CASE STUDY OF HOSPITAL

FORTIS HOSPITAL
INTRODUCTION OF FORTIS HOSPITAL , GURGAON
Fortis Memorial Research Institute
Location : sector 44, Gurgaon
Site area : 43,303 sq. m.
Built – up area : 65,961 sq.m.
FAR : 1.52 NO. OF BEDS- 430
Principal Architect : Ar. Rajinder kumar, General care beds: 250
Rajinder Kumar Associates, New Delhi
FACILITIES-
ICU beds : 100
▪ Fortis Memorial Research Institute, Gurgaon (FMRI) is a flagship hospital TUMMY LUCK OPD chamber- 80
of the Fortis Healthcare Limited.
▪ FMRI is a multi super-speciality, hospital. A multi-cuisine food court CRECHE
▪ FMRI is a set on an 11 –acre campus.
A day care and an activity centre for
▪ It has 430 functional beds, with a further planned increase in beds to
1000.
children.
▪ FMRI is accessible easily by road, It can also be reached using Delhi
Metro, as the hospital is located opposite to the HUDA city metro station
DEPARTMENTS -
▪ Minimal Access, Bariatric & GI Surgery
▪ Plastic Surgery MEDITORIUM
▪ Ophthalmology An auditorium for knowledge sharing
▪ Pulmonology programme R & R LOUGE
▪ Plastic Surgery Rest options with recliners, private
▪ Dental Sciences cubicles, shower, and locker facilities
▪ Internal Medicine for attendants.
▪ Cosmetic & Plastic Surgery
▪ Invasive Cardiology
▪ Paediatrics
▪ Minimal Assess Surgery (Gynae)
▪ C-DOC
▪ Neonatology
HEALTH4U
▪ IVF Preventive programme with lifestyle
▪ Liver Transplant, GI & Hepato Pancreato Interventions including tailor-made
health screenings. FORTIPLEX
Biliary Surgery
▪ Mental Health & Behavioural Science ▪ The main aim of Movie lounge
▪ Radiation Oncology hospital is creating
▪ Radiology a environment not
▪ Rheumatology
to give feeling of a
▪ ENT
▪ Gastroenterology & Hepatobiliary Sciences boring hospital.
APPROACH AND CONNECTIVITY

INDIA
HARYANA

SATELITE VIEW OF THE SITE

GURGAON
APPROCHES TO THE HOSPITAL
NEAREST GURGAON BUS STAND NEAREST METRO STATION

ROAD CONNECTIVITY MAP

GURGAON BUS STAND HUAD CITY CENTRE


6.6 KM VIA MEHRAULI –GURGAON 400 M VIA SECTOR ROAD
ROAD NEAR BY HOSPITALS
FORTIS HOSPITAL FORTIS HOSPITAL
30 M WIDE SECTOR MAIN ROAD MAX HOSPITAL
NETAJI SUBHASH MARG PARAS HOSPITAL
SECTOR 44 ROAD MEDANTA
ROAD WITHIN SECTOR HOSPTAL
NEAREST BUS STOP SHEETLA
HOSPITAL
ARVY HOSPITAL
UMKAL HOSPITAL
NEAREST RAILWAY STATION HUDA CITY
CENTRE BUS STOP

NEAREST AIRPORT

RAILWAY STATION

HUDA CITY CENTRE BUSTOPS


120 M

GURGAON RAILWAY STATION 9.7 KM INDIRA GANDHI INTERNATIONAL AIRPORT


120 KM 30 MIN
NEARBY AREAS OF THE HOSPITAL

Amity School
FORTIS
HOSPITAL
Oyster Park

RESIDENTIAL

Metro
FORTIS
HOSPITAL

Vivanta
TERI GRIHA RATING
▪ Air- conditioned area : 26,254 sq.m
▪ Non- Air- conditioned area : 44,612 sq.m
▪ Energy consumption reduction : 33% reduction in
energy consumption compared to TERI GRIHA
benchmark
▪ EPI : 154 KWh/ sq.m/year
▪ Renewable energy installed on site : Rated capacity of
solar PV installed on site is 25 KWp Air-conditioned area Non-Air-conditioned area
▪ TERI GRIHA provisional rating : 4 stars
The following strategies were adopted to reduce the building impact on the natural
environment :
▪ Sustainable site planning
▪ Top soil from the site, which was not very fertile was stacked, preserved, made fertile with the
addition of manure and re- laid on the landscape areas.
▪ Consolidation of all site services along the transportation corridors minimizes the site disturbances.
▪ Surface parking is provided with 100% grass pavers reduce the heat island effect on site.
▪ Sufficient plantation done at the site reduces the noise levels considerably and enhances exterior
environmental quantity.
▪ Reduction in water consumption (compared to GRIHA benchmark) :
▪ Low flow plumbing fixtures used to minimize the building water consumption reduction by 63%.
▪ Drip Irrigation system adopted on the site along with native plant species to cut short the
landscape water consumption by 50%.
▪ 100% Treated water from sewage treatment plant is reused for cooling towers and irrigation
purposes.
▪ Reduction in energy consumption (compared to GRIHA benchmark) while maintaining occupant comfort : ▪ Use of low energy materials :
▪ For achieving visual comfort ▪ Autoclaved Aerated Concrete blocks
▪ Ingress of daylight in patient areas & Waiting areas. are used for the construction of
▪ Landscape in sync with the Architectural spaces to provide visual comfort. building.
▪ For achieving thermal comfort ▪ Cement with sufficient percentage of
▪ Use of AAC blocks, Double Glazing & Roof insulation. fly ash had been used for the
construction.
▪ Renewable energy technologies installed on site : ▪ Low embodied energy construction
▪ Solar Photovoltaic Panels for 25 K Wp are installed at site. materials and finishes have been used
▪ Solar Water heaters for 8000 litres are also installed to meet the surplus hot water requirement in the hospital interiors.
after heat recovery system.
VERTICAL DISTRIBUTION OF SPACES -

Typical Floor

Third Floor (patient beds 67)

Service floor

Second floor (surgical floor 10 OT. ICU BEDS 92)

First floor (maternity ICU 62 beds, wards, ICU


relatives

Upper ground (maternity, atrium lobby)

Lower ground (diagnostics, OPD, ER)

Basement (parking, plant rooms)

DISTRIBUTION OF SPACES FLOOR-WISE

PLOT BOUNDARY
SITE PLAN- Emergency parking
(36 cars)
Ramp up and down
for parking
Main OPD
drop off Service entry
drop off Emergency
parking (36 cars)

OPD FORTIS HOSPITAL


Entry/exit
Site area : 43,303 sq.m
Service
Built-up area : 65,961 sq.m
Yard
-8800 FAR : 1.52
Surface parking : 143 cars

-2750 -2750 Total no. of entry/exit in the building-


▪ OPD entry- at lower ground floor to the OPD
Service- ▪ Main entry- at upper ground floor
entry/exit ▪ Emergency entry- at lower ground floor
+1500
▪ Service entry- at upper ground floor
▪ Oncology OPD entry- at upper ground floor
Oxygen
plant
Total no. of entry/exit in the site-

Maternity ▪ OPD entry- at lower ground floor


entry/exit ▪ Maternity entry- at upper ground floor
Maternity ward ▪ Emergency entry- at lower ground floor
drop off ▪ Service entry- at upper ground floor
E S Maternity ward Emergency
Parking (71 cars) entry/exit
Emergency
W drop off
Oncology
N drop off
EAST
SUN DIAGRAM

SOUTH

OPD BUILDING ORIENTATION STUDY


Entry/exit
Service ▪ The main Façade of the building is facing
Yard North-West Direction
-8800 ▪ The service areas are provided in the
South-East Direction
▪ The bed tower extending up to G+5 is
providing shade to the rest portion of the
-2750 -2750 building from sunrays coming from south
WEST direction.
▪ The Atrium in the center of the building is
Service- receiving diffused light from north
entry/exit direction .
+1500
▪ Healing gardens are provided in North
direction shaded all the time from
sunrays.
▪ Heavy plantation is done at site
boundaries to absorb most of the noise
coming from the vehicles outside.
Maternity
entry/exit

E S Emergency
entry/exit

W
N
BASEMENT PLAN

LINAC (Radiation therapy)


used for treatment of
oncology has 1 to 1.5
meters thick wall D.G.Room
LINAC (Radiation therapy)

Total parking in the basement-

▪ 280 cars parking


▪ 51 two wheeler parking
E S

Admin area W
Service yard
Mechanical therapy
N
Radiation therapy
Lifts and services

BASEMENT IS USED FOR-


▪ The basement is used for engineering
services plant room like HVAC, LT panel
room, DG room, Pump rooms etc.
▪ And it is also used for radiation therapy used
HVAC Plant Room
in oncology treatment.
▪ And for parking and HR department and
staff areas.
Water Supply
And Fire Fighting LT Panel Room
Pump
LOWER GROND FLOOR LOWER GROUND FLOOR IS USED FOR
▪ OPD
▪ Oncology OPD
E S ▪ Laundry
▪ CSSD
▪ Radiology
W ▪ Emergency
N ▪ Physiotherapy department

Total area of lower


Laundry ground floor –
7864.890 SQ.M.
Radiology

CSSD
Laundry

Lower G.F.

OPD
OPD
Emergency
entry
Entry

Swimming Physiotherapy
pool Gym

Physiotherapy
Oncology
UPPER GROUND FLOOR
UPPER GROUND FLOOR IS USED FOR-
▪ Maternity ward
▪ SPA
▪ kitchen
▪ Food court
▪ Finance department
▪ Shop arcade
Food Court Kitchen ▪ Health check-up area
Total area of lower ground floor –
7864.890 SQ.M.
Food Court Finance
deptt.
E S

Health Waiting W
Waiting
check-ups N
Shops
SPA
SPA Food court
Maternity Finance Deptt.
Ward Maternity ward
Kitchen
Shops
Health check-up

SPA

Shops

Reception
FIRST FLOOR
E S

W
N

WARD WARD

AUDITORIUM
Total area of first floor –
6828.190 SQ.M. Blood
bank &
LAB
Ward

BLOOD DONAR
DIALYSIS
Auditorium
Auditorium
General ward
Maternity Maternity surgical
FIRST FLOOR IS USED FOR - Surgical &
Blood bank/lab
LDR
▪ Maternity Surgical & LDR Chemo & chemo/Dialysis
▪ Chemo and dialysis Dialysis
▪ Auditorium
▪ General wards
▪ Blood bank/Lab
SECOND FLOOR

FIRST FLOOR IS USED


FOR-
▪ Surgical suite
▪ ICU
▪ Cath labs

OT OT
POST OT
Total site area of
second floor-
6828.190 SQ.M.

E S

OT Area W
N

ICU
ICU OT area
Cath labs

Cath Labs

CATH LAABS
THIRD AND FOURTH FLOOR
Third and fourth floor are used for-

▪ Single patient room


E S ▪ Double patient room

Total area of third and


fourth floor-
W 1944 SQ.M.
N
CORRIDORS
Total no. of beds on both
SINGLE PATIENT ROOM floor –
140
DOUBLE PATIENT ROOM Double Patient Room RR Lounge

LIFT AND STAIRCASE

Single Patient Room

DOUBLE PATIENT ROOM

SINGLE PATIENT ROOM RR LOUNGE


FIFTH FLOOR

E S PRESIDENTIAL SUITE

Presidential Suite Deluxe Room


W
N
Suite Room
DELUXE ROOM

NURSE STATION & CU/DU


MANAGEMENT
AMINSTRATION
SUITE
DELUX PATIENT ROOM
LIFT AND STAIRCASE

Total no. of beds on both floor- 140


Total area of third and forth floor-
1808 SQ.M.
PRESIDENTIAL SUITE

SUITE ROOM
PENUMATIC CONTROL SYSTEM PENUMATIC CONTROL SYSTEM

▪ Pneumatic tubes (or capsule pipelines; also known as


pneumatic tubes Transport or PTT) are systems that propel
cylindrical air or by partial vacuum.
▪ They are used for transporting solid objects, as opposed to
conventional pipelines, which transport fluids.

RECEIVING SYSTEM
SENDING STATION
SECTIONS -
FIRE FIGHTING FIRE FIGHTING OUTSIDE THE Fire tank capacity - 1.5 lakh litre
BUILDING- Sprinklers used are with red colored bottle
FIRE FIGHTING In case of fire In case of fire
INSIDE THE FIRE CONTROL SYSTEM-
BUILDING-

Smoke detector Hydrant pumps get


detect the fire and activated
raise the alarm
Fcs Tells In Which Zone Fire Is Spread
And Raise The Alarm Installed In Every
Floor

If it is not sufficient
Then the sprinklers get second hydrant pump
activated having access from gets activated Control Panel Pump
Pipelines To Carry Water
overhead tank (if it fails) During Fire Connected From
U.G. Tank

Fhc Outlets Are Given


On The Periphery Of
The Site

IF electricity is switched Exhaust Ducts To Carry


Then the sprinklers jockey down then diesel pump Smoke Above
pump get activated starts the hydrant pump If it is also not
sufficient then
FHC is used ▪ FHC Is Operated
Manually By Fire Man
Only.
▪ It Is Also Having Water
Access From Under
If electricity is switched Ground Fire Tanks
If it is not sufficient then second down then diesel tank
sprinklers jockey pump starts starts the pump

Vous aimerez peut-être aussi