Académique Documents
Professionnel Documents
Culture Documents
M check list for high pressure fire misting system ( high pressure & booter& jockey pumps , deluge, wet )
1 change operation mode of 15 pumps to off mode
2 turn on manually pump# 1 , after pump pressure reach upto 140 bar ,check & fill column of P#1 which is the below mentioned
3 turn off pump#1 , reduce the pressure to 100 bar
4 turn on manually pump# 2 after pump pressure reach upto 140 bar ,check & fill column of P#2 which is the below mentioned
5 repeat the above mentioned for 13 remaining pumps
6 when pressure reach to 140 bar soleniod valve must be opened
7 to ensure that safety valve open at 160 bar , close manual valve or disconnect power of soleniod valve & pressure valve for increasing of pressure upto 160 bar
8 take pressure reading from control panel & mech pressure gauge , for flow rate read from control panel
9 change operation mode of 15 pumps to auto mode
10 make drain to reduce pressure under 20 bar , ensure that three pumps will start one by one each one second
11 after 15 second if the pressure not reach 100 bar other three pumps will start
S.N item P#1 P#2 P#3 P#4 P#5 P#6 P#7 P#8 P#9 P#10 P#11 P#12 P#13 P#14 P#15
set #1 set#2 set#3
1
check E/M consultants inspection requests ,
there arent comments
2 check pump frame
1 check for abnormal noise &vibration
wet system
the below are connected as per mentioned
1 location:
2 valve tag
3 limit switch for manual valve/fire control panel
4 flow switch / fogtech panel
5 check pipes are supported properly
6 check nozzles location no obstruction for its job
7 check drain line
8 check manual valves
interface between fire control panel & fogtech panel
pump starting signal sent from fire control panel to
fogtech
10 check
)
phase failure relay remove wire No.( 11 or 14
booster pump
pump#1 pump#2
1
check E/M consultants inspection requests ,
there arent comments
2 check pump frame
3 check for abnormal noise &vibration