Name of Division :

Name of District : Name of Block :

Between adjucent Points


Reduce Levels of Steam

Sectional Area (m2) XD

Diff. of Levels between


Adjucent Points (m) X
Mean Depth of Water
HFL=58.28m to Bed
Depth of water from

Dist. Betwwen The

Points (m)
Level (m)

D
Bed (m)
Ch. (m)

Y
LWL
HFL

(m)

X2
0.00 289.50 287.00 289.965
1.80 289.50 287.00 289.206 1.31 0.657 1.800 1.183 0.76 3.24
3.00 289.50 287.00 288.586 1.93 1.624 1.200 1.949 0.62 1.44
3.80 289.50 287.00 288.168 2.35 2.143 0.800 1.714 0.42 0.64
5.80 289.50 287.00 287.530 2.99 2.671 2.000 5.342 0.64 4.00
8.60 289.50 287.00 287.437 3.08 3.036 2.800 8.502 0.09 7.84
10.30 289.50 287.00 287.358 3.16 3.122 1.700 5.308 0.08 2.89
15.35 289.50 287.00 287.255 3.26 3.213 5.050 16.228 0.10 25.50
18.88 289.50 287.00 286.275 4.25 3.755 3.530 13.255 0.98 12.46

Ground Elevati ons (m ) →


19.30 289.50 287.00 286.085 4.44 4.340 0.420 1.823 0.19 0.18
20.00 289.50 287.00 286.090 4.43 4.433 0.700 3.103 0.00 0.49
21.55 289.50 287.00 285.850 4.67 4.550 1.550 7.052 0.24 2.40
24.62 289.50 287.00 287.014 3.51 4.088 3.070 12.550 -1.16 9.42
291.000
25.74 289.50 287.00 289.759 0.76 2.133 1.120 2.390 -2.75 1.25
80.40 290.000

289.000

288.000

287.000

286.000

285.000

284.000

283.000
0.00
Hydraulic calculation Sheet ---- 2 ( Metric Units )

1. Length of existing Bridge : 24.00 M

2. Distance from Nearest Railway Bridge :

3. (i) H.F.L ( Normal) 290.52 (ii) H.F.L. (Back Flow)

(iii) L.W.L. 287.00 (iv) L.B.L = 285.85 M


v) Scour depth (observed) = 4.67 M
4. Bench Mark (R.L.) and reference : Assumed B.M. = 100.000 m

5. Catchment Area : Not Well Defined

6. Observed Velocity : 1.00 M/Sec

7. Slope (i.e. fall of the river), S = 0.0013

8. R= A/P = 2.821
Where A= Area of x section of the channel , 80.40 Sqm
P = Wetted Perimeter = 28.50 M
9. Assumed value of n = 0.03
10. Mannings Velocity (v) = 1/n x R2/3 x S1/2 = 2.399 M/Sec

11. Discharge.

11.1 Discharge at existing Bridge site.


(a) Area Velocity method. = A.V 80.40 Cum/Sec
( by observed velocity )
(b) Mannings velocity method = A.V 192.91 Cum/Sec
( by mannings velocity )
(c) Dickens formula = C (M)
C= Constant M = Area of catchment in sq K.M.

11.2 Discharge at 300m U/S


(a) Area Velocity method. =
( by observed velocity )
(b) Mannings velocity method =
( by mannings velocity )
(c) Dickens formula = C (M)
C= Constant M = Area of catchment in sq K.M.

11.3 Discharge at 300m D/S


(a) Area Velocity method. =
( by observed velocity )
(b) Mannings velocity method =
( by mannings velocity )
(c) Dickens formula = C (M)
C= Constant M = Area of catchment in sq K.M.
11.4 Discharge adopted for water way = 120.60 Cum/Sec

11.4a Increasing discharge by 20 as HFL 144.72 Cum/Sec


non over Topped the bank

11.5 Discharge adopted for foundation depth = 188.13 Cum/Sec

12. (a) Lacys width . W = 4.8 \/ Q = Meter 52.71 M

(b) Water spread at H.F.L. between banks = 21.94 M

13. Proposed water way L = 24.00 M

14. Discharge in cumec per meter width Db = 7.84 Cumec/M

15. (a) Mean scour depth= d 2 = 1.34 ( Db2/ Ksf )1/3 = 5.287 M

Db = Discharge in cumec per meter width.


Ksf = Silt factor = 1
(b) Scour depth adopted = 5.287 M
Maxm scour depth adopted D=2d = 10.574 M

16. Minimum design founding depth = 1.33 x D = 14.064 M

17. Minimum Design founding level = H.F.L. - (16) = 276.46 RL

18. Depth of minimum FL to LWL = L.W.L. - (17) = 10.54 M

19. Depth of minimum FL to LBL = L.B.L. - (17) = 9.39 M

20. Depth adopted in existing bridge.

21. Remarks( If any ) Foundation : Well (RCC) May be adopted.


Super - Structure : No of Span 1 24.00 M Span RCC T Beam Girder
Two lane with Footpath . Carriage way width 10.9 over all width = 12
Length each 24.57 M Depth Of Super Str. 2.466 M
Over all length = 24.65 M V.C = 0.90 M
Deck Level = HFL + VC + Depth of super structure + WC = 293.96 RL
Wetted Perimeter in (m)
(X2+Y2)1/2
X2+Y2

287.07
Y2

0.00 0
0.58 3.82 1.95 1.72 1 287.00 lwl
0.38 1.82 1.35 2.36 2 285.850 lbl
0.17 0.81 0.90 2.53 3 290.52 hf
0.41 4.41 2.10 2.59 4
0.01 7.85 2.80 2.38 5
0.01 2.90 1.70 1.70 6
0.01 25.51 5.05 0.00 7
0.96 13.42 3.66 2.59 4
Ground Elevati ons (m ) →

0.04 0.21 0.46 2.38 5


0.00 0.49 0.70 1.70 6
0.06 2.46 1.57 0.00 7
1.35 10.78 3.28
Bridge Cross-Section & HFL 1.70 6
291.000
7.54 8.79 2.96 0.00 7
290.000 P= 28.50
289.000

288.000

287.000

286.000

285.000

284.000

283.000
0.00 5.00 10.00 15.00 20.00 25.00 30.00
Cross-Section Distance (m) →
1

M
3.44
1.15
285.550

0.00

-5.80

-10.30