Present system
Siemens Germany make 115U PLC (S5 series) installed in 1988 at Waste
gas area at D.R. Plant is used for automation and control of complete Waste
gas system including ID fan, DPG, Recycle group, Dedusting group etc.
This is connected with S7-400 PLC, 155 H PLC and WinCC HMI through
Profibus network.
CPU Module
TYPE : 6ES5-942-7UA12,
CYCLE SCAN TIME: 300 MILLI SECONDS
MAKE : SIEMENS
OLM Module
OPTIC LINK MODULE,
SIMATIC NET PROFIBUS OLM/P12,
TYPE : 6GK1 502-3CA10,
MAKE : SIEMENS
Existing Network
Profibus network of 115 U PLC, 155 H PLC, S7-400 PLC and WinCC HMI
(OS1 and OS2 consoles) is shown in attached annexure PLC_Network.
Baud rate of Profibus is 187.5 kbps.
REQUIRED SYSTEM
The new system should be PLC (Programmable Logic Controller). The input
and output requirements are as follows.
1. Digital Inputs: :
Type : 48 Volt DC, 8/16/32 channels per card
Quantity : 288 numbers
2. Digital Outputs:
Type : 24 Volt DC, 8/16/32 channels per card
Quantity : 128 numbers
Communication:
SOFTWARE:
SPARES:
List and unit price of two years maintenance spares should be indicated. At
least one card/electronic item of each type should be included in spares.
ENVIRONMENTAL CONDITIONS
6. Documentation
a) As commissioned wiring diagram, 02 sets hardcopy and one set of
CD-ROM.
b) As commissioned software schematic, 02 sets hardcopy and one set
of CD-ROM.
c) Operation and maintenance manuals 02 sets
d) Schematic diagram of the cards and power supplies.
e) Bill of material
f) List of bought-out items with source and specification
7. Commissioning:
8. Diagnostic:
With self diagnostic to report failure up to card / component level.
Diagnostic features to report the exact cause of failure and the revival from
failure.
9. Power Supply :
System should be tolerant to 220/110 Volt AC +/- 15%, 50 Hz +/- 5% single
phase power supply variation.
10. Guarantee:
Seller will guarantee the complete system for performance to work best and
well within the norms, for 24 months from the date of successful
commissioning.
11. Support:
Seller will service and support for the developed software and hardware for
a period of 24 months from the date of commissioning.
12. Training:
Training to buyer’s 02 Engineers during execution of the project at buyer’s
site. Advanced training at factory center for 03 engineers.