MASTER SCHEDULE

PROYEK : THE RESIDENCE THAMRIN DISTRICT


PEKERJAAN STRUKTUR, ARSITEK DAN PLUMBING

BOBOT BULAN
No. URAIAN PEKERJAAN 04/18 05/18 06/18 07/18 08/18 09/18 10/18 11/18 12/18 01/19 02/19 03/19 04/19 05/19 06/19 07/19 08/19 09/19 10/19 11/19 12/19
(%) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21

I BAB 7 - PEKERJAAN PERSIAPAN 12.85% 0.14% 0.14% 0.64% 0.64% 0.64% 0.64% 0.64% 0.64% 0.64% 0.64% 0.64% 0.64% 0.64% 0.94% 0.94% 0.94% 0.94% 0.94% 0.78%

II BAB 8 - PEKERJAAN STRUKTUR 48.37%


2.1 PEKERJAAN PONDASI BORE PILE 0.46% 0.46%
2.2 LANTAI BASEMENT 20.06%
2.2.1 - PEKERJAAN TANAH 3.45% 0.55% 1.15% 1.75%
2.2.2 - STRUKTUR BAWAH 8.05% 3.79% 4.25%

HARI RAYA IDUL FITRI 1439 H

HARI RAYA IDUL FITRI 1440 H


2.2.3 - KERANGKA DAN PLAT LANTAI 7.69% 0.56% 5.06% 2.06%
2.2.4 - TANGGA 0.16% 0.05% 0.05% 0.05%
2.2.5 - RAMP 0.72% 0.36% 0.36%
2.3 LANTAI PODIUM RETAIL (Lantai 1 & 2) 8.00%
2.3.1 - KERANGKA DAN PLAT LANTAI 5.30% 3.65% 1.65%
2.3.2 - TANGGA 0.45% 0.15% 0.15% 0.15%
2.3.3 - ATAP 2.25% 1.13% 1.13%
2.4 LANTAI TYPIKAL APARTEMEN (LANTAI 3 s/d 24) 19.85%
2.4.1 - KERANGKA DAN PLAT LANTAI 17.87% 4.57% 4.17% 3.07% 2.97% 3.07%
2.4.2 - LANTAI ATAP APARTMENT 1.08% 1.08%
2.4.3 - TANGGA 0.90% 0.18% 0.18% 0.18% 0.18% 0.18%

III BAB 9 - PEKERJAAN ARSITEKTUR 32.37%


3.1 LANTAI BASEMEN (Lantai SB, B1 dan B2) 2.40% 1.20% 1.20%
3.2 LANTAI PODIUM RETAIL (Lantai 1 s/d 2) 3.47% 0.16% 1.16% 2.16%
3.3 LANTAI TYPIKAL APARTEMEN (Lantai 3 s/d 24) 26.39% 0.30% 1.50% 2.30% 3.30% 4.48% 4.48% 4.78% 4.08% 1.18%
3.4 LANTAI ATAP 0.11% 0.11%

IV BAB 10 - PEKERJAAN INSTALASI PLUMBING 5.44%


4.1 LANTAI BASEMEN (Lantai SB, B1 dan B2) 1.34% 0.45% 0.45% 0.45%
4.2 LANTAI PODIUM RETAIL (Lantai 1 s/d 2) 0.35% 0.12% 0.12% 0.12%
4.3 LANTAI TYPIKAL APARTEMEN (Lantai 4 s/d 24) 3.34% 0.37% 0.37% 0.37% 0.37% 0.37% 0.37% 0.37% 0.74%
4.4 LANTAI ATAP 0.41% 0.21% 0.21%

V BAB 11 - PROVISIONAL SUM 0.97% 0.10% 0.10% 0.10% 0.10% 0.10% 0.10% 0.10% 0.10% 0.10% 0.10%

Jumlah 100.00%
Progress Bulanan 0.14% 0.69% 0.00% 1.79% 2.39% 4.89% 5.46% 5.76% 6.41% 8.57% 8.96% 8.86% 8.99% 8.75% 0.00% 6.43% 6.25% 6.19% 6.07% 2.43% 0.99%
Kumulative Progress 0% 0.14% 0.83% 0.83% 2.63% 5.02% 9.91% 15.37% 21.13% 27.54% 36.10% 45.06% 53.92% 62.91% 71.65% 71.65% 78.08% 84.33% 90.52% 96.58% 99.01% 100.00%

DIBUAT OLEH,
PT. BRANTAS ABIPRAYA (PERSERO)

Ir. BUDI DARMANTO


PROJECT MANAGER

Schedule Bulanan
MASTER SCHEDULE
PROYEK THAMRIN DISTRICT - BEKASI
PEKERJAAN STRUKTUR, ARSITEK DAN PLUMBING

2018
1 2 3 4 5
No. Uraian Bobot (%) April Mei Juni Juli Agustus
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22
08-14 15-21 22-28 29-05 06-12 13-19 20-26 27-02 03-09 10-16 17-23 24-30 01-07 08-14 15-21 22-28 29-04 05-11 12-18 19-25 26-01 02-08

BAB 7 - PEKERJAAN PERSIAPAN 12.8483% 0.0356% 0.0356% 0.0356% 0.0356% 0.0285% 0.0285% 0.0285% 0.0285% 0.0285% 0.1071% 0.1071% 0.1071% 0.1071% 0.1071% 0.1071% 0.1606% 0.1606% 0.1606% 0.1606% 0.1606%

BAB 8 - PEKERJAAN STRUKTUR 48.3729%


2.1 PEKERJAAN PONDASI BORE PILE 0.4573% 0.1143%
2.2 LANTAI BASEMENT 20.0606%
2.2.1 - PEKERJAAN TANAH 3.4470% 0.1098% 0.1098% 0.1098% 0.1098% 0.1098% 0.1915% 0.1915% 0.1915% 0.1915% 0.1915% 0.1915% 0.4372% 0.4372% 0.4372% 0.4372%
2.2.2 - STRUKTUR BAWAH 8.0488% 0.9486%
2.2.3 - KERANGKA DAN PLAT LANTAI 7.6876%
2.2.4 - TANGGA 0.1570%
2.2.5 - RAMP 0.7201%
2.3 LANTAI PODIUM RETAIL (Lantai 1 & 2) 8.0030%
2.3.1 - KERANGKA DAN PLAT LANTAI 5.3026%

HARI RAYA IDUL FITRI 1439 H


2.3.2 - TANGGA 0.4502%
2.3.3 - ATAP 2.2503%
2.4 LANTAI TYPIKAL APARTEMEN (LANTAI 3 s/d 24) 19.8520%
2.4.1 - KERANGKA DAN PLAT LANTAI 17.8737%
2.4.2 - LANTAI ATAP APARTMENT 1.0820%
2.4.3 - TANGGA 0.8964%

BAB 9 - PEKERJAAN ARSITEKTUR 32.3725%


3.1 LANTAI BASEMEN (Lantai SB, B1 dan B2) 2.3973%
3.2 LANTAI PODIUM RETAIL (Lantai 1 s/d 2) 3.4736%
3.3 LANTAI TYPIKAL APARTEMEN (Lantai 3 s/d 24) 26.3920%
3.4 LANTAI ATAP 0.1096%

BAB 10 - PEKERJAAN INSTALASI PLUMBING 5.4394%


4.1 LANTAI BASEMEN (Lantai SB, B1 dan B2) 1.3412%
4.2 LANTAI PODIUM RETAIL (Lantai 1 s/d 2) 0.3472%
4.3 LANTAI TYPIKAL APARTEMEN (Lantai 4 s/d 24) 3.3398%
4.4 LANTAI ATAP 0.4113%

BAB 11 - PROVISIONAL SUM 0.9668%

Jumlah 100.0000%
Rencana Progress Mingguan 0.0356% 0.0356% 0.0356% 0.0356% 0.1383% 0.1383% 0.1383% 0.1383% 0.1383% 0.0000% 0.0000% 0.2986% 0.2986% 0.2986% 0.2986% 0.2986% 0.2986% 0.5979% 0.5979% 0.5979% 0.5979% 1.2235%
Rencana Kumulative Progress Mingguan 0.0356% 0.0712% 0.1068% 0.1424% 0.2807% 0.4190% 0.5573% 0.6955% 0.8338% 0.8338% 0.8338% 1.1324% 1.4310% 1.7295% 2.0281% 2.3267% 2.6252% 3.2231% 3.8209% 4.4188% 5.0166% 6.2402%
Realisasi Progress Mingguan
Realisasi Kumulative Progress Mingguan
Deviasi Progress Mingguan
Deviasi Kumulative Progress Mingguan

Dibuat oleh,
PT. Brantas Abipraya

Ir. Budi Darmanto


Project Manager
6 7 8 9 10 11 12
September Oktober November Desember Januari Februari Maret
23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50
09-15 16-22 23-29 30-06 07-13 14-20 21-27 28-03 04-10 11-17 18-24 25-01 02-08 09-15 16-22 23-29 30-05 06-12 13-19 20-26 27-02 03-09 10-16 17-23 24-01 02-08 09-15 17-23

0.1606% 0.1606% 0.1606% 0.1285% 0.1285% 0.1285% 0.1285% 0.1285% 0.1606% 0.1606% 0.1606% 0.1606% 0.1285% 0.1285% 0.1285% 0.1285% 0.1285% 0.1606% 0.1606% 0.1606% 0.1606% 0.1606% 0.1606% 0.1606% 0.1606% 0.1606% 0.1606% 0.1606%

0.1143% 0.1143% 0.1143%

0.9486% 0.9486% 0.9486% 0.8509% 0.8509% 0.8509% 0.8509% 0.8509%


0.1125% 0.1125% 0.1125% 0.1125% 0.1125% 1.2656% 1.2656% 1.2656% 1.2656% 0.4125% 0.4125% 0.4125% 0.4125% 0.4125%
0.0131% 0.0131% 0.0131% 0.0131% 0.0105% 0.0105% 0.0105% 0.0105% 0.0105% 0.0131% 0.0131% 0.0131% 0.0131%

0.7303% 0.7303% 0.7303% 0.7303% 0.7303% 0.4128% 0.4128% 0.4128% 0.4128%


0.0375% 0.0375% 0.0375% 0.0375% 0.0375% 0.0375% 0.0375%
0.2813% 0.2813% 0.2813% 0.2813% 0.2813% 0.2813% 0.2813%

1.1437% 1.1437% 1.1437% 1.1437% 1.0437% 1.0437% 1.0437% 1.0437% 0.7687% 0.7687% 0.7687%

0.0448% 0.0448% 0.0448% 0.0448% 0.0448% 0.0448% 0.0448%

0.2997% 0.2997% 0.2997% 0.2997% 0.2997% 0.2997% 0.2997% 0.2997%


0.0395% 0.0395% 0.0395% 0.0395% 0.2895% 0.2895% 0.2895%
0.0747% 0.0747% 0.0747% 0.0747% 0.3747% 0.3747% 0.3747%

0.1118% 0.1118% 0.1118% 0.1118% 0.1118% 0.1118% 0.1118% 0.1118% 0.1118% 0.1118% 0.1118%
0.0289% 0.0289% 0.0289% 0.0289% 0.0289% 0.0289% 0.0289%
0.0928% 0.0928% 0.0928% 0.0928% 0.0928% 0.0928% 0.0928%

0.0242% 0.0242% 0.0242% 0.0242% 0.0242% 0.0242% 0.0242%

1.2235% 1.2235% 1.2235% 1.0919% 1.0919% 1.0919% 1.0919% 1.0919% 1.4393% 1.4393% 1.4393% 1.4393% 1.2817% 1.2817% 1.2817% 1.2817% 1.2817% 2.1416% 2.1416% 2.1416% 2.1416% 2.2394% 2.2394% 2.2394% 2.2394% 2.2148% 2.2148% 2.2148%
7.4637% 8.6872% 9.9108% 11.0026% 12.0945% 13.1864% 14.2783% 15.3701% 16.8095% 18.2488% 19.6881% 21.1274% 22.4091% 23.6909% 24.9726% 26.2543% 27.5360% 29.6776% 31.8193% 33.9609% 36.1025% 38.3419% 40.5814% 42.8208% 45.0602% 47.2750% 49.4898% 51.7045%
2019
12 13 14 15 16 17 18
Maret April Mei Juni Juli Agustus September
51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78
24-30 31-06 07-13 14-20 21-27 28-04 05-11 12-18 19-25 26-01 02-08 09-15 16-22 23-29 30-06 07-13 14-20 21-27 28-03 04-10 11-17 18-24 25-31 01-07 08-14 15-21 22-28 29-05

0.1606% 0.1285% 0.1285% 0.1285% 0.1285% 0.1285% 0.2141% 0.2141% 0.2141% 0.1178% 0.1178% 0.1178% 0.1178% 0.1178% 0.1178% 0.1178% 0.1178% 0.2356% 0.2356% 0.2356% 0.2356% 0.1885% 0.1885% 0.1885% 0.1885% 0.1885%

0.0450% 0.0450% 0.0450% 0.0450% 0.0450% 0.0450% 0.0450% 0.0450% 0.0900% 0.0900% 0.0900% 0.0900%

HARI RAYA IDUL FITRI 1440 H


0.0375% 0.0300% 0.0300% 0.0300% 0.0300% 0.0300%
0.2813%

0.7687% 0.5949% 0.5949% 0.5949% 0.5949% 0.5949% 1.0249% 1.0249% 1.0249%


0.3607% 0.3607% 0.3607%
0.0448% 0.0359% 0.0359% 0.0359% 0.0359% 0.0359% 0.0598% 0.0598% 0.0598% 0.0224% 0.0224% 0.0224% 0.0224% 0.0224% 0.0224% 0.0224% 0.0224%

0.2895% 0.4316% 0.4316% 0.4316% 0.4316% 0.4316%


0.3747% 0.4598% 0.4598% 0.4598% 0.4598% 0.4598% 1.0997% 1.0997% 1.0997% 0.5598% 0.5598% 0.5598% 0.5598% 0.5598% 0.5598% 0.5598% 0.5598% 1.1196% 1.1196% 1.1196% 1.1196% 0.9557% 0.9557% 0.9557% 0.9557% 0.9557%

0.1118%
0.0289% 0.0231% 0.0231% 0.0231% 0.0231% 0.0231%
0.0928% 0.0742% 0.0742% 0.0742% 0.0742% 0.0742% 0.1237% 0.1237% 0.1237% 0.0464% 0.0464% 0.0464% 0.0464% 0.0464% 0.0464% 0.0464% 0.0464% 0.0928% 0.0928% 0.0928% 0.0928% 0.0742% 0.0742% 0.0742% 0.0742% 0.0742%

0.0242% 0.0193% 0.0193% 0.0193% 0.0193% 0.0193% 0.0322% 0.0322% 0.0322% 0.0121% 0.0121% 0.0121% 0.0121% 0.0121% 0.0121% 0.0121% 0.0121% 0.0242% 0.0242% 0.0242% 0.0242% 0.0193% 0.0193% 0.0193% 0.0193% 0.0193%

2.2148% 1.7974% 1.7974% 1.7974% 1.7974% 1.7974% 2.9150% 2.9150% 2.9150% 0.0000% 0.0000% 0.8035% 0.8035% 0.8035% 0.8035% 0.8035% 0.8035% 0.8035% 0.8035% 1.5622% 1.5622% 1.5622% 1.5622% 1.2377% 1.2377% 1.2377% 1.2377% 1.2377%
53.9193% 55.7167% 57.5140% 59.3114% 61.1088% 62.9062% 65.8212% 68.7362% 71.6513% 71.6513% 71.6513% 72.4548% 73.2583% 74.0618% 74.8653% 75.6687% 76.4722% 77.2757% 78.0792% 79.6414% 81.2035% 82.7657% 84.3278% 85.5656% 86.8033% 88.0410% 89.2787% 90.5164%
19 20 21
Oktober November Desember Bobot (%)
79 80 81 82 83 84 85 86 87 88 89 90 91
06-12 13-19 20-26 27-02 03-09 10-16 17-23 24-30 01-07 08-14 15-21 22-28 29-04

0.2356% 0.2356% 0.2356% 0.2356% 0.2356% 0.2356% 0.2356% 0.2356% 0.1570% 0.1570% 0.1570% 0.1570% 0.1570% 12.8483%

48.3729%

0.4573%

20.0606%

3.4470%

8.0488%

7.6876%

0.1570%

0.7201%

8.0030%

5.3026%

0.4502%

2.2503%

19.8520%

17.8737%

1.0820%

0.8964%

32.3725%

2.3973%

3.4736%

1.0196% 1.0196% 1.0196% 1.0196% 0.2956% 0.2956% 0.2956% 0.2956% 26.3920%

0.0274% 0.0274% 0.0274% 0.0274% 0.1096%

5.4394%

1.3412%

0.3472%

0.1855% 0.1855% 0.1855% 0.1855% 3.3398%

0.0514% 0.0514% 0.0514% 0.0514% 0.0514% 0.0514% 0.0514% 0.0514% 0.4113%

0.0242% 0.0242% 0.0242% 0.0242% 0.0242% 0.0242% 0.0242% 0.0242% 0.0193% 0.0193% 0.0193% 0.0193% 0.0193% 0.9668%

100.0000%
1.5163% 1.5163% 1.5163% 1.5163% 0.6068% 0.6068% 0.6068% 0.6068% 0.2037% 0.2037% 0.2037% 0.2037% 0.1763%
92.0327% 93.5491% 95.0654% 96.5817% 97.1885% 97.7953% 98.4021% 99.0089% 99.2126% 99.4163% 99.6200% 99.8237% 100.0000%