Date 13/01/20 14/01/20 15/01/20 16/01/20 17/01/20 18/01/20 19/01/20

Plan Begin working on Create production Write about idea Finish putting all Complete any plan article ideas Work 10 am –
context. Complete schedule, generation, and information into unfinished work for magazine 5pm
rationale, project Bibliography. describe idea. one professional from the week.
concept, and Begin problem Write up why we brief. Complete a
evaluation. Gather solving document. think our idea weekly evaluation.
feedback on three Find a client or should be
ideas. competition to produced. Begin
work for. putting documents
in to a brief.

Date 20/01/20 21/01/20 22/01/20 23/01/20 24/01/20 25/01/20 26/01/20


Plan Work on feedback. Topic research – Analyse TA survey Topic research – Topic research – Continue any Work
Send out target Concept Hotel results. Create Look for upcoming 80s Interiors unfinished topic Update production
audience survey Group infographic. Write exhibitions to article research. Think schedule.
(suitability, what about idea review about smaller
they like/disliked adaptation Complete a weekly projects
about my idea Topic research – evaluation. (advertisements,
etc). James Turrell videos, etc.)

Date 27/01/20 28/01/20 29/01/20 30/01/20 31/01/20 01/02/20 02/02/20


Plan Work on feedback. Topic research – Topic research - Complete a weekly Topic research - Topic research - Work
Topic research – advertising, evaluation.
interior design and photography and Topic research -
architecture cinematography
Date 03/02/20 04/02/20 05/02/20 06/02/20 07/02/20 08/02/20 09/02/20
Plan Work on feedback. Continue Create infographic Continue Continue Complete Work
Begin Codes and magazine analysis with survey magazine analysis magazine analysis magazine analysis
Conventions (typography, responses. (typography, (typography, (typography,
research, send images, Continue images, images, images,
genre survey, advertisements, magazine analysis advertisements, advertisements, advertisements,
begin art and layout etc.) (typography, layout etc.) layout etc.) layout etc.)
design magazine images, Complete a weekly
analysis advertisements, evaluation.
layout etc.)

Date 10/02/20 11/02/20 12/02/20 13/02/20 14/02/20 15/02/20 16/02/20


Plan Work on feedback. Write about Look at different Think about Complete anything London Work
Begin C&C magazine design methods, magazine titles, that is unfinished.
practice, find structure, create how magazines experiment with
tutorials, and flow chart for my are produced, typefaces and
analyse. Then re- magazine. Begin software used, cover layout.
create the looking at how I’m going to Complete a weekly
elements shown. interactive produce mine. evaluation.
publications.

Date 17/02/20 18/02/20 19/02/20 20/02/20 21/02/20 22/02/20 23/02/20


Plan (Half Term) Catch up with any
Make unfinished work. If
improvements to everything is
work. Update completed, get a
Problem solving head start on next
document. weeks work.
Date 24/02/20 25/02/20 26/02/20 27/02/20 28/02/20 29/02/20 01/03/20
Plan Begin planning Create scripts, Continue working Complete a weekly Update Production
smaller projects - storyboards (or on layout evaluation. Schedule
look for creators, equivalent) if structure.
actors/models, needed. Begin
locations, send working on layout
emails to confirm structure.

Date 02/03/20 03/03/20 04/03/20 05/03/20 06/03/20 07/03/20 08/03/20


Plan Work on feedback. Location Recces, Continue any Complete all Put together an
(Auditions) Create a shooting unfinished planning Planning & Pre-
Create Lists, schedule planning documents. production
equipment, crew, documents Complete a weekly Booklet.
props etc. evaluation.
Create a
contingency plan

Date 09/03/20 10/03/20 11/03/20 12/03/20 13/03/20 14/03/20 15/03/20


Plan Work on feedback. Complete a weekly
evaluation.
Date 16/03/20 17/03/20 18/03/20 19/03/20 20/03/20 21/03/20 22/03/20
Plan Work on feedback. Complete a weekly
Create Pitch evaluation.
(props, lines,
PowerPoint)

Date 23/03/20 24/03/20 25/03/20 26/03/20 27/03/20 28/03/20 29/03/20


Plan Work on feedback. Complete a weekly
Pitch Week. evaluation.

Date 30/03/20 31/03/20 01/04/20 02/04/20 03/04/20 04/04/20 05/04/20


Plan Work on feedback. Prepare For New
Work on Magazine York
(Layout, Articles,
Advertisements,
Photos, Videos)
Date 06/04/20 07/04/20 08/04/20 09/04/20 10/04/20 11/04/20 12/04/20
Plan (Half Term) New York New York New York New York New York
New York

Date 13/04/20 14/04/20 15/04/20 16/04/20 17/04/20 18/04/20 19/04/20


Plan (Half Term)
Work on Magazine
(Layout, Articles,
Advertisements,
Photos, Videos)

Date 20/04/20 21/04/20 22/04/20 23/04/20 24/04/20 25/04/20 26/04/20


Plan Work on feedback. Complete a weekly
Work on Magazine evaluation.
(Layout, Articles,
Advertisements,
Photos, Videos)
Date 27/04/20 28/04/20 29/04/20 30/04/20 01/05/20 02/05/20 03/05/20
Plan Work on feedback. Complete a weekly
Work on Magazine evaluation.
(Layout, Articles,
Advertisements,
Photos, Videos)

Date 04/05/20 05/05/20 06/05/20 07/05/20 08/05/20 09/05/20 10/05/20


Plan Work on feedback. Carry out re- Carry out re- Carry out re- Carry out re-
Carry out re- shoots if needed. shoots if needed. shoots if needed. shoots if needed.
shoots if needed. Complete any Complete any Complete any Complete any
Complete any unfinished work, if unfinished work, if unfinished work, if unfinished work, if
unfinished work, if needed. needed. needed. needed.
needed. Complete a weekly Production
evaluation. Deadline

Date 11/05/20 12/05/20 13/05/20 14/05/20 15/05/20 16/05/20 17/05/20


Plan Production Production Begin Final Work on Final Work on Final Work on Final
Viewings in set Viewings in set Evaluation. Evaluation Evaluation Evaluation
groups, Peer groups, Peer
feedback forms to feedback forms to
be completed. be completed.
Date 18/05/20 19/05/20 20/05/20 21/05/20 22/05/20 23/05/20 24/05/20
Plan Work on Final Complete Final
Evaluation Evaluation.
Final Evaluation
Deadline

Date 25/05/20 26/05/20 27/05/20 28/05/20 29/05/20 30/05/20 31/05/20


Plan (Half Term)

Date 01/06/20 02/06/20 03/06/20 04/06/20 05/06/20 06/06/20 07/06/20


Plan Grades Received. Improve work if Improve work if
Improve work if close to the next close to the next
close to the next grade. grade.
grade. No More Work
Submitted After
3rd of June