Points (m)
Level (m)
D
Bed (m)
Ch. (m)
Y
LWL
HFL
(m)
X2
0.00 289.50 287.00 289.965
1.80 289.50 287.00 289.206 1.31 0.657 1.800 1.183 0.76 3.24
3.00 289.50 287.00 288.586 1.93 1.624 1.200 1.949 0.62 1.44
3.80 289.50 287.00 288.168 2.35 2.143 0.800 1.714 0.42 0.64
5.80 289.50 287.00 287.530 2.99 2.671 2.000 5.342 0.64 4.00
8.60 289.50 287.00 287.437 3.08 3.036 2.800 8.502 0.09 7.84
10.30 289.50 287.00 287.358 3.16 3.122 1.700 5.308 0.08 2.89
15.35 289.50 287.00 287.255 3.26 3.213 5.050 16.228 0.10 25.50
18.88 289.50 287.00 286.275 4.25 3.755 3.530 13.255 0.98 12.46
289.000
288.000
287.000
286.000
285.000
284.000
283.000
0.00
Hydraulic calculation Sheet ---- 2 ( Metric Units )
8. R= A/P = 2.821
Where A= Area of x section of the channel , 80.40 Sqm
P = Wetted Perimeter = 28.50 M
9. Assumed value of n = 0.03
10. Mannings Velocity (v) = 1/n x R2/3 x S1/2 = 2.399 M/Sec
11. Discharge.
15. (a) Mean scour depth= d 2 = 1.34 ( Db2/ Ksf )1/3 = 5.287 M
287.07
Y2
0.00 0
0.58 3.82 1.95 1.72 1 287.00 lwl
0.38 1.82 1.35 2.36 2 285.850 lbl
0.17 0.81 0.90 2.53 3 290.52 hf
0.41 4.41 2.10 2.59 4
0.01 7.85 2.80 2.38 5
0.01 2.90 1.70 1.70 6
0.01 25.51 5.05 0.00 7
0.96 13.42 3.66 2.59 4
Ground Elevati ons (m ) →
288.000
287.000
286.000
285.000
284.000
283.000
0.00 5.00 10.00 15.00 20.00 25.00 30.00
Cross-Section Distance (m) →
1
M
3.44
1.15
285.550
0.00
-5.80
-10.30