Académique Documents
Professionnel Documents
Culture Documents
—
ABB PowerTEC
Technical Presentation
Disconnector
— Agenda
§ Disconnectors in a substations.
§Disconnectors
Expectation
§ Reality & Consequences
§Reality &
Consequences
§A probable
§ A Probable SOLUTION
SOLUTION
§ABB’s offering § ABB’s offering against Disconnecting Switch
§Few
© ABB Group
June 11, 2019 | Slide 2
1
6/11/2019
— Disconnectors in a Substation
§Disconnectors
in a substation
§ Theoritical Definition: Isolating Switches are switches
§User’s which, when opening, provide an isolating distance
Expectation
§Reality &
and switch more or less at no load. [1]
Consequences
§A probable § Major Difference with Circuit Breaker:
SOLUTION
§ABB’s offering § Operates at no-load
§Few installations
and accolades § Visible isolation of circuit
[1] A Text Book on Power System Engineering – Chakraborty, Soni, Gupta, Bhatnagar
© ABB Group
June 11, 2019 | Slide 3
—
User’s Expectation
§Disconnectors in
© ABB Group
June 11, 2019 | Slide 4
2
6/11/2019
— Reality &
Consequances
§Disconnectors in Unable to carry rated current due
a substation to deterioration of current
§User’s
carrying path
Expectation Unable to close or open (correctly) § Grid collapse
§Reality & due to deterioration of
Consequences linkages etc. § Unableto (close)
§A probable Failure of interlocks due to energize circuit. § Threat of
SOLUTION auxiliary switch malfunction
§ABB’s offering
Failure of electrical circuits due to § Moredowntime for safety
§Few installations
poor enclosure. maintenance
and accolades
Failure to withstand seismic § Lossof
§ Spare inventory
forces. revenue
§ Unsafe operation
§ Unable to isolate
(open) the circuit.
© ABB Group
June 11, 2019 | Slide 5
— A probable SOLUTION
Contact Alignment – Flexibility at any time
§Disconnectors in
Expectation
§Reality &
Consequences
OR
§A probable
SOLUTION
§ABB’s offering
§Few installations
and accolades
3
6/11/2019
— A probable SOLUTION
Spring less Contact – Add contact relaibility
§Disconnectors in
a substation
§User’s
OR
Expectation
§Reality &
Consequences
§A probable
SOLUTION
§ABB’s offering
§Few installations
and accolades
© ABB Group
June 11, 2019 | Slide 7
— A probable SOLUTION
Terminal Head – Weather proof & Reliable
§Disconnectors in
Expectation
§Reality &
Consequences
§A probable
SOLUTION
§ABB’s offering
§Few installations
and accolades
© ABB Group
June 11, 2019 | Slide 8
4
6/11/2019
— A probable SOLUTION
Rotary Pedestal – Maintenance free design
§Disconnectors in
a substation
§User’s
Expectation
§Reality &
Consequences
§A probable
SOLUTION
§ABB’s offering
§Few installations
and accolades
© ABB Group
June 11, 2019 | Slide 9
— A probable SOLUTION
Links – Frictionless joints
Special maintenance-free
§Disconnectors in rod-end spherical bearing
a substation
§User’s
Expectation
§Reality &
Consequences
§A probable
SOLUTION
§ABB’s offering
§Few installations
and accolades
Conventional bush-bearing
© ABB Group
June 11, 2019 | Slide 10
5
6/11/2019
— A probable SOLUTION
Drive
a substation
non corrosive material
§User’s
§ Aux. Switch is suitable for
Expectation
§Reality & SCADA application and can be
Consequences
§A probable
changed from NO to NC and vice-
SOLUTION
versa even at site.
§ABB’s offering
© ABB Group
June 11, 2019 | Slide 11
— A probable SOLUTION
Dead Center Locking
§Disconnectors in
a substation
Disconnector -- Close Disconnector -- Open
§User’s Dead center position -- 1 Dead center position -- 2
Expectation
§Reality &
Consequences
§A probable
SOLUTION
§ABB’s offering
§Few installations
and accolades
© ABB Group
June 11, 2019 | Slide 12
6
6/11/2019
— A probable SOLUTION
Over Travel Prevented – A full proof design
§Disconnectors in
a substation
§User’s
Expectation
§Reality &
Consequences
§A probable Motor
SOLUTION
§ABB’s offering driven shaft
§Few installations
and accolades
Shaft of Disconnector
is connected here
© ABB Group
June 11, 2019 | Slide 13
— A probable SOLUTION
Safety & Protection
a substation
§User’s
© ABB Group
June 11, 2019 | Slide 14
7
6/11/2019
— A probable SOLUTION
PMDC Motor – EMI issue overcome
Root cause of NO ‘L’
OVERVOLTAGE in MOTOR is ‘L’
§Disconnectors in
a substation
in PMDC motor
§User’s
Expectation
Field
§Reality &
Vm winding N
Consequences
Vs C
§A probable Rotor
SOLUTION Permanent
§ABB’s offering Magnets
§Few installations
i
and accolades
Frequency of oscillation
1
i
2 LC Vs S
Vm
2 Applied Voltage ‘Vs’
2 C L
Vm v 2 + 2
i2
© ABB Group
June 11, 2019 | Slide 15
§Few installations
Provides adequate isolation during
and accolades Economical maintenance
Rate
© ABB Group
June 11, 2019 | Slide 16
8
6/11/2019
—
ABB’s offering
Impact on Profitability
§Energy Loss in the Current
§Disconnectors in Carrying Path
a substation
§User’s
The Contact resistance of 145kV, 1600 A
Expectation Centre break disconnector is 75μΩ for well
§Reality & designed contact system
Consequences
While in Conventional designs it is up to
§A probable
300μΩ in New Contacts and it increases
SOLUTION
upto 800 to 1000 μΩ
§ABB’s offering
§Few installations
and accolades
© ABB Group
June 11, 2019 | Slide 17
Telco Construction
Dharward,
Karnataka
§Disconnectors in
a substation
§User’s
Expectation
§Reality &
Consequences
§A probable
SOLUTION
§ABB’s offering
§Few HINDALCO,
installations and Renukot
accolades
© ABB Group
June 11, 2019 | Slide 18
9
6/11/2019
Hindustan Zinc
Chittorgarh
§Disconnectors in
a substation
§User’s
Expectation
§Reality &
Consequences
§A probable
SOLUTION
§ABB’s offering
§Few NLC,
installations and Tamilnadu
accolades
© ABB Group
June 11, 2019 | Slide 19
Before
§Disconnectors in
a substation
§User’s
Expectation
§Reality &
Consequences
§A probable
SOLUTION
§ABB’s offering
§Few After
installations and
accolades
Retrofitting Job
Sarojininagar,
UPSEB
© ABB Group
June 11, 2019 | Slide 20
10
6/11/2019
NDPL 72.5kV
§Disconnectors in
Bihar Caustic 145kV
a substation
SPS 145kV
§User’s
HZN Ltd. Hindalco DPL 145kV
Expectation
145kV 145kV CESC 145kV
§Reality &
Consequences
IPCL 245kV
§A probable
SOLUTION
AECO WBPDL
72.5/145/245 kV 145/245kV
§ABB’s offering
NLC 245kV
KSEB 72.5kV
© ABB Group
June 11, 2019 | Slide 21
§Disconnectors in
VIETNAM
a substation 245/123/36kV
§User’s
IRAN
72.5/145/245/300kV
Expectation TAWAIN
§Reality & 72.5kV
BHUTAN
Consequences 245/72.5kV
§A probable SURINAME PHILIPPINES
170kV 72.5/90kV
SOLUTION EGYPT
§ABB’s offering 245/145/123kV MALAYSIA
§Few INDIA 170/72.5/36kV
NIGERIA 245/145/123/72.5kV/36
installations and
362/145kV AUSTRALIA
accolades COLOMBIA Drive only
36/123/145kV
MALAWI
145/ 72.5kV
PERU
245/123/72.5/36kV
INDONESIA
KENYA 170kV
BOLIVIA 36/72.5kV
145/245kV
SRILANKA
ZIMBABWE 36kV
72.5/36kV
10/04
© ABB Group
June 11, 2019 | Slide 22
11
6/11/2019
§Disconnectors in
a substation
§User’s
Expectation
§Reality &
Consequences “So far has been
§A probable
SOLUTION
satisfactory and the
§ABB’s offering disconnectors have not
§Few
required any attention”
installations and
accolades
© ABB Group
June 11, 2019 | Slide 23
§Disconnectors in
a substation
§User’s
Expectation
§Reality &
Consequences “So far has been
§A probable
SOLUTION
satisfactory and the
§ABB’s offering disconnectors have
§Few
not required any
installations and
accolades
attention”
© ABB Group
June 11, 2019 | Slide 24
12
6/11/2019
§Disconnectors in
a substation
§User’s
Expectation
§Reality &
Consequences “So far has been
§A probable
SOLUTION
satisfactory and the
§ABB’s offering disconnectors have not
§Few
required any attention
installations and
accolades
i.e. Maintenance Free”
© ABB Group
June 11, 2019 | Slide 25
—
ABB PowerTEC™ scheduled courses Y2019
Sr. Course
Course Name Days Jan Feb March April May June July August Sep Oct Nov Dec
No. No.
INTCV566
16 HVDC and FACTS 2 19-20
& 567 Manisha Shukla
17 Microgrids, renewables & BESS * INTCV570 3 21-23 manisha.d.shukla@in.abb.com
18 Asset Performance management * INTCV569 2 17-18
ABB reserves all rights for the content provided in this presentation. Reproduction, use by or
disclosures to third parties without ABB’s written permission is strictly forbidden
13
6/11/2019
14