Vous êtes sur la page 1sur 1

4''CHB WITH PLASTERING

PAINT FINISH PARAPET WALL

CUSTOM CLADDING CUSTOM CLADDING

4''CHB WITH PLASTERING


PAINT FINISH WALL

J I H G F E D C B A
TOP OF PARAPET WALL

2.00
TOP OF BEAM

0.50
BOT. OF BEAM

3.00

2.60
8.20
TOP OF BEAM

0.50
BOT. OF BEAM

3.20

2.50
F.F.L.
N.G.L.

0.20

1 LEFT SIDE VIEW ELEVATION


SCALE 1:150mtrs.
A 5

4''CHB WITH PLASTERING 0.05THK x 0.60m CONCRETE CANOPY


PAINT FINISH PARAPET WALL

CUSTOM CLADDING

10 9 8 7 6 5 4 3 2 1

TOP OF PARAPET WALL


2.00

TOP OF BEAM
0.50

BOT. OF BEAM
3.00

2.60
8.20

TOP OF BEAM
0.50

BOT. OF BEAM
3.20

2.50

F.F.L.
N.G.L.
0.20

2 REAR VIEW ELEVATION


SCALE 1:150mtrs.
A 5

PREPARED BY : RECOMMENDING APPROVAL : APPROVED : PROJECT TITLE : CHECKED BY : SHEET CONTENT : SHEET NO. :
LEFT SIDE VIEW ELEVATION
PROPOSED CONSTRUCTION OF DATE

5
REAR VIEW ELEVATION
HEALTH AND SCIENCE BUILDING RECEIVED
CADD BY : JAYPEE MANUEL
ELYZAR R. RICO RICHARD P. PABLO SAMUEL O. BENIGNO, Ph. D. LOCATION :
DATE
QUANTITY SURVEYOR OIC-DIRECTOR, PHYSICAL PLANT PRESIDENT
AND SITE DEVELOPMENT QSU - DIFFUN CAMPUS, DIFFUN, QUIRINO SUBMITTED ARCHITECTURAL

Vous aimerez peut-être aussi