Sr. Description of items with detailed specifications/nature of services to be
Quantity
No. tendered (repairs, servicing, etc.)
1. Design, Manufacturing, Pre‐dispatch inspection, Guarantee, Supply, installation,
Testing & Commissioning of
1) 3.3 KV, 1600A, 3 phase, metal clad Indoor, Single tier VCB Switchgear 01 Set
Panel with draw out type trolley mounted/ with trolley Vacuum circuit
breakers i.e. (14Nos switchgears)
For detail specifications of all above works refer enclosed Annexure.
Important Notes :
1) Vacuum Circuit Breakers & Switchgear Panels shall be of the same make.
The offer shall be rejected for different make of switch gear panel.
2) Offered switchgear panel shall be Type Tested (TTA) for rated capacity &
duties. Copy of the type test certificates of short circuit, heat run &
impulse tests shall be submitted along with the quotation. If type test
certificates for 3.3KV rating are not available then the bidder may submit
type test certificates of higher KV rated panel upto 12 KV. However the
offered panel shall confirm the submitted type test reports and suitable
for 3.3 kV application. If the firm is offering higher kV rated type tested
switchgear panel with 3.3 kV rated circuit breaker then type test reports
of the 3.3 kV circuit breaker is to be submitted. The offer shall be
considered if type test reports are submitted with the quotation. The
offer shall be rejected if proper type test certificate is not available along
with the quotation.
3) Offered Switchgear shall be in satisfactory operation for minimum 2
years in a continuously operated industrial scale plant. List of such
installations along with customers name & address and date of
installation shall be attached along with the offer.
4) The interested bidders must meet the following conditions.
A) The bidder must have experience of execution of similar works / H.T.
works i.e. supply, installation, testing and commissioning of H. T.
switchgear panels in industrial scale installations. However this
condition is not applicable for manufacturer of HT switchgears. List of
such installations / works carried out in last 03 years along with
customers name & address and details of work shall be attached
along with the offer.
B) The bidder must have sufficient resources such as qualified &
experienced graduate engineers, supervisors, skilled staff, tools,
machineries, testing equipments necessary for carrying out
installation, testing & commissioning work at site. List of such
resources available with bidder shall be submitted along with the
offer.
5) Bidders are advised to note the specific requirements of installation,
testing and commissioning at site before submission of quotations.
Page 1 of 12
ANNEXURE-A
Technical specifications for 3.3 KV Indoor Switchgear Panel
Sr
TECHNICAL PARAMETERS DETAILS
No.
1 SYSTEM DETAILS
1.1 Ambient Temperature
a) Maximum Ambient Temp. 45 Deg.C
b) Reference Ambient Temp. 40 Deg C
1.2 Maximum relative humidity 100 %
1.3 Neutral Earthling Solidly Earthed
1.4 Rated Voltage
a) Rated operational voltage 3.3 KV 3 Phase
b) Highest system voltage 3.60 KV
1.5 Rated frequency 50 Hz
1.6 Space available 15000mmx2500mm(WXD)
2 SWITCH BOARD DETAILS
2.1 General Natural cooled ,3.3 KV,1600 A, 40 KA (1 Sec) breaking
capacity ,metal clad horizontal isolation, horizontal
draw out type Indoor switch gear panel with Vacuum
CBs including relays, meters, CTs, PTs and other
accessories as per Single line diagram, Technical
specifications & bill of materials.
2.2 Rating Panel board shall be consist of 2 incomers as 1600Amp
40 KA VCB, 1 Bus coupler as 1600 A 40 KA VCB, 11
outgoing feeders as 1600 A 40 KA VCB.
2.3 Bus bar The bus bar shall be made of high conductivity
electrolytic copper & be designed to carry 1600 Amp
current. Further the bus bars shall be insulated with
heat shrinkable sleeve and shrouds / self amalgating HT
Tape/shroud shall be provided over the joints.
2.4 Ground Bus A continuous Copper grounds bus having a minimum
Cross section of 300 Sq mm shall be provided for switch
gear bolted to frame work for support.
The ground bus shall be provided with facility of
connection with existing switch gear earth bus & other
end for connection to the purchaser’s grounding system.
2.5 Constructional Features Switch gear Shall be dust and vermin Proof
Construction. The Sheet Steel used in the fabrication of
the switchgear housing shall be cold rolled and leveled
and finished smooth in such a manner that the complete
structure shall be rigid, self supporting free from
vibration, twists and bends.
2.5.1 Compartmentalization of The switch gear panel shall have four compartments.
Switch board panel. 1) VCB Compartment.
2) Cable compartments.
3) Bus bar compartment
4) L.T Compartment.
2.5.2 Pressure Relief Device Pressure relief device shall be provided in
1) C. B Compartment
Page 2 of 12
2) Cable Compartment.
2.5.3 Fixing of panel The panel shall be installed on RCC/Trench
2.5.4 Cable Entry / Suitability of
Termination.
A) Incoming Cable 6X 3C X 300 sq.mm PVC Cable. Provision for entry of
Incomer 1 & 2 (1600A) incoming cable shall be from bottom of the panel.
B) Outgoing Cable
Transformer Feeder (1600A) 2X3C X300 sq.mm PVC Cable.
Motor feeder (1600A) 1X3CX300 sq.mm PVC Cable.
Provision for termination of outgoing cable shall be
from bottom of the panel.
2.5.6 Space heaters 2Nos 230V 80/100 Watt in series Auto controlled by
thermostat.
2.5.7 Illumination CFL lamps Auto controlled with door limit switches.
2.6 MEASUREMENT
a) Following measurements shall be 1) Voltage, current, pf, kWh, current and voltage
provided on all the panels through harmonics, frequency.
multifunction meters: 2) Software is to be supplied for display of these
parameters on user’s pc in single line diagram
and data logging. Software shall be compatible
with window xp/window7 operating system,
b) One analog voltmeter shall be with minimum 2 GB ram and 1 TB storage hard
provided in incomers disk. The firm shall install the software during
installation at site and demonstrate these
2.7 PROTECTION features.
Following Protections shall be
provided by the numerical relay in OVERCURRENT, SHORT CIRCUIT, EARTH FAULT,
incomers and outgoing feeders UNDERVOLTAGE, TRIP CKT. SUPERVISION
in addition to above
A) INCOMERS Overvoltage, REF, directional
B) MOTOR FEEDERS Stalling, single phasing, negative sequence
C) TRANSFORMER FEEDERS Over fluxing,
D) BUS COUPLER Overcurrent, short circuit, earth fault, trip ckt.
Numerical Relay shall be suitable for, Supervision
CT secondary 5 A, Auxiliary voltage
110 V DC, IEC 61850 communication
2.8 Following CTs is to be provided in
switchgear as per following (THREE
CORE CT instead of 2 core is also
acceptable provided they meet the
requirements and burden. Different
burden ct is also acceptable if the firm
gives the detail calculation regarding
burden suitability as per load :
A) INCOMERS CTs:
I) Dual core Epoxy resin cast current transformers as
follows:
Core‐1 for metering
Burden Class Ratio
20VA 1 1600‐800/5A
Core‐2 for protection
Burden Class Ratio
20 VA 5P10 1600/5A
Page 3 of 12
II) Dual core Epoxy resin cast current transformers for
REF PROTECTION as follows:
Core‐1 for protection
Burden Class Ratio
15VA 5p10 1600‐ 800/5A
Core‐2 for protection
Burden Class Ratio
20 VA PS VKM 350V for REF
III) Dual core Epoxy resin cast current transformers FOR
DIFFERENTIAL as follows:
Core‐1 for protection
Burden Class Ratio
20 VA PS Vkm 40 ( Rct+1) 3600/1A
Core‐2 for protection
Burden Class Ratio
20 VA PS Vkm 40 ( Rct+1) 1800/1A
PTs:
Epoxy resin cast 3.3 KV potential transformers shall be
with dual secondary. PT shall be fixed at the bottom of
switchgear panel. Rated voltage factor shall be
1.2√con nuous 1.9 for 30 secs.
3.3/√3 KV / 110/√3 /110√3 Volts (Dual CORE)
200 VA‐Class1 Main winding for metering
50 VA –Class 3P Tertiary Winding for protection
CTs:
I) Dual core Epoxy resin cast current transformers as
B) BUS COUPLER 1 NO. follows:
Core‐1 for metering
Burden Class Ratio
20VA 1 1600‐800/5A
Core‐2 for protection
Burden Class Ratio
20 VA 5P10 1600/5A
CTs:
1. Dual core epoxy resin cast current transformer
C) TRANSFORMER FEEDERS as follows:
Core‐1 for meeting
Burden Class Ratio
15VA 1 1600/800/5A
Core‐2 For protection
Burden Class Ratio
15VA 5P10 1600/5A
CTs:
I) Dual core epoxy resin cast current
D) MOTOR FEEDERS transformer
TOTAL 3 NOS as follows:
Core‐1 for meeting
Burden Class Ratio
15VA 1 125/5A
Core‐2 For protection
Burden Class Ratio
15VA 5P10 125/5A
PTs:
Epoxy resin cast 3.3 KV potential transformers shall be
with dual secondary. PT shall be fixed in BOTTOM OF
SWITCHGEARR PANEL. Rated voltage factor shall be 1.2
continuous 1.9 for 30 secs.
Page 4 of 12
3.3/√3 KV / 110/√3 /110√3 Volts (Dual CORE)
200 VA‐Class1 Main winding for metering
50 VA –Class 3P Tertiary Winding for protection
For each 3.3KV Switchgear panel 12 windows Solid state
type with test, accept & reset facility & operating on110
2.7 Annunciation scheme DC power supply.
Each cubicle shall have breaker control switch (TNC),
Lockable Remote/Local switch, DC control supply on/off
2.8 Selector switches MCB.
Each cubicle shall have ON, OFF, auto trip, service, Test,
Trip circuit healthy indication. All indication shall be LED
2.9 Indications Lamps lamps.
2.10 VACCUM CURCUIT BREAKERS 3.3 KV, 3 phase.
A) Service Voltage 3.6 KV
B) Maximum System Voltage 50 Hz
C) Rated Frequency
D) Rated Current of VCBs 1600 A 2 Nos.
Incomer 1600A 1 Nos.
Bus coupler 1600A 8 Nos.
Transformer feeders 1600A 3 Nos.
Motor Feeders
1600A
E) Rated Continuous Current of
connected bus bar 10 KV(RMS)
F) One minute power frequency
withstand voltage 40KV PEAK
G) Standard Impulse Withstand
Voltage. (1.2 X 50 MICRO SEC) 40 KA (1 SEC)
H) Rated symmetrical Short
Time Current 85 KA PEAK
I) Making Capacity 40 KA
J) Braking Capacity 3 Sec‐Co‐3min‐CO
K) Operating Duty 2.5 cycle max
L) Opening Time 3 cycle max
M) Closing Time For limiting external switching over voltages surge
N) Surge Arresters Details Arresters of suitable rating for motor & transformer
feeders shall be provided along with VCBs. Surge
arrestors shall be installed within the switchgear cubicle
between line & earth.
2.2 p.u.
1) Switching over voltage limit Metal Oxide
2) Type of device 3.6KV
3) Rated voltage As per IEC 99‐1/ 99‐4
4) Continuous withstand voltage
between line & earth As per IEC 99‐1/ 99‐4
5) Nominal discharge current (8 X
20 micro sec). As per IEC 99‐1/ 99‐4
6) Residual voltage at nominal
discharge current.
All VCBs shall have facility for Remote & Local operation
110V DC +10% & ‐ 15% For closing, tripping an indication
2.10.1 Operating modes and 230 volts AC +10% & ‐15%, 50 Hz, single phase A.C
2.10.2 Control supply for spring charging motor. All control protections shall
be through mcb instead of fuses.
In addition to the auxiliary contacts required for normal
2.10.3 Auxiliary Contacts operation and control of circuit breaker, the breaker
shall be provided with spare 6 N/O + 6 N/C AUXILIARY
CONTACTS.
1) Electrically operated through 110 V DC. A
Page 5 of 12
2.10.4 VCB Operation lockable L/R switch shall also be provided apart
from trip neutral close (TNC) control switch to
select local/ remote operation of the breakers.
The breakers control switch shall be of ODS type
having Trip‐ Neutral _ close positions spring
return sequence locking mechanism. The
breakers control switch and selector switch shall
be mounted on front side of cubicle and located
at convenient height for easy operation.
2) CB shall be provided with manual closing Facility
on front door.
3) Emergency push button on front door.
i) Opening (tripping) of C.B mechanically and
2.10.5 Operation to be performed on VCB electrically both in test & service position
with front door closed ii) Disconnection & connection of VCB module
(racking in & racking out operation ) from
Service positions to test/ isolated positions
& vice‐versa
iii) Manual spring charging.
(i) The outgoing feeder breaker shall trip if the
2.11 Safety Features cover of the cable chamber is opened. In
case of Incomers up stream breaker shall
trip if the cover of the cable chamber is
opened.
(ii) It shall not be possible to engage or
disengage the fixed & moving contact unless
the breaker is in the open position.
(iii) It shall also not be possible to operate the
breaker unless it is in the fully latched in
service position, fully drawn‐out
position/test position
(iv) Shutter shall be provided with mechanism
for automatic closing to prevent accidental
contact with main stationary contacts or
other live parts, when the breaker is drawn
out. When the breaker is inserted into its
cubicle, it shall automatically raise the
shutters, allowing the breaker to continue
its travel until it finally engages the main
stationary contacts.
(v) Suitable guides, slides and stops for proper
positioning of the truck or trolley with the
breaker shall be provided to ensure easy
removal, replacement and positioning of the
breaker.
(vi) Anti‐pumping Feature
(vii) Trip free mechanism
(viii) Trip circuit healthy indication
Normally Bus section 1 & Bus section 2 shall be in
2.12 Bus Transfer Scheme operation simultaneously & Bus coupler in OFF
condition. However during failure of one bus section or
planned outage of one bus section load transfer shall be
carried out in following modes with bus transfer relay:
1. Auto Mode: In case of failure of any one
incomer breaker on under voltage the bus
coupler should be closed automatically.
2. Manual Mode: It shall be possible to
transfer the loads of any one section to the
other without any interruption manually
Page 6 of 12
using make before break principle using bus
transfer relay. The switchgear shall require
to be designed considering momentary
paralleling of the bus sections.
5 PREDISPATCH INSPECTION & TESTING
3.3 KV SWITCHGEAR PANEL.
The original equipment manufacturer shall carried out
at his works all routine & acceptance tests mentioned in
the relevant Indian Standard on each VCB, switchgear
assembly in the presence of purchaser’s The following
tests whether included in the manufacturer’s routine
tests or not shall be carried out on each breaker at
manufacturer’s works during inspection.
Complete switchgear assembly :‐
(i) Inter‐changeability of circuit breakers.
(ii) Mechanical operation of circuit breakers,
auxiliary switches, manual devices etc.
(iii) One minute power frequency withstand
insulation test.
(iv) Insulation tests, 2.5 KV for one minute, for all
control and instrument wiring
(v) CT circuit polarity tests and continuity test.
(vi) Breaker tripping through relay contacts
Vacuum Circuit Breakers
The operation of the breaker shall be tested under the
following conditions :
(a) Closing of breaker when the voltage at the
terminals of the closing device is within 85% to
110% of the rated auxiliary supply voltage.
(b) Tripping of breaker (not carrying load current)
when the auxiliary supply voltage is between 85%
to 110% of the rated value.
(The current in amperes and the voltage required
for the closing and tripping operations shall be
recorded)
(c) Manual closing and tripping of breaker
(d) Closing with the trip coil energized
(e) Tripping with the closing coil energized
(f) Latching and complete closing from a momentary
operation of the control switch
(g) Checking of anti‐pumping device.
(h) Milli volt drop test shall be made across the breaker
contacts and between terminals.
6. SITE WORKS
6.1 General The new VCB type 3.3KV Switchgear panel is being
procured to replace the existing old MOCB type 3.3KV
Switchgear Panel. Removal of old 3.3 KV Switchgear
panels & shifting of removed panels & scraps materials
to scrap yard. The approximate distance for shifting of
removed panels & scrap materials shall be
approximately 300 mtrs. The necessary material
handling equipments & manpower for this shall be
arranged by the bidder. The scope of Site works includes
following works.
1. Removal & Shifting of Old Panel Bus Section 1
2. Modification of existing foundation.
3. Installation of Bus section 1
4. Installation & Jointing / end terminations of
power cables.
5. Installation & Jointing / end terminations of
control cables.
6. Testing & commissioning of bus section 1
Page 7 of 12
7. Installation Testing & commissioning of Bus
section 2
8. FINISHING WORK
9. Site Clearance
6.2 Specific Requirements of the work Installation, testing & commissioning work shall be
A) General carried out in phased manner and under the supervision
of Original equipment Manufacturer’s experienced
Engineer.
PHASE I PHASE II PHASE III
Installation Installation Integration of
Testing and Testing and Bus 1 & 2
Commissioning Commissioning through B/C
of Bus section 1 of Bus section 2
B) Deputation of OEM’s It shall be mandatory on the part of the bidder to
Engineers ensure the deployment of OEM’s engineer with
sufficient experience at site from the date of start of the
installation work till the date of handing over of
complete switchgear panel to the purchaser. It shall be
the responsibility of the OEM’s Engineer to ensure the
quality of Installation, testing & commissioning work so
as to achieve trouble free operation & maintenance of
new 3.3KV switchgear panel. In case of the absence of
the OEM’s Engineer at site, the execution of the work
shall be stopped. The OEM’S Engineer should be on
OEM’s pay role for minimum two years. Permission of
entry of bidder’s persons to AFFF BARC Tarapur site for
installation work shall be given subject to submission of
following documents.
a) Police Verification Certificates.
b) Person’s photo identity proof.
c) Three copies of recent photograph.
C) Total shutdown requirement Before taking up the site work the requirement of the
for integration of Bus 1 &2 total shut down of bus section 1&2 shall be worked out
Through Bus coupler by the firm and intimated to the BARC. It will be
necessary for the firm to keep minimum duration of the
total shutdown period by arranging sufficient
manpower, tools, machineries and testing facilities.
BARC shall Intimate date, time & duration of the total
shutdown period only after confirming the readiness of
the firm & considering plant requirements. It shall be
binding on the firm to complete the related work within
the given time.
6.3 D) Schedule Compliance 1) Bidder should submit schedule in the form of
bar chart for all the activities of the site works as
indicated in 6.1 for approval of BARC
2) Strict compliance of approved schedule is
required to be done by the bidder to avoid
penalty.
6.4 Removal of Old Panel Bus Section 1 Removal of the old MOCB type 3.3KV Switchgear Panel
Bus section 1 including bus coupler shall be done to
make space available for installation of new VCB type
3.3KV Switchgear panel bus section 1. This includes
removal all MOCB type switchgear cubicles,
disconnection of power & control cables at both the
ends & shifting of all removed switchgears & cables at
the suitable place.
Page 8 of 12
6.5 Modification of existing foundation. Existing 3.3KV switchgear panel is installed on RCC cum
Trenches. This foundation is to be modified as per the
requirements of new switchgear panel. The supply of
materials & necessary tools, machines etc for this
purpose shall be in the scope of the bidder. BARC shall
not supply any material, tools, manpower for this work.
6.6 Installation of Bus section 1 Installation of switchgear cubicles of Bus section 1
including bus coupler shall be planned & executed.
6.8 Installation & Jointing / end Incoming & outgoing power and control cables of new
terminations of power and control switchgear panel shall be installed and terminated at
cables. both the ends i.e. new switchgear panel end and
respective equipment end.
1. Incomer VCBs For each incomer 6 runs of 3 cores 300sq.mm. 3.3 KV
2 Nos pvc cable .Total No. of end termination kits required are
2X 12 = 24 Nos.
2. Transformer feeders
5 Nos For each transformer feeder 2 runs of 3 cores
300sq.mm. 3.3 KV PVC cable .Total No. of end
termination kits required are 5X 4 = 20 Nos.
3. Motor feeders
3 Nos For each motor feeder 1runs of 3 core 300sq.mm. 3.3 KV
PVC cable. Total No. of end termination kits required are
3X 2 = 6 Nos.
6.9 Installation & Jointing / end After successful completion of installation work of bus
terminations of control cables. section 1 & remote operation their testing &
commissioning work shall be carried out.
It shall be kept energized & loaded for minimum one
week. Any fault/ failure taking place during this period
shall be attended / rectified by the bidder up to the
complete satisfaction of the BARC. Only after this BARC
shall offer existing second bus section for planning of
removal of old panels & installation of new panel
second bus section.
a) Testing & commissioning of bus Following Commissioning tests shall be carried out.
section 1 1. Electrical operations ON/OFF of VCBs in Local &
Remote mode.
2. Mechanical operations ON/OFF /Rack IN /OUT
3. Functional Test of VCB through relay.
4. H.V. and I.R. Test of panel
5. Checking of all electrical & mechanical interlocks
6. Testing of CTs & PTs for polarity & ratio
7. Interchangeability of VCBs.
6.10 Installation Testing & commissioning Installation of switchgear cubicles of Bus section 2 shall
of Bus section 2 be planned & executed. Required Steps from Sr. No. 6.3
to 6.10 shall be repeated till complete satisfaction of
BARC.
FINISHING WORK After complete execution of work open area of trenches
shall be covered with M.S. Chaqer plates with suitable
supports and painted with two quotes of red oxide.
Fabrication work for this is in the scope of the bidder.
Damaged RCC floor shall be repaired in such a manner
that it look like the integral part of the existing floor.
After commissioning of complete switchgear panel &
Remote operation & data acquisition panel,
7 SPARES & TOOLS Following spares shall be supplied for each type of VCB.
1. VCB with Trolley 1600 A – 1 No.
2. Closing Coil ‐ 10Nos
3. Tripping Coil‐ 10Nos
4. Spring Charging motor – 04 Nos
Page 9 of 12
5. Isolating Contacts ‐1 Set of 6 contacts of VCB
8 DRAWING APPROVAL After placing the order the bidder shall submit to In‐
Charge (ESS) for approval, four copies of drawings which
shall include but not limited to the following.
(a) Complete assembly drawings of the switchgear
showing plan, elevation and typical sectional
view.
(b) Foundation plan showing locations of channel
sills, foundation bolts and anchors, floor plans
and openings
(c) Complete wiring diagram including terminal
wiring designations.
(d) The schematic control diagram both AC and DC
for breaker control, interlocks, relays,
instruments and space heaters.
(e) Complete terminal block details, showing ferrule
numbers with wire destinations.
(f) Complete wiring diagram including terminal
wiring designation also shall be provided in the
panel at appropriate location to ease the
identification during maintenance.
(g) The overall scheme, GA, layout diagram of
Remote Operation & Data Acquisition shall be
prepared by the firm & submitted to BARC for
approval. After approval by BARC the fabrication
of the panel shall be taken up.
9 DOCUMENTS The following documents shall be submitted on delivery
of panels. (4 HARD copies & ONE Soft copies )
a) Operation and Maintenance manual for Breaker,
Panel, Relays and other components
b) As built drawings in A2 size
c) Test Reports.
d) Guarantee Certificates.
10 TRAINING Training for operation & maintenance of numerical
relays and switchgear panels shall be provided to 4
persons free of cost at the Original Equipment
Manufacturer’s work place / training centre for a period
Minimum 1 week or as advised by Original Equipment
Manufacturer.
11 STANDARDS APPLICABLES IS 13118 (LATEST) General requirements for circuit
breakers above 1000V
IS 13516 (LATEST) Method of testing of HV AC CBs
12 TENDER EVALUATION CRITERIA a) Bid Evaluation ‐ As per annexure E
b) Vendor / Bidder Evaluation ‐ As per annexure E
Page 10 of 12
ANNEXURE B
BILL OF MATERIAL