qty Width Depth Length Quantity
EA-3B Disposal of Soil (Outside of Factory) 1.98
CO-1A Leveling Concrete 0.22
FM-1A Form for Sub-STR. 13.03
FM-2A Form for Super-STR.
CO-2A Concrete for Sub-STR. 5.33
CO-3A Concrete for Super-STR.
RE-1A Re-Bar for Sub-STR. (Deformed) 0.14
RE-2A Re-Bar for Super-STR. (Deformed)
AN-1A Anchor Box 6.00
PLA-6A Grouting (Non shrink)
JT-5A Isolation Joint 8.60
345 of 476
Progress per Item Calculation As of 25-Oct-17
CIVIL 2
CUMULATIVE QUANTITY
NO. AREA ITEM CODE WORK ITEM
Qty Width Depth Length Quantity
51 FOUNDATION P.1374.01 CRUMBS SLURRY RECIRCULATING PUMP
Calculation Ref. No : 'SSP-CVL2-FDN-2360-P.2361.06
346 of 476
Progress per Item Calculation As of 25-Oct-17
CIVIL 2
CUMULATIVE QUANTITY
NO. AREA ITEM CODE WORK ITEM
Qty Width Depth Length Quantity
RE-2A Re-Bar for Super-STR. (Deformed)
AN-1A Anchor Box 4.00
PLA-6A Grouting (Non shrink)
JT-5A Isolation Joint 6.00
347 of 476
Progress per Item Calculation As of 25-Oct-17
CIVIL 2
CUMULATIVE QUANTITY
NO. AREA ITEM CODE WORK ITEM
Qty Width Depth Length Quantity
CO-1A Leveling Concrete 0.14
FM-1A Form for Sub-STR. 5.22
FM-2A Form for Super-STR.
CO-2A Concrete for Sub-STR. 1.82
CO-3A Concrete for Super-STR.
RE-1A Re-Bar for Sub-STR. (Deformed) 0.07
RE-2A Re-Bar for Super-STR. (Deformed)
AN-1A Anchor Box 4.00
PLA-6A Grouting (Non shrink)
JT-5A Isolation Joint 6.00
348 of 476
Progress per Item Calculation As of 25-Oct-17
CIVIL 2
CUMULATIVE QUANTITY
NO. AREA ITEM CODE WORK ITEM
Qty Width Depth Length Quantity
Calculation Ref. No : SSP-CVL2-FDN-1370 - P.6307.01
349 of 476
Progress per Item Calculation As of 25-Oct-17
CIVIL 2
CUMULATIVE QUANTITY
NO. AREA ITEM CODE WORK ITEM
Qty Width Depth Length Quantity
AN-1A Anchor Box 4.00
PLA-6A Grouting (Non shrink)
JT-5A Isolation Joint 2.60
350 of 476
Progress per Item Calculation As of 25-Oct-17
CIVIL 2
CUMULATIVE QUANTITY
NO. AREA ITEM CODE WORK ITEM
Qty Width Depth Length Quantity
FM-1A Form for Sub-STR. 18.62
FM-2A Form for Super-STR.
CO-2A Concrete for Sub-STR. 1.90
CO-3A Concrete for Super-STR.
RE-1A Re-Bar for Sub-STR. (Deformed) 0.20
RE-2A Re-Bar for Super-STR. (Deformed)
JT-4A Water Stop Plate 3.20
ANA-2 Climbing Rung (Chemical Resistant) 0.02
LN-5E-1 Chemical Resistant Resin Lining (Epoxy) 6.40
ML-5B Grating Cover 0.32
AN-3B-1 Embedded Steel Supply & Setting(Carbon Steel) -
JT-5A Isolation Joint 6.40
65 P3- AMH06 AREA COC MAIN HOLE TYPE 2 PLAN, SECTION- A/B
Calculation Ref. No : 'SSP-CVL2-FDN-AMH03
351 of 476
Progress per Item Calculation As of 25-Oct-17
CIVIL 2
CUMULATIVE QUANTITY
NO. AREA ITEM CODE WORK ITEM
Qty Width Depth Length Quantity
PLA-6A Grouting (Non shrink)
JT-5A Isolation Joint 14.40
352 of 476
Progress per Item Calculation As of 25-Oct-17
CIVIL 2
CUMULATIVE QUANTITY
NO. AREA ITEM CODE WORK ITEM
Qty Width Depth Length Quantity
CO-2A Concrete for Sub-STR. 0.28
CO-3A Concrete for Super-STR.
RE-1A Re-Bar for Sub-STR. (Deformed) 0.04
RE-2A Re-Bar for Super-STR. (Deformed)
ANA-2 Climbing Rung (Chemical Resistant) 0.001
LN-5E-1 Chemical Resistant Resin Lining (Epoxy) 2.17
ML-5B Grating Cover 0.64
AN-3B-1 Embedded Steel Supply & Setting(Carbon Steel)
JT-5A Isolation Joint
JT-4A Water Stop Plate 4.00
353 of 476
Progress per Item Calculation As of 25-Oct-17
CIVIL 2
CUMULATIVE QUANTITY
NO. AREA ITEM CODE WORK ITEM
Qty Width Depth Length Quantity
72 P3- CONCRETE ENCASMENT PIPE DN - 250
Calculation Ref. No : SSP-CVL2-AOC-P3-C0C- CEP DN 250
354 of 476
Progress per Item Calculation As of 25-Oct-17
CIVIL 2
CUMULATIVE QUANTITY
NO. AREA ITEM CODE WORK ITEM
Qty Width Depth Length Quantity
PPX-2-16 45 deg Elbow 10" (GRE)
PPX-2-17 Lateral Tee 10"x8" - Y Branch (GRE)
PPX-2-18 Lateral tee 6"x6" - Y Branch (GRE)
PPX-2-2 45 deg Elbow 4" (GRE) 2.00
PPX-2-3 Tee Branch 4"x4"x4" (GRE)
PPX-2-4 45 deg Elbow 6" (GRE) 8.00
PPX-2-5 Tee Branch 6"x6"x6" (GRE)
PPX-2-6 Flange 4" 150#RF, GRE
PPX-2-7 Flange 6" 150#RF, GRE
PPX-2-8 Elbow 45deg ,CSP DN.200
PPX-2-9 Elbow 90deg ,CSP DN.200
355 of 476
Progress per Item Calculation As of 25-Oct-17
CIVIL 2
CUMULATIVE QUANTITY
NO. AREA ITEM CODE WORK ITEM
Qty Width Depth Length Quantity
74 AOC U-DITCH WORK (P3 Area)
Calculation Ref. No. : SSP-CVL2-AOC- P3-AOC SEWER P3 AREA
EA-1A Excavation by Equipment (D≦3.0M) -
EA-1C Excavation for Sewer by Hand 404.42
EAW-4 Backfilling and Compaction by Hand 172.53
EA-3B Disposal of Soil (Outside of Factory) 212.46
FM-1A Form for Sub-STR. 1,358.85
CO-1A Leveling Concrete 22.91
CO-2A Concrete for Sub-STR. 143.06
COA-5A Concrete Cover 150 thk. 0.42
RE-1A Re-Bar for Sub-STR. (Deformed) 14.63
ML-5B Grating Cover 215.86
AN-3B-1 Embedded Steel Supply & Setting(Carbon Steel) 3.13
JT-5A Isolation Joint 953.78
356 of 476
Progress per Item Calculation As of 25-Oct-17
CIVIL 2
CUMULATIVE QUANTITY
NO. AREA ITEM CODE WORK ITEM
Qty Width Depth Length Quantity
AN-3B-1 Embedded Steel Supply & Setting(Carbon Steel) -
AN-4B Chemical Anchor 72.00
JT-5A Isolation Joint 1.44
357 of 476
Progress per Item Calculation As of 25-Oct-17
CIVIL 2
CUMULATIVE QUANTITY
NO. AREA ITEM CODE WORK ITEM
Qty Width Depth Length Quantity
EA-3B Disposal of Soil (Outside of Factory) 12.38
CO-1A Leveling Concrete 1.99
FM-1A Form for Sub-STR. 28.41
FM-2A Form for Super-STR. -
CO-2A Concrete for Sub-STR. 11.23
CO-3A Concrete for Super-STR. -
RE-1A Re-Bar for Sub-STR. (Deformed) 0.92
RE-2A Re-Bar for Super-STR. (Deformed) -
AN-2B Anchor Bolt W/O Template Setting 0.01
AN-3B-1 Embedded Steel Supply & Setting(Carbon Steel) 0.20
AN-4B Chemical Anchor -
JT-5A Isolation Joint 16.20
358 of 476
Progress per Item Calculation As of 25-Oct-17
CIVIL 2
CUMULATIVE QUANTITY
NO. AREA ITEM CODE WORK ITEM
Qty Width Depth Length Quantity
JT-5A Isolation Joint 21.60
359 of 476
Progress per Item Calculation As of 25-Oct-17
CIVIL 2
CUMULATIVE QUANTITY
NO. AREA ITEM CODE WORK ITEM
Qty Width Depth Length Quantity
FM-1A Form for Sub-STR. 8.45
FM-2A Form for Super-STR. -
CO-2A Concrete for Sub-STR. 2.83
CO-3A Concrete for Super-STR. -
RE-1A Re-Bar for Sub-STR. (Deformed) 0.24
RE-2A Re-Bar for Super-STR. (Deformed) -
AN-2B Anchor Bolt W/O Template Setting 0.01
AN-3B-1 Embedded Steel Supply & Setting(Carbon Steel) -
AN-4B Chemical Anchor -
JT-5A Isolation Joint 6.00
360 of 476
Progress per Item Calculation As of 25-Oct-17
CIVIL 2
CUMULATIVE QUANTITY
NO. AREA ITEM CODE WORK ITEM
Qty Width Depth Length Quantity
361 of 476
Progress per Item Calculation As of 25-Oct-17
CIVIL 2
CUMULATIVE QUANTITY
NO. AREA ITEM CODE WORK ITEM
Qty Width Depth Length Quantity
CO-2A Concrete for Sub-STR. 5.56
CO-3A Concrete for Super-STR. -
RE-1A Re-Bar for Sub-STR. (Deformed) 0.80
RE-2A Re-Bar for Super-STR. (Deformed) -
AN-2B Anchor Bolt W/O Template Setting 0.01
AN-3B-1 Embedded Steel Supply & Setting(Carbon Steel) -
AN-4B Chemical Anchor -
JT-5A Isolation Joint -
362 of 476
Progress per Item Calculation As of 25-Oct-17
CIVIL 2
CUMULATIVE QUANTITY
NO. AREA ITEM CODE WORK ITEM
Qty Width Depth Length Quantity
Calculation Ref. No : SSP-CVL2-LF -2370- STRIPPING V.2373.01
363 of 476
Progress per Item Calculation As of 25-Oct-17
CIVIL 2
CUMULATIVE QUANTITY
NO. AREA ITEM CODE WORK ITEM
Qty Width Depth Length Quantity
AN-3B-1 Embedded Steel Supply & Setting(Carbon Steel) 0.50
JT-5A Isolation Joint 94.00
364 of 476
Progress per Item Calculation As of 25-Oct-17
CIVIL 2
CUMULATIVE QUANTITY
NO. AREA ITEM CODE WORK ITEM
Qty Width Depth Length Quantity
CO-1A Leveling Concrete 0.11
FM-1A Form for Sub-STR. 14.14
FM-2A Form for Super-STR.
CO-2A Concrete for Sub-STR. 1.25
CO-3A Concrete for Super-STR.
RE-1A Re-Bar for Sub-STR. (Deformed) 0.13
RE-2A Re-Bar for Super-STR. (Deformed)
ANA-2 Climbing Rung (Chemical Resistant) 0.007
LN-5E-1 Chemical Resistant Resin Lining (Epoxy) 6.73
ML-5B Grating Cover 1.00
AN-3B-1 Embedded Steel Supply & Setting(Carbon Steel)
JT-5A Isolation Joint
JT-4A Water Stop Plate 5.20
365 of 476
Progress per Item Calculation As of 25-Oct-17
CIVIL 2
CUMULATIVE QUANTITY
NO. AREA ITEM CODE WORK ITEM
Qty Width Depth Length Quantity
AN-3B-1 Embedded Steel Supply & Setting(Carbon Steel)
JT-5A Isolation Joint 37.20
366 of 476
Progress per Item Calculation As of 25-Oct-17
CIVIL 2
CUMULATIVE QUANTITY
NO. AREA ITEM CODE WORK ITEM
Qty Width Depth Length Quantity
100 GUARD POST P3 AREA
Calculation Ref. No : SSP-CVL2-GP- P3-GUARD POST P3 AREA
367 of 476
Progress per Item Calculation As of 25-Oct-17
CIVIL 2
CUMULATIVE QUANTITY
NO. AREA ITEM CODE WORK ITEM
Qty Width Depth Length Quantity
RE-2A Re-Bar for Super-STR. (Deformed)
ML-5B Grating Cover -
AN-1A Anchor Box 4.00
JT-5A Isolation Joint 5.60
368 of 476
QTY PLAN
100% 258.94
100% 168.95
100% 89.99
100% 6.30
100% 201.88
100% 76.49
100% 10.57
100% 39.20
100% 454.18
100% 301.33
100% 152.85
100% 11.34
100% 303.00
100% 131.22
100% 17.96
100% 56.00
100% 97.02
100% 4.85
100% 62.29
100% 39.58
100% 0.71
100% 92.72
100% 13.75
100% 4.59
83% 16.55
100% 0.63
100% 3.44
100% 14.40
100% 0.08
100% 0.04
100% 56.05
-
100% 83.22
100% 1.39
100% 55.44
100% 29.17
369 of 476
QTY PLAN
100% 0.55
100% 79.92
100% 9.83
100% 3.82
100% 13.69
100% 0.48
100% 2.97
100% 12.80
100% 0.07
100% 0.04
100% 44.65
-
100% 83.86
100% 13.95
100% 69.91
100% 79.54
100% 2.45
100% 12.10
100% 105.43
100% 23.28
100% 26.36
100% 1.30
100% 2.85
100% 1.66
100% 0.12
100% 23.56
100% 83.86
100% 13.95
370 of 476
QTY PLAN
100% 69.91
100% 79.54
100% 2.45
100% 12.10
100% 105.43
100% 23.28
100% 26.36
100% 1.30
100% 2.85
100% 1.66
100% 0.12
100% 7.50
100% 83.86
100% 13.95
100% 69.91
100% 78.96
100% 2.45
100% 12.10
100% 105.43
100% 23.28
100% 26.36
100% 1.30
100% 2.85
100% 1.66
100% 0.12
100% 23.56
100% 696.95
-
100% 512.87
100% 184.08
100% 17.40
100% 363.41
-
100% 175.35
-
100% 23.41
-
100% 0.41
100% 88.00
371 of 476
QTY PLAN
100% 176.47
-
100% 109.39
100% 67.08
-
100% 4.68
100% 132.31
-
100% 68.21
-
100% 8.12
-
100% 0.29
100% 63.20
100% 176.47
-
100% 109.39
100% 67.08
63.20
100% 4.68
100% 132.31
-
100% 68.21
-
100% 8.19
-
100% 0.29
100% 63.20
372 of 476
QTY PLAN
100% 666.61
-
100% 250.22
100% 416.39
100% 18.13
100% 99.22
100% 783.89
100% 388.85
100% 92.51
100% 147.33
100% 46.42
100% 59.00
100% 2.97
100% 44.80
100% 397.05
-
100% 295.37
100% 101.68
100% 9.62
100% 193.46
-
100% 96.43
-
100% 12.90
-
100% 0.23
100% 50.80
100% 176.47
-
100% 109.61
100% 66.86
100% 4.68
100% 131.13
-
100% 67.86
-
100% 8.19
-
373 of 476
QTY PLAN
100% 0.29
100% 62.40
100% 30.69
-
100% 21.87
100% 8.82
100% 0.82
100% 9.48
100% 44.30
100% 8.82
100% 8.14
100% 0.60
100% 1.12
100% 8.00
100% 9.80
100% 560.46
-
100% 409.48
100% 150.98
100% 13.89
100% 141.91
-
100% 139.88
-
100% 18.58
-
100% 0.17
100% 38.32
100% 31.15
-
100% 22.63
100% 8.52
100% 0.86
100% 9.02
100% 36.99
100% 8.52
374 of 476
QTY PLAN
100% 7.22
100% 1.88
100% 1.00
100% 8.00
100% 13.60
100% 20.96
-
100% 15.57
100% 5.39
100% 0.56
100% 6.99
100% 30.49
100% 5.39
100% 6.41
100% 0.82
100% 0.52
100% 8.00
100% 12.60
100% 609.47
-
100% 320.06
100% 289.42
100% 18.13
100% 72.16
100% 672.34
100% 282.80
100% 52.13
100% 121.53
100% 30.43
100% 49.96
100% 2.36
100% 33.60
100% 451.08
-
100% 307.36
100% 143.72
375 of 476
QTY PLAN
100% 13.22
100% 117.31
-
100% 133.18
-
100% 11.01
-
100% 0.16
100% 34.40
100% 14.31
-
100% 10.23
100% 4.08
100% 0.41
100% 22.30
-
100% 3.30
-
100% 0.64
-
100% 16.01
100% 0.01
100% 8.94
100% 1.00
100% 8.82
-
100% 14.80
100% 5.98
100% 7.93
100% 22.23
-
100% 21.17
-
100% 0.39
-
100% 8.00
100% 12.56
376 of 476
QTY PLAN
100% 8.82
-
100% 14.80
100% 5.98
100% 7.93
100% 22.23
-
100% 21.17
-
100% 0.39
-
100% 8.00
100% 12.56
100% 8.82
-
100% 14.80
100% 5.98
100% 7.93
100% 22.23
-
100% 21.17
-
100% 0.39
-
100% 8.00
100% 12.56
100% 14.31
-
100% 10.34
100% 3.97
100% 0.41
100% 21.80
-
100% 3.24
-
100% 0.64
-
100% 16.01
100% 0.01
100% 8.74
377 of 476
QTY PLAN
100% 1.00
100% 47.04
-
100% 39.30
100% 7.74
100% 1.15
100% 26.64
-
100% 9.31
-
100% 1.12
-
100% 0.01
100% 8.00
100% 19.90
-
100% 13.88
100% 6.02
100% 2.55
100% 30.37
-
100% 6.88
-
100% 0.67
-
100% 0.03
100% 12.80
SSP-CVL2-FDN-1370 - P.1371.01/02/03
100% 6.01
-
100% 3.18
100% 2.83
100% 0.34
100% 17.42
-
100% 5.36
378 of 476
QTY PLAN
-
100% 0.18
-
100% 12.00
100% 16.20
SSP-CVL2-FDN-1370 - P.1373.01/02/03
100% 6.01
-
100% 3.18
100% 2.83
100% 0.34
100% 17.42
-
100% 5.36
-
100% 0.18
-
100% 12.00
100% 16.20
100% 1.94
-
100% 0.36
100% 0.89
379 of 476
QTY PLAN
100% 0.11
100% 5.70
-
100% 1.69
-
100% 0.06
-
100% 4.00
100% 5.30
100% 14.31
-
100% 11.58
100% 2.73
100% 0.41
100% 16.38
-
100% 2.56
-
100% 0.51
-
100% 0.01
100% 6.58
100% 1.00
-
100% 6.00
100% 11.91
-
100% 10.28
100% 1.63
100% 0.38
100% 13.08
-
100% 1.36
-
100% 0.39
-
100% 0.005
100% 5.985
100% 1.00
-
100% 5.20
380 of 476
QTY PLAN
100% 49.08
100% 2.40
100% 38.84
100% 12.64
100% 0.27
100% 3.80
100% 37.92
100% 1.00
100% 5.13
100% 0.13
100% 0.80
100% 8.00
100% 0.01
100% 18.43
100% 1.00
-
100% 2.00
100% 37.83
-
100% 33.86
100% 3.97
100% 0.41
100% 20.37
-
100% 2.73
-
100% 0.58
-
100% 0.01
100% 8.73
100% 1.00
-
100% 16.01
100% 46.71
100% 0.76
100% 36.42
381 of 476
QTY PLAN
100% 11.05
100% 0.49
100% 3.70
100% 34.38
100% 0.90
100% 4.65
100% 0.11
100% 0.83
100% 7.60
100% 0.01
100% 16.51
100% 1.00
-
100% 2.00
100% 46.71
100% 1.52
100% 37.00
100% 11.23
100% 0.49
100% 3.70
100% 35.04
100% 0.90
100% 4.73
100% 0.11
100% 0.86
100% 7.60
100% 0.01
100% 16.79
100% 1.00
-
100% 3.00
100% 8.47
-
100% 7.52
100% 0.95
100% 0.14
100% 5.19
100% 16.63
100% 0.95
100% 2.18
100% 0.14
382 of 476
QTY PLAN
100% 0.35
100% 0.01
100% 5.60
100% 1.94
-
100% 1.04
100% 0.89
100% 0.11
100% 5.70
-
100% 1.69
-
100% 0.06
-
100% 4.00
100% 5.30
SSP-CVL2-FDN-2370 - P.2371.01/02/03
100% 6.34
-
100% 3.28
100% 3.06
100% 0.36
100% 18.06
-
383 of 476
QTY PLAN
100% 5.81
-
100% 0.18
-
100% 12.00
100% 16.80
100% 52.32
100% 2.40
100% 42.08
100% 12.64
100% 0.51
100% 3.80
100% 37.62
100% 1.00
100% 5.20
100% 0.13
100% 0.80
100% 8.00
100% 0.02
100% 18.82
100% 1.00
-
100% 3.00
SSP-CVL2-FDN-1360 - P.1361.01/05
100% 24.35
-
100% 8.76
100% 15.59
100% 1.64
100% 69.35
-
100% 37.45
-
100% 0.62
-
100% 30.00
-
100% 40.80
384 of 476
QTY PLAN
100% 4.45
-
100% 2.18
100% 2.26
100% 0.26
100% 12.05
-
100% 4.31
-
100% 0.14
-
100% 8.00
-
100% 11.20
100% 3.55
-
100% 1.57
100% 1.98
100% 0.22
100% 12.77
-
100% 5.23
-
100% 0.11
-
100% 6.00
-
100% 8.60
100% 8.15
-
100% 2.94
100% 5.22
100% 0.55
100% 15.44
-
100% 12.28
-
385 of 476
QTY PLAN
100% 0.24
-
100% 10.00
-
100% 13.60
100% 4.45
-
100% 2.18
100% 2.26
100% 0.26
100% 12.04
-
100% 4.31
-
100% 0.15
-
100% 10.00
-
100% 11.20
100% 8.15
-
100% 2.94
100% 5.22
100% 0.55
100% 15.44
-
100% 12.28
-
100% 0.27
-
100% 10.00
-
100% 28.75
100% 3.55
-
100% 1.57
386 of 476
QTY PLAN
100% 1.98
100% 0.22
100% 13.03
-
100% 5.33
-
100% 0.14
-
100% 6.00
-
100% 8.60
100% 1.24
-
100% 0.77
100% 0.47
100% 0.06
100% 3.85
-
100% 0.87
-
100% 0.06
-
100% 0.004
-
100% 3.60
100% 1.41
-
100% 0.84
100% 0.57
100% 0.07
100% 4.28
-
100% 1.07
-
100% 0.08
-
100% 0.004
-
100% 4.00
387 of 476
QTY PLAN
100% 2.97
-
100% 1.35
100% 1.62
100% 0.18
100% 6.30
-
100% 2.52
-
100% 0.07
-
100% 4.00
-
100% 7.20
SSP-CVL2-FDN-1370 - P.1374.02/03
100% 6.69
-
100% 2.89
100% 3.80
100% 0.42
100% 13.65
-
100% 5.92
-
100% 0.16
-
100% 8.00
-
100% 15.60
100% 2.34
-
100% 1.16
100% 1.18
100% 0.14
100% 5.46
-
100% 1.90
-
100% 0.06
388 of 476
QTY PLAN
-
100% 4.00
-
100% 6.00
100% 146.94
-
100% 116.20
100% 30.74
100% 3.84
100% 67.43
-
100% 32.41
-
100% 3.13
-
100% 0.05
-
100% 21.60
100% 3.34
-
100% 1.44
100% 1.90
100% 0.21
100% 6.79
-
100% 2.94
-
100% 0.09
-
100% 4.00
-
100% 7.80
100% 2.34
-
100% 1.16
100% 1.18
389 of 476
QTY PLAN
100% 0.14
100% 5.22
-
100% 1.82
-
100% 0.07
-
100% 4.00
-
100% 6.00
100% 0.86
-
100% 0.61
100% 0.25
100% 0.04
100% 3.07
-
100% 0.50
-
100% 0.03
-
100% 4.00
-
100% 2.60
390 of 476
QTY PLAN
100% 0.86
-
100% 0.61
100% 0.25
100% 0.04
100% 3.07
-
100% 0.50
-
100% 0.03
-
100% 4.00
-
100% 2.60
100% 0.86
-
100% 0.61
100% 0.25
100% 0.04
100% 3.12
-
100% 0.51
-
100% 0.03
-
391 of 476
QTY PLAN
100% 4.00
-
100% 2.60
100% 78.94
-
100% 60.74
100% 18.20
100% 1.85
100% 49.12
-
100% 19.14
-
100% 1.44
-
100% 0.03
-
100% 16.00
100% 33.71
-
100% 31.31
100% 2.40
100% 0.10
392 of 476
QTY PLAN
100% 18.62
-
100% 1.90
-
100% 0.20
-
100% 3.20
100% 0.02
100% 6.40
100% 0.32
-
100% 6.40
100% 46.71
100% 0.76
100% 36.42
100% 11.05
100% 0.49
100% 3.70
100% 37.02
100% 0.90
100% 4.98
100% 0.11
100% 0.86
100% 7.60
100% 0.02
100% 17.63
100% 1.00
100% 7.60
100% 2.00
100% 73.59
-
100% 53.93
100% 19.66
100% 1.81
100% 46.86
-
100% 18.93
-
100% 1.31
-
100% 0.04
393 of 476
QTY PLAN
-
100% 14.40
100% 7.68
-
100% 6.61
100% 1.07
100% 0.07
100% 4.02
-
394 of 476
QTY PLAN
100% 0.28
-
100% 0.04
-
100% 0.001
100% 2.17
100% 0.64
-
-
100% 4.00
100% 7.20
-
100% 6.30
100% 0.90
100% 0.06
100% 4.60
-
100% 0.29
-
100% 0.05
-
100% 0.003
100% 2.27
100% 0.48
-
-
100% 5.60
395 of 476
QTY PLAN
100% 1,673.97
100% 969.98
100% 105.51
100% 612.06
100% 197.29
100% 53.07
100% 133.67
100% 101.07
100% 1.50
100% 10.00
-
100% 111.46
100% 100.00
100% 431.18
100% 87.00
100% 6.00
100% 13.00
100% 7.00
396 of 476
QTY PLAN
100% 2.00
100% 8.00
397 of 476
QTY PLAN
-
100% 404.42
100% 172.53
100% 212.46
100% 1,358.85
100% 22.91
100% 143.06
100% 0.42
100% 14.63
100% 215.86
100% 3.13
100% 953.78
100% 195.70
0% -
0% -
100% 794.07
0% -
100% 32.50
0%
100% 719.69
100% 96.38
100% 0.13
100% 25.19
100% 292.19
100% 6,962.17
100% 192.47
0% -
100% 3,749.30
398 of 476
QTY PLAN
-
100% 72.00
100% 1.44
399 of 476
QTY PLAN
100% 12.38
100% 1.99
100% 28.41
-
100% 11.23
-
100% 0.92
-
100% 0.01
100% 0.20
-
100% 16.20
400 of 476
QTY PLAN
100% 21.60
-
-
-
-
100% 0.95
100% 6.30
-
100% 2.15
-
100% 0.51
-
100% 0.02
-
-
#DIV/0! -
401 of 476
QTY PLAN
100% 8.45
-
100% 2.83
-
100% 0.24
-
100% 0.01
-
-
100% 6.00
100% 31.37
-
100% 24.88
100% 6.49
100% 1.41
100% 43.66
-
100% 9.24
-
100% 0.80
-
100% 0.01
100% 0.19
-
100% 39.70
402 of 476
QTY PLAN
403 of 476
QTY PLAN
100% 5.56
-
100% 0.80
-
100% 0.01
-
-
#DIV/0! -
404 of 476
QTY PLAN
-
100% 149.09
100% 67.60
100% 81.49
100% 411.07
100% 9.09
100% 42.34
100% 5.64
100% 4.33
100% 32.87
405 of 476
QTY PLAN
100% 0.50
100% 94.00
100% 10.83
-
100% 8.94
100% 1.89
406 of 476
QTY PLAN
100% 0.11
100% 14.14
-
100% 1.25
-
100% 0.13
-
100% 0.01
100% 6.73
100% 1.00
-
-
100% 5.20
407 of 476
QTY PLAN
-
100% 37.20
408 of 476
QTY PLAN
100% 1.78
-
100% 0.96
100% 0.82
100% 0.10
100% 5.14
-
100% 1.54
-
100% 0.06
-
-
100% 4.00
100% 4.80
100% 2.19
-
100% 1.09
100% 1.10
100% 0.13
100% 5.99
-
100% 2.07
-
100% 0.06
409 of 476
QTY PLAN
-
-
100% 4.00
100% 5.60
410 of 476
BESI BETON Ø BESI BETON Ð 9,461.65 5,631.02 M² M³ M¹ 0 #VALUE! Err:502 Err:502 Err:502 Err:502 #VALUE! #VALUE!
*
START DATE Fri, 03-Jan-2020
FINISH DATE
Calculation Data REVISION <0>
#VALUE! #VALUE! #VALUE! 9,461.65
SUB- REINFORCEMENT STATUS STRUCTURE NUMBER/ NO's LENGTH/ L WIDTH/ W HEIGHT / DEEP / THICK AREA(M²)/ Q VOLUME (M³)/ V
AREA FOR OTHER LOOKUP OVL TOTAL TOTAL SUM SUM PROGRESS
LIST BQ CODE TITL DIVISION MAJOR ITEM MINOR ITEM MTRL GROUP DESCRIPTION / MATERIAL UNIT FUNCTION AXIS BOC EL TOC EL NO DWG REV
FUNCTION FCTR
PROGRE FCTR TOTAL NO's
LENGTH WIDTH
TTL H/D/T
AREA M² VOL M³
QTTY
QTTY
WISE E ÐIA SPACE-A SPACE-B KG/ M¹ SS N-1 N-2 N-3 N-4 N-5 L-a L-b L-c L-d L-e L-f L-OVL W-1 W-2 W-3 W-4 H-1 H-2 H-3 H-4 Q-1 Q-2 Q-3 Q-4 V-1 V-2 V-3 V-4
A B C 0 -1 D TOTALE F G
TOTAL H I J J
5 7 10 12 13 14 15 16 17 18 19 20 21 22 23 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70
LIST AREA BQ CODESUB-TITLE DIVISION MAJOR ITEM MINOR ITEM MTRL GROUP DESCRIPTION / MATERIAL UNIT FUNCTION AXIS BOC EL TOC EL NO DWG REV for other lookup OVL ÐIA SPACING SPACING KG/ UNIT STATUS FCTR N-1 N-2 N-3 N-4 N-5 N-6 TOTAL NO's L-a L-b L-c L-d L-e L-f L-OVL SUM W-1 W-2 W-3 W-4 SUM H-1 H-2 H-3 H-4 SUM H/D/T A-1 A-2 A-3 A-4 SUM V-1 V-2 V-3 V-4 SUM TOTAL QTY PROGRESS
WISE function FCTR A B PROGRE LENGTH WIDTH AREA M² VOL M³ QTTY
SS
1.0001
1.0002 P2 CO-2A F1 FOUNDATION FOOT FDN F1 ( 3500L x 3500W x 500HCONCRETE CONCRETE M³ EL -2.150 EL -1.650 C0-CVL-DWG-SSFD-2101~21 REV 1 6 6 3.500 3.500 3.500 3.500 0.500 0.500 36.75 -
1.0003 P2 FM-1A F1 FOUNDATION FOOT FDN F1 ( 3500L x 3500W x 500HFORM WORK FORM WORK M² EL -2.150 EL -1.650 C0-CVL-DWG-SSFD-2101~21 REV 1 6 6 3.500 3.500 3.500 3.500 14.000 2.150 -1.650 0.500 42.00 -
1.0004 P2 RE-1A F1 FOUNDATION FOOT FDN F1 ( 3500L x 3500W x 500HREBAR REBAR Ð 13 TON TRANS, TOP C0-CVL-DWG-SSFD-2101~21 REV 1 13 0.150 1.040 0.001 6 24 144 3.400 0.350 0.350 4.100 0.61 -
1.0005 P2 RE-1A F1 FOUNDATION FOOT FDN F1 ( 3500L x 3500W x 500HREBAR REBAR Ð 16 TON TRANS, BOTT C0-CVL-DWG-SSFD-2101~21 REV 1 16 0.150 1.580 0.001 6 24 144 3.400 0.350 0.350 4.100 0.93 -
1.0006 P2 RE-1A F1 FOUNDATION FOOT FDN F1 ( 3500L x 3500W x 500HREBAR REBAR Ð 13 TON LONG, TOP C0-CVL-DWG-SSFD-2101~21 REV 1 13 0.150 1.040 0.001 6 24 144 3.400 0.350 0.350 4.100 0.61 -
1.0007 P2 RE-1A F1 FOUNDATION FOOT FDN F1 ( 3500L x 3500W x 500HREBAR REBAR Ð 16 TON LONG, BOTT C0-CVL-DWG-SSFD-2101~21 REV 1 16 0.150 1.580 0.001 6 24 144 3.400 0.350 0.350 4.100 0.93 -
1.0008 P2 RE-1A F1 FOUNDATION FOOT FDN F1 ( 3500L x 3500W x 500HREBAR REBAR Ð 13 TON TIE C0-CVL-DWG-SSFD-2101~21 REV 1 13 1.040 0.001 6 2 12 0.078 3.440 3.440 0.078 7.036 0.09 -
1.0009 P2 RE-1A F1 FOUNDATION FOOT FDN F1 ( 3500L x 3500W x 500HREBAR REBAR Ð 16 TON SUPPORT C0-CVL-DWG-SSFD-2101~21 REV 1 16 1.580 0.001 6 9 54 0.400 0.342 0.200 0.342 0.400 1.684 0.14 -
1.0009 P2 CO-2A F1 FOUNDATION SOCKET COLUMN-OUTER SC ( 1400L x 1400W) CONCRETE CONCRETE M³ EL -1.650 EL -0.600 C0-CVL-STD-0104 REV 1 6 6 1.400 1.400 1.400 1.400 1.650 -0.600 1.050 12.35 -
1.0010 P2 CO-2A F1 FOUNDATION SOCKET COLUMN-OUTER SC ( 700L x 700W) CONCRETE CONCRETE M³ EL -1.650 EL -0.600 C0-CVL-STD-0104 REV 1 6 -1 -6 0.700 0.700 0.700 0.700 1.650 -0.600 1.050 -3.09 -
1.0011 P2 FM-1A F1 FOUNDATION SOCKET COLUMN-OUTER SC ( 1400L x 1400W) FORM WORK FORM WORK M² EL -1.650 EL -0.600 C0-CVL-STD-0104 REV 1 6 6 1.400 1.400 1.400 1.400 5.600 1.650 -0.600 1.050 35.28 -
1.0012 P2 FM-1A F1 FOUNDATION SOCKET COLUMN-OUTER SC ( 700L x 700W) FORM WORK FORM WORK M² EL -1.650 EL -0.600 C0-CVL-STD-0104 REV 1 6 6 0.700 0.700 0.700 0.700 2.800 1.650 -0.600 1.050 17.64 -
1.0013 P2 RE-1A F1 FOUNDATION SOCKET COLUMN-OUTER SC ( 1400L x 1400W) REBAR REBAR Ð 19 TON VERT OUTER EL -2.150 EL -0.600 C0-CVL-STD-0104 REV 1 19 2.230 0.001 6 38 228 0.500 1.430 1.930 0.98 -
1.0014 P2 RE-1A F1 FOUNDATION SOCKET COLUMN-OUTER SC ( 1400L x 1400W) REBAR REBAR Ð 19 TON VERT INNER EL -2.150 EL -0.600 C0-CVL-STD-0104 REV 1 19 2.230 0.001 6 30 180 0.500 1.430 1.930 0.77 -
1.0015 P2 RE-1A F1 FOUNDATION SOCKET COLUMN-OUTER SC ( 1400L x 1400W) REBAR REBAR Ð 19 TON HORI OUTER C0-CVL-STD-0104 REV 1 19 2.230 0.001 6 5 2 60 0.114 1.300 0.250 1.300 0.250 0.114 3.328 0.45 -
1.0016 P2 RE-1A F1 FOUNDATION SOCKET COLUMN-OUTER SC ( 1400L x 1400W) REBAR REBAR Ð 19 TON HORI INNER C0-CVL-STD-0104 REV 1 19 2.230 0.001 6 5 2 60 0.114 1.300 0.250 1.300 0.250 0.114 3.328 0.45 -
1.0017 P2 RE-1A F1 FOUNDATION SOCKET COLUMN-OUTER SC ( 1400L x 1400W) REBAR REBAR Ð 19 TON ADD HORI UPPER C0-CVL-STD-0104 REV 1 19 2.230 0.001 6 2 2 24 0.800 0.800 0.04 -
1.0018 P2 RE-1A F1 FOUNDATION SOCKET COLUMN-OUTER SC ( 1400L x 1400W) REBAR REBAR Ð 10 TON CROSS TIE C0-CVL-STD-0104 REV 1 10 0.620 0.001 6 30 5 900 0.060 0.250 0.060 0.370 0.21 -
1.0019 P2 RE-1A F1 FOUNDATION SOCKET COLUMN-OUTER SC ( 1400L x 1400W) REBAR REBAR Ð 13 TON BOTTOM TIE C0-CVL-STD-0104 REV 1 13 1.040 0.001 6 2 12 0.078 1.300 1.300 1.300 1.300 0.078 5.356 0.07 -
1.0020 P2 CO-1A F1 FOUNDATION FOOT FDN F1 ( 3500L x 3500W x 500HPLAIN CONCRETE LEVELING CONCRETE T= 50 M³ EL -2.200 EL -2.150 C0-CVL-DWG-SSFD-2101~21 REV 1 SOIL DISPOSAL 6 6 3.500 0.200 3.700 3.500 0.200 3.700 2.200 -2.150 0.050 4.11 -
1.0021 P2 F1 FOUNDATION FOOT FDN SC ( 1400L x 1400W) EARTH WORK COMPACTIED SOIL 95% MAX DRY M² C0-CVL-DWG-SSFD-2101~21 REV 1 6 6 1.400 0.600 2.000 1.400 0.600 2.000 24.00 -
1.0022 P2 EA-1B F1 FOUNDATION FOOT FDN SC ( 1400L x 1400W) EARTH WORK EXCAVATION BY EQUIPMENT (D>3 M³ EL -2.200 EL -0.300 C0-CVL-DWG-SSFD-2101~21 REV 1 SOIL EXCAVATION 6 0 0 1.400 0.600 2.000 1.400 0.600 2.000 2.200 -0.300 - 1.900 - -
1.0023 P2 EA-1A F1 FOUNDATION FOOT FDN SC ( 1400L x 1400W) EARTH WORK EXCAVATION BY EQUIPMENT (D<=M³ EL -2.200 EL -0.300 C0-CVL-DWG-SSFD-2101~21 REV 1 SOIL EXCAVATION 6 6 1.400 0.600 2.000 1.400 0.600 2.000 2.200 -0.300 - 1.900 45.60 -
1.0024 P2 EA-3B F1 FOUNDATION FOOT FDN SC ( 1400L x 1400W) EARTH WORK SOIL DISPOSAL M³ DISPO: CONCRETE EL -2.150 EL -1.650 C0-CVL-DWG-SSFD-2101~21 REV 1 6 6 1.400 1.400 1.400 1.400 2.150 -1.650 0.500 5.88 -
1.0025 P2 EA-3B F1 FOUNDATION SOCKET COLUMN-OUTER SC ( 1400L x 1400W) EARTH WORK SOIL DISPOSAL M³ DISPO: CONCRETE EL -1.650 EL -0.600 C0-CVL-DWG-SSFD-2101~21 REV 1 6 6 1.400 1.400 1.400 1.400 1.650 -0.600 1.050 12.35 -
1.0026 P2 EA-3B F1 FOUNDATION FOOT FDN SC ( 1400L x 1400W) EARTH WORK SOIL DISPOSAL M³ DISPO: LC + SB C0-CVL-DWG-SSFD-2101~21 REV 1 1 1 4.107 4.107 4.11 -
1.0027 P2 EA-2A F1 FOUNDATION FOOT FDN SC ( 1400L x 1400W) EARTH WORK SOIL BACKFILL M³ C0-CVL-DWG-SSFD-2101~21 REV 1 1 1 45.600 -22.335 23.265 23.27 -
1.0028 P2 F1 FOUNDATION SOCKET COLUMN-INNER SO ( 700L x 700W) OTHERS SHEAR KEY 100x25 MM M C0-CVL-STD-0104 REV 1 6 5 30 0.700 0.700 0.700 0.700 2.800 84.00 -
1.0029 P2 CO-2A F1A FOUNDATION FOOT FDN F1A ( 3500L x 3500W x 500CONCRETE CONCRETE M³ EL -2.150 EL -1.650 C0-CVL-DWG-SSFD-2101~21 REV 1 1 3 3 3.500 3.500 3.500 3.500 0.500 0.500 18.38 18.38
1.0030 P2 FM-1A F1A FOUNDATION FOOT FDN F1A ( 3500L x 3500W x 500FORM WORK FORM WORK M² EL -2.150 EL -1.650 C0-CVL-DWG-SSFD-2101~21 REV 1 1 3 3 3.500 3.500 3.500 3.500 14.000 2.150 -1.650 0.500 21.00 21.00
1.0031 P2 RE-1A F1A FOUNDATION FOOT FDN F1A ( 3500L x 3500W x 500REBAR REBAR Ð 13 TON TRANS, TOP C0-CVL-DWG-SSFD-2101~21 REV 1 13 0.150 1.040 1 0.001 3 24 72 3.400 0.350 0.350 4.100 0.31 0.31
1.0032 P2 RE-1A F1A FOUNDATION FOOT FDN F1A ( 3500L x 3500W x 500REBAR REBAR Ð 16 TON TRANS, BOTT C0-CVL-DWG-SSFD-2101~21 REV 1 16 0.150 1.580 1 0.001 3 24 72 3.400 0.350 0.350 4.100 0.47 0.47
1.0033 P2 RE-1A F1A FOUNDATION FOOT FDN F1A ( 3500L x 3500W x 500REBAR REBAR Ð 13 TON LONG, TOP C0-CVL-DWG-SSFD-2101~21 REV 1 13 0.150 1.040 1 0.001 3 24 72 3.400 0.350 0.350 4.100 0.31 0.31
1.0034 P2 RE-1A F1A FOUNDATION FOOT FDN F1A ( 3500L x 3500W x 500REBAR REBAR Ð 16 TON LONG, BOTT C0-CVL-DWG-SSFD-2101~21 REV 1 16 0.150 1.580 1 0.001 3 24 72 3.400 0.350 0.350 4.100 0.47 0.47
1.0035 P2 RE-1A F1A FOUNDATION FOOT FDN F1A ( 3500L x 3500W x 500REBAR REBAR Ð 13 TON TIE C0-CVL-DWG-SSFD-2101~21 REV 1 13 1.040 1 0.001 3 2 6 0.078 3.440 3.440 0.078 7.036 0.04 0.04
1.0036 P2 RE-1A F1A FOUNDATION FOOT FDN F1A ( 3500L x 3500W x 500REBAR REBAR Ð 16 TON SUPPORT C0-CVL-DWG-SSFD-2101~21 REV 1 16 1.580 1 0.001 3 9 27 0.400 0.342 0.200 0.342 0.400 1.684 0.07 0.07
1.0036 P2 CO-2A F1A FOUNDATION SOCKET COLUMN-OUTER SC ( 1400L x 1400W) CONCRETE CONCRETE M³ EL -1.650 EL -0.600 C0-CVL-STD-0104 REV 1 1 3 3 1.400 1.400 1.400 1.400 1.650 -0.600 1.050 6.17 6.17
1.0037 P2 CO-2A F1A FOUNDATION SOCKET COLUMN-OUTER SC ( 700L x 700W) CONCRETE CONCRETE M³ EL -1.650 EL -0.600 C0-CVL-STD-0104 REV 1 1 3 -1 -3 0.700 0.700 0.700 0.700 1.650 -0.600 1.050 -1.54 -1.54
1.0038 P2 FM-1A F1A FOUNDATION SOCKET COLUMN-OUTER SC ( 1400L x 1400W) FORM WORK FORM WORK M² EL -1.650 EL -0.600 C0-CVL-STD-0104 REV 1 1 3 3 1.400 1.400 1.400 1.400 5.600 1.650 -0.600 1.050 17.64 17.64
1.0039 P2 FM-1A F1A FOUNDATION SOCKET COLUMN-OUTER SC ( 700L x 700W) FORM WORK FORM WORK M² EL -1.650 EL -0.600 C0-CVL-STD-0104 REV 1 1 3 3 0.700 0.700 0.700 0.700 2.800 1.650 -0.600 1.050 8.82 8.82
1.0040 P2 RE-1A F1A FOUNDATION SOCKET COLUMN-OUTER SC ( 1400L x 1400W) REBAR REBAR Ð 19 TON VERT OUTER EL -2.150 EL -0.600 C0-CVL-STD-0104 REV 1 19 2.230 1 0.001 3 38 114 0.500 1.430 1.930 0.49 0.49
1.0041 P2 RE-1A F1A FOUNDATION SOCKET COLUMN-OUTER SC ( 1400L x 1400W) REBAR REBAR Ð 19 TON VERT INNER EL -2.150 EL -0.600 C0-CVL-STD-0104 REV 1 19 2.230 1 0.001 3 30 90 0.500 1.430 1.930 0.39 0.39
1.0042 P2 RE-1A F1A FOUNDATION SOCKET COLUMN-OUTER SC ( 1400L x 1400W) REBAR REBAR Ð 19 TON HORI OUTER C0-CVL-STD-0104 REV 1 19 2.230 1 0.001 3 5 2 30 0.114 1.300 0.250 1.300 0.250 0.114 3.328 0.22 0.22
1.0043 P2 RE-1A F1A FOUNDATION SOCKET COLUMN-OUTER SC ( 1400L x 1400W) REBAR REBAR Ð 19 TON HORI INNER C0-CVL-STD-0104 REV 1 19 2.230 1 0.001 3 5 2 30 0.114 1.300 0.250 1.300 0.250 0.114 3.328 0.22 0.22
1.0044 P2 RE-1A F1A FOUNDATION SOCKET COLUMN-OUTER SC ( 1400L x 1400W) REBAR REBAR Ð 19 TON ADD HORI UPPER C0-CVL-STD-0104 REV 1 19 2.230 1 0.001 3 2 2 12 0.800 0.800 0.02 0.02
1.0045 P2 RE-1A F1A FOUNDATION SOCKET COLUMN-OUTER SC ( 1400L x 1400W) REBAR REBAR Ð 10 TON CROSS TIE C0-CVL-STD-0104 REV 1 10 0.620 1 0.001 3 30 5 450 0.060 0.250 0.060 0.370 0.10 0.10
1.0046 P2 RE-1A F1A FOUNDATION SOCKET COLUMN-OUTER SC ( 1400L x 1400W) REBAR REBAR Ð 13 TON BOTTOM TIE C0-CVL-STD-0104 REV 1 13 1.040 1 0.001 3 2 6 0.078 1.300 1.300 1.300 1.300 0.078 5.356 0.03 0.03
1.0047 P2 CO-1A F1A FOUNDATION FOOT FDN F1A ( 3500L x 3500W x 500PLAIN CONCRETE LEVELING CONCRETE T= 50 M³ EL -2.200 EL -2.150 C0-CVL-DWG-SSFD-2101~21 REV 1 SOIL DISPOSAL 1 3 3 3.500 0.200 3.700 3.500 0.200 3.700 2.200 -2.150 0.050 2.05 2.05
1.0048 P2 F1A FOUNDATION FOOT FDN F1A ( 3500L x 3500W x 500EARTH WORK COMPACTIED SOIL 95% MAX DRY M² C0-CVL-DWG-SSFD-2101~21 REV 1 1 3 3 3.500 0.600 4.100 3.500 0.600 4.100 50.43 50.43
1.0049 P2 EA-1B F1A FOUNDATION FOOT FDN F1A ( 3500L x 3500W x 500EARTH WORK EXCAVATION BY EQUIPMENT (D>2 M³ EL -2.200 EL -0.300 C0-CVL-DWG-SSFD-2101~21 REV 1 SOIL EXCAVATION 1 3 0 0 3.500 0.600 4.100 3.500 0.600 4.100 2.200 -0.300 - 1.900 - -
1.0050 P2 EA-1A F1A FOUNDATION FOOT FDN F1A ( 3500L x 3500W x 500EARTH WORK EXCAVATION BY EQUIPMENT (D<=M³ EL -2.200 EL -0.300 C0-CVL-DWG-SSFD-2101~21 REV 1 SOIL EXCAVATION 1 3 3 3.500 0.600 4.100 3.500 0.600 4.100 2.200 -0.300 - 1.900 95.82 95.82
1.0051 P2 EA-3B F1A FOUNDATION FOOT FDN F1A ( 3500L x 3500W x 500EARTH WORK SOIL DISPOSAL M³ DISPO: CONCRETE EL -2.150 EL -1.650 C0-CVL-DWG-SSFD-2101~21 REV 1 1 3 3 3.500 3.500 3.500 3.500 2.150 -1.650 0.500 18.38 18.38
1.0052 P2 EA-3B F1A FOUNDATION SOCKET COLUMN-OUTER SC ( 1400L x 1400W) EARTH WORK SOIL DISPOSAL M³ DISPO: CONCRETE EL -1.650 EL -0.600 C0-CVL-DWG-SSFD-2101~21 REV 1 1 3 3 1.400 1.400 1.400 1.400 1.650 -0.600 1.050 6.17 6.17
1.0053 P2 EA-3B F1A FOUNDATION FOOT FDN F1A ( 3500L x 3500W x 500EARTH WORK SOIL DISPOSAL M³ DISPO: LC + SB C0-CVL-DWG-SSFD-2101~21 REV 1 1 1 1 2.054 2.054 2.05 2.05
1.0054 P2 EA-2A F1A FOUNDATION FOOT FDN F1A ( 3500L x 3500W x 500EARTH WORK SOIL BACKFILL M³ C0-CVL-DWG-SSFD-2101~21 REV 1 1 1 1 95.817 -26.603 69.215 69.21 69.21
1.0055 P2 RE-1A F1A FOUNDATION FOOT FDN F1A ( 3500L x 3500W x 500REBAR REBAR Ð 16 TON LIFTING LUG C0-CVL-DWG-SSFD-2101~21 REV 1 16 1.580 1 0.001 3 4 12 0.600 0.525 0.150 0.525 0.600 2.400 0.05 0.05
1.0056 P2 SS-4A F1A FOUNDATION FOOT FDN F1A ( 3500L x 3500W x 500STEEL L 50x50x5 TON LIFTING LUG C0-CVL-DWG-SSFD-2101~21 REV 1 3.770 1 0.001 3 4 12 0.500 0.500 0.02 0.02
1.0057 P2 F1A FOUNDATION SOCKET COLUMN-INNER SO ( 700L x 700W) OTHERS SHEAR KEY 100x25 MM M C0-CVL-STD-0104 REV 1 1 3 5 15 0.700 0.700 0.700 0.700 2.800 42.00 42.00
1.0058 P2 CO-2A F2 FOUNDATION FOOT FDN F2 ( 3500L x 3500W x 500HCONCRETE CONCRETE M³ EL -2.150 EL -1.650 C0-CVL-DWG-SSFD-2101~21 REV 1 1 3 3 3.500 3.500 3.500 3.500 0.500 0.500 18.38 18.38
1.0059 P2 FM-1A F2 FOUNDATION FOOT FDN F2 ( 3500L x 3500W x 500HFORM WORK FORM WORK M² EL -2.150 EL -1.650 C0-CVL-DWG-SSFD-2101~21 REV 1 1 3 3 3.500 3.500 3.500 3.500 14.000 2.150 -1.650 0.500 21.00 21.00
1.0060 P2 RE-1A F2 FOUNDATION FOOT FDN F2 ( 3500L x 3500W x 500HREBAR REBAR Ð 13 TON TRANS, TOP C0-CVL-DWG-SSFD-2101~21 REV 1 13 0.150 1.040 1 0.001 3 24 72 3.400 0.350 0.350 4.100 0.31 0.31
1.0061 P2 RE-1A F2 FOUNDATION FOOT FDN F2 ( 3500L x 3500W x 500HREBAR REBAR Ð 16 TON TRANS, BOTT C0-CVL-DWG-SSFD-2101~21 REV 1 16 0.150 1.580 1 0.001 3 24 72 3.400 0.350 0.350 4.100 0.47 0.47
1.0062 P2 RE-1A F2 FOUNDATION FOOT FDN F2 ( 3500L x 3500W x 500HREBAR REBAR Ð 13 TON LONG, TOP C0-CVL-DWG-SSFD-2101~21 REV 1 13 0.150 1.040 1 0.001 3 24 72 3.400 0.350 0.350 4.100 0.31 0.31
1.0063 P2 RE-1A F2 FOUNDATION FOOT FDN F2 ( 3500L x 3500W x 500HREBAR REBAR Ð 16 TON LONG, BOTT C0-CVL-DWG-SSFD-2101~21 REV 1 16 0.150 1.580 1 0.001 3 24 72 3.400 0.350 0.350 4.100 0.47 0.47
1.0064 P2 RE-1A F2 FOUNDATION FOOT FDN F2 ( 3500L x 3500W x 500HREBAR REBAR Ð 13 TON TIE C0-CVL-DWG-SSFD-2101~21 REV 1 13 1.040 1 0.001 3 2 6 0.078 3.440 3.440 0.078 7.036 0.04 0.04
1.0065 P2 RE-1A F2 FOUNDATION FOOT FDN F2 ( 3500L x 3500W x 500HREBAR REBAR Ð 16 TON SUPPORT C0-CVL-DWG-SSFD-2101~21 REV 1 16 1.580 1 0.001 3 9 27 0.400 0.342 0.200 0.342 0.400 1.684 0.07 0.07
1.0065 P2 CO-2A F2 FOUNDATION SOCKET COLUMN-OUTER SC ( 1400L x 1400W) CONCRETE CONCRETE M³ EL -1.650 EL -0.600 C0-CVL-STD-0104 REV 1 3 3 1.400 1.400 1.400 1.400 1.650 -0.600 1.050 6.17 -
1.0066 P2 CO-2A F2 FOUNDATION SOCKET COLUMN-OUTER SC ( 700L x 700W) CONCRETE CONCRETE M³ EL -1.650 EL -0.600 C0-CVL-STD-0104 REV 1 3 -1 -3 0.700 0.700 0.700 0.700 1.650 -0.600 1.050 -1.54 -
1.0067 P2 FM-1A F2 FOUNDATION SOCKET COLUMN-OUTER SC ( 1400L x 1400W) FORM WORK FORM WORK M² EL -1.650 EL -0.600 C0-CVL-STD-0104 REV 1 3 3 1.400 1.400 1.400 1.400 5.600 1.650 -0.600 1.050 17.64 -
1.0068 P2 FM-1A F2 FOUNDATION SOCKET COLUMN-OUTER SC ( 700L x 700W) FORM WORK FORM WORK M² EL -1.650 EL -0.600 C0-CVL-STD-0104 REV 1 3 3 0.700 0.700 0.700 0.700 2.800 1.650 -0.600 1.050 8.82 -
1.0069 P2 RE-1A F2 FOUNDATION SOCKET COLUMN-OUTER SC ( 1400L x 1400W) REBAR REBAR Ð 19 TON VERT OUTER EL -2.150 EL -0.600 C0-CVL-STD-0104 REV 1 - 1 0.001 3 38 114 0.500 1.430 1.930 - -
1.0070 P2 RE-1A F2 FOUNDATION SOCKET COLUMN-OUTER SC ( 1400L x 1400W) REBAR REBAR Ð 19 TON VERT INNER EL -2.150 EL -0.600 C0-CVL-STD-0104 REV 1 19 2.230 1 0.001 3 30 90 0.500 1.430 1.930 0.39 0.39
1.0071 P2 RE-1A F2 FOUNDATION SOCKET COLUMN-OUTER SC ( 1400L x 1400W) REBAR REBAR Ð 19 TON HORI OUTER C0-CVL-STD-0104 REV 1 19 2.230 1 0.001 3 5 2 30 0.114 1.300 0.250 1.300 0.250 0.114 3.328 0.22 0.22
1.0072 P2 RE-1A F2 FOUNDATION SOCKET COLUMN-OUTER SC ( 1400L x 1400W) REBAR REBAR Ð 19 TON HORI INNER C0-CVL-STD-0104 REV 1 19 2.230 1 0.001 3 5 2 30 0.114 1.300 0.250 1.300 0.250 0.114 3.328 0.22 0.22
1.0073 P2 RE-1A F2 FOUNDATION SOCKET COLUMN-OUTER SC ( 1400L x 1400W) REBAR REBAR Ð 19 TON ADD HORI UPPER C0-CVL-STD-0104 REV 1 19 2.230 1 0.001 3 2 2 12 0.800 0.800 0.02 0.02
1.0074 P2 RE-1A F2 FOUNDATION SOCKET COLUMN-OUTER SC ( 1400L x 1400W) REBAR REBAR Ð 10 TON CROSS TIE C0-CVL-STD-0104 REV 1 10 0.620 1 0.001 3 30 5 450 0.060 0.250 0.060 0.370 0.10 0.10
1.0075 P2 RE-1A F2 FOUNDATION SOCKET COLUMN-OUTER SC ( 1400L x 1400W) REBAR REBAR Ð 13 TON BOTTOM TIE C0-CVL-STD-0104 REV 1 13 1.040 1 0.001 3 2 6 0.078 1.300 1.300 1.300 1.300 0.078 5.356 0.03 0.03
1.0076 P2 CO-1A F2 FOUNDATION FOOT FDN F2 ( 3500L x 3500W x 500HPLAIN CONCRETE LEVELING CONCRETE T= 50 M³ EL -2.200 EL -2.150 C0-CVL-DWG-SSFD-2101~21 REV 1 SOIL DISPOSAL 1 3 3 3.500 0.200 3.700 3.500 0.200 3.700 2.200 -2.150 0.050 2.05 2.05
1.0077 P2 F2 FOUNDATION FOOT FDN F2 ( 3500L x 3500W x 500HEARTH WORK COMPACTIED SOIL 95% MAX DRY M² C0-CVL-DWG-SSFD-2101~21 REV 1 1 3 3 3.500 0.600 4.100 3.500 0.600 4.100 50.43 50.43
1.0078 P2 EA-1B F2 FOUNDATION FOOT FDN F2 ( 3500L x 3500W x 500HEARTH WORK EXCAVATION BY EQUIPMENT (D>2 M³ EL -2.200 EL -0.300 C0-CVL-DWG-SSFD-2101~21 REV 1 SOIL EXCAVATION 1 3 0 0 3.500 0.600 4.100 3.500 0.600 4.100 2.200 -0.300 - 1.900 - -
1.0079 P2 EA-1A F2 FOUNDATION FOOT FDN F2 ( 3500L x 3500W x 500HEARTH WORK EXCAVATION BY EQUIPMENT (D<=M³ EL -2.200 EL -0.300 C0-CVL-DWG-SSFD-2101~21 REV 1 SOIL EXCAVATION 1 3 3 3.500 0.600 4.100 3.500 0.600 4.100 2.200 -0.300 - 1.900 95.82 95.82
1.0080 P2 EA-3B F2 FOUNDATION FOOT FDN F2 ( 3500L x 3500W x 500HEARTH WORK SOIL DISPOSAL M³ DISPO: CONCRETE EL -2.150 EL -1.650 C0-CVL-DWG-SSFD-2101~21 REV 1 1 3 3 3.500 3.500 3.500 3.500 2.150 -1.650 0.500 18.38 18.38
1.0081 P2 EA-3B F2 FOUNDATION SOCKET COLUMN-OUTER SC ( 1400L x 1400W) EARTH WORK SOIL DISPOSAL M³ DISPO: CONCRETE EL -1.650 EL -0.600 C0-CVL-DWG-SSFD-2101~21 REV 1 1 3 3 1.400 1.400 1.400 1.400 1.650 -0.600 1.050 6.17 6.17
1.0082 P2 EA-3B F2 FOUNDATION FOOT FDN F2 ( 3500L x 3500W x 500HEARTH WORK SOIL DISPOSAL M³ DISPO: LC + SB C0-CVL-DWG-SSFD-2101~21 REV 1 1 1 1 2.054 2.054 2.05 2.05
1.0083 P2 EA-2A F2 FOUNDATION FOOT FDN F2 ( 3500L x 3500W x 500HEARTH WORK SOIL BACKFILL M³ C0-CVL-DWG-SSFD-2101~21 REV 1 1 1 1 95.817 -26.603 69.215 69.21 69.21
1.0084 P2 F2 FOUNDATION SOCKET COLUMN-INNER SO ( 700L x 700W) OTHERS SHEAR KEY 100x25 MM M C0-CVL-STD-0104 REV 1 1 3 5 15 0.700 0.700 0.700 0.700 2.800 42.00 42.00
1.0085 P2 CO-2A F2 FOUNDATION FOOT FDN F2 ( 3500L x 3500W x 500HCONCRETE CONCRETE M³ EL -2.150 EL -1.650 C0-CVL-DWG-SSFD-2101~21 REV 1 1 6 6 3.500 3.500 3.500 3.500 0.500 0.500 36.75 36.75
1.0086 P2 FM-1A F2 FOUNDATION FOOT FDN F2 ( 3500L x 3500W x 500HFORM WORK FORM WORK M² EL -2.150 EL -1.650 C0-CVL-DWG-SSFD-2101~21 REV 1 1 6 6 3.500 3.500 3.500 3.500 14.000 2.150 -1.650 0.500 42.00 42.00
1.0087 P2 RE-1A F2 FOUNDATION FOOT FDN F2 ( 3500L x 3500W x 500HREBAR REBAR Ð 13 TON TRANS, TOP C0-CVL-DWG-SSFD-2101~21 REV 1 13 0.150 1.040 1 0.001 6 24 144 3.400 0.350 0.350 4.100 0.61 0.61
1.0088 P2 RE-1A F2 FOUNDATION FOOT FDN F2 ( 3500L x 3500W x 500HREBAR REBAR Ð 16 TON TRANS, BOTT C0-CVL-DWG-SSFD-2101~21 REV 1 16 0.150 1.580 1 0.001 6 24 144 3.400 0.350 0.350 4.100 0.93 0.93
1.0089 P2 RE-1A F2 FOUNDATION FOOT FDN F2 ( 3500L x 3500W x 500HREBAR REBAR Ð 13 TON LONG, TOP C0-CVL-DWG-SSFD-2101~21 REV 1 13 0.150 1.040 1 0.001 6 24 144 3.400 0.350 0.350 4.100 0.61 0.61
1.0090 P2 RE-1A F2 FOUNDATION FOOT FDN F2 ( 3500L x 3500W x 500HREBAR REBAR Ð 16 TON LONG, BOTT C0-CVL-DWG-SSFD-2101~21 REV 1 16 0.150 1.580 1 0.001 6 24 144 3.400 0.350 0.350 4.100 0.93 0.93
1.0091 P2 RE-1A F2 FOUNDATION FOOT FDN F2 ( 3500L x 3500W x 500HREBAR REBAR Ð 13 TON TIE C0-CVL-DWG-SSFD-2101~21 REV 1 13 1.040 1 0.001 6 2 12 0.078 3.440 3.440 0.078 7.036 0.09 0.09
1.0092 P2 RE-1A F2 FOUNDATION FOOT FDN F2 ( 3500L x 3500W x 500HREBAR REBAR Ð 16 TON SUPPORT C0-CVL-DWG-SSFD-2101~21 REV 1 16 1.580 1 0.001 6 9 54 0.400 0.342 0.200 0.342 0.400 1.684 0.14 0.14
1.0092 P2 CO-2A F2 FOUNDATION SOCKET COLUMN-OUTER SC ( 1400L x 1400W) CONCRETE CONCRETE M³ EL -1.650 EL -0.600 C0-CVL-STD-0104 REV 1 1 6 6 1.400 1.400 1.400 1.400 1.650 -0.600 1.050 12.35 12.35
1.0093 P2 CO-2A F2 FOUNDATION SOCKET COLUMN-OUTER SC ( 700L x 700W) CONCRETE CONCRETE M³ EL -1.650 EL -0.600 C0-CVL-STD-0104 REV 1 1 6 -1 -6 0.700 0.700 0.700 0.700 1.650 -0.600 1.050 -3.09 -3.09
1.0094 P2 FM-1A F2 FOUNDATION SOCKET COLUMN-OUTER SC ( 1400L x 1400W) FORM WORK FORM WORK M² EL -1.650 EL -0.600 C0-CVL-STD-0104 REV 1 1 6 6 1.400 1.400 1.400 1.400 5.600 1.650 -0.600 1.050 35.28 35.28
1.0095 P2 FM-1A F2 FOUNDATION SOCKET COLUMN-OUTER SC ( 700L x 700W) FORM WORK FORM WORK M² EL -1.650 EL -0.600 C0-CVL-STD-0104 REV 1 1 6 6 0.700 0.700 0.700 0.700 2.800 1.650 -0.600 1.050 17.64 17.64
1.0096 P2 RE-1A F2 FOUNDATION SOCKET COLUMN-OUTER SC ( 1400L x 1400W) REBAR REBAR Ð 19 TON VERT OUTER EL -2.150 EL -0.600 C0-CVL-STD-0104 REV 1 19 2.230 1 0.001 6 38 228 0.500 1.430 1.930 0.98 0.98
1.0097 P2 RE-1A F2 FOUNDATION SOCKET COLUMN-OUTER SC ( 1400L x 1400W) REBAR REBAR Ð 19 TON VERT INNER EL -2.150 EL -0.600 C0-CVL-STD-0104 REV 1 19 2.230 1 0.001 6 30 180 0.500 1.430 1.930 0.77 0.77
1.0098 P2 RE-1A F2 FOUNDATION SOCKET COLUMN-OUTER SC ( 1400L x 1400W) REBAR REBAR Ð 19 TON HORI OUTER C0-CVL-STD-0104 REV 1 19 2.230 1 0.001 6 5 2 60 0.114 1.300 0.250 1.300 0.250 0.114 3.328 0.45 0.45
1.0099 P2 RE-1A F2 FOUNDATION SOCKET COLUMN-OUTER SC ( 1400L x 1400W) REBAR REBAR Ð 19 TON HORI INNER C0-CVL-STD-0104 REV 1 19 2.230 1 0.001 6 5 2 60 0.114 1.300 0.250 1.300 0.250 0.114 3.328 0.45 0.45
1.0100 P2 RE-1A F2 FOUNDATION SOCKET COLUMN-OUTER SC ( 1400L x 1400W) REBAR REBAR Ð 19 TON ADD HORI UPPER C0-CVL-STD-0104 REV 1 19 2.230 1 0.001 6 2 2 24 0.800 0.800 0.04 0.04
1.0101 P2 RE-1A F2 FOUNDATION SOCKET COLUMN-OUTER SC ( 1400L x 1400W) REBAR REBAR Ð 10 TON CROSS TIE C0-CVL-STD-0104 REV 1 10 0.620 1 0.001 6 30 5 900 0.060 0.250 0.060 0.370 0.21 0.21
1.0102 P2 RE-1A F2 FOUNDATION SOCKET COLUMN-OUTER SC ( 1400L x 1400W) REBAR REBAR Ð 13 TON BOTTOM TIE C0-CVL-STD-0104 REV 1 13 1.040 1 0.001 6 2 12 0.078 1.300 1.300 1.300 1.300 0.078 5.356 0.07 0.07
1.0103 P2 CO-1A F2 FOUNDATION FOOT FDN F2 ( 3500L x 3500W x 500HPLAIN CONCRETE LEVELING CONCRETE T= 50 M³ EL -2.200 EL -2.150 C0-CVL-DWG-SSFD-2101~21 REV 1 SOIL DISPOSAL 1 6 6 3.500 0.200 3.700 3.500 0.200 3.700 2.200 -2.150 0.050 4.11 4.11
1.0104 P2 F2 FOUNDATION FOOT FDN F2 ( 3500L x 3500W x 500HEARTH WORK COMPACTIED SOIL 95% MAX DRY M² C0-CVL-DWG-SSFD-2101~21 REV 1 1 6 6 3.500 0.600 4.100 3.500 0.600 4.100 100.86 100.86
1.0105 P2 EA-1B F2 FOUNDATION FOOT FDN F2 ( 3500L x 3500W x 500HEARTH WORK EXCAVATION BY EQUIPMENT (D>3 M³ EL -2.200 EL -0.300 C0-CVL-DWG-SSFD-2101~21 REV 1 SOIL EXCAVATION 1 6 0 0 3.500 0.600 4.100 3.500 0.600 4.100 2.200 -0.300 - 1.900 - -
1.0106 P2 EA-1A F2 FOUNDATION FOOT FDN F2 ( 3500L x 3500W x 500HEARTH WORK EXCAVATION BY EQUIPMENT (D<=M³ EL -2.200 EL -0.300 C0-CVL-DWG-SSFD-2101~21 REV 1 SOIL EXCAVATION 1 6 6 3.500 0.600 4.100 3.500 0.600 4.100 2.200 -0.300 - 1.900 191.63 191.63
1.0107 P2 EA-3B F2 FOUNDATION FOOT FDN F2 ( 3500L x 3500W x 500HEARTH WORK SOIL DISPOSAL M³ DISPO: CONCRETE EL -2.150 EL -1.650 C0-CVL-DWG-SSFD-2101~21 REV 1 1 6 6 3.500 3.500 3.500 3.500 2.150 -1.650 0.500 36.75 36.75
1.0108 P2 EA-3B F2 FOUNDATION SOCKET COLUMN-OUTER SC ( 1400L x 1400W) EARTH WORK SOIL DISPOSAL M³ DISPO: CONCRETE EL -1.650 EL -0.600 C0-CVL-DWG-SSFD-2101~21 REV 1 1 6 6 1.400 1.400 1.400 1.400 1.650 -0.600 1.050 12.35 12.35
1.0109 P2 EA-3B F2 FOUNDATION FOOT FDN F2 ( 3500L x 3500W x 500HEARTH WORK SOIL DISPOSAL M³ DISPO: LC + SB C0-CVL-DWG-SSFD-2101~21 REV 1 1 1 1 4.107 4.107 4.11 4.11
1.0110 P2 EA-2A F2 FOUNDATION FOOT FDN F2 ( 3500L x 3500W x 500HEARTH WORK SOIL BACKFILL M³ C0-CVL-DWG-SSFD-2101~21 REV 1 1 1 1 191.634 -53.205 138.429 138.43 138.43
1.0111 P2 F2 FOUNDATION SOCKET COLUMN-INNER SO ( 700L x 700W) OTHERS SHEAR KEY 100x25 MM M C0-CVL-STD-0104 REV 1 1 6 5 30 0.700 0.700 0.700 0.700 2.800 84.00 84.00
1.0085 P2 CO-2A F3 FOUNDATION FOOT FDN F3 ( 3000L x 3300W x 500HCONCRETE CONCRETE M³ EL -2.150 EL -1.650 C0-CVL-DWG-SSFD-2101~21 REV 1 1 1 3.000 3.000 3.300 3.300 0.500 0.500 4.95 -
1.0086 P2 FM-1A F3 FOUNDATION FOOT FDN F3 ( 3000L x 3300W x 500HFORM WORK FORM WORK M² EL -2.150 EL -1.650 C0-CVL-DWG-SSFD-2101~21 REV 1 1 1 3.000 3.300 3.000 3.300 12.600 2.150 -1.650 0.500 6.30 -
1.0087 P2 RE-1A F3 FOUNDATION FOOT FDN F3 ( 3000L x 3300W x 500HREBAR REBAR Ð 13 TON TRANS, TOP C0-CVL-DWG-SSFD-2101~21 REV 1 13 0.150 1.040 0.001 1 22 22 2.900 0.350 0.350 3.600 0.08 -
1.0088 P2 RE-1A F3 FOUNDATION FOOT FDN F3 ( 3000L x 3300W x 500HREBAR REBAR Ð 16 TON TRANS, BOTT C0-CVL-DWG-SSFD-2101~21 REV 1 16 0.150 1.580 0.001 1 22 22 2.900 0.350 0.350 3.600 0.13 -
1.0089 P2 RE-1A F3 FOUNDATION FOOT FDN F3 ( 3000L x 3300W x 500HREBAR REBAR Ð 13 TON LONG, TOP C0-CVL-DWG-SSFD-2101~21 REV 1 13 0.150 1.040 0.001 1 20 20 3.200 0.350 0.350 3.900 0.08 -
1.0090 P2 RE-1A F3 FOUNDATION FOOT FDN F3 ( 3000L x 3300W x 500HREBAR REBAR Ð 16 TON LONG, BOTT C0-CVL-DWG-SSFD-2101~21 REV 1 16 0.150 1.580 0.001 1 20 20 3.200 0.350 0.350 3.900 0.12 -
1.0091 P2 RE-1A F3 FOUNDATION FOOT FDN F3 ( 3000L x 3300W x 500HREBAR REBAR Ð 13 TON TIE C0-CVL-DWG-SSFD-2101~21 REV 1 13 1.040 0.001 1 2 2 0.078 2.940 3.240 0.078 6.336 0.01 -
1.0092 P2 RE-1A F3 FOUNDATION FOOT FDN F3 ( 3000L x 3300W x 500HREBAR REBAR Ð 16 TON SUPPORT C0-CVL-DWG-SSFD-2101~21 REV 1 16 1.580 0.001 1 9 9 0.400 0.342 0.200 0.342 0.400 1.684 0.02 -
1.0092 P2 CO-2A F3 FOUNDATION SOCKET COLUMN-OUTER SC ( 1400L x 1400W) CONCRETE CONCRETE M³ EL -1.650 EL -0.600 C0-CVL-STD-0104 REV 1 1 1 1.400 1.400 1.400 1.400 1.650 -0.600 1.050 2.06 -
1.0093 P2 CO-2A F3 FOUNDATION SOCKET COLUMN-OUTER SC ( 700L x 700W) CONCRETE CONCRETE M³ EL -1.650 EL -0.600 C0-CVL-STD-0104 REV 1 1 -1 -1 0.700 0.700 0.700 0.700 1.650 -0.600 1.050 -0.51 -
1.0094 P2 FM-1A F3 FOUNDATION SOCKET COLUMN-OUTER SC ( 1400L x 1400W) FORM WORK FORM WORK M² EL -1.650 EL -0.600 C0-CVL-STD-0104 REV 1 1 1 1.400 1.400 1.400 1.400 5.600 1.650 -0.600 1.050 5.88 -
1.0095 P2 FM-1A F3 FOUNDATION SOCKET COLUMN-OUTER SC ( 700L x 700W) FORM WORK FORM WORK M² EL -1.650 EL -0.600 C0-CVL-STD-0104 REV 1 1 1 0.700 0.700 0.700 0.700 2.800 1.650 -0.600 1.050 2.94 -
1.0096 P2 RE-1A F3 FOUNDATION SOCKET COLUMN-OUTER SC ( 1400L x 1400W) REBAR REBAR Ð 19 TON VERT OUTER EL -2.150 EL -0.600 C0-CVL-STD-0104 REV 1 19 2.230 0.001 1 38 38 0.500 1.430 1.930 0.16 -
1.0097 P2 RE-1A F3 FOUNDATION SOCKET COLUMN-OUTER SC ( 1400L x 1400W) REBAR REBAR Ð 19 TON VERT INNER EL -2.150 EL -0.600 C0-CVL-STD-0104 REV 1 19 2.230 0.001 1 30 30 0.500 1.430 1.930 0.13 -
1.0098 P2 RE-1A F3 FOUNDATION SOCKET COLUMN-OUTER SC ( 1400L x 1400W) REBAR REBAR Ð 19 TON HORI OUTER C0-CVL-STD-0104 REV 1 19 2.230 0.001 1 5 2 10 0.114 1.300 0.250 1.300 0.250 0.114 3.328 0.07 -
1.0099 P2 RE-1A F3 FOUNDATION SOCKET COLUMN-OUTER SC ( 1400L x 1400W) REBAR REBAR Ð 19 TON HORI INNER C0-CVL-STD-0104 REV 1 19 2.230 0.001 1 5 2 10 0.114 1.300 0.250 1.300 0.250 0.114 3.328 0.07 -
1.0100 P2 RE-1A F3 FOUNDATION SOCKET COLUMN-OUTER SC ( 1400L x 1400W) REBAR REBAR Ð 19 TON ADD HORI UPPER C0-CVL-STD-0104 REV 1 19 2.230 0.001 1 2 2 4 0.800 0.800 0.01 -
1.0101 P2 RE-1A F3 FOUNDATION SOCKET COLUMN-OUTER SC ( 1400L x 1400W) REBAR REBAR Ð 10 TON CROSS TIE C0-CVL-STD-0104 REV 1 10 0.620 0.001 1 30 5 150 0.060 0.250 0.060 0.370 0.03 -
1.0102 P2 RE-1A F3 FOUNDATION SOCKET COLUMN-OUTER SC ( 1400L x 1400W) REBAR REBAR Ð 13 TON BOTTOM TIE C0-CVL-STD-0104 REV 1 13 1.040 0.001 1 2 2 0.078 1.300 1.300 1.300 1.300 0.078 5.356 0.01 -
1.0103 P2 CO-1A F3 FOUNDATION FOOT FDN F3 ( 3000L x 3300W x 500HPLAIN CONCRETE LEVELING CONCRETE T= 50 M³ EL -2.200 EL -2.150 C0-CVL-DWG-SSFD-2101~21 REV 1 SOIL DISPOSAL 1 1 3.000 0.200 3.200 3.300 0.200 3.500 2.200 -2.150 0.050 0.56 -
1.0104 P2 F3 FOUNDATION FOOT FDN F3 ( 3000L x 3300W x 500HEARTH WORK COMPACTIED SOIL 95% MAX DRY M² C0-CVL-DWG-SSFD-2101~21 REV 1 1 1 3.000 0.600 3.600 3.300 0.600 3.900 14.04 -
1.0105 P2 EA-1B F3 FOUNDATION FOOT FDN F3 ( 3000L x 3300W x 500HEARTH WORK EXCAVATION BY EQUIPMENT (D>3 M³ EL -2.200 EL -0.300 C0-CVL-DWG-SSFD-2101~21 REV 1 SOIL EXCAVATION 1 0 0 3.000 0.600 3.600 3.300 0.600 3.900 2.200 -0.300 - 1.900 - -
1.0106 P2 EA-1A F3 FOUNDATION FOOT FDN F3 ( 3000L x 3300W x 500HEARTH WORK EXCAVATION BY EQUIPMENT (D<=M³ EL -2.200 EL -0.300 C0-CVL-DWG-SSFD-2101~21 REV 1 SOIL EXCAVATION 1 1 3.000 0.600 3.600 3.300 0.600 3.900 2.200 -0.300 - 1.900 26.68 -
1.0107 P2 EA-3B F3 FOUNDATION FOOT FDN F3 ( 3000L x 3300W x 500HEARTH WORK SOIL DISPOSAL M³ DISPO: CONCRETE EL -2.150 EL -1.650 C0-CVL-DWG-SSFD-2101~21 REV 1 1 1 3.000 3.000 3.300 3.300 2.150 -1.650 0.500 4.95 -
1.0108 P2 EA-3B F3 FOUNDATION SOCKET COLUMN-OUTER SC ( 1400L x 1400W) EARTH WORK SOIL DISPOSAL M³ DISPO: CONCRETE EL -1.650 EL -0.600 C0-CVL-DWG-SSFD-2101~21 REV 1 1 1 1.400 1.400 1.400 1.400 1.650 -0.600 1.050 2.06 -
1.0109 P2 EA-3B F3 FOUNDATION FOOT FDN F3 ( 3000L x 3300W x 500HEARTH WORK SOIL DISPOSAL M³ DISPO: LC + SB C0-CVL-DWG-SSFD-2101~21 REV 1 1 1 0.560 0.560 0.56 -
1.0110 P2 EA-2A F3 FOUNDATION FOOT FDN F3 ( 3000L x 3300W x 500HEARTH WORK SOIL BACKFILL M³ C0-CVL-DWG-SSFD-2101~21 REV 1 1 1 26.676 -7.568 19.108 19.11 -
1.0111 P2 RE-1A F3 FOUNDATION FOOT FDN F3 ( 3000L x 3300W x 500HREBAR REBAR Ð 16 TON LIFTING LUG C0-CVL-DWG-SSFD-2101~21 REV 1 16 1.580 0.001 1 4 4 0.600 0.525 0.150 0.525 0.600 2.400 0.02 -
1.0112 P2 SS-4A F3 FOUNDATION FOOT FDN F3 ( 3000L x 3300W x 500HSTEEL L 50x50x5 TON LIFTING LUG C0-CVL-DWG-SSFD-2101~21 REV 1 3.770 0.001 1 4 4 0.500 0.500 0.01 -
1.0113 P2 F3 FOUNDATION SOCKET COLUMN-INNER SO ( 700L x 700W) OTHERS SHEAR KEY 100x25 MM M C0-CVL-STD-0104 REV 1 1 5 5 0.700 0.700 0.700 0.700 2.800 14.00 -
1.0114 P2 CO-2A F4 FOUNDATION FOOT FDN F4 ( 3000L x 3300W x 500HCONCRETE CONCRETE M³ EL -2.150 EL -1.650 C0-CVL-DWG-SSFD-2101~21 REV 1 1 1 3.000 3.000 3.300 3.300 0.500 0.500 4.95 -
1.0115 P2 FM-1A F4 FOUNDATION FOOT FDN F4 ( 3000L x 3300W x 500HFORM WORK FORM WORK M² EL -2.150 EL -1.650 C0-CVL-DWG-SSFD-2101~21 REV 1 1 1 3.000 3.300 3.000 3.300 12.600 2.150 -1.650 0.500 6.30 -
1.0116 P2 RE-1A F4 FOUNDATION FOOT FDN F4 ( 3000L x 3300W x 500HREBAR REBAR Ð 13 TON TRANS, TOP C0-CVL-DWG-SSFD-2101~21 REV 1 13 0.150 1.040 0.001 1 22 22 2.900 0.350 0.350 3.600 0.08 -
1.0117 P2 RE-1A F4 FOUNDATION FOOT FDN F4 ( 3000L x 3300W x 500HREBAR REBAR Ð 16 TON TRANS, BOTT C0-CVL-DWG-SSFD-2101~21 REV 1 16 0.150 1.580 0.001 1 22 22 2.900 0.350 0.350 3.600 0.13 -
1.0118 P2 RE-1A F4 FOUNDATION FOOT FDN F4 ( 3000L x 3300W x 500HREBAR REBAR Ð 13 TON LONG, TOP C0-CVL-DWG-SSFD-2101~21 REV 1 13 0.150 1.040 0.001 1 20 20 3.200 0.350 0.350 3.900 0.08 -
1.0119 P2 RE-1A F4 FOUNDATION FOOT FDN F4 ( 3000L x 3300W x 500HREBAR REBAR Ð 16 TON LONG, BOTT C0-CVL-DWG-SSFD-2101~21 REV 1 16 0.150 1.580 0.001 1 20 20 3.200 0.350 0.350 3.900 0.12 -
1.0120 P2 RE-1A F4 FOUNDATION FOOT FDN F4 ( 3000L x 3300W x 500HREBAR REBAR Ð 13 TON TIE C0-CVL-DWG-SSFD-2101~21 REV 1 13 1.040 0.001 1 2 2 0.078 2.940 3.240 0.078 6.336 0.01 -
1.0121 P2 RE-1A F4 FOUNDATION FOOT FDN F4 ( 3000L x 3300W x 500HREBAR REBAR Ð 16 TON SUPPORT C0-CVL-DWG-SSFD-2101~21 REV 1 16 1.580 0.001 1 9 9 0.400 0.342 0.200 0.342 0.400 1.684 0.02 -
1.0121 P2 CO-2A F4 FOUNDATION SOCKET COLUMN-OUTER SC ( 1400L x 1400W) CONCRETE CONCRETE M³ EL -1.650 EL -0.600 C0-CVL-STD-0104 REV 1 1 1 1.400 1.400 1.400 1.400 1.650 -0.600 1.050 2.06 -
1.0122 P2 CO-2A F4 FOUNDATION SOCKET COLUMN-OUTER SC ( 700L x 700W) CONCRETE CONCRETE M³ EL -1.650 EL -0.600 C0-CVL-STD-0104 REV 1 1 -1 -1 0.700 0.700 0.700 0.700 1.650 -0.600 1.050 -0.51 -
1.0123 P2 FM-1A F4 FOUNDATION SOCKET COLUMN-OUTER SC ( 1400L x 1400W) FORM WORK FORM WORK M² EL -1.650 EL -0.600 C0-CVL-STD-0104 REV 1 1 1 1.400 1.400 1.400 1.400 5.600 1.650 -0.600 1.050 5.88 -
1.0124 P2 FM-1A F4 FOUNDATION SOCKET COLUMN-OUTER SC ( 700L x 700W) FORM WORK FORM WORK M² EL -1.650 EL -0.600 C0-CVL-STD-0104 REV 1 1 1 0.700 0.700 0.700 0.700 2.800 1.650 -0.600 1.050 2.94 -
1.0125 P2 RE-1A F4 FOUNDATION SOCKET COLUMN-OUTER SC ( 1400L x 1400W) REBAR REBAR Ð 19 TON VERT OUTER EL -2.150 EL -0.600 C0-CVL-STD-0104 REV 1 19 2.230 0.001 1 38 38 0.500 1.430 1.930 0.16 -
1.0126 P2 RE-1A F4 FOUNDATION SOCKET COLUMN-OUTER SC ( 1400L x 1400W) REBAR REBAR Ð 19 TON VERT INNER EL -2.150 EL -0.600 C0-CVL-STD-0104 REV 1 19 2.230 0.001 1 30 30 0.500 1.430 1.930 0.13 -
1.0127 P2 RE-1A F4 FOUNDATION SOCKET COLUMN-OUTER SC ( 1400L x 1400W) REBAR REBAR Ð 19 TON HORI OUTER C0-CVL-STD-0104 REV 1 19 2.230 0.001 1 5 2 10 0.114 1.300 0.250 1.300 0.250 0.114 3.328 0.07 -
1.0128 P2 RE-1A F4 FOUNDATION SOCKET COLUMN-OUTER SC ( 1400L x 1400W) REBAR REBAR Ð 19 TON HORI INNER C0-CVL-STD-0104 REV 1 19 2.230 0.001 1 5 2 10 0.114 1.300 0.250 1.300 0.250 0.114 3.328 0.07 -
1.0129 P2 RE-1A F4 FOUNDATION SOCKET COLUMN-OUTER SC ( 1400L x 1400W) REBAR REBAR Ð 19 TON ADD HORI UPPER C0-CVL-STD-0104 REV 1 19 2.230 0.001 1 2 2 4 0.800 0.800 0.01 -
1.0130 P2 RE-1A F4 FOUNDATION SOCKET COLUMN-OUTER SC ( 1400L x 1400W) REBAR REBAR Ð 10 TON CROSS TIE C0-CVL-STD-0104 REV 1 10 0.620 0.001 1 30 5 150 0.060 0.250 0.060 0.370 0.03 -
1.0131 P2 RE-1A F4 FOUNDATION SOCKET COLUMN-OUTER SC ( 1400L x 1400W) REBAR REBAR Ð 13 TON BOTTOM TIE C0-CVL-STD-0104 REV 1 13 1.040 0.001 1 2 2 0.078 1.300 1.300 1.300 1.300 0.078 5.356 0.01 -
1.0132 P2 CO-1A F4 FOUNDATION FOOT FDN F4 ( 3000L x 3300W x 500HPLAIN CONCRETE LEVELING CONCRETE T= 50 M³ EL -2.200 EL -2.150 C0-CVL-DWG-SSFD-2101~21 REV 1 SOIL DISPOSAL 1 1 3.000 0.200 3.200 3.300 0.200 3.500 2.200 -2.150 0.050 0.56 -
1.0133 P2 F4 FOUNDATION FOOT FDN F4 ( 3000L x 3300W x 500HEARTH WORK COMPACTIED SOIL 95% MAX DRY M² C0-CVL-DWG-SSFD-2101~21 REV 1 1 1 3.000 0.600 3.600 3.300 0.600 3.900 14.04 -
1.0134 P2 EA-1B F4 FOUNDATION FOOT FDN F4 ( 3000L x 3300W x 500HEARTH WORK EXCAVATION BY EQUIPMENT (D>3 M³ EL -2.200 EL -0.300 C0-CVL-DWG-SSFD-2101~21 REV 1 SOIL EXCAVATION 1 0 0 3.000 0.600 3.600 3.300 0.600 3.900 2.200 -0.300 - 1.900 - -
1.0135 P2 EA-1A F4 FOUNDATION FOOT FDN F4 ( 3000L x 3300W x 500HEARTH WORK EXCAVATION BY EQUIPMENT (D<=M³ EL -2.200 EL -0.300 C0-CVL-DWG-SSFD-2101~21 REV 1 SOIL EXCAVATION 1 1 3.000 0.600 3.600 3.300 0.600 3.900 2.200 -0.300 - 1.900 26.68 -
1.0136 P2 EA-3B F4 FOUNDATION FOOT FDN F4 ( 3000L x 3300W x 500HEARTH WORK SOIL DISPOSAL M³ DISPO: CONCRETE EL -2.150 EL -1.650 C0-CVL-DWG-SSFD-2101~21 REV 1 1 1 3.000 3.000 3.300 3.300 2.150 -1.650 0.500 4.95 -
1.0137 P2 EA-3B F4 FOUNDATION SOCKET COLUMN-OUTER SC ( 1400L x 1400W) EARTH WORK SOIL DISPOSAL M³ DISPO: CONCRETE EL -1.650 EL -0.600 C0-CVL-DWG-SSFD-2101~21 REV 1 1 1 1.400 1.400 1.400 1.400 1.650 -0.600 1.050 2.06 -
1.0138 P2 EA-3B F4 FOUNDATION FOOT FDN F4 ( 3000L x 3300W x 500HEARTH WORK SOIL DISPOSAL M³ DISPO: LC + SB C0-CVL-DWG-SSFD-2101~21 REV 1 1 1 0.560 0.560 0.56 -
1.0139 P2 EA-2A F4 FOUNDATION FOOT FDN F4 ( 3000L x 3300W x 500HEARTH WORK SOIL BACKFILL M³ C0-CVL-DWG-SSFD-2101~21 REV 1 1 1 26.676 -7.568 19.108 19.11 -
1.0140 P2 F4 FOUNDATION SOCKET COLUMN-INNER SO ( 700L x 700W) OTHERS SHEAR KEY 100x25 MM M C0-CVL-STD-0104 REV 1 1 5 5 0.700 0.700 0.700 0.700 2.800 14.00 -
1.0141 P2 CO-2A F5 FOUNDATION FOOT FDN F5 ( 3000L x 3300W x 500HCONCRETE CONCRETE M³ EL -2.150 EL -1.650 C0-CVL-DWG-SSFD-2101~21 REV 1 1 1 3.000 3.000 3.300 3.300 0.500 0.500 4.95 -
1.0142 P2 FM-1A F5 FOUNDATION FOOT FDN F5 ( 3000L x 3300W x 500HFORM WORK FORM WORK M² EL -2.150 EL -1.650 C0-CVL-DWG-SSFD-2101~21 REV 1 1 1 3.000 3.300 3.000 3.300 12.600 2.150 -1.650 0.500 6.30 -
1.0143 P2 RE-1A F5 FOUNDATION FOOT FDN F5 ( 3000L x 3300W x 500HREBAR REBAR Ð 13 TON TRANS, TOP C0-CVL-DWG-SSFD-2101~21 REV 1 13 0.150 1.040 1 0.001 1 22 22 2.900 0.350 0.350 3.600 0.08 0.08
1.0144 P2 RE-1A F5 FOUNDATION FOOT FDN F5 ( 3000L x 3300W x 500HREBAR REBAR Ð 16 TON TRANS, BOTT C0-CVL-DWG-SSFD-2101~21 REV 1 16 0.150 1.580 1 0.001 1 22 22 2.900 0.350 0.350 3.600 0.13 0.13
1.0145 P2 RE-1A F5 FOUNDATION FOOT FDN F5 ( 3000L x 3300W x 500HREBAR REBAR Ð 13 TON LONG, TOP C0-CVL-DWG-SSFD-2101~21 REV 1 13 0.150 1.040 1 0.001 1 20 20 3.200 0.350 0.350 3.900 0.08 0.08
1.0146 P2 RE-1A F5 FOUNDATION FOOT FDN F5 ( 3000L x 3300W x 500HREBAR REBAR Ð 16 TON LONG, BOTT C0-CVL-DWG-SSFD-2101~21 REV 1 16 0.150 1.580 1 0.001 1 20 20 3.200 0.350 0.350 3.900 0.12 0.12
1.0147 P2 RE-1A F5 FOUNDATION FOOT FDN F5 ( 3000L x 3300W x 500HREBAR REBAR Ð 13 TON TIE C0-CVL-DWG-SSFD-2101~21 REV 1 13 1.040 1 0.001 1 2 2 0.078 2.940 3.240 0.078 6.336 0.01 0.01
1.0148 P2 RE-1A F5 FOUNDATION FOOT FDN F5 ( 3000L x 3300W x 500HREBAR REBAR Ð 16 TON SUPPORT C0-CVL-DWG-SSFD-2101~21 REV 1 16 1.580 1 0.001 1 9 9 0.400 0.342 0.200 0.342 0.400 1.684 0.02 0.02
1.0148 P2 CO-2A F5 FOUNDATION SOCKET COLUMN-OUTER SC ( 1400L x 1400W) CONCRETE CONCRETE M³ EL -1.650 EL -0.600 C0-CVL-STD-0104 REV 1 1 1 1.400 1.400 1.400 1.400 1.650 -0.600 1.050 2.06 -
1.0149 P2 CO-2A F5 FOUNDATION SOCKET COLUMN-OUTER SC ( 700L x 700W) CONCRETE CONCRETE M³ EL -1.650 EL -0.600 C0-CVL-STD-0104 REV 1 1 -1 -1 0.700 0.700 0.700 0.700 1.650 -0.600 1.050 -0.51 -
1.0150 P2 FM-1A F5 FOUNDATION SOCKET COLUMN-OUTER SC ( 1400L x 1400W) FORM WORK FORM WORK M² EL -1.650 EL -0.600 C0-CVL-STD-0104 REV 1 1 1 1.400 1.400 1.400 1.400 5.600 1.650 -0.600 1.050 5.88 -
1.0151 P2 FM-1A F5 FOUNDATION SOCKET COLUMN-OUTER SC ( 700L x 700W) FORM WORK FORM WORK M² EL -1.650 EL -0.600 C0-CVL-STD-0104 REV 1 1 1 0.700 0.700 0.700 0.700 2.800 1.650 -0.600 1.050 2.94 -
1.0152 P2 RE-1A F5 FOUNDATION SOCKET COLUMN-OUTER SC ( 1400L x 1400W) REBAR REBAR Ð 19 TON VERT OUTER EL -2.150 EL -0.600 C0-CVL-STD-0104 REV 1 19 2.230 0.001 1 38 38 0.500 1.430 1.930 0.16 -
1.0153 P2 RE-1A F5 FOUNDATION SOCKET COLUMN-OUTER SC ( 1400L x 1400W) REBAR REBAR Ð 19 TON VERT INNER EL -2.150 EL -0.600 C0-CVL-STD-0104 REV 1 19 2.230 0.001 1 30 30 0.500 1.430 1.930 0.13 -
1.0154 P2 RE-1A F5 FOUNDATION SOCKET COLUMN-OUTER SC ( 1400L x 1400W) REBAR REBAR Ð 19 TON HORI OUTER C0-CVL-STD-0104 REV 1 19 2.230 0.001 1 5 2 10 0.114 1.300 0.250 1.300 0.250 0.114 3.328 0.07 -
1.0155 P2 RE-1A F5 FOUNDATION SOCKET COLUMN-OUTER SC ( 1400L x 1400W) REBAR REBAR Ð 19 TON HORI INNER C0-CVL-STD-0104 REV 1 19 2.230 0.001 1 5 2 10 0.114 1.300 0.250 1.300 0.250 0.114 3.328 0.07 -
1.0156 P2 RE-1A F5 FOUNDATION SOCKET COLUMN-OUTER SC ( 1400L x 1400W) REBAR REBAR Ð 19 TON ADD HORI UPPER C0-CVL-STD-0104 REV 1 19 2.230 0.001 1 2 2 4 0.800 0.800 0.01 -
5 7 10 12 13 14 15 16 17 18 19 20 21 22 23 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70
Sheet >>
EA EARTH WORK
EA-1A Excavation by Equipment (D≦3.0M) M3 1,542.69
EA-2A Backfilling (Excavated Soil) M3 1,058.54
EA-3B Disposal of Soil (Outside of Factory) M3 484.15
RE-1A Re-Bar for Sub-STR. (Deformed) Ton 55.48
JT-4A Water Stop Plate M -
JT-5A Isolation Joint M 179.20
FM-1A Form for Sub-STR. M2 965.48
CO-1A Leveling Concrete M3 35.80
CO-2A Concrete for Sub-STR. M3 415.42
LN-5E-1 Chemical Resistant Resin Lining (Epoxy) M2 -
ANA-2 Climbing Rung (Chemical Resistant) Ton -
Pipe Rack
SSP-CVL2- SSP-CVL2-
SSP-CVL2- SSP-CVL2- SSP-CVL2- SSP-CVL2- SSP-CVL2- SSP-CVL2-
FDN-PR02- FDN-PR02-
FDN-PR02-1 FDN-PR02-3 PIT-M6486-19 PIT-V6482.01 PIT-V6484.01 PIT-V6483.01
2.1 2.2
1 2 1A 3 4 Sheet >> 1 2 3 4
5 6 7 8 9 10 11 12 13 14
445.50 1,921.41 4,282.41 345.35 143.66 281.68 166.99 26.63 23.48 227.41
SSP-CVL2- SSP-CVL2- SSP-CVL2- SSP-CVL2- SSP-CVL2- SSP-CVL2-
SSP-CVL2-SP SSP-CVL2- SSP-CVL2-
FDN-STR P2- CMH01- FDN-2340 - FDN-STR P2- FDN-STR P2- FDN-1340-
P2 CMH02-P2C0C FDN-STR P2-7
5 P2C0C V.6416.01 13 6 T6304.01
15 16 17 18 19 20 21 22 23
24 25 26 27 28 29 30 31 32
33 34 35 36 37 38 39 40 41
Sheet >> 1 2 3 4 5 6 7
8 9 10 11 12 13 14 15 16
6.01 3.75 1.94 14.31 11.91 49.08 37.83 46.71 46.71 8.47
3.18 2.02 0.36 11.58 10.28 38.84 33.86 36.42 37.00 7.52
2.83 1.73 0.89 2.73 1.63 12.64 3.97 11.05 11.23 0.95
0.18 0.11 0.06 0.51 0.39 0.13 0.58 0.11 0.11 0.14
- - - 6.00 5.20 8.00 16.01 7.60 7.60 -
16.20 10.20 5.30 - - - - - - 5.60
17.42 10.97 5.70 16.38 13.08 3.80 20.37 3.70 3.70 5.19
0.34 0.21 0.11 0.41 0.38 0.27 0.41 0.49 0.49 0.14
5.36 3.27 1.69 2.56 1.36 1.00 2.73 0.90 0.90 0.95
- - - 6.58 5.98 18.43 8.73 16.51 16.79 -
- - - 0.01 0.00 0.01 0.01 0.01 0.01 -
63.51 40.25 20.05 62.05 51.22 181.46 125.51 167.14 170.71 48.12
Equipment Foundation and Structure (P3)
SSP-CVL2-
SSP-CVL2- SSP-CVL2- SSP-CVL2- SSP-CVL2- SSP-CVL2- SSP-CVL2- SSP-CVL2- SSP-CVL2- SSP-CVL2-
FDN-2370 -
FDN-1370 - FDN-1370 - AMH03- FDN-1360 - FDN-1360 - FDN-1360 - FDN-2360 - FDN-2360 - FDN-2360 -
P.2371.01/02/
P.2373.01 A/B P.2373.03 P3A0C P.1361.01/05 P.1361.02 P.1361.06 P.2361.01 P.2361.02 P.2361.05
03
36 37 38 39 40 41 42 43 44 45
3.19 1.94 6.34 52.32 24.35 4.45 3.55 8.15 4.45 8.15
1.83 1.04 3.28 42.08 8.76 2.18 1.57 2.94 2.18 2.94
1.36 0.89 3.06 12.64 15.59 2.26 1.98 5.22 2.26 5.22
0.08 0.06 0.18 0.13 0.62 0.14 0.11 0.24 0.15 0.27
- - - 8.00 - - - - - -
9.00 5.30 16.80 - 40.80 11.20 8.60 13.60 11.20 28.75
9.68 5.70 18.06 3.80 69.35 12.05 12.77 15.44 12.04 15.44
0.17 0.11 0.36 0.51 1.64 0.26 0.22 0.55 0.26 0.55
2.56 1.69 5.81 1.00 37.45 4.31 5.23 12.28 4.31 12.28
- - - 18.82 - - - - - -
- - - 0.02 - - - - - -
35.86 20.73 65.88 189.34 228.57 44.85 40.03 68.41 46.84 83.59
SSP-CVL2- SSP-CVL2- SSP-CVL2- SSP-CVL2- SSP-CVL2- SSP-CVL2- SSP-CVL2- SSP-CVL2- SSP-CVL2- SSP-CVL2-
FDN-2360 - FDN-2360 - FDN-2360 - FDN-1370 - FDN-1370 - FDN-1370 - FDN-1370 FDN-2370 - FDN-2370 - FDN-1370 -
P.2361.06 S.2361.01 S.1361.01 P.1374.01 P.1374.02/03 P.1374.04 P3-4 P.2374.02 P.2374.04 P.6306.01
46 47 48 49 50 51 52 53 54 55
3.55 1.24 1.41 2.97 6.69 2.34 146.94 3.34 2.34 0.86
1.57 0.77 0.84 1.35 2.89 1.16 116.20 1.44 1.16 0.61
1.98 0.47 0.57 1.62 3.80 1.18 30.74 1.90 1.18 0.25
0.14 0.06 0.08 0.07 0.16 0.06 3.13 0.09 0.07 0.03
- - - - - - - - - -
8.60 3.60 4.00 7.20 15.60 6.00 21.60 7.80 6.00 2.60
13.03 3.85 4.28 6.30 13.65 5.46 67.43 6.79 5.22 3.07
0.22 0.06 0.07 0.18 0.42 0.14 3.84 0.21 0.14 0.04
5.33 0.87 1.07 2.52 5.92 1.90 32.41 2.94 1.82 0.50
- - - - - - - - - -
- - - - - - - - - -
40.43 10.92 12.32 26.21 57.12 22.24 422.35 28.52 21.92 11.95
SSP-CVL2-
SSP-CVL2- SSP-CVL2- SSP-CVL2- SSP-CVL2- SSP-CVL2- SSP-CVL2- SSP-CVL2- SSP-CVL2- SSP-CVL2- DIKE WALL-
FDN-1370 - FDN-1370 - FDN-1370 - FDN-1370 - FDN-1370 - FDN-1370 AOC-P3-A0C- AMH06- FDN-2370 1360 -
P.6306.02 A/B P.6307.01 P.6307.02 A/B P.6308.01 P.6308.02 A/B P3-10 JB 01/02 P3AOC P3-9 BLENDING
AREA
56 57 58 59 60 61 62 63 64 65
1.72 0.86 1.72 0.86 1.72 78.94 33.71 46.71 73.59 96.73
1.22 0.61 1.22 0.61 1.22 60.74 31.31 36.42 53.93 63.84
0.49 0.25 0.49 0.25 0.49 18.20 2.40 11.05 19.66 32.89
0.06 0.03 0.05 0.03 0.06 1.44 0.20 0.11 1.31 6.97
- - - - - - 3.20 7.60 - -
5.20 2.60 5.20 2.60 5.20 16.00 6.40 7.60 14.40 158.05
5.98 3.07 5.85 3.12 5.98 49.12 18.62 3.70 46.86 319.45
0.07 0.04 0.07 0.04 0.07 1.85 0.10 0.49 1.81 5.32
0.97 0.50 0.95 0.51 0.97 19.14 1.90 0.90 18.93 51.62
- - - - - - 6.40 17.63 - -
- - - - - - 0.02 0.02 - -
23.72 11.95 23.56 12.01 23.72 245.44 104.58 178.86 230.52 735.00
SSP-CVL2-
DIKE WALL- SSP-CVL2- SSP-CVL2- SSP-CVL2- SSP-CVL2- SSP-CVL2-
SSP-CVL2- SSP-CVL2-
2360 - AOC-P3-C0C- AOC-P3-C0C- CB-P3CB- FDN-1360 - FDN-2360 -
CB-P3CB-01 CB-P3CB-02
BLENDING CEP DN 200 CEP DN 250 01COC V6474.04 V6474.05
AREA
66 67 68 69 70 71 72 73
91.62 92.93 67.08 3.89 263.34 172.04 192.72 35.15 116.65 4.79
SSP-CVL2- SSP-CVL2- SSP-CVL2- SSP-CVL2-
SSP-CVL2-LF SSP-CVL2-LF SSP-CVL2-LF SSP-CVL2- SSP-CVL2-
SSP-CVL2-LF CT-2350- LPF- P2- HB- P2-HOSE GP- P2-
-1340- ACHE -1350- - 1350 LF-2350- LF-1352-
-1340- AOTP CABLE TRAY LIGHTING BOX GUARD
E1341.01 & CONCENTRA CONCENTRA STAGE PRE- STAGE PRE-
P6304.02 A/B SUPPORT POLE FOUNDATION POST P2
1344.01 TION AREA TION ( P2-1) HEATER HEATER
2350 FOUNDATION P2 AREA AREA
15 16 17 18 19 20 21 22 23 24
18.54 63.01 97.96 82.51 13.63 5.49 0.99 44.25 89.78 60.68
SSP-CVL2-LF SSP-CVL2-
SSP-CVL2- SSP-CVL2-
-1360- LF- 1360-
LF- P3-1360- LF- P3-1360-
P1361.01A/02 P1361.01B,
V,1361.02/03 V.1361.01
/05/06,S1361 V6474.04
Sheet >> 1 2 3 4
131.95 140.76 9.92 8.33 38.28 7.51 157.75 98.60 20.33 23.51
Local Foundation (P3)
SSP-CVL2- SSP-CVL2-LF SSP-CVL2- SSP-CVL2- SSP-CVL2- SSP-CVL2-
SSP-CVL2-LF SSP-CVL2- SSP-CVL2-LF
LF- 2370- -2370- LF- 2370- LPF- P3- HB- P3-HOSE GP- P3-
-2370- CT- P3-2360 -2370-
STRIPPING STRIPPING STRIPPING LIGHTING BOX GUARD
STRIPPING AREA CABLE CRUMBS
U.32 WATER V.6412.01, V.2371.01/02/ POLE FOUNDATION POST P3
V.2373.01 TRAY SLURRY U-32
LINE V6415.01 03 FOUNDATION P3 AREA AREA
15 16 17 18 19 20 21 22 23
-
-
-
4.77
-
23.63
4.90
56.14
-
-
1
5
8
32
52
54
61
63
179
338
List of Calculation
STR Name & File Name Sheet Calculation No
Pipe Rack
1. Pipe Rack 1 SSP-CVL2-FDN-PR02-1
2 SSP-CVL2-FDN-PR02-2.1
1A SSP-CVL2-FDN-PR02-2.2
3 SSP-CVL2-FDN-PR02-3
Equipment Foundation and Structure (P2)
2. STR&EQP FDN (P2) 1 SSP-CVL2-PIT-M6486-19
2 SSP-CVL2-PIT-V6482.01
3 SSP-CVL2-PIT-V6484.01
4 SSP-CVL2-PIT-V6483.01
5 SSP-CVL2-PIT-V6485.01
6 SSP-CVL2-1340-STR P2-1
7 SSP-CVL2-FDN-STR P2-2
8 SSP-CVL2-FDN-E.1352.01
9 SSP-CVL2-FDN-STR P2-4
10 SSP-CVL2-FDN-E.1352.02
11 SSP-CVL2-FDN-STR P2-11
12 SSP-CVL2-FDN-1340 - V.6315.01
13 SSP-CVL2-FDN-1340 - V.6315.02
14 SSP-CVL2-FDN-P2-3
15 SSP-CVL2-FDN-STR P2-5
16 SSP-CVL2-SP P2
17 SSP-CVL2-CMH01-P2C0C
18 SSP-CVL2-CMH02-P2C0C
19 SSP-CVL2-FDN-2340 - V.6416.01
20 SSP-CVL2-FDN-STR P2-13
21 SSP-CVL2-FDN-STR P2-6
22 SSP-CVL2-FDN-STR P2-7
23 SSP-CVL2-FDN-1340-T6304.01
24 SSP-CVL2-FDN-2350 - V2353.01 RSD
25 SSP-CVL2-FDN-1340-SHELTER
26 SSP-CVL2-FDN-2350 - V1353.01 RSD
27 SSP-CVL2-AMH01-P2C0C
28 SSP-CVL2-AMH02-P2C0C
29 SSP-CVL2-FDN-1350 - P1351.01 PSD
30 SSP-CVL2-FDN-1350 - P1351.02
31 SSP-CVL2-FDN-1350 - P1352.01
32 SSP-CVL2-FDN-1350 - P1352.02
33 SSP-CVL2-FDN-1350 - P1352.03/04
34 SSP-CVL2-FDN-E.2352.01 A/B
35 SSP-CVL2-FDN-E.2352.02 A/B
36 SSP-CVL2-FDN-1350 - P1353.01 A/B
37 SSP-CVL2-FDN-2350-E.6323.02 MEH
38 SSP-CVL2-FDN-P.6416.01 PBP
39 SSP-CVL2-FDN-1340 - P.6304.02A/B
40 SSP-CVL2-FDN-V.6317.01
41 SSP-CVL2-FDN-V.6318.01
42 SSP-CVL2-FDN-V.6318.02
43 SSP-CVL2-FDN-P.6317.02 A/B
44 SSP-CVL2-FDN-V.6319.01
45 SSP-CVL2-FDN-P.6318.02 A/B
46 SSP-CVL2-FDN-P.6319.02 A/B
47 SSP-CVL2-FDN-2350 - P2353.01 A/B RSP
48 SSP-CVL2-FDN-2350 - P2352.04 CPSP
49 SSP-CVL2-FDN-2350 - P2352.03 CPSP
50 SSP-CVL2-FDN-2350 - P2352.02 CPSP
51 SSP-CVL2-FDN-2350 - P2352.01 A/B CPSP
52 SSP-CVL2-FDN-2350 - P2351.01 A/B CPSP
53 SSP-CVL2-FDN-2350 - P2351.02 CPSP
54 SSP-CVL2-DIKE WALL-1340- T6304.01
55 SSP-CVL2-FDN-2340-V6328.01
56 SSP-CVL2-FDN-2340 - P2342.01 /02
57 SSP-CVL2-FDN-E.2341.01
58 SSP-CVL2-FDN-1340 - P1345.01 /02
59 SSP-CVL2-FDN-1340 - P1342.01 /02
60 SSP-CVL2-FDN-1340- E.1344.01
61 SSP-CVL2-FDN-1340 - P2352.04 CPSP
62 SSP-CVL2-FDN-1340-C6417.01
63 SSP-CVL2-AOC-P2-A0C-JB 23/24/25/26
64 SSP-CVL2-FDN-1350 - ANALYZER HOUSE
65 SSP-CVL2-FDN-1350 - V6474.02
66 SSP-CVL2-FDN-1350 - P6343.01
67 SSP-CVL2-FDN-1340 - P6315.01
68 SSP-CVL2-FDN-1340 - P6315.02 A/B
69 SSP-CVL2-VB-P2VB-01
70 SSP-CVL2-CB-P2CB-01
71 SSP-CVL2-FDN-1350 -V6343.01
72 SSP-CVL2-AMH03-P2A0C
73 SSP-CVL2-VB-P2VB-02
74 SSP-CVL2-AOC-P2-A0C-JB 13
75 SSP-CVL2-AOC-P2-A0C-JB 19
76 SSP-CVL2-AOC-P2-C0C- CEP
77 SSP-CVL2-FDN-2340 - PIPE SUPPORT V.6416.01
78 SSP-CVL2-FDN-1350 - V6474.03
79 SSP-CVL2-FDN-2340 - LOCAL PLATFROM TIFANE, DELTASTOP
80 SSP-CVL2-FDN-1350 - HVAC & AIR STACK
Equipment Foundation and Structure (P3)
3. STR&EQP FDN (P3) 1 SSP-CVL2-PIT-M6486-20
2 SSP-CVL2-PIT-M6486-21
3 SSP-CVL2-FDN-T1374.01
4 SSP-CVL2-FDN-T1374.02
5 SSP-CVL2-FDN-T2374.02
6 SSP-CVL2-FDN-P3-3
7 SSP-CVL2-FDN-V1371
8 SSP-CVL2-FDN-V1372
9 SSP-CVL2-FDN 1360 - STR. P3-1
10 SSP-CVL2-FDN-P3-8
11 SSP-CVL2-FDN-V2371.01/02/03
12 SSP-CVL2-FDN-1370 - V.6415.01
13 SSP-CVL2-FDN-STR P3-2
14 SSP-CVL2-FDN-1370 - V.1373.01
15 SSP-CVL2-FDN-1370 - V.2373.01
16 SSP-CVL2-FDN 2360 - STR. P3-6
17 SSP-CVL2-FDN-STR P3-7
18 SSP-CVL2-CMH02-P3C0C
19 SSP-CVL2-FDN-1370-T6306.01
20 SSP-CVL2-FDN-1370-T6307.01
21 SSP-CVL2-FDN-1370-T6308.01
22 SSP-CVL2-CMH03-P3C0C
23 SSP-CVL2-FDN-2370 P3-12
24 SSP-CVL2-FDN-1370 P3-5
25 SSP-CVL2-FDN-1370 - P.1371.01/02/03
26 SSP-CVL2-FDN-1370 - P.1373.01/02/03
27 SSP-CVL2-FDN-1370 - P.1373.01 A/B
28 SSP-CVL2-FDN-1370 - P.1373.03
29 SSP-CVL2-CMH01-P3C0C
30 SSP-CVL2-CMH05-P3C0C
31 SSP-CVL2-AMH01-P3C0C
32 SSP-CVL2-CMH04-P3C0C
33 SSP-CVL2-AMH04-P3AOC
34 SSP-CVL2-AMH05-P3AOC
35 SSP-CVL2-FDN-2370 - V.6412.01
36 SSP-CVL2-FDN-1370 - P.2373.01 A/B
37 SSP-CVL2-FDN-1370 - P.2373.03
38 SSP-CVL2-FDN-2370 - P.2371.01/02/03
39 SSP-CVL2-AMH03-P3A0C
40 SSP-CVL2-FDN-1360 - P.1361.01/05
41 SSP-CVL2-FDN-1360 - P.1361.02
42 SSP-CVL2-FDN-1360 - P.1361.06
43 SSP-CVL2-FDN-2360 - P.2361.01
44 SSP-CVL2-FDN-2360 - P.2361.02
45 SSP-CVL2-FDN-2360 - P.2361.05
46 SSP-CVL2-FDN-2360 - P.2361.06
47 SSP-CVL2-FDN-2360 - S.2361.01
48 SSP-CVL2-FDN-2360 - S.1361.01
49 SSP-CVL2-FDN-1370 - P.1374.01
50 SSP-CVL2-FDN-1370 - P.1374.02/03
51 SSP-CVL2-FDN-1370 - P.1374.04
52 SSP-CVL2-FDN-1370 P3-4
53 SSP-CVL2-FDN-2370 - P.2374.02
54 SSP-CVL2-FDN-2370 - P.2374.04
55 SSP-CVL2-FDN-1370 - P.6306.01
56 SSP-CVL2-FDN-1370 - P.6306.02 A/B
57 SSP-CVL2-FDN-1370 - P.6307.01
58 SSP-CVL2-FDN-1370 - P.6307.02 A/B
59 SSP-CVL2-FDN-1370 - P.6308.01
60 SSP-CVL2-FDN-1370 - P.6308.02 A/B
61 SSP-CVL2-FDN-1370 P3-10
62 SSP-CVL2-AOC-P3-A0C-JB 01/02
63 SSP-CVL2-AMH06-P3AOC
64 SSP-CVL2-FDN-2370 P3-9
65 SSP-CVL2-DIKE WALL-1360 - BLENDING AREA
66 SSP-CVL2-DIKE WALL-2360 - BLENDING AREA
67 SSP-CVL2-CB-P3CB-01
68 SSP-CVL2-CB-P3CB-02
69 SSP-CVL2-AOC-P3-C0C- CEP DN 200
70 SSP-CVL2-AOC-P3-C0C- CEP DN 250
71 SSP-CVL2-CB-P3CB-01COC
72 SSP-CVL2-FDN-1360 - V6474.04
73 SSP-CVL2-FDN-2360 - V6474.05
1 SSP-CVL2-FDN-PR02-2.2 228,512,010.48
2 SSP-CVL2-FDN-PR02-3 383,813,965.39
3 SSP-CVL2-PIT-M6486-20 153,556,928.72
4 SSP-CVL2-PIT-M6486-21 128,236,386.56
5 SSP-CVL2-FDN-T1374.01 161,277,496.15
6 SSP-CVL2-FDN-T1374.02 159,474,113.02
7 SSP-CVL2-FDN-T2374.02 161,090,845.54
8 SSP-CVL2-FDN-P3-3 517,777,403.31
9 SSP-CVL2-FDN-V1371 183,738,706.99
10 SSP-CVL2-FDN-V1372 184,424,211.31
11 SSP-CVL2-FDN 1360 - STR. P3-1 1,902,964,702.22
12 SSP-CVL2-FDN-P3-8 286,149,741.70
13 SSP-CVL2-FDN-V2371.01/02/03 183,835,598.52
14 SSP-CVL2-FDN-1370 - V.6415.01 49,123,497.39
15 SSP-CVL2-FDN-STR P3-2 385,231,803.54
16 SSP-CVL2-FDN-1370 - V.1373.01 58,021,995.36
17 SSP-CVL2-FDN-1370 - V.2373.01 36,259,437.79
18 SSP-CVL2-FDN 2360 - STR. P3-6 1,471,578,593.95
19 SSP-CVL2-FDN-STR P3-7 288,916,934.44
20 SSP-CVL2-CMH02-P3C0C 28,367,412.41
21 SSP-CVL2-FDN-1370-T6306.01 32,120,082.91
22 SSP-CVL2-FDN-1370-T6307.01 32,125,847.90
23 SSP-CVL2-FDN-1370-T6308.01 32,125,847.90
24 SSP-CVL2-CMH03-P3C0C 28,020,457.41
25 SSP-CVL2-FDN-2370 P3-12 28,932,884.16
26 SSP-CVL2-FDN-1370 P3-5 22,181,517.55
27 SSP-CVL2-FDN-1370 - P.1371.01/02/03 11,688,531.96
28 SSP-CVL2-FDN-1370 - P.1373.01/02/03 11,688,531.96
29 SSP-CVL2-FDN-1370 - P.1373.01 A/B 7,265,717.51
30 SSP-CVL2-FDN-1370 - P.1373.03 3,741,523.89
31 SSP-CVL2-CMH01-P3C0C 20,844,954.33
32 SSP-CVL2-CMH05-P3C0C 17,131,331.61
33 SSP-CVL2-AMH01-P3C0C 56,029,132.19
34 SSP-CVL2-CMH04-P3C0C 29,394,067.29
35 SSP-CVL2-AMH04-P3AOC 52,314,061.82
36 SSP-CVL2-AMH05-P3AOC 53,919,074.96
37 SSP-CVL2-FDN-2370 - V.6412.01 14,502,439.61
38 SSP-CVL2-FDN-1370 - P.2373.01 A/B 6,050,361.84
39 SSP-CVL2-FDN-1370 - P.2373.03 3,780,230.11
40 SSP-CVL2-FDN-2370 - P.2371.01/02/03 12,278,483.40
41 SSP-CVL2-AMH03-P3A0C 57,807,343.48
42 SSP-CVL2-FDN-1360 - P.1361.01/05 54,413,180.97
43 SSP-CVL2-FDN-1360 - P.1361.02 8,772,401.58
44 SSP-CVL2-FDN-1360 - P.1361.06 8,701,795.20
45 SSP-CVL2-FDN-2360 - P.2361.01 17,105,565.33
46 SSP-CVL2-FDN-2360 - P.2361.02 8,898,015.28
47 SSP-CVL2-FDN-2360 - P.2361.05 19,126,117.84
48 SSP-CVL2-FDN-2360 - P.2361.06 9,118,431.31
49 SSP-CVL2-FDN-2360 - S.2361.01 2,470,241.88
50 SSP-CVL2-FDN-2360 - S.1361.01 2,966,798.74
51 SSP-CVL2-FDN-1370 - P.1374.01 5,011,987.20
52 SSP-CVL2-FDN-1370 - P.1374.02/03 11,273,377.94
53 SSP-CVL2-FDN-1370 - P.1374.04 4,110,746.78
54 SSP-CVL2-FDN-1370 P3-4 86,839,111.30
55 SSP-CVL2-FDN-2370 - P.2374.02 5,720,044.03
56 SSP-CVL2-FDN-2370 - P.2374.04 4,047,727.20
57 SSP-CVL2-FDN-1370 - P.6306.01 1,729,185.33
58 SSP-CVL2-FDN-1370 - P.6306.02 A/B 3,412,047.02
59 SSP-CVL2-FDN-1370 - P.6307.01 1,730,398.10
60 SSP-CVL2-FDN-1370 - P.6307.02 A/B 3,332,614.07
61 SSP-CVL2-FDN-1370 - P.6308.01 1,719,966.89
62 SSP-CVL2-FDN-1370 - P.6308.02 A/B 3,412,047.02
63 SSP-CVL2-FDN-1370 P3-10 47,876,107.35
64 SSP-CVL2-AOC-P3-A0C-JB 01/02 19,557,273.71
65 SSP-CVL2-AMH06-P3AOC 55,730,686.82
66 SSP-CVL2-FDN-2370 P3-9 45,508,958.93
67 SSP-CVL2-DIKE WALL-1360 - BLENDING AREA 191,660,213.65
68 SSP-CVL2-DIKE WALL-2360 - BLENDING AREA 242,672,089.26
69 SSP-CVL2-CB-P3CB-01 5,539,142.33
70 SSP-CVL2-CB-P3CB-02 6,115,964.32
71 SSP-CVL2-AOC-P3-C0C- CEP DN 200 3,866,548.69
72 SSP-CVL2-AOC-P3-C0C- CEP DN 250 3,787,862.10
73 UG PIPE P3 800,502,064.48
74 AOC U-DITCH P3 783,665,586.13
75 RDPV P3 1,461,534,132.53
76 SSP-CVL2-LF- P3-1360- V,1361.02/03 18,197,360.66
77 SSP-CVL2-LF- P3-1360- V.1361.01 6,188,100.12
78 SSP-CVL2-LF -1360- P1361.01A/02/05/06,S1361 80,860,264.58
79 SSP-CVL2-LF- 1360- P1361.01B, V6474.04 34,253,347.69
80 SSP-CVL2-LF- 1360 - P2361.05,P2361.02,S2361.01 53,237,863.42
81 SSP-CVL2-LF - 2360- P.2361.01, V6474.05 39,888,125.72
82 SSP-CVL2-LF -2360- V.2361.01 8,425,894.78
83 SSP-CVL2-LF -2360- V.2361.02/03 6,875,462.41
84 SSP-CVL2-LF -1370- STRIPPING AREA 7,958,527.06
85 SSP-CVL2-LF -1370- STRIPPING P.1373.01 A/B, P 1373.03, V 1373.01 8,222,783.43
86 SSP-CVL2-LF -1370- TAMOL 35,870,635.59
87 SSP-CVL2-LF -1370- CRUMBS SLURRY U-3 33,924,349.16
88 SSP-CVL2-LF- 1370- STRIPPING V 1372.01/02/03 19,557,102.23
89 SSP-CVL2-LF- 1370- STRIPPING V 1371.01/02/03 14,716,872.43
90 SSP-CVL2-LF- 2370- STRIPPING U.32 WATER LINE 15,558,852.20
91 SSP-CVL2-LF -2370- STRIPPING V.6412.01, V6415.01 4,505,319.97
92 SSP-CVL2-LF -2370- STRIPPING V.2373.01 9,099,923.77
93 SSP-CVL2-LF- 2370- STRIPPING V.2371.01/02/03 19,644,787.18
94 CWS U-DITCH P3 223,532,217.99
95 SSP-CVL2-CT- P3-2360 AREA CABLE TRAY 13,360,469.10
96 SSP-CVL2-LF -2370- CRUMBS SLURRY U-32 11,245,841.69
97 SSP-CVL2-CB-P3CB-01COC 14,778,327.47
98 SSP-CVL2-LPF- P3- LIGHTING POLE FOUNDATION 7,300,027.46 Muhamma
Nilainya be
99 SSP-CVL2-HB- P3-HOSE BOX FOUNDATION P3 AREA 16,729,635.43
summary.
100 SSP-CVL2-GP- P3-GUARD POST P3 AREA 23,232,616.40
101 SSP-CVL2-FDN-1360 - V6474.04 3,474,606.30
102 SSP-CVL2-FDN-2360 - V6474.05 4,205,894.55
24,614,817,908.19
Muhammad Naufal:
Nilainya berbeda dengan
summary.
CONTROL EDIT CONTROL PROGRESS PER BULAN (VALUE)
55551927639 SUB-TOTAL OF DIRECT COST 1 Bulan Previous This Month Cumulative Check
16108072361 TOTAL INDIRECT COST 1 Feb-March 2016 0 400987263.341 400987263.341 1
71660000000 TOTAL COST (Direct + Indirect Cost) 1 April 2016 400987263.341 806870029.11 1207857292.451 1
May 2016 1207857292.451 1024564037.454 2232421329.906 1
June 2016 2232421329.906 1540323762.933 3749494357.989 1
July 2016 3749494357.989 1060493589.932 4809987947.921 1
Aug 2016 4809987947.921 4243881789.843 9033868171.544 1
Sept 2016 9033868171.544 2839215380.61 11873083552.154 1
Oct 2016 11873083552.154 3550169726.711 15430902066.339 1
Nov 2016 15430902066.339 2451829078.225 17833289773.133 1
Des 2016 17833289773.133 2038340175.498 19871629948.63 1
Jan 2017 19871629948.63 1036598335.94 20922371581.471 1
Feb 2017 20922371581.471 1201523657.324 22123895238.795 1
Maret 2017 22123895238.795 2395223617.167 24519118855.962 1
April 2017 24519118855.962 1409256226.073 25928375082.035 1
May 2017 25928375082.035 1411585620.551 27339960702.586 1
June 2017 27339960702.586 728059034.613 28068019737.199 1
July 2017 28068019737.199 566358697.699 28634378434.899 1
Aug 2017 28634378434.899 605956925.213 29240335360.111 1
Sept 2017 29240335360.111 482948080.039 29723283440.15 0
Oct 2017 29410758507.252 597513083.491 29997307490.743 0
30391698111.767
Progress
0.56%
1.69% 1.126%
3.12% 1.430%
5.23% 2.117%
6.71% 1.480%
12.61% 5.894%
16.57% 3.962%
21.53% 4.965%
24.89% 3.352%
27.73% 2.844%
29.20% 1.466%
30.87% 1.677%
34.22% 3.342%
36.18% 1.967%
38.15% 1.970%
39.17% 1.016%
39.96% 0.790%
40.80% 0.846%
41.48% 0.674%
41.86% 0.382%