(CIVIL)/(AGRI) BPS - 17 TO 18 (WATER WING)

PAPER — A (RULES & CURRENT AFFAIRS)

Maximum Marks = 50 Time Allowed = 01 Hour

Note: Read and follow carefully the Instructions given below before attempting the paper
■ Attempt all questions.
■ Consultation of books if permitted in the syllabus i$ allowed in Descriptive Paper but other books, typed or
written material are not allowed. However nothing is allowed to consult in Objective Paper.
■ Write your Roll Number on the top right corner of the Paper / Answer Book.
■ Write your answers with blue pen/ball point only. Answers attempted with lead pencil or in any other colour
of ink, will be cancelled.
■ No mark of identification should be made on the answer book, otherwise it will be cancelled.
■ Exchange of books amongst the candidates is not allowed in the examination hall.
■ Use of Mobile Phone and Blue Tooth communication devices are strictly prohibited.

Total Marks: 17
Pass Marks: 40%

PART-I (OBJECTIVE — Current Affairs)

Fill in the blanks 17 Marks

1. Former US President George H W Bush died at the age of

2. This year (Nos) Pakistanis will perform Hajj as per hajj quota.

3. In the Chief Justice's Dam Fund Rs.


. Billion have been collected.
i
4. This winter which Pakistani city recorded minimum temperature

5. Mohmand Dam is proposed near which existing water head-works


6. Which country's king abdicated early this year

7. What is the storage capacity of Mohmand Dam MAF. t

8. What date is today by Hijri calendar

9. In what case Aasia Bibi got fame/release

10. Islamabad gets ready to receive, after 10yrs , which Country's Airliner

11. Which cricketing term Pak.'s Foreign Minister used w.r.t. Kartarpur border
12. Punjab Gov't has decided to revive which controversial festival

13. In which case former PM Nawaz Sharif sentenced to 7 years

14. Which country's PM's wife requested for a photo with PM lmran Khan

15. PTI Gov't offered PAC's Chairmanship to which political leader who declined
16. What record Sarfraz Ahmad made during PAK-SA Test cricket series

17. Which famous monument of Karachi restored by removing encroachments

P.T.O
Maximum Marks = 33 Pass Marks = 50%
Part-II (Objective - Rules & Regulations)

Fill in the blanks 17 Marks

1. Under E&D Rules willful or loss of the Authority 's goods or property is misconduct
2. To be guilty of misconduct provides ground for
3. Withholding of promotion is a penalty
4. Reduction to a lower stage in time scale is penalty.
5. Enquiry procedure is given under E&D Rule
6. Real and children falls in family definition under Conduct rules
7. Permission is required to buy/sell property beyond Rs. by BPS 17 officer
8. No permission is required for study during
9. Under Retirement Rules an employee can be retired on year's service.

10. To probe loss of Rs. 01 million convener of Enquiry shall be BPS officer.
11. Application for encashment of LPR shall be given months before retirement.
12. Study leave can be granted upto years.
13. Different types of leave can be combined for Leave upto years.
14. Leave ex-Pakistan can be granted upto days.
15. Medical facilities are not admissible during EOL beyond months.
16. and step children of an employee are covered under Medical Rules.

Find True / False as T or F T/F


1. An employee who has drawn LT* Advance can't be guarantor of other employee.
2. An advance can be given to an employee not exceeding his 36 month's pays.
3. Long Term* Advances are recoverable @ 120th part of total amount per month.
4. Motor car advance is admissible upto Rs.500,000.
5. Medical leave b a chronically sick employees can be granted @ 1/4th of pay.
6. Free food in WAPDA hospitals will be provided upto BPS-1 to 11 only.
7. M.S. of regional hospitals can also approve certain M.B. proceedings alike DGMS.
8. Annual declaration of property is required on calendar year basis.
9. WAPDA Retirement Rules are not applicable to probationers.
10. WAPDA employees in BPS-4 fall under Category-III of TA Rules gradation.
11. Member concerned can retire a Jr.Eng'r under WAPDA retirement rules 1979.
12. Appointing authority means an officer designated as such by any rules.
13. Officers who fail to initiate/countersign ACRs shall be imposed with major penalty.
14. With just one Member and Chairman, Authority meeting can be held.
15. Under the TA Rules step children of an employee are not covered.
16. TA Rule-19 is not applicable to workcharge employees.
17. There are four kinds of Travelling allowance given in the TA Rules.
lar- C %Jr JI.J1111%./R. CIV<711YCCR 1%elVII- / 1 %.,/ OC11111/401‘. G111%7111CCIN

(CIVIL)/(AGRI) BPS -17 TO 18 (WATER WING)

PAPER — A (RULES & CURRENT AFFAIRS)

Maximum Marks = 50 Time Allowed = 02 Hours


Note: Read and follow carefully the Instructions given below before attempting the paper
■ Attempt all questions.
Consultation of books if permitted in the syllabus is allowed in Descriptive Paper but other books, typed Or
written material are not allowed. However nothing is allowed to consult in Objective Paper.
Write your Roll Number on the top right corner of the Paper / Answer Book.
Write your answers with blue pen/ball point only. Answers attempted with lead pencil or in any other colour
of ink, will be cancelled.
No mark of identification should be made on the answer book, otherwise it will be cancelled.
Exchange of books amongst the candidates is not allowed in the examination hall.
Use of Mobile Phone and Blue Tooth communication devices are strictly prohibited.

PART — I (Subjective — Current Affairs)


(Books not allowed)
Pass Marks = 40%

Please attempt any two questions:- 16 Marks


Q.1. How Brexit is going to affect world peace and Economics? (08 Marks)
Q.2. What will be concern for Pakistan if USA pullsiout of Afghanistan? (08 Marks)
Q.3. Why are there demonstrations on the streets of Paris? (08 Marks)

PART — II (Subjective — Rules & Regulation)


(WAPDA Rules can be consulted)
Pass Marks = 50%

Please attempt any four questions:- 34 Marks


Q.1. What circumstances determine whether an enquiry is conducted (8.5 Marks)
or not under EnD Rules?
Q.2. (8.5 Marks)
What are the roles of Prosecution witness, Deptt. Rep, Defence
witness & inquiry officer?
Q.3. How can an employee be retired on 20 years service? (8.5 Marks)
Q.4.
What are the pre and post long term advance requirements? (8.5 Marks)
Q.5.
What is the difference in treatment under medical rules and (8.5 Marks)
chronically sick persons rules?
Q.6. How WAPDA land/property can be leased/sold what (8.5 Marks)
rules/procedures to be followed?
Roll No

PAKISTAN
WATER AND POWER DEVELOPMENT AUTHORITY
DEPARTMENTAL PROMOTION EXAMINATION
OF

JUNIOR ENGINEER (CIVIL)


BPS-17 TO SENIOR ENGINEER (CIVIL) BPS-18

(CONSTRUCTION MANAGEMENT, MATERIAL & EQUIPMENT)

PAPER-B (TECHNICAL)

PART-I (OBJECTIVE)

TOTAL MARKS: 50
PASS MARKS: 25
TIME ALLOWED: ONE HOUR
Note: 1

Read and follow the instructions given below before attempting the paper:

➢ Attempt all question of objective paper and number of questions as per instruction in descriptive paper.
➢ No extra question should be attempted, if attempted the candidate should himself cross the extra
question, otherwise the first required number of answers shall be marked.
> Books not allowed.
> Write your Roll Number on the top right of the paper/ answer book.
➢ Write your answers with blue pen/ ball point only. Answer attempted with led pencil or in any other
color of ink, will be cancelled.
➢ No mark of ideetification should be made on the answer book, otherwise it will be cancelled.
> Use of mobile phone and blue tooth communication devices are strictly prohibited.
> Overwriting, tempering and cutting of answer, result in zero marks.

Q. No.1 10 Marks (5X2)

i. Which one of the following impurity is not desired in the soil for brick formation:
a) Alkali
b) Kankar
c) Iron Oxide
d) (a) and (b) above
e) (b) and (c) above

ii. Steel used in RCC work is:


a) Mild Steel
b) Cast Iron
c) Stainless Steel
d) None of the above

1
Roll No

iii. Piles for cofferdam are :


a) Sheet piles
b) Bearing Piles
c) Friction Piles
d) Compaction piles

iv. Concrete is considered as unsuitable for compaction by vibration if it is:


a) Plastic
b) Semi Plastic
c) Dry
d) Moist Earth
e) None of the above

v. Quality control is aimed at


a) Maintaining the desired quality
b) Exceeding the desired quality
c) Continuously improving the quality
d) Following the quality

Q No.2 Following abbreviations are used for: 10 Marks (10X1)

i. PVC=

ii. CDWP=

iii. IPP=

iv. PEC=

v. BOQ=

vi. ACI=

vii. ECNEC=

viii. PERT=

ix. CPM=

x. QCBS=

Q No.3 Fill in the Blanks: 10 Marks (5X2)

i. Slump test for concrete is carried out to determine


ii. When excess water comes upon the surface of concrete, it is called of concrete.
iii. Naulong Dam is located in District, Baluchistan.
iv. Contour lines can cross each other only in case of
v. 'Type of the Bhasha Dam is Dam

2
Roll No

Q. No.4 Answers the Following: 10 Marks (5X2)

i. What is the difference between the Plane Table Survey and Total Station Survey

ii. What is the difference between the Honey Combing and Segregation in Concrete

iii. What is the difference between the Ordinary Portland and Sulphate Resistant Cement

iv. What is the difference between the Tender Drawings and Shop Drawings

v. Commonly used professional softwares for Scheduling and Planning of construction Projects

Q.No.5 Define Following: 10 Marks (5X2)

i. Critical Activity

ii. Renewable sources of Energy

iii. Heat of Hydration


Roll No

iv. Roller Compacted Concrete

v. Construction Joint

4
PAKISTAN
WATER AND POWER DEVELOPMENT AUTHORITY
DEPARTMENTAL PROMOTION EXAMINATION
OF

JUNIOR ENGINEER (CIVIL)


BPS-17 TO SENIOR ENGINEER (CIVIL) BPS-18

(CONSTRUCTION MANAGEMENT, MATERIAL & EQUIPMENT)

PAPER-B (TECHNICAL)

PART-II (DESCRIPTIVE)

TOTAL MARKS: 50
PASS MARKS: 25
TIME ALLOWED: TWO HOURS
All questions carry equal marks
Attempt any five questions

Note: 1

Read and follow the instructions given below before aIempting the paper:

> Attempt all question of objective paper and number of questions as per instruction in descriptive paper.
> No extra question should be attempted, if attempted the candidate should himself cross the extra
question, otherwise the first required number of answers shall be marked.
> Books not allowed.
> Write your Roll Number on the top right of the paper/ answer book.
> Write your answers with blue pen/ ball point only. Answer attempted with led pencil or in any other
color of ink, will be cancelled.
> No mark of identification should be made on the answer book, otherwise it will be cancelled.
> Use of mobile phone and blue tooth communication devices are strictly prohibited,
> Overwriting, tempering and cutting of answer, result in zero marks.

Q. No. 1 10 Marks (5X2)

Define the Following:

i. Ultimate Bearing Strength


ii. Tunnel Boring Machine
iii. River Morphology
iv. Coffer Dam
v. Grouting

1
Q. No.2 10 Marks

i. What is Construction Management, Briefly Describe? 4


ii. What is purpose of Project Feasibility Report? 3
iii. Short note on Internal Rate of Return 3

Q. No.3 10 Marks

i. Types of Piles 4
ii. Concreting in hot weather conditions 3
iii. Types of Turbines 3

Q. No.4 10 Marks

i. Define Open competitive bidding. 4


ii. What is Conflict of Interest, Elaborate your answer with example. 3
iii. Compensable Extension of Time in Contract 3

Q. No.5 10 Marks (2X5)

i. Write a brief note to differentiate between Weir, Barrage, Head works and Dam
ii. Brief note on Mohmand Dam Project or Diamer Bastia Dam Project

Q. No.6 10 Marks

i. Write brief note on soil compaction and soil consolidation 4


ii. Machinery used for soil compaction 3
iii. Depreciation cost of equipment/ machinery 3

Q. No.7 10 Marks (2X5)

i. Planning commission procedure/steps for approval of Projects


ii. Purpose of PC-I, PC-II, PC-Ill, PC-IV and PC-V

2
Roll No.
PAKISTAN WATER & POWER DEVELOPMENT AUTHORITY
DEPARTMENTAL PROMOTION EXAMINATION
JUNIOR ENGINEER (CIVIL) TO SENIOR ENGINEER (CIVIL) BPS-17 TO 18
PAPER — B
(TECHNICAL — DAMS & HYDROPOWER ENGINEERING)
Part — .I (Objective)
January, 2019
Total Marks: 50 Pass Marks: 25 Time Allowed: One Hour
Note: Read and follow the instructions given below before attempting the paper:
a. Write your answers with blue or black ball point / pen and blue or black marker (for heat -"igs
/ sub headings) otherwise paper will be cancelled.
b. Write your Roll No. on the top right corner of the question paper/answer book.
c. Attempt all the questions.
d. Consultation of books, typed or written material are not allowed.
e. Use of Mobile Phone and Bluetooth Communication devices are strictly prohibited.

Q.No.1: For what are the following abbreviations stand 10


i) MOWR
ii) MDHP
iii) DBDP
iv) CFRD
v) USBR
vi) RBOD
vii) GLOF
viii) GBHP
ix) RQD
x) USGS

' Q.No.3: Write True or False in front of the following statements 20


i) Jinnah Hydropower Project is located on Kabul River.
ii) Hydrograph is a plot of discharge and time.
iii) Gomal Zam Dam is a CFR dam.
iv) RCC in dam construction stands for Reinforced Cement Concrete.
v) Tarbela Dam is the largest dam of the country with respect to storage of water at present.
vi) Ponch River is a tributary of River Jhelum.
vii) The maximum conservation level of Tarbela Reservoir is 1242 ft SPD.
viii) 'Tarbela 5th Extension HPP has the potential to generate 1500 megawatts.
ix) The top of weir over which water flows is called crest.
x) Gilgit River is a tributary of Chitral River.
xi) The installed generation capacity of Chashma hydroelectric power stations is 184 MW.

xii) Qadirabad Barrage is located downstream of Khanki Barrage.


xiii) Rawal Dam is located on Zhob River.
xiv) Francis Turbines are used for high head power projects.
xv) The storage of water below minimum operating level of a reservoir is called live storage.

xvi) Mohmand Dam Hydropower Project is a run of the river hydropower project.
xvii) Kotri Barrage is the last water distribution structure on the Indus before it enters sea.
xviii) NJHEP tunnels are steel lined at their crossing point under river Jhelum.
xix) Diamer Basha Dam is going to be constructed downstream of Dasu HPP.
xx) Run off = Surface run off - Ground water flow

Q.No.4: Fill in the blanks 20

i) IWT is an agreement between and


ii) is responsible for regulation of Tarbela, Mangla & Chashma Reservoirs.
iii) Pelton turbine is an turbine.
iv) Chashma Hydropower project is a head HPP.
v) Mohmand (Munda) Dam Hydropower Project is located on River.
vi) Minimum Operating Level of Mangla Reservoir is ft SPD.
vii) Golen Gol is located River.
viii) Indus Water Treaty gives water use rights of & Rivers to Pakistan.
ix) Trimmu Barrage is located at the confluence of & Rivers.
x) Mirani dam is located on River.
xi) Pehur High Level Canals offtakes from dam.
xii) Nai Gaj dam is located in province.
xiii) Allai Khwar Hydropower Project is a head project.
xiv) The purpose of is to protect the structure from wave action.
xv) Under sluices are provided for
xvi) Compressive strength of OPC is than its tensile strength.
xvii) Discharge is calculated by multiplying and velocity.
xviii) Installed capacity of Khan Khawar Hydropower Project is
xix) PMF means
xx) Project is going to be inaugurated in near future.
PAKISTAN WATER & POWER DEVELOPMENT AUTHORITY
DEPARTMENTAL PROMOTION EXAMINATION
JUNIOR ENGINEER (CIVIL) TO SENIOR ENGINEER (CIVIL) BPS-17 TO 18
PAPER — B
(TECHNICAL — DAMS & HYDROPOWER ENGINEERING)

Part — II (Subjective)
January, 2019

Total Marks: 50 Pass Marks: 25 Time Allowed: Two Hours '

Note: Read and follow the instructions given below before attempting the paper:

a. Write your answers with blue or black ball point / pen and blue or black marker (for headings
sub headings) otherwise paper will be cancelled.
b. Write your Roll No. on the top right corner of the question paper/answer book.
c. Attempt any five questions. All questions carry equal marks.
d. Consultation of books, typed or written material are not allowed.
e. No extra questions should be attempted. If attempted the candidate should himself/herself cross the
extra questions, otherwise the first required no. of answers shall be marked.
f. Use of Mobile Phone and Bluetooth Communicatiori devices are strictly prohibited.

Q No. 1 Describe the following? 10


(i) Surge Chamber (ii) Forebay
(iii) PMF (iv) Water Hammer
(v) PC-II
Q No. 2 (a) What is hydrographic survey, write its purposes? 05
(b) Calculate Power Potential in Megawatts if net head is 130 meters and 05
discharge is 55 cumecs?
Q No. 3 Describe the main components of a run of the river hydropower project? 10
also draw its schematic diagram?

Q No. 4 (a) Write a note on site selection for a hydropower project? 06


(b) Write the project planning steps for a hydropower project? 04

Q No. 5 (a) What are the different types of spillway gates? 04


(b) Write a note on the Roller Compacted Concrete? 06

Q No. 6 (a) Define main features of Microsoft Power Point? 03


(b) What is the difference between system software and application software? 03
(c) What are the abbreviations HTTPS, URL, BIOS & PDF stand for? 04
WAPDA

DEPARTMENTAL PROMOTION EXAMINATION


OF JUNIOR ENGINEER(CIVIL) TO SR. ENGINEER(CIVIL) BPS 17 TO 18
JANUARY - 2019

PAPER-C(FINANCE & ACCOUNTS)


PART-II (OBJECTIVE)

Time Allowed: 1 Hour Total Marks: 50


Passing Marks: 50%

Read and follow Carefully the instructions given below before attempting the paper:

a. Write your answers with blue or black ball point/pen and blue or black marker (for headings/sub headings) otherwise
paper will be cancelled.
b. Attempt all questions of Objective Paper and Number of questions as per instruction in Descriptive Paper.
c. No extra question should be attempted. If attempted the candidate should himself cross the extra question otherwise the
first required number of answers shall be marked.
d. Books, typed or written material are not allowed in the examination hall.
e. Write your Roll Number on the top right corner of the Paper/Answer Book.
f. Exchange of books amongst the candidates is not allowed in the examination hall.
g. Use of Mobile Phone and Blue tooth communication devices are strictly prohibited.

Q.No.1. Fill in the blanks (Marks-20).

(i) The primary purpose of accounting for capital work in progress is to record accurately
the done.

(ii) Pre-feasibility stage means

(iii) In case of advertised tender shall be endorsed


by the purchasing agency to firms brought on the approved list for the items for which
inquiry has been issued.

(iv) The offer for acceptance of tender may not be considered which are linked up
against the offer invited on a firm and final basis

(v) Reserve price should be as near the prevailing market


rate as reasonably possible.

(vi) Prior to fixing reserve price for the same items or the item in
similar condition or age must be observed.

(vii) Hydel Power Development schemes undertaken by the WAPDA Power Wing, fall under
two main categories(one is based on Dam/Reservoirs and the second flow of River)
depending on Sources.

(viii) The Foreign Exchange Budget shall be prepared Rupees.

(ix) Review of the accuracy and effectiveness of system comes


of internal audit.
developed

.No.2. Marks True or False to the following statements. (Ma rks-20)

(i) On recommencement of construction of a component an account will be


opened in subsidiary ledger.

(ii) The General Manager Finance(Coord) shall be responsible for prescribing


accounts receivable policies, procedures and guidelines.

(iii) In case the tender does not give the break up the purchasing officer shall
not workout all offers on the basis of end price.

(iv) Offer can be considered if it is received after the time and date fixed for its
receipt.

(v) After verification by the verification team no issue, addition or


cannibalization of the stores is allowed, without prior approval of competent
authority.

(vi) A disposal item may not be sold through negotiation process, if the bids
offered through tender/auction are not reasonable and below the prevailing
market price.

Usually the scheme/program like irrigation/jdrainage program and flood


damages work are not undertaken by WAPDA.

(viii) Reference to the Planning Division shall be necessary while drawing up


estimate of Foreign Exchange Budget regarding proposal involving
expenditure on entertainment and other contingencies.

(ix) Fraud prevention and deduction is the primary responsibility of the


management of the Audit Unit.

(x) It is not the responsibility of Audit to check whether book of accounts are
properly maintained in accordance with the generally accepted accounting
principles.

Q.No.. Define the following briefly:- (Marks-10)

(I ) Administrative approval:

BID:

Contingent Expenditure:

(iv) Deposit Work:


( ) Major Head of Account:

ii) Minor Head of Account:

viii Repeat Orders:

(i
x Re-appropriation:

(x) Technical Sanction:


WAPDA

DEPARTMENTAL PROMOTION EXAMINATION


OF JUNIOR ENGINEERfCIVIL) TO SR. ENGINEER(CIVIL) BPS 17 TO 18
JANUARY - 2019

PAPER-C(FINANCE & ACCOUNTS)


PART-II (SUBJECTIVE)

Time Allowed: 2 Hour Total Marks: 50


Passing Marks: 50%

Read and follow Carefully the instructions given below before attempting the paper:

a. Write your answers with blue or black ball point/pen and blue or black marker (for headings/sub headings) otherwise paper will be
cancelled.
b. Attempt all questions of Objective Paper and Number of questions as per instruction in Descriptive Paper.
c. No extra question should be attempted. If attempted the candidate should himself cross the extra question otherwise the first
required number of answers shall be marked.
d. Books, typed or written material are not allowed in the examination hall.
e. Write your Roll Number on the top right corner of the Paper/Answer Book.
f. Exchange of books amongst the candidates is not allowed in the examination hall.
g. Use of Mobile Phone and Blue tooth communication devices are strictly prohibited.

Note: Attempt all, question carry 10 marks each.

Q.No.l . What internal controls will be observed to promote the accuracy of Wapda's accounts
receivable records and to discourage fraudulent manipulation of accounting record ?

Q.No.2. Write a note on the following:-

(i) Payment against F.O.R. contract.


(ii) Payment against F.O.B. contract.

Q.No.3. What are the policy and principles of Disposal ?

Q.No.4. What guidelines will be followed in drawing up the estimates of Foreign Exchange Budget ?

Q.No.5. Write down a brief note on the scope of internal audit with its functions.
Roll No.

PAKISTAN WATER & POWER DEVELOPMENT AUTHORITY


WATER WING DEPARTMENTAL PROMOTION EXAMINATION
JR. ENGINEER (CIVIL) TO SR. ENGINEER (CIVIL) BPS-17 TO BPS-IS

PAPER: B (PROFESSIONAL) Canal & Distribution System


January 30, 2019. -

Part I (OBJECTIVE)
-

Total Marks = 50 Pass Marks = 25 Time = ONE Hour


Note: React and follow the instructions given below, before attempting the Paper.
a. Write your answers with blue or black hall point/pen and marker (far headings/sub-headings), otherwise
paper will be canceled.
h. Utenrpt rrll questions ol'Objective Paper and Number of Questions as per instruction in Descriptive Paper.
c No extra question should be attempted. if attempted the candidate should himself cross the extra questions.
otherwise the first required number of answers shall he marked.
d. Consultation of hooks or hand-written material are not allowed in Objective and Descriptive Paper.
c. II7 ile your Roll ,Number on the top corner oj'Paper/Ansiver Book
Exchange of Books amongst the candidate is not allowed in the examination hall. .
g. (:se Llohile Phone and Bluetooth communication device are strictly prohibited

/
(Attempt All Questions)

Q. No. 1 Write in full the following abbreviations. (10 Marks)


(1 Mark Each)
(i) M.A.F.
(ii) N.D.P.
(iii) I.C.I.D.
(iv) L.I.R.B.P
(v) N.E.C.
(vi) P.P.M.
(vii) N.J.H.E.P.
(viii) P.P.R.A.
(ix) C.M.T.L.
(x) O.F.W.M.
Q. No. 2 Fill in the Blanks. (20 Marks)
(1 Mark Each)

(i) The hydraulic mean depth is the ratio between and

(ii) A regime channel is one which neither nor

(iii) Kachhi Canal is located partly in and partially in

v) Surge tank is provided in the water supply line to reduce the effect of

(v) Canals taken directly from the rivers with or without head regulators are
called

(vi) A device to release water from a canal to the water course is called an

(vii) Movement of water under or around an impervious structure is called

(viii) A canal in which the amount of excavation is same as in the fill portion is
called a section.

x) A siphon is cross drainage work in which the canal is taken


the river.

(x) When a river starts meandering, the sediments carrying capacity of the river
first and ultimately
(xi) Water logging, takes place due to in ground water table.

(xii) A launching apron in a hydraulic structure provides safety against

(xiii) A cistern in a canal fall serves as a

(xiv) Fish ladder is a component part in

(xv) The difference in water level u/s and d/s of a bridge is known as

(xvi) Thiessen polygon method is used to find

(xvii) Land reclamation is the process by which an unproductive or barren land is


made for cullivation.

(xviii) Linking of canal with time.

(xix) The infiltration capacity of soil of the lining.

(xx) When the canal with bed level higher than the high flood level in drain cross
each other, then the cross drainage structure is called
Q. No. 3 Tick True/False for the following statements. (10 Marks)
(1 Mark Each)

(i) The principle function of interceptor drains is


to control ground water levels on sloping True / False
lands.

(ii) Geological formation that may contain ground


water but is capable of transmitting/significant
True / False
qualities of it under normal hydraulic
condition.

(iii) In a lined canal, the resistance to flow


True / False
decreases and velocity of flow increases.

(iv) A metrological station should always be


True / False
surrounded with high walls .

(v) The amount of precipitation is measured by


True / False
osmoscope.

(v Sprinklers irrigation is adopted for rocky area. True / False

(vii) Earth consists of 70 % water ailid 30% land. True / False

(viii) The Jinnah Hydro Power Project is being


True / False
constructed on Jhelum River.

(ix) An aquifer is a surface layer of water. True / False

(x) The filters are provided in hydraulic structures


to provide drainage and prevent clogging of True / False
slots.
Q. No. 4 Tick the correct answer for the following (10 Marks)
Surface run off is the difference between
(a) rainfall and discharge of water in river
(b) rainfall and discharge of water from dam
(c) rainfall and rainfall losses
(d) the discharge of water from a dam and rainfall.
ii Rain gauge is an instrument for measuring the rainfall in
(a) square centimeter (b) centimeter
(c) centimeter cube (d) square inch.
iii - The area under a flood hydrograph denotes
(a) the volume of flood
(b) the velocity of flood
(c) the area which is submerged under the flood
(d) none of the above
iv- The critical velocity is that velocity
(a) which ensures no silting in a channel
(b) at which the channel will not be stable
(c) at which depth of flow in a canal will be a constant
(d) at which silt transporting power of a channel will be maximum
v- According to Lacey's silt theory, the velocity of water in a channel
(a) depends on vertical depth of flow
(b)' depends on hydraulic mean depth of the channel
(c) depends on the bed slope of the channel
(d) depends on none of the above
vi- Bed scour in a channel causes
(a) out flanking (b) under mining
(c) increase in rate of flow (d) none of the above
vii- Canal drops are required when
(a) the natural slope of the ground is very steep
(b) the natural slope of the ground is almost horizontal
(c) the average velocity of water exceeds the critical velocity
(d) the width of the canal is 5 times the depth of the canal
viii- Guide banks or Bell's bunds are
(a) walls constructed along the sea shore to prevent sea erosion
(b) construction across a river to store water
(c) used to direct the river flow axially towards an irrigation structure
(d) used for none of the above
ix- In case of weirs on permeable foundations, the effective weight of the
structure
(a) is reduced by the force uplift (b) is increased by the uplift force
(c) remains the same (d) will be assumed as zero
x- The process of the continuous removal of soil particles from an irrigation
structure is called
(a) uplift (b) interception loss
(c) piping (d) infiltration
Roll No.

PAKISTAN WATER & POWER DEVELOPMENT AUTI imary


WATER WING DEPARTMENTAL PROMOTION EXAMINATION
JR. ENGINEER (CIVIL) TO SR. ENGINEER (CIVIL) I3PS-17 TO BPS-18
PAPER: B (PROFESSIONAL) Canal & Distribution System
January 30, 2019.
Part-II (DESCRIPTIVE)
Total Marks = 50 Pass Marks = 25 Time = 2 Hours

Note: Read and follow the instructions given below, before attempting the Paper.

a. Write your answers )vith blue or black ball point/pen and marker (for headings/sub-headings), otherwise
paper will be canceled.
h. Attempt all questions of Objective Paper and Number of Questions as per instruction in Descriptive Paper.
c. No extra question should be attempted, if attempted the candidate should himself cross the extra questions,
otherwise the first required number of answers shall be marked.
d C'onsuRation of books or hand-written material are not allowed in Objective and Descriptive Paper.
11 .rite moo, Roll Number on the top corner of Paper/Answer Book
1...X•hauge of Books :amongst the candidate is not .allowed in the examination hall.
I e llobile Phone and Bluelooth communication device are strictly prohibited

(Attempt any 5 questions, all questions carry equal marks) (Marks)


J
Q.1 Elaborate the following: 10
(i) Draw the typical layout of a canal head works,
Explain its functions
(ii) Draw a typical Cross Section of a canal Head Regulator.

Q.2 (I) Define Kennedy's and Lacey's theory for canal design? 10
(ii) Discuss the types and essential requirements of outlets.

Q.3 (i) What is fall? Where they should be provided? 10


(ii) Differentiate with sketch Silt extractor and a Silt excluder.

Q.4 (I) What do you understand by lining of channel? 10


State various methods of lining of canal?
(ii) Discuss the factors Responsible for selection of a particular
type of lining.

Q.5 Write short notes on the following: 10


(i) Aqueduct (ii) Super passage
(iii) Syphon Aqueduct (iv) Level crossing

Q.6 Describe the following:


(i) Hydrograph and its components (ii) Hydrologic cycle 10
(iii) River Training works
WAPDA

DEPARTMENTAL PROMOTION EXAMINATION


OF JUNIOR ENGINEER(CIVIL1 TO SR. ENGINEER(CIVIL) BPS 17 TO 18
JANUARY - 2019

PAPER-C(FINANCE & ACCOUNTS)


PART-II (OBJECTIVE)

Time Allowed: 1 Hour Total Marks: 50


Passing Marks: 50%

Read and follow Carefully the instructions given below before attempting the paper:

a. Write your answers with blue or black ball point/pen and blue or black marker (for headings/sub headings) otherwise
paper will be cancelled.
b. Attempt all questicins of Objective Paper and Number of questions as per instruction in Descriptive Paper.
c. No extra question should be attempted. If attempted the candidate should himself cross the extra question otherwise the
first required number of answers shall be marked.
d. Books, typed or written material are not allowed in the examination hall.
e. Write your Roll Number on the top right corner of the Paper/Answer Book.
f. Exchange of books amongst the candidates is not allowed in the examination hall.
g. Use of Mobile Phone and Blue tooth communication devices are strictly prohibited.

Q.No.1. Fill in the blanks (Marks-20).

(i) The primary purpose of accounting for capital work in progress is to record accurately
the done.

(ii) Pre-feasibility stage means

(iii) In case of advertised tender shall be endorsed


by the purchasing agency to firms brought on the approved list for the items for which
inquiry has been issued.

(iv) The offer for acceptance of tender may not be considered which are linked up
against the offer invited on a firm and final basis

(v) Reserve price should be as near the prevailing market


rate as reasonably possible.

(vi) Prior to fixing reserve price for the same items or the item in
similar condition or age must be observed.

(vii) Hydel Power Development schemes undertaken by the WAPDA Power Wing, fall under
two main categories(one is based on Dam/Reservoirs and the second flow of River)
depending on Sources.

(viii) The Foreign Exchange Budget shall be prepared Rupees.

(ix) Review of the accuracy and effectiveness of system comes


of internal audit.
Lu UJG OLL1111...“4.•

developed

.No.2. Marks True or False to the following statements. (Marks-20)

(i) On recommencement of construction of a component an account will be


opened in subsidiary ledger.

(ii) The General Manager Finance(Coord) shall be responsible for prescribing


accounts receivable policies, procedures and guidelines.

(iii) In case the tender does not give the break up the purchasing officer shall
not workout all offers on the basis of end price.

(iv) Offer can be considered if it is received after the time and date fixed for its
receipt.

(v) After verification by the verification team no issue, addition or


cannibalization of the stores is allowed, without prior approval of competent
authority.

(vi) A disposal item may not be sold through negotiation process, if the bids
offered through tender/auction are not reasonable and below the prevailing
market price.

(vii) Usually the scheme/program like irrigation/fIrainage program and flood


damages work are not undertaken by WAPDA.

(viii) Reference to the Planning Division shall be necessary while drawing up


estimate of Foreign Exchange Budget regarding proposal involving
expenditure on entertainment and other contingencies.

(ix) Fraud prevention and deduction is the primary responsibility of the


management of the Audit Unit.

(x) It is not the responsibility of Audit to check whether book of accounts are
properly maintained in accordance with the generally accepted accounting
principles.

Q.No.. Define the following briefly:- (Marks-10) •


(i) Administrative approval:

(ii) BID:

(i i i) Contingent Expenditure:

(iv) Deposit Work:


(vi) Major Head of Account:

(vii) Minor Head of Account:

(viii) Repeat Orders:

(ix) Re-appropriation:

(x) Technical Sanction:


WAPDA

DEPARTMENTAL PROMOTION EXAMINATION


OF JUNIOR ENGINEER(CIVIL) TO SR. ENGINEER(CIVIL) BPS 17 TO 18
JANUARY - 2019

PAPER-C(FINANCE & ACCOUNTS)


PART-II (SUBJECTIVE)

Time Allowed: 2 Hour Total Marks: 50


Passing Marks: 50%

Read and follow Carefully the instructions given below before attempting the paper:

a. Write your answers with blue or black ball point/pen and blue or black marker (for headings/sub headings) otherwise paper will be
cancelled.
b. Attempt all questions of Objective Paper and Number of questions as per instruction in Descriptive Paper.
c. No extra question should be attempted. If attempted the candidate should himself cross the extra question otherwise the first
required number of answers shall be marked.
d. Books, typed or written material are not allowed in the examination hall.
e. Write your Roll Number on the top right corner of the Paper/Answer Book.
f. Exchange of books amongst the candidates is not allowed in the examination hall.
g. Use of Mobile Phone and Blue tooth communication devices are strictly prohibited.

Note: Attempt all, question carry 10 marks each.

Q.No.1. What internal controls will be observed to promote the accuracy of Wapda's accounts
receivable records and to discourage fraudulent manipulation of accounting record ?

Q.No.2. Write a note on the following:-

(i) Payment against F.O.R. contract.


(ii) Payment against F.O.B. contract.

Q.No.3. What are the policy and principles of Disposal ?

Q.No.4. What guidelines will be followed in drawing up the estimates of Foreign Exchange Budget ?

Q.No.5. Write down a brief note on the scope of internal audit with its functions.
Roll No.
PAKISTAN WATER & POWER DEVELOPMENT AUTHORITY
WATER WING DEPARTMENTAL PRMOTION EXAMINATION
JR. ENGINEER (CIVIL) TO SR. ENGINEER (CIVIL) BPS-17 TO BPS-18
PAPER: B (PROFESSIONAL) Canal & Distribution System
January 23, 2018.
Part-I (OBJECTIVE)
Total Marks = 50 Pass Marks = 25 Time = One Hours

Note: Read and follow the instructions given below, before attempting the Paper.
a. Write your answers with blue or black ball point/pen and marker (for headings/sub-headings), otherwise
paper will be cancelled.
b. Attempt all questions .of Objective Paper and Number of Questions as per instruction in Descriptive
Paper.
c. No extra question should be attempted, if attempted the candidate should himself cross-the extra
questions, otherwise the first required number of answers shall be marked
d. Consultation of books or hand written material are not allowed in Objective and Descriptive Paper.
e. Write your Roll Number on the top right corner of Paper/AnsWer Boa
f Exchange of BoOks amongst'the candidate is not alio -Wed in the examination hall.
g. Use of Mobile Phone and Bluetooth communication device are strictly.prohibited

(Attempt All Questions)

Q. No. 1 Write in full the following abbreviations. (10 Marks)


(1 Mark. Each)
(i) S.M.O
(ii) W.E.C.
(iii) W.R.P.O.
(iv) L.I.R.B.P
(v) G.I.S.
(vi)
(vii) N.J.H.E.P.
(viii) D.V.D.
(ix) B.O.Q.
(x) O.F.W.M.
Q. No. 2 Fill in the Blanks? (20 Marks)
(1 Mark Each)

) When the canal bed is above maximum level of water surface


in the natural drain it is called

(ii) A regime channel is one which neither


nor

(iii) Kachhi Canal is located Partly in and


Partially in

(iv) Cement concrete lining is but

(v) When the maximum water level is the


bed of the canal, then canal is carried

(vi) Gomal Zam Dam is located on river


in

(vii) A maximum velocity of 5 ft. per second has been adopted


for in Pakistan.

(viii) Rainee Canal Project offtakes from


of river upstream of Guddu Barrage.

(ix) Cement Concrete lining is' durable but

(x) In order to use the outlet as a measuring device, the


co-efficient of discharge remain
in full modular range.
(xi) In outlet the higher the crest with respect to the channel
bed, the is the silt drawing capacity.

xii) A Syphon aqueduct or syphon super passage carries the


discharge of one drain the bed of another.

(xiii) When the Bed of natural drain is below of F.S.L. of the


anal, it is called

(xiv) The slope for the open flume aqueduct shall be


to the slope of the energy line.

(xv) An outlet must be strong and be without movable parts to


minimize 4.

(xvi) A super passage is constructed when F.S.L. in the canal


is the bed of drain.

(xvii) Land reclamation is the process by which a unproductive or


barren land is made for cultivation.

(xviii)Linking of canal the seepage losses.

(xix) Water tightness is measured by the permeability of the lining.

(xx) The term minimum permissible velocity means a


which will prevent silting and
vegetation groWth.

c
Q.No. 3: Tick True/False for the following statement
(10 Marks)
1 Mark Each)

(i) The water table is the surface where the


water pressure head is greater than the False / True
atmospheric pressure.

(ii) Geological formation that may contain


ground Water but is capable of True / False
transmitting/significant qualities of it under
normal hydraulic condition.

(iii) The super passage is constructed when FSL


True / False
in the canal is above the bed of the drain.

(iv) The velocity of flow in the barrel is less than


True False
in the canal upstream and down-stream.

(v) The open flume outlet is smboth.weir. True / False

(vi) The slope for the open flume aqueduct shall


True / False
be parallel to the slope of the energy line.

(vii) In order to use outlet as measuring device


the co-efficient of discharge remains not True / False
constant in the full modular range.

(viii) A bed of Low permeability adjacent to as


True / False
aquifers

(ix) An aquifer is an surface layer of water True / False

(x) The friction blocks used in montegue type


canal fall are a very efficient means of True ./ .False
increasing energy
Q No. 4. (a) Write down the names .of western rivers. marks)

(v)

(b) Complete the followings? (5 marks)

(i) 1 sq. mile

(ii) 1 cu ft of water

(iii) 1 KM is equal

(iv) 1 long ton

(v) 1 cm
Roll No.
PAKISTAN WATER & POWER DEVELOPMENT AUTHORITY
WATER WING DEPARTMENTAL PRMOTION EXAMINATION
JR. ENGINEER (CIVIL) TO SR. ENGINEER (CIVIL) BPS-17 TO BPS-18
January 23, 2018.
Part-II (Descriptive)
Total Marks = 50 Pass Marks = 25 Time = 2 Hours

Note: Read and follow the instructions given below, before attempting the Paper.
Write your answers with blue or black ball point/pen and. marker (for headings/sub-headings), otherwise
paper will be cancelled.
Attempt all questions of Objective Paper and Number of Questions as per instruction in Descriptive
Paper.
c. No extra question should be attempted, if attempted the candidate should himself cross the extra
questions, otherwise the first required number of answers shall be marked.
d. Consultation of books or hand written material are not allowed in Objective and Descriptive. Paper.
e. Write your Roll Number on the top corner of Paper/Answer Book
f. Exchange of Books amongst the candidate is not allowed in the examination hall.
g. Use of Mobile Phone and Bluetooth communication device are strictly prohibited

(Attempt any 5 questions, all questions carry equal marks) (Marks)


Q.1 Elaborate the following: • • 10
(i) Types of transitions in canal structure.
(ii) Types of cross drainage:structures.

Q.2 (i) Define Kennedy's and Lacy's theory? 10


(ii) Discuss the essential requirements of outlets.

Q.3 (i) What is fall? Where they should be provided? 10


(ii) Differentiate between cross regulator and head regulator.

Q.4 (i) Draw typical x-section of earthen channel when natural 10


surface level below FSL but above bed level.
(ii) What do you understand by lining of channel?
State various methods of lining of canal?

Q.5 Write short notes on the following: 10


(i) Aqueduct and Syphon (ii) Super passage
(iii) Types of outlet

Q.6 Describe the following: 10


(i) Data and information (ii) Hardware and software
(iii) Utility of MS Word and MS Excel
Roll No

PAKISTAN WATER & POWER DEVELOPMENT AUTHORIT


DEPARTMENTAL PROMOTION EXAMINATION OF
JUNIOR ENGINEER (CIVIL) TO SR. ENGINEER (CIVIL) BPS 17 to 18
JANUARY 2018
PAPER-C (FINANCE & ACCOUNTS)
PART I (OBJECTIVE)

ime Allowed: 1 Hour Total Marks : 50


Passing Marks: 50%

Read and follow carefully the instructions given below before attempting the paper

Write your answers with blue or black ball point / pen and blue or black marker (for
headings / sub headings) otherwise paper will be cancelled.
b. Attempt all questions of Objective Paper and number of question as per instruction in
Descriptive paper.
c. No extra question should be attempted. If attempted the candidate should himself cross
the extra question, otherwise the first required number of answers shall be marked.
d. Books, typed or written material are not allowed in the examination hall.
e. Write your Roll Number on the top right corner of the paper/Answer Book.
f. Exchange of books amongst the candidates is not allowed in the examination hall.
g. Use of Mobile Phone and Blue tooth communication devices are strictly prohibited.
J

Fill in the Blanks (20 Marks)

i. The primary purpose of accounting for capital work in progress is to record


the actual cost of work done.

ii. On completion of the project, when the final costs direct and indirect have been
ascertained, the indirect charges will be apportioned over the facilities in an
basis.

iii.The formation undertaking the task will keep the advance amount received in a
account and record expenses of the related job
in a separate deposit work account.

iv.A reconciliation of individual account balances to the control balance shall be performed

v. The employee will submit TA adjustment account as early as possible after performing
journey but not later than of advance in which
case'the amount shall be adjusted from his salary.

vi. The capital assets like plant & machinery, equipment, vehicles, computers and furniture &
fixture etc. received, are recorded in the and
not routed through the store.

) 17
Moll IV()

vii. Procurement section will price the SRW for un-used material at the unit rate applied to
Material Requisition Slip (MRS) against which said material was initially drawn from

viii.The activity of water wing involves execution of surface and sub-surface water
development and drainage-Salinity Control and

ix. This Inter Audit manual shall remain the property of WAPDA; therefore, copies of this
manual must not be provided to any external party except with the prior approval of

. It may be understood that internal auditors are not responsible for fraud detection on the
basis of their activity.

i. The internal audit division shall perform the internal audit of the
and key financial areas of WAPDA wings, divisions and offices

xii. The Chief Auditor, who is the head of internal audit function, shall report to the

xiii.The for the year are outlined in Public Sector


Development Programme

xiv. Budgeting is a very serious process and if revised estimates are less than the authorized
grants, the reasons for of the grants have to be clearly stated.

xv. Under clause 8 of WAPDA Act, the Authority is charged with the responsibility for
preparation of comprehensive plans for the development and utilization of

xvi. Direct contracting without completive is another method of procurement which shall be
exercised in

xvii.The successful bidder is required to remove the goods within days.

xviii. is the stanaing survey committee to dispose of the vehicle.

xix. Measurement book are very important record.

xx. Contractor Advance can be issued on receipt of


Roll No.

What does the following Abbreviations stands for? (10 Marks)

Q3. Whether following statements True or False (20 Marks)

i. .
Foreign Loan Budget and Foreign Exchange Budget are same.
ii. PSDP after approval of WAPDA is forwarded to Planning
Development & Reform Division.
Aged listing of individual receivable balances shall be prepared on
iii.
monthly basis and shall reflect the results of billing and collection
follow-up activity.
When an error has been made in an original invoice or it becomes
iv.
necessary to adjust a receivable account, the error shall be corrected
upon the approval of the competent authority.
H011 NO.

Audit is the function of Internal Audit only.


For Purchase of Non-rate contract item NOC has to be issued by GM
C&M office.
The Authority Fund consists of the following Loans and grants
obtained from the federal and provincial governments Sale proceeds
of WAPDA Bonds and Sale of power.
Cash foreign Exchange Budget are prepared on quarterly basis.
Negotiation tenders with or without prior publication of a procurement
notice is allowed under PPRA Rule 429(d).
The proposed schemes in PSDP should be arranged in Alphabetic
order.
Some of the foreign Lenders require WAPDA to contribute a portion
of the project cost from its own sources up to a certain fixed
percentage.
The internal audit function shall be responsible for the review and
examination of financial, operational accounts and related records of
all formations.
iii. Departmental charges @20% would be levied on inter wing works
performed one organization on behalf of another.
Feasibility studies of the projects are carried out through preparation
of PC-II and are executed in accordance with financing arrangement
stated in PC-I. f

v. In no case the detail of completion of the work should be changed


/altered in the Measurement Books.
If there is some savings on a project and execution agency may
desire to utilize the same on some other project being executed by
the same agency, the request is to be made to Planning and
Development Division
The cost of temporary facilities acquired for the construction of
permanent works should be shown as a separate item in the accounts
of a project.
The basis of the development budgeting is approved PC-II and PC-1
Proforma.
WAPDA Water wing implements the projects as an execution agency
through the Financing provided by GoP and the related provinces and
a encies.
. Invoices shall be pre-numbered and all numbers accounted for
periodically
PAKISTAN WA I EK & YOWEK 1JEvr.LVrlvirAN i to irivivt
DEPARTMENTAL PROMOTION EXAMINATION OF
JUNIOR ENGINEER (CIVIL) TO SR. ENGINEER (CIVIL) BPS 17 to 18
JANUARY 2018
PAPER-C (FINANCE & ACCOUNTS)
PART II (SUBJECTIVE)
Time Allowed: 2 Hour Total Marks: 50
Passing marks: 50%

Read and follow carefully the instructions given below before attempting the paper
Write your answers with blue or black ball point / pen and blue or black marker
(for headings / sub headings) otherwise paper will be cancelled.
b. Attempt all Questions of Objective Paper and Number of question as per instruction in
Descriptive paper.
c. No extra question should be attempted. If attempted the candidate should himself
cross the extra question, otherwise the first required number of answers shall be
marked.
d. Books, typed or written material are not allowed in the examination hall.
e. Write your Roll Number on the top right corner of the paper/ Answer Book.
f. Exchange of books amongst the candidates is not allowed in the examination hall.
g. Use of Mobile Phone and Blue tooth communication devices are strictly prohibited.

Write short notes on following with reference to WAPDA internal audit (10 Marks)
Manual:
a) Fraud indicators
b) Proposed Draft Para
c) Commercial Audit
d) Audit Report

What are the guidelines for preparing foreign Loan/aid budget for the (10 Marks)
next financial year under PSDP.

3. Deposit work in progress within WAPDA relate to specific work (10 Marks)
undertaken by one wing for another wing please explain procedure.

4. All Procuring agencies shall use open competitive bidding as the (10 Marks)
principle method of procurement. What are the different procedures to
be used for procurement? )

5. The Explain the procedure for disposal of official vehicles under Disposal (10 Marks)
procedure stating the method to fix reserve price, survey report, issuing of
tender and issuance of acceptance letter.
Roll No.

PAKISTAN WATER & POWER DEVELOPMENT AUTHORITY


WATER WING DEPARTMENTAL PROMOTION EXAMINATION
JR. ENGINEER (CIVIL) TO SR. ENGINEER (CIVIL) BPS-17 TO BPS-18
PAPER: B (PROFESSIONAL- CANALS & DISTRIBUTION SYSTEM)

January, 2017
PART-I (Objective)
Total Marks: 50 Pass Marks: 25. Time Allowed: 1 Hour

Note: Read and follow carefully the instructions given below before
attempting the paper:
• Attempt all questions.
• Books, typed or written material not allowed. Write your roll number on the
top right corner of the paper/ answer book. Write your answers with blue
pen/bal point only. Answers attempted with lead pencil or in any other color
of ink will be cancelled. No mark of identification should be made on the
answer book, otherwise it will be cancelled. Use of mobile phone and
Bluetooth communication devices are strictly prohibited.

Q.No.1 Write in full the following abbreviations. 10

i. CDWP
ii. PERT
iii. ECC
iv. APCC
v. IBSP
vi. WCAP
vii. SPD
viii. MREP
ix. PHLC
x. EPA
Q.No.2 a) Write down the names of future water storage projects.

b) Complete the following 5

i. One cumecs is equal to cusecs.


ii. One ton is equal to cwt.
iii. One square mile is equal to hectares.
iv. One horse power is equal to kilowatts.
v. 98.6 degree F is equal to degree C.

.No.3 Fill in the blanks. 20

i. The of fluid is a measured of its resistance to shear or


angular deformation.
ii. ACOP stands for
iii. Total cusecs required at the outlet to irrigate one thousand acres of CCA
are known as the
iv. The canal fall, involving parabolic glacis, is called
v. The hydropower potential in Pakistan is about MW.
vi. The ratio of the mean supply discharge to the full capacity discharge is
called
vii. The type of canal alignment, which involves maximum X-drainage
structures/works is a
viii. The live storage capacity of Hingole Dam is
ix. A technique used to analyze the passage of flood wave through the
reservoir is known as
x. Kharif crops are sown and harvested in the months of
and

Q.NO. 4 Tick True/False for the following statements. 10

i. A good irrigation module is the one, which draw fair share


of silt from the canal. True/False
ii. The bed of alluvial channel carrying silted water at high
velocity is expected to be flat. True/False
iii. The discharge carried by a minor distributary is usually more
than one cumecs. True/False
iv. The unsteady flow, the flow changes with time. True/False
v. An outlet controls the flow of water in the canal. True/False
vi. Steep slope creates less erosion on bed of channel. True/False
vii. Flowing water possesses kinetic energy. True/False
viii. Small hydropower can be installed everywhere. True/False
ix. Q-B link canal connects Jhelum and Ravi rivers. True/False
x. Rainy Canal off-takes from Sukker barrage. True/False
Roll No.
FAKESTAN WATER & POWER DEVELOPMENT AUTHORITY
WATER WING DEPARTMENTAL PROMOTION EXAMINATION
AL ENGINEER (CIVIL) TO SR. ENGINEER (CIVIL) -17 TO BPS-18

PAPER: B (PROFESSIONAL) Canals & Distribution System

January 201 7
PART —II cSUBJECT 11 Total Marks: 50
Pass Marks: 25
Note: five Questions Time Allowed: 2 Hours
Attempt any
1)
Books are not Allowed
2) Calculator can be used where necessary
3) ns will not be entertained
4) Extra quest
All questions carry equal marks 10
5)
-kg,
.1 a) Deane the takowix
Divide NN a‘‘
\. ex SN. xce,s
ii. Fish Ladder

b) Differentiate between Barrage and Head Works.


"c:sescibciebileivNr.

i. Density ii. Plasticity index


iii. Regime Flow iv. Latitude and Longitude
v. Hydraulic jump
3 Write short notes on the following: 10
Transition Curve ii. Alluvial Canals
Time Factor iv. Level Crossings
v. Intensity of Irrigation

Q.No.4 a) Draw the typical layout of a canal head works. 10


b) Explain the functions of individual canal components.

Q.No.5 Describe the following: 10


i. Baffle Wall ii. Sediment Load
iii. Drainage outlet iv. Meandering of Rivers
Q.No.6 Write short notes on the following:

a) WAPDA vision-2025
b) Projects completed under Indus Basin Settlement Plan
Roll No.

DEPARTMENTAL PROMOTION EXAMINATION


JUNIOR ENGINEER (CIVIL) TO SENIOR ENGINEER (CIVIL) BPS-17 TO BPS-18

PAPER B (Technical)
January, 2017

Part-II (Objectives)

Total Marks = 50 Pass Marks = 25 Time = One Hour

(Attempt any live Questions) Marks


Note: read and follow carefully the instruction given below before attempting the paper:

• Write your answer with blue or black ball point/pen and marker (for headings)/sub
headings) otherwise paper will be cancelled.
• Attempt all questions.
• Books, typed or written material are not allowed.
• Write your Roll Number on the top right corner of the paper/Answer Book.
• No extra question should be attempted. If attempted the candidate should himself cross
the extra question, otherwise the first required number of answer shall be marked.
• Use of mobile phone and blue tooth communication devices are strictly prohibited.

Q.1. What do the following abbreviations stand for? (15 Marks)


(1 Each)
i) NPV
ii) ISRIP
iii) DTW
iv) SGW
v) rnmolL-1
vi) RSC
vii) dSrri l
viii) ECe
ix) LIM
x) SCARP
xi) 'MDP
xii) GIS
xiii) ECNEC
xiv) IPTRID
xv) OFRB

.2. Fill in the Blanks. (10 Marks)


(2 Each)

i) Application efficiency is the ratio between quantity of irrigation water effectively


used by , and the quantity of water applied to field.
ii) Sodium Adsorption Ratio (SAR) is used to estimate
of the soil surface.
iii) Area having water table depth ranging from m is called severely
waterlogged.
iv) Auger-hole test measures the of soil profile.
v) In Pakistan, effective disposal of is one of the major
challenges being faced by the experts.

Q.3. Circle the right answer as True or False (10 Marks)


(1 Each)
i) In Pakistan, effective disposal of is one of the major challenges being faced by the
experts. T/F
ii) A soil that contain less exchangeable sodium and soluble salts is called saline
sodic soil T/F
iii) Electrical conductivity is used to estimate electrical resistance measuring
between same faces. T/F
iv) Piezometer is a small-diameter pipe used to observe the pressure head of
groundwater. T/F
v) A drain with an exposed water surface that covey's drainage water
is called sub-surface drain. T/F
vi) Application of fertilizer is common amendment to reclaim sodic soil. T/F
vii) Inflow-outflow is the most common method for seepage measurement. T/F

11
PAKISTAN WATER & POWER DEVELOPMENT AUTHORITY ROLL No.

DPE OF JUNIOR. ENGINEER (CIVIL)/(AGRI.) TO SENIOR. ENGINEER


(CIVIL)/(AGRI) BPS -17 TO 18 (WATER WING)
PAPER - A (RULES & CURRENT AFFAIRS)

Maximum Marks = 50 Time Allowed = 01 Hour

Note: Read and follow carefully the Instructions given below before attempting the paper
Attempt all questions.
Consultation of books if permitted in the syllabus is allowed in Descriptive Paper but other books, typed or
written material are not allowed. However nothing is allowed to consult in Objective Pa per.
Write your Roll Number on the top right corner of the Paper / Answer Book.
Write your answers with blue pen/ball point only. Answers attempted with lead pencil or in any other colour
of ink, will be cancelled.
No mark of identification should be made on the answer book, otherwise it will be can celled.
Exchange of books amongst the candidates is not allowed in the examination hall.
Use of Mobile Phone and Blue Tooth communication devices are strictly prohibited.

Total Marks: 17
Pass Marks: 40%

PART-I (OBJECTIVE — Current Affairs)

Fill in the blanks 17 Marks

1. Former US President George H W Bush died at the age of

2. This year (Nos) Pakistanis will perform Hajj as per hajj quota. 6

3. In the Chief.Justice's Dam Fund Rs. Billion have been collected.


i

4. This winter which Pakistani city recorded minimum temperature

5. Mohmand Dam is proposed near which existing water head-works rc


6. Which country's king abdicated early this year

7. What is the storage capacity of Mohmand Dam MAF.

8. What date is today by Hijri calendar

9. In what case Aasia Bibi got fame/release

10. Islamabad gets ready to receive, after 10yrs , which Country's Airliner
11. Which cricketing term Pak.'s Foreign Minister used w.r.t. Kartarpur border

12. Punjab Gov't has decided to revive which controversial festival


13. In which case former PM Nawaz Sharif sentenced to 7 years

14. Which country's PM's wife requested for a photo with PM lmran Khan

15. PTI Gov't offered PAC's Chairmanship to which political leader why declined

16. What record Sarfraz Ahmad made during PAK-SA Test cricket series
17. Which famous monument of Karachi restored by removing encroachments

P.T.O
Maximum Marks = 33 Pass Marks = 50%
Part-II (Objective - Rules & Regulations)
Fill in the blanks 17 Marks
1. Under E&D Rules willful or loss of the Authority 's goods or property is misconduct
2. To be guilty of misconduct provides ground for
3. Withholding of promotion is a penalty
4. Reduction to a lower stage in time scale is penalty.
5. Enquiry procedure is given under E&D Rule
6. Real and children falls in family definition under Conduct rules
7. Permission is required to buy/sell property beyond Rs. by BPS 17 officer
8. No permission is required for study during
. ,
9. Under Retirement Rules an employee can be retired on year's service.
10. To probe loss of Rs. 01 million convener of Enquiry shall be BPS officer.
11. Application for encashment of LPR shall be given months before retirement.
12. Study leave can be granted upto years.
13. Different types of leave can be combined for Leave upto years.
14. Leave ex-Pakistan can be granted upto days.
15. Medical facilities are not admissible during EOL beyond months.
16. and step children of an employee are covered under Medical Rules.

Find True I False as T or F TIF


1. An employee who has drawn LT* Advance can't be guarantor of other employee.
2. An advance can be given to an employee not exceeding his 36 month's pays.
3. Long Term* Advances are recoverable @ 120th part of total amount per month.
4. Motor car advance is admissible upto Rs.500,000.
5. Medical leave ID a chronically sick employees can be granted @ 1/4th of pay.
6. Free food in WAPDA hospitals will be provided upto BPS-1 to 11 only.
7. M.S. of regional hospitals can also approve certain M.B. proceedings alike DGMS.
8. Annual declaration of property is required on calendar year basis.
9. WAPDA Retirement Rules are not applicable to probationers. '
10. WAPDA employees in BPS-4 fall under Category-III of TA Rules gradation.
11. Member concerned can retire a Jr.Eng'r underWAPDA retirement rules 1979.
12. Appointing authority means an officer designated as such by any rules.
13. Officers who fail to initiate/countersign ACRs shall be imposed with major penalty.
14. With just one Member and Chairman, Authority meeting can be held.
15. Under the TA Rules step children of an employee are not covered.
16. TA Rule-19 is not applicable to workcharge employees.
PAKISTAN WATER & POWER DEVELOPMENT AUTHORITY ROLL No.

DPE OF JUNIOR. ENGINEER (CIVIL)/(AGRI.) TO SENIOR. ENGINEER


(CIVIL)/(AGRI) BPS - 17 TO 18 (WATER WING)

PAPER — A (RULES & CURRENT AFFAIRS)

Maximum Marks = 50 Time Allowed = 02 Hours


Note: Read and follow carefully the Instructions given below before attempting the paper
Attempt all questions.
Consultation of books if permitted in the syllabus is allowed in Descriptive Paper but other books, typed or
written material are not allowed. However nothing is allowed to consult in Objective Pa per.
Write your Roll Number on the top right corner of the Paper / Answer Book.
Write your answers with blue pen/ball point only. Answers attempted with lead pencil or in any other colour
of ink, will be cancelled.
No mark of identification should be made on the answer book, otherwise it will be can celled.
Exchange of books amongst the candidates is not allowed in the examination hall.
Use of Mobile Phone and Blue Tooth communication devices are strictly prohibited.

PART — I (Subjective — Current Affairs)


(Books not allowed)
Pass Marks = 40%

Please attempt any two questions:- 16 Marks


Q.1. How Brexit is going to affect world peace and Economics? (08 Marks)
Q.2. What will be concern for Pakistan if USA pullsiout of Afghanistan? (08 Marks)
Q.3. Why are there demonstrations on the streets of Paris? (08 Marks)

PART — II (Subjective — Rules & Regulation)


(WAPDA Rules can be consulted)
Pass Marks = 50%

Please attempt any four questions:- 34 Marks


Q.1. What circumstances determine whether an enquiry is conducted (8.5 Marks)
or not under EnD Rules?
Q.2. (8.5 Marks)
What are the roles of Prosecution witness, Deptt. Rep, Defence
witness & inquiry officer?
Q.3. How can an employee be retired on 20 years service? (8.5 Marks)
Q.4. What are the pre and post long term advance requirements? (8.5 Marks)
Q.5. What is the difference in treatment under medical rules and (8.5 Marks)
chronically sick persons rules?
Q.6. How WAPDA land/property can be leased/sold what (8.5 Marks)
rules/procedures to be followed?
Roll No

PAKISTAN
WATER AND POWER DEVELOPMENT AUTHORITY
DEPARTMENTAL PROMOTION EXAMINATION
OF

JUNIOR ENGINEER (CIVIL)


BPS-17 TO SENIOR ENGINEER (CIVIL) BPS-18

(CONSTRUCTION MANAGEMENT, MATERIAL & EQUIPMENT)

PAPER-B (TECHNICAL)

PART-I (OBJECTIVE)

TOTAL MARKS: 50
PASS MARKS: 25
TIME ALLOWED: ONE HOUR
Note: 1

Read and follow the instructions given below before attempting the paper:

➢ Attempt all question of objective paper and numbqr of questions as per instruction in descriptive paper.
➢ No extra question should be attempted, if attempted the candidate should himself cross the extra
question, otherwise the first required number of answers shall be marked.
➢ Books not allowed.
➢ Write your Roll Number on the top right of the paper/ answer book.
➢ Write your answers with blue pen/ ball point only. Answer attempted with led pencil or in any other
color of ink, will be cancelled.
➢ No mark of ide%ification should be made on the answer book, otherwise it will be cancelled.
➢ Use of mobile phone and blue tooth communication devices are strictly prohibited.
➢ Overwriting, tempering and cutting of answer, result in zero marks.

Q. No.1 10 Marks (5X2)

i. Which one of the following impurity is not desired in the soil for brick formation:
a) Alkali
b) Kankar
c) Iron Oxide
d) (a) and (b) above
e) (b) and (c) above

ii. Steel used in RCC work is:


a) Mild Steel
b) Cast Iron
c) Stainless Steel
d) None of the above

1
Roll No

iii. Piles for cofferdam are :


a) Sheet piles
b) Bearing Piles
c) Friction Piles
d) Compaction piles

iv. Concrete is considered as unsuitable for compaction by vibration if it is:


a) Plastic
b) Semi Plastic
c) Dry
d) Moist Earth
e) None of the above

v. Quality control is aimed at


a) Maintaining the desired quality
b) Exceeding the desired quality
c) Continuously improving the quality
d) Following the quality

Q No.2 Following abbreviations are used for: 10 Marks (10X1)

i. PVC=

ii. CDWP=

iii. IPP=

iv. PEC=

v. BOQ=

vi. ACI=

vii. ECNEC=

viii. PERT=

ix. CPM=

x. QCBS=

Q No.3 Fill in the Blanks: 10 Marks (5X2)

i. Slump test for concrete is carried out to determine . ..... ............. ..................
ii. When excess water comes upon the surface of concrete, it is called of concrete.
iii. Naulong Dam is located in District, Baluchistan.
iv. Contour lines can cross each other only in case of
v. 'Type of the Bhasha Dam is Dam

2
Roll No

Q. No.4 Answers the Following: 10 Marks (5X2)

i. What is the difference between the Plane Table Survey and Total Station Survey

ii. What is the difference between the Honey Combing and Segregation in Concrete

iii. What is the difference between the Ordinary Portland and Sulphate Resistant Cement

iv. What is the difference between the Tender Drawings and Shop Drawings

v. Commonly used professional softwares for Scheduling and Planning of construction Projects

Q.No.5 Define Following: 10 Marks (5X2)

i. Critical Activity

ii. Renewable sources of Energy

iii. Heat of Hydration


Roll No

iv. Roller Compacted Concrete

v. Construction Joint

4
PAKISTAN
WATER AND POWER DEVELOPMENT AUTHORITY
DEPARTMENTAL PROMOTION EXAMINATION
OF

JUNIOR ENGINEER (CIVIL)


BPS-17 TO SENIOR ENGINEER (CIVIL) BPS-18

(CONSTRUCTION MANAGEMENT, MATERIAL & EQUIPMENT)

PAPER B (TECHNICAL)
-

PART-II (DESCRIPTIVE)

TOTAL MARKS: 50
PASS MARKS: 25
TIME ALLOWED: TWO HOURS
All questions carry equal marks
Attempt any five questions

Note: 1

Read and follow the instructions given below before attempting the paper:

> Attempt all question of objective paper and number of questions as per instruction in descriptive paper.
> No extra question should be attempted, if attempted the candidate should himself cross the extra
question, otherwise the first required number of answers shall be marked.
> Books not allowed.
> Write your Roll Number on the top right of the paper/ answer book.
> Write your answers with blue pen/ ball point only. Answer attempted with led pencil or in any other
color of ink, will be cancelled.
> No mark of identification should be made on the answer book, otherwise it will be cancelled.
> Use of mobile phone and blue tooth communication devices are strictly prohibited,
> Overwriting, tempering and cutting of answer, result in zero marks.

Q. No. 1 10 Marks (5X2)

Define the Following:

i. Ultimate Bearing Strength


ii. Tunnel Boring Machine
iii. River Morphology
iv. Coffer Dam
v. Grouting

1
Q. No.2 10 Marks

i. What is Construction Management, Briefly Describe? 4


ii. What is purpose of Project Feasibility Report? 3
iii. Short note on Internal Rate of Return 3

Q. No.3 10 Marks

i. Types of Piles 4
ii. Concreting in hot weather conditions 3
iii. Types of Turbines 3

Q. No.4 10 Marks

i. Define Open competitive bidding. 4


ii. What is Conflict of Interest, Elaborate your answer with example. 3
iii. Compensable Extension of Time in Contract 3

Q. No.5 10 Marks (2X5)

i. Write a 'brief note to differentiate between Weir, Barrage, Head works and Dam
ii. Brief note on Mohmand Dam Project or Diamer Basha Dam Project

Q. No.6 10 Marks

i. Write brief note on soil compaction and soil consolidation 4


ii. Machinery used for soil compaction 3
iii. Depreciation cost of equipment/ machinery 3

Q. No.7 10 Marks (2X5)

i. Planning commission procedure/steps for approval of Projects


ii. Purpose of PC-I, PC-II, PC-Ill, PC-IV and PC-V

2
viii) The Electrical Conductivity is the electrical resistance measured between opposite
faces. T/F
ix) A measure of the oxygen ions concentration in a solution is called pH. T/F
x) Soil salinity is the presence of salts on soil surface that effect crop production. T / F

.4. Define the following (15 Marks)


(3 Each)
i. Groundwater Monitoring

ii. Hydraulic conductivity

iii) Application efficiency

iv) Drainage coefficient

v) Subsurface Drainage
Roll No.
DEPARTMENTAL PROMOTION EXAMINATION
JUNIOR ENGINEER (CIVIL) TO SENIOR ENGINEER (CIVIL) BPS-17 TO BPS-18

PAPER B (Technical)
January, 2017

Part-II (Descriptive)

Total Marks = 50 Pass Marks = 25 Time = Two Hour


(Attempt any five Questions) Marks
Note: read and follow carefully the instruction given below before attempting the paper:

• Write your answer with blue or black ball point/pen and marker (for headings)/sub
headings) otherwise paper will be cancelled.
• Attempt all questions.
• Books, typed or written material are not allowed.
• Write your Roll Number on the top right corner of the paper/Answer Book.
• No extra question should be attempted. If attempted the candidate should himself cross
the extra question, otherwise the first required number of answer shall be marked.
• Use of mobile phone and blue tooth communication devices are strictly prohibited.

Q.1. What is groundwater depletion and how the groundwater is artificially recharged? (10)

Q.2. Discuss the measures taken up to now by WAPDA to control waterlogging


and salinity in Pakistan. (10)
Q.3. Describes the adverse effects of waterlogging and salinity on crop and land. (10)
Q.4. What is the difference between two following terms used in computers: (10)
a) HTTP and HTTPS

b) Verification and Validation

Q.5. Describe major reasons for varying depth to groundwater in IBIS. (10)
Roll No.
PAKISTAN WATER & POWER DEVELOPMENT AUTHORITY
DEPARTMENTAL PROMOTION EXAMINATION OF
JUNIOR ENGINEER (CIVIL) TO SR. ENGINEER (CIVIL) BPS-17 TO BPS-18
JANUARY 2017
PAPER-C (FINANCE & ACCOUNTS)
PART-I (OBJECTIVE)
Total Marks: 50 Time Allowed: One Hour

Passing marks: 25

Note: Read and follow the instructions given below before attempting the paper:
a. Write your answer with blue pen/ball point only. Attempting the paper with lead
pencil or pen/ball point of any other color and marker is not allowed.
b. Attempt all questions of objective paper.
c. Books, typed or written material are not allowed.
d. Write your roll number on the top right corner of the paper/ Answer book.
e. Use of Mobile phone and Bluetooth communication devices are strictly prohibited.

Ql: Fill in the Blanks (20 Marks)


i. Internal audit division, headed by Chief Auditor, is responsible to the
for the examination of accounts.
ii. All bills of contractors are to be verified before payments is made with the quantities
recorded in the
iii. Departmental charges @ % would be levied on interwing works performed
by one organization on behalf of another.
iv. The primary purpose of accounting in all construction projects is to find out accurately
the actual cost of
v. The record of expenditure on every work and an each of the components thereof will
be maintained in which will have a separate account for
the work and for each of the components.
vi. An advance to the contractor can be issued on the production
vii. Prior approval of the Authority will be required in any case where the terms of the
proposed advance to contractor exceed
viii. Project expenditure will be controlled strictly according to the

ix. Normally it should be possible to settle final bills of contractors and supply within
of completion of construction or of supply.
x. Measurement book are very important records.
xi. Liquidated damages are recovered in case of
xii. is to be forfeited by the Authority if the *
contractor commits any breach of contract.
xiii. is the standing survey committee to dispose of the vehicles.
xiv. The successful bidder will be required to deposit the total bid amount within
days.
xv. PSDP after approval of WAPDA is forwarded to
xvi. The year-wise phasing of funds should be based on the phasing given in
wherever possible, while keeping in sight the project completion
period.
xvii. For the purchase of Non-rate contract items, NOC has to be issued by
xviii. Engagement of daily wagers are approved by
xix. When an order to pay has been signed on a bill, every page of the Measurement
book containing the detailed measurements must invariably be scored by a ,
4

xx. Repeat order shall not exceed percent of the original procurement.

Q2: What does the following Abbreviations stands for? (10 Marks)

ADB

IBRD
PAC
DAC
CIDA
SFD
SOF
PPRA
CDWP
COC
Roll No.

3: Whether following statement True or False. (20 Marks)


I
III Estimates of foreign economic assistance are prepared on disbursement
basis.
Foreign exchange budget are prepared on half yearly basis.

Lump sum provision in the foreign exchange budget can be made.

B&AO is not associated in awarding contracts.

PC-I is approved in Authority meeting.

PD/B&AO will not be responsible if funds remain unutilized due to non-


payment of bills.
IRS

Liquidated damages are recovered in case of supplies only.

t. In. Rate contract can also be made for the disposal of material.

ix. Income tax is to recovered from contractor only on final payment of IPC.

x. Donor s assistance is also component of PSDP.

xi. Approval of Planning Division is not necessary in proposal involving re-


appropriation from Development to current expenditure of foreign exchange
budget.
xii. The terms of a contract must be lengthy land detailed that there is no room
for ambiguity or mis-construction.
mi. In formulating Development Programme, resources should be fully allocated
to new projects.

;ay. On receipt of report of loss of the measurement book, the next higher
authority shall carry out re-measurements of the items of works done or
quantities of store received in respect of already paid claims.
xv. Settlement of transactions between WAPDA projects through SS Cheques
has since been discontinued.
!xvi. Foreign Exchange Budget and Foreign Loan Budget are two different things.

V ii. Foreign exchange budget should be prepared in millions of Dollars

'xviii. Accounts of WAPDA Projects costing Rs.20 million or more will also be
audited by Internal Audit Division.
xix. Transfer of vehicles between WAPDA Projects is also treated as disposal.

•)(x. In no case the details of completion of the work should be changed / altered
in the Measurement Book.

3
PAKISTAN WATER & POWER DEVELOPMENT AUTHORITY
DEPARTMENTAL PROMOTION EXAMINATION OF
JUNIOR ENGINEER (CIVIL) TO SR. ENGINEER (CIVIL) BPS-17 TO BPS-18
JANUARY 2017
PAPER-C (FINANCE & ACCOUNTS)
PART-II (SUBJECTIVE)
otal Marks: 50 Time Allowed: Two
our
assing marks: 25
ote: Read and follow the instructions given below before attempting the paper:
a. Write your answer with blue pen/ball point only. Attempting the paper with lead
pencil or pen/ball point of any other color and marker is not allowed.
b. Attempt all questions.
c. Books, typed or written material are not allowed.
d. Use of Mobile phone and Bluetooth communication devices are strictly
prohibited.

Q1: Write short notes on following:


a) Internal audit
b) External audit
c) Advance para
d) Draft para
Q2: Briefly explain:
a) Basis of development budget
b) Essential components of PC-1

Q3: Write down the main checks to be applied while checking final bill of the contractor?
Q4: What are rules regarding (i.) advances to contractors and (ii.) for refund of security
deposit of contractors for works?
Q5: Define the following terms:
a) Disposal
b) Survey report
c) Reserve price
d) Letter of acceptance
Roll No.
t,
PAKISTAN

WATER AND POWER DEVLEPMENT AUTHORITY

DEPARTMENTAL PROMOTION EXAIMINATION

OF

JUNIOR ENGINEER (CIVIL)

BPS-17 TO SENIOR ENGINEER (CIVIL) BPS-18

(CONSTUCTION MANGEMENT, MATERIAL & EQUIPMENT, COMPUTER IT)

PAPER: B (TECHNICAL)

PART-I (OBJECTIVE)

Total Marks : 50

Pass Marks: 25

Time Allowed : One Hour

Note: 1

Read and follow the instructions given below before attempting the paper:

> Attempt all questions of objective paper and number of questions as per instruction in
descriptive paper.
> No extra question should be attempted, if attempted the candidate should himself
cross the extra question, otherwise the first required number of answers shall be
marked.
> Books not allowed
> Write your Roll Number on the top right corner of the paper/answer book.
> Write your answers with blue pen/ball point only. Answers attempted with lead pencil
or in any other color of ink, will be cancelled.
> No mark of identification should be made on the answer book, otherwise it will be
cancelled.
> Use of mobile phone and blue tooth communication devices are strictly prohibited:
> Overwriting, tempering and cutting of answer, result in zero marks.

Q.No.1 Answer the following: 10

i. What is the difference between cement and Pozzalanas 2


ii. Define bulking of sand 2

iii. What is the difference between CDWP and PDWP 2

iv. Define alkali-aggregate reaction 2

v. What is roller compacted concrete 2

Q.No.2 For what does the following abbreviations stand for? 10

1. USB

2. NATO

3. USBR

4. ISRIP

5. IWASRI

6. PPRA
7. AASHO

8. AC-pipes

9. GTS bench marks

10. ASTM

Q.No.3 Fill in the blanks. 10

a) The stiffing of cement paste is called


b) .of concrete is a form of segregation in which some of the water in
the mix tends to rise the surface of freshly placed concrete.
may be regarded as arts and science for map or plan making.
d) The reaction between active silica constituents of the aggregates and alkali in cement is
called vil(

e) To increase the dry density of soil by dynamic load is


called
f) The constituents of concrete are generally mixed by
g) The extent of depends on the percentage of moisture present in sand
and on its fineness.
h) A structure which carries one channel over another without lowering the bed of lower
channel is called
i) The preliminary inspection of the area to be surveyed is called
j) Heat of hydration of super sulphated ( .is low

Q.No.4 Tick the following True/False (T/F) 10

1) Surveying is science and art. ( T / F )


2) Hydel energy is sustainable. ( T / F )
3) Munda darn is on Kabul River. ( T / F )
4) As built drawings are prepared at tendering stage. ( T / F )
5) Head Marala is on river Ravi. ( T / F )
6) ROM will not retain data for all time. ( T / F )
7) PC-II is prepared before PC-I. ( T / F )
8) AutoCAD software is used for project planning ( T / F )
9) Primavera software is not used for making maps ( T / F )
10) Tenders drawings are issued after signing of contract ( T / F )

Q No. 5 Define the following: 10

i. Geodetic surveying

ii. Shear strength of soil

iii. Segregation of concrete


iv: Standard definition of project

. Optimum moisture content


Roll No.

PAKISTAN

WATER AND POWER DEVLEPMENT AUTHORITY

DEPARTMENTAL PROMOTION EXAIMINATION

OF

JUNIOR ENGINEER (CIVIL) TO SERNIOR ENGINEER (CIVIL)

BPS-17 TO BPS-18

(CONSTUCTION MANGEMENT, MATERIAL & EQUIPMENT, COMPUTER IT)

PAPER: B (TECHNICAL)

PART-II (DESCRIPTIVE)

Total Marks:50

Pass marks: 25

Time Allowed : Two Hours


All questions carry equal marks

Attempt any five questions

Note: 1

Read and follow the instructions given below before attempting the paper:

> Attempt all questions of objective paper and number of questions as per instruction in
descriptive paper.
> No extra question should be attempted, if attempted the candidate should himself
cross the extra question, otherwise the first required number of answers shall be
marked.
> Books not allowed
> Write your Roll Number on the top right corner of the paper/answer book.
> Write your answers with blue pen/ball point only. Answers attempted with lead pencil
or in any other color of ink, will be cancelled.
> No mark of identification should be made on the answer book, otherwise it will be
cancelled.
> Use of mobile phone and blue tooth communication devices are strictly prohibited.
> Overwriting, tempering and cutting of answer result in zero marks.
Q.No.1 Write a short note on the following:

a) Types of cement 4

b) Vibration of concrete 3

c) Pre-stressed concrete 3

Q.No.2 Describe the following:

a) Project Clearance Process 4

b) Anticipatory approval 3

c) Administrative approval 3

Q.No.3 Write a Comprehensive note on:

a) Quality control of concrete 4

b) Design mix of concrete 3

c) Testing of aggregate 3

Q.No.4 Write a note on:

a) Types of operating systems 4

b) Power point

c) Data storage devices

Q.No.5 Describe the following:

a) Casting of cylinder and cube

b) Slump test 3

c) Cooling towers 3

Q.No.6 Describe the following:

a) Dasu Hydro Power Project 4

b) Tarbela dam 4th extension 3

c) Kachhi canal project 3

Q.No.7 Write a short note on:

a) Construction equipmentAnachinery

b) TBM (Tunnel Boring Machine) 4

c) ICB (International Competitive Bidding) 3


Roll No.

PAKISTAN WATER & POWER DEVELOPMENT AUTHORITY


WATER WING DEPARTMENTAL PROMOTION EXAMINATION
JUNIOR ENGINEER (CIVIL) TO SENIOR ENGINEER (CIVIL) BPS-17 TO 18

PAPER — B (PROFESSIONAL CANALS & DISTRIBUTION SYSTEM)


January, 2016
PART — I (Objective)
NOTE: Total Marks : 50
i) No Book / Notes allowed Pass Marks : 25
ii) Attempt all Questions Time Allowed : One Hour

Q.No.1 Write in full the following abbreviations 08 •

i) CVR
ii) GBTI
iii) ECNEC
iv) CDTA
v) WSCB
vi) EMMP
vii) IBMR
viii) ACOP

Q.No.2 Write the names of eight link canals completed by WAPDA under Indus Basin 08
Settlement Plan

Q.No.3 Write the names of four (4) off channel storage sites identified in Vision 2025 04

Q.No.4 Write the names of Rivers on which the following small & medium storage dams 05
located
(i) Dhok Pathan
(ii) Papin
`OH) Darwat
(iv) Naulang
(v) Pelar
Q.No.5 Write the five main functions of canals and other irrigations works 05

Q.No.6 Fill in the blanks 20

i) When WAPDA was created in 1959. It has only MW power generation capacity
ii) The installed power generation capacity of Tarbela 5 E1' Extension Hydropower Project will be
MW
iii) About MAF of surface water is diverted annually for irrigation purposes
iv) Present installed hydel generation capacity of Pakistan is MW
v) A cement and sand mortar of ratio when placed by hand. It is called cemcnt
plaster lining
vi) The total estimated amount of water on earth is _ _
vii) Normally an average velocity of m/s to m/s will prevent silting in a
channel
viii) Total cusecs required at outlet to irrigate 1000 acres of CCA is called
ix) is defined to be the solid material carried by flowing water whether
in suspension or solution
x) The purpose of is to protect the country side from the river spills
xi) The alignment of canals are selected in such a way that they run along the
xii) is the area irrigated a crop per cusec of the mean discharge
xiii) is an outlet in which the discharge depends upon the water level in the
distributary only
xiv) are bulid to escape surplus water from a canal into the river
xv) The separates under sluice bays from the normal bays
xvi) Write the Manning's equation in fps and SI units

xvii) Dotara carryover darn is located on River


xviii) One(l) Sq. km (km2) = hectares
xix) One(1) Acre m2
xx) One(1) Imperial Gallon = liters
Roll No.

PAKISTAN WATER & POWER DEVELOPMENT AUTHORITY


WATER WING DEPARTMENTAL PROMOTION EXAMINATION
JUNIOR ENGINEER (CIVIL) TO SENIOR ENGINEER (CIVIL) BPS-17 TO 18

PAPER — B (PROFESSIONAL — CANALS & DISTRIBUTION SYSTEM)

January, 2016
PART — II (Descriptive)

Note: Total Marks : 50


i) Attempt any five Questions Pass Marks : 25
ii) Books are not Allowed Time Allowed : Two(02) Hours
iii) Extra question will not be entertained
iv) All questions carry equal marks

Q.No.1 Define the following briefly (all carry equal marks) 10

a) Steady Flow f) Critical Flow


b) Uniform Flow g) Canal irrigation
c) Non-uniform Flow h) Lift Irrigation
d) Normal Flow i) Permanent Canal
e) Regime Flow j) Inundation Canal

Q.No.2 (a) Discuss in detail Kennedy's silt theory 06


(b) Write different parts of a weir 04

Q.No.3 Design an unlined channel as per Lacey's theory to carry a discharge of 60 10


cusecs with longitudinal slope of one(1) ft/canal mile

Q.No.4 (a) Draw typical x-section of an unlined canal when natural surface level (NSL) 05
is below FR, but above bed level
(b) What is canal headworks? Also write its aims and objectives 05

Q.No.5 (a) How the alignment of a water course is selected while designing 05
(b) Write a detail note on pipe or barrel type outlets 05

Q.No.6 (a) Write the basic requirement for canal fall structure 03
(b) Write a detail note on construction of spurs and gabions 07
Roll No.

PAKIDSETP
AANRW
TmA ET ENRT A&LPPORWOEMR0D
TEI OVNE LEO(
DEVELOPMENT AR
OUNT HOOF
EXAM I NATION
JUNIOR ENGINEER (CIVIL)TOVCENGINtER (CIVIL) BPS-17 TOBPS-18
JANUARY 2016
PAPER-C (FINANCE & ACCOUNTS)
PART-I (OBJECTIVE)
Total Marks: 50 Time Allowed: One
Hour
Passing Marks: 25

Note: Read and follow the Instructions riven below before attemptinr the paper:
a. Write your answers with blue pen/ball point only. Attempting the paper with lead pencil or pen/ball
point of any other colour and marker of any colour is not allowed; otherwise paper will be cancelled.
b. Attempt all questions of Objective Paper.
C. Books, typed or written material are not allowed.
d. Write your Roll Number on the top right corner of the Paper / Answer Book
e. Use of Mobile Phone and Blue tooth communication devices are strictly prohibited.

Q.No.1 Following statements are true or false. (30


Marks)

1 Removing serviceable parts from one item of equipment for


utilization on another item of equipment is called cannibalization
2 Mode of disposal in any given transaction shall be determined
by the committee constituted for the purpose.
3 According to disposal procedure a disposable item may be sold
through negotiation process, if the bids offered are not
reasonable and below the prevailing market rate.
4 Normally all stores declared disposable and not
transferred/issued to a Wapda formation within 60 days of
notification shall be disposed off through tender/auction.
5 Chief Engineer Purchase & Disposal has no Authority to
amend/modify the Wapda material disposal procedure as
needed.
6 Copies of all contracts documents should be obtained by the
Budget & Accounts Officer and kept in his office.
7 An advance to a contractor may be made for acquisition by him
of equipment or material provided that such goods are
imperishable.
8 The person find at fault for loss of measurement Book should
be dealt according efficiency and discipline rules.
9 The construction work in progress Account is control account in
General Ledger.
10. Internal Audit can prescribed what such rules and orders should
be and suggest administrative action.
11 Wapda's formation/projects are audited biannually.

(Page 1)
'--%
12 While auditing Divisional accounts analysis of one major work or
in its absence, two minor works will also be carried out as per
scope of internal Audit.
13 Accounts of Wapda's formations are not post audited by
Director Audit Wapda on-behalf of Auditor General of Pakistan.
14 The term deposit work is applied to works of construction or
repair the cost of which is met out of Authority's fund.
15 No administrative approval will be required for PC-I Proforma
stands already approved with sufficient details of components
of work included in the project.
16 Paras of inspection report settled pending verification by
regional office will be verified by Chief Auditor.
17 The Officer In charge Audit Party should never stay behind for
more than two days except with the prior approval of Deputy
Chief Auditor.
18 TA/DA advance can be drawn by members of any audit party
only when they leave permanent Headquarter on temporary
duty.
19 Member of any audit party are not aimed k dram advance
from any Wapda formation during tour.
20 Re-appropriation means the assignment lb meet specified
expenditure of funds at the disposal of the assigning authority.
21 The register used for recording the account 11° be debited is
known as ledger.
22 It is not necessary that measurement book shook. be numbered
serially and including their pages.
23 A security deposit received in cash from a Contactor will be
debited to Contractor's Cash deposal aroma* and credited to
the bank account in which cash is lodged.
24 Construction work in progress account is a coollint account in
the General ledger.
25 Public Sector Development fund is tiia^ d by the
parliament.
26 Provision must be made in appn:yved •PC4 addle preparing
foreign loan budget.
27 Foreign exchange budget is directly subialltert Iiii the project
Authorities to the donor.
28 Suspense account are kept for major and wiliaarargligs.
29 Foreign loan, credit, grant which are dinecalimesplialed by the
Authority with the lending agencies are granted 1111fapda wider
guaranteed loans and in various cunenies.
30 Budget Book provide a complete moon. of vie rlini performed
under a contract and therefore, include ad alms> Inatiing a
financial value so that full support is given lit o Se amosmit of the
final sum due to the contractor.

(Page 2)
Q. No.2 Fill in the blanks. (20
Marks)

The Audit Officer and his staff are expected to audit completely and
intelligently all transaction of receipts and which of all within
their scope of check.

ii. of Wapda formation is carried out by internal Audit.

iii. is exercised by the Authority empowered to


sanction the execution of work at stated cost.

iv. Measurement Book should be numbered

v. The price of disposal stores to be used a guide by the


disposing agency.

vi. The document which shows the description of disposable material and its
reserve price is called

vii. All transaction between Wapda projects are settled through

viii. On acceptance of the offer, the contractor shall, at the option of the
purchaser and the period specified by the purchaser deposit with him a
security deposit not exceeding

ix. is entirely responsible for the successful execution of


the contract in all respect in accordance with terms and conditions as
specified in the contract.

x. As per general condition of purchase rules if the contractor / Manufacturer


commit any the contracting officer will be right to
forefeet the security.

is 7
(Page 3)
PAKISTAN WATER & POWER DEVELOPMENT AUTHORITY
DEPARTMENTAL PROMOTION EXAMINATION OF
JUNIOR ENGINEER (CIVIL)TO SR. ENGINEER (CIVIL) BPS-17 TO BPS-18
JANUARY 2016
PAPER-C (FINANCE & ACCOUNTS)
PART II (SUBJECTIVE) -

Total Marks: 50 Time Allowed: Two Hours


Pass Marks: 25

Note: Read and follow the Instructions given below before attempting the paper:
a. Write your answers with blue pen/ball point only. Attempting the paper with lead pencil or pen/ball point
of any other colour and marker of any colour is not allowed; otherwise paper will be cancelled.
b. Attempt Number of questions as per instruction in Descriptive Paper.
C. No extra question should be attempted. 1f attempted the candidate should himself cross the extra question,
otherwise the first required number of answers shall he marked.
d. Books, typed or written material are not allowed.
e. Write your Roll Number on the top right corner of the Answer Book.
f. Use of Mobile Phone and Blue tooth communication devices are strictly prohibited.

Attemp any five question carrying equal marks.

Q. No.1 Discuss various methods to dispose off unwanted stores. (10 Marks)

Q. No.2 What are the responsibilities of Wapda Officer for executing the contract with
the Manufacturer or Contractor. . (10 Marks)

Q. No.3 Explain the following and what points are taken in to consideration while
preparing these budgets for Development/Non Development Projects.
(10 Marks)
i. Foreign Exchange Budget.
ii. Foreign loan budget.

Q. No.4 Elaborate and justify the statement that Measure Books are very important
account records. (10 Marks)

Q. No.5 How control over expenditure will be made through budget control register.
(10 Marks)

No.6 Briefly explain the following: (10 Marks)


(i) Vouchers (ii) Imprest Cash Book.
(iii) Suspense account (iv) Muster roll.

z
Roll No.

PAKISTAN WATER AND POWER DEVELOPMENT AUTHORITY

Promotion Examination of Junior Engineer (Civil) BPS-17 to Sr. Engineer (Civil) BPS-18

SESSION 2016

PAPER-B (TECHNICAL) : DAMS AND HYDROPOWER ENGINEERING

PART-I (OBJECTIVE)

Note: All questions to be answered in this part. All questions carry equal marks.

Time Allowed: 1 Hour Books are not Allowed


Total Marks=50
Note: Read and follow the instructions given below before attempting the paper:

> Attempt all questions of Objective Paper and Number of questions as per instructions in Descriptive
Paper.
• No extra question should be attempted. If attempted the candidate should himself cross the extra
question, otherwise the first required number of answers shall be marked.
> Write your Roll number on the top right corner of the paper/Answer Book.
> Write your answers with blue pen/ball point only. Answers attempted with lead pencil or in any other
colour of ink will be cancelled.
> No mark of identification should be made on the answer book, otherwise it will be cancelled.
> Use of Mobile Phone and Blue tooth communication devices are strictly prohibited.

Q.No.1 Tick the correct answer for the following

1) The non-commercial source of energy are:


a) Fossil fuels and radio active substances b) Solar, wind, biomass
c) Wood, animal wastes and agriculture wastes d) None of above

2) Which of the following power plants is the least reliable:


a) Wind b) Solar
c) Tidal d) Geothermal

3) The power output from an hydroelectric plants depends on:


a) Type of turbine, type of dam and type of b) Type of dam, head, system efficiency.
catchment area
c) Type of dam, type of catchment area and d) Discharge, system efficiency
discharge

4) In hydroelectric power plants:


a) Both operating and initial cost are high b) Both operating and initial cost are low
c) Operating cost is low and initial cost is high d) Operating cost is high and initial cost is
low
5) Water hammer is developed in a:
a) Penstock b) Draft tube
c) Surge tank d) Turbine

6) With reference to hydro meter station the graphical representation of the discharge as
function of time is known as:
a) Hectograph b) Hydrograph
c) Load duration curve d) Monograph
7) An hydrograph indicates:
a) The average run off during the period b) The discharge at any time during the
period under consideration
c) The maximum and minimum run off during d) All of the above
the period

8) In hydropower station what is an enlarged body of water just above the intake and used
as a regulating reservoir called:
a) Penstock b) Spillways
c) Reservoir d) Forebay

9) The function of a surge tank is to:


a) Produce surge in the pipeline b) Relieve water hammer pressure in the
penstock
c) Supply water at constant pressure d) None of above

10) Gross head of an hydroelectric power station is:


a) The height of water level in the river where the b) The difference of water level between the
storage is provided level in storage and tailrace
c) The height of water level in the river where d) All of above
the tailrace is provided

11) The annual depreciation of hydropower plant is about:


a) 0.5 1 .5`)/0 b) 10 15`)/0
c) 15 20% d) 20 25%

12) The factor affecting run off are:


a) Amount of vegetation and weather condition in b) The topography and nature of soil in the
the catchment area catchment area
c) Rainfall pattern, shape and size of catchment d) All of above
area
13) In a hydroelectric power station surge tanks are constructed:
a) To provide flood relief b) To provide water level control
c) To provide water in storage period d) To provide sudden pressure, wave in
penstock
14) In high head hydroelectric power plant the velocity of water flow in penstock is around:
a) 2 m/s b) 4 m/s
c) 8 m/s d) 10 m/s

15) Bulb turbines are:


a) High speed turbine b) High head turbine
c) Low head axial flow turbine d) High pressure turbine

16) Downstream section of straight drop spillway is called as:


a) Apron b) Stilling basin
c) Both (a) & (b) d) None of these

17) An imaginary line joining the points of equal elevation on the surface of the earth
represents:
a) Level line b) Contour surface
c) Contour Line d) Contour gradient
18) An ideal vertical curve to join two gradients is:
a) Elliptical b) Circular
c) Hyperbolic d) Parabolic

19) Closed contours of decreasing values towards their centre represent:


a) A depression b) A hill
c) A saddle or pass d) A river bed

20) Which Plant can never have 100% lead factor:


a) Peak load plant b) Base load plant
c) Nuclear power plant d) Hydroelectric plant

21) The area under the load curve gives:


a) Average demand b) Energy consumed
c) Maximum demand d) None of the above

22) The increased load during summer months is due to:


a) Increased business activity b) Increased water supply
c) Increased use of fans and air-conditioners d) None of the above

23) Which of the following developments deals with emission trading and clean
development mechanism:
a) Kyoto Protocol b) Responsible case
c) ISO 14000 d) LEED classification

24) On what factors does the selection of a water turbine depend?


a) Working head b) Nature of load
c) Speed d) All of above

25) A hydropower plant of run off river type should be provided with pondage so that the:
a) Operating head is controlled b) Firm capacity of plant is increased
c) Kinetic energy of the running water is fully d) Pressure inside the turbine casing
utilized remains

Q.No.2 Fill in the Blanks 17

i. MW and MW will be the power 1


generation capacity of Mohmand and Dudhnial Multipurpose Project
respectively.

ii. In Pakistan normally Run off River Projects are designed on 1


Hrs peaking.

iii. dam is a temporary Structure constructed to exclude 1


water from the area during construction.

iv. The larger particles of sediments carried by the streams leading to 1


reservoirs are deposited at the head of the reservoirs forming

v. Major factors for reduction of reservoir life are and 1


. .

tr-fr
,
vi. Mangla Dam is raised by ft and energy added by 1
GWh.

vii. Basalt is type of Rock. 1

viii. Gabro is type of Rock. 1

,,
ix. The Water Storage Dams in Pakistan are & . 1

x. The Limits used in soil classification process are 1


Liquid limit and Plastic limit.

xi. Spillway is provided to . 1

xii. Penstock is provided to carry from forebay to 1


Powerhouse.

xiii. is a pipe which connects the turbine and the 1


tailrace.

xiv. Embankment dams are made from compacted, earth and have two 1
main types and dams.

xv. In hydropower plants we use force of fluid water 1


to run the turbine.

xvi. Tanda Dam was completed in year. 1

xvii. The capacity of the Golen Gole Hydropower will be MW 1

Q.No.3 True or False. 8

i. Basha Dam will be an RCC Dam. [True/Faso)


ii. Tarbela and Mangla are Earthfill dams. (True/ False)
iii. RCC Dam is founded on Rock. (True/ False)
' iv. Khosla's theory is applicable to permeable foundation. (True/ False)
v. Dasu HPP will generate 4350 MW. (True/ False)
vi. Cutoff walls are provided to increase the creep of the percolating
sub-surface water. (True/ False)
vii. PC-I comes before PC-II (True/ False)
viii. The function of sand trap is to catch up the sediments. (True/ False)
Roll No.

PAKISTAN WATER AND POWER DEVELOPMENT AUTHORITY

Promotion Examination of Junior Engineer (Civil) BPS-17 to Sr. Engineer (Civil) BPS-18

SESSION 2016

PAPER B: DAMS AND HYDROPOWER ENGINEERING

PART-II (SUBJECTIVE)

Time Allowed: 2 Hours Books are not Allowed


Total Marks=50
Note: Question 1 is compulsory, attempt any other two questions.

Read and follow the instructions given below before attempting the paper:

➢ Write your Roll number on the top right corner of the paper/Answer Book.
➢ Write your answers with blue pen/ball point only. Answers attempted with lead pencil or marker in any
other colour of ink will be cancelled.
➢ No mark of identification should be made on the answer book, otherwise it will be cancelled.
➢ Use of Mobile Phone and Blue tooth communication devices are strictly prohibited.

Q1 a) Write Down a note on classification and factors governing the selection of dam type. 10
b) What is the difference between hydropower and thermal power project, draw
schematic diagram of a low head hydropower project? What are the basic hurdles in 10
non development of hydropower in Pakistan?
Q2 Write Short Explanatory notes on the following:
• Modified Compaction Test. 3
• Trap Efficiency 4
• Probable Maximum Flood. 4
• Settlement in Earthen Dam. 4
Q3 a) Define the following:
i) PC-I Proforma 1
ii) PC-II Proforma 1
iii) Clean Development Mechanism (CDM) 2
b) Briefly describe the seepage reduction measures taken for an earthen dam. 4
c) What are the following abbreviations stands for?
i. USCOLD 7
ii. UNFCC
iii. GPSs
iv. IPP
v. EIA
vi. RAP
vii. QBCS
Q4 a) Enlist the Projects under construction by WAPDA. What is meant by priority projects 5
by WAPDA?
b) Name five field or laboratory tests performed during investigations of Earthen Dam.
c) Briefly Describe Geological mapping.
5
Q5 a) Narrate type of Rock, give examples of metamorphic rocks? 5
b) Differentiate between:
• Weir and Barrage. 5
• Storage and Run of River Project.
• Load Factor and Plant Factor.
c) Write a short note on Total Station used in survey.
Roll No.

PAKISTAN WATER & POWER DEVELOPMENT AUTHORITY

Departmental Promotion Examination of Junior Engineer (Civil) BPS-17

To Senior Engineer (Civil) BPS-18

SESSION 2015

Paper "B" — Part-I (Objective)

(Dams and Hydro Power Engineering)

Time Allowed: 1 Hour Total Marks = 50

All questions carry equal marks. Books are not allowed.

Note: Read and follow the instructions given below before attempting the paper:

➢ Attempt all questions of Objective Paper and Number of questions as per instruction in
Descriptive Paper
➢ No extra question should be attempted. If attempted the candidate should himself cross the
extra question, otherwise the first required number of answers shall be marked
➢ Write your Roll number on the top right corner of the paper/Answer Book
➢ Write your answers with blue pen/ball point only. Answers attempted with lead pencil or in any
other colour of ink will be cancelled.
➢ No mark of identification should be made on the answer book, otherwise it will be cancelled.
➢ Use of Mobile Phone and Blue tooth communication devices are strictly prohibited.

Q.No.1 Tick the correct answer for the following 20

1) The minimum power, which hydropower plant can generate throughout the year is
called

a) Power plant capacity b) Power plant load


c) Firm power d) Water power

2) Conjunctive use of water in a basin means

a) Combine use of water for irrigation b) Combine use of surface and ground water
and hydropower generation resources

c) Use of irrigation water for both rabbi d) Use of irrigation water by cooperative of
and kharif seasons Farmers

3) The gross storage capacity of Gomal Zam Dam is

a) 1.240 MAF b) 1.140 MAF

c) '1.116 MAF d) 1.130 MAF

4) Mangla Dam has been raised

a) 50 ft b) 80 ft.
c 25 ft d) 30 ft
5) Bugaliar Dam is located on river

a) Ravi b) Indus

c) Chenab d) Jhelum

6) Maximum height of Hub Dam is

a) 170 ft b) 195 ft

c) 180 ft d) 154 ft

7) In a Hydropower Project the pipe between Surg Tank and Power house is known as

a) Hydraulic pipe b) Pen stock pipe

c) Hydraulic pressure pipe d) None of the above

8) The useful storage in Dam reservoir is the value of water stored between

a) Minimum and maximum reservoir level b) Minimum and normal reservoir level

c) Normal and maximum reservoir level d) None of the above

9) The life storage of Basha Dam is

a) 6.4 MAF b) 5.4 MAF

c) 6.1 MAF d) 7.1 MAF

10) What pulls water into the pen stock ?

a) Gravity b) Force of all the water

c) Turbine d) Pressure

Q.No.2 Fill in the blanks: 20


i. The hydrographic survey is also known as
ii. Mega watt (MW) will be the power generation capacity of
Keyal Khwar Hydropower Project
iii. Tanda Dam was completed (year)
iv. A transition structure constructed to induce the formation of a Hydraulic jump is
called
v. Hungol dam is located province
vi. Electric power is measure in
vii. Type of turbine at Chashma hydropower plant is
viii. The correlation between storage and discharge is called
ix. Shale type of rock
x. The electric load at the time of maximum demands is called
10
Q.No.3 Tick the following True/False (T/F)
i. Hydropower project with a benefit cost ratio lower than 1 or automatically
rejected (True/False)

ii. , hydroelectric energy a non renewable resource (True/False)

iii. Pelton turbines are radial flow reaction turbine (True/False)

iv. Bunji hydropower project will provide 4500 MW of electricity (True/False)

v. Kharif crops are sown and harvested in the months of October and March
(True/False)
PAKISTAN WATER & POWER DEVELOPMENT AUTHORITY
Departmental Promotion Examination of Junior Engineer (Civil) BPS-17
To Senior Engineer (Civil) BPS-18

SESSION 2015

Paper "B" — Part-II (Subjective)

(Dams and Hydro Power Engineering)

Time Allowed: 2 Hours Total Marks = 50

Question No.1 is compulsory, attempt any other two questions BOOKS ARE NOT ALLOWED

Note: Read and follow the instructions given below before attempting the paper:

➢ Write your Roll number on the top right corner of the paper/Answer Book
Write your answers with blue pen/ball point only. Answers attempted with lead pencil or in any
other colour of ink will be cancelled.
No mark of identification should be made on the answer book, otherwise it will be cancelled.
Use of Mobile Phone and Blue tooth communication devices are strictly prohibited.

Q.No.1 a) What is meant by Hydro power ? Name major storage dams/reservoir of the (10)
country, their initial and present storage capacities
b) What steps WAPDA/Government of Pakistan taken to enhance the overall (10)
hydropower potential and water storage capacity in the country

Q.No.2 a) What are the major components of a hydro electric power plant? (5)
b) What are the different types of turbine used in hydro electric power plants? (5)
c) What are the causes of dam failures? (5)
Q.No.3 Write short note on
a) Flow duration curve (3)
b) Fish ladder (3)
c) Draft tube (3)
d) Cavitations (3)
e) Trap efficiency (3)
Q.No.4 a) Name the main causes of loss in storage of reservoir (3)
b) Name at least six kinds of dams (3 )
c) What are the following abbreviations stands for (9)
1. NPV 2. CDM
3. WCAP 4 IRR
5. SPD 6 EPC
7 EPA 8 PPIB
9 WRPO
Q.No.5 a) Define Hydrographic survey (1)
b) What are the methods applied for topographic survey? (3\
c) Name five fields and laboratory test performed during investigations of earth
fill dams (5)
d) Differentiate between (6)
Live storage and dead storage
Storage and run of river projects
Rated head and design head
PAKISTAN WATER & POWER DEVELOPMENT AUTHORITY

Departmental Promotion Examination of Junior Engineer (Civil) BPS-17

To Senior Engineer (Civil) BPS-18

SESSION 2015

Paper "B" - Part-II (Descriptive)

(Technical - Constructions Management, Materials & Equipment, Computer IT)

Time Allowed: 2 Hours Total Marks = 50

All questions carry equal marks. Books are not allowed.


Attempt any five questions. No extra question should be attempted if so, last question in
series will be cancelled.

Note: Read and follow the instructions given below before attempting the paper:

➢ Write your Roll number on the top right corner of the paper/Answer Book
➢ Write your answers with blue pen/ball point only. Answers attempted with lead pencil or in any
other colour of ink will be cancelled.
➢ No mark of identification should be made on the answer book, otherwise it will be cancelled.
➢ Use of Mobile Phone and Blue tooth communication devices are strictly prohibited.

Q.No.1 a) Give a short brief of project clearance process in case of hydropower project. 5
b) Tender opening procedure. 5

Q.No.2 What is prequalification of consultants for construction supervision. Write its evaluati,..; 10
criteria.

Q.No.3 Write short note on the following :- 10.


i. Salvage value of machine.
ii. Heat of Hydration.
iii. RAM -
iv. Arbitration in contracts,
v. Defect liability period

Q.No.4 a) Write a note on various types of cranes used in construction process 5


b) Enlist various types of steel bars. 5

Q.No.5 Define the following 10


i. Ductility.
ii. Residual/ultimate strength.
iii. Working load.
iv. Required properties of concrete
v. Soft copy and hard copy

Q.No.6 Brief note on compaction of soils methods of compaction and machines used f- r 10
compaction. Importance of compaction for different structures.
Q.No.7 Write a brief note on lining of canals/channels and equipments used for its
10
construction.
Roll No.

PAKISTAN WATER & POWER DEVELOPMENT AUTHORITY

Departmental Promotion Examination of Junior Engineer (Civil) BPS-17

To Senior Engineer (Civil) BPS-18

SESSION 2015

Paper "B" — Part-I (Objective)

(Technical - Constructions Management, Materials & Equipment, Computer IT)

Time Allowed: 1 Hour Total Marks = 50

All questions carry equal marks. Books are not allowed.

Note: Read and follow the instructions given below before attempting the paper:

➢ Attempt all questions of Objective Paper and Number of questions as per instruction in
Descriptive Paper
➢ No extra question should be attempted. If attempted the candidate should himself cross the
extra question, otherwise the first required number of answers shall be marked
➢ Write your Roll number on the top right corner of the paper/Answer Book
➢ Write your answers with blue pen/ball point only. Answers attempted with lead pencil or in any
other colour of ink will be cancelled.
➢ No mark of identification should be made on the answer book, otherwise it will be cancelled.
➢ Use of Mobile Phone and Blue tooth communication devices are strictly prohibited.

Q.No.1 Answer the following:-

. What are slump values for shear and collapse slump ?

What is consistency of cement and write its test ?


ii.

What are the functions of ECNEC & CDWP ?


iii.

Types of joints in concrete, why they are provided.


iv.

Types /classification of aggregates with refer to its shape.


v.
Q.No.2 What are the following abbreviations stands for:-
i. FSL 1
SWH 1
iii. ECNEC 1
iv. ALU 1
v. PDWP 1
vi. ASTM 1
vii. RAM 1
viii. OPC 1
ix. EPC 1
x. SRC 1

Q.No.3 Fill in the blanks


i. Granules soil is compacted by roller. 1
ii. For concreting of tunnels lining, transportation of concrete is done by 1
iii. SPT is carried for 1
iv. An agreement by law is called contract. 1
v. Defect liability period starts after the issuance of completion certificate. 1
vi. Sheep foot roller is used for soil. 1
vii. machine is used to test the aggregate for crashing strength. 1
viii. Printed is a common device. 1
ix. Grade 60 steel has a yield strength of MPa (Mega pascal). 1
x. are used to measure water table 1

Q.No.4 Tick the following True/False (T/F)


i. ROM will not retain the data at all times• (True/False) 1
ii. Storage media is a hard disc . (True/False) 1
iii. RCC stands for Roller compacted concrete (True/False) 1
iv. In case of disagreement between two arbitrators, the matter referred to courts - 1
(True/False)
v. SPT test performed for clayey soils. (True/False)
vi. Excavation under water is called under mining (True/False) 1
vii. OMC stands for optimum moisture content (True/False) 1
viii. PC-II comes after PC-I . (True/False) 1
ix. PC stands for project proforma . (True/False) 1
x. 28-days cylinders strength is greater than cube strength in concrete testing • 1
(True/False)

`4 2
Q.No.5 Define the following , -
I. Workability :

ii. Optimum moisture content

iii• Contract

iv. Project

V. Passive earth pressure


Roll No .

PAKISTAN
WATER AND POWER DEVELOPMENT AUTHORITY

DEPARTMENTAL PROMOTION EXAMINATION OF


JUNIOR ENGINEER (CIVIL) TO SENIOR ENGINEER (CIVIL) BPS-17 TO 18

January 21, 2015

PAPER-B (TECHNICAL — WATERLOGGING AND SALINITY)

PART-I (OBJECTIVE)

Total Marks: 50 Pass Marks: 25 Time Allowed: 1 Hour (09:30 to 10:30)

Note: Read and follow carefully the Instructions given below before attempting the paper:

• Attempt all questions.


• Books, typed or written material / nothing is allowed to consult.
• Write your Roll Number on the top right corner of the Paper / Answer Book.
• Write your answers with blue pen/ball point only. Answers attempted with lead pencil or in any other colour of
ink, will be cancelled. Use of marker of any colour is not allowed.
• No mark of identification should be made on the answer book, otherwise it will be cancelled.
• Use of Mobile Phone and Blue Tooth communication devices are strictly prohibited.

Q.1 What are the following abbreviations stand for? Marks: 30 (2 each)

i) Ac

ii) EIA

iii) FIRR

iv) IBMR

v) MAF

vi) Mt

vii) RB Link

viii) IWASRI

ix) TDS

x) WEC

xi) EPA

xii) EMP

xiii) LPG

xiv) SMO

xv) PARC
Roll No.

Q.2 Tick mark the True/False for the following statements. Marks: 20 (2 each)

1 Indus Water Treaty was signed in 1961. True False

2. Nai Gaj Dam Project is planned on Sindh river. True False]

3. Crop water requirements have been calculated True False


on the basis of crop area.

4. Excessive use of groundwater has resulted in 1 Truee False


Deterioration of groundwater quality. _
5. Installed capacity of Duber Khwar Hydropower project True False
is 160 MW.

6. Kachhi Canal offtakes from C.J. Link Canal. True False

The Lower Bari Doab Command System is situated True False 1


In East-South of Punjab province of Pakistan.

8. Hydraulic slope is defined as the slope of every gradient. True [False I

9. The area of Cholistan desert is 2.6 million hectare. True False

10. SCARP-II is located in districts Gujrat, Sargodha and Jhang. [True False
Roll No.

PAKISTAN
WATER AND POWER DEVELOPMENT AUTHORITY

DEPARTMENTAL PROMOTION EXAMINATION OF


JUNIOR ENGINEER (CIVIL) TO SENIOR ENGINEER (CIVIL) BPS-17 TO 18

January 21, 2015

PAPER-B (TECHNICAL — WATERLOGGING AND SALINITY)

PART-II (SUBJECTIVE)

Total Marks: 50 Pass Marks: 25 Time Allowed: 2 Hours (10:30 to 12:30)

Note: Read and follow carefully the Instructions given below before attempting the paper:

• Attempt all questions.


• No extra question should be attempted. If attempted the candidate should himself cross the extra question,
otherwise the first required number of answers shall be marked.
• Books, typed or written material / nothing is allowed to consult.
• Write your Roll Number on the top right corner of the Paper / Answer Book.
• Write your answers with blue pen/ball point only. Answers attempted with lead pencil or in any other colour of
ink, will be cancelled. Use of marker of any colour is not allowed.
• No mark of identification should be made on the answer book, otherwise it will be cancelled.
• Use of Mobile Phone and Blue Tooth communication devices are strictly prohibited.

Marks

Q.1 What is drainage? Describe the main types of drainage technologies. 10

Q.2 Describe the following: 10

a) Skimming well
b) Fractional well

Q.3 Describe the irrigation system of Pakistan in detail. 10

Q.4 Write the name and describe the link canals constructed
under Indus Basin Project? 10

Q.5 Explain the measures to control waterlogging in Pakistan. 10

Li 7
Roll NO.

PAKISTAN WATER & POWER DEVELOPMENT AUTHORITY .

Departmental Promotion Examination


Junior Engineer (Civil) to Sr. Engineer (Civil) BPS-17 to 18
January, 2015
Paper-C (Finance & Accounts)
Part-I (Objective)
Total Marks 50 Time Allowed: One Hour
Passing Marks: 25

NOTE
Books and handwritten/typed notes are not allowed
Attempt all questions
Q.No.1 Following statements are true or false. 25 Marks.

1 The net amount paid to contractor against his progress or final bill will be
debited to his •ersonal account.
2 Late or delayed tender submission shall not be considered.

3 Director Account is the primary disbursing officer of a project and all


receipts and payments on account of authority made by his subordinate
are made on his behalf and on his responsibility.
4 Foreign loan, credit, grant which are directly negotiated by the Authority
with the lending agencies are granted to Wapda under guaranteed loans
and in various currencies.
5 Measure book should be numbered serially including their pages.

6 Chief Engineer Purchase & Disposal has the authority to amend/modify


the Wapda material disposal procedure as needed.
7 A credit advice shall be cancelled or modified by writing a letter.

8 No commitment to the Contractors should be made for advance in


excess of 70% of the value of goods to be acquired.
9 Loss of Measure Book should not be reported to the nearest Police
Station.
10 Goods received notes are used for all stores, material, machinery and
any other item received from supplier.
11 Budget Book provide a complete record of works performed under a
contract and therefore, include all items having a financial value so that
full support is given to the amount of the final sum due to the contractor.
12 Mustor roll is a record of monthly attendance of labour employed on daily
rates, register of arrears of wages due to labour ,and the progress of
work done by the daily labour.
13 Procuring agency shall disqualify a supplier or contractor if it finds, at any
time that the information submitted by him concerning his qualification as
supplier or contractor was false or incomplete.
14 The register used for recording the account to be debited is known as
ledger.
15 Standing advance of a fixed sum of money given for meeting
expenditure of certain types in accordance with rules and subject to such
restrictions as may be laid down by the Authority is known as suspense ..
account.
16 Issue of material and stores to Wapda project will not be through book
adjustment but by making payment through superscribed cheque.
17 Purchase Committee is responsible for fixing the reserve price for the
items recommended for disposal.
18 If the interval between the preparation of verification report and the
approval by the competent authority exceeds six months other then
survey report will be verified afresh.
19 The bidder will be required to lift the stores from the location as soon as
possible but not later than 21 days of the issue of release order
confirmation letter.
20 Accounts of Wapda Formations are also post audit by Wapda Audit on
behalf of Auditor General of Pakistan.
21 It is not necessary for Incharge of Audit party to ensure that all
documents mentioned in the list of Auditable documents have been
audited.
22 Works in Wapda which falls within the preview of internal audit are
cate_gorized as Civil Works, Water Works and Power Works.
23 Proper requisition and receipts is not required for issuance of
Measurement Book.
24 "Force majeure" means to apply force for implementing contractual
obligation.
25 Suspense account are kept for major and minor works.

Q No.2 Fill in the blanks. 20 Marks

to contractor are as a rule prohibited and endeavour should be made to


maintain a system under which no payments are made except for work actually done.

All measurements should be neatly taken down in a

iii. No should be made to the contractors in anticipation of the


measurement of complete works .

iv. In control register the annual approved under various major and minor head
of account will be entered.

v. All transaction between Wapda Projects are settled through issue of

vi. Monthly trial balance which will also be signed by Project Director will be prepared
by

Page-2
Roll No.

PAKISTAN WATER & POWER DEVELOPMENT AUTHORITY


WATER WING DEPARTMENTAL PROMOTION EXAMINATION
JUNIOR ENGINEER (CIVIL) TO SENIOR ENGINEER (CIVIL) BPS-17 TO 18
PAPER — B (PROFESSIONAL — CANALS & DISTRIBUTION SYSTEM)
January, 2015
PART — I (Objective)
NOTE: Total Marks : 50
i) No Book / Notes allowed Pass Marks : 25
ii) Attempt all Questions Time Allowed : One Hour

Q.No. 1 Write in full the following abbreviations 10


i) IBSP
ii) HP'11
iii) SMST
iv) PSDP
v) TPIBIS
vi) HYCOS
vii) NEPRA
viii) BRBD
ix) FFC
x) WAA

Q.No.2 Complete the following statements 05


i) One square meter is equal to cm2
ii) One ton is equal to cwt
iii) 10 Litre is equal to dm3
iv) 5 Square miles is equal to hectares
v) 6000000 acre feet is equal to million acre feet

Q.No.3 Write names of Barrages on Indus River 05


Q.No.4 Write names of five (5) Canals off taking from Sukkur Barrage 05

Q.No.5 Write different forms of artificial irrigation 05

Q.No.6 Fill in the blanks 20

i) A channel through which surplus or excess water may be removed for a canal, reservoir or
stream is called
ii) The Naulong Dam is located on River
iii) The Rainee Canal is located in Sanghar and Districts
iv) The installed power generation capacity at Tarbela Dam Project after completion of 4th
Extension Project will becomes
v) Canals are designed to irrigate in Rabi Season only
vi) When the bed of Drain and the Canal are almost at the same level. Then it is called .
vii) The best channel section is that which gives the discharge for a given a. a of
water way
viii) is the best discharging rectangular channel
ix) is defined as the channel which is in a state of equilibrium
x) The silt grade or the size of plays a dominant role in the attainment
of regime in the channel
xi) Water in contact with the embankment or seepage of water through the embankment are
potential danger to
xii) The stability analysis . of the slopes in canals are carried out
xiii) The main cause of the loss of water during transit is
xiv) An ideal canal lining should be impervious, strong durable and easy to
construct.
xv) In Chezy formula "S&R" stands for
xvi) Lift irrigation is flow from to
xvii) When the FSL in the canal is below the bed of the drain, it is called
:

xviii) Maximum conservation level of Mangla Dam after raising has become ft. SPD
xix) The Garuk Dam is located across River
xx) New Bong Hydro Power Project is located on _
Roll No.
PAKISTAN WATER & POWER DEVELOPMENT AUTHORITY
WATER WING DEPARTMENTAL PROMOTION EXAMINATION
UNIOR ENGINEER (CIVIL) TO SENIOR ENGINEER (CIVIL) BPS-17 TO 18

PAPER — B (PROFESSIONAL — CANALS & DISTRIBUTION SYSTEM)

PART — II (Descriptive)
te: Total Marks : 50
)i Attempt any five Questions Pass Marks : 25
y Books are not Allowed Time Allowed : Two(02) Hours
ii) Extra question will not be entertained
v) All questions carry equal marks

Define the following terms used in open channel

i) Wetted perimeter
ii) Depth
iii) Hydraulic slope
iv) Hydraulic radius
v) Mean depth
Describe briefly destruction of energy of the canal fall 05

Define canal 02
Write and discuss various classes of irrigation canals 04
Describe briefly the parts of an irrigation canal 04

Write the factors which should be considered in deciding the suitability of 05


canal lining
Discuss concrete lining in detail 05

Write the Lacey's conception of Regime 05


Write defects in Kennedy's and Lacey's theories 05

Define the following briefly (all parts carry equal marks) 10


(i) Intensity of irrigation (ii) Non-modular outlet (iii) Semi-modular outlet
(iv) Rigid module outlet (v) Stable channel section (vi) Fish ladder
(vii) Water allowance (viii) Irrigation

A trapezoidal channel has a bed width of 27 ft. and side slopes of 2:1. 10
The longitudal slope of the channel is 1:5000. If the depth of water in it is 4.5 ft.
Calculate the discharge. Take co-efficient of roughness 0.02
Ro11410.1--
PAKISTAN WATER AND POWER DEVELOPMENT AUTHORITY
Departmental Promotion Examination
Junior Engineer (Civil) to Sr. Engineer (Civil) BPS-17 to 18
January 2015
Paper-C (Finance & Accounts)
Part-II (Subjective)

otal Marks: 50 Time Allowed: Two Hours


ass Marks: 25

o e: Books and hand written/typed note are not allowed.


Please attempt any five questions carrying equal marks.

. No.1 Explain concept of disposal and principal to guide all disposal actions in Wapda.

No.2 What guideline are to be observed for checking/controlling irregularities in purchase of


store and equipments.

No.3 What consideration should be kept in view by drawing up a Public Sector Development
Programme Budget Estimates.

No.4 Briefly state reasons for acceptance of bid which require prior approval of next higher
authority.

No.5 (i) What are the instructions/guideline for making provisional payment to the Contractor.
(ii) What are instruction for maintaining measurement book register.
(iii) Briefly described security deposit some contract may require the Contractor to lodge
with the Authority.

Q.No.6 Described composition of Survey Committee and instructions for filling Survey Report.
Roll No.

PAKISTAN WATER & POWER DEVELOPMENT AUTHORITY


DEPARTMENTAL PROMOTION EXAMINATION OF JR. ENGR (CIVIL) TO SR.
ENGR (CIVIL) BPS-17.TO 18 — JANUARY 2014

PAPER— A (CURRENT AFFAIRS AND WAPDA RULES & REGULATIONS)

PART-1 (OBJECTIVE) Time Limit: 1 Hour


Total Marks: 50

NOTE:

Attempt all questions


ii Consultation of Books/Notes/Typed/Written material not allowed
iii Write your Roll No. on top right corner on all pages of Answer Book
iv Use blue ink pen/ballpoint. Lead Pencil not allowed
v No mark of identification shall be made on the Answer Book, otherwise it will be
cancelled
vi Cutting/overwriting is unacceptable
vii Use of Mobile/Bluetooth communication not allowed

Section-I 13 marks
(Pass Marks 40%)

Q.1 Elaborate the following abbreviations: (3 marks)


i. ISAF

ii. ECL

iii. WHO

Q2. Fill in the Blanks: (5 marks)


i. A student from Hangu named is being posthumously awarded
Sitara-e- Shujaat due to his bravery against terrorism.

ii. is the Prime Minister of Turkey.

iii. has been appointed as Acting Chairman NADRA.

iv. Super Typhoon played havoc in Philippines.

v. Sochi 2014 Winter Olympics Games are being held in the country

• P.T.O
-2—

Q3. Tick the following as True or False: (5 marks)

i. Khurasan border is used for trade between Pakistan and Iran. T/F

ii. Muneer A Mailk is the Attorney General of Pakistan. T/F

iii. Euro- II Emissions Standards control pollution caused by vehicles. T/F

iv. Pentagon is the Headquarter of US Army. T/F

v. Jalil Abbas Jilani is the Pakistan's Ambassador to US. T/F

Section-II 37 marks
(Pass marks 50%)

Q4. Elaborate the following abbreviations: (7 marks)

i. TOR

ii. PW

iii. FIR

iv. EOL
v. DW

vi. LPR

vii. TA

Q5. Fill in the blanks: (15 marks)

i. Cases of serious nature involving loss of large amount of public money may be
reported to by the competent authority.
ii. On retirement of an employee, TA is allowed from the place of to his
home town.

iii. In most cases, frauds are rendered due to lack of supervision and of
rules.

iv. An employee who has been awarded penalty may within period make
representation to the competent authority.

Contd...P/3
Roll No.

- 3-

v. An employee who falls under Medical category- E permanently is for


any kind of service.

vi. An employee having at least years service can be granted advance for
construction/purchase of house/ plot.

vii. All enquiries should be finalized within a period of before the retirement
of an employee.

viii. In case an employee is found liVing beyond means, action shall be taken against him
under WAPDA rules.

ix. The advances for the purchase of motor car will be sanctioned by the competent
authority as per WAPDA Book of

x. Committee can recommend retirement of an employee when two or


more penalties have been imposed upon him.

xi. Earned leave on full pay cannot be granted beyond days.

xii. Reimbursement of medical charges to retired employees will be made by the offices
from where they are receiving

xiii. Suspension period beyond three months of an employee requires approval of

xiv. An employee shall require prior sanction of to engage in any trade,


employment or work; other than his official duties.

xv. Daily allowance is admissible to an employee beyond limits of the


town in which headquarters are situated.

Q6.Tick the following as True/False: (15 marks)

i. During an enquiry the accused is allowed to cross examine the witness evidence
against him. T/F

ii. Exoneration is a minor penalty. T/F

iii. An employee on leave if required to attend departmental enquiry is allowed. TA.


T/F

iv. Special rates of daily allowance are only admissible at Federal and Provincial capital
cities. T/F

P.T.O
Roll No.

-4-
r
v. An employee accused of misconduct can be directed by the competent authority to 1 4
•proceed on leave. T/F A

vi. Maternity leave to a female employee can be granted up to a maximum of 3 times in , %1


the entire service. T/F

vii. Cases of retirement of employees on completion of 25 years of service are reviewed


twice a year. T/F

viii. An employee is not allowed Ex-Pakistan leave in case of disciplinary cases


outstanding against him. T/F

ix. An employee suffering from mental or bodily illness rendering him permanently
incapable of discharging his official duties shall be examined by the Medical
Superintendent of concerned WAPDA Hospital. T/F

x. On the death of husband of female employee, she is granted Special Leave. T / F

xi. There is no bar in law for taking disciplinary action against the accused before the
disposal of criminal case in the court of law. T/F

xii. An employee is required to obtain permission for station leave from sanctioning
authority even during holidays. T/F

xiii. An employee on deputation earns leave during such period. T/F

xiv. An employee who frequently remains absent from duty is required to be reviewed for
retirement by the Review Committee. T/F

• xv. Encashment of LPR is admissible to an employee on completion of 25 years service.


T/F
PAKISTAN 'WATER & POWER DEVELOPMENT AUTHORITY
DEPARTMENTAL PROMOTION EXAMINATION OF JR. ENGA (CIVII2130
SR..ENGR 1CIVILLBPS-17 TO 18 JANUARY 2014

PAPER— A (CURRENT AFFAIRS AND WAPDA RULES & RE(AJLATIONS)

PART-II (SPIKJECTIVE) Time Limit: 2 Hours


Total Marks: 50

NOT14:.:

Attempt any two questions from Section-I and any three questions from Section-II.
is No extra questions should be attempted. If attempted, only the first inquired number
of answers shall be marked
iii Consultation of syllabus books is allowed
iv Use blue ink pen/ballpoint. Lead Pencil not allowed
v No mark of identification shall be made on the Answer Book, otherwise it will be
cancelled
vii Cutting/overwriting is unacceptable
ix Use of Mobile/Bluetooth communication not allowed

Section zI 20 marks (Pass marks 40%)

Q1 Pakistan's security and economy is at stake. Do you think dialogue with Taliban and
stoppage of drone attacks will help us out of this quagmire? Discuss.

Q2. Construction of Rescrsoir Dams and Hydropower Projects will resoi ,...e the problems of
water shortage, load shedding, expensive electricity and flood disaster. Elaborate.

0,3.Pakistan'.s foreign policy is required to be revisited in the light of our national interests.
Comment.

Section — II 30 marks (Pass marks 50%)

Q4. If an employee is charged in a criminal offence, what guide lines are to be followed
under WAPDA E&D Rules against such individuals?

Q5. What are the eligibility conditions for encashment of LPR? Can it be refused? Elaborate.

Q6. The employees who are suffering from mental/bodily illness and incapable of
discharging their official duties are dealt under what rules and procedures. Explain.

Q7. What formalities are required to be fulfilled by an employee on his retirement for
claiming TA :low his home town?

Q. Can an employee receive a second advance f;Dr construction of house or purchase of


land? Also briefly explain liow recovery of advance is made from his ::.;Alary?
ROLL No:

PAKISTAN WATER AND POWER DEVELOPMENT AUTHORITY


WATER WING DEPARTMENTAL PROMOTION EXAMINATION
JUNIOR ENGINEER (CIVIL) TO SENIOR ENGINEER (CIVIL) BPS-17 TO 18

PAPER-B (PROFESSINOAL — CANALS & DISTRIBUTION SYSTEM)

Part — Il (Objective) January, 2014

Total Marks:50
Pass Marks: 25 Time Allowed: 1 Hour

NOTE:
i) No Book / Notes allowed
ii) Attempt all questions

Q.1. Write in full the following abbreviations: (5)

i) GENCO
ii) PHLC
iii) BW
iv) LBDC
v) DID
vi) EPA

Q.2. Tick True / False for the following statements: (20)

i) Most Hydropower Plants only have one turbine and two True / False
generators.
ii) Hydropower is the major source of power generation in India. True / False
iii) Hydraulic turbine is a turbine that converts water into True / False
mechanical energy.
iv) Light has dual characteristics. It has photons that act as energy. True / False
It can also be represented as waves.
v) Flowing water possesses Kinetic energies. True / False
vi) Electricity is the movement of atoms and molecules. True / False
vii) Small hydropower can be installed everywhere. True / False
viii) In most parts of Pakistan, high wind velocity is available during True / False
winter time.
ix) The body of water behind dam that pushes forward at high True / False
pressure is the reservoir.
x)) Hydropower is energy obtained from flowing water. True / False
Q.3. Complete the following: ( 5)

i) 5 horse power is equivalent to kilowatts


ii) Ten km is equal to ft.
iii) 98.6 degree F is equivalent to degree C.
iv) 5 mile is equivalent to kilometer
v) 10 Cu. Ft. is equal to litres.

Q.4. Fill in the blanks. (20)

i) A hydraulic jump is a sudden increase in depth that occurs when flow


changes from to as a result of a rapid deceleration.
ii) A technique used to analyze the passage of a flood wave through a reservoir
is known as
iii) The type of canal alignment, which involves maximum cross drainage works
is a
iv) Types of Turbines with installed capacities at Chashma and Jinnah HPP are
and
respectively.
v) The type of fall, which you may recommend for very high drops and very low
discharges, is
vi) Installed power generation capacity at Tarbela Dam Project is MW
vii) A channel which is designed to irrigate all the year round is called

viii) Proposed Tunnel of Neelum-Jhelum Hydropower Project has length of


km.
ix) Warsak Dam is constructed on river and has the installed
capacity of MW.
x) Munda and Khazana Dams are proposed on River and
River respectively.
ROLL No:

PAKISTAN WATER AND POWER DEVELOPMENT AUTHORITY


WATER WING DEPARTMENTAL PROMOTION EXAMINATION
JUNIOR ENGINEER (CIVIL) TO SENIOR ENGINEER (CIVIL) BPS-17 TO 18

PAPER-B (PROFESSINOAL — CANALS & DISTRIBUTION SYSTEM)

Part — II (Descriptive) January, 2014

Total Marks:50
Pass Marks: 25 Time Allowed: 2Hours

NOTE:
i) No Book / Notes allowed
ii) Attempt any five questions. All questions carry equal marks. No extra
question should be attempted. If attempted, the candidate should himself
cross extra question, otherwise, the first required number of answer will be
marked.

Q.1. Write short notes on the following;


i) Ladoga Canal ii) Panama Canal
iii) Eric Canal iv) Types of artificial Waterways

Q.2. Describe the following;


i) Canal Boat Escape ii) Sedimentary Rock
iii) Plasticity Index Methodology iv) Bed Bars Roll Bars
v) Outlets for Drainage System

Q.3. What is meant by Irrigation Canals with Geosynthetics, describe Typical


Layout and Lining of Canals with canal lining materials.

Q.4. a) List of Barrages and Headworks in Pakistan


b) Describe what is difference between Barrage and Headworks.

Q.5. Describe briefly;


i) What is Hydrographic Survey by Sounding
ii) Baffle Wall
iii) Water Resources
iv) What is Calix
v) Roles of Water Pressure
vi) How does Siphon work

Q.6. a) Write short notes on Application Software and Microsoft Excel Document
b) Write down the steps to make an e-mail ID
ROLL NUMBER

PAKISTAN WATER & POWER DEVELOPMENT AUTHORITY


DEPARTMENTAL PROMOTION EXAMINATION
OM JUNIOR ENGINEER (CIVIL) TO SENIOR ENGINEER (CIVIL) (BPS17 TO 18)
JAUARY 2014
PAPER-C (FINANCE & ACCOUNTS)
PART —I (OBJECTIVE)

Marks: 50 Time Allowed: 1 Hours


Marks :25

d and follow carefully the instructions given below before attempting the paper:
Attempt all questions of objective paper and number of questions as per instruction in
descriptive/ subjective paper.
No extra question should be attempted. If attempted the candidate should himself cross the
extra question otherwise the first required no of answers shall be marked.
Consultation of books if permitted in the syllabus is allowed in descriptive paper but other
books, typed or written material are not allowed. However nothing is allowed to consult in
oOjective paper
Write your roll no on the top right corner of paper / answer book
Write your answers with blue pen/ ballpoint only answers attempted with led pencil or in any
other color of ink will be cancelled.
No mark of identification should be made on the answer book otherwise it will be cancelled.
Exchange of books amongst the candidates is not allowed in the examination hall.
Use of mobile phone and blue tooth commination devices are strictly prohibited.

No. 1. Please write True of False against each statements. (Marks-20)

1. Voucher for expenditure incurred by the budget and account


officer will be passed for_payment by the Project Director.
2. Budget estimates is to be revised after six month on actual
basis.
3. Wapda works executed by NHA shall be treated as
contingent work
4. Primary disbursing officer of a project is Engineer.
5. PC II follows PC I.

6. A Project Director can delegate his power to pass the


voucher to any other officer.
7. All payments to a contractor must be through S.S Cheque.
8. Unutilized funds remaining with the project at the close of
the month is treated by the head office as project
expenditure.
9. Project expenditure will be controlled strictly according to
the annual development programme.
10. Budget and account officer renders full assistance to project
director in preparation of annual budgets.
11. Contractor should be reported in case of loss of M.B.

12. It is necessary to keep separate account for each separately


identification work.
O. Detailed measurement should be recorded only by Executive
Assistant Engineer.
14. The Authority has prescribed the procedure to be followed in
inviting tenders, in selecting bids, and in awarding contracts.
15. After closing the accounts of the month the works abstracts
are submitted to the Divisional officer in the register of work.
16. Security deposit submitted by the contractors should be in
cash.
17. All measurement should be neatly taken down in a
measurement book and elsewhere.
18. A officer competent to accept a contract is also competent
to amend it.
19. Wapda shall not be required to submit any earnest money 1
along with the tender.
20. Work are executed either departmentally or through
contractors.

No. 2. Fill in the Blanks. (Marks-25)

. The Classification of separate identifiable works has been prescribed by the

. Material may be issued to a contractor against a requisition approved bv,. the

An advance for purchase of equipment should be recovered in fixed

mi
. The preparation of a bill is the function of . A-
No should be made to contractor in
a nticipation of the measurement of complete works.
PC-II proforma of a development project relates to
rior approval of the Authority will be required in any case where the terms
of the proposed advance exceed of the value
of goods to be acquired.
Bill for the work done should be prepared on
Issue of material to any government department or public work division
should be made only on and

. It is the normal public works practice to add a fixed


the cost of store and material for
An advance to the contractor may be made for
provided that such goods are
imperishable.
. Measurement books are very important
. The expenditure incurred with the sanction of a competent authority on
inauguration ceremonies of important public works should be debited to the

a lump sum contract the contractor agrees to execute a


with all its in accordance
with the drawings and specification for a fixed sum.
;'15. Funds should not be allowed to remain un-utilized with the project at the
close of a
16., The voucher for payment must be invariably bear a reference to the
I-
of the Measurement book.

17. Authority define and communicate polices for budget each year by `-%

18. An administrative approval is valid maximum for

years.
19. Allotment of a particular sum of money for a specific purpose is called

20. provision in foreign exchange budget should


not be proposed.
21. The Initial work for preparation of annual development programme is
undertaken in the office of the
22. All serviceable items will be circulated to all before
publication of tender notice for disposal.
23. Rate contract shall be executed on basis for common use
items as for as possible.
24. Earnest money deposit receipt of an un-successful tender shall be return
after
25. is a documents which sows the description and reserve
price of disposal material.

0. No. 3. What do the following abbreviations stand for? (Marks 5) -

1. CDWP:

2. IDC:

3. ECNEC:

4. SRS:

5. EOI:
PAKISTAN WATER & POWER DEVELOPMENT AUTHORITY
DEPARTMENTAL PROMOTION EXAMINATION
ROM JUNIOR ENGINEER (CIVIL) TO SENIOR ENGINEER (CIVIL) (BPSJ 7 TO 18)
JAUARY 2014
PAPER-C (FINANCE & ACCOUNTS)
PART —I I (SUBJECTIVE)
tal Marks: 50 Time Allowed: 2 Hours
ss Marks: 25

• Attempt all questions


eral Instructions:
Attempt all questions of objective paper and number of questions as per instruction in descriptive/ subjective paper.
No extra question should be attempted. If attempted the candidate should himself cross the extra question
otherwise the first required no of answers shall be marked.
Consultation of books if permitted in the syllabus is allowed in descriptive paper but other books, typed or written
material are not allowed. However nothing is allowed to consult in objective paper
Write your roll no on the top right corner of paper / answer book
Write your answers with blue pen/ ballpoint only answers attempted with led pencil or in any other color of ink will
oe cancelled.
No mark of identification should be made on the answer book otherwise it will be cancelled.
Lxchange of books amongst the candidate is not allowed in the examination hall.
Use of mobile phone and blue tooth commination devices are strictly prohibited.

Ql. Briefly Explain the Following 10


a. Deposit work
b. Intermediate payment
c. Check Measurement Book
d. Public Auction

Q2. Authority has issues instruction for adjustment of the cost of material 1U
issued to contractors explain them.

Q3. What are the instruction which are required when a bill is to be processed 10
what check should be applied.

4. Budget preparation is governed by general rules as per Wapda budget 10


manual explain them.

5. When advances to contractor are made? How these are subsequently 10


accounted for.
Rol{ No.

PAKISTAN WATER AND POWER DEVELOPMENT AUTHORITY

Promotion Examination of Junior Engineer (Civil) BPS-17 to Sr. Engineer (Civil) BPS-18

SESSION 2014

PAPER B: DAMS AND HYDROPOWER ENGINEERING

PART-I (OBJECTIVE)

Note: All questions to be answered in this part.

Allowed Time: 1 Hours Books are not Allowed


Max. Marks=50

Q1 Fill in the Blanks 40

i. MW will be the power generation capacity of Bunji


Hydropower Project.

ii. Proposed Bunji Hydropower Project is at stream and


proposed Dasu HPP is at stream of Diamer Basha
Dam.

iii. Channel of Ghazi- Barotha Hydropower project is km long.

iv. Storage Capacity of Basha Dam is MW.

v. dam is a temporary Structure constructed to exclude


water from the work area during construction.

vi. The larger particles of sediments carried by the streams leading to


reservoirs are deposited at the head of the reservoirs forming

vii. Tarbela Dam is constructed on river.

viii. Major factors for reduction of reservoir life are . and

ix. Mangla Darn is recently raised by ft. 2

x. Shale is type of Rock. 2

xi. Granite is type of Rock. 2


xii. The Water Storage Dams in Pakistan Are

xiii. The Atterberg Limits used in soil classification process are


limit and limit.

xiv. Spillway is provided to .

xv. Penstock is provided to carry from forebay to


Powerhouse.

xvi. is a pipe which connects the turbine and the


tailrace.

xvii. Longitudes are measured from 0 degree to eastward or


westward.

xviii. Tainter gate is radial gate used to control flow over a .

xix. Satpara dam is located at .

xx. Satpara is core type of dam.

Q2 True or false. 10

i. Basha Dam will be an RCC Dam. (True/ False)

ii. Tarbela' and Mangla are Earthfill dams. (True/ False)

iii. RCC Dam is founded on Rock. (True/ False)

iv. Khosla's theory is applicable to permeable foundation. (True/ False)

v. Dasu HPP will generate 4350 MW. (True/ False)

vi. The amount of seepage through an earthen dam can be estimated


from flow net. (True/ False)

vii. Cutoff walls are provided to increase the creep of the percolating
sub-surface water. (1 rue/ False)

viii. PC-I comes before PC -II (True/ False)

ix. The function of sand trap is to catch up the sediments. (True/ False)

' x. Diamer Basha darn Project is on Jhelum River. (True/ False)


Roll No.

PAKISTAN WATER AND POWER DEVELOPMENT AUTHORITY

Promotion Examination of Junior Engineer (Civil) BPS-17 to Sr. Engineer (Civil) BPS-18

SESSION 2014

PAPER B: DAMS AND HYDROPOWER ENGINEERING

PART-II (DESCRIPTIVE)

Note: Question 1 is compulsory, attempt any other two questions.

Allowed Time: 2 Hours Books are not Allowed


Max. Marks=50

Q1 a) Write Down a note on classification and factors governing the 10


selection of dam type.
b) What are the main components of a hydropower project? Explain 10
with Sketch.
Q2 Write Short Explanatory notes on the following:
• Trash racks.
• Trap Efficiency
• Reservoir Sedimentation.
• Seepage in Earthen Dam.

Q3 a) What are different kinds of Spillways? Explain.

LO
b) Briefly Describe Ghazi Barotha Hydropower Project?
c) What are following abbreviations?
i. PMF
ii. TOR
iii. ICB
iv. IRSA
v. IPP
vi. EIA
vii. EPA
viii. RAP
ix. BOQ
x. HFL
Lr)LO

Q4 a) Name the main components of raised Mangla dam. 5


b) Name five field or laboratory tests performed during investigations of 5
Earthen Dam.
c) Briefly Describe Geological mapping.
1.0

5
a) Narrate type of Rock, give examples?
LoCO

Q5
b) Differentiate between
Live Storage and Dead Storage.
Storage and Run of River Project.
Rated Head and Design head.
c) Write a short Note on KAPLAN Turbine.
Lo
Page 1 of 2

PAKISTAN
WATER AND POWER DEVELOPMENT AUTHORITY

DEPARTMENTAL PROMOTION EXAMINATION OF JUNIOR ENGINEER TO


SENIOR ENGINEER(CIVIL) BPS-17 TO 18

JANUARY 22, 2014 (09:30 AM TO 10:30 AM)

PAPER 11: (TECHNICAL = WATERLOGGING AND SALINITY)

Total Marks = 50 Pass Marks = 25 Time Allowed = 1 Hour

Note: Read and follow carefully the Instructions given below before attempting the paper:
• Books not allowed.
• Attempt all questions.
• Write your Roll Number on the top right corner of the Paper / Answer Book.
• Write your answers with blue pen/ball point only. Answers attempted with lead pencil
or in any other colour of ink, will be cancelled.
• No mark of identification should be made on the answer hook, otherwise it will he
cancelled.
• Use of Mobile Phone and Blue Tooth communication devices are strictly prohibited.

PART -1 (OBJECTIVE)

Q. No.1: What does following mean? 30 Marks


(2 each)

i) SCARP

ii) Q

iii) CA

iv) Cl

v) F.S.L.

vi)

vii) I .1).S.

viii) SAR

ix) EC
x) (7mm:es

xi ) M1ZLV

xii) (CA

xiii FYM

\iv) (uIS

xv) MNVD

Q. No.2: Tick mark the True/False for the following statements: 20 Marks.
(2 each)

Tile drainage effluent is useable


T. Sandy soils has less infiltration
Gypsum is a good amendment lbr saline land
Saline k ads do not contain soluble salts
SW is fertile substance for lands
6. Clay is not cohesive
7. Peddy is a kabi crop
K. fubewells always help to control watertable
Canal ',valet - helps leaciting. saline lands 1:
-10. Desilling of canal as per design. controls breaches
Roll No.

PAKINTAN
WATER AND POWER DEVELOPMENT AuritoRrry

PAKTMENTAL PROMOTION EXAMINATION OF JUNIOR ENGINEER TO


SENIOR ENGINEER(CIVIL) BPS-17 TO 18

JANUARY 22,2014 (10:30 AM TO 12:30 PM) •

PAPER (rEciINICAL = WATERLOGGING AND SALINITY)

Total Marks = 50 Pass Marks = 25 Time Allowed = 2 flour

Note: Read and follow carefully the Instructions given below before attempting the paper:
• Books not allowed.
• Attempt all questions.
• Write your Roll Number on the top right corner of the Paper.
• your answers with blue pen/ball point only. Answers attempted .\\, ith lead pencil or in
any other colour of ink. will be cancelled.
• No mark of identification should be made on the answer book; otherwise it will be cancelled.
• Use of Mobile Phone and Blue Tooth communication devices are strictly prohibited -.

PART —II (SUBJECTIVE).

Ayempt alt questions

WI , ai are the causes Of \.t, aterlogging'?

Q. (a) Describe any four methods to control waterlogging'?


(b) Define any four methods to recharge depleted groundwater?

1.)cscrille horiionlal and vertical drainage and give your opinion


one better option'?

Vvhat is
(II) Describe four classifications of salinity?

(,).5 Write down the demerits of un-maintained irrigation system?


Roll No.
PAKISTAN WATER AND POWER DEVELOPMENT AUTHORITY
DEPARTMENTAL PROMOTION EXAMINATION
Junior Engineer (Civil) BPS-17 To Sr. Engineer BPS-18
PAPER-B (TECHNICAL- DAMS AND HYDROPOWER ENGINEERING)
Note: Read and follow carefully the instructions given below before attempting the paper
), Write your Roll Number on the Top right cover of the Paper/answer Book
• Write your answers with blue pen/ball point only. Answers attempted with lead pencil or in
any other colour of ink will be cancelled.
➢ No mark of identification should be made on the answer book, otherwise it will be cancelled
➢ Use of Mobile Phone and Blue Tooth communication devices are strictly prohibited
➢ Attempt all question
BOOKS NOT ALLOWED
Part-I (Objective)
Time Allowed: One Hour Max. Marks: 50
Q.1 Fill In the Blanks Marks
i Wapda is responsible for planning, implementation, operation and maintenance of 1
water sector and projects.

ii According to latest generation expansion plan, Patan HPP will be enter into
in year 2024-25
iii The elevation —surface area —capacity relations are compiled from contour

iv Rotary core Drilling relates to information

v RQD stands for


vi Earthquake shaking relates to 1
vii At Low head plants racks are used to remove trash 1
viii Pelton Turbine is a head Turbine 1
ix Hydropower plants now day are peaking 1
x GLOF stands for glacial lake outburst 1
xi Open channels and Tunnels both can be used for diversion 1
xii Drilling and mapping are used for Geological 1
xiii At present Tarbela Dam_projects hydel capacity is MW 1
xiv Warsak Dam was constructed on River 1
xv Khanpur dam is a supply and irrigation project 1
xvi Simly dam project is a water project for Islamabad 1
xvii Mangla Dam Project is a Multipurpose 1
xviii Reservoir sedimentation is majot. in our dams 1
ixx Satpara dam has generation capacity of MW 1
xx Gilgit and Hunza rivers are tributary of River 1
xxi Dasu dam will produce MW 1
xxii Instrumentation data is used for monitoring of 1
xxiii Discharge is equal to multiply by velocity 1
xxiv Q is symbol generally used for water 1
xxv PPM stands for 1
Q.2 Tick("I): True / False Marks
i One year discharge of a site is essential for planning of a hydropower project T/ 1
F
ii RCC Dam means roller compacted concrete dam T/
F
iii Ghazi Brotha HPP has over flow spillway T/
F
iv PMF means Probable Maximum Flood TI 1
F
v Bed load is assumed to be 50 to 60 % of suspended Sediment loads in rivers TI
F
vi Francis Turbines are used for very low head Hydropower project T/ 1
F
vii Ecology is nothing to do with EIA study T/ 1
F
viii Kanshi pocket is upstream of Tarbela Dam project T/ 1
F
ix Chashma Hydropower project generates 184 MW of electricity T/ 1
' F
x Power houses should not construction on OBE T/
'F
xi Contour of an area and geological mapping is one and same thing TI
F
xii Different colors should not be used for surface geological mapping T/
F.
xiii Bunji HPP is a storage project and will generate 7100 MW TI 1.
F
xiv IBIS is an agreement between Pakistan and Iran T/
F
xv Hunza River is tributary of Kabul River T/
F
xvi PPM is used to derive PMF T/ 1
F
xvii. Warsak HPP was constructed with help of Fr'ance T/
F
Xviii Pit is a turbine used in medium head Power projects T/ 1
F
xix Spur is type of training works T/ 1
F
xx Kaplan is of high head turbine T/ 1
F
xxi Dain Holes should not be used for pressure release of foundation T/
F
xxii Dewatering is a costly item in river diversion T/ 1
F
xxiii Chimney Drain is a drain in main body of RCC dam T/ 1
F
xxiv Riprap and Stone pitching havesame use T/ 1
F
xxv Circuit breakers are protection device in power house T/ 1
F
Roll No.
PAKISTAN WATER AND POWER DEVELOPMENT AUTHORITY
DEPARTMENTAL PROMOTION EXAMINATION
Junior Engineer (Civil) BPS-17 To Sr. Engineer BPS-18
PAPER-B (TECHNICAL- DAMS AND HYDROPOWER ENGINEERING)
gcte: Read and follow carefully the instructions given below before attempting the paper
• Write your Roll Number on the Top right cover of the Paper/answer Book
• Write your answers with blue pen/ball point only. Answers attempted with lead pencil or in
any other colour of ink will be cancelled.
• No mark of identification should be made on the answer book, otherwise it will be cancelled
➢ Use of Mobile Phone and Blue Tooth communication devices are strictly prohibited
• Attempt all question prohibited
BOOKS NOT
ALLOWED
Part-II (Descriptive)
(Attempt all questions)
Time Allowed: Two Hour Max. Marks: 50
No. Marks
Q.1 i) Calculate Q if A= 30 m and V= 2 m/s

ii) Calculate Power in MW if net head h= 150 meters, discharge Q= 35 m3/s, 5

• n is the dimensionless efficiency of the turbine 2


• p is the density of water in kilograms per cubic meter
• g is the acceleration due to gravity i

iii) Calculate annual Energy in GWh of the part ii above

Q.2 Write Note on the followings.


i) Earth core Rock Fill Dam and sketch & name the components 6,4
ii) Hydrograph and Gauging Station
Q.3 Define the following
i) PC- II ii) PC- I iii) PC - Ill iv) PC — IV v) PC — V 10
OR
i) Fore bay ii) Head Race iii) Penstock iv) Draft Tube v) Tail Race
. Q.4 Explain the following:
The steps for hydropower project planning i) desk study ii) prefeasibility iii) feasibility, 10
iv) Detailed Design v) implementation
or
i) Surge Tank ii) Core iii) Riprap iv) Stone Pitching v) Free board vi)
Abutment vii) Toe Drain viii) Dam crest ix) Excitation x) Bus bar
Q.5 Write the following abbreviations used for:
a. ACI f. HVAC 10 -
b. ADB • g. ICOLD
c. CFRD h. MCE
d. FIRR i. RAP
e. ROC j. SOP