NOTE :-
LHS SUPPORT (STRAIGHT) RHS SUPPORT
L1 = CENTRE TO CENTRE SPAN CONCRETE GRADE :- BEAM - M20
L1 / 3 Ld L1 / 3 L3 / 3 Ld L3 / 3 L4 / 3 BEAM TOP LVL. L4 / 3 COLUMN - M25
VDS TREMIX FLOOR - M25
STEEL GRADE IS HYSD DEFORMED BAR OF GRADE FE500
57d
57d
CONFORMING TO IS:1786.
L1/ 4 EXTRA @ L1 / 4 Ld EXTRA BOTTOM @ 16d 16d EXTRA BOTTOM @ L4 / 3 PROVIDE CLEAR COVER TO REINF : FOR COLUMNS ....................40 MM
BOTTOM 0.15 L3 BOTTOM STEEL RHS SUPPORT
L3 / 3 L4 / 3
LHS SUPPORT FOR BEAMS.........................25 MM
L2 / 3 (STIRRUPS) STIRRUPS L2 / 3 (STIRRUPS) EXTRA BOTTOM @
(STRAIGHT) RHS SUPPORT FOR VDS FLOOR SLAB..........40 MM
LHS SUPPORT MIDSPAN RHS SUPPORT
L2 = CLEAR SPAN L3 = CENTRE TO CENTRE SPAN L4 = CENTRE TO CENTRE SPAN
D
STIRRUPS (LHS SUPP) EXTRA @ BOTTOM JUNCTION OF BEAM & COLUMN.
IN STRUCTURAL ELEMENTS NOT MORE THAN 50% REINFORCEMENT
BOTTOM BAR (STRAIGHT) BOTTOM BAR (STRAIGHT) SHALL BE LAPPED AT ONE LOCATION.
ENTRY SEC - 2 WHERE MORE THAN 50% REINFORCEMENT ARE SPLICED/LAPPED AT A
N B SECTION, LAP LENGTH MAY BE INCREASED BY 1.8 TIMES DEVELPMENT
D
STIRRUPS (RHS SUPP) 50MM THK PCC SHOULD BE PROVIDED BELOW GROUND BEAM.
SECURITY ALL DIMENSIONS ARE IN MM.
ROOM BOTTOM BAR (STRAIGHT)
NO ADDITION, ALTERATION SHALL BE MADE WITHOUT PERMISSION
SEC - 3
OF CONSULTANT.
MULTIBUILD CONSULTATNS,
K J I H G F E D C B A IN CASE OF DESCREPENCY IN THIS DWG, PLEASE STOP THE WORK
Plot No. 136/9/A, 2nd Phase, GIDC, VAPI. 396195 Mo. 09998881351
66000 AND CONSULT US.
REFERENCE DRAWING: -
GB1 300 x 530 2 #12 2 #12 2 #10 2 #16 2 #16 + 2L-#8@150 2L-#8@200
1 #12
GB2 300 x 530 2 #12 2 #12 2 #10 2 #16 + 2 #16 + 2L-#8@150 2L-#8@200
1 #12 1 #12
Plot No.
GB3 300 x 530 2 #12 2 #12 2 #10 2 #16 + 2 #16 2L-#8@150 2L-#8@200
CLIENT
3 3 1 #12
GB4 300 x 600 2 #12 2 #12 + 2 #10 2 #16 3 #16 + 2L-#8@150 2L-#8@200
1 #10 1 #12
GB5
GB5
GB5
GB5
GB5 300 x 600 2 #12 2 #12 + 2 #10 3 #16 + 3 #16 + 2L-#8@150 2L-#8@200
1 #10 1 #12 1 #12
ARIF
ARIF
ARIF
A2
4 4
MBC
66000
52500
GB5
GB5
GB5
GB5
GB5
GB5
230 mm THK 230 mm THK
GSB Packing GSB Packing
1050
HARD MURRUM HARD MURRUM
220
GB5
GB5
GB5
GB5
COMPACTED EARTH COMPACTED EARTH <1.3 Ld
Ld
GB4
GB4
GB4
225 75
225 75
150 150
150mm THK. VDS FLOORING 150mm THK. VDS FLOORING
PLINTH Lvl (Reinf Mesh - 8# @ 200) PLINTH Lvl (Reinf Mesh - 8# @ 200)
A 230mm THK. (Both Ways) 230mm THK. (Both Ways)
BB MASONARY 75mm THK. M10 PCC BB MASONARY 75mm THK. M10 PCC
8 8
GB1 GB2 GB2 GB2 GB2 GB2 GB2 GB2 GB2 GB3 230 mm THK 230 mm THK
1050
1050
GSB Packing GSB Packing
K i1 h1 H f1 F e2 e1 E D C B A GROUND GROUND
HARD MURRUM HARD MURRUM
J I I BEAM FILLING WITH BEAM FILLING WITH
PROPER COMPACTION PROPER COMPACTION
Road Lvl COMPACTED EARTH
Road Lvl COMPACTED EARTH
77000
530
600
150
220
NOTATIONS: 50mm THK PCC SECTION - A 50mm THK PCC
SECTION - B
BELOW BEAM
GB DENOTES GROUND BEAM BELOW BEAM