ZITAN PROJECT Date:JULY 10,2018

Shaw Boulevard cor. Santo Cristo Street Ref. No: ZTAN-TCC-POR-____


Greenfield District, Mandaluyong City Contractor: Tekton Const. Corp.

Contractor’s Pull-out Request


(To be completed by authorized personnel)

Quantity Materials Description/Remarks


1 PC TABLE (FABRICATED) FOR PULL OUT
1 PC GRINDER (HITACHI) FOR PULL OUT
4 ROLL EXTENTION WIRE 20.2M
11.7M
3.8M
19M
1PC VACUUM ( Shop.vac MICRO)
8 PCS SCAFFOLDING
4 PCS WHEELS
4 PCS CROSS BRACE
1 PC TOOL BOX

Requested by: Noted by: Approved by:

TEKTON CONSTRUCTION CORP. Design Coordinates Inc. Equus Property Venture, Inc.