Prepare the WBS in three different categories ( labour, Material, Equipment, Level, Stage, Units, …..

)
List out minimum 10 different activities; Prepare Bar Chart with Assumed Durations;; Draw the AoA network;; Identify the CP;; Calculate Minimum Project Duration
# Section Name Structure # Section Name Structure
1 A Amala Foundation RCC Footings 30 B Diaphragm Wall
st
2 A Brick Wall for 1 Floor 31 B Roof sheeting after Steel Trusses are erected
3 A Flooring 32 B Wall Plastering
4 A RCC Slab 33 B Painting of Old Steel Structures
5 A Bridge 34 B Borewell Drilling and Installation
6 A Pile Driving 35 B New Artificial Lake
7 A Dewatering of Foundation Pit 36 B Sewer Network for a Village
8 A Cofferdam 37 B 3 storeys of a cast-in-situ RCC high – rise
9 A Pavement - Flexible 38 B Compound Wall in Brick Work & Piles
10 A Pavement - Rigid 39 B
11 A Industrial Concrete Flooring 40 B
12 A Steel Truss Fabrication & Erection 41 B
13 A Earthwork in Excavation 42 B
14 A Earthwork in Filling for Embankment 43 B
15 A Retaining Wall CAST – IN - SITU RCC 44 B
16 A RE Wall with Precast Wall Panels 45 B
17 A Underground RCC Sump Construction 46 B
18 A Segmental Bridge using LG 47 B
19 A Underground Pipeline for Water 48 B
20 A Dam 49 B
21 A Canal with RCC Lining 50 B
22 A Railway Track on Natural Ground 51 B
23 A Swimming Pool with Water Treatment plant 52 B
24 A Plant
Cell Phone Signal Tower on Ground 53 B
25 A Electricity Transmission Line Towers 54 B
26 A Sewage Treatment Plant 55 B
27 A Bridge Pier in RCC 56 B
28 A RCC Column 57 B
29 A Post- tensioned Slab 58 B